2026-08-24 - Conservation Commission

Summary

Based on auto-generated captions plus the posted agenda and official minutes; names and details may be misheard.

Time on topic (from transcript timestamps; approximate, includes side talk):

Topic Minutes Share
Orders of conditions 35 63%
Conservation Commission Enforcement Orders 9 17%
Other business 8 15%
Wetlands Protection Ordinance Revisions 2 3%
Postponed hearings 1 2%
  • Monday, August 24, 2026, City Hall with Zoom.
  • Vice Chair Devin Canton chaired in the absence of Chair Diane Fratoni; with Lindsay Nystrom and Stuart Kirshner every vote was 3-0.
  • Staff: Eric Flint and Mattie VandenBoom.
  • Adjourned about 6:25 p.m. (the video runs about 55 minutes).

Postponed hearings

3:04-4:21

Orders of conditions

4:21-38:59

  • 4 Spring Valley Road (request for determination): builder Neil Hassett rebuilding a deck that collapsed over the winter on the same footprint with new code footings; flagged by staff because it sits just over 30 ft from a wetland. Negative determination, 3-0.
  • Indian Lake Dam Vegetation Management (149 West Boylston Drive): Pare Corporation (captioned "Gray LaCroix" and "Dave Fresh") reported the flood-zone elevation change from 542 to 542.4 ft, handheld tools behind the chain-link fence and a stockpile area far from the resource area. Hearing closed; order issued as a limited project.
  • Malden Woods Subdivision (Whippoor LLC): patios (now impermeable) and the Lot 10A driveway moved outside the 30-ft buffer; amendment lets the developer build wooden decks instead of patios on lots 8 to 10 if impervious area stays equal or smaller and zoning side-yard limits are respected. Condition 34 sequencing language dropped. Amended order issued.
  • 9 Dalton Street: five-unit building with an underground infiltration chamber. Staff worried about groundwater reaching the chambers; the engineer offered a 40-mil liner but argued it would cut recharge. Commissioners were "50/50" and no liner was required. Order issued.
  • 46, 51 and 52 Modoc Street: Attorney Donald O'Neil for St. Anthony Realty LLC; ten units in five semi-detached buildings, new filing because the 2018 approval expired. Aerials show the lots cleared and foundation excavation begun. Order issued.
  • 20 and 22 Goldthwaite Road: 28-unit apartment building replacing a single-family house, keeping the three-family at No. 20. Local filing only (catch basin proximity); a possible isolated flooding area was ruled out. Landscape plan must be at least 50 percent native species. Commissioners asked about snow storage and 16 surface spaces for 31 units; the applicant said a Planning Board inclusionary special permit covers a parking reduction and there is garage parking. Order issued.

Conservation Commission Enforcement Orders

43:16-52:36

  • 262 Mill Street (Westside Animal Clinic): replication area owed since about 2001 is now functioning wetland after two growing seasons (over 75 percent wetland plantings); order lifted.
  • 145 Newton Avenue North: 10,000 sq ft of disturbance near a catch basin; site confirmed stabilized; order lifted.
  • 88 Webster Street Riprap Restoration: new enforcement order issued to implement a restoration plan for a riprapped bank.
  • 11 Holden Street Porch Enforcement: staff-issued order ratified.
  • 142 Olean Street Shoreline Enforcement: staff-issued order ratified; plan due September 30.
  • Staff explained that the Commission can issue an order at a meeting or staff can issue one for urgent matters and have it ratified next meeting.

Wetlands Protection Ordinance Revisions

52:44-54:20

  • Flint said the administrative-approval section is being simplified because of pending state regulations: one process for activities defined in the Act rather than a long list. A redline is due at the next meeting.

Other business

0:04-3:04, 38:59-43:16, 52:36-52:44, 54:20-55:11

  • Certificates of Compliance granted: 222 Brook Street (low-rise apartments, steep hillside stabilized), a partial for 74 and 76 Valmor Street (dead plantings replaced) and 1195 Grafton Street (Twin Oaks utility drilling).
  • Elm Park Playground: Parks Department's request to replace pads under 21 picnic tables approved as a project change under the existing determination.
  • Minutes approved; FY26 Annual Report approved (staff said the last one on file is from the 1990s).
  • No open-space, communications or liaison news.

Official Minutes

Posted on PrimeGov (summary of actions, not verbatim). Layout follows the posted document; in the enforcement section the minutes' item lettering is partly collapsed, so findings may sit under a neighboring address.

                                Conservation Commission

                                       Meeting Minutes

                                       August 24th, 2026

                              City Hall – Levi Lincoln Chamber,

                 with remote participation options available via Zoom online at
                    https://worcesterma.zoomgov.com/j/1604682366 and
                 call-in number 1-669-254-5252 (Meeting ID: 160 468 2366).

Attendance:

Commissioners                 Devin Canton, Vice Chair
Present:                      Lindsay Nystrom, Commissioner
                              Stuart Kirshner, Commissioner

Commissioners                 Diane Fratoni, Chair
Absent:
                              Eric Flint, Division of Planning & Regulatory Services (DPRS)
Staff Present:                Mattie VandenBoom, Division of Planning & Regulatory Services
                              (DPRS)

  Call to Order

  Commissioner Canton, acting as Chair in the absence of Commissioner Fratoni, called the
  meeting to order at approximately 5:30 PM.

  Requests for Continuances, Postponements and Withdrawals
    Item 1 – Providence and Worcester Railroad ROW – Request for
    Determination of Applicability (CC-2026-033)
    Request to postpone the public hearing to 09/14/2026 & extend the constructive grant
    deadline to 10/06/2026

    Item 3 – 35 State Road (MBL 32-019-00316) – Notice of Intent (CC-2026-045
    & DEP#349- 14xx)
    Request to postpone the public hearing to 09/14/2026 & extend the constructive grant
    deadline to 10/06/2026

    Item 7 – 99 Sears Island Drive – Notice of Intent (CC-2026-052 & DEP#349-
    14xx)
    Request to postpone the public hearing to 09/14/2026 & extend the constructive grant
    deadline to 10/06/2026

     Item 9 – 3 Mann Street (MBL 14-033-00002) – Notice of Intent (CC-2026-058
     & DEP#349-14xx)
     Request to postpone the public hearing to 09/14/2026 & extend the constructive grant
     deadline to 10/06/2026

     Item 10 – 300 & 301 Barber Avenue (MBL 22-015-00001 & 22-015-00002) –
     Notice of Intent (CC-2026-059 & DEP#349-14xx)
     Request to postpone the public hearing to 09/14/2026 & extend the constructive grant
     deadline to 10/06/2026

     Item 12 – 278 Grove Street, 4 Brookfield Street, 4 & 4A Powers Court – Notice
     of Intent (CC-2026-061 & DEP#349-14xx)
     Request to postpone the public hearing to 09/14/2026 & extend the constructive grant
     deadline to 10/06/2026

     Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
     Commission voted 3-0 to postpone the public hearings as discussed.
New Business – Request for Determination of Applicability
  2) 4 Spring Valley Road (MBL 55-017-00201) – CC-2026-057
    Neil Hassett, the applicant, explained that the project involved reconstructing an existing
    deck that had collapsed over the winter. The new deck would retain the exact footprint of
    the previous structure, with upgrades including pressure-treated framing and deck boards,
    updated railings, and newly dug code-compliant footings.

     Ms. VandenBoom reported that the project initially appeared in the building permit
     system, where staff flagged it because of the wetland buffer. She reported no concerns with
     the project.

     Commissioner Canton asked about the old footings. Mr. Hassett explained the old,
     outdated supports will be removed.

     Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
     Commission voted 3-0 to issue a negative determination of applicability as discussed.

       List of Exhibits:

          Exhibit A: Request for Determination of Applicability; dated 07/22/2026; prepared
             by Neil Hassett
Old Business – Notice of Intent
   4) 149 West Boylston Drive (MBL 13-035-0001A) - CC-2026-056 & DEP# 349-
   1457
     Gregory LaCroix and Dave Presch, Pare Corporation, on behalf of the applicant, City of
     Worcester Department of Sustainability and Resilience, presented updates on the City’s
     vegetation management project along the crest of Indian Lake Dam. They explained that
     since the previous hearing, they had received and responded to comments from both staff
     and MassDEP. The most significant change involved adjusting the Bordering Land Subject
     to Flooding (BLSF) elevation from 542 to 542.4 feet, increasing the mapped flood coverage

     area. The team also addressed Commission concerns about how vegetation behind a chain-
     link fence would be maintained, explaining that handheld tools such as weed whackers
     would be used due to limited equipment access. Questions about material stockpiling
     triggered the addition of a designated stockpile area located as far from resource areas as
     possible.

     Mr. Flint reported only minor comments after completing a full review and expressed no
     concern about the updated plans.

     No comments from the public or staff.

     Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
     Commission voted 3-0 to close the public hearing.

     Mr. Flint noted the work is approved as a limited project pursuant to 310 CMR 10.53(3)(i).

     In addition to the standard conditions, Mr. Flint recommended special conditions for
     wetland flagging, maintenance of flood storage capacity, native seed mix application to
     disturbed areas, wood removal, dust controls, dewatering, equipment placement, and spill
     prevention.

     Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
     Commission voted 3-0 to issue the order conditions as discussed.

       List of Exhibits:

           Exhibit A: Notice of Intent; dated 07/20/2026; prepared by George LaCroix, Pare
              Corporation
           Exhibit B: Site Plan; dated 07/17/2026; prepared by Allen R. Orsi, Pare Corporation
           Exhibit C: Department of Environmental Protection Comments; dated 08/10/2026;
              prepared by Rebecca Gendreau
           Exhibit D: Division of Planning & Regulatory Comments; dated 08/17/2026;
              prepared by Eric Flint & Mattie VandenBoom
           Exhibit E: Response to Comments; dated 08/24/2026; prepared by George LaCroix
              & David Pretsch, Pare Corporation

Old Business – Request Amended Order of Conditions
   5) 0 Whippoorwill Drive & 0 Danielle’s Way (aka Malden Woods Subdivision)
       (MBL 32-011-0001A & B through -0007A & B; -00008 through -00013; -
       0014A & B; & -0015A & B); the Whippoorwill Drive Right-of-Way; and the
       westerly portion of the Castine Street Right-of-Way
     Nikita Shugrue and Alex Wood, Thompson Liston Associates representing Whippoor LLC,
     the applicant, presented revised plans. They explained that the Commission had
     previously objected to patios and a driveway encroaching into the 30‑foot buffer. In
     response, the applicant reconfigured plans so all patios, now impermeable, and the
     driveway for Lot 10A are fully outside the buffer. They also introduced the possibility that
     the developer might install decks instead of patios for certain lots during construction. To
     streamline future approvals, they requested an amendment allowing decks if they also

     remained outside the 30‑foot buffer and maintained equal or lesser impervious area.

     Mr. Flint supported incorporating this flexibility directly into the Order of Conditions and
     advised including limitations based on zoning setbacks, which prohibit decks in some side-
     yard areas.

     Commissioner Kirshner asked what materials would be used for the deck. Mr. Wood
     confirmed the decks would be made from wood.

     No comments from the public.

     Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
     Commission voted 3-0 to close the public hearing.

     Mr. Flint noted the work is approved as a limited project pursuant to 310 CMR 10.53(3)(i).

     Mr. Flint recommended modifications to the existing Order of Conditions including
     allowing the applicant to construct decks or patios and adjusting condition 34 related to
     sequencing.

     Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
     Commission voted 3-0 to issue the amended order conditions as discussed.

       List of Exhibits:

          Exhibit A: Request for Amended Order of Conditions; dated 07/14/2026; prepared
             by Patrick Healey, Thompson Liston Associates
          Exhibit B: Site Plan; dated 07/10/2026; revised 08/07/2026; prepared by Patrick
             Healey, Thompson Liston Associates

New Business – Notice of Intent
  6) 9 Dalton Street (MBL 34-019-00002) – CC-2026-048
  Kevin Quinn, Quinn Engineering on behalf of the applicant, Amanda Russo-Folco, described
  the construction of a five‑unit multifamily building. He explained how stormwater would be
  collected in catch basins, treated in a stormwater treatment unit, and discharged to a
  chamber gallery designed to retain runoff until the system reaches a specified capacity.

   Mr. Flint explained staff’s biggest concern relates to groundwater proximity to the
   underground chambers of the infiltration unit. He asked if there is a risk for groundwater to
   seep into the infiltration unit and enter the city’s drainage system. Mr. Quinn that the
   seasonal high groundwater remained below the chamber bottom, negating risk of
   groundwater infiltration.

   Mr. Quinn explained that a liner could be installed in infiltration unit but was not necessary
   and might reduce beneficial groundwater recharge.

   After a brief discussion, the Commission chose not to require a liner for the infiltration unit.

 No comments from the public.

 Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
 Commission voted 3-0 to close the public hearing.

 Mr. Flint noted the work is approved as a limited project pursuant to 310 CMR 10.53(3)(i).

 In addition to the standard conditions, Mr. Flint recommended special conditions
 stormwater management system maintenance, infiltration unit inspection, certification of
 stormwater infrastructure, wood removal, dust controls, dewatering, cement truck
 washing, and sand and salt. He recommended ongoing conditions for stormwater
 management system maintenance, and sand and salt.

 Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
 Commission voted 3-0 to issue the order conditions as discussed.

   List of Exhibits:

       Exhibit A: Notice of Intent; dated 07/07/2026; prepared by Chris Keenan, Quinn
          Engineering
       Exhibit B: Site Plan; dated 06/22/2026; revised 08/07/2026; prepared by Kevin J.
          Quinn, Quinn Engineering
       Exhibit C: Stormwater Report; dated 06/18/2026; prepared by Kevin J. Quinn,
          Quinn Engineering
       Exhibit D: Division of Planning & Regulatory Comments; dated 07/29/2026;
          prepared by Eric Flint & Mattie VandenBoom
       Exhibit E: Response to Comments; dated 08/07/2026; prepared by Chris Keenan,
          Quinn Engineering

6) 46, 51, & 52 Modoc Street (MBL 38-017-1A-11, 38-017-1A-10, & 38-017-1A-09)
   - CC-2026-054
 Attorney Donald O’Neil, joined by engineer Joseph Graham, presented a revised
 subdivision layout involving ten total dwelling units formed by five semi-detached
 structures. The project required a new Notice of Intent because the original 2018 approval
 expired before construction of these remaining lots. Mr. O’Neil explained that each unit
 would include an individual infiltration chamber to manage stormwater.

 Mr. Flint explained that staff reviewed updated plans and a revised stormwater report,
 noting that their previous concerns related to perimeter controls, planting plans, and
 stormwater calculations had been resolved.

 Commissioner Canton asked about the project phasing. Mr. O’Neil explained the road has
 already been constructed. Mr. Flint noted through aerial imagery that the lots already
 appeared to be cleared and some foundation excavation had begun.

 Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
 Commission voted 3-0 to close the public hearing.

 In addition to the standard conditions, Mr. Flint recommended special conditions
 Stormwater Pollution Prevention Plan, stormwater management system maintenance,
 infiltration unit inspection, certification of stormwater infrastructure, dust controls,
 dewatering, cement truck washing, construction monitoring reports, sand and salt,
 wetland permitting. He recommended ongoing conditions for stormwater management
 system maintenance, and sand and salt.

 Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
 Commission voted 3-0 to issue the order conditions as discussed.

  List of Exhibits:

      Exhibit A: Notice of Intent; dated 07/15/2026; prepared by Donald J. O’Neil, Esq.
      Exhibit B: Site Plan; dated 07/02/2026; revised 08/20/2026; prepared by Joseph
         Graham
      Exhibit C: Stormwater Report; dated 04/26/2026; revised 08/20/2026; prepared
         by Joseph Graham
      Exhibit D: Division of Planning & Regulatory Comments; dated 07/22/2026;
         prepared by Eric Flint & Mattie VandenBoom
      Exhibit E: Response to Comments; dated 08/20/2026; prepared by Joseph Graham

11) 20 & 22 Goldthwaite Road (MBL 39-021-00045 & 39-021-43+44) - CC-2026-
   060

 Nikita Shugrue and Alex Wood, Thompson Liston Associates on behalf of the applicant,
 Pappas Prime Properties, LLC Whippoor LLC, the applicant, presented a redevelopment
 project involving demolition of an existing single-family house and construction of a new
 28‑unit multifamily apartment building while retaining the existing three‑family structure
 at number 20 Goldthwaite Road. Although no wetland buffers exist on-site, the filing was
 required due to proximity to municipal catch basins.

 Ms. VandenBoom confirmed that a previously flagged area potentially subject to isolated
 flooding did not qualify as a regulated resource after further study. The only staff comment
 concerned the landscape plan, which needed greater inclusion of native trees and shrubs.

 Commissioner Canton and Commissioner asked for clarification on the snow storage areas
 and parking configuration. Mr. Shugrue clarified that interior garage parking is proposed
 supplemented the external parking count and that a special permit process for reduced
 parking was underway through the Planning Board.

 No comments from the public.

 Upon a motion by Commissioner Kirshne, seconded by Commissioner Nystrom, the
 Commission voted 3-0 to close the public hearing.

 In addition to the standard conditions, Ms. VandenBoom recommended revised plans
 including at least 50 percent native tree and shrub species, stormwater management
 system maintenance, infiltration unit inspection, certification of stormwater

     infrastructure, dust controls, dewatering, cement truck washing, sand and salt. She
     recommended ongoing conditions for stormwater management system maintenance and
     sand and salt.

     Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
     Commission voted 3-0 to issue the order conditions as discussed.

       List of Exhibits:

           Exhibit A: Notice of Intent; dated 08/05/2026; prepared by Nikita Shugrue,
              Thompson Liston Associates
           Exhibit B: Site Plan; dated 07/24/2026; prepared by Patrick Healey, Thompson
              Liston Associates
           Exhibit C: Stormwater Report; dated 06/03/2026; prepared by Patrick Healey,
              Thompson Liston Associates
           Exhibit D: Division of Planning & Regulatory Comments; dated 08/18/2026;
              prepared by Eric Flint & Mattie VandenBoom

Other Business
   13) Request for Certificate of Compliance
     a. 222 Brook Street (CC-2019-009)
     Ms. VandenBoom reviewed the Certificate of Compliance request for 222 Brook Street.
     The project involved construction of a low-rise apartment building. She noted that an as-
     built plan and engineer’s letter confirmed the project was constructed as approved. The
     site was inspected on August 18 and found the entire property, including a steep hillside,
     fully stabilized with healthy plantings.

     Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
     Commission voted 3-0 to issue the Certificate of Compliance.

     List of Exhibits:

         Exhibit A: Certificate of Compliance Request; dated 07/07/2026; prepared by Tom
            Corbett, Zero Point Development, Inc.

     b. 74 & 76 Valmor Street (CC-2023-075)
     Ms. VandenBoom explained that a partial Certificate of Compliance was being requested
     for a duplex. She confirmed the site was fully stabilized and noted that previously flagged
     dead tree plantings had been replaced.

     Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
     Commission voted 3-0 to issue a partial Certificate of Compliance.

     List of Exhibits:

         Exhibit A: Certificate of Compliance Request; dated 07/02/2026; prepared by JAE
            Wor, LLC

 c. 1195 Grafton Street (CC-2025-046 & DEP#349-1421)
 Ms. VandenBoom explained this project involved directional drilling to replace utility
 lines. She explained that staff conducted a site visit on August 18th and confirmed the site
 was fully stabilized.

 Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
 Commission voted 3-0 to issue a certificate of compliance.

 List of Exhibits:

    Exhibit A: Certificate of Compliance Request; dated 07/09/2026; prepared by Sam
       Keffestan, BSC Group

14) Project Change Request
 a. Elm Park Playground (CC-2025-002)

 Mr. Flint reviewed a project change request from the Parks Department for Elm Park. The
 Parks Department previously received a negative determination for playground
 resurfacing and now sought approval to replace pads under 21 picnic tables. Given the
 minor nature of the work and proposed erosion controls, staff recommended processing it
 as a project change under the existing DOA.

 Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
 Commission voted 3-0 to approve the project change request.

 15) Enforcement Order and Violation Updates

 a. 133 Lake Avenue North (CC-2020-007)
 b. 99 Wildwood Avenue (CC-EO-2020-009)
 c. 269 James Street (CC-EO-2021-007)
 d. 4 Tiffany Avenue (CC-EO-2023-001)
 e. 570 Lincoln Street (CC-EO-2023-010)
 f. 198 Granite Street (CC-EO-2024-001)
 g. 86 Webster Street (CC-EO-2024-003)
 h. Salisbury Hill (CC-EO-2024-005 & DEP#349-1253)
 i. 262 Mill Street (CC-EO-2024-007)
 Ms. VandenBoom reviewed the history of the Enforcement Order. The enforcement order
 was issued in 2024 for incomplete wetland replication required back in 2001 when the
 Westside Veterinary Clinic was constructed. The replication area has since been
 completed and monitored for two growing seasons. A final report confirms native
 vegetation and a functional wetland (>75% wetland plantings).

 Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
 Commission voted 3-0 to lift the Enforcement Order.

j. 142-158 Wildwood Avenue (CC-EO-2024-010)
k. 1256 West Boylston Street (CC-EO-2025-001)
l. 13 Holden Street (CC-EO-2025-002 & DEP# 349-1409)
m. 270 Webster Street (CC-EO-2025-004)
n. 34 Eskow Road & 224 Southwest Cutoff (CC-EO-2025-006)
o. 148A Tory Fort Lane (CC-EO-2025-007, CC-2023-016, & DEP# 349-1356)
p. 1259 West Boylston Street (CC-EO-2025-008)
q. 145 Newton Ave North (CC-EO-2025-009)
Ms. VandenBoom explained that unpermitted disturbance within 100 feet of a catch basin
previously triggered an enforcement order. The homeowner was required to stabilize the
site and allow staff to inspect the site during 2026 growing season. A staff inspection
confirmed full stabilization of the site.

Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
Commission voted 3-0 to lift the Enforcement Order.

r. 757 Salisbury Street (CC-EO-2025-010 & CC-2023-005)
s. 9 & 13 Elton Street (CC-EO-2025-011, CC-2024-083, & DEP#349-1407)
t. 612 Grove Street (CC-EO-2026-001)
u. 342 (aka 344, 346, & 348) Lake Avenue (CC-EO-2026-002 & DEP#349-1435)
v. 88 Webster Street (CC-2023-025 & DEP#349-1361)
Nick Facendola, Level Design Group, LLC, reviewed the proposed restoration plan from
wetland scientist Matt Marro. The restoration plan involves the removal of riprap,
regrading, soil decompaction, topsoil addition, and native replanting.

Mr. Flint recommended the Commission issue an enforcement order to implement the
restoration plan.

Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
Commission voted 3-0 to issue the Enforcement Order as discussed.

w. 11 Holden Street (CC-EO-2026-003)
Ms. VandenBoom explained that an unpermitted covered porch was constructed within
the 30‑foot buffer to Delany Brook. Staff issued an enforcement order requiring an as-built
plan to be provided.

Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to ratify the Enforcement Order.

x. 142 Olean Street (CC-EO-2026-004)
Mr. Flint stated that vegetation removal and installation of an above-ground pool directly

     adjacent to the shoreline prompted an enforcement order. The homeowner was
     cooperative and explained that some shrubs were damaged by a fallen tree, leading to
     cleanup and unintended over-removal. Staff required retention of a wetland scientist to
     develop a restoration plan, likely to include native plantings and consideration of
     relocating the pool outside the buffer.

     Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
     Commission voted 3-0 to ratify the Enforcement Order.

     There was no discussion of item 15a-15h, 15j-15p & 15r-15u.

16) Open Space Discussion
    There was no discussion of item 16.

17) Discussion of Active Projects
    There was no discussion of item 17.

18) Communications
    There was no discussion of item 18.

19) Approval of Minutes – August 13th, 2026
    Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
    Commission voted 3-0 to approve the minutes.

20) Update to Wetlands Protection Ordinance and Regulations
    Mr. Flint provided an update on ongoing revisions to the Wetlands Protection Ordinance,
    particularly on simplifying administrative approvals, which will be presented in redline
    form at a future meeting.

21) Approval of FY26 Annual Report
    Mr. Flint reviewed the draft Fiscal Year 26 Annual Report detailing permitting activity,
    land management, and open space accomplishments by the Conservation Commission.

     Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
     Commission voted 3-0 to approve FY26 Annual Report.

22) Commission Liaison Update
    Liaison updates for Lake Commission and Community Preservation were brief, with no
    significant new information.

23) Policies and Procedures
    There was no discussion of item 23.

Adjournment:
     Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
     Commission voted to adjourn at approximately 6:25 PM.

Sources

Video

Watch the video

Transcript

Auto-generated YouTube captions; names and terms are likely misheard.

Transcript

0:04This August 24th meeting of the

0:06Worcester Conservation Commission is now

0:08called to order.

0:10My name is Devin Canton and I will be

0:11chairing this meeting.

0:13As part of this meeting we'll be holding

0:14hearings under the Massachusetts

0:16Wetlands Protection Act and regulations

0:18and the City of Worcester's Wetlands

0:20Protection Ordinance and regulations.

0:23The Commissioners are volunteers that

0:25serve to enforce these laws and

0:26regulations in order to protect specific

0:28values identified as being important to

0:31the Massachusetts to Massachusetts and

0:33the City of Worcester.

0:35Commission decisions are based on these

0:37laws and regulations and are not

0:38arbitrary or based on personal likes or

0:41dislikes.

0:42It's important to the Commission that

0:43these hearings are held in a fair and

0:45equitable way for all parties involved.

0:48This requires that discussion takes

0:49place in a civil manner and that every

0:51individual in the meeting is treated

0:53respectfully.

0:55To facilitate the hearings,

0:57they take place in the order that they

0:58are listed on the agenda, which is also

1:00available by the door and online.

1:04And they'll follow a specific format.

1:07First, the applicant or their

1:08representative will present the project

1:11to the Commission.

1:12Next, staff will provide comments on the

1:14proposed work.

1:16Then the Commission will direct any

1:17questions it has to the applicant.

1:21After the Commission is done questioning

1:23the applicant, the floor will be open to

1:25the public.

1:26Comments and questions must be directed

1:28to the Chairperson, not to the applicant

1:30or the representative, and they must

1:32pertain to the regulations that the

1:33Commission oversees. For example,

1:36although you may have concerns about the

1:37traffic resulting from a particular

1:39project, the Conservation Commission

1:41does not regulate traffic, so traffic

1:43concerns will not be discussed in the

1:45meeting.

1:47Please note that while new points will

1:49be given ample time to present,

1:51repetitive comments will be cut short in

1:53the interest of having all parties being

1:55given the opportunity to speak.

1:57Since the meeting is televised, we ask

1:59that all applicants and members of the

2:01public who wish to address the

2:02commission please address approach the

2:05podium, state their name and city of or

2:08town of residence for the record, and

2:11use the microphone.

2:13To manage

2:14remote participation during hybrid

2:17meetings and prevent disruptions, all

2:20participants and are automatically

2:22blocked from unmuting themselves,

2:24turning on their video, or sending chat

2:26messages.

2:28For remote participants who would like

2:30to comment on an item or agenda, we ask

2:33that we you use the raise hand feature

2:35in Zoom during the discussion on that

2:37item. If you are joined by phone, you

2:39can raise your hand by pressing star

2:41nine.

2:42Staff will then call on members of the

2:44public one at a time and give them

2:46permission to unmute themselves. If you

2:48are joined by phone, you will then be

2:51able to unmute yourself by pressing star

2:53six.

2:55Since all of the

2:57commissioners are here tonight, we can

2:59skip the introductions.

3:01I think uh next are there any uh

3:04items for continuances, postponements,

3:07or withdrawals?

3:08>> Yes, we have

3:09several requests for postponement. All

3:12of these are requests to postpone the

3:14public hearing to September 19th and

3:16extend the constructive grant deadline

3:18to October 6th.

3:20Uh we have item one, Providence and

3:22Worcester Railroad right-of-way. We just

3:24received this

3:25>> September 14th.

3:27>> September 14th.

3:28>> Yep.

3:29>> Okay.

3:31Oh, I I might I might have. Yes, so

3:33September 14th with a constructive grant

3:35deadline of October 6th.

3:37Um so, item number one, we just received

3:40this request last minute, so it's not on

3:42the continuance form, but Providence and

3:45Worcester Railroad right-of-way. We have

3:47item number three, 35 State Road. Item

3:49number seven, 99 Sears Island Drive.

3:52Item number nine, three Main Street,

3:54item number 10,

3:56300 and 301 Barber Ave, and item 12, 278

4:01Grove Street, 4 Brookfield Street, and 4

4:03and 4A Powers Court.

4:07>> Is there a motion?

4:09>> Motion to postpone items 1, 3, 7, 9, 10,

4:13and 12.

4:15>> Second.

4:16>> All in favor?

4:17>> Aye.

4:17>> Aye.

4:21>> Okay, well that gets us to our first

4:23item, item number two, 4 Spring Valley

4:26Road.

4:28Request for determination of

4:29applicability.

4:41>> My name is Neil Hassett, Hassett

4:42Builders, Jefferson, Mass.

4:45I'm the builder who's going to be

4:46building the deck.

4:50>> Can you uh describe the project a little

4:52more in detail?

4:53>> Okay, it's a existing deck that has

4:56collapsed. So, I'm not changing the

4:58footprint of the deck at

5:00at all.

5:02Um

5:02and um

5:07>> Can you Can you talk a little bit about

5:09the materials and uh foundations?

5:11>> pressure treated uh framing, um pressure

5:13treated deck, um handrails, um up to

5:17code, you know, footings. I'm going to

5:19dig uh footings

5:21for the um the deck.

5:23>> So, you'll be digging new footings?

5:26>> Yes.

5:26>> Yes, okay.

5:27>> Yep.

5:29Yep.

5:30That was the existing deck.

5:33Um and it collapsed over the winter.

5:36That's the That was the location of the

5:38deck.

5:39>> Yep.

5:40Were there any uh existing footings that

5:43are being removed?

5:44>> There was existing There are footings

5:46there, but they're not up to code now.

5:48>> Okay.

5:49>> Yep.

5:50Pretty straightforward.

5:51>> For today's quote.

5:52>> Any questions or comments from staff?

5:56>> Yep, so this project was flagged during

5:57the building permit process just due to

5:59its proximity to wetlands. So, it's just

6:01over 30 ft away from a wetland, so we

6:03did flag it since it did require new

6:04footings

6:05and the old footings to be taken out.

6:07So, we requested that they file an RDA

6:09to go before the commission. We did ask

6:12to confirm that the new deck would be in

6:14the same exact footprint as the the old

6:16existing deck and which has been

6:18confirmed. So, no concerns from staff at

6:20this time.

6:21>> Okay.

6:23Are there any questions or comments from

6:25members of the public?

6:31Skip to staff. Questions or comments

6:33from

6:34commissioners? If not, is there a

6:36motion?

6:39>> Motion to issue a negative

6:40determination.

6:42>> Second.

6:43>> All in favor?

6:44>> I.

6:45>> I.

6:46>> Okay, you're all set. Thank you.

6:48>> All right, thank you.

6:49>> Yep.

6:54Next item on the agenda is item number

6:56four, 149 West Boylston Drive, notice of

6:59intent.

7:09>> All right. Good evening, commissioners.

7:10My name is Gray LaCroix from Pare

7:12Corporation. I'm joined virtually by

7:14Dave Fresh,

7:16also from Pare Corporation. He's the

7:17engineer on the job. I'm the

7:19environmental scientist. We're here on

7:21behalf of the city as the applicant for

7:24a vegetation removal

7:26project along the crest of the dam,

7:29Indian Lake Dam,

7:31to be specific.

7:33Last meeting we came, opened up the

7:35public hearing, presented the project,

7:38fielded initial questions and concerns

7:40from the commission.

7:41Um

7:43At that time, we did not have a DEP file

7:44number either. So, um since then, staff

7:48has provided some comments. Um DEP did

7:51as well um in conjunction with them

7:53issuing their file number. We have

7:55responded to those comments um just this

7:57morning. Um so, apologies for the delay

7:59on that, but um we have responded to all

8:01those comments um addressed those

8:03concerns. The the biggest change

8:07was BLSF area on site. We um

8:11as a result of comments from the staff,

8:13we increased the BLSF number uh

8:15elevation from 542 to 542.4.

8:19Um so, that changed the area and also

8:21the associated impacts, which had been

8:23reported.

8:24Um some other questions and concerns

8:26that we addressed in the RTC were um

8:29as a result of commission questions last

8:31meeting, primarily how were we going to

8:33get behind the chain link fence at the

8:35site and

8:37maintain vegetation um water ward of

8:40that chain link fence. Um

8:42through discussions with the city and

8:43DPW, sounds like it's just going to be

8:46handheld equipment like weed whackers

8:48and things like that. Um unfortunately,

8:51as the commission pointed out last last

8:53meeting, um

8:54it's difficult to get large machinery

8:56back there. So, it will be small

8:58handheld equipment. Um

9:00The other question uh

9:02primary question that we wanted to make

9:03sure we responded to was concerning um

9:06stockpiles and whether or not

9:08material was going to be immediately

9:10loaded onto a trucks and hauled off or

9:12if it was going to be stockpiled on

9:14site. Unfortunately, at this time, we we

9:16weren't sure. So, just to be safe, we

9:18provided a stockpile area on the plans

9:21um

9:22away from the resource area as far at

9:24least as far away as we could really on

9:26the site. So, um

9:28and that's where we stand today. Um so,

9:30happy to happy to respond to any more

9:32questions from the commission or any

9:34other concerns. Okay.

9:36Question questions or comments from

9:38staff?

9:39>> I don't have too much to add. Um at the

9:41last meeting we had mentioned that we

9:42hadn't done a full review of the NOI yet

9:45and

9:46as was just noted we we did do that and

9:48only had a couple minor comments. The

9:50biggest change just being the boundary

9:52of bordering land subject to flooding

9:53based on the um

9:56base flood elevation in the FIS

9:59um which you know expands the resource

10:01area coverage on the site but ultimately

10:03there's not a lot of change to the work

10:04itself. Um

10:06So no real concerns at this point.

10:09Um we do have a draft order of

10:10conditions if the commission's ready to

10:12close.

10:14>> Questions or comments from

10:15commissioners?

10:19Questions or comments from members of

10:20the public? If you're

10:22called in it's uh star nine to

10:25request to speak.

10:32There are no public comments or

10:34questions. Is there a motion?

10:36>> Motion to close the hearing.

10:39>> Second.

10:40>> All in favor?

10:41>> I.

10:41>> I.

10:42>> Okay.

10:44So the public portion of the uh meeting

10:46is uh going to be paused while we go

10:49through the orders of conditions and let

10:52staff

10:54>> Yep. So first we have a finding that the

10:56work is approved as a limited project

10:58pursuant to 310 CMR 10.533I.

11:02And then for conditions in addition to

11:04the standard conditions we'd have 24 for

11:06wetland flagging.

11:08Uh we have a condition that all grades

11:09within bordering land subject to

11:11flooding be maintained to avoid changes

11:13to the flood storage capacity of the

11:14site.

11:15Uh we have a comment or condition rather

11:18that all disturbed areas be seeded with

11:20a native seed mix at the conclusion of

11:22work. Uh that was coming out of a

11:23comment from MassDEP.

11:25We have condition 46 for wood removal,

11:2748 for dust control, 49 for dewatering,

11:3151 for equipment placement, 56 for spill

11:34prevention.

11:38And that's it.

11:41>> Any questions or comments from

11:42commissioners?

11:45There's nothing more to add. Is there a

11:47motion?

11:48>> Motion to issue the order of conditions.

11:51>> Second.

11:52>> All in favor?

11:53>> Aye.

11:53>> Aye.

11:53>> Aye.

11:54>> Okay.

11:55Motion carried.

11:56>> very much.

11:57>> Thank you very much, guys.

12:05Next item is item five, zero

12:07Whippoorwill Drive and zero Daniels Way.

12:22>> Good evening.

12:23My name is Alex Wood. I am an EIT civil

12:27engineer with Thompson Liston

12:28Associates. I'm joined by my colleague

12:31Nikita Shagrou, EIT,

12:34on behalf of the client

12:35Wipper LLC.

12:38The client is seeking an amendment to

12:40their order of conditions. At the last

12:43meeting, which I believe was August 3rd,

12:45Patrick Healy, PE,

12:48presented some plans to the commission.

12:51And since that meeting, we have revised

12:54the plans

12:56such that they will have impermeable

12:59patios outside of the 30-ft buffer to

13:02the wetland resource,

13:04which is consistent with the discussion

13:06at the last meeting. And we also shifted

13:09the driveway for lot 10A to be 30-ft

13:14from the resource area.

13:16And it will be bituminous, consistent

13:19with the other driveways.

13:20So, the prior submittal from last time

13:23instead had permeable paver patios, and

13:26they were situated closer than 30 ft to

13:29the wetland resource for several lots

13:32and a portion of lot 10A's driveway,

13:35which at the time was pervious, was also

13:37situated less than 30 ft from a resource

13:40area.

13:41So, the idea for these updated plans is

13:44just to

13:45bring the the patios and the driveway

13:47outside of the 30-ft

13:50In terms of other aspects of the site,

13:53we haven't made any further changes to

13:56the stormwater in terms of we are still

13:58proposing subsurface infiltration as

14:02presented at the last meeting.

14:05Due to the fact that the purpose for the

14:07amended order is increased building

14:10footprint sizes. So, that is why we

14:13proposed the subsurface infiltration to

14:15mitigate the runoff associated with

14:18those areas.

14:19And consistent with last time, we are

14:21still proposing construction period

14:23erosion and sedimentation controls as

14:26well as permanent slope stabilizing

14:28features per the construction details.

14:31So, we believe that these revised plans

14:35adequately address the concerns of the

14:36commission.

14:38But, we have also

14:40with with these plans some sketch plans

14:43or exhibits

14:45depicting the potential for decks

14:47instead of patios.

14:49This is something that the applicant is

14:51considering doing

14:52and so

14:54what we would like to present to the

14:56commission is

14:57if we could receive the the approval for

15:00the amended order

15:01for the stamp plan with the patios. The

15:04inquiry from the applicant was if they

15:06were to decide to do decks instead at at

15:09a future point like during construction

15:12as long as decks were

15:14located outside of the 30-ft buffer and

15:17a smaller or same uh,

15:21footage of impervious um, that it could

15:23be included as a condition, uh, in the

15:25order.

15:26Um,

15:27other than that, I'm I'm happy to answer

15:30any questions. Thank you.

15:31>> Okay. Thank you. Turn it over to staff.

15:34>> Yes, so I think obviously the main

15:35discussion at the last hearing was just

15:37about the encroachments on the 30-ft

15:39buffer, and it seemed like the

15:40commission had a, um, pretty clear

15:42position that, um,

15:44wanted to see those structures

15:46relocated, um, and the applicant's team

15:48had reached out regarding the

15:49possibility of

15:51swapping these out for, um, decks at

15:54some point, um, and so I I raised the

15:57possibility of trying to include some

15:58sort of condition, as was just

16:00mentioned, to allow for that, rather

16:01than have them come back again down the

16:03line when they decide, uh, if they

16:05decide that they want to go that route.

16:07Um, so we do have in included in the

16:09draft, uh, conditions, uh, something

16:11that would allow for that, consistent

16:13with what was just described here.

16:15Um, but yeah, aside from that, don't

16:16really have too much. Happy to answer

16:18any questions.

16:19>> Okay.

16:20Questions or comments from

16:22commissioners?

16:28>> On the

16:29on the decks, would it be wood or some

16:33synthetic?

16:35>> Um, in terms of the specific materials,

16:37um, you know, I I would imagine it would

16:39be, you know, probably some some sort of

16:41wood or or something similar. We don't

16:42have exact specs for it, but, um, I

16:45think, you know, I think the key would

16:47just be that it would be, you know, a

16:49smaller square footage of impervious,

16:51you know, just with respect to the to

16:53the resource area.

16:54>> Okay, thank you.

16:56>> And and one other thing I'll add

16:58quickly, um, that came up during our,

17:00um, kind of inter-team review, is just

17:03the potential for,

17:05um, for decks, there there would be some

17:08prohibition of decks in the side yard

17:10setback, which it seems like may have

17:12already been noted by the project team,

17:14just based on the exhibit plans that did

17:15not have decks in those side yard

17:17setbacks, but

17:18I just wanted to flag that as well that

17:20there is some other limitations in the

17:21zoning ordinance outside of the

17:23commission's purview that would prohibit

17:24decks in some areas in this property.

17:27>> Yeah.

17:33Any

17:34questions or comments from members of

17:35the public? Star 92 to unmute if you're

17:38called in.

17:46I don't have any further questions or

17:48comments.

17:49If there are no more questions, is there

17:51a motion?

17:54>> Motion to close.

17:57>> Second.

17:57>> All in favor? I.

17:59>> I.

17:59>> I.

18:02>> So I can will pause the public portion

18:04of the hearing to go through the orders

18:06of conditions.

18:10>> Yes.

18:11Um

18:15Sorry, just catching up on the

18:19last condition here.

18:22All right. So

18:23there's already an active order of

18:25conditions for this site. So this would

18:26just be a couple of small modifications

18:28to the existing order. So related to

18:32what we were just discussing, adding a

18:34new construct rather a new condition to

18:36meet during construction stating that

18:37the commission recognizes the

18:39applicant's consideration of either

18:40decks or patios for lots 8 to 10 and

18:42hereby approves either option provided

18:44that the layout of these amenities

18:46remains consistent with either the

18:48approved plans or the additional exhibit

18:50sheets referenced in section A of this

18:51order of conditions and maintains the

18:53same amount of impervious area.

18:55And that they be located outside of the

18:5730-ft buffer zone.

18:59And then unrelated to the discussion,

19:01kind of just a correction on some of the

19:03sequencing. Condition 34 has a couple of

19:06sub conditions related to sequencing

19:09that don't make a ton of sense

19:11practically, it relates to the um

19:14the construction and bringing online of

19:16stormwater infrastructure for a part of

19:18the site prior to construction on

19:19another part of the site um

19:22commencing, and we wanted to scrap that

19:24as

19:25um doing that would force that system to

19:27come online before um the up-gradient

19:30areas are fully stabilized. Um so, just

19:32removing those sub conditions on work

19:34sequencing and sticking to the standard

19:36condition for work sequencing that just

19:38states um that work will be done in

19:40accordance with the plans on file with

19:41the commission.

19:43Um so, that's it for changes to the

19:44order.

19:45>> Okay.

19:47Any questions or comments on the orders

19:49of conditions? If not, is there a

19:51motion?

19:52>> Motion to issue the order of conditions.

19:55>> Second.

19:55>> All in favor?

19:57>> Aye.

19:57>> Aye.

19:58>> Okay, we're all set.

20:00>> Thank you so much.

20:01>> Yeah, thanks.

20:02>> Thank you.

20:08>> That gets us to new business, item

20:10number six, nine Dalton Street.

20:24>> Mr. Chairman,

20:25Kevin Quinn with Quinn Engineering. I'm

20:27here on behalf of Amanda Ruco Folco,

20:29who's Russo Folco, who's owner and

20:31applicant. Uh Amanda is attending

20:33tonight remotely.

20:35The application for this is for a notice

20:36of intent under the ordinance. Uh the

20:39resource areas in question are two

20:41proposed catch basins on the north and

20:44south ends of the site. This project is

20:46the construction of a multi-family

20:47building with five dwelling units,

20:50uh associated parking, maneuvering area,

20:52and underground utilities.

20:54Um

20:55a recreational area is called out in the

20:57rear of the site as well, on the east

20:59side of the site. Stormwater is

21:01collected on site and treated in

21:03accordance with the mass storm

21:04stormwater standards.

21:06Um

21:07the water is collected in the catch

21:08basins and is drained to a

21:11uh stormwater treatment unit. The water

21:13discharges into a gallery of underground

21:16chambers.

21:17The chambers are designed so that the

21:19water goes into them and there's an

21:20outlet control structure a manhole

21:23so that the water will only discharge to

21:25the city's system when the chambers have

21:27been filled. So, under normal

21:29circumstances, less than storms, no

21:31water would be introduced normally to

21:33the to the city's drainage system.

21:35Um we have called out for erosion

21:37controls on the entire perimeter of the

21:38site. That's wattles with silt fence and

21:41also silt sacks in the catch basins once

21:44they've been installed.

21:47Can I answer questions?

21:51Okay.

21:52Turn it over to staff.

21:53>> Yeah, so we had a few staff comments, a

21:55couple of minor plan revision requests

21:58related to

22:00erosion controls, labeling of service

22:02treatments, and precipitation totals

22:05used in stormwater reports.

22:07Um and then our other comment was just

22:08related to the depth of groundwater at

22:11the location of the proposed detention

22:13system. It's pretty close, so we were

22:15just concerned that there might be some

22:16potential for uh introduction of

22:18groundwater into the city system via

22:20that underground pipe. Um

22:23but the we received responses to all

22:25those comments. Um I believe the

22:27response to that particular comment was

22:29that there is still separation between

22:30seasonal high groundwater.

22:31>> The water table's below the bottom of

22:33the chambers.

22:34>> Right.

22:34>> So, the chambers won't fill or partially

22:36fill, presumably, um with groundwater.

22:39>> So, I guess the the one follow-up

22:40question we would have about that is is

22:42there some need for

22:44um like a liner of some sort to keep

22:46that system

22:48separate from the groundwater? Is there

22:49risk of

22:51>> Good question. Um

22:53we don't propose recharge. But the water

22:56that goes into the chambers is fully

22:58treated. Um we don't have separation

23:02required because it's a because of the

23:04soil type. We're we can comply to the

23:06greatest extent practicable under

23:08hydrologic soil group C soils.

23:11Um, we can put a liner. We could

23:13certainly put a uh

23:14a 40-mil plastic liner under everything

23:17to ensure that water doesn't

23:20recharge into the groundwater table.

23:23>> I guess um yeah, I don't have a strong

23:25position on that. I was just curious to

23:26get your take on whether or not it was

23:28appropriate or desirable for this just

23:29given where the water table is.

23:31>> I mean the the 2-ft separation is

23:33desirable if we could do it we would we

23:35can't.

23:35>> Right.

23:36>> Um, but certainly putting a chain a

23:38plastic layer in there to ensure that no

23:40recharge takes place. Yeah, we can we

23:41can certainly do that.

23:44>> What do you think What do you think that

23:45would be a a good move to do just to

23:48prevent potential issues from

23:49groundwater or is it something that

23:50doesn't necessarily matter?

23:52>> Well, state methodology says we get

23:54treatment in those 2 ft of separation.

23:57So, technically we would be

23:58under-treating water that was recharged.

24:01Um, it is we are I mean we do have a

24:04stormwater treatment

24:06manhole with a mechanical system that

24:08removes

24:10particulates from the stormwater but

24:11conceivably

24:12it could contribute to to groundwater um

24:15contamination or

24:17whatever you call it. So, yeah, I think

24:18putting a putting a liner in is it's

24:21being careful. We we feel we think

24:24recharge is important. In an urban

24:26environment getting water into the

24:27groundwater is pretty important. Um,

24:30but I would defer to the board as far as

24:33um

24:34how you feel about it. If we If we

24:36thought it was critical we would have

24:37put it in.

24:38I'll say that.

24:45>> Comments? Questions?

24:47>> I'm personally

24:4950/50 on that.

24:51I mean I don't see

24:53see a

24:54great cost benefit

24:56to doing it.

24:58But I don't know what my other

25:01my colleagues would say.

25:04>> I think I share everyone's

25:06sort of same opinion that it it could go

25:08either way.

25:10>> I think as long as it doesn't impact the

25:12functioning of a system, staff doesn't

25:14have a concern about it.

25:18>> Okay.

25:20Any additional questions or comments

25:21from commissioners?

25:24Open it up to the public.

25:27Are there any questions or comments from

25:28members of the public? Star 9 if you're

25:31called in.

25:38Hearing none, is there a motion?

25:41>> Motion to close.

25:43>> Second.

25:44>> All in favor? Aye.

25:46>> Aye.

25:48>> Okay.

25:49So, again, pause the public portion of

25:51the hearing just to go over the orders

25:53of conditions.

25:56Turn it over to staff to go through

25:57those.

25:58>> All right.

25:59So, in addition to standard conditions,

26:01we would have condition 37 for

26:03stormwater system maintenance, 38 for

26:06infiltration unit inspection, or rather

26:08um

26:10stormwater unit inspection, uh 39 for

26:12certification of stormwater

26:13infrastructure,

26:1546 for wood removal, 48 for dust

26:18control, 49 for dewatering, 50 for

26:20cement truck washing, 56 for spill

26:22prevention,

26:24uh 66 for sand and salt as ongoing

26:27conditions 37 and 66.

26:30Um and this does not include adding a

26:33condition that a liner be added based on

26:36the discussion we've had.

26:41>> Does not include

26:42>> Does not include a condition, yeah.

26:45>> I have no problem with that.

26:48>> So, if there are no further questions or

26:50comments on those, uh is there a motion?

26:52>> Motion to issue the order of conditions.

26:55>> Second.

26:55>> All in favor?

26:56>> I.

26:57>> I.

26:57>> I.

26:58>> Very good.

26:59All right.

26:59>> Okay. Thank you.

27:00>> All right now.

27:09Seven has been postponed. So, that gets

27:10us to item eight. Uh 46-51 and 52 Mower

27:15Doc Street.

27:18>> Um good evening, Mr. Chairman members of

27:20the commission. Um my name's Donald

27:22O'Neil. I'm a lawyer here in Worcester

27:24here this evening on behalf of um St.

27:26Anthony Realty LLC.

27:29Also um

27:31online, I believe, is Joseph Graham

27:33who's

27:34>> [snorts]

27:34>> uh done the engineering on this site.

27:38Um so, he would be available to

27:41address any questions you might have of

27:43a technical nature.

27:45Um this is

27:47a

27:48uh modification of a previously approved

27:51subdivision. Um what the proposal

27:54includes um

27:56five um

27:59two-family structures, single-family

28:00semi-detached under the ordinance, which

28:03allows for a party wall with separate

28:06lot ownership. So, it's a total of

28:0810 units. Um it's a filing under the

28:11local ordinance only.

28:14Uh and we are providing for infiltration

28:17um

28:18separate infiltration chambers

28:21uh for all 10 units um on the property.

28:24We had gotten comments from staff

28:27um

28:29that, I believe, were addressed by Mr.

28:30Graham. Um

28:32and he did submit

28:34um

28:35updated or revised plans and also a

28:37stormwater management report. So, I can

28:42answer any questions you might have for

28:43me or believe Joe is online if you've

28:46got questions for him.

28:48>> Okay.

28:49Turn it over to staff for questions or

28:51comments.

28:52>> Yeah, so this was um a project that the

28:54commission has seen before. There was a

28:56a notice of intent filed back in 2018, I

29:00believe, for the full subdivision.

29:02Um

29:03that since expired before um

29:06the completion of these lots that are

29:08that are shown here. So, a new notice of

29:10intent was required. This is also a

29:11slightly different layout um than what

29:13was originally approved.

29:15Um

29:16so, we reviewed the stormwater report

29:18and site plans um once we received the

29:21filing. Most of our comments related to

29:23the stormwater report. Um

29:26and then just a couple minor uh plan

29:28changes related to perimeter controls

29:30and also uh landscaping to include

29:33uh more native plantings. And so, at

29:36this point, um as Don just mentioned, we

29:38received

29:40a response to those comments. We

29:41received a revised plan and revised

29:42stormwater report addressing them. So,

29:44we don't have any further concerns at

29:45this point.

29:46>> Okay.

29:48Any questions or comments from

29:50commissioners?

29:56Uh can you talk a little bit about the

29:58uh phasing of this if whether uh all of

30:01these lots will be cleared at the same

30:03time or we just installing

30:06>> Yeah. Um

30:07the well, the road it's a

30:10the road itself is installed and was

30:12accepted as public um

30:15the year

30:16approximately a year ago.

30:18Um and uh I think the the lots are

30:21pretty much already cleared.

30:24Um it was originally some of these lots

30:27were proposed as single-family house

30:28lots. So, most of that I believe all of

30:31that

30:33heavy

30:34work basically has already been

30:35completed and that the lots are

30:38um I don't believe there's there

30:40um significant

30:42further clearing that would need to be

30:44done other than what's already been

30:45completed?

30:47>> Based on the most recent aerials, it

30:48does look like the entire section here

30:50has already been cleared. And there it

30:52looks like the

30:53excavation for foundations probably has

30:55started there as well.

30:58>> Say that again. The excavation for

30:59foundations have been done all

31:01>> Has begun at least is what it looks like

31:03on the most recent aerial that we see,

31:04yeah. Yeah.

31:05>> Okay.

31:07Sounds good.

31:10>> Uh if there are no questions or comments

31:11from commissioners, are there questions

31:13or comments from members of the public?

31:17If you're online, star nine to unmute.

31:27Hearing none, is there a motion?

31:30>> Motion to close.

31:32>> Second.

31:33>> All in favor?

31:34>> Aye.

31:34>> Aye.

31:36>> Okay. We'll pause the public portion of

31:38the hearing again to go through

31:40orders of conditions.

31:44>> All right. So, in addition to the

31:45standard conditions, we have 31 for

31:47SWIP, 37 for stormwater management

31:50system maintenance, 38 for infiltration

31:52unit inspection, 39 for certification of

31:55stormwater infrastructure, 48 for dust

31:57control, 49 for dewatering, 50 for

32:00cement truck washing, 55 for

32:02construction monitoring reports,

32:05uh 66 for sand and salt with ongoing

32:07conditions 37 and 66.

32:14>> Questions, comments, additions to the

32:15orders of conditions?

32:22>> Are you ready to do it?

32:24>> [laughter]

32:25>> Motion to approve conditions.

32:28>> Second.

32:29>> All in favor?

32:30>> Aye.

32:30>> Aye.

32:30>> Aye.

32:31>> Aye.

32:32>> Okay. Thank you very much.

32:34>> Yep. Thanks.

32:36>> You caught me mid-mid thought.

32:40>> All right. So, like I said to you, item

32:42number 11, 20 22 Goldthwaite Road.

32:58>> Good evening. My name is Nikita [snorts]

33:00Shagru and this is Alex Wood and we are

33:03EIT civil engineers with Thompson Liston

33:06Associates.

33:07I'm representing tonight the applicant

33:10Pappas Prime Properties LLC.

33:13The site is consisting of two parcels,

33:1620 and 22 Goldthwaite Road

33:19just off Lincoln Street in the RG5

33:22zoning district.

33:24And the site does not have any

33:28buffers or resource areas. It is only a

33:30local notice of intent filing due to the

33:33proximity to Catch Basins.

33:38The applicant proposes to demolish the

33:41existing single family on 22,

33:45keep the three family on 20 and

33:48reconstruct a 28 unit multi-family

33:51apartment building with improved

33:54parking,

33:55storm water infrastructure, utilities,

33:58amenity spaces,

34:01and standard demolition and construction

34:04erosion controls.

34:12During IRT, there was an area in the

34:14north

34:16east corner of the site that was flagged

34:18as a potential ILSF.

34:21We did conduct a study and determined

34:24with Eric's agreement that there is no

34:26resource present there.

34:30So, we are looking at again, just the

34:32local notice.

34:39And there was one staff comment on the

34:42project regarding

34:44native tree species. They'd like to see

34:46more on landscaping plan. So, we have

34:49forwarded those along to our landscape

34:51architect and we'd like to ask that

34:53those be made a condition of approval.

34:58Any questions?

35:02>> Turn it over to staff for questions or

35:04comments.

35:05>> Yep. So,

35:06last year we did receive calculations

35:09confirming that isolated land subject to

35:11flooding was not

35:13applicable to this site.

35:15So, no concerns with that. And as I

35:17said, staff had relatively one single

35:20relatively minor comment just regarding

35:22the landscape plan that can easily be

35:24conditioned within the order conditions.

35:26>> Okay.

35:28Any questions or comments from

35:30commissioners?

35:36So, just looking at the plan briefly,

35:38just looks like the snow storage might

35:41be a little light. It's just on the

35:45right from what I see. Let me know if

35:47I'm missing anything.

35:49On the north of the right lot there.

35:52Uh

35:55So,

35:57just wondering if that's enough snow

35:58storage for the amount of parking area.

36:02>> In general, it's a fairly small area,

36:04but we can we can certainly when we

36:06reissue that revised landscape sheet, we

36:09can issue another sheet to show a couple

36:11more areas. And those areas themselves

36:14are larger than what that

36:16icon there indicates. If you would flip

36:18to the grading plan, please.

36:23Um you can see there that the down slope

36:25doesn't start until behind the dumpster

36:27enclosure, so those are uh pretty large

36:29flat areas. Um

36:31so we could you know, it's really just

36:33an issue of the symbol we use and not

36:35really a a storage space issue, so.

36:38>> Yeah. Yeah. Okay.

36:40That's good.

36:42Um

36:44are there any questions or comments from

36:46members of the public? If you're online,

36:48star nine to unmute.

36:59Any questions or comments from

37:01commissioners? Lindsay, I see you.

37:04>> I was just looking at it. Looks like

37:06there's 16 parking spaces for 31 units.

37:11Just

37:13It's just not for much parking, that's

37:15all.

37:15>> Yes, so we actually are going through

37:17the uh special permit for inclusionary

37:20zoning through the planning board for uh

37:22I believe we're allowed up to a 50%

37:25parking reduction, but um

37:28we're not asking for the full allowable

37:30reduction. Um but yes, that would be um

37:33satisfied by that special permit through

37:35planning.

37:38>> Oh, is there more parking underneath the

37:40building?

37:40>> Uh yes, there's also interior uh first

37:43floor parking.

37:44>> Okay.

37:46Thank you.

37:51>> Motion to close.

37:53>> Second.

37:54>> All in favor?

37:55>> I.

37:57>> Thank you.

37:58>> And we'll pause the public hearing to go

38:00through the uh orders of conditions.

38:04>> So, in addition to the standard

38:05conditions, staff recommends uh

38:07condition 25 for recent revised uh

38:10plans. So, revised landscaping plan to

38:12include at least 50% native species for

38:15both tree and shrubs.

38:16Um 37 for 30 Wow. Storm water management

38:20system maintenance, 38 for infiltration

38:22unit inspection, 39 for certification of

38:24stormwater infrastructure, 48 for dust

38:27control, 49 for dewatering, 50 for

38:29cement truck washing.

38:31Uh

38:3266 for sand and salt and ongoing

38:34conditions for 37 and 66.

38:37>> Okay.

38:39There are no additional comments or

38:42questions. Is there a motion?

38:44>> Motion to issue the order of conditions.

38:46>> Second.

38:47>> All in favor?

38:48>> I.

38:49>> I.

38:49>> I.

38:50>> Thank you.

38:51>> Thank you.

38:52>> Thank you.

38:59>> That gets us to item 13, request for a

39:02certificate of compliance.

39:08>> All right. So, first up we have uh 22

39:10Brick Street. So, in 2019, a local only

39:14filing was uh presented to to the

39:16commission for construction of a

39:17residential development. Um

39:20as part of this request an as-built plan

39:22and a letter from a professional

39:24engineer have been provided confirming

39:25that uh it was constructed according to

39:28the approved plans. Uh staff inspected

39:30the site on August 18th, they confirmed

39:33that the site is fully stabilized at

39:34this point. Um there was a pretty

39:36significant steep hill in the back of

39:38this property and that is all stabilized

39:39at this point. Um all the plantings are

39:41doing well and yeah, the site looks

39:44good. So, no concerns from staff.

39:46>> All right.

39:47Is there a motion?

39:49>> Motion to approve approve the

39:52certificate of

39:53compliance. Um my mouth doesn't work.

39:57>> [laughter]

39:58>> Second.

39:59>> All in favor?

40:00>> I.

40:00>> I.

40:01>> I.

40:04>> All right. And then next up uh we have

40:08So, this is a partial certificate of

40:10compliance request for a duplex at uh 74

40:12and 76 Valmore streets. Um this was a

40:15part of a larger construction uh

40:19with multiple duplexes. Um

40:21last year we did issue a certificate of

40:23compliance for duplex next to it. I

40:25believe that was uh 72 and 70. Um the

40:29site is fully stabilized. Staff did

40:31inspect the site. Um

40:33we did flag that a couple of the

40:35planting the tree plantings had um

40:37not survived. So we requested that they

40:39replace them and they have been replaced

40:41at this time. Um so no concerns.

40:43>> Okay.

40:46There are no comments or questions. Is

40:47there a motion?

40:49>> Motion to approve approve certificate of

40:52compliance.

40:53>> Second.

40:54>> All in favor.

40:55>> I.

40:55>> I.

40:56>> I.

40:58>> Okay.

41:03>> All right. And our last certificate of

41:05compliance request is for

41:07uh

41:091195 Grafton Street. So this is the Twin

41:12Oaks complex. Uh this application was

41:14reviewed by the commission last year.

41:16This is with a directional drilling to

41:18replace the uh utility lines within the

41:20Twin Oak uh

41:22condo complex. Uh the site is fully

41:25stabilized at this point. Uh staff did

41:27inspect it um

41:29on the 18th and no concerns with the

41:31issuance of a certificate of compliance.

41:37>> There are no comments or questions. Is

41:38there a motion?

41:39>> Motion to approve certificate of

41:40compliance.

41:41>> Second.

41:43>> All in favor.

41:44>> I.

41:44>> I.

41:44>> I.

41:48>> Okay. Next up is uh project change

41:50request.

41:51Item 14A.

41:54>> Yep. So this is a uh project change

41:56request that was submitted by the Parks

41:58Department for Elm Park. Uh the

42:00commission might recall a negative

42:01determination was issued for the

42:04resurfacing of the existing playground

42:06in this area.

42:07Um Parks is now looking to also uh kind

42:11of

42:12replace the the pads associated with 21

42:16picnic tables in this area which are

42:17kind of depicted on the plans.

42:19You can see the the numbering. Those

42:21depict the different picnic tables.

42:23They range from anywhere as close as

42:25around 30 ft from the resource area to

42:29being outside of the buffer zone.

42:31It felt like a pretty minor

42:34change. They proposed to have straw

42:37wattle down gradient of any disturbed

42:39areas.

42:40So I had suggested that the

42:42Parks Department could

42:44file a a project change request for this

42:46under the active DOA.

42:49Alternatively, they could file a new

42:50RDA, but it seemed relatively minor.

42:55>> Seems straightforward.

42:57Are there any comments or questions?

43:01If not, is there any motion?

43:04>> I'm not sure what the motion is.

43:05>> Motion to approve the change request.

43:09>> Second.

43:10>> All in favor?

43:11>> Aye.

43:11>> Aye.

43:16>> Enforcement

43:17orders, item 15.

43:22>> So the first item we have an update on

43:25Okay, first item we have an update on is

43:2715

43:29I which is 262 Mill Street. So in 2024

43:33the commission issued an enforcement

43:34order for

43:36the Westside Animal Clinic. They were

43:38required to create a wetland restoration

43:42area or replication area back in I think

43:452001,

43:47but that was never completed and when

43:48staff inspected the site they noted this

43:50problem. So we issued an enforcement

43:52order requiring that they

43:55do the required replication area. It has

43:58been two

43:59two growing seasons since that

44:01replication area was completed.

44:03So we received the final required report

44:06confirming that

44:08it is acting as a wetland

44:11and the

44:13vegetation is native in there and

44:15over 75% of it is

44:18wetland

44:20plantings.

44:22So, it is functioning as a wetland. So,

44:24I think at this point it is

44:28good to lift the enforcement order.

44:31>> Okay.

44:35Motion to lift the enforcement order.

44:37>> Second.

44:38>> All in favor?

44:38>> Aye.

44:39>> Aye.

44:46>> All right. So, another one. So, this is

44:48145 New England Ave North. The

44:50commission issued an enforcement order

44:52last year under the local ordinance for

44:5510,000 square feet of ground disturbance

44:57within 100 feet of a catch basin. So, it

44:59wasn't near a wetland, but it was

45:02a project that would have required a

45:03permit. So,

45:04the decision was to reinspect the site

45:08uh

45:09in 2026 have staff go out there and make

45:12sure it was stabilized.

45:14Um so, it was inspected on Friday and

45:16confirming that the site is fully

45:18stabilized at this point.

45:19Since that was the only remaining

45:21condition, we recommend lifting the

45:23enforcement order.

45:25>> Motion to lift the enforcement order.

45:27>> Second.

45:28>> All in favor?

45:29>> Aye.

45:29>> Aye.

45:42>> Any more?

45:45Just do the slides. There we go.

45:50>> [snorts]

45:50>> All right. There we go.

45:51So, moving on to item 15

45:55B.

45:5688 Webster Street.

45:58The commission reviewed this either at

46:01the the last meeting or the meeting

46:02before, but essentially uh staff had

46:04observed a section of bank at the

46:08backside of this property that had been

46:09armored with riprap. Um we did receive a

46:12proposed uh restoration plan from the

46:16applicant's wetland scientist and

46:17engineer.

46:19Um this plan includes removing the

46:21riprap, uh lightly regrading the banks

46:23to have a natural

46:25um pitch back into the shoreline, um

46:28loosening soil, loosening the compacted

46:30soil, and adding a little bit of

46:32topsoil, and then revegetating the bank

46:35with native plants.

46:37Um it also proposed a uh

46:40two monitoring visits the year after uh

46:43the restoration is complete to make sure

46:45that all the plantings

46:47are um

46:48in good order. Um at this point, so we

46:50actually haven't issued a formal

46:52enforcement order for this yet. Um it

46:54was just on the agenda as a as a

46:56violation.

46:57Um so at this point, staff's

46:59recommendation would be to uh formally

47:02issue the enforcement order just

47:03requiring the implementation of the plan

47:05that their wetland scientist provided.

47:07Um but we have no concerns uh about the

47:10the restoration plan itself.

47:13>> Okay.

47:15I'll infuse that emotion on this one.

47:18>> So this would just be a a motion to

47:20issue the enforcement order.

47:22>> Motion to issue enforcement order.

47:24>> Second.

47:27>> All in favor?

47:28>> Aye.

47:29>> Aye.

47:33>> [snorts]

47:39>> All right. And then up next, we have a

47:41new enforcement order that was issued by

47:44staff um since the last meeting. This is

47:4711 Holden Street. Uh so we received a

47:50complaint about construction of a

47:53um

47:54covered porch uh within the buffer zone

47:56to to Lenny Brook.

47:58Um, so staff did go out to the site and

48:00measure and the carport is appears to be

48:04within the 30-ft buffer.

48:06Um, we are requiring that they provide

48:08an as-built plan, you know, showing the

48:09exact buffer zones,

48:11um, and the structures uh,

48:14location relative to those buffer zones.

48:16Um, so at this point we are just looking

48:18for a motion to ratify this enforcement

48:20order.

48:24>> Motion to ratify.

48:26>> Second.

48:26>> All in favor?

48:27>> Aye.

48:28>> Aye.

48:34>> All right. And then lastly, we have

48:35another enforcement order that was

48:37issued by staff at 142 Orleans Street.

48:40Um, we had received a complaint

48:42regarding removal of vegetation along

48:44the shoreline and the installation of a

48:46pool.

48:47Um, it's kind of hard to see, but in the

48:49top right picture, you can see, um,

48:52oh, that's a better one.

48:55Yeah. So, the pool is very close to the

48:57edge of the bank. Um,

48:59it's an above-ground pool, but it looks

49:01like there was a

49:02uh, a little bit of regrading and almost

49:04like a wooden small wooden retaining

49:07wall put in to kind of create a little,

49:09um,

49:10bay for it to sit in.

49:13Um, so we issued an enforcement order.

49:15We met with the homeowner who was very

49:17cooperative and understanding. Um, I

49:19think they they just were not aware of

49:22wetlands protection regulations and

49:24just started doing things in a house

49:26that they just bought. Um,

49:28but obviously there needs to be some,

49:30uh, planting along that buffer to

49:32replace the shrubs that, um, were taken

49:34out. And I would add also that, um, what

49:37started this is that one of the I think

49:39believe that tree right there, uh, that

49:41you can see in the left picture in the

49:43pre

49:44photos had fallen, um, and I think

49:46crushed some of those bushes.

49:48Um, so it wasn't just out of nowhere

49:50that they started doing the vegetation

49:52removal. It was a result of cleaning up

49:54the tree and then um

49:56just removing what was left under it and

49:59you know, whatever else had survived.

50:01But um you know, what what I tried to

50:03explain out there is that you know, just

50:05because some of the bushes got taken

50:06down doesn't mean you can kind of go and

50:08sod the lawn all the way to the edge of

50:10the uh

50:12bank without without some sort of

50:14approval or review.

50:15>> Yeah.

50:15>> Um so at this point the enforcement

50:17order just required them to uh retain a

50:20wetland scientist to come up with a plan

50:22to remediate the issues on site.

50:24Um and we would again expect that to

50:26include some sort of planting along the

50:27shoreline and have some sort of plan for

50:29relocation of the that pool. Um I'm not

50:32sure if they have

50:34space to have it um outside of the 30-ft

50:37buffer. We'll have to see what they come

50:38back um with, but

50:40uh it doesn't seem like something that

50:42the commission would generally approve

50:43if it was presented uh up front, so

50:46um

50:47>> Yeah, that was that was going to be my

50:48question as well. Will they be required

50:50to just move that somewhere else cuz it

50:52is

50:54you know, it's right up against the

50:55bank.

50:56>> Right. And ultimately we can

50:58the commission can decide that, but um

51:00the way we kind of worded it was to

51:02for them to present a plan to bring

51:04things back into compliance with our

51:05regulations. So they if they come back

51:08asking for that to stay, we can cross

51:10that bridge when we get there, but um

51:12yeah, so we we we set that um deadline

51:14for September 30th, so I'd expect

51:17hopefully to have something to discuss

51:18at the October 6th and figure out a way

51:21forward from there.

51:22>> Yeah.

51:22>> Um but similar to the last one, uh this

51:24was you know, an enforcement order

51:25issued by staff. So at this point we're

51:27just looking for a a ratification vote.

51:29>> Yep.

51:30>> So this is a motion to approve

51:32the enforcement order.

51:34>> To ratify it, yep.

51:35>> So moved.

51:36>> Second.

51:37>> All in favor?

51:38>> Aye.

51:38>> Aye.

51:40>> And just for um

51:42just

51:43the a procedural point since we kind of

51:44had several different enforcement order

51:47votes for this. If the commission is

51:50um so either the commission can issue an

51:52enforcement order or a mandate order at

51:54a at a meeting, which is kind of the

51:56preferred way to go. Um if there's, you

51:58know, time to discuss uh the other

52:00option is that, you know, staff issues

52:02the enforcement order for something that

52:03needs to be addressed quickly and then

52:05the commission then ratifies it at their

52:07at their next meeting. So, that's the

52:08reason for the different types of

52:09motions that are needed here.

52:11>> Thank you.

52:14>> All right. Uh next up is item 16, open

52:17space discussion.

52:19>> Nothing from staff.

52:21>> Uh item 17, discussion of active

52:22projects.

52:27Item 18, communications.

52:30>> We did not receive any communications

52:31over the past 3 weeks.

52:33>> Okay.

52:34Item 19, approval of minutes.

52:36>> Motion to approve the minutes from

52:38August 3rd.

52:39>> Second.

52:40>> All in favor?

52:41>> Aye.

52:41>> Aye.

52:44>> Item 20, update to wetlands protections

52:46ordinance and regulations.

52:48>> Yep, so we're continuing on

52:50um with drafting the proposed revisions.

52:52Uh we we decided to tweak uh the section

52:55on administrative approvals we had

52:57talked about previously.

52:59Um

53:01for the minor buffer zone activities

53:03that are covered under the act. Um

53:06there's a lot of pending regulations at

53:09the state level right now that would

53:11kind of change some of what we had

53:12drafted. Um so, I think we're toying

53:14with the idea of just

53:16um simply creating a process for

53:18administrative approval for the

53:21activities that are defined in the act

53:22rather than individually list them all

53:25out and um

53:26so, we should have that updated

53:29redline version at the next meeting.

53:36>> All right. Item 21, approval of uh

53:39fiscal year 26 annual report.

53:42>> Yep, so staff prepared a um um draft

53:45fiscal year 2026 annual report. Um it's

53:47up in the Google Drive folder. It's

53:49basically just an overview of

53:51permitting, open space, grants,

53:54land management, everything over the

53:55past year. This is something that we

53:58haven't done in a while. The last one

53:59we're seeing in our files is from the

54:01'90s. Um but I think it is something

54:03that um the commission should

54:05technically be doing every year.

54:08Um and I think if nothing else, it's a

54:09good um just way to kind of track and

54:12monitor the kind of annual volume and

54:14achievements in open space. So, um just

54:17looking for a vote for approval of that

54:19draft report.

54:20>> Motion to approve

54:23fiscal year 2026 annual report.

54:26>> Second.

54:27>> All in favor?

54:28>> I.

54:28>> I.

54:32>> Okay, item 22, commission liaison

54:34updates.

54:38>> Uh I have no updates for Lake Wind

54:40Advisory Commission. We just have our

54:41meeting this coming Wednesday.

54:43>> Okay.

54:45>> No updates from Community Preservation,

54:47either.

54:50>> Item 23, policies and procedures.

54:56And lastly, adjournment.

54:59>> I.

55:00>> [laughter]

55:02>> Motion to adjourn.

55:02>> Motion to adjourn.

55:04All in favor?

55:05>> I.

55:06>> I.

55:07>> Thank you.

55:11That was fun.