2026-08-24 - Conservation Commission
Summary
Based on auto-generated captions plus the posted agenda and official minutes; names and details may be misheard.
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| Orders of conditions | 35 | 63% |
| Conservation Commission Enforcement Orders | 9 | 17% |
| Other business | 8 | 15% |
| Wetlands Protection Ordinance Revisions | 2 | 3% |
| Postponed hearings | 1 | 2% |
- Monday, August 24, 2026, City Hall with Zoom.
- Vice Chair Devin Canton chaired in the absence of Chair Diane Fratoni; with Lindsay Nystrom and Stuart Kirshner every vote was 3-0.
- Staff: Eric Flint and Mattie VandenBoom.
- Adjourned about 6:25 p.m. (the video runs about 55 minutes).
Postponed hearings
3:04-4:21
- Six hearings were postponed to September 14 with constructive grant deadlines extended to October 6: Providence and Worcester Railroad Right-of-Way Vegetation Management (request received at the last minute), 35 State Road (SAL LLC), 99 Sears Island Drive, 3 Mann Street (ZB-2026-061), 300 and 301 Barber Avenue and 278 Grove Street.
Orders of conditions
4:21-38:59
- 4 Spring Valley Road (request for determination): builder Neil Hassett rebuilding a deck that collapsed over the winter on the same footprint with new code footings; flagged by staff because it sits just over 30 ft from a wetland. Negative determination, 3-0.
- Indian Lake Dam Vegetation Management (149 West Boylston Drive): Pare Corporation (captioned "Gray LaCroix" and "Dave Fresh") reported the flood-zone elevation change from 542 to 542.4 ft, handheld tools behind the chain-link fence and a stockpile area far from the resource area. Hearing closed; order issued as a limited project.
- Malden Woods Subdivision (Whippoor LLC): patios (now impermeable) and the Lot 10A driveway moved outside the 30-ft buffer; amendment lets the developer build wooden decks instead of patios on lots 8 to 10 if impervious area stays equal or smaller and zoning side-yard limits are respected. Condition 34 sequencing language dropped. Amended order issued.
- 9 Dalton Street: five-unit building with an underground infiltration chamber. Staff worried about groundwater reaching the chambers; the engineer offered a 40-mil liner but argued it would cut recharge. Commissioners were "50/50" and no liner was required. Order issued.
- 46, 51 and 52 Modoc Street: Attorney Donald O'Neil for St. Anthony Realty LLC; ten units in five semi-detached buildings, new filing because the 2018 approval expired. Aerials show the lots cleared and foundation excavation begun. Order issued.
- 20 and 22 Goldthwaite Road: 28-unit apartment building replacing a single-family house, keeping the three-family at No. 20. Local filing only (catch basin proximity); a possible isolated flooding area was ruled out. Landscape plan must be at least 50 percent native species. Commissioners asked about snow storage and 16 surface spaces for 31 units; the applicant said a Planning Board inclusionary special permit covers a parking reduction and there is garage parking. Order issued.
Conservation Commission Enforcement Orders
43:16-52:36
- 262 Mill Street (Westside Animal Clinic): replication area owed since about 2001 is now functioning wetland after two growing seasons (over 75 percent wetland plantings); order lifted.
- 145 Newton Avenue North: 10,000 sq ft of disturbance near a catch basin; site confirmed stabilized; order lifted.
- 88 Webster Street Riprap Restoration: new enforcement order issued to implement a restoration plan for a riprapped bank.
- 11 Holden Street Porch Enforcement: staff-issued order ratified.
- 142 Olean Street Shoreline Enforcement: staff-issued order ratified; plan due September 30.
- Staff explained that the Commission can issue an order at a meeting or staff can issue one for urgent matters and have it ratified next meeting.
Wetlands Protection Ordinance Revisions
52:44-54:20
- Flint said the administrative-approval section is being simplified because of pending state regulations: one process for activities defined in the Act rather than a long list. A redline is due at the next meeting.
Other business
0:04-3:04, 38:59-43:16, 52:36-52:44, 54:20-55:11
- Certificates of Compliance granted: 222 Brook Street (low-rise apartments, steep hillside stabilized), a partial for 74 and 76 Valmor Street (dead plantings replaced) and 1195 Grafton Street (Twin Oaks utility drilling).
- Elm Park Playground: Parks Department's request to replace pads under 21 picnic tables approved as a project change under the existing determination.
- Minutes approved; FY26 Annual Report approved (staff said the last one on file is from the 1990s).
- No open-space, communications or liaison news.
Official Minutes
Posted on PrimeGov (summary of actions, not verbatim). Layout follows the posted document; in the enforcement section the minutes' item lettering is partly collapsed, so findings may sit under a neighboring address.
Conservation Commission
Meeting Minutes
August 24th, 2026
City Hall – Levi Lincoln Chamber,
with remote participation options available via Zoom online at
https://worcesterma.zoomgov.com/j/1604682366 and
call-in number 1-669-254-5252 (Meeting ID: 160 468 2366).
Attendance:
Commissioners Devin Canton, Vice Chair
Present: Lindsay Nystrom, Commissioner
Stuart Kirshner, Commissioner
Commissioners Diane Fratoni, Chair
Absent:
Eric Flint, Division of Planning & Regulatory Services (DPRS)
Staff Present: Mattie VandenBoom, Division of Planning & Regulatory Services
(DPRS)
Call to Order
Commissioner Canton, acting as Chair in the absence of Commissioner Fratoni, called the
meeting to order at approximately 5:30 PM.
Requests for Continuances, Postponements and Withdrawals
Item 1 – Providence and Worcester Railroad ROW – Request for
Determination of Applicability (CC-2026-033)
Request to postpone the public hearing to 09/14/2026 & extend the constructive grant
deadline to 10/06/2026
Item 3 – 35 State Road (MBL 32-019-00316) – Notice of Intent (CC-2026-045
& DEP#349- 14xx)
Request to postpone the public hearing to 09/14/2026 & extend the constructive grant
deadline to 10/06/2026
Item 7 – 99 Sears Island Drive – Notice of Intent (CC-2026-052 & DEP#349-
14xx)
Request to postpone the public hearing to 09/14/2026 & extend the constructive grant
deadline to 10/06/2026
Item 9 – 3 Mann Street (MBL 14-033-00002) – Notice of Intent (CC-2026-058
& DEP#349-14xx)
Request to postpone the public hearing to 09/14/2026 & extend the constructive grant
deadline to 10/06/2026
Item 10 – 300 & 301 Barber Avenue (MBL 22-015-00001 & 22-015-00002) –
Notice of Intent (CC-2026-059 & DEP#349-14xx)
Request to postpone the public hearing to 09/14/2026 & extend the constructive grant
deadline to 10/06/2026
Item 12 – 278 Grove Street, 4 Brookfield Street, 4 & 4A Powers Court – Notice
of Intent (CC-2026-061 & DEP#349-14xx)
Request to postpone the public hearing to 09/14/2026 & extend the constructive grant
deadline to 10/06/2026
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to postpone the public hearings as discussed.
New Business – Request for Determination of Applicability
2) 4 Spring Valley Road (MBL 55-017-00201) – CC-2026-057
Neil Hassett, the applicant, explained that the project involved reconstructing an existing
deck that had collapsed over the winter. The new deck would retain the exact footprint of
the previous structure, with upgrades including pressure-treated framing and deck boards,
updated railings, and newly dug code-compliant footings.
Ms. VandenBoom reported that the project initially appeared in the building permit
system, where staff flagged it because of the wetland buffer. She reported no concerns with
the project.
Commissioner Canton asked about the old footings. Mr. Hassett explained the old,
outdated supports will be removed.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to issue a negative determination of applicability as discussed.
List of Exhibits:
Exhibit A: Request for Determination of Applicability; dated 07/22/2026; prepared
by Neil Hassett
Old Business – Notice of Intent
4) 149 West Boylston Drive (MBL 13-035-0001A) - CC-2026-056 & DEP# 349-
1457
Gregory LaCroix and Dave Presch, Pare Corporation, on behalf of the applicant, City of
Worcester Department of Sustainability and Resilience, presented updates on the City’s
vegetation management project along the crest of Indian Lake Dam. They explained that
since the previous hearing, they had received and responded to comments from both staff
and MassDEP. The most significant change involved adjusting the Bordering Land Subject
to Flooding (BLSF) elevation from 542 to 542.4 feet, increasing the mapped flood coverage
area. The team also addressed Commission concerns about how vegetation behind a chain-
link fence would be maintained, explaining that handheld tools such as weed whackers
would be used due to limited equipment access. Questions about material stockpiling
triggered the addition of a designated stockpile area located as far from resource areas as
possible.
Mr. Flint reported only minor comments after completing a full review and expressed no
concern about the updated plans.
No comments from the public or staff.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to close the public hearing.
Mr. Flint noted the work is approved as a limited project pursuant to 310 CMR 10.53(3)(i).
In addition to the standard conditions, Mr. Flint recommended special conditions for
wetland flagging, maintenance of flood storage capacity, native seed mix application to
disturbed areas, wood removal, dust controls, dewatering, equipment placement, and spill
prevention.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to issue the order conditions as discussed.
List of Exhibits:
Exhibit A: Notice of Intent; dated 07/20/2026; prepared by George LaCroix, Pare
Corporation
Exhibit B: Site Plan; dated 07/17/2026; prepared by Allen R. Orsi, Pare Corporation
Exhibit C: Department of Environmental Protection Comments; dated 08/10/2026;
prepared by Rebecca Gendreau
Exhibit D: Division of Planning & Regulatory Comments; dated 08/17/2026;
prepared by Eric Flint & Mattie VandenBoom
Exhibit E: Response to Comments; dated 08/24/2026; prepared by George LaCroix
& David Pretsch, Pare Corporation
Old Business – Request Amended Order of Conditions
5) 0 Whippoorwill Drive & 0 Danielle’s Way (aka Malden Woods Subdivision)
(MBL 32-011-0001A & B through -0007A & B; -00008 through -00013; -
0014A & B; & -0015A & B); the Whippoorwill Drive Right-of-Way; and the
westerly portion of the Castine Street Right-of-Way
Nikita Shugrue and Alex Wood, Thompson Liston Associates representing Whippoor LLC,
the applicant, presented revised plans. They explained that the Commission had
previously objected to patios and a driveway encroaching into the 30‑foot buffer. In
response, the applicant reconfigured plans so all patios, now impermeable, and the
driveway for Lot 10A are fully outside the buffer. They also introduced the possibility that
the developer might install decks instead of patios for certain lots during construction. To
streamline future approvals, they requested an amendment allowing decks if they also
remained outside the 30‑foot buffer and maintained equal or lesser impervious area.
Mr. Flint supported incorporating this flexibility directly into the Order of Conditions and
advised including limitations based on zoning setbacks, which prohibit decks in some side-
yard areas.
Commissioner Kirshner asked what materials would be used for the deck. Mr. Wood
confirmed the decks would be made from wood.
No comments from the public.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to close the public hearing.
Mr. Flint noted the work is approved as a limited project pursuant to 310 CMR 10.53(3)(i).
Mr. Flint recommended modifications to the existing Order of Conditions including
allowing the applicant to construct decks or patios and adjusting condition 34 related to
sequencing.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to issue the amended order conditions as discussed.
List of Exhibits:
Exhibit A: Request for Amended Order of Conditions; dated 07/14/2026; prepared
by Patrick Healey, Thompson Liston Associates
Exhibit B: Site Plan; dated 07/10/2026; revised 08/07/2026; prepared by Patrick
Healey, Thompson Liston Associates
New Business – Notice of Intent
6) 9 Dalton Street (MBL 34-019-00002) – CC-2026-048
Kevin Quinn, Quinn Engineering on behalf of the applicant, Amanda Russo-Folco, described
the construction of a five‑unit multifamily building. He explained how stormwater would be
collected in catch basins, treated in a stormwater treatment unit, and discharged to a
chamber gallery designed to retain runoff until the system reaches a specified capacity.
Mr. Flint explained staff’s biggest concern relates to groundwater proximity to the
underground chambers of the infiltration unit. He asked if there is a risk for groundwater to
seep into the infiltration unit and enter the city’s drainage system. Mr. Quinn that the
seasonal high groundwater remained below the chamber bottom, negating risk of
groundwater infiltration.
Mr. Quinn explained that a liner could be installed in infiltration unit but was not necessary
and might reduce beneficial groundwater recharge.
After a brief discussion, the Commission chose not to require a liner for the infiltration unit.
No comments from the public.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to close the public hearing.
Mr. Flint noted the work is approved as a limited project pursuant to 310 CMR 10.53(3)(i).
In addition to the standard conditions, Mr. Flint recommended special conditions
stormwater management system maintenance, infiltration unit inspection, certification of
stormwater infrastructure, wood removal, dust controls, dewatering, cement truck
washing, and sand and salt. He recommended ongoing conditions for stormwater
management system maintenance, and sand and salt.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to issue the order conditions as discussed.
List of Exhibits:
Exhibit A: Notice of Intent; dated 07/07/2026; prepared by Chris Keenan, Quinn
Engineering
Exhibit B: Site Plan; dated 06/22/2026; revised 08/07/2026; prepared by Kevin J.
Quinn, Quinn Engineering
Exhibit C: Stormwater Report; dated 06/18/2026; prepared by Kevin J. Quinn,
Quinn Engineering
Exhibit D: Division of Planning & Regulatory Comments; dated 07/29/2026;
prepared by Eric Flint & Mattie VandenBoom
Exhibit E: Response to Comments; dated 08/07/2026; prepared by Chris Keenan,
Quinn Engineering
6) 46, 51, & 52 Modoc Street (MBL 38-017-1A-11, 38-017-1A-10, & 38-017-1A-09)
- CC-2026-054
Attorney Donald O’Neil, joined by engineer Joseph Graham, presented a revised
subdivision layout involving ten total dwelling units formed by five semi-detached
structures. The project required a new Notice of Intent because the original 2018 approval
expired before construction of these remaining lots. Mr. O’Neil explained that each unit
would include an individual infiltration chamber to manage stormwater.
Mr. Flint explained that staff reviewed updated plans and a revised stormwater report,
noting that their previous concerns related to perimeter controls, planting plans, and
stormwater calculations had been resolved.
Commissioner Canton asked about the project phasing. Mr. O’Neil explained the road has
already been constructed. Mr. Flint noted through aerial imagery that the lots already
appeared to be cleared and some foundation excavation had begun.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to close the public hearing.
In addition to the standard conditions, Mr. Flint recommended special conditions
Stormwater Pollution Prevention Plan, stormwater management system maintenance,
infiltration unit inspection, certification of stormwater infrastructure, dust controls,
dewatering, cement truck washing, construction monitoring reports, sand and salt,
wetland permitting. He recommended ongoing conditions for stormwater management
system maintenance, and sand and salt.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to issue the order conditions as discussed.
List of Exhibits:
Exhibit A: Notice of Intent; dated 07/15/2026; prepared by Donald J. O’Neil, Esq.
Exhibit B: Site Plan; dated 07/02/2026; revised 08/20/2026; prepared by Joseph
Graham
Exhibit C: Stormwater Report; dated 04/26/2026; revised 08/20/2026; prepared
by Joseph Graham
Exhibit D: Division of Planning & Regulatory Comments; dated 07/22/2026;
prepared by Eric Flint & Mattie VandenBoom
Exhibit E: Response to Comments; dated 08/20/2026; prepared by Joseph Graham
11) 20 & 22 Goldthwaite Road (MBL 39-021-00045 & 39-021-43+44) - CC-2026-
060
Nikita Shugrue and Alex Wood, Thompson Liston Associates on behalf of the applicant,
Pappas Prime Properties, LLC Whippoor LLC, the applicant, presented a redevelopment
project involving demolition of an existing single-family house and construction of a new
28‑unit multifamily apartment building while retaining the existing three‑family structure
at number 20 Goldthwaite Road. Although no wetland buffers exist on-site, the filing was
required due to proximity to municipal catch basins.
Ms. VandenBoom confirmed that a previously flagged area potentially subject to isolated
flooding did not qualify as a regulated resource after further study. The only staff comment
concerned the landscape plan, which needed greater inclusion of native trees and shrubs.
Commissioner Canton and Commissioner asked for clarification on the snow storage areas
and parking configuration. Mr. Shugrue clarified that interior garage parking is proposed
supplemented the external parking count and that a special permit process for reduced
parking was underway through the Planning Board.
No comments from the public.
Upon a motion by Commissioner Kirshne, seconded by Commissioner Nystrom, the
Commission voted 3-0 to close the public hearing.
In addition to the standard conditions, Ms. VandenBoom recommended revised plans
including at least 50 percent native tree and shrub species, stormwater management
system maintenance, infiltration unit inspection, certification of stormwater
infrastructure, dust controls, dewatering, cement truck washing, sand and salt. She
recommended ongoing conditions for stormwater management system maintenance and
sand and salt.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to issue the order conditions as discussed.
List of Exhibits:
Exhibit A: Notice of Intent; dated 08/05/2026; prepared by Nikita Shugrue,
Thompson Liston Associates
Exhibit B: Site Plan; dated 07/24/2026; prepared by Patrick Healey, Thompson
Liston Associates
Exhibit C: Stormwater Report; dated 06/03/2026; prepared by Patrick Healey,
Thompson Liston Associates
Exhibit D: Division of Planning & Regulatory Comments; dated 08/18/2026;
prepared by Eric Flint & Mattie VandenBoom
Other Business
13) Request for Certificate of Compliance
a. 222 Brook Street (CC-2019-009)
Ms. VandenBoom reviewed the Certificate of Compliance request for 222 Brook Street.
The project involved construction of a low-rise apartment building. She noted that an as-
built plan and engineer’s letter confirmed the project was constructed as approved. The
site was inspected on August 18 and found the entire property, including a steep hillside,
fully stabilized with healthy plantings.
Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
Commission voted 3-0 to issue the Certificate of Compliance.
List of Exhibits:
Exhibit A: Certificate of Compliance Request; dated 07/07/2026; prepared by Tom
Corbett, Zero Point Development, Inc.
b. 74 & 76 Valmor Street (CC-2023-075)
Ms. VandenBoom explained that a partial Certificate of Compliance was being requested
for a duplex. She confirmed the site was fully stabilized and noted that previously flagged
dead tree plantings had been replaced.
Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
Commission voted 3-0 to issue a partial Certificate of Compliance.
List of Exhibits:
Exhibit A: Certificate of Compliance Request; dated 07/02/2026; prepared by JAE
Wor, LLC
c. 1195 Grafton Street (CC-2025-046 & DEP#349-1421)
Ms. VandenBoom explained this project involved directional drilling to replace utility
lines. She explained that staff conducted a site visit on August 18th and confirmed the site
was fully stabilized.
Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
Commission voted 3-0 to issue a certificate of compliance.
List of Exhibits:
Exhibit A: Certificate of Compliance Request; dated 07/09/2026; prepared by Sam
Keffestan, BSC Group
14) Project Change Request
a. Elm Park Playground (CC-2025-002)
Mr. Flint reviewed a project change request from the Parks Department for Elm Park. The
Parks Department previously received a negative determination for playground
resurfacing and now sought approval to replace pads under 21 picnic tables. Given the
minor nature of the work and proposed erosion controls, staff recommended processing it
as a project change under the existing DOA.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to approve the project change request.
15) Enforcement Order and Violation Updates
a. 133 Lake Avenue North (CC-2020-007)
b. 99 Wildwood Avenue (CC-EO-2020-009)
c. 269 James Street (CC-EO-2021-007)
d. 4 Tiffany Avenue (CC-EO-2023-001)
e. 570 Lincoln Street (CC-EO-2023-010)
f. 198 Granite Street (CC-EO-2024-001)
g. 86 Webster Street (CC-EO-2024-003)
h. Salisbury Hill (CC-EO-2024-005 & DEP#349-1253)
i. 262 Mill Street (CC-EO-2024-007)
Ms. VandenBoom reviewed the history of the Enforcement Order. The enforcement order
was issued in 2024 for incomplete wetland replication required back in 2001 when the
Westside Veterinary Clinic was constructed. The replication area has since been
completed and monitored for two growing seasons. A final report confirms native
vegetation and a functional wetland (>75% wetland plantings).
Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
Commission voted 3-0 to lift the Enforcement Order.
j. 142-158 Wildwood Avenue (CC-EO-2024-010)
k. 1256 West Boylston Street (CC-EO-2025-001)
l. 13 Holden Street (CC-EO-2025-002 & DEP# 349-1409)
m. 270 Webster Street (CC-EO-2025-004)
n. 34 Eskow Road & 224 Southwest Cutoff (CC-EO-2025-006)
o. 148A Tory Fort Lane (CC-EO-2025-007, CC-2023-016, & DEP# 349-1356)
p. 1259 West Boylston Street (CC-EO-2025-008)
q. 145 Newton Ave North (CC-EO-2025-009)
Ms. VandenBoom explained that unpermitted disturbance within 100 feet of a catch basin
previously triggered an enforcement order. The homeowner was required to stabilize the
site and allow staff to inspect the site during 2026 growing season. A staff inspection
confirmed full stabilization of the site.
Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
Commission voted 3-0 to lift the Enforcement Order.
r. 757 Salisbury Street (CC-EO-2025-010 & CC-2023-005)
s. 9 & 13 Elton Street (CC-EO-2025-011, CC-2024-083, & DEP#349-1407)
t. 612 Grove Street (CC-EO-2026-001)
u. 342 (aka 344, 346, & 348) Lake Avenue (CC-EO-2026-002 & DEP#349-1435)
v. 88 Webster Street (CC-2023-025 & DEP#349-1361)
Nick Facendola, Level Design Group, LLC, reviewed the proposed restoration plan from
wetland scientist Matt Marro. The restoration plan involves the removal of riprap,
regrading, soil decompaction, topsoil addition, and native replanting.
Mr. Flint recommended the Commission issue an enforcement order to implement the
restoration plan.
Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
Commission voted 3-0 to issue the Enforcement Order as discussed.
w. 11 Holden Street (CC-EO-2026-003)
Ms. VandenBoom explained that an unpermitted covered porch was constructed within
the 30‑foot buffer to Delany Brook. Staff issued an enforcement order requiring an as-built
plan to be provided.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to ratify the Enforcement Order.
x. 142 Olean Street (CC-EO-2026-004)
Mr. Flint stated that vegetation removal and installation of an above-ground pool directly
adjacent to the shoreline prompted an enforcement order. The homeowner was
cooperative and explained that some shrubs were damaged by a fallen tree, leading to
cleanup and unintended over-removal. Staff required retention of a wetland scientist to
develop a restoration plan, likely to include native plantings and consideration of
relocating the pool outside the buffer.
Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
Commission voted 3-0 to ratify the Enforcement Order.
There was no discussion of item 15a-15h, 15j-15p & 15r-15u.
16) Open Space Discussion
There was no discussion of item 16.
17) Discussion of Active Projects
There was no discussion of item 17.
18) Communications
There was no discussion of item 18.
19) Approval of Minutes – August 13th, 2026
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to approve the minutes.
20) Update to Wetlands Protection Ordinance and Regulations
Mr. Flint provided an update on ongoing revisions to the Wetlands Protection Ordinance,
particularly on simplifying administrative approvals, which will be presented in redline
form at a future meeting.
21) Approval of FY26 Annual Report
Mr. Flint reviewed the draft Fiscal Year 26 Annual Report detailing permitting activity,
land management, and open space accomplishments by the Conservation Commission.
Upon a motion by Commissioner Nystrom, seconded by Commissioner Kirshner, the
Commission voted 3-0 to approve FY26 Annual Report.
22) Commission Liaison Update
Liaison updates for Lake Commission and Community Preservation were brief, with no
significant new information.
23) Policies and Procedures
There was no discussion of item 23.
Adjournment:
Upon a motion by Commissioner Kirshner, seconded by Commissioner Nystrom, the
Commission voted to adjourn at approximately 6:25 PM.
Sources
- Video: https://youtube.com/watch?v=QTq40KmJW2A
- Minutes: https://worcesterma.primegov.com/Public/CompiledDocument?meetingTemplateId=76044&compileOutputType=1
Video
Transcript
Auto-generated YouTube captions; names and terms are likely misheard.
Transcript
0:04This August 24th meeting of the
0:06Worcester Conservation Commission is now
0:08called to order.
0:10My name is Devin Canton and I will be
0:11chairing this meeting.
0:13As part of this meeting we'll be holding
0:14hearings under the Massachusetts
0:16Wetlands Protection Act and regulations
0:18and the City of Worcester's Wetlands
0:20Protection Ordinance and regulations.
0:23The Commissioners are volunteers that
0:25serve to enforce these laws and
0:26regulations in order to protect specific
0:28values identified as being important to
0:31the Massachusetts to Massachusetts and
0:33the City of Worcester.
0:35Commission decisions are based on these
0:37laws and regulations and are not
0:38arbitrary or based on personal likes or
0:41dislikes.
0:42It's important to the Commission that
0:43these hearings are held in a fair and
0:45equitable way for all parties involved.
0:48This requires that discussion takes
0:49place in a civil manner and that every
0:51individual in the meeting is treated
0:53respectfully.
0:55To facilitate the hearings,
0:57they take place in the order that they
0:58are listed on the agenda, which is also
1:00available by the door and online.
1:04And they'll follow a specific format.
1:07First, the applicant or their
1:08representative will present the project
1:11to the Commission.
1:12Next, staff will provide comments on the
1:14proposed work.
1:16Then the Commission will direct any
1:17questions it has to the applicant.
1:21After the Commission is done questioning
1:23the applicant, the floor will be open to
1:25the public.
1:26Comments and questions must be directed
1:28to the Chairperson, not to the applicant
1:30or the representative, and they must
1:32pertain to the regulations that the
1:33Commission oversees. For example,
1:36although you may have concerns about the
1:37traffic resulting from a particular
1:39project, the Conservation Commission
1:41does not regulate traffic, so traffic
1:43concerns will not be discussed in the
1:45meeting.
1:47Please note that while new points will
1:49be given ample time to present,
1:51repetitive comments will be cut short in
1:53the interest of having all parties being
1:55given the opportunity to speak.
1:57Since the meeting is televised, we ask
1:59that all applicants and members of the
2:01public who wish to address the
2:02commission please address approach the
2:05podium, state their name and city of or
2:08town of residence for the record, and
2:11use the microphone.
2:13To manage
2:14remote participation during hybrid
2:17meetings and prevent disruptions, all
2:20participants and are automatically
2:22blocked from unmuting themselves,
2:24turning on their video, or sending chat
2:26messages.
2:28For remote participants who would like
2:30to comment on an item or agenda, we ask
2:33that we you use the raise hand feature
2:35in Zoom during the discussion on that
2:37item. If you are joined by phone, you
2:39can raise your hand by pressing star
2:41nine.
2:42Staff will then call on members of the
2:44public one at a time and give them
2:46permission to unmute themselves. If you
2:48are joined by phone, you will then be
2:51able to unmute yourself by pressing star
2:53six.
2:55Since all of the
2:57commissioners are here tonight, we can
2:59skip the introductions.
3:01I think uh next are there any uh
3:04items for continuances, postponements,
3:07or withdrawals?
3:08>> Yes, we have
3:09several requests for postponement. All
3:12of these are requests to postpone the
3:14public hearing to September 19th and
3:16extend the constructive grant deadline
3:18to October 6th.
3:20Uh we have item one, Providence and
3:22Worcester Railroad right-of-way. We just
3:24received this
3:25>> September 14th.
3:27>> September 14th.
3:28>> Yep.
3:29>> Okay.
3:31Oh, I I might I might have. Yes, so
3:33September 14th with a constructive grant
3:35deadline of October 6th.
3:37Um so, item number one, we just received
3:40this request last minute, so it's not on
3:42the continuance form, but Providence and
3:45Worcester Railroad right-of-way. We have
3:47item number three, 35 State Road. Item
3:49number seven, 99 Sears Island Drive.
3:52Item number nine, three Main Street,
3:54item number 10,
3:56300 and 301 Barber Ave, and item 12, 278
4:01Grove Street, 4 Brookfield Street, and 4
4:03and 4A Powers Court.
4:07>> Is there a motion?
4:09>> Motion to postpone items 1, 3, 7, 9, 10,
4:13and 12.
4:15>> Second.
4:16>> All in favor?
4:17>> Aye.
4:17>> Aye.
4:21>> Okay, well that gets us to our first
4:23item, item number two, 4 Spring Valley
4:26Road.
4:28Request for determination of
4:29applicability.
4:41>> My name is Neil Hassett, Hassett
4:42Builders, Jefferson, Mass.
4:45I'm the builder who's going to be
4:46building the deck.
4:50>> Can you uh describe the project a little
4:52more in detail?
4:53>> Okay, it's a existing deck that has
4:56collapsed. So, I'm not changing the
4:58footprint of the deck at
5:00at all.
5:02Um
5:02and um
5:07>> Can you Can you talk a little bit about
5:09the materials and uh foundations?
5:11>> pressure treated uh framing, um pressure
5:13treated deck, um handrails, um up to
5:17code, you know, footings. I'm going to
5:19dig uh footings
5:21for the um the deck.
5:23>> So, you'll be digging new footings?
5:26>> Yes.
5:26>> Yes, okay.
5:27>> Yep.
5:29Yep.
5:30That was the existing deck.
5:33Um and it collapsed over the winter.
5:36That's the That was the location of the
5:38deck.
5:39>> Yep.
5:40Were there any uh existing footings that
5:43are being removed?
5:44>> There was existing There are footings
5:46there, but they're not up to code now.
5:48>> Okay.
5:49>> Yep.
5:50Pretty straightforward.
5:51>> For today's quote.
5:52>> Any questions or comments from staff?
5:56>> Yep, so this project was flagged during
5:57the building permit process just due to
5:59its proximity to wetlands. So, it's just
6:01over 30 ft away from a wetland, so we
6:03did flag it since it did require new
6:04footings
6:05and the old footings to be taken out.
6:07So, we requested that they file an RDA
6:09to go before the commission. We did ask
6:12to confirm that the new deck would be in
6:14the same exact footprint as the the old
6:16existing deck and which has been
6:18confirmed. So, no concerns from staff at
6:20this time.
6:21>> Okay.
6:23Are there any questions or comments from
6:25members of the public?
6:31Skip to staff. Questions or comments
6:33from
6:34commissioners? If not, is there a
6:36motion?
6:39>> Motion to issue a negative
6:40determination.
6:42>> Second.
6:43>> All in favor?
6:44>> I.
6:45>> I.
6:46>> Okay, you're all set. Thank you.
6:48>> All right, thank you.
6:49>> Yep.
6:54Next item on the agenda is item number
6:56four, 149 West Boylston Drive, notice of
6:59intent.
7:09>> All right. Good evening, commissioners.
7:10My name is Gray LaCroix from Pare
7:12Corporation. I'm joined virtually by
7:14Dave Fresh,
7:16also from Pare Corporation. He's the
7:17engineer on the job. I'm the
7:19environmental scientist. We're here on
7:21behalf of the city as the applicant for
7:24a vegetation removal
7:26project along the crest of the dam,
7:29Indian Lake Dam,
7:31to be specific.
7:33Last meeting we came, opened up the
7:35public hearing, presented the project,
7:38fielded initial questions and concerns
7:40from the commission.
7:41Um
7:43At that time, we did not have a DEP file
7:44number either. So, um since then, staff
7:48has provided some comments. Um DEP did
7:51as well um in conjunction with them
7:53issuing their file number. We have
7:55responded to those comments um just this
7:57morning. Um so, apologies for the delay
7:59on that, but um we have responded to all
8:01those comments um addressed those
8:03concerns. The the biggest change
8:07was BLSF area on site. We um
8:11as a result of comments from the staff,
8:13we increased the BLSF number uh
8:15elevation from 542 to 542.4.
8:19Um so, that changed the area and also
8:21the associated impacts, which had been
8:23reported.
8:24Um some other questions and concerns
8:26that we addressed in the RTC were um
8:29as a result of commission questions last
8:31meeting, primarily how were we going to
8:33get behind the chain link fence at the
8:35site and
8:37maintain vegetation um water ward of
8:40that chain link fence. Um
8:42through discussions with the city and
8:43DPW, sounds like it's just going to be
8:46handheld equipment like weed whackers
8:48and things like that. Um unfortunately,
8:51as the commission pointed out last last
8:53meeting, um
8:54it's difficult to get large machinery
8:56back there. So, it will be small
8:58handheld equipment. Um
9:00The other question uh
9:02primary question that we wanted to make
9:03sure we responded to was concerning um
9:06stockpiles and whether or not
9:08material was going to be immediately
9:10loaded onto a trucks and hauled off or
9:12if it was going to be stockpiled on
9:14site. Unfortunately, at this time, we we
9:16weren't sure. So, just to be safe, we
9:18provided a stockpile area on the plans
9:21um
9:22away from the resource area as far at
9:24least as far away as we could really on
9:26the site. So, um
9:28and that's where we stand today. Um so,
9:30happy to happy to respond to any more
9:32questions from the commission or any
9:34other concerns. Okay.
9:36Question questions or comments from
9:38staff?
9:39>> I don't have too much to add. Um at the
9:41last meeting we had mentioned that we
9:42hadn't done a full review of the NOI yet
9:45and
9:46as was just noted we we did do that and
9:48only had a couple minor comments. The
9:50biggest change just being the boundary
9:52of bordering land subject to flooding
9:53based on the um
9:56base flood elevation in the FIS
9:59um which you know expands the resource
10:01area coverage on the site but ultimately
10:03there's not a lot of change to the work
10:04itself. Um
10:06So no real concerns at this point.
10:09Um we do have a draft order of
10:10conditions if the commission's ready to
10:12close.
10:14>> Questions or comments from
10:15commissioners?
10:19Questions or comments from members of
10:20the public? If you're
10:22called in it's uh star nine to
10:25request to speak.
10:32There are no public comments or
10:34questions. Is there a motion?
10:36>> Motion to close the hearing.
10:39>> Second.
10:40>> All in favor?
10:41>> I.
10:41>> I.
10:42>> Okay.
10:44So the public portion of the uh meeting
10:46is uh going to be paused while we go
10:49through the orders of conditions and let
10:52staff
10:54>> Yep. So first we have a finding that the
10:56work is approved as a limited project
10:58pursuant to 310 CMR 10.533I.
11:02And then for conditions in addition to
11:04the standard conditions we'd have 24 for
11:06wetland flagging.
11:08Uh we have a condition that all grades
11:09within bordering land subject to
11:11flooding be maintained to avoid changes
11:13to the flood storage capacity of the
11:14site.
11:15Uh we have a comment or condition rather
11:18that all disturbed areas be seeded with
11:20a native seed mix at the conclusion of
11:22work. Uh that was coming out of a
11:23comment from MassDEP.
11:25We have condition 46 for wood removal,
11:2748 for dust control, 49 for dewatering,
11:3151 for equipment placement, 56 for spill
11:34prevention.
11:38And that's it.
11:41>> Any questions or comments from
11:42commissioners?
11:45There's nothing more to add. Is there a
11:47motion?
11:48>> Motion to issue the order of conditions.
11:51>> Second.
11:52>> All in favor?
11:53>> Aye.
11:53>> Aye.
11:53>> Aye.
11:54>> Okay.
11:55Motion carried.
11:56>> very much.
11:57>> Thank you very much, guys.
12:05Next item is item five, zero
12:07Whippoorwill Drive and zero Daniels Way.
12:22>> Good evening.
12:23My name is Alex Wood. I am an EIT civil
12:27engineer with Thompson Liston
12:28Associates. I'm joined by my colleague
12:31Nikita Shagrou, EIT,
12:34on behalf of the client
12:35Wipper LLC.
12:38The client is seeking an amendment to
12:40their order of conditions. At the last
12:43meeting, which I believe was August 3rd,
12:45Patrick Healy, PE,
12:48presented some plans to the commission.
12:51And since that meeting, we have revised
12:54the plans
12:56such that they will have impermeable
12:59patios outside of the 30-ft buffer to
13:02the wetland resource,
13:04which is consistent with the discussion
13:06at the last meeting. And we also shifted
13:09the driveway for lot 10A to be 30-ft
13:14from the resource area.
13:16And it will be bituminous, consistent
13:19with the other driveways.
13:20So, the prior submittal from last time
13:23instead had permeable paver patios, and
13:26they were situated closer than 30 ft to
13:29the wetland resource for several lots
13:32and a portion of lot 10A's driveway,
13:35which at the time was pervious, was also
13:37situated less than 30 ft from a resource
13:40area.
13:41So, the idea for these updated plans is
13:44just to
13:45bring the the patios and the driveway
13:47outside of the 30-ft
13:50In terms of other aspects of the site,
13:53we haven't made any further changes to
13:56the stormwater in terms of we are still
13:58proposing subsurface infiltration as
14:02presented at the last meeting.
14:05Due to the fact that the purpose for the
14:07amended order is increased building
14:10footprint sizes. So, that is why we
14:13proposed the subsurface infiltration to
14:15mitigate the runoff associated with
14:18those areas.
14:19And consistent with last time, we are
14:21still proposing construction period
14:23erosion and sedimentation controls as
14:26well as permanent slope stabilizing
14:28features per the construction details.
14:31So, we believe that these revised plans
14:35adequately address the concerns of the
14:36commission.
14:38But, we have also
14:40with with these plans some sketch plans
14:43or exhibits
14:45depicting the potential for decks
14:47instead of patios.
14:49This is something that the applicant is
14:51considering doing
14:52and so
14:54what we would like to present to the
14:56commission is
14:57if we could receive the the approval for
15:00the amended order
15:01for the stamp plan with the patios. The
15:04inquiry from the applicant was if they
15:06were to decide to do decks instead at at
15:09a future point like during construction
15:12as long as decks were
15:14located outside of the 30-ft buffer and
15:17a smaller or same uh,
15:21footage of impervious um, that it could
15:23be included as a condition, uh, in the
15:25order.
15:26Um,
15:27other than that, I'm I'm happy to answer
15:30any questions. Thank you.
15:31>> Okay. Thank you. Turn it over to staff.
15:34>> Yes, so I think obviously the main
15:35discussion at the last hearing was just
15:37about the encroachments on the 30-ft
15:39buffer, and it seemed like the
15:40commission had a, um, pretty clear
15:42position that, um,
15:44wanted to see those structures
15:46relocated, um, and the applicant's team
15:48had reached out regarding the
15:49possibility of
15:51swapping these out for, um, decks at
15:54some point, um, and so I I raised the
15:57possibility of trying to include some
15:58sort of condition, as was just
16:00mentioned, to allow for that, rather
16:01than have them come back again down the
16:03line when they decide, uh, if they
16:05decide that they want to go that route.
16:07Um, so we do have in included in the
16:09draft, uh, conditions, uh, something
16:11that would allow for that, consistent
16:13with what was just described here.
16:15Um, but yeah, aside from that, don't
16:16really have too much. Happy to answer
16:18any questions.
16:19>> Okay.
16:20Questions or comments from
16:22commissioners?
16:28>> On the
16:29on the decks, would it be wood or some
16:33synthetic?
16:35>> Um, in terms of the specific materials,
16:37um, you know, I I would imagine it would
16:39be, you know, probably some some sort of
16:41wood or or something similar. We don't
16:42have exact specs for it, but, um, I
16:45think, you know, I think the key would
16:47just be that it would be, you know, a
16:49smaller square footage of impervious,
16:51you know, just with respect to the to
16:53the resource area.
16:54>> Okay, thank you.
16:56>> And and one other thing I'll add
16:58quickly, um, that came up during our,
17:00um, kind of inter-team review, is just
17:03the potential for,
17:05um, for decks, there there would be some
17:08prohibition of decks in the side yard
17:10setback, which it seems like may have
17:12already been noted by the project team,
17:14just based on the exhibit plans that did
17:15not have decks in those side yard
17:17setbacks, but
17:18I just wanted to flag that as well that
17:20there is some other limitations in the
17:21zoning ordinance outside of the
17:23commission's purview that would prohibit
17:24decks in some areas in this property.
17:27>> Yeah.
17:33Any
17:34questions or comments from members of
17:35the public? Star 92 to unmute if you're
17:38called in.
17:46I don't have any further questions or
17:48comments.
17:49If there are no more questions, is there
17:51a motion?
17:54>> Motion to close.
17:57>> Second.
17:57>> All in favor? I.
17:59>> I.
17:59>> I.
18:02>> So I can will pause the public portion
18:04of the hearing to go through the orders
18:06of conditions.
18:10>> Yes.
18:11Um
18:15Sorry, just catching up on the
18:19last condition here.
18:22All right. So
18:23there's already an active order of
18:25conditions for this site. So this would
18:26just be a couple of small modifications
18:28to the existing order. So related to
18:32what we were just discussing, adding a
18:34new construct rather a new condition to
18:36meet during construction stating that
18:37the commission recognizes the
18:39applicant's consideration of either
18:40decks or patios for lots 8 to 10 and
18:42hereby approves either option provided
18:44that the layout of these amenities
18:46remains consistent with either the
18:48approved plans or the additional exhibit
18:50sheets referenced in section A of this
18:51order of conditions and maintains the
18:53same amount of impervious area.
18:55And that they be located outside of the
18:5730-ft buffer zone.
18:59And then unrelated to the discussion,
19:01kind of just a correction on some of the
19:03sequencing. Condition 34 has a couple of
19:06sub conditions related to sequencing
19:09that don't make a ton of sense
19:11practically, it relates to the um
19:14the construction and bringing online of
19:16stormwater infrastructure for a part of
19:18the site prior to construction on
19:19another part of the site um
19:22commencing, and we wanted to scrap that
19:24as
19:25um doing that would force that system to
19:27come online before um the up-gradient
19:30areas are fully stabilized. Um so, just
19:32removing those sub conditions on work
19:34sequencing and sticking to the standard
19:36condition for work sequencing that just
19:38states um that work will be done in
19:40accordance with the plans on file with
19:41the commission.
19:43Um so, that's it for changes to the
19:44order.
19:45>> Okay.
19:47Any questions or comments on the orders
19:49of conditions? If not, is there a
19:51motion?
19:52>> Motion to issue the order of conditions.
19:55>> Second.
19:55>> All in favor?
19:57>> Aye.
19:57>> Aye.
19:58>> Okay, we're all set.
20:00>> Thank you so much.
20:01>> Yeah, thanks.
20:02>> Thank you.
20:08>> That gets us to new business, item
20:10number six, nine Dalton Street.
20:24>> Mr. Chairman,
20:25Kevin Quinn with Quinn Engineering. I'm
20:27here on behalf of Amanda Ruco Folco,
20:29who's Russo Folco, who's owner and
20:31applicant. Uh Amanda is attending
20:33tonight remotely.
20:35The application for this is for a notice
20:36of intent under the ordinance. Uh the
20:39resource areas in question are two
20:41proposed catch basins on the north and
20:44south ends of the site. This project is
20:46the construction of a multi-family
20:47building with five dwelling units,
20:50uh associated parking, maneuvering area,
20:52and underground utilities.
20:54Um
20:55a recreational area is called out in the
20:57rear of the site as well, on the east
20:59side of the site. Stormwater is
21:01collected on site and treated in
21:03accordance with the mass storm
21:04stormwater standards.
21:06Um
21:07the water is collected in the catch
21:08basins and is drained to a
21:11uh stormwater treatment unit. The water
21:13discharges into a gallery of underground
21:16chambers.
21:17The chambers are designed so that the
21:19water goes into them and there's an
21:20outlet control structure a manhole
21:23so that the water will only discharge to
21:25the city's system when the chambers have
21:27been filled. So, under normal
21:29circumstances, less than storms, no
21:31water would be introduced normally to
21:33the to the city's drainage system.
21:35Um we have called out for erosion
21:37controls on the entire perimeter of the
21:38site. That's wattles with silt fence and
21:41also silt sacks in the catch basins once
21:44they've been installed.
21:47Can I answer questions?
21:51Okay.
21:52Turn it over to staff.
21:53>> Yeah, so we had a few staff comments, a
21:55couple of minor plan revision requests
21:58related to
22:00erosion controls, labeling of service
22:02treatments, and precipitation totals
22:05used in stormwater reports.
22:07Um and then our other comment was just
22:08related to the depth of groundwater at
22:11the location of the proposed detention
22:13system. It's pretty close, so we were
22:15just concerned that there might be some
22:16potential for uh introduction of
22:18groundwater into the city system via
22:20that underground pipe. Um
22:23but the we received responses to all
22:25those comments. Um I believe the
22:27response to that particular comment was
22:29that there is still separation between
22:30seasonal high groundwater.
22:31>> The water table's below the bottom of
22:33the chambers.
22:34>> Right.
22:34>> So, the chambers won't fill or partially
22:36fill, presumably, um with groundwater.
22:39>> So, I guess the the one follow-up
22:40question we would have about that is is
22:42there some need for
22:44um like a liner of some sort to keep
22:46that system
22:48separate from the groundwater? Is there
22:49risk of
22:51>> Good question. Um
22:53we don't propose recharge. But the water
22:56that goes into the chambers is fully
22:58treated. Um we don't have separation
23:02required because it's a because of the
23:04soil type. We're we can comply to the
23:06greatest extent practicable under
23:08hydrologic soil group C soils.
23:11Um, we can put a liner. We could
23:13certainly put a uh
23:14a 40-mil plastic liner under everything
23:17to ensure that water doesn't
23:20recharge into the groundwater table.
23:23>> I guess um yeah, I don't have a strong
23:25position on that. I was just curious to
23:26get your take on whether or not it was
23:28appropriate or desirable for this just
23:29given where the water table is.
23:31>> I mean the the 2-ft separation is
23:33desirable if we could do it we would we
23:35can't.
23:35>> Right.
23:36>> Um, but certainly putting a chain a
23:38plastic layer in there to ensure that no
23:40recharge takes place. Yeah, we can we
23:41can certainly do that.
23:44>> What do you think What do you think that
23:45would be a a good move to do just to
23:48prevent potential issues from
23:49groundwater or is it something that
23:50doesn't necessarily matter?
23:52>> Well, state methodology says we get
23:54treatment in those 2 ft of separation.
23:57So, technically we would be
23:58under-treating water that was recharged.
24:01Um, it is we are I mean we do have a
24:04stormwater treatment
24:06manhole with a mechanical system that
24:08removes
24:10particulates from the stormwater but
24:11conceivably
24:12it could contribute to to groundwater um
24:15contamination or
24:17whatever you call it. So, yeah, I think
24:18putting a putting a liner in is it's
24:21being careful. We we feel we think
24:24recharge is important. In an urban
24:26environment getting water into the
24:27groundwater is pretty important. Um,
24:30but I would defer to the board as far as
24:33um
24:34how you feel about it. If we If we
24:36thought it was critical we would have
24:37put it in.
24:38I'll say that.
24:45>> Comments? Questions?
24:47>> I'm personally
24:4950/50 on that.
24:51I mean I don't see
24:53see a
24:54great cost benefit
24:56to doing it.
24:58But I don't know what my other
25:01my colleagues would say.
25:04>> I think I share everyone's
25:06sort of same opinion that it it could go
25:08either way.
25:10>> I think as long as it doesn't impact the
25:12functioning of a system, staff doesn't
25:14have a concern about it.
25:18>> Okay.
25:20Any additional questions or comments
25:21from commissioners?
25:24Open it up to the public.
25:27Are there any questions or comments from
25:28members of the public? Star 9 if you're
25:31called in.
25:38Hearing none, is there a motion?
25:41>> Motion to close.
25:43>> Second.
25:44>> All in favor? Aye.
25:46>> Aye.
25:48>> Okay.
25:49So, again, pause the public portion of
25:51the hearing just to go over the orders
25:53of conditions.
25:56Turn it over to staff to go through
25:57those.
25:58>> All right.
25:59So, in addition to standard conditions,
26:01we would have condition 37 for
26:03stormwater system maintenance, 38 for
26:06infiltration unit inspection, or rather
26:08um
26:10stormwater unit inspection, uh 39 for
26:12certification of stormwater
26:13infrastructure,
26:1546 for wood removal, 48 for dust
26:18control, 49 for dewatering, 50 for
26:20cement truck washing, 56 for spill
26:22prevention,
26:24uh 66 for sand and salt as ongoing
26:27conditions 37 and 66.
26:30Um and this does not include adding a
26:33condition that a liner be added based on
26:36the discussion we've had.
26:41>> Does not include
26:42>> Does not include a condition, yeah.
26:45>> I have no problem with that.
26:48>> So, if there are no further questions or
26:50comments on those, uh is there a motion?
26:52>> Motion to issue the order of conditions.
26:55>> Second.
26:55>> All in favor?
26:56>> I.
26:57>> I.
26:57>> I.
26:58>> Very good.
26:59All right.
26:59>> Okay. Thank you.
27:00>> All right now.
27:09Seven has been postponed. So, that gets
27:10us to item eight. Uh 46-51 and 52 Mower
27:15Doc Street.
27:18>> Um good evening, Mr. Chairman members of
27:20the commission. Um my name's Donald
27:22O'Neil. I'm a lawyer here in Worcester
27:24here this evening on behalf of um St.
27:26Anthony Realty LLC.
27:29Also um
27:31online, I believe, is Joseph Graham
27:33who's
27:34>> [snorts]
27:34>> uh done the engineering on this site.
27:38Um so, he would be available to
27:41address any questions you might have of
27:43a technical nature.
27:45Um this is
27:48uh modification of a previously approved
27:51subdivision. Um what the proposal
27:54includes um
27:56five um
27:59two-family structures, single-family
28:00semi-detached under the ordinance, which
28:03allows for a party wall with separate
28:06lot ownership. So, it's a total of
28:0810 units. Um it's a filing under the
28:11local ordinance only.
28:14Uh and we are providing for infiltration
28:17um
28:18separate infiltration chambers
28:21uh for all 10 units um on the property.
28:24We had gotten comments from staff
28:27um
28:29that, I believe, were addressed by Mr.
28:30Graham. Um
28:32and he did submit
28:34um
28:35updated or revised plans and also a
28:37stormwater management report. So, I can
28:42answer any questions you might have for
28:43me or believe Joe is online if you've
28:46got questions for him.
28:48>> Okay.
28:49Turn it over to staff for questions or
28:51comments.
28:52>> Yeah, so this was um a project that the
28:54commission has seen before. There was a
28:56a notice of intent filed back in 2018, I
29:00believe, for the full subdivision.
29:02Um
29:03that since expired before um
29:06the completion of these lots that are
29:08that are shown here. So, a new notice of
29:10intent was required. This is also a
29:11slightly different layout um than what
29:13was originally approved.
29:15Um
29:16so, we reviewed the stormwater report
29:18and site plans um once we received the
29:21filing. Most of our comments related to
29:23the stormwater report. Um
29:26and then just a couple minor uh plan
29:28changes related to perimeter controls
29:30and also uh landscaping to include
29:33uh more native plantings. And so, at
29:36this point, um as Don just mentioned, we
29:38received
29:40a response to those comments. We
29:41received a revised plan and revised
29:42stormwater report addressing them. So,
29:44we don't have any further concerns at
29:45this point.
29:46>> Okay.
29:48Any questions or comments from
29:50commissioners?
29:56Uh can you talk a little bit about the
29:58uh phasing of this if whether uh all of
30:01these lots will be cleared at the same
30:03time or we just installing
30:06>> Yeah. Um
30:07the well, the road it's a
30:10the road itself is installed and was
30:12accepted as public um
30:15the year
30:16approximately a year ago.
30:18Um and uh I think the the lots are
30:21pretty much already cleared.
30:24Um it was originally some of these lots
30:27were proposed as single-family house
30:28lots. So, most of that I believe all of
30:31that
30:33heavy
30:34work basically has already been
30:35completed and that the lots are
30:38um I don't believe there's there
30:40um significant
30:42further clearing that would need to be
30:44done other than what's already been
30:45completed?
30:47>> Based on the most recent aerials, it
30:48does look like the entire section here
30:50has already been cleared. And there it
30:52looks like the
30:53excavation for foundations probably has
30:55started there as well.
30:58>> Say that again. The excavation for
30:59foundations have been done all
31:01>> Has begun at least is what it looks like
31:03on the most recent aerial that we see,
31:04yeah. Yeah.
31:05>> Okay.
31:07Sounds good.
31:10>> Uh if there are no questions or comments
31:11from commissioners, are there questions
31:13or comments from members of the public?
31:17If you're online, star nine to unmute.
31:27Hearing none, is there a motion?
31:30>> Motion to close.
31:32>> Second.
31:33>> All in favor?
31:34>> Aye.
31:34>> Aye.
31:36>> Okay. We'll pause the public portion of
31:38the hearing again to go through
31:40orders of conditions.
31:44>> All right. So, in addition to the
31:45standard conditions, we have 31 for
31:47SWIP, 37 for stormwater management
31:50system maintenance, 38 for infiltration
31:52unit inspection, 39 for certification of
31:55stormwater infrastructure, 48 for dust
31:57control, 49 for dewatering, 50 for
32:00cement truck washing, 55 for
32:02construction monitoring reports,
32:05uh 66 for sand and salt with ongoing
32:07conditions 37 and 66.
32:14>> Questions, comments, additions to the
32:15orders of conditions?
32:22>> Are you ready to do it?
32:24>> [laughter]
32:25>> Motion to approve conditions.
32:28>> Second.
32:29>> All in favor?
32:30>> Aye.
32:30>> Aye.
32:30>> Aye.
32:31>> Aye.
32:32>> Okay. Thank you very much.
32:34>> Yep. Thanks.
32:36>> You caught me mid-mid thought.
32:40>> All right. So, like I said to you, item
32:42number 11, 20 22 Goldthwaite Road.
32:58>> Good evening. My name is Nikita [snorts]
33:00Shagru and this is Alex Wood and we are
33:03EIT civil engineers with Thompson Liston
33:06Associates.
33:07I'm representing tonight the applicant
33:10Pappas Prime Properties LLC.
33:13The site is consisting of two parcels,
33:1620 and 22 Goldthwaite Road
33:19just off Lincoln Street in the RG5
33:22zoning district.
33:24And the site does not have any
33:28buffers or resource areas. It is only a
33:30local notice of intent filing due to the
33:33proximity to Catch Basins.
33:38The applicant proposes to demolish the
33:41existing single family on 22,
33:45keep the three family on 20 and
33:48reconstruct a 28 unit multi-family
33:51apartment building with improved
33:54parking,
33:55storm water infrastructure, utilities,
33:58amenity spaces,
34:01and standard demolition and construction
34:04erosion controls.
34:12During IRT, there was an area in the
34:14north
34:16east corner of the site that was flagged
34:18as a potential ILSF.
34:21We did conduct a study and determined
34:24with Eric's agreement that there is no
34:26resource present there.
34:30So, we are looking at again, just the
34:32local notice.
34:39And there was one staff comment on the
34:42project regarding
34:44native tree species. They'd like to see
34:46more on landscaping plan. So, we have
34:49forwarded those along to our landscape
34:51architect and we'd like to ask that
34:53those be made a condition of approval.
34:58Any questions?
35:02>> Turn it over to staff for questions or
35:04comments.
35:05>> Yep. So,
35:06last year we did receive calculations
35:09confirming that isolated land subject to
35:11flooding was not
35:13applicable to this site.
35:15So, no concerns with that. And as I
35:17said, staff had relatively one single
35:20relatively minor comment just regarding
35:22the landscape plan that can easily be
35:24conditioned within the order conditions.
35:26>> Okay.
35:28Any questions or comments from
35:30commissioners?
35:36So, just looking at the plan briefly,
35:38just looks like the snow storage might
35:41be a little light. It's just on the
35:45right from what I see. Let me know if
35:47I'm missing anything.
35:49On the north of the right lot there.
35:52Uh
35:55So,
35:57just wondering if that's enough snow
35:58storage for the amount of parking area.
36:02>> In general, it's a fairly small area,
36:04but we can we can certainly when we
36:06reissue that revised landscape sheet, we
36:09can issue another sheet to show a couple
36:11more areas. And those areas themselves
36:14are larger than what that
36:16icon there indicates. If you would flip
36:18to the grading plan, please.
36:23Um you can see there that the down slope
36:25doesn't start until behind the dumpster
36:27enclosure, so those are uh pretty large
36:29flat areas. Um
36:31so we could you know, it's really just
36:33an issue of the symbol we use and not
36:35really a a storage space issue, so.
36:38>> Yeah. Yeah. Okay.
36:40That's good.
36:42Um
36:44are there any questions or comments from
36:46members of the public? If you're online,
36:48star nine to unmute.
36:59Any questions or comments from
37:01commissioners? Lindsay, I see you.
37:04>> I was just looking at it. Looks like
37:06there's 16 parking spaces for 31 units.
37:11Just
37:13It's just not for much parking, that's
37:15all.
37:15>> Yes, so we actually are going through
37:17the uh special permit for inclusionary
37:20zoning through the planning board for uh
37:22I believe we're allowed up to a 50%
37:25parking reduction, but um
37:28we're not asking for the full allowable
37:30reduction. Um but yes, that would be um
37:33satisfied by that special permit through
37:35planning.
37:38>> Oh, is there more parking underneath the
37:40building?
37:40>> Uh yes, there's also interior uh first
37:43floor parking.
37:44>> Okay.
37:46Thank you.
37:51>> Motion to close.
37:53>> Second.
37:54>> All in favor?
37:55>> I.
37:57>> Thank you.
37:58>> And we'll pause the public hearing to go
38:00through the uh orders of conditions.
38:04>> So, in addition to the standard
38:05conditions, staff recommends uh
38:07condition 25 for recent revised uh
38:10plans. So, revised landscaping plan to
38:12include at least 50% native species for
38:15both tree and shrubs.
38:16Um 37 for 30 Wow. Storm water management
38:20system maintenance, 38 for infiltration
38:22unit inspection, 39 for certification of
38:24stormwater infrastructure, 48 for dust
38:27control, 49 for dewatering, 50 for
38:29cement truck washing.
38:31Uh
38:3266 for sand and salt and ongoing
38:34conditions for 37 and 66.
38:37>> Okay.
38:39There are no additional comments or
38:42questions. Is there a motion?
38:44>> Motion to issue the order of conditions.
38:46>> Second.
38:47>> All in favor?
38:48>> I.
38:49>> I.
38:49>> I.
38:50>> Thank you.
38:51>> Thank you.
38:52>> Thank you.
38:59>> That gets us to item 13, request for a
39:02certificate of compliance.
39:08>> All right. So, first up we have uh 22
39:10Brick Street. So, in 2019, a local only
39:14filing was uh presented to to the
39:16commission for construction of a
39:17residential development. Um
39:20as part of this request an as-built plan
39:22and a letter from a professional
39:24engineer have been provided confirming
39:25that uh it was constructed according to
39:28the approved plans. Uh staff inspected
39:30the site on August 18th, they confirmed
39:33that the site is fully stabilized at
39:34this point. Um there was a pretty
39:36significant steep hill in the back of
39:38this property and that is all stabilized
39:39at this point. Um all the plantings are
39:41doing well and yeah, the site looks
39:44good. So, no concerns from staff.
39:46>> All right.
39:47Is there a motion?
39:49>> Motion to approve approve the
39:52certificate of
39:53compliance. Um my mouth doesn't work.
39:57>> [laughter]
39:58>> Second.
39:59>> All in favor?
40:00>> I.
40:00>> I.
40:01>> I.
40:04>> All right. And then next up uh we have
40:08So, this is a partial certificate of
40:10compliance request for a duplex at uh 74
40:12and 76 Valmore streets. Um this was a
40:15part of a larger construction uh
40:19with multiple duplexes. Um
40:21last year we did issue a certificate of
40:23compliance for duplex next to it. I
40:25believe that was uh 72 and 70. Um the
40:29site is fully stabilized. Staff did
40:31inspect the site. Um
40:33we did flag that a couple of the
40:35planting the tree plantings had um
40:37not survived. So we requested that they
40:39replace them and they have been replaced
40:41at this time. Um so no concerns.
40:43>> Okay.
40:46There are no comments or questions. Is
40:47there a motion?
40:49>> Motion to approve approve certificate of
40:52compliance.
40:53>> Second.
40:54>> All in favor.
40:55>> I.
40:55>> I.
40:56>> I.
40:58>> Okay.
41:03>> All right. And our last certificate of
41:05compliance request is for
41:07uh
41:091195 Grafton Street. So this is the Twin
41:12Oaks complex. Uh this application was
41:14reviewed by the commission last year.
41:16This is with a directional drilling to
41:18replace the uh utility lines within the
41:20Twin Oak uh
41:22condo complex. Uh the site is fully
41:25stabilized at this point. Uh staff did
41:27inspect it um
41:29on the 18th and no concerns with the
41:31issuance of a certificate of compliance.
41:37>> There are no comments or questions. Is
41:38there a motion?
41:39>> Motion to approve certificate of
41:40compliance.
41:41>> Second.
41:43>> All in favor.
41:44>> I.
41:44>> I.
41:44>> I.
41:48>> Okay. Next up is uh project change
41:50request.
41:51Item 14A.
41:54>> Yep. So this is a uh project change
41:56request that was submitted by the Parks
41:58Department for Elm Park. Uh the
42:00commission might recall a negative
42:01determination was issued for the
42:04resurfacing of the existing playground
42:06in this area.
42:07Um Parks is now looking to also uh kind
42:11of
42:12replace the the pads associated with 21
42:16picnic tables in this area which are
42:17kind of depicted on the plans.
42:19You can see the the numbering. Those
42:21depict the different picnic tables.
42:23They range from anywhere as close as
42:25around 30 ft from the resource area to
42:29being outside of the buffer zone.
42:31It felt like a pretty minor
42:34change. They proposed to have straw
42:37wattle down gradient of any disturbed
42:39areas.
42:40So I had suggested that the
42:42Parks Department could
42:44file a a project change request for this
42:46under the active DOA.
42:49Alternatively, they could file a new
42:50RDA, but it seemed relatively minor.
42:55>> Seems straightforward.
42:57Are there any comments or questions?
43:01If not, is there any motion?
43:04>> I'm not sure what the motion is.
43:05>> Motion to approve the change request.
43:09>> Second.
43:10>> All in favor?
43:11>> Aye.
43:11>> Aye.
43:16>> Enforcement
43:17orders, item 15.
43:22>> So the first item we have an update on
43:25Okay, first item we have an update on is
43:2715
43:29I which is 262 Mill Street. So in 2024
43:33the commission issued an enforcement
43:34order for
43:36the Westside Animal Clinic. They were
43:38required to create a wetland restoration
43:42area or replication area back in I think
43:452001,
43:47but that was never completed and when
43:48staff inspected the site they noted this
43:50problem. So we issued an enforcement
43:52order requiring that they
43:55do the required replication area. It has
43:58been two
43:59two growing seasons since that
44:01replication area was completed.
44:03So we received the final required report
44:06confirming that
44:08it is acting as a wetland
44:11and the
44:13vegetation is native in there and
44:15over 75% of it is
44:18wetland
44:20plantings.
44:22So, it is functioning as a wetland. So,
44:24I think at this point it is
44:28good to lift the enforcement order.
44:31>> Okay.
44:35Motion to lift the enforcement order.
44:37>> Second.
44:38>> All in favor?
44:38>> Aye.
44:39>> Aye.
44:46>> All right. So, another one. So, this is
44:48145 New England Ave North. The
44:50commission issued an enforcement order
44:52last year under the local ordinance for
44:5510,000 square feet of ground disturbance
44:57within 100 feet of a catch basin. So, it
44:59wasn't near a wetland, but it was
45:02a project that would have required a
45:03permit. So,
45:04the decision was to reinspect the site
45:08uh
45:09in 2026 have staff go out there and make
45:12sure it was stabilized.
45:14Um so, it was inspected on Friday and
45:16confirming that the site is fully
45:18stabilized at this point.
45:19Since that was the only remaining
45:21condition, we recommend lifting the
45:23enforcement order.
45:25>> Motion to lift the enforcement order.
45:27>> Second.
45:28>> All in favor?
45:29>> Aye.
45:29>> Aye.
45:42>> Any more?
45:45Just do the slides. There we go.
45:50>> [snorts]
45:50>> All right. There we go.
45:51So, moving on to item 15
45:55B.
45:5688 Webster Street.
45:58The commission reviewed this either at
46:01the the last meeting or the meeting
46:02before, but essentially uh staff had
46:04observed a section of bank at the
46:08backside of this property that had been
46:09armored with riprap. Um we did receive a
46:12proposed uh restoration plan from the
46:16applicant's wetland scientist and
46:17engineer.
46:19Um this plan includes removing the
46:21riprap, uh lightly regrading the banks
46:23to have a natural
46:25um pitch back into the shoreline, um
46:28loosening soil, loosening the compacted
46:30soil, and adding a little bit of
46:32topsoil, and then revegetating the bank
46:35with native plants.
46:37Um it also proposed a uh
46:40two monitoring visits the year after uh
46:43the restoration is complete to make sure
46:45that all the plantings
46:47are um
46:48in good order. Um at this point, so we
46:50actually haven't issued a formal
46:52enforcement order for this yet. Um it
46:54was just on the agenda as a as a
46:56violation.
46:57Um so at this point, staff's
46:59recommendation would be to uh formally
47:02issue the enforcement order just
47:03requiring the implementation of the plan
47:05that their wetland scientist provided.
47:07Um but we have no concerns uh about the
47:10the restoration plan itself.
47:13>> Okay.
47:15I'll infuse that emotion on this one.
47:18>> So this would just be a a motion to
47:20issue the enforcement order.
47:22>> Motion to issue enforcement order.
47:24>> Second.
47:27>> All in favor?
47:28>> Aye.
47:29>> Aye.
47:33>> [snorts]
47:39>> All right. And then up next, we have a
47:41new enforcement order that was issued by
47:44staff um since the last meeting. This is
47:4711 Holden Street. Uh so we received a
47:50complaint about construction of a
47:53um
47:54covered porch uh within the buffer zone
47:56to to Lenny Brook.
47:58Um, so staff did go out to the site and
48:00measure and the carport is appears to be
48:04within the 30-ft buffer.
48:06Um, we are requiring that they provide
48:08an as-built plan, you know, showing the
48:09exact buffer zones,
48:11um, and the structures uh,
48:14location relative to those buffer zones.
48:16Um, so at this point we are just looking
48:18for a motion to ratify this enforcement
48:20order.
48:24>> Motion to ratify.
48:26>> Second.
48:26>> All in favor?
48:27>> Aye.
48:28>> Aye.
48:34>> All right. And then lastly, we have
48:35another enforcement order that was
48:37issued by staff at 142 Orleans Street.
48:40Um, we had received a complaint
48:42regarding removal of vegetation along
48:44the shoreline and the installation of a
48:46pool.
48:47Um, it's kind of hard to see, but in the
48:49top right picture, you can see, um,
48:52oh, that's a better one.
48:55Yeah. So, the pool is very close to the
48:57edge of the bank. Um,
48:59it's an above-ground pool, but it looks
49:01like there was a
49:02uh, a little bit of regrading and almost
49:04like a wooden small wooden retaining
49:07wall put in to kind of create a little,
49:09um,
49:10bay for it to sit in.
49:13Um, so we issued an enforcement order.
49:15We met with the homeowner who was very
49:17cooperative and understanding. Um, I
49:19think they they just were not aware of
49:22wetlands protection regulations and
49:24just started doing things in a house
49:26that they just bought. Um,
49:28but obviously there needs to be some,
49:30uh, planting along that buffer to
49:32replace the shrubs that, um, were taken
49:34out. And I would add also that, um, what
49:37started this is that one of the I think
49:39believe that tree right there, uh, that
49:41you can see in the left picture in the
49:43pre
49:44photos had fallen, um, and I think
49:46crushed some of those bushes.
49:48Um, so it wasn't just out of nowhere
49:50that they started doing the vegetation
49:52removal. It was a result of cleaning up
49:54the tree and then um
49:56just removing what was left under it and
49:59you know, whatever else had survived.
50:01But um you know, what what I tried to
50:03explain out there is that you know, just
50:05because some of the bushes got taken
50:06down doesn't mean you can kind of go and
50:08sod the lawn all the way to the edge of
50:10the uh
50:12bank without without some sort of
50:14approval or review.
50:15>> Yeah.
50:15>> Um so at this point the enforcement
50:17order just required them to uh retain a
50:20wetland scientist to come up with a plan
50:22to remediate the issues on site.
50:24Um and we would again expect that to
50:26include some sort of planting along the
50:27shoreline and have some sort of plan for
50:29relocation of the that pool. Um I'm not
50:32sure if they have
50:34space to have it um outside of the 30-ft
50:37buffer. We'll have to see what they come
50:38back um with, but
50:40uh it doesn't seem like something that
50:42the commission would generally approve
50:43if it was presented uh up front, so
50:46um
50:47>> Yeah, that was that was going to be my
50:48question as well. Will they be required
50:50to just move that somewhere else cuz it
50:52is
50:54you know, it's right up against the
50:55bank.
50:56>> Right. And ultimately we can
50:58the commission can decide that, but um
51:00the way we kind of worded it was to
51:02for them to present a plan to bring
51:04things back into compliance with our
51:05regulations. So they if they come back
51:08asking for that to stay, we can cross
51:10that bridge when we get there, but um
51:12yeah, so we we we set that um deadline
51:14for September 30th, so I'd expect
51:17hopefully to have something to discuss
51:18at the October 6th and figure out a way
51:21forward from there.
51:22>> Yeah.
51:22>> Um but similar to the last one, uh this
51:24was you know, an enforcement order
51:25issued by staff. So at this point we're
51:27just looking for a a ratification vote.
51:29>> Yep.
51:30>> So this is a motion to approve
51:32the enforcement order.
51:34>> To ratify it, yep.
51:35>> So moved.
51:36>> Second.
51:37>> All in favor?
51:38>> Aye.
51:38>> Aye.
51:40>> And just for um
51:42just
51:43the a procedural point since we kind of
51:44had several different enforcement order
51:47votes for this. If the commission is
51:50um so either the commission can issue an
51:52enforcement order or a mandate order at
51:54a at a meeting, which is kind of the
51:56preferred way to go. Um if there's, you
51:58know, time to discuss uh the other
52:00option is that, you know, staff issues
52:02the enforcement order for something that
52:03needs to be addressed quickly and then
52:05the commission then ratifies it at their
52:07at their next meeting. So, that's the
52:08reason for the different types of
52:09motions that are needed here.
52:11>> Thank you.
52:14>> All right. Uh next up is item 16, open
52:17space discussion.
52:19>> Nothing from staff.
52:21>> Uh item 17, discussion of active
52:22projects.
52:27Item 18, communications.
52:30>> We did not receive any communications
52:31over the past 3 weeks.
52:33>> Okay.
52:34Item 19, approval of minutes.
52:36>> Motion to approve the minutes from
52:38August 3rd.
52:39>> Second.
52:40>> All in favor?
52:41>> Aye.
52:41>> Aye.
52:44>> Item 20, update to wetlands protections
52:46ordinance and regulations.
52:48>> Yep, so we're continuing on
52:50um with drafting the proposed revisions.
52:52Uh we we decided to tweak uh the section
52:55on administrative approvals we had
52:57talked about previously.
52:59Um
53:01for the minor buffer zone activities
53:03that are covered under the act. Um
53:06there's a lot of pending regulations at
53:09the state level right now that would
53:11kind of change some of what we had
53:12drafted. Um so, I think we're toying
53:14with the idea of just
53:16um simply creating a process for
53:18administrative approval for the
53:21activities that are defined in the act
53:22rather than individually list them all
53:25out and um
53:26so, we should have that updated
53:29redline version at the next meeting.
53:36>> All right. Item 21, approval of uh
53:39fiscal year 26 annual report.
53:42>> Yep, so staff prepared a um um draft
53:45fiscal year 2026 annual report. Um it's
53:47up in the Google Drive folder. It's
53:49basically just an overview of
53:51permitting, open space, grants,
53:54land management, everything over the
53:55past year. This is something that we
53:58haven't done in a while. The last one
53:59we're seeing in our files is from the
54:01'90s. Um but I think it is something
54:03that um the commission should
54:05technically be doing every year.
54:08Um and I think if nothing else, it's a
54:09good um just way to kind of track and
54:12monitor the kind of annual volume and
54:14achievements in open space. So, um just
54:17looking for a vote for approval of that
54:19draft report.
54:20>> Motion to approve
54:23fiscal year 2026 annual report.
54:26>> Second.
54:27>> All in favor?
54:28>> I.
54:28>> I.
54:32>> Okay, item 22, commission liaison
54:34updates.
54:38>> Uh I have no updates for Lake Wind
54:40Advisory Commission. We just have our
54:41meeting this coming Wednesday.
54:43>> Okay.
54:45>> No updates from Community Preservation,
54:47either.
54:50>> Item 23, policies and procedures.
54:56And lastly, adjournment.
54:59>> I.
55:00>> [laughter]
55:02>> Motion to adjourn.
55:02>> Motion to adjourn.
55:04All in favor?
55:05>> I.
55:06>> I.
55:07>> Thank you.
55:11That was fun.