| Topic | Minutes | Share |
|---|---|---|
| 232 Stafford Street (ZB-2026-068) | 69 | 39% |
| 6 Woburn Street (ZB-2026-041) | 26 | 15% |
| 79 Pullman Street (ZB-2026-073) | 22 | 12% |
| Other business | 21 | 12% |
| 69 Orient Street (ZB-2026-017) | 20 | 11% |
| 30 Lagrange Street (ZB-2026-076) | 14 | 8% |
| 27-29 and 31 Camp Street (ZB-2026-074) | 5 | 3% |
| 149 Plantation Street (ZB-2026-003) | 1 | 0% |
- Monday, August 10, 2026, hybrid meeting, Chair Jordan Berg Powers.
- Present or voting in the roll call: Enxhi Muharremi, Eric Torkornoo, George Cortes, and alternates Erik Bartenhagen and Matthew Sacco; Vice Chair Lawrence Abramoff does not appear in the captioned roll call.
- Planning staff Michelle M. Smith and a second planner (captioned "Amy Beth") and David Horne (Inspectional Services) were present.
- Every item was approved, apparently 5-0.
- Two five-minute recesses; adjourned after 30 Lagrange Street.
149 Plantation Street (ZB-2026-003)
5:24-6:16
- Continued at the applicant's request to August 31; constructive grant deadline extended to September 29. No testimony.
69 Orient Street (ZB-2026-017)
8:30-28:14
- Attorney Mike Sowydra (captioned "Sawerta") for ML Realty Group: split an 11,000 sq ft lot with 110 ft of frontage. The existing two-family keeps a 5,000 sq ft lot (1,000 sq ft and 5 ft variances); the rest becomes two 3,000 sq ft lots for a semi-detached duplex, built to sell.
- Staff: by-right alternatives exist (single-family plus ADU, or reallocating frontage). Planning Board frontage subdivision and site plan review are required because of slopes over 15%. Special permit covers reduced landscape buffers (3 ft driveway, 5 ft parking) between the two lots.
- No public opposition. Cortes asked about accessibility from the garage; the designers said the garage connects to each unit.
- Approved: both variances, the parking special permit, and two waivers, with staff conditions on page six of the memo.
6 Woburn Street (ZB-2026-041)
28:20-54:44
- Marcelo Barreto's fire extinguisher business headquarters (30x80 two-level building, about 4,800 sq ft) on a narrow 9,230 sq ft lot, engineer James Tedro (captioned "Tetro") of Expedited Engineering.
- Staff said only one of two floor-area-ratio variances had been advertised because a buffer note near the residential district cuts the FAR in half for a sliver of the lot; the applicant chose to proceed.
- Relief: side yard setback (about 2 ft), two FAR variances, and a parking special permit (driveway 18 ft instead of 20, narrow buffers, no room for shade trees beside the retaining wall).
- Two abutters from Montvale (captioned "Montavis") asked about appearance, the steep street, retaining wall height (4 ft maximum), trees and use. Answers: office use, arborvitae screening and a fence are conditions, and the Planning Board will review slopes. Owner said existing trees stay and it would employ himself and his son at first.
- Approved with the staff conditions and the requested waiver.
232 Stafford Street (ZB-2026-068)
1:00:43-2:10:12
- Attorney Mark Borenstein for 232 Stafford, LLC. The 36.7-acre site is the Worcester Academy New Balance athletic fields, rezoned RG-5 by the City Council in February 2026. It borders Kettle Brook and partly lies in the 1 percent flood zone.
- Plan, updated at the meeting: 209 units (the four-story building grew from 57 to 59 units) plus 150 rental townhouses in 26 buildings, 452 parking spaces, a pool and clubhouse, trails linked to the Greater Worcester Land Trust. Staff said the site could hold about 2,100 units by right as large multifamily.
- Relief: frontage variance of about 2,411 ft (from 3,000 ft, because townhouses lack the multifamily frontage cap), 10 ft of height relief (45 ft versus 35 ft, partly to lift buildings above the flood zone), and a special permit for drive aisles of 20 to 22 ft instead of 24 ft.
- Staff flagged unfinished review: the fire department and emergency management required a second access, now an emergency connection to Hyatt Street that needs upgrades; only a draft traffic study was filed the Friday before; Department of Transportation and Mobility comments were issued that day. Still to come: Planning Board site plan and "more than one building on a lot" reviews, private street approvals, and a Conservation Commission Notice of Intent.
- Applicant terms: a conservation restriction on the western and northern land before first occupancy, no on-site affordable units but a fee-in-lieu of about 3 percent of construction costs to the Affordable Housing Trust Fund, about 5 percent accessible units, one- and two-bedroom apartments and two- and three-bedroom townhouses. Applicant said it does not own the land and will not file with the Planning Board until it has relief.
- Public comment: one speaker welcomed taxable housing and asked for play space. A nearby Cherry Valley resident filed six pages and said Stafford Street is already congested and dangerous (about 6,100 to 12,300 vehicles a day, crashes, "Dead Horse Hill" in winter). Another worried about Hyatt Street for emergency trucks.
- Board: agreed housing is needed and traffic is a city problem beyond the ZBA's purview; Bartenhagen was uneasy approving without seeing Hyatt Street and traffic details but supported moving it on. Cortes asked about affordability and recreation.
- Approved both variances and the special permit with staff conditions as amended: brick wording changed to south and west elevations, "shall" changed to "may" in condition 4, condition 5 (flood depth markers) struck, condition 7 amended, and waivers.
79 Pullman Street (ZB-2026-073)
2:17:34-2:39:28
- Charter Foods North, engineer Patrick Doherty (Midpoint Engineering): a Taco Bell with a full drive-thru on the former Silven Learning Center site, replacing an approved Chipotle pickup design. Roughly 2,250 sq ft, drive-thru lane about 214 ft (240 ft required) and an escape lane of about 242 ft; queue projected at five to seven cars.
- Parking cut from 29 to 27 spaces so none sit in the Pullman Street front yard. Hours 9 a.m. to 4 a.m.; staff believed the overnight hours are drive-thru only but it was not regulated.
- Staff conditions struck: six shade trees on the south line (1A), 25 percent compact spaces (1H) and rooftop screening language (1I). A missing entry tree (omitted for sight lines) was added to the landscaping relief.
- No public speakers. Approved: drive-thru special permit and parking special permit, with the waivers.
27-29 and 31 Camp Street (ZB-2026-074)
2:39:28-2:44:00
- Attorney Matt Eckle (Fletcher Tilton) sought a six-month extension of relief granted June 23, 2025 for the two-family at 31 Camp Street; no changes to the project.
- Approved: variances extended to January 15, 2027 and the special permit to July 15, 2027.
30 Lagrange Street (ZB-2026-076)
2:44:00-2:57:33
- Attorney Donald O'Neil for Worcester OZ Fund 2 LLC: a 41-space lot to serve the former 98 Beacon Street mill conversion (about 58 apartments). Non-accessory parking is barred in the downtown overlay, so it relied on a privileged pre-existing parking use of 30-plus years.
- Staff: the lot was carved off for financing; setbacks cannot yet be verified and the applicant may return for more relief. A separate zone change was not favorably recommended by the Planning Board and went back to the City Council's Economic Development Committee. Condition: the lot is dedicated to the Beacon Street apartments.
- Approved with staff conditions and a waiver; parking plan review still needed.
Other business
0:00-5:24, 6:16-8:30, 54:44-1:00:43, 2:10:12-2:17:34, 2:57:33-2:57:51
- No communications. Minutes of 5/18, 6/8, 6/29 and 7/20 were not taken up in the captions.
Agenda
Zoning Board of Appeals meeting agenda, Monday, August 10, 2026, 5:30 pm, Levi Lincoln (North) Chamber, 3rd Floor (Room 309), Worcester City Hall, 455 Main St. In person, with remote participation by Zoom (https://worcesterma.zoomgov.com/j/1604564634) or phone 1-669-254-5252, access code 160 456 4634. Written comments to [email protected] at least 48 hours ahead; interpretation requests 2 business days ahead (the posted agenda repeats this in several other languages, omitted here).
Board members: Jordan Berg Powers (Chair), Lawrence Abramoff (Vice Chair), George Cortes, Eric Torkornoo, Enxhi Muharremi; alternates Erik Bartenhagen, Matthew Sacco.
Call to Order - 5:30 pm
Requests for Continuances, Extensions, Postponements, & Withdrawals
Old Business - Public Hearings
- 149 Plantation Street (ZB-2026-003) - 149 Plantation Street (ZB-2026-003)
- Special Permit: low-rise multi-family dwelling use in the RL-7 zone (Art. IV, Sec. 2, Table 4.1, Residential Use No. 11)
- Special Permit: To modify the parking dimensional, layout, and/or landscaping requirements, loading requirements, and/or the number of required parking spaces (Art. IV, Sec. 7.A.2)
- Petitioner: Ram Hill Avenue Investments & Developments, LLC
- Present use: Vacant wooded lot.
- Zone: RL-7 (Residence, Limited)
- Purpose: Construct two 3-story low-rise multi-family dwellings, each with about 24 units (about 48 total), an about 88-space parking facility, and associated site improvements.
- Testimony dates: 3/16/2026, 4/27/2026. Constructive grant deadline: 9/01/2026.
New Business - Public Hearings
-
69 Orient Street (ZB-2026-017) - 69 Orient Street (ZB-2026-017)
- Variance: minimum lot area for a two-family dwelling in RG-5 (Art. IV, Sec. 4, Table 4.2)
- Variance: minimum frontage for a two-family dwelling in RG-5
- Special Permit: To modify the parking dimensional, layout, and/or landscaping requirements, loading requirements, and/or the number of required parking spaces (Art. IV, Sec. 7.A.2)
- Petitioner: ML Realty Group, LLC
- Present use: Two-family dwelling and associated parking.
- Zone: RG-5 (Residence, General)
- Purpose: Divide the property and build a single-family semi-detached dwelling (duplex) with each new unit on its own lot.
- Public hearing deadline: 9/23/2026. Constructive grant deadline: 10/28/2026.
-
6 Woburn Street (ZB-2026-041) - 6 Woburn Street (ZB-2026-041)
- Variance: minimum side yard setback for a non-residential use in MG-0.5 (Art. IV, Sec. 4, Table 4.2)
- Special Permit: To modify the parking dimensional, layout, and/or landscaping requirements, loading requirements, and/or the number of required parking spaces (Art. IV, Sec. 7.A.2)
- Petitioner: Marcelo Barreto
- Present use: Vacant lot with a small retaining wall.
- Zone: MG-0.5 (Manufacturing, General)
- Purpose: Construct an industrial building with associated parking and site improvements.
- Public hearing deadline: 9/2/2026. Constructive grant deadline: 10/7/2026.
- Note: The relief list now also includes a variance from the maximum floor area ratio (FAR) in MG-0.5 (Art. IV, Sec. 4, Table 4.2).
-
232 Stafford Street (ZB-2026-068) - 232 Stafford Street (ZB-2026-068)
- Variance: minimum frontage for a single-family attached dwelling in RG-5 (Art. IV, Sec. 4, Table 4.2)
- Variance: maximum height for a single-family attached dwelling in RG-5
- Special Permit: To modify the parking dimensional, layout, and/or landscaping requirements, loading requirements, and/or the number of required parking spaces (Art. IV, Sec. 7.A.2)
- Petitioner: 232 Stafford, LLC
- Present use: Athletic fields.
- Zone: RG-5 (Residence, General); partially in the Floodplain Overlay District
- Purpose: Construct about 26 single-family attached structures with about 150 dwelling units and about 300 parking spaces, plus an about 71,088 SF 4-story multi-family high-rise with about 57 units and about 152 parking spaces, and associated site improvements.
- Public hearing deadline: 9/3/2026. Constructive grant deadline: 10/8/2026.
-
79 Pullman Street (ZB-2026-073) - 79 Pullman Street (ZB-2026-073)
- Special Permit: food service (drive-thru) use in ML-0.5 and MG-0.5 (Art. IV, Sec. 2, Table 4.1, Business Use No. 6)
- Special Permit: To modify the parking dimensional, layout, and/or landscaping requirements, loading requirements, and/or the number of required parking spaces (Art. IV, Sec. 7.A.2)
- Petitioner: Charter Foods North
- Present use: Vacant lot.
- Zone: Split-zoned ML-0.5 (Manufacturing, Limited) and MG-0.5 (Manufacturing, General)
- Purpose: Remove existing site improvements and build an about 2,328 SF restaurant with a drive-thru, outdoor seating, about 29 parking spaces and other site improvements.
- Public hearing deadline: 9/18/2026. Constructive grant deadline: TBD.
-
27-29 & 31 Camp Street (ZB-2026-074) - 27-29 and 31 Camp Street (ZB-2026-074)
- Extension of Time of relief previously approved in ZB-2025-031
- 27-29 Camp Street Variance: minimum lot area for a three-family dwelling in RG-5 (Art. IV, Sec. 4, Table 4.2)
- 27-29 Camp Street Special Permit: To modify the parking dimensional, layout, and/or landscaping requirements, loading requirements, and/or the number of required parking spaces (Art. IV, Sec. 7.A.2)
- 31 Camp Street Variance: minimum lot area for a two-family dwelling in RG-5
- 31 Camp Street Variance: frontage for a two-family dwelling in BL-1.0
- 31 Camp Street Variance: maximum height for a two-family dwelling in RG-5
- Petitioner: PG Properties Inc - Patricia Vega
- Present use: 27-29 Camp Street: three-family dwelling. 31 Camp Street: parking lot.
- Zone: 27-29 Camp Street in RG-5 (Residence, General); 31 Camp Street partly RG-5 and partly BL-1.0 (Business, Limited)
- Purpose: Extension of time for previously approved relief for parking layout and striping changes at 27-29 Camp Street and a two-family dwelling with parking at 31 Camp Street.
- Public hearing and constructive grant deadlines: N/A (extension of time).
-
30 Lagrange Street & a portion of 42 Lagrange Street (ZB-2026-076) - 30 Lagrange Street (ZB-2026-076)
- Special Permit: extend, alter or change a privileged pre-existing, nonconforming structure and/or use (Art. XVI, Sec. 4)
- Petitioner: Worcester OZ Fund 2 LLC
- Present use: Vacant former parking lot with gravel and retaining walls.
- Zone: BG-6.0 (Business, General); Commercial Corridors Overlay District - Downtown Subarea (CCOD-D)
- Purpose: Construct an about 41-space non-accessory parking lot.
- Public hearing deadline: 9/24/2026. Constructive grant deadline: TBD.
Other Business
- Communications
- Discussion of Board Policies and Procedures
- Approval of Minutes - 5/18/2026; 6/8/2026; 6/29/2026; 7/20/2026
- Adjournment
Sources
- Video: https://youtube.com/watch?v=2KF6dHjAQIQ
- Agenda: https://worcesterma.primegov.com/Public/CompiledDocument?meetingTemplateId=75787&compileOutputType=1
Video
Transcript
Auto-generated YouTube captions; names and terms are likely misheard.
Transcript
0:03Good evening and welcome to Monday,
0:06April 10th, I mean, excuse me, August
0:0810th. Um, welcome to Monday, August
0:1110th, 2026 meeting of the city of
0:13Worcester Zoning Board of Appeals. My
0:15name is Jordan Burke Powers and I will
0:16chair tonight's meeting. This meeting of
0:19the Worcester zoning board of appeals
0:20will be conducted in a hybrid manner
0:23with both inperson and remote
0:24participation. As a preliminary matter
0:27to tonight's meeting, I would like to
0:28confirm the board members and staff who
0:30are present. Board members, when I call
0:32your name, please um respond in the
0:35affirmative. Board member Mormy
0:37>> present.
0:38>> Board member Barnhagen
0:39>> here.
0:40>> Board member Tono
0:42>> here.
0:43>> Board member Sacko
0:45>> here.
0:46>> And is board member Cortez not here yet?
0:48Okay. Um and uh city staff Michelle
0:52Smith
0:53>> present. Amy Bethlehe
0:56>> present.
0:57>> Uh David Horn
0:58>> here. All right.
1:01Tonight's meeting is being livereamed
1:03from the city of Worcester website and
1:05the recording will be available for
1:06rebroadcast. This is a public meeting
1:09which means both that it is being
1:10recorded and that will be taken and
1:13published at a later date. The public
1:16may participate remotely by calling
1:2016669254
1:245252.
1:27Again, that number is 1 16669
1:322545252
1:37with the access code
1:40164564634.
1:46Again, that's access code
1:49164564634
1:56or using the link shown on the screen.
1:58Once an item is called, there will be a
2:01brief presentation of the item, followed
2:03by any additional comments and
2:05clarifications from members of the city
2:07staff, then an opportunity from anyone
2:09from the public to speak on that item
2:12before we proceed to board discussion
2:15and action. To manage remote
2:17participation during our hybrid meetings
2:20and prevent disruptions, all
2:22participants are automatically blocked
2:23from unmuting themselves, turning on
2:26their video, or sending chat messages.
2:28For remote participants who would like
2:30to comment on an item on our agenda, we
2:33ask that you use the raised hand feature
2:35in Zoom during the discussion on that
2:37item. If you're joined by phone, you can
2:40raise your hand by pressing star9.
2:44Again, if you're joined by phone, you
2:46can raise your hand by pressing star9.
2:49Staff will then call on members of the
2:51public one at a time and give them
2:53permission to unmute themselves. If you
2:55are joined by phone, you will then be
2:58able to unmute yourself by pressing star
3:01six. Again, it's star six to unmute. So,
3:05you'd press star 9 to raise your hand
3:07and star six to unmute. Please note that
3:10board appreciates brevity in your
3:12comments. To help with this process, we
3:15ask all speakers participating in person
3:17to use a microphone to please clearly
3:20identify yourselves each time you speak.
3:22And the first time you speak, please
3:25state your city of town of residents for
3:27the record. To help maintain an orderly
3:29meeting, please address all comments and
3:32questions through the chair, that's me,
3:34rather than directly to any of the other
3:36speakers or applicants.
3:39Applicants should be aware that
3:41approvals are genuinely are generally
3:43conditional. Decisions are typically
3:45signed by the board at the next meeting
3:47and filed with the city clerk the
3:48following day beginning the spee. It is
3:52the applicant's responsibility to
3:53address any conditions of approval and
3:55lack of doing so may result in delays or
3:58enforcement. Please contact the planning
4:00division with any questions. Any party
4:03agrieved by a decision of this board has
4:05the right of appeal under Mass General
4:08Laws chapter 4A section 17. There are a
4:12number of items on our agenda being
4:13continued or postponed tonight which I
4:16will read through shortly. If you are
4:18here on one of those items, please note
4:20that no additional notice will be sent
4:22to you before the next meeting. The best
4:25thing to do is call the planning
4:26division the day prior to our next
4:28meeting to confirm if the item will be
4:30heard or postponed. that night. And it
4:32is not uncommon for items to be
4:34postponed multiple times before they're
4:36heard by this board. I'll suggest for
4:40the purposes of streamlining our uh
4:42meeting that board member Barnhagen
4:44offer to make any motions. Um and that
4:47for um all purposes, board member Mormy
4:49will second any such motion. Um and we
4:52might we'll figure out what to do if
4:54you're making a motion. In the event
4:56after either member prefers not to do
4:58so, I simply ask that you identify
5:00another member to do so. Okay. So, right
5:03now
5:05um
5:08>> he's
5:10>> okay.
5:11Uh let me just also
5:18I'm going to do the thing that I just
5:20told you all to do, which is silence my
5:21own phone. Okay. So, um, [clears throat]
5:24we have one item for a continuence, 149
5:28Plantation Street, there's a special
5:30permit. Um, and for this, uh, uh, board
5:33member Sacko, while, um, while while
5:36board member Cortez is logging on, I'll
5:38ask that you and board member Barton
5:39Hagen vote, um, on the motion for 149
5:42Plantation Street, a special per uh,
5:44continuence, a request to continue the
5:47hearing to August 31st, 2026, and extend
5:49the constructive grant deadline to
5:51September 29th, 2026. Is there a motion?
5:54like to make a motion to continue item
5:56number 149 Plantation Street to the
5:59dates as stated by the chair.
6:00>> Is there a second?
6:02>> Second.
6:03>> On the motion, board member Mormmy,
6:07>> yes.
6:08>> Board member Barnhagen,
6:09>> yes.
6:09>> Board member Tono,
6:11>> yes. Board member Sacko.
6:16Board member Sacko.
6:26I can't hear him.
6:37Remember Sacko? Looks like you're still
6:39on mute if you haven't unmuted.
6:42We're gonna try again.
6:49>> Board member Sacko, you're still on
6:51mute.
6:55>> Okay. Well,
6:59>> yeah, my vote is yes. I mean, I'll move
7:02we'll move it forward. The problem is
7:03that we need five people to vote and we
7:04don't currently have five people online.
7:07So, we need to we need to wait a second
7:09to see if we can get one of them to
7:10respond. Uh, board member Sacko or board
7:14member Cortez, we need a fifth person
7:16voting at this moment.
7:20>> Hey, can you hear me?
7:21>> Yes, I can hear you now.
7:22>> Sorry, guys.
7:24>> All right. [laughter]
7:26So, if you are here for item number one,
7:29149 Plantation Street, please talk to
7:31the planning division um and they can
7:33let you know when it will be heard. So,
7:36um, as of right now, if I'm correct,
7:39voting on this one is board member
7:41Barnhagen and voted and board member
7:43Sacko.
7:45Is that correct?
7:48City staff
7:50>> through the chair. We have George. We
7:52just need to make him a co-host. So,
7:53give us a sec.
7:54>> Okay. Yep. I'll give you a second.
8:08All right, Mr. Cortez, looks like you're
8:10unmuted. You want to confirm we've got
8:12you?
8:13>> Okay. This is George Cortez. Uh, can you
8:16hear me now?
8:17>> We can hear you. All right. Um,
8:19>> excellent.
8:20>> Voting on the first one will be board
8:22member Barton Hagen and then, um, uh,
8:25board member Sacko, you'll vote on, um,
8:27number three. And in the meantime, uh we
8:30will always encourage everyone's
8:32participation. Okay, if you are here for
8:3569 Orient Street, sorry for all the uh
8:38having to make a manage, but please come
8:41forward. Or if you're online, um raise
8:43your hand.
8:47Just state your name and city of town of
8:49residence for the record, please.
8:58>> [snorts]
9:01>> Good evening, Mr. Chairman and board.
9:03Uh, my name is Mike Sawerta. I'm an
9:05attorney here in Worcester. I live at 32
9:08Barber Jean Street in Grafton,
9:10Massachusetts. Uh, my office is at 1
9:12Merkantile Street um, here in the city.
9:15I am here representing ML Realy. Um, the
9:18two principles, Helios Michael and Andy
9:23Loce. I hear um for questions. They have
9:26done some projects in the city and um
9:28are anxious to see if they can do
9:30another one um if granted the relief. Um
9:34our petition asked for three uh pieces
9:37of relief for 69 Orient Street. Um the
9:41first was a variance for frontage, the
9:44second was a variance for area. Um and
9:47third, a special permit um with regard
9:50to modification of the driveway and
9:52parking. Um I was advised by planning
9:55that there were two requests for waiver
9:57that we should also make orally um
9:59regarding um the lot percentage and the
10:02distance to adjacent buildings. Um so
10:05that would also be um
10:08uh at this point as you can see from um
10:10the plans that we filed um right now
10:13there is a one two family home that sits
10:16on the extreme left side of the lot if
10:18you look at it from Orient Street. Um
10:21the uh the hope is that we will get
10:23relief to um allow a division of this
10:2611,000 square foot lot which has right
10:29now 110 ft of frontage and divide so
10:33that the um current house lot will be um
10:37have 50 ft of frontage and um 5,000
10:41square feet which we would do variances
10:43for the thousand square feet and also
10:45five feet for the frontage. and um that
10:48the other lot be the other portions of
10:51the lot be split into two lots each of
10:533,000 square ft² which would allow us to
10:56build a duplex semi- detached single
10:58family home. Um the um the existing lot
11:02right now does have 11,000 square ft um
11:06in the frontage. Um,
11:09interestingly, if the building were not
11:11on the lot right now, we would actually
11:13have sufficient frontage and square
11:15footage to actually put four units on
11:17the lot if the building weren't there.
11:18And that's sort of our um topographic um
11:22issue with the variance that the house
11:24is there and it's on the extreme side of
11:26the um of the lot. Um, as far as um its
11:32location and its consistency with the
11:34neighborhood, um, most of the houses on
11:37that section of Orient Street are multif
11:39family. There are very few single
11:41families and it would seem appropriate
11:43that we have a duplex put in in the area
11:46which actually has um, uh, a lot of
11:50multif family homes. Um secondly, uh for
11:54again consistency in the neighborhood,
11:56we did some research as to how many
11:58square feet each lot in the area has
12:02with regard to a single unit. And um the
12:06multifamilies in the in the uh area on
12:09Orient currently average about 2,55
12:13square feet of land per unit and our
12:16project will have an average of 2750
12:19square feet. So, we're actually
12:21having a larger lot than what most of
12:23the uh the project there currently has.
12:26Um, as far as uh the new standards that
12:29we have with regard to practical um
12:32practical difficulty, um they've said we
12:35would be able if the land were vacant
12:38today, we would be able to build. Um
12:40secondly, from the petitioner's end, as
12:42far as um the benefits to this the the
12:45city they'll be producing, we'd be
12:47increasing housing stock with the extra
12:49two units. Um excellent location for
12:53those two units is because there are WTA
12:56bus routes, two of them that come to the
12:58southern end of Orient Street. Um so
13:01access to the core city would be
13:03available. Um the new units will
13:06certainly also increase the uh the value
13:09of the adjacent homes in the area
13:11because right now with that portion of
13:12the lot is kind of bladed um and paved.
13:15Um
13:17as far as the difficulties again
13:19relating to you know conditions of
13:20structures I've addressed that um in the
13:23fact that the it's the fact that the
13:25house is actually on on the lot right
13:27now. Um and um if as far as the hardship
13:33u the full value of the large lot if we
13:36cannot divide it up we really had a
13:38benefit of four lots if there was
13:40nothing there right now or four units
13:41we'd only have three units which would
13:43be a hardship. Uh there's really no
13:45other way for us to address this other
13:48than for the two variances in this
13:49special permit. And uh it was certainly
13:52not a self-created hardship because the
13:54house that's on there now was built for
13:56the assessor's records in 1870. Um so it
13:59was well before even zoning came in uh
14:01came into shape. Um regarding our
14:04special permit
14:06um the um we are not affecting any
14:11setbacks as far as the abuing neighbors.
14:14The setback squeeze that we have with
14:16regard to the driveways etc is between
14:19our two lots that we're setting up. So
14:20nobody is going to be inconvenienced
14:22that's in the neighborhood already. Um
14:26I'll turn it over. Gentlemen, anything
14:28you would like to like to add?
14:30>> We're eager to work with the city to get
14:33>> You just got to stay. It's on. You just
14:34got to state your name.
14:35>> My name is Helios Marco. I'm one of the
14:37owners of ML Realy and we're just
14:40excited to um hopefully get this process
14:43on the way and uh possibly be build the
14:45two family there. Yeah.
14:48>> Okay.
14:49>> Thanks. questions for the board.
14:50>> Uh, city staff first.
14:52>> Okay.
14:53>> Sure. Through the chair, Michelle Smith
14:54in the city's planning division. So, in
14:56front of you this evening, as you heard,
14:57two variances. One related to lot area,
15:001,000 ft of relief from the 6,000 square
15:02foot minimum requirement, and then 5T of
15:05uh relief for frontage, which is a 55-
15:07ft requirement. And then you've got a
15:09special permit to modify parking and
15:10loading, which you see quite often. We
15:12have recommendations for conditions of
15:13approval on page six of your memo. Um,
15:17in terms of byite alternatives, you
15:18heard the applicant summarize that
15:20essentially they could build a single
15:21family with an ADU. Um, they could also
15:24adjust the allocation of frontage and
15:26would be able to build uh the two units
15:28u by right. Um, the lot would be
15:30deficient with respect to lot area
15:33still. Um, but those are sort of the the
15:35options that the applicant would have.
15:37So similar density with an ADU. Um, in
15:39terms of the comments that we had,
15:41mostly just related to questions about
15:43tree plantings and storm water
15:45management, the application will be
15:46required to go in front of the planning
15:48board for both site plan review due the
15:50steep slopes on the lot as well as a
15:51frontage subdivision to reconfigure the
15:53lot lines, a glorified ANR. And the
15:56properties located in a background or
15:58baseline growth area in the long range
16:00plan. Um, I want to clarify just with
16:05respect to the landscape buffer
16:07requirements that they're seeking for
16:08the parking and loading. As you heard,
16:10that was along the kind of interior lot
16:12line between the two lots. Um, they are
16:15providing less about a half a foot um
16:18between the the parking area and that
16:20property line. And it's varies whether
16:22it's 5 feet or 3 feet where it is sort
16:24of a parking facility where you kind of
16:26have the um parking stalls located
16:29versus where you have the driveway just
16:30leading to that area. So it's 3T for the
16:32driveway and 5T for that rear kind of
16:34parking area. Um that varies. I'm happy
16:37to answer any questions that the board
16:39has. Thank you.
16:41>> Is anybody here for um is anybody here
16:44for 69 Orient Street?
16:48Is anybody online?
16:50Use the raise your hand feature or press
16:53um star nine.
16:57>> Right.
16:59>> We do have someone online.
17:01>> Okay. Just state your name for city um
17:04and city of town of residence, please.
17:08>> Sorry, I muted him by accident.
17:18Oh my god.
17:20>> My fault. [snorts]
17:22>> Oh my god.
17:24>> I think we're just having an issue
17:25unmuting. There you go. You should be on
17:27mute.
17:30>> Go ahead.
17:31>> It's Yumi here, the designer of uh the
17:34dublex.
17:35>> Okay.
17:42Anything else to add?
17:49>> Did you want to say anything else?
17:52>> Um uh working uh working on the project
17:56and uh uh putting the the design
17:58together.
17:59>> Can you hear Can you hear me properly?
18:01>> Yes, we can hear you. Go ahead.
18:03>> So, working on this project and putting
18:05the design together. Um, this is going
18:07to be a great uh a great structural
18:09addition to the to the area
18:12>> and uh it's going to uh it it it is
18:16going to work uh uh uh perfectly with
18:19the surrounding uh the way we put
18:21everything together. The uh in the
18:24architectural um uh context and the
18:27design language, it flows perfectly fine
18:29with the uh uh with the with the
18:32surroundings. So, this is going to be
18:34great for the um for that for that lot.
18:36I see a good good project.
18:40>> Okay. Thank you very much.
18:44Uh okay, not seeing anybody else. Uh
18:46>> there was one other person that had
18:48their hand raised. I'm not sure. Chris,
18:50did you want to be unmuted? If you did,
18:52please raise your hand again.
19:01>> Chris, go ahead.
19:02Uh, hi. Uh, my name is Chris Peretti.
19:05Uh, I'm representing Land Design
19:07Collaborative, uh, project engineer, uh,
19:09for this project. Uh, I had nothing to
19:11add. I just wanted to make sure I, uh,
19:13was available.
19:15>> All right. Okay.
19:17>> Chris Chris's um, organization, they'll
19:19be handling the the planning board uh,
19:2115% grade.
19:24>> Great. Um, okay. Uh, not seeing anybody
19:27else come forward. Um, I'll just say
19:30really quickly for myself, um, this is,
19:33uh, pretty straightforward. Um, it's not
19:35far from my house. Uh, and, um, I think
19:40you're going to be adding some parking,
19:42which is going to be helpful for folks,
19:44um, for the house that's already there.
19:46Um, as well as having underneath parking
19:49and a duplex there will be fine. um this
19:52is a relatively
19:54um and all things being considered small
19:57uh um variance and special permit. So
20:00from my perspective, I'm happy to move
20:02this forward. Um and I look forward to
20:05other board members thoughts. Um uh
20:08board member um I guess I'll start with
20:10board member Barthagen
20:13>> to the chair. I guess I just want to
20:15just make sure the applicant um you're
20:19okay with all of the conditions of
20:21approval that the staff put on page six
20:23of nine of the memo. You don't have any
20:24issues with any of those. You're okay
20:26accepting those as part of your permit?
20:28>> Uh I know there was we're supposed to be
20:30adding a tree in the back.
20:36>> What was that?
20:37>> Go ahead.
20:38um a tray in the back and we do have to
20:41handle um runoff um which is something
20:43that we we need to you know certainly
20:46take care of and would have that ready
20:48for the planning board meeting that
20:50>> we got coming up.
20:51>> Okay. Yeah. Just want to make sure
20:52because sometimes applicants take issue
20:54with one or two of these and they want
20:55to discuss them but if you're okay with
20:56these that's fine.
20:57>> Yeah. Planning has been great to work
20:59with. Okay.
21:00>> Um so and they've been very helpful. So
21:02I appreciate the the cooperation that
21:04they've given.
21:05>> Then I agree with the chair. I think
21:06this is pretty straightforward. It's a
21:07minimal relief they're requesting. It'll
21:08be a good addition to the street and um
21:11I'm I'm happy to move it forward.
21:13>> Uh board member Rammy.
21:16>> Um I also support this project. It's a
21:18really nice design and an addition to
21:20the neighborhood. Um and I would just
21:23like to ask one question for cur
21:25curiosity. I was wondering if the two
21:28driveways to the garage, are they going
21:30to be separated or combined like in the
21:33picture?
21:34Just looking at the side plan and I see
21:37some planting to the drive between the
21:39driveways.
21:40>> We've actually adjusted that from where
21:42we actually started. Um in this case
21:45there will be um separate driveways. Um
21:48>> understood
21:48>> the the cur the turns to bring it into
21:50the middle. We weren't going to make a
21:52little some of the
21:53>> okay
21:54>> the basics.
21:55>> Great. Thank you. So no other comments
21:58besides that.
22:00>> Great. Uh, board member Cortez.
22:05>> Uh, the chair. Um, yes, I agree that
22:09this is uh sort of a straightforward
22:11good project uh and the provision of
22:15housing uh and actually I think it's an
22:18improvement for the uh neighborhood the
22:20area because that lot the empty lot that
22:23the way it is right now is it's not a
22:26good looking the way it is. So it is I
22:29uh I I I do support uh the approval. Uh
22:33just couple of questions. Um
22:38since the entrance uh since you have a
22:42steps uh no first of all let me let me
22:45ask I'm sorry is this is they is is it
22:48the intent to rent uh the units or or or
22:53is it a plan to sell uh those those
22:56houses? Uh those two units, those two
22:59houses,
23:01>> they're going to I think both be be sold
23:04um as individual units.
23:05>> Family home attachments.
23:07>> Did you hear that? Go ahead.
23:08>> The intent is to build a cell.
23:12>> Yes, they it's a built to sell.
23:16>> Uh I see. Um yeah, the the the reason I
23:20asked the reason I asked that is because
23:23um looking at the steps uh if they are
23:27individuals
23:29uh with disabilities
23:31uh looking to get into the house, they
23:35probably would have to use the garage to
23:37go in if at the end of the of the garage
23:41there is an easy way to get into the
23:43apartments. uh otherwise uh it would be
23:48not not accessibility uh at all the way
23:52it is right now but that's you know that
23:55that that would be up to the people who
23:57wants to buy it and and and if there are
24:01individuals with disability wanted to
24:03buy uh basically they would not have a
24:06chance so that that's just a point that
24:08I I make um it's not that that I have
24:14the priv to stop the project because of
24:17that.
24:19>> M Mr. Chairman, I said,
24:20>> could I comment?
24:22>> Sure. Yeah. Go ahead.
24:23>> Um part of it part of the problem is
24:26because of the sloping in the back of
24:27the lot, um it it the grade goes down.
24:30So the ability to to have um you know
24:34some um flatter axis in the back is
24:36compromised by the the lot shape and
24:38topography.
24:42>> Uh through the chair, this is why You
24:44know it does happen and individuals with
24:48disabilities they can enter through the
24:50garage when they need it but but then
24:53has to be
24:55access from the garage into the
24:57apartment. So
25:00>> so
25:02I I can imagine that there might be a
25:04step uh steps or from the garage into
25:08the into the house itself. Is that is
25:11that correct?
25:14you want to comment.
25:16>> So, so if you're if you're speaking
25:18regarding the garage, if you you should
25:20have access from the garage to the unit.
25:23So, once you park the car into the
25:24garage.
25:26>> Okay, that was solved. Thank you. Uh
25:30let's move forward. I uh I'm for the uh
25:33project. Um Mr. Chairman,
25:36>> yes, and thank you for raising that.
25:38That's a really good point. I just want
25:39to echo that when possible um it's not a
25:43requirement but we certainly look
25:44favorably when taking into consideration
25:47people's accessibility needs. So um
25:49thank you uh board member Cortez for
25:51raising that
25:52>> uh board member Tarono
26:06Board
26:13member,
26:15sorry, technical difficulties. Board
26:18member Tota, when you get a chance.
26:29Yeah, Erica, it looks like you're still
26:31muted if you're trying to unmute.
26:41Now you unmute me. I was put on mute by
26:44[laughter] the host.
26:46>> Go ahead.
26:47>> I have no comment.
26:52>> Board member Sacko, any comment?
26:55>> Project chair. Um, no additional
26:57comment. Thanks.
26:59>> Okay. In that case, I will take a motion
27:01on 69 Orient Street.
27:04like to make a motion to close on 69
27:06Orient Street.
27:07>> Is there a second on the motion to
27:08close?
27:10>> Second.
27:11>> On the motion to close, uh, board member
27:13Cortez,
27:14>> yes.
27:15>> Board member Mammy,
27:17>> yes.
27:18>> Board member Tono,
27:19>> yes.
27:20>> Board member Barnhagen,
27:21>> yes.
27:22>> My votes, yes. Is there a motion on 69
27:24Orient Street? Uh, I'd like to make a
27:26motion on 69 Ori Orient Street for
27:28approval of variance for relief of 1,000
27:31square feet from the 6,000 foot minimum
27:33lot area requirements for a two family
27:35dwelling in an RG5 zone. Approval of a
27:37variance for relief of 5T from the 55 ft
27:40minimum frontage requirements for a two
27:41family dwelling in an RG5 zone. and
27:43approval of a special permit to modify
27:46the parking dimensional layout and or
27:47landscaping requirements, loading
27:49requirements, and or the number of
27:50required parking spaces subject to the
27:53conditions as set out in the staff memo
27:55on page six of nine and the waiverss as
27:58requested by the applicant.
27:59>> Is there a second?
28:01>> Second
28:02>> on the motion. Board member Cortez,
28:05>> yes.
28:06>> Board member Mormmy,
28:07>> yes.
28:08>> Board member Tono,
28:09>> yes.
28:10>> Board member Bartagen,
28:11>> yes.
28:12>> My votes, yes. Thank you very much.
28:14>> Thank you very much for your time. Thank
28:15you.
28:16>> All right. Next up is 6 Wurn Street. Six
28:20Wurn Street. If the applicant could
28:22please come forward and state your name
28:23and city of town of residence, please.
28:30>> Hi, Mr. Chairman. I'm James Tetro from
28:32Expedited Engineering out in South
28:34Burough here representing Marcela Berto
28:36who is the owner of the property at 6
28:38Wurn Street and he is also the
28:40applicant. Um he has before you a
28:43proposal to construct a small uh uh
28:47structure to house his headquarter his
28:49business. He's been running his fire
28:51extinguisher business for over 20 years
28:54and right now is working as out of a
28:57headquarters if you will maybe a little
28:59grandiose
29:00uh out of Quinsey
29:02>> uh Charleston.
29:03>> Charletown, excuse me. I knew it was
29:04right next to Boston. Um and wants to
29:08establish uh his headquarters much
29:09closer to home. He's actually a resident
29:11off Randall Street. And so the uh parcel
29:15of land that you have before you at six
29:17Warurn Street is essentially mostly a
29:19meadow
29:20um between a parking lot and and on one
29:23side and condominiums on the other side.
29:26Uh it's just over 9,000 square feet.
29:28It's 180 ft deep by 50 feet at the far
29:32end away from the street and 51 and
29:34change feet along the street. Um that
29:38relatively small dimension is really the
29:41foundation of the difficulties which
29:44require us to be before you uh asking
29:46for uh variances from floor to area
29:49ratio
29:51uh and setback only for even just a
29:54fraction of a foot. Um and we're also
29:57seeking uh special permits in regard to
30:00squeezing in the parking uh per the city
30:02standards. Um, this lot again is, uh,
30:099230 square feet. Um, as I say, it's on
30:13the north side of Warurn Street between
30:16Mount even evenly between Mount A and
30:19and Rockdale. Um, it is in the MG0.5
30:24district, also borders, uh, one of the
30:27residential districts. Um the applicant
30:31would propose to construct a 30 by 80
30:33building with two levels inside. Um it
30:37would have an access of a man door and
30:40an overhead door at the front at lower
30:42level would have uh some additional
30:45doors at uh upper level uh on the left
30:48side. Um we did uh soil testing there to
30:53show that we actually had had pretty
30:55good stuff. We designed a proposed
30:57infiltration for all the roof and
30:59parking lot surface runup to come in. Uh
31:02city staff asked us actually to also
31:04provide uh a diagram showing that it
31:07because we have a relatively narrow
31:08driveway that folks somebody could turn
31:11in. We looked at Mr. Berto's uh actually
31:13fairly large van as the vehicle uh
31:16though um so it it had a good test.
31:18There again is the uh the architectural
31:20plan and then that's a good
31:22representation of what you see lower
31:24level entrance from the front. Um I
31:28guess I will just uh leave it at that.
31:30I'll just note that we are proposing a
31:32few retaining walls but in all cases uh
31:35not more than four feet high. Um it's
31:39varying from two to four feet on on uh
31:41on most of them. And uh I'll just try
31:44and answer any questions. I will just
31:45say we reviewed staff uh comments and
31:48suggested conditions. We have no
31:50objection to them. Um they included uh
31:52changing a couple trees uh adding some
31:55arborvite uh uh plantings, adding fence.
31:58Uh we've discussed that. We have no
31:59objection. I'll try and take uh any
32:01questions.
32:02>> And uh you have one waiver. Are you
32:04requesting the waiver?
32:06>> Oh yeah. I forget which.
32:07>> Six of 10.
32:09>> Yeah.
32:10>> It's percentage of lot covered by
32:12principal accessory dwellings.
32:13>> Oh correct. Correct.
32:14>> Do you ex do you do you request the
32:16waiver?
32:17>> Um, yes. Thank you. All right. City
32:19staff.
32:20>> Sorry. Yeah. There was there was a
32:22little bit of uncertainty even with the
32:23staff as to exactly which uh which
32:26variances or waiverss we had to ask for.
32:28>> Yeah. No worries.
32:30>> Yeah. Through the chair. And just to to
32:31clarify on that, Michelle Smith and the
32:33planning division. So, uh, as Mr.
32:36Teacher highlighted, um, there are
32:38actually two different variances related
32:41to floor area ratio here. And so through
32:43our discussions, we identified after
32:46advertisement that that we had actually
32:47only advertised one of the two different
32:50floor area ratio uh variances that are
32:52needed because there is a note in the
32:54dimensional table that modifies sort of
32:56the standard floor area ratio for a
32:58portion of the lot. Um, so the
33:01applicants in front of you for three
33:02different variance requests, two related
33:04to floor area ratio, um, which is for,
33:08if we could go to the site plan, there's
33:10a sliver of the lot on the right hand
33:12side, like 1.57 ft that is located
33:15outside of a 50-ft buffer that the
33:17ordinance provides uh, which reduces the
33:20intensity of development adjacent to
33:23residential districts. And so basically
33:25if you imagine from the west property
33:28line heading over and eclipsing the
33:30majority of the building um there is
33:32this buffer and in that area it reduces
33:34the standard floor area ratio in half.
33:36So it's a 0.5 floor area ratio. So this
33:39reduces it to a 0.25. So we had a
33:41conversation with the applicant about
33:42it. We think that the nature and
33:44description of the project were adequate
33:46to provide notice. Ultimately the
33:48applicant's decision as to if they wish
33:51to proceed. they indicated they did, but
33:52just to put it out there for the record
33:54and have them confirm on the record that
33:56they would like to proceed.
33:57>> We would like to proceed. Yes.
33:59>> Great. Thank you. So, the the other
34:01forms of relief that the applicant is
34:03seeking to request relate to the
34:04sideyard setback for the west side uh
34:06because of the proximity to the
34:08residential zoning district. This also
34:10um takes the more uh conservative
34:13buffers for the residential district and
34:15applies them to the manufacturing
34:17structure even though the we're in a
34:19manufacturing zone here. So some of the
34:21nuances to provide some additional
34:22separation. Um so that's a 20 foot
34:24setback and the applicant is proposing
34:26um just shy of that. They're looking for
34:292 ft of relief from that requirement. Um
34:32and then they are also seeking a special
34:34permit with respect to the uh various
34:37parking layout requirements along the
34:40west side of the driveway. You can see
34:42the driveway is more or less along the
34:44property line given the narrow shape of
34:46the lot. Um so staff have asked for
34:49screening in that location in the form
34:50of a fence just given the the width of
34:53that. Um that is a variable width. Um
34:56it's generally speaking about a a foot
34:59uh and and a half. Um but in some places
35:03it does reduce down to about half a
35:04foot. So um that that is an adjustment
35:07kind of depending on where you are on
35:09that lot line. But the five foot setback
35:11is what's required for a driveway. Um,
35:13similarly on the opposite side, the east
35:16side, there's a similar five- foot
35:18setback requirement and the applicant
35:20has two feet. It's required to be fully
35:22permeable. There's a retaining wall as
35:23Mr. Tedro noted in that location as well
35:26as others um resulting in that not being
35:28permeable. Um, so they're seeking relief
35:30from that form. There's also two shade
35:32trees that are required uh on the
35:34western side in the location abuing the
35:37parking area in the rear which the
35:38applicant is not able to provide given
35:40the location of the wall. So they're
35:42seeking to relieve that requirement. And
35:44finally, uh the requirement for the
35:46driveway to be 20 feet wide for two
35:48directional circulation. They have an 18
35:50foot wide driveway. So those are the the
35:53various forms of relief that they're in
35:54front of you for. Um by right options
35:56would be obviously to build a smaller
35:58building. This is 4,800 ft, so it's
36:00relatively small to begin with. Um so
36:02they would have to to reduce that in
36:04size further. Um, they could also
36:07reconfigure the layout and design, most
36:09likely shifting the building to the
36:10back, but it would require substantial
36:12redesign and reconfiguration of the
36:13building, giving they're trying to use
36:15the sort of slope to their advantage to
36:17have sort of a ble access to the
36:19structure. Um, and it would likely
36:22result in um other changes, but that
36:25could potentially result in the parking
36:27being compliant um with the requirements
36:29in terms of setback consolidating the
36:31driveways. So there are potentially some
36:33other options um but they would likely
36:35you know be challenging for the
36:36operational component of of the
36:38building. Um we had a number of
36:42questions that the applicant has
36:43responded to. We do have um all the
36:45comments that we have conditioned
36:46adequately. The applicant was amendable
36:48to those. Um they will be in front of
36:51the uh planning board given the slopes
36:53on the site for site plan review and the
36:57locations in in a managed growth area in
36:59the city. This is north of Ararat
37:00Street. Um, west of Rockdale and uh to
37:04the north we have mostly residential
37:05neighborhood, but along Rockdale and
37:07further kind of to the east you have
37:10more u manufacturing and commercial
37:11uses. This transitional area obviously
37:15um based on the zoning district uh line
37:17that we've been talking about and how
37:18that's affected the relief for the
37:20project. Um the applicant did indicate
37:22they're planning to operate um 8 to 5
37:25Monday through I believe Saturday as
37:27potential um hours. Um, not that you're
37:29conditioning the special permit, but
37:31just for a little bit of context about
37:32how they're intending to operate. Um,
37:34with essentially everything located in
37:36the building, including trash, they're
37:38not proposing to have a dumpster at this
37:40point. Um, again, happy to answer any
37:42questions. Thanks. [snorts]
37:45>> Okay. Is anybody here for six Wilburn
37:47Street?
37:49>> Yes, please come forward. Just state
37:51your uh name and city of town of
37:53residence, please.
38:03Hi,
38:05Carlos Cordero
38:07and I live in 18 Montavis
38:10and uh this parcel this gentleman's
38:14build is to the right of my backyard.
38:16I'm just more curious because the
38:18picture looks really nice.
38:21It's when it's built how what is it
38:23going to look like? You know that street
38:26is on an incline, not flat like that.
38:30That's misleading.
38:33Well, go ahead, laugh. But that's the
38:34truth.
38:36And uh I just don't know how you can fit
38:42three pair of shoes in one box.
38:48And behind that there's a three d uh
38:50three apartments
38:52>> that doesn't show none of the pictures.
38:54I'd like to see a more blown picture
38:56that shows the apartments and the
38:59surrounding areas
39:01because I didn't know that Wuburn Street
39:03I've been there since the streets were
39:05dirt. That's how long I am I've been
39:08around. And oh, now the the picture
39:12shows and uh
39:16the guy that built those three
39:17apartments
39:19paved the street, but Wuburn Street was
39:21never a business side that things
39:25Rockdale is. And the parking lot in
39:28front of that his parcel is
39:32belongs to the school in front. So, I
39:34don't know.
39:37I'm just curious.
39:40Thank you.
39:42>> Yeah. Um, I'll let the applicant answer
39:44your question directly, but I think
39:46having been out there, you're right,
39:47it's very steep. Um, I remember, uh,
39:50and, um, Wurn uh, you know, getting
39:53paved. And so, um, the un the the way to
39:56think about it is that it's a it's
39:58actually a transition portion. So the
40:00parking lot is in a manufacturing
40:02district and the and
40:03>> which belongs to the school across the
40:05street
40:05>> and and and the up the street is the
40:08residential and so they are triggered
40:11because it's like a transition piece of
40:13lot but it's technically in the
40:15>> but the the parking lot doesn't belong
40:17to his land anymore. No belongs to the
40:20school.
40:20>> Yeah. Yeah. But the the way street,
40:22>> right? But the way to think about it for
40:24our laws is it's it's it's considered
40:27manufacturing.
40:29>> Yes. Well, that's what I'm governed by.
40:31So, so that so the way that the city
40:33thinks about it is that it's a
40:35manufacturing area even though obviously
40:37it's a school and a parking lot. And so
40:39what we're do so what it does is it
40:41transitions into the into the
40:43residential and he has to meet the
40:45criteria of the slope that you're
40:47talking about that gets extra look at
40:49from the from the planning board and he
40:52has to build it to look something like
40:55what he's giving us.
40:55>> If I'm the owner of the parking lot and
40:57I go in there and put a fence
41:00>> you would you could do it if you have
41:02some rules. There's some rules around
41:03it. You could have just do it. But yeah,
41:07>> but yes, but so if you wanted to if you
41:09wanted to do if you wanted to do
41:11something like depend that gets more
41:13complicated I'd tell you to get to the
41:14planning board. But essentially um if
41:17they wanted to make changes to the
41:18parking lot they'd probably have to come
41:20before us as well. And similarly because
41:22of what he's doing to build the thing
41:24the build a building there even though
41:26it's in the manufacturing district
41:27because it's transitioning into the
41:29residential he has special oversight.
41:31And so some of the things you're
41:32concerned about, the slope, the look,
41:35the making sure that it actually
41:37functions, those are both what we look
41:39at with our and the city staff and also
41:41the next board should we pass it. The
41:43planning board will also look at those
41:44questions and make sure that it looks
41:46like what he's proposing.
41:46>> My other question, what is it going to
41:48be a built?
41:50>> It's a business for I think fire
41:52extinguishers.
41:53>> Fire extinguisher company.
41:54>> Yeah, it might be the safest building in
41:55the city.
41:56>> Mr. BTO's business uh through the chair
41:58is is he he provides fire extinguisher
42:02extinguishers to various businesses.
42:03>> Okay.
42:04>> Fire extinguishers. Yeah. Yeah. Um so
42:07does that answer your question?
42:08>> My question?
42:09>> No. Well, I want one at a time. Yeah. I
42:11want to make sure I get his question.
42:11I'll get your question.
42:13>> I chose a driveway over there in
42:16>> through the chair. If you could just
42:16talk into the microphone.
42:18>> Oh, yeah. You got to talk in the
42:19microphone.
42:19>> The microphone.
42:20>> Sorry. It's for public record.
42:21>> Thought it was loud enough.
42:23>> You don't know. Yeah. So that's in front
42:25that driveway is in front of the
42:28building.
42:29>> And so what's behind it?
42:30>> The parking lot.
42:31>> The parking lot. The parking goes the
42:33parking lot to the the length of it.
42:34>> So you're going to have to
42:37>> just make sure you talk to me, please.
42:39>> And over here there's a three buildings,
42:42right?
42:44>> So what are you going to to retain that
42:47wall?
42:48What are you going to put there?
42:51You're looking at me like I'm talking
42:53from another world.
42:54>> You got to talk to
42:55>> You said what do we How are we going to
42:56retain that wall?
42:57>> Correct.
42:58>> Well, I don't know. That's an
42:59interesting phrasing. You use the
43:00retaining wall to hold back the earth.
43:03>> Yeah, there's going to be a wall.
43:04>> It's a pretty
43:05>> It's right. So, it's going to be
43:07>> six feet tall.
43:08>> So, the the the wall at its height will
43:09be no more than four feet to hold back
43:13the the whatever is going to be down
43:14there.
43:15>> Is that what you heard?
43:17>> Well, that's the rules. If it is more
43:18than that, then they'll get in trouble.
43:20Four feet.
43:21>> Four feet.
43:22>> Yeah. If they try to do more than that,
43:24then it'll get it. Again, you have to
43:25talk into the microphone, but if you if
43:28you if there's if there's any trouble,
43:30like if you're worried about the height,
43:31you can always call the city and they do
43:33to get a to get a permit for this, they
43:36have to meet the what they've told us,
43:37right? There's rules on what they can
43:39and can't do.
43:41>> Yeah. Go ahead. Come forward. Just state
43:42your name and city of town residence,
43:44please.
43:44>> Maria Corddiero at Montav right behind
43:47it. Also, my question is, is
43:49>> can you just talk a little bit more to
43:50the
43:50>> I'm sorry. Is it going to be an office
43:52or is they going to be building
43:54manufacturing things there?
43:55>> I don't believe they're going to be
43:56manufacturing things, but I'll let the
43:58applicant answer that question.
43:59>> It's an it's an office.
44:00>> Yes, that's correct.
44:01>> Okay. No, behind the building.
44:04>> Yeah.
44:05>> Right. Is there going to be trees?
44:07Because to be honest with you, I'm right
44:09behind I'm my Here's a three decker.
44:14Here's my house right here. I I can look
44:17down and see it. And to be honest with
44:19you, last thing I want to look is that a
44:22building like that is there going to be
44:25trees behind
44:27where
44:28>> Yeah. Let the applicant answer the
44:30question.
44:30>> Just just quickly, Mr. Chairman, uh, one
44:33of the conditions of approval to which
44:34we have no objection which is suggested
44:36by city staff was uh, planning arbravite
44:38along the west left side as you're
44:41standing in the road and nor and uh,
44:43north the far side away from the road
44:45boundaries and we have no objection.
44:47>> The short answer to your question is
44:48yes, there will be trees in your view.
44:52>> There will be trees.
44:53>> Yes, they have to place them
44:54>> this way and this way cuz when I look
44:57>> Yes, in that corner. Yes, in your exact
44:59corner. So my other question is
45:01>> can you just talk into the microphone
45:02again please? No
45:03>> my other question is now the building is
45:06it being built where the grass is?
45:09>> Yes.
45:10>> Okay. Right where the grass is.
45:12>> Yes, that's correct.
45:13>> Okay. I'm not only concerned for myself
45:16with the trees but I don't think there's
45:18nobody here from those three decas. I
45:20mean
45:21>> I feel bad for them. I really do. I know
45:24they have children. They play, you know,
45:27that's they ride their little bikes
45:29there and they play there. That's like
45:31the, you know, I do feel bad because
45:34they have little ones. I mean, I don't,
45:36but
45:37>> Okay. So, there's trees at some point,
45:39we're not going to see this building.
45:41>> You might still see the building through
45:42the trees, but there'll be trees there.
45:44>> But there will be trees.
45:45>> That's correct.
45:45>> Okay. And how many people are they're
45:48employing? How many people are going to
45:50be employed there?
45:52>> Uh, from now it's just me and my son.
45:55Okay,
45:56>> just state your name.
45:57>> And the trees that are there right now,
45:59>> state your name.
46:00>> Yeah, my name is Marcelo. I'm sorry. I'm
46:02the owner of the property. And the trees
46:05that are there right now, they're going
46:06to remain. And if we have, you know, as
46:09was proposed, we're going to, you know,
46:11put the trees and a fence up if you need
46:14it. You know, there
46:15>> we're not going to try to, you know,
46:17change drastically anything. It's just
46:20>> we want you to run your business
46:22successfully. You know, we just wanted
46:24to have it look nice.
46:25>> Yeah.
46:25>> Talk to me, please.
46:26>> Oh. Oh, sorry.
46:28>> It's okay. It's okay. No worries at all.
46:30No worries at all. It's a formal formal
46:32process.
46:33>> Okay. It was my first time. I'm nervous.
46:34>> You should not be nervous. Go ahead.
46:36You're asking great questions. Go ahead.
46:37>> Okay. Well, that was it.
46:39>> Okay. Great.
46:39>> And Okay. And when you planning on
46:41building?
46:42>> So, they will have to go through the
46:44planning. If if it gets passed here, it
46:46has to go to the planning board. And if
46:47you have any questions on their
46:49timeline, you can always contact the
46:50city and they're happy to give you any
46:52information you need.
46:53>> Okay. Thank you so much.
46:54>> Thank you so much. No problem at all.
46:56Thank you.
46:56>> And through the chair just minutia, but
46:59just want to clarify the trees are
47:01arborvite, not trees. So they're like
47:03evergreen shrubs. I just want to clarify
47:05just because of the location with the
47:06retaining wall.
47:08>> So they would be like six foot tall, six
47:11foot tall um when they're planted and
47:13they grow fast. So they'll continue to
47:15grow into like a hedge and extend
47:17taller. Uh but because of the location
47:19of the wall, I don't believe that there
47:20was uh adequate room particularly on the
47:23west side to have anything beyond that.
47:25So I just I just want to clarify um that
47:27they're not like big shade trees,
47:29>> right? So they're not Does that make
47:30sense? They're like they're they're
47:32basically meant for like big hedge.
47:34They're about six feet to block some of
47:35the view, but they're not like a big oak
47:37or or shade tree.
47:39>> They're six feet. They'll grow a little
47:41bit to over six feet. There'll be above
47:42the There'll also be a wall there as
47:45well. Yep. Okay. Um, anybody else? Okay.
47:50Uh, anybody online?
47:53Okay. So, going to board comment. Um,
47:57I'll just say really quickly, this is a
48:00small request. Um, literally in the
48:03point zeros. Uh, and, um, I think u, I
48:08think this will I actually think this
48:09will be nice. I was out there. Um it
48:12looks like a fine thing and as I joked
48:14it'll be the safest building in the city
48:16of Worcester um with fire extinguishers.
48:18So um uh I'm happy to move it forward.
48:22Um
48:23and you got all the other questions. Uh
48:27board member uh um board member uh oh
48:30sorry voting on this is going to be
48:32board member uh Sacko as the alternate
48:35on this one. Um and with that I'll go to
48:38the room first. uh board member Barhagen
48:40>> uh through the chair. Yeah, I don't have
48:42too much to say. I mean, yeah, because
48:44the requests for relief are minuscule
48:46here. So, this is almost
48:50complying with every u uh zoning rule we
48:54have except just slightly off. So, I
48:57tend to give the benefit of the doubt to
48:59those types of applications. Plus, I
49:01think I think I agree with the chair
49:02that this looks like a really good
49:04building. it'd be nice for you to have
49:06your business be closer to where you
49:08live. Um I also feel a little bit um
49:11it's, you know, unfortunate that this is
49:14right next to that condo building. Um
49:17but
49:19I think it's it's relatively minor in my
49:21mind. I think this is in the
49:23manufacturing district district. Um and
49:26this would be a good use for that
49:28manufacturing acreage. So uh I have no
49:32problem with it.
49:34Okay. Uh, board member Remy. [snorts]
49:37>> Um, I agree with your comments and I
49:39have no additional comments except I
49:41support this as well.
49:43>> Uh, board member Cortez.
49:54>> Board member Cortez, you are muted.
49:57>> Yeah. Just uh just to get ready.
50:01>> Sorry. Sorry about that through the
50:02chair.
50:03>> Um uh I don't have any uh any problems
50:07with the uh uh proposed uh building the
50:10way it is and everything else. I just
50:12have uh a question. Um
50:17it is uh there is a basement and and in
50:22and the first floor, correct?
50:25>> Yes. the the the the
50:27entrance off that's closer to Wurn
50:30Street uh will be one level below uh
50:33some doors on the uh left side of the
50:35building off the driveway.
50:37>> Okay. So, with that on the bridges, I do
50:40see windows on top of the first floor.
50:45Is that something
50:48is is that just for uh light that goes
50:52through?
50:53>> Yes. uh or or or or is it something that
50:56is is another uh kind of a level type in
50:59there like a attic or something for
51:02storage or what is it?
51:03>> It it as you've first guessed it is just
51:05for light. It's because that's the south
51:07face of the building. It's to to bring a
51:09little a little light in that won't
51:10otherwise be there.
51:12>> Okay. Uh thanks. Other than that, uh I'm
51:15fall
51:17for it.
51:18>> Okay. Uh, board member Tono,
51:27>> no comment.
51:29>> Board member Sacko,
51:30>> no comment. Thank
51:33>> Okay. Um,
51:34>> to the chair.
51:35>> Yes.
51:36>> Uh, this is George uh Cortez again. Uh,
51:40I I missed another question and and
51:43that's in regard to the uh the retaining
51:45wall. Um
51:48and and that retaining wall is basically
51:52should be low, no more than 4 ft. And
51:56and so is there a fence to be placed on
52:01top of that retaining wall? What is
52:04behind the retaining wall? Um
52:09and
52:10just for purposes of say safety or
52:13anything like that um I kind of I always
52:17ask you know retaining walls if there's
52:19going to be some type of a fence on top
52:23>> and to the chair uh one of the other uh
52:26staff uh recommended comments was the
52:29installation of fencing which would in
52:31in much of the case be either on top of
52:34or immediately beside that retaining
52:36wall or those retaining walls I should
52:38say
52:39>> either way. So that's that's an option
52:41retaining wall. So that answers my
52:43question. Uh thank you and let's move
52:46forward.
52:48>> Okay.
52:49Um so uh we will need um board member
52:53Cortez, we'll need you to second on
52:55these motions upcoming. So on that um I
52:58will entertain a motion to close.
53:01>> I'd like to make a motion to close for
53:03six Wuburn Street.
53:05>> Second.
53:05>> No. Yeah. So moved.
53:07>> So moved. Sorry.
53:08>> Uh is there a second?
53:10>> I do second the motion.
53:11>> On the motion to close. Uh board member
53:14uh board member Cortez.
53:16>> Yes.
53:17>> Board member Mormmy.
53:18>> Yes.
53:19>> Board member Tono.
53:20>> Yes.
53:21>> Board member Sacko.
53:23>> Yes.
53:24>> My votes yes. Is there a motion on six
53:26Wilurn Street?
53:27>> I'd like to make a motion on Six Wuburn
53:28Street for approval of a variance for
53:30relief of 0.2 2 ft from the 20 foot
53:32minimum sideyard setback requirement for
53:35a non-residential use in an MG0.5 zone.
53:38Uh approval of a variance for relief of
53:400.02 from the 0.5 to1 maximum
53:43dimensional floor to area ratio in the
53:46MG0.5 zone. A variance for a relief of
53:490.27 from the 0.25 to1 maximum
53:52dimensional floor to area ratio in an
53:54MG0.5 zone. and for approval of a
53:56special permit to modify the parking
53:58dimensional layout and/or landscaping
54:00requirements, loading requirements,
54:01and/or the number of required parking
54:03spaces subject to the uh conditions set
54:07forth in the staff memo on page six of
54:1010 and the waiver is requested by the
54:12applicant.
54:16>> So moved.
54:16>> Is there a second?
54:18>> I do second the motion.
54:20>> On the motion, board member Cortez,
54:23>> yes.
54:23>> Board member Mammy,
54:24>> yes. Board member Tono,
54:27>> yes.
54:28>> Board member Sacko,
54:30>> yes.
54:30>> My votes, yes. Thank you very much.
54:33>> Thank you all for your time and uh thank
54:34you staff especially for making what was
54:36a very uh confusing uh uh situation a
54:39little more clear. Thank you.
54:42>> Thank you. Have a good night.
54:44>> Do you guys mind make a motion real
54:45quick for recess? Um hold on one second.
54:49Like to make a motion for a fivem minute
54:51recess.
54:52>> Uh do you second it? Second.
54:55>> All right. All in favor? I. Okay. Uh
54:58we'll be back at 6:41. Thanks.
55:01>> Cool.
59:43Uh before we get started, we need to
59:45confirm um the board members online are
59:48available. Uh board member Cortez
59:51here.
59:52>> Board member Tokono
59:54here. Board member Sacko,
1:00:03just a second. Is this better? Can you
1:00:05hear me? Okay.
1:00:07>> Can you hear him?
1:00:08>> Can you hear me? Okay. Okay, great.
1:00:12>> Board member Sacko.
1:00:34He's there.
1:00:36>> Board member Sacko, if you could unmute.
1:00:40>> Oh, there we go. Great. All right. Next
1:00:43up is 232 Stra uh Stafford Street. If
1:00:46the applicant could please come forward,
1:00:47state your name. City of town of
1:00:48residence.
1:00:49>> Good evening, Mr. Chair, members of the
1:00:50board. For the record, Mark Borenstein.
1:00:52and I'm an attorney here in Worcester at
1:00:53Prince Lebell representing the
1:00:55applicant. Um before you this evening um
1:00:59are applications um in connection with a
1:01:01residential community at 232 Safford
1:01:03Street um for variances for relief for
1:01:05the maximum height and um and also for
1:01:09frontage and also a special permit to
1:01:11modify parking layout requirements. We
1:01:13have a short video presentation for you.
1:01:15After that, we'll turn over to staff and
1:01:17um to need to introduce other members of
1:01:19the team that will speak to any
1:01:20questions that the board may have.
1:01:22>> So, we'll do the video. Thank you.
1:01:24>> Okay. There's gonna be a video
1:01:29>> hopefully.
1:01:34232 Stafford LLC is pleased to present
1:01:37its proposed residential community at
1:01:39232 Stafford Street in Worcester. The
1:01:41property consists of an approximately
1:01:4336.7 acres and is currently occupied by
1:01:46the Worcester Academyy's New Balance
1:01:48Athletic Fields. While the site has
1:01:50approximately 588.8 ft of frontage along
1:01:53Stafford Street, it extends
1:01:54significantly to the west, creating a
1:01:56large, irregularly shaped parcel with
1:01:59unique environmental features. The
1:02:00property is surrounded by a diverse mix
1:02:03of uses. The property is bordered by
1:02:05established single family homes along
1:02:06Lello Street to the east, commercial
1:02:08development along Stafford Street to the
1:02:10south, residential neighborhoods in the
1:02:12town of Leicester to the west, and the
1:02:14Greater Worester Land Trust Kettlebrook
1:02:16Conservation Area and Trail Network to
1:02:18the north. A defining feature of the
1:02:19site is Kettlebrook, a perennial stream
1:02:22that runs through the property, placing
1:02:23portions of the site within the flood
1:02:25plane. Together with the site's varied
1:02:27topography, these natural features
1:02:29create constraints which have guided the
1:02:31project's design from the very
1:02:32beginning. In February 2026, the
1:02:35Worcester City Council reszoned the
1:02:36property to the Residents General RG5
1:02:38zoning district to facilitate
1:02:40residential development at the property.
1:02:42The proposed project has been designed
1:02:44to implement that vision while
1:02:46respecting the site's natural resources
1:02:47and the surrounding neighborhood. The
1:02:49project will create a residential
1:02:51community with a total of 207
1:02:53residential units. It includes a
1:02:54four-story multif family building
1:02:56containing approximately 57 apartments
1:02:58and surface parking with approximately
1:03:00152 spaces. The project will also
1:03:02include 150 town home rental units
1:03:05located within 26 single family attached
1:03:07buildings. Variations in exterior wall
1:03:10materials, depth, and detailing will
1:03:12provide a rich texture and break down
1:03:13the scale of the proposed buildings.
1:03:15Each town home includes an attached
1:03:17garage and private driveway parking. In
1:03:19total, the development will provide 452
1:03:22parking spaces, satisfying the city's
1:03:24off- streetet parking requirements and
1:03:26ensuring ample parking for residents and
1:03:28visitors. The layout of the project has
1:03:30been carefully planned to place the
1:03:32majority of the development away from
1:03:33Kettlebrook and the flood plane while
1:03:35preserving substantial open space and
1:03:37existing wooded areas along the western
1:03:39portion of the property. Those preserved
1:03:41areas will continue to provide natural
1:03:43habitat, protect water resources, and
1:03:45create a vegetative buffer between the
1:03:48residential development and the
1:03:49surrounding properties. The residential
1:03:51community is organized around an
1:03:52interconnected internal driveway system.
1:03:54There will be a primary driveway off of
1:03:56Stafford Street to the south and an
1:03:58emergency access driveway off of Hyatt
1:04:00Street to the north. The internal
1:04:01roadway network has been designed to
1:04:03provide safe and efficient circulation
1:04:05for residents, visitors, service
1:04:07vehicles, and emergency responders. For
1:04:09example, the primary entrance is located
1:04:11in an elevated portion of the site and
1:04:13the emergency access driveway is located
1:04:15entirely outside of the flood plane.
1:04:17Furthermore, a comprehensive traffic
1:04:18analysis concluded that the surrounding
1:04:21roadway network can safely accommodate
1:04:22the projected traffic generated by the
1:04:24development without creating significant
1:04:26congestion or adverse impacts to nearby
1:04:29intersections. The project also includes
1:04:31landscaped open spaces, amenity space
1:04:33along Stafford Street, pedestrian
1:04:34walkways, bicycle parking, storm water
1:04:37management facilities, and extensive new
1:04:38landscaping throughout the site. New
1:04:40trees and plantings have been selected
1:04:42for their long-term sustainability and
1:04:44resilience with all tree species being
1:04:46Asian longhorn beetle and emerald borer
1:04:48ash resistant. The project will require
1:04:50relief from the drive aisle width,
1:04:52frontage, and building height
1:04:53requirements. Certain drive alises will
1:04:55be as narrow as 20 ft, requiring 4 ft of
1:04:58relief through the requested special
1:04:59permit. The 150 townhouse units would
1:05:02generally require 3,000 ft of frontage,
1:05:04while the property has approximately
1:05:06588.8 ft of frontage along Stafford
1:05:08Street. The project therefore requires
1:05:10approximately 2,411 ft of frontage
1:05:13relief through a variance. Certain
1:05:15townhouse buildings will be elevated
1:05:17above the flood plane, resulting in
1:05:18additional height, while other buildings
1:05:20are designed to follow the property's
1:05:21natural topography and minimize grading.
1:05:23These townhouse buildings that will
1:05:25exceed the maximum height requirements
1:05:26will require relief through a variance.
1:05:28Importantly though, these buildings will
1:05:30be set below and away from the existing
1:05:32Lello Street homes. Moreover, the
1:05:35tallest structure, the multif family
1:05:36building, will comply with the RG5
1:05:39maximum height requirement and will also
1:05:40be set below and away from the existing
1:05:42homes. Overall, the proposed development
1:05:45reflects a balanced and thoughtful
1:05:46approach to residential growth. By
1:05:48responding to the property's unique
1:05:49natural features, preserving substantial
1:05:51open space, and providing a diverse mix
1:05:54of housing opportunities, the project
1:05:56creates a well-designed neighborhood
1:05:57that complements the surrounding
1:05:58community while helping to meet
1:06:00Worcester's growing need for housing.
1:06:08Thanks, Amy Beth. Uh, Mr. Chair, if I
1:06:11may, just a couple additional points.
1:06:13Um,
1:06:13>> yeah, if you could just talk into the
1:06:14microphone a little bit more.
1:06:15>> Yes, certainly. Is this is this good?
1:06:18>> Can you hear me?
1:06:19>> Barely.
1:06:20>> Barely. Okay. I'm going to really I'm
1:06:23going to really um not shout, but I'm
1:06:25I'm going to try to be as clear as I can
1:06:26and as loud as I can. So, just a couple
1:06:29additional pieces of information um just
1:06:31to supplement the video presentation. Um
1:06:34as the team has been refining the uh
1:06:36floor plans for the multif family
1:06:38building, they've decided to modify such
1:06:41that there will be 59 units instead of
1:06:4357 units. So, we're now proposing 209
1:06:46units total versus 207 units, which are
1:06:49reflected in the in the um the findings
1:06:53uh that we submitted to staff. But I
1:06:54just wanted to make that clear for for
1:06:56the public and for staff and the board.
1:06:58Um in addition, um I just would like to
1:07:01talk through some of the ongoing
1:07:03processes that have have taken place and
1:07:05I'm sure um staff will also comment. Uh
1:07:08once we receive once we submitted the
1:07:09applications, we received some initial
1:07:11feedback from um the fire department and
1:07:14emergency mana management with respect
1:07:15to the flood plane and they asked for
1:07:17certain modifications. We had previously
1:07:19proposed um a an an additional emergency
1:07:22exit off to off of Stafford Street, not
1:07:24off of Hyatt Street. The fire department
1:07:26determined that they would like a second
1:07:28means of access um from Hyatt Street.
1:07:31So, we have we've added that to the
1:07:34plan. So, you might see in in the staff
1:07:35memorandum that we submitted the plans
1:07:37on August 3rd. That was in response to
1:07:39that particular comment. Other than
1:07:41that, the the layout of the site has not
1:07:43changed. In addition, um we've been
1:07:45working with DTM to address any
1:07:47questions they have regarding um traffic
1:07:49counts. We've submitted that memorandum.
1:07:51Uh we were requested, I think on
1:07:53Thursday or Friday, and we immediately
1:07:54submitted that report. Um certainly a
1:07:57lot of these additional um items while
1:07:59while partially within the purview of
1:08:01the of the ZBA will also be addressed
1:08:02through the planning board approval
1:08:04process. Um I would also like to just
1:08:06highlight one aspect um of the the
1:08:09relief globally is you'll see that the
1:08:12relief associated with frontage and
1:08:14height pertain to the town houses and
1:08:17that's because town houses usually
1:08:19contemplate ownership units and there's
1:08:21no cap on the required amount of
1:08:23frontage for town houses. Um as staff I
1:08:26think references in the materials if we
1:08:28had built subdivision roads and had
1:08:30separate ownership we wouldn't need
1:08:31relief. Um, similarly, as referenced in
1:08:34the staff memorandum, if we were
1:08:36proposing only multif family housing,
1:08:38large multif family housing, I believe
1:08:40we can build over 2100 units by right on
1:08:42the property, uh, without need for
1:08:45relief or frontage or height. Um, so it
1:08:48it it I just want to make it clear to
1:08:50the board while we're seeking relief
1:08:51associated with the project, it's not
1:08:53because the project is overly dense or
1:08:56that we are somehow trying to um, find
1:09:00accommodations. It's because the
1:09:02developer is proposing a very unique
1:09:04type of housing option which is single
1:09:07family rentals. And so because they're
1:09:10all on one lot, we have to seek relief
1:09:12associated with frontage. And similarly,
1:09:14because there's internal driveways
1:09:16instead of streets, we have to seek
1:09:17relief associated with the frontage. So
1:09:19I just want to make sure that's clear.
1:09:20As we're evaluating the criteria, we're
1:09:23evaluating the relief. this site could
1:09:25be significantly more dense than the
1:09:27developer is proposing, but they want to
1:09:29provide a more attractive neighborhood
1:09:31for residents. Um, and and the other
1:09:34piece that I want to speak to, which I
1:09:36think is important in terms of the
1:09:37overall development is, and it's one of
1:09:39the conditions of approval, the
1:09:40development team has been actively um
1:09:43speaking with Greater Worester Land
1:09:44Trust to come up with some method to
1:09:47preserve the westerly portion and the
1:09:49norly portion of the site. So uh so
1:09:52globally we're going to have a less
1:09:54dense site than what's permitted by
1:09:56Wright if we were to do multif family
1:09:57housing and we're going to have a
1:09:59portion of the site that's going to be
1:10:00either conveyed or or uh there will be a
1:10:03conservation restriction that will
1:10:04restrict development on that Wesley
1:10:06portion going forward. Um I I know that
1:10:09in the staff memorandum staff has has
1:10:11highlighted that they would appreciate
1:10:13additional time to review this this this
1:10:16application and these plans. We
1:10:17certainly understand that and we
1:10:19certainly welcome that ongoing dialogue
1:10:20with the with the planning staff. Uh we
1:10:22would just respectfully request that
1:10:24after we've go through the conditions of
1:10:26approval that to the extent that the
1:10:27board would like to move forward with
1:10:28with a vote, we would ask for that for
1:10:30purposes of of moving the project
1:10:33timeline forward that that the applicant
1:10:35is not the owner of the property. They
1:10:37have not submitted any planning board
1:10:39applications and they don't want to do
1:10:40so until they're they they have the
1:10:42necessary relief to the extent that the
1:10:43board is willing to grant it. So, we
1:10:45recognize the staff um has evaluated the
1:10:47plans. Uh but I just want to highlight
1:10:49for the board that, you know, we are
1:10:51continue we are committed to continue to
1:10:52work with staff, all the departments to
1:10:54ensure a safe development. Um um and
1:10:58with that, I'm happy to turn it over to
1:10:59staff. Uh we've talked through some of
1:11:00the conditions of approval. They're
1:11:01generally all acceptable. Um we would
1:11:04respectfully request the waiverss
1:11:05recommended by staff. Um but happy to
1:11:07answer any questions after staff has has
1:11:09weighed in on the project. Thank you.
1:11:13>> Okay. city staff
1:11:15>> through the chair Michelle Smith again
1:11:16in the city's planning division. Um so
1:11:18again in front of you this evening an
1:11:20application for two variances and a
1:11:23special permit. Um we're in an RG5
1:11:25zoning district. You heard that the
1:11:26property was recently reszoned by the
1:11:28city council. Um so this was a
1:11:31relatively recent change and the sort of
1:11:34general character of the neighborhood. I
1:11:36think there was a slide that we had that
1:11:37showed the kind of land use
1:11:38classifications. So basically to the
1:11:40northeast you have a lot of lower
1:11:42density residential uses and then along
1:11:44Stafford Street itself you have a
1:11:45variety of different uses including
1:11:48manufacturing uses directly off of of
1:11:50where the driveway is proposed across
1:11:52the street. Um so in terms of the the
1:11:56project they are proposing to build 26
1:11:58different structures for attached or
1:12:00townhouse style single family dwellings.
1:12:04Um, so these are are units that have to
1:12:05have a minimum of three units in each
1:12:08building to qualify for that under our
1:12:10zoning. Um, so that equates to 26
1:12:13buildings with a total of 150 dwelling
1:12:16units within those buildings. Um, there
1:12:19are 300 parking spaces associated with
1:12:21those units related to the garage spaces
1:12:24and the surface spaces that are being
1:12:25provided. And then with respect to the
1:12:28larger building that you see on the
1:12:30site, this is a multif family uh
1:12:32building, a high-rise building
1:12:34technically speaking, which is four
1:12:35stories. Um and that building itself um
1:12:39is proposed to have not 57 as was
1:12:41advertised, but in fact 59. Um the
1:12:44applicant has uh changed that with their
1:12:47updated findings as of today. So we're
1:12:49first just matter of business confirming
1:12:51that the applicant is comfortable
1:12:52proceeding.
1:12:53>> Great. Um, so, uh, the plan the plans
1:12:56that the board members have do not
1:12:57reflect that change in unit count, just
1:12:59to be clear. So, if if you're wondering,
1:13:01it's just two units, but just the
1:13:03materials don't include that that change
1:13:04that was recent. So, and then as part of
1:13:07uh the multif family area of the site,
1:13:09there are 152 parking spaces. So
1:13:13basically this breaks down to 209
1:13:15dwelling units and 452 parking spaces
1:13:18that are proposed on the overall site in
1:13:20the configuration of multif family and
1:13:22the single family attached townhouse
1:13:24style dwellings. So just to to re
1:13:27reiterate um so the reason that the
1:13:29application is in front of the board is
1:13:31because the law is lacking the minimum
1:13:33frontage. So there's 3,000 ft as you
1:13:36heard required by our ordinance. Um the
1:13:38multif family uses have a cap that
1:13:40actually limits frontage at 100 ft. Um
1:13:44we have that it's satisfied but
1:13:46unfortunately the townhouse style
1:13:47dwellings do not have a similar cap. Uh
1:13:50they're contemplated in a different way
1:13:52and so that note that we have limiting
1:13:54for multif family density does not apply
1:13:56to the townhouse style units. So that is
1:13:58really what's driving the relief that's
1:13:59in front of the board this evening. Um
1:14:02so they're seeking relief from that. It
1:14:04is 2411.2
1:14:062 feet about 80% of what the requirement
1:14:08would be for that. And then similarly
1:14:11for the attached style dwellings they
1:14:14are in excess of the 35 ft height
1:14:17limitation. Uh they comply with the
1:14:19number of stories we believe. Uh but
1:14:21it's just the overall height um as
1:14:23measured on the the facade that has the
1:14:25main entry is basically how we measure
1:14:27that from the grade to the roof line.
1:14:29And so they're seeking relief of 10 ft
1:14:31in order to be able to provide a 40 foot
1:14:3345 foot tall um structure. And that's
1:14:36for all the different building types
1:14:37they have. I believe there are four
1:14:38different typologies for that style of
1:14:41of house. So, four different variations
1:14:43of that depending on where it is
1:14:44throughout the site based on grading,
1:14:45location of the flood plane, and what
1:14:47have you. Um, they're also seeking a
1:14:50special permit related to the parking
1:14:52loading landscaping requirements,
1:14:54specifically to have drive a width that
1:14:56are not 24 ft as we require, but instead
1:14:59a variable width of 20 to 22 feet in
1:15:02locations that they are not 24 feet. So,
1:15:04the kind of main corridor is 24 feet,
1:15:07but as you kind of get into the more
1:15:08peripheral, if you will, neighborhood
1:15:10network, um those driveways reduce and
1:15:13are a mix of uh 20 and 22 feet uh
1:15:16respectively. Um so, the applicant is
1:15:19seeking relief in in those three
1:15:20respects. That's really what's in front
1:15:22of the board. The application will
1:15:23require site plan review where the
1:15:25planning board reviews kind of means
1:15:27methods of construction, understands
1:15:29phasing, sequencing, grading, looks at
1:15:31lighting, landscaping, and all of the
1:15:33other details. So, what has been
1:15:35submitted to the board at this point is
1:15:37sort of this more conceptual plan that
1:15:39the board has up on the screen here.
1:15:41There's no phototric plan um that was
1:15:43included. So some of those details have
1:15:45not been progressed um as part of of the
1:15:48process at this stage but will be
1:15:50required to be progressed at a site plan
1:15:52review level um where the application to
1:15:54move forward um from the zoning board of
1:15:57appeals because of the location of the
1:15:59property both in the flood plane as well
1:16:02as within proximity to Kettlebrook. Uh
1:16:04there will also be a filing with the
1:16:06conservation commission. We call it a
1:16:07notice of intent application, but
1:16:09basically a permit with the conservation
1:16:11commission to make sure that the
1:16:12wetlands and the flood plane are
1:16:13protected throughout construction and
1:16:15that the proposal doesn't have an
1:16:16adverse impact on the natural
1:16:18environment resulting from storm water
1:16:20and the construction activities
1:16:21themselves. So, just a little bit about
1:16:23other permits that are going to be
1:16:24needed. Um, we also require because of
1:16:27the number of residential buildings that
1:16:29are proposed and that they are proposed
1:16:30on one lot that they obtain a more than
1:16:33one building on a lot permit from the
1:16:35planning board which essentially is a
1:16:37review for compliance of the driveways
1:16:40and the site with the subdivision
1:16:41regulations that we have here in the
1:16:42city. Um, so there'll be another
1:16:44opportunity for uh the planning board to
1:16:46review related to making sure that the
1:16:49driveway network is safe and
1:16:50satisfactory um for all all um that it
1:16:54serves and that we'll be using it. And
1:16:56finally, the emergency interconnection
1:16:58that you heard about um that is located
1:17:00plan north or top of the screen which
1:17:02will interconnect with Hyatt Street. Um,
1:17:05in that location, there'll be likely two
1:17:08different approvals that will be needed
1:17:09with the planning board because a
1:17:10portion of a street is going to be
1:17:12opened and a portion of a street is
1:17:13going to be upgraded and those are
1:17:15private streets. So, the planning board
1:17:17has a role in reviewing the changes to
1:17:19that. Um, unlike public streets where
1:17:21city council makes that decision. Um, so
1:17:23the planning board will have that and
1:17:24that's that's our best guess based on
1:17:26the information that's been provided.
1:17:27Um, as the applicants council indicated,
1:17:30um, there have been a number of concerns
1:17:32expressed by different departments. The
1:17:34applicant has been exceptionally
1:17:35responsive um to trying to address
1:17:37those, but unfortunately time is just
1:17:39something we cannot create more of. Um
1:17:41so uh the applicant did provide a
1:17:43response to uh concerns that the fire
1:17:45department and emergency management had
1:17:47expressed. Originally, as you heard,
1:17:49there was one driveway proposed from
1:17:51Stafford Street. Um, and the applicant
1:17:54proposed a secondary emergency access
1:17:56with a redundant driveway, I'll call it,
1:17:58also along Stafford Street to which the
1:18:00fire department and emergency management
1:18:02still had concerns about that not
1:18:03meaningfully providing access and
1:18:05wanting to ensure you know that all of
1:18:07these families are safe were there to be
1:18:09a flood. Um, so the applicants revised
1:18:11the plans to provide this
1:18:12interconnection to the north. So in
1:18:14response to that, we still have
1:18:15additional comments. There are some
1:18:16conditions that have been included
1:18:18related to ensuring that that emergency
1:18:20interconnection ends up being adequately
1:18:22improved to the satisfaction of the fire
1:18:25department as well as DPW um and the
1:18:28department of transportation and
1:18:29mobility and then that will happen
1:18:30through the planning board process. But
1:18:32you don't have plans that show exactly
1:18:34what is proposed there either. So I'll
1:18:36just caveat again something that is um
1:18:38to be developed or has yet to be
1:18:40developed um at this stage in the
1:18:43process. Um, and I'm calling it an
1:18:45emergency interconnected
1:18:46interconnection. But I just I will
1:18:48clarify um that at this point there's
1:18:50only a draft traffic study that the
1:18:52applicant submitted u on Friday in
1:18:54response to the the concerns that um the
1:18:56Department of Transportation and
1:18:57Mobility raised. Um so they were able to
1:19:00review that in in its draft form, but
1:19:02it's not essentially a complete traffic
1:19:03study. That'll be required uh for the
1:19:06site plan review with the planning
1:19:08board. Um, but at this point, um, they
1:19:10have issued preliminary comments which
1:19:12are included for the board members in
1:19:14your packet. They were just issued
1:19:15today, so I'm not sure folks had a
1:19:17chance to look through them all. Um, but
1:19:18those are included there. Um, I don't
1:19:21believe we have included those as
1:19:24conditions. Um, it's really more of like
1:19:26a narrative comment for the applicant
1:19:28and something that they're looking for
1:19:29as part of the site plan. Should you
1:19:31feel any of those are important to
1:19:33include, you could certainly do so. Um,
1:19:35but that's not the way that the memo for
1:19:37planning anyways has been structured.
1:19:39Um, so just again calling attention to
1:19:41that. Um, and I again get back to the
1:19:44the calling it emergency. It is possible
1:19:47that through the results of the traffic
1:19:48study and conversations with DTM that
1:19:50perhaps that isn't an emergency. I don't
1:19:53know. I don't think that that is
1:19:54intention or desire at this point, but
1:19:56it's hard to say because the traffic
1:19:58study is is not fully complete and
1:20:00obviously we haven't had a chance to to
1:20:02completely weigh in in that regard. Um
1:20:05so that's a little bit about the the
1:20:08other permitting. Um just again
1:20:10recapping related to the the specific
1:20:13relief and what the buy alternatives are
1:20:15or alternatives without this board's
1:20:18permission that would just go to the
1:20:20planning board for site plan review. Um
1:20:22that would be building multif family
1:20:24units at a a much greater potential
1:20:26density. Um as was referenced um of
1:20:29high-rise. of something that is uh four
1:20:32stories or up to eight stories. In fact,
1:20:35um could be constructed by right at this
1:20:37location. Uh and based on the area
1:20:40that's available, that is in the order
1:20:41of magnitude of about 2100 potential
1:20:44units. Um because the lot area becomes
1:20:46the limiting factor for that density. Um
1:20:50there are a variety of other pieces as
1:20:52well. Um [snorts] in terms of the uh
1:20:56relief on the driveways, they could
1:20:58easily accommodate a 24 ft drive aisle.
1:21:00Um that would result in more impervious
1:21:02surface and would likely start to
1:21:04encroach on some of the structures
1:21:05closer to some of the resource areas and
1:21:08the buffers that the city and the state
1:21:10have related to that. Um which while not
1:21:13impossible in terms of the site design,
1:21:15uh would in kind of infringe on those
1:21:16natural resource areas and make
1:21:19construction potentially more
1:21:20challenging as well. Um,
1:21:23and the al other alternative that I
1:21:25neglected to mention. So, while there
1:21:27isn't enough frontage on Stafford
1:21:29Street, the applicant could lay out a
1:21:31subdivision. And in laying out a
1:21:32subdivision, you create the frontage
1:21:34that's needed. Um, so the applicant
1:21:36could essentially create a new road and
1:21:38create the frontage through that
1:21:39process. Um, we would look in a
1:21:41situation like that for an
1:21:42interconnection as well to an adjacent
1:21:44street like Hyatt Street. Um and there
1:21:46may be other uh challenges in designing
1:21:49a road that meets the city standards. Um
1:21:51so the applicant has chosen not to do
1:21:53that and instead they're in front of you
1:21:54for this particular uh form of relief.
1:21:57And then again with respect to the
1:21:58height requirements, the applicant could
1:22:00reduce the height for the proposed
1:22:02structures by 10 ft um and comply with
1:22:04the zoning requirements. Um so just
1:22:06emphasizing some of the unique features
1:22:08of this were in the flood plane overlay
1:22:10district. You know, not every property
1:22:12is located in this area. So the the
1:22:14property is located in the 1% often
1:22:16referred to as a 100redy year, but I
1:22:18don't want you to get caught up on that
1:22:19because it doesn't necessarily happen
1:22:21every hundred years. Um 1% theoretical
1:22:24flood event um special flood hazard
1:22:26area. Basically in that theoretical
1:22:28event portions of the site saw the kind
1:22:30of red, yellow, green map that was
1:22:33included in one of the graphics shows
1:22:35kind of the intensity of um flooding
1:22:37that would be on the site with the depth
1:22:39of flood flooding modeled based on the
1:22:42theoretical study that FEMA had
1:22:44conducted um in this area um
1:22:46representing you know again what that
1:22:48would look like. So the the driveway
1:22:49does get um eclipsed by the the flooding
1:22:53in that location on Stafford Street. So
1:22:55the the purpose of Hyatt being to
1:22:57provide an uninated area to provide
1:23:00access to those units. There are I
1:23:04believe three of the buildings that are
1:23:06fully located within the flood plane.
1:23:07The town houses that you see kind of
1:23:09horizontal to the bottom of the screen.
1:23:11Um those units and the team should
1:23:13correct me if I've got that wrong, but
1:23:15um those are are located um in that
1:23:18area. A series of parking areas
1:23:20including the main parking area and the
1:23:21driveway like I mentioned also being
1:23:23within the flood plane. Um so all of
1:23:25those will have to comply with building
1:23:26code requirements for construction in
1:23:28the flood plane as well as the
1:23:29conservation commission requirements
1:23:31preventing any flooding from occurring
1:23:33um and affecting neighboring properties.
1:23:35So if there's any fill there has to be a
1:23:37commensurate cut. Um
1:23:40in terms of uh the layout itself uh the
1:23:43it's relatively suburban as you can see
1:23:45in terms of its orientation sighting.
1:23:47Some of that's being driven by the flood
1:23:49plane. Part of that's also just being
1:23:51driven by the design type and kind of
1:23:53the market that the applicant is seeking
1:23:55to to fill. Um the applicant is
1:23:58providing 2.2 parking spaces per unit.
1:24:01So that's in excess of our high require
1:24:03rents for parking which are two spaces
1:24:05typically. Um so there's excess parking
1:24:08than is required by the zoning
1:24:09ordinance. Um we have um encouraged the
1:24:12applicant to from from the outside of
1:24:14their project to work with WRTA to
1:24:17consider an extension of the bus line
1:24:19down to accommodate potential future
1:24:22users from the development given the
1:24:23intensity of the development um to
1:24:25provide other convenient opportunities
1:24:27and help potentially um reduce trip
1:24:29generation from the site and in single
1:24:32occupant um vehicle trips. Um so we have
1:24:35um encouraged them to do that. So that's
1:24:37something that we've provided in our
1:24:38comments, not a requirement, just
1:24:39something that we're encouraging them to
1:24:40do and making sure that as part of the
1:24:42traffic study that that includes a
1:24:44transportation demand management plan.
1:24:46Um talking about how they will be trying
1:24:48to address the increases in truck
1:24:50generation from the project. We've also
1:24:52requested that they include both
1:24:54interior and exterior bike storage um
1:24:57for maybe families with kids that want
1:24:59to have their scooters and scoot over
1:25:01and go swimming in the pool just within
1:25:03the project. Um or guests that might be
1:25:04coming to visit uh for convenience or
1:25:06residents that live within the buildings
1:25:08and don't want to shle their bike up to
1:25:10their unit. Um so some of those a bit
1:25:12more sight planning but related to
1:25:14specifically the density and and trying
1:25:16to make sure that those accommodations
1:25:17are there. Um, you'll see on the bottom
1:25:20right there's a pale green area. This is
1:25:23noted as an amenity area. The specific
1:25:25programming, if you will, for the space
1:25:27has not been developed. There is
1:25:29currently a parking lot in that
1:25:30location. So, we have requested that the
1:25:33applicant maintain at least a portion of
1:25:34that parking lot available for public
1:25:37parking because the applicant is working
1:25:39with the greater interest on
1:25:40conservation of the area that's
1:25:42essentially not shown in green here. Um,
1:25:44so really the river and everything to
1:25:46the west of it and potentially some
1:25:48things to the east um to be determined
1:25:51at a later date. We do have a a
1:25:53condition in the recommendations which
1:25:55would include a requirement that prior
1:25:57to occupancy of their first unit that
1:25:59they have to show us that that property
1:26:02has been perpetually preserved um
1:26:04through conservation restriction
1:26:06basically being subjected to the state's
1:26:08protections for open space which is
1:26:10article 97. Um so we have condition in
1:26:13here to address that um to help with
1:26:16help with that. Um but we are looking
1:26:18for additional information about how
1:26:19kind of the public versus kind of
1:26:21private common space amenities and
1:26:23connection from the larger site to the
1:26:26amenity area would be provided without
1:26:28folks having to kind of make a trip in
1:26:30their vehicle to the amenity area to try
1:26:32to minimize again some of those trip
1:26:34generation um activities that might
1:26:36otherwise occur within the site just
1:26:38because of the scale of the project. Um
1:26:41and uh let's see anything else otherwise
1:26:45we are still in the process of obviously
1:26:48it's a large scale project so we're
1:26:49still in the process of reviewing all of
1:26:51the details of what's been provided. So
1:26:52really the review that we've done at
1:26:53this point is related just to the relief
1:26:56that the board's seeking. A lot of times
1:26:57our review is a bit more comprehensive
1:26:59in nature um just given some of the time
1:27:01limitations and the progression of the
1:27:02different plans. We haven't fully had
1:27:04the opportunity to do that. So you do
1:27:06see in our recommendation a note related
1:27:08to continuence. Ultimately, it's a
1:27:10discretion of the board as to, you know,
1:27:12if if you're comfortable with the
1:27:13information that's been provided, um,
1:27:15you know, there while the changes from
1:27:17the plans last week were relatively
1:27:20minimal, there are changes not just to
1:27:21the emergency access, but also to the
1:27:23main driveway. You know, again, some of
1:27:24these things that that staff are are
1:27:26still in the process of reviewing. Um
1:27:28but again the Department of
1:27:29Transportation and Mobility didn't feel
1:27:31necessarily strongly one way or the
1:27:33other um related to uh having that prior
1:27:37to the ZBA considering this. Um in terms
1:27:40of where we are in the city, we are over
1:27:42by a Cherry Valley in the good old town
1:27:44of Leicester here on the left. Um and we
1:27:48have this area indicated as a kind of
1:27:51background or baseline growth area in
1:27:53the city. Um although it it's near uh
1:27:56walking distance to transit along
1:27:58Stafford Street. Um and I think I hit
1:28:02all of the other approvals that will be
1:28:04needed. So with that um I just want to
1:28:06call out some conditions uh that we have
1:28:10discussed modifications to with the
1:28:12applicant. So, specifically on page
1:28:14seven of your memo, um the applicant is
1:28:16looking to adjust 1D where it says um
1:28:20reflect the use of brick throughout the
1:28:21first story of the front and left
1:28:23elevations of building one. So, this is
1:28:25the multif family building. They would
1:28:26like to change front and left to south
1:28:28and west. We have no problem with that.
1:28:31Um and then related to
1:28:36the condition number four, the second
1:28:39sentence indicates mitigation measures
1:28:42shall they would like to change shall to
1:28:44may. Um those are just examples and I
1:28:47will call attention that these
1:28:48conditions three, four and five were
1:28:50provided specifically by the um
1:28:52department of emergency management in
1:28:54response to the unique consideration
1:28:56that the property is located with the
1:28:57flood plane. So these are intended to
1:28:58make sure all occupants remain safe in
1:29:01the event of a flood. Um so including
1:29:03information about how to subscribe to
1:29:05alert Worcester emergency contacts,
1:29:08evacuation routes, things like that that
1:29:09might uniquely affect the property as
1:29:11compared to a traditional um development
1:29:13that the board's used to seeing. So
1:29:16mitigation around sort of warning
1:29:19signage areas that would be flooded so
1:29:21that folks visually have a way to
1:29:22identify, you know, that if there's
1:29:23flooding, there's signs that are saying
1:29:25it's, you know, don't don't go through.
1:29:27um turn around don't drown as we say and
1:29:29then they are looking to strike
1:29:31condition five uh from our perspective.
1:29:34Um this is something that can be worked
1:29:36out through the provisions with the
1:29:38flood plane overlay district in our
1:29:40zoning code. Um and through the site
1:29:42plan process um so we're amendable to
1:29:44that uh just something that was specific
1:29:46to showing flood depth markers in areas
1:29:50that are subject to inundation.
1:29:52And then finally on condition seven,
1:29:55they're looking to strike the language
1:29:57that refers to incompensatory storage
1:29:59facilities, flood planes, uh, which we
1:30:02have no problem eliminating. Um, we'll
1:30:04deal with this at the site plan level.
1:30:07Um, the applicant already requested the
1:30:09two waiverss. And with that, I'm happy
1:30:11to answer any questions the board
1:30:12members have. Thank you.
1:30:18[clears throat]
1:30:18>> Okay. So just to clarify um you're
1:30:21requesting the waiverss.
1:30:22>> Yes, sir.
1:30:23>> Um okay. So
1:30:26and [clears throat]
1:30:27um I want to make sure that that I heard
1:30:30that correctly um that the buy right if
1:30:33they did multif family units keeping in
1:30:35mind um that there are other things that
1:30:38might come into play with the planning
1:30:39division and other pieces. Um but
1:30:43essentially they could do 2,100
1:30:45units through the multi of
1:30:47multifamilies. Um, and they're proposing
1:30:50209.
1:30:51>> Correct.
1:30:52>> Okay. Um, [clears throat]
1:30:54uh, and with that, um, I'm sure there's
1:30:57extensive public comment. So, um, I will
1:31:00ask, uh, that people, um, state their
1:31:03name and city of town of residence and
1:31:05just address, um, all comments to me
1:31:08directly. Okay. Please come forward.
1:31:12>> And I'll just note too that we do have
1:31:13written public comment as well that came
1:31:15in today.
1:31:15>> Yeah. Yes. Uh, for board members. Oh, I
1:31:18should say that before we get to this.
1:31:20Uh, for board members, there is written
1:31:21comment in our packets. Um, and for
1:31:24voting on this one, although obviously,
1:31:26um, we always encourage conversation.
1:31:28Board member Barton Hagen will be the
1:31:30alternate and, um, this one. Okay. Uh,
1:31:34state your name, city, town of
1:31:35residence, please.
1:31:36>> Uh, Nathan Worcester. First of all, I
1:31:40have no horse in this game, but as a
1:31:44Worcester resident
1:31:47um lifetime, Mr. Chair, I just want to
1:31:51uh make you a couple of points here. Uh
1:31:53Worcester Academy has owned this
1:31:55property for 16 years.
1:31:58I I think they're actually um as the
1:32:02developers, they're actually getting a
1:32:04pretty good deal.
1:32:06uh paying four and a half million
1:32:07dollars for six for 36 point uh seven
1:32:11acres of
1:32:13basically open land.
1:32:16Uh my question would be is uh can we
1:32:19assume now it doesn't really uh pertain
1:32:23here but uh but just curious all these
1:32:26years it's probably been tax exempt
1:32:30which will now become taxable property
1:32:33now and um
1:32:37uh let's face it Worcester needs housing
1:32:40housing housing housing. Oh, by the way,
1:32:44they need more housing. So, however they
1:32:49go about it, however we find the land to
1:32:52build, there's going to be more housing
1:32:54built. Uh, these are things that are
1:32:58inevitable.
1:33:00Uh the only thing that I don't know if
1:33:02they can do it,
1:33:04but it would be a very nice gesture of
1:33:07these developers
1:33:09if they can put some sort of track of
1:33:12land on there that still have a very
1:33:15small play field for, you know, the
1:33:20people that might be living there. They
1:33:21might have kids and they might have
1:33:23grandkids. He might I don't know if it's
1:33:25possible, but it would be nice.
1:33:30Uh
1:33:33that's it.
1:33:35>> Okay. Thank you so much. I guess I can
1:33:37answer the one and then I'll let the
1:33:38applicant answer the other. Um I think
1:33:41my understanding is that's correct that
1:33:42it was not taxable and this would turn
1:33:44this into taxable property. Um, I know
1:33:47that there are plans, there's
1:33:48requirements for there to be publicly
1:33:51for residents to have access to area um
1:33:55to to play or to have recreation and so
1:33:58there's a requirement that this will be
1:34:00meeting. Um, so if the applicant could
1:34:02just speak a little bit to that as as
1:34:04knowing that the plans are not finalized
1:34:06at this point for the zoning, but um in
1:34:08compliance with that.
1:34:10>> Yeah. So certainly so um we haven't
1:34:13programmed the amenity space yet. Um,
1:34:16but certainly there's going to be some
1:34:18type of recreational active space there.
1:34:20And as I referenced in my early remarks,
1:34:23the intention is to ensure that ongoing
1:34:26connection with the Greater Wister Land
1:34:28Trust um, recreational trails. So
1:34:31whether or not there's going to be
1:34:32soccer fields, probably not, but there
1:34:35still will be opportunities for folks in
1:34:37the community to enjoy recreation in
1:34:39this particular area. um as in the staff
1:34:42uh recommended conditions approval,
1:34:44there'll be a trail head, some type of
1:34:45parking. There's going to be some
1:34:47ongoing um efforts to to ensure those
1:34:50those areas are maintained. So, um and I
1:34:52would also note that um it's my
1:34:54understanding that the fields currently
1:34:55aren't open to the public. Uh when I
1:34:57went there, they seem to be locked up.
1:34:59So, um to the extent that people are
1:35:01playing on these fields, I don't know if
1:35:02that's actually the case or lawful. So,
1:35:04I would just point that out as well.
1:35:07>> Okay, go ahead. Next person like to come
1:35:09up. Just state your name and city of
1:35:11town of residence, please.
1:35:15>> My My name is Greg Buto from to Merrick
1:35:19Street in Cherry Valley. I I live about
1:35:23500 ft from the edge of the border and I
1:35:26appreciate you allowing us to comment.
1:35:29And although I've submitted written
1:35:31comments, I uh I think you have a button
1:35:35to release me to the downstairs floor if
1:35:37I go through the six pages of written
1:35:40comments. So, I'll try to give you the
1:35:42cliff's notes version as fast as I can
1:35:46and I'm asking my wife to assist me. I
1:35:48have a personal problem. I have a hard
1:35:51hearing time. I I would appreciate the
1:35:53developer if he could show one of the
1:35:55first pictures that shows the roads. Uh,
1:35:58could you do that? I mean, I
1:36:00>> He doesn't have control, so it's
1:36:01actually the city the city staff
1:36:02controls it. So, you'll have to ask.
1:36:05>> Yeah. So, you're looking for the roads.
1:36:08Um,
1:36:09>> the street staff street and uh
1:36:11>> Yep.
1:36:12>> Whatever. And I'll walk over there.
1:36:15>> You You have to You have to use the
1:36:16microphone.
1:36:17>> It's got to take the microphone.
1:36:23>> Thought I could be loud enough. My wife
1:36:24says I'm loud enough at home. So, I
1:36:26figured that
1:36:26>> Well, you got to pick it up for the city
1:36:28for the standard.
1:36:29>> Is this the one you're looking for?
1:36:31>> Huh?
1:36:32>> Is this the Is this the one you're
1:36:33looking for?
1:36:34>> Yeah. Okay. So, uh and I'll try not to
1:36:37have my back to you. Okay. Uh but in
1:36:42terms of the entrance, uh right right
1:36:45here is
1:36:46>> that's the entrance is a little bit
1:36:48higher. It's a little bit higher.
1:36:50>> So, that's the that's the kettle book
1:36:52stream. That's the brook.
1:36:54>> Oh, the brook. Oh, the entrance here.
1:36:56>> Yep, that's correct.
1:36:57>> Okay. From there, there's Lello Street.
1:37:01But even before Lello Street, there
1:37:04shows a count right there of around uh
1:37:07it's in your packet around 6,100
1:37:11cars per day. This is from Mass Dot's
1:37:14Whiteside 2025.
1:37:18Further up, there's the intersection of
1:37:20Bloodlo Street that shows a count of
1:37:24around 9300 cars.
1:37:28And lastly, which is not shown, if it
1:37:31was a different further up, the
1:37:33intersection of Stafford [snorts] Street
1:37:37and uh uh James Street, it shows uh 12
1:37:4112,300.
1:37:43And it's important to recognize the area
1:37:46because it's very congested. It's very
1:37:49congested a such a and and the those
1:37:54traffic counts to give you a feel is up
1:37:58on the further end on the other artery
1:38:01as such uh a count around Route 9 is
1:38:0515,200.
1:38:07So when I'm talking about 12,200,
1:38:11that's a lot of cars in very simple
1:38:13language. Okay. So the before you come
1:38:18down to the opening
1:38:21>> on the west side, you're coming down an
1:38:25incline about 10% slope average. That's
1:38:30has a name dead horse hill. And I'll let
1:38:34you use your logic that the dead horse
1:38:36was the horses died going up the hill.
1:38:40So there is currently a very
1:38:46uh strong problem with just traffic.
1:38:50It's a nightmare to get out there during
1:38:53uh peak travel hours particularly in the
1:38:56morning and that be becomes aggravated
1:39:00when uh there's inclement weather like
1:39:03winter whatever
1:39:05uh the uh other thing I wanted to reveal
1:39:09to you uh up here at the intersection of
1:39:14Stafford Street and James Street they
1:39:18had crash data on the police uh website
1:39:22and it showed 30 crashes in five years.
1:39:26It also said that that uh travel way has
1:39:30a 67%
1:39:32uh increased crash rate over other
1:39:36secondary roads in the com commonwealth.
1:39:40I don't have and I have a request in to
1:39:42get the crash rate of Lello and uh
1:39:46Stafford Street, but my wife and I and
1:39:49maybe other people here have seen many a
1:39:51crash. They're not a f vender. The
1:39:54reason I bring this up is if you uh my
1:39:57comments were structured along what the
1:40:00uh developer submitted and what he he
1:40:04said was that there was minimal impact.
1:40:08uh they uh they will not result in
1:40:11significant increases in traffic volumes
1:40:14or traffic delays. I I respectfully very
1:40:18strongly disagree with that because
1:40:21there's already an existing problem. You
1:40:24can go out there and it's backed up. In
1:40:28wintertime it gets real treacherous
1:40:31because that dead horse hill if you ever
1:40:34sat in a car on a hill with uh ice or
1:40:38snow is it's it's not it's a hazardous
1:40:42condition. So as submitted I disagree
1:40:46with that. I said I did Mr. Chairman I
1:40:49promised I'd give you the cliffstone
1:40:51version. I'm going to go to the last
1:40:53page. One of the other comments I had
1:40:57and it has to do with I'm sorry it has
1:41:00to do with hardship. Uh that respect to
1:41:04the relief may be granted without
1:41:06detriment to the public ill. uh uh I I I
1:41:10say the existing problem with travel
1:41:14with traffic will be only exasperated by
1:41:17this project and that use of the road by
1:41:20me or you or anybody is a public good.
1:41:24So it becomes a balancing of hey we have
1:41:27something a road which should we all be
1:41:29used and yes there's a need for housing.
1:41:32I I don't disagree with that but this
1:41:35would exaggerate the situ this the the
1:41:39uh situation. The other point in the in
1:41:43the developers presentation he refers to
1:41:47the Salisbury green project way up on
1:41:50Salisbury Road as hey you gave relief
1:41:53for uh frontage requirements. Uh yeah,
1:41:57that's agreed. But I don't know if
1:41:59you've ever been there is the traffic
1:42:02isn't that uh bad. In fact, if you look
1:42:05at the traffic count there, it's around
1:42:083,800. I left that in the package. And
1:42:11the point I'm trying to make make is
1:42:14it's 12,000 down there or 12,000 or plus
1:42:18down near there. It's order of
1:42:20magnitudes low as such. So it's an
1:42:24incomplete analysis. doesn't tell you
1:42:27what the city may have granted and if
1:42:29you ever go up Salary Street near that
1:42:31end. Yeah. No, if you had a 5% increase,
1:42:35it wouldn't be that bad. I I really
1:42:37appreciate your time. I appreciate your
1:42:40p patience and your understanding my
1:42:43limitation and I thank you for not
1:42:45dropping me through the door.
1:42:47>> Thank you very much. And we did um just
1:42:49for the board, we did get your comments
1:42:51uh your full six pages of comments.
1:42:53Although that wasn't six pages full of
1:42:55just yours. You were commenting on other
1:42:57folks. Um so thank you very much. Uh
1:43:02other public comment
1:43:05>> you absolutely can just state your name
1:43:07and city of town of residence, please.
1:43:08>> Okay. Beatress Buto. I live in Cherry
1:43:11Valley and um the gentleman and her
1:43:15talked a little too fast for me and I'm
1:43:18a little bit confused about um the the
1:43:22two access points for emergency or
1:43:25something or other I think you said and
1:43:27one of them that was mentioned was Hyatt
1:43:29Street.
1:43:30>> Is that still
1:43:33proposed Hyatt Street as one of the
1:43:35entrances exits?
1:43:37>> Yes. So I can I can answer real quickly.
1:43:40So this so the um the fire department
1:43:43requested of the developer um they had
1:43:47two access points on Stafford Street for
1:43:50this property and they requested that
1:43:52one of them be um above the flight of um
1:43:55the flood plane which would be so they
1:43:57requested that it go to Hyatt Street.
1:43:59The details of that they are still
1:44:02working out. So we don't have those full
1:44:04details. that would be something should
1:44:06this progress to the planning board that
1:44:08they would work out with the city. But
1:44:10that was a relatively recent request of
1:44:14the fire department to change the
1:44:16emergency uh emergency access.
1:44:19>> Had I known about that, I would have
1:44:21brought photographs of Hyatt Street.
1:44:25It's quite impossible for me to imagine
1:44:29emergency trucks trying to enter or
1:44:32access there and and Highest Street's
1:44:35relation to Route 9 and the traffic that
1:44:40Route 9 absorbs for the airport is
1:44:43unbelievable.
1:44:45>> Yeah. So the the proposal would be that
1:44:47there would have to be some updates to
1:44:48Hyatt Street to facilitate that. And
1:44:51again, because it was a relatively
1:44:52recent development from the city to the
1:44:55developer, those details about how they
1:44:57would upgrade Hyatt to accommodate that
1:44:59would be something that they would still
1:45:01have to work out.
1:45:04Thank you. Yes. Uh other public comment,
1:45:07please.
1:45:11Okay. um online,
1:45:14please use you can use your raise your
1:45:15hand function um by pressing use the
1:45:18raise your hand feature or pressing
1:45:20star9.
1:45:27Okay. Um I really appreciate the
1:45:29thoughtful I want to say thank you. I
1:45:31thought your letter was very good um and
1:45:34thoughtful and um I and similar the um
1:45:38some of the comments I will note are
1:45:40some of the things that DTM is also
1:45:43working to so the things that you
1:45:45pointed out for the traffic are some
1:45:47things that the department of
1:45:48transportation and mobility have also
1:45:51have questions about that they're asking
1:45:53to go through when they go through the
1:45:55planning part of the process. So the
1:45:58other boards that would see this should
1:45:59this move forward are the conservation
1:46:02commission which would look at how this
1:46:04would be affecting the water flow for
1:46:07the brook and the other would be the
1:46:09planning division which looks at a lot
1:46:11of the questions about how will this
1:46:13look how will this be put how will this
1:46:16actually be built like what's the
1:46:17sequencing additionally they will look
1:46:20at um the uh more detail about the
1:46:23traffic study about the driveway aisles
1:46:26about um the uh the emergency exit what
1:46:30that would look like for Hyatt Street.
1:46:32So some of the questions about um the
1:46:35actual like how this fits into the city
1:46:38are the questions of planning division
1:46:40generally we do we do cover them a
1:46:42little but they are also very much a
1:46:44part of the planning and so should this
1:46:46move forward the planning would also
1:46:48look at those questions that you have um
1:46:50to answer some of them. So, um, just
1:46:53going to board comment for for us, the
1:46:56other thing that I want the board to
1:46:57consider, um, that I think is important
1:46:59for that the applicant made is that
1:47:02because the focus of the housing that's
1:47:06being built is to be rentals, that's the
1:47:10reason for the frontage. So if they were
1:47:13to build a subdivision, which this site
1:47:17could for sure contain, that request for
1:47:21variance would go away. Which means if
1:47:23they were to make them sort of um for
1:47:26like higher profit uh subdivisions to
1:47:30buy, they wouldn't need the frontage.
1:47:32The frontage is coming because they're
1:47:34focusing on making this rentals. And the
1:47:38height is in response in some of the in
1:47:40some of the cases to the flood plane and
1:47:43the desire to build up from the flood
1:47:45plane. So to be in in congruence with
1:47:48the fact that it may flood at some point
1:47:50and if it does there would be some
1:47:52protection for the homeowners by being
1:47:53higher up and so therefore they're
1:47:55hitting the um the height the the height
1:47:57requirement. Um, speaking for myself,
1:48:00um, I I think, um,
1:48:04uh, you know, we're always trying to
1:48:08tackle the question of, um, there's no
1:48:12question that if something gets built
1:48:13here, there will be more cars. There
1:48:16will be more cars, that'll cause more
1:48:18traffic. Um, and so, um, we're always
1:48:21trying to balance those things, but I
1:48:23think the need for more housing,
1:48:25especially in a place where there is
1:48:28there will be there should be housing
1:48:29here, like we should be putting housing.
1:48:32And there is just so much space here and
1:48:35there's such a need for housing that
1:48:36some sort of housing should go here. And
1:48:40so then the question is for me is not
1:48:42should there be housing because housing
1:48:44will cause cars, cars will cause
1:48:46traffic. So the question isn't is
1:48:48traffic going to increase. Some form of
1:48:51traffic is going to increase if we are
1:48:53ever going to get the housing we need.
1:48:55So I think we need housing and I think
1:48:58that means that we're going to have more
1:49:00traffic. So then the question is are
1:49:03they doing it in a responsible way? And
1:49:05from my perspective and other board
1:49:07members get to have a say. they could be
1:49:09trying to a lot of developers come in
1:49:11and they try to get as many units as
1:49:13possible and sort of just try to do
1:49:16whatever they can and they're actually
1:49:19doing about a tenth of the possible
1:49:22units. So, not only are they not
1:49:24maximizing it, there's just a far fewer
1:49:26housing requests than is possible. So
1:49:30because of the sort of like the the um
1:49:34the because of the um
1:49:37uh the the sort of that we need housing,
1:49:40I think some housing will go here and
1:49:42there's a need for something. This is a
1:49:44relatively small request actually for us
1:49:47considering how big this project is. Um
1:49:49this is actually I actually thought when
1:49:51um when I heard that there was going to
1:49:52be something I actually thought there'd
1:49:53be more requests for variances and
1:49:55there's actually very few considering.
1:49:58So from my perspective, I'm I'm I want I
1:50:01think this project um is a good project
1:50:04to move forward. It generally will get
1:50:06my vote. I'm cur I'm as well as other U
1:50:09board members thoughts on this project.
1:50:11I'm curious what board members think
1:50:13about the sort of DTM does have some
1:50:16good questions about sort of um the uh
1:50:21the neat like figuring out like does the
1:50:24flow of traffic they have some questions
1:50:26about that. Um, we have we have two more
1:50:29units that weren't proposed. I'm a
1:50:31little bit more comfortable for that
1:50:32since it's internal to a building that
1:50:34we're roughly not really seeing. So,
1:50:36it's not like you've added new buildings
1:50:38per se. You've just changed the inside
1:50:41of a building, which isn't particularly
1:50:43in this case, um, the thing that's most
1:50:46pressing before us.
1:50:48>> So, I feel I feel more comfortable
1:50:50moving forward um, knowing that. Um but
1:50:54I am but I think the other board members
1:50:56um I'm curious your thoughts about
1:50:57moving forward based on those things. So
1:50:59um I'm I'm prepared in this moment to
1:51:02move it forward um to the other boards
1:51:04for oversight. Um I think that there are
1:51:07some really good questions like I think
1:51:08the question about the city does need to
1:51:11figure out what to do about Stafford
1:51:12Street. Stafford Street has a lot of
1:51:15traffic. It is not that safe at the
1:51:16moment. the flow onto Lello and the flow
1:51:20onto those things. Those are real
1:51:21questions that I also have that the city
1:51:24needs to address. And the other thing
1:51:26that happens with a lot of these
1:51:27projects is that developers get pinged
1:51:30for the problems that the city has. So
1:51:32the city has a traffic the city needs to
1:51:35figure out how to manage traffic on
1:51:36Stafford Street and we need housing.
1:51:40That feels like something the city
1:51:41should do to step in to make sure that
1:51:43this is safer because I agree with the
1:51:46um with the comments and the very
1:51:47thoughtful letter we got. The current
1:51:50plan the current what's currently
1:51:51ongoing on Lello Street and Stafford
1:51:54need something to mitigate what's
1:51:57happening. Um I'm not sure I'm not in a
1:52:00position where I feel like that's my
1:52:02purview as a zoning board member. It's
1:52:04certainly my purview as a member of
1:52:07Worcester who can call my city
1:52:08councelor, but I don't I don't feel like
1:52:10that's my purview as a zoning board
1:52:12member. So, that's my perspective on it.
1:52:14Um, we'll go around the board to get
1:52:16other people's thoughts. Um, and uh,
1:52:18thanks everyone. Okay, so um, let's
1:52:21start with in the room and then we'll go
1:52:22to the online folks. So, online folks,
1:52:24prepare yourselves to be unmuted. Um,
1:52:27and we'll start with, uh, board member
1:52:28Barthagen.
1:52:30>> Uh, through the chair. Um yeah, I share
1:52:33a lot of of almost everything you just
1:52:36said I think I agree with. Um I have
1:52:40some serious concerns and so there it's
1:52:43a the way this application has been
1:52:46presented to us but I have to balance
1:52:48normally I would like to have the
1:52:49answers to these even if they're
1:52:51technically a little bit beyond our
1:52:52purview. I have I'm a little
1:52:54uncomfortable just kind of punting it.
1:52:57It feels like a punt uh not being able
1:52:59to see a lot of the things that I would
1:53:01want to see
1:53:03before I approve something. Uh I would
1:53:05want to see how they're going to uh
1:53:06ameliate the traffic situation on
1:53:09Stafford Street, which is difficult. You
1:53:11when you're there and I was, you know, I
1:53:13was pulling in, I guess got to the same
1:53:14gate you did, uh turn around and then
1:53:17you're trying to leave and it wasn't
1:53:19easy. Um the cars go fast down that
1:53:22street and there's a dip and it goes
1:53:24back up and you're right next to Lello
1:53:26Street, which is another major street.
1:53:27So if there's no lighting at the
1:53:30intersection of Stafford and Leler,
1:53:31which there isn't right now, you have a
1:53:33a a problem accessing the road. But if
1:53:36you have a light there, as I saw in the
1:53:37DTM report, well, that would cause
1:53:39traffic backup and then you would have a
1:53:41a different problem of trying to get
1:53:42onto Stafford Street. I'm very concerned
1:53:45about Hyatt. I actually drove drove up
1:53:48Hyatt. Um, and it's it's needs a lot of
1:53:51improvement if that's going to be a
1:53:52secondary emergency access for big um
1:53:55trucks. And I know the the promise is,
1:53:57oh, we'll figure all that out at the
1:53:59planning board and that that will have
1:54:01to happen. It's it's so but but I'm not
1:54:04going to be able to see that before I
1:54:06approve it. So, it's I hear what the
1:54:09chair is saying and these things do need
1:54:11to be addressed and I am comforted
1:54:13somewhat by the fact that the planning
1:54:14board and the conservation commission
1:54:15will be addressing these things. um you
1:54:18know the access to the to the um area
1:54:20for recreation
1:54:22uh you're right there's no direct access
1:54:25at least on this plan because it's
1:54:27preliminary between that area over the
1:54:29brook to the development and so right
1:54:32now it seems like if in order to access
1:54:34that area you'd have to get in your car
1:54:36drive out and on a staffer street and
1:54:37access it. I'm sure that's not going to
1:54:38be the way it's going to be but it's you
1:54:40know it's right now that's all we've
1:54:42got. So,
1:54:44um,
1:54:46on the other hand, this I agree with
1:54:48everything else you said about how this
1:54:50is a much less dense development than it
1:54:53could otherwise have been. I don't want
1:54:55to hold this up because I think it's a
1:54:57very good development. I think the pros
1:54:59and cons between the housing, as you
1:55:02say, any housing at all will cause an
1:55:05increase in traffic. Um, the developer
1:55:07isn't responsible for the bottleneck and
1:55:09the speed that's happening right now on
1:55:10Stafford Street. Um it's something that
1:55:13they're going to have to address um with
1:55:16the city further down the line. But and
1:55:19I but I like this development. I think
1:55:21it's a you know it's a it's a definitely
1:55:25a lot lower density than could be put
1:55:26there. We need housing. Uh and housing
1:55:28causes more cars. There's just no way
1:55:30around it. Um
1:55:32so I think I'm leaning towards moving it
1:55:35forward to the next stage with the
1:55:37understanding that you know the planning
1:55:38board is going to take a close look at
1:55:40this. Um I I guess that's where I stand.
1:55:43Um and I'm okay, by the way. Um all of
1:55:45the the if we do get to the point where
1:55:47we're approving this with these staff
1:55:49recommendations, I'm fine with all the
1:55:51proposed changes that um that Miss Smith
1:55:55went through.
1:55:58>> Oh, I just wanted to note for the board
1:56:00um some of the comments. Uh there is
1:56:02currently a pedestrian bridge that
1:56:04connects um the field to that amenity
1:56:06space. has to be evaluated for
1:56:08accessibility purposes, but all of that
1:56:10will be designed and engineered as part
1:56:12of the final plan set. So, it kind of
1:56:14gets back to my earlier point, which is
1:56:16VHB is ready to go to fully design, you
1:56:19know, Hyatt Street, what's the width
1:56:20going to be, what brush needs to be
1:56:22removed, but it's kind of we're at we're
1:56:24at the stage right now where is the
1:56:25relief going to be granted and then we
1:56:26can move forward with the more
1:56:28comprehensive review. Well,
1:56:29>> I mean, a lot of work is going to have
1:56:30to be done on Hyatt Street for
1:56:31>> Certainly. Yeah.
1:56:34Uh, board member Remy.
1:56:38>> Um, well, this is a great proposal and
1:56:41from my perspective, I think it is well
1:56:44integrated within the site and I
1:56:47understand all the traffic concerns and
1:56:49I'm hoping that will be addressed later
1:56:52with the city. And as far as the Hyatt
1:56:54Street connection, I'm not sure if there
1:56:56could be another connection to like the
1:56:58the shape of the Hyatt Street area, but
1:57:01I know that's necessary because my
1:57:02initial concern was are there going to
1:57:05be two means of egress for this very
1:57:07large site. So with that being said, I
1:57:11know there is some factors that are
1:57:12being changed. I do support this
1:57:15project. Um, I like the overall design
1:57:19and I think it is very well integrated.
1:57:23Um, so that's that's what I think so
1:57:27far. Yeah. Thank you.
1:57:28>> Thank you, board member Cortez.
1:57:31>> Uh, through the chair, I echo um most of
1:57:36the comments made by you, Mr. Chair, and
1:57:39Mr.
1:57:40uh um when my colleague u uh on the site
1:57:46um also they you know uh all the
1:57:49comments I I agree with that and I
1:57:53understand that the there's some
1:57:56particular parts that they need to be
1:57:57addressed by the sonic board. So, uh
1:58:01there's not not much I could, you know,
1:58:04uh oppose or comment on it since they're
1:58:07going to be addressed uh by other uh
1:58:10sources. Um
1:58:13one question, um I in in regarding
1:58:16traffic, regarding traffic, yes, I I'm
1:58:19not sure if uh um members of, you know,
1:58:22the the developers uh you know, can seek
1:58:26help. uh and when you're talking about
1:58:28the city uh the city council for that
1:58:31particular district uh should be uh
1:58:35aware and I'm sure it is aware uh of
1:58:39what's going what's going on in here and
1:58:41what the traffic situation uh may be
1:58:44affected by and and and so the the city
1:58:48councelor from that particular district
1:58:50could be help to you know to to to bring
1:58:54it up uh uh with the uh traffic
1:58:58department um similar to what happened
1:59:02on Mill Street Mill Street in Worcester
1:59:05uh you know city council had to be
1:59:07involved in you know and and talk about
1:59:10you know the resolving traffic issues
1:59:12there so I'm I'm just mentioning you
1:59:15know when you talk about the city may
1:59:17not be only the traffic department but
1:59:20but but the the c the city councelor
1:59:22from that district can be approached by
1:59:27by the people or by the uh project uh
1:59:31proposals here. Now um in regards I I
1:59:35had a question um is are those most most
1:59:40of these apartment one one and two
1:59:43bedrooms.
1:59:46>> So through the chair um it varies by the
1:59:49building type. Um the multif family
1:59:52buildings will be one to two bedrooms.
1:59:54The town houses will be two to three
1:59:56bedrooms
1:59:58>> and uh in accordance with applicable
1:59:59code in case um Mr. Cortez would like to
2:00:02know um 5% of the units will be
2:00:05accessible. So approximately 11
2:00:07accessible units will be added.
2:00:09>> Great. Great. those those I like to hear
2:00:11those both answers and I I was I was
2:00:13waiting for uh uh the threebedroom spot
2:00:17which you're uh we're building again
2:00:19we're building a lot of uh one and two
2:00:22bedrooms on on most of the projects and
2:00:24you know I don't know where uh families
2:00:27with we at least two children would be
2:00:29living so I'm glad to hear you know it's
2:00:32going to be some three bedrooms there
2:00:34too so that's another positive um
2:00:37another another question I had or or one
2:00:41of the questions was the rec
2:00:43recreational area which uh is being sort
2:00:46of a uh uh answer that yes it's going to
2:00:50be some recreational areas. Uh I was
2:00:53looking at at the uh um you know where
2:00:58where where is the recreational area
2:01:00maybe located uh you know accessible
2:01:04with you know to to the res building the
2:01:08to the buildings um you know I I I you
2:01:11know and it's not that I'm you know
2:01:16mandate or request what type of a
2:01:18facilities can be there I just put as an
2:01:20example uh some areas There can be a
2:01:23kiosk uh where families can gather and
2:01:27celebrate birthdays around the kiosk and
2:01:29so forth. Another uh another idea is
2:01:31like the the the Green Hill Green Hill
2:01:35Park uh sort of um uh is like it's it's
2:01:42a recreational uh house or patio album
2:01:46cover you know
2:01:49if you're familiar with the greedy old
2:01:51park you know there there is a house
2:01:54there where people get together for
2:01:56celebrate and so forth. So, so some of
2:01:58the couple ideas I'd like to mention and
2:02:01where where can that be located uh I I I
2:02:06I don't know but I'm I'm sure that can
2:02:08be worked out since there are several
2:02:10issues or or points that still need to
2:02:13work with the staff. Um so I hope that
2:02:16they they work out uh some sort of a
2:02:20good recreational area for the residents
2:02:23there. Um
2:02:26now I'm in agreement to uh to go along
2:02:33with the request uh the request made by
2:02:35the developer regarding uh on item on
2:02:39questions four, five and seven. I have
2:02:41no problem with those requests made by
2:02:44by the developer. Um
2:02:48the uh affordability
2:02:51at this
2:02:54Those are rentals. So is there uh are we
2:02:59provided some uh uh affordability
2:03:03uh number of units affordable?
2:03:07So through the chair the the proponent
2:03:09is um going to be doing the fee and loo.
2:03:13So, no affordable units are proposed as
2:03:15part of the project, but a uh 3% of all
2:03:18of the construction costs will be paid
2:03:20into the affordable housing trust fund,
2:03:21which will allow for the creation of
2:03:23additional affordable units in the city.
2:03:27>> Hopefully,
2:03:29we're looking at that because again, we
2:03:31again and I said that again and again.
2:03:34Uh
2:03:36housing, yes, we need housing, housing,
2:03:39housing. But you know it it it just
2:03:42there that there is shortage of housing
2:03:45and and again I said again there's no
2:03:46there's no shortage of housing and
2:03:48wisdom that the shortage is the
2:03:50affordable affordable housing. That's
2:03:52what is that's what the shortage is. So
2:03:55hopefully there could be work out of
2:03:57along along the line. Um
2:04:01and this this is pretty much my you know
2:04:04my comments. Hopefully some of them been
2:04:07uh you know have some attention to it.
2:04:10Um but um that's it to the chair.
2:04:14>> Thank you. I want to highlight one of uh
2:04:16board member Cortez's questions which um
2:04:19it looks like there's a pool being
2:04:22proposed and is there like a kiosk or
2:04:24some sort of area around it because it
2:04:26looks like there's a building next to it
2:04:28as well. Do you guys I mean if you don't
2:04:30have plans for that yet I guess that's
2:04:31not technically on our perview but
2:04:32>> yeah I think it's um like a guest house
2:04:35maybe Evan Miller from VHB could comment
2:04:37on that.
2:04:37>> Evan Miller VHB our office is on Front
2:04:40Street right over here. Um yeah the
2:04:42intent is to have uh a pool area for
2:04:45active recreation as well as a pool
2:04:47house clubhouse for any other assorted
2:04:50activities that go along with that.
2:04:52>> So possibly something.
2:04:54>> Yeah. And then the first floor of that
2:04:56area will have active area for residents
2:04:59within the space as well.
2:05:01>> Okay, thank you. Um, okay, board member
2:05:05Tono.
2:05:12>> Well, enough has been said about this
2:05:14project [clears throat]
2:05:16um by you, the chair, and my other board
2:05:20members, and I have nothing more to say.
2:05:22uh um you've said discussed all the
2:05:25issues concerning the traffic that it
2:05:28won't pose but at the same time we still
2:05:29need housing and I don't think we have
2:05:32enough housing in that place. My concern
2:05:34is Lord Lord Street and that's up to the
2:05:36city. So but I'm for the project and I
2:05:39don't have any negative comments and I
2:05:41don't have anything to say bad against
2:05:43it. I would like to move it forward and
2:05:45I will vote for it.
2:05:48>> Okay. Thank you very much. Uh board
2:05:50member Sako to the chair. I agree with
2:05:53board member Tarpono where there's not
2:05:55much new um comments I can really add
2:05:57here. Everything you know through the
2:05:59board has been pretty well said so far
2:06:00and I am fully on board to move forward.
2:06:02I don't think I'm voting but I would
2:06:04move forward if I was. Thanks.
2:06:08>> Okay. Through the chair just Yeah,
2:06:09please. Um, can I ask this the city
2:06:12staff? Uh, earlier on in the
2:06:14presentation, you mentioned that if we
2:06:15were going to move this forward, we
2:06:16should perhaps consider incorporating
2:06:18some comments you we'd received from
2:06:20DTM. Do you have a suggestion as to what
2:06:23the that might be or is it already
2:06:24covered by what's in the recommendations
2:06:26already or?
2:06:27>> Yeah, through the chair. Um, so none of
2:06:29the comments are really, you'll note the
2:06:31comment letter, which is dated today's
2:06:32date, August 10th, is really more of a
2:06:35narrative than it is a condition list,
2:06:37which you're kind of typically used to
2:06:39seeing. So really this is more just
2:06:40specifying for the applicant some of the
2:06:42minimum requirements that they're going
2:06:44to anticipate standards for the traffic
2:06:47study. Um just call attention to
2:06:50specific issues. So I don't feel that
2:06:51you need to include that. Um ultimately
2:06:54your discretion if you wanted to you
2:06:55certainly could. I can propose something
2:06:57if that's the direction you'd like to
2:06:58go.
2:06:59>> Well it sounds like the planning board
2:07:00is going to be dealing with that. That's
2:07:02correct.
2:07:02>> Okay. So I don't I don't think in my
2:07:04view at least uh we don't need to do
2:07:05that.
2:07:06>> Okay.
2:07:08Um, okay.
2:07:10>> Yes. Sorry,
2:07:11>> one last question.
2:07:12>> No, please. You could keep asking. Yes.
2:07:14Go ahead.
2:07:14>> Okay. No, I just wanted to confirm for
2:07:16that uh previous northern secondary
2:07:19access. Is that entirely removed from
2:07:21the scope due to doing it on the north
2:07:24side over here?
2:07:28So, so I'm looking sorry at a previous
2:07:30site plan where we had the
2:07:33the emergency secondary access on top of
2:07:36>> that that's removed
2:07:37>> removed entirely. Okay, great. Thank
2:07:39you.
2:07:39>> Y
2:07:40>> that's all.
2:07:42>> Okay, any last questions?
2:07:45Okay, great. Um Okay. Uh
2:07:50>> sorry through the chair. I did have a
2:07:51hand raised. I just saw it when I turned
2:07:53over. Okay. Um, I'm not sure. Britney,
2:07:56if you wanted to speak, could you raise
2:07:58your hand one more time?
2:08:02>> I think we're Is it Britney Gnner?
2:08:03>> Oh, maybe.
2:08:04>> I think I think we're good then.
2:08:05>> Okay.
2:08:06>> Yeah, she's part of the team.
2:08:07>> Okay. In that case, I will take a motion
2:08:10to close.
2:08:11>> All right. I'd like to make a motion to
2:08:12close on 232 Stafford Street.
2:08:14>> Is there a second?
2:08:15>> Second.
2:08:16>> Second.
2:08:17>> On the motion to close, board member
2:08:19Cortez?
2:08:20>> Yes.
2:08:20>> Board member Mormmy?
2:08:23>> Yes. Board member Tarono,
2:08:26>> yes.
2:08:27>> Board member Barnhagen,
2:08:28>> yes.
2:08:29>> My votes yes. Is there a motion on 232
2:08:32Stafford Street?
2:08:33>> I'd like to make a motion for 232
2:08:35Stafford Street for a variance approval
2:08:38of a variance for relief of 2,411.2
2:08:41ft from the 3000 ft minimum frontage
2:08:43requirements for a single family
2:08:44attached dwelling in an RG5 zone. for
2:08:46approval of a variance for relief of 10
2:08:48feet from the 35 foot maximum height
2:08:50requirements for a single family
2:08:52attached dwelling in an RG5 zone and for
2:08:54approval of a special permit to modify
2:08:57the parking dimensional layout and or
2:08:58landscaping requirements, loading
2:09:00requirements and or the number of
2:09:01required parking spaces subject to the
2:09:04conditions of approval set out in the
2:09:05staff memo on pages 7 to 8 um with the
2:09:08amendments to 1D
2:09:104, the removal of five and the amendment
2:09:13to seven and the waiverss as requested
2:09:16by the applicant. Is there a second?
2:09:19>> Second.
2:09:20>> On the motion, board member Cortez,
2:09:23>> yes.
2:09:24>> Board member Mori,
2:09:25>> yes.
2:09:26>> Board member Tono,
2:09:28>> yes.
2:09:28>> Board member Barnhagen,
2:09:29>> yes.
2:09:30>> And my votes, yes. Thank you very much.
2:09:32>> Thank you.
2:09:32>> So to um the Mr. BTO, I want to say that
2:09:35you have a really thoughtful letter here
2:09:39that a lot of the questions that you
2:09:41have still need to be answered by a um
2:09:45by the planning board and a um and a
2:09:47traffic study. So, please get the
2:09:49contact info for the planning division
2:09:51because I want to say that like we can't
2:09:53answer your questions, but they should
2:09:55get answered. And I just wanted to thank
2:09:56you for your thoughtfulness.
2:09:58>> Does that make sense? So, please just
2:10:00get the the the card for the planning
2:10:03division.
2:10:06get information from them on how to
2:10:08contact.
2:10:11>> Okay, thank you.
2:10:12>> Um, next up is 79 Pullman Street.
2:10:24>> Yeah, of course.
2:10:25>> Um, uh, we actually need, uh, you got to
2:10:28stay here for a second. We got, we got
2:10:29make motion for motion for a fivem
2:10:30minute break.
2:10:31>> For a fiveminute break. Can I get a
2:10:32second? Second.
2:10:34>> All right. All in favor? I All right.
2:10:36We'll be back at 7:56.
2:16:06Hello. Great. The folks online, um, we
2:16:09just need to confirm you're back. Board
2:16:11member Cortez,
2:16:13>> I'm here.
2:16:15>> Board member, uh, board member Tarono or
2:16:18board member Cortez.
2:16:23>> I'm here.
2:16:25>> All right. Board member Cortez.
2:16:37>> Yeah. Board member Cortez.
2:16:44>> He's not back yet.
2:17:00What?
2:17:02>> It's been six minutes.
2:17:05>> Yeah. Yeah.
2:17:07>> Well, we we could technically start, but
2:17:09then he's not voting, so that's why we
2:17:11want to give him a chance.
2:17:19board member Cortez.
2:17:27>> Yeah.
2:17:28>> Awesome. All right.
2:17:32Next up is 79 Pullman Street. Uh if the
2:17:34applicant could please come forward,
2:17:36state your name and city of town of
2:17:37residence.
2:17:37>> Uh good evening. Um my name is Patrick
2:17:40Doherty. I'm a professional engineer
2:17:41with Midpoint Engineering and
2:17:42Consulting. Uh office address is 37
2:17:45Sutton Road in Webster, Massachusetts.
2:17:49>> Great. Tell us tell us about the
2:17:51project.
2:17:51>> Sure. So, I'm here presenting um 79
2:17:55Pullman Street uh for Charter Foods, who
2:17:57is the applicant. Charter Foods proposes
2:18:00to construct a Taco Bell um on the
2:18:03property. The existing site is uh 68
2:18:06acres. Prior use of the site was the
2:18:09Silven Learning Center. Um it had a 2400
2:18:13foot building on it and 26 parking lots
2:18:16um and a driveway on Pullman Street.
2:18:20That building's been raised. Um parking
2:18:22lot remains.
2:18:24Um site is frontage on three streets, uh
2:18:27Pullman Street, uh West Mountain Street,
2:18:29and Brook Street.
2:18:31Uh the applicant proposes to um remove
2:18:35all the remainder of the site
2:18:37improvements and construct a a new Taco
2:18:39Bell restaurant. uh with drive-thru.
2:18:42That store would be 22 um 50 square
2:18:46feet. Um may have a drive-thru, single
2:18:49drive-through lane and an escape lane.
2:18:51That um requirement for for um
2:18:56drive-thru and escape lanes in the city
2:18:57are 240 ft. Um so we'd be looking for a
2:19:01special permit to um modify the
2:19:04dimensional requirements. Also, uh,
2:19:06drive-thru with food service with
2:19:09drive-thru is a special permit use. Um,
2:19:12some of you may recall me being here a
2:19:14couple of years ago. Um, and we had
2:19:16proposed similar site plan. Um, that
2:19:19tenant was going to be at Chipotle.
2:19:22Buildings about the same size, parking
2:19:24lots about the same size. The difference
2:19:25is that Chipotle is a pickup only um,
2:19:30drive drive lane. um where this would be
2:19:33um a full service traditional uh
2:19:35drive-thru.
2:19:37We've modified the site from that
2:19:39approved plan slightly. Um we've moved
2:19:42the drive-thru lanes um to the far east
2:19:46side of the site. Um it it allowed us to
2:19:48get a little additional length for the
2:19:51for the queue and also separate the
2:19:53parking um so that there was no conflict
2:19:55with the escape lane.
2:19:59Um along with the building here, we'd be
2:20:01proposing um a we originally proposed a
2:20:0529 um space parking lot which was
2:20:07similar to the Chipoti. As you'll hear
2:20:09during staff comments, um there's a
2:20:12request to reddes designated what we had
2:20:15considered the front yard. Um in the
2:20:18zoning code, when you have frontage
2:20:19along more than one street, um one side
2:20:22becomes the front front yard and the
2:20:24other two become sideyard. So um in in
2:20:28doing so, two of parking spaces would be
2:20:31in the front yard. Um and we've
2:20:33conferred with the client and they say
2:20:34they can they can operate effectively
2:20:36with the 27 parking spaces. Um we've
2:20:39provided a a traffic report um that
2:20:43addresses the queue.
2:20:45[clears throat] That traffic report was
2:20:47done using it generated trip rates. Um
2:20:51and what we found is is the general
2:20:54consensus for fast food with drive-thru
2:20:56um generates a little bit more traffic
2:20:58than a than a traditional Taco Bell. Um
2:21:01we've provided in the traffic report
2:21:03sales data for another uh Taco Bell
2:21:06restaurant in um Worcester that's
2:21:09operated by the same same by the
2:21:12applicant. Um and it basically says that
2:21:15that Taco Bell is about you know roughly
2:21:1870 or 80% of what a what the IAT
2:21:22trip generation would would um would um
2:21:26generate. They also provided some data
2:21:29um on on the the types of transactions.
2:21:34Um since COVID and and with modern turn
2:21:37technology, these fast food um operators
2:21:40operate a little bit differently. Um
2:21:42they're projecting about 30% of the
2:21:44traffic coming to the Taco Bell would be
2:21:46going through the drive-through lane.
2:21:48About 60% would be done via uh mobile
2:21:51apps. Um and most of that 60% is picked
2:21:55up by a Door Dash driver or some other
2:21:57delivery service. Um only about 10% of
2:22:00the transactions are people who come
2:22:02into the restaurant and sit down um and
2:22:04eat their meal. Um
2:22:07>> so with that the the queue um that that
2:22:09is required by the city is is more than
2:22:12is going to be needed here. Um we
2:22:14project about five to seven spaces or
2:22:16five to seven vehicles would be in
2:22:18queue. Um and that's what they
2:22:20experience with their other restaurants
2:22:22um in the area. Um five to seven
2:22:25vehicles translates to about 140 feet of
2:22:28queue length um where we're proposing
2:22:31214 ft. Um we did receive the staff memo
2:22:35uh today and um had had chance to
2:22:39discuss u the the recommendations.
2:22:43Um our our feeling is that most of the
2:22:46recommendations that are provided by
2:22:48staff we could accommodate. There are um
2:22:51three items that that um we'd like to
2:22:53discuss with the board. One of those
2:22:55comments was the provision to it's
2:22:58actually um recommendation 1A which is a
2:23:01recommendation to provide six additional
2:23:03shade trees along the Southerntherly
2:23:05property line. So that would be the the
2:23:08true side lot line between our property
2:23:11and in an addition commercial property.
2:23:14Um we don't feel it's appropriate there.
2:23:16Um the distance from our property line
2:23:18to that building is about 9 ft. They've
2:23:21got mechanical equipment on the side of
2:23:22the building. Um it's not a zoning
2:23:26requirement per se. Um and we we feel I
2:23:29think we we're providing 15 um new trees
2:23:33on this this you know roughly 610 of a
2:23:37of a of an acre um and feel that um that
2:23:41we we should not be required to do that.
2:23:44Um secondly uh staff has recommended
2:23:48providing 25% compact car spacing. Um
2:23:52again in in this case um with only
2:23:55having the required amount of parking
2:23:57that zoning notes um we we'd rather have
2:24:01standardized spaces with the high
2:24:03turnover parking lots, people coming in
2:24:05and out opening up doors. Um the
2:24:08additional room from a standard space we
2:24:10feel is is necessary.
2:24:13Um third comment is is is um just a
2:24:17comment to reflect that the rooftop
2:24:19units would be screened. Um while we
2:24:22don't have a problem with that, we uh we
2:24:24did um submit architectural
2:24:27um elevation plans. Um the building will
2:24:31have a 4ft minimum parapit along the
2:24:33entire perimeter and then there's some
2:24:35tower sections that extend up higher.
2:24:37You can see the elevation plans here.
2:24:39the two gray areas um that you can see
2:24:42popping up a little bit higher than the
2:24:44the parapit that that's showing what you
2:24:47would see of the rooftop unit if you
2:24:50were at roof level. Um the building wall
2:24:52is about 18 ft high. Um the the rooftop
2:24:56units are centered in about the middle
2:24:58of the the roof area and with that 4ft
2:25:01parapit in most vantage points you won't
2:25:04see them. I'm sure that there's maybe a
2:25:06spot on Brook Street or somewhere where
2:25:08you may see the top portion of the
2:25:10rooftop unit, but we we feel that that
2:25:12it's adequately screened and we would
2:25:14hope that that the commission would u
2:25:16would agree with us.
2:25:18Um that that's um kind of in essence on
2:25:21on the site plan if there's there's any
2:25:23questions um from the board.
2:25:26>> Uh do you request the waiverss on as
2:25:29stated on page 40 of eight?
2:25:30>> Yes. So, um staff actually also put
2:25:34together a list of waiverss um the
2:25:36owner's names of abuing properties we'd
2:25:38request to be waved from the plan, the
2:25:40distances to all the adjacent buildings.
2:25:42Um and the percentage of the lot covered
2:25:45by principal and accessory buildings. I
2:25:46I believe that we did have that, but um
2:25:49I'd have to check the site plan in the
2:25:51existing and proposed topography.
2:25:53>> Great. Um, city staff
2:25:56>> through the chair. Uh, this proposal at
2:25:5979 Pullman Street, uh, as stated, the
2:26:04presently on premise is a partially
2:26:06paved vacant lot, and the applicant is
2:26:09seeking to remove all existing
2:26:10improvements and construct a 2,250
2:26:14ft food service use with a drive-thru,
2:26:1729 parking spaces. Now, we'll get to
2:26:19amended 27 parking spaces and other
2:26:22assorted site improvements. And we're
2:26:25here because they are requiring Oh,
2:26:28sorry, back up the truck. Uh, this is a
2:26:30splitzoned lot um between the ML0.5
2:26:34and the MG0.5
2:26:37zoning districts. And so, we're here
2:26:39because the applicant requires two
2:26:40special permits. one to allow the food
2:26:43service use with the drivethru in the
2:26:46ML0.5
2:26:49um and also a special permit to modify
2:26:52the parking and dimensional requirements
2:26:54layout andor landscaping requirements
2:26:56for the drive-thru lane and escape lane
2:26:59length as required by the ordinance to
2:27:02be 240
2:27:04ft. And so for staff comments, there was
2:27:09um a question about the length of the
2:27:11drive-through lane and the escape lane.
2:27:13And the applicant is um going to clearly
2:27:16mark the plans and submit plans that
2:27:19have those clearly demarked so that we
2:27:21can make sure that we indicate the exact
2:27:23length of the
2:27:26lanes, which um the applicant has said
2:27:30is for the drive-thru lane is 214 ft.
2:27:34and for the ES esc es escape lane
2:27:37actually does comply at 242 feet.
2:27:42Um the applicate indicated that the
2:27:44hours of operation will be 9:00 a.m. to
2:27:474 a.m. 7 days a week and will employ 20
2:27:50to 30 employees working 4 to 8 hours per
2:27:53shift. The restaurant will serve
2:27:55breakfast, lunch, and dinner. Um, and
2:27:58because they're not opening until 9:00
2:28:00a.m., uh, feel that the least amount of
2:28:03traffic will be during the morning
2:28:04breakfast time. Um, and the anticipated
2:28:09peak traffic times are lunch and then
2:28:12evening time. Um, one of our questions
2:28:16was confirming
2:28:18that the cues proposed for the end user
2:28:22were like during peak service at similar
2:28:24locations. Um, the traffic study does
2:28:27indicate that the queue can hold nine
2:28:31cars, I believe. I think that's correct.
2:28:34Um,
2:28:39so the project requires 27 parking
2:28:42spaces and the applicant has proposed
2:28:4429. Um, two of which would be ADA and
2:28:48six of which will be EV ready. Um, so
2:28:52the applicant's surplus of two spaces,
2:28:55again, it was confirmed with
2:28:58inspectional services that Brooks
2:29:01Street, I'm sorry, Pullman Street would
2:29:03be the front of the
2:29:07um would be considered the frontage for
2:29:10the building. And so therefore, these
2:29:12two first spaces would be considered in
2:29:16the front yard. So they should be
2:29:17removed. And so as stated, the applicant
2:29:20has agreed to do so. Um
2:29:26and then
2:29:29um wow meth
2:29:33trees are required every 25 ft on center
2:29:36along the perimeter and the applicant
2:29:38has um provided a landscape plan which
2:29:40does show trees around the perimeter. Um
2:29:44it does seem that one tree is missing
2:29:47from the entry area. Um the traffic
2:29:51study does indicate that it is
2:29:54recommended that the tree not be planted
2:29:56there for sighteline reasons. And so
2:29:59that would be an additional piece of
2:30:01relief under the parking loading
2:30:03landscaping special permit to vary or to
2:30:07not vary to um seek relief for not
2:30:10meeting that requirement. So we can add
2:30:13that to the special permit if the
2:30:15applicant um wants to confirm that
2:30:17piece.
2:30:20Um [clears throat]
2:30:23we also are looking to understand again
2:30:27the applicant and I and I have had
2:30:28conversations so I know the answers but
2:30:31they're not in the in the um materials.
2:30:34So, I'm uh we're looking for the
2:30:36applicant to clarify what materials are
2:30:39proposed for the island that's
2:30:43separating the drive-thru and the
2:30:45northern parking lot. Um staff would
2:30:47ideally like to see a landscaped island
2:30:50separating the drive-through aisle from
2:30:51the parking area. Um to extend the idea
2:30:55that cars would cut a cut cut across
2:30:58from the entrance into the parking area.
2:31:01Um
2:31:03also because of the size of the parking
2:31:05lot, staff is recommending providing 25%
2:31:08compact spaces which the applicant has
2:31:10explained um is not
2:31:14uh amendable. So staff that was our you
2:31:18know request because of the size of the
2:31:20parking lot. So if that's stricken
2:31:21that's that is fine with us. Um
2:31:26and again the shade trees along the
2:31:28southern property line was to shade some
2:31:31of the parking lot because this is a
2:31:33again a large parking lot. Um again as
2:31:36stated it is not a zoning requirement.
2:31:37So that is completely up to the board
2:31:39whether or not you keep or strike that
2:31:40condition.
2:31:45And the only other thing that we're
2:31:46looking for is that there was we're
2:31:48looking for the applicant to confirm the
2:31:50gate materials using for the proposed
2:31:52dumpster enclosure. Um, DTM is
2:31:56requesting a queuing analysis from the
2:31:59traffic report. Um, the applicant and I
2:32:02did have a conversation uh about that
2:32:05request. So,
2:32:08this item does also have to go to the
2:32:12planning board for a parking plan. So,
2:32:14that could also be something that is
2:32:17discussed at that time. If this board
2:32:19decides that they
2:32:21don't see a need or want to strike that
2:32:24condition for for this um this will be
2:32:26reviewed again. Um
2:32:30and the rooftop equipment I leave that
2:32:33to the board and then I can answer any
2:32:36other questions. So, this uh property is
2:32:38in the transformative growth area in the
2:32:40citywide long range plan and encourages
2:32:42significant reinvestment and physical
2:32:44transformation in areas with unmet
2:32:47potential for high walkability and
2:32:49transit access.
2:32:52So, I can answer any questions if
2:32:54needed.
2:32:57>> So, I guess I I have a [clears throat] I
2:32:58have a question to city staff. So 3A it
2:33:02sounds like that if they provide it in
2:33:05between now and like they don't need to
2:33:07provide it for they would just need to
2:33:09provide it before the planning board. Is
2:33:10that correct to be satisfied?
2:33:12>> Yeah, it's just to review just so DTM
2:33:14can review.
2:33:15>> Okay. Um Okay. Well, there's no one here
2:33:18I believe for this. Uh is anybody online
2:33:21for um 79 Pullman Street?
2:33:28I'm going to guess no. Um, I'm happy to
2:33:31move this forward. I think, uh, this is
2:33:34pretty straightforward. Um, I am okay
2:33:38cutting 1A. I'm okay cutting one H. I'm
2:33:42okay cutting one I. Um, for 3A, which is
2:33:47the parking thing. So, you verbally told
2:33:49us if you just like write it down, I
2:33:51think that suffices.
2:33:53>> So,
2:33:53>> okay.
2:33:54>> I don't know if that sounds okay to you.
2:33:56>> Sure.
2:33:57>> Okay. Yep. uh because you verbally gave
2:33:59it to gave it to us. So um those are all
2:34:02the things. So I think those are
2:34:06um those are all the conditions.
2:34:09Um
2:34:10uh so I'm happy to move this forward. Uh
2:34:13board member um we'll go in person here
2:34:15and then we'll go online. So online
2:34:17folks and voting is uh board member
2:34:19Sacko. Um uh so board member Barhagen
2:34:24>> uh through the chair. Um, I'm fine
2:34:26moving this forward too. I think it's
2:34:28pretty straightforward and I'm fine with
2:34:30moving A and H. I just have a question
2:34:32about I because I
2:34:34um
2:34:36I don't see uh I seems more like
2:34:40suggestive than mandatory. It just maybe
2:34:43the first sentence because it the second
2:34:44sentence or the second and third
2:34:46sentences just says any rooftop
2:34:47equipment that may be visible shall be
2:34:49set back and screened to minimize the
2:34:51appearance. um provided a plan detail
2:34:54for the screening materials. So, but
2:34:56you're you want to just get rid of I
2:34:58altogether. Is that right?
2:34:59>> I I mean that that would just be
2:35:01clearer. Um I think that you know if
2:35:04planning
2:35:06I I would imagine the planning would
2:35:08agree that the screening that's provided
2:35:09with the parapit would
2:35:11>> would be sufficed. The architectural
2:35:13plans didn't show the rooftop pipe is
2:35:15probably what why there was some
2:35:16confusion.
2:35:17>> Okay. All right. All right. I'm fine
2:35:18with I being removed as well. Okay.
2:35:21Thank you.
2:35:22Uh, board member Brammy,
2:35:24>> no comments.
2:35:25>> Board member Cortez.
2:35:27>> Uh, true the chair. Uh, I'm pretty much
2:35:31in general in fa in favor of uh uh the
2:35:35approval of uh this uh uh project. Um
2:35:40uh and
2:35:43besides uh you know my uh leading to
2:35:47approval, I'm fine with uh the three uh
2:35:53parts that the project uh wants to uh
2:35:57strike out. One a uh the one regarding
2:36:01uh the 27 uh compact cars and the
2:36:05rooftop. So, uh I'm in favor of uh um
2:36:11going along with the request by the
2:36:13project uh personnel. Uh, regarding the
2:36:19the drive-thru,
2:36:21uh, my, uh, my understanding is that,
2:36:25uh, uh, it'll be open from 9 to 4 a.m.
2:36:30And my question is, uh, is that
2:36:34is that operational or open those hours
2:36:38also for inside services only the
2:36:41drive-thru?
2:36:43Um, I'm not sure what time it cuts off,
2:36:46but the overnight hours are are are
2:36:48drive-thru only.
2:36:50>> I don't know if it's at 11 o'clock or
2:36:52midnight or or 1, but
2:36:54>> So, the the the inside uh services, what
2:36:58are the hours again?
2:37:01>> It's it's 9:00 to 4:00 a.m. Uh, the
2:37:04applicant wasn't sure when they turn
2:37:05over to no longer accepting inside, but
2:37:08they do close the inside at night.
2:37:13So it so that is that is open depending
2:37:18on on a number of clientele it's not
2:37:20something that has been regulated here
2:37:22>> we don't regulate it now
2:37:24>> no no I mean the the inside the the
2:37:27hours of services inside
2:37:30so
2:37:31>> yeah we don't regulate that
2:37:33>> okay so that was just a question just to
2:37:37make sure you know if the difference
2:37:39between the inside services and outside
2:37:41So basically the the the four the 9 to4
2:37:45applies to both of them. Uh no further
2:37:47questions. I'm in favor of moving
2:37:49forward with this project. Uh good luck
2:37:53to all.
2:37:55>> Okay. Board member Tarono.
2:37:58>> Um I have no comment.
2:38:01>> Board member Sacko.
2:38:03>> No additional comment. Thank you.
2:38:05>> All right. I'll take a motion to close.
2:38:07Um, I'd like to make a motion to close
2:38:09on 79 Pullman Street.
2:38:12>> So moved.
2:38:13>> Is there a second?
2:38:15>> I do second.
2:38:16>> On the motion to close, board member
2:38:18Cortez,
2:38:20>> yes.
2:38:20>> Board member Mormmy,
2:38:22>> yes.
2:38:23>> Board member Tono,
2:38:29>> yes.
2:38:30>> Board member Sacko,
2:38:31>> yes.
2:38:32>> My votes yes. Is there a motion on 79
2:38:35Pullman Street? like to make a motion
2:38:36for 79 Pullman Street for approval of a
2:38:38special permit to allow food service
2:38:40drive-thru use in an ML0.5 and MG0.5
2:38:44zone and for approval of a special
2:38:46permit to modify the parking dimensional
2:38:48layout and/or landscaping requirements,
2:38:50loading requirements, andor the number
2:38:52of required parking spaces subject to
2:38:55the conditions set forth in the staff
2:38:57memo on pages three and four, excluding
2:39:00and striking from those conditions 1A,
2:39:031H, and one I and the waivers is
2:39:06requested by the applicant.
2:39:11>> So moved.
2:39:12>> Is there a second?
2:39:14>> Second.
2:39:15>> On the motion, board member Cortez,
2:39:18>> yes.
2:39:18>> Board member Mammy,
2:39:20>> yes.
2:39:20>> Board member Tono,
2:39:22>> yes.
2:39:22>> Board member Sacko,
2:39:25>> yes.
2:39:26>> My votes yes. Thank you very much.
2:39:27>> Thank you.
2:39:28>> All right. Next up is 27 to 29 and 31
2:39:32Camp Street.
2:39:35through the chair. The applicant is
2:39:36online and I have asked him to unmute.
2:39:38Hopefully I did that correctly.
2:39:40>> Okay.
2:39:47>> Change the screen.
2:39:49>> Extension of time.
2:39:52>> Good evening.
2:39:54>> Yes. Go ahead. We can hear you.
2:39:56>> Great. Uh good evening, M Mr. Chair,
2:39:59members of the board. For the record, my
2:40:00name is Matt Eckle. I am an attorney
2:40:02with Fletcher Tilton on behalf of the
2:40:04applicant. And for the record, I reside
2:40:06in Burlington, Massachusetts. Uh we're
2:40:08here tonight to respectfully request a
2:40:11six-month extension in connection to the
2:40:13special permit and variances previously
2:40:15granted by this board back on June 23rd
2:40:18of last year relating to the proposed
2:40:20project at 31 Camp Street as well as
2:40:2327-29
2:40:24Camp Street. By way of very brief
2:40:27background, I know it's been a long
2:40:28night already, so I'll be brief. The
2:40:30applicant received an approval from this
2:40:32board for a new two family building at
2:40:3431 Camp Street along with parking and
2:40:36site improvements.
2:40:38Uh for this portion of the project, the
2:40:40applicant received variances from the
2:40:42board relating to the lot area,
2:40:43frontage, and height of the proposed
2:40:45building. Uh the companion case, which
2:40:47was filed under 27-29 Camp Street, also
2:40:50received relief uh despite no changes
2:40:53actually being proposed to that portion
2:40:54of the lot. Uh however, since they had
2:40:56been considered merged uh for zoning, uh
2:40:59we did need to seek relief for that
2:41:01portion of the lot as well. And
2:41:03specifically, we received relief in the
2:41:05form of variance for lot area and a
2:41:07special permit relating to the parking
2:41:09setback requirements and drive aisles
2:41:11with parking and loading requirements.
2:41:14The applicant still remains committed to
2:41:16commencing this project uh as soon as
2:41:18possible and bringing muchneeded
2:41:19residential housing units to the city
2:41:22and currently no changes are proposed to
2:41:24the previously approved project. Uh we
2:41:27just need a little bit more time and
2:41:28therefore we are respectfully requesting
2:41:31your approval uh for a six-month
2:41:33extension. Uh, with that I'll I'll
2:41:35happily pause and take any questions you
2:41:36may have
2:41:40>> through the chair Amy Bethle for the
2:41:42planning division. Uh, everything the
2:41:44applicant said. Um, I will one point of
2:41:48clarification though. I think and I'm
2:41:51going to look to my colleague Miss Smith
2:41:53just to shake her head for me. Um, the
2:41:55variances can have a sixmonth extension.
2:41:58I'm fairly certain that the special
2:42:00permit can get a year.
2:42:04Um, and also the special permits can be
2:42:08administratively
2:42:10approved through for an extension
2:42:12through inspectional services
2:42:15if that needs to happen in the future if
2:42:18if that's a thing. So, just one point of
2:42:21clarification. Um but for the new um
2:42:25deadlines just for the board um the
2:42:27variance deadline would be January 15,
2:42:302027 and the special permit uh would be
2:42:34July 15, 2027.
2:42:37Thank you.
2:42:38>> Okay.
2:42:40Um is there any comment? [snorts]
2:42:44>> Great. Uh sounds good to me. I'm happy
2:42:47to move it forward. Um board member
2:42:49Barton Hagen voting on this. Board
2:42:50member Barthagen. No comment.
2:42:52>> Board member Mory,
2:42:55>> no comments.
2:42:56>> Board member Cortez,
2:42:58>> no comment.
2:42:59>> Board member Tono,
2:43:01>> no comment.
2:43:02>> Board member Sacko,
2:43:03>> no comment.
2:43:04>> All right, I'll take a motion to close.
2:43:06>> I'd like to make a motion to close on
2:43:072729 and 31 Camp Street.
2:43:10>> Is there a second?
2:43:11>> Second.
2:43:12>> On the on the motion to close, uh, board
2:43:14member Cortez,
2:43:15>> yes.
2:43:16>> Board member Remy,
2:43:17>> yes.
2:43:18>> Board member Tarono,
2:43:20>> yes. Board member Barthagen.
2:43:21>> Yes.
2:43:22>> My votes yes. Is there a motion?
2:43:24>> Uh I'd like to make a motion for 27 to
2:43:2629 and 31 Camp Street for an extension
2:43:29of time. The extension for the variance
2:43:31would would be extended to January 15,
2:43:332027 and the extension of the previously
2:43:35approved special permit would be through
2:43:37July 15, 2027.
2:43:39>> Is there a second?
2:43:41>> Second.
2:43:42>> On the motion, board member Cortez,
2:43:45>> yes.
2:43:46>> Board member Mammy,
2:43:47>> yes.
2:43:47>> Board member Tarono,
2:43:49>> yes. Yes. Board member Bartagen.
2:43:50>> Yes.
2:43:51>> My votes yes. All right. Next up.
2:43:53>> Thank you very much.
2:43:54>> Next up is 30 Lraange Street.
2:44:02>> Good evening, Mr. Chairman, members of
2:44:03the board. Um, for the record, my name
2:44:05is Donald O'Neal. I'm a lawyer here in
2:44:08Worcester.
2:44:09Uh, here this evening, um, on behalf of
2:44:12Worcester Oz Fund 2 LLC.
2:44:17Um, and this is a request that we filed
2:44:21to allow for the expansion or alteration
2:44:24of a pre-existing non-conforming uh
2:44:26parking use. Um, this is a use which is
2:44:31allowed in the underlying zone. Uh,
2:44:34however, because it is also in this CCOD
2:44:39um overlay district uh does not allow
2:44:42for um non-accessory parking. Um the
2:44:46property itself has a history going back
2:44:5030 plus years of uh being used for
2:44:53parking for
2:44:56uh parcels in this case primarily for
2:44:58something that was in the other side of
2:45:00the grain street. Um and what we're
2:45:02looking to do is utilize this parking.
2:45:05Uh my clients are also involved in the
2:45:09property at 98 Beacon Street, uh which
2:45:13is a former industrial mill building
2:45:16that has been uh approved for up to 58
2:45:22apartments. Uh the situation there is
2:45:25that the parking that goes with that
2:45:28parcel is 8 to 10 spaces. Um and
2:45:32although there is no parking requirement
2:45:33in the CCOD overlay district, uh there
2:45:37is still a need for parking for um
2:45:40tenants. Um and because the property is
2:45:47not directly across the street, but
2:45:48pretty close. Um but um there's no
2:45:52ability to they would have to be on the
2:45:54side same side of the street and
2:45:57adjacent to each other to be considered
2:45:59accessory parking which would be
2:46:01permitted. um staff has um gone through
2:46:06and I should say also that the parking
2:46:10plan that we had submitted to you um was
2:46:14originally developed when this parking
2:46:16area was part of the other development
2:46:19on that side of the street. So it's it's
2:46:23um
2:46:24and that is the location that we are
2:46:27proposing
2:46:28uh has been cut out of the other parcel
2:46:31with portions of 30 LR street and 42 LR
2:46:34street. Um and
2:46:38>> um our purpose really in terms of coming
2:46:41forward tonight is to
2:46:44uh get the board's permission to um
2:46:48proceed with an alteration or expansion
2:46:50of the existing parking lot. the actual
2:46:53there may be a few things that change on
2:46:55this um but that would all be done so
2:46:58that um it would fit within the ANR lot
2:47:02that was created to establish this lot.
2:47:05Uh so some of the issues that for
2:47:07example the U parking lot setback
2:47:10requirement
2:47:12um is 3 feet but if there's a a a
2:47:16property line it's 5T.
2:47:19Um, so [snorts] there's going to be a
2:47:20little bit of work that needs to be done
2:47:22there. And it's entirely possible that
2:47:25if we need some kind of relief for that,
2:47:29that we would be back uh before you once
2:47:32the plan is
2:47:34further refined. I should also say that
2:47:37because it's in the overlay district, it
2:47:39will require uh site plan approval and a
2:47:42parking plan.
2:47:44Um but uh we didn't want to go to
2:47:50uh the effort of redesigning
2:47:54the parking lot. Um and this is this is
2:47:58like 90% or 95% of what we would be
2:48:01coming back with. But uh we wanted to
2:48:04confirm the use first. So, uh I have
2:48:07looked at the comments from a staff um
2:48:11and th those were similar to the
2:48:14comments that
2:48:15um were generated when the project was
2:48:20initially looked at by the planning
2:48:22board. Um so for our purposes we're
2:48:25comfortable proceeding with those
2:48:27recommendations with likely
2:48:30understanding that um you know we may be
2:48:33back before you at some point. Um, the
2:48:37other thing I would say is that [snorts]
2:48:39one of the comments which we're fine
2:48:41with is that the
2:48:43parking expansion that we're proposing
2:48:46that this lot be sort of dedicated to
2:48:49the property at 100 Beacon Street so
2:48:52that it doesn't become um, you know, um,
2:48:55ballpark parking or something of that
2:48:58nature, but but it is just going to be
2:49:00the residential parking component for
2:49:02the across the street. Uh, I would
2:49:06request the waiver which is on page five
2:49:08of 10 and happy to answer any questions
2:49:12you might have.
2:49:14>> Great. City staff
2:49:17>> through the chair Michelle Smith and the
2:49:18city's planning division. Um, in front
2:49:20of you again this evening a request in
2:49:23this case to expand alter change any
2:49:25pre-existing non-conforming use. Um, in
2:49:28this case, we are located in the BG6 or
2:49:31the downtown district with the
2:49:33commercial corridors overlay district,
2:49:34the CCOD.
2:49:36Uh, we don't like parking lots in this
2:49:38area. So, the zoning code prohibits them
2:49:41um when they're not accessory to
2:49:42something else. Um, so as you heard the
2:49:45the applicants uh council describe,
2:49:48basically prior iterations of this uh
2:49:52redevelopment of the larger campus area,
2:49:54if you will, um, to support housing
2:49:58development did envision continuously
2:50:01this location as parking in the form
2:50:03that you essentially see on the plans
2:50:05here, which were plans previously
2:50:06submitted um, to the planning board for
2:50:08consideration.
2:50:10they were approved for uh a special
2:50:12permit to exceed the maximum
2:50:14requirements for parking um that we have
2:50:17in that that district uh to be able to
2:50:20facilitate the construction of this
2:50:22amount of parking. Subsequent to that,
2:50:24based on the financing and my
2:50:26understanding of just kind of the
2:50:27different players and and how things
2:50:29worked out, essentially they've had to
2:50:30carve this lot off onto its own lot um
2:50:34for financing purposes. And so the
2:50:36applicant is now uh different than what
2:50:39it was originally. Uh and so this this
2:50:42proposal is really associated with the
2:50:44former 98 now 100 Beacon location which
2:50:47is on the corner of Beacon and Lraange.
2:50:49You see top right corner here um that is
2:50:51going to be converted into believe it's
2:50:5458 um residential units. So that
2:50:56historic building converted. So this
2:50:59parking lot is in support of that not
2:51:01because of zoning. Um zoning has no
2:51:02parking requirements. So, this is not
2:51:04needed from a zoning perspective. I
2:51:06think it's an important thing for folks
2:51:08to be thinking about, especially as we
2:51:09start talking about changing zoning
2:51:10requirements for parking. Um, just
2:51:12because we don't require parking doesn't
2:51:14mean people don't build it. Case in
2:51:16point. Um, so, so really the use itself
2:51:20is not allowed. Non-accessory surface
2:51:22parking lots are not allowed. We allow
2:51:24garages um and we allow parking to be
2:51:27accessory to something else. So, in
2:51:28terms of the applicant's options by
2:51:30right, um they have the ability to
2:51:33construct a garage similar or larger.
2:51:35Obviously, there's cost associated with
2:51:37a parking garage. Um they could
2:51:38construct a small building or a large
2:51:40building and have parking associated
2:51:42with that. Um they could not provide
2:51:44parking and instead provide some dense
2:51:46housing development on the lot. Um
2:51:48hopefully that will come in the future.
2:51:49Um and it won't need parking, but at
2:51:51this moment in time, um that is is what
2:51:53they're hoping to be able to do. So if
2:51:55if you look at or drove by the site or
2:51:57looked at any of the aerial imagery and
2:51:59the documentation provided, you can see
2:52:00that there's a lengthy history of the
2:52:03property being used for parking of
2:52:05vehicles um most recently in association
2:52:07with a property across the street and
2:52:09sort of a quonet hut area um that was an
2:52:12auto body shop and they were parking
2:52:14cars over here. And so the applicant
2:52:15provided a basically a tested statement
2:52:18from the prior uh owner about the
2:52:21history of the use of that for the last
2:52:24um 30 years or so indicating that they
2:52:27had uh not a lease but an informal
2:52:30arrangement where basically someone was
2:52:32using that property for parking. So they
2:52:34are looking to reconstruct, demolish all
2:52:36of that, reconstruct something that is
2:52:38much larger um but in more modern form
2:52:41than the reg grinds and uh gravel and
2:52:45spots of pavement that are out there
2:52:47today if you went by. U so what we do
2:52:50have as attorney O'Neal mentioned is a
2:52:52plan that is likely to change based on
2:52:55the the nature of what the site was at
2:52:58the time this proposal was put forward.
2:53:00You can see there are stairwells that
2:53:02interconnect with the adjacent lots.
2:53:04Don't believe that those are likely to
2:53:05be proposed any longer. There's a
2:53:06transformer. I'm not sure if the
2:53:07transformer will still be necessary. So,
2:53:09some of our comments, you know, we
2:53:10really kind of regurgitated for the most
2:53:12part the comments we' previously issued
2:53:14on this concept um and pulled those
2:53:17forward as conditions that you have
2:53:19here. Essentially, the applicant will
2:53:21either be back in front of you for an
2:53:22amendment to this and possibly
2:53:24additional relief if they can't comply
2:53:26with those requirements because they
2:53:27reconfigured the lots to create this on
2:53:30its own lot. And in in doing that, um
2:53:32there are likely some issues with the
2:53:34setbacks for the parking area that
2:53:36they've created. Um the plans don't
2:53:38expressly clearly show that on a survey
2:53:41that has been provided. So, that's
2:53:42something we're looking to get so that
2:53:44we can kind of confirm that. Without
2:53:45that, we're not able to verify zoning
2:53:47compliance. So again, in kind of a
2:53:49couple projects tonight where there's a
2:53:50little bit of caveats on these where we
2:53:52just we don't have that level of
2:53:53information to review. As was stated,
2:53:56planning board will need to review this
2:53:57for a full parking plan review. So that
2:53:59will be something that will be necessary
2:54:02[snorts] for the board to move this
2:54:03forward. But really the applicants here
2:54:04to have you consider the existing use,
2:54:08its privilege, and hopefully see that
2:54:10this what they're proposing is an
2:54:11upgrade from what is there and has
2:54:14historically been there as this
2:54:16neighborhood continues to transform and
2:54:17change away from relic manufacturing
2:54:19uses and move forward into housing and
2:54:22hopefully a vibrant a continued vibrant
2:54:25neighborhood. Um, so I can go into more
2:54:29detail, but basically 41 spaces is
2:54:31what's shown on the plan that you have
2:54:34had the opportunity to review and the
2:54:37the applicant does have a zone change
2:54:39pending as sort of a plan B, if you
2:54:41will, or the board not to to grant this.
2:54:43Um, that went in front of the planning
2:54:44board was not favorably recommended from
2:54:46planning board um and was sent back to
2:54:49uh city council for economic development
2:54:50committee. So just a little context on
2:54:52other things, other moving pieces um to
2:54:54facilitate this project. Um we were able
2:54:57to identify this as a potential pathway
2:54:58with a shorter timeline and the
2:55:00applicant has as you're seeing this
2:55:01evening pursued that. Um so I don't need
2:55:05to go over really any of the comments
2:55:07that I have. I think the applicant's
2:55:08agreeable to all the conditions. This is
2:55:10an area just contextually for now next
2:55:13um that is sort of at the transitional
2:55:15fringe of a managed growth area and a
2:55:18transformational growth area and artisan
2:55:20growth area associated with those mill
2:55:21buildings didn't include this side of
2:55:23the street and then the infill corridor
2:55:25of Main Street. Um all very walkable to
2:55:27transit. Um happy to answer any
2:55:30questions. Thank you.
2:55:32>> Is anybody here for
2:55:3430 lb
2:55:37online?
2:55:40All this to keep a parking lot parking
2:55:41lot. Um I'm happy to move this forward.
2:55:44Uh board member um we'll go so voting on
2:55:47this it will be board member um who just
2:55:50voted?
2:55:51>> Board member Sacko. Um and uh uh but
2:55:55we'll start in the room. Um board member
2:55:56Bartagen.
2:55:58>> Yeah, I I don't have any additional
2:56:00comments to make.
2:56:01>> Board member Rammy.
2:56:02>> No other comments.
2:56:04>> Uh board member Cortez. Moving through.
2:56:08>> No comments.
2:56:09>> Board member Tono.
2:56:12>> I'm good. No comment.
2:56:14>> Board member Sacko.
2:56:16>> No comment.
2:56:17>> All right. I'll take a motion to close.
2:56:20>> Uh, I'd like to make a motion to close
2:56:21on 30 of the Grain Street and a portion
2:56:23of 42 L of the Grain Street.
2:56:25>> So moved.
2:56:26>> So moved.
2:56:26>> Is there a second?
2:56:28>> Second.
2:56:29>> On the motion, board member Cortez.
2:56:32>> Yes.
2:56:32>> Board member Mormy.
2:56:34>> Yes. Board member Tono.
2:56:41>> Board member Tono.
2:56:44>> Yes.
2:56:44>> Board member Sacko.
2:56:46>> Yes.
2:56:47>> My votes. Yes. Is there a motion on 30
2:56:50Lraange Street? I'd like to make a
2:56:51motion on 30 Lraange Street and a
2:56:53portion of 42 Lraange Street for
2:56:55approval of a special permit to extend,
2:56:57alter, or change a privilege
2:56:58pre-existing non-conforming structure
2:57:00and/or use subject to the conditions of
2:57:02approval set forth on pages four to five
2:57:05of the staff memo and the waiver is
2:57:07requested by the applicant.
2:57:09>> So moved.
2:57:12>> Excuse me. Is there a second?
2:57:14>> I do second the motion.
2:57:15>> On the motion, board member Cortez,
2:57:18>> yes. Board member Mori,
2:57:20>> yes.
2:57:20>> Board member Tono,
2:57:22>> yes.
2:57:22>> Board member Sacko,
2:57:24>> yes.
2:57:24>> My votes, yes. Thank you very much.
2:57:26>> Thank you very much.
2:57:27>> All right. Um, it does not appear that
2:57:30we have any communications. Uh, so um
2:57:33and I don't think did we have
2:57:36>> Okay. I was like, I didn't see any. So,
2:57:38make sure in that case I'll take a
2:57:40motion to adjurnn.
2:57:41>> Motion to adjurnn.
2:57:42>> Is there a second?
2:57:44>> Second.
2:57:44>> Second.
2:57:45>> All in favor? Hi.
2:57:47>> Hi.
2:57:48>> Good night.