2026-08-03 - Conservation Commission
Summary
Based on auto-generated captions plus the posted agenda; names, file numbers and dates may be misheard. No official minutes yet.
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| Malden Woods Subdivision (Whippoor LLC) | 20 | 21% |
| Other business | 15 | 15% |
| 520 Park Avenue and 111 Maywood Street Soil Excavation (Clark University) | 14 | 15% |
| Indian Lake Dam Vegetation Management (149 West Boylston Drive) | 11 | 11% |
| MassDOT Yearly Vegetation and Herbicide Plan (I-190, I-290, Route 146) | 10 | 11% |
| Conservation Commission Enforcement Orders | 8 | 8% |
| 21 New Bond Street Restaurant Depot (Green Tech Park) | 6 | 6% |
| 413 Lake Avenue Deck (CC-2026-049) | 6 | 6% |
| 283 Lake Avenue Quinsigamond State Park Playground | 4 | 5% |
| Continuances | 1 | 1% |
- Monday, August 3, 2026, 5:30 PM, Levi Lincoln Chamber (hybrid).
- Chair Diane Fratoni, Devin Canton, Stuart Kirshner and Lindsay Nystrom present, with staff Eric Flint and Mattie VandenBoom.
- Every vote was 4-0 unless noted; adjourned after the usual business.
- The August 24 meeting needs three members (Fratoni will be absent), so in-person attendance was requested.
Continuances
2:43-4:07
- Postponed to August 24 (constructive grant deadline extended to September 15): Providence and Worcester Railroad Right-of-Way Vegetation Management, 35 State Road (SAL LLC), 9 Dalton Street, 99 Sears Island Drive and 46, 51 and 52 Modoc Street.
- 497 Granite Street postponed to September 14 (deadline extended to October 6).
520 Park Avenue and 111 Maywood Street Soil Excavation (Clark University)
14:23-28:27
- Clark's licensed site professional (captioned Brandon Fagan) described re-excavating contaminated test-pit soils on the former Chevy dealership lot beside Beaver Brook under a state release abatement plan filed in July: gasoline, oil and PAH areas, plus ash with lead and arsenic.
- About two weeks of work, mostly in parking areas, with wattles and extended protection along the brook; trucks live-loaded where possible, one truckload of lead-failing soil to an out-of-state hazardous-waste facility.
- Resident Fred Nathan asked whether the old dealership lot had been checked by DEP; the consultant said the plan is filed with DEP and more investigation backs it.
- Negative determination of applicability issued.
MassDOT Yearly Vegetation and Herbicide Plan (I-190, I-290, Route 146)
13:22-14:23, 49:06-58:21
- MassDOT's District 3 environmental engineer (captioned Tracy Coppola) described the annual plan for herbicide use on weeds in guardrails, curbs and medians. Heard after a delay getting the applicant into the Zoom room.
- Staff found three unmapped wetland areas within 100 feet (Coal Mine Brook at I-290, a stream from Bovenzi Conservation Area, and one near 384 Southwest Cutoff) that MassDOT must add to revised plans before work.
- Commission issued a positive determination confirming boundaries plus negative determinations 3 and 5: no thermal treatment within 100 feet of a cold-water fishery, and a revised map before work.
283 Lake Avenue Quinsigamond State Park Playground
28:27-32:44
- DCR (represented by Hatch) got its DEP number; test pits for the stormwater system in the active parking lot will be a construction-phase condition, which staff accepted because impervious area is reduced.
- Nystrom recused. Hearing closed and Order of Conditions issued 3-0 (conditions include tree protection, stormwater maintenance and certification, dust, dewatering and spill prevention).
21 New Bond Street Restaurant Depot (Green Tech Park)
32:44-38:23
- Bohler Engineering for a roughly 50,000 sq ft Restaurant Depot on 4.4 acres with 171 parking spaces; Planning Board conditional site plan approval already received.
- Filed under the city ordinance only because the site is near drainage structures; the flood plain was recently revised in a map update from the Weasel Brook restudy. Staff had no concerns.
- Kirshner asked about the construction entrance, stockpiles and snow storage. Hearing closed; Order of Conditions issued.
Indian Lake Dam Vegetation Management (149 West Boylston Drive)
38:23-49:06
- Pare Corporation for the City (MassDOT owns the dam) proposed clearing all vegetation from the dam embankment, root removal where roots exceed 3 inches, backfill, loam and seed.
- Commissioners asked about follow-up monitoring (condition to be drafted), root holes in an earthen dam, who inspects, fence and mowing access (twice yearly), truck access and staging.
- Waiting on a DEP file number, so continued to August 24.
Malden Woods Subdivision (Whippoor LLC)
58:29-1:18:00
- Thompson Liston Associates asked for permeable-paver patios and a driveway slightly inside the 30-foot buffer on six units in a larger-floorplan redesign, with mitigation plantings and added roof infiltration.
- Fratoni said there is no precedent for patios, decks or driveways in the 30 feet and that project economics are not the Commission's concern; Canton agreed. Kirshner and Canton urged new plans.
- Applicant continued to August 24 to revise (move structures out of the 30 feet); lot 8B remained unresolved.
413 Lake Avenue Deck (CC-2026-049)
7:46-13:22
- Contractor sought a Request for Determination to rebuild a deck over Lake Quinsigamond, including footings in the lake bed. Staff and the chair said that needs a Notice of Intent; positive determination issued.
Conservation Commission Enforcement Orders
1:22:36-1:30:30
- 612 Grove Street Driveway Enforcement: MassDOT will not allow a curb cut on the state-road side (captions confused Grove and Holden Streets), so the owner is looking at restoring part of the buffer and a driveway compliant with zoning; to return.
- 88 Webster Street Riprap Restoration: engineer for the owner (captioned Nick Fasciandola, Level Design Group) acknowledged riprap placed without a permit to stop washout; a restoration plan was promised for August 24. The Commission also wanted to know how snow will be handled there.
Other business
0:00-2:43, 4:07-7:46, 1:18:00-1:22:36, 1:30:30-1:34:06
- 43 Weatherstone Drive (Blythewood condos): Deck It replacing a porch about 80 feet from wetland with a helical pile; negative determination.
- Certificates of Compliance issued for 2A Nonquit Street (a 1981 order, boathouse remnant), 20 Sherer Trail and 3 Crest Avenue; emergency certificate for 2A Nonquit Street (fallen oak and two declining trees) ratified.
- Communications: draft Priority Habitat Map comment period (to August 5) and an Eversource gas main replacement on Stoddard Drive.
- July 13 minutes approved.
- Lake Quinsigamond liaison report: the Lake Commission reviewed a Senate bill limiting wake boats to 300 feet from shore in water at least 15 feet deep, which would be hard to meet on the narrow lake.
Agenda
Conservation Commission Meeting Agenda, Monday, August 3, 2026, 5:30 PM, Worcester City Hall, Levi Lincoln Chamber, 3rd Floor (Room 309), 455 Main Street, with Zoom and phone participation. Commission members: Diane Fratoni (Chair), Devin Canton (Vice Chair), Stuart Kirshner, Lindsay Nystrom. Staff: Eric Flint (Conservation Manager), Mattie VandenBoom (Asst. Conservation Agent), among others. Upcoming meetings: August 24, September 14, October 5, October 26, November 16, December 7, 2026.
Call to Order - 5:30 PM. Requests for Continuances, Postponements, Withdrawals. Public Hearings.
New Business - Request for Determination of Applicability
- Providence and Worcester Railroad Right-of-Way - CC-2026-033 - Applicant: TEC Associates. Determine whether resource area boundaries on the plans are accurately delineated for a five-year vegetation management plan. (WPA and City Ordinance)
- 43 Weatherstone Drive (MBL CO-NDO-01061) - CC-2026-047 - Applicant: Deck It. Replacement of an existing concrete porch with composite decking and related sitework. (WPA and City Ordinance)
- 413 Lake Avenue (MBL 41-004-00027) - CC-2026-049 - Applicant: Oasis Construction Inc. Partial demolition and reconstruction of an existing deck and related sitework. (WPA and City Ordinance)
- I-190, I-290 & Route 146 Right-of-Way (Yearly Operational Plan) - CC-2026-053 - Applicant: Massachusetts Department of Transportation. Confirm resource area boundaries and whether vegetation management and targeted herbicide spraying along the rights-of-way is subject to jurisdiction. (WPA)
- 520 Park Avenue & 111 Maywood Street (MBL 14-023-00004 & 14-023-00016) - CC-2026-055 - Applicant: Clark University. Excavation and removal of soils and related sitework. (WPA and City Ordinance)
Old Business - Notice of Intent
- 283 Lake Avenue (Quinsigamond State Park) (MBL 41-047-00004) - CC-2026-044 & DEP# 349-1455 - Applicant: Massachusetts Department of Conservation and Recreation. Remove existing site improvements, reconfigure parking, construct a playground, spray park, cooling station, stormwater infrastructure and related sitework. (WPA and City Ordinance)
- 35 State Road (MBL 32-019-00316) - CC-2026-045 & DEP# 349-14xx - Applicant: SAL, LLC. Remove existing site improvements and construct an 8-unit residential building, parking, stormwater infrastructure and related sitework; request for a discretionary allowance from performance standard 4.2.4. (WPA and City Ordinance)
New Business - Notice of Intent
- 497 Granite Street (MBL 45-001-91-93) - CC-2026-026 & DEP# 349-1452 - Applicant: Eskay Builders LLC. Single-family dwelling, driveway, rain gardens and related sitework. (WPA and City Ordinance)
- 9 Dalton Street (MBL 34-019-00002) - CC-2026-048 - Applicant: Amanda Russo-Folco. Two-story residential building with driveway, utilities, stormwater infrastructure and related sitework. (City Ordinance)
- 21 New Bond Street (MBL 37-001-001EC) - CC-2026-051 - Applicant: RD Mass, INC. Commercial building, parking lot, stormwater infrastructure and related sitework. (City Ordinance)
- 99 Sears Island Drive (MBL 13-034-52+53) - CC-2026-052 & DEP# 349-14xx - Applicant: Lawerence Johnson. Addition and deck on a single-family home, shed removal, related sitework; waiver of performance standard 4.2.4. (WPA and City Ordinance)
- 46, 51, & 52 Modoc Street (MBL 38-017-1A-11, 38-017-1A-10 & 38-017-1A-09) - CC-2026-054 - Applicant: St. Anthony Realty, LLC. Five duplexes with driveways, stormwater infrastructure, utilities and related sitework. (City Ordinance)
- 149 West Boylston Drive (MBL 13-035-0001A) - CC-2026-056 & DEP# 349-14xx - Applicant: City of Worcester Department of Sustainability and Resilience. Remove vegetation along the embankment of the Indian Lake spillway and dam; waiver of performance standard 4.2.4. (WPA and City Ordinance)
New Business - Request for Amended Order of Conditions
- 0 Whippoorwill Drive & 0 Danielle's Way (aka Malden Woods Subdivision), the Whippoorwill Drive Right-of-Way and the westerly portion of the Castine Street Right-of-Way - CC-2026-050 (CC-2025-055, CC-2019-074 & DEP# 349-1266) - Applicant: Whippoor, LLC. Subdivision of approximately 30 residential units and a new roadway network connecting Whippoorwill Drive to Castine Street, with utilities, grading, paving, drainage, culvert installation and related sitework; discretionary allowance from performance standard 4.2.4. (WPA and City Ordinance)
Other Business
- Request for Certificate of Compliance: (a) 2A Nonquit Street (DEP# 349-0090); (b) 20 Sherer Trail (CC-2019-071 & DEP# 349-1261); (c) 3 Crest Avenue (CC-2024-052 & DEP# 349-1403)
- Emergency Certificate: (a) 2A Nonquit Street (CC-EC-2026-003)
- Enforcement Order and Violation Updates: (a) 133 Lake Avenue North (CC-2020-007); (b) 99 Wildwood Avenue (CC-EO-2020-009); (c) 269 James Street (CC-EO-2021-007); (d) 4 Tiffany Avenue (CC-EO-2023-001); (e) 570 Lincoln Street (CC-EO-2023-010); (f) 198 Granite Street (CC-EO-2024-001); (g) 86 Webster Street (CC-EO-2024-003); (h) Salisbury Hill (CC-EO-2024-005 & DEP# 349-1253); (i) 262 Mill Street (CC-EO-2024-007); (j) 142-158 Wildwood Avenue (CC-EO-2024-010); (k) 1256 West Boylston Street (CC-EO-2025-001); (l) 13 Holden Street (CC-EO-2025-002 & DEP# 349-1409); (m) 270 Webster Street (CC-EO-2025-004); (n) 34 Eskow Road & 224 Southwest Cutoff (CC-EO-2025-006); (o) 148A Tory Fort Lane (CC-EO-2025-007, CC-2023-016 & DEP# 349-1356); (p) 1259 West Boylston Street (CC-EO-2025-008); (q) 145 Newton Ave North (CC-EO-2025-009); (r) 757 Salisbury Street (CC-EO-2025-010 & CC-2023-005); (s) 9 & 13 Elton Street (CC-EO-2025-011, CC-2024-083 & DEP# 349-1407); (t) 612 Grove Street (CC-EO-2026-001); (u) 342 (aka 344, 346 & 348) Lake Avenue (CC-EO-2026-002 & DEP# 349-1435); (v) 88 Webster Street (CC-2023-025 & DEP# 349-1361)
- Open Space Discussion
- Discussion of Active Projects
- Communications: (a) Draft Priority Habitat Map - comment period - MassWildlife; (b) Natural Gas Main Replacement - Stoddard Drive - Eversource
- Approval of Minutes - 07/13/2026
- Update to Wetlands Protection Ordinance and Regulations
- Commission Liaison Updates
- Policies & Procedures
Adjournment
Sources
- Video: https://youtube.com/watch?v=BTOpqNM2HAI
- Agenda: https://worcesterma.primegov.com/Public/CompiledDocument?meetingTemplateId=75471&compileOutputType=1
Video
Transcript
Auto-generated YouTube captions; names and terms are likely misheard.
Transcript
0:02This August 3rd, 2026 meeting of the
0:04Worcester Conservation Commission is now
0:06called to order. My name is Dianne
0:07Fratoni. I will be chairing this
0:09meeting.
0:10As part of this meeting, we will be
0:11holding hearings under the Massachusetts
0:13Wetlands Protection Act and Regulations
0:15and the City of Worcester Wetlands
0:16Protection Ordinance and Regulations.
0:19The Commissioners are volunteers who
0:20serve to enforce these laws and
0:21regulations to protect specific values
0:24identified as being important to
0:25Massachusetts and the City of Worcester.
0:28Commission decisions are based on these
0:29laws and regulations and are not
0:31arbitrary or based on personal likes or
0:32dislikes.
0:34It is important to the Commission that
0:35these hearings are held in a fair and
0:37equitable way for all parties involved.
0:39This requires that discussion takes
0:41place in a civil manner and that every
0:43individual in this meeting is treated
0:44respectfully.
0:46To facilitate this, the hearings take
0:47place in the order they are listed on
0:49the agenda, which is available by the
0:51door and online.
0:52First, the applicant will present an
0:54overview of the project to the
0:55Commission. Next, staff will provide
0:58comments on the proposed work.
1:00Then, the Commission will direct any
1:01questions it has to the applicant or
1:03staff.
1:04After the Commission is done questioning
1:06the applicant, the floor will be open to
1:08the public. Comments and questions must
1:10be directed to the Chairperson, not to
1:12the applicant or their representative,
1:14and they must pertain to the regulations
1:16that the Commission oversees. For
1:18example, although you might have
1:19concerns over the traffic resulting from
1:21a particular project, the Conservation
1:24Commission does not regulate traffic, so
1:25traffic concerns will not be discussed
1:27during the meeting.
1:29Please note that while new points will
1:30be given ample time to present,
1:32repetitive comments will be cut short in
1:34the interest of having all parties be
1:35given the opportunity to speak.
1:38We ask that all applicants and members
1:39of the public please state their name
1:41and city or town of residence for the
1:43record.
1:44To manage remote participation during
1:46our hybrid meetings and prevent
1:48disruptions, all participants are
1:50automatically blocked from unmuting
1:51themselves, turning on their video, or
1:54sending chat messages.
1:56For remote participants who would like
1:57to comment on an item on our agenda, we
1:59ask that you use the raise hand feature
2:01in Zoom during the discussion on that
2:03item.
2:05If you are joined by phone, you can
2:06raise your hand by pressing star nine.
2:09Staff will then call on members of the
2:10public one at a time and give them
2:12permission to unmute themselves. If you
2:14are joined by phone, you will then be
2:15able to unmute yourself by pressing star
2:17six.
2:20Okay. Will everyone please introduce
2:22themselves?
2:24>> Eric Division of
2:25>> Planning and Regulatory Services.
2:28>> Maddy Vanderveen, Division of Planning
2:29and Regulatory Services.
2:31>> Lindsey Nystrom, Commissioner.
2:34>> Stewart Kirshen, Commissioner.
2:37>> Devin Canton, Commissioner.
2:40>> Thank you.
2:41Um first, are there any requests for
2:43continuances, postponements, or
2:45withdrawals?
2:46>> Yes. Uh we have item number one,
2:49Providence and Worcester Railroad
2:50right-of-way, request to postpone the
2:52public hearing to August 24th and extend
2:54the constructive grant deadline to
2:55September 15th.
2:57Item number seven, 35 State Road, a
3:00request to postpone the public hearing
3:01to August 24th and extend the
3:02constructive grant deadline to September
3:0515th.
3:06Item number eight, 497 Granite Street, a
3:09request to postpone the public hearing
3:10to September 14th and extend the
3:13constructive grant deadline to October
3:156th.
3:17Um item number nine, request to postpone
3:20the public hearing to August 24th and
3:21extend the constructive grant deadline
3:23to
3:24September 15th. 11,
3:27uh 99 Sears Island Drive, a request to
3:29postpone the public hearing to August
3:3024th and extend the constructive grant
3:32deadline to September 15th. And then
3:34lastly, item number 12, 46, 51, and 52
3:38Mower Dock Street, a request to postpone
3:40the public hearing to August 24th and
3:42extend the constructive grant deadline
3:43to September 15th.
3:46>> Okay. Thank you. Is there
3:48>> items 1, 7, 8, 9, 11, and 12.
3:55>> Second.
3:57>> Commissioner Canton?
3:58>> I.
3:59>> Commissioner Kirchner?
4:01>> I.
4:01>> Commissioner Nystrom? I. Commissioner
4:03Fatone? I.
4:05Uh first item then, uh new business,
4:07request for determination of
4:08applicability, uh 43 Weatherstone Drive.
4:31Applicant there or just
5:02>> Hello?
5:03>> Hello?
5:05>> Hello?
5:06>> Yes, can you hear us?
5:09>> Can you hear me now?
5:10>> I I hear you.
5:12>> Oh, okay. All right, I couldn't get on
5:13muted. Sorry.
5:15>> Um
5:16>> Yes.
5:16>> Well, let's let's make sure the room
5:18here hears you. Does the room
5:20>> We got it. Okay, we can hear it. Thank
5:21you.
5:22>> Oh, okay. All right. Um yeah, my name is
5:25Kevin McKinnon. I'm from Deck It. Um
5:28we're rebuilding existing uh landings uh
5:32and all on most of the condo units
5:36at Blythewood. Um
5:39and number 43 is uh
5:42approximately 80 ft from the wetland.
5:46Um
5:48so
5:51that's why we're here.
5:55>> Okay.
5:56>> So, we we would just want to rebuild
5:58exactly what's there. This one post
6:01there which will stay, we'll just
6:04temporarily support the roof.
6:07And we'll put a new footing in
6:08underneath that post which would be a
6:10helical pile. Um so, it wouldn't be
6:14concrete. So, it'll be minimal
6:16disturbance.
6:17Um
6:19and then just rebuild it exactly the
6:20same but out of wood.
6:23Um and also composite decking.
6:29>> Okay. Um staff, any comments on the
6:32project?
6:34>> Yep, so this project came through as a
6:35building permit. Staff did flag it due
6:37to the proximity to a wetland.
6:39This would be considered a minor
6:41activity in the buffer zone and would be
6:43exempt under the wetlands protection
6:44act, but they did have to file under our
6:47local ordinance. Um so, they are working
6:50on multiple decks throughout this
6:51complex, but unit 43 was the only one
6:54that was within the buffer zone of a
6:55wetland.
6:56So, no concerns from staff at this time.
6:59>> Thank you. Commissioners, any questions
7:01or concerns about the project?
7:09Uh
7:10is there anyone here from the public on
7:12this or online?
7:20Okay. Is there a motion?
7:22>> Uh motion to issue a negative
7:23determination.
7:25>> Oh, sorry. This is a hearing.
7:28>> No, it's the RDA, isn't it?
7:31Yep, good.
7:32>> Yep, we're good. Sorry.
7:34>> Second.
7:34>> Commissioner Canton.
7:36>> Aye.
7:36>> Commissioner Kushner.
7:38>> Aye.
7:38>> Commissioner Nystrom.
7:39>> Aye.
7:40>> Commissioner Fratoni. Aye. Thank you.
7:42You're all set.
7:43>> Okay, great. Thank you.
7:46>> Next item also an RDA 413 Lake Ave.
8:12>> [snorts]
8:18>> Do we have the applicant online for item
8:21number three?
8:26>> We weren't able to get a hold of them
8:28today, so it's possible they're just not
8:30>> Okay. I mean we can circle back I guess
8:32if they
8:32>> We do have a hand raised.
8:33>> Okay, there we go.
8:46>> No.
8:47>> You should be able to speak now.
8:49Or you should be able to unmute
8:50yourself.
9:04>> Hello.
9:06>> Hello.
9:07>> Hello.
9:08>> Hey, can you hear me now?
9:09>> Yes.
9:10>> Okay, great. Thank you.
9:12Yeah,
9:13we're doing application for 413 Lake
9:15Ave.
9:17The application is to redo
9:19[clears throat] part of the deck.
9:22>> I'm sorry, could you just could you back
9:24up just a second and just state your
9:25name
9:27and are you the homeowner?
9:29>> No, I'm the GC.
9:31I'm the project manager for the project
9:33actually. I'm not the homeowner.
9:37>> Okay, go ahead.
9:38>> My name is Pedro Melo.
9:42>> I'm sorry, please go ahead.
9:45>> Yeah, my name is Pedro Melo. I'm the
9:47project manager
9:49for Origins Construction at this
9:51project.
9:52And where you can see it's marked in
9:55green
9:56is the area we are proposing to replace
9:59the exact same way it is right now.
10:03Like the same footprint, same size.
10:11And this is like close to the water.
10:13Actually, the lower deck is sitting on
10:16the water.
10:18So, that's why
10:20we are here today
10:21to try
10:22make that work for the client.
10:25>> Understood. Um
10:27Staff comments on this project?
10:30>> So, this was another project that came
10:32through as a building permit. Uh staff
10:33did flag it to this proximity to Lake
10:35Winnisquam as needing a filing. Uh the
10:38initial review of the building permit,
10:40uh we were thinking an RDA would be a
10:42suitable, but based on the work
10:45proposed, it seemed like a little bit
10:46more work on footings was going to
10:48happen rather than just like replacing
10:50deck boards and whatnot. So, I guess
10:53we would like to know a little bit more
10:55of what is actually happening with the
10:57footings. Uh
11:00Yeah, if you could just describe the
11:01work a little bit more.
11:02>> Okay, yeah, 100%. So, yeah, we're not
11:05just replacing the the decking boards.
11:07We are replacing the footings, replace
11:09the structure, like the beam, the the
11:12floor joists, the railing, pretty much
11:14on that uh green part where you marking
11:17out, we're going to redo the whole
11:19structure because like the existing
11:21footings
11:22it's like 3 ft exposed. So, they are not
11:26strong enough to hold the deck anymore.
11:29So, all those footings inside the green
11:32area,
11:33we're going to redo it.
11:35And the foot is inside on the the lake,
11:38where you have four inside the lake,
11:40we're doing a technical metal post.
11:46>> So, if I'm hearing you correctly, you
11:48are working in the lake bed. You are
11:49replacing structure in the lake bed.
11:53>> Yes.
11:54If you look at the last one where where
11:56you have like the
11:58four posts
11:59in the beam on top,
12:01that where it's actually inside the
12:03water in the water.
12:06>> Okay, so I mean, from my point of view,
12:08it's an NOI, not an RDA. Um,
12:11do you do we even vote on this?
12:14>> Yeah, so essentially, since there is
12:16active work within the resource area, we
12:18would also recommend that an uh
12:20notice of intent be filed. So, you will
12:22be looking for a positive determination.
12:26>> Um, any comments or questions from
12:27commissioners? They certainly could
12:29dispute my interpretation of this.
12:34No.
12:36Anyone here in the public on the
12:37project?
12:42>> Motion to issue a positive
12:43determination.
12:47>> Second.
12:48>> Commissioner Canton?
12:49>> I.
12:49>> Commissioner Kushner?
12:51>> I.
12:52>> Commissioner Nystrom?
12:53>> I.
12:54>> Commissioner Fortunati, I. Um, to the
12:56applicant, you understand that that's a
12:57different filing than the one you've
12:59submitted for tonight.
13:01>> Yeah, I understood now.
13:02>> Okay.
13:04>> So, I need to reapply for the R28, you
13:07said?
13:08>> Yep, so um staff will reach out later
13:11this week just kind of giving you an
13:12overview of what we would expect with
13:14that notice of intent filing.
13:16>> Okay. Thank you very much, guys.
13:18>> Thank you. Thank you. Have a good night.
13:20>> You too.
13:21>> Uh
13:22Next item number four,
13:24uh I-190 I-290 Route 146 right of way, a
13:27year yearly operational plan
13:30uh
13:31for MassDOT.
13:47>> Just a reminder, if you're in the Zoom
13:48room and here to present, please please
13:51raise your hand and we can uh
13:52give you speaking access.
14:16I can make a sudden note to the project
14:18team. Maybe we come back to this one at
14:19the end of the public hearings if
14:20>> Okay.
14:21>> see if we have somebody by then.
14:22>> All right.
14:23Uh so, moving on then, number 5, 520
14:25Park Avenue and 111 Maywood Street.
14:35>> I don't know if you're set up to see a
14:36storyboard, but
14:49My name is Brandon.
14:53>> Yep.
14:54Yeah. It it's
14:55>> Shut it off.
14:56>> You shut it off, but I didn't say
14:57>> Now it's on.
14:58>> Yeah. Okay. Yep.
15:00>> My name is Brandon Fagan, licensed site
15:02professional of record for the 520
15:05Maywood Street. It's also known as 111
15:07Maywood Street and Park Avenue.
15:09Uh we conducted um the site is located
15:13in Worcester uh on Beaver Brook, as you
15:16can see in the drawing here.
15:18Um uh back in the beginning of last
15:21year, we conducted an investigations
15:24as part of a ramp plan, which is a
15:26release abatement measure plan
15:28to investigate the property to identify
15:30impact conditions around the property
15:33for characterization main for
15:36investigation that would lead to
15:38cleaning up the property and conducting
15:40remedial measures.
15:42The investigations were conducted in the
15:43April and July window. Test pits were
15:45completed and following those test pits,
15:48we excavated certain soils and certain
15:50areas that were impacted.
15:52At the time we weren't permitted to do
15:54anything with that material, so we put
15:56it back in the hole and it's in certain
15:59test pits identified impacted areas.
16:02Consequent to that, we filed a ramp plan
16:04in July of this year in order to remove
16:07those soils in addition to some
16:08additional soils around them
16:10in order to get to what we're
16:12considering a commercial risk base use
16:14standard for the property.
16:16So those test pit locations that you
16:18approved under the original RDA,
16:21basically there are certain locations
16:22we're going to re-excavate that soil out
16:24in addition to a perimeter around those
16:27areas
16:28that was identified in this filing with
16:30the RDA.
16:32Those are again test pits that you
16:34already saw, you already looked at.
16:36We're basically going back and then
16:38digging them out. We're going to take
16:40that material out in addition to some
16:42additional material. We're going to
16:43characterize the limited extent of those
16:45areas when we excavate them.
16:47This excavation will can be conducted
16:50over about a two-week period. The idea
16:52is to try and remove that material.
16:55It's again within all parking area. None
16:57of this area is in kind of in open area
16:59or grassed areas. Um
17:02and then I can walk through each one of
17:03these as a point-to-point
17:05at this point just so you're aware of
17:07what we're doing.
17:09There's basically four areas.
17:12Five if you want to count some of the
17:15areas. There's two or three cuts in the
17:16same areas. Um under one uh phase one,
17:21the SB-14 area,
17:23um that location,
17:27we good there?
17:29Okay.
17:30SB-14, there's a number of locations
17:33that were along in the preliminary zone
17:35that were uh outside of the AE zone, but
17:38I'm just making you aware of them. Um
17:40the two primary areas of excavation are
17:42where the old Chevy dealership was. I
17:44don't know if you're familiar with the
17:45property, but it was right along the
17:47front edge of the of of Park Street. Uh
17:50one area was uh by MW-107 was an area
17:53that had a gasoline tank. It looks like
17:56the excavation of the tank was removed.
17:58Um we excavated around that area. We
18:00identified it impacts. We put the
18:02material back in the hole. We're going
18:04to re-excavate that area in addition to
18:06some additional areas. Again, it's
18:08outside the AE area, but it's an area of
18:10excavation.
18:11Same similar to SB-8, it's in the same
18:13area. Um it's further that's not
18:16gasoline impacted that was some kind of
18:18a drain or oil impacted area. We have
18:20polyaromatic hydrocarbons. We're going
18:23to excavate that area.
18:25All these areas will be removed, will be
18:27conducted with uh um
18:29uh wattles around them just so that we
18:31have any protection of runoff in the
18:33asphalt area.
18:34In addition, the academy um academy um
18:37the university is planning on
18:39uh putting wattles along the Beaver
18:41Brook boundary. Now again, most of these
18:43locations are good 100 plus feet if not
18:46more from where we're excavating, but we
18:49already put in um wattles. Actually, we
18:52put um core logs along the property edge
18:55over by the building at 520 Maywood.
18:58We're just going to extend that and
18:59carry that down along Beaver Brook. Case
19:01there's any concern just for the for the
19:03boundary condition.
19:04Um those two locations again not out not
19:08inside the AE area, but they're going to
19:09be excavated. You you to move to the
19:11next slide?
19:14>> Um
19:16Which one is this?
19:19>> You can take the microphone with you.
19:21>> Okay, SB-14 area.
19:24Those areas look like we have some ash
19:26in in the um
19:28We have some ash in the ground over
19:29there.
19:30Um those test pits are going to be
19:31removed. Um we had uh lead as well over
19:35in those areas. Um again, a lot of
19:37building debris um and residuals from
19:39the ash content uh presents arsenic and
19:42lead out of those areas. Those areas
19:45represented on your drawing are about 10
19:47by 10.
19:48Um those again, the limits you're
19:50currently seeing for test pits are
19:52basically re-excavating that material
19:54and just disposing of it. Uh again, the
19:57areas will be backfilled with clean
19:58material um and they'll be set with a a
20:01crushed dense grade uh similar to what's
20:04been done in the past for the other test
20:05pits.
20:06Um next one.
20:09Um
20:13>> Okay, TP-22.
20:15>> Um
20:16TP-22, when we originally mapped out
20:18TP-22, we used the uh boundary condition
20:21for the river um for the brook.
20:24Um as you can see, the line bends more
20:26around this location we originally
20:28thought was just outside the buffer
20:30zone. Uh it's just just inside the
20:32buffer zone. Um it was on the original
20:34RDA as inside the buffer zone, so
20:36there's no change there.
20:38Um we're going to excavate that material
20:40out and again, get rid of it. Um
20:42basically do the same exact thing we did
20:43in the RDA, except instead of
20:45back instead of putting the soil back in
20:47the hole, we're just going to excavate
20:48it out.
20:50Um and the last one,
20:52um
20:54I think that covers actually. We had two
20:56for one in in part of that. Those are
20:58the excavation areas that we're looking
21:00at. Um the UST came out, it was clean,
21:03which is good. We did have one of the
21:04sidewalls had some arsenic levels that
21:07were above our commercial industrial
21:09standards and we'll take another 5 yd
21:11out of there when we excavate these test
21:12pits.
21:14We requested an RDA just only because
21:16we're really effectively doing the same
21:17thing we're doing before and we're we're
21:19will have all of the conditions that the
21:21Conservation Commission asked for for
21:23protection from before.
21:25Systematically we'll do the same exact
21:27thing here.
21:28Um
21:29any questions?
21:31>> Uh staff do you have any comments on the
21:32project?
21:33>> Uh no concerns from staff.
21:35>> Okay. Um so I I I just have a question
21:37in terms of um I know you mentioned a a
21:402-week window where you intend to
21:41excavate.
21:42>> Yep.
21:43>> The soil will be removed immediately or
21:45are they going to be stored for any
21:46period of time uh on the outside?
21:48>> So we're going to try and live load
21:49everything we can. I can't guarantee it
21:51will go. It's just we're trying to line
21:53up the disposal facilities cuz every one
21:55of those locations is different. One's
21:56gasoline, one's arsenic. Um and one's a
21:59heavy PAH impact. So we have disposal
22:03facilities including Fitchburg,
22:04Andricks, and several others that we're
22:06going we're trying to line up the
22:07profiles.
22:09If we do have to stockpile, we'll cover
22:11them in poly as we normally will do
22:13similar to the pile that's up there
22:14currently. Um we line it underneath, we
22:16poly over the top, we secure it, and
22:18then we wrap it with a wattle set um
22:21until it's disposed of. Um again I
22:25I'd like to say I can we would live load
22:26everything cuz it's basically in our
22:28interest to have it directly live loaded
22:30cuz if we have to stockpile it's double
22:32handling.
22:32>> Right. Right. I understand. Okay. So you
22:34you have a plan in the in the event that
22:36you can't remove the material
22:38on the same [clears throat] day.
22:39>> Right. Well, we'll try to.
22:41A Andricks will take it. Any recycling
22:43facility will go direct.
22:45>> Yep.
22:45>> Um and most of this is fits that
22:47recycling. Where we run into the one
22:49place
22:50and it's a it's that 10 by 10 square
22:52which is so like about 15 tons
22:54is the SB 14 location. One of those
22:57three locations has um lead that failed
23:00TCLP which is a toxicity characteristic
23:03leaching procedure,
23:04which makes it effectively hazardous
23:06waste. So, it's one truckload that'll
23:07have to go
23:09it'll have to be hauled out to the west.
23:11It'll have to go to Michigan or
23:12someplace like that.
23:13>> Okay.
23:14>> So, that might That That again, that's
23:15one truckload of soil.
23:17>> Do you have um I guess do you have a
23:20contingency plan as you re-excavate
23:22these sites? Um I assume you've got the
23:24intention to get to
23:27I you know, as clean a soil as, you
23:29know, the background conditions allow.
23:31You So, you've already determined the
23:33perimeter of these excavations.
23:35>> Right. And now one of the things and
23:37it's it is in the RAM plan, which is
23:40what originally set the filing. The RAM
23:42plan has closure criteria for it. So,
23:44effectively we excavate the sidewalls we
23:47excavate it and then we sample the
23:48sidewalls and bottom to identify the
23:50impacts. Now, metals we can't, you know,
23:53with there's no visual screening
23:55indicator for metals, so we just sample
23:57the sidewalls and the bottom.
23:58Uh polyaromatic hydrocarbons, anything
24:01else that has an odor has basically
24:03something that we can screen to a
24:04certain level. We typically take the
24:06highest reported screening
24:08concentration, then we take a composite
24:10for disposal, and then we usually take a
24:11bottom sample as a minimum.
24:14Um we may if we see something that says,
24:15"Hey, I've got two sidewalls that are
24:17pretty hot." We'll take both samples on
24:19those. Again, we're comparing them to
24:21commercial standards for for closure.
24:23>> And I mean, I assume it that most of
24:26these excavations were based on what you
24:29either knew to be prior disposal sites
24:32or potential disposal sites. I mean, you
24:33obviously you're not excavating the
24:35entire parcel. Um
24:37>> No, we didn't run into
24:39Again, this came out of a phase what
24:41they call it phase two investigation.
24:43So, what we're only showing is the test
24:45pits.
24:46There were several other dozen soil
24:48borings that were conducted over a
24:49several year period. So, there's
24:51additional investigations that
24:52characterize these areas.
24:54Um the good news is the limited extent
24:56wasn't as extensive as we expected, but
24:59we have some localized removal.
25:01>> Okay.
25:02Um,
25:03I don't have further questions. Any of
25:04the commissioners, anything else?
25:06>> Um, through the chair.
25:08>> Yeah.
25:08>> So, if you can't live load all of it,
25:12and you're going to have to impound on
25:14site, uh, is there any type of security
25:18to prevent the general public from
25:20having access to those
25:22you know, the the impoundment this soil?
25:25>> Those area this the area in the
25:27property, I mean, albeit it's not chain
25:29link fence, but it is fenced in.
25:32And it is secured and locked on a daily
25:33basis.
25:35>> Okay.
25:36Thank you.
25:38>> Uh, any other questions or is there
25:40anyone here from the public on the
25:42Yes, sir.
25:48Could you come up to the microphone?
25:55>> Uh, Fred Nathan, Wooster.
25:57And looking this over and realizing that
26:00these are two
26:01independently uh, distinct uh,
26:04properties
26:06that where uh,
26:08uh, Daddy uh, Diamond Chevrolet was
26:11on Pawtucket from 1979
26:14until 2010.
26:17And 10, that's 31 years.
26:20I would have to think that there were
26:22enough vehicles that that whole lot has
26:25it ever really been checked out the
26:26entire lot cuz I
26:28that lot was always full of cars and
26:31trucks and other kind of vehicles.
26:33Uh, one would think there'd be more
26:35contamination.
26:38I'm just curious if you ever had the DEP
26:40come in and check it out.
26:42>> You address me.
26:43>> I'm sorry.
26:45Uh, Madam Chair, just uh, curious if
26:47they ever had the DEP come in and check
26:50it out.
26:51>> Understood. Okay.
26:53Would you care to address the presence
26:54of the site?
26:56>> The The filing you have here for the RDA
26:58is separate from what's What is the RAM
27:00plan? And the release abatement
27:02measurement plan is filed with the DEP.
27:05Um you know, it effectively that becomes
27:07under DEP review.
27:09Um
27:10in the past they had a 21-day right of
27:12refusal or a right of review period.
27:15That no longer exists, but it is filed
27:17with the DEP.
27:17>> Okay. And those
27:18>> Um and again, this was filed in July.
27:20So, there it has been reviewed. It does
27:23follow additional investigations into
27:25the gentleman's point. We do have
27:27additional investigations that have
27:28characterized the limited extent around
27:30that Chevy dealership because
27:31specifically cuz we saw the same thing.
27:33You know, you have historical uses of
27:35the property both residential and
27:37commercial. Um there were several
27:39parcels actually, not just two. It's
27:41actually
27:42eight total parcels, six units areas,
27:46which is shown in the RAM plan, but not
27:47on here.
27:49>> Got it.
27:51Does that answer your question?
27:53Thank you. Thank you. Anybody online?
27:58Right.
28:01Is there a motion?
28:02>> Motion to issue a negative
28:03determination.
28:05>> Second.
28:07>> Commissioner Canton.
28:10>> Aye.
28:11>> Commissioner Kushner.
28:13>> Aye.
28:13>> Commissioner Nystrom.
28:14>> Aye.
28:14>> Commissioner Fortuny, aye.
28:17You're all set.
28:17>> Okay.
28:18>> Thank you.
28:19>> Thank you.
28:21>> Leave that on?
28:23>> Yes, that's fine. Thanks.
28:25Uh next item old business notice of
28:27intent for 283 Lake Avenue, the
28:30Quinsigamond State Park.
28:56>> Hi, I'm Andrew Kiel. I'm with Hatch,
28:59uh,
28:59appearing before you,
29:02um, for the DCR. Also in attendance is
29:05Joey Silvera for the DCR.
29:07We presented this NOI at the last
29:10hearing,
29:12although we did not have a DEP number
29:14because it was not yet issued.
29:16Um, since then, DEP did issue the
29:19number. They had one comment that
29:21related to,
29:24uh, test pits, which we discussed during
29:27the last hearing, so we
29:29have not performed test pits because the
29:31location of proposed BMP
29:34is actually in an active parking lot
29:36area.
29:38So, our hope was that we could,
29:41um,
29:42include that testing
29:46as part of a construction phase,
29:49uh, condition
29:50within the order of conditions.
29:54It's kind of that gray box that's that's
29:57above. I mean, I can go through the
30:01have an overview of the project again,
30:04if that's necessary.
30:06Um,
30:07>> Do you I I don't think so. The
30:08commissioner is comfortable with the
30:10coverage on this project at the last
30:12meeting.
30:15>> I'm okay.
30:15>> Yes.
30:16>> Okay. Okay. Um,
30:20uh, any updated comments from staff?
30:22>> Uh, no, [clears throat] not really. Just
30:23in in uh, response or in regards to the
30:26DEP comments, I think we had, you know,
30:28mentioned at the last hearing that we
30:29were comfortable with the test pits
30:30being a condition of approval just given
30:32the reduction in impervious and that
30:34the, um,
30:35you know, subsurface infiltration is not
30:36strictly required by the standards
30:37anyway. So, if this were a new
30:39development where
30:40new impervious area was being proposed,
30:42we would want to see the test pits up
30:43front, but staff's fine with this as a
30:45condition of approval.
30:46>> Okay.
30:48Uh is there anyone here from the public
30:50on the project?
30:52Here? No? Online?
30:56Um
30:58So, Commissioner Nice from's going to
30:59recuse herself from voting on the
31:01project. Uh so, if I could have a motion
31:04from either one of the other
31:05commissioners
31:08to close the hearing.
31:10>> I move to close.
31:12>> Second.
31:13>> Commissioner Canton?
31:15>> I.
31:15>> Commissioner Kirchner?
31:17>> I.
31:17>> Commissioner Fortunati? I.
31:20Uh is there a motion
31:24Sorry, proposed order of conditions.
31:26>> Yep. So, in addition to the standard
31:28conditions, we have condition number 24
31:30for wetland flagging, 27 for test pit
31:33data,
31:34um
31:3532 [clears throat]
31:36for trees to remain, 37 for stormwater
31:38management system maintenance, 38 for
31:42infiltration unit inspection, 39 for
31:44certification of stormwater
31:45infrastructure,
31:46uh 46 for wood removal, 48 for dust
31:49control, 49 for dewatering, 50 for
31:52cement truck washing, 51 for equipment
31:54placement, 56 for spill prevention,
31:58um that an as-built plan be provided as
32:00part of the request for a certificate of
32:01compliance, condition 66 for sand and
32:04salt, and 68 for wetland permitting,
32:07ongoing conditions 37, 66, and 68.
32:13>> Does the applicant have any questions
32:14about the conditions?
32:17>> No.
32:18>> Okay.
32:20Uh is there a motion
32:20>> a motion to issue the orders of
32:23conditions as described.
32:25>> Second.
32:26>> Commissioner Canton?
32:28>> I.
32:28>> Commissioner Kirchner?
32:29>> I.
32:30>> Commissioner Fortunati? I.
32:32Uh you are all set.
32:34>> Thanks, everyone. Have a good night.
32:35>> Thank you, you too.
32:39Okay.
32:41Next up, number 10.
32:44Notice of intent, 21 New Bond Street.
32:50>> Good evening. I'm Keith Carron from
32:52Bohler Engineering representing
32:53Restaurant Depot on this project. Um
32:57We have, just a note before I start, we
32:59have already received conditional
33:00approval from the planning board for
33:01definitive site plan approval on this.
33:04Um basically it's a 4.4 acre site within
33:07the larger Green Tech Park.
33:09Our proposal is about a 50,000 square
33:11foot Restaurant Depot building with 171
33:14parking spaces.
33:15Um three curb cuts and five loading
33:19loading docks. There are no wetland
33:21resources on the site. Uh we also are
33:24not within the the flood zone.
33:27Uh again, we're here just because we're
33:28within 100 feet of existing, you know,
33:30drainage structure. That's the purpose
33:31for being for being here. Um as part of
33:34the plan set and stormwater report, we
33:36have full stormwater management meeting
33:39the stormwater Massachusetts bylaws. Uh
33:42deep sump putting catch basins,
33:44proprietary water quality units, and
33:46there in the loading dock area you'll
33:47see the subsurface infiltration basin to
33:51uh promote uh groundwater recharge and
33:54obviously help us reduce the peak runoff
33:56from the site. There's a slight uh
33:58increase in impervious, but that's the
34:00whole purpose of the the groundwater
34:02recharge.
34:07So, yep, unless there's questions and
34:09that's about it.
34:10>> Thank you. Uh staff comments?
34:13>> Uh not a ton of comments on this one.
34:15Um it it was filed under the wetlands
34:17protection ordinance only. This area
34:19used to be within the mapped 100-year
34:22flood plain.
34:23Um on the previous firm, the
34:26the WBDC recently submitted a letter of
34:28map revision to uh revise the flood
34:30plain in this area based on a detailed
34:32restudy of Weasel Brook.
34:34Um so, this area is is no longer within
34:36the effective uh flood plain based on
34:38that that map update. Um so, the only
34:41thing triggering filing with the
34:42commission is just the proximity to um
34:45existing or proposed catch basins tied
34:47into the surface drainage system.
34:49Um so, again, main focus for review
34:52under those types of projects is just
34:53erosion and sedimentation control uh and
34:56stormwater management. I think we just
34:57got a summary of the stormwater
34:58management for the site. Uh staff
35:00reviewed the stormwater report and
35:02didn't have any concerns.
35:04Uh similarly with erosion and
35:06sedimentation control, uh not overly
35:08concerned about this site despite it
35:10being
35:11relatively large, it's also relatively
35:12flat, so we don't think there's a huge
35:15uh potential for for runoff from the
35:17site. So, nothing further from staff.
35:19>> Thank you. Uh commissioners, any
35:21questions, comments, or concerns about
35:23the project?
35:31>> Through you, Madam Chair. I have just a
35:32couple of quick questions if uh
35:34I'd like to just hear a little bit more
35:35about the uh construction entrance uh
35:38location and how you're dealing with
35:39that, stockpile locations,
35:42and uh
35:44and snow removal or storage.
35:48>> Sure. So, up in the top right, um
35:52I forget which direction it's on the
35:53site, that is the proposed construction
35:54entrance. And the stockpile location is
35:57there. Again, the these are permanent
35:59level plans. Um the contractor has been
36:02brought on board yet, so obviously if
36:04they make propose any changes, they have
36:05to let the city know, but that is the
36:07proposed location. Also, on the snow
36:10removal, on I believe the layout plan,
36:12it shows locations of, you know,
36:15stockpiling for snow if needed. And then
36:18at some point, again, as those locations
36:20fill up, obviously they'd have to Best
36:22Buy Depot would be required to remove it
36:24offsite if there's no no more area
36:26available.
36:28>> Yep.
36:29>> There's a hatch. There's a hatch. You
36:30can see that there.
36:31>> Yep.
36:31>> Yes, I do see that.
36:33Thank you.
36:34>> You're welcome.
36:36>> Uh is there anyone from the public on
36:38the project?
36:41Anyone online?
36:48Uh is there a motion?
36:50Motion to close.
36:53>> Second.
36:54>> Commissioner Canton?
36:55>> I.
36:56>> Commissioner Kershner?
36:57>> I.
36:58>> Commissioner Nystrom?
36:59>> I. Commissioner Fratoni, I.
37:01>> Uh proposed order conditions?
37:04>> Uh so in addition to the standard
37:06conditions, we have condition number 31
37:08for a SWIP, 37 for a storm water
37:10management system maintenance, 38 for
37:12infiltration unit inspection,
37:1439 for certification of storm water
37:17infrastructure,
37:18uh 48 for dust control, 49 for
37:21dewatering, 50 for cement truck washing,
37:2456 for spill prevention,
37:26uh that an as-built site plan be
37:28provided as part of the certificate of
37:30compliance process, uh condition 66 for
37:33sand and salt, and ongoing conditions 6
37:36uh sorry, 37 and 66.
37:41>> Any questions?
37:42>> I do not.
37:43>> Okay. Is there a motion?
37:45Motion to issue the order of conditions
37:47as described.
37:49>> Second.
37:49>> Commissioner Canton?
37:51>> I.
37:51>> Commissioner Kershner?
37:53>> I.
37:54>> Commissioner Nystrom?
37:55>> I. Commissioner Fratoni, I.
37:57>> Thank you, Commissioner Fratoni.
37:58>> Have a good evening.
38:02>> Uh next item, notice of intent 13 149
38:07West Boylston Drive.
38:11>> [snorts]
38:21>> Uh good evening, commissioners. My name
38:23is Greg LaCroix from Pare Corporation.
38:25I'm here with Dave Presch also from Pare
38:26Corporation.
38:28We're here on behalf of the city as the
38:30applicant and MassDOT as the property
38:32owner.
38:34What we're presenting is a dam
38:36maintenance project but primarily or the
38:38only thing being proposed is vegetation
38:41maintenance along the dam embankment.
38:44There's some trees, shrubs and other
38:45vegetation that has naturalized the dam
38:48embankment area. In keeping with typical
38:51dam maintenance practices, we are
38:53proposing to remove all vegetation from
38:55the embankment. Backfill any resulting
38:59voids from root root areas and then loam
39:02and seed the area and stabilize it.
39:05The work is being proposed as a limited
39:07project. Under 10.533I
39:11which allows for maintenance of
39:12structures in existence prior to 1983.
39:17And work will occur within bordering
39:19land subject to flooding within
39:21riverfront area and within buffer zone.
39:24We do meet the bylaw standards under
39:294.2.4
39:31of the wetland ordinance.
39:35Outside of that, any questions the
39:37commission has we're we're happy to
39:39address them.
39:40>> Okay, thank you. Staff comments or
39:42questions?
39:43>> So we're still in the process of our
39:45staff review of the NOI. We'll send any
39:48comments letter over to the project team
39:50once we have a chance to complete that
39:51review.
39:52We're still waiting on a file number and
39:54comments from MassDEP at this point. Um
39:57so we'll have to continue the hearing
39:59rather than close tonight obviously.
40:02But yeah, we thought it would make sense
40:03to at least start the discussion with
40:04the commission and get any concerns out
40:06now while we wait for
40:08>> Sure.
40:08>> the respective comments to be finished.
40:10>> Commissioners, any questions or concerns
40:12about this project?
40:16>> Through the chair.
40:17>> Yep.
40:18>> Um, what type of follow-up will you be
40:21doing to make sure that the
40:24the seating and the stabilization is
40:28actually working?
40:32>> Um, with any activity like this, there
40:34is some construction oversight, so
40:36we will be following up and making sure
40:38that the area is stabilized. Um,
40:40they There's anything additional.
40:43>> Yeah, um
40:46there's a period, um,
40:48where the contractor has to make sure
40:50the seed has established, um, and if it
40:52hasn't established within
40:54um, the timelines in our specifications,
40:56then they'll have to address that
40:58accordingly. Um, in terms of future
41:00maintenance, the city comes out that
41:02goes out there and mows it at least
41:04twice a year.
41:05Um, and they have been recently. They're
41:07just not able to maintain where the
41:09trees currently stand on the embankment.
41:11Um
41:12So, this is really just looking to get
41:13rid of those trees, so it can look like
41:16the rest of the dam.
41:19>> Okay.
41:20Uh, is it possible through the chair and
41:23to staff, um, to add a con-
41:27a contingency
41:29to have a maintenance for at least, uh
41:34a certain amount of months or something
41:35like that to make sure it's working?
41:38>> Uh, through the chair, yeah. I mean, a
41:40condition specifying the desired length
41:43and frequency of monitoring is certainly
41:44something that the commission could put
41:45into an order of conditions for the
41:46work.
41:48>> Okay.
41:49I I'd like that. Thank you.
41:51>> And we can plan to, uh, include
41:52something along those lines, uh, in a
41:54draft order of conditions once this has
41:56a a file number at a future meeting.
41:59>> Excellent. Thank you.
42:01>> Okay.
42:02Uh, I have a question about the process.
42:03You are going to be removing the trees
42:06and removing the root,
42:07uh, and then backfilling with, um
42:11suitable material brought on site from
42:13somewhere else,
42:15um, compacted in 12-in lifts, I
42:18understand from the the plan.
42:20Uh,
42:22I just
42:23want to try and understand how
42:25in that process you are able to fill the
42:28root holes that would be extending in
42:31and under the soil
42:33as you remove them. And, you know,
42:37if you're not able to fully do that,
42:39aren't you in fact compromising an
42:40earthen dam by creating water pathways
42:43for
42:44water to travel into the dam with these
42:46root holes then created?
42:49>> So, you have to, um,
42:51the contractor in the location of a tree
42:54will have to remove all roots that are
42:56up to 3 in in diameter. Um,
42:58less than that, they're really less of a
43:01concern. Um, so, they'll just have to
43:03excavate as wide of an area until they
43:06don't find any roots over 3 in diameter
43:08anymore.
43:10Um, you know, with some of like the
43:1212-in trees it winds up being a pretty
43:13big area sometimes. And, um, there's a
43:16few trees that are very close to the
43:18wall where the roots will just be left
43:21in place to not compromise the wall.
43:24Um,
43:26but no, the contractor will remove the
43:28majority of the roots that would be
43:29coming into the
43:29>> your firm be overseeing this project
43:32once a contractor is selected? I mean,
43:33who's who's qualified to assess whether
43:36or not they've gotten too close to the
43:38dam wall or roots should be left in
43:40place rather than removed?
43:42>> Yes, so Pare will be providing the
43:43observation, um,
43:45and MassDOT will be doing the majority
43:48of the clearing. Um,
43:52I don't remember if there's going to be
43:53a different contractor for site
43:55finishing, but the DOT is going to be
43:56the one doing the majority of the tree
43:58clearing.
43:59>> The DOT will do it themselves, it won't
44:01be subcontracted out?
44:02>> Correct.
44:02>> Okay.
44:04Um, and then, uh, similar to, um, the
44:06commissioner's questions about ongoing
44:07maintenance.
44:09um,
44:10The fence that currently exists actually
44:12prevents the city from accessing the
44:14trees that are grown on the other side
44:16of the wall. Is that fence coming down
44:18so that it can be mowed or is there
44:21how will that other side of the fence be
44:23accessed if the fence is not coming
44:25down?
44:27>> Um
44:30At the moment the if the fence might
44:32will probably come down during
44:33construction but be replaced
44:36afterwards.
44:39We don't have answer that right now.
44:41>> There is a gate that provides access.
44:44>> There's a gate but that would mean you
44:46would have to get hand equipment into
44:48the site. It's currently mowed with
44:49basically tractors given the size of the
44:52site. So um
44:54I guess I would like to understand a
44:55little bit more about how the ongoing
44:57maintenance will be done once the fence
44:58is back in place.
45:00Um and then what's the frequency of
45:03cutting the the meadow that is currently
45:05on the site is is grown
45:09to be a meadow.
45:11You know, the intention is to not let
45:12trees I guess re-emerge and is that
45:14going to be how the rest of the
45:17the site will be handled going forward?
45:19>> Generally clearing is done once in the
45:21spring and once in the fall each year.
45:23Um
45:24that's typical guidelines for dams
45:27and I believe that's what the city is
45:29continuing on planning on doing.
45:31Um
45:33And we can definitely
45:34discuss the fence further with the city.
45:36>> portion of this is is important because
45:39obviously these conditions came to exist
45:41because somebody didn't do
45:43what they were supposed to do.
45:45And I also know the city sort of leases
45:47this space. They don't own it.
45:50It is MassDOT property. Ultimately I
45:52think it is MassDOT's responsibility. I
45:54believe they also own the dam.
45:57Correct?
45:58>> MassDOT owns the dam and the city does
45:59the maintenance.
46:00>> Right. Okay.
46:02Yeah, so I'd like to make sure that that
46:03was part of any kind of conditions.
46:07>> We will get an answer for you on
46:09planned access for the far side of the
46:10fence.
46:11>> And then just one more question related
46:12to the material that's coming in and the
46:15material going out. That's a very narrow
46:18way into the property. If you've been
46:20there, you know that it's just enough
46:22room for a vehicle to to come in and out
46:24of.
46:26How will trucks be handled on the site?
46:30And you're talking about some good size
46:31dump trucks I expect for both removal
46:33and bringing in fill.
46:36>> I mean, I've been on the access road. It
46:38It's should be wide enough for trucks to
46:40access and we are providing a or
46:42proposing a stabilization pad going in
46:45and out from the site so the trucks
46:47aren't tracking dirt into the road.
46:48>> Yeah.
46:50Yeah, cuz there's just there's storm
46:51drains right along that roadway and
46:55it's
46:56let's call it moist soil on the site.
46:59Normally muddy.
47:00Coming in and out.
47:03But is there a lay down area for
47:04material that you are
47:07removing or is it a live load situation?
47:10The trees will come out, they'll go on a
47:11truck and they'll be gone.
47:14>> There is a staging area proposed. I'm
47:16not sure if there's a plan as far as
47:19stockpiling or live loading.
47:21>> Yeah, I don't think we specified a
47:22stockpile area, but we could add that to
47:25the plan set.
47:26>> Yeah. Yeah, it'd be I think important to
47:27know where materials are going to be
47:28stored and if if soil is being brought
47:31in or gravel and soil are being in,
47:33where are they being stored? Because
47:35there are no paved surfaces on this
47:37site. It is
47:38>> Yeah.
47:39The staging area will be fully
47:41surrounded in compost filter socks
47:43and the embankment is fairly flat, so
47:47the staging area would be within there,
47:50but we haven't proposed a specific spot
47:51within the plan yet.
47:54>> Right.
47:57We need a vote to postpone.
47:59>> Yes, the applicant amenable to our next
48:01meeting on the 24th as the date. Yep.
48:04>> Do I'm sorry, do we have anyone here
48:06from the public? I didn't ask.
48:10>> Motion to postpone to August 24th.
48:14>> Is that you'll be ready for August 24th
48:16if we have a file number?
48:18>> Yeah, if we have a file number, that
48:19should be fine.
48:21>> I got
48:23>> Commissioner Canton.
48:24>> Aye.
48:25>> Commissioner Kirchner.
48:26>> Aye.
48:27>> Commissioner Nystrom.
48:28>> Aye.
48:28>> Commissioner Frattaroli, aye.
48:32We'll see you again soon.
48:33>> Thank you.
48:34>> Thank you.
48:38Uh, next item 14.
48:43Whipple Road Drive, Danielle Way, also
48:45known as Malden Woods Subdivision.
48:51>> It does not look like we have the
48:53applicant
48:54>> Okay.
48:54>> at the moment.
48:57Anybody online for
49:00Malden Woods?
49:04I do see that we have somebody from Mass
49:06DOT if we wanted to go back to
49:08>> back to that?
49:09>> them.
49:09Uh, yeah.
49:10>> Okay.
49:11>> So, that was item number four.
49:14>> [sighs]
49:40>> Tracy, you should be able to unmute.
49:45>> Thank you, Eric. Yeah, I just tried and
49:47I couldn't. Um, thank you. Tracy
49:49Coppola,
49:50District 3 Environmental Engineer from
49:52MassDOT
49:53and um Angela Scofield
49:57who um worked with our maintenance
50:00section to put this together. Um
50:02Angela's one of my assistants and she
50:04should be joining momentarily. She was
50:07hung up out on the road and um is trying
50:10to get to the computer.
50:12So, she's more well-versed with this
50:14application than I am, but I've been
50:16involved kind of as on in the sidelines.
50:19Um but this is for a yearly operational
50:24maintenance plan that we are proposing
50:28to
50:30um apply
50:32herbicides to some of the weeds in our
50:36more
50:37um
50:40I guess more nuisance areas that are,
50:42you know, areas that are affecting our
50:45infrastructure.
50:47Um the you know, grass you see coming up
50:51in between the guardrail sections, that
50:53kind of thing.
50:54Um behind curb lines and coming up
50:57through concrete. If you see like
50:59concrete medians and you see the grass
51:01growing out through, that type of stuff
51:04and
51:05um I know those plans were all sent to
51:07the commission and I know we had a
51:09little bit of back and forth, Eric
51:11on that and some questions from the
51:14commission. And our last correspondence
51:17with you, I think it was this afternoon
51:20or this morning, was that you still had
51:23um some areas that you would like to
51:25have shown on the plan and we can
51:27certainly revise the plan to delineate
51:31those areas and have that to you, I
51:34would say by, you know, tomorrow or
51:36Thursday at the latest.
51:40Smart tomorrow, Wednesday, sorry.
51:44>> Um do you want to
51:46>> Yeah, so we um
51:48as Tracy just mentioned, we've we've
51:49been going back and forth a little bit
51:50on this uh and I talked to Angela about
51:52it late last week. Um
51:55So, basically, one of the
51:58commissions the commission's main job in
52:01um reviewing this type of of RDA is uh
52:05reviewing and confirming wetland
52:06resource area boundaries so that uh
52:08limited spray and no spray zones can be
52:11uh mapped per uh the applicable state
52:14regulations. Um so, we have been going
52:16back and forth a little bit about how
52:17far off the um limit of of work we
52:20actually needed to see shown on the
52:22plans.
52:23Um obviously, the plans themselves kind
52:25of encompass the whole city and we're
52:26not trying to confirm every wetland in
52:29the city, just really focused on the
52:30what's in the immediate project
52:31vicinity. Um so, there were three areas
52:34um that we identified that appear to be
52:36within uh 100 ft of the right-of-ways.
52:41So, that's
52:42uh Coal Mine Brook and kind of just the
52:45um
52:46kind of the halfway point of 290 between
52:49the um
52:52interchange with 190 and Lake
52:54Quinsigamond. Coal Mine Brook comes
52:56under um up from a culvert discharged uh
53:00up on on Lincoln Street. Um so, just
53:03Coal Mine Brook where it crosses right
53:04there and flows on the south side of the
53:07highway for a short bit before veering
53:09off to the southeast back towards Lake
53:10Quinsigamond. Uh there was another
53:12stream coming out of Bovenzi
53:13Conservation Area.
53:15Um this one is
53:19it it's definitely a little further set
53:20back than Coal Mine Brook is as far as
53:23uh proximity to the right-of-way. I
53:24think it would only um
53:26only come into play uh if if some of
53:29those like side roads were being uh
53:31maintained as part of this YLP and not
53:33the the main portion of the highway
53:35itself.
53:36Uh because it's uh it it's daylighted
53:39just before those um
53:43roads to the side. I forget the I think
53:44it's um
53:46I can't not remember the name of the
53:47roads off my head, but I think it might
53:48be Frontage Road and then some other
53:49road over there.
53:50>> Yeah, the Frontage Road that it's the
53:51access between West Mountain Street and
53:53Ararat Street. It runs parallel to the
53:56highway.
53:56>> Yeah. So, I think that that particular
53:58stream is most likely outside of the the
54:00100-ft buffer for the highway itself,
54:02but has those other two um kind of
54:04parallel streets within the 100-ft
54:06buffer.
54:07>> Right.
54:07>> And then and then and then
54:08lastly is just one resource area near
54:12um
54:13it's closest to 384 Southwest Cutoff,
54:16and that's a uh kind of stream that
54:19appears to have a bordering vegetated
54:20wetland associated with it, and that's
54:22just yeah, shown up on the screen uh
54:24here, and maybe we could just go back up
54:26actually, Matty, to the um first one
54:28just for reference real quick.
54:30Um
54:33Yeah, so you can you can see here Coal
54:35Mine Brook how it comes out um
54:38You can see it on the USGS map right
54:40here. It comes out on the north side It
54:41comes down from the north from Lincoln
54:43Street down under 290, and then we can
54:46go to Bevenzi real quick.
54:50Yeah, there's the culvert. And then
54:51Bevenzi here again kind of flowing under
54:53the highway there. Um and this is where
54:55it potentially daylights further than
54:57100 ft away from from the highway
54:58itself. And then lastly, the one I was
55:01just referencing on Southwest Cutoff.
55:03Um
55:07You can kind of visually see the
55:10drainage pattern and and leaf staining
55:12from this aerial photo here.
55:14Um and so these are all these are all
55:16wetlands that are not that don't appear
55:18on Mass GIS wetlands layer. Um so it's
55:21probably challenging to to pick them out
55:24on a um
55:25you know, plan of this at this scale. Um
55:28so
55:30you know, ultimately again, the
55:30commission's job here is to um
55:33not just review work uh aside from
55:36herbicide application, but to confirm
55:38the wetland boundary. So,
55:39>> Sure.
55:40>> These are These are things we'd want to
55:41see added to the plan. I think, you
55:42know, this is a relatively
55:43straightforward type of application, and
55:45staff is comfortable including basically
55:47a condition that revised plans be
55:49provided in a determination if the
55:51commission's comfortable with that.
55:53Um we did just kind of
55:55briefly draft uh determinations for this
55:57since it's kind of an odd um
56:00it's not like a simple positive or
56:02negative determination for this type of
56:03filing. So, our our recommendation if
56:05the commission's comfortable with what's
56:06in front of us would be a positive
56:08determination to a confirming the
56:10wetland resource area boundaries
56:11depicted on the plans,
56:13um but adding a note that additional
56:15wetland resource areas are um confirmed
56:18as present as identified in this letter.
56:21Uh negative determination three
56:22confirming that the work is within the
56:24buffer zone, but will not alter a
56:25resource area or requiring require the
56:28filing of an NOI with the following
56:29conditions. One, that the thermal
56:31treatment identified in the yearly
56:32operation plan not be implemented within
56:34100 ft of a cold water fishery.
56:36Um and two, just prior to commencing
56:38work that a revised map be provided
56:40depicting the additional resource areas
56:42described in the comment letter. And
56:44then lastly, a negative determination
56:45five just setting the various
56:47presumptions uh established in the
56:49wetlands protection regs as the basis
56:51for exempting the herbicide application
56:53for for future review under the wetlands
56:54protection act.
56:56Um
56:56>> And we we did receive that in that email
56:59earlier, and those are um those are all
57:02acceptable and appreciated. And that
57:04would be um
57:08you know, DOT would be happy with those
57:09conditions if the commission
57:12granted those.
57:16>> Okay.
57:16>> But aside from that, nothing nothing
57:18else from staff.
57:19>> Okay. Uh any comments or questions from
57:21commissioners?
57:27Is anybody here from the public?
57:34Okay.
57:35Anything else?
57:39>> I'll see if I got this right. Pos-
57:40Motion to issue a positive determination
57:43to a negative determination number for
57:46number three and negative termination
57:48for number five.
57:51Good job.
57:53Is there a second?
57:54>> Second.
57:55>> Second.
57:56>> Commissioner Canton?
57:58>> Aye.
57:58>> Commissioner Kirshner?
58:00>> Aye.
58:00>> Commissioner Nystrom?
58:01>> Aye.
58:02>> Commissioner Frattaroli? Aye.
58:05All set.
58:07>> Great. Thank you so much, commissioners
58:09and staff. Eric and
58:13everyone there. Thank you so much and
58:16have a good evening.
58:17>> You too. Thank you. Thanks.
58:21>> Okay.
58:22Uh resuming the agenda at item 14.
58:27Zero Whippoorwill Drive, zero Daniel's
58:29Way, aka Malden Woods.
58:40>> Good evening. I'm Patrick Healey. I'm a
58:41civil engineer with Thompson Liston
58:42Associates, representing Wipper LLC
58:46on this uh particular project.
58:49So, we were looking at uh three distinct
58:52lots, each with two units of housing on
58:55them
58:56um to try to increase the floor uh plan
58:58the size of the floor plans here to make
59:00the buildings more sellable.
59:03The original plan was approved for a
59:05very small footprint. Um the market is
59:07really in this area looking for a
59:09two-car garage, first-floor living
59:12space, and some outdoor amenities. So,
59:14we've adjusted the plan a bit to
59:16accommodate those changes.
59:18Um
59:20so, each of these uh two-unit buildings
59:22now has a two-car garage. Uh
59:26these two are facing Danielle's way and
59:29on the Whipperwill Drive
59:31lot, one faces Danielle's way and one
59:34faces uh
59:36Whipperwill.
59:37Uh actually, sorry. We rotated it so
59:39they both face Whipperwill.
59:42Um in doing so,
59:44part of the uh improvements that are
59:46proposed end up
59:48um encroaching slightly into the uh
59:5130-ft buffer zone. So, I think that's
59:54what I'd like to focus our attention on
59:55is what we're proposing exactly that
59:57differs from what was approved
59:59previously. So, on the lot that you see
1:00:01on the screen here, for example, the
1:00:03driveway encroaches slightly into the
1:00:0630-ft zone.
1:00:07And at the rear of the left building,
1:00:10lot 10A, there's an outdoor patio that
1:00:13encroaches slightly into the 30-ft zone.
1:00:17Um so, we looked at some different
1:00:18options for how to accommodate the
1:00:20exterior amenity on the building. One of
1:00:23the things we looked at was whether we
1:00:25could construct decks in this area. I
1:00:27know the commission's policy on other
1:00:29lots has been that the decks are
1:00:32classified as impervious cover. So,
1:00:34we're trying to come up with some
1:00:35options that provide a pervious cover.
1:00:39In this case, these are uh permeable
1:00:41paver patios and a permeable paver
1:00:43driveway.
1:00:45Don't say that three times fast.
1:00:48Um
1:00:49in an effort to, you know, maintain the
1:00:51permeability of the surfaces here.
1:00:53Um
1:00:55in this case, we're looking at uh
1:00:58BVW bordering on boundary bounding on
1:01:01what is effectively a drainage ditch
1:01:03that drains I-290 uh 190 drainage in uh
1:01:09the plan's southerly direction.
1:01:12>> [clears throat]
1:01:13>> Um
1:01:14along this area, the commission had
1:01:16previously approved
1:01:18um construction and in the order of
1:01:21conditions required that
1:01:23Excuse me.
1:01:24Um
1:01:26Permanent bounds be set at the 15-ft
1:01:28buffer zone. You'll see those noted on
1:01:30the plan.
1:01:32In in the yards, there are those squares
1:01:34are the proposed permanent bounds.
1:01:37So, this builder has been building other
1:01:40houses on the street here. So, the two
1:01:42lots just to the south of this are
1:01:44currently under construction.
1:01:46And if you've driven by, then you saw
1:01:48that you know, the bounds are in place,
1:01:50the erosion controls are in place.
1:01:53And you know, maybe the bounds extend up
1:01:55onto lot 10 here. I couldn't really tell
1:01:58when I was out there how far, you know,
1:01:59those were constructed, but
1:02:01you know, they're they're following the
1:02:03order to the letter of the law at this
1:02:05point.
1:02:06Um
1:02:07>> [snorts]
1:02:09>> So, we'd like the commission to consider
1:02:13uh waving its
1:02:14uh
1:02:15standards to allow these pervious
1:02:17surfaces within the 30-ft
1:02:20acknowledging that there's permanent
1:02:22markers at the 15-ft
1:02:24uh buffer line.
1:02:27And I'm willing to hear any questions
1:02:29you might have.
1:02:31>> Thank you.
1:02:32>> Thank you.
1:02:33>> Uh staff comments or questions?
1:02:35>> Yeah, we don't have a a ton of comments
1:02:37on this.
1:02:38Um
1:02:39you know, the ultimately the change in
1:02:40footprint is not a a huge impact in
1:02:43terms of overall uh impervious cover for
1:02:46the site.
1:02:47Um the units proposed subsurface
1:02:50infiltration units shown on the plan um
1:02:52are in place to handle roof run run off
1:02:54from I think
1:02:56five out of the six units
1:02:58um
1:02:59that are subject to this amendment. Um
1:03:02I think obviously the the question one
1:03:04of the questions for the commission
1:03:05relates to the um
1:03:07as Patrick was saying, the hardscaping
1:03:09within the
1:03:10um
1:03:1130-ft buffer. We had had a um you know,
1:03:13pre-filing meeting with the applicant to
1:03:15discuss
1:03:17um
1:03:19you know, the
1:03:20potential of getting a discretionary
1:03:22allowance for that. One of the things
1:03:23Steph suggested was to um try to provide
1:03:26some sort of mitigation plantings to
1:03:28offset the increased hard and surfaces
1:03:31within the 30. Um so there were also um
1:03:35some proposed plantings shown on the
1:03:36plan.
1:03:38Uh I'm not sure was there a I don't know
1:03:39if there was a planting table or
1:03:41anything associated with that or if that
1:03:43was something that was
1:03:45still to be determined or maybe decided
1:03:48by the commission after his discussion,
1:03:50but
1:03:51um
1:03:52>> Yes, I am proposing some plantings.
1:03:54Thank you for pointing that out. I
1:03:55didn't mention that. So as a mitigating
1:03:57factor to these, you know, pervious
1:03:59paver patios, in large storms there will
1:04:01be a little bit of runoff from them.
1:04:03They will manage to handle the runoff
1:04:05from say up to 2 in of rainfall. You
1:04:07will get a little bit of runoff.
1:04:09Um
1:04:10so we are proposing some
1:04:13planting buffers just downstream of each
1:04:15of these
1:04:16pervious paver surfaces.
1:04:18So on sheet five of six of my plan, I'm
1:04:21showing that there would be one tree and
1:04:23six shrubs at each of the lots in to
1:04:26create that buffer.
1:04:28And that's shown on sheet one of six
1:04:30shows where we're proposing those. So
1:04:32they're directly in the path of where
1:04:34runoff would leave those patios or
1:04:36driveway and head toward the wetland
1:04:38resources.
1:04:39Um Eric, you also pointed out we're
1:04:41showing um
1:04:43infiltration systems on these lots.
1:04:45These were not part of the original
1:04:46approval. So we're confident that on
1:04:49five of the six lots we can get an
1:04:52infiltration system that handles the
1:04:54roof runoff
1:04:56uh on the street side of the buildings.
1:04:59So we have reviewed the soil test pits
1:05:00that were done out there.
1:05:02Given that these lots all have some fill
1:05:04in the front yards, it provides us with
1:05:06an opportunity to provide that
1:05:08infiltration as a, you know, more
1:05:11improved stormwater
1:05:13mitigation plan than what was previously
1:05:15approved.
1:05:21>> Um,
1:05:23and any other
1:05:24>> Uh, no, nothing nothing else from staff.
1:05:26>> Uh, commissioners uh, comments or
1:05:27questions?
1:05:35Okay. Um,
1:05:38So, here are my concerns.
1:05:39Uh, I I don't
1:05:41I'm not worried about stormwater
1:05:43management component of this expansion,
1:05:45uh, but I am very concerned about the
1:05:47encroachment.
1:05:49We have no precedent for allowing decks
1:05:52or patios or driveways in the 30-ft. The
1:05:56These are not themselves part of the
1:05:58stormwater management infrastructure, so
1:06:00I think that's the only place where
1:06:01we've made any kind of exception for
1:06:03riprap or headwall to be in the 30-ft no
1:06:06belts.
1:06:07Um, my other concern, you know, in that
1:06:10They're not allowed anyway, and I can't
1:06:11see any a way to to create an exemption
1:06:14for them is that this encroachment is
1:06:17going to make it very difficult for the
1:06:18future homeowners to understand the
1:06:20limits of their ability to do anything
1:06:23in these yards. Um, you know, they're
1:06:25they're 15-ft boundary marker may or may
1:06:28not mean anything to them. I suspect
1:06:30when the properties are sold, there's
1:06:32very little information that's conveyed
1:06:33to property owners about why their lot
1:06:37is as narrow as it is and why these
1:06:39boundary markers are there and that they
1:06:41can't go back and fill in the patio with
1:06:43something else or fill in the driveway
1:06:45with real asphalt because who's going to
1:06:47be the only property owner in the
1:06:49development with this pervious weird
1:06:51driveway.
1:06:52Um, and they're [clears throat] going to
1:06:54want some lawn.
1:06:55Uh, they're going to want to step out
1:06:56and have something else there, and
1:06:58there's no room for that. And by
1:07:01allowing these structures in these
1:07:02spaces, it suggests that, well, we could
1:07:04just push out a little bit further. Uh,
1:07:07and that's that's my other concern. So,
1:07:09uh, um, I personally don't see a way to
1:07:12approve this expansion if if the market
1:07:15requires the house to be bigger, then
1:07:17maybe you figure out how to not have a
1:07:18patio. Um, or the house maybe doesn't
1:07:22have to be bigger. Um, but frankly, the
1:07:24economic viability of this project isn't
1:07:26our concern.
1:07:29So,
1:07:30from my point of view, this is a no-go
1:07:33for this expansion.
1:07:39Is there
1:07:40anyone else here?
1:07:43>> I concur with that.
1:07:50>> Okay.
1:07:56We don't often come to this moment. Um,
1:08:00so,
1:08:01>> I mean, is there
1:08:02>> uh an option for them to refile,
1:08:05resubmit, or
1:08:06>> Well, I mean, it the commission doesn't
1:08:08have to close the hearing tonight if the
1:08:10applicants are amenable to continuing
1:08:12to
1:08:14um, provide additional time time to
1:08:16potentially revise the plans, we can do
1:08:18that. We don't have to don't have to
1:08:20close tonight.
1:08:21>> Okay.
1:08:21>> Um,
1:08:22but if
1:08:26if we want a decision voted tonight,
1:08:27then I guess
1:08:29>> Okay. Well, I'd like to see if there's
1:08:30some middle ground where we can meet
1:08:32halfway or something. So, we are
1:08:33proposing
1:08:34three patios and one driveway out of the
1:08:37six units.
1:08:39If
1:08:40we have the opportunity on one of these
1:08:42lots on lot 9A,
1:08:44if you could go back to the other view,
1:08:46to reduce the size of the patio and sort
1:08:49of make it wider,
1:08:50same square footage, but shorten it by 2
1:08:53ft.
1:08:54So, if you look at the one on the
1:08:56the left there, that's lot 9A.
1:08:59So, that's currently a 10-ft patio. That
1:09:01could be pulled back to 8 ft and made 14
1:09:04ft wide instead of 12.
1:09:06You know, same effective area. It's just
1:09:092 ft shorter.
1:09:11Um the the other one to the right there,
1:09:13it's very difficult to get any outdoor
1:09:16amenity given the way that the lot's
1:09:18being graded.
1:09:19Um
1:09:21to provide something outside for these
1:09:24uh
1:09:25unit owners to use.
1:09:27Um
1:09:28I'd like to say that we proposed these
1:09:30patios as a way to limit how much of the
1:09:33yard would be,
1:09:34you know, used and prevent
1:09:37the expansion of the yard over time.
1:09:39You also have the bounds in place at the
1:09:41limit of the 15-ft zone.
1:09:43There's kind of a slope going down to
1:09:45that. I think it's a pretty clearly
1:09:46delineated um
1:09:48area, especially when we put these
1:09:49supplemental plantings
1:09:51uh between those bounds to sort of
1:09:54create that line of demarcation of
1:09:56the yard ends here, you know, the buffer
1:09:58in the wetland are below here.
1:10:01Um
1:10:02so on one, I think we can, you know,
1:10:04reduce that.
1:10:06So then we're only looking at two,
1:10:09you know, small incursions into the
1:10:1130-ft zone.
1:10:12So on this one here, on lot 8B,
1:10:15you're talking about, you know, 4 ft by
1:10:1812 ft. That's within the 30-ft zone.
1:10:21And it's pervious, so we're not looking
1:10:23at, you know, a structure per se where
1:10:26the regulations prohibit the
1:10:27construction of a structure.
1:10:29I wouldn't classify a pervious patio as
1:10:32a structure. That's why we didn't
1:10:33propose them as decks. You know, I've
1:10:35been here before with the commission and
1:10:37talked about what constitutes a
1:10:39structure and what doesn't.
1:10:40>> Okay.
1:10:41>> You know, we're trying to work within
1:10:42the framework to find a way to provide
1:10:45something reasonable for these
1:10:47particular
1:10:47>> I appreciate what you're trying to do. I
1:10:49really do, but you know, my problem is
1:10:51the incursion, period.
1:10:53Um and the fact is that somebody will
1:10:54move into this home and that will be a
1:10:56meaningless boundary in their minds.
1:10:59Um and if you if it's important enough
1:11:01to expand the size of the house, then
1:11:04put in a balcony if they need outdoor
1:11:06space. Cantilevered balcony off of the
1:11:08house that sits two stories up and
1:11:10they'll have a lovely view of the woods.
1:11:12Um but from my point of view, there's no
1:11:14justification in pushing it out other
1:11:16than financial, and that's not
1:11:19you know, that's not an exemption or not
1:11:21an you know, a permissible reason to
1:11:24allow a structure in the 30.
1:11:29>> Okay.
1:11:39>> Mr. Chair,
1:11:41um
1:11:43I mean, I'd like to see
1:11:45new drawings other than
1:11:49possibilities
1:11:51now that could happen. Um it probably
1:11:55would be a good idea to come back to us
1:11:59after you've had time to think about it
1:12:02and discuss it with the powers that be
1:12:06and come up with a new set of plans that
1:12:09we may entertain.
1:12:11But,
1:12:12you know, in you know, encroaching into
1:12:15the 30-ft simply because that's what's
1:12:19needed
1:12:22as was as said earlier, we protect the
1:12:25wetlands and and the regulations,
1:12:28not the economic viability of a project.
1:12:34So, it may be in your best interest to
1:12:38come back and think about this with a
1:12:41new set of plans. But, that's up to you.
1:12:55>> Would you like to postpone?
1:12:56>> Uh I'm just looking at my plans if I
1:12:58could just have a minute to kind of
1:13:00think through what other options might
1:13:01be available.
1:13:03You know, a lot of a lot of thought did
1:13:04go into these plans to find the least
1:13:07disruptive method of providing the
1:13:09space. We worked with our builder client
1:13:11and we met with staff prior to filing to
1:13:14try to address Bill what the concerns
1:13:16might be.
1:13:18>> Can we scroll down to number 50 or 16
1:13:21and 18?
1:13:24Looks like on the
1:13:27building number 16
1:13:29there would potentially be space for
1:13:31that patio in its current shape on
1:13:35the south side of the house outside of
1:13:37the 30-ft buffer, right?
1:13:42>> Yes, I think there's an opportunity to
1:13:44move that one around the corner.
1:13:51I'm just looking at ways to try to
1:13:53reconfigure that driveway and still have
1:13:55a a two-car garage.
1:14:03So, if there if we could move the
1:14:05driveway closer to Danielle's way where
1:14:08it's currently shown you know,
1:14:10encroaching just at the edge of that
1:14:1130-ft zone
1:14:13and
1:14:14it was a paved driveway outside the 30,
1:14:17would that be acceptable to the
1:14:18commission?
1:14:20>> A paved driveway outside of the 30?
1:14:22Yeah, I don't unless it
1:14:24impacts the storm water calculation in a
1:14:26meaningful way, that's If you're outside
1:14:28the 30, you're outside the 30.
1:14:31>> But I think then we lose the benefit of
1:14:32having the pervious pavers and
1:14:34>> I
1:14:35>> No, I'm trying to find a way to be least
1:14:38impactful and still achieve
1:14:40>> but I'm also looking at what happens to
1:14:42these properties when the contractor
1:14:44leaves. And my observation has been that
1:14:46people will push the limits of their
1:14:50what they perceive to be their property
1:14:51and you know, oh well, that's my
1:14:53property line. I can move it and then
1:14:55again, why do I have this oddball
1:14:56driveway when everyone else has a nice
1:14:58asphalt easy to shovel driveway. And so
1:15:02I I wouldn't it wouldn't take me like a
1:15:04month before I replace that with
1:15:05something more familiar to me as a
1:15:07property owner. I'm not saying it will
1:15:09happen, but but the worst of what
1:15:11happens always happens when the
1:15:13homeowner shows up. And the
1:15:15information's not shared with them about
1:15:17their drainage structure or why this is
1:15:19so and why they shouldn't do that. So
1:15:21what I'm
1:15:22hoping to do in addition to complying
1:15:24with the regulations the way they're
1:15:26written
1:15:27is prevent the enforcement order that
1:15:30will come when somebody decides that
1:15:33they want to have a vegetable garden at
1:15:35the back of their property and that
1:15:37their patio is not really big enough.
1:15:40So that those are my concerns and
1:15:41they're they're long-term and they have
1:15:43more to do with you know, with what
1:15:45happens next.
1:15:46>> So can any of your concerns be resolved
1:15:49with adding fencing or some other form
1:15:51of barrier?
1:15:52>> seems to me that fencing would be then
1:15:53to adding even more to the to the
1:15:56>> Mhm.
1:15:56>> property that would be
1:15:59If you're going to put up a fence to
1:16:00prevent what? You're already in the 30.
1:16:03>> But I'm not in the 15. I mean, the 15 is
1:16:06the bounded no touch zone.
1:16:08>> No, I I
1:16:08>> So I'm allowed to have my yard between
1:16:11my house and my 15-ft bounds.
1:16:14>> I understand, but no, I I don't see
1:16:16putting up a fence being the answer.
1:16:18That would to me just dig more holes in
1:16:20the ground for no
1:16:21particular reason.
1:16:23Um
1:16:24If you can get the the driveway out of
1:16:26the 30, figure out the patios, if they
1:16:28want to have a bigger footprint for
1:16:29their for their property, go go with a
1:16:32balcony.
1:16:32>> Okay. So just following this through
1:16:35logically, on 10A, if I were to move the
1:16:37driveway over
1:16:39the 5 ft or 6 ft and I was to reshape
1:16:42the patio,
1:16:44would it be acceptable outside the 30 to
1:16:46make these improvements?
1:16:48>> If you stay outside of the 30 mile
1:16:50>> plan, come back next time, right? And
1:16:52these are the the changes I make,
1:16:55will the commission accept them?
1:16:57>> If all of the structures, patios,
1:16:59driveways stay out of the 30,
1:17:02>> Mhm.
1:17:03>> then I'm fine with it.
1:17:07>> Okay. So the one lot where I will have
1:17:09difficulty with that is 8B. If we could
1:17:11look at that.
1:17:16>> Say 8B.
1:17:17>> 8B.
1:17:19So you're right in the center of the
1:17:20screen, the left side of the right
1:17:23building.
1:17:24So the the building's almost at the 30,
1:17:26and I need to provide some outdoor
1:17:28amenity space.
1:17:30Do you have a suggestion of where,
1:17:32you know, that that might go?
1:17:34>> I don't. It's not my problem to solve.
1:17:40>> Okay.
1:17:44I guess I would ask the commission for a
1:17:46continuance. We'll submit some revised
1:17:47plans and see if we can close it out at
1:17:50the next meeting. Thank you.
1:17:51>> Okay.
1:17:52Um
1:17:53Your motion?
1:17:54>> Motion to continue to August 24th.
1:17:56>> For sure. Sorry, should we take uh ask
1:17:58for public comment first?
1:17:59>> Oh, I'm sorry. Uh is there anyone here
1:18:00from the public?
1:18:04Online?
1:18:07Okay. Sorry. Thank you.
1:18:09Motion to continue to August 24th.
1:18:12>> Second.
1:18:13>> Commissioner Canton?
1:18:15>> I.
1:18:15>> Commissioner Kirshner?
1:18:17>> I.
1:18:17>> Commissioner Nystrom?
1:18:18>> I.
1:18:19>> Commissioner Frattani? I.
1:18:21>> Thank you. It was a worthwhile
1:18:22discussion.
1:18:23>> Thanks.
1:18:28Uh next item, request for certificate of
1:18:31compliance
1:18:32to A Nonquit.
1:18:39Okay. So, this is definitely one of the
1:18:41oldest
1:18:42certificate of compliance requests that
1:18:43we've seen.
1:18:44So, this is from 1981.
1:18:47So, we
1:18:49based on
1:18:50the materials that we had, it seemed
1:18:52to be just transferring of a property
1:18:55with a boat house on it.
1:18:56You can see the current condition of
1:18:58that boat house is not great.
1:19:00>> [laughter]
1:19:01>> Basically, it's a couple walls and
1:19:02essentially the concrete foundation at
1:19:04this point. But, it seems like under
1:19:06that notice of intent, there is no
1:19:07actual work proposed. So,
1:19:12in a recent real estate transaction,
1:19:14this came up. So, essentially, the new
1:19:16owner is looking to close out that order
1:19:18of conditions on the property.
1:19:20Um
1:19:21So,
1:19:22based on
1:19:23the current conditions and based on that
1:19:25notice of intent materials that we
1:19:27found, there's no concerns
1:19:30from staff about closing this out as a
1:19:32complete certificate of compliance.
1:19:34Okay.
1:19:36>> Motion to issue the certificate of
1:19:38compliance.
1:19:40>> Second.
1:19:41>> Commissioner Canton.
1:19:42>> I.
1:19:43>> Commissioner Kirshner.
1:19:44>> I.
1:19:45>> Commissioner Nystrom.
1:19:46>> I.
1:19:46>> Commissioner Fratoni, I.
1:19:5120 Scherer Trail.
1:19:55>> Yep.
1:19:56So, this was for construction of a
1:19:58single family home on Scherer Trail.
1:20:01So, it was within um
1:20:04the buffer zone of a wetland
1:20:06bordering a vegetated wetland.
1:20:08An as-built plan has been provided as
1:20:10well
1:20:11as well as a certification letter from a
1:20:13professional engineer.
1:20:15They were required to install permanent
1:20:16markers, which have been installed. Um
1:20:19It's essentially along the wood line, so
1:20:21it's even a little bit further in their
1:20:23lawn than what was originally required.
1:20:25Um so, no concerns from staff. They're
1:20:27looking for a complete certificate of
1:20:29compliance.
1:20:32>> Motion to issue the certificate
1:20:33certificate of compliance.
1:20:36>> Second.
1:20:37>> Commissioner Canton.
1:20:38>> I.
1:20:39>> Commissioner Kirshner.
1:20:40>> I.
1:20:41>> Commissioner Nystrom.
1:20:42>> I.
1:20:43>> Commissioner Fortunato, I.
1:20:45Uh three Crest Avenue.
1:20:48All right, so this is for construction
1:20:49of a single family home uh within the
1:20:51buffer zone of a bordering vegetated
1:20:53wetland.
1:20:54Um so this required concrete bounds to
1:20:57be installed um and as-built plan has
1:20:59been provided showing the location of
1:21:01these concrete bounds and uh all
1:21:03constructed improvements of the
1:21:05property.
1:21:06Uh staff did conduct a site visit back
1:21:08in May and have confirmed uh that those
1:21:10bounds are actually installed.
1:21:12Um all of erosion controls have been
1:21:14removed. Um
1:21:15they were removed a couple weeks ago. So
1:21:17in my photos you do see it, but they
1:21:19were have since been removed. Um so no
1:21:21concerns from staff.
1:21:24Motion to issue the certificate of
1:21:26compliance.
1:21:28>> Second.
1:21:28>> Commissioner Canton.
1:21:30>> I.
1:21:30>> Commissioner Kirshner.
1:21:32>> I.
1:21:33>> Commissioner Nystrom.
1:21:34>> I. Commissioner Fortunato, I.
1:21:36>> Uh
1:21:36number 16, emergency certificate.
1:21:39All right, so this is uh 2A Nonquit. So
1:21:43the uh property that just requested the
1:21:45certificate of compliance for that 1981
1:21:47uh
1:21:48notice of intent. Um so
1:21:50a oak tree on a neighboring property
1:21:53came down uh
1:21:55and landed on essentially their deck and
1:21:57roof. Uh so they're looking to have that
1:22:00removed. Um so staff did issue an
1:22:01emergency certificate. Um I also
1:22:04inspected a couple other trees out
1:22:05there. There's another oak um that's
1:22:07declining
1:22:08and a hemlock that has a lot of ant
1:22:10damage and was also showing signs of
1:22:12decline. So they asked if they could
1:22:14remove those. So I also included those
1:22:16in that emergency certificate. So just
1:22:18looking to essentially ratify that
1:22:20emergency certificate.
1:22:24Motion to ratify the emergency
1:22:26certificate.
1:22:27>> Second.
1:22:28>> Commissioner Canton.
1:22:30>> I.
1:22:30>> Commissioner Kushner.
1:22:32>> I.
1:22:32>> Commissioner Nystrom.
1:22:33>> I.
1:22:34>> Commissioner Fratoni. I.
1:22:36Uh are there any are there any
1:22:38enforcement order updates?
1:22:41>> Yep, so just a quick update on uh 612
1:22:44Grove Street. So this was the
1:22:46construction of a driveway essentially
1:22:49right next to Delaney Brook. Um
1:22:51so originally we were discussing what
1:22:53ISD uh if this is zone and compliant. Um
1:22:57a written response
1:23:00they wanted to see a site plan or
1:23:02suggested that they look for another
1:23:04uh
1:23:05driveway option along uh the Holden
1:23:08Street side. Turns out Holden Street is
1:23:10a state uh managed mass. DOT managed uh
1:23:14state road um and they would not allow
1:23:17the curb cut on that side of the street.
1:23:18So they are looking for additional
1:23:21options. Um
1:23:22so they are looking back at this option
1:23:25to kind of restore that buffer zone and
1:23:27keep that driveway
1:23:28uh in the area on the Holden Sorry.
1:23:32On uh sorry, I'm at the Grove Street
1:23:34side of things is the state highway
1:23:36where the Holden Street side
1:23:38>> Holden Street's the city street, yeah.
1:23:39>> Yeah.
1:23:40>> Grove is the highway.
1:23:40>> sorry about that.
1:23:41>> Yep, that's all right. I knew what you
1:23:42meant.
1:23:43>> Yep.
1:23:43>> [laughter]
1:23:44>> So looking to keep it on the Holden
1:23:45Street side. Um
1:23:47so
1:23:48ISD
1:23:50said if they remove a certain amount uh
1:23:53it would be compliant with the zoning.
1:23:56Uh
1:23:56so they are
1:23:58going to look forward look into doing
1:24:00this restoration plan. Um so we're going
1:24:02to ask if they come to the next meeting
1:24:03to discuss this with us.
1:24:05>> Okay.
1:24:05>> So I just wanted to give you that
1:24:06update.
1:24:07>> All right. So just to restate, they
1:24:09cannot put the driveway on the Grove
1:24:12Street side.
1:24:14Even though there's a curb cut there.
1:24:17>> Correct.
1:24:18>> Right.
1:24:19>> Yep.
1:24:19>> Um
1:24:20so they're going to come back and maybe
1:24:22reconfigure this to be in compliance
1:24:25both with
1:24:27zoning and
1:24:30>> Okay.
1:24:30>> Yeah.
1:24:31>> Correct.
1:24:33>> Yeah.
1:24:34Okay.
1:24:35>> Yep.
1:24:37>> Anything else?
1:24:38>> Nope, that's all I had for or well we
1:24:40also have I
1:24:42I have 88 Webster Street. Um so, this we
1:24:45somewhat touched on at the last meeting,
1:24:47but essentially a riprap slope was added
1:24:50to this bank along um
1:24:53I can't think uh Curtis Pond. Uh so, it
1:24:56was added over the winter.
1:24:58Uh so, we do have uh let's see. The
1:25:01engineer online to kind of just talk
1:25:03about it. Uh the wetland scientist Matt
1:25:05Morrow did go out and investigate the
1:25:07area. Um and did kind of put together
1:25:10like a slight suggestion on how we could
1:25:13potentially restore the area, but I will
1:25:15let Nick
1:25:16take over.
1:25:17>> [laughter]
1:25:20>> All right, Nick, you should be able to
1:25:22unmute.
1:25:22>> Okay.
1:25:24Thank you. Good evening. Nick
1:25:26Fasciandola, Level Design Group, here on
1:25:28behalf of the property owner.
1:25:30Um
1:25:31so, we did have our wetland scientist
1:25:32Matt Morrow go out to the site. Uh I
1:25:36believe it was last Friday, and he
1:25:37worked up a quick letter, and we sent it
1:25:39over to uh
1:25:42the office this morning. Um
1:25:44basically, you know, he recorded the
1:25:47observations that he saw out there.
1:25:48Obviously, there's some riprap that was
1:25:51placed by the property owner without a
1:25:53permit um in the location as shown. Um
1:25:56it's right at the edge of an existing
1:25:58parking area
1:26:00um along the pond, and that area was
1:26:04having some issues with some washout,
1:26:06and the contractor kind of just took it
1:26:09upon himself to quickly stabilize that
1:26:13um you know, late winter, early spring.
1:26:17Um
1:26:18we weren't aware of it. It was brought
1:26:20to our attention
1:26:22by the
1:26:23planning and development office.
1:26:25Once we were notified, we had our
1:26:29wetland scientist out there to take a
1:26:31look at it. So,
1:26:32if the commission
1:26:34insists, we can have that area cleaned
1:26:36up, remove the riprap, and
1:26:40re-stabilize with some
1:26:42plantings on the shoreline, and we can
1:26:44work with staff on preparing a plan
1:26:47detailing the
1:26:49types of plantings, number of plantings,
1:26:51and kind of work up a quick sketch of
1:26:55how that area will be addressed.
1:27:07But, that's all we have for for this
1:27:09evening. We don't have a a plan to share
1:27:12on proper restoration of that area.
1:27:16>> So, I think the staff recommendation at
1:27:17this point would be to um
1:27:20just allow them to proceed with putting
1:27:21that plan together, and we can
1:27:23communicate with them on
1:27:26>> So, how long
1:27:27>> and bring it back to the commission for
1:27:29further discussion at that point.
1:27:30>> how long of a timeline to allow for a
1:27:33plan to be submitted?
1:27:38>> Um Nick, do you have a sense of how long
1:27:40it would take?
1:27:40>> Yeah, it shouldn't take too long.
1:27:43Um
1:27:44Mr. Morrow is actually on vacation next
1:27:46week. So, when when's the commission's
1:27:49next scheduled public
1:27:50>> Next meeting's on the 24th.
1:27:53>> 24th?
1:27:54>> One after that is September 14th, if
1:27:56that's not going to fly. But, we can aim
1:27:58aim for the 24th, and
1:28:00>> Yeah, I mean, let's aim for the 24th. If
1:28:02I have if I run into issues, I'll let
1:28:04you know, but I should be able to get
1:28:05out there,
1:28:07do a quick survey of that area, prepare
1:28:09plan, and uh coordinate with the wetland
1:28:12scientists on um plantings and other
1:28:14types of
1:28:15uh measures that they would like to see
1:28:17in that area.
1:28:19>> Okay.
1:28:21I would say in addition to the to the
1:28:22plantings, um obviously this area was
1:28:25used for
1:28:26snow
1:28:28disposal during the winter because we
1:28:30understand that that's how this area
1:28:33came to be.
1:28:34Um I guess re-supported was when the
1:28:37snow plows got stuck
1:28:39in the back. Um so in addition to the
1:28:42restoration, I'd like to understand how
1:28:43that property is going to be managed
1:28:45going forward. Um
1:28:48because this is likely to repeat itself
1:28:51if
1:28:52they intend to use it for snow removal
1:28:54in the future.
1:28:57>> Well, I know there's a future
1:28:59redevelopment plan the property owner
1:29:01would be looking to come in with um
1:29:04I mean, as far as I know snow activities
1:29:06back there are just to keep that area
1:29:08clear for fire and safety.
1:29:11Um
1:29:11I mean, some snow does get plowed down
1:29:13in that area, but there's a transformer
1:29:15down there that needs to remain active
1:29:16and and overhead doors. So,
1:29:19um
1:29:20I don't believe it's a snow dump uh as
1:29:23as was classified. I believe there was
1:29:24snow plowing activities for general
1:29:26maintenance purposes and that was part
1:29:28of the issue back there uh with the
1:29:30plow, but I don't believe it's you know,
1:29:33there there is a giant stock pile of
1:29:35snow in that that area.
1:29:37>> Okay. Yeah, I I I I
1:29:39understood it was no operations or snow
1:29:40plowing where the truck got hung up back
1:29:42there. That was
1:29:43>> Yeah, and then that's required to keep
1:29:45the driveways clear for fire and safety,
1:29:47but um yeah, it's it's not a snow dump
1:29:50where they're bringing snow from offsite
1:29:52and and leaving in that area and
1:29:53allowing it to drain into the pond. I
1:29:55just wanted to make that clear.
1:29:56>> Okay, understood.
1:29:57>> Yep.
1:29:58>> Okay.
1:29:58>> Yeah, we can also talk about um general
1:30:01operations, but the buildings mostly
1:30:03vacant at this this in time as from what
1:30:06I understand, so
1:30:08um just general um maintenance to keep
1:30:10it clear for fire and safety. Those are
1:30:12the
1:30:13um only activities that are occurring
1:30:15out there today. But like I said, I know
1:30:16there is a redevelopment plan that the
1:30:18property owner's working on, so um
1:30:20hopefully we'll have that area cleaned
1:30:22up uh in the near future.
1:30:24>> Thank you.
1:30:26>> Thank you.
1:30:30>> Uh anything else on violations,
1:30:32enforcement orders?
1:30:34>> Nothing this week.
1:30:35>> Okay. Open space?
1:30:38>> Nothing from staff.
1:30:39>> Okay.
1:30:39Active projects?
1:30:42Uh communications?
1:30:46>> We did receive two communications this
1:30:48um past couple weeks. One regarding a
1:30:50draft priority habitat map that will be
1:30:52out for comment. Um I think that's
1:30:55today or this week.
1:30:56>> August 5th.
1:30:57>> August 5th, Wednesday.
1:30:59Um
1:31:00and then uh utility
1:31:03gas main replacement notification from
1:31:04Eversource.
1:31:07>> Okay.
1:31:08Uh minutes?
1:31:11>> Yep. So the July uh 13th uh 2026 minutes
1:31:14were available for review.
1:31:17>> Is there a motion?
1:31:18>> Motion to approve the July 13th minutes.
1:31:23>> Second.
1:31:23>> Second.
1:31:24>> Commissioner Canton?
1:31:26>> Aye.
1:31:26>> Commissioner Kirchner?
1:31:28>> Aye.
1:31:28>> Commissioner Nystrom?
1:31:29>> Aye.
1:31:30>> Commissioner Frattone, aye.
1:31:32Uh
1:31:34ordinance updates?
1:31:36>> Nothing this week.
1:31:40>> Liaison, you're still off for the
1:31:41summer, right?
1:31:42>> Correct.
1:31:42>> How about the
1:31:44Lake Winnecunnet?
1:31:45>> Yep. So Lake Winnecunnet Commission uh
1:31:47met last week. Um
1:31:50It was a pretty efficient meeting
1:31:51considering uh the number of items we
1:31:53had on our agenda. Um
1:31:55no real discussion on the uh wake boat
1:31:59issue um other than reviewing the
1:32:02essentially
1:32:03what's in front of what bill's in front
1:32:05of the Senate. So, um
1:32:09Yeah, so essentially there's a a
1:32:10discussion of
1:32:13limiting wake boats to 300 ft off of
1:32:16shore um
1:32:17and have to it has to be a
1:32:20a water depth of at least 15 ft which on
1:32:23Lake Quinsigamond is quite hard to
1:32:25achieve based on how narrow that
1:32:28water body is to be 300 ft off of
1:32:31off line to operate that boat.
1:32:33>> [laughter]
1:32:33>> Um
1:32:34so it was just a discussion of that
1:32:36really. Um
1:32:37but yeah.
1:32:39No real updates.
1:32:40>> Okay.
1:32:42Um policies and procedures.
1:32:44>> Uh I'm just wanted to check uh touch
1:32:46base with the commission on quorum for
1:32:48next week next meeting cuz I know that
1:32:50you're going to be out, right? On the
1:32:5124th. Do we have Is everybody else able
1:32:54to attend the meeting on the 24th?
1:32:57>> I'm currently able to attend.
1:33:00>> Stewart, Devin?
1:33:02>> Uh I'm just looking at the calendar.
1:33:04Yes, yeah, yep.
1:33:08>> [snorts]
1:33:09>> Stewart, are you able to make the 24th?
1:33:13>> Say again, I'm sorry.
1:33:14>> Are you able to make the meeting on the
1:33:1524th? Just cuz Diane's not going to be
1:33:17here so we'll have uh we'll be down to
1:33:19three.
1:33:22>> As of now, I don't have anything that
1:33:23would stop me.
1:33:25>> Okay, sounds good. If if everyone's able
1:33:28to make it in person, that's always
1:33:29preferable when we're down to three just
1:33:31because if technological difficulties
1:33:33knock someone off then we lose quorum,
1:33:35but um
1:33:36if there's going to be any issue with
1:33:37attendance, just uh reach out as as soon
1:33:39as you can and let us know and we'll
1:33:40figure out something with uh either
1:33:42rescheduling the meeting or
1:33:45uh yeah, we'll take it from there, I
1:33:46guess, but
1:33:47>> Understood. So, I'll keep you in the
1:33:49loop.
1:33:50>> Thank you.
1:33:51That's it for from staff.
1:33:53>> All right. Is there a final motion?
1:33:56>> Motion to adjourn.
1:33:57>> Second?
1:33:58>> Seconded. Yes.
1:34:00>> [snorts]
1:34:00>> I.
1:34:01>> I.
1:34:02>> I.
1:34:02>> Have a good night.
1:34:03>> Thanks. Good night, everyone.
1:34:04>> everyone.
1:34:06>> Bye.