2026-08-25 - Public Works and Traffic and Parking Joint Committee
Summary
Based on auto-generated captions plus the posted agenda and official minutes; names, figures and speaker attributions may be misheard (the captions have no speaker labels).
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| Street and Sidewalk Rehabilitation Process | 67 | 56% |
| 2025 Pavement Management Plan | 24 | 20% |
| Rubber Chip Seal Failures and Cape Seal Pilot | 21 | 17% |
| Other business | 7 | 6% |
- Tuesday, August 25, 2026.
- The recording runs about 1 hour 59 minutes.
- Two committees met at once and discussed one item: Public Works (Tony Economou, chair; Satya B. Mitra, who arrived a few minutes late; John P. Fresolo) and Traffic and Parking (Jose A. Rivera, chair; Luis A. Ojeda; Robert A. Bilotta, remote).
- AJ Pottle clerked and explained that each committee takes its own votes.
- Each approved its prior minutes 3-0 (Public Works, July 21; Traffic and Parking, August 19, per the minutes).
2025 Pavement Management Plan
6:25-30:38
- Economou's order asked both committees to review the city's pavement management plan, prepared by Apex Companies and Cyvl.ai. John K. Westerling (Public Works) and Stephen S. Rolle (Transportation and Mobility) presented, with Jay Mello on treatments and Frank Marinaccio of Apex available.
- The plan was released in January 2025 (work began late 2023). It is a block-by-block GIS map using the pavement condition index (PCI); a public version is on the DPW and DTM websites.
- Citywide average PCI was 69.6 at the 2023 scan. Fixing worst roads first was put at about $19.4 million a year; a balanced preservation program at about $16.2 million a year (the 2023 backlog estimate was $288 million). Rolle said costs are roughly 30 percent higher now, and past annual spending was about $12-13 million.
- The target is to keep most roads near PCI 80 and above the 65 'complaint line', using crack seal (all roads at age 5), permanent patching (first serious program this year) and preservation treatments before roads need rehabilitation. Fog seal has been avoided. Preventative work costs roughly $10-15 a square yard against over $100 for reclamation or reconstruction.
- Roughly 21 percent of streets rate poor; about 30 percent of the 480 miles (about 160 miles) sit in the preservation band. A Rolle illustration: at $14 million a year a worst-first approach could pave about five miles a year (96 years to touch every road) against about 50 miles a year with preservation.
- This year's resurfacing funding is about $20 million by a commissioner's figure (Fresolo recalled $22 million; described as a record), plus about $2 million from MassDOT to resurface much of Grafton Street.
- Selection: DPW and DTM choose arterial and collector streets by PCI; district councilors pick local streets (every two years), and a pick takes a year or two to reach construction. This year's December picks are slated for the 2027-28 seasons. Fresolo said he had not seen district 3 work; Mello said contractors mobilize area by area and a report listing every project would be re-sent. A rescan is planned (scans every 3-5 years; last in 2023).
- Crack sealing was recently awarded and starts this fall, with the rest likely next spring. Contract bids cannot start until the budget passes in mid-July.
Rubber Chip Seal Failures and Cape Seal Pilot
30:38-51:10
- Mello said forensics found the main problem was excess loose stone: steep grades, and street parking that hinders post-application sweeping (worse once cars are off the street for winter plowing). Application on very hot days (near 90 degrees) also led to shoving on steeper streets. Specifications are being revised.
- Ojeda asked about alternatives and the storm drains; DPW said metal plates cover catch basins during application, early sweepings catch most stone and it has not seen a big rise in catch basin cleaning.
- A cape seal pilot has gone to bid, funded from money originally budgeted for chip seal. Cape seal costs roughly two to three times chip seal, and later treatments are limited (it generally cannot be overlaid; it must be milled or re-microsurfaced).
- Hot-in-place recycling was dropped: it scorches trees, left the Mill Street job nearly as costly as mill and overlay and has no compaction standard. Cold-in-place (used on Granite Street) was praised.
- A committee member asked about roads where chip seal did not take; Mello said a cape seal or microsurface can go over it in some cases. DPW asked councilors to send failed-road locations so it can inspect and bring the contractor out. Economou and Bilotta pressed for contractor accountability.
Street and Sidewalk Rehabilitation Process
51:10-1:58:13
- Contractor quality and inspection dominated the discussion. Mello said punch-list items (loam and seed, castings, curbs) fall through the cracks because specialist subcontractors will not return for small jobs; liquidated damages or withholding retainage are slow and often not worth the cost. He was to meet one contractor the next day.
- Economou said the real flaw is acceptance of poor work, citing hydroseeded gravel that was never suitable for grass. Ojeda added that residents need earlier, multilingual notice on projects (Endicott Street, Chandler Street), and criticized utility patches (Perry Street) while praising the extended utility-warranty policy; another councilor cited sidewalks left open for weeks on Park Avenue (speaker unclear in captions).
- Rolle said the city has about five resident road inspectors, each overseeing around $4 million of work, and that this is a capacity issue; Economou said the Council needs to know if staffing is short. See DPW Staffing and Civil Service Hiring.
- Mitra asked for a plan to resurface the major arteries within three to four years (he said Rolle's list has about 20 arteries, roughly $300 million), a standard for each road, and whether private streets deserve one. See Street Resurfacing Capital Loan Program.
- On Park Avenue (Chandler to Salisbury Streets), Mitra wanted the whole street repaved. A commissioner's 'paint only the bathroom that needs it' analogy explained why only the worst section was done.
- Fresolo asked when district picks would start and about the 21 percent poor figure, and a commissioner credited engineering for finding the MassDOT money.
- Public comment (two speakers, both neither for nor against): a resident of Coombs Road, a dead end beside Foley Stadium, said her street and sidewalk have deteriorated for about three years, that she was told it was on a list and then pushed off, and raised drainage behind the stadium and snow piles; Rivera said he would follow up with Rolle. Fred Nathan asked how much CSX truck traffic has damaged Grafton Street and whether the city spends too much on private snow contractors instead of enough DPW staff.
- Votes: both committees voted 3-0 on roll calls to hold the item (Public Works: Fresolo, Mitra, Economou; Traffic and Parking: Bilotta, Ojeda, Rivera) and then adjourned. A closing speaker said he wanted to hear more on the chip seal failures.
Other business
0:05-6:25, 1:58:13-1:59:14
- Clerk read the Zoom and phone call-in notice; nobody was online to speak.
Official Minutes
Journal of the committee as posted on PrimeGov (summary of actions, not verbatim). Page headers and footers removed.
Public Works Committee version
CITY OF WORCESTER
PUBLIC WORKS COMMITTEE
Tuesday, August 25, 2026
Esther Howland (South) Chamber
Convened: 5:01 P.M.
Adjourned: 7:00 P.M.
MAYOR
Joseph M. Petty
COMMITTEE MEMBERS CLERK OF THE CITY COUNCIL
Chairperson Tony Economou Nikolin Vangjeli
Vice Chairperson Satya B Mitra
Councilor John P Fresolo
www.worcesterma.gov
City Hall - 455 Main Street Worcester, Massachusetts
Present Were: Chairperson Councilor Tony Economou
Councilor Satya B. Mitra, who arrived at 5:03 p.m.
Councilor John P. Fresolo
Also: Chairperson Councilor Jose A. Rivera
Councilor Robert A. Bilotta, who participated in the meeting
remotely
Councilor Luis A. Ojeda
Commissioner of Public Works John K. Westerling
Assistant Commissioner of Engineering Jay Mello
Commissioner of Transportation and Mobility Stephen S.
Rolle
Assistant Director of Transportation and Mobility Todd
Kiranne
Principal for Apex Companies Frank Marinaccio
Deputy City Clerk Stephen A.J. Pottle, clerk
1. Virtual Attendee Call-In Information
a. Pursuant to Chapter 20 of the Acts of 2021 and in order to ensure active, public
engagement, the City of Worcester currently allows for both in-person and remote
participation at all City Council and Standing Committee meetings. To partake in the
meeting, you may attend the meeting in-person within the meeting location, follow the
below link to join via Zoom or dial the direct line as indicated. If you join a Zoom
meeting by dialing in with a phone number, you can raise your hand by dialing *9.
Public Works Committee and Traffic and Parking Committee Zoom Link:
https://worcesterma.zoomgov.com/j/1615992759
Public Works Committee and Traffic and Parking Committee Zoom Phone Number: +1
646 828 7666
Public Works Committee and Traffic and Parking Committee Zoom Access Code: 161
599 2759
2. Approval of the Minutes
a. Order - That the City Council Standing Committee on Public Works hereby approves the
minutes of the Public Works Committee meeting on July 21, 2026.
Chairperson Councilor Economou read the item and moved for a roll call vote to adopt the item.
Order adopted on a roll call vote of 3 Yeas and 0 Nays
3. Miscellaneous Item
a. Order of Councilor Tony Economou - Request Standing Committee on Public Works
meet jointly with the Standing Committee on Traffic and Parking for the purpose of
reviewing and discussing the city’s strategic pavement management plan. Further,
request Commissioner of Public Works and Commissioner of Transportation and
Mobility attend the joint committee meeting to present the city’s 2025 Pavement
Management, prepared by Apex Companies, LLC and Cyvl.ai. (see attached).
# 12m CC July 21, 2026
Chairperson Councilor Economou read the item and recognized the Commissioner of Public
Works, who provided an overview of the item, including how the Department of Transportation
and Mobility and Department of Public Works collaborate for the city’s pavement management
plan.
Chairperson Councilor Rivera recognized the Commissioner of Transportation and Mobility and
the Assistant Commissioner of Public Works, who provided a presentation relative to the city’s
street construction and pavement management program. Said presentation included information
concerning the importance of pavement preservation, advanced and flexible project planning and
project selections based on pavement condition index (PCI) data, the process relative to developing
the 2025 Pavement Management Plan, an overview of how to classify road PCI with estimated
treatment costs, impacts of pavement preservation on PCI, the importance of performing
routine/preventative maintenance to avoid road deterioration, the requirement for major
rehabilitation with the goal to maintain the majority lowest road classification at eighty (80) PCI,
monetary advantages associated with maintaining acceptable road conditions over a longer period
of time, the 2023 average PCI of the city’s road network rated at 69.6 with the estimated cost at
$19.4 million annually towards pavement management to fix the worst classified roads first,
considerations to inflation since 2023 with an estimated thirty percent (30%) increase for
pavement management supplies and labor, the 2023 estimated cost at $16.2 million annually
towards pavement management by following a balanced pavement preservation program, and
routine maintenance options to maintain roads at eighty (80) to ninety (90) PCI such as crack seal,
fog seal, and permanent patch methods.
Chairperson Councilor Economou recognized Councilor Fresolo, who discussed the whether the
permanent long patch program addresses issues related to manholes with the Assistant
Commissioner of Public Works.
Chairperson Councilor Rivera recognized Councilor Ojeda, who discussed concerns related to the
chip seal treatment method, feasible alternative treatment options in lieu of chip seal, best
practices for using chip seal, benefits to using the cape seal treatment method, cost differentials
between chip and cape seal methods, and subsequent treatment limitations after using the cape
seal and microsurfacing methods with the Assistant Commissioner of Engineering and
Commissioner of Transportation and Mobility.
Chairperson Councilor Rivera recognized Councilor Bilotta, who discussed concerns related to
excess chips impacting stormwater infrastructure, issues related to hot in place recycling
treatment, cold in place recycling and mill and overlay treatment methods with the Assistant
Commissioner of Public Works.
Chairperson Councilor Economou discussed the feasibility of cape sealing and microsurfacing
roadways that did not withstand chip seal with the Assistant Commissioner of Engineering.
Chairperson Councilor Rivera recognized Councilor Ojeda, who discussed pavement management
budget allocations available for piloting cape seal treatment methods with the Assistant
Commissioner of Engineering.
Chairperson Councilor Economou recognized Councilor Fresolo, who spoke concerning when the
projects associated with street and sidewalk selections made by district councilors would begin, as
well as project delays due to utility holds with the Assistant Commissioner of Engineering,
Commissioner of Transportation and Mobility, and Commissioner of Public Works.
Chairperson Councilor Rivera recognized Councilor Ojeda, who discussed the street and sidewalk
resurfacing process, whether there have been changes to the inspection process for street
construction projects and challenges related to construction work done by utility companies with
the Commissioner of Transportation and Mobility and the Assistant Commissioner of Public
Works.
Chairperson Councilor Economou discussed issues with the process used to inspect contracted
work, the ability to hold said contractors accountable for the quality of the work performed,
communication methods used to inform residents of scheduled roadwork, and the process used by
residents to obtain specific project information with accompanying contact information to file a
complaint/express concerns with Councilor Ojeda and Commissioner of Public Works.
Chairperson Councilor Rivera recognized Councilor Bilotta, who highlighted the importance of
holding contractors to higher standards and a timeline of roads in each district identified to be
treated with crack seal with the Assistant Commissioner of Engineering and Commissioner of
Public Works.
Chairperson Councilor Economou then recognized the following Speakers:
1. Maria Kaplanes, Worcester resident, spoke neither in favor of nor opposed to the item
2. Fred Nathan, Worcester resident, spoke neither in favor of nor opposed to the item
Chairperson Councilor Rivera discussed the poor sidewalk conditions, construction status, and
drainage issues on Coombs Rd. with Speaker #1, Traffic and Parking Committee Member
Councilor Ojeda, and Commissioner of Public Works.
Chairperson Councilor Economou discussed the benefits and positive progress made since
establishing the city’s pavement management program and highlighted challenges associated with
inflation with the Assistant Commissioner of Engineering.
Chairperson Councilor Mitra recognized Councilor Mitra, who highlighted the importance of
improving processes in the city to create a more inviting community for residents and business
owners, the feasibility of resurfacing major arteries in the city in the next three (3) to four (4)
years, the process used for District Councilors to select streets/sidewalks for resurfacing, and the
process used to allocate funds for each street/sidewalk selected for resurfacing with the
Commissioner of Public Works and Principal for Apex Companies.
Chairperson Councilor Economou discussed the benefits of establishing a pavement preservation
program, highlighted the notion that significant pavement preservation results takes time, and the
impact of an insufficient pavement preservation program with the Commissioner of
Transportation and Mobility.
Chairperson Councilor Rivera discussed how many streets in the city fell into each PCI
classification, the process used to fund the city’s various pavement projects, and the number of
streets in the city’s road network with the Commissioner of Transportation and Mobility and
Principal for Apex Companies.
Chairperson Councilor Economou recognized Councilor Fresolo, who spoke concerning Fiscal
Year 2027 (FY27) resurfacing budget allocations, Massachusetts Department of Transportation
(MassDOT) funding opportunities associated with resurfacing Grafton St., and why twenty-one
percent (21%) of the city’s streets classified as being in poor condition with the Commissioner of
Transportation and Mobility, Assistant Commissioner of Engineering, and Commissioner of
Public Works.
Chairperson Councilor Economou discussed inspecting failed chip seal treatments with the
Commissioner of Public Works.
Chairperson Councilor Economou moved for a roll call vote to recommend the item be held.
Recommend Hold on a roll call vote of 3 Yeas and 0 Nays
Traffic and Parking Committee version (same meeting; differs in the attendance list and minutes approval)
CITY OF WORCESTER
TRAFFIC AND PARKING COMMITTEE
Tuesday, August 25, 2026
Esther Howland (South) Chamber
Convened: 5:01 P.M.
Adjourned: 7:00 P.M.
MAYOR
Joseph M. Petty
COMMITTEE MEMBERS CLERK OF THE CITY COUNCIL
Chairperson Jose A Rivera Nikolin Vangjeli
Vice Chairperson Luis A Ojeda
Councilor Robert A Bilotta
www.worcesterma.gov
City Hall - 455 Main Street Worcester, Massachusetts
Present Were: Chairperson Councilor Jose A. Rivera
Councilor Luis A. Ojeda
Councilor Robert A. Bilotta, who participated in the meeting
remotely
Also: Chairperson Councilor Tony Economou
Councilor Satya B. Mitra, who arrived at 5:03 p.m.
Councilor John P. Fresolo
Commissioner of Public Works John J. Westerling
Assistant Commissioner of Engineering Jay Mello
Commissioner of Transportation and Mobility Stephen S.
Rolle
Assistant Director of Transportation and Mobility Todd
Kirranne
Principal for Apex Companies Francis Marinaccio
Deputy City Clerk Stephen A.J. Pottle, clerk
1. Virtual Attendee Call-In Information
a. Pursuant to Chapter 20 of the Acts of 2021 and in order to ensure active, public
engagement, the City of Worcester currently allows for both in-person and remote
participation at all City Council and Standing Committee meetings. To partake in the
meeting, you may attend the meeting in-person within the meeting location, follow the
below link to join via Zoom or dial the direct line as indicated. If you join a Zoom
meeting by dialing in with a phone number, you can raise your hand by dialing *9.
Public Works Committee and Traffic and Parking Committee Zoom Link:
https://worcesterma.zoomgov.com/j/1615992759
Public Works Committee and Traffic and Parking Committee Zoom Phone Number: +1
646 828 7666
Public Works Committee and Traffic and Parking Committee Zoom Access Code: 161
599 2759
2. Approval of the Minutes
a. Order - That the City Council Standing Committee of Traffic and Parking hereby
approves the minutes of the Traffic and Parking Committee meeting of August 19, 2026.
Chairperson Councilor Rivera read the item and moved for a roll call vote to adopt the item.
Order adopted on a roll call vote of 3 Yeas and 0 Nays
3. Miscellaneous Item
a. Order of Councilor Tony Economou - Request Standing Committee on Public Works
meet jointly with the Standing Committee on Traffic and Parking for the purpose of
reviewing and discussing the city’s strategic pavement management plan. Further,
request Commissioner of Public Works and Commissioner of Transportation and
Mobility attend the joint committee meeting to present the city’s 2025 Pavement
Management, prepared by Apex Companies, LLC and Cyvl.ai. (see attached).
# 12m CC July 21, 2026
Chairperson Councilor Economou read the item and recognized the Commissioner of Public
Works, who provided an overview of the item, including how the Department of Transportation
and Mobility and Department of Public Works collaborate for the city’s pavement management
plan.
Chairperson Councilor Rivera recognized the Commissioner of Transportation and Mobility and
the Assistant Commissioner of Public Works, who provided a presentation relative to the city’s
street construction and pavement management program. Said presentation included information
concerning the importance of pavement preservation, advanced and flexible project planning and
project selections based on pavement condition index (PCI) data, the process relative to developing
the 2025 Pavement Management Plan, an overview of how to classify road PCI with estimated
treatment costs, impacts of pavement preservation on PCI, the importance of performing
routine/preventative maintenance to avoid road deterioration, the requirement for major
rehabilitation with the goal to maintain the majority lowest road classification at eighty (80) PCI,
monetary advantages associated with maintaining acceptable road conditions over a longer period
of time, the 2023 average PCI of the city’s road network rated at 69.6 with the estimated cost at
$19.4 million annually towards pavement management to fix the worst classified roads first,
considerations to inflation since 2023 with an estimated thirty percent (30%) increase for
pavement management supplies and labor, the 2023 estimated cost at $16.2 million annually
towards pavement management by following a balanced pavement preservation program, and
routine maintenance options to maintain roads at eighty (80) to ninety (90) PCI such as crack seal,
fog seal, and permanent patch methods.
Chairperson Councilor Economou recognized Councilor Fresolo, who discussed the whether the
permanent long patch program addresses issues related to manholes with the Assistant
Commissioner of Public Works.
Chairperson Councilor Rivera recognized Councilor Ojeda, who discussed concerns related to the
chip seal treatment method, feasible alternative treatment options in lieu of chip seal, best
practices for using chip seal, benefits to using the cape seal treatment method, cost differentials
between chip and cape seal methods, and subsequent treatment limitations after using the cape
seal and microsurfacing methods with the Assistant Commissioner of Engineering and
Commissioner of Transportation and Mobility.
Chairperson Councilor Rivera recognized Councilor Bilotta, who discussed concerns related to
excess chips impacting stormwater infrastructure, issues related to hot in place recycling
treatment, cold in place recycling and mill and overlay treatment methods with the Assistant
Commissioner of Public Works.
Chairperson Councilor Economou discussed the feasibility of cape sealing and microsurfacing
roadways that did not withstand chip seal with the Assistant Commissioner of Engineering.
Chairperson Councilor Rivera recognized Councilor Ojeda, who discussed pavement management
budget allocations available for piloting cape seal treatment methods with the Assistant
Commissioner of Engineering.
Chairperson Councilor Economou recognized Councilor Fresolo, who spoke concerning when the
projects associated with street and sidewalk selections made by district councilors would begin, as
well as project delays due to utility holds with the Assistant Commissioner of Engineering,
Commissioner of Transportation and Mobility, and Commissioner of Public Works.
Chairperson Councilor Rivera recognized Councilor Ojeda, who discussed the street and sidewalk
resurfacing process, whether there have been changes to the inspection process for street
construction projects and challenges related to construction work done by utility companies with
the Commissioner of Transportation and Mobility and the Assistant Commissioner of Public
Works.
Chairperson Councilor Economou discussed issues with the process used to inspect contracted
work, the ability to hold said contractors accountable for the quality of the work performed,
communication methods used to inform residents of scheduled roadwork, and the process used by
residents to obtain specific project information with accompanying contact information to file a
complaint/express concerns with Councilor Ojeda and Commissioner of Public Works.
Chairperson Councilor Rivera recognized Councilor Bilotta, who highlighted the importance of
holding contractors to higher standards and a timeline of roads in each district identified to be
treated with crack seal with the Assistant Commissioner of Engineering and Commissioner of
Public Works.
Chairperson Councilor Economou then recognized the following Speakers:
1. Maria Kaplanes, Worcester resident, spoke neither in favor of nor opposed to the item
2. Fred Nathan, Worcester resident, spoke neither in favor of nor opposed to the item
Chairperson Councilor Rivera discussed the poor sidewalk conditions, construction status, and
drainage issues on Coombs Rd. with Speaker #1, Traffic and Parking Committee Member
Councilor Ojeda, and Commissioner of Public Works.
Chairperson Councilor Economou discussed the benefits and positive progress made since
establishing the city’s pavement management program and highlighted challenges associated with
inflation with the Assistant Commissioner of Engineering.
Chairperson Councilor Mitra recognized Councilor Mitra, who highlighted the importance of
improving processes in the city to create a more inviting community for residents and business
owners, the feasibility of resurfacing major arteries in the city in the next three (3) to four (4)
years, the process used for District Councilors to select streets/sidewalks for resurfacing, and the
process used to allocate funds for each street/sidewalk selected for resurfacing with the
Commissioner of Public Works and Principal for Apex Companies.
Chairperson Councilor Economou discussed the benefits of establishing a pavement preservation
program, highlighted the notion that significant pavement preservation results takes time, and the
impact of an insufficient pavement preservation program with the Commissioner of
Transportation and Mobility.
Chairperson Councilor Rivera discussed how many streets in the city fell into each PCI
classification, the process used to fund the city’s various pavement projects, and the number of
streets in the city’s road network with the Commissioner of Transportation and Mobility and
Principal for Apex Companies.
Chairperson Councilor Economou recognized Councilor Fresolo, who spoke concerning Fiscal
Year 2027 (FY27) resurfacing budget allocations, Massachusetts Department of Transportation
(MassDOT) funding opportunities associated with resurfacing Grafton St., and why twenty-one
percent (21%) of the city’s streets classified as being in poor condition with the Commissioner of
Transportation and Mobility, Assistant Commissioner of Engineering, and Commissioner of
Public Works.
Chairperson Councilor Economou discussed inspecting failed chip seal treatments with the
Commissioner of Public Works.
Chairperson Councilor Economou moved for a roll call vote to recommend the item be held.
Recommend Hold on a roll call vote of 3 Yeas and 0 Nays
Sources
- Video: https://youtube.com/watch?v=iqIwWtE5Qcw
- Minutes: https://worcesterma.primegov.com/Public/CompiledDocument?meetingTemplateId=75450&compileOutputType=1
Video
Transcript
Auto-generated YouTube captions; names and terms are likely misheard.
Transcript
0:05Good evening everybody. Uh welcome to
0:07our joint meeting this evening. Um
0:12public works subcommittee
0:14and
0:16traffic and parking subcommittee.
0:18Um I'll introduce my members of my
0:21committee and then I'll turn it over to
0:24um Council Rivera for his committee. Uh
0:29to my right is councelor District 3
0:31council John Fazolo and uh at large
0:35counselor Satcha Mitra should be here at
0:39any moment.
0:42I'll turn it over to councelor Rivera.
0:44>> Oh, thank you. Um I have we have uh
0:47District 2 councelor Robert Vad online.
0:49I got District 4 city councelor Louis
0:51O'A here. We also have online with us uh
0:55um assistant director Todd Karine. Um,
0:58Department of Transition Mobility, uh,
1:00Commissioner, uh, um, Stephen Raleigh
1:03and also Frank Marini, Marinichio, Apex
1:07Company. Did I say it right? Marinacio.
1:11Thank you. No problem. Close enough. All
1:13right.
1:14>> And from here we have Commissioner of
1:17Public Works, Commissioner Wessling, and
1:19Assistant Commissioner J. Melo. Thank
1:22you. Um,
1:26yeah.
1:29Approval of the minutes.
1:32Order that the city council standing
1:34committee of public works hereby
1:35approves the minutes of the public works
1:36subcommittee on July 24th, 2026.
1:43>> Councilors Friso,
1:48>> yes.
1:50>> Mitra,
1:51>> yes.
1:52>> And chairperson, councelor econom.
1:54>> Yes. Also approve amendments for traffic
1:57and parking. Um, city council standing
1:59committee of traffic and parking hereby
2:01approves a minutes of traffic and
2:02parking committee meeting of August
2:0419th, 2026.
2:06Roll call.
2:07>> Councilors Bada.
2:09>> Yes.
2:09>> Oh,
2:10>> yes. And chairperson councelor Rivera.
2:12>> Yes.
2:14>> Thank you, Mr. Clerk. if you would just
2:15go over the virtual attendee call-in
2:17information. And I don't know, maybe you
2:20can just just give a brief overview of
2:24how this
2:26setup is working for the the public just
2:29so they're aware of it.
2:31>> Absolutely, Mr. Chairman. Thank you. So,
2:32item 1A, virtual attendee call
2:35information. Pursuant to chapter 20 of
2:36the acts of 2021, in order to ensure
2:39active public engagement, the city of
2:40Wester currently allows for both
2:41inperson and remote participation at all
2:44of its meetings. To partake in the
2:45meeting, you can either come in in
2:46person or you can join via Zoom. The
2:48Zoom link is listed on the agenda on the
2:50municipal calendar of the city's
2:51website. And there's also a phone number
2:53for this meeting. The meeting is
2:5616468287666
2:58and the access code tonight is
3:00161-599-2759.
3:04And thank you again counselor for the
3:06opportunity to kind of explain this. So
3:08right now both the public works
3:10committee and the traffic and parking
3:12committee have opened their own
3:14meetings. There are two agendas but it
3:16is for you know one general discussion.
3:18The item before you, item 3A, was
3:21referred to both traffic and parking and
3:24public works committee at the July 21st
3:26city council meeting um to allow for
3:28this kind of robust discussion that
3:30impacts both of the committees as it was
3:33determined by the city council. Um
3:36essentially, you are both running your
3:38own meetings simultaneously and at the
3:40same time, and it allows for this
3:42further discussion to take place. So,
3:45um, with that, you're welcome to kind of
3:47take that item and, um, hold any
3:49discussion. You would each make your own
3:52motion whether you'd like to hold the
3:53item or file the item, um, at your own
3:57discretion, so each committee can do
3:59what they want with the item ultimately
4:02once they're complete with it.
4:04>> Thank you, Mr. Clark.
4:05>> Thank you.
4:07Um,
4:09so do do each of us need to read the
4:12item in our own committees or is just
4:16one reading of the item?
4:18>> Mr. Chair, I would say one one reading
4:20would suffice. It's the same exact item.
4:22It just was referred to both committees.
4:24>> Just want to make sure. Item 3A, order
4:27of council Tony Econom requests the
4:29standing committee on public works meet
4:32jointly with the standing committee on
4:33traffic and parking for the purpose of
4:35reviewing [clears throat] and discussing
4:37the city's strategic pavement management
4:39plan. Further request Commissioner of
4:41Public Works and Commissioner of
4:42Transportation and Mobility attend the
4:44joint committee meeting to present the
4:47city's 2025 pavement management
4:51prepared by Apex Companies LLC
4:54and
4:56I couldn't tell you how to pronounce it.
4:58Um, CYVL.ai.
5:04That's how that's how I'll deal with
5:06that. So, thank you. Um is it who would
5:10like to open?
5:13Commissioner Westerling
5:15>> through the chairs. I want to thank both
5:18of the committees coming together this
5:20evening. I know that the counselor's
5:22time is uh very precious and uh this is
5:26this is an important discussion that
5:28we're having this evening because we
5:30want to have an informed policy decision
5:33as we move forward. I know that many of
5:36you, if not all of you, have been uh
5:39briefed on the pavement management plan
5:41that was uh that was produced last year
5:44by the Department of Transportation and
5:45Mobility. But we wanted to give you
5:48again an overview of that pavement
5:50management plan along with the uh
5:53potential pavement preservation
5:55techniques that are identified in that
5:56plan as well as the lessons learned from
5:59last year's pavement preservation work,
6:02namely the rubber chip. Uh so
6:05Commissioner Raleigh has put together a
6:07presentation that we're going to walk
6:08through talks about the again the
6:10pavement management program the
6:12techniques we're going to give you the
6:14good the bad and the ugly so that uh we
6:18can have again an informed policy
6:20decision with that.
6:24Yeah, thank you through the through the
6:25chair. Um AJ, we have a slideshow if
6:28you're able to to share that. And I'll
6:31echo Commissioner Westerling's uh words.
6:34I want to thank the committee for
6:35hosting this conversation.
6:38Um
6:44thank you counselor.
6:52So, we want to take the opportunity to
6:54review the pavement management program
6:56and talk about some of the more
6:57important aspects of that program.
7:00>> Uh AJ, oh, you're already there. You're
7:02ahead of me.
7:04One of the things you'll you'll see in
7:06our presentation and and we're going to
7:08actually go back and forth quite a bit
7:10here. I think we'll treat this like a
7:11fairly informal conversation because I
7:14know that we all have different um
7:16things we'd like to contribute to it.
7:18Um, but you'll see an emphasis in
7:21particular on pavement preservation. So,
7:23those are techniques that are intended
7:26to uh really extend the life of the
7:29roadway and get the maximum lifespan
7:31that you can out of a roadway in uh in
7:34good condition.
7:36As we do this, we want to walk through
7:38just a quick overview of the different
7:40types of treatments that the city is
7:42considering, both those that we've
7:45employed in recent years, uh, as well as
7:48some others that we haven't yet, but
7:50talk about some of the pros and cons of
7:52those and some of their characteristics
7:54and when they're appropriate. Uh and
7:57then really just to focus on, you know,
8:01to kind of wrap this up on three
8:02aspects, which is those pavement
8:04preservation techniques that I I
8:06mentioned, we're going to want to
8:07emphasize the importance of having
8:10advanced planning and flexibility as
8:13we're running uh a pavement management
8:15program. And then relying on what's
8:17known as the pavement condition index or
8:19PCI. You've pro you're probably familiar
8:21with that term. You'll see it a lot in
8:23this presentation. that is a
8:26standardized
8:28uh way of measuring the structural
8:31integrity and condition of roadway
8:33surfaces that's used across the nation.
8:36Next slide please.
8:40So the pavement management plan itself
8:43was officially released in January of of
8:4625. So uh about a year and a half ago,
8:49but we actually started working on that
8:51plan in uh late 2023, early 24. Uh, and
8:56it was a collaborative effort between
8:58DTM, who was a new department at that
8:59time, the Department of Public Works,
9:02and we worked with a consulting team
9:03that was led by Apex Companies, and and
9:05Frank is here um, representing Apex
9:08today and has a lot of great knowledge
9:10that he's uh, able to share with us um,
9:13and that went into the development of
9:15this plan.
9:17So just briefly when we use the term
9:19pavement management what we're really
9:20talking about is an intentional and
9:23systematic process of assessing the
9:26pavement condition of our roadways and
9:29then prioritizing
9:31how we apply everything from pres
9:34preservation treatments to maintenance
9:36to full rehabilitation of roadways in
9:39the way that's most costeffective and
9:41makes the best use of resources. So,
9:43what we're really trying to do is
9:44stretch our dollars as much as we can
9:46and keep as much of that roadway network
9:49in good usable condition.
9:53Next slide, please.
9:55So, you obviously aren't going to be
9:57able to pick out the details here, but
9:58just wanted to give you an overview of
10:00the tool that was built as this program
10:02was was developed. So this is a a
10:05GISbased
10:07um mapping system that has every block
10:10of roadway in the city, every block of
10:12public roadway. Um and the platform is
10:15available to DTM staff, DPW staff. We
10:19both regularly use it. The consultant um
10:22helps us with some of the updates as
10:24well. And as you can see, it provides
10:27information on the pavement condition
10:29for every block of public street in the
10:32city. And that's that's colorcoded. Um,
10:34so in this case, green means pavement
10:37condition is fantastic. It's between 90
10:40and 100. That's basically a street
10:42that's just been reconstructed or
10:45resurfaced within the last few years
10:46most likely. And then it works its way
10:48down to yellow, orange, and red are
10:50those streets that are uh that are
10:53reaching the point of failing. I do want
10:56to note this information is also
10:58available online to the public. So, one
11:00of the cool things about this tool is
11:01there's a a public interfacing version.
11:04The color scheme is going to be a little
11:05bit different because we converted it to
11:07meet accessibility standards and you
11:10can't really use reds and greens at the
11:11same time when you do that. But for you
11:14know the internal facing tool, we're
11:15still using the color scheme that you
11:17see here. Just wanted to explain that in
11:19case there's any confusion. So, in
11:21addition to having this map, we have all
11:24sorts of cool tools that are rolled up
11:26into it. We can generate reports
11:28automatically that give us a list of
11:30street segments by pavement condition,
11:33by council district, um by potential
11:37treatment types, um all sorts of things.
11:41Next slide, please.
11:43And then the other aspect is that you
11:46can click on any link, any uh block in
11:50the city and see what the conditions are
11:52for that. So, it'll show you the name of
11:54the street, where it's located, the
11:57roadway surface material, how long it
11:59is, the approximate width of the street,
12:02then of course, most importantly, the
12:04pavement condition.
12:08Any any questions so far?
12:12All righty. Next slide, please.
12:15when I refer to PCI or pavement
12:17condition index, this is the uh the
12:19table that outlines what that range is.
12:23So we again we start at 90 to 100 that
12:25represents good condition. Um and those
12:28are roadways that really don't require
12:29any sort of treatment at all. Not even
12:31routine maintenance at that point. They
12:33are essentially brand new or or close to
12:36brand new. Next category down about 80
12:39to 90. That's satisfactory condition.
12:42That's where we start looking at what we
12:44call routine maintenance and um
12:47assistant commissioner Melo is going to
12:49get into some of these options that
12:50we're using and considering using. Um
12:53but the idea here is that these are very
12:56cost-effective treatments at this point.
12:58So by spending just a little bit of
13:00money, you can greatly preserve the the
13:02length or the lifespan of roadways in
13:05this category.
13:07Next step down 65 to 80. Those are roads
13:09that are in fair condition.
13:12This is getting to the point where
13:13you're going to start maybe hearing some
13:15complaints from residents or people are
13:17going to start noticing that um you know
13:19the roadway can visibly noticing the
13:21roadway surface is deter deteriorating.
13:25Here we look at targeting them with
13:26preventative maintenance. So, these
13:28become more intensive treatments, but as
13:30you can see, looking at the typical
13:32costs, and I'll caveat that by saying
13:34these are pretty broad ranges here, but
13:37just to give you an idea of what the
13:39treatments cost, it's still
13:40significantly less expensive than full
13:43reconstruction of the roadway, which we
13:45need to do as as the roadways further
13:47degrade. And then finally, the last two
13:49categories, 50 to 65 and and 0 to 50,
13:52those are in poor or very poor uh
13:55condition. At this point, the roadway,
13:57you don't have any choice. You have to
13:59do major rehabilitation to the roadway.
14:01Um, which is obviously a much more
14:03intensive process and a much costlier
14:06process.
14:07>> Commissioner, excuse me. Um, real quick,
14:10I just ask a question. Either e either
14:13you or commissioner is looking at the
14:14answer. out of uh all the streets
14:17because I see you have it colorcoded and
14:19the whole um di diagram and everything.
14:23How many streets in the city of Whistler
14:25are we aware of are in the major
14:27rehabilitation area? Do you have a
14:30number? Do we have a number?
14:31>> Yeah, Mr. Chair, we do. We're actually
14:32we have a slide near the end that'll uh
14:34give us a a preview of that. So,
14:36>> do your thing.
14:40>> I'm going to go ahead and turn it over
14:41to Commissioner
14:42>> Malo.
14:43>> Thank you, Commissioner Ry. So uh AJ
14:46could we get the next slide please?
14:48Thank you. So this figure here shows the
14:51impact of pavement preservation on PCI
14:54rating for a road. So when a road is
14:56paved we give it a 98. That's a fresh
14:58brand new road. That's up all the way on
15:00the left top here. Then excellent. So
15:02over about the first 15 years or so 75%
15:05of the anticipated age of the roadway
15:08you see about a 40% quality uh decline.
15:11So that's where your cracks you're
15:13unraveling. you're starting some
15:14delamination things of the like. Um the
15:17second 40% quality drop uh occurs in a
15:20much shorter period of time. So it
15:21occurs in about 10% or so of the road's
15:24life. Um and that happens very rapidly.
15:26So the objective is to make it so that
15:29we never really let a road get below the
15:32fair line. Um and you can kind of see
15:34what would happen. It's a little bit
15:35higher than uh generally you can keep a
15:38road with the the spiky thing up at the
15:40top there, the shark fin if you will.
15:42Um, but the next slide, and we're not
15:44quite ready for that yet, but um, we'll
15:46kind of get in some some additional
15:48information on that. You can see here if
15:50we spend a dollar or two per, you know,
15:54uh, foot or lane mile on the road, how
15:57much further that goes when the road is
15:58in good condition versus when it
16:00degrades. As soon as we get below that
16:02fair point, the amount of money that we
16:04need to spend on the road goes up by a
16:05factor of 10, 15, or 20. So it's very
16:08important that we capture our roads in
16:10that upper band and keep them there. Uh
16:12AJ, next slide please.
16:15[clears throat]
16:19So uh this particular image here kind of
16:22gets at what I was just speaking about.
16:24So this shows uh the lifespan of a road
16:27if instead of allowing the road to
16:29degrade all the way to a point in which
16:31significant or major rehabilitation was
16:34required, we performed routine
16:36maintenance on the road. So you can kind
16:37of see the lines dip down to a circle
16:40and then they get kicked back up and
16:41they go down to a circle and get kicked
16:43back up. That represents regular routine
16:45or preventative maintenance on the road.
16:47So the road naturally declines in
16:49quality over time. A processes are
16:51performed to the road that is very
16:53cost-effective and restores that quality
16:55and we keep uh essentially I used the
16:58term keepyuppy before but essentially
17:00keep pushing the balloon that is the
17:02quality of the road up in the air. Um
17:04there is a very informative line on this
17:06figure here. It's a pink line. It says
17:07the complaint line. So that's that 65
17:09PSI that Commissioner Raleigh had spoke
17:11about. So really our objective is to
17:14constantly keep that the condition of
17:16the roads above that line. Ideally, if
17:18we're doing things holistically uh and
17:22efficiently, we can uh you can kind of
17:24see there's this line almost averages
17:26around 80, right? So a PCI 80 is a
17:30relative target for where we would like
17:33the majority of the roads in the city to
17:34fall. And with preventative and regular
17:36maintenance, we should be able to
17:38accomplish that. Uh, and now AJ, if you
17:40don't mind the next slide.
17:43This image right here is of a road that
17:45is PCI 80. Uh, so you can see the road
17:48is in generally great condition. Curb is
17:51nice and straight. There's plenty of
17:52reveal. There's still a nice crown on
17:54the roadway. Um, any sort of cracking in
17:56the road that has occurred has been
17:58cracksealed. There is some patching. Uh,
18:00so not a perfect road, not a brand new
18:03road, but definitely a very high quality
18:05road that will give you a nice ride and
18:07won't be jarring your car. So that's
18:08that's what an 80 represents. And with
18:11prop or regular application of
18:13preventative maintenance, this is what
18:15we should be able to achieve. Uh, AJ,
18:17next slide, please.
18:20So this particular slide is informative
18:23as to what happens if you perform
18:25pavement preservation processes and what
18:27what happens if you don't. So these uh
18:31particular roads, if you see there's
18:32actually a joint that kind of straddles
18:34the right side of that yellow line. The
18:37that's actually the town line in between
18:38these two municipalities. So these two
18:41municipalities are in Connecticut. So
18:43you know regionally local and in 2004
18:46they teamed up and performed a 2-in mill
18:48and overlay. So the whole road received
18:50the same process in 2004.
18:53In 2010, community on the right
18:56performed a crack seal in conventional
18:58micro. Um, so it's, you know, the black
19:01lines we saw in the last picture plus a
19:03thin uh lift of a cementous material
19:05over the road to reestablish the riding
19:07surface.
19:09Community on the left decided not to
19:11perform that treatment. So this picture
19:13was taken eight years following the
19:15crack seal and conventional micro and
19:17you can see the impact of pavement
19:19preservation versus not. So the roadway
19:22on the right hand side still in great
19:25condition after eight years. Maybe some
19:26minor cracking that you can kind of see
19:28along the road, but nothing that's
19:30anything deeper than superficial or
19:32impacting the actual structural uh
19:35integrity of the road. the road on the
19:37lefth hand side, that road is is fairly
19:39blown out and now that has reached the
19:41the point that we need either minor or
19:43major rehabilitation and the dollars
19:45spent per lane mile on that road are a
19:48factor of 10 if not higher than the road
19:50on the right. So this is very
19:53illustrative as to you know the the
19:55value and importance of pavement
19:57preservation. Mr. Podle, next slide,
19:59please.
20:02>> Yeah, and Mr. Mr. Chair, I'm going to
20:03jump in for just one slide here before I
20:05hand it back over to Assistant
20:07Commissioner Melo. Um, so I think the
20:09last slide, you know, depicted one of
20:11the big advantages of a pavement
20:12management program that has these
20:14varying levels of treatments, which is
20:16that you're keeping your road in
20:18acceptable condition for a much longer
20:20time. So instead of uh instead of
20:22drivers suffering with the roadway on
20:24the left where it was degraded and
20:27that's not going to get replaced for
20:29some time because the community has to
20:31find the the money necessary to do it.
20:33They're dealing with a roadway in very
20:35poor condition for a long time. Through
20:37the pavement preservation, the community
20:38on the right was able to keep that
20:40roadway in a relatively good condition
20:43over the longer term. So that's one of
20:45the key benefits of a pavement
20:46management program. The other one is
20:49frankly financial. Um, and that's
20:51because what we're doing in a pavement
20:53management program is we're spending the
20:55available resources as strategically as
20:57possible. So these these two tables are
20:59actually out of the pavement management
21:02uh plan itself.
21:04When that plan um it was released in
21:072025, but we actually started working on
21:09it in 2023. So in 2023, it estimated
21:12that the total backlog of of
21:16street
21:18um resurfacing and maintenance work at
21:20that time was $288 million. Now that's
21:23sort of a fictitious number, right? No
21:25community can ever go out and fix all
21:26the streets at once, but it's helpful in
21:29helping people, I think, understand the
21:31magnitude of the challenge that we're
21:33facing here. And it's a a challenge that
21:35communities all across the country face.
21:38um I think made worse here because of
21:40some of the winter um maintenance
21:43impacts that that we bear and that the
21:45roads suffer from. So, it's a
21:48significant issue. On the left was is a
21:51graph showing what happens if you don't
21:54really have a pavement management
21:55program in place and you're doing what
21:58most communities before they have a
21:59pavement management program do, which is
22:02you're just trying to fix those worst
22:04roads as you get money available to do
22:06it.
22:07Um, at the time we did the full scan of
22:10the street network, our average PCI uh
22:14was rated at 69.6.
22:17Um, and you can see in that table on the
22:19left. If we followed that approach at
22:22that time, if we wanted to just maintain
22:25the streets at the level they were,
22:27which that's a little bit lower than
22:29we'd like to see on a citywide basis, we
22:31were looking at about $19.4 million per
22:35year. So each and every year spending
22:36$19.4 million um on the the pavement
22:41management program.
22:44Just a a reminder that's in 2023.
22:47There's been, you know, considerable
22:48inflation since then, but more so than
22:51just inflation, we're seeing the cost of
22:53this type of work increasing at a faster
22:56rate. So in talking with with Frank,
22:58some of the data both regionally and
23:00nationally is showing that these costs
23:04are probably in the order of 30% higher
23:06now just in that 3 to four year period.
23:10So if we wanted to using that approach
23:12at the time, if we wanted to um and I
23:15should point out $19.4 million is more
23:17than the city has ever had available to
23:20put into our street resurfacing program
23:22historically. I think there was one year
23:24where we came close to finding the those
23:26kinds of resources as a a one-year
23:29spend, but at the point this plan was
23:31developed, um, you know, we were
23:33typically down in that 12 to$13 million
23:36range. So, you can see if you're
23:38spending 12 or $13 million and you're
23:40spending that amount of money, that's
23:42that's the wrong line. That line falls
23:44off pretty quickly. And in a fairly
23:46short period of time, this was
23:47forecasting that we were going to see
23:49our PCI drop to somewhere around 50. So
23:52that's that's a bad outcome.
23:54Uh the graph on the right is
23:58taking the pavement management plan as
24:01proposed which included a heavy emphasis
24:03in these pavement preservation
24:05techniques
24:07um and then projecting that out forward
24:10over a similar uh time span. So what
24:12that showed is that for the amount we
24:15had been spending historically, we could
24:17keep the PCI at about about the same
24:20level if we spent that amount every
24:23single year um and constructed that
24:25amount of work every year. It also
24:29brings into range the possibility of
24:31actually improving our our street
24:32system. I don't think any of us are
24:34happy with the the PCI condition of the
24:36the street network. It's you know we
24:39want to see that improved over where it
24:40is. So, a pavement management program
24:44starts to make that a possibility, a
24:45real a real possibility. So, um at that
24:48time, somewhere around $16 million
24:51following the pavement management um
24:53prescribed approach was forecast to
24:55increase um the PCI somewhere up closer
24:58to 80. So that's getting close to the
25:00point that that Jay mentioned is um you
25:03know that's a really high level target
25:06for a citywide measure that that in
25:10general you find the public's going to
25:11be quite satisfied with. At the time
25:14that was looking at a $16 million
25:16investment a year, you know, now that's
25:18probably somewhere around a $20 million
25:20investment a year just to kind of
25:21ballpark that.
25:26>> Thank you, Commissioner Raleigh. Uh AJ,
25:28if you wouldn't mind. Next slide,
25:29please.
25:31So, uh, what we're going to go into now
25:33is kind of some of the more finer
25:35details or fine details, I should say,
25:37over, uh, or concerning these various
25:39maintenance, uh, options. I apologize in
25:42advance if I bore you folks. So, uh,
25:45these three things right here are what
25:47we consider our primary options for
25:49routine maintenance. Uh, crack seal, I
25:51think this is one everyone is familiar
25:52with. Those are the big squiggly lines
25:54down the road. We take a rubber modified
25:57product uh an asphalt liquid product and
26:00inject it into cracks. And what that
26:01does is it prevents water from intruding
26:03into the crack and it prevents the
26:04freeze thaw cycle from uh further
26:06degrading the roadway. This is generally
26:08the first treatment process done on any
26:11road. We perform this on all roads uh at
26:15age five. So as soon as a road hits five
26:17years, it's automatically on this list.
26:18We go out and we do this process because
26:20it's generally as the industry has found
26:22when that needs to be performed.
26:24Fog seal uh is a process in which um
26:29excuse me as I try to make this painful.
26:32Um a liquid is applied to a roadway
26:35which restores some of the asphaltic
26:37proteins um in the road. So essentially
26:40as you see a road uh go from black to
26:43gray over time those are different
26:45molecules in the asphalt degrading and
26:47this process adds those back into the
26:49roadway and essentially rejuvenates it.
26:52Um as uh Commissioner Westerling had
26:55mentioned uh we're going to talk about
26:57the good and the bad of these processes.
26:58We don't want to leave anything uh not
27:00uncovered. This particular process we
27:02have shied away from due to the uh
27:04application involved with it. Uh so this
27:07generally needs a rather long time to
27:09set up and can leave the road uh tacky.
27:12So we have generally avoided this
27:14process in the city due to the impact
27:16that it would have on mobility. Um and
27:18then the third process we have here is
27:21uh permanent patching. So this is when
27:23we get uh you know something that's like
27:25a significant pothole, a rather large
27:27crack or any sort of defect that really
27:29needs to be cut out and removed from the
27:30road. We go all the way down to the base
27:33pavement course, dig that out and put a
27:34patch in. Um the only issue with
27:37patching anything, right, is you've now
27:38compromised the surface of the asphalt.
27:40So no matter how we seal that, it's
27:42never going to be 100%.
27:46moving into preventative maintenance.
27:47Um, so these are the things that we like
27:49to perform on a road to to play that,
27:52you know, keep the balloon up game, if
27:53you will, where we're keeping our roads
27:55above 65 in that complaint line, trying
27:57to keep them around 80. Uh, so the first
27:59on here is rubber chip seal. Uh, so this
28:02is an application of a liquid asphalt uh
28:05with stone over that and then the stone
28:07is uh worked into the asphalt. Um as we
28:10have observed over the last uh treatment
28:13of this um there are issues with this
28:16well can be issues with this treatment
28:17as well namely the accumulation of loose
28:20aggregate
28:22um this particular treatment is probably
28:25the most cost effective in this whole
28:28menu of options here. So uh recognizing
28:32the significant issues that we faced
28:34with this process over the last season,
28:36DPW, DTM, our consultant and our
28:39industry uh vendor partners are working
28:42to develop our medial plans as to how to
28:45go back and approach this again in
28:47future years u solely based the value um
28:51this provides to the city.
28:52Microsurfacing is another option
28:54available. Um microsurfacing and bonded
28:57wearing course are very similar
28:59processes. So
29:00>> if I could interrupt just a moment.
29:02>> Council Frisa has a question.
29:06>> I apologize through you Mr. Chairman on
29:08this on we're talking long patch
29:11program.
29:11>> Um so this would be slide 12 councelor
29:15permanent patch long and sight specific.
29:19>> Okay. I had a question on the line
29:21permanent long patch. Should I
29:23>> Yeah, go ahead.
29:24>> Ask it. Um
29:27at our last traffic and parking meeting
29:30I attended um many residents on uh Lake
29:34AB came out and spoke on um the manhole
29:40covers sinking
29:42and
29:44heavy truck traffic uh when it hits it
29:47that makes you know the uh the uh noise
29:52and the sound much more alarming. in the
29:55long patch pro program when that is you
29:59know an example of a a manhole cover
30:02sinking do we does that is that
30:06addressed in that program
30:07>> so prior to performing any of these
30:09pavement processes whether it's chip
30:11seal crack seal um long patching what
30:14we'll do is we'll perform immedial work
30:16to the localized pavement so if there's
30:19sunken gate boxes or manhole covers
30:21those are addressed if there's cracking
30:23those that's addressed if there's an
30:24underlying issue that's addressed
30:26because if we don't essentially we're
30:28just painting over an issue. So if there
30:30is something like a sinking manhole
30:33that's going to be in the area we would
30:34look to reset that in concrete.
30:36>> Okay. Thank you. I appreciate that.
30:38Thank you Mr. Chairman.
30:43>> Thank you. So uh microsurfacing and uh
30:46bonded wearing course. So these are very
30:49similar processes. Um both uh in essence
30:52restore the riding surface to the road
30:54by applying a thin layer of either an
30:58asphalt uh mixture in the the uh case of
31:01ultra thin bonding c uh wearing course
31:03or for microsurfacing a cementous based
31:05mixture. Um these are really great at
31:08providing a nice smooth road surface. Um
31:11so if you look at the surface of a ultra
31:13thin bonded wearing course treated road
31:14or a microsurface road it looks very
31:17smooth. The counter to that is that
31:21these treatments are applied very thin.
31:24So under an inch um and because of such
31:28they're prone to surface cracking. Now
31:30both of these processes [clears throat]
31:33include placing a membrane uh under the
31:39[clears throat] uh the surface
31:40treatment. Right? So that's going to
31:41prevent intrusion from water uh through
31:44the surface cracks into the underlying
31:46pavement. So despite the fact that you
31:48do see surface cracking with these
31:50processes, the underlying asphalt has
31:52been um treated and is preserved. But
31:58you know, one of the common uh bits of
32:01feedback that we are received from
32:02municipalities that engage in
32:04microservicing and bonded wearing
32:05courses, hey, you know, this is already
32:08starting to crack after a year or two,
32:09folks. And it's like, well, yes, that is
32:11what is going to happen with that
32:12material. However, the underlying
32:14asphalt is not compromised, nor is the
32:16ride quality. And those cracks can be
32:18addressed by crack sealing as well. Uh,
32:20cape seal is actually a combination
32:23process. So, this particular process is
32:25a rubberized chip seal followed by a
32:27microsurface.
32:28Um, as you could imagine, when you
32:31combine two treatment processes like
32:33this, the cost goes up. So as much as
32:35possible u DTM DPW and our consultants
32:38try to find single application processes
32:41and try to stay away from things like
32:42cape seal which will drive up the cost.
32:47Let's see next slide Mr. Podle. Thank
32:50you. Um [clears throat] so now we're
32:52getting into minor rehab. Um, and these
32:54are the more intensive things that are
32:55really going to take a roadway and
32:58reduce its ability to function as a mode
33:01of transportation and mobility for an
33:02extended period of time. Additionally,
33:05these are much more cost effect uh
33:07costly processes. Right? So, both in
33:09terms of impact to the community and
33:11impact to our budget, it's um a focus of
33:15ours to stay away from letting roads get
33:16to this level so we do not have to apply
33:19these processes. Unfortunately, that is
33:21not, you know, we don't live in a world
33:23where we can stay away from them, so
33:24they are still used in the city. Uh, hot
33:26inplace recycling is an option that has
33:29been utilized in the past. Um, and this
33:31process essentially scarifies the road,
33:34heats it up, and then you take that
33:36recycled material and replace it on the
33:38road. Um, this application, in the
33:41opinion of DPW, I
33:43>> I don't want to interrupt. Yes. Um, do
33:45you prefer if we have questions of that,
33:47do you prefer wait till you're done or
33:50interrupt because we don't want to
33:51interrupt.
33:52>> Council, you guys can feel free to
33:53interrupt.
33:54>> All right, councelor O'Hara has a couple
33:56questions for you. So, thank you, Mr.
33:58Chairman. Sorry, this is two
34:00departments, so I just wanted to make
34:01sure two committees wasn't sure if there
34:03you go and then we come after. But thank
34:04you. Thank you, Council Rivera. Um, just
34:06to circle back real quick on the on the
34:08rubber uh chip seal, microsurfing and
34:11cape seal. Um,
34:14did you mention that
34:17obviously there were some issues with
34:18the with the uh the chip seal? Did you
34:21mention that you guys were that you were
34:24looking into better ways? Uh, in my you
34:28explained it and what were some of the
34:30main major issues with it?
34:32>> Yeah, so I I kind of left it at about a
34:3410,000 foot and I I mentioned that we're
34:36looking at remedial action as kind of a
34:38a partnership, but I can delve a little
34:40bit further into that. So what we found
34:43um through our forensics to be the
34:45primary issue experienced with chip seal
34:47was the accumulation of [clears throat]
34:50excess chip. Um generally in other
34:54communities this isn't as great of an
34:56issue for a number of reasons. Um, the
34:59two biggest ones that stuck out here
35:01were the grade of our streets because we
35:03have significantly steeper slopes than
35:05most other communities and the
35:08volume and extent of street parking. So,
35:12when we performed
35:14uh post application sweepings of these,
35:19the efficiency of that was greatly
35:21reduced by a number of cars parked on
35:23the roadway. um which was then
35:25exacerbated during the winter when cars
35:28are off the roadway um due to threat of
35:31being uh towed during plowing. And at
35:34that point, say you know, you have 20%
35:37of the roadway which might not have been
35:38adequately swept due to parked vehicles.
35:41Well, all that chip that was accumulated
35:43in that which may have been in a
35:45concentrated pile that could have been
35:47easily swept up is now in a concentrated
35:49pile that is easily cast onto everyone's
35:51lawn. Um so we've found that um that
35:57particular bit of the process can be
35:59much better addressed.
36:01Additionally, we're looking at some
36:03items that involve temperature
36:05application. So what we have found was
36:09especially around uh steeper parts of
36:12the roadway, there was some shoving of
36:13the material. And when we went back and
36:16looked at the time of year at which this
36:18was performed, it was particularly hot
36:20like uh approaching 90 or hotter some
36:23days. Um and that actually can go ahead
36:26and have a detrimental effect on the
36:28application of the other way in so much
36:30as it doesn't allow the material to
36:32adequately set up. So um we're in
36:36combination the the four parties
36:37involved here. We're looking at ways to
36:39modify our specifications to account for
36:42those items.
36:43>> Thank you. um to the chair. Um I know
36:46councelor Conwell had mentioned that
36:48people were finding it in in in their
36:49homes and their beds. Um I remember
36:52going down one of the streets in my
36:53district and it looked really nice right
36:56from a distance. Uh but to your point on
36:59the towards the sidewalks there was
37:00those issues where it was really loose.
37:03Um is it more of the installation
37:06process versus coming back and doing the
37:08sweep? Is it more of the installation
37:10process to make sure it is settled in
37:12and and set down much better versus
37:16coming back and sweeping up the loose
37:18ends versus on the edge. And when I mean
37:20on the edge is probably about could be
37:22about a foot out from the sidewalk where
37:25I'm guessing maybe laying it down a
37:28little bit better or what it what what
37:30was the issues? Why couldn't that be
37:31done the same way it is in the middle of
37:33the road? Why isn't it from sidewalk to
37:36sidewalk as smooth as it can be and then
37:38come back around and get the loose
37:40particles?
37:41>> Yep. So there are some limitations for
37:44how close these machines can get, right?
37:46So they're not going to rub right up
37:47against the curb, but they will get very
37:49close, you know, within inches. Um, but
37:51again, most of that accumulation of
37:53material is really due to the post
37:55application sweeping. Um, more material
37:58is cast onto the road during application
38:01than will lie on the road following
38:03compaction. And that's simply due to the
38:05fact that the contractor wants to ensure
38:07that there's a a full application of
38:08stone. In this particular case, it is
38:13the majority opinion of the group that
38:16the cleanup work just wasn't sufficient
38:19and most likely due to, you know, as
38:21we've experienced with snow plowing
38:23issues with parked cars. It is um it
38:26does represent some fair challenges for
38:27us. So, we're working to establish
38:31better guidelines for how we perform
38:32these post application processes.
38:35>> Okay. Lastly, through the chair real
38:36quick, um, you know, there are these
38:39three options or four, but it seems like
38:42the the Cape Seal, um, as it says it's a
38:46it's a mixture of it's it's actually
38:49could be both in a way. Would it just
38:52make more sense? I know costwise, but
38:55seeing that there are some issues with
38:57both of them, would it just make sense
38:58just to go with the cape sale versus
39:02one and then if there's issues, we got
39:04to go back anyways. So to the chair to
39:06the
39:07>> Yep. Thank you, counselor. So um DPW and
39:11DTM are investigating the use of cave
39:13seal this year. So we do have a pilot
39:15program that has gone out to bid that
39:16we'll be uh performing throughout the
39:18city. Um, you know, the big
39:21consideration there is you kind of
39:22nailed it as cost. Um, I think if we had
39:26our way about it, u we would mill and
39:28overlay everything, right? And we
39:29perform none of these pavement treatment
39:31processes because that's going to really
39:33get you a higher quality road.
39:35Unfortunately, just the reality of
39:36funding kind of makes that uh, you know,
39:39a non-starter. Um
39:42there are certain areas where perhaps a
39:45cap seal is a more appropriate treatment
39:46process than a chip seal. Um but
39:50generally in terms of budget, we
39:52wouldn't be able to outright remove
39:54chips seal as a process and go over to
39:56cape seal. It's about a factor of two to
39:58three times more expensive to cape seal
40:00rather than chip seal. So um the cost
40:03does add up. That being said, um you
40:05know, there are potentially some
40:06applications where it's better, say a
40:08higher volume roadway or something with
40:10a steeper grade and know the things that
40:13we're looking at kind of expanding this.
40:15Um so, one of the items before I go back
40:18into the nitty-gritty here with these um
40:21treatment processes that Frank actually
40:23noted when we were speaking earlier is
40:26our pavement management program is
40:28actually the second largest in New
40:30England. I mean, that's obviously by
40:32virtue of the fact that we're the second
40:33largest municipality in New England, but
40:36it is the second largest in New England
40:38outside of Boston. So, um, getting a
40:41program like this to operate at 100%
40:44efficiency and output takes some time
40:47and some growing pains as we've
40:48experienced with the chip seal. But I uh
40:51speaking for the team here, uh you know,
40:55we're all very committed to make sure
40:57this works because this is the tool that
40:58we need to to bring the city's payment
41:00up to where it needs to be.
41:02>> Um not to continue boring you
41:04>> through the chair, if I could just just
41:06add a couple things. So, um I agree,
41:09councelor Roa sort of highlighted the
41:11the big why don't you do that, which is
41:14it costs more. So cape seal costs
41:17probably somewhere around twice the
41:19price of of rubber chip seal. It's still
41:22a significant improvement, you know,
41:24following these four tiers and using
41:26preventative maintenance where it makes
41:28sense as opposed to waiting for
41:29everything to degrade. So it's still
41:31better than that,
41:32>> but you're not stretching your dollar as
41:34as far as you were previously, which
41:35means that we're treating
41:38uh less mileage roadway for the same
41:39same amount of money. Um the second
41:42thing and and Frank just reminded me of
41:44this is that um with a cape seal once um
41:50once you've cape sealed the street
41:53you're limiting the treatments that you
41:54can then apply the next time around. So
41:57that means you have to go to a more
41:58expensive treatment like a millin
42:00overlay or something like that when it
42:02eventually gets to the point where you
42:03need to to do the next thing. Now, all
42:06roadways are going to eventually get
42:07there, but you get there the next step
42:10with a cape seal. So, that's something
42:11to keep in mind as well.
42:13>> Yeah. So, really that's any of those
42:16processes. So, we say with a cape seal.
42:18So, it's cape seal microsurface
42:21ultra thin bonded course kind of um and
42:24that's due to the material, right? So,
42:26with the cape seal and the microsurface,
42:28it's essentially a cement blend you're
42:30putting on the top of the road that's
42:32not going to want asphalt to stick to
42:33it. So we can't go ahead and overlay
42:35that afterward. We either have to
42:36continue to microsurface that once it's
42:38been microsurfaced or we have to mill
42:40off the microsurfacing and then apply
42:42another treatment.
42:44>> May I chair?
42:46>> If I may
42:49um just to commissioner Melo I just had
42:51a question about the the you know
42:52understanding that the chip and seal and
42:54that you know there's been material is
42:57there any concern that the loose
43:00material from chip and seal would impact
43:03are um you know storm water runoff and
43:06and catch basins and and is is it would
43:10it be is there any consideration to that
43:12and could that be like an addition an
43:15additional
43:17cost potentially like just 2DW in
43:20general? So, I was just curious if if is
43:22there any because I'd like to see us
43:24move away from the chip seal just
43:26because it seems like it's a it's a real
43:28challenge to to clean up afterwards and
43:31I I also worry, you know, what how
43:33that's going to impact our storm water
43:36infrastructure as well. Is there any
43:38concern about chip seals getting into,
43:42you know, our our catch basins?
43:44>> Thank you, counselor. So,
43:45[clears throat] um there's a few parts
43:47to this. During the actual application,
43:50the vendor lays down over the catch
43:52basins a a large piece of heavy metal,
43:55right? So the chip uh during its
43:58application does not make it into the
43:59drainage system because of that. Um the
44:02[clears throat] first sweeping of the
44:04chips roads is done immediately. So it's
44:07like the first day or something. So
44:09that's capturing most of the heavy
44:10material. And then [clears throat] over
44:13time um you know at a week and then a
44:15month um the volume of material that's
44:17captured during subsequent sweepings is
44:20considerably less. Um
44:23with respect to the catch basin um I'm
44:28sure
44:29>> no not to be flippant but essentially
44:31the purpose of the catch basin is to
44:33catch things like
44:34>> um chip before they enter the drainage
44:36system. So if some does enter the catch
44:39basin, it's not, you know, you know, the
44:42end of the world or a large deal.
44:44>> Um, and from speaking with uh assistant
44:47commissioner Ghard, I don't understand
44:50there to be a significant increase in
44:52catch basin uh collection. Um, you know,
44:54and that was also assistant well I
44:56should say director Harris over in
44:59sewers. So, um, we haven't seen a
45:02massive uptake where it's like, oh man,
45:05we had an extra 50 yards of material
45:07next year and we're going to see $30,000
45:09in increased cost. So, that thankfully
45:11hasn't translated into anything there.
45:14>> It's good. I, you know, I'm also
45:15concerned about just uh what type of
45:19chemicals and things like that that are
45:20that are, you know, might be leeching
45:22off of those materials that even if
45:25they're not blocking, you know what I
45:26mean, drain sewage uh or catch basins
45:28that water runoff is still containing a
45:31lot of just materials and sediment or or
45:33even chemicals that are part of but I
45:34understand that's something that's
45:36probably a little bit inevitable. Um,
45:39but I appreciate that. I was just
45:41curious how much of an impact that that
45:42might have had. And my follow-up
45:44question is hot in place recycling, I'm
45:46assuming, is more expensive than the
45:48chip seal. Is that correct?
45:50>> Uh yes, councelor that is correct. Um
45:53>> okay.
45:53>> There are some uh and I'll dive back in
45:56here in a in a moment to uh the various
45:58processes. So hot in place recycling. Um
46:02I think that sounds great, right? Uh
46:05because it says it's it's 100% of the
46:07material is recycled on place and it's
46:09environmentally friendly. Um, the fact
46:11of the matter is is that hot inplace
46:13recycling has some pretty significant
46:16drawbacks to it. Um, unsure if anyone
46:19had the opportunity to tour the process
46:22when we were last using it in the city.
46:24Um, but it gives off an awful lot of
46:28heat. So, um, for example, any sort of
46:32nearby or overhanging trees are
46:34typically burned. Um, so the branches
46:37are burned, the you know, smaller trees
46:39can be killed. So it has a lot of
46:41negative impacts on vegetation.
46:44The second bit that we found um with hot
46:46and place recycling is that you are
46:49putting back the same amount of material
46:51that you were taking out which presents
46:53some issues because the process for hot
46:55and place recycling does not leave a
46:57wearing surface afterwards. It leaves a
47:00road surface that is much more akin to a
47:02binder. Um, so from there we have to
47:04surface hot inplace roads and unless we
47:07were to use a process like
47:08microsurfacing or ultra thin bonded
47:10wearing course which we've kind of
47:12already cited the drawbacks from
47:13applying those uh you would then have to
47:17mill the gutter line down the roadway or
47:19mill the you know or mill off some part
47:22of the road that you just recycled in
47:24order to account for adding a wearing
47:26surface. Right? So that's kind of what
47:28we experienced on Mil Street is by the
47:30end of that process having to do the
47:32extra things such as a 4 foot wide
47:34gutterline mill and flaring pavement
47:36out, it actually ended up almost being
47:38as expensive as uh just a standard mill
47:40and overlay. Um [clears throat] the
47:42third uh part that ourselves and our
47:45pavement consultings don't particularly
47:47like about hot and place is that there
47:49is no standard for what compaction is on
47:52a road that has been hot and placed. So,
47:54one of the most important things that we
47:56look at when paving a road is if the
47:58road has been compacted correctly,
48:00because that's what's going to allow the
48:02asphalt to really achieve its full
48:03lifespan. Unfortunately, with this
48:06material, there's no way to determine
48:08what full compaction is because there's
48:09no way to take a sample, take it to a
48:12lab, judge what its compaction is prior
48:14to the process, and judge what it can be
48:16after. So, it leaves us in a world where
48:19we're not quite sure of how the road is
48:21underneath. So uh DPW has moved away
48:24from applying this process in the city.
48:27Um its cousin cold in place uh in our
48:30opinion is an excellent process. Um
48:33for a [clears throat] number of reasons.
48:34One there isn't the uh generation of
48:36excess heat. Uh two the compaction
48:39issues aren't as apparent. And then the
48:41third bit of that is that cold in place
48:43recycling the road u can be driven on as
48:47soon as the process is performed. So
48:49this treatment train goes down the road,
48:52grinds up the road, adds some material
48:54back in, and then that places it back
48:56down, and that road is back in service
48:58that day. So this is a great process to
49:01be used on uh arterial and collector
49:04roads with uh pavement thickness that
49:06can uh support the process. Um for
49:09example, we used this on granite street
49:11uh about a year or two ago, and you can
49:14go out and check out that road, and it's
49:15in great condition. Uh mill and overlay
49:18is a kind of a classic treatment we're
49:19all familiar with. That's we take the
49:20big old sandpaper machine down the road
49:22and we grind the top of the road off or
49:24sand the top of the road however you
49:26like to think of it. Uh and
49:27>> and Jake, sorry to I'm just going to
49:29interrupt briefly. So there's a typo in
49:31your slides so don't read the definition
49:33of milan overlay because it's wrong.
49:36[laughter]
49:36>> If I read that I would expect you to
49:38glare at me heavily, sir. Thank you. Um
49:42>> so uh milanov is just that. We take a
49:44machine, it's got a big drum down the
49:45road, we mill off an inch or two of
49:47asphalt depending on what's out there
49:49and the recommendation of consultant and
49:50then we add the same amount of asphalt
49:52back.
49:54>> Can I ask a question before we get off
49:56topic? Yes, Mr.
49:57>> I prefer you probably finish then I'll
49:59ask other questions. But on the roadways
50:02that had the chip seal done and
50:06it has not taken as well.
50:09Is it
50:11is there the an option to go over it
50:14with the cape seal process or is that
50:17not an option? I'm just trying to think
50:20of a way to shut it down. Right. Put a
50:22clamp on it.
50:24>> As long as the road has not degraded to
50:26some [clears throat] condition that we
50:28generally would not expect. Yes, we
50:30could cape seal or microsurface over the
50:31top of that. Um,
50:34>> okay. Just I was just curious something
50:36[clears throat] to maybe have further
50:38discussions on on and at least the
50:39streets that you know we've all of us
50:42have talked about that have for whatever
50:44reason did not take well. You know, not
50:46on all of them, but the ones that were
50:48of the poorest condition
50:51after it was done.
50:53>> Thank you.
50:53>> Y if I may just just to jump on that on
50:56the on the um the cape seal to the
50:58chair. Um
51:00[clears throat] you you're looking to
51:02pilot this. Is that is that true? And
51:04then correct is that
51:05>> within the budget already. How how is
51:07that funded?
51:09>> Yep. So uh we have a uh DT DBW and DTM
51:14have a dedicated pavement u management
51:17budget. Uh in that it's broken down into
51:19different categories. Major
51:20rehabilitation, minor rehabilitation,
51:22preventative maintenance and all the
51:23different categories we're speaking
51:24about. Uh initially we had money
51:27budgeted to be performed as chips seal
51:29for this year after the performance of
51:31that process last year that was placed
51:32on hold. So we're using the monies that
51:34were set aside and budgeted for chips to
51:36explore these other preservation
51:38options.
51:38>> So no additional money would be correct
51:40or needed or from any other department.
51:42>> Correct. Thank you.
51:45>> So kind of at the bottom of our scale
51:46here uh we have uh full depth
51:49reclamation. Um, so this is uh the even
51:52bigger grinding machine that goes down
51:53the road and instead of just kind of
51:55taking the top layer of the asphalt off
51:58with full depth reclamation, you are
52:00taking the entire asphalt matrix plus
52:02the soil underneath it and grinding it
52:04all together to produce new base course.
52:06Um, this is a much more intensive
52:07process. This requires removing all of
52:09the structures and castings in the road,
52:11lowering them, removing your curbing and
52:14doing all these things. Um, this process
52:17also requires removing excess material
52:19from the road, right? So, whatever we're
52:21going to put back in asphalt, we have to
52:23take that out in terms of reclaimed
52:25material. So, this process is very
52:27timeconuming. It's very impactful for
52:29the neighborhood. Um, so we tried as
52:33hard as we possibly can to not perform
52:35this process on roads. In some cases, it
52:38has to be done if there's a large scale
52:40water main break or a utility project.
52:42Unfortunately, this the ground is so
52:43disturbed, we'd have another option. Um,
52:45but generally, this is the last thing
52:48that we want to do. This is really the
52:50last option we have for fixing a
52:51roadway. And then full depth
52:53reconstruction. Um,
52:57you can only reclaim a road once in its
52:59lifetime, right? So once it road if it
53:02has to be reclaimed has been reclaimed
53:05unfortunately due to what you've done to
53:07the underlying soil the base is what we
53:09call it you can't reclaim that again
53:11because you'll change the consistency of
53:12that in uh ratios in that material too
53:15much. So the only option left if a road
53:18has been reclaimed and goes so far down
53:20the PCI chain that it needs to be
53:22addressed is to rip all the material in
53:25the road out which is a very labor
53:27intensive process and extremely uh
53:30disturbing to the neighborhood. So at
53:32all costs we avoid that process right
53:35there. um as we've talked about before
53:39um you know these processes are
53:43varied in their application right so if
53:45we can do stuff that's preventative
53:47maintenance we're talking $10 $15 a
53:49square yard if we're down here it's over
53:52100 um so to 150 so we're talking almost
53:56a factor of 10 higher to address a road
53:59with either full depth reclamation or
54:00reconstruction rather than just chip
54:03sealing or something along those lines
54:05so it's Um when you talk in those
54:07numbers, you can see how vitally
54:09important it is to make sure our roads
54:10don't reach this condition.
54:14Uh Commissioner, is this uh shall I
54:17continue here or is this slide for
54:18yourself?
54:19>> Uh through through the chair, I I don't
54:20think we talked about the rest of the
54:22order, so I think we're going to going
54:24to wing it here a little bit, but I I
54:25can jump in just real quick and and hand
54:27it back to you. Um
54:30the next few slides really just sort of
54:32recap the current program and we've
54:34we've actually done that already so I
54:35think we can move through them pretty
54:36quickly but um yeah just starting out
54:40again looking at this balanced approach
54:42with pavement preservation techniques.
54:44Um
54:47looks like AJ's already to the next
54:48slide. So um just to recap the current
54:51program characteristics. So there's
54:52routine maintenance which includes uh
54:54crack sealing and the permanent
54:55patching. As assistant commissioner Melo
54:58said, we haven't we haven't done fog
55:00seal for a variety of reasons. So we're
55:01really focusing on those um those two
55:05treatments.
55:06Uh really this coming year, and
55:08gentlemen, correct me if I'm wrong, but
55:10this coming year is the first time we've
55:11had a a really serious patching program,
55:14permanent patching program proposed. So
55:16that'll be a a good tool to add. um you
55:20know pavement preservation candidates.
55:22So those lower cost treatments are based
55:25on making sure the street has an
55:28appropriate PCI so it's still in good
55:29enough condition that you can extend the
55:31life of the street before it
55:32deteriorates too far. Um in terms of
55:36arterial and collector roadways, those
55:39are uh addressed uh those have been
55:44selected historically uh by DPW or more
55:48recently in combination by DPW and DTM
55:51based on the PCI. Um they're also I
55:54should mention those are the streets
55:55where we usually see a more extensive
55:57project. So, you're us at that point
55:59when the roadway conditions that bad,
56:01you're usually looking at having to um
56:04upgrade the sidewalks, replace those. Um
56:07on arterial streets and even collector
56:09streets, often there's safety
56:11improvements that it makes sense to
56:12incorporate at that time because you've
56:15got the street torn off. There's no more
56:17cost-effective time to make changes
56:19than. So any sort of, you know, if
56:21there's been prior items that have been
56:23approved by either of your committees um
56:26on that street, we'll try to incorporate
56:27it into the street design at that point.
56:30Um the local roadways have traditionally
56:32been handled differently. So that's
56:33where we've relied predominantly on the
56:36district counselor's picks. So every two
56:38years. Councilor,
56:41not to interrupt you, but can you give
56:44examples of arterial streets, collector
56:46streets, local streets,
56:49just so us and the audience has an idea
56:52of what those streets are. I don't need
56:54a lot of them, just a handful.
56:56>> Yeah, Mr. Chair, I'd be happy to. And I
56:57I will note um we did sub recently
57:00submit an item on this um in response to
57:03a a request by councelor Metitra. Um so
57:05if folks are interested in doing a
57:07deeper dive um you have that available
57:10but so starting out at the highest
57:12category uh principal arterial are
57:14that's our our most major roadways. Um I
57:18should say the classification system is
57:19actually administered by the Federal
57:21Highway Administration. So this is a
57:22nationwide system. Um and if you want to
57:26change the classification of a roadway
57:28there's a long involved process to do
57:30that that ultimately involves approval
57:32through the FHWA.
57:34Um so principal arterials again those
57:37are your major streets. So we're talking
57:38about Belmont Street um Gold Star
57:42Boulevard, Park Avenue carries a lot of
57:45traffic serves not only trips in the
57:47city of Worcester but people passing
57:48through the city of Worcester longer
57:50distance trips typically freight trips.
57:53There's another classification of our
57:55arterial streets below that called minor
57:57arterials. Some people hear the word
57:59minor and think oh that's not a
58:00significant street. It's actually the
58:01second highest classification of
58:03streets. So these are also important
58:05regional streets but just a little bit
58:07different characteristic
58:09um tend to have you know more frequent
58:11driveway access or cross street access.
58:14So it's um it's a little bit more I like
58:17to think of it as more urban in
58:19character typically but but not always.
58:21Um collectors are kind of the in between
58:25streets that collect traffic from
58:28individual neighborhoods and distribute
58:30it to that arterial system. Um, and then
58:34your local streets are, you know, what
58:36you think of in your neighborhoods. And
58:38those can actually those exist both in
58:40residential neighborhoods, but also in
58:41commercial and mixed use areas as well.
58:43So, a lot of the smaller side streets in
58:45downtown are actually classified as as
58:47local streets. So, that's the hierarchy
58:50uh involved with those. Thank you. Y
58:55um so just to reiterate again uh the
58:57local streets have uh traditionally been
58:59selected by district counselors and
59:01that's based on constituent input um
59:04petitions that have been heard by the
59:06public works committee and approved uh
59:09information concerning the pavement
59:10condition and planning level cost
59:12estimates for for uh improving those
59:14streets
59:17um with this new tool that we have. It's
59:20not that new anymore. We've had it for
59:22three years, but it's uh with the tool
59:23that we have, we actually scan the
59:26entire street system about every
59:30you really want to do it every 3 to 5
59:32years. Um so we last did this in 2023.
59:36We're talking with DPW about um bringing
59:39the equipment back out and doing another
59:40scan to get an updated picture, but it's
59:43not a black hole between when we last
59:45scanned it and now. The model
59:47automatically assumes a standard rate of
59:51degradation for each and every link in
59:53the system. And then every time DPW
59:56completes a project, we'll go in and
59:58we'll manually change that PCI to 100 or
1:00:01something close to 100 um to reflect
1:00:03that that street's been addressed. Then
1:00:05every like I said four to five years,
1:00:07you do the entire scan and you get an
1:00:09updated you know picture of the whole
1:00:11system.
1:00:13And then the last thing I want to
1:00:14mention this slide is just um that uh
1:00:17we've got a pavement management page
1:00:19that can be accessed either through
1:00:21DPW's website or through DTM's website.
1:00:24So whichever one you're poking around
1:00:26on, you can find your way there. Has a
1:00:28[clears throat] lot of great
1:00:28information. It has the pavement
1:00:30management report itself for people that
1:00:31want to dig further into that. And it
1:00:34also has the interactive map that shows
1:00:37the pavement condition as well as a
1:00:39separate map that shows the ongoing
1:00:41projects in the city. So if you're
1:00:43curious about a street construction
1:00:45project in your neighborhood, you can go
1:00:46on there, you can click on it, you can
1:00:48get information on what's being done,
1:00:50the schedule, who to contact in terms of
1:00:52the uh inspector on the project and that
1:00:54kind of thing.
1:00:56>> One more question from councelor Fzolo
1:00:59>> to you, Mr. Chairman. Um, could someone
1:01:02answer me the question? Um, the streets
1:01:06and sidewalks that will be done this
1:01:08year
1:01:10that a district counselor picks,
1:01:14the ones that will be performed this
1:01:16construction season, when will they
1:01:19start?
1:01:22Have they started?
1:01:23>> Yep. [clears throat] So, through the
1:01:25chair, um,
1:01:27during this construction season, they're
1:01:29already active. There are already roads
1:01:31active under construction that were
1:01:33selected as counselor picks. Those
1:01:36counselor picks are not from this past
1:01:39December though. Those picks will be put
1:01:41into construction contracts for the
1:01:43coming construction season. So whether
1:01:44it be the 2728 construction season, uh
1:01:48just due to the timing for how the picks
1:01:50are made, it generally takes a year or
1:01:53two before a road selected by a
1:01:55councelor actually makes it into a
1:01:56resurfacing project. So, um, yeah, to
1:01:59circle back and answer your question,
1:02:01the roads that were selected this year,
1:02:03um, those are due to be constructed
1:02:05[clears throat] over the 27 and 28
1:02:07construction season.
1:02:08>> And if I, if I could, um, just to add to
1:02:10to, um, Assistant Commissioner Melo's
1:02:13response, um, a couple things to keep in
1:02:15mind is when there are utility holds,
1:02:18then one of the unfortunate things is,
1:02:20you know, if we find out there's utility
1:02:22work that's needed in the roadway, it
1:02:23doesn't make any sense to go ahead and
1:02:24resurface the roadway and then come back
1:02:26and tear it up.
1:02:27So sometimes you'll find projects get
1:02:30deferred out for several years. So one
1:02:32of the things we've started doing is
1:02:34providing the council with periodic
1:02:36construction status updates. Um we did
1:02:39not provide one to council in August
1:02:41because of the single meeting and
1:02:43knowing we were going to have this
1:02:44meeting. We didn't want to interject
1:02:46something new right before the meeting.
1:02:47But you'll get the next updated report
1:02:50in September and that has every project
1:02:52that is either currently planned or
1:02:55under construction when it was selected
1:02:57if it was a a district counselor pick
1:03:00and what the best estimate of when that
1:03:02that work will take place uh at the
1:03:05present time is.
1:03:06>> Okay. Through you, Mr. Shannon, as a new
1:03:09counselor, this is all new to me and I
1:03:11appreciate being educated,
1:03:13but I can remember giving be we I was
1:03:16giving a list of streets and sidewalks
1:03:19that were I thought supposed to be
1:03:22completed this construction season. Is
1:03:25there such a list?
1:03:29I thought I I know I received one with
1:03:31names of streets and sidewalks to be
1:03:33done.
1:03:34>> Yeah. Through through the chair. So,
1:03:35they haven't started. Excuse me,
1:03:37Matthew.
1:03:38>> Yeah, through the chair. So that I
1:03:40believe if we're talking about the same
1:03:41list, that would have been the most
1:03:43recent counselor selections. And as
1:03:45assistant commissioner Melo said, those
1:03:47are being bid out for construction the
1:03:49following year.
1:03:50>> Okay. So they won't be done this year.
1:03:52So, what streets and sidewalks, last
1:03:55time I'll ask, what streets and
1:03:56sidewalks that a district council has
1:04:00picked maybe two years ago that might be
1:04:04this construction season? When will they
1:04:07start?
1:04:08>> Oh, have they started? I have not seen
1:04:11any in in district three.
1:04:12>> Yep. So, those roads have started. Um,
1:04:16so if I can pontificate on why you might
1:04:20have not seen work in your particular
1:04:21district, um, the contractors generally
1:04:24like to mobilize to one area in the city
1:04:26and then work there. So I know there's,
1:04:28you know, for example, like Hadwin Road
1:04:30was a counselor selection and that road
1:04:32is is quite dug up at the moment. Um,
1:04:34I'm just citing the one road that can
1:04:36come to my mind off hand. Um, so what
1:04:41may be experiencing in your district is
1:04:43the contractors simply have not
1:04:45mobilized to that area as they're
1:04:47dealing with streets that are open in
1:04:49another part of the city. We try to
1:04:51restrict the contractors to having only
1:04:53a certain amount of footage open at any
1:04:55given point in time because we don't
1:04:56want them leaving the whole city open.
1:04:59Um, but there are roads in district 3
1:05:02that will be constructed in FY, you
1:05:04know, in calendar year 26 and calendar
1:05:06year 27 that were counselor picks. I
1:05:08appreci I appreciate you um again
1:05:11informing me, educating me. I appreciate
1:05:13that. I I I'll backtrack. One street
1:05:16that I've noticed sidewalks and street
1:05:18that has started is Actton Street. So,
1:05:22is that a street that was scheduled to
1:05:25be done this year?
1:05:27>> I'll have to dig a little bit to provide
1:05:29that exact information. So, if you don't
1:05:31mind a few minutes, um I can get that
1:05:32information.
1:05:33>> That's fine. Okay. Thank you. I I
1:05:34appreciate it, Mr. Chairman. Thank you.
1:05:37line.
1:05:37>> Oh, sorry. Go ahead.
1:05:38>> Sorry.
1:05:39>> Uh through the chair. Thank you very
1:05:40much. What I will do is I will reforward
1:05:43the July construction project uh report
1:05:47that was provided by DTM and DPW and
1:05:50that lists all the streets in every
1:05:52category so that you can look and see
1:05:54which streets are expected to be
1:05:56completed by when.
1:05:59>> Council, thank you, Mr. Chairman. Uh
1:06:02yeah, I don't want to keep everybody,
1:06:04but I do have some some questions
1:06:06regarding, you know, a lot of the work
1:06:07that's been done. Um so through the
1:06:10chair to commissioners uh is it safe to
1:06:13say that the the PCI so residents will
1:06:16understand um if they're not sure the
1:06:18PCI will determine what process is taken
1:06:21like what's the next process and then
1:06:24obviously
1:06:25does that turn back to the counselors to
1:06:27decide what will be done or is that
1:06:29something that you guys will continue to
1:06:31just say hey we'll do this before it's
1:06:34time to bring it to the council
1:06:37>> so through the chair If I and gentlemen
1:06:39please please jump in if if you have a
1:06:41different perspective on this but for as
1:06:43I understand the question um we we're
1:06:47still following the process as we have
1:06:49previously um district counselors select
1:06:53local streets based on information we
1:06:55share with you as well as petitions DTM
1:06:58and DPW uh select arterial and um
1:07:01collector streets. The types of
1:07:03treatments that are proposed for those
1:07:05streets though will be tied to that PCI
1:07:08band that it falls in. So, we're using
1:07:10the appropriate type of treatment given
1:07:13the condition of the street. So, we
1:07:14don't want to spend, you know, $100 a
1:07:16square yard doing
1:07:19reclamation on a street that's has PCI
1:07:2275, for example.
1:07:23>> Okay. Thank you. So then, you know, one
1:07:25of my major concerns is, and I I believe
1:07:27you guys have been dealing with this as
1:07:28well, is when it comes down to the the
1:07:32inspections
1:07:34um of the work that's being done um the
1:07:37the the prior the the the setup, the
1:07:40work that's being done, and then after
1:07:42um and also the works, the sewer
1:07:44projects that they're, you know, they're
1:07:46properly they're restored or the work is
1:07:49being done correctly. has some of those
1:07:52um have you strengthened those
1:07:54inspections? Have you um how are those
1:07:56conversations have have come along with
1:07:58some of the contractors? Because there's
1:08:01many times within the district, you
1:08:02know, some projects are being done um
1:08:05but there's just not satisfied.
1:08:08It's not good for the residents, but
1:08:10they say they completed the work and
1:08:11then we have a hard time getting that
1:08:13contract back. So, I just want to know
1:08:15how have those conversations been?
1:08:17[snorts]
1:08:17>> Yep. So through the chair, um,
1:08:20[clears throat]
1:08:21punch list items on projects are
1:08:24essentially, you know, the crux of your
1:08:26conversation or what you're focusing on.
1:08:29And I think
1:08:33generally I've found over the course of
1:08:35my career, those are the items that you
1:08:37just have to nag a contractor to
1:08:40perform.
1:08:41um they are something that
1:08:44we are working to close the loop on but
1:08:49it is difficult sometimes to get these
1:08:52things performed in a timely fashion due
1:08:54to the type of worker involved. Now
1:08:56please bear with me for a second. Um and
1:08:59this is not to provide excuses for
1:09:00contractors because that's the last
1:09:02thing I'm in business to do. It's more
1:09:04to provide just kind of a reality
1:09:06picture here. So
1:09:09contractors essentially do one thing. So
1:09:12they're a paving contractor, they're a
1:09:14excavation contractor, they're utility
1:09:16contractor.
1:09:18All of the rest of the services that
1:09:19these guys provide on a roadway to us
1:09:21are subcontracted. So if it's moving a
1:09:24casting, moving curbing, installing
1:09:26concrete, generally all that work is
1:09:28brought in from a consult a
1:09:30subcontractor from out of house. when we
1:09:33have items that are punch list items
1:09:35that unfortunately fall through the
1:09:37crack. Um, and that can be for any
1:09:40number of reasons. Um, it can be
1:09:43difficult to get a contractor to come
1:09:45back and do them when we, you know,
1:09:47within a prescribed timeline say you
1:09:49need to do this by the end of the month.
1:09:51Um, and that can be for, you know,
1:09:54generally for scheduling reasons, right?
1:09:56So the contractor has to bring that
1:09:58subcontra contractor back into the city
1:10:01and get them to perform that work. If
1:10:03there's not sufficient volume, say they
1:10:05only have to go and do a number of homes
1:10:07frontages, their subcontractor just
1:10:09won't show up. Um so that's kind of the
1:10:12re unfortunate reality there is
1:10:13sometimes for example lmen seed. Um
1:10:16there are a number of roads that have um
1:10:20you know over the course of the winter
1:10:21it was it's become apparent that the lom
1:10:23that was placed was uh inadequate.
1:10:27Well the problem is that the landscape
1:10:29crew that puts the lom in won't be
1:10:30coming back until they have a massive
1:10:32amount of lom to put in. So as we
1:10:34continuously poke the contractor they're
1:10:36just not able to really get anything
1:10:38done on their end which leaves us with
1:10:41two choices. uh going after the
1:10:44contractor for liquidated damages, which
1:10:46represents a greater cost to the city
1:10:48than we're going to get. The juice isn't
1:10:50worth the squeeze there often, unless
1:10:52it's a a massive issue that's arisen. Or
1:10:55we could pull the um retainage for a
1:10:59job. And again, that's very
1:11:02timeintensive process, right? So, we
1:11:04have to file some paperwork, go through
1:11:06a legal process, essentially take their
1:11:07retainage, and then we'd have to
1:11:08contract the performance of that workout
1:11:10anyway.
1:11:12So, um, we focus a lot on punch list
1:11:15items because they come up at the end of
1:11:17the year, uh, when contractors, labor
1:11:19forces are typically diminished and guys
1:11:21are getting laid off and contractors are
1:11:23looking to be done. Um,
1:11:26uh, but the unfortunate part of that is
1:11:28some of these just do fall through the
1:11:29cracks. So, we are working with the
1:11:32contractors. We have one particular
1:11:33right now that I'm meeting with actually
1:11:35tomorrow to address a number of concerns
1:11:36that have been brought up multiple
1:11:38times. Um, but it is an issue that we
1:11:40are continuously addressing.
1:11:41>> Yeah, I I I believe it's it's
1:11:43frustrating, right? It's frustrating for
1:11:44us counselors where, you know, we we we
1:11:46hear from our residents that the roads
1:11:48and sidewalks and we want to support
1:11:49them and then it's it's just not done
1:11:52well and and the city takes the takes
1:11:54the hit on it. So within this bid
1:11:57process, is there those conversations
1:11:59that within the bid process they have
1:12:02when the work is done um the inspections
1:12:05and even though they leave is within the
1:12:07bid process they have someone ready to
1:12:10go in cases of those issues versus oh
1:12:12they're going to have to come back three
1:12:13months later or it's too late now in the
1:12:16year it's cold out now you're going to
1:12:18have to come back now the residents are
1:12:20deal with those issues and and also you
1:12:22know um utility
1:12:25um companies come in, they cut up the
1:12:28sidewalk, they don't come back, they
1:12:30throw down um the black top on a on a
1:12:33sidewalk and they don't come back and
1:12:35it's left like that. uh Perry the street
1:12:38and we we've talked about Perry numerous
1:12:40times and it's unfortunate for the
1:12:41residents to to to have a road and the
1:12:43sidewalk like that but a lot of work is
1:12:45done throughout the city and district 4,
1:12:47you know, um has a lot of those areas
1:12:49where utility trucks come in, they tear
1:12:51up the road, they tear up the sidewalk,
1:12:53they throw down the the the the asphalt,
1:12:55the black top and they head out and
1:12:57whatever it may be. And it's not, you
1:12:59know, not done to anyone's liking, but
1:13:02it just stays like that. It just seems
1:13:03like nothing. we're not getting any
1:13:05headway and we continue to go back and
1:13:07forth with with these um with these
1:13:09companies. Um and it feels like our
1:13:12hands are tied with them because the
1:13:14amount of work that needs to be be done
1:13:16in the city and I understand but it's
1:13:18like they're able to do that and just
1:13:20continue to do this process where we're
1:13:22now you're saying you're meeting with
1:13:23someone where you have constant
1:13:25conversations with them over and over
1:13:26again and for me it's like well this is
1:13:28your job this is your responsibility.
1:13:31Um,
1:13:32>> if I can I jump on that?
1:13:36>> It's eating me up inside. So, I got to
1:13:37say it. I got to get it out of me.
1:13:42>> There's a There's a issue with the
1:13:44process.
1:13:45There's an issue with the process.
1:13:49We represent
1:13:51the city of Worcester and our
1:13:52constituents, the taxpayers.
1:13:55when work gets done,
1:13:58somebody must
1:14:00go to that site, inspect it, and you
1:14:04know, I'm I'm going to use the issues
1:14:06that I'm dealing with now.
1:14:09That material that was put down that
1:14:11they sprayed grass seed over
1:14:15was not adequate material from the
1:14:17beginning. It should have never been
1:14:18signed off on. It should never been
1:14:20accepted.
1:14:21That's where the that's where we need to
1:14:25change our process.
1:14:27So
1:14:29the inspector who's on site says, "No,
1:14:31that gravel that you put down that we
1:14:33just hydro seated is not suitable for
1:14:36growing grass." So now that poor
1:14:38resident, those residents on that street
1:14:41now are done dealing with it this year.
1:14:44Now they're back into this this upcoming
1:14:46year dealing with the same issue. That's
1:14:49the that's my biggest frustration.
1:14:52Um, and that's where I, you know, as
1:14:55council hater said, the process needs to
1:14:58change and there's got to be better
1:15:01oversight over what we expect
1:15:06collectively as a municipality for the
1:15:08people that we represent. That's my
1:15:11frustration.
1:15:12Um,
1:15:14with that, I know council I don't know
1:15:16if you're done. No, just to your point,
1:15:18you know, there's times where we hear um
1:15:20some people won't do certain jobs in a
1:15:22city because we're not paying enough,
1:15:24right? But I'm pretty sure we're paying
1:15:25good money for for them to do this work,
1:15:27right? So, that's a different type of um
1:15:30ball game there. So, it's not like we're
1:15:32not paying the money for it and and the
1:15:34and the work we're getting in return is
1:15:35just it's unacceptable and you know,
1:15:37there's a lot of money that's goes that
1:15:39goes out there. It's frustration. Um,
1:15:41and then on top of that, it's also the
1:15:44communication to our residents about
1:15:46these projects. Um, you know, I'm
1:15:50dealing with uh Endeott Street and then
1:15:52obviously Chandler Street that'll come
1:15:54down the road, too. So, I just want to
1:15:56make sure we get ahead of making sure we
1:15:59provide as much information to these
1:16:00residents with all these projects in
1:16:02multiple languages. Make sure they're
1:16:04involved um so they can give us valuable
1:16:07information on what's going on and
1:16:09what's needed in the in in the
1:16:10neighborhood. and then understand this
1:16:12this whole process. Um, again, it's it's
1:16:15something that as counselors, that's
1:16:16that's where, you know, they hold us
1:16:18responsible, but when we're in this like
1:16:21like uh councelor Econom said, it's the
1:16:24process and this process is holding us
1:16:26back and it's making the city look bad.
1:16:27So, I just I really want to force and
1:16:29push the fact that we we got to do a
1:16:31better job on pushing back and making
1:16:32sure this work is done properly and we
1:16:35notify the residents as much as possible
1:16:37on this process. Thank you. So through
1:16:39the chair, if I may.
1:16:40>> Yes.
1:16:41>> So your your points are well taken,
1:16:43right? There are processes in place that
1:16:46we are continuing to improve upon. $20
1:16:49million worth of work going on in the
1:16:52city is a lot of work. So the inspectors
1:16:54are under a lot of stress. That's no
1:16:56excuse for poor quality work, but that's
1:16:59something that we're continuing to work
1:17:00on and something that we are dealing
1:17:02with our contractors at the start of the
1:17:05job and at the end of the job. And as uh
1:17:08as Mr. Melo mentioned,
1:17:11staying on them on the punch list
1:17:13requirements because we're paying good
1:17:16money. We expect good work in return. So
1:17:19that's something that we're working on.
1:17:21Um I've been to a couple of
1:17:23publicformational meetings where there's
1:17:25going to be um a lot of work and a lot
1:17:29of changes to the the roadway itself.
1:17:31for example, um, College College Hill.
1:17:36Uh, and the one before that was
1:17:39>> Mass. Yeah.
1:17:41>> Uh, so we're getting out there well in
1:17:44advance of these projects even being
1:17:46designed. Uh, we're we're out there with
1:17:48preliminary designs for the residents so
1:17:50that we can hear the residents, hear
1:17:53their concerns, and make changes where
1:17:55we can in those designs. Uh, and I will
1:17:58credit the engineering division. and
1:17:59they go out and they they put flyers on
1:18:02all the doors to identify uh the work
1:18:05that's going to be done, an estimated
1:18:07time of when it'll be done. And
1:18:08Commissioner Ry mentioned something
1:18:10earlier. Uh we've developed a more
1:18:12comprehensive website where if residents
1:18:15have questions on a roadway, they can
1:18:17click on the road, it will give the
1:18:19inspectors information in the
1:18:20engineering office so they know who to
1:18:22contact and make complaints and express
1:18:24their concerns. So it is a process that
1:18:27every day we're trying to improve upon.
1:18:31>> The chair
1:18:32I just have a followup. I just wanted to
1:18:34kind of reiterate what some of the other
1:18:35counselors have said and also I think to
1:18:38just express I think for a lot of
1:18:39residents and for counselors too you
1:18:41know we're understanding how long the
1:18:43work takes and so um you know it is I
1:18:45think additionally frustrating to see
1:18:47when contract work happens that you know
1:18:51it's residents have waited a while for
1:18:52something to happen for whatever the
1:18:54work may be and then the work is subpar
1:18:56and and and you know what I mean then
1:18:58understanding how long it takes to get
1:19:01to circle have everyone circle back I
1:19:04think is just I wanted to add to what my
1:19:06colleagues had said and and about just
1:19:09you know needing to do better and I
1:19:10think the the um new ordinance or or
1:19:13policy that was put forward to extend
1:19:16the warranty that utility companies need
1:19:18to come back you know to work on those
1:19:20utility patches I I think is a great
1:19:22step but I I agree with the um you just
1:19:25needing to deliver you know hold
1:19:27contractors to a better standard and I
1:19:29think of the what happened earlier this
1:19:32summer on park a where there were
1:19:34sections of sidewalks that were just
1:19:35open for for for weeks um on a you know
1:19:39very busy area. So um yeah, I just
1:19:42wanted to reate that and I had one
1:19:45follow-up question regarding crack
1:19:47sealing. Um has that work are there
1:19:50roads that in each district that have
1:19:52been identified for crack sealing and
1:19:55when can we expect that work to start?
1:19:58>> So if I may to the first you can take
1:20:01the second one. Go ahead.
1:20:02>> Go ahead,
1:20:03>> please. No.
1:20:03>> Okay. Um, relative [clears throat] to
1:20:05the crackling counselor, um, that work
1:20:07has been put out to bid. We anticipate
1:20:09that work being uh, No, I'm sorry. I
1:20:11have to stand I have to correct myself.
1:20:13That work was awarded recently. So, we
1:20:15anticipate that work beginning
1:20:17uh this fall. Um, we will be up against
1:20:20it when it comes to time. It gets a
1:20:21little too cold to crack seal towards
1:20:23the end of October or so. Uh, so that
1:20:25work will most likely pick back up in
1:20:27the spring. Um but we do have roads uh
1:20:29that have been identified um including a
1:20:32number that uh the commissioner has
1:20:33passed me uh from your desk. So those
1:20:36will be addressed um over the coming
1:20:38construction season.
1:20:39>> If I may, Mr. uh Mr. Chairman, it's
1:20:42important to understand that the city
1:20:44cannot advertise for new contracts until
1:20:47the budget is ordained by the city
1:20:49council. So that occurred sometime mid
1:20:52July. So the FY27
1:20:55funding was not available until mid July
1:20:58and that's the only time that we could
1:21:00then begin the bidding process. So FY27
1:21:04we're going to see a lot of work done
1:21:06but several of those contracts aren't
1:21:09even open yet because we can't advertise
1:21:11until uh again the funds are available.
1:21:14So there's a lot of work forthcoming but
1:21:17it it takes time to get through that
1:21:19contracting process. If I could also add
1:21:22Thank you.
1:21:23>> One item that I think is of relative
1:21:26importance when it comes to the volume
1:21:28uh
1:21:29our contractors. So we have roughly five
1:21:32resident inspectors
1:21:35uh for con or asphalt jobs in the city.
1:21:37We have engineers who are resident
1:21:39engineers on you know water and sewer as
1:21:42well up in engineering. But we have
1:21:43about five uh gentlemen who do road work
1:21:46for the city. So each of those uh
1:21:48inspectors is managing about $4 million
1:21:50worth of construction work. Um
1:21:55at a project at that level if mass dot
1:21:58would be performing it there'd be about
1:21:59four guys on it. So in terms of capacity
1:22:04our my team or our team is asked to do
1:22:07an awful lot um several act orders of
1:22:10magnitude greater in my opinion than
1:22:13their counterparts in other
1:22:14transportation organ organizations. So
1:22:16while I do as commissioner Wesling said
1:22:20fully appreciate and agree with the fact
1:22:22that we've had issues with completion on
1:22:24these projects um I don't want that to
1:22:26lie at the feet of the gentleman who
1:22:27worked for me very hard. So
1:22:30if I may that there's no doubt right but
1:22:33that's information we need to know too
1:22:34right because that's information we need
1:22:36to talk to the city manager about if we
1:22:38don't have the manpower to do the job
1:22:39properly
1:22:41we need to we need as a council we need
1:22:45to collectively look to to change that.
1:22:48So, you know, that information does
1:22:50help. Um, if if I can just change course
1:22:54just to let the people in the audience
1:22:57give their two cents.
1:22:59>> Oh, sorry.
1:23:05>> Just your name and city of residence,
1:23:06please.
1:23:07>> Good evening. Maria Kaplanis. I live
1:23:09here in Worcester. I live in 01602. And
1:23:12Councilman uh Rivera is my
1:23:15representative.
1:23:18So, I just want him to come back to the
1:23:20table. He's busy.
1:23:21>> Yeah.
1:23:28>> Good evening, Councilman Rivera. You've
1:23:30received my emails and my pictures. I'm
1:23:33here to talk about my little slice of
1:23:34heaven on Kums Road. It's a dead end
1:23:37that abutts Foley Stadium. And you've
1:23:40all seen my emails. I'm not sure if
1:23:43you've come to my little slice of
1:23:45heaven. Councilman Rivera, you've
1:23:46inherited me from Etel Hajier. She also
1:23:49saw my emails and my pictures. If I was
1:23:52techsavvy, I would put them up to show
1:23:54you that my street is no longer a
1:23:57street. It's down to the dirt. I have a
1:24:0067year-old husband.
1:24:02I'm almost there myself. We have a
1:24:04tenant. There's a young couple next
1:24:06door. Took five months to sell that
1:24:08house next door. We have two huge humps
1:24:12and our road is down to the dirt. You've
1:24:15seen the pictures. I've said it three
1:24:17times. Look back into the thread and
1:24:19share it with your councilman.
1:24:22It's distressing. It's not safe. It's
1:24:25unattractive. It's messy.
1:24:29And
1:24:31I live in the best house in the city of
1:24:33Worcester. My house of Butts Foley
1:24:35Stadium. I have the best view in the
1:24:37city. and I have I live in the culde-sac
1:24:41of CalPley and uh Kulage Road. Please
1:24:45take care of us. I thought I was on a
1:24:47list. I received the emails. It seemed
1:24:50to have gone ahead and then I just
1:24:52called on a whim to verify and I was
1:24:55pushed back again. Help me help myself.
1:24:59If the city can't help me,
1:25:02can I keep my taxes? Can I pay a
1:25:04contractor?
1:25:06We finally were blessed that we saved
1:25:08enough money. We had our driveway
1:25:10and the guy said, "I'll do it for you. I
1:25:12know someone in the city, but I know
1:25:15someone, too. I know you. I voted for
1:25:18you.
1:25:21Help me. Help my husband. Help the
1:25:24walkers in on Kum's Road. We are three
1:25:28homes. It's weird geographically. We're
1:25:30three addresses on Kums Road. Even
1:25:32though we have five homes, people come
1:25:34down there all the time. Halloween with
1:25:37their babies, with their cars, walking
1:25:40their dogs.
1:25:42We have a beautiful, beautiful deadend
1:25:45street in Worcester. Fix it for me,
1:25:47please.
1:25:49This is 3 years in and it's only getting
1:25:52larger
1:25:53because what gets put off is not going
1:25:56to go away. It's going to get bigger. 17
1:25:59Kums Road 1517.
1:26:02>> Okay.
1:26:03>> I'm hearing all the speak and I have to
1:26:05say, Councelor Folo, you speak my mind
1:26:07in almost every meeting. I love how you
1:26:10represent me with your questions and
1:26:12your comments. You really do. Um, Mr.
1:26:16Econom, we know each other from kids
1:26:19through our church community, but you
1:26:21also represent me. I really love the way
1:26:24you advocate for all of us.
1:26:28I'm really understanding your speak now
1:26:30as a larger picture. Money, time,
1:26:34management.
1:26:36That's on you. That's why we voted for
1:26:38you, right? We do other things in the
1:26:39city for you. Do for us.
1:26:43>> Thank you, Maria.
1:26:44>> Can I just ask Maria a question? You
1:26:46said that your your street was selected
1:26:49already to be fixed.
1:26:50>> We were and then we weren't. So, I got
1:26:53the emails and then I called 311 again
1:26:56and said, "It's almost winter. Where is
1:26:59the con construction?" And she says,
1:27:01"Oh, it's been push pushed off. You
1:27:03didn't make it on the cutoff." I I had
1:27:05three papers. I didn't bring them with
1:27:07me tonight. We had already been accepted
1:27:10again.
1:27:13>> You want to talk?
1:27:13>> I'm not here to complain. I'm here to
1:27:15advocate. I'll I'll touch base with
1:27:18Commissioner Raleigh on on that street
1:27:20stuff like that just to get an update on
1:27:22on the emails and stuff you sent us.
1:27:25>> It's already down to the dirt, so it
1:27:27can't get worse. It can only get larger.
1:27:30But if you give me the go-ahad, I'll
1:27:32bring my tar guy back. He's happy to fix
1:27:34it. I just really don't know how to find
1:27:37a way around it.
1:27:40Thank you for your time. Thanks for
1:27:41everything you do. One thing before you
1:27:43go, you and I were talking about the
1:27:45water issue.
1:27:46>> Yes.
1:27:47>> Is that something? Maybe
1:27:48>> because I abut Foley Stadium
1:27:51pretty much onethird of the length at
1:27:53the baseball field section in the back.
1:27:58It must be a bog. There's water
1:28:00everywhere. You can't see it. It's under
1:28:02the surface, right? It's like a water
1:28:03catches water. I don't know the
1:28:06geographical term. Do you're nodding.
1:28:09So, you see where I live? You're looking
1:28:11it up. No, if I may through the chat.
1:28:13>> Yes, go ahead.
1:28:14>> So, uh, a couple of things. Number one,
1:28:17with regard to the drainage issue, we'll
1:28:20speak to Commissioner Anteneelli and see
1:28:21what he's got for issues on the baseball
1:28:24field and how it drains off of uh that
1:28:27property onto private property. Uh, and
1:28:30secondly, your com your concerns about
1:28:34uh Kums Road. Is that the sidewalk or
1:28:36the road?
1:28:37>> Oh, the sidewalk.
1:28:38>> The sidewalk.
1:28:39>> The sidewalk. But if I may, since I'm in
1:28:42front of it,
1:28:44>> I'm going to come back anyways.
1:28:45[clears throat]
1:28:46>> So this time last time last year, winter
1:28:48time, the first snowfall, we have a snow
1:28:52bin that the plow can drive through
1:28:54because we're a dead end. So they can go
1:28:56all the way to the end, right? There's a
1:28:59a weird [clears throat]
1:29:01>> cut out.
1:29:02>> There's a square at the end of my
1:29:03street. It's not a street. It's where
1:29:06you could have walked into the field,
1:29:07but they shut that door. So that's where
1:29:09the snow plow goes. But the snow plow
1:29:11this year didn't bring the snow into
1:29:13there. He left it on the street. So what
1:29:16that did was accumulate all winter long
1:29:18at every huge snowfall. We had snow. We
1:29:23had a an ice pile in the middle of our
1:29:25street. We couldn't get out of our
1:29:26driveway
1:29:28because he didn't push it in far enough.
1:29:30So it impacted at the edge of our road
1:29:33starting on both mine and the across
1:29:35sister Julie Amy uh our driveways.
1:29:41So a lot of curious things.
1:29:43>> Yeah.
1:29:43>> Thank you.
1:29:45>> Thank you for listening.
1:29:45>> Thank you.
1:29:46>> I appreciate it.
1:29:47>> Thank you.
1:29:47>> Yeah.
1:29:48>> Thank you. Good evening.
1:29:54>> Uh Fred Nathan Worester. So I've been
1:29:57sitting here for an hour and a half.
1:29:59We've talked about the color schemes.
1:30:01We've talked about the chip uh ceiling
1:30:04or and crack ceiling. There's a lot of
1:30:07mumble jumble and slides and everything.
1:30:10I just want to ask one thing about
1:30:12something that has not been talked about
1:30:14at all.
1:30:17My friend John Prisa's district with all
1:30:20the trucks from CSX, how much how much
1:30:24damage has that done to Grafton Street
1:30:26proper?
1:30:29I mean, has it made a good part of
1:30:31Grafton Street almost untraable?
1:30:35Who knows?
1:30:37Um,
1:30:40something that you kind of touched up
1:30:42about uh just a small amount
1:30:46uh dealing with the amount of uh people
1:30:49that you have working in the DPW.
1:30:53Hopefully there will be enough people on
1:30:57board uh through the chair. Um if there
1:31:02are not enough people on board with the
1:31:05DPW,
1:31:07we have been paying for the last couple
1:31:09years probably three times the amount uh
1:31:13because we've needed private
1:31:15contractors.
1:31:17It would be nice if they could pay the
1:31:20Worcester people and not the private
1:31:23contractors to handle all the snow.
1:31:27Obviously, that's not possible because
1:31:30uh the city of this size, it takes a lot
1:31:33of money. I mean, but when they're
1:31:35spending I I don't know how much money
1:31:38has been spent, but I've been told more
1:31:41money than you could think has been
1:31:43actually spent on private contractors
1:31:46compared to paying the people from uh
1:31:51who actually work for the DPW. I mean,
1:31:53I'm sure he'll make a comment, but uh
1:31:56but I've heard that. I don't know how
1:31:58true it is. I'm I'm putting it out here.
1:32:00If it's true,
1:32:02it's not right. If it's if I'm wrong,
1:32:05well, then I'm wrong. But if I'm right,
1:32:09uh, we should have enough people working
1:32:11in the DPW. I get it. You got to go
1:32:14through civil service, but it kind of
1:32:18makes us look like a laughingstock. If
1:32:22>> bring this back to
1:32:23>> Yes. I just wanted to bring it all into
1:32:26context, Sam.
1:32:27>> Thank you.
1:32:27>> Because it's all interwoven. Uh no
1:32:30matter how you look at it, uh the roads
1:32:35are the roads and the roads lead in and
1:32:38the roads lead out. And if enough people
1:32:40get sick and tired of the stuff, they
1:32:42might move out.
1:32:44>> Thank you.
1:32:45>> Just a thought.
1:32:46>> Thank you. Is there anyone online, Mr.
1:32:49Mr. Clerk?
1:32:51>> Mr. Chairman, there is no one online at
1:32:52the time.
1:32:53>> Okay, great. Um,
1:32:56I don't know if we have to go much
1:32:58further on the It's pretty
1:32:59self-explanatory. The rest of it's just
1:33:01kind of what we're doing, what we're not
1:33:02doing. Um,
1:33:07so you guys started this in 2024. Is
1:33:10that is that accurate?
1:33:13>> That's that that's correct. Yeah.
1:33:14>> And how's it how how are you seeing
1:33:16things from your from your end of it?
1:33:18How are how are you seeing the progress?
1:33:21And then I'm going to go to Council Me.
1:33:23>> Yep. Uh sorry council
1:33:24>> through the chair. I think like any
1:33:26process um and I apologize I'm like the
1:33:30hokey analogy guy so I will avoid that
1:33:32here but this is like learning a new
1:33:33hobby for us right so um
1:33:38with a city this large uh despite the
1:33:41professionalism that's contained between
1:33:43DTM DPWR consultant and everything else
1:33:46this is still the second largest
1:33:47pavement management system in New
1:33:49England which you know comes with some
1:33:51challenges. So I feel like our first uh
1:33:55run through this we've shown uh the
1:33:57utility and efficiencies that can be
1:33:59provided by using this program. Um I
1:34:01think we've seen more ground level
1:34:04challenges when it comes to the
1:34:05application of different processes. you
1:34:07know, chips seal is a good example, but
1:34:09um in terms of the value this can
1:34:12provide, our budget
1:34:14um the value this provides for planning,
1:34:17the efficiency for addressing PCI and
1:34:20improving the road the city's roadway
1:34:22network, all of that is very apparent.
1:34:24Um,
1:34:25you know, if anything from this process,
1:34:27I think one of the things that we can
1:34:30take away is, uh, as Commissioner
1:34:32Raleigh at earlier is, um, although
1:34:34we've had projections from 2023 that
1:34:37kind of showed what we need to have for
1:34:39investments, um, I think that is the one
1:34:42part of the program that unfortunately
1:34:44isn't reflective of reality anymore. And
1:34:47that's not due to the fault of of any of
1:34:50the members of the team. Uh that's
1:34:51really just the economy being a runaway
1:34:53train at the moment. Um so even with our
1:34:55best projections for how inflation would
1:34:57have impacted the plan, unfortunately
1:35:00those have kind of been um cooked a
1:35:02little bit. Um but in terms of the
1:35:04actual utility and efficiency of it, I
1:35:06think that's already shown its value.
1:35:09>> Thank you, Council Me.
1:35:13>> Thank you, Chairman. [clears throat] U
1:35:15first of all, I I really would like to
1:35:17thank Commissioner U.
1:35:21Don Westclinger here and assistant
1:35:24commissioner J Melo and also
1:35:28commissioner [clears throat]
1:35:30uh Steve Raleigh along with the
1:35:32assistant commissioner appreciate you
1:35:34coming and giving us uh really good
1:35:37knowledge about how the system works. uh
1:35:41I'm not an engineer and uh really
1:35:44none of these things that you explained
1:35:47today was in my knowledge before but I
1:35:51learned some but again I think uh I as a
1:35:55counselor count more on our expert
1:35:58engineers like you all your department
1:36:00what you do is what I trust that is done
1:36:03the best way so
1:36:06I still feel that uh at the end of the
1:36:09day we want to see we want to see
1:36:11results we're not here I think the joint
1:36:14meeting was done probably to exchange
1:36:16some ideas and thoughts and see how we
1:36:18can improve our situation
1:36:22u yes definitely I think the process is
1:36:26something it's not only the this
1:36:28particular aspect of the city but many
1:36:30aspect of the city uh needs to have an
1:36:33improved process in my opinion not only
1:36:36this but that we have to work on But I
1:36:40think at the end of the day we want to
1:36:41see results. You know I know that we
1:36:44have challenges. I know we have
1:36:46difficulties. I know that there are all
1:36:48the things that I learned today the PCI
1:36:50level the you know minor uh preparation
1:36:54or the major rehabilitation or the
1:36:57system that we use to fix the fix the
1:37:00streets and make it good. The end of the
1:37:02day I think you know we're trying really
1:37:04to entice and attract businesses to our
1:37:08city. Uh I've been in the city council
1:37:11this probably my 32nd week and I have
1:37:15gone about at least 30 ribbon cutting I
1:37:19would say to see that how businesses are
1:37:21coming.
1:37:23I always think that we got to retain
1:37:25them. If they are walking or driving on
1:37:29the street where they don't find it
1:37:31comfortable certainly someday they'll
1:37:34probably not be here and they'll leave.
1:37:36And that's where I think we're gathering
1:37:37together to see that how we can make
1:37:40this city more attractive and more
1:37:43comfortable to live and do business,
1:37:45raise family and do everything. So this
1:37:47is an important part in my opinion
1:37:50having city of booster comfortable
1:37:52streets. That's why I requested what are
1:37:55the major arteries that you think and
1:37:57thank you very much uh commissioner
1:37:59rally for giving me that list and I
1:38:01think there are about 20 of them that
1:38:03you listed. I like to see that those 20
1:38:06if not all which is costing us about
1:38:08$300 million to do back in couple years
1:38:11back that you mentioned here which
1:38:13probably not going to be I'm not saying
1:38:14that we should do all the streets in a
1:38:17year. I am of the opinion that let's
1:38:19pick three or four streets at a time and
1:38:22see it within the budget or what it
1:38:24takes for us to really fix and make
1:38:26those streets. So at least the residents
1:38:29know that we have a plan, we have a
1:38:31project, we have a standardized system.
1:38:34Personally, I think we lack
1:38:35standardization. Don't we have a
1:38:38standardized system that the city of
1:38:40Worster should have roads of particular
1:38:43standard so much PCI? Now I know the
1:38:47private streets are not probably part of
1:38:50our maintenance but do we have any
1:38:53responsibility to see that even private
1:38:55streets have some kind of standards that
1:38:57should be kept maintained by the city to
1:39:00bring safety for those who live around
1:39:04there. So I have a question that you
1:39:07know how do we really resolve this issue
1:39:10because I like to see at least the major
1:39:11arteries are maybe in the next 3 four
1:39:14year project if this could be done I
1:39:16have already requested the manager to
1:39:19look into it I have requested the other
1:39:21day a loan program if we take extra
1:39:24money for this project how much it would
1:39:26cost for the city to have an extra
1:39:29budget so we're looking into it and I'm
1:39:30really going to very strongly come back
1:39:34and request DPW DTM
1:39:38to give us a result that okay we have
1:39:40done 20 major streets done
1:39:45commissioner Ali you just mentioned that
1:39:47the
1:39:48streets are selected by the district
1:39:52counselors
1:39:53I wasn't aware that it is always
1:39:55selected by the district counselors I
1:39:57believe if the district counselor
1:40:00say for example didn't select any do we
1:40:03have a system that our inspectors will
1:40:06kind of make a round of the city and
1:40:08figure out which street needs to be
1:40:10taken care of. Do we have a proactive
1:40:12approach or we always depend on the
1:40:15district councilors to come back to you
1:40:17to see these streets need to be done?
1:40:20I'm not sure uh how does that work. I'm
1:40:23sure I have also given some requests to
1:40:27pave and resurface some of the streets
1:40:29even though I'm not a district council
1:40:31but I think we all can do that in my
1:40:33opinion but uh I'm not looking for an
1:40:37answer right now but I I'm just
1:40:39suggesting that
1:40:41to commissioner here commissioner there
1:40:44that all of us here together I like to
1:40:47see that our streets we do like for
1:40:50example we're doing Park Avenue right
1:40:52now from uh say I believe Chandler to
1:40:56[snorts] Salisbury Street that area is
1:40:59going to be done and then it looks like
1:41:02sometimes some areas are done they look
1:41:04like patchy they don't look so good you
1:41:06know we don't want to have a good
1:41:08appearance of our city to attract
1:41:10everybody to come here
1:41:12after we do all these I understand the
1:41:15budgeting is the issue and we may just
1:41:16do a portion of the street because
1:41:19that's the major part where the PCI is
1:41:21below the standard.
1:41:24Can we after all pave the whole street
1:41:27so that it looks good like just the
1:41:29paving just like we do driveway paving
1:41:31so it looks black top and looks nice. I
1:41:34don't know but I'm not an engineer but I
1:41:36think I let's let's see that the city
1:41:37looks good and the necessary things that
1:41:40needs to be done is done in the right
1:41:42way with the proper patching approach
1:41:45taken which I believe few people are
1:41:48expert on it. what is done uh I don't
1:41:51understand so much the engineering part
1:41:53of it but I trust that our experts are
1:41:55doing the right thing and we should have
1:41:57inspectors after those contacts get the
1:42:00job done we should have enough
1:42:01inspectors to go and make sure that it's
1:42:04done right and if not then there should
1:42:06be some kind of consequences
1:42:08so that's my my request I would like to
1:42:11see that in coming few years we have
1:42:13done at least the major arteries thank
1:42:15you for giving me the names of the art
1:42:17because some of them are probably done
1:42:18some of them are really good like burnt
1:42:20coat street looks nice to me. I go to
1:42:22Newton Avenue beautiful but I go to
1:42:25Marboro Avenue I can't even walk so I
1:42:28think we need to have a standardization
1:42:30in our city that at least this level of
1:42:33standard standard system should be there
1:42:36in each road particularly the major
1:42:38arteries. So that's what my suggestion
1:42:40is that what can we do maybe let's put
1:42:43together our mind and see budget if the
1:42:46money is not there how much we need
1:42:49manpower is not there like council
1:42:51economist said let us know what do we
1:42:53need because we need to get it done I
1:42:55think I like to have people say woo
1:42:58streets are very nice right now
1:43:00everybody say that our streets are
1:43:02horrible I want to change that image
1:43:06thank you
1:43:08>> commissioner
1:43:10Thank you, Mr. Chairman. Uh, we share
1:43:14common goals here, right? We would love
1:43:15to have all of our streets at an 80 or
1:43:19above PCI. I give credit to the folks
1:43:22that came before me, uh, the folks over
1:43:24at DTM, the folks at the DPW who put
1:43:26together this pavement management plan
1:43:29starting in 2024 and and produced in
1:43:332025. Before that, the city didn't have
1:43:37a standardized approach to how to best
1:43:41get the biggest bang for the buck with
1:43:44the limited funds that the city had for
1:43:46the roadways. Uh this year we're putting
1:43:49some $20 million down into the roadways.
1:43:52Previous years was averaged about 13
1:43:54million. So we were always falling
1:43:56behind. So I want to thank the city
1:43:58manager and the city council for funding
1:44:01up to $20 million this year. That's
1:44:03terrific and that will make a bigger
1:44:05impact. Um, and I know that uh there's a
1:44:09there's an interest in paving more of a
1:44:12road than is selected for resurfacing.
1:44:16I'm going to put this in an analogy. If
1:44:19the if the paint is peeling in the
1:44:22bathroom and you need to paint the
1:44:23bathroom, then you take care of that.
1:44:25You don't paint all the other rooms in
1:44:27the house just because uh one room needs
1:44:30painting. So that's an analogous to Park
1:44:34Avenue. The section that was done was uh
1:44:37more of a poor condition, a lower PCI
1:44:40than the rest of it. And we would love
1:44:42to have been able to mill and overlay
1:44:45all of Park Avenue, but then that would
1:44:48take away from those limited funds uh
1:44:50that are necessary for pavement
1:44:53preservation, counselor selections,
1:44:55arterial road reconstruction, and other
1:44:58roads that are done.
1:45:00Thank you, Mr. Mayor.
1:45:01>> I just I just like to, you know, thank
1:45:03you for the analogy you gave of the
1:45:04bathroom. See, my bathroom is my
1:45:07bathroom. It's private. I can do
1:45:09whatever I want. Nobody else is looking
1:45:11at it. This is the city. This is where
1:45:14I'm attracting outsiders to come and
1:45:16live. I want the city to look beautiful,
1:45:19look good, look comfortable, look right.
1:45:22And that's why I'm saying that do that
1:45:24piece of park. That's fine with me. But
1:45:27then [clears throat] pave it all the way
1:45:29like we do the driveway to make it look
1:45:31good. I mean I do have to make sure that
1:45:34the city looks better than my patching
1:45:38in my bathroom because that's only me.
1:45:40So I hope you understand what I'm trying
1:45:42to say. We try to bringing in businesses
1:45:44bringing in people live here thrive with
1:45:47their businesses
1:45:49make their kids go to school have a
1:45:51great school. So that's all the ultimate
1:45:53plan and all these things make that
1:45:56happen and that's why my request is to
1:45:59see that what it takes to do that. You
1:46:01let us know what is not available to you
1:46:04and we'll see what we can do through the
1:46:06administration to get you that to make
1:46:08that happen. That's all. Thank you.
1:46:10>> Thank you counselor.
1:46:13>> I just want to add and kind of like put
1:46:15it into into perspective here. So, you
1:46:17know, Jay went through all of the
1:46:19techniques that are available in the
1:46:21toolbox and we want to keep all of those
1:46:23available because we need to use all of
1:46:26them. There's $480 of road. That's
1:46:30insurmountable. So, if you use the the
1:46:33funding that Steve showed earlier of $14
1:46:35million a year, if we let all the roads,
1:46:38if all the roads were in that worst
1:46:40category at $160, the most expensive
1:46:42category, you can pave five miles a year
1:46:45out of $480,
1:46:47that would take you 96 years to touch
1:46:50every road in the city. And nothing on
1:46:52that list will even come close to
1:46:55lasting for 96 years. If you use the
1:46:57pavement preservation program um which
1:47:01most of the mileage of roads about 160
1:47:03miles of that system is in that category
1:47:07at $15 would be 50 miles a year. So
1:47:10every year your construction
1:47:13um program would be touching 50 miles of
1:47:16the city instead of five and that way
1:47:19you could resurface every road about 10
1:47:21years. Um so you touch the whole city in
1:47:2410 years. So it just kind of shows the
1:47:26we need all of these. Not every road is
1:47:28in that category or in the worst
1:47:29category. So it's a mixture of them. And
1:47:31plus with all the intricacies of all of
1:47:33those things in the toolbox, we just
1:47:35need them all to have a comprehensive
1:47:37system so that we can pave as much as we
1:47:40can with the money that's available. And
1:47:42if we just focus on the worst roads,
1:47:44we're not going to get that far and
1:47:45we're going to be even more um digging
1:47:48ourselves into a hole. So that's kind of
1:47:50what this program is based on. Um, so
1:47:52that you're doing all these different
1:47:54types of treatment for the right road at
1:47:55the right time to try to keep the
1:47:57status, keep those roads that are in
1:47:59good condition in good condition while
1:48:01fixing some of the bad ones to bring it
1:48:03up into that good condition. But as the
1:48:04roads make it into that good condition,
1:48:07you keep them there and you preserve
1:48:08them at a lower cost. So,
1:48:11>> thank you. I I like this system. I'm
1:48:14glad we finally have a proc excuse me,
1:48:19[clears throat and cough] a process for
1:48:21it.
1:48:25you know, we're we're still at the
1:48:27infancy of it, so it's going to take
1:48:28some time for for it to really show out
1:48:31there. Um, the question I have is how
1:48:35how do you guys attack it? Like I'm I
1:48:38look at the um
1:48:40the 65 to 80 PCI as being the biggest
1:48:44chunk
1:48:46of mileage
1:48:48um in the preventative maintenance.
1:48:52Is that an area that we're working more
1:48:54on to keep things more prevented in more
1:48:57preventative stage? Are you spending
1:48:59more time on minor rehab? How how does
1:49:03it work from your guys' standpoint?
1:49:05>> How do you look at it,
1:49:06>> Mr. Chair, I think you you've hit the
1:49:07nail on the head there, which is that is
1:49:09our biggest category, and that's also a
1:49:11category where there are still
1:49:13cost-effective treatments. So, it's
1:49:14important for us to really emphasize and
1:49:18apply those preventative maintenance
1:49:19treatments and prevent as much of that
1:49:22mileage from falling into the next
1:49:23categories as we can. So, that has to be
1:49:26a a key part of the program. Um, and
1:49:28just, you know, for everyone's
1:49:30information, you're referencing um the
1:49:32chart on on slide 20, and this gets to
1:49:34councelor Rivera's question earlier
1:49:36about how many miles do we have in each
1:49:38category. So you can see here um
1:49:41>> too just for clarification um I see the
1:49:44miles but
1:49:46in a broader um picture I I was I don't
1:49:50know if you guys have this or not but
1:49:52just an example let's say city of
1:49:53Worester has
1:49:55a thousand streets right how many of
1:49:58those are in the really need repair and
1:50:03some how many are maintenance you know
1:50:05and based on the color configuration
1:50:08that you gave was 1, two, three, four.
1:50:10Do we have that kind of numbers or no?
1:50:13Just mileage.
1:50:14>> So, it's all in the in the DTM report on
1:50:18the pavement management website. So, we
1:50:19have it broken out by percentage of
1:50:22roads and there's a list of every of we
1:50:24have um you know internally with DBW a
1:50:27list of all the roads and all the
1:50:28categories so that we can make these
1:50:30decisions. Um but basically it's how
1:50:33they make the decision is based on that
1:50:35data as a planning level and then go to
1:50:37engineering from there. Um but in that
1:50:40report it also shows the allocation of
1:50:42Jay mentioned earlier that okay this is
1:50:44the budget for the year. Um there's so
1:50:47much percentage of that budget allocated
1:50:49to each type of those repairs. Um and we
1:50:53looked at two funding scenarios. So, we
1:50:54said, "Okay, um the if we didn't do any
1:50:58preservation and all the money we put it
1:51:00in, um the worst category, it would cost
1:51:04us $20 million just to to stay status
1:51:06quo. Um but in moving those percentages
1:51:10around, putting more percentage into the
1:51:12paving preservation to keep those roads
1:51:14good that are already in good condition,
1:51:16uh we can reduce the amount of money
1:51:18that we need each year to about 14
1:51:19million. So um we look at that
1:51:22percentage to see um that will change
1:51:24from year to year also depending on how
1:51:26many roads are in that category. Um but
1:51:28right now there's about 30% of the roads
1:51:30are in that pavement preservation or 160
1:51:32miles um in 2023 when they were scanned.
1:51:36So um we look to scan the roads every 3
1:51:38to 5 years because the further we get
1:51:41away from scanning the roads the more
1:51:43relying on modeling and you know
1:51:45predictions and actual not actual
1:51:47numbers. So,
1:51:48>> not that it's important, but just out of
1:51:50curiosity, how many rows does the city
1:51:52of Wester have in total if you have that
1:51:55on you
1:51:56>> through the chair? I I would have to
1:51:57report back to you on do maybe it looks
1:52:01like assistant commissioner Melo may may
1:52:03know here.
1:52:04>> That's we do it more in miles and square
1:52:06yards because it's like the length of
1:52:08the roads because it could be 10 roads
1:52:11in 480 miles or it could be 10,000 roads
1:52:14in 480 mi. We have that number. It's
1:52:16just
1:52:17>> the other the other thing we through the
1:52:18chair the other thing we find is that
1:52:20the condition of a road may vary from
1:52:23block to block. So there's some roads
1:52:24that have say four blocks that are you
1:52:27know in terrible condition and need
1:52:28major rehab and the next eight blocks
1:52:32perhaps were done more recently and are
1:52:34candidate for a different treatment.
1:52:37>> Councelor Fizzola has a question.
1:52:40Just quickly, I I I'm just going from
1:52:45memory. Just recently, I thought I heard
1:52:4916 million earlier $19 million. I
1:52:51thought we were spending $22 million on
1:52:54streets this year. Somebody
1:52:57>> Yeah, Commissioner Wesley can verify
1:52:59this year. This year is our highest I
1:53:01think um funding level ever but
1:53:04historically we have in the past
1:53:06typically been at around 12 to 14
1:53:09million a year
1:53:11through the chair that is correct. Uh
1:53:13last year we did increase the monies in
1:53:16the uh so this would be FY26
1:53:19we increase the monies in the
1:53:20resurfacing budget to match the $19.2 $2
1:53:22million uh threshold that wouldn't be
1:53:25needed to bring up the roads to the PCI
1:53:28that we've uh kind of been harping on.
1:53:30Um the only issue really that we've also
1:53:33cited there is that money has now become
1:53:36inadequate to reach that. So this year
1:53:39we were given additional resurfacing
1:53:41funds through administration and we're
1:53:43putting very good use to those. Um
1:53:45however, if we want to achieve the goals
1:53:48laid out in the payment management plan,
1:53:49we need to explore um making that a
1:53:52permanent shift uh just due to
1:53:54inflationary costs. Otherwise, we're
1:53:56going to be back um just kind of trying
1:53:59to tread water.
1:54:01>> Mr. Chairman, I want to give credit to
1:54:02Jay Melo and his team because you
1:54:04received how much for Grafton Street?
1:54:06>> It was $2 million.
1:54:08>> So, above and beyond the local funds. Uh
1:54:11the engineering team found $2 million
1:54:13from Mass DOT to resurface a major
1:54:16section of Grafton Street.
1:54:18>> Yeah.
1:54:19>> Okay. Thank you. Through you through you
1:54:21Mr. Chairman. So um that 2 million is
1:54:25additional to the 22 million.
1:54:28>> Uh
1:54:30uh through the chair that is correct.
1:54:31So, uh, we were given additional monies
1:54:33for resurfacing through, uh,
1:54:35administration and then, uh, through
1:54:37some strong partnerships we have over at
1:54:38Mass DOT and their pavement preservation
1:54:40folks, we were able to achieve, uh, some
1:54:42funds to pave almost another two miles
1:54:44worth of, uh,
1:54:45>> Oh, that's great news and I appreciate
1:54:48that. The only other thing on page two,
1:54:51I see this pavement management system
1:54:53dashboard. Out of all the colors,
1:54:56unfortunately, I see more red than
1:54:57anything. Is that is that the case where
1:55:00our streets are are in that much need of
1:55:02repair that we have
1:55:05>> through the chair there's a lot of red
1:55:06it's not it's not the majority it's not
1:55:08the highest category um but there's
1:55:10there's a lot it's about um sorry I need
1:55:14to turn to the slide where I can
1:55:16actually see the percentage
1:55:17>> I can assist you there commissioner it's
1:55:1921%
1:55:21looks a lot on the map it looks a lot
1:55:24more than 21% but that's
1:55:25>> the red really jumps out Yeah. Okay, Mr.
1:55:29Chairman, thank you very much. I
1:55:30appreciate your information, team. Thank
1:55:32you.
1:55:34>> Um, I don't know if there's any other
1:55:36questions,
1:55:39>> guys. I I just want to thank you all. I
1:55:41appreciate you coming in and just
1:55:42enlightening us as to what's available
1:55:44to us as a municipality.
1:55:47Um,
1:55:48my my sense is in the next couple of
1:55:50years, we're going to see more a greater
1:55:53impact um through this programming. um
1:55:56which is phenomenal. Um I look forward
1:55:59to hearing more about
1:56:03what we can do with some of the chip
1:56:05seal fails. I think that's important for
1:56:08people. They're struggling with it. It's
1:56:10affecting their everyday life. Um but I
1:56:14appreciate I appreciate the management
1:56:16the pavement management program. I think
1:56:18it will do what it set out to do for us.
1:56:22So thank you.
1:56:24>> Mr. Mr. Chairman, can I ask for feedback
1:56:27from the counselors? If there is a road
1:56:29that we believe uh that the rubber chip
1:56:32failed to share that with us so we can
1:56:34go out, inspect it, we can bring the
1:56:36contractor out, inspect it. Um but we
1:56:39did a lot of roads last year. I don't
1:56:41believe that they've all failed. Uh but
1:56:43if you've got that feedback, and we can
1:56:46also do an inventory, but if you've got
1:56:48that feedback, we can take a closer
1:56:50look.
1:56:50>> And I And I Sure. Of course. And I still
1:56:56I like the chip seal process because
1:56:58I've seen it in other communities and it
1:56:59worked. Whatever happened on the few
1:57:01streets where it didn't work I feel is,
1:57:06you know, a roll of the dice that on
1:57:08that particular day or that particular
1:57:10week something failed in their system.
1:57:14Um but I do think it's a it could be a
1:57:16very useful tool
1:57:19um for us here in in our city. So,
1:57:22>> Mr. Chairman, you're absolutely correct.
1:57:24We would love to mill an overlay or full
1:57:26depth reconstruction every 450 miles in
1:57:30the city. We simply can't afford it. So,
1:57:32this extends the life of existing
1:57:34pavement. Doesn't come out to the same
1:57:36level as a brand new pavement. But
1:57:39without doing that, those roads would
1:57:41deteriorate until they failed. At which
1:57:44point, the city would be able to go in
1:57:45and would have to do work
1:57:47>> because I see the value. If you can
1:57:48preserve a street for another five
1:57:50years, eight years at a at a you know,
1:57:53just like at your own home, you know,
1:57:54you do it at home, you know, you spend a
1:57:57couple bucks to paint that room, okay,
1:57:59that room's done. I don't have to worry
1:58:01about it again. So,
1:58:04um, if there aren't any more questions
1:58:06from my my uh committee members,
1:58:13Mr. Chairman, um, Mr. Clerk. Um, I'd
1:58:17like to make the motion um to hold this
1:58:19item in committee
1:58:21with the roll call vote, please.
1:58:23>> Councilors Fizzolo,
1:58:26>> yes.
1:58:26>> Mitra, yes. And chairperson, councelor
1:58:29Conor,
1:58:29>> yes.
1:58:31>> And uh, traffic parking is going to do
1:58:34the same thing. Want to hold it, keep it
1:58:36in our agenda for future discussions.
1:58:39Roll call.
1:58:40>> Councilors Bada.
1:58:42>> Yes. Oh,
1:58:44>> yes.
1:58:45>> And chairperson councelor Rivera.
1:58:46>> Yes.
1:58:49>> Uh for um
1:58:53for my committee of public works motion
1:58:56would be to adjurnn.
1:58:58All in favor?
1:59:00>> Opposed? So vote.
1:59:03>> And for traffic and parking uh meeting
1:59:06adjourn. Roll call.
1:59:08>> Councilors Bada
1:59:11>> Oha.
1:59:12>> Yes. Yes. And chairperson counc.
1:59:14>> Yes.
