2026-09-14 - Conservation Commission

Summary

Based on auto-generated captions; names, numbers and details may be misheard (including applicants' and consultants' names).

Time on topic (from transcript timestamps; approximate, includes side talk):

Topic Minutes Share
1 and 3 Suburban Road 94 60%
300 and 301 Barber Avenue 19 12%
Other business 13 8%
26 and 28 Milton Street 12 7%
35 State Road (SAL LLC) 9 5%
3 Mann Street (ZB-2026-061) 8 5%
Conservation Commission Enforcement Orders 2 1%
Postponements 2 1%
Wetlands Protection Ordinance Revisions 1 0%
  • Monday, September 14, 2026, Levi Lincoln Chamber, chaired by Diane Fratoni with staff led by Eric Flint.
  • Every vote was 3-0 by voice.
  • The recording runs about 2:37; the 1 and 3 Suburban Road hearing took roughly 1 hour 45 minutes of it.

Postponements

2:27-4:00

35 State Road (SAL LLC)

5:39-14:15

  • Returned for stormwater concerns about an outstanding resource water. The engineer added a separator, filtration and recharge for paved areas and re-flagged the wetland.
  • A riprap outfall in the 30-foot buffer needed a discretionary allowance under section 4.2.4; the property is in a Zone A, and the state agency (DEP) allowed flexibility for a mix of new and redeveloped area.
  • A commissioner asked about snow storage near the wetland; staff pointed to salt and snow conditions.
  • Hearing closed; order of conditions issued, 3-0 (flags A5 to A23 confirmed, markers every 25 feet, revised marker plan before construction).

3 Mann Street (ZB-2026-061)

14:15-22:18

  • Renovation of an existing four-unit building and a new duplex on a second lot; about three quarters of the lot is bordering land subject to flooding from a brook behind it (name garbled in the captions).
  • Staff noted the bioretention basin has under a foot of separation to groundwater; the engineer offered a confirmatory test pit and said the second infiltration system is optional.
  • Order of conditions issued, 3-0, including condition 27 requiring test pit data and plan changes if separation is inadequate, plus a certified as-built showing compensatory flood storage.

300 and 301 Barber Avenue

22:18-40:57

  • After-the-fact repair of a roughly 100-foot retaining wall that collapsed in March or April and spilled debris to within 8 to 10 feet of the wetland, with a concrete block wall of the same height, deadman anchors and drainage upgrades; work from the parking lot side with possible small compaction equipment on the slope.
  • A nearby stormwater basin may or may not be a protected resource area (it predates 1996 and records were unclear); the order expressly makes no finding on that and the work there is only hand cleanup of trash.
  • Discretionary allowance for the 15-foot buffer; order of conditions issued, 3-0.

1 and 3 Suburban Road

40:57-2:13:06, 2:35:53-2:37:55

  • Notice of Intent by PR II/Wood West Side LLC (Wood Partners) for about 300 apartments in three five-story buildings, 600 parking spaces, a 5,000 sq ft clubhouse, pool and an emergency access road from Havlin St. The filing is under the City ordinance only because more than 5,000 sq ft of disturbance falls in the 100-foot stormwater protection zone; no work is in the 100-foot buffer of the delineated wetland.
  • The applicant said the filled area dates to 1938 to 1960, before the state Wetlands Protection Act (1972) and the City ordinance (September 1990), and showed shallow infiltration systems, a reduced berm (cut about 50 percent) and 34 test pits.
  • Staff asked for construction phasing plans, groundwater and soil data at each infiltration site, answers on up to 12 feet of urban fill and trash, and noted the site is a land use with higher pollutant load. No environmental site assessment has been submitted.
  • Chair Fratoni's concerns: stability, whether infiltration can work, contamination, long-term maintenance, and the risk of a cleared, abandoned site. She said asking that the site be treated as a wetland is outside what the Commission can decide here because it was filled before the laws.
  • About 15 neighbors and others spoke against it. Themes: a former dump with coal ash, tannery waste and petroleum-smelling soil; peat acting as a filter and sponge; soil classes in the stormwater model said to be wrong; flooding and sump pumps on Havlin St.; loss of trees; traffic; and the developer's record elsewhere. A speaker argued the filled area still functions as a wetland and the land could be conserved.
  • Staff said anyone can file a request for determination of applicability to test jurisdiction (a notice of intent needs the owner's permission).
  • No vote. Continued to October 5, with revised materials due a week earlier. The Planning Board took the project up two days later.

26 and 28 Milton Street

2:13:10-2:24:46

  • Two three-unit townhouses, largely already built; the engineer said the team was brought in near the end of construction and a stop work order was in place until approvals.
  • Roof runoff goes to shallow underground infiltration under the front driveways; two catch basins are planned on the private road.
  • Order of conditions issued, 3-0, with a groundwater mounding analysis and a revised planting plan with at least 50 percent native species. Staff warned the erosion controls were inconsistent.

Conservation Commission Enforcement Orders

2:32:28-2:34:15

  • 570 Lincoln Street (parking area dredged in 2023) restored and the order lifted.
  • 612 Grove Street: asphalt near Delaney Brook removed over the weekend; straw waddles requested until the site is stable.
  • 148 Tory Fort Lane received its certificate of compliance but its enforcement order stays until the last monitoring report.

Wetlands Protection Ordinance Revisions

2:35:02-2:35:42

  • Staff are behind because of caseload; they are also adjusting the fee schedule and still aim to finish this calendar year.

Other business

0:00-2:27, 4:00-5:39, 2:13:06-2:13:10, 2:24:46-2:32:28, 2:34:15-2:35:02, 2:35:42-2:35:53, 2:37:55-2:38:14

  • 104 Lamartine Street (Patriot Paving, repair of an existing paved entrance): negative determination.
  • Certificates of compliance issued for Lots 1 to 7 Tory Fort Lane (partial), 34 Bittersweet Blvd. (partial), 115 Northeast Cutoff (electric school bus work; conservation restriction now recorded), Hemans Street and Milton Street lots, 148 Tory Fort Lane and 522 Grove St.
  • Emergency certificate for 320 June Street (a leaning oak) ratified.
  • A volunteer group collected 11 bags of trash at Perkins Farm on September 12.
  • No update on the Community Preservation Act committee or on a lake boat wake decision (hoping the state decides).
  • August 24 minutes approved.

Agenda

Conservation Commission Meeting Agenda, Monday, September 14, 2026, 5:30 PM, Worcester City Hall, Levi Lincoln Chamber, 3rd Floor (Room 309), 455 Main Street, with Zoom and phone participation. Commission members: Diane Fratoni (Chair), Devin Canton (Vice Chair), Stuart Kirshner, Lindsay Nystrom. Upcoming meetings: October 5, October 26, November 16, December 7, December 28, 2026; January 25, 2027.

Call to Order - 5:30 PM. Requests for Continuances, Postponements, Withdrawals. Public Hearings.

New Business - Request for Determination of Applicability

  1. Providence and Worcester Railroad Right-of-Way - CC-2026-033 - Applicant: TEC Associates. Determine whether resource area boundaries are accurately delineated for a five-year vegetation management plan. (WPA and City Ordinance)
  2. 104 Lamartine Street (MBL 05-012-00005) - CC-2026-063 - Applicant: Patriot Paving. Repair of an existing paved entrance and related sitework. (WPA and City Ordinance)

Old Business - Notice of Intent

  1. 35 State Road (MBL 32-019-00316) - CC-2026-045 & DEP# 349-1458 - Applicant: SAL, LLC. Remove existing site improvements and construct an 8-unit residential building, parking, stormwater infrastructure and related sitework; discretionary allowance from performance standard 4.2.4. (WPA and City Ordinance)

New Business - Notice of Intent

  1. 497 Granite Street (MBL 45-001-91-93) - CC-2026-026 & DEP# 349-1452 - Applicant: Eskay Builders LLC. Single-family dwelling, driveway, rain gardens and related sitework. (WPA and City Ordinance)
  2. 99 Sears Island Drive (MBL 13-034-52+53) - CC-2026-052 & DEP# 349-1456 - Applicant: Lawerence Johnson. Addition and deck, shed removal, related sitework; waiver of performance standard 4.2.4. (WPA and City Ordinance)
  3. 3 Mann Street (MBL 14-033-00002) - CC-2026-058 & DEP# 349-1459 - Applicant: Daniel Remeika, Jr. Renovate the existing multi-family dwelling and construct a new two-family dwelling, parking areas, walkways, stormwater infrastructure and related sitework. (WPA and City Ordinance)
  4. 300 & 301 Barber Avenue (MBL 22-015-00001 & 22-015-00002) - CC-2026-059 & DEP# 349-1460 - Applicant: 301 Barber Avenue Owner LLC. Repair and replace an existing retaining wall, drainage improvements, related sitework; discretionary allowance from performance standard 4.2.4. (WPA and City Ordinance)
  5. 278 Grove Street, 4 Brookfield Street, 4 & 4A Powers Court (MBL 09-026-0000C, 09-026-00021, 09-026-00023 & 09-026-0023A) - CC-2026-061 & DEP# 349-14xx - Applicant: 278-284 Grove Street 2022 LLC. Sitework for redevelopment of a commercial lot, including two new stormwater connections to an existing drainage culvert. (WPA and City Ordinance)
  6. 42 First Street & 35 Second Street (MBL 42-034-00040 & 42-034-00091) - CC-2026-062 - Applicant: Daniel Wyco. Single-family home, driveways, stormwater infrastructure and related sitework. (City Ordinance)
  7. 1 & 3 Suburban Road (MBL 11-011-0002A & 43-011-0001B) - CC-2026-064 - Applicant: PR II/Wood West Side LLC. Three residential buildings, a clubhouse, outdoor amenities, stormwater infrastructure, parking, fire access road and related sitework. (City Ordinance)
  8. 6 Woburn Street (MBL 12-028-0004B) - CC-2026-065 - Applicant: Marcelo Barretto. Two-story commercial building, parking area and related sitework. (City Ordinance)
  9. 26 & 28 Milton Street (MBL 09-028-19-22 & 09-028-1922A) - CC-2026-066 - Applicant: Milton Street Properties, LLC. Two three-unit townhouses, driveways, walkways, utilities, stormwater infrastructure and related sitework. (City Ordinance)

Other Business

  1. Request for Certificate of Compliance: (a) Lots 1-7 Tory Fort Lane (CC-2005-038 & DEP# 349-0837); (b) 34 Bittersweet Boulevard (CC-2009-042 & DEP# 349-0979); (c) 115 Northeast Cutoff (CC-2022-004 & DEP# 349-1314); (d) 0, 9 & 19 Hemans Street, 7 Hemans Court, and 40 & 40R Milton Street (CC-2022-032); (e) 148 Tory Fort Lane (CC-2023-016 & DEP# 349-1356); (f) 522 Grove Street (CC-2025-023)
  2. Emergency Certificate: (a) 320 June Street (CC-EC-2026-004)
  3. Enforcement Order and Violation Updates: (a) 133 Lake Avenue North (CC-2020-007); (b) 99 Wildwood Avenue (CC-EO-2020-009); (c) 269 James Street (CC-EO-2021-007); (d) 4 Tiffany Avenue (CC-EO-2023-001); (e) 570 Lincoln Street (CC-EO-2023-010); (f) 198 Granite Street (CC-EO-2024-001); (g) 86 Webster Street (CC-EO-2024-003); (h) Salisbury Hill (CC-EO-2024-005 & DEP# 349-1253); (i) 142-158 Wildwood Avenue (CC-EO-2024-010); (j) 1256 West Boylston Street (CC-EO-2025-001); (k) 13 Holden Street (CC-EO-2025-002 & DEP# 349-1409); (l) 270 Webster Street (CC-EO-2025-004); (m) 34 Eskow Road & 224 Southwest Cutoff (CC-EO-2025-006); (n) 148A Tory Fort Lane (CC-EO-2025-007, CC-2023-016 & DEP# 349-1356); (o) 1259 West Boylston Street (CC-EO-2025-008); (p) 757 Salisbury Street (CC-EO-2025-010 & CC-2023-005); (q) 9 & 13 Elton Street (CC-EO-2025-011, CC-2024-083 & DEP# 349-1407); (r) 612 Grove Street (CC-EO-2026-001); (s) 342 (aka 344, 346 & 348) Lake Avenue (CC-EO-2026-002 & DEP# 349-1435); (t) 88 Webster Street (CC-EO-2026-005); (u) 11 Holden Street (CC-EO-2026-003); (v) 142 Olean Street (CC-EO-2026-004)
  4. Open Space Discussion
  5. Discussion of Active Projects
  6. Communications
  7. Approval of Minutes - 08/24/2026
  8. Update to Wetlands Protection Ordinance and Regulations
  9. Commission Liaison Updates
  10. Policies & Procedures

Adjournment

Sources

Video

Watch the video

Transcript

Auto-generated YouTube captions; names and terms are likely misheard.

Transcript

0:02Good evening. This September 14th, 2026

0:05meeting, the Wister Conservation

0:07Commission is now called to order. My

0:09name is Diane Freroni and I'll be

0:10chairing this meeting. As part of this

0:13meeting, we will be holding hearings

0:14under the Massachusetts Wetlands

0:16Protection Act and Regulations and the

0:17City of Worcester Wetlands Protection

0:19Ordinance and Regulations. The

0:21commissioners are volunteers who serve

0:23to enforce these laws and regulations to

0:25protect specific values identified as

0:27being important to Massachusetts and the

0:28city of Worcester. Commission decisions

0:31are based on these laws and regulations

0:32and are not arbitrary or based on

0:34personal likes or dislikes. It is

0:37important to the commission that these

0:38hearings are held in a fair and

0:39equitable way for all parties involved.

0:42This requires that discussion take place

0:44in a civil manner and that every

0:46individual in this meeting is treated

0:47respectfully. To facilitate this, the

0:50hearings take place in the order they

0:51are listed on the agenda, which is

0:53available by the door and online.

0:56First, the applicant will present an

0:57overview of the project to the

0:58commission. Next, staff will provide

1:01comments on the proposed work. Then, the

1:03commission will direct any questions it

1:05has to the applicant or staff. After the

1:08commission is done questioning the

1:09applicant, the floor will be open to the

1:11public. Comments and questions must be

1:13directed to the chairperson, not to the

1:15applicant or their representative, and

1:17they must pertain to the regulations

1:19that the commission oversees. For

1:21example, although you might have

1:23concerns over the traffic resulting from

1:25a particular project, the conservation

1:27commission does not regulate traffic, so

1:29traffic concerns will not be discussed

1:30during the meeting. Please note that

1:33while new points will be given ample

1:34time to present, repetitive comments

1:36will be cut short in the interest of

1:38having all parties be given an

1:39opportunity to speak. We ask that all

1:42applicants and members of the public,

1:43please state their name and city or town

1:45of residents for the record. To manage

1:48remote participation during our hybrid

1:50meetings and prevent disruptions, all

1:52participants are automatically blocked

1:53from unmuting themselves, turning on

1:55video, or sending chat messages. For

1:58remote participants who would like to

2:00comment on an item on our agenda, we ask

2:02that you use the raise hand feature in

2:04Zoom during the discussion on that item.

2:06If you are joined by phone, you can

2:08raise your hand by pressing star9. Staff

2:10will then call in members of the public

2:12one at a time and give them permission

2:14to unmute themselves. If you are joined

2:16by phone, you will then be able to

2:17unmute yourself by pressing star six.

2:25Um, first, are there any requests for

2:27continuances, postponements, or

2:29withdrawals?

2:30>> Uh, yes. We have item number one,

2:32Providence and Worcester Railroad right

2:34away. Uh, it's a request to postpone the

2:36public hearing to October 5th and extend

2:38the constructive grant deadline to

2:40October 27th. Item number four, 497

2:43Granite Street. That's a request to

2:45postpone the public hearing to a date

2:47unknown and extend the constructive

2:49grant deadline to uh 21 days following

2:53uh the eventual hearing date. So

2:55essentially in this case, there would be

2:56a readvertising of the public hearing.

2:58So, renotice to a butters and

2:59re-advertisement in the newspaper. Uh,

3:02once the applicant's ready to move

3:03forward, we have item number five, 99

3:06Sears Island Drive. That's a request to

3:08postpone the public hearing to October

3:095th and extend the constructive grant

3:11deadline to October 27th. Item number

3:14eight, 278 Grove Street for Brookfield

3:16Street 4 and 4A Powers Court. That's a

3:18request to postpone the public hearing

3:20to October 5th and extend the

3:21constructive grant deadline to October

3:2327th. Item number nine, 42 1st Street

3:26and 35 Second Street, request to

3:29postpone the public hearing to August

3:305th or October 5th and extend the

3:33constructive grant deadline to October

3:3427th. [clears throat] And then lastly,

3:37item number 116 Wurn Street, a request

3:39to postpone the public hearing to

3:40October 5th and extend the constructive

3:43grant deadline to October 27th.

3:45>> Make a motion to postpone or continue

3:48items 1, four, 5, 8, 9, and 11 as

3:51described.

3:53Second.

3:54>> All in favor?

3:55>> I

3:55>> I

3:56>> I

3:58>> uh first item, new business, uh request

4:01for determination of applicability, 104

4:03Lambertine Street.

4:10>> Hi, good evening. John Goff, live in

4:13Conquered, Massachusetts. Thank you for

4:15your time. Um, we're looking to repair

4:18the existing paved apron area off of

4:21Sergeant Street. It's the entrance way

4:23into the property, which we acquired

4:25last year and um uh is in in need of

4:29repair. We're not looking to add any

4:30impervious surface area to um to widen

4:35or anything except to repair that

4:36existing area and make it nice and flush

4:40and safe for the tenant we're trying to

4:42bring in there and people walking down

4:44that sidewalk. Thank you for your

4:46consideration.

4:46>> Okay.

4:47>> Thank you. Uh staff, any comments or

4:49concerns about the work?

4:51>> Yep. So, just note this property is

4:54within borderland subject to flooding.

4:55Um this is the reason they had to file

4:57with us. Uh so, no concerns with this

5:00project. Uh they are repairing uh what's

5:04existing. Um they will be maintaining

5:06same grades, so no concerns with fill in

5:08the flood plane. Um yeah, that's all

5:10from staff.

5:11>> All right. Thank you. Um, uh,

5:13commissioners, any comments or concerns

5:15about the project?

5:21>> No.

5:21>> Uh, anybody from the public here on this

5:24item?

5:29>> I'll make a motion for a negative

5:30determination.

5:32>> Second.

5:33>> All in favor?

5:34>> I

5:34>> I

5:34>> I

5:35>> You're all set.

5:36>> Thank you.

5:36>> Thank you. Have a good night.

5:39Uh, next item, old business, notice of

5:41intent, 35 State Road.

5:53>> All right.

5:54Hello, I'm Veto Colono with Connorstone

5:56Engineering. Uh, here on behalf of the

5:58applicant, sitting right behind me. Um,

6:02let's see. I don't know where we left

6:04off last time. Um, the continued. uh

6:07there were concerns mostly about the

6:09storm water management in relation to

6:12the outstanding resource water. Um and

6:15so basically what we've done is updated

6:17the plans to provide treatment uh and

6:21recharge to all of the impervious

6:23surfaces especially the um the paved

6:26surfaces. That was the main concern. uh

6:28previously we were treating those

6:30through a structural uh storm scepter um

6:33but there wasn't any infiltration

6:35component and that alone didn't meet the

6:38OW uh standards um that higher level of

6:42treatment uh so what we did was we

6:44collected that we went it through a

6:45swamp separator just as pre-treatment

6:47then did filtration then to discharge uh

6:50so it now it has that extra level of

6:52treatment um and complies with those

6:55standards

6:57Um, I think that was the major revision

7:00uh made to the plans uh during that last

7:03um round. Uh, we also did have the

7:06welling consultant go and ref flag or

7:08rehang the flags just to refresh them um

7:12and just because I think a lot of the

7:13numbers wore off uh just because they

7:15had been up for about a year.

7:16[clears throat] And I think in our

7:18package, we also asked for a waiver um

7:22to where that discharge outlet is um

7:24just to place a rip wrap uh within that

7:27inner uh 30 foot to 15 foot uh zone. Um

7:32because technically I think it's

7:33classified as a structure uh to have the

7:35rip wrap there. Um and it's kind of one

7:38of those ones we wouldn't put it there

7:40if we didn't have to. It's just where

7:41that's where the grade change is and

7:43that's where we can get elevation to be

7:44able to discharge. uh that storm water

7:47uh through there. And one thing with

7:49that also is that we are infiltrating.

7:51So during most storms there should be

7:53zero discharge out that um your everyday

7:56storms uh once it gets over like a two

7:58three inch storm then it finally starts

8:00uh flowing. But your everyday storms

8:02which are most inch or less uh there'd

8:04be zero flow uh to that point. Um I

8:08think that those were the only revisions

8:10really kind of substantial um since the

8:13last time we were here. So I guess hand

8:15it back over and

8:16>> thank you. Um staff comments on the

8:20change in the work.

8:20>> Yeah. The only other thing I would add

8:22is just uh at the last hearing we had a

8:24discussion about the zone A um and we

8:26had some back and forth with D about

8:29>> we can't hear anything you're saying.

8:31>> Okay. So

8:37at the last hearing we were discussing

8:39the presence of this property in the

8:40zone A and the uh storm water standards

8:43essentially state that you can't provide

8:45infiltration BMPPS in in zone A's. Um

8:48and so we had a a little bit of a back

8:50and forth with D about how that standard

8:53could be applied in a project like this

8:54where there is an increase in impervious

8:56area. Uh but it is a mix of new and

8:58redevelopment. Um and ultimately the

9:00feedback they gave us was that since it

9:02is a mix of redevelopment um there was

9:05some flexibility on that standard. So

9:08going back and forth with the applicant

9:09um just ensured that the rest of the um

9:12storm water standard components for

9:14standard six for discharge to a critical

9:16area were met and those were the um

9:19things that veto just described in terms

9:20of the extra treatment layer before

9:22infiltration for the storm water coming

9:24off the parking lot.

9:26>> Okay. uh commissioners uh comments or

9:29questions about the project

9:37>> through Madam Chair. Just a question. I

9:40I notice here that the snow snow storage

9:43is uh closest to the wetlands. And are

9:46there any uh thoughts or concerns of you

9:51know potential contaminated snow just

9:54being placed closest to the wetland

9:58area?

10:00>> Sure. We I can kind of go over that.

10:05>> Yeah. Use your mic close to your mouth

10:06or something. Like nothing back here.

10:09>> Okay. I think it the question mine's

10:10pretty loud so the question he asked was

10:12related to snow storage uh just where

10:14that may be if there are any concerns if

10:16it was off the end of the parking area

10:17closest towards the wetlands. Um and on

10:20this one

10:23>> um we do have other available area kind

10:25of to the left behind the sidewalk area.

10:28Um it would just generally get pushed to

10:30the sides so it wouldn't be one giant

10:32stockpile. Um so it kind of be dispersed

10:35throughout. I don't think there'd be

10:36really a point source discharge that

10:38would really, you know, consolidate all

10:40those contaminants in one spot. Um, and

10:43then I think you could also condition

10:44the type of salt used. I think it might

10:47be one of your standard conditions

10:49anyway. Um,

10:50>> yeah.

10:51>> Okay.

10:52>> Y

10:54>> um I do have a question about the picnic

10:57table that's depicted. Is that just a

10:59piece of furniture or is it a platform?

11:02>> Yeah, it's just a piece of furniture.

11:03Right. Did you have any concern um plans

11:06for like a concrete slab, right? Or

11:08anything like that? No, just a piece of

11:09furniture. So,

11:10>> okay. All right. So, really not

11:11necessary for the plan.

11:12>> Yep.

11:13>> All right. Um in general, you know, we

11:15don't like to see anything in the

11:1630-foot. Um we do have a precedent for

11:19allowing rip wrap and you know, a storm

11:21water discharge uh there. Um you sure

11:23you looked at every avenue to pull that

11:25back in?

11:26>> Yeah. So if just because of the site's

11:29fairly flat right now and then right

11:31near the wetland that's where the drop

11:32off is. Uh so to get our elevation for

11:36that discharge we have to get close uh

11:38to that. Um otherwise we'd be have to

11:41kind of gouge it back uh and do all that

11:43disturbance anyway. Um you know to make

11:46like a basically a channel from that

11:48same point back uh to it. So it didn't

11:52seem to make too much sense to do that.

11:55>> Got it.

11:56Um, anything else? Does anyone hear from

11:59the public on the project?

12:03Anyone online?

12:07>> I'll make a motion to close.

12:09>> Second.

12:10>> All in favor?

12:11>> I

12:11>> I

12:12>> I

12:12>> Is there a proposed order of conditions?

12:16>> Yes. Just bear with me one second.

12:20All right. So, first we have a couple

12:23findings. one only wetland flags uh A5

12:27through A23 are confirmed by this order

12:30of conditions. Um and then we have a

12:33finding for a discretionary allowance

12:35issued under section 4.2.4 of the

12:37Worcester wetlands protection or

12:39regulations for the rip wrap outfall in

12:40the 30-foot buffer zone. We have

12:42condition number 24 for wetland

12:45flagging.

12:46Um we have condition number 34 for

12:50demarcation of limit of work, 37 for

12:52storm water management system

12:54maintenance, 38 for infiltration unit

12:56inspection, 39 for PE certification of

12:59the storm water in infrastructure.

13:02Uh condition number 44 for permanent

13:04markers. Um just that those be placed uh

13:07along the 15t buffer spaced out every 25

13:10ft. Um, and we'd also just want to see

13:12revised plans uh depicting the location

13:14of those markers uh prior to

13:16construction. Um,

13:19let's see. We have 46 for wood removal,

13:2248 for dust control, 49 for dewatering,

13:2550 for cement truck washing, 51 for

13:27equipment placement, 56 for spill

13:30prevention,

13:32uh an asbuilt site plan as part of the

13:33certificate of compliance process, a

13:36condition for sand and salt that that be

13:38minimized to the extent possible, a

13:40condition for snow storage,

13:43uh for wetland permitting, and that

13:45would be ongoing conditions 3765

13:48through 68.

13:50Sorry. 66 through 68.

13:54>> Do you have any questions about the

13:55conditions?

13:56>> Nope. That sounds good.

13:58>> Any further discussion on them?

14:02>> I'll make a motion to issue the orders

14:04of conditions as described.

14:07>> Second.

14:08>> All in favor?

14:08>> I

14:09>> I

14:09>> I.

14:10>> All right. Thank you.

14:15Uh, next item number six, uh, new

14:19business notice of intent, three man

14:21street.

14:27>> Good evening. Uh, Mike Andre, Graves

14:29Engineering. Um, I'll keep my comments

14:32brief. I see you have a room full of

14:33interested parties for for another

14:35matter, it seems. Um, we're before you

14:37tonight for project at three main

14:39street. It's an existing lot with a

14:41four-unit multifamily building. Uh we're

14:44creating a second lot for a new duplex

14:48and uh creating off- streetet parking to

14:50support um the existing multif family in

14:52the back. Uh we're here because about

14:55threequarters of the property um to the

14:57right side of the page as you're looking

14:58at it here is within u boarding land

15:00subject to flooding associated with the

15:02flood plane of Viva Brook which is

15:04immediately behind the property. Um, so

15:08we had to be very careful with the

15:09design to u make sure we're not altering

15:12grades too much in that area. Um, there

15:16were some comments from D and from staff

15:18uh about um compensatory storage and how

15:21we were providing that as it relates to

15:23the stormwater basis. So we provided

15:24some more information on that. Um we're

15:27also um seeking consideration for

15:31allowing um a test pit at the second uh

15:34stormwater facility. There's one

15:36[clears throat]

15:37um near the proposed house to collect

15:40and recharge roof runoff. Uh initially

15:42soil testing was not done there because

15:43that was not considered at the time we

15:45did the soil testing. So we added it as

15:47an additional feature. Um we would ask

15:49that that confirmatory soil testing be

15:51done prior to construction as opposed to

15:54having to go back and dig another test

15:55pit. And I I'll point out that we don't

15:57even really need that system for the

15:59storm water to work. We could allow that

16:01roof to run off to the rain garden and

16:03everything would still would still work.

16:04storm water wise. Um

16:07um but we're okay with a condition of um

16:10doing a confirmatory test pit at that

16:11location if the commission so desires

16:13it. We feel the groundwater elevation

16:15will not change from what we've already

16:16done for testing in the back. Um so I

16:20don't think there'll be any changes on

16:21that system regardless. Um that's all my

16:24comments. I'll take any questions anyone

16:25might have.

16:26>> Okay. Thank you staff.

16:28>> Yeah, I think that was a good summary of

16:30the the comments we had. Uh the

16:32[clears throat] only other thing I would

16:33note is just that the infiltration basin

16:35itself or bio retention basin rather

16:37just has um just under a foot of

16:40separation to groundwater. Um you know

16:42the standard being uh two two feet of

16:45separation typically. Um again you know

16:49there's a little bit of flexibility in

16:51this project as well given that it's

16:53only subject to the standards to the

16:54maximum extent practicable. Um, in

16:56general in the past, uh, as far as test

16:59pits as a condition of approval, um, you

17:02know, we've we've allowed it in cases

17:04where there is redevelopment on a site.

17:06Typically, we wouldn't do it for, um,

17:08new development or projects where there

17:10are, uh, increase in impervious area,

17:12but as Mike mentioned, there was that

17:13other test pit. It was probably about

17:15100 feet away from the location of that

17:17infiltration BMP. Um, I think that

17:19showed about 3.6 feet of separation to

17:21that other uh, subsurface unit. Um so we

17:26could leave it up to the commission as

17:27far as the um condition of approval for

17:31additional test pit data. Um but uh yeah

17:34the other minor comments that we had in

17:36our in our letter have been addressed at

17:38this point.

17:39>> Thank you. [clears throat] Uh

17:40commissioners questions or comments

17:42about the project

17:50>> through you madam chair. Uh just a

17:52question on the uh the planting that you

17:54have. I see that you've called out um

17:57specifically some of the larger trees,

17:59but uh the shrubs and ornamentals are to

18:02be determined. Is there any uh line of

18:06thinking of what types of shrubs uh that

18:10you're planning for?

18:11>> So are you referring to within the bio

18:13retention area?

18:14>> No, no, just at the

18:15>> Oh, in general around the site.

18:16>> In general on the site.

18:17>> Yeah. Um let me refresh my memory what

18:20we had there. We generally like to give

18:23um for shrubs and perennials a few

18:25options that the um developer and owner

18:28can choose from. Um so I think in this

18:31case uh it's should be in the notes on

18:34what we're proposing. Usually we leave

18:36um yeah the landscape notes. There's

18:39three options for perennial grasses and

18:41perennial shrubs and flowers that they

18:44can choose from.

18:46All native.

18:48>> Okay.

18:48>> All native.

18:50Um, I have a question about the test pit

18:52that you will be doing. I mean, should

18:54the results show that you can put the

18:57infiltration there? Is your plan to just

18:59simply abandon the infiltration

19:01structure?

19:02>> Yeah, as I explained, we don't really

19:04need that one for the storm water to

19:05work. So, we I I don't expect that. We

19:07won't be able to do But I don't think

19:08the soils are going to change and the

19:10groundwater elevation, but should they

19:12for some reason, we will probably just

19:14delete that, omit it from the plan. And

19:16we'll obviously submit any revisions to

19:17the to the commission as necessary.

19:20>> Significant enough to consider it a

19:21change in the in the work or

19:25>> uh we could evaluate it once the

19:28revision any necessary revisions came

19:30in. I guess I mean the commission would

19:32have the option as it normally does to

19:33either handle something through a

19:34project change request or an amendment

19:36depending on the scope of the changes.

19:38Um so that could be a call that we make

19:40if and when there were a need for any

19:41changes.

19:42>> Got it. Got it. And when do you propose

19:43to do the work?

19:46>> Um I don't have a definitive time frame.

19:48I know the owner is uh would like to get

19:51started on the parking for the existing

19:53multif family and that rain garden. I

19:55don't have a timeline on the house and

19:57that work that may be sold to someone

19:59else for development. So, um I can't

20:01speak as to the timeline for that part.

20:04>> See, good.

20:06Um I don't have any other questions. Uh

20:09anyone here from the public on the

20:10project?

20:12>> Anyone online?

20:18>> I'll make a motion to close.

20:21>> Second.

20:22>> All in favor? Hi

20:24>> I

20:24>> I

20:25>> um proposed order conditions for the

20:27project.

20:31>> All right. So in addition to the

20:32standard conditions, we have condition

20:33number 27 for test pit data. Um and that

20:37also specifies that any plan revisions

20:39uh resulting from inadequate or

20:41inadequate separation to groundwater. Uh

20:43that those be provided to the commission

20:45for review. We have condition 37 for

20:47storm water management system

20:49maintenance, 38 for infiltration unit

20:51inspection, 39 for PE certification of

20:54storm water infrastructure,

20:56uh 48 for dust control, 49 for

20:58dewatering, 50 for cement truck washing,

21:02uh 40 for uh retention basin vegetation,

21:06[snorts]

21:08uh 56 for spill prevention,

21:13and then as part of the certificate of

21:14compliance process, an asbuilt plan

21:16showing uh final grades with one foot

21:20contour lines and spot grades as needed.

21:22Uh all constructed improvements and then

21:24certification from a PE that confirms

21:28compensatory storage was provided as

21:30proposed on the plan. And then we'd have

21:32condition number 66 for sand and salt,

21:3567 for snow storage, 68 for wetland

21:38permitting. Ongoing conditions 37 and 66

21:42through 68.

21:44Any questions?

21:46>> No, I I haven't seen those specifically,

21:49but they sound pretty familiar with the

21:51usual ones, so I think they're fine.

21:55>> Further discussion on the conditions.

21:59>> Make a motion to issue the orders of

22:02conditions as described.

22:04>> Second.

22:05>> All in favor?

22:06>> I

22:06>> I

22:07>> I

22:08>> Thank you.

22:09>> Thank you. [clears throat]

22:12Uh, next item, uh, new business notice

22:15of intent number seven, 3031 Barber

22:18Avenue.

22:39Doug, you should be able to talk.

22:41>> Hey there, guys. Can you hear me?

22:43>> Yep.

22:44>> Yes.

22:44>> Perfect. This is Douglas Dylan, wetland

22:47scientist with Garter Consulting,

22:48representing the applicant for 301

22:51Barber Avenue. So, this is a notice of

22:53intent we filed for an after the fact

22:57repair um which we'll be performing for

23:00a collapsed uh retaining wall in

23:02addition to some drainage upgrades

23:05around the property. So around March or

23:08April uh about a 100 linear foot section

23:11of this uh large retaining wall which is

23:14supporting the parking lot surrounding

23:15this commercial building collapsed when

23:17we were getting some pretty substantial

23:18rain. And I have a few of these pictures

23:20here showing that the one on your right

23:22hand side showing just totally just

23:24slipped away. So immediately the owner

23:26applicant property manager you know put

23:28some cones up did the right thing

23:30section that off and with this filing

23:32we're looking to repair that. So, the

23:35proposed repair is going to be a

23:37concrete block uh and here's here's some

23:40additional photos. You can just see the

23:42kind of damage a concrete block stacked

23:45um uh retaining wall of similar and same

23:51height as the existing and in addition

23:55drainage will be rectified. A um a

23:58gravel drainage column will be installed

24:00behind the proposed and existing

24:04um wall along the edge of the parking

24:07lot and we will be having some drainage

24:11wise installed building and of course in

24:14addition we will be proposing the

24:15cleanup of the debris and sort of spill

24:18out. So luckily none of that went into

24:20the wetland itself. it did get close

24:22about 8 to 10 ft approximately. And so

24:24in order to perform that work properly,

24:26we'll be asking for a waiver for the 15

24:29and 30 foot uh work buffers in order to

24:32perform that properly. And that is also

24:35the reason why that we have um jointly

24:38filed this with 300 barber because if

24:41you look very closely, you can see the

24:43property line

24:45really falls almost exactly in line with

24:48the edge of the retaining wall. So

24:51nothing is proposed on that adjacent

24:54property. It's just for the cleanup work

24:57and we have our uh limits of work and

25:00everything will be cased within a very

25:02sophisticated regimen erosion controls

25:05all the drains on site. We'll be having

25:07um silt sacks installed during

25:10construction to catch anything that may

25:12run run off into the parking lot. Um, we

25:14did also receive some feedback from D

25:17and city staff which we have addressed

25:19with a newer revision of the plan which

25:21is what you have in front of yourself

25:23right here on the screen. Um, and that

25:28is more or less a summary of the

25:30project. Uh, I will also just tail

25:32things off. So there is a drainage

25:35basin.

25:37You can see it sort of depicted in

25:41diamonds number two and four on the

25:44currently displayed site plan. So as

25:47part of this application

25:49right that is not depicted as a

25:50jurisdictional resource area as during

25:52the um due diligence phase and research

25:55phase of this application a prior filing

25:58was discovered wherein it was shown that

25:59that had not been constructed in an area

26:02subject to jurisdiction

26:04um being a wetland of course and has

26:07continued to serve as a base and and has

26:10been made maintained as such. uh on that

26:13as well in the listed descriptions of

26:16work for this project. There was a

26:18little bit of confusion which I'll just

26:19clear up for you guys now. So it was a

26:21task number one which was provided by

26:23the contractor. It's it stated that you

26:26know basin shall be so and so and

26:29reconnected to um the the swale. So I

26:34just want to very very uh clearly say

26:37that that reconnection is just um going

26:41to be done by the hand cleaning of trash

26:44and debris and styrofoam cups and Dunkin

26:47Donuts cups which are currently located

26:49within that basin. Um

26:52you can see in the bottom right picture

26:56that's kind of a pretty good depiction

26:59of what is in there. there's, you know,

27:00styrofoam coolers and, you know, in the

27:03basin, the picture directly above it,

27:06uh, what I have labeled as picture 10 is

27:08just, you know, there's styrofoam and

27:10paper and and junk in there. And so, the

27:12intention is just to clean that out

27:14entirely by hand, like one or two

27:17individuals with trash bags and, you

27:19know, that's about it. There's no work

27:20to sort of uh, hydraulically

27:22hydraologically alter these areas with

27:25actual construction. So, I just wanted

27:27to clarify that. But that's the project

27:29here in a nutshell and I'll happily turn

27:31it back to the board and answer any

27:33questions and open it up for discussion.

27:36>> Okay. Thank you. Uh staff comments.

27:40>> Yeah, sure. So, um we received staff uh

27:43responses to comments uh later last week

27:46and we haven't had a chance to to go

27:47back and forth with uh the applicants

27:50representatives on it yet other than a

27:52quick email exchange today. Um but our

27:56comments largely related to uh plan

27:59revisions that were requested and

28:00addressed on the most recently revised

28:02set of plans. Uh the comment we received

28:05from D um the primary comment related to

28:09the jurisdictional status of that basin

28:11and the documentation needed um

28:15to basically prove that that's that's a

28:17non-jurisdictional area. Um, so I guess

28:20through through our research, we weren't

28:22clear on the timing of the construction

28:24of that basin. Um, because it's really

28:27basins after 1996 that are exempt that

28:29are not considered resource areas. Um,

28:32and it wasn't also clear to us that the

28:34basin was constructed as part of an

28:35order of conditions because the plans

28:37that were provided uh that were dated

28:391991 didn't appear to show that basin.

28:42Um, so we were uh just hoping Doug, I

28:45don't know if you could provide any any

28:46feedback on those points. um just

28:48related to this the jurisdictional

28:50status of the basin. I think the work

28:51itself is not a concern. Just picking up

28:53trash is obviously

28:54>> Yes, absolutely. So, it it was

28:57constructed prior to 1996 and I'm just

29:00going to pull up that D comment right

29:03now just so I can uh refer to it

29:05verbatim if necessary. Um so essentially

29:08the distinction is that

29:13basins constructed prior to 1996 right

29:16the regulations at the time allowed the

29:19storm water standards allowed basins and

29:21storm water features to be constructed

29:23within wetlands or using wetlands for

29:26their basis. That's no longer the case.

29:28So essentially it's if you're able to

29:31show that a wet a basement was not

29:34constructed it's sort of you know you're

29:36showing that is not an area subject to

29:37jurisdiction right so um it's

29:39essentially bring back wetland which may

29:43have been lost or converted to storm

29:45water basins are now made jurisdictional

29:47and this one per its uh delineation or

29:51the delineation of the property for one

29:53of these older orders of conditions

29:54rather I believe it was delineated by um

29:57Glen Kbas key. Um

30:02six, the the commission applicant should

30:04evaluate if the the swale and or basin

30:07contain characteristics of wetland. So

30:10if sort of if it has not been maintained

30:12and has also been allowed to grow out

30:14into a wetland sort of naturalized, it's

30:18been shown that the applicant has not

30:20operated and maintained and and use this

30:23feature as a basin. then you know it

30:26would also be liable to be considered a

30:29wetland resource area at this point

30:31which in this case is not um the case.

30:35It still is very much it's free of

30:36vegetation and really the intent is to

30:39just continue to utilize it as a storm

30:42water feature, remove some of the trash

30:45from it and you know continue on as uh

30:49as has been.

30:52>> Okay. I think I mean from from staff's

30:55perspective, I think we would need more

30:56time to review and confirm the

30:59applicability of the regulations if we

31:00were going to make a determination on

31:02the jurisdictional status of that basin

31:04tonight. Um, you know, if the commission

31:07and applicant are comfortable with a

31:08finding that an order of conditions for

31:10this work doesn't confirm the

31:12jurisdictional status one way or

31:14another, I think staff would be okay

31:15with that. Um but again I don't I think

31:18we would want a little more time to

31:19review u the applicability of the

31:22regulations to that area. Um aside from

31:25again and this is really just a a

31:27question of

31:29determining the jurisdictional status.

31:31It's not a comment on the work that's

31:32proposed within it because obviously the

31:34removal of debris and trash is a

31:36positive for the area regardless of what

31:39it is from a jurisdictional standpoint.

31:41Um the the only other uh comment and

31:44response that I just wanted to follow up

31:46on uh related to the plan to uh

31:50exclusively access this area using

31:52machinery from the parking lot. I saw

31:54that the the response noted that any

31:57access is included within the limit of

31:59work. Did that does that imply that

32:01there there will need to be machinery

32:02down in that area off off of the wall or

32:05will all the work be able to be

32:06performed from the upgradient side?

32:10All the work will be able to be

32:12performed from the upgrading. So that's

32:13sort of like access in the in the

32:15general sense as you know work will be

32:18occurring there and you know material

32:21will need to be moved there. But um my

32:24understanding is that the machinery will

32:27not need to be traveling down the um

32:32slope areas. It's it's really difficult

32:33to even get down there anyway.

32:37>> That's all from staff for now.

32:40Okay. Thank you. Um commissioners

32:43comments or questions about the project?

32:45>> Yes. Uh through you madam chair. So um

32:48couple of questions. So the uh the dead

32:52man anchors that are shown. Can you talk

32:54a little bit about uh the installation

32:57process of those because you just

32:59mentioned that all work is going to be

33:01done on the uh upland side or all

33:02machinery is going to be on that side.

33:05So, can you just sort of walk me through

33:07how those are installed?

33:09>> Yep. So, that'll just be the from from

33:11the top, right? So, if you can imagine

33:13the top of the wall being, you know,

33:16approximately flush with the surface or

33:19parking lot up there. So nearest to the

33:21wall on the up upper parking lot side,

33:25it'll be scraped back and then there

33:27will be some um you know like cables or

33:31brackets essentially installed into the

33:34existing face of the wall

33:38uh laid back into the soil or fill and

33:42then rolled back over such that they're

33:45just anchored by the soil. um like

33:49inwardly, right? Like pulled it's sort

33:51of pulling itself together structurally

33:53so that the overall structural integrity

33:56and strength of the structure is uh

33:59increased and maintained.

34:00>> Right. Right. Is there uh concrete or

34:03some sort of other material that is uh

34:05around the anchors?

34:09>> Uh

34:10>> or is it just compacted

34:12>> be encased in concrete?

34:17Sorry, say that again. Are

34:19>> are you asking if they're going to be um

34:20encased in concrete?

34:22>> Yes.

34:24>> No.

34:25>> Okay. So, it's just uh compacted soil

34:27around them.

34:28>> Yes. Correct. I mean appropriate fill,

34:31you know, sand like you know, but yes.

34:33>> Yep. Okay. And then my second question

34:37uh relates to the uh the gravity blocks

34:40that are going to be placed. Is there

34:42any uh preparatory excavation that's

34:45going to happen before those are put in

34:47place?

34:49>> Yeah, they will be you know the area

34:51will need to be made level and

34:53accommodating to the install process and

34:57you know all of that will be done you

34:59utilizing to the maximum kind of

35:01practical um fill on site um within the

35:06sort of limited work. So no material is

35:08going to be brought in but everything is

35:10going to be um reused maximally and

35:14within the confines of the erosion

35:16controls and all that.

35:17>> Yep. Yep. And then uh again just

35:19confirming

35:21whatever compaction is required before

35:24you place the gravity blocks will be

35:28done by Can you just describe that a

35:32little?

35:33>> Yep.

35:39That will likely be done by

35:43uh likely an excavator of a suitable

35:46size with a an attachment and just to

35:49compact that material down is um has

35:52been described to me most recently.

35:54>> So So not a walkbehind compactor. Those

35:56this will be something that uh there's

35:59an arm that reaches over the wall and

36:01then does this work?

36:05uh requesting some clarification. You're

36:07referring to the area that will the the

36:09collapsed area that will have the the

36:13blocks,

36:14>> correct? Yeah. Yeah. So, I'm presuming

36:16that you're going to like you said,

36:17you're going to prep the area first and

36:19you're going to ensure that the area to

36:22receive the blocks are properly

36:24compacted so those don't settle, right?

36:27>> Absolutely. Yeah. Yeah. either like

36:30>> um sticking with the working from the

36:33upper side, you know, an excavator will

36:37be able to compact that material

36:39suitably. So, if found not to be the

36:42case, something like, you know, you've

36:43suggested a sort of the mini kind of

36:45like the oneman um walkbehind compactor

36:48can be brought down to that area and

36:52used and then pulled up, you know, via

36:54by the chains. I've seen that done

36:55before.

36:56>> Okay. So there is potential for some

36:57machinery to get down into that area. So

37:00I think if we're doing um any uh uh

37:04conditions we might want to just address

37:07that.

37:09>> Sure. That can be noted like I I want to

37:12also just um stipulate like the axis of

37:16that you know wouldn't be through any of

37:19the um adjacent undisturbed buffer. It

37:21would just be sort of up and down

37:23vertically of course. But yes, we can

37:26absolutely know it's definitely.

37:27>> Yep. Okay. Thank you.

37:31>> Uh Commissioner, any other questions? Um

37:36I just want to clarify the if we move

37:38forward tonight, the the stipulation is

37:40that we're not making a determination

37:42about whether that basin is

37:43jurisdictional or not. The work could

37:46proceed without that decision. Uh or is

37:51your preference to to postpone? Uh I

37:54mean staff could go either way on that

37:55one. I think just given that the you

37:57know the work that's proposed in that

37:58area is really not disturbing or

38:00altering. It's just removal of trash. I

38:02think it's a little bit of a moot point

38:04for this application. Um is the

38:06applicant amendable to a finding that

38:08there's no determination on the status

38:10of that basin in this order.

38:11>> Yeah, that that won't be a problem.

38:13>> We just haven't had enough time to

38:14review the responses since last late

38:16last week. So um yeah, I mean if

38:19everyone's on board with that, I don't

38:20see an issue with that as a finding.

38:22Yeah, I mean my preference would be get

38:24this work done before there's further

38:26problems with this site.

38:28>> I would agree.

38:30>> Uh is there anyone here from the public

38:32on the

38:34item? Anyone online?

38:41>> We'll make a motion to close.

38:43>> Second.

38:44>> All in favor? I

38:45>> I

38:46>> I

38:46>> so proposed order of conditions.

38:53>> All right. So, we'd have a

38:56discretionary allowance issued under

38:58section 4.2.4

39:00for activity within the 15t buffer and

39:03the reconstruction of the retaining wall

39:05within its existing footprint in the

39:0630-oot buffer. a finding that this order

39:09of conditions does not confirm the

39:10jurisdictional status of the basin or

39:13swale where trash and debris is proposed

39:14to be removed. In addition to the

39:17standard conditions, we'd have condition

39:18number 24 for wetland flagging.

39:21Condition 25 for revised plans. Uh just

39:24a small revision adding a note to the

39:25plans regarding the removal of trash

39:28from the storm water swale and basin.

39:30Condition number 50 for cement truck

39:33washing, 49 for dewatering, 51 for

39:36equipment placement, 56 for spill

39:39prevention,

39:41and that's it. In addition to anything

39:44the commission might want to see.

39:46>> Okay. Does the applicant have any

39:47questions?

39:48>> Nope. That all sounds perfectly good.

39:50>> Uh quick question. So, does spill

39:53prevention cover uh non making sure

39:56you're not refueling any machinery on

39:59that opposite side of the wall or should

40:01that be a separate line item?

40:02>> Uh so, I believe, let me pull up the

40:04exact language, full language from that

40:06condition. Um I believe it expressly

40:09says that anything

40:12uh bear with me one second.

40:20Uh so the full condition for spill

40:22prevention reads, "No fuel, oil, or

40:24other pollutant shall be stored in any

40:25resource area or the 100 foot buffer

40:27zone. Refueling shall take place outside

40:29of the 100 foot buffer zone. Applicants

40:31shall take all necessary precautions to

40:32prevent discharge or spillage of fuel,

40:34oil, or other pollutants onto any part

40:36of the site, and a spill kit shall be

40:38present on site at all times."

40:40>> Great. Thank you.

40:43>> I'll make a motion to issue the orders

40:45of conditions as described.

40:48>> Second.

40:48>> All in favor? Hi.

40:50>> Hi.

40:50>> Hi.

40:51>> Thank you. You're all set.

40:54>> Thank you for your time.

40:57>> Okay. Um, so before we go to item number

41:0010, could I get a show of hands of who

41:02plans to speak so we can manage the time

41:05tonight? So, one, two, three, seven. Do

41:09we have people online?

41:14Yep. So, if you're interested in

41:16speaking, can you just raise your hand

41:17online?

41:24Okay. So, seven. All right. Um, so I

41:27don't think we we need to put a time

41:29limit on the speakers. Um, I just I just

41:32ask one that you stick to the

41:33regulations that we're responsible for

41:35administering here. Uh, and then if you

41:38are uh are going to say the exact same

41:40thing as the person that just came

41:42before you, um, just say say ditto. Um,

41:45but if you have something new to add,

41:46please by all means come up and and and

41:48speak. So, if you um would like to kind

41:51of get prepared for this by either

41:53lining up at the back or in some way um

41:56organizing yourselves, that'd be great.

41:58Um, in the meantime, let's uh let's get

42:00started. Uh, item number 10, one and

42:02three Suburban Road.

42:14I can get us going.

42:32>> Good evening. Derek Massionus, project

42:34manager with VHB here on behalf of the

42:37applicant. Here with me tonight are

42:40representatives from Wood Partners, Jim

42:42Lambert and Kellen Arjo, as well as my

42:45colleague Scott Morrison, a professional

42:47wetland scientists with BHB. Um, as you

42:50mentioned, we've filed the notice of

42:51intent under the local wetlands

42:53protection ordinance. As you'll see

42:55throughout the presentation, we are not

42:58proposing any work within the 100 foot

43:01buffer zone of the delineated wetland on

43:03site. This is related to the 100 foot

43:06locally regulated storm water protection

43:08zone that you can see in blue in the

43:11southwest corner of the property.

43:14Um we've received initial comments uh

43:17from staff. Uh we're working on

43:19providing formal responses as well as

43:22updated site plans and a updated storm

43:24water management report based on those

43:26comments. Um our goal for the meeting

43:29tonight is really to introduce the

43:32project. um and receive initial comments

43:35from the commission as well as uh listen

43:38to the abutters that have come out for

43:40the meeting tonight and really gather

43:42their feedback as well. Um and with that

43:44I'll I'll turn it over to Jim Lambert

43:46with Wood Partners.

43:49Good evening. Uh my name is Jim Lambert.

43:51I'm the managing director for Wood

43:52Partners New England office. U thank you

43:54for the time tonight to review our

43:56application. For those of you who might

43:58not be familiar with us here at Wood

44:00Partners, uh we're a multif family

44:01developer with a strong presence

44:03throughout New England. Um during uh

44:06throughout that course of work, we have

44:08developed a strong appreciation for the

44:10importance of working collaboratively

44:11with local boards, municipal staff, and

44:14community stakeholders. Uh we're not new

44:16to Worcester. Several years ago, we

44:18developed a project called Alta on the

44:20Row in the downtown. And although that

44:22project did not involve wetlands

44:23permitting, we work closely with the

44:25city's planning staff and board and

44:27planning board um and to come up with a

44:30project that we think everybody was

44:32proud of and has been a huge success.

44:35Turning to the project before you this

44:36evening, our team has spent many months

44:38studying the site and evaluating its

44:40opportunities and constraints. Our goal

44:42is straightforward to create a

44:44thoughtfully designed residential

44:45community that provides much neededed

44:47housing while respecting the wetlands

44:49and natural resources around the around

44:51and on the property. We recognize the

44:54commission's important role here in

44:55protecting those resources and we have

44:58worked extensively with our team to

44:59minimize impacts and develop a plan that

45:01is responsible responsive to the site's

45:04unique characteristics. Uh we know there

45:06are many folks here tonight that are uh

45:08going to speak about the project and

45:09hear what we have to say. Many of those

45:11folks have seen this project before in a

45:13slightly different form as we were

45:15proposing a reszoning several months

45:17back and they'll likely see it again on

45:19Wednesday at the planning board. Um so

45:21we're looking forward to hearing the

45:22feedback from this commission and from

45:24from folks in the neighborhood and

45:26taking that back um after tonight. Um

45:29with that, I'll turn it back over to

45:31Derek to go through the project in

45:32greater detail, but I'm here to answer

45:34any questions if needed. Thank you.

45:37I think Scott Morrison's gonna walk

45:39through existing conditions.

45:40>> Sure. If you could go back, I think one

45:42slide.

45:44>> Yes, perfect. Um, just for the record,

45:47my name is Scott Morrison, professional

45:48wetland scientist for BHB. Um, I was the

45:52one that went out, um, evaluated the

45:54site, walked the site, evaluated the

45:57wetlands, um, delineated those wetlands.

46:00Um, prior to me um, getting out to the

46:03site, the wetlands were actually

46:05delinated at least twice before um, my

46:08arrival. Um, I reviewed those wetland

46:11boundaries located, we located those

46:14shown on the the site plan. Um, all

46:16those wetland boundaries from the other

46:18two consultants and myself are all

46:20consistent. So, all the locations are

46:23pretty much identical. Um, and then

46:26subsequent to that, I kind of walked the

46:28site, make sure that there were no

46:30additional wetlands. Um, importantly

46:32too, I kind of went back um, before this

46:34meeting went back to some of the

46:37historical areas. I know there's some

46:38questions about potentially, you know,

46:40filled wetlands and such. Um, back in

46:431938, the historical areas show some uh,

46:46deposits of materials being placed on

46:49the site. By 1960, that that work had

46:51been completed and com and done. So um

46:54the wetlands protection act was enacted

46:57in 1972. So any fill that's occurring

47:00out on the site was was done well before

47:03the wetlands protection act as well as

47:05the uh city of Worcester wetlands

47:07protection ordinance which was approved

47:09in September of 1990.

47:12So, as far as existing conditions, I

47:14think it's important. I'll walk up and

47:16kind of point it out in a second, but um

47:19there's a tree line that you can see,

47:20which I'll point out to everybody.

47:24>> Could you bring the mic up with you?

47:26>> Could you just bring the mic? So,

47:28>> I'm just going to point to it.

47:29>> Okay.

47:31>> Right in here.

47:42So as I just identified that's the

47:44existing tree line. So that's the limit

47:46of areas on the site that are routinely

47:48mowed and you know maintained lawn.

47:50There are a number of trees within that

47:52area but that's you know an area that's

47:55existing maintained and the vast

47:56majority of the project is located over

47:58those that portion of the site.

48:02areas on the page north page northeast

48:06are areas that uh historically have just

48:08grown up uh completely forested areas.

48:11Um the projects intended to to kind of

48:14cluster everything on the south side of

48:16that page south of that to uh cluster

48:19the work there.

48:21So again, I just want to reiterate to uh

48:23that's the existing conditions. We're

48:25here tonight not because we're doing any

48:28work within the 100 foot buffer zone. Um

48:30we've kept all work completely outside

48:32that buffer zone. But under the wetlands

48:34protection uh city of Worcester wetlands

48:37protection ordinance, anything uh

48:40disturbance of greater than 5,000 square

48:43feet within um storm water protection

48:46zone. So it's existing or proposed catch

48:48basins is a trigger for this notice of

48:50intent filing in order of conditions.

48:54So the main focus of what we're here

48:56tonight is to demonst, you know, show

48:58erosion control and storm water

48:59management to to meet those performance

49:01standards. So at this point, I can turn

49:03it back over to Derek who can walk us

49:06through the uh the storm water and

49:07erosion control.

49:09>> Thanks, Scott.

49:10>> And sorry, can I just post pause for a

49:12sec? Hey, cable services, can you turn

49:14up the mic just a little bit? Uh people

49:16in the audience are having a hard time

49:17hearing.

49:22Good.

49:24If you can just go to the next slide,

49:25Maddie.

49:28So before getting into the proposed

49:30grading and and storm water and erosion

49:32controls for the site, I would just like

49:34to give an overview of the proposed site

49:37plan. Uh so what you have in front of

49:40you here is a total of 300 multif family

49:44residential units. Each building is

49:47roughly 105,000 gross square feet, five

49:51stories, and contains 100 units each.

49:53Those are those three bar buildings that

49:55you see kind of working back up and

49:58through the site.

50:00Parking is is based on the required uh

50:03zoning ordinance. So, in this uh based

50:06on this use, it's two parking spaces per

50:09unit. Uh so, we're providing a total of

50:12600 parking spaces on the site. that's

50:15combined surface and there's also three

50:18detached garages kind of dedicated for

50:21each residential building throughout the

50:23site.

50:24Access is entirely off of Suburban Road

50:28uh for this development. However, we are

50:31in the process of working with the

50:33Worcester Fire Department on a secondary

50:35means of egress off of Havlin Street

50:38that would be gated on either end and

50:40and not open uh for public use. Like I

50:43said, primary access to the site would

50:46be off of Suburban Road. Uh, as far as

50:49landscape goes, we are conforming with

50:52the interior landscape requirements. So,

50:54one tree for 10 interior parking spaces.

50:58Um, we're providing a landscape setback

51:01all along the the development and the

51:03the property. Um, and we have various

51:06trees and shrubs throughout uh kind of

51:09behind the curb of the parking areas as

51:10well as interior uh islands as well.

51:17Um,

51:22is that my mic or maybe that one?

51:25>> Just wonder if that helps.

51:28Um, the other thing I wanted to point

51:30out on this plan is there are a couple

51:33accessory buildings as well that support

51:35this use. So, there's a 5,000 ft²

51:38clubhouse that you can see kind of in

51:40the the middle as you enter the site as

51:43well as a mail room uh for delivery

51:45service and then outdoor amenities like

51:47a pool and and fire pit uh with an

51:50associated pool house as well. Um, so I

51:55won't get too much into the the zoning

51:57aspect of this project, but this

51:58proposed development is all located

52:00within the RG5 zoning district. However,

52:04you will see um kind of on the northern

52:06portion of the site plan. Uh there's a

52:09hatched area in green and then a

52:11cross-hatch area that extends further

52:13north uh to the northernmost uh bound of

52:16the property. So our proposed plan is

52:20for all uh material on site to remain

52:24um so any material that's generated

52:26during construction is planned to remain

52:28on site. Uh what you can see in the the

52:31diagonally hatched area is what was

52:34originally submitted as as part of the

52:36site plan package. Um we've been working

52:39with the applicant on a detailed cut

52:41fill analysis. Um and originally we

52:44designed that area to be um a detention

52:46basin because of the limit of clearing.

52:49We've been able to reduce that now just

52:51based on a detailed cut fill analysis by

52:53roughly 50%. Um and as we flip over to

52:56the grading, I can start to talk about

52:58the the overall intent with the the site

53:00grading. If you want to go to the next

53:02slide.

53:09So, as Scott kind of mentioned, the

53:11existing topography throughout the site

53:13is generally flat and most of these

53:17residential buildings have multiple

53:19entrances on either side. So, just based

53:22on the existing topography being

53:24generally flat through the development

53:26area and the multiple entrances for each

53:29of the residential buildings, um, we're

53:32really not changing grade a lot through

53:34the site. It's it's going to be

53:35generally flat with a series of high and

53:38low points um that are obviously lower

53:41than the finished floor of the building.

53:45All surface runoff from the site is

53:47going to be pitched and directed um to

53:49the proposed closed drainage system.

53:53What you can see on this site plan here

53:54in orange is the 34 test pit locations

53:58that Haley and Aldrich, the the record

54:00geotechnical engineer on the project,

54:02has performed out here. Um, as you can

54:06see, they're they're blanketed

54:07throughout the site and have really

54:09guided both the grading and the storm

54:11water design to date. Um, as I

54:14mentioned, runoff from the site and the

54:17buildings is all going to be directed

54:18towards the proposed closed drainage

54:21system.

54:22Um, as far as inlets, we either have

54:24dump deep sump hooded catch basins or uh

54:27the proposed subsurface infiltration

54:29systems that we're proposing are

54:32concrete retained structures uh by LID

54:35tech. Uh based on the existing soil

54:38conditions that are out there, they are

54:40primarily shallow systems. Most of the

54:42systems are are 2 feet 6 in in height.

54:46um but they extend um you know generally

54:50along the footprints of the buildings

54:52themselves.

54:54So all the runoff from the site and the

54:58roof areas is going to be uh directed

55:00towards the the closed drainage system

55:02and enters uh the subsurface systems

55:05themselves. We've designed these systems

55:08to completely infiltrate the 2-year

55:10storm. So your general storm events, you

55:14know, everything's going to be

55:15infiltrating into the ground. However,

55:18we do have each system has an outlet

55:20control structure and an overflow pipe

55:23that eventually works its way back to

55:25the the northwest corner of this

55:27development. Um, and we have a a

55:30engineered uh outlet control structure

55:32in that corner that based on, you know,

55:35the volume and the the height of each

55:37storm, that'll eventually act as our

55:40overflow back to the wetland, which is

55:42our ultimate design point.

55:45Um, as far as compliance with the mass D

55:48storm water standards, we are reducing

55:50peak rates in the 2, 10, 25, and 100year

55:54storms. Um, we're providing more than

55:56double the required amount of recharge

55:58for the site. Um, and I know staff had a

56:01comment as to whether this project was

56:03going to be defined as a lup. Uh, we

56:05would agree with your determination. Um,

56:07I can say that we can treat the 1-in

56:09water quality volume as well as provide

56:1244% uh pre-treatment and 80% TSS removal

56:17uh based on the storm water design.

56:19Um, as I mentioned, the burm area uh in

56:23the northern portion of the site, that's

56:24where you can kind of see how we've

56:26reduced the limit and now that has a

56:2810-ft shelf uh at the top of that.

56:32you know, water that's landing in that

56:34area is either going to be directed to

56:36the north down the slope uh to a swale

56:38that eventually works its way to the

56:40wetland or there's a there's also an

56:42additional swale that takes the grading

56:44for the uh emergency access road and

56:47directs that back to the wetland as

56:49well.

56:51If you could go to the next slide, I'd

56:52like to just touch on erosion controls

56:54and and construction sequencing.

56:58So, as you can see in orange, this is

57:00pretty much our our general limit of

57:02work for the project. Um, there will be

57:05an enclosed construction fence with

57:07scrim along the uh residential abuing

57:10properties. Um, but the there will be a

57:14continuous construction fence along the

57:16entire limit of work. Havlin Street is

57:19generally high and our site sits fairly

57:21lower. So, we won't have any erosion

57:24controls proposed along that side of the

57:26property. But everywhere else as the

57:28grade starts to fall off a little bit,

57:30we will have straw bales with a silt

57:33fence. Um

57:35there will be uh silt sack sediment

57:38traps in all existing and proposed

57:41structures once those come online. Um

57:44and just talking with the applicant,

57:45we've started to and we'll provide a

57:47formal response with more detailed

57:49construction sequencing. Um but first

57:52step is obviously to get the site

57:54secure, establish erosion controls and

57:56then we are generally going to clear the

57:59entire limit of the site. As Scott

58:01mentioned, there is a good portion of

58:04where this development is that is

58:05continuously mowed. There's obviously

58:07some trees in that area which we are

58:09proposing to remove. Um but general site

58:13clearing uh within this limit of work is

58:15f kind of the first step. Uh then the

58:18site's going to be bulg graded based on

58:21the proposed grades uh that we are

58:24providing. Um and that's where the burm

58:27in the back area is going to start to be

58:29established. Um once we kind of have the

58:31site entirely bulk graded, that's when

58:34underground utility and foundation work

58:36is going to start to commence and you'll

58:38start to see the burm in the back area

58:40take shape um with some of that

58:42material. I think that'll typically be

58:45around 3 or 4 months worth of work just

58:47with the amount of utility

58:49infrastructure and foundation work that

58:50that needs to happen here. Um but once

58:53that is complete uh site layout will

58:57commence and then binder will be set

59:00immediately uh after that before they

59:03actually go up with any of the

59:05residential buildings. So binder uh for

59:07the surface treatment will be

59:08established before construction of any

59:11of the the residential buildings

59:14themselves. Um at that point the the

59:17storm water system will become online.

59:20So we'll keep uh silt sacks sediment

59:22traps and all of the the structures

59:24themselves and um we'll make sure that

59:26the burm area at that point should be uh

59:30you know that volume of material should

59:32be consistent. So that'll be stabilized

59:34as well as any areas behind the curb and

59:36and landscape areas uh as construction

59:39for the residential buildings takes

59:41place.

59:44Scott, I'm not sure if you wanted to add

59:45anything else, but

59:46>> yeah, I think just one one thing on this

59:48plan that I'm not sure that Derek

59:51highlighted on is the area hatched is an

59:53area.

59:54>> Sorry, I think you just got to turn on

59:55your mic, Scott.

59:56>> Sorry about that. Um, just to remind

1:00:00people, uh, the area that's hatched on

1:00:02this is, um, we're pulling that back.

1:00:05So, we don't need to do tree clearing in

1:00:07that area, uh, based upon kind of

1:00:09revisiting some of the the work and kind

1:00:11of shrinking that as much as possible.

1:00:13So, there's a a large area that we can

1:00:14remain trees. So, just to kind of

1:00:17summarize as well, you know, we filed

1:00:19this under the requirements under the

1:00:22storm water protection zone. So, you

1:00:24know, the really the permit revolves

1:00:25around work within existing and proposed

1:00:28catch basins as well as, you know,

1:00:30erosion control and storm water

1:00:32management. So, I think at this point

1:00:34we'd be happy to answer questions. I

1:00:35think there's individuals from the

1:00:37public who'd like to speak as well,

1:00:38which we can let them speak and then

1:00:41answer questions after if whatever is

1:00:43amendable to the commission.

1:00:47>> Uh, staff comments.

1:00:50>> Yeah. So I can I can just kind of give a

1:00:52broad summary of the uh comment letter

1:00:55that we issued that was referenced a

1:00:56couple times throughout the

1:00:57presentation. Um so you know a lot of

1:01:00our comments related to erosion and

1:01:03sedimentation control which has been

1:01:04described here. One of the main things

1:01:06we are looking for is a little more

1:01:07detail on the phasing and sequencing

1:01:09like Derek was mentioning. Um you know

1:01:11typically for projects of this size we'd

1:01:12like to have you know a few plan sheets

1:01:14showing different phases of construction

1:01:15and how erosion and sediment will be

1:01:17controlled during those phases. Um,

1:01:22sorry, just getting a lot of feed.

1:01:23>> A little slower.

1:01:25>> Sure. Uh, and I'm sorry. I'm just

1:01:28getting some feedback on my mic, too.

1:01:29So, it's a little disorienting.

1:01:31>> Want to turn the mic down a little bit

1:01:32at this point.

1:01:34>> Okay. Well, we can't we can't turn it up

1:01:36and down. But maybe if you turned one of

1:01:38those off, that might help there.

1:01:42>> Okay. All right.

1:01:46Um, where was I? So, erosion and

1:01:49sedimentation control, talking about

1:01:50sequencing, trying to get a little more

1:01:52information about um just plan details

1:01:55for some of the stockpiles and temporary

1:01:57sediment basins. Um a couple locations

1:02:00where we wanted to see additional silt

1:02:02sacks added to protect inlets. Uh plans

1:02:04for dewatering. Um and just some

1:02:06suggestions for uh different additional

1:02:09controls in certain areas.

1:02:12Um, one of the one of the questions we

1:02:14had related to that northern portion of

1:02:16the site that's now kind of hatched and

1:02:18shown as out of the limit of work. Um,

1:02:20so we'll have to obviously review the

1:02:22new plans when they come in with the

1:02:23newly proposed BM um, and get a sense of

1:02:26how that grading might affect uh, storm

1:02:28water management or erosion control on

1:02:30the site. Um,

1:02:33related to storm water management, we

1:02:35had some comments.

1:02:37Sorry, this is a a lot of feedback here.

1:02:45Um, one of the one of the comments

1:02:47related to soil investigation uh to

1:02:49determine suitability for the location

1:02:51of those infiltration structures. Um, I

1:02:53think you know it was shown on the

1:02:54screen, one of those slides had the

1:02:56locations of all the different test

1:02:58pits. I think not all of those test pits

1:03:00had um like details on redux features

1:03:03and estimated seasonal high groundwater

1:03:06elevations. So, I think we're really

1:03:07just looking for more um kind of nailing

1:03:10down those elevations at the location of

1:03:12the BMPs, particularly given how long

1:03:14and uh and how close they are to

1:03:17groundwater. Um just making sure that

1:03:19they have that adequate separation to

1:03:20the bottom of stone. Um we had some

1:03:24questions about the depth of urban fill

1:03:27materials and trash reported across the

1:03:28site. Um there were some areas where

1:03:31there were 12 feet of basically fill and

1:03:35sand uh in some locations. Uh so we just

1:03:38wanted some clarity on whether the soils

1:03:39beneath the areas that are proposed for

1:03:41infiltration are suitable for

1:03:42infiltration or if additional excavation

1:03:44might be needed um to make that

1:03:46suitable.

1:03:48Um

1:03:49yeah, the lapable comment that was

1:03:51mentioned earlier that's a land land use

1:03:53with higher pollutant load just given

1:03:54the volume of uh trip generation that

1:03:57the parking lots are expected to create

1:03:58that adds some additional um standards

1:04:01at the state level uh related to the

1:04:03wetland resource area. Scott talked

1:04:05about that um a lot describing existing

1:04:09conditions. So we went out and reviewed

1:04:11the site. Uh we walked the line. It was

1:04:14uh it was fairly easy to confirm the

1:04:16delineation. It was along the toe of

1:04:18slope for um a good portion of the line.

1:04:21There was a pretty clear delineation

1:04:22between uh wetland and upland vegetation

1:04:25um along the line as well. Um

1:04:30and again this project was filed or this

1:04:32NOI rather was filed under the storm or

1:04:35under the wetlands protection ordinance

1:04:37only. Um so this is not

1:04:40something that we have been or not

1:04:42something that the commission reviews in

1:04:43respect to um obviously wetlands

1:04:45protection act regulations but also just

1:04:47um buffer zone performance standards

1:04:49would not be applicable given that the

1:04:50limit of work is outside of those. Um

1:04:55and you know again this is also not a an

1:04:58avenue to seek a formal determination on

1:05:00any sort of jurisdictional status under

1:05:02the wetlands protection act. simply work

1:05:04proposed outside of the buffer zone

1:05:06falling into the commission's

1:05:07jurisdiction due to the uh existing or

1:05:09proposed inlets that ultimately

1:05:11discharge to a wetland resource area. Um

1:05:15so that's a broad overview of of staff

1:05:18comments. Happy to answer any questions

1:05:19the the commission has.

1:05:23Okay.

1:05:24>> Uh commissioners uh questions on this.

1:05:27We just this is our first time seeing

1:05:29this revision. So I think we'll have

1:05:31some more questions but maybe not

1:05:33tonight. Uh any questions as to um the

1:05:36the current presentation of this

1:05:38project?

1:05:42>> Through you madam chair. Yes I

1:05:45through you madam chair. Yes I've got a

1:05:47couple of questions. Um, so just looking

1:05:49at the plan, um,

1:05:52so what was the thinking originally on

1:05:55the placement of the buildings? Are you

1:05:58just trying to stay away from the

1:05:59wetlands or I'm just trying to get a

1:06:02gauge as to um what drove the layout

1:06:06>> as far as the layout for the residential

1:06:08buildings?

1:06:09>> Yes. Um,

1:06:12so I think I mentioned this in my

1:06:14presentation, but where the development

1:06:16area is, that's all located within the

1:06:19RG5 zoning district. So we we don't have

1:06:22the flexibility to use the northern

1:06:25portion of the site as well. If we did,

1:06:29um, I'm sure the buildings would maybe

1:06:31be spread out a little bit more. Um, but

1:06:33we're kind of limited to the area that's

1:06:36within the the RG5 zoning district,

1:06:39which is what you see here. Y

1:06:41>> um, and as far as layout goes, we've

1:06:43we've tried to create this sort of um,

1:06:47you know, nice entry drive experience

1:06:49that brings you up and through the site

1:06:51while centrally locating um, the

1:06:54clubhouse area and the e exterior

1:06:56amenity spaces kind of right as you

1:06:58enter that building just adjacent to

1:07:00building A. Um, so that was kind of the

1:07:02the thought process with how the

1:07:04building's laid out.

1:07:06>> Okay. And then, uh, one of the things

1:07:08you mentioned was, uh, trying to get a

1:07:10good landscaped setback, uh, around the

1:07:13perimeter of the building. And I'm not

1:07:17seeing that might be a little outside of

1:07:19the jurisdiction, but bear with me

1:07:21because I think I'll bring it back to

1:07:22that point. I'm not seeing that on the

1:07:25east and south specifically. are pretty

1:07:27close to the um to the boundaries

1:07:31um and specifically along the south

1:07:34where you mentioned that all of the

1:07:36water is being collected and diverted

1:07:39elsewhere. When I look at the grading

1:07:42plan, the revised grading does show that

1:07:45there's a slope now to these southern

1:07:48properties. And correct me if I'm wrong,

1:07:50but that's just what I'm saying. So, uh,

1:07:53if you can address that portion of it

1:07:55because it looked like it was generally,

1:07:57uh, grading sloping towards,

1:08:01uh, suburban road and the portion behind

1:08:04that 10car garage is now sloping towards

1:08:07the properties. I

1:08:09>> I believe there is a small portion of

1:08:11landscape area that is sloping there. We

1:08:14can certainly take a look at that area

1:08:16to see. I I know we have a swale along

1:08:18the backside of that garage that's kind

1:08:21of in the midpoint of building A

1:08:24>> um with an area drain. So, we can see if

1:08:26we can kind of redirect that landscape

1:08:28area back to the area.

1:08:29>> Yeah. Yeah, I do see that there's a

1:08:31drain behind the 10car garage, but the

1:08:33way that I'm interpreting the grading

1:08:35looks like it it may be not all

1:08:38concentrating all of that water there.

1:08:41Um, and then the other thing was, um,

1:08:46maybe I missed it, a planting plan. Um,

1:08:50I I think what might be nice is to maybe

1:08:55try to reinforce what you were trying to

1:08:58achieve with getting a nice landscaped

1:09:00setback. Um I think that buffer would be

1:09:05desirable um and would have a lot of uh

1:09:08positive uh environmental effects as

1:09:11well.

1:09:13And then uh if you can talk a little bit

1:09:15about uh your plans for snow storage or

1:09:19snow removal.

1:09:23>> Um yeah, so I I think we did show them

1:09:26on the layout and materials plan. Um,

1:09:29but we we do have some flat areas kind

1:09:32of directly behind the curb that are not

1:09:35within plant beds or some of those tree

1:09:37locations that we're proposing for snow

1:09:40storage. Um, and then we're kind of

1:09:43assuming the the least desirable parking

1:09:45spaces on the site are probably going to

1:09:47be in the the western portion there. Um,

1:09:51not that snow storage would be piled

1:09:53there, but kind of we have some room

1:09:55back behind the curb in that location,

1:09:57which would be pretty easy to kind of

1:09:59direct all the snow back to that area

1:10:01and then set it behind the curb there.

1:10:03>> Yeah, there's just a lot of paved area

1:10:06and I'm just thinking, you know,

1:10:07significant storm

1:10:09trying to get all of that snow back to

1:10:11that isolated area. I'm sure it's going

1:10:13to be dispersed, but um, if I was hoping

1:10:16that you would walk us through just sort

1:10:18of your your plans for that. I Some may

1:10:20be shown on the plans, but if uh just a

1:10:23verbal description of

1:10:25>> Yeah.

1:10:25>> for the meeting,

1:10:26>> we we can chat with the applicant too to

1:10:29see what their procedures are typically

1:10:31with snow removal, whether it gets

1:10:33hauled off site or if it's stored on

1:10:36site. Um but we can certainly look at

1:10:38the the areas that we are providing on

1:10:40the layout materials plan and and check

1:10:43those calculations.

1:10:44>> Okay. And then lastly, I do see that uh

1:10:48by the clubhouse where the property line

1:10:52sort of overlaps

1:10:54uh some of the existing buildings and

1:10:56maybe I missed the uh that part of it.

1:10:59Can you walk me through what happened

1:11:01there? Is that those is that building

1:11:03just part on your site and you're just

1:11:06sort of reclaiming that land or what's

1:11:09>> That's correct.

1:11:10>> Yeah,

1:11:11>> that's correct.

1:11:12>> Okay. The are you referring to the

1:11:15existing walkway and gazebo that's on

1:11:18Yes. Yep. That's proposed to be removed.

1:11:20>> Yep. Okay. Okay.

1:11:23That's it for now.

1:11:24>> Okay. Anything else?

1:11:28>> I just have a question.

1:11:31I It's from what you were saying.

1:11:35These are slab on slab on grade the

1:11:39buildings.

1:11:40>> They'll be foundations.

1:11:42>> Okay. Fil foundation slabs. Okay.

1:11:46Cuz you said you're not changing not

1:11:49changing the ele elevation

1:11:53and u

1:11:56you would have to you would have to do

1:11:58that to keep everything on site with a

1:12:00foundation with the with all the corre

1:12:04correct. So that burm area is really

1:12:06going to formulate when we start the

1:12:08foundation work and a lot of the

1:12:10underground utility infrastructure

1:12:12um just because we're going to need to

1:12:14bring in material base materials and uh

1:12:17material for to support utilities. Um so

1:12:21some of that excess material that's

1:12:23generated on the site is that's going to

1:12:26be the majority of what's burned in the

1:12:28back there.

1:12:31>> Okay. Thank you.

1:12:34the um

1:12:37sorry that threw you, Madam Chair. Uh so

1:12:40I see the proposed buildings have sloped

1:12:43roofs. Um you're going to have external

1:12:47gutters, I presume, and those are all

1:12:49going to just be picked up and uh

1:12:52directed to the infiltration systems.

1:12:55>> There'll be down spouts with direct

1:12:56connections into these systems. Y

1:12:58>> Okay.

1:13:04Um, okay.

1:13:06So, this is a fairly complex site. Um,

1:13:10this won't be decided on tonight just so

1:13:12that everyone understands won't be a

1:13:15vote. Uh, I just wanted to raise a

1:13:17couple things that I think um, members

1:13:20of the public have done a tremendous job

1:13:22explaining. There are a couple of folks

1:13:24if they're here, Mr. Pap and Miss

1:13:26Silverstein. Uh, tremendous work. um

1:13:30really raised a lot of issues um some of

1:13:32which just aren't going to apply because

1:13:34frankly this site was filled uh prior to

1:13:37the passage of the wetland protection

1:13:39act. So some of the desire to see this

1:13:41site treated as a wetland um is not

1:13:44something we're going to be able to uh

1:13:46address here. Um, but I did want to I

1:13:50did want to make sure that they were

1:13:52acknowledged because obviously there's a

1:13:53lot of people here in support of of

1:13:55doing this project well or perhaps not

1:13:57doing this project at all.

1:13:59[clears throat] Uh, my concerns I think

1:14:01are are shared with some of the members

1:14:02of the public which are the um stability

1:14:05of this site, the ability of the site to

1:14:08absorb the storm water runoff that you

1:14:10are proposing these infiltration systems

1:14:12can handle. um based on the test pits

1:14:15that we do have and I think at this

1:14:17point we're in agreement that we need

1:14:18more in the areas where these

1:14:20infiltration units will go uh suggest

1:14:23that some of the material uh underground

1:14:25would not be suitable for infiltration

1:14:27uh and that possibly some of the

1:14:29material underground is in fact even

1:14:30contaminated. Um, so the statement that

1:14:33you made about keeping fill on site um

1:14:36by creating a burm with it is a bit

1:14:38bothersome for me because I don't

1:14:40understand the nature of some of the

1:14:41soil that'll be removed uh from this

1:14:44site to create a burm of

1:14:48what um so that that's a question in my

1:14:51mind. Um, and then what the the

1:14:54maintenance ongoing maintenance for the

1:14:56infiltration basement will be. Um, you

1:14:59know, one of the things I asked at all

1:15:01of these meetings is who's responsible

1:15:03for this property on an ongoing basis?

1:15:05[music] How long do we expect these

1:15:06infiltration structures to function? Um,

1:15:09and if they aren't functioning properly

1:15:11after construction is complete, you

1:15:13know, who's responsible for digging them

1:15:16up and starting all over again? Uh so in

1:15:18in my mind there there needs to be more

1:15:23um exploration of this site to be

1:15:25certain that these infiltration

1:15:28structures can work. Um you know we're

1:15:31not here to determine whether the

1:15:33buildings are engineered properly for

1:15:34the site. So that's uh you know that's

1:15:37for somebody else to handle. Um, but we

1:15:40do need to know that those structures

1:15:42will function as designed because I have

1:15:43never seen a site and I know I've only

1:15:45done this for a few years, but I have

1:15:46never seen a site with so much

1:15:48infiltration structure spread out on a

1:15:50property. Um,

1:15:53so those would be I guess my concerns uh

1:15:56initially. Uh and just from past

1:15:59personal experience constructing

1:16:02buildings on unstable wet land um on

1:16:05Gold Star Boulevard, uh these projects

1:16:08are twothirds of your expense

1:16:11underground just trying to support

1:16:13what's going on on the surface. If this

1:16:16project doesn't become economically

1:16:18feasible for the builder, I just want to

1:16:20make sure we don't have a a wiped out

1:16:22cleared site that somebody then abandons

1:16:26um because they've determined that, you

1:16:27know what, it's either contaminated and

1:16:29I can't afford the cleanup or I can't

1:16:31afford to build, you know, these

1:16:34buildings uh in a way that would allow

1:16:36them uh to, you know, to be safe.

1:16:40Um,

1:16:44so, uh, anyone here like to speak on the

1:16:49project? Okay. If you could kind of

1:16:51organize yourselves in a line and come

1:16:53up to the podium, uh, and just state

1:16:54your name. And

1:16:56>> I'm sorry to kind of burst to the first.

1:16:57I have some things fresh. I have some

1:16:59things kind of fresh in my mind that I

1:17:00wanted to say if it's all right.

1:17:01>> So, could you please get to a

1:17:02microphone?

1:17:03>> Okay. I was going to do this one. This

1:17:04one This one seems to be ringing over

1:17:06here.

1:17:07>> Introduce yourself.

1:17:08>> Yes. My name is D. Peterson. I'm a

1:17:09Worester resident. I live in the Elm

1:17:11Park area and my parents also have a

1:17:13house near Dherty High School. I first

1:17:16want to say much respect to everyone

1:17:18here for your roles and your patience

1:17:20and for this opportunity for the public

1:17:23for us the public uh ordinary citizens

1:17:26to speak. Um I prepared some statements

1:17:29just a few hours ago when I learned

1:17:31about this. Um I know we were asked to

1:17:34stay on point. Um, forgive me if I this

1:17:37is my first time coming to such a

1:17:38meeting, so I wasn't aware of just how

1:17:40formal and the regulations and

1:17:42everything. Um, forgive me if my writing

1:17:44is just a little more philosophical. Uh,

1:17:47it gets to the point though, and you

1:17:49you'll you'll get my meaning. Also, no

1:17:51disrespect intended to anyone. So, what

1:17:54I wrote was, "My understanding is that

1:17:56the Conservation Commission has already

1:17:58largely approved this project, though

1:18:00maybe that's not true, pending review

1:18:02completion, and that the reason for our

1:18:05being here tonight is more as an

1:18:07opportunity for people to vent rather

1:18:09than actually change something. If true

1:18:12that the conservation commission has

1:18:14already approved or is planning to

1:18:15approve this project, I ask you like our

1:18:18government's environmental protection

1:18:20agency which doesn't actually protect

1:18:22the environment. What is it actually

1:18:24conserving? You have a piece of land,

1:18:27one of the few remaining pieces of

1:18:29undeveloped land in the entire area and

1:18:31you are putting it up for development

1:18:33with three large highrises proposed

1:18:35here. I just want to take a time out and

1:18:37say that Mr. landers uh said that they

1:18:40want to be respectful of the resources

1:18:43and natural surroundings, but you're

1:18:45planning to cut out the entire forest,

1:18:48the woods, the trees. Mr. Derek said all

1:18:50trees are going and there's going to be

1:18:52something like 600 parking spots. So,

1:18:55what I wrote was highrises are eyes.

1:18:58This is particularly so with modern

1:19:00construction methods that don't even use

1:19:02bricks anymore, but fakel looking

1:19:04synthetic materials. I don't know, maybe

1:19:06they're planning to do brick. And the

1:19:08architecture is not 1970s, let's put it

1:19:10that way. In addition, a friend of mine

1:19:13who lives out near the proposed site of

1:19:14development said the traffic at Newton

1:19:17Square is always very congested. She

1:19:19rightly pointed out that building new

1:19:21developments there is going to make this

1:19:23problem significantly worse. In a number

1:19:25of ways, highrises would degrade the

1:19:28quality of life in these areas. In that

1:19:30regard, it doesn't seem like this

1:19:32proposal has been well thought out.

1:19:34The real issue is the land and what it

1:19:37means to once again be encroaching. I

1:19:40understand that there is a perpet I

1:19:41understand that there is a perpetual

1:19:43housing crisis and affordability crisis

1:19:46and appreciate people's efforts to

1:19:48problem solve. The actual issue however

1:19:51in my view and maybe I should have

1:19:53decorated this statement is not housing

1:19:55but overpopulation and what human

1:19:58overpopulation means in terms of the

1:20:00earth. When there are too many people,

1:20:02the need for new development will go on

1:20:04indefinitely into the sunset. Instead of

1:20:07three or five highrises, there will be

1:20:0913, then 30, and so on until one day the

1:20:12bottom of the bucket drops out. That day

1:20:14of consequence is upon us. Cities are

1:20:17becoming more inhospitable. Social

1:20:19problems have gotten worse, and our

1:20:21trees are dying from climate change and

1:20:22other human-caused factors. And I might

1:20:25add, all the more reason to save the

1:20:27trees we do have. Yet, city planners

1:20:29Worcester and elsewhere want to move

1:20:31ahead rather than just stop or find

1:20:34something new. A high-rise with people

1:20:37living on top of each other up high in

1:20:39the sky is not natural living. It is not

1:20:42a humble abode like Thoro's cabin in the

1:20:44woods. The real issue I feel is our

1:20:47disconnect from nature as a society and

1:20:50the consequences it is bringing. In this

1:20:52case, those consequences would be losing

1:20:54not only Pete Meadow, a wetlands, but a

1:20:57huge swath of surrounding woods. Tree

1:21:00clearing has also been linked to climate

1:21:02change. So, this is a worst case

1:21:04scenario for all of us. Lastly, Pete

1:21:07Meadow is a piece of nature that this

1:21:09community has long held an appreciation

1:21:11for. And may I add, I used to walk by

1:21:14there going to Dory High School. That

1:21:15was 35 years ago. And the fact that this

1:21:18is wetlands as well as the woods I

1:21:20described is even more concerning in

1:21:22terms of the proposed development. I

1:21:24commend the individuals who have rallied

1:21:26around this cause whether for aesthetic

1:21:28reasons, environmental reasons, or

1:21:31practical reasons like the traffic

1:21:33congestion I was talking about easier

1:21:35earlier. If you go to the neighborhoods

1:21:38surrounding Pete Meadow in its woods,

1:21:40just about everyone has signs saying

1:21:42save Pete Meadow. I like to think of

1:21:44these people as friends to the earth.

1:21:47I want to remind people that this was

1:21:49once and some believe still is Indian

1:21:51land, American Indians, Native

1:21:54Americans. And American Indians of

1:21:57course were our close to the earth. You

1:22:00can't take Indian land and tell me you

1:22:02want to build ugly unnatural highrises

1:22:04to suit what have always been human and

1:22:08not earth environmental interests. Thank

1:22:11you.

1:22:14>> Thank you very [applause] much.

1:22:17I also had a copy that I wanted to leave

1:22:19with the commission. Is that allowed?

1:22:20>> Yeah.

1:22:30>> Are we sitting? Are we sitting? This is

1:22:33the sitting. Okay. Um Katie Silverstein

1:22:35and Worcester. Um through the chair, I

1:22:38just have a couple questions. Um just so

1:22:40that I don't get something wrong. Has

1:22:43there been, and I checked last week, but

1:22:44maybe it happened since then, has there

1:22:46been any kind of environmental site

1:22:48assessment or a a phase one phase 2 LSP

1:22:51report provided to the commission or the

1:22:54staff?

1:22:55>> Uh, at this time, uh, we have not

1:22:57received an environmental report, uh,

1:22:59phase one or phase two on the site. No.

1:23:01>> Okay. All right. Just wanted to make

1:23:02sure that that was still the case. Um,

1:23:04and then my second question is has any I

1:23:06know that you don't consider the the

1:23:08building site within your jurisdiction,

1:23:09but I was curious if anybody had done a

1:23:12site visit and if you would classify

1:23:14that site as mostly flat.

1:23:22>> We did do a site visit. Um,

1:23:25the there are certainly some areas on

1:23:27the site that are not flat. I can't I

1:23:29think the area right if you're talking

1:23:32about mainly where the buildings are

1:23:33going is a flatter area where it kind of

1:23:36opens up to lawn there are once you get

1:23:38I think the further back you go on the

1:23:40site the more steep the topography

1:23:42becomes

1:23:43>> right but where where it is being

1:23:45considered flat is actually I mean there

1:23:47are several old women who live elderly

1:23:50lovely elderly women who live in the

1:23:52Highland West apartments that will not

1:23:54walk out there besides it being a

1:23:55trespassing violation they're worried

1:23:57about tripping

1:23:58because it goes like this. Um, and I

1:24:00think that's important to recognize if

1:24:02we're talking about the little vegetated

1:24:04wet wet the little vegetated wet meadow

1:24:08in the northwest and the storm water

1:24:10management plan is being designed to

1:24:12replicate or be similar to existing

1:24:15drainage patterns. If the site is doing

1:24:18this and the new site is going to funnel

1:24:21everything towards that wet meadow,

1:24:23that's very different. So, I'm going to

1:24:25I'm going to talk about the storm water

1:24:27management plan because that's what

1:24:28we're really here to do. And I know that

1:24:30I I expand I will expand on that a

1:24:32little bit, but um I do understand what

1:24:34is considered in the jurisdiction of

1:24:36this commission. Um now, the storm water

1:24:40management plan is over 400 pages long

1:24:42and this is a volunteer commission and

1:24:44there's two members of staff and this is

1:24:47one of many uh sites that you're

1:24:50reviewing. I cannot imagine that you

1:24:52have time to go through it in the way

1:24:54that it needs to be gone through, but

1:24:55there are problems with that report.

1:24:59Now, included in those 400 pages are

1:25:02pages and pages of outputs from Hydraad.

1:25:06That is just something that will make

1:25:08anybody's eyes glaze over. I even spoke

1:25:10to several engineers who said to me,

1:25:12"Don't bother looking at those. Those

1:25:14are fine. Boilerplate. Move on." Well,

1:25:17okay. So, those are the outputs. What

1:25:20about the inputs? What data went into

1:25:23those modeling the modeling software

1:25:27that provided the data that created the

1:25:30plan that's going to drain this site?

1:25:33Well, one of the important inputs is the

1:25:35soil types. So, soil types are

1:25:38classified based on how well they drain.

1:25:40So, you've got type A that drains really

1:25:42well, that would be like gravel, and

1:25:43you've got type D that drains very

1:25:45poorly. That's like clay that acts like

1:25:47a swimming pool liner. There's a big

1:25:49difference in those and that's how you

1:25:51model storm water runoff and recharge

1:25:54volume. Well, if you get the soil type

1:25:57wrong, then your model is wrong. Well,

1:26:01if you look at the geotechnical data

1:26:03provided hundreds of pages later in the

1:26:06back in the geotechnical report that's

1:26:08also included in the storm water report,

1:26:10just to make things really hard to find,

1:26:12>> [snorts]

1:26:12>> um you will find that if you go down

1:26:15deep enough, and you were supposed to

1:26:16use the most restrictive layer in these

1:26:19equations, if you go down deep enough,

1:26:22you find that you have wet clay, which

1:26:24was noted in several locations. You have

1:26:27wet pete, which was noted in several

1:26:29locations. And you have wet sand. Wet

1:26:32sand is different from dry sand because

1:26:34if sand is sitting in a puddle, water

1:26:36doesn't move through it. Dry sand

1:26:39obviously will infiltrate better. So the

1:26:41soils on this site largely would be

1:26:43classified as group D soils. Group D.

1:26:48But if you look at the inputs, 0% of

1:26:51this land was considered group D. And

1:26:53again, you're supposed to use the most

1:26:55restrictive layer. Well, what did they

1:26:58classify the soils as? group A and group

1:27:00C. What does that mean? They expect that

1:27:02these soils or the model will anticipate

1:27:05that those existing conditions will

1:27:07infiltrate better than they actually do.

1:27:10That means that the storm water

1:27:11management plan has underestimated storm

1:27:15water runoff and overestimated recharge

1:27:18volume. They said that they're they're

1:27:20providing I don't remember how many

1:27:21times big of a infiltration basin. We're

1:27:25expecting less to come off and more to

1:27:28actually sink into those soils than is

1:27:30actually possible because all of the

1:27:32groundwater that's in this site has been

1:27:35ignored.

1:27:36That's a recipe for flooding. And since

1:27:39all the water is being funneled now to

1:27:41the little wet meadow in the northwest,

1:27:43that wet meadow will be inundated with

1:27:45water and ultimately destroyed. If we

1:27:47care only about vegetation, no wa no

1:27:50vegetation's going to grow when it's

1:27:52subi subsumed by water. But

1:27:55unfortunately, this is the least of our

1:27:58problems. I would like to talk about the

1:28:00dump because it does also affect that

1:28:02little wet meadow. And this is a dump,

1:28:04by the way. I'm not making that up. It

1:28:07was referred to as a dump through the

1:28:101940s and 50s. If you look at newspaper

1:28:12articles, they refer to dump fire at

1:28:15Pete Meadow, which is what the site used

1:28:17to be called before it was the proposed

1:28:18building site. Or my favorite is the

1:28:21affectionate description of it as the

1:28:23ratinfested dump behind Havlin Street.

1:28:27This site was an open open unregulated

1:28:31unline dump that operated probably from

1:28:33the late 1920s into the 1950s.

1:28:37Now, this matters. You can see that on

1:28:39the aerial photograph that was mentioned

1:28:40earlier. You see that large clearings

1:28:42we're talking about the land was filled.

1:28:44It shows the large clearing of the dump

1:28:47site where the geotechnical data shows

1:28:49the deepest layers of fill right in the

1:28:51middle with three very well-used roads

1:28:54running to it. Why does that matter?

1:28:56Well, everybody keeps calling this urban

1:28:57fill. Urban fill this, urban fill that,

1:28:59fill fill. Where are you going to move

1:29:01the fill? This isn't fill. This is a

1:29:03landfill with garbage from the 1930s

1:29:06through 50s, which was not the best time

1:29:08for clean garbage. People threw out

1:29:11mercury. People threw out asbess and and

1:29:14the plastics that were used during that

1:29:16time are now banned. But it gets worse

1:29:18than that because if you look at the

1:29:20geotechnical data, it lists some

1:29:22interesting findings. And this is just

1:29:24what can be seen with the eyes and

1:29:25smelled. And we don't have any chemical

1:29:28data of what's actually the stuff that

1:29:30we can't see. But they listed large

1:29:33amounts of leather scrap, orange, red,

1:29:36and yellow ash, in some cases a foot

1:29:39thick, at least one rusted out metal

1:29:41drum. Now, I don't have a full sense of

1:29:43scale of that, but it looks to be about

1:29:46five or six Japanese knotweed leaves

1:29:48wide, which seems like a 55gallon metal

1:29:52drum. Soils that smell of petroleum or

1:29:55napsylene.

1:29:57Now, degrading benzene is not urban

1:30:01fill, although I don't know what urban

1:30:02fill is, so maybe it is. These findings

1:30:05point not only to the presence of

1:30:07industrial waste at this site, but to

1:30:10the specific use of this site by a

1:30:12tannery, which Worcester had at least

1:30:14one of that according to the Worcester

1:30:16History Museum was processing 300,000

1:30:19hides a year. What's in this site that

1:30:21we cannot see that that if it was used

1:30:24by a tannery that they would have left

1:30:26potentially tetrachloroethylene

1:30:28and other disgusting things that are now

1:30:31being proposed to just be excavated and

1:30:34moved to the north and left until it is

1:30:37feasible to remove them. Meanwhile, all

1:30:40of the water is going to run through

1:30:42that into the storm water basins into

1:30:45the little vegetated wet meadow and

1:30:47preventing it from functioning at its

1:30:49full capacity. And then since that's

1:30:51going to flood, it will end up in the

1:30:52Blackstone River once it makes it to Wer

1:30:54storm water drains.

1:30:59So, it matters now what is under the

1:31:02landfill because you'd say, well, this

1:31:04is really bad, so it's just going to be

1:31:07bad. except that right now that landfill

1:31:09sits on top of Pete. Pete was found,

1:31:12especially in that area where all of the

1:31:15contaminated stuff was found. So the

1:31:18worst part of this landfill, that

1:31:19clearing that was shown in that

1:31:21photograph is where the pete is. And in

1:31:24that in some cases, it's over 13 and 1/2

1:31:26ft of pete. They didn't get to the

1:31:28bottom of the pete. We don't know how

1:31:29deep it really goes. Pete has a fibrous

1:31:32structure that filters contaminants, not

1:31:34just solids, but liquids like

1:31:36tetrachloroethylene if it's in there.

1:31:40That is one of the functions that Pete

1:31:42serves and and it is sitting there

1:31:44providing pollution control. Now, if it

1:31:48is excavated, it will oxidize. Those

1:31:51fibers will break down and everything

1:31:52that is stored in that pete will be

1:31:54released up in the northern portion of

1:31:56the site while it waits for feasibleness

1:31:58of being removed.

1:32:00And while I'm talking about Pete, Pete

1:32:02performs another important function

1:32:04which is that of water retention. That

1:32:06same fibrous structure absorbs water. I

1:32:09think the going number is 20 times its

1:32:11weight in water. But in any case, it

1:32:13acts like a sponge. And if you have

1:32:15acres and acres of pete, you have over

1:32:18feet, several feet deep, you've got the

1:32:20biggest sponge ever that cannot be

1:32:22replicated with an infiltration basin.

1:32:25The pete regulates the groundwater. It

1:32:28absorbs water when the ground water is

1:32:30high and releases it back into the

1:32:32ground when it's sorry it absorbs water

1:32:35when it's wet and it releases it back

1:32:36into the ground when it's dry. And its

1:32:39ability to absorb water prevents

1:32:40flooding and its ability to release

1:32:42water keeps things hydrated. Now that is

1:32:45where it is that is important to note

1:32:47because the groundwater protection that

1:32:49it offers at this site is also afforded

1:32:53to that little wet meadow in the

1:32:54northwest because historically these two

1:32:58sites are or were they still are but

1:33:01they were the same wetland. There was no

1:33:04delineation. The toe of the slope is

1:33:06Phil. It's fake. These are the same

1:33:09wetland. They still think they're the

1:33:12same wetland. The only difference

1:33:13between them is that one has an an a

1:33:16dump on top and the other one has less

1:33:19of a dump so it can grow ve it can grow

1:33:21vegetation.

1:33:22So anything that is done to this

1:33:24building site in terms of groundwater

1:33:25and that's going to include dewatering

1:33:27which it looks like it's going to be ex

1:33:29much more extensive than is being

1:33:31reported because they didn't actually

1:33:33examine groundwater during higher

1:33:35groundwater levels. We've been in a

1:33:37drought kind of well the the all the

1:33:39data was collected during a drought that

1:33:41had started in September 2024. So that's

1:33:45a long time of depleting groundwater. So

1:33:47groundwater could be feet below where it

1:33:49is. It's basically at the historic

1:33:51surface or above it. And we haven't

1:33:54taken any of it into account. Nor we

1:33:55take into account where that groundwater

1:33:57is coming from which is the adjacent

1:33:59hills which I described in my

1:34:01dissertation that I sent to you. Um so I

1:34:03won't go into it but it's coming off of

1:34:04there. And unless you remove the hills

1:34:06that surround this site, you're not

1:34:08going to get rid of it. So, will it be

1:34:10redirected? What will be the effect on

1:34:12the little wet meadow when this gigantic

1:34:15recharge area no longer can function?

1:34:19So, talking about the building site

1:34:21itself, I did mention that it performs

1:34:24pollution control and flood prevention

1:34:26and those are two very critical wetland

1:34:28functions that are happening at the

1:34:31proposed building site despite the

1:34:32landfill on top of it. So, I know you

1:34:35don't have jurisdiction over this site,

1:34:36but I think that there is a question of

1:34:39whether or not this site is a wetland

1:34:42because it was a wetland. That was the

1:34:44whole reason for filling it. In the 1924

1:34:47Worcester city plan, they said, "Let's

1:34:49fill the swamp uh to the east of Newton

1:34:52A. We need to fill that swamp. It's in

1:34:55the way of development." So, the whole

1:34:57excuse for filling it was that it was a

1:34:58wetland. It was a filled wetland, but it

1:35:01still seems to be functioning as a

1:35:02wetland. [snorts] So, is it still a

1:35:05wetland? Well, in Massachusetts,

1:35:07wetlands are defined by three

1:35:09distinguishing characteristics. The the

1:35:11class characteristic hydrophic plants,

1:35:13the presence of hydric soils, and

1:35:15wetland specific hydraology, which is

1:35:17soil saturation, high water table or

1:35:19surface water. Well, if we consider the

1:35:21historic surface, we do have those

1:35:23hydraologic signs. Obviously we don't

1:35:26have the vegetation but if we look at

1:35:28the soils you see the organic hydric

1:35:30soils you see pete over large stretches

1:35:32of this property and you see the

1:35:34inorganic hydrox soil signs of

1:35:36redoxorphic features gllaying all sorts

1:35:38of interesting stuff if you read all of

1:35:40the geotechnical data and analyze it and

1:35:43not just go and look at the toe of the

1:35:45slope.

1:35:47Now

1:35:48why doesn't the site have the vegetation

1:35:50though? Is it because it doesn't have

1:35:52what the vegetation needs to grow? Well,

1:35:55the one of the reasons that vegetation

1:35:57is used to delineate wetlands is because

1:36:00it indicates what's underground.

1:36:02[snorts] So, that vegetation is the only

1:36:04vegetation that will tend to grow in

1:36:06some of these extreme environments. They

1:36:09are the only plants that will grow in

1:36:11areas with reduced forms of those

1:36:13minerals. So the minerals aren't being

1:36:15oxidized and that is for the most part

1:36:18toxic to plants except the few that will

1:36:20grow there. Most plants need oxygen for

1:36:22their roots. There's no oxygen for roots

1:36:24in a saturated environment. You only get

1:36:26specific plants under these conditions,

1:36:28especially with Pete. Now you've added

1:36:29in an acidic environment. All of those

1:36:32things exist here. So where are the

1:36:34plants? Well, those plants also need

1:36:36sunlight. There's no sunlight because

1:36:39there's 16 1/2 ft of fill on top of the

1:36:42site. If that fill were removed, this

1:36:44site could support vegetation. So, is it

1:36:48then not a wetlands? Well, Massachusetts

1:36:50has said that the fill doesn't affect

1:36:53the wetlands if there is all that other

1:36:56stuff under there. And we're in an

1:36:57unusual situation that we've seen what's

1:37:00underground thanks to the very generous

1:37:02contribution of of geotechnical test pit

1:37:05data. Um, we know that underground it it

1:37:08has the features that would support this

1:37:10vegetation and if the landfill were

1:37:13removed, it could grow. So, this

1:37:16landfill, all that separates it from

1:37:19what it is now and something that would

1:37:21no doubt be protected by the

1:37:23Massachusetts Wetland Protection Act and

1:37:25fall under the Conservation's

1:37:26jurisdiction is the presence of this

1:37:29unauthorized landfill, which has been

1:37:31maintained. And I realize that it was

1:37:32put there before the wetland protection

1:37:33act and before the solid waste disposal

1:37:35act, but it has been maintained by the

1:37:37current owner. He had ample time to

1:37:39remove it. So which [snorts] the

1:37:41landfill is now being used as an

1:37:44opportunity for the applicant to evade

1:37:47this commission's jurisdiction and

1:37:48proceed with destruction of those

1:37:50remaining defining characteristics and

1:37:52functions that remain at the site. It's

1:37:54no different than if someone were to put

1:37:55a tarp over their wetland on their

1:37:59property and come here and say, "No

1:38:01vegetation, no wetlands, not your

1:38:04jurisdiction." The purpose of wetland

1:38:07protection isn't aesthetic like nice

1:38:10plants, but it's functional. That's what

1:38:12gives this commission legitimacy. That's

1:38:15what gives you jurisdictional oversight.

1:38:17Wetlands serve a public good. This site

1:38:19performs a public good in the form of

1:38:21flood control, storm damage prevention,

1:38:24groundwater protection, and pollution

1:38:26prevention. All critical functions of a

1:38:28wetland. The proposed building site at

1:38:30three suburban road is a historic

1:38:32wetland. It continues to function as a

1:38:34wetland. It maintains all the

1:38:36topographic, geologic, and hydraologic

1:38:38characteristics of a wetland underneath

1:38:40the fill. And barring that fill, it

1:38:42would have the vegetation of a wetland.

1:38:44Nearly the entire site proposed for

1:38:46development is a wetland resource area

1:38:49and development here would excavate,

1:38:51fill, and dewater it, eliminating all of

1:38:53the functions it serves. It would leave

1:38:55that tiny still vegetated wet meadow in

1:38:58the Northwest alone to compensate for

1:39:00those lost functions. And that assumes

1:39:02that that little wet meadow can maintain

1:39:04its functionality at all once it is cut

1:39:06off from 13.9

1:39:09acres of its former self.

1:39:12So returning to the storm water

1:39:14management plan, the main reason why it

1:39:16is so woefully inadequate, you see, is

1:39:19not that it just needs an input

1:39:20correction of the right soils, but that

1:39:22the site is in fact fact a functioning

1:39:25wetland. And generally you're not

1:39:27supposed to build on those without a

1:39:29onetoone replication of lost

1:39:31functionality. This has the

1:39:33functionality, but we don't want to call

1:39:35it a wetland. There's no way to

1:39:37adequately account for that lost

1:39:39functionality of the site without

1:39:41admitting that this requirement must be

1:39:44met. There's undoubtedly wet land here.

1:39:48We just don't know where its boundaries

1:39:50are. But unfortunately, because of all

1:39:53this contaminated fill, you can't do a

1:39:55delineation safely. I saw that there was

1:39:57some requests for more test pit data.

1:40:00Every time a test pit is dug here, it's

1:40:02driving this contaminated these

1:40:05contaminated soils that we don't know

1:40:06enough about into the groundwater

1:40:09because it's breaking up that pete

1:40:11filtration layer that is there. So, we

1:40:13really ought to stop doing anything to

1:40:16this site until it can be analyzed,

1:40:18until that fill layer is removed, the

1:40:20site can be properly delineated and we

1:40:22can figure out the permit applicability

1:40:24of this site. And I think that that is

1:40:26what needs to proceed here. This this

1:40:29commission needs to require the removal

1:40:33of this landfill in the proper way

1:40:35according to hazard waste procedures and

1:40:38have the applicant remove this landfill.

1:40:41They'll have to do it anyway and then we

1:40:43can look at where those delineation

1:40:45boundaries really are and then you can

1:40:47reassess your jurisdiction. So, thank

1:40:49you so much for your time. I do hope you

1:40:51will consider at least the effect of the

1:40:53building site on little vegetated wet

1:40:55meadow. Thank you.

1:40:58>> [applause]

1:41:05[applause]

1:41:11>> Thank you, commission. My name is Harlem

1:41:13Montero, pro bono subject matter expert,

1:41:17professional wetland scientist.

1:41:19I find it highly ironic with all these

1:41:22conversations about fancy storm water

1:41:25retention basins when the ecosystem that

1:41:28exists here has already provided one

1:41:30greater than we could ever dream of

1:41:32building in the form of this old growth

1:41:35pete bog ecosystem single-handedly as

1:41:39Katie stated holding 20 times their

1:41:41weight in retention

1:41:44protecting this community from horrific

1:41:47flooding events and also simultaneously

1:41:50still supporting the ecosystem that we

1:41:52also need to survive.

1:41:56And I think in a nod to this being the

1:41:58250th anniversary of this country, I

1:42:02think we need to pay close attention to

1:42:04the legacy we're leaving for the next

1:42:06250 years and beyond. And I firmly

1:42:09believe the answer to that is not to

1:42:13pile an additional layer of abuse on

1:42:17this precious ecosystem that has already

1:42:19suffered numerous layers of incalculable

1:42:23abuse over the years despite our best

1:42:26efforts still existing and still with

1:42:30opportunity to thrive into the future.

1:42:37Thank you very much for your time.

1:42:39>> Thank you.

1:42:41[applause]

1:42:49>> I'm Dr. Beverly Rotor. I'm a

1:42:51veterinarian. I'm also a Worcester

1:42:53resident. Um having had the excellent

1:42:56presentations by the previous speakers

1:42:59um the things that really are of concern

1:43:02disturbing any of this Pete bog wetland

1:43:05region is of great concern particularly

1:43:08with the groundwater contamination both

1:43:11for public health for human health and

1:43:14animal health. And there are also

1:43:17sensitive animal species within a

1:43:19wetland ecosystem that will certainly be

1:43:22disturbed if not destroyed for what

1:43:25habitat they need. So these are quite

1:43:28concerning. The other concerns here

1:43:30related to this building project saying

1:43:33300 units, two parking spaces, all of

1:43:36those would be highly coveted and having

1:43:38this 5,000 um square footage clubhouse

1:43:42is going to be party city. And where on

1:43:45earth is the parking going to go? I

1:43:47mean, Dardy High School is landlocked

1:43:49enough and parking is a premium many

1:43:53hours of the day as well as when they're

1:43:55going to have football games and track

1:43:57meets and whatever else is going to go

1:43:59on that is important for high school

1:44:01students and the surrounding community.

1:44:04This Pete Bog wetlands has been a

1:44:08marvelous way of controlling and

1:44:10preventing flooding. And so that is a

1:44:13huge huge benefit and not to disturb and

1:44:16destroy this is really critical. So I

1:44:19appreciate your thoughtfulness on this.

1:44:21The other concern I have there was an

1:44:24excellent uh expose type of article

1:44:26written by Adam Bass with masslive.com

1:44:30when the previous uh consideration prior

1:44:33to when there was supposed to be a

1:44:34public meeting at Dy High School. The

1:44:36applicant had withdrawn and then had now

1:44:39we're back to this proposal. Um, having

1:44:42read that, my understanding is this

1:44:44developer has previously built uh

1:44:47apartments and buildings in Florida and

1:44:49there were considerable problems with

1:44:51those projects after they had been built

1:44:54and were sold by this developer. So, I

1:44:57think it's really imperative that the

1:44:59city of Worcester really understand

1:45:01what's going on here and if we have a

1:45:03history of problems with a developer,

1:45:06that should certainly been taken into

1:45:08consideration. I appreciate this. Thank

1:45:10you. Thank you. [applause]

1:45:19Kim Sabrowski and I grew up up the

1:45:22street from Pete Meadow and um there is

1:45:27a tremendous amount of wildlife in this

1:45:29area as well as being a Pete bog and a

1:45:33one of the last remaining stands of

1:45:36green area in the city that is so far

1:45:39untouched. Um, in addition to knowing

1:45:42now all this about the contamination and

1:45:45waste that has been dumped there over

1:45:47the decades, um, I had a situation many

1:45:51years ago with an oil tank remediation

1:45:54and um, I had it completely uh, cleared

1:45:58up. But when they were excavating to

1:46:01remove the contaminated soil, they came

1:46:03across, and this is up the hill, a

1:46:06tremendous amount of clay in the soil,

1:46:09which was allowing the water from an

1:46:12underground groundwater up on the hill

1:46:15to remain in that hole that had to be

1:46:18pumped out in order for them to continue

1:46:21the remediation.

1:46:23That soil was so dense that the water

1:46:26could not drain anywhere. And this

1:46:28Groundwater comes down from Bankrooft

1:46:31Tower coming through that area of my

1:46:35backyard in the front yard continuing

1:46:37down Howardson Way and down into Pete

1:46:40Meadow. I urge the conservation

1:46:42committee to seriously consider not

1:46:44approving this development. It's a total

1:46:46detriment to the neighborhood, the

1:46:48surrounding people that live in those

1:46:50homes who have already already

1:46:53uh been affected by wetland and um

1:46:57issues with their homes and foundations

1:46:59because of the the water situation there

1:47:03and that there's also been some settling

1:47:05of the existing building I believe by

1:47:08about 6 in that it was built on and um I

1:47:12just urge that they give a serious

1:47:15consideration to not approving this

1:47:17development. Thank you.

1:47:20[applause]

1:47:28Hello, my name is Paula Rosen Blum and I

1:47:31am a home own homeowner on Havlin Street

1:47:34and a director of butter to the property

1:47:36at number three Suburban Road where

1:47:38there is consideration this evening for

1:47:40a development plan being proposed by

1:47:43Wood Partners. I would like to thank the

1:47:46members of the conservation commission

1:47:47for the opportunity to express my

1:47:49concerns about this project and to share

1:47:52the reasons I believe it should not be

1:47:54approved. I've lived in my home for the

1:47:56past 44 years. We recently built an ADU

1:48:01on our property for our adult daughter

1:48:03who has a disability to live in. During

1:48:06that process, our initial attempt to dig

1:48:08a foundation for the structure revealed

1:48:10there was 10 to 12 feet of coal ash just

1:48:15below a layer of surface soil. This

1:48:18discovery was alarming and had us

1:48:20scrambling to figure out another plan

1:48:23for building the ADU.

1:48:25Finding so much coal ash buried on our

1:48:28property led us to a deeper

1:48:29understanding about what we are really

1:48:32living next to. We learned that coal ash

1:48:35had been dumped throughout the property

1:48:37and that trash was dumped there as well.

1:48:40Another alarming discovery. But an even

1:48:43greater concern for us was discovering

1:48:46that the development plans do not

1:48:48include any form of containment or

1:48:50remediation.

1:48:52We also now understand that wet pete

1:48:55which is prevalent on this property acts

1:48:58as a giant filtration system protecting

1:49:01adjacent properties from toxic m leate.

1:49:05The coal aash we found on our property

1:49:07will remain safely buried but the

1:49:10numerous additional findings of

1:49:12potential industrial waste are not

1:49:14something that I wish to worry about.

1:49:17Yet the developer's plan to excavate the

1:49:19landfill and pete layer on the property

1:49:22to prepare it for building would

1:49:23eliminate this f function putting all

1:49:26the butters in the general area at risk

1:49:29of exposure to these toxic toxic wastes.

1:49:33The natural pollution controls this area

1:49:36performs is the function of a wetland.

1:49:39As already covered, there is evidence to

1:49:42support that the entire building site

1:49:44continues to maintain characteristics of

1:49:46a wetland. If the wetlands are valued

1:49:50valued for their function, then

1:49:52certainly this function makes this one

1:49:55an invaluable and a free resource to the

1:49:58city which has an obligation to protect

1:50:01its residents. This commission also has

1:50:04an obligation to protect wetland values

1:50:07including pollution control and it

1:50:10therefore has an obligation to protect

1:50:12the wetland at three suburban road. As

1:50:15members of the conservation commission,

1:50:18you also have a responsibility to make

1:50:20recommendations on the planning,

1:50:23acquisition, and management of property

1:50:25for conservation and passive recreation.

1:50:29This property is located next to Duffy

1:50:32Field, a city park and land owned by the

1:50:35Greater Worester Land Trust and is, I

1:50:38believe, an I ideal candidate for

1:50:41conservation, as was done recently with

1:50:44a parcel near near Nelson Place School.

1:50:47I thank you for your consideration.

1:50:51[applause]

1:50:57Hi, my name is Sarah Samserion. Our

1:51:00family has owned our property on Havlin

1:51:02Street for over 68 years.

1:51:05Um,

1:51:08I just want to touch base about the

1:51:13risk that we are facing if you go ahead

1:51:18with approving this plan. Because

1:51:23I should also add that a number of homes

1:51:25on our street have drains built into

1:51:28them because of the water that flows

1:51:31through both down from Bankraftoft and

1:51:34through the underground area from the

1:51:36meadow.

1:51:38when you excavate

1:51:41and uh

1:51:44uh dig up toxic waste. I want to know

1:51:47who's going to pay my medical bills if I

1:51:49have respiratory illness or cancer. I

1:51:53want to know who's going to take care of

1:51:56our neighborhood that will be destroyed

1:51:59if the entire neighborhood becomes

1:52:01flooded and contaminated.

1:52:04We are here because you are here as our

1:52:08representatives to try to decide on

1:52:11what's best for the community balance

1:52:14against individual needs. And I look at

1:52:17the community which is a pretty large

1:52:20one and don't see a good balance here.

1:52:24We absolutely need more housing,

1:52:27ownership of housing, which partners is

1:52:30not providing from the last meeting I

1:52:32was here. We need affordable housing,

1:52:35which this is not.

1:52:38We need traffic management, which we are

1:52:41still waiting for with the Dory, where

1:52:45we're still not having our needs met.

1:52:48And

1:52:50you're gambling with us. And as Ms.

1:52:52Fratoni mentioned, Wood Partners um has

1:52:57built stuff before, but they've also

1:52:59usually flipped their properties within

1:53:01two years and they're gone. So that

1:53:04property in Orlando that uh collapsed

1:53:07and everyone lost all of their

1:53:09possessions and they're busy suing

1:53:12whomever. Um Wood Partners already sold

1:53:15that. So, I don't know who's responsible

1:53:17for the building that Wood Partners

1:53:20designed,

1:53:22determined was structurally sound, and

1:53:24then fell apart. Um,

1:53:29I would ask you to put yourself in our

1:53:32shoes to imagine you living in our

1:53:35neighborhood and ask you to think if

1:53:38this is the best balance of public need

1:53:43and and personal ownership. Thank you

1:53:46very much.

1:53:48[applause]

1:53:56My name is Katherine Perkins. I live on

1:53:58the other side of Duffy Field. Um, and

1:54:03I've learned in the last few years more

1:54:06intensively about trees. My

1:54:08understanding is that trees hold and

1:54:12process huge amounts of water. What's

1:54:15planted there was an intentional

1:54:17arboritum with a variety of trees.

1:54:20They're very tall. They're quite old.

1:54:24They're very lovely. They provide a huge

1:54:26amount of shade.

1:54:29I wonder if any of the engineers

1:54:32have assessed how much water would be

1:54:35added to the site if the trees aren't

1:54:39processing it, and would that be a

1:54:42factor in whether that um that site can

1:54:46handle any more water?

1:54:50Thank you for your consideration.

1:54:53[applause]

1:55:06>> Turn on.

1:55:09>> Hello. Okay. Uh, friend Nathan Worester,

1:55:13I I wasn't going to speak on this. I've

1:55:15spoken before on this.

1:55:18um you know about the whole thing.

1:55:21Obviously

1:55:22development is needed, but it's

1:55:28um with a development ruin uh the

1:55:32neighborhood because you obviously have

1:55:34the issues of the Pete wetlands and just

1:55:38in general

1:55:40um you know the wetlands that are there.

1:55:44But let's also be clear.

1:55:48There are things that have been built

1:55:51probably shouldn't have been built that

1:55:52you can argue those points. Like for

1:55:55example, the McDonald's at Tatnik Square

1:55:58on Mil Street. They took I don't know

1:56:00how much area they took, but they

1:56:02definitely took a sizable area to put

1:56:04that McDonald's in there. Was it good?

1:56:07Was it bad? Who knows? But now, let's be

1:56:10clear.

1:56:12something will get built there. The only

1:56:14magnitude is how much of it will be

1:56:16used. Uh uh should they choose

1:56:21something else? Yeah, probably. But

1:56:24also, let's face it, if and when they do

1:56:27build this, if it does get the okay,

1:56:31somebody paying rent over there and a

1:56:34two decker or a three decker or say

1:56:372600, you're going to be talking north

1:56:39of probably 3500.

1:56:41It's inevitable cuz all the development

1:56:46uh forces rents up cuz you have that

1:56:49much property. Even though there's

1:56:51competition, let's face it, we we have a

1:56:54lot of people uh living in Worcester who

1:56:58previously lived in Boston came here

1:56:59because it was cheaper.

1:57:01They will flood this area. Not in terms

1:57:04of just all the water damage, but there

1:57:07will be people coming in from Boston

1:57:09that will be living there. It's

1:57:11inevitable. So, uh, this committee will

1:57:14do what they want and hopefully, uh,

1:57:16they will do the smart thing. I mean,

1:57:19let's face it, you're not going to stop

1:57:20them entirely. The only question is if

1:57:23you can limit the scope of the damage to

1:57:26this uh, neighborhood. I hope uh, that

1:57:30people make the right decisions and that

1:57:32the developers aren't just in it uh,

1:57:34just to make a quick buck and then after

1:57:37they do it, they just look up. Oh,

1:57:38sorry. My hands are dying. I I can't do

1:57:41anything. I'm done with it. I hope you

1:57:45make the right decision

1:57:48cuz otherwise there will be people here

1:57:50every single meeting.

1:58:00Either one.

1:58:02>> Um, my name is Phyllis Spatrick. I live

1:58:05on Vassor Street, so I'm not in the

1:58:07immediate neighborhood, but I wanted to

1:58:09say a couple of things. One is I know

1:58:11that so I am a bit of a distance from

1:58:14there, but even where I live, the people

1:58:16who live on the across the street from

1:58:18me, so somewhat to the east, they all

1:58:20have water issues now. And so I'm sure

1:58:24that that this situation with removal of

1:58:28the trees with the remov the problem

1:58:31with the peak bog is going to make the

1:58:34situation worse. And another thing to

1:58:36think about and it was an article that I

1:58:38read just today in the New York Times

1:58:40about culverts and how important they

1:58:43are that almost according to this

1:58:46article which was in the New York Times

1:58:48almost 2thirds of the nation's six

1:58:50million culverts were built to standards

1:58:53insufficient for today's storms.

1:58:56Um

1:58:58and so

1:59:02that's another thing to think about. I

1:59:03know there's a huge culvert at Duffy

1:59:06Field that carries water away towards

1:59:09the direction of where I live. So that's

1:59:11another thing to think about is how much

1:59:13you know will these culverts and I don't

1:59:16know how many more there are but will

1:59:18these function as they will need to as

1:59:20we get more severe storms in the coming

1:59:24time because now we have storms that

1:59:26dump way more often way more rain

1:59:31per hour than we used to have. So it's

1:59:34something definitely consider. Thank

1:59:36you.

1:59:38>> [applause]

1:59:42>> Do we have anyone online?

1:59:46>> Just a reminder that it's star9 to raise

1:59:48your hand.

1:59:51>> If you're dialed in by phone, that is.

1:59:55>> Yep, we do have somebody.

2:00:00>> Richie, you should be able to speak.

2:00:02>> Awesome. Thank you. Um, hi, my name is

2:00:05Richie Scoffield. Um, I live on Highland

2:00:09Street abuing the proposed development

2:00:11and uh, I'm new to the neighborhood. Uh,

2:00:14my wife and I, um, our house was built

2:00:16in 1910

2:00:18and our first home improvement project

2:00:21had to be supporting our basement. And

2:00:25uh you know, we got the the company into

2:00:29our into our house and they started

2:00:31setting up temporary supports

2:00:33for the construction. And uh the

2:00:37houselifting company found massive

2:00:40vacuous holes between the concrete slab

2:00:44and the soil beneath it. Uh in some

2:00:47places it was up to se

2:01:00Oh, sorry about that, Richie. You should

2:01:02be able to speak.

2:01:02>> That's good.

2:01:03>> That's okay. Sorry about that. Um, yeah.

2:01:06So, they found these massive holes uh

2:01:08between the concrete slab and the soil

2:01:10beneath it. Up to 7 in of just bare air

2:01:15underneath

2:01:17um underneath our concrete slab. Um, and

2:01:20so the holes were so big that the

2:01:23engineers in the Worcester building

2:01:24department actually required us to

2:01:27install uh 20 foot helical coils uh

2:01:30helical piles into the soil underneath

2:01:34each of the lolly columns that we

2:01:36replaced.

2:01:37Um, it ballooned our cost way out of our

2:01:40original budget. Um, but the

2:01:43houselifting company decided it was too

2:01:45much of a liability to continue without

2:01:48the helical piles. Um, and I I don't

2:01:51really have a a you know, a big

2:01:55statement to to make here or specific

2:01:58things to consider, but I I just wanted

2:02:00to be known that this I mean very

2:02:02practically within the last 6 months

2:02:05underneath this soil or underneath our

2:02:08uh concrete slab there are massive

2:02:10massive holes and this building is you

2:02:12know maybe 115 years old. So um I just

2:02:16think it's really really important uh to

2:02:19understand

2:02:20uh and to build appropriately because if

2:02:23you don't I mean you will end up with

2:02:26these massive holes and this massive

2:02:28sinking in our house at some places uh

2:02:31is up to 5 in between you know from the

2:02:34wall to the center of the house. Um

2:02:37that's it.

2:02:40>> Yep. Thank you. Anyone else?

2:02:43>> [applause]

2:02:47>> Alexander, you should be able to unmute.

2:02:49>> Thank you. Uh the first thing I'd like

2:02:52to do is uh just thank and and give a

2:02:56huge shout out to all of our neighbors.

2:02:58I think um we clearly are all on the

2:03:01same page. So, I really hope that the

2:03:05commission is listening to to what

2:03:08everyone has to say. Um, and I would say

2:03:12ditto to all the comments and then I

2:03:15guess I would just like to make the

2:03:18comment and

2:03:21um, you know, have the commission

2:03:22understand that I think all of us do

2:03:25understand and appreciate that housing

2:03:28is needed. However, housing is not

2:03:31needed at all costs and given the

2:03:37information that has been shared,

2:03:40the housing um that is being proposed

2:03:44would be at the cost of all of us

2:03:47existing neighbors right now. So, I

2:03:50guess I would just like the commission

2:03:51to think about that as well. Thank you.

2:03:56[applause]

2:04:00And just for the record, can you just

2:04:01state your name?

2:04:02>> Sure. It's Alexandra and I'm on Havlin

2:04:05Street. Okay.

2:04:06>> Thank you.

2:04:07>> Thank you.

2:04:10>> Anyone else?

2:04:14>> So, I said a comment. I Kevin Crowley. I

2:04:18grew up on Weston Street, which is two

2:04:20streets over from Havland. Um,

2:04:24I haven't been up there in 50 years.

2:04:25Eric, you said you walked it. Um, when

2:04:28we were kids, we used to go up there to

2:04:30hunt for salamanders and we called it

2:04:32the swamp. So, that's all.

2:04:38[applause]

2:04:42>> Hi. Um, my name is Blaine

2:04:43[clears throat] Grandstaff. I live on

2:04:44Avalon Street. Um, initially had no

2:04:47plans on making any comments today. um

2:04:50was really hoping that someone else

2:04:52would have mentioned, but I think Sally

2:04:54in in some regard mentioned about the

2:04:57potential toxicity of the the

2:04:59groundwater. Um I have two sump pumps in

2:05:02my basement. Uh last year when it rains,

2:05:05those pumps run continuously and they

2:05:08discharge into my backyard, literally

2:05:10into my backyard. And that water does

2:05:12not go away. It just there's a permanent

2:05:14little puddle that is going to be there

2:05:18for 2 or 3 days after it rains. And now

2:05:21after listening to all of the discussion

2:05:23so far, hearing about the quality of the

2:05:27fill, the the the potential toxicity of

2:05:30the coal ash, the pete, the the tannery

2:05:33chemicals, I'm I'm now more concerned

2:05:36than before I went into this meeting

2:05:38about the impact of the groundwater

2:05:41literally flooding my backyard with

2:05:44toxic chemicals and the the pumps in my

2:05:47basement that have you can take the lid

2:05:50it off and you can see the water in your

2:05:51in the basement sitting there. It that's

2:05:54where my home office is now. I'm going

2:05:55to have the the the the chemical air

2:05:59leeching into my basement and I don't

2:06:03think based on the plans that they've

2:06:04submitted so far. I'm not convinced that

2:06:08their discharge or their ability to

2:06:10absorb all that water is sufficient. And

2:06:12I'm um also interested in what you had

2:06:16said earlier about how are they going to

2:06:18be maintaining this in an ongoing

2:06:20fashion? Who's going to be responsible

2:06:22for that? Not today, not next year, but

2:06:2610 years from now. So that when I go

2:06:28into my backyard, I I'm not encountering

2:06:31all of this toxic material. That's it.

2:06:36[applause]

2:06:43Hello, my name is Marica Davio. Um, I'm

2:06:45speaking on behalf of myself and and my

2:06:47husband, uh, David. We're on Havlin

2:06:49Street, number three. Um, mainly I just

2:06:53want to say ditto, but I think it's

2:06:55important that you see our faces and

2:06:57hear our voices. Um, more I'm more

2:07:00concerned, too. Um, and that's it. And I

2:07:03want to thank all my neighbors for

2:07:04coming. And I want to thank Katie

2:07:07Silverstein for her amazing research and

2:07:10presentation. [applause]

2:07:22Greg Dorsler. I'm a Worcester resident.

2:07:25I live uh off of Highland Street right

2:07:26on the other side of Elm Park. um in an

2:07:29area that frequently floods during

2:07:31torrential rainstorms and during the Dhy

2:07:34High School construction project um the

2:07:36flooding would include mud washed down

2:07:39from the site as far as the Fruit Street

2:07:41area. So I know that some of the water

2:07:43that we receive is coming from Upper

2:07:45Highland Street. Um how much of a

2:07:48difference this project would make um in

2:07:50terms of intensifying that I I don't

2:07:52know. But I think any additional storm

2:07:55water that we get is not a good thing.

2:07:59Um I also was drawn um when I read when

2:08:02I was looking this afternoon at this

2:08:04site plan to that large footprint on the

2:08:06northern side that looked like it was

2:08:08all clearcut and leveled and groomed and

2:08:11was very curious about why that was what

2:08:13that was and why that was needed. I

2:08:15understand from the changes tonight that

2:08:17that's been reduced and changed to a

2:08:19burm, which on the surface sounds like a

2:08:21good thing, but when I heard all of the

2:08:24stories about what is beneath the

2:08:26surface and the contaminants that may

2:08:29lie there and and realizing that that

2:08:31material was what the burm was going to

2:08:33be constructed out of, bringing that

2:08:35material to the surface along with

2:08:37whatever chemicals might be used to

2:08:38groom that bur that burm and maintain it

2:08:40as a lawn or how however it's going to

2:08:42be maintained. um and how that material

2:08:45could leech into the existing official

2:08:48wetland. Um that that's something that

2:08:50this commission should consider as well.

2:08:52Thank you.

2:08:55[applause]

2:09:00Okay. Um the applicant want to address

2:09:02any specific questions at this point? I

2:09:04mean, we are not we're not voting

2:09:06tonight. Um, there's a lot of

2:09:08information we still need, but if

2:09:11there's something you wanted to address,

2:09:13>> I don't necessarily think there's

2:09:14anything to to address. We just

2:09:16appreciate that the commission's time.

2:09:17We appreciate the the public and

2:09:19neighborhood concerns as well. Um, we

2:09:22do, as Eric indicated early on, we do

2:09:25have a number of comments that we need

2:09:26to address. Um, so we're working

2:09:29obviously we're going to ask for

2:09:31continuation to allow that to to play

2:09:33out and provide those additional

2:09:35comments to the satisfaction of the

2:09:37commission and the agent. Okay.

2:09:41>> Do you have a uh a [clears throat]

2:09:43meeting date you think you could

2:09:44realistically be prepared for? I think

2:09:46we'd want to avoid just like continuing

2:09:48one meeting out and then having to have

2:09:50a Butters followup for continued

2:09:52postponements. So, our next meetings are

2:09:54on October 5th, October 26th, November

2:09:5716th.

2:09:59>> Yeah, the next meeting should be fine.

2:10:01>> Okay.

2:10:05>> So, October 5th would have a um deadline

2:10:09of one week prior for revised materials.

2:10:23through you, Madame Chair. Sorry. So,

2:10:25there are a lot of points that were

2:10:27brought up today and just a lot of

2:10:29questions that were raised. I'm

2:10:32presuming that when you come back,

2:10:33you'll be able you're planning on

2:10:35addressing a lot of those concerns. Is

2:10:38that

2:10:38>> Yeah, we did take I did take a number of

2:10:40notes and between I think planning board

2:10:42comments, conservation comments and

2:10:44comments that we've written down

2:10:46tonight, I think we'll provide a package

2:10:47that we can address

2:10:49>> and we'll be available to answer

2:10:50questions.

2:10:51>> Okay. And they have access to all the

2:10:52public uh submissions that we received.

2:10:55>> Correct. Yeah. And we'll keep you guys

2:10:56posted if we get any new written

2:10:58comments as well.

2:10:59>> Perfect. Thank you. I think we've got

2:11:01two so far, but if you just want to pass

2:11:03along any additional ones, that'd be

2:11:04appreciated.

2:11:06So, one of the more striking questions

2:11:08that came up was uh whether or not this

2:11:11land was or should be uh wetland. Um and

2:11:16it maybe at one point is that something

2:11:19that we are assisting them in finding

2:11:22out some of this information or are do

2:11:24you have a good handle on?

2:11:25>> Well, I think I addressed that early on.

2:11:27you know, going back into the the early,

2:11:30you know, photo aerial photos back in,

2:11:32you know, 1938, the area was clearly an

2:11:35area that dumping was occurring based

2:11:37upon the aerial photos, based upon that

2:11:39the photos from 1960 that ceased to to

2:11:42occur. So, what you see today out there

2:11:46um was in place well before the Wetlands

2:11:49Protection Act or the City of Worcester

2:11:50wetlands ordinance. And if the

2:11:52commission has any would like to go and

2:11:54and walk the site with us, we'd be happy

2:11:56to take you out to show you

2:11:58>> um you know the existing conditions and

2:12:00>> trees on the site and whatnot.

2:12:03>> Okay. And um as the chair had mentioned

2:12:06before we opened to public comments was

2:12:08the fear of uh you know getting into it

2:12:12and realizing that maybe the soils are

2:12:15contaminated and you have to remediate

2:12:17more and uh the potential of abandoning

2:12:20the project because it's not just not

2:12:23you know profitable at that point. Um,

2:12:26so we want to make sure that we have all

2:12:27of that information up front to avoid

2:12:30something like that because, uh, you

2:12:32know, it is a nice area of green space

2:12:36that's not there and we wouldn't want it

2:12:39to just be, you know, leveled and and

2:12:42have someone abandon.

2:12:43>> Agreed.

2:12:47[applause]

2:12:51>> So, are you good with a postponement?

2:12:53Yeah, we'd ask for extension to the

2:12:55October 5th meeting, please.

2:12:57>> So moved. All

2:12:59>> in favor?

2:13:00>> I I

2:13:02>> sorry

2:13:03>> with the second.

2:13:05>> Thank you very much. We appreciate your

2:13:06time.

2:13:06>> See you in a few weeks.

2:13:09[clears throat]

2:13:10>> Uh next item number 12. Does anyone need

2:13:13a break before [laughter] we have one

2:13:15more? What am I? Um 26 and 28 Milton

2:13:18Street.

2:13:28Good job. No disrespect.

2:13:33>> Thank you.

2:13:50Is the applicant online?

2:13:53>> Yes. Sorry, I was trying to get off.

2:13:54>> Joe, you should be able to unmute

2:13:55yourself.

2:13:57>> Can you hear me now?

2:13:59>> Um, you might need to speak up.

2:14:08>> Can you hear me now?

2:14:26better

2:14:32customer service most of my life.

2:14:43Okay.

2:14:44>> So, is the applicant online?

2:14:50>> We're still we're still in the middle of

2:14:51a public hearing.

2:14:56>> Um I'm sorry. Was the applicant online?

2:15:01>> Somebody started to talk but we couldn't

2:15:02hear him.

2:15:03>> Yeah. So, Joe, Yep. you should be able

2:15:04to speak again. And Don just walked out,

2:15:07but

2:15:23>> Can you hear me now? Is that better?

2:15:25>> Um, yep. Yeah, we can hear you now.

2:15:27>> Okay. Apologies for that.

2:15:30Um,

2:15:32lower my hand.

2:15:35Good evening. I am the uh engineer uh of

2:15:38record on this uh Milton Street

2:15:39properties. Um this is a development of

2:15:45two

2:15:47buildings uh three unit buildings each.

2:15:50Um we've made it through conser uh

2:15:53planning board and zoning board and

2:15:56we're in front of conservation

2:15:57commission. Um

2:16:00a little bit of history on this project.

2:16:02this project. Um many of the zoning and

2:16:07planning board conditions we obtained

2:16:10after the fact. Both myself and Don were

2:16:12brought in at the tail end of um

2:16:15construction which is not as typical and

2:16:20um and have been working towards a path

2:16:23of making sure that this project is in

2:16:25compliance and pulling it back into the

2:16:27compliance and city regulations. So, we

2:16:30view this as our last step in in that

2:16:33process as we um work through the

2:16:37conservation um commission and the

2:16:42[clears throat] and um working with Eric

2:16:44and Maddie on the the conservation

2:16:48commission

2:16:49agents. um proposed here today is

2:16:55the remaining construction of these

2:17:00two buildings. Both buildings will

2:17:03utilize

2:17:05capture roof runoff route to underground

2:17:09infiltration units uh positioned in the

2:17:13front driveway areas. Um and there was

2:17:17uh several comments that we work through

2:17:20with city staff on

2:17:24um

2:17:27ensuring that the rainfall calculations

2:17:29and you you know just went through a

2:17:30whole understanding of um hydroad and in

2:17:34the development of that. So um we also

2:17:37had to update our hydrocad model for for

2:17:39this development in order to be in

2:17:41compliance. And um

2:17:45that was one of the the remaining

2:17:48comments

2:17:50that that um we actually uh were able to

2:17:54provide um

2:17:57uh earlier today. Um so we understand

2:17:59that you know it might not have been um

2:18:04as timely but you know rushing in order

2:18:07to get um comments completed. Um another

2:18:10aspect of the project for this is Milton

2:18:13Street is a private roadway and we are

2:18:19paving um and installing two catch

2:18:22basins here both on the plan right side.

2:18:26If you see those um those catch basins

2:18:29are are after discussions with with the

2:18:33city staff on providing treatment and

2:18:38providing

2:18:40um stormwater capture in in the um in

2:18:45this newly paved section.

2:18:48as as I stated um these buildings are

2:18:51actually already had been completed and

2:18:55you know once we noted that you know we

2:18:57need to once we told the construction

2:19:00team that you know we obviously need

2:19:02these permits and we need to

2:19:07be constructing this in accordance with

2:19:08city regulations.

2:19:10Um, we installed erosion controls on the

2:19:14site and there was a stop work order

2:19:16until um until

2:19:20um we we made it through planning board

2:19:23and and presenting here um in front of

2:19:26conservation.

2:19:30So, a little

2:19:33different of um a little strange way to

2:19:37to present here tonight. um where where

2:19:40some of what the structure is has been

2:19:42completed, but um I'm happy to take

2:19:45comments or questions on on that.

2:19:51>> Okay. Staff [clears throat] uh comments

2:19:53on the project.

2:19:54>> Sure. So, we just had a few uh comments

2:19:57related to the storm water report uh

2:19:59that Joe mentioned. Um those have

2:20:01largely been addressed at this point.

2:20:03Although given the separation of um the

2:20:05bottom of the unit to groundwater, I

2:20:07think we would want to see a mounting

2:20:08analysis uh as a condition of approval.

2:20:11Um one other question or comment we had

2:20:14rather was a request to incorporate more

2:20:16native species into the planting plan.

2:20:18Is that something that could be

2:20:19accomplished on a revised plan?

2:20:22>> U yes.

2:20:25Okay, that's it for staff comments at

2:20:28this point. Uh so I just have a question

2:20:29on um uh the timing. The the catch

2:20:32basins aren't currently installed. I can

2:20:34see the materials on site for the catch

2:20:38basins. What's the sequence of the

2:20:39remainder of the work?

2:20:41>> That is that is correct. Um the catch

2:20:43basins will have to be that is the the

2:20:46roadway is in base. Um and the the catch

2:20:50basins will have to be cut into that

2:20:51base and installed. Um and then

2:20:57final patched and then there will be a

2:20:59top of asphalt on placed on top of that.

2:21:02Um so there'll be two lifts of asphalt,

2:21:04right? Um,

2:21:06additionally for site work, uh, the only

2:21:08other remaining pieces of site work are

2:21:10landscaping, um, which, you know, will

2:21:13happen as, you know, in accordance with,

2:21:16um, the revised plans and the

2:21:20installation of that the storm water

2:21:22infiltration system within the driveways

2:21:24and the pavement of the driveways.

2:21:28>> So, um, just remind me on this site

2:21:30where the utilities are coming from.

2:21:32They are coming from Milton Street and

2:21:35they already connect. Yep.

2:21:36>> Okay. So, they're already connected. The

2:21:38infiltration structures are going in the

2:21:41front of the property. What's coming in

2:21:42underground from the front?

2:21:45>> Um the water and the sewer. We've worked

2:21:47with um maintaining

2:21:52a a a system that is a very shallow

2:21:54system, 2.5 ft total depth for this this

2:21:58underground infiltration system. and

2:22:00that um we're coordinating the utility

2:22:02installation to make sure that we are

2:22:05not in conflict.

2:22:07>> Got it. And and um I mean once you have

2:22:10approval, how long do you expect it to

2:22:11take before this site's finally buttoned

2:22:13up?

2:22:14>> Uh the the hope is right but um after

2:22:17approval this is buttoned up before the

2:22:18winter. um we want to be able to

2:22:22complete this and and finalize that work

2:22:25>> in order to make sure we can capture as

2:22:26much of the you know whatever remaining

2:22:29growing seasons left.

2:22:30>> Okay. I don't know how often you're

2:22:32going up to the site, but you might want

2:22:33to double check on the um the erosion

2:22:35[clears throat] controls. There's

2:22:36doesn't look like there's a lot coming

2:22:38off the site right now because the the

2:22:40brand new base coat is kind of creating

2:22:43a bit of a barrier. Um but there's

2:22:46they're inconsistently applied.

2:22:49>> Okay. No.

2:22:54>> Um

2:22:54>> we we will get with um the the

2:22:57contractor on this to ensure that that

2:22:59is no longer the case.

2:23:01>> Okay. Um thank you. Any other questions

2:23:05or comments?

2:23:09Anybody on the public online here?

2:23:14analysis as

2:23:16>> uh a mounding analysis was the request.

2:23:18A mounding analysis

2:23:19>> mounding like

2:23:22>> Thank you. Sorry.

2:23:24>> No worries.

2:23:27>> So, nobody.

2:23:28>> Yes.

2:23:30>> Okay.

2:23:34>> Make a motion to close.

2:23:36>> Make a motion to close.

2:23:38>> Second.

2:23:39>> All in favor? I

2:23:41>> I proposed order of conditions.

2:23:47>> All right. So, in addition to the

2:23:49standard conditions, we have a

2:23:51requirement for a mounting analysis,

2:23:54a requirement for revised plans with a

2:23:56revised planting plan incorporating at

2:23:58least 50% native species. Uh condition

2:24:0137 for storm water management system

2:24:03maintenance, 38 for infiltration unit

2:24:05inspection, 39 for certification of

2:24:07storm water infrastructure, 48 for dust

2:24:10control, 48 for de 49 for dewatering, uh

2:24:1350 for cement truck washing, and 56 for

2:24:16spill prevention

2:24:19as built plan for the certificate of

2:24:20compliance process. Uh condition 66 for

2:24:23sand and salt with ongoing conditions 37

2:24:26and 66.

2:24:28The

2:24:30>> applicant have any questions?

2:24:32>> We do not. Nope. We We appreciate this.

2:24:34Thank you.

2:24:37>> I'll make a motion to issue the orders

2:24:39of conditions as described.

2:24:42>> Second.

2:24:43>> All in favor?

2:24:44>> I

2:24:45>> I

2:24:46>> Right. Have a good night.

2:24:47>> Thank you.

2:24:50>> Uh next up, certificate of compliance.

2:24:54All right. So, first up, we have a

2:24:55partial certificate of compliance

2:24:56request for uh lots 1 through 7 Tory

2:25:00Fort Lane. Uh so, this focuses on the um

2:25:04lot that affects 148A Tory Fort Lane. Um

2:25:08so, this was from 2005, this filing for

2:25:10construction of multiple houses. um the

2:25:12lot that's in interest um doesn't exist

2:25:15on this plan but now exists um and was

2:25:19part of a single family home

2:25:20construction in 2023 which we'll discuss

2:25:22in a couple items down um but yeah

2:25:26they're looking for a partial

2:25:26certificate compliance essentially it

2:25:28came up during the real estate

2:25:29transaction that this old order was also

2:25:31still on the property so

2:25:35>> okay so there's nothing really to

2:25:38>> yeah yeah nothing no work was proposed

2:25:40on that section of the property for this

2:25:42but still was included.

2:25:47>> Is there a motion?

2:25:49>> So moved.

2:25:50>> Second.

2:25:51>> All in favor?

2:25:52>> I

2:25:52>> I

2:25:58>> All right. Up next we have 34

2:26:00Bittersweet Boulevard. This is also a

2:26:02partial certificate of uh certificate of

2:26:04compliance request um for lot 34. So one

2:26:08side of a duplex. This is part of the

2:26:09arboritum uh development. Uh the

2:26:12orderation is from 2009. So one of those

2:26:14old ones that just never get closed out

2:26:16properly. Came up during a real estate

2:26:18transaction. So looking for a partial.

2:26:20It's fully stabilized at this point. So

2:26:23no concerns.

2:26:24>> Is there a motion?

2:26:26>> So moved.

2:26:27>> Second.

2:26:28>> All in favor?

2:26:29>> I

2:26:29>> I.

2:26:33>> And then up next we have 115 northeast

2:26:36cutoff. I do see okay uh Patrick Healey

2:26:41is online. Um he might want to speak to

2:26:43this.

2:26:48>> Good evening, Madam Chair. Uh Patrick

2:26:50Healey from Thompson Liston Associates.

2:26:52So, we've requested a certificate of

2:26:54compliance for the completion of the

2:26:56work related to the uh electric school

2:26:59bus improvements that we had come before

2:27:01the commission last year to propose

2:27:04as a friendly amendment to our existing

2:27:07order of conditions. Um, in that case,

2:27:10we showed you that there was sufficient

2:27:13volume within the infiltration system to

2:27:15handle that additional area was properly

2:27:18mitigated. At this point, all of that

2:27:20work is complete. the land has been

2:27:21stabilized. You previously received

2:27:24documentation that the replication area

2:27:27was all constructed and functioning

2:27:29properly. And then I think the last

2:27:32outstanding item we were waiting for was

2:27:34the conservation restriction to be

2:27:36recorded signed by the city of Worcester

2:27:39the Commonwealth and that has been

2:27:41recorded now at the registry of deeds

2:27:43and the transfer was made. So thanks to

2:27:46all involved in getting that done.

2:27:49>> Thank you.

2:27:51Yep. So, no concerns from staff. Staff

2:27:53did confirm that the CR has been

2:27:55recorded at this point. Um, and staff

2:27:57inspected the site. It is fully

2:27:58stabilized. Um, and yeah.

2:28:03>> Okay.

2:28:03>> Motion to issue the certificate of

2:28:05compliance.

2:28:07>> All in favor?

2:28:08>> I

2:28:08>> I

2:28:09>> I

2:28:10>> thank you. Have a good evening.

2:28:12>> Have a good night.

2:28:16>> All right. And up next, we have 0 9 and

2:28:1919. Heman Street, 7 Heman's Court, and

2:28:2240 and 40R Milton Street. So, this was

2:28:24construction of a large, uh,

2:28:26residential, uh, lowrise building, uh,

2:28:29with multiple units. I had a fairly, uh,

2:28:32significant hill. Um, we did have an

2:28:34enforcement order that we since released

2:28:36um, I think probably last year. Um, but

2:28:40the site is fully stabilized at this

2:28:42point. uh a asbuilt plan has provi been

2:28:46pro provided and a certification from a

2:28:48professional engineer certifying that

2:28:50the storm water infrastructure is

2:28:52working properly. Um and they're just

2:28:54looking to complete a complete

2:28:56certification at this point or

2:28:58>> yeah so no concerns.

2:29:00>> No concerns.

2:29:01>> Motion to issue the certificate of

2:29:03compliance.

2:29:05>> Second.

2:29:05>> All in favor? I

2:29:07>> I

2:29:07>> I

2:29:15>> All right. And we're back to 148 uh Tory

2:29:18Fort Lane. So, this is for construction

2:29:19of a single family home. Uh so, as part

2:29:22of this, uh permanent markers were

2:29:24required and have been installed. Uh the

2:29:27site is fully stabilized. This one was

2:29:29also one that currently has an

2:29:30enforcement order on it. We're just

2:29:32waiting for the final monitoring report

2:29:33for that. Um staff did conduct it

2:29:36conduct a site visit. The restoration

2:29:38area has grown in nicely. Um all

2:29:40permanent markers haven't been

2:29:41installed. Um there was still some silt

2:29:44fence on the site when staff visited. Um

2:29:48but the applicant has confirmed that the

2:29:49site uh the silk fence was removed

2:29:51today. Um so they're looking for a

2:29:53complete certificate uh certificate of

2:29:55compliance.

2:29:57>> So we have a certificate of compliance

2:29:58but an outstanding enforcement order.

2:30:00>> Yep. Yep. So, we're still waiting on

2:30:01that last monitoring report to finally

2:30:03lift that. Okay.

2:30:07>> So, what's the motion here? You have a

2:30:09certificate of compliance already, but

2:30:11>> uh no. So, uh issuing the certificate of

2:30:14compliance. Yeah.

2:30:14>> Good. Motion to issue the certificate of

2:30:17compliance.

2:30:18>> Second.

2:30:19>> All in favor?

2:30:20>> I

2:30:20>> I

2:30:21>> I.

2:30:26>> All right. And so our final COC request

2:30:31is for 522 Gro Street. Uh so this

2:30:34project involved so this was also an

2:30:38enforcement order uh back in the day. So

2:30:39we required that they file a notice of

2:30:41intent with the conservation commission

2:30:42for existing structures. So this deck

2:30:44structure out on the peninsula and the

2:30:47dock and there was an old dock that was

2:30:50required to be removed under the order

2:30:51of conditions which has been removed. Um

2:30:54this is a photo of where it used to

2:30:56exist. Um so they're looking to close

2:30:58out their um order of conditions. Uh so

2:31:02there was a D file number for this. Um D

2:31:06issued a supersceding order of

2:31:07conditions. Um

2:31:10so they will be they have to close out

2:31:12on their end, but we're closing out from

2:31:13the uh wetlands protection ordinance

2:31:16standpoint.

2:31:18>> Motion to issue their certificate of

2:31:20compliance.

2:31:21>> Second.

2:31:22>> All in favor? Hi.

2:31:23>> Hi.

2:31:23>> Hi.

2:31:25>> Okay. We have an emergency certificate.

2:31:28>> Yes. So, this was an emergency

2:31:30certificate issued for 320 June Street.

2:31:33This is a large three- stemmed oak uh

2:31:37that's actually right on the property

2:31:39line with the with the conservation

2:31:40commission property. Um, so we had the

2:31:43um homeowner reach out to us after the

2:31:46stem on that left picture fell down back

2:31:50in back towards the conservation land

2:31:51with concerns about the um structural

2:31:54stability of those other two stems

2:31:56leaning towards their house and their

2:31:58neighbor. Um so we've we issued the

2:32:01emergency certification since this is in

2:32:03buffer zone to a BBW uh which is kind of

2:32:06just at the base of a hill um a pretty

2:32:08steep hill on the back side of that

2:32:10property. Um and the work is currently

2:32:12scheduled for tomorrow.

2:32:18>> So I just need to um valid

2:32:20>> uh just to ratify the emergency.

2:32:22>> Yep.

2:32:22>> So moved.

2:32:24>> Second.

2:32:25>> All in favor?

2:32:26>> I

2:32:26>> I

2:32:26>> I

2:32:28>> Okay. Any enforcement order updates?

2:32:31>> So a couple enforcement order updates.

2:32:33Um first up, so we have uh 570 Lincoln

2:32:37Street. So this was um behind a church a

2:32:42parking area. They essentially in 2023

2:32:45um

2:32:45>> dugal

2:32:47>> Yeah. So they uh drenched kind of

2:32:49dredged out this area to kind of create

2:32:52better flow in their parking lot. Um so

2:32:54an enforcement order was issued to

2:32:55restore the area. Um we have received uh

2:33:00two two of the follow-up monitoring

2:33:02reports. Um so receiving the la the

2:33:04final required one uh confirming that

2:33:06the plantings um in area have been

2:33:09restored um with native plants. Um so

2:33:13looking to lift the enforcement order at

2:33:15this point.

2:33:18>> Is there a motion?

2:33:19>> So moved.

2:33:21>> Second.

2:33:22>> All in favor?

2:33:22>> I

2:33:23>> I

2:33:29>> All right. And then just one more update

2:33:30for you. So 612 Grove Street. So this

2:33:33was construction of that uh that drive

2:33:36little parking area uh near Delaney

2:33:38Brook. Uh over the weekend that asphalt

2:33:41was removed at this point. Um I did

2:33:43request that they install straw waddles

2:33:45until the site is fully stabilized just

2:33:46to make sure we don't get any runoff

2:33:48into Delany Brook, but we're making

2:33:50progress. Um so hopefully once that's

2:33:52fully stabilized, we can lift this

2:33:53enforcement order.

2:33:54>> Okay.

2:34:00Uh anything on open space?

2:34:02>> Yep. So, one item on open space. So,

2:34:05Thrive Bridge. Um so, the volunteer

2:34:08group uh reached out to the uh staff to

2:34:11see if there was an area they could work

2:34:12on cleaning up. Um so, on September

2:34:1512th, they went to Perkins Farm and

2:34:17hauled out 11 bags of trash. Um so, we

2:34:21appreciate their um work to help keep

2:34:24our conservation property clean.

2:34:26So they are Worcester based uh

2:34:28>> Yep. So they are a Worcester based

2:34:29organization um and just trying to get

2:34:31involved and make the city greener. And

2:34:34>> we have a long list.

2:34:36>> We do. We do. Yep. So we appreciate them

2:34:39reaching out to us to partner with us.

2:34:40>> Great. Thank you. Uh active projects.

2:34:45>> Nothing this week. Okay.

2:34:48>> Communications.

2:34:50N uh approval of the minutes from August

2:34:5324th.

2:34:56Motion to approve the minutes.

2:34:59>> Second.

2:34:59>> All in favor?

2:35:01>> I

2:35:01>> I

2:35:02>> uh any ordinance update?

2:35:05>> Uh not too many updates. We've been a

2:35:07little bit swamped with case load

2:35:08recently, so we haven't had a chance to

2:35:10make too much progress. Um most

2:35:12recently, we've been kind of working on

2:35:14trying to adjust the uh fee schedule as

2:35:16part of the part of this update because

2:35:18that's also contained within the

2:35:19regulations. Uh still targeting getting

2:35:22this done this calendar year. Um, and

2:35:24hopefully we can put a little more

2:35:26energy towards it in the coming weeks or

2:35:28months if things slow down.

2:35:31>> Um,

2:35:33uh, any update on the CPA? No, haven't

2:35:36met.

2:35:37>> Reconvened yet.

2:35:38>> Okay. Thank Quinn Sigman.

2:35:40>> Uh, no. No updates from Lake.

2:35:42>> No, no decisions on the wake.

2:35:43>> Nope. No decision on the week. Hoping

2:35:46the state will make those decisions for

2:35:47us.

2:35:48>> It's nice when they take over sometimes.

2:35:50[laughter]

2:35:50>> Um, all right. and policies and

2:35:52procedures.

2:35:53>> I have a I have a question

2:35:57to

2:35:59touch base on whether suburban road is

2:36:03actually still a wetland or not a

2:36:06wetland. Is there any legal precedent

2:36:09for us to consider that?

2:36:11>> So, we shouldn't really shouldn't really

2:36:13discuss the matter outside of the of the

2:36:15hearing at the moment since it's not on

2:36:18the agenda. um

2:36:21more generally speaking in terms of

2:36:24wetland

2:36:26um delineations and and confirmation of

2:36:29jurisdictional areas just generally

2:36:31broadly applicable to any project um

2:36:34that that can be done through the RDA

2:36:36process that can be done through the

2:36:37NRAAD process. Those are processes under

2:36:40the um wetlands protection act that

2:36:43basically ask the commission a question

2:36:44as to whether you know a is the is the

2:36:48area jurisdictional or is the work

2:36:50require the filing of a notice of

2:36:51intent. Um and an NRA would be to more

2:36:53specifically define resource area

2:36:56boundaries. So that would be the the

2:36:58procedure for um you know any area land

2:37:02project in general to get a formal

2:37:04determination on on the jurisdictional

2:37:06status under either set of regulations.

2:37:08So would that request come from the

2:37:11public or internal?

2:37:15>> Um again I mean depends on the type of

2:37:18filing you're asking about. Um in

2:37:21general

2:37:22uh RDAs can be filed by anyone. Uh

2:37:26notices of intents can be filed also by

2:37:29anyone but you need to have the property

2:37:31owner's permission to file a notice of

2:37:33intent. Um ANRADS I believe are the same

2:37:36as the notice of intent. um just because

2:37:39those are like recordable decisions so

2:37:41that the property owner needs to sign

2:37:43off. I'm not positive about the property

2:37:44owner permission for the INRAD, but I

2:37:46know uh RDAs can be filed by anybody.

2:37:50But again, just broadly speaking, not

2:37:53wanting to get into specifics of any

2:37:55other project that came up, you know, so

2:38:02>> thank you.

2:38:03>> Great. Is there a motion

2:38:06>> motion to

2:38:10>> second? All second. All in favor? I

2:38:14>> thank you. Thank you for the long night.

Last modified 2026-10-27