2026-09-14 - Green Worcester Advisory Committee
Summary
Summary written from the captions; names and numbers may be misheard.
- Minutes: the August minutes were amended 7-0 to add a member's suggestion that the city offer a TIF to the first large multifamily developer building under the specialized stretch code, and 7-0 to attach the five handouts from that meeting (four city memos plus his notes). The minutes were then approved as amended. A staff member cautioned against attaching members' loose notes as a precedent.
- Transportation and Mobility presentation: the city's senior transportation planner gave the first annual update on the 2024 Mobility Action Plan (46 strategies): expanded Safe Routes to School, 14 new crosswalks, 13 curb extensions, 22 flashing pedestrian beacons, over 13 miles of new bike lanes, the first bike boxes, 96 new bike racks, a pilot income-eligible e-bike share at $1 per day, and a record 5 million-plus WRTA trips in FY25. The first Vision Zero annual report is out; early results on lower speed limits are promising but too new to be conclusive. Members raised e-bike and scooter safety for young riders; the planner said state legislation would set speed-based categories, age limits and licensing, and distinguished legal e-bikes from illegal electric motorcycles.
- Data centers: a member summarized the state's June framework for data centers over 25 megawatts and the September 8 executive order 658 implementing it (no non-disclosure agreements with state agencies, a community benefits agreement before state permits, large-load rate schedules, municipal guidance by year end). Members debated the weak "should" wording and the exemptions for medical, academic and public institutions. The member suggested endorsing the framework, barring non-disclosure agreements with the city, putting the sustainability department and this committee at any community-benefits table, and lowering the threshold to 5 megawatts. Endorsement was held for more study, and a three-member ad hoc subcommittee on data centers was formed (7-0) to report back by the October 19 meeting.
- Public comment: two letters on tree stewardship and light pollution were summarized briefly; members want to learn the departments' responses before taking them up.
- Sustainability department updates: zero-waste events at the summer Out to Lunch series diverted 50 pounds of compost and 384 pounds of recyclables; Clean Team events collected 98 bags of litter and removed 74 bulk items; a fall curbside recycling contamination campaign (outreach in October and early November, then uncollected bins if still contaminated); a $2.7 million Green Schoolworks grant for air-to-water heat pumps at City View School (work targeted for summers 2027 and 2028); electric vehicle charging growing by about 75 percent to 52 city-owned ports by December; the electricity aggregation supply price dropping to a little over 14 cents per kWh with the October bills; a $900,000 Municipal Vulnerability Preparedness grant for phase three of the stormwater model; the Project Blue Worcester watershed report nearing a draft with public meetings expected late October or early November; and a green jobs video to be shown to incoming Tech High freshmen.
- Future agenda: a data center update, an update on outreach for the specialized stretch code, and (later) the letters. A member also wants to discuss volunteer-planted traffic islands. Next meeting October 19; adjourned.
Issues discussed
- Data Center Framework and Executive Order 658
- Curbside Recycling Contamination Campaign
- Mobility Action Plan and Vision Zero
- Motorized Scooter and E-Bike Registration
- Zero Waste Master Plan and Public Recycling Bins
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:00to make a comment.
00:02Um, they should click the react button
00:05on the bottom of your Zoom screen.
00:07What's on the bottom of my computer, but
00:09hit the react button to raise your hand.
00:12You can also agree with things by
00:14raising your hand. If we're taking any
00:16votes, you can do that or you can if we
00:20call a role, you'll have to say your
00:21name. This is a public meeting. It is
00:23being recorded. The draft meeting
00:26minutes are generally available for
00:27review and approval at the consequent
00:30meeting. Once an agenda item is called,
00:33there will be a brief presentation on
00:34the item, followed by any additional
00:37comments and clarifications from members
00:39of city staff and then an opportunity
00:42for anyone from the public to speak on
00:43that item before we proceed to comm
00:46committee discussion and action. The
00:48members of the public will be given a
00:50maximum of two minutes to speak in order
00:52to provide enough time for the
00:53discussion and keep the meeting on time.
00:57To [clears throat] help maintain an
00:58orderly meeting, please address all
01:01comments and questions through the chair
01:03rather than directly to any of the other
01:05speakers or committee members.
01:07Each agenda has the opportunity for the
01:10public to speak on a matter not on the
01:12agenda for a limited amount of time, no
01:14more than two minutes per person. at the
01:17public participation/ community
01:19engagement or standing items
01:22items to be considered for placement on
01:24the next agenda. While an item outside
01:27of the agenda cannot be discussed by the
01:29committee, the committee may decide to
01:31take a vote to formally place the item
01:32for formal discussion on one of the
01:34forthcoming agendas.
01:37So we will start by calling the role.
01:44Uh, Mary N here.
01:47>> Evelyn Herurwitz
01:48>> here.
01:51>> Pat Austin
01:52>> here.
01:54>> Ted Connor.
01:59>> I see his name.
02:02>> We'll come back to Ted. Mary Leovich
02:05>> here.
02:06>> David Macaulay
02:07>> here.
02:08>> Deja Murphy.
02:12Okay. Ted Connor
02:14>> here.
02:15>> Here. Good.
02:16>> There we go. Okay. I'm having
02:18[clears throat] issues.
02:21>> Yeah.
02:21>> And Mary Deardra just is trying to join
02:24too. Oh,
02:25>> okay. I see Dearra.
02:27So, we're all here. The gang's all here.
02:29Thank you everybody for joining us
02:31tonight. Um, in spite of not being in
02:34person.
02:36Uh, the we've done the welcome and the
02:38rules. Not everybody heard the um the
02:41part about the the comments. So we
02:43encourage people to use the react button
02:47to raise your hand if you'd like to be
02:48recognized.
02:51Okay. Um and
02:55there is a chat and people can put
02:58things in the chat as well if they need
03:00to.
03:05So, um, the first order of business
03:08after all of that is the approval of
03:10minutes.
03:11Any comments or questions on the minutes
03:14as they are presented in your packet?
03:17Otherwise, we'll take a motion to accept
03:19them.
03:24>> So, moved.
03:26>> We have a second.
03:29>> have a comment. Oh,
03:29>> Ted's hand is up. Sorry.
03:33Go ahead, Ted.
03:34>> So, two things that I would like to see.
03:37Um there there was um
03:42I had I had um
03:46I had said
03:48>> at at the meeting in relation to um the
03:52discussion
03:54of the specialized code
03:57that I would like to see the city
03:59potentially boost the specialized code
04:02using a a tiff. and I had suggested
04:04language
04:06um at the meeting well for the minutes
04:09about what I said at the meeting.
04:12>> Um I would like to see that included in
04:14the minutes. That's the first thing. The
04:16second thing is that I also suggest
04:20that when like the last meeting we had I
04:23had four pages of notes on paper. The
04:26city provided four different memos um to
04:30us on paper.
04:33Open meeting law does not require us to
04:36attach all those things to our minutes,
04:38but I just think it's good transparent
04:40practice because otherwise
04:43someone's reading the minutes, they want
04:45to see one of those things, it takes a
04:48public records request and by the time
04:50you get it, you've lost interest or the
04:53world has moved on. Um, and this stuff
04:56all exists electronically. So I don't
04:58see that it creates any any kind of
05:00burden or problem to attach it. So So I
05:04would move that all of those things be
05:06attached to our to our minutes um for
05:10for this round and also going forward
05:12and then just referenced as um
05:15attachments in the minutes.
05:22>> Okay. Thank you Ted. Does anybody have
05:24any comment or question on that? Mary,
05:30>> I think Ted Ted makes a valid point and
05:33if people are people could be interested
05:36in why make it harder for them. I I
05:38don't think that's what we're about,
05:40right? So, I I agree with what Ted's
05:42proposing.
05:44>> Okay. Thank you, Mary. Uh John.
05:48>> Yeah. Um so regarding uh the second
05:53question uh proposal first um the city's
05:57policy in general is and I think it's
06:00just good practice is we absolutely
06:03always include uh presentations or
06:07reports that are uh formally included uh
06:11or presented um for uh meetings like
06:15this. Um, and I wholeheartedly agree
06:18with Ted's rationale that they should
06:20be. It's good practice. The concern I
06:22have is with notes when they are not um,
06:27uh, a for in the form of a presentation
06:30or report uh, opens up a bit of a
06:32Pandora's box because there's a lot of
06:35context that are missing from notes that
06:37you get in a presentation or a report.
06:40Um, and they can cause more confusion
06:43than they solve typically. Um, so I'm
06:46I'd be concerned with that adding notes
06:49for that reason. Um, and for that same
06:51reason, I would be concerned it as as a
06:54precedent. Um, we typically, uh, as Ted
06:58correctly mentioned, we're not obliged
07:00to include this. If we're going to be
07:02transparent, I want it to be in a way
07:05that actually is beneficial for the
07:08public. And I don't want to set us up
07:10for not just for this particular set of
07:13notes, but for anybody's sets of notes.
07:15Ted's were actually in relatively good
07:17order, but that's no guarantee that all
07:19of them will be. And even his did not
07:22have uh um uh nuance that were actually
07:27captured already in the minutes. So, it
07:28seemed redundant. And it also seemed
07:31that we did not need uh to add
07:33potentially in my mind confusion to the
07:36topics which is why they weren't
07:38included in the first place.
07:42>> Thank you, John.
07:47Does anybody else have any Ted?
07:51>> Well, uh sure. just in in reaction
07:54uh to that
07:57um I mean as as you know I think it's
08:00good policy
08:04we can certainly make exceptions to our
08:05own policy or we could do it case by
08:08case um but I think we all agree that
08:12transparency is good and completeness is
08:14good with regard to my notes I I know
08:19it's I mean I provided the notes on
08:22paper and then in the meeting we had
08:24limited time and I said well I'm going
08:26to summarize what's in the notes. So the
08:29notes I think add some value to someone
08:34who wants to see it. Um but I I guess
08:38you know I I certainly also understand
08:40John's point that you know we don't want
08:42a blanket policy that has us publishing
08:46things. We don't publish anything that's
08:48in draft form for example. those come
08:50out to us. I get that they don't go
08:54public until we've approved things. Um,
08:58but in this case, there were there were
09:00four different memos from the city.
09:03And you know, the city there were good,
09:06clear memos. The city had gone to the
09:08trouble of producing them.
09:10Again, if someone wants to see it, why
09:13put them through a public records
09:15request? So
09:18that's all.
09:21>> So do you have um we had a a motion to
09:26approve the minutes as they were.
09:29And did you make a motion to change the
09:31minutes? I mean, will we vote on that
09:33one way or another and see how that
09:34lands before we take this further?
09:38>> Well, I guess if you're there would be
09:40two motions. One would be to add that
09:42sentence that I suggested and um the
09:47second
09:49and I can read that sentence uh
09:51referring to me.
09:54He would like to see the city promote
09:56the specialized code by offering a tiff
09:58to the first large multif family
10:00developer building a project under the
10:03specialized code.
10:05And since sustainability equals
10:07affordability and sensitive economic
10:09development, he see no sees no reason
10:11why the city couldn't do so. So that it
10:15was the sentence that I would like to
10:17see in the minutes at the end of uh
10:23it's uh section E of number three,
10:30the end of section 3E.
10:33Um,
10:34and my second motion would be maybe
10:37rather than do a a motion that's sort of
10:40blanket would be to just say, you know,
10:43those five things that we received on
10:46paper for this meeting,
10:48I would like to see them attached to the
10:50minutes as a as attachments as a
10:53resource if anyone wants to see them.
10:59>> Okay. So,
11:01>> well, that's two separate motions.
11:03>> So, now we've got three motions.
11:05>> Well, the third one,
11:07>> the third one was to accept the mo the
11:09minutes as they were.
11:10>> Oh, yeah. These come first and then
11:12that. Yeah.
11:14>> Okay. So Ted has made a motion to amend
11:19the paragraph about the specialized
11:21stretch code to include the language
11:23that he just said which he took from the
11:28transcription
11:29of the meeting.
11:32Does anybody want to second that?
11:36Evelyn will second it.
11:40[clears throat]
11:40>> All right. So we'll do a roll call on
11:43adding that sentence.
11:46um which you have already written down
11:48and provided to the department. Is that
11:50right, Ted?
11:51>> That's right.
11:52>> Okay. And do you have that, Jesse?
11:56Okay.
11:57Um
12:01so the roll call. Um Mary Nettle, yes.
12:05Evelyn,
12:07>> yes.
12:10>> Pat,
12:11>> yes.
12:13>> Ted,
12:13>> yes.
12:15Mary Leovich.
12:16>> Yes.
12:18>> And Stephen McCauley.
12:20>> Yes.
12:21>> Okay. And Dearra,
12:23>> yes.
12:24>> Okay.
12:27So likewise with the handouts.
12:32Ted's second motion is to
12:37Evelyn.
12:39Evelyn
12:41>> second his motion as was stated.
12:45>> Okay. And that is
12:47>> excuse me sorry Mary through the chair.
12:50Can you repeat the motion? What were the
12:53I just want to make sure I capture it
12:54accurately.
12:58Ted, so we're attaching
13:00the the four handouts from the city plus
13:06your list of notes
13:08>> that you provided at the meeting.
13:10>> Hold on. Yeah, there were four uh memos
13:15from the city
13:18that were um included in our meeting
13:21packet last time for our review. And
13:24then the fifth item was my notes from my
13:27presentation, those five things.
13:31>> Okay. So Ted's motion is to
13:35add those things to the minutes, those
13:38five items. Evelyn has second it.
13:40Seconded it. We'll do a roll call. Um
13:45>> Mary Nettle, yes. Evelyn,
13:47>> yes.
13:49>> Um Pat,
13:50>> yes.
13:51>> Ted,
13:52>> yes. Mary,
13:56>> yes.
13:58>> Uh, Stephen,
13:59>> yes.
14:00>> And Dearra,
14:01>> yes.
14:02>> Okay.
14:05So, do we need to approve the minutes
14:10with those amendments?
14:12>> Yes. I
14:13>> another motion.
14:14>> I move that we approve the minutes as
14:16amended.
14:18>> Okay.
14:19>> Second.
14:20>> Second.
14:21>> Second.
14:23Okay, I'll call a roll. Mary N, yes.
14:27>> Evelyn,
14:28>> yes.
14:29>> Pat Austin,
14:31>> yes.
14:32>> Ted Connor,
14:33>> yes.
14:34>> Mary Leovich,
14:36>> yes.
14:37>> Steven Macaulay,
14:39>> yes.
14:40>> And Dearra Murphy,
14:42>> yes.
14:43>> Okay, thank you everyone.
14:48So with that we will move on to item
14:52three our new business for this meeting
14:55um which is a presentation by the
14:56department of transportation and
14:59mobility on vision zero and mobility
15:02action plan with Brian Pigeon.
15:06>> Welcome Brian.
15:07>> Thank you. Good evening everybody. Um
15:11as you said uh my name is Brian Pigeon.
15:12I'm senior transportation planner for
15:14the city uh department of transportation
15:16and mobility and uh I'll go ahead and
15:20share my screen here.
15:24All right. Are we able?
15:28All right. Are we able to see the
15:29presentation?
15:31>> Yes.
15:31>> Yes. Okay. Very good. Um
15:34so the mobility action plan is a uh
15:38transportation plan that we completed in
15:412024.
15:42in uh
15:45with the support of staff from
15:48sustainability and resilience and uh we
15:51have issued our first annual report on
15:54the status of that plan uh much as you
15:58guys do with the the green worester
16:00plan. So just a refresher here and I
16:03believe some of my colleagues have
16:05spoken to you in the past but the
16:07mobility action plan was a plan that put
16:10together
16:1246 different strategies with the four
16:15different goals of safety, connectivity,
16:17equity, and sustainability for the
16:20city's transportation network. One that
16:22would support um people of all ages and
16:25abilities with all mobility choices.
16:29And I'm not going to go over all 46 the
16:31strategies because that would be longer
16:33than we have tonight. But just uh wanted
16:35to run through a couple of the ones that
16:37would be uh of interest to this group.
16:40So, one of the first things we got to
16:42working on was expanding the safe routes
16:45to school program. Now, safe routes to
16:47school, if you're not familiar with it,
16:48is a a nationwide program that promotes
16:51walking, biking, and rolling to uh to K
16:54through2 schools. And while it has been
16:57available in Massachusetts since 2005,
17:00up until recently, it hasn't really been
17:03uh comprehensively
17:06directed by by the school district.
17:08really it was up to the individual
17:09schools to participate or not. And so we
17:13got together with uh the school safety
17:16office, the school parent engagement
17:18office, and the facilities office uh
17:21along with some other city departments
17:22to really promote this program and get
17:25more schools participating. And since
17:27then we've had
17:30funded through the program we've had
17:32some projects done at Belmont Community
17:34School, City View School. We have funded
17:37some walk audits at Jacob Hyatt and
17:40Vernon Hill schools and uh done some
17:43arrival and dismissal evaluations where
17:45we observe the arrival and dismissal
17:48procedures and get some recommendations
17:50on how to improve those. Um obviously
17:53most schools in Worcester were built at
17:55a time when most kids did walk to
17:57school. So there's a very high um
18:00potential for walkability with Worcester
18:02schools and we want to get back to that.
18:08To promote walking more generally,
18:11we've done a number of corridor and
18:13intersection studies. Um most notably
18:15Stafford Street, Berno Street, and Grove
18:18Street. Um, we have installed new
18:21sidewalks in some places where there
18:23have been sidewalk gaps. And we've
18:26completed a uh ADA transition plan which
18:29is looking at all of the curb ramps and
18:31sidewalks in the city, looking at their
18:33condition and getting a sense of which
18:35ones uh meet ADA standards and which
18:38ones need uh need some work.
18:42And additionally, we've painted 14 new
18:44crosswalks,
18:46um, installed 13 new curb extensions,
18:48and installed 22 new rectangular rapid
18:52flashing beacons, which are those, uh,
18:55neon
18:57yellow pedestrian signs with the
18:58flashing lights that you may see uh,
19:00around the city.
19:04And one of the things that we wanted to
19:06do as well is to support community
19:09groups that want to do popup projects um
19:13with in their neighborhoods. So the
19:17image at the top there, we had uh done a
19:20project with Vernon Hill School as part
19:23of our ver of our vision zero project.
19:28um that included a street mural, um some
19:32painted crosswalks and some
19:34demonstration curb extensions and a bike
19:36lane up there. And that inspired a lot
19:39of other community groups to want to do
19:42similar types of either crosswalk art or
19:45um street murals. So, with the Main
19:49South Community Development Corporation
19:51and the uh business group in the
19:53Pleasant Street area, we've had two
19:55projects where the community has
19:56initiated projects to paint crosswalks
20:00and paint curb extensions to draw some
20:03more attention to pedestrians in the
20:05area and uh and promote some safety
20:07along there. Um, that's something that
20:09we want to see more of. And so if you
20:12are part of a community group that's
20:13interested in that kind of thing,
20:15contact our office and we can talk
20:16through the uh project ideas.
20:21In terms of promoting biking, we have
20:23installed uh over 13 miles of new bike
20:26lanes on Grove Street, Burncoat Street,
20:29and Safford Street. We installed our
20:31first bike boxes to assist with bikers
20:34turning through an intersection at the
20:36intersection of Grove Street and Forest
20:38Street. And we've painted a number of
20:41painted bike crossings uh on different
20:44streets in the city as well.
20:47And whenever we do anything like that
20:48that's new to Worcester that people
20:50haven't seen here before, we uh team up
20:53with the city's communications
20:54department to have a social media
20:57campaign about that. Um, some of you may
20:59have seen we put out a video earlier
21:01this year where I got out on my bike and
21:03rode through the uh, Grove Street,
21:05Forest Street intersection to
21:07demonstrate exactly how those uh, bike
21:09boxes should be used. Uh, it got a ton
21:11of views and a ton of likes. So, that
21:13was really great to see people um, so
21:16interested in that one.
21:23Additionally, in promoting biking, we
21:26need to have safe places to lock your
21:28bike up once you get to your
21:29destination. So, we went about creating
21:33an inventory of all the publicly
21:35available bike racks in the city and we
21:38posted an interactive web map of those
21:40locations on our website and we created
21:43an online request form for locations
21:45where you might want to see more bike
21:47racks and that is still open. Um, and we
21:50check it regularly. So, if you have a
21:52location you think might warrant a bike
21:54rack, go ahead and put that in there and
21:57we can take a look at it and see if it
21:59is an appropriate location.
22:01We also published bike rack guidelines
22:04for the city that describe the type of
22:06racks that we prefer uh where they
22:09should be spaced and included some best
22:12practices as well for private property
22:14uh whether that's bike racks outdoors or
22:17in some kind of indoor bike room.
22:20And we installed a total of 96 new bike
22:23racks around the city.
22:29We also launched a pilot ebike share
22:33program. So this is funded through the
22:35Massachusetts clean energy center. They
22:37have a program called uh accelerating
22:40clean energy for all. And Metrobility,
22:43which is a Cambridgebased bike share
22:46operator, received funding to install
22:49their bike racks near three uh regional
22:53transit agencies. So here in Worcester
22:56as well as Lawrence and Lel for a pilot
22:59program that would support transit
23:00ridership through uh these ebike shares
23:04and income eligible riders are able to
23:07rent these bikes for a dollar for a full
23:1024-hour period. And
23:14each bike is GPS enabled. So that allows
23:17us to get good data on where people are
23:20riding them uh to understand those
23:21travel patterns. And it also helps with
23:23maintenance as well. so we can quickly
23:25uh retrieve them if they're abandoned or
23:28anything like that.
23:30Um so we've seen a lot of a lot of
23:32enthusiasm for this program. Um the
23:35hotspots are some of the streets you
23:37would expect. Shrewsbury Street, Main
23:39Street. But we've also noticed some
23:41cases where people are taking these onto
23:44say the commuter rail, riding into
23:47Shrewsbury or Westboro or uh somewhere
23:49like that and then riding the rest of
23:52the way to their destination to a place
23:54that they can't get to by transit alone.
24:01And on the subject of transit, uh we
24:03work very closely with the WRTA and they
24:06have been doing a lot of work to improve
24:08their service lately. Um they have
24:10recently put together new real-time
24:13transit information. So you can now on
24:18your phone apps you can find exactly
24:20when new buses are going to be arriving
24:23and help plot out your your trips. Um,
24:27in FY25 they had a record ridership of
24:29over five million passenger trips, which
24:31is a record for WRTA.
24:35They are working on a bus stop inventory
24:38study right now and putting together
24:41guidelines for bus stops when they're
24:43appropriate to have shelters or benches
24:45or other amenities that would make
24:47riding more uh
24:52something you would want to do.
24:55And they have also implemented the first
24:57phase of a schedule change that expanded
25:00the service hours and uh the frequency
25:03of that service.
25:07And we've partnered with sustainability
25:09and resilience uh as you guys are no
25:11doubt aware to repurpose some of the
25:13space in the McGrath municipal parking
25:15lot into the first Mawaki forest.
25:21And lastly, what I'll end on
25:24is our vision zero plan. So, one of the
25:27big things that came out of the mobility
25:29action plan was the need for us to um
25:32adopt a vision zero plan, which is a
25:35deep dive into all of our crash data and
25:38identifying where our most dangerous
25:40streets are and come up with a plan to
25:43eliminate death and serious injury on
25:45our roads.
25:46And we have just published our first
25:48annual report on the vision zero uh
25:51implementation. So that is available on
25:54our website. Uh probably warrants its
25:57own presentation. Maybe we can come back
25:58later and and discuss that. Um but that
26:01is available online. We're happy to take
26:04any questions.
26:11>> Thank you, Brian. That's fabulous
26:13information. Um, does anybody on the
26:17committee have any comments or questions
26:18for Brian? [cough and clears throat]
26:26>> I um
26:28>> I do, but I can't find I can't find the
26:31little um hand.
26:33>> That's all right. We we've got you. You
26:34can also put your own hand up.
26:37>> Okay. All right. So, I was just I was
26:39just curious if you've um
26:43this a little maybe little beyond what
26:45you've presented tonight, but I've had a
26:49lot of really bad experiences in this
26:51summer with those um
26:55ebikes with young kids that I think
26:57shouldn't be on them. And I was just
26:59wondering if um like the safety in terms
27:03of very scary in terms of I was afraid I
27:07was going to hit them or something like
27:09that. So, I just wondered about if
27:11that's something that's being addressed
27:13and looked at.
27:15>> Yeah, we've had a lot of conversations
27:16with uh with the school department, some
27:18folks with um some conversations with
27:20police department, and ebike safety is a
27:22big concern for for all of us. So, it's
27:24something that we're looking into. Um I
27:27don't have a lot to report on that right
27:28now, but it is something that we're
27:30we're looking into.
27:32>> Thank you.
27:34Thank you, Pat. Uh Stephen,
27:37>> uh thanks a lot, Brian. This is really
27:38awesome to hear about all this. Um, on a
27:41related note, are you all tracking data
27:43about uh e scooters and scooter use
27:45around the city and looking at that?
27:49>> Yeah, and that's another one that we're
27:51uh that we're looking into. Um, there's
27:53a lot of different categories of what we
27:54would sort of term micromobility. Um,
27:57and there's actually some there's some
27:59legislation pending in the state house
28:01right now. Um, recently the state
28:04convened a special commission on
28:06microobility to recommend updates to
28:10state law uh to bring state law more
28:12into in line with how people actually
28:16use scooters and ebikes and some of the
28:19other things that we're seeing on the
28:20roads right now. Um, so once that
28:23advances, we'll be able to have a lot
28:26better data on that. um it will
28:30once it's passed, it'll change some of
28:32the ways that um a lot of reporting is
28:35done when it comes to accidents and and
28:37things like that. Um so we'll be able to
28:39get better data and it's certainly
28:41something we're looking into. We don't
28:42have a lot of good data on that right
28:44now, frankly, but it's something that
28:46we're looking into.
28:49>> All right. Thank you. Anybody else have
28:53any comments or questions? Ted,
29:00you need you're you're muted, Ted.
29:03>> There we go.
29:05I I want to echo the those comments that
29:09I I too think that particularly the the
29:13motorized and and sometimes over
29:15motorized microobility. [clears throat]
29:18I mean, there's all already people
29:20getting killed because they don't know
29:21how to use it and there's going to be
29:23more of it without some kind of public
29:26education. So, I think the the schools
29:29is a perfect place to have that
29:31partnership and we want to encourage
29:34micromobility, but we certainly want
29:36anyone who's riding to understand how to
29:38do it safely. Um, and I'm sure that, you
29:43know, you folks at DTM are are probably
29:45all over that. Um, I hope you are. I had
29:49also a couple of bicycle questions. Um,
29:52you mentioned Shrewsbury Street as being
29:55a a major corridor for cycling.
29:59Shrewsbury Street is on my short list of
30:02streets I hate to be on a bicycle
30:05because there are no bike lanes. And I
30:08also think of Main Street, Park Avenue,
30:10Goldstar Boulevard.
30:12>> Gold Star Boulevard
30:13>> for various reasons there. you know,
30:15it's harder to integrate bike lanes in
30:17those places. But I'm wondering if that
30:19is the long-term plan because, you know,
30:22Main Street's not so bad because it's
30:24not quite it's slower and it's not quite
30:25so busy. But when you get into fast
30:27traffic in two lanes with no bike lane
30:30and parked cars, it's pretty gnarly on a
30:34bicycle. And and I get less and less
30:36comfortable with it as I age.
30:39Um, you can laugh. And and my my second
30:44uh uh thought comment was at one point I
30:48I had I took the bus to the Brookfields
30:51and and the bus had a bike rack,
30:55rode in front of the bus and then I got
30:57off the bus and rode two more miles and
30:59that was awesome. And I wonder how many
31:02of the buses have that. Um obviously
31:06more useful in some places than others.
31:09So those are my comments. Sure. So to
31:12the uh to the question about the uh bike
31:16lanes on some of those streets you'd
31:18mentioned, um the mobility action plan
31:20does lay out a sort of broad vision for
31:23what a cohesive bike network would look
31:25like and some of those streets you
31:27mentioned are included on there.
31:29>> Um but that is sort of the grand
31:31long-term vision of where we want to
31:33take things. And on some of those
31:35streets that where we do see higher
31:37speeds and higher traffic volumes are
31:39going to require a lot more study than
31:41some of the other streets that we've
31:43done where we've incorporated bike lanes
31:45through um the pavement management
31:48program. Um so
31:51some of those do require a lot more
31:53study and probably a lot more
31:55infrastructure work. Um, in terms of the
31:58bike racks on the buses, uh, all was all
32:01all WRT buses do have bike racks on them
32:04on the front. Um, they are not equipped
32:07to in most cases handle ebikes. Um,
32:09they're just not strong enough to do
32:12that. They're typically uh designed to
32:14handle standard
32:16conventional bikes.
32:22>> Thank you, Dearra.
32:24Are there any e trikes available
32:29>> in the pilot program that we have? There
32:32are not. Um I have seen some um just
32:36generally I've seen them around but um
32:38we don't have any in the uh in the pilot
32:41program right now. [clears throat]
32:44>> U Mary
32:47>> uh yeah you know it's it's good that
32:49we're having this conversation today. I
32:51was listening to Boston Public Radio
32:53this morning, early afternoon, and they
32:56were having this discussion in another
32:58part of Massachusetts talking very
33:00specifically about the dangers of
33:02children in motorized vehicles in
33:04hightra areas like ebikes and ecooters.
33:08And so it sounds like uh across the
33:10Commonwealth actually they may be
33:13looking at this um from a perspective of
33:16of safety perspective as well as a um as
33:20as something that's age related as well.
33:23And so I was wondering if um if uh the
33:26gentleman was aware of that and um if he
33:29had heard any inkling perhaps of people
33:32needing a license in order to have an
33:34ebicycle because after all it is
33:36motorized over
33:39>> Yeah. So we have uh we have heard from a
33:41lot of our um our colleagues in other
33:45towns are having a lot of similar
33:47concerns. This is definitely a
33:48conversation that is that is happening
33:50statewide. um in the the proposed
33:53legislation that I had referenced
33:54earlier um basically comes up with a
33:58speedbased categorization for different
34:00types of vehicles for microobility and
34:05would set age restrictions on some of
34:08them and empower the RMV to set
34:12licensing and um insurance requirements
34:15for for certain of the higher speed um
34:19types of microobility as Well, so that's
34:22something that is that is probably in
34:24the works. Um, one thing that we we've
34:28had a lot of conversations with with
34:29other folks about, it's important in any
34:32sort of public safety messaging on this
34:34to make a clear distinction between the
34:38sort of safe and legal ebikes that are
34:41um sold by, you know, reputable shops
34:44and um for folks who are
34:48behaving uh
34:50>> Yeah. and the really the illegal ebikes
34:56that are really e motorcycles that are
35:00causing a lot of the uh the harm here.
35:02Things that are being aggressively
35:03marketed to kids and teens that are not
35:06safe and not street legal and really not
35:08bicycles but really um electric
35:11motorcycles effectively. So, it'll be
35:13really important to make a clear
35:16distinction between those because we are
35:18supportive of ebikes, the the safe and
35:21legal ones. They I think they're great
35:22for trying to get around a hilly city
35:25like Worcester, but there's a lot of
35:27things that are being deceptively
35:29marketed that are really dangerous right
35:31now.
35:34>> Thank you. Um Ted has his hand up.
35:39>> Yes. in relation to uh the the the sort
35:44of busier streets that that don't yet
35:47have bike lanes,
35:49you mentioned that some of the ones I
35:51mentioned are in the long uh range plan.
35:54Is there
35:56is there anything that isn't any street
35:59that's really just too busy or, you
36:02know, too dangerous to even think about?
36:04Obviously not the highway, but now I'm
36:07just thinking of the biggest arterials
36:09in the city. They're the hardest places
36:11to uh ride a bike. Typically, a cyclist
36:15will try to find an an alternate route.
36:17That's what I do. Um but I wonder if
36:21there if there are major arterials that
36:23you just are saying we're not going to
36:25do it there.
36:28>> You know, I I don't have that map in
36:30front of me right now. Um, but a lot of
36:33the busier materials
36:35in order to have bike accommodations
36:37would need um a lot more work. And so I
36:41I don't want to categorically say that
36:45any particular street is is off the
36:47table. Um, but you know, we would have
36:50to do a lot of studies to determine
36:52what's appropriate in any given
36:54location.
36:58>> Thank you. as as we're running out out
37:01of time on our [clears throat] our um
37:04allocated time for this. Ted, did you
37:08are you all set with that?
37:09>> Well, I was just going to say, is it
37:11fair to say that the the harder it is,
37:13the further in the future it probably
37:15is?
37:17>> It typically if it's going to be, you
37:19know, requiring a full full scale
37:21reconstruction. And if if you're
37:24thinking of some of the busier streets,
37:26probably a separated bike lane that does
37:28require generally to seek funding um
37:31either from the federal government or
37:32from the states and that does take a
37:34while.
37:37>> Um so I'd like to add one thing as a
37:40Burn code street resident. Um, it's just
37:43beautiful up here. And anybody who's
37:45pushed a baby stroller or a wheelchair
37:47along the straight straight line of
37:51sidewalks, all ADA, um, it's it's really
37:56a beautiful thing and, you know, we
37:58appreciate it and appreciate in
38:01particular um, the adding of the
38:03sidewalk at Quincig, which was a large
38:06space, just rocks. It was a it was a
38:08real challenge for people and you did it
38:10in such a way that um very old trees
38:13were preserved. So um we met a lot of
38:16goals there and and one other question
38:19and it might not be your bailey wick but
38:21is it too soon
38:23to know if there's any data about
38:27um reduction in accidents or incidents
38:31related to the decrease in the speed
38:33limit across the city?
38:37It's it's tough to say u this early on.
38:40Um the initial results are promising um
38:43and the the vision zero um annual report
38:46does discuss that
38:49uh in some degree. And so yeah, I would
38:52say the initial results are promising,
38:55but to get any real statistical
38:57significant uh data, we need a little
39:00bit more time to be able to definitively
39:02say um if it's working or not.
39:05>> Yeah. and and probably compliance
39:07enforcement
39:09>> in some areas.
39:09>> That's definitely Yeah, that's
39:10definitely um but the police department
39:14has been a really good partner with us
39:15in in targeted enforcement and uh really
39:20assisting with that.
39:22>> That's great. Um Steve, last last
39:25question.
39:26>> I know. Sorry. Um, I loved seeing Brian
39:29the um, painted bike crossing and
39:30painted bike boxes and I understand that
39:32those painted lanes are much safer but
39:35also expensive. Can you give us just a
39:37perspective on any data or understanding
39:39you have about how much safer and also
39:41how expensive and how likely to do that
39:43more widespread.
39:47>> That's kind of a big one. Um, you know,
39:50I I I don't know if I can I can put a
39:52hard number on
39:54the degree to which that uh increases
39:57safety. Um, it's a proven safety measure
40:01um to draw visual attention to those
40:04places where where cyclists are going to
40:06be. Um, but I can't necessarily put a
40:08hard number on that. Um, and then in
40:11terms of cost, it it's really kind of
40:13rolled into our um general striping
40:15budget. Um, so it's a little tough to,
40:19you know, block that out. Um, but it's
40:23we find them effective and, uh, we hope
40:26to include them in future projects.
40:30>> That's great, Evelyn. Okay, the real
40:33last one.
40:36>> This is just a quick thank you to you
40:38and the department for helping to
40:41establish the Miaaki Forest at McGrath
40:44parking lot. very much appreciated.
40:49>> You're welcome. Thank you.
40:51>> Well, thank you, Brian, for very
40:53informative and you can see we have a
40:56lot of questions. Everybody's very
40:57engaged in your presentation. So, um,
41:00extend our appreciation to your
41:03colleagues in your department and thank
41:04you very much for being here today.
41:06>> All right. Thank you for having me.
41:10>> Thanks, Brian.
41:10>> You're welcome to hang out for the rest
41:12of the meeting if you're very brave.
41:16Um, our next item
41:19is a presentation from our member Ted
41:23Connor, a followup on the data center
41:27information that he provided us with
41:29last month. So, if you're ready to go,
41:31Ted, we'll turn it over to you. It's
41:346:13.
41:36I forgot to time Brian at the beginning.
41:49You're muted.
41:51>> Thought I did that. All right. There we
41:52go. Better.
41:54>> Better.
41:55>> Okay.
41:56>> Thank you.
41:57>> So, well, I had um I emailed everyone
42:01links to uh two things over the weekend.
42:04uh both the document and the press
42:06release for the state's framework for
42:09evaluating data centers which was
42:13released in June. And then just last
42:16week uh there's an executive order um
42:19number 658 that came out on September
42:228th
42:24that is uh you know focused on starting
42:27to implement that framework. Um so I'll
42:31I'll talk about both of them. Um I I
42:33hope people have had a chance to look at
42:35them because I won't go into that degree
42:38of detail.
42:40But the framework I find to be
42:45um
42:46very comprehensive and it starts by
42:50acknowledging that this is not a totally
42:53black and white thing.
42:55Um, as we talked about last time, data
42:58centers can have major impacts, but also
43:01in New England, the climate can give us
43:03a natural efficiency advantage when
43:06we're trying to cool them in the winter.
43:09Um, so that cold climates actually have
43:12a benefit.
43:13Um, so the framework is intended to
43:19establish explicit expectations for
43:22those seeking sales and use tax
43:24exemption.
43:25Um, that the this that's available under
43:28state law.
43:30And the state intends that the framework
43:33be used to guide their own executive
43:35agencies
43:38as well as municipalities in evaluating
43:40data data center proposals
43:44and um and the DPU um within its
43:47authority.
43:49Um so it's
43:52intended to apply to
43:55data centers
43:58uh whose
44:01Let's see. Um,
44:06exceeding 25 megawws
44:09of of peak demand.
44:13And just going down the list, there's
44:15eight there's eight key points in the
44:17framework. The first one is that uh the
44:20data centers should either supply or
44:22directly procure
44:25their own green energy uh in alignment
44:29with Massachusetts climate laws and
44:31clean energy requirements
44:34because they demand a lot of energy. We
44:36we we want them to bring their own. Um
44:40second point related to that is that
44:42they should um
44:45attempt not to make transmission
44:48and distribution system stress worse so
44:52that we're not putting extra demand on
44:55the grid. Um, and that they ought to try
44:58and promote grid efficiency and avoid
45:01unnecessary infrastructure expansion and
45:04cost by means of using solar and
45:07storage, advanced energy management
45:10systems, and partnering with communities
45:12in in sort of uh micro grids and such.
45:18Um they're looking to see them use
45:21alternatives to diesel-based backup
45:23generation in in uh in support of air
45:27quality. Again, focus on solar and
45:31storage and cleaner alternatives like
45:33fuel cells.
45:35um
45:38water um so again planning so that they
45:42don't make uh water system stress work
45:45worse or cause water shortages or impact
45:48water quality including temperature
45:51and um
45:55let's see then uh and we're looking for
45:58best management in cooling technologies
46:02which also in often includes closed loop
46:04systems that recycle the water rather
46:06than just have a throughput and high
46:08water demand.
46:10Um
46:12point five, data center projects should
46:14support high quality jobs, training, and
46:17workforce opportunities.
46:20Uh community benefit and engagement.
46:23They're looking for um
46:26citing decisions that don't make
46:28existing inequities worse, align with
46:31host community needs,
46:34and um ensure early, transparent, and
46:37ongoing community engagement.
46:41Um point seven uh is that they be um
46:48um
46:50congruent with local economic
46:52development goals and among other things
46:54try to avoid citing them in places that
46:57are designated for other priorities. Um
47:02and the final thing uh the state wants
47:04to see is project transparency that the
47:08data center developers should provide
47:12the information necessary for state
47:14agencies,
47:16municipalities and communities to make
47:18informed decisions about them.
47:21uh avoiding non-disclosure agreements
47:25and reporting on annual and peak energy
47:29demand um fossil fuel use, energy and
47:33water use
47:35and uh efficiency measures and water
47:38sourcing.
47:40Um
47:43and
47:47um oh and the other thing that the that
47:51that the um framework said is that the
47:54executive office of economic development
47:57and uh energy and environmental affairs,
48:00that's two offices,
48:02will develop and disseminate a resource
48:05guide to support municipalities in
48:07potential sighting of these data
48:09centers.
48:11So, that's a a quick summary of um the
48:16um framework, the June framework. And
48:19what did I just burn? Half my time.
48:23>> When did I start, Mary?
48:26>> You're muted.
48:27>> You started at 14.
48:29>> Okay. So,
48:30>> six minutes in.
48:31>> I got a few more. Good. So um now on uh
48:35on just last week the state came out
48:38with the executive order number 658
48:43which is beginning to implement this
48:45framework and I'll I'll sort of rip
48:47through that the the again it's for data
48:50centers of 25 megawws or greater
48:55with certain exemptions
48:57and those include college college and
49:00university data centers for academic IC
49:03research,
49:04those for the provision of medical care
49:08and those involved with a state
49:10sponsored program. So there's a few
49:13caveats there, but otherwise greater
49:16than 25 megawws,
49:19the state wants to see them conform to
49:21the framework. And until they get local
49:26approval, the state will not permit
49:29them. And by local approval, the state
49:31means
49:32they want to see a community benefits
49:34agreement with the community.
49:38Um, and the state wants to see uh is is
49:42basically the governor's ordering that
49:44there be no
49:47NDAs, non-disclosure agreements
49:50with state permitting agencies.
49:53Um
49:56the uh let's see I'm going to just skip
49:59through some of this. Um and you
50:02obviously it's available and perhaps
50:04some of you have already read it. Um
50:07again they want the DPU
50:11to um
50:14develop large load rate schedules to
50:17ensure other rateayers don't end up
50:20paying for grid upgrades or or data
50:23center infrastructure.
50:26Um the DPU is to direct electric
50:30distribution companies to eliminate
50:32speculative data center projects from
50:35interconnection cues
50:38>> so we don't have
50:39>> two minutes to
50:40>> okay um so that we don't tie up
50:43potential um capacity
50:47um
50:51many of these things are it's repetitive
50:53of of the framework work. They're
50:55basically just dictating that that um
51:00that the uh the the the state agencies
51:04actually um
51:06um follow the the framework they want.
51:09Uh so that this is for clean
51:12electricity, for greenhouse gas
51:14emissions, for water quality. State
51:17agencies will oversee that.
51:20uh they want to see annual reporting as
51:23the framework said.
51:25Uh the municipal guidance that I talked
51:28about should be published by um the end
51:31of this year to support municipal
51:34leaders uh trying to um evaluate uh data
51:40centers in their engagement with data
51:43center developers
51:45um
51:48and encouraging responsible labor
51:50practices.
51:53um annual reporting to begin a year from
51:56now.
51:59And um
52:02that's that's basically it that the uh
52:05the the exec order 658 was to was to
52:08implement the the framework. So I I do
52:12have uh some thoughts about what we
52:15might do with this, but let me open it
52:16up to questions.
52:21What questions does he do you have,
52:22Evelyn?
52:24>> Yeah. Oh, thanks Ted for the summary.
52:26Yeah, I did skim through the materials
52:28you sent and it's it just seems very
52:31very thoughtful and careful and
52:34comprehensive to me. So, I don't know if
52:37what you're thinking of is us doing some
52:39kind of an endorsement of it or support
52:42statement of some sort. Um, that's what
52:45comes to mind for me.
52:52for Mary
52:55>> through the chair. Are you able to hear
52:57me?
52:58>> Yes.
53:00>> Okay. So, folks, actually, to be honest
53:02with you, um I have a soap box on this
53:05because I did go through the framework
53:07and the executive order news uh news
53:11bite as well. And so I just I'll but
53:14I'll try and stick to a couple of bullet
53:17points on this. Number one, I you know I
53:19applaud the state for taking a a bite
53:22out of this huge elephant because the
53:24elephant is a recently emerging one and
53:27you know wrapping wrapping your arms
53:29around it can be quite hard uh to start
53:31with. So I I think it's a great a great
53:34first attempt. But there's some concerns
53:36I have and I think very specifically for
53:39Worcester um as Worcester goes forward
53:42because um on the advisory committee
53:44that's we talked to uh but there's I
53:48think we we should be very um look very
53:51carefully at how those things are are
53:53worded. For example, words like should
53:56instead of shall are used throughout the
53:58uh framework and the executive order.
54:01That's concerning because should is a
54:03request versus shall is a direction. So
54:07there's nothing there that's that is
54:09saying that the state will hold these
54:11the utilities or the stakeholders in a
54:14data center accountable for anything.
54:17However, it does on the state agency
54:19side um
54:21say um put some onus on them to provide
54:25some amount of oversight, some amount of
54:28uh coordination and compliance. So it's
54:30good that the state is stepping up in
54:32that regard. However, the the mechanisms
54:35to hold um data center stakeholders
54:39accountable is unfortunately the
54:42language is quite weak. It's it's
54:44comprehensive but the language is weak.
54:46So I think that we should hope and
54:49expect that um even in the absence of
54:52states um strong a strong wording from
54:56the state or or an aggressive position
54:58from the state that the city considers
55:00through its various mechanisms ways to
55:04to help actively and proactively and I
55:07cannot stress the word proactive enough
55:11um take positions on data centers as
55:14those um applications come across on
55:18city desks in the future. And I can also
55:21point out that there is a fund um it
55:24points to some of this literature uh
55:27points to a fund that should be um
55:30instituted to you know assist you know
55:33greater taxpayer
55:36um and utility rate payer
55:40to to benefit them. However, it doesn't
55:42talk very specifically about who that
55:45taxpayer rate uh who that would really
55:48directly benefit, how it would directly
55:51benefit them. Uh so funds are always one
55:54of those things that makes it look like
55:56uh you know, well, they're giving us
55:58money towards this fund, so they're kind
56:00of complying. It's like a very dangerous
56:04uh thing to go down. Um there's also uh
56:07the transparency.
56:09Transparency is also one other thing
56:11that it's not just transparency but
56:14these things are a lot of them are very
56:16much after the fact. So after a data
56:19center has been implemented if they're
56:21doing this they should be reporting on
56:24it or they should be fixing it. But in
56:26fact we should be thinking proactively
56:28instead about what ex what do we mean by
56:31transparency? What exactly do we expect
56:33out of them and how do we mandate that
56:36before we give approvals? And I and I
56:39think the same thing goes with on the
56:41environmental side. What regulations are
56:43we expecting them to comply with? And we
56:45need to call them out. You know, we
56:47don't just say they should they should
56:49comply with this. In fact, they shall
56:51comply with it. And uh and I also on a
56:54on a secondary note also uh find concern
56:57with some of our our Worcester County
57:00neighbors, you know, because we may not
57:03have land in in the city of Worcester
57:05for a data center. I don't know. Maybe
57:07we do, maybe we don't, right? But I
57:09think it's probably more likely that the
57:10towns are going to be looking at this
57:12and town resources are even more
57:15restricted than um than the city of
57:18Worcester has. And so the city may cons
57:20consider um being making their experts
57:24available to whatever they can um to
57:26coordinate with our local towns that may
57:29be looking at a data center trying to to
57:32be put in their neighborhoods, too. Uh
57:35because you know if you have a town a
57:37town clerk for example who's only
57:40available three days a week, maybe their
57:43town council only meets once a month.
57:45You know the this is not a town that it
57:47wouldn't be a town that would have
57:49resources to to do a full investigation
57:52to really to really sus out the impacts
57:55of a data center. And so um I like I
57:58said I I think it's it's a great first
58:00step. I don't think it's an a full
58:02answer. I think I've got concerns over
58:04the language, frankly, that public
58:06utilities and private partners will take
58:08advantage of. They absolutely 100% will.
58:11And so, and I don't think that that will
58:14be to the benefit of the people in our
58:18communities. I think it will be to the
58:20benefit whoever is making fun of
58:23um the the information and the power
58:26generated through through this mechanism
58:28in the data storage. So, and I think
58:30what what's very important is Ted
58:33pointed out that there are medical
58:35institutions, academic institutions, and
58:37public institutions can get waiverss.
58:40Well, my god, this is Massachusetts.
58:41That's all we are, guys. We're medical,
58:44we're academic, and we're public
58:45institutions. There are no other types
58:47of major industries that sit in in
58:49Massachusetts. Uh so or at least the
58:52majority of them are are revolving
58:54around medical in the medical industry,
58:57the biotech industry, academia. And so
59:01what we can we're going to say we're
59:03going to that we've got these
59:05restrictions, but these the people who
59:07would most likely need a data center are
59:10going to be exempted from it. I think I
59:13I think that's a a disconnection in in
59:16what we would be trying to achieve. So,
59:19uh, it's probably quite controversial
59:21that I've said that, but I'm saying that
59:23as a as a warning label for as we move
59:26forward for some things for us to keep
59:29in mind as we will probably have to
59:31address them in the near future.
59:38>> Okay, Mary, that's a lot. You've done
59:41some thinking about this. Um, Steve has
59:44his hand up.
59:45>> Yeah, thanks for that, Mary. I echo
59:47those um thoughts about it. Um I was
59:50concerned about the language too,
59:51especially, you know, I like the the
59:52guidance that um these data centers
59:55should produce their own uh power
59:57through green energy. Um that was
1:00:00encouraging, but if it's just a
1:00:02suggestion, then I'm not hopeful about
1:00:03it. Um I'm also concerned about the
1:00:06exemptions that Mary mentioned and even
1:00:08the size exemption because in a city
1:00:10likely they would be smaller but the
1:00:12aggregation of a bunch of data centers
1:00:15in the city would still put a a higher
1:00:18you know load on and and still put
1:00:21stress on the system and increase cost
1:00:23for everybody. So, if we are to endorse
1:00:26the these guidelines or if we are to
1:00:28come up with other guidelines for the
1:00:30city, we might look at um a lower size
1:00:33threshold that isn't exempt um in the
1:00:35city.
1:00:39>> Thank you, Steve. Um Pat,
1:00:42>> yeah, just kind of in this kind of
1:00:45following the same vein, but maybe
1:00:47taking a step back. Um I'm not really
1:00:50even sure what an executive order means.
1:00:53Um, I worked in EOEA for 35 years doing
1:00:58regulatory stuff and I never did I never
1:01:03recall doing getting somebody to do
1:01:05something because of an executive order.
1:01:08There has to be a framework of um
1:01:12environmental regulations and you know
1:01:15certainly these
1:01:18encompass a lot of different um agencies
1:01:22a lot of different uh CMRs or whatever.
1:01:25So I just yeah I think it's kind of it's
1:01:28kind of wishy-washy.
1:01:33Okay. Uh Mary again.
1:01:41>> Sorry about that.
1:01:45Um so one of the other things too that's
1:01:48I find concerning is that you know I I
1:01:50love that they're they're trying to
1:01:53empower local communities to make
1:01:56decisions on this. The problem also
1:01:58becomes though if the framework does not
1:02:01call out requirements like um specific
1:02:05environmental requirements, specific
1:02:07interconnect requirements that again
1:02:11local resources do not it may not be
1:02:14regulated at the local level. Right? EPA
1:02:16stuff is federal. Mass has its own
1:02:18environmental but I I can pretty much I
1:02:21can pretty much put a bet on the fact
1:02:22that Shbury doesn't have environmental
1:02:24regulations. If they do, good dog, good
1:02:27on them, for example. Uh, but I think
1:02:30the onus uh there's also um there there
1:02:33there are going to be gaps, right? And I
1:02:36I think we should be very mindful of
1:02:38gaps. Um it's just it's out of an
1:02:40abundance of concern. And um yeah,
1:02:42executive orders, who does it really
1:02:44apply to? Well, on the federal level,
1:02:46executive orders really only apply
1:02:49within government. So you can't you
1:02:51don't usually executive orders don't
1:02:54usually um have anything to do with
1:02:56outside of government. It's you're
1:02:57directing members of government to
1:03:00behave in a certain way and in that case
1:03:03well the shoulds I guess make sense as a
1:03:06language tool but then they don't really
1:03:08mean anything if that's the case. So I I
1:03:12just and uh to to the gentleman's point
1:03:15about um interconnects and um providing
1:03:18their own clean power, you know, I
1:03:20worked micro grids out in the on in the
1:03:22Pacific um of several years ago and
1:03:26interconnects between self-generated
1:03:28power at scale are um a big they are an
1:03:33engineering challenge. Uh not one that
1:03:35can't be overcome of course because it
1:03:37they are done. It's just that they're
1:03:39not um just some easy, oh, we're going
1:03:41to stick up some solar panels, generate
1:03:43power, and when we need it, we'll pull
1:03:44from the grid. Me, okay, that's the
1:03:48thought. But the engineering process
1:03:51requires some some uh
1:03:54equipment and infrastructure that is um
1:03:57not always transparent at the beginning
1:04:00can hold up progress and that starts to
1:04:03be when stakeholders start looking back
1:04:06to government and saying you know we
1:04:07didn't anticipate this can you give us a
1:04:09grant and it brings a lot of stuff to
1:04:11screeching halts so um and I it's just a
1:04:15voice of some experience out West on
1:04:19that issue uh to make Worester aware.
1:04:22Over.
1:04:25>> Thank you, Mary. Um Evelyn.
1:04:28>> So, um I just want to say I certainly
1:04:30respect
1:04:32[clears throat] the apparent opinions
1:04:34and experience of those of you Mary and
1:04:36Pat and Steve who have much more
1:04:39experiences in engineering than I do.
1:04:42Um, I I just want to be a little bit of
1:04:44a devil's advocate here and say, you
1:04:46know, the perfect is the enemy of the
1:04:49good here. And I think that there is a
1:04:53sincere effort on the part of the Healey
1:04:55administration to move in the right
1:04:58direction and start to provide some
1:05:01framework and guidance and priorities
1:05:04about these data centers and that
1:05:07whether we agree fully with
1:05:10the um the way this is worded and I
1:05:14understand Mary's point on the shall
1:05:16versus should as a writer I get it but
1:05:19at the same time I think we need to
1:05:21recognize that this is a good first
1:05:22step. I don't think it's presented as
1:05:25the only step, the final step or
1:05:27anything. They're trying to shape the
1:05:30conversation and I I I think that
1:05:33they've done a good job starting that
1:05:37whatever the weaknesses are that you all
1:05:39are pointing out. That's all.
1:05:43>> Right. Thank you, Emiline Ted.
1:05:46Um yeah, let me try to just first of all
1:05:50regarding should shall that that
1:05:53nuance may may be reacting to what's in
1:05:56writing. Um I may very well have mucked
1:06:00that up in my presentation. Um
1:06:04um but the executive order
1:06:08seemed to be directing various state
1:06:11agencies
1:06:13to to do what they can within their
1:06:16legislative authority to follow the
1:06:18framework which it was written a few
1:06:21months earlier and seems to be more
1:06:24aspirational.
1:06:26Um,
1:06:27and you know, I mean, this is how
1:06:31policy develops, I think. And I agree
1:06:34with with Evelyn that it's a it's a very
1:06:38good start. Sure, there'll be a lot to
1:06:40work out. In fact, um, some of that is
1:06:44in that more more detailed language is
1:06:48is in the executive order. I just didn't
1:06:51repeat it because I I couldn't do it
1:06:53articulately. you know, some of this
1:06:55stuff gets pretty arcane in in the
1:06:58details and and hard to uh convey.
1:07:01So, I think that um I think it is a good
1:07:05first start. Um it seems like that to me
1:07:09the state framework, you know, I
1:07:11couldn't think of anything that was
1:07:12missing from it and um and they seem to
1:07:18hit a lot of the key sustainability
1:07:20points.
1:07:21Um,
1:07:23and so I just uh hold on, I'm looking
1:07:26for a note here. Yeah. Oh, I just, you
1:07:29know, Mary mentioned the towns. I wanted
1:07:32to come back to that too. Um, because
1:07:36with regard to data centers, interest in
1:07:39this subject, you know, it's becoming a
1:07:42a political flash point quickly all over
1:07:45the country. People are concerned about
1:07:48AI and and data centers are the sort of
1:07:51the physical.
1:08:00Oh dear.
1:08:04We we may have frozen Ted.
1:08:11Let's give him a moment.
1:08:21Interesting that he freezes talking
1:08:23about AI.
1:08:24[laughter]
1:08:28>> AI is listening.
1:08:30>> He's gone. He'll be back.
1:08:35Mary, I call on you in the meantime, but
1:08:37I probably want Ted to hear it.
1:08:49I wrote him in the chat that his
1:08:50connection froze.
1:08:52>> Yeah, thank you.
1:08:58>> Any signs of him, Jesse?
1:09:03>> No, I think he dropped off.
1:09:06>> Do you think he knows?
1:09:08>> Yeah, he's not in the waiting room. He's
1:09:10not showing up there yet. Can you all
1:09:12see the waiting room or No. No. Okay.
1:09:15Well, he's up there.
1:09:16>> I haven't looked. [laughter]
1:09:19>> All right. Well, while we're waiting for
1:09:21Ted to come back, um Mary, do you want
1:09:24to
1:09:28>> Yeah. Well, so first of all, I started
1:09:31out with my opinion saying that I
1:09:34thought it was a good first effort.
1:09:37>> Yeah.
1:09:37>> Right. I did say that. So, you know,
1:09:40it's always hazardous providing an
1:09:42opinion here, you know, because I'm
1:09:44doing so in public. I did acknowledge
1:09:46the fact that this is a very that I said
1:09:48it was a a bite out of the elephant and
1:09:51it was a big one. It was a big elephant,
1:09:53right? But the fact is is that we won't
1:09:56make progress unless we are critical of
1:09:58what we are seeing and understand where
1:09:59the gaps are because we may not see
1:10:02further written direction for some time
1:10:04out of the state because it does take
1:10:06some time to to pull that stuff
1:10:08together. In the meantime, the city
1:10:11should be thinking about it and thinking
1:10:12about it critically. So
1:10:15I stand firm on the fact that I see gaps
1:10:18here that Worcester should be thinking
1:10:21about and uh it doesn't mean that healy
1:10:24bad Worcester good. It just means that
1:10:27nothing is perfect and there is no such
1:10:29thing as a perfect communication and and
1:10:31we should be thinking about problems in
1:10:34other communities that some of your your
1:10:37your teammates have already experienced.
1:10:40And this isn't an issue of word smithing
1:10:43and picking on words. And it's not a a
1:10:46matter of because we have deep
1:10:48engineering experience, you couldn't
1:10:50possibly know it. No, we're pointing out
1:10:53things that we already know are out
1:10:55there that are concerns that typically
1:10:58happen with these communities. And I got
1:11:01to say that most of my experience when
1:11:03it comes to uh public private
1:11:05partnerships and these kind of
1:11:06frameworks has happened throughout my
1:11:08engineering career. It doesn't just have
1:11:10to do with public utilities. It's just a
1:11:13matter of program management issues. So,
1:11:17you know, let's let's not try to pin
1:11:20Mary's opinion in a corner. It it's
1:11:22really just we need to be thinking about
1:11:24this. Here are some flaws that are
1:11:26there. And I already know those kind of
1:11:28flaws will be exploited if they're given
1:11:31a chance to be exploited. So, let's get
1:11:33in front of it and let's think about it
1:11:34as a problem instead of saying, "Well,
1:11:37geez, it's a let's wait for somebody
1:11:38else to make it more perfect."
1:11:41>> Over.
1:11:44>> Thank you, Mary. I think your comments
1:11:45were very well received with with the
1:11:48intention that you just expressed as you
1:11:50said them. So, um
1:11:53just just want to put that out there. Um
1:11:56Ted, nice to see you back.
1:11:58Um if you want to continue your thought,
1:12:01you can go ahead. Uh yeah, sorry about
1:12:04that. I just lost the the the
1:12:06connection. Um
1:12:09what where exactly was I when I cut out
1:12:13was talk about to talk about the towns
1:12:15perhaps
1:12:17>> physical manifestation of
1:12:19>> All right. Yes. Thank you.
1:12:21>> Very near the end, Ted.
1:12:23>> Very very good. [laughter]
1:12:26Thanks, John.
1:12:30Yeah, it comes after the beginning
1:12:32somewhere. [laughter]
1:12:35Um, this what I need a heckler.
1:12:39[laughter]
1:12:40Um, yeah. So, I was about to say that,
1:12:43you know, this is heating up as a a
1:12:46political flash point about people's
1:12:49concerns about AI.
1:12:52And you, Mary, mentioned the towns. In
1:12:54fact, since our last meeting, I've read
1:12:57that both Shrewsbury and Grafton
1:13:00are starting to talk about this and what
1:13:03what do they want to do? What controls
1:13:05do they want to put in place?
1:13:08A lot of places are talking about
1:13:10moratoria and and which is temporary and
1:13:14bans which are more permanent. Of
1:13:16course, those have limits as well, but
1:13:19that's the the typical choice is do you
1:13:21ban it or do you try to mandate best
1:13:25practices?
1:13:27And you know, that's a conversation we
1:13:30could have. I think my own view
1:13:33in the city um
1:13:37you know, bands just move a problem
1:13:39somewhere else. Whereas if you mandate
1:13:41best practices, ideally you're you're
1:13:44advancing the industry toward more
1:13:47sustainable practice.
1:13:49Um so so that that's been um
1:13:54my my thought is is to you know to to
1:13:57sort of focus on trying to bring about
1:14:00the best practices that we can um if
1:14:04this becomes an issue here in the city.
1:14:06I agree with what Mary has said. I
1:14:09agree. We need to be very proactive. We
1:14:11need to be on top of it. Devil's in the
1:14:14details.
1:14:16Policy develops over time and part of
1:14:18that is public participation.
1:14:21Um, but as a starting point,
1:14:26I want to offer uh four suggestions uh
1:14:29that that echo what some of the rest of
1:14:32you have have said. Um the first thing
1:14:36would be that um that we the Green
1:14:41Worester Advisory Committee
1:14:44um endorse the state framework and it's
1:14:49um its use and application here. If if
1:14:53if the city of Worcester ends up in a in
1:14:56a position to need to evaluate a data
1:14:58data center proposal,
1:15:01I I think uh it would be good for Guac
1:15:04to endorse the use of the state
1:15:05framework as a starting point in
1:15:07evaluating the proposal.
1:15:10Um that's the first thing. The second
1:15:12thing is
1:15:14um
1:15:16hold on just a second because when I
1:15:19have three things I always forget the
1:15:21third one.
1:15:24Here we are. Yes. So the second thing
1:15:26would be that the the state um executive
1:15:30order
1:15:32mandates no non-disclosure agreements
1:15:34with state agencies.
1:15:37Uh, I would like to see Guacco on record
1:15:39that we do not want to see any
1:15:42non-disclosure agreements between a data
1:15:45center developer and and the city of
1:15:47Worcester.
1:15:49So that if a proposal comes to
1:15:51Worcester, it gets done in daylight and
1:15:54it doesn't show up on the public agenda
1:15:56as a done deal. That's my second point.
1:16:01The third thing I would like to see is
1:16:04that if Worcester's called upon to
1:16:07develop a community benefits agreement
1:16:11and offer local uh welcome to a data
1:16:14center that the department of
1:16:16sustainability and resilience and the
1:16:18Green Worester Advisory Committee
1:16:22be at the table as stakeholders in in
1:16:25developing what that looks like.
1:16:28Okay. And and the fourth thing, and
1:16:31Steve raised this, and I'm I'm glad he
1:16:34did.
1:16:3525 megawws is big.
1:16:38Um, and in fact, I did a little bit of
1:16:40of number crunching. This is very crude,
1:16:44but based on the peak load, peak
1:16:48electricity load for New England is
1:16:5025,000 megawws roughly, and New England
1:16:54population, which is a little bit north
1:16:56of 15 million, 15.4 4 million.
1:17:01That means peak load is about 1.62
1:17:06megaww per thousand people.
1:17:10Um and what that means is that a 25
1:17:14megawatt
1:17:16uh data center is consuming electricity
1:17:19comparable to more than 15,000 people.
1:17:23And this is total load. This includes
1:17:25the commercial, the medical, the
1:17:27industrial. We're just sort of reducing
1:17:30total load to to per capita per people.
1:17:36So in the and using the same numbers,
1:17:39the city of Worcers's peak load is in
1:17:42the neighborhood of 350 megawws.
1:17:45Now
1:17:49Mr. Odell, John may have better numbers.
1:17:52If he does, I hope he'll he'll share
1:17:54them. But I think that gets us in the
1:17:56ballpark of scale and and 25 megawws
1:18:01would be a huge hit trying to add that
1:18:04to the grid. So I would suggest that
1:18:07that we
1:18:10in in terms of the pol the three things
1:18:12that I just mentioned that our own
1:18:14suggestion be that I mean it for any
1:18:18size data center um
1:18:22I think that the framework is a good way
1:18:24to evaluate it but I think we are our
1:18:26threshold ought to be five megawws not
1:18:2925.
1:18:31So I I make all that in the form of
1:18:35a motion or four motions. Uh not sure.
1:18:40Um but that that's what I would suggest
1:18:43we do with this.
1:18:50Okay. Any further question or comment on
1:18:53what Ted is saying?
1:19:00Evelyn.
1:19:02>> Yeah. Um, I'd certainly agree with your
1:19:05first
1:19:06suggestion, Ted. I think the others are
1:19:08getting very specific early on and maybe
1:19:13I don't is is now necessary except for
1:19:16the non-disclosure agreement. That one I
1:19:18also would support, but the other two
1:19:21are extremely specific
1:19:23and maybe jumping ahead too far. I don't
1:19:26know. I just I want to try and condense
1:19:28what we need to accomplish tonight.
1:19:30That's all.
1:19:33>> Um let's go to Steve.
1:19:36>> Um just because it seems like this is a
1:19:38really meaty issue, I wonder if this is
1:19:40something that we might do a a task
1:19:43force on so that we can focus research
1:19:46and come back with more concise
1:19:48proposals to the committee.
1:19:53>> You got a thumbs up from Mary. It's a
1:19:55good idea, Steve.
1:19:58Um, Ted,
1:20:00Evelyn also has a thumb up.
1:20:05All right, so we've got an unofficial
1:20:07vote happening here. Ted, um, did you
1:20:10want to say anything else?
1:20:13>> I did. Um,
1:20:15>> if you want to wait, you can wait. We'll
1:20:17be fine.
1:20:18>> Yeah. No, thanks. Thanks.
1:20:21[laughter]
1:20:23um if if if people want to dig deeper
1:20:26and and develop this further um and come
1:20:30back to it, I'm certainly okay with that
1:20:33because the the more thorough a job we
1:20:36do, the better.
1:20:38Um
1:20:40I also in reaction to what Evelyn said,
1:20:44um
1:20:46there there was a reason for all those
1:20:48those specificities.
1:20:50Um,
1:20:52you know, no NDAs, BSR is at the table,
1:20:56a smaller threshold. I I don't I mean, I
1:20:59took a a while to say it. I can usually
1:21:01say it more quickly the the second time.
1:21:05Um,
1:21:06but,
1:21:08you know, at the very least,
1:21:11perhaps tonight we could we could go on
1:21:13record doing some of that. And if there
1:21:18are things that people feel warrant
1:21:20further discussion,
1:21:22hold off on acting on everything I've
1:21:24said. Um, I mean, an endorsement
1:21:28of the um of the framework as a as a a
1:21:34um
1:21:36an evaluating tool and uh and no NDAs,
1:21:40you know, those kind of seem like
1:21:42no-brainers to me, but you know,
1:21:48that's what I
1:21:49>> Okay, Mary,
1:21:58>> did you hear me? Mary, can
1:22:00>> you're muted.
1:22:01>> Yeah, problems with the uh interface
1:22:04again. I apologize.
1:22:05>> No worries. So, I just I just wonder um
1:22:07so uh I we did get the read aheads and
1:22:10we did have um a brief presentation here
1:22:13and the proposals out to maybe do some
1:22:15more homework on some of this, but so I
1:22:18wonder if we should table the vote on
1:22:20whether or not the committee um says
1:22:23anything about endorsing or or anything
1:22:26of that nature on on the state's memo. I
1:22:29think that might be a little bit
1:22:31premature given the depth of information
1:22:34that that is there and stuff that should
1:22:37be discussed and its limitations. So my
1:22:40suggestion is this is the first time
1:22:42it's formally come up that we don't take
1:22:45a vote on endorsing it right now that we
1:22:47table that to another meeting. Um, and
1:22:50that way all of the committee members
1:22:52can ensure that they've had adequate
1:22:54time to review and and and discuss
1:22:58or have a subcommittee discuss um the
1:23:01ins and outs of what an endorsement of
1:23:03the state's position would mean and what
1:23:05what it would be. So, I I would ask the
1:23:08committee to uh consider
1:23:12holding off on an endorsement. I'm not
1:23:14saying don't endorse. I'm just saying uh
1:23:16this is kind of fast and this is
1:23:18important and maybe we should take some
1:23:20more time before we take a formal
1:23:22position on it. And let me add our next
1:23:25meeting is October 19th which is very
1:23:28close like sometimes our meetings are
1:23:31much farther apart so it's very
1:23:34very close. So do we have
1:23:38do we have a motion there Mary or does
1:23:42Ted want to respond?
1:23:44Go ahead, Ted.
1:23:46>> Um, yeah. I mean, I again I I feel like
1:23:51there's a certain amount of consensus
1:23:53here that
1:23:55we're at least moving in the right
1:23:57direction.
1:23:58Um,
1:24:01I, you know, I've I've made what amounts
1:24:04to four motions. Um, they would require
1:24:07seconds.
1:24:08I guess Mary Mary is moving that we we
1:24:11postpone
1:24:14I forget the Robert's rules of which
1:24:16comes first, but um but I I don't
1:24:22understand if if there's a a downside to
1:24:25just going on record that you know, we
1:24:28could simply say we're we we uh
1:24:32you know, we support the um
1:24:36uh we endorse the state framework and
1:24:39its use here if it becomes relevant.
1:24:43I'm not sure what the objection would be
1:24:45and I and I'm so I don't you know it's
1:24:49great if we want to dig in and and do a
1:24:51thorough job with this and come up with
1:24:53something better but we have something
1:24:56good to start with and again as Evelyn
1:24:59said let's not let the perfect be the
1:25:00enemy of the good. I think that was
1:25:02Evelyn.
1:25:06Okay, Mary
1:25:08>> through the chair this but there's no
1:25:10requirement for us to even respond at
1:25:12all. So why rush something while we're
1:25:15still very much in a discussion phase
1:25:17about it? I think um the information is
1:25:20just being um formally submitted to
1:25:23everybody. Yeah, sure. There's been
1:25:25talk, there's been whispers, there's
1:25:27stuff available on the internet for us
1:25:29to read, but this is the first time
1:25:31we're formally looking at something of
1:25:34great impact and long-term impact to our
1:25:36community. And I think if we are going
1:25:39to endorse a framework, even if we think
1:25:41it's appears on its first blush to be a
1:25:43good framework um and applicable to us,
1:25:47I still think um I think it's it the the
1:25:51right thing to do is to actually be more
1:25:53deliberative because if we aren't, we're
1:25:56going to end up in the the catch-up
1:25:59phase of well, here we are. we've we've
1:26:01endorsed this framework and we've went
1:26:04out on a limit to say that we think this
1:26:06is applicable to us, but maybe it isn't
1:26:09as applicable as we thought or maybe
1:26:11we're finding more um fallacies rather
1:26:14than truths to our particular
1:26:15circumstances. I just don't think we've
1:26:17done our diligence to be honest with
1:26:19you. I think a brief presentation and a
1:26:21couple of uh very quick readroughs for
1:26:24me doesn't get my endorsement of
1:26:26anything. So, and I think it doesn't um
1:26:29from an ethical point of view for me, I
1:26:32can't support endorsing that framework.
1:26:34Even if in a month I I say, "Yep, okay,
1:26:36I feel much better about this. I I'm I'm
1:26:39happy to raise my hand and say I endorse
1:26:41it." I don't feel like even though I've
1:26:43got notes on it that I've done my
1:26:44diligence yet to give a vote to give an
1:26:46opinion and and do that on effectively
1:26:49on this on behalf of the folks in my in
1:26:53my district that that I that I'm sitting
1:26:55on this committee for. So, I think
1:26:57people expect me to do my homework and I
1:26:59feel like the homework's part none. And
1:27:01I don't know that everybody else has
1:27:05maybe everybody else has uh read through
1:27:07everything thoroughly and convinced
1:27:09themselves that they're satisfied to
1:27:10give their endorsement. Maybe they are,
1:27:13but you know, I I just feel like I feel
1:27:16like we're rushing to an answer for a
1:27:18question that isn't being asked. No
1:27:20one's asked us to give their opinion.
1:27:22We're offering it up. and are we really
1:27:24offering it up in an in an an informed
1:27:27way? Well, partially informed.
1:27:31So, that's where my hesitance comes
1:27:32from.
1:27:35>> Okay. As we're approaching 7 o'clock,
1:27:37we'll take one more comment on this for
1:27:39Evelyn and then we will
1:27:42have to make some decision.
1:27:43>> Yes. I I I think Mary makes a very
1:27:46compelling case and I agree with exactly
1:27:49the way you've expressed it Mary and
1:27:51we've spent an awful lot of time talking
1:27:53about this already and we're not
1:27:55anywhere near any kind of conclusion. So
1:27:57I would you know suggest and thank Ted
1:28:01really for taking the time to bring all
1:28:03of this to us and the thought that
1:28:06you've put into it and let's take the
1:28:09time to do the homework as Mary has
1:28:11suggested. Thank you.
1:28:14Okay. So,
1:28:16go Ted,
1:28:19since it was your thing, you'll get one
1:28:20more last word. This the last last word.
1:28:24>> Well, just you know, in terms of
1:28:26process,
1:28:28um
1:28:29if if the motion is to postpone
1:28:31discussion, you know, take that. I guess
1:28:35um
1:28:38um I I'll want to see it on the next
1:28:40agenda and and we can we can come back
1:28:43to it in the future. No, no one actually
1:28:46seconded my motion. So you you know, you
1:28:49can't do anything until someone does
1:28:51that. And it sounds like this is moving
1:28:53towards uh let's come let's study it
1:28:55some more and come back to it.
1:28:58But with regard to
1:29:00why we do this and no one asked us for
1:29:03our opinion, we're we're advisory and
1:29:06the the whole point here is to be
1:29:08proactive
1:29:10because if someone comes in with a big
1:29:13proposal three weeks from now and they
1:29:15want an NDA and you know five weeks from
1:29:19now our next meeting that's in the past.
1:29:22So that's that's why I'm eager to to get
1:29:25things done here. Um, you know, our job
1:29:29is to advise the city on sustainability.
1:29:31That's what we're trying to do.
1:29:35>> Okay. So, on on Ted's motions,
1:29:40there were no seconds, and they weren't
1:29:42we really didn't define them as motions
1:29:44anyway. We were just talking about
1:29:46thematically.
1:29:48Um,
1:29:49>> well, I did
1:29:50>> before. Well, we didn't write down the
1:29:53words like we've been doing, saying we
1:29:55have a motion that says exactly this.
1:29:59And for um for the sake of argument
1:30:05on any of the three, were they spelled
1:30:08out specifically? Would we have any
1:30:10seconds?
1:30:14Okay. So, seeing none, we're going to
1:30:16put those aside. And I want to echo
1:30:20everybody else's comments, Ted, to thank
1:30:22you because your work on this is what
1:30:24got us to this place. And I think this
1:30:26is a really good place and a really
1:30:28constructive conversation that we're
1:30:29having.
1:30:31So with that um the suggestion is to
1:30:38make a subcommittee to discuss this over
1:30:41the course of the next several weeks.
1:30:46Sorry.
1:30:49Um, and then that group could bring
1:30:53that discussion with perhaps some
1:30:56motions or perhaps not if they're not
1:30:57ready um to our next meeting.
1:31:03Does that kind of um capture what you
1:31:06were thinking, Mary?
1:31:10I don't know. We we don't have a motion.
1:31:12Am I making the motion or do somebody
1:31:14else want to make the motion? Okay.
1:31:15>> Motion
1:31:17motion to uh through the chair. Motion
1:31:19to establish a subcommittee on data
1:31:22centers to report back to the green
1:31:24worester advisory committee at before
1:31:27the next meeting
1:31:31that
1:31:33>> through the chair. So in terms of
1:31:35process remember we make a subcommittee
1:31:39um we end up against open meeting law.
1:31:43Um, if we have an ad hoc group, it's got
1:31:46to be limited to three people. I feel
1:31:49like we might have more than three
1:31:51people here that are interested in this.
1:31:53I'm not I'm just not sure
1:31:56how we uh we proceed expeditiously.
1:32:01I agree it might be good to work some of
1:32:03this out outside of a meeting so, you
1:32:06know, we come in with more of a
1:32:07consensus. But you know,
1:32:11>> well, let's ask um if we form an ad hoc
1:32:16group, who would be interested in
1:32:18participating in that group?
1:32:21>> I would through the chair.
1:32:23>> Okay, we have 10.
1:32:24>> Maybe just raise the hands.
1:32:26>> And we have Mary.
1:32:31>> We have 10. And we have Mary. Okay,
1:32:34we're not gonna exceed the three people.
1:32:36>> Well, okay. So, uh, we you're suggesting
1:32:40that I mean it's open to up to three
1:32:44people,
1:32:45>> right?
1:32:47>> Um,
1:32:48>> I recommend that we do have three
1:32:50people. Um,
1:32:53I will do it if if nobody else is really
1:32:55passionate about it.
1:33:01Okay. So, that's what we have. Two Marys
1:33:04and Ted.
1:33:05>> Okay.
1:33:07Okay,
1:33:08>> thank you all.
1:33:09>> So,
1:33:11do we need Did somebody say something?
1:33:15>> Okay,
1:33:15>> you said thank you for volunteering
1:33:17especially you under uh you know just
1:33:20fill that committee Mary.
1:33:22>> Okay.
1:33:24Um my pleasure. So, we're going to form
1:33:28the the subcommittee. So let's have um
1:33:31we have Mary's
1:33:33motion to form the subcommittee to meet
1:33:36and present. Do we have a second?
1:33:38>> Second.
1:33:39>> Evelyn second. We'll vote on this.
1:33:44Um Mary N. Yes. Evelyn. Yes.
1:33:48>> Yes.
1:33:50>> Since you seconded it. U Pat Austin.
1:33:53>> Yes.
1:33:54>> Ted Connor.
1:34:01Are you saying yes, Ted?
1:34:02>> Sorry, I was muted. Um, yes. I, you
1:34:05know, yes, because that's what we're
1:34:06going to do. [laughter]
1:34:09>> Mary Leovich,
1:34:12>> yes.
1:34:13>> Steven Macaulay,
1:34:15>> yes.
1:34:16>> Dear Murphy,
1:34:18>> yes.
1:34:19>> Okay,
1:34:24I think that that's fabulous.
1:34:27So, the three of us will
1:34:31email
1:34:33tomorrow because I have a meeting to go
1:34:35to tonight when we finish this um and
1:34:38set something up and begin our
1:34:40discussion and prepare something for our
1:34:42next meeting.
1:34:44So, with that, we thank you and
1:34:46everybody, we thank you for your
1:34:47patience as we sorted that out. It went
1:34:49way over time, but I think it had to.
1:34:52So,
1:34:55John and Jess, sorry. [laughter]
1:34:59Um, can we move on to item number four,
1:35:02public participation, community
1:35:03engagement? Is there anybody has
1:35:05anything that they would like to offer
1:35:08in this space?
1:35:16Okay. Then we will move on to
1:35:19um project updates from the department
1:35:21of sustainability and resilience.
1:35:26Ted,
1:35:26>> hold on, chair. With regard to community
1:35:29engagement, there was there were letters
1:35:31we had received
1:35:33>> that I thought uh uh we were told Jesse
1:35:36was going to summarize those.
1:35:40>> I don't think it's coming out of
1:35:41community engagement, is it?
1:35:43>> I thought that's where it did come up.
1:35:45>> Oh, okay. It wasn't that I was going to
1:35:48summarize them. It was we had
1:35:51um DSR internally spoke with Evelyn and
1:35:55Mary about a plan for what to do with
1:35:57the letters and it was determined that
1:35:59summarizing the letters during public
1:36:01comment period would be um appropriate
1:36:04and that's what Evelyn and Mary wanted
1:36:06to do. So that's what we sent the email
1:36:08about.
1:36:09>> Okay,
1:36:10>> that is correct through the chair. That
1:36:12refreshed my memory. Yeah, one of you
1:36:14was going to do it. I could I could do
1:36:16it, but I I didn't want to just sweep it
1:36:19under the rug.
1:36:21>> Okay. Um would you like to do it, Ted,
1:36:23since I have not read them recently?
1:36:25>> Uh if Evelyn agrees to that,
1:36:30>> we just I'm thinking either that or we
1:36:33would postpone it till our next meeting
1:36:34because it's not timely.
1:36:38>> We can do that. I I'll do it very
1:36:40quickly. Um the and the I've seen these
1:36:43letters. The the letter writer is a
1:36:45person that I know. Um I'm going to I
1:36:49I'm I'm going to summarize them in just
1:36:51a few words. One of them was really
1:36:54focused on um good uh stewardship of the
1:36:58city's trees and the other one uh was
1:37:01focused on light pollution.
1:37:04And um both letters contain suggestions
1:37:08that I do not think are actionable and
1:37:11uh and I I've spoken to the the writer
1:37:15and I've told him so that both of them
1:37:18also contain suggestions that I that I
1:37:20think are good and um
1:37:24I'm not prepared to go into it at this
1:37:27meeting. So that is what I was going to
1:37:29suggest that you know maybe take a
1:37:31closer look and and put some some of the
1:37:34good ideas on a on a future agenda.
1:37:39>> Okay.
1:37:41Thank you, Ted.
1:37:43Did anybody else look at them and want
1:37:45to make a comment?
1:37:50>> Okay.
1:37:52Well, then we will move on to the
1:37:55department updates. please.
1:37:58>> Uh thanks Mary. Um so through the chair
1:38:01um I'm going to defer the zero waste
1:38:03program update and the first item under
1:38:06energy smart energy advice if uh Jesse
1:38:10uh could play point on those and walk us
1:38:13through them.
1:38:14>> Sure. Thanks John. So first up is
1:38:17zerowaste events out to lunch report. So
1:38:20I've brought this up uh recently a
1:38:22couple times. So, we had our zerowaste
1:38:25coordinator and our intern out at um
1:38:28some of the out to lunch events this
1:38:30summer and they went really well. Um
1:38:33overall 50 lbs of food waste were
1:38:36collected and composted.
1:38:38384 pounds of recyclables were diverted.
1:38:42Um because currently there's only trash
1:38:45bins there. So, this was adding
1:38:46recycling bins and compost collection
1:38:48bins there. and Taylor and Zach, our
1:38:51intern, actually stood near the bins to
1:38:53make sure they were sorted correctly.
1:38:56Um, and that w that went really well.
1:38:59And it was a collaboration between four
1:39:02community partners. Downtown Worcester
1:39:05BID that uh collaborates with the city
1:39:08to plan those events. Um, Black Earth
1:39:10Compost Collected and Wind Waste
1:39:13Innovations helped by donating
1:39:15compostable wear to give to the food
1:39:18vendors. And this year, 18 new food
1:39:20vendors adopted compostable service wear
1:39:24uh for their meals. And next year, we're
1:39:26hoping to have all 10 events be zero
1:39:29waste. This year, we only did a few, I
1:39:32think maybe three. Yeah, three events um
1:39:35because Taylor was still getting
1:39:36onboarded and we were getting things set
1:39:38up. So, it went really well and next
1:39:40year we hope to make all of them your
1:39:42waste.
1:39:44That's that for the out to lunch event.
1:39:47Then for the city manager clean team
1:39:49events,
1:39:51um wanted to give just a summary of how
1:39:53the summer events went. So we in June we
1:39:56did Union Hill and Lower Grafton Street.
1:39:58In July we did Lower Pleasant Street.
1:40:01August May Street and Park a
1:40:05gave the summer a total of 98 bags of
1:40:08litter collected and 74 bulk items
1:40:11removed from these Worcester
1:40:13neighborhoods. and a lot of great
1:40:15volunteers spending their time helping
1:40:18to clean up and beautify the city which
1:40:20we greatly appreciate.
1:40:23Um, next up is our campaign was to
1:40:27recycles, right? It's an upcoming
1:40:29outreach effort that we're working on.
1:40:32Recently, our contamination has
1:40:35increased in our curbside recycling
1:40:37bins. The city services one to six unit
1:40:40buildings and that curbside recycling
1:40:43has um higher contamination rate than it
1:40:46previously did and we have decided to do
1:40:50an outreach and enforcement effort to
1:40:53reduce the contamination to get those
1:40:55things don't belong in the bin back out
1:40:57of them. We think there's probably a
1:40:59variety of reasons why it's increased.
1:41:01We are hoping that doing this enhanced
1:41:05outreach will really help with that. So,
1:41:08we're going to do social media, press
1:41:11releases, newsletters, all of the online
1:41:15typical outreach that we do. And then
1:41:17we're also going to be hitting the
1:41:19streets. We are creating door hangers
1:41:23and going to walk through neighborhoods,
1:41:26check on bins, see which ones aren't
1:41:28sorted correctly, put flyers or stickers
1:41:31on them to explain this is, you know,
1:41:34kind of a warning. This is what um is in
1:41:36this bin that shouldn't be in the bin.
1:41:38And uh we have outreach materials to
1:41:41give out. So we'll be doing that
1:41:44throughout October, beginning of
1:41:46November. And then we'll have a time
1:41:49frame where if your bin is still
1:41:52contaminated after all this outreach
1:41:54efforts, it won't be collected anymore
1:41:56because the city can't be collecting
1:41:59this recycling that's really
1:42:01contaminated. It's unsafe for workers
1:42:03that work in the recycling facilities.
1:42:06It's more expensive for the city to
1:42:08manage that waste as well. So, there's
1:42:11lots of reasons. That's a summary of the
1:42:14campaign. And we're actually going to be
1:42:16looking for volunteers to help us walk
1:42:19the streets. And Evelyn has kindly
1:42:22volunteered her husband who is dedicated
1:42:24to keeping our city clean. And we'll be
1:42:28out there and um I'm going to send you
1:42:30all an email call for volunteers. And if
1:42:33you can also forward that along to
1:42:35others, anyone who's interested. And
1:42:37it'll be from 9:00 a.m. to 11:00 a.m. a
1:42:40couple days. and you can come when you
1:42:42can and have a little clipboard and
1:42:44we'll hand out flyers and door hangers
1:42:47and hopefully um help people understand
1:42:49how to recycle. Right.
1:42:51>> Yes. Volunteering your partner is
1:42:54encouraged. [laughter]
1:42:56>> Exactly.
1:42:58>> I I have a question, Jess. Is there
1:43:01>> um
1:43:03have they are they able to identify any
1:43:06particular neighborhoods? Um, are
1:43:08tenants are they tenants or homeowners,
1:43:11single family, multif family? Are there
1:43:13any of those type things that
1:43:15um are indicators more frequently?
1:43:19>> Yeah. So, we do quarterly audits with
1:43:21Cassella, our recycling hauler, and they
1:43:25um sort through the waste by day, by
1:43:27collection day, and Wednesdays and
1:43:29Fridays are consistently the highest
1:43:31contamination days. So those are the
1:43:33areas of the city that we'll be
1:43:35canvasing with the flyers and door
1:43:37hangers.
1:43:39>> Okay?
1:43:40>> Because obviously we can't do the whole
1:43:41city with a small group of volunteers.
1:43:43So we're targeting the most highly
1:43:45contaminated areas.
1:43:47>> Okay. Thank you, Ted.
1:43:52Yeah, I'm I'm just um um the
1:43:56contamination,
1:43:58you know, I see a lot of it in my
1:43:59neighborhood and I I when I see my
1:44:02tenants do it, I give them a hard time.
1:44:05If the penalty is just that we don't
1:44:07pick up the bin, um that seems like it's
1:44:11creating a new kind of problem. And I'm
1:44:14wondering if there's any
1:44:16um thought of of doing some civil
1:44:19enforcement. You know, can you issue
1:44:21something like a parking ticket uh for
1:44:24people who don't, you know, respect the
1:44:26the rules about recycling because it,
1:44:29you know, in Maine South it it it ends
1:44:32up on the street. It makes the
1:44:34neighborhoods ugly, yada yada. We all
1:44:37know. Um but, you know, can can we
1:44:40actually penalize people who do it? And
1:44:42I realize as a landlord that I'm gonna
1:44:45get stuck in the middle of this because
1:44:46the city often blames the landlord for
1:44:49what the tenants do. But I can turn
1:44:52around and and and put that in my lease
1:44:54and if my if I get a ticket, my tenants
1:44:56get to pay for it
1:44:58if they if they're to blame. You know,
1:45:01we got to start somewhere.
1:45:04>> Yeah, I understand your point. We're
1:45:07going to start here. Um, and we did this
1:45:11campaign, a very similar one in 2022,
1:45:13and it was very successful. It turned
1:45:16out really people just needed uh one
1:45:18week of their recycling not being picked
1:45:20up to realize, oh, I don't want to keep
1:45:22all of this at my house an extra week.
1:45:24And it worked really well. The
1:45:26contamination decreased significantly.
1:45:28And we're hoping that we can replicate
1:45:30that again. And that by doing education
1:45:33and enforcement, that will be sufficient
1:45:35to get the contamination rate down. And
1:45:38hopefully we don't need to pursue
1:45:40another avenue like you suggested.
1:45:49>> All right. Thank you, Jesse. You can
1:45:51carry on.
1:45:52>> Sure. Did you want to ask another
1:45:55question, Ted?
1:45:57Well, I was just going to say I imagine
1:45:59[clears throat]
1:46:00the when the city has to enforce that
1:46:03kind of suggestion, it it it probably
1:46:05costs more than it's worth
1:46:08except as a symbolic thing. I think
1:46:10that, you know, the the fact that you
1:46:12you can be penalized might help motivate
1:46:15people to behave better. But, you know,
1:46:18I agree the the the what is it? honey is
1:46:22attracts more flies than vinegar or
1:46:25something like that. There's, you know,
1:46:28I get the point and good luck.
1:46:32>> Thank you.
1:46:35>> All right. So, I'll move on to energy
1:46:37then. Y
1:46:39>> um so quick update smart energy advice.
1:46:42As per usual, we've been writing those
1:46:44brief reports on what outreach
1:46:46activities we've been doing monthly. So,
1:46:49the past two months have been busy with
1:46:50tableabling. The summer is always really
1:46:52busy because there's so many events. Um,
1:46:54so Gabby was at a couple of the out to
1:46:57lunch events and national night out. She
1:47:00also tabled at Wester Community Action
1:47:02Council, the community clinics that
1:47:04they've been doing. Did that a couple
1:47:06times and continuing our partnership
1:47:08with the National Grid Customer
1:47:10Advocates. It's been really successful.
1:47:12So, she's been still tableabling with
1:47:13them. And that's all in the report if
1:47:17you want to read it, but it's pretty
1:47:18brief, just an update on what we've been
1:47:20doing. Um, and the second one, we wanted
1:47:22to share the press release that went out
1:47:25announcing our grant, the community
1:47:27first partnership grant that primarily
1:47:28funds the smart energy advice program,
1:47:31we could officially announce it now that
1:47:34all of the contracts and everything have
1:47:36been signed. And uh we're really excited
1:47:39to have this funding through the end of
1:47:412027 to keep this program going that we
1:47:44think is really having a positive impact
1:47:46and helping a lot of people. So that is
1:47:49the quick report for smart energy
1:47:52advice. Happy to take any questions.
1:47:57>> Thank you Jesse.
1:48:01So, picking up the ball from there, um I
1:48:04will uh move on to the green schoolworks
1:48:07grant uh award. Um, believe you guys
1:48:10have uh seen this in both in the
1:48:12attachment and you uh may have heard me
1:48:15talk about this before, but we were
1:48:16awarded a 2.7 plus million dollar grant
1:48:20to do some um uh air to water source
1:48:25heat pumps over at the City View School,
1:48:27which is the primary um implementation
1:48:30measure that we'll be taking there.
1:48:31There'll be some other um uh efforts
1:48:35there too to uh do some uh insulation
1:48:39work and other related ancillary work
1:48:41that need that needs to be done for
1:48:43that. But uh it's a it's a great award.
1:48:45It's the biggest a single award that
1:48:46we've ever gotten. It was very
1:48:49competitive. So we're very happy to have
1:48:51gotten it. Um and so uh we hope to move
1:48:54forward uh to implement that award
1:48:58through our uh ongoing uh esco project.
1:49:02So that'll be uh uh hopefully we can get
1:49:05moving on that so that if we time
1:49:07everything well we can uh start the work
1:49:09this summer and then this coming summer
1:49:12in 27 and then finish the work in 28 the
1:49:16summer of 28. So,
1:49:18>> more to come on that as we as we process
1:49:20through that, but that's but that's a
1:49:22good news. Um, electric vehicle uh
1:49:26charging installation project update.
1:49:28Um, you may have seen the press release
1:49:30that just went out um today. Uh, we are
1:49:35increasing our portfolio of EV charging
1:49:39stations, city-owned EV charging
1:49:41stations by about 75%. Uh we're adding
1:49:44stage four five new locations uh four
1:49:47through one particular grant um that uh
1:49:51allows us to do them on street and then
1:49:53we're also doing um at the uh Great
1:49:57Brook Valley um in the parking area
1:49:59there which has just been refurbished uh
1:50:02and we installed some uh units there as
1:50:04well. They'll all be uh or are being in
1:50:07the process of installing them. We've
1:50:08got all the um electrical work done for
1:50:12the Great uh Brook Valley. We're just
1:50:14putting in the uh units and and getting
1:50:16them charged uh activated, I should say,
1:50:18shortly. The rest of the work for the
1:50:21other four locations will happen uh it's
1:50:23actually started already today over I
1:50:25happen to see on Russell Street. That's
1:50:27the first one and that'll run through uh
1:50:30December as we get the other four
1:50:32locations up. But once completed, uh we
1:50:34should have a total of 52 uh EV charging
1:50:38station ports available for uh folks in
1:50:41the city owned by the city that are
1:50:44actually owned by the city as well.
1:50:45Plenty of other locations beyond that,
1:50:47but the city owned ones. Um and then the
1:50:51last item under energy and uh if there's
1:50:54any questions on these three after um
1:50:57but just wanted to let folks know about
1:50:58the aggregation price change uh
1:51:00effective with the October bills.
1:51:02Believe I mentioned this at our last
1:51:04meeting. Uh rates have uh going to go
1:51:07down to a little over 14 cents a
1:51:09kilowatt hour for the supply side which
1:51:11is down um almost 10% from what it was
1:51:16uh which is a pretty significant
1:51:17reduction on the supply side. Uh, and so
1:51:21that will take effect uh you'll note it
1:51:24in your October bill, but it actually
1:51:26affects your September usage. So that's
1:51:28uh uh just to let people uh we let
1:51:31people know. We've done a whole social
1:51:32media blast on that. But it's a it's
1:51:34good news um for keeping rates uh a bit
1:51:38lower um especially coming into the
1:51:40winter season uh for folks uh uh who
1:51:43heat with electricity in particular.
1:51:45It's a it couldn't come soon enough. So,
1:51:48>> any questions on the electricity side or
1:51:51energy side, I should say, before I move
1:51:53on.
1:51:53>> Ted has a question.
1:51:55>> Sure.
1:51:56>> Um, yeah. Um,
1:51:59that's certainly good news in terms of
1:52:02of cost, but when I read the fine print,
1:52:05it sounded like
1:52:08the reason the cost come come came down
1:52:11is that
1:52:13the sort of the new projects have kind
1:52:14of ground to a halt. and we were paying
1:52:17a little premium to to advance
1:52:21additional
1:52:23um renewable energy projects. So that so
1:52:26that now the the aggregation program is
1:52:30I think it was just sort of buying the
1:52:32sort of windrex for projects that
1:52:35already exist. Do do I have that right?
1:52:37It's I think it's worth understanding
1:52:40some of the nuances of of how this stuff
1:52:42develops.
1:52:45you partially right. Um you're right in
1:52:48that what we ended up doing is we were
1:52:51buying class one Rex which are
1:52:53essentially renewable energy credits
1:52:56that are uh from um
1:52:59uh renewable project projects that are
1:53:03local in New England um and and
1:53:05particularly in Massachusetts. Uh so uh
1:53:08and the idea is that the buying these
1:53:10incentivizes the installation of more of
1:53:13these uh applications. The difference in
1:53:16what you said though is that it's um uh
1:53:20the seed money that these provide
1:53:23essentially is no longer needed and
1:53:24hasn't been needed actually for a few a
1:53:26few months now. And the trend has been
1:53:28that there's been so many new projects
1:53:31that are come online, they're coming
1:53:33online without the incentive. And so the
1:53:36idea here is um at least for the near
1:53:38term and we can always go back uh but
1:53:41for the near term we weren't getting any
1:53:43value out of paying extra is basically
1:53:47the in if the incentive is not
1:53:48incentivizing anything anymore why are
1:53:51we spending more it was the argument and
1:53:54that's the ultimately we decide well but
1:53:56then we probably shouldn't and so we
1:53:58went back to still buying those uh clean
1:54:00energy renewable energy credits just not
1:54:02the locally sourced ones we're buying
1:54:04them from um uh uh uh wind power out
1:54:08west uh specifically if memory serves
1:54:11the think upstate New York um and so
1:54:13those are much less money and so that's
1:54:15how we can pass those savings on but
1:54:17that's the context
1:54:20>> um yeah through the chair I noticed also
1:54:22that the the difference in cost between
1:54:26basic green standard green and 100%
1:54:29green
1:54:30has has contracted to just fractions of
1:54:33a cent
1:54:35And you know, I'm already on 100% green,
1:54:38but at this point it's it it costs very
1:54:41little more to do that, which I I would
1:54:43think that why doesn't everybody do
1:54:45that? It might be worth promoting that.
1:54:47Um while while that's true, obviously it
1:54:51might not always be true. Um
1:54:54but uh yeah, that was great. I I um the
1:54:58other thing I wanted to just uh mention,
1:55:01you know, I'm I'm I'm um I I my concern
1:55:06about the specialized code um remains
1:55:10high
1:55:12and I know that there was a plan to try
1:55:15and do some developer outreach to
1:55:18um
1:55:20um to to to sort of just make sure
1:55:24people understand it and expedite
1:55:27people, you know.
1:55:29>> Ted, does this have to do with the
1:55:31aggregation?
1:55:31>> It has to do with energy,
1:55:34>> but not the aggregation.
1:55:35>> It's not the aggregation. It has to
1:55:37>> All right. Let's make sure that John has
1:55:39a chance to to finish.
1:55:42>> Oh, well, I thought Yeah. Okay. If
1:55:44there's more on aggregation, I'll I'll
1:55:45wait.
1:55:47>> Right.
1:55:48Are we I mean before we're bringing up
1:55:51something new because
1:55:53>> we really at this hour at 7:30 now and I
1:55:59don't know if we really
1:56:01he might have an update further on with
1:56:03these things. You you tell me John,
1:56:06>> but I want to stick to the agenda so
1:56:09that we can I have a place to be at 7
1:56:11o'clock myself. So let's uh
1:56:14>> you're late if it's seven
1:56:15>> agenda. [laughter]
1:56:17Yeah, let's stick to the agenda if we
1:56:19don't have an update on something.
1:56:22>> Yeah, I don't I didn't prepare anything
1:56:24for the specialized code because it was
1:56:25not on the agenda. So, I don't have
1:56:27anything there.
1:56:28>> Okay.
1:56:29>> But I can uh we can table that for now
1:56:33and it certainly can be put on a future
1:56:35agenda if that's uh the request of the
1:56:38um committee. Um
1:56:39>> okay, we'll get to that part.
1:56:41>> We'll get to that. Yeah. So, in terms of
1:56:43the lakes and ponds program, um just
1:56:46want let folks know that the project
1:56:48blue worester uh which is the uh report
1:56:51that we would be doing on the local
1:56:53watersheds uh the three water the local
1:56:56wersheds that feed into Wister. Uh that
1:57:00report is uh getting closer and closer
1:57:03to near final. Um and we hope that by
1:57:06the end of uh certainly by the middle of
1:57:10next month um we would have that as near
1:57:12final and at that point we will set up
1:57:15uh public meetings on that draft plan
1:57:17which would come shortly thereafter. So
1:57:19look for that. I expect I'll have very
1:57:21specific dates for for at the next
1:57:23meeting. Uh but in case um they come out
1:57:26earlier, we'll be sure to send them so
1:57:27that you can plan accordingly, give
1:57:29yourself a little extra lead time. But
1:57:31most likely in the back end of October,
1:57:33early November is what we're expecting
1:57:35at this point. So, more to come on that.
1:57:38Uh,
1:57:39moving on to resilience. Um, our
1:57:42municipal vulnerability preparedness
1:57:44grant award. Um, again, I think I
1:57:47mentioned this last time, but just to
1:57:49reiterate that, uh, we did receive a
1:57:51$900,000
1:57:53uh, award, which was great. So, we've
1:57:56gotten just doing the quick math in my
1:57:59head, about $3.6 6 million in grants
1:58:01that we've received over the last um uh
1:58:04couple months. Uh which is this 900,000
1:58:07is going to allow us to complete uh
1:58:10phase three of our basically it's our
1:58:13storm water management plan. um which is
1:58:16hugely uh important in both in terms of
1:58:20um uh allowing us to uh plan our um uh
1:58:25understand our uh or how our system
1:58:30works uh for managing storm water. Um it
1:58:33also will allow us to u much better
1:58:36identify the key locations for both gray
1:58:39and green infrastructure improvements.
1:58:42Um and even do the kind of analysis that
1:58:45allows us to know if we solve one
1:58:48problem here or we inadvertently
1:58:49creating a a a new problem downstream
1:58:53from that. We can we can address all
1:58:55that under one model which is pretty
1:58:58exciting. What we're hoping to do with
1:59:01this phase in particular is to do all
1:59:04the calibration and validation work. Uh
1:59:07basically hoping that we get a few
1:59:10>> intense but not overly intense storms.
1:59:13Uh nothing that will cause damage but
1:59:15intense enough that we can actually
1:59:16check and make sure that the model what
1:59:18we the model predicts is actually based
1:59:21uh in reality. So that's uh to come. Uh
1:59:25it's a it's a this one's a good one too,
1:59:27I think, for the long-term uh benefit
1:59:28for the city. Probably has uh potential
1:59:31to save literally millions of dollars
1:59:34over time in terms of to being smarter
1:59:36about our green and gray infrastructure
1:59:38projects.
1:59:40Um,
1:59:42and then the last item uh that I was
1:59:44going to talk to you about is on our uh
1:59:46Wister green jobs video. Uh, as part of
1:59:50our phase two of the, uh, municipal
1:59:52vulnerability plan, the MVP plan, MVP
1:59:56project, I should say, we put together a
1:59:59video. I would recommend that if you get
2:00:01a chance, the website's right there on
2:00:03the agenda uh, uh, on the agenda there,
2:00:05the green Wister green jobs. Take a look
2:00:08at it. I think it's about 12 or 13
2:00:11minutes. Uh it's really well done,
2:00:14professionally done. We've sent it to a
2:00:16variety of folks to spread the word. Uh
2:00:18the key people we did hear back from the
2:00:20tech high school in particular, which
2:00:22was obviously a
2:00:24>> folks we wanted to send this to. And not
2:00:26only did we get the um s the uh
2:00:29environmental class to be a strong
2:00:32endorser of this and very appreciative
2:00:34of it, sent it to the principal and he
2:00:36said that he's going to show it to every
2:00:38incoming freshman uh that goes that they
2:00:41that they have that runs through their
2:00:43whole program. So that's about 350 kids
2:00:45who are in the process right now of
2:00:47selecting what avenue they want to
2:00:50explore. And this, I think, gives them a
2:00:53uh uh a real tool in the tool shed to to
2:00:57promote this kind of uh uh focus in in a
2:01:00future career. So, we're we're pretty
2:01:02excited about this one, too. Um so, take
2:01:04a look if you haven't seen it already. I
2:01:07don't say this lightly. Um you know,
2:01:09some of these are good, but this one's
2:01:12really good. So,
2:01:13>> Okay,
2:01:14Evelyn.
2:01:18>> Yeah. I just want to emphasize I've seen
2:01:20the videos and they're they're really
2:01:22great and they're very um uplifting
2:01:26and wonderful testimonials to get people
2:01:28thinking about green jobs. So job well
2:01:30done.
2:01:31>> Thank you. And a quick shout out to our
2:01:33former member Nate Fornier who's uh
2:01:35highlighted one of the people uh come is
2:01:38in the video and speaks well. It's worth
2:01:42just seeing Nate. The guy has not
2:01:44changed a bit. He is in fact perhaps
2:01:46even more enthusiastic in the video than
2:01:48you've met him in real life. And that's
2:01:50hard to do. So that that's a uh as
2:01:54strong as an endorsement I as I can
2:01:56give. It's it's it's good stuff. Um and
2:02:00that's all I've got. Uh so uh uh turn it
2:02:03back to you, Mary to the chair.
2:02:06>> All right. Thank you, John. There's a
2:02:08lot of good news in there today, so
2:02:10thanks for hanging in there. Um
2:02:16any everybody have anybody have any more
2:02:18questions about any of those items?
2:02:22No. So um for informationational
2:02:26purposes we had placed on and were there
2:02:28anything that we noticed coming up on
2:02:31the city council and school committee in
2:02:33the next couple weeks.
2:02:34>> Anything relevant to the [clears throat]
2:02:36plan now?
2:02:37>> Okay. Thank you.
2:02:40>> So
2:02:40>> to the chair.
2:02:42Um I I noticed a couple of things um
2:02:45tucked into one of the August city
2:02:48council agendas. I don't always
2:02:52scan through these carefully because
2:02:54it's a lot of work. Um but I happened to
2:02:56do it the other night and um so there
2:03:00there were two things of interest. I
2:03:02can't I'm just going to mention what
2:03:03they are. Um the one was from it was a
2:03:07petition from a couple of people
2:03:10including Stephanie Cavino who is
2:03:12another former Guac member who now leads
2:03:17the Blackstone River Watershed
2:03:19Collaborative. I believe she's the
2:03:21director.
2:03:23Um it and it concerned uh
2:03:27posing questions about the development
2:03:29of a long-term control plan for CSOS.
2:03:33So, I I that's as much as I've got. I
2:03:35don't know anything more, but it's
2:03:37something apparently that that uh
2:03:39certainly um might be of interest to us.
2:03:43And and um and the other was uh someone,
2:03:47I forget who
2:03:50asking the city manager for
2:03:52recommendations
2:03:54how we can avoid lake closures.
2:03:57And this is the cyanobacteria and all
2:03:59all of that stuff that you know, I'm not
2:04:02sure
2:04:03I mean, I
2:04:05we could the recommendations are way
2:04:08back upstream, you know, don't don't
2:04:10don't put stuff in the water,
2:04:13but uh but that it's it's on the
2:04:16political radar and I thought we should
2:04:18uh we should just take note of that.
2:04:20That's all.
2:04:23>> Okay. Thank you, Ted. Um what's a CSO?
2:04:27>> Combined sewer. Uh
2:04:29>> oh, okay. Yeah. Combined sewer overflow.
2:04:33>> Overflow. Okay. Yeah.
2:04:34>> It's the It's the older part of the city
2:04:36where the storm water and the sanitary
2:04:40sewer flows in the same divided pipe.
2:04:44>> Yeah. I I had a sense that that's what
2:04:46it was, but I wanted to be sure.
2:04:48>> Yeah.
2:04:49>> Okay. So, then do we have any um items
2:04:53for consideration on a future agenda?
2:04:56Ted wants to know about the stretch
2:04:59code.
2:05:00Um yes through this three things on my
2:05:04list data centers update on specialized
2:05:09code um outreach and um
2:05:13to to return at some point to the uh I
2:05:18want to give those letters that we
2:05:20received
2:05:22a a fair hearing and see if there's
2:05:24anything in there that
2:05:26we want to come back to. So, you know,
2:05:29I'd like to
2:05:31have the committee's authorization to do
2:05:34that when we're ready.
2:05:36It was uh the the issues were were tree
2:05:39care and light pollution.
2:05:43>> Okay. So, in my interpretation of the
2:05:46letters, which weren't necessarily
2:05:47addressed to us,
2:05:49>> they were to departments. So,
2:05:52>> CC No, CC to us. That's right.
2:05:55>> Right. So,
2:05:58I feel it's probably prudent to find out
2:06:00what the department's replies were or
2:06:02responses before we and and maybe invest
2:06:08after that.
2:06:10Is that reasonable? Do we know what the
2:06:14outcomes of these letters were to the
2:06:15people they were sent to?
2:06:18>> Uh through the chair, no. As it sits
2:06:21right now, no.
2:06:23All
2:06:26right. Um,
2:06:29>> you're the chair. I wasn't promising to
2:06:31be ready for that at the next meeting.
2:06:34>> Yeah.
2:06:35>> I would just like I mean, you know, we
2:06:37vote on these things tonight, but then
2:06:38we can add things later.
2:06:41There's a bunch of different ways things
2:06:42get on our agenda. So, I'm not this one.
2:06:45I don't want to burn too much air on it
2:06:48right now.
2:06:49>> Okay. So, we have the data centers
2:06:51already. We [clears throat] can ask for
2:06:53an update if there's anything new on the
2:06:55stretch code.
2:06:57>> Specialized code.
2:06:58>> Do we pardon
2:07:00>> uh for clarification? Specialized codes.
2:07:02>> Specialized stretch code. Yes. Do we
2:07:04need a a vote on that?
2:07:08>> I think you could just do it.
2:07:10>> Okay.
2:07:10>> You don't need to.
2:07:12>> You could do unanimous consent.
2:07:15>> Anyone opposed?
2:07:17>> Yeah. Is anyone opposed to getting an
2:07:18update on the outreach for specialized
2:07:21stretch code? No. Okay, good.
2:07:26Um,
2:07:29any other items that people are
2:07:30interested in?
2:07:32>> Just going back. I don't get a vote on
2:07:33that one, right? Just
2:07:37>> No.
2:07:38>> Through the chair, John, do you want a
2:07:40vote on that one? [laughter]
2:07:42>> I don't have to do a report. I will
2:07:44always say that. I don't want to do
2:07:46that. Could could I just clarify through
2:07:48the chair when when when I ask for a
2:07:52report, I'm not a verbal report is good
2:07:56to me. I don't I don't need a something
2:07:58in writing. I'm not trying to make extra
2:08:00work for you guys. We just want to know
2:08:02what's going on.
2:08:08Okay. Um, one item that I'm interested
2:08:12in discussing sometime in the future is
2:08:15about the volunteer groups that plant
2:08:18things at traffic islands and how
2:08:20they're maintained and who's responsible
2:08:22for them and um how we appreciate them
2:08:26or
2:08:28there was an incident with one recently
2:08:30and I I just feel like it impacts our
2:08:34purview here and not urgent but I would
2:08:37like to talk about that one time.
2:08:45So, um, just for clarity, so we know, do
2:08:48we need to, uh, do you want us to
2:08:50include that for next month or is that
2:08:52or is that just something we're
2:08:53>> I think while we've got the data
2:08:54centers, we've got a lot to talk about,
2:08:56but I think if an opportunity comes up
2:08:59maybe to whoever is responsible for
2:09:01those things or whatever the the
2:09:03pathways that some of those things
2:09:04happen, we can talk about how that's
2:09:08going. But I I think with the discussion
2:09:11about the data centers, we don't want to
2:09:12overwhelm you and we don't want to
2:09:13overwhelm ourselves. Is that fair to
2:09:17everybody?
2:09:18>> So through the chair. So we won't be
2:09:20putting it on the agenda specifically
2:09:21just for our sake. Uh
2:09:23>> right. Just be think about it.
2:09:24>> Got it. Thank you.
2:09:25>> Got it.
2:09:27Okay. Anybody have any updates, events,
2:09:30and programs that are not DSR
2:09:32sanctioned, organized, or provided at
2:09:34this time?
2:09:39Okay, I see nothing mentioned. So, I
2:09:43would like to remind you all that our
2:09:44next meeting is October 19th. And thank
2:09:47you all for your time and attendance
2:09:49today.
2:09:50We have a motion to adjourn this very
2:09:54lengthy meeting. Evelyn, who
2:09:57>> move?
2:09:58>> Jesse, you can't second.
2:10:00>> Second. [laughter]
2:10:01>> Dearra seconds.
2:10:04Oh, anybody opposed?
2:10:07Okay, thank you everybody. Have a great
2:10:10night. Be well. Thank you.
2:10:12>> Thank you, Mary.
2:10:13>> Bye.