2026-08-05 - Planning Board

Summary

Based on auto-generated captions plus the posted agenda; names, addresses and numbers may be misheard. No official minutes yet.

Time on topic (from transcript timestamps; approximate, includes side talk):

Topic Minutes Share
12 New Bond Street Lot 2 C Street Preliminary Site Plan (Green Tech Park) 35 32%
Minimum Parking Requirements Zoning Amendment 21 19%
27-35 Chandler Street and 47-53 Irving Street (ZB-2026-070) 18 16%
9 Dalton Street 12 11%
42 First Street and 35 Second Street (PB-2026-042) 10 9%
Other business 6 6%
3 Mann Street (ZB-2026-061) 4 4%
Postponements 2 2%
287 Providence Street Hotel Site Plan Extension 2 2%
  • Wednesday, August 5, 2026, Levi Lincoln Chamber (hybrid).
  • Chair Albert LaValley presided with Brandon King, Anthony Dell'Aera, Stephen Toomey and alternate Carlos Rosende; staff included Stephen Cary and Michelle M. Smith (Planning) and Leslie Rodriguez (DPW). Every vote was 4-0.
  • The meeting ran from 5:30 PM to roughly 9 PM.

Postponements

2:57-4:39

42 First Street and 35 Second Street (PB-2026-042)

4:39-14:42

  • Definitive site plan for a new single-family home on 35 Second Street, triggered by slopes of 15 percent or more; taken with the lot-line ANR (14C) that gives it frontage and a driveway on First Street.
  • Abutter Harry Cook (name per captions) was not opposed but asked about drainage, tree removal, construction traffic on narrow private Second Street and repairs; the engineer pointed to infiltration trenches and tire-cleaning mats on both streets.
  • DPW wanted the First Street driveway perpendicular to the road.
  • ANR endorsed and site plan approved, both 4-0, with staff conditions (added trees, test pit results, pedestrian walkway; a copied-in construction management plan paragraph struck).

27-35 Chandler Street and 47-53 Irving Street (ZB-2026-070)

14:42-32:43

  • Definitive site plan for GoVenture Capital Group's five-story, 74-unit apartment building with no on-site parking (covered walkway to the adjoining owner-controlled garage) on the former historic laundry site; the ZBA had granted a front setback variance.
  • Staff conditions: window pane pattern near historic districts, glazing on the trash room doors, relocating a trash room door off the neighbor's side, a direct bike-room entry, gated garage access, a travel demand management plan. The applicant accepted most, asked to relocate the trash man door to Irving Street with frosted glazing but keep the rollup door solid, and asked to keep the bike room entry internal (staff condition struck on both after discussion).
  • DPW noted about $21,000 of additional bonding at the permit stage.
  • Chamber of Commerce's Darnell Dunn and resident Emma Morrison spoke in support. Approved 4-0.

287 Providence Street Hotel Site Plan Extension

32:43-34:36

  • Park Silver Development LLC (attorney Stephen Madaus, per captions) sought a two-year extension of the January 2025 site plan approval for a hotel; it has applied for a building permit but not yet received it. Approved 4-0.

9 Dalton Street

34:36-46:50

  • Five-unit residential building by Cozy Corner LLC (attorney Todd Broer, engineer from Quinn Engineering); ZBA had already granted a parking special permit.
  • Applicant won deletion of conditions on concrete driveway (G), photometric plan (I) and, to avoid duplicating the ZBA decision, the architectural conditions B and C.
  • Approved 4-0.

3 Mann Street (ZB-2026-061)

46:50-50:49

  • Public hearing on a definitive frontage subdivision of the lot into two (existing multifamily and a new two-family at what will be 1 Mann Street). Donald O'Neil asked for waivers of subdivision rules.
  • Added street tree condition. Hearing closed and plan approved, both 4-0.

12 New Bond Street Lot 2 C Street Preliminary Site Plan (Green Tech Park)

50:49-1:25:23

  • Bohler Engineering and WBDC presented a preliminary site plan for three speculative advanced-manufacturing buildings (about 59,800, 147,500 and 210,000 sq ft; 417,000 total) on about 29 acres of the former Saint-Gobain campus; a future end user would file the definitive plans.
  • Staff's feedback list covers a historic-dedication area under a state memorandum of agreement, bike parking, compact spaces, rooftop screening, lighting, easements and street-extinguishment evidence. The applicant asked to soften the wording to "consideration of" and to drop the contamination-tracking item; the Board agreed and also adjusted the zoning-compliance item.
  • Approved 4-0 with those changes. Related: GreenTech Park TIF Zone.

Minimum Parking Requirements Zoning Amendment

1:25:23-1:45:54

  • Petition by Mark Borenstein to cut the base minimum from two spaces to one for one- to multi-family homes. The Board's role is a non-binding recommendation to the City Council.
  • Staff supported the goal but warned the change would leave overlay districts such as Shrewsbury Street requiring more parking than the base, and would tie into inclusionary zoning reductions; the City is preparing a broader parking overhaul by year end.
  • Three residents spoke in support. Hearing closed and favorable recommendation 4-0; Rosende urged the Council to move faster.

Other business

0:00-2:57, 1:45:54-1:49:25

  • C Street definitive subdivision: form of surety set as a restrictive covenant, 4-0.
  • ANR plans: 14D (4 Chequesset Road and Pocono Road, four lots) and 14E (a lot-line adjustment) endorsed 4-0 along with 14C; others were not properly before the Board.
  • Draft Priority Habitat Map noted; minutes tabled to the next meeting.

Agenda

Planning Board members: Albert LaValley (Chair), Conor McCormack (Vice Chair), Brandon King, Anthony Dell'Aera, Stephen Toomey, Carlos Rosende (Alternate). Meeting at 5:30 PM, Levi Lincoln Chamber (Room 309), Worcester City Hall, with Zoom and phone participation. Application materials at worcesterma.gov/planning-regulatory/boards/planning-board.

Call to Order - 5:30 PM. Requests for Continuances, Postponements, & Withdrawals.

New Business

  1. 24-28 Chequesset Road & 0, 29 Dominion Road (PB-2026-007): Public Meeting - Definitive Site Plan; Public Meeting - MGL 81-G and/or GRO Ch. 12, Sec. 12, Private Street Improvement
  2. 25-27 Perkins Street (PB-2026-026): Public Meeting - Definitive Site Plan; Public Hearing - Special Permit (IZ) for relief from minimum off-street parking and/or loading requirements, parking dimensional requirements, and landscaping requirements (Article VII, Section 6.A.ii)
  3. 42 First Street & 35 Second Street (PB-2026-042): Public Meeting - Definitive Site Plan
  4. 454-456 Granite Street (PB-2026-047): Public Meeting - Definitive Site Plan
  5. 114 Lincoln Street (PB-2026-049): Public Meeting - Definitive Site Plan
  6. 27-35 Chandler Street & 47-53 Irving Street (PB-2026-052): Public Meeting - Definitive Site Plan
  7. 287 Providence Street (PB-2026-061): Public Meeting - Definitive Site Plan - Extension of Time
  8. 9 Dalton Street (PB-2026-63): Public Meeting - Definitive Site Plan
  9. 3 Mann Street (PB-2026-064): Public Hearing - Definitive "Frontage" Subdivision Plan
  10. 12 New Bond Street, 0 Ararat Street, 0 & 14 Indian Hill Road (aka Lot 2 C Street) (PB-2026-66): Public Meeting - Preliminary Site Plan
  11. 25 West Chester Street (ZA-2026-002): Public Hearing - Zoning Map Amendment
  12. Minimum Parking Requirements (ZA-2026-011): Public Hearing - Zoning Ordinance Amendment

Other Business (Public Meeting)

  1. Subdivisions: C Street - Definitive Subdivision Plan (PB-2025-062), request to set form of Surety
  2. Approval Not Required (ANR) Plans: AN-2026-034 - 240 Moreland Street (Public); AN-2026-036 - 52 Butler Street (Public & Private); AN-2026-039 - 42 First Street & 35 Second Street (Public & Private); AN-2026-040 - 4 Chequesset Road & Pocono Road (Private); AN-2026-041 - 59 Pocasset Avenue (Public); AN-2026-042 - 13 Southgate Place (Private); AN-2026-043 - 22 Shaffner Street (Public)
  3. Communications: Draft Priority Habitat Map of Rare Species - available for public comment
  4. Board Policy and Procedures
  5. Approval of Minutes - 6/3/2026; 6/24/2026; 7/15/2026

Adjournment

Sources

Video

Watch the video

Transcript

Auto-generated YouTube captions; names and terms are likely misheard.

Transcript

0:00All right. Uh, we'll get started. Good

0:02evening everybody and welcome to the

0:04Wednesday, August 5th, 2026 meeting of

0:06the city of Worcester Planning Board. My

0:08name is Albert Lavali and I'll chair

0:10tonight's meeting. Uh, before we begin,

0:12a couple brief announcements concerning

0:14how our meeting typically proceeds.

0:16First, this is a hybrid meeting, which

0:18means you can participate both in person

0:20here at city hall or by going online to

0:22worcestermath.zoomv.com/j161731497.

0:23zoomggov.com/j1617314-979

0:30or by calling in at 669-254-5252

0:34and entering access code 161731-4979

0:39followed by the pound sign to manage

0:42remote participation during our hybrid

0:44meetings and prevent disruptions. All

0:46participants are automatically blocked

0:47from unmuting themselves, turning on

0:49their video, or sending chat messages.

0:51For those participants who would like to

0:53comment on an item on our agenda, we ask

0:55that you use the raise your hand feature

0:57in Zoom uh during discussion on that

0:59item. You can do that if you're uh in

1:02the on a computer um inside the app by

1:06uh pressing the icon or on the phone by

1:08pressing star 9. Once it's uh time for

1:12folks from the public to comment, staff

1:14will call on you one by one and give you

1:16permission to unmute yourself. Uh you'll

1:18have to do that either in the app or uh

1:20by pressing star six on your phone. Um

1:23next, I know this is a public meeting

1:25which is both being broadcast and

1:26recorded. Minutes will also be published

1:28at a later date. To help with that

1:29process, we ask all speakers

1:31participating in person to use a

1:32microphone. To please clearly identify

1:35yourself each time you speak and the

1:37first time you speak, please also state

1:38your city or town of residents for the

1:40record. To help maintain an orderly

1:42meeting, please address all comments and

1:44questions through the chair rather than

1:45directly to any of the other speakers or

1:47applicants.

1:49Uh, next, there are a few items on our

1:52agenda tonight that are going to be

1:53continued or postponed. I'm going to

1:55read through those shortly. If you're

1:57here on one of those items, please note

1:58no additional notice will be sent to you

2:01prior to the next meeting. The best best

2:03thing to do is call the planning

2:04division either the day of or the day

2:06prior uh to confirm if that item is

2:09going to be heard or postponed. It's not

2:11uncommon for things to be postponed

2:13multiple times before they're heard by

2:14this board. Uh once an item is called,

2:17there will be a brief presentation of

2:18that item followed by any additional

2:19comments or clarifications from members

2:21of the city staff and then an

2:23opportunity for anyone for the public to

2:24speak on that item before we proceed to

2:26board discussion and action. Uh finally,

2:29all applicants should be aware that

2:30approvals are generally conditional.

2:32Decisions are generally signed by the

2:33board at the next meeting and were

2:34appropriate filed with the city clerk

2:36the following day, which is the trigger

2:38for any appeals periods. Uh decisions

2:41are typically not released to the

2:42applicant until all conditions of

2:43approval have been satisfactorily

2:45addressed. It's the applicant's

2:47responsibility to address those

2:48conditions of approval and a lack of

2:49doing so can result in delays or

2:51enforcement. Applicants with questions

2:53about that are asked to please call the

2:55planning division.

2:57All right, moving into postponements.

3:02[clears throat] Item number one, 24

3:05through 28 uh Chquest Road and 0 and 29

3:08Dominion Road. This will be a definitive

3:10site plan in MGL81G

3:12for a private street improvement. The

3:14request is to postpone the public

3:15hearing to August 26 26 and extend the

3:18construction grant deadline to September

3:201726. Item number 2, 25 through 27

3:23Perkins Street, a definitive site plan

3:25and special permit. Questes to postpone

3:28the public hearing to August 26 26 and

3:30extend the constructive grant deadline

3:32to September 1726. Item number four, 454

3:36through 456 Granite Street, a definitive

3:38site plan. Request to postpone the

3:40public hearing to August 26 26 and

3:42extend the constructive grant deadline

3:44to September 1726.

3:49Uh item number five, 114 Lincoln Street,

3:52a definitive site plan request to

3:54postpone the public hearing to August 26

3:5626 and extending the constructive grant

3:57deadline to September 1726. And lastly,

4:00item number 11,25 Westchester Street, a

4:03zoning map amendment request to postpone

4:06the public hearing to August 26 26 and

4:08extend the constructive grant deadline

4:09to September 1726.

4:12Is there a motion on the postponements?

4:21>> Sorry, I couldn't see in the room there.

4:22Uh, I'd make a motion to postpone items

4:25number one, 2, 4, 5, and 11.

4:29Second

4:31>> on the motion. Mr. King,

4:33>> yes.

4:33>> Mr. Delera,

4:34>> yes.

4:35>> Mr. Tumi,

4:36>> yes.

4:37>> I vote yes as well. Motion passes four

4:39to zero. Uh, first item we're going to

4:41hear tonight,

4:43um, which we're going to take

4:44simultaneously with the ANR 14C is item

4:48number three, which is 42 First Street

4:50and 35 Second Street, a public meeting

4:52for a definitive site plan.

4:55>> Mr. Mr. Chairman, I'm James Tetro from

4:57uh E Expedited Engineering uh out in

5:00Southboro. Uh here representing Mr. Wo,

5:03who's the owner of both 42 First Street

5:05and 352nd Street. Um he purchased uh 42

5:10First Street approximately eight years

5:11ago and about three years ago purchased

5:1435 Second Street. What he is proposing

5:16to do is to construct a new home on

5:19352nd Street and redivide the lot line

5:23so that that property has access for a

5:26driveway and legal frontage from First

5:29Street. Uh Second Street is only I don't

5:32know if I'd say unimproved or partway

5:34improved, but the new home would have

5:37its driveway and access from First

5:39Street. We are here before you. The

5:41trigger was working on and creating

5:43slopes of 15% or greater. Um we have in

5:46our in our plans proposed uh erosion

5:49control measures including sediment

5:50control barrier at the limit of work uh

5:53specific erosion control matting for use

5:55on slopes steeper than 3:1. Uh and we uh

5:59had included uh drainage calculations in

6:02our uh filing which showed that this lot

6:04uh which receives drainage from as far

6:06away as Wood Farm Circle uh further to

6:09the to the west uh with all the actually

6:12a few different infiltration measures

6:14proposed will not have greater flow to a

6:17butters afterward than are receiving

6:19now. Uh and I'll just leave it at that.

6:22It be very simple. I'll try and take any

6:24questions that you may have.

6:25>> Okay. Thank you. uh city staff on this

6:27item.

6:28>> Sure. This is Steve Kerry with the city

6:30of Worcester. Um [clears throat]

6:32not too much more to add to that. Um as

6:34the applicant noted, this is a single

6:35family home. Um this it's before you

6:38site plan approval because of slopes of

6:3915% or more. Um they are proposing to um

6:43have vehicular access um from both First

6:46and um Second Street. Um, Second Street

6:49is a private street that is uh really is

6:52on a paper street is a paper street for

6:54most of the frontage of this pro of this

6:57property or most of the lot line of this

6:58property. So, um the ANR plan that

7:00should be endorsed concurrently um

7:03adjust the lot line to give this

7:04frontage on First Street. Um there is um

7:09there is as I mentioned also access off

7:11of Second Street where the road does

7:12exist. Um, our conditions of approval um

7:17are largely annotational. We're asking

7:19for an addition of a few trees um on the

7:22northern side of the Second Street

7:24driveway um where there's presently some

7:27shrubs proposed. Um we're also asking

7:29that um prior to the release of the

7:32decision, we do see um test pit results

7:34from the observation holes um for the

7:36subservice infiltration that um they're

7:38proposing. Um, and then we'd just like

7:40to see a a pedestrian walkway added from

7:42that second street driveway to the to

7:44the primary um entrance. Um, one

7:47condition of approval we have in the

7:49staff member that can be struck. Um, we

7:51have a requirement for a construction

7:53management plan and we realized we uh

7:55had inadvertently included some

7:57additional um CMP requirements that are

8:00typically more required of a of a more

8:01urban project. It was just an accidental

8:03copy paste essentially. So um for the

8:05condition two prior to issuance of

8:07building permit um that can just read a

8:09detailed construction management plan

8:10shall be submitted to the department of

8:12transportation mobility for review and

8:13approval that is informed by the hired

8:15general contractor. Um the rest of that

8:17about the plan shall include the

8:18following in addition that can all be

8:20struck. Um

8:23that's really all I have and I just also

8:25note this will also go to the

8:26conservation commission um for a filing

8:29under the local storm water ordinance.

8:31Um, yeah, glad to answer any questions

8:33you guys have.

8:34>> Thank you, Mr. Kerry. Any concerns with

8:36any of that from the applicant?

8:37>> No, the uh staff sent us uh those uh

8:40prospective conditions of approval

8:42earlier. We have no objections to them.

8:44>> Okay. Thank you. Um, anyone else from

8:47city staff on this item

8:53hearing? None. Is there anyone from the

8:55public who wishes to speak tonight?

9:00Seeing no one in the room. Is there

9:01anyone online?

9:02>> We do have one person online. Uh Harry

9:05Koka. I'm going to unmute you on our

9:07end. You just have to unmute on your

9:08end.

9:16>> Good evening everyone. Uh can you hear

9:18me? Okay,

9:18>> we can.

9:20>> Oh, great. Okay. So, uh my name is Harry

9:22Cook and I reside to at 32nd Street

9:25directly adjacent to the property that

9:27is proposed for this development. Um

9:32I just want for I just want to say that

9:34I'm not opposed to this. Uh I just have

9:36I'm just having a few concerns about uh

9:39mainly on the exceeding 15% slope of

9:43this property over this development that

9:45would be happening here. Um

9:48uh as as currently we're stated, Second

9:50Street is a um it's a private street uh

9:54not greatly maintained. Um where are a

9:58few houses here and then we use this

9:59narrow street for obviously for for our

10:01liwood and um all the water that comes

10:04from this side of the street comes runs

10:07out all the way down to and mainly to my

10:09property. Um so uh we've been noticing

10:12some development here in this uh

10:14property u and um there are few trees

10:18were removed uh from from that and then

10:20there are other concerns that if any

10:22other trees will be moved here because

10:23I'm seeing from the plan that there's a

10:25plan to be used from uh both streets

10:28second street and the first street uh

10:31entrance. Um so is there any other

10:34concerns that this uh you know this this

10:37the committee will have about drainage

10:39uh if there are any other trees will be

10:41moved or if uh this slot will be more

10:44than 15% what are are there any uh you

10:47know uh elevation or walls or uh and how

10:51this water will be contained to to this

10:53to to to this local property. This is my

10:55first question uh or concern. The second

10:58one is where is the um the construction

11:01traffic will be will be routed or be

11:04used. Again the concern is for second

11:06sheet which is um pretty narrow and then

11:11they would they would if if there's a

11:14plan to be used uh for second sheet for

11:17traffic that would raise concerns for

11:19the neighbors uh and uh traffic jams or

11:23traffic uh difficulties and for

11:26emergency uh as well. So um

11:32and if second street has been planned to

11:34be used for any any other construction

11:37will is there any plans for to maintain

11:40or to um you know sort of um redevelop

11:45this portion of second street which will

11:47be damaged obviously from the heavy

11:49vehicles and and and all that traffic.

11:52This all all I had. Thank you for your

11:54attention.

11:55>> Okay. Thank you very much. Um, I'll let

11:57the applicant address those if you like.

11:59>> Sure. Uh, just briefly, you know, to

12:01address drainage, we're proposing a, uh,

12:05large leeching trench on on the uphill

12:07side of the driveway from First Street,

12:10uh, leeching trenches on both sides of

12:11the driveway, uh, from Second

12:13[clears throat] Street, and a separate

12:14infiltration structure that's just

12:16receiving the house roof runoff. Um and

12:18we show um uh site exit mats, stone uh

12:23tire clearing mats on both streets

12:25because even though the construction

12:28traffic to construct the house will come

12:30from first street at for to do the

12:32driveway and the uh um infiltration

12:35trenches on that lead out to second

12:38street that really has to come from

12:40second street itself. So, you know,

12:42there will be some smaller portion of

12:44the traffic uh that will come from

12:47Second Street um in the course of

12:49construction.

12:51>> Okay. Thank you. Uh other questions from

12:54members of the public on this item.

12:58>> Uh no other members of the public. I do

12:59see we have um Leslie Rodriguez from DPW

13:02has raised her hand, so I think she may

13:03want to provide some um departmental

13:05comment. Um

13:07let's see. I think Leslie, you should be

13:10able to unmute um and we can make you a

13:13a host so that you can unmute.

13:15>> Hi everyone, this is Leslie Rodriguez

13:17from DPW. My only comment will be like

13:20the driveway on the first street have to

13:23be perpendicular to the road.

13:26>> Thank you.

13:29>> Okay. Thank you, Miss Rodriguez.

13:33Uh okay. Um, board members,

13:37who'd like to go first?

13:44>> Uh, to help make this easier, maybe I'll

13:45just call in folks. Mr. King.

13:48>> No comment on this one. Thank you.

13:50>> Thank you, Mr. Delera.

13:52>> Uh, likewise. No comment. Thank you,

13:54>> Mr. Tumi.

13:55>> Uh, no comment. Thank you,

13:57>> Mr. Rosende.

13:58>> No comments. Thank you.

14:00>> I also have no comments. So, I do

14:02appreciate you addressing uh how the

14:03construction traffic is going to work in

14:05the drainage for the uh a butter with

14:07questions. Um is there a motion on this

14:09item?

14:11>> Yep. I'd make a motion to approve item

14:15>> pardon. Sorry to interrupt. I think we

14:16should endorse the ANR plan first.

14:19Create the lot.

14:20>> Oh, okay.

14:22>> Move to endorse ANR 14C.

14:26[snorts]

14:27>> Second.

14:28>> On the motion, Mr. King.

14:30>> Yes.

14:30>> Mr. Gallera.

14:31>> Yes.

14:31>> Mr. Tumi.

14:33>> Yes.

14:33>> I vote yes as well. Four to zero. That

14:35motion passes.

14:37>> Ready for the big motion.

14:39>> Yep. I make a motion to approve the

14:42definitive site plan for item number

14:43three subject to the staff conditions as

14:45written and discussed during the

14:47meeting.

14:49>> Second

14:50>> on the motion. Mr. King.

14:52>> Yes.

14:52>> Mr. Delera.

14:53>> Yes.

14:54>> Mr. Tumi.

14:55>> Yes.

14:55>> I vote yes. Four to zero. That passes

14:58luck. Thank you very much for your time

14:59everyone.

15:03>> All right, next item on the agenda is

15:05going to be item number six which is 27

15:08through35 Chandler Street and 47 through

15:1153 Irving Street. This will be a public

15:13meeting for a definitive site plan.

15:23>> Good evening. Um, for the record, my

15:25name is Sam Alfronty. I'm a professional

15:26engineer in the Commonwealth. Um I'm

15:28here on behalf of Soleie Engineering. Um

15:30our office is at 2300 Crown Colony Drive

15:32in Quinsey, Massachusetts. Um I'm

15:34representing the applicant which is Go

15:36Venture Capital Group. Um their address

15:38is at one Merkantile in Worcester.

15:41Um so the project before you here for

15:44definitive site plan um review is an

15:47existing um vacant three parcels um just

15:51under point4 acres on the corner of um

15:53Chandler and Irving Street. Um

15:56the application proposes a 67,000 square

16:00foot gross floor area, 74 unit multif

16:02family development. Um

16:05there are no proposed parking spaces on

16:08the lot. Um and we do have proposed

16:12access as a covered walkway to the

16:14adjoining parking garage to the

16:15northeast. Um which is owned by the

16:18current owner of this parcel as well.

16:21Um, we have proposed, like I mentioned,

16:23a covered walkway that will provide

16:24connection um through a courtyard which

16:26is about 2,000 square feet to the rear

16:29um of the the development.

16:32And we have both external internal bike

16:35parking. Um we have a bike room um on

16:37the first level. Um this project did was

16:40before the zoning board of appeals um a

16:42few weeks ago to um for a front setback

16:46variance um which was unanimously

16:49approved. Um now the the front setback

16:52and the sighting of this building um

16:54provides a a continuation of the

16:55streetscape that exists um and that's

16:59really high level. Um we have a

17:01reduction imperous surfaces um so

17:03there's a reduction of peak flow. Um,

17:05we're tying into the Chandler Street

17:06utilities and we have received um

17:10some conditions of uh recommendations

17:13through staff that um we would like to

17:17discuss a few of them with you all. Um

17:20but for the most part there was about

17:22there was a handful that we're um in

17:24agreement with. Um there's just a few

17:26architectural ones that we would like to

17:28discuss.

17:29>> Okay.

17:32Um we can let maybe staff go through

17:34their portion and then we'll we'll get

17:35to those that work.

17:37>> Y

17:38>> sure through the chair. This is Michelle

17:40Smith in the city's planning division.

17:41So in front of you is a site plan

17:43application definitive site plan

17:45application for a project that involves

17:47um a property that was a former historic

17:49laundry which was demolished in 2025 as

17:52well as a singlestory um commercial

17:55building which was demolished as well.

17:57Uh so the site if you went by is sort of

18:00the remnants of uh the construction

18:02debris from those prior uh structures.

18:04So what the applicant is seeking to do

18:05is construct a five-story 67,000 foot

18:08multif family highrise um with 74

18:12dwelling units along with some common

18:14areas. This is in the BG6 in the CCOD,

18:17so the downtown district. So there's no

18:19parking requirements in this district.

18:21Um you heard the applicant talk about um

18:23how they plan to handle uh that with the

18:26adjacent commonly owned uh property. Um

18:29so we're looking for information in the

18:31form of a TDM plan to just kind of

18:33formalize that and and put that on

18:35record as a condition of approval. Um we

18:38have some requests to related to that uh

18:41interconnection if you will to the

18:42adjacent parking garage that's proposed

18:45um in order to facilitate uh easements

18:47to make sure that we have documentation

18:49about the rights for that. um wanted to

18:51have a little bit more understanding and

18:52hopefully the applicant can just clarify

18:54exactly how that is envisioned to work.

18:56If that would be restricted to residents

18:59only and specifically um or if folks who

19:01are in the parking garage, you know,

19:03public members of the uh members of the

19:05public using the parking garage could

19:06end up kind of out into the courtyard

19:08area or how that would work. So, we're

19:10looking for a little clarity on that. Um

19:11but otherwise feel that, you know, that

19:13that has been appropriately conditioned.

19:15Um it sounds like the applicant has um

19:18some comments. I know we had the chance

19:19to talk to them earlier about a few of

19:21those, but some that maybe remain

19:22unresolved. Um, just kind of

19:25highlighting some of the the themes of

19:27the comments and conditions that we do

19:29have. Um, we did ask that they

19:31incorporate some more prominent building

19:33identification. If we go to the Chandler

19:35Street elevation, um, they've got um,

19:37interesting masonry um, and generally a

19:40very attractive architectural design for

19:42the building um, with a lot of permanent

19:44um, masonry materials. And so you can

19:46see kind of the more prominent entrance

19:48there where they have an awning. So

19:49looking for them to enhance that a

19:50little bit further with numbers or

19:52signage for the building. Um also given

19:54the context and the location, this is

19:56about a block away from our local

19:58historic district and Crown Hill. Um and

20:00it's also adjacent to two structures

20:02that are located on the National

20:03Register of Historic Places. So um our

20:05preservation planner had comments

20:07related to the types of windows and the

20:09panes. So specifically we're looking for

20:11something with a different scheme. So

20:13looking for a 12 over 12 or or six over

20:15six. So we have that conditioned. Um

20:18we've also asked for some glazing within

20:20the trash room. There's a rollup door

20:22that you see sort of southwest on the

20:24plan here. Um that is for the trash room

20:28and we're typically the board has asked

20:29to incorporate additional glazing into

20:31those. So we've incorporated that as a

20:33condition. I think that's perhaps a

20:35condition the applicant wants to

20:36discuss. We've also noted a a if we go

20:39back to the floor plan, there's a a door

20:41in the trash room that just egresses out

20:43onto the north side of the property,

20:46which actually only is about a foot wide

20:48there. So, it would end up on the

20:50neighboring property. So, we've asked

20:51them to either shift that or provide

20:52evidence of an easement as a condition.

20:54Um, and incorporate if that door faces

20:56Irving Street, um, incorporate some

20:58glazing within that door as well. um

21:00even if it too ends up being frosted uh

21:03given the the kind of facilities in the

21:05room that it it's proposed to connect

21:07to. We've asked for a direct

21:09interconnection for a bike room that's

21:11located in the rear sort of top right

21:14corner of the first floor um to make

21:17that easier for folks who might be

21:19community via bike. Um so if you come in

21:22the only way to access that bike room is

21:23either to go on the main entrance and go

21:25all the way down the hall or if you're

21:26going from outside to go in through the

21:28kind of gated courtyard. So just to

21:30limit the number of doors that you have

21:31to open as a cyclist to encourage folks

21:33to be using that mode of transportation.

21:35Um so we've asked for a direct entry

21:37from the bike room from the courtyard.

21:39Um uh we have also um asked that all

21:44doors and gates be in swing. So again

21:47that the doors not swinging out onto the

21:49sidewalk into a pedestrian or passer by

21:51just given the location of the building.

21:53Um the building does essentially extend

21:55the street wall in this area which is

21:56great. Um it it does require technically

21:59a five foot setback because it

22:00incorporates ground flooror residential.

22:02That applicant did obtain a variance

22:03from the zoning board of appeals in

22:05order to enable that recently. Um so

22:07that that means we do have ground floor

22:09units um right up kind of to the

22:11sidewalk edge. Um so we can probably

22:13expect folks to have their shades

22:15closed. Um, so we had asked the

22:16applicant to look at um any potential to

22:20adjust the location of the bike room or

22:21the location of some of those common

22:23elements to pull those closer to the

22:25street to help increase activation. We

22:26understand that because of the building

22:28layout and design um the applicant isn't

22:30um able to do that. Um so just to

22:33highlight that that was something that

22:34we've discussed with them. Uh we do have

22:36a number of other conditions that I

22:38don't necessarily feel that I need to

22:40highlight. um many of our typical

22:42standard conditions including pedestrian

22:44diversion facilities for construction

22:46management plan given the urban context

22:48of the location. Um I think one comment

22:51that we have and this is not a condition

22:53um if we go to the elevations um they

22:56are less prominent for sure but uh

22:59wanted to ask the applicant to just

23:01discuss u the rationale for the

23:03southeastern and northern elevations

23:05which are are solid brick um they don't

23:07have any uh window openings uh likely

23:10for energy efficiency purposes um but

23:13these do face uh residential structures

23:15on either side so had a a comment or

23:17question about if there was any

23:19potential potential to incorporate

23:20additional glazing or architectural

23:22elements in these. Um it's not a

23:24condition certainly think that the

23:26building's been tastefully designed but

23:27just looking at any potential

23:29opportunities. So we um felt the the

23:31need to comment on that related to um

23:34that context. Um and

23:38beyond that I think I have covered the

23:41majority of the comments. The only

23:43remaining one that I wanted to mention

23:45was just the along the eastern side

23:47there is a again a walkway that's

23:49connecting from Chandler back into the

23:50courtyard. Um that area is lit um and

23:53it's well lit and we had a question just

23:55related to the phototric plan and if the

23:57modeling reflected the installation of

23:59the fence that's in that location um

24:01which would help reduce light levels but

24:02there's a little bit of spillover into

24:03the windows of the adjacent residential

24:05structure. So just wanted to confirm if

24:07if perhaps that wasn't included and that

24:09would probably bring the light levels

24:10down. Um, in any event, they're less

24:12than one foot candle, but still higher

24:14than we'd like to see at a adjacent

24:16residential property line. Um, there's

24:18no light, however, on the the northern

24:20side. So, it's really just in that one

24:22location that we had a comment. Um, the

24:24location here is within one of our

24:26transformative growth areas, which is a

24:28mixed use uh vision here. Um, obviously

24:31the property is is fully residential,

24:33but certainly um the area could benefit

24:35from some additional infill. So,

24:37exciting to see a project being uh put

24:39forward. happy to answer any questions

24:41or talk about any of the conditions

24:43further. I know the applicant wants to

24:44discuss. So, thank you.

24:46>> Yeah, it's probably a good time to to do

24:48that now. So, do you want to highlight

24:51the uh topics you'd like to cover?

24:53>> Yeah, we spoke with um the architect and

24:55I had a conversation with staff this

24:57afternoon. Um the the window um matrix,

25:02we're open and accepting of um including

25:06that condition. Um that's not an issue

25:08for us. um the glazing along the trash

25:12room rollup door. Um I I had a

25:14conversation with staff. The northerly

25:16door um that was added exiting the trash

25:20room, there was a condition that that be

25:22um relocated to the Irving Street um

25:25facade, which we're open to. We were

25:28hopeful that if that man door to be

25:30frosted um glazing, we could omit the

25:33rollup door being of glazing. Um,

25:37and that was something that I discussed

25:39with staff this afternoon. They left the

25:41condition as as written, but um,

25:44deferred it to to the planning board on

25:46that. We thought that was a compromise

25:48that we added that glazing for the man

25:50door, but the the roll-up door be

25:52maintained as as proposed, which is a

25:54solid um rollup door.

25:56>> So, we're located in the bottom left

25:58corner.

25:58>> I was going to say we're looking at the

26:00elevation now. It's that you're talking

26:01about the bottom left.

26:02>> Yep. And so the the man door that you're

26:05referring to is around the corner from

26:07the bottom left.

26:08>> It is. So on this on that bottom image,

26:10which is Irving Street looking at the

26:12building,

26:12>> the man door is is around that left

26:14side. So we'd be relocating that to

26:16basically the corner um just to the left

26:19of that roll black rollup door.

26:21>> Okay. And your request is to leave the

26:23door opaque if that's the case

26:26>> with the man door as fraud as glazing.

26:28Yeah.

26:30>> Um I can't speak for my colleagues, but

26:31that does seem pretty reasonable to me.

26:33Uh

26:36>> okay. Um and then the the other one we

26:39would request that um the board consider

26:43is the direct entry into the bike room.

26:45Um while we understand staff's um

26:48comment and and logistically it makes

26:51sense to minimize the doors you have to

26:52go through with a bike, um the site's

26:54really tight um with the covered walkway

26:56and the exter external bike racks. Um

26:59there's just not a whole lot of room to

27:00to fit that on the external on the

27:03courtyard side of it. Um, we also feel

27:05as if that bring it internal allows

27:07people um, entering the building through

27:10Chandler Street, which is the prominent

27:12entrance to access that without going

27:14through the courtyard. Um, because

27:16otherwise they would have to go around

27:18the building externally through the

27:20courtyard and then and then and then

27:23enter via the courtyard.

27:25>> Is it a single set of doors to get out

27:27uh into the courtyard? I I I know you

27:29got to go the door, you know, out of the

27:32>> out of the bike room itself, but then

27:33you're in the hallway.

27:34>> It's a double door into the courtyard.

27:36>> Okay. But not like an airlock situation

27:38where you have to go through two sets of

27:39doors.

27:40>> Oh, thank you.

27:41>> No, so it's in that it's in that

27:42vestibule.

27:43>> Yeah.

27:44>> Yeah.

27:45>> Okay.

27:47Um I'm sure we can discuss that uh when

27:49we get to board discussion.

27:52Speaking for myself, I also wouldn't

27:54have a problem with that. I think it's I

27:56as a cyclist I find it much harder to go

28:00through two sets of doors in a row than

28:02come out into the vestibial and then go

28:04through a set of doors.

28:05>> Okay.

28:06>> And then the only other one that I would

28:07like to discuss um which we're we're

28:09open to but um I just thought it was

28:12worth mentioning. So we had

28:13conversations um during the the meeting

28:17um with the fire department regarding

28:19access to the courtyard. Um, we'll have

28:22it was omitted on the plans and and and

28:24we're very open to this condition, but

28:25there is going to be gated access at the

28:27covered walkway to the parking garage to

28:29prevent um just anyone from entering the

28:32courtyard from the parking garage. Um,

28:34so that was a a catch from the staff

28:37that we will have that gated um with

28:39either key code or um fob access through

28:43for residents.

28:44>> Okay. So, it it's not shown on the plan,

28:46but staff wanted it shown on the plan.

28:48>> It was a condition that they

28:48recommended. Yep, understood.

28:51>> Otherwise though, um

28:54we're we're open to accepting all of

28:55them. Um and no questions or comments.

28:58>> Okay. Thank you. Um Michelle, is that

29:01anything you want to add to that?

29:03>> Um nope. It sounds like I mean

29:06ultimately depending on the discussion,

29:07the applicant's looking to strike F. Um,

29:10and then looking to strike D, but is in

29:12is willing to change E to include

29:15instead of half light glazing, full

29:17glazing for the door on Irving, if I

29:20understood that correctly.

29:21>> Yeah. Relocating it onto Irving. Yep.

29:26>> Okay. Uh, excellent. Thank you. Uh,

29:29comments from DPW on this.

29:32>> This is Lesie for DPW. Uh my only

29:37comment in addition to the one that we

29:39already submit is that uh they will this

29:44is not a condition for the planning

29:46board approval but it's a condition for

29:48the permit. I just want to let know the

29:50applicant that there is an additional

29:53bonding that is going to be required and

29:56the approximate it will be approximately

29:5921,000.

30:01Thank you.

30:03>> Okay. Thank you. Uh, is there anyone

30:06from the public wishing to speak on this

30:07item tonight?

30:10Come on up.

30:16[snorts]

30:18Uh, good evening everyone. My name is

30:19Darnell Dunn. I work with the uh,

30:21Chamber of Commerce and we just wanted

30:23to speak in support of this project. um

30:26for many of the reasons that were

30:27mentioned by staff.

30:3074 units creating housing in a um

30:33strategic development area um with a a

30:38lot of um curb appeal uh with the

30:40building as well by a developer who's

30:43demonstrated commitment to Worcester,

30:44has done other projects in Worcester and

30:46is based here. So um just wanted to

30:48voice our support. Thank you.

30:51>> Okay. Thank you. Anyone else in the room

30:53tonight? Come on up.

31:01Hello, my name is Emma Morrison. I'm a

31:03Worcester resident and I just also

31:05wanted to say that I support this

31:06project. Thank you.

31:07>> Thank you.

31:10Anyone else in the room?

31:15Seeing none. Anybody online?

31:18>> This is Steve Carrie in the planning

31:19division. Uh not seeing anyone with

31:22their hand raised.

31:24Okay, we can move to board discussion.

31:26Uh, Mr. King,

31:28>> just in general, the great design

31:30project. Happy to support it. No

31:32concerns with the items discussed.

31:35>> Okay. Thank you, Mr. King. Mr. Delera.

31:38>> Thank you, Mr. Chairman. Yes. Uh, I am

31:40in support of this and I am, uh,

31:42amendable to the applicant's response to

31:46staff comments. Thank you.

31:48>> Thank you, Mr. Delera. Uh, Mr. Tumi.

31:51Yeah, I'm supportive as well and agree

31:53with the conditions that we talked about

31:55uh being okay with the bike and also

31:57with the uh the door.

31:59>> Okay. Thank you. Uh Mr. Rosende,

32:03>> nothing further to add. Thank you.

32:05>> Okay. Um I would echo my colleagues

32:08comments. Uh this is right now sort of a

32:11hole in the ground um after we demolish

32:13the the laundry and I'll be really

32:15excited to see a project go in there. I

32:16think this going to be very attractive.

32:20Um, I think we're ready for a motion.

32:23>> I'll make a motion to approve new

32:25business item number six subject to the

32:27conditions as written and discussed

32:28during meeting.

32:30>> Second.

32:31>> On the motion, Mr. King?

32:33>> Yes.

32:34>> Mr. Delera?

32:35>> Yes.

32:35>> Mr. Tumi?

32:36>> Yes.

32:37>> I vote yes as well. Motion passes four

32:39to zero. Good luck.

32:40>> Thank you all very much.

32:43Uh, next item on the agenda will be

32:45number seven, 287 Providence Street, a

32:47public meeting for a definitive site

32:49plan extension of time.

32:52Thank you, Mr. Chairman. Uh, good

32:54evening, Steven Madow of Mrick. Uh, here

32:58on behalf of Park Silver Development

33:00LLC, the applicant, uh, requesting

33:03requesting an extension of time of two

33:06years as allowed under article 5 uh, 3

33:10section 3. F of the zoning ordinance for

33:12site plan approval. Uh we're requesting

33:15an extension of two years for the

33:17definitive site plan approval issued by

33:20this board on January 10th of last year

33:23uh for the development of a hotel uh on

33:26the property located at uh 277, also

33:30known as 287 Providence Street.

33:34>> Okay. Thank you. Uh staff, do we have

33:36any uh concerns with an extension? Uh,

33:40no concerns through you, Mr. Trey. The

33:41applicants applied for a building

33:42permit. They've just yet to obtain it,

33:44and so that's why the extension is

33:45necessary. So, they're actively moving

33:47forward um and making progress towards

33:49proceeding with construction as far as I

33:50understand. So, two-year extension is

33:52what they're seeking this evening.

33:54>> Okay. Thank you very much. Uh, anyone

33:56from the public want to comment on this?

34:01>> No one's in the room. Is anyone online?

34:05>> Uh, no members of the public online with

34:06their hand raised.

34:07>> Okay. Uh board members, if you have any

34:10comment, feel free to speak now.

34:12Otherwise, we will move to a motion.

34:18>> All right.

34:19>> I make a motion to approve item number

34:22seven, the extension of time.

34:25>> Second.

34:26>> On the motion, Mr. King.

34:28>> Yes.

34:28>> Mr. Delera,

34:29>> yes.

34:30>> Mr. Tumi,

34:31>> yes.

34:31>> I vote yes. Four to zero. Motion passes.

34:33Good luck.

34:34>> Thank you very much.

34:35>> Thank you.

34:36Uh, next up, item number 8, nine, Dalton

34:39Street, a public meeting for a

34:41definitive site plan.

34:46>> Good evening, Mr. Chairman, members of

34:48the board. Attorney Todd Broer from

34:50Fletcher Tilton. Here on behalf of the

34:52applicant, Cozy Corner LLC, sitting up

34:55here with me is Chris Keenan from Quinn

34:58Engineering, who's the civil engineer on

34:59the project, and our client, Amanda

35:02Fulco, has joined us online. I believe

35:05we're speaking to you tonight about a a

35:08a proposal to construct five units of

35:10residential housing on Dalton Street.

35:13Formerly a single family home on the

35:15property was demolished and this will be

35:17a you know groundup rebuild and reuse of

35:20the entire site. Um there are some

35:24visuals for you, but I'll I'll kind of

35:26just jump right in. This is a multif

35:27family low-rise structure, five units.

35:30Uh the owner's unit would be on the left

35:33side of the building, first and second

35:34floor. Two rental units on the right

35:37side of the building, one up, one down,

35:39and then two units over a garage towards

35:42the rear of the property. As you see

35:44some of the visuals, it is a fairly long

35:47uh site, fairly deep site, if you will,

35:49with a reasonable amount of frontage.

35:51The thought was to use that depth and

35:54construct the building sort of into into

35:56the lot. Uh it provides for a pretty

35:59nice yard area on the side of the

36:01property under under which is the some

36:03of the storm water elements for the

36:05site. Um I have I do have a a couple of

36:09notes on the staff comment letter that

36:12I'd like to discuss with you at at at

36:13the appropriate time, but we're

36:15generally in agreement with the you know

36:17the concepts and there weren't a ton of

36:19items in there. Anyway, this has gone

36:21through uh zoning board of appeal

36:23appeals process. We've received the

36:25special permit for the use special

36:27permit to reduce the parking from 10

36:29spaces to nine and for some slight

36:32dimensional relief on the driveway

36:35arrangement. Um, so this has been

36:37through

36:39uh zoning board of appeals and I think

36:40there's there's an obligation to go to

36:43conservation as well. And because I'll

36:45forget, I'll just mention there are a

36:47couple waiverss that staff noted we

36:49should ask for so we will do so. Um, I

36:52will always forget that one because it's

36:54not that prominent. Um, so on the on the

36:57recommendations, I don't know if you

36:59want to take staff comment now or later.

37:02>> Yeah, why don't we have staff go through

37:03their comments and then we can discuss

37:05the ones that you'd like.

37:06>> Thank you.

37:07>> Sure. Uh, this is Steve Kerry in the

37:08planning division. Um, this is before

37:11you because it triggers site plan

37:12approval because there are five units

37:14within the building. Um, three that are

37:16sort of situated more towards the front

37:17and access from the front of the

37:19building. um which does give sort of the

37:21um appearance of of a sort of two family

37:23with with two doors in the front and

37:25then there's an additional two units

37:26towards the back that are accessed um

37:28from from a rear access. Um

37:33don't have um extensive comments on

37:34this. Glad to talk through whichever

37:36ones the the applicant wishes to

37:38discuss. Um just to go through some of

37:40our uh conditions of approval. Um the

37:43applicant does propose a um sidewalk

37:47along the um length of the the frontage.

37:49Um DPW has requested that be um uh made

37:52of concrete with granite curbing. Um

37:55we're also asking that um we we had

37:59initially requested a um revision to the

38:02phototric plan that they had uh

38:04submitted. um that were comfortable um

38:07striking that condition. One eye. Um we

38:09had noted there wasn't on the phototric

38:11plan didn't show illumination between

38:13that sidewalk I just mentioned and the

38:15um and the points of conflict with any

38:17vehicle coming out of the driveway. Um

38:19but the Apple pointed out there is

38:20actually a street lamp right there on

38:22that corner that should provide adequate

38:24illumination. So we are not actually

38:25concerned with that revision to the

38:27phototric plan. Um otherwise I think the

38:30conditions of approval are uh fairly

38:33annotational. Um and I am uh yeah glad

38:37to discuss any that the board is

38:38interested in.

38:40>> Sure. So let's discuss those now.

38:42>> Okay. Thank you. Um so on on you know

38:45page two of the memo where the staff

38:47conditions are prior to release of the

38:49decision issuance of building permits.

38:51So one A talks about reconciliation of

38:54the civil and the architectural plans

38:56with respect to a couple of items and

38:57and we can certainly do that. This ties

38:59into B and C. I'm just kind of

39:02snowballing into that. I think the the

39:04issue with the um architectural plans in

39:07particular, the render rendering which

39:09you saw on the screen earlier is that

39:11those were done early in the process. Uh

39:13that rendering in particular was done

39:15early in the process and was meant to be

39:17a little more illustr illustrative than

39:20exact. And one of the issues I would

39:22point out is there there it doesn't show

39:24trees on the site plan. That was just so

39:27that we could show the elements of the

39:29site plan better. it wasn't meant to

39:32disregard the obligation to provide

39:34trees. So that that's carried through in

39:37in one of the other comments. But on on

39:40B and C, which are really more detailed

39:42architectural comments, we did discuss

39:45these at the zoning board meeting and

39:47they were items that were on the staff

39:49review memo at that time and it was some

39:52time ago, but I I I believe the

39:54discussion around those was those were

39:57sort of requests and we talked through

39:59why we didn't feel that those were

40:01appropriate, particularly the the detail

40:04on the rear elevation. There are a

40:06couple of jogs in the the roof line

40:08already. This was this was another

40:11detail sort of proposed or requested

40:13which we suggested that we were not in

40:15favor of adding. Um and then the awning

40:18above the slider. To be quite honest,

40:20I'm not even really sure what that was

40:22relating to, but we I think we did

40:24discuss that and came to the same

40:26conclusion that we thought it was a

40:27little bit of a an extra ask, if you

40:29will. So that's items B and C which we

40:32would ask to be stricken from uh the

40:35conditions. Uh on item F which is

40:39provide details of the proposed

40:41plantings. There is a small landscape

40:45table within the detail sheets. I I

40:47think it's sheet five sheet three which

40:51does show um nine trees and the species

40:54that would be planted. And I think on

40:56the plan set in in the earlier detail

40:59sheets or earlier uh site plan sheets it

41:02does show so show show excuse me shrubs

41:05but doesn't specify. We can certainly do

41:07that. Not intending to do anything other

41:10than plant the recommended species of

41:12course but I I think I just wanted to

41:15make sure everybody knew we we did

41:16provide those details for plantings. Um

41:20on item G

41:22this came up. Uh the request is to have

41:25concrete for the driveway treatment. I

41:28think this came up because the applicant

41:30proposed a section of concrete on the

41:32driveway towards the rear because

41:34there's a dumpster and it was felt that

41:38pavement might not hold up well. So

41:41perhaps concrete in that area would be a

41:43better material just for overall, you

41:45know, usability and so that it would it

41:47would it would have some longevity. that

41:50that transformed into, well, why don't

41:52you do the whole driveway in concrete,

41:53which is not what we want to do. Um, and

41:55I understand, you know, nobody wants a

41:58patchwork uh on the driveway, but the

42:00the portion of the driveway is is in the

42:02rear. I don't believe it's going to be

42:04visible from the public way. It's

42:06certainly it's a long driveway if you've

42:08seen if you've seen the plan. So the

42:11intention is not to create a huge area

42:14of you know mixing match of materials

42:16but we would like to stick with the

42:18concrete as shown on the original site

42:20plan and use pavement for the rest of

42:22the driveway. So that's item G which

42:25would need some modification if if folks

42:27were amendable. And then um Stephen did

42:30mention the phototric plan. We we we

42:33showed that there's a a street pole with

42:35a street light right there at the

42:37driveway entrance. So I did I I agree

42:39with that. uh change to the to the

42:41conditions and that was it.

42:44>> Um having briefly discussed this item

42:46with staff uh earlier, I I do believe uh

42:50and I don't mean to speak for you,

42:52Steve, but uh the concrete walk is un I

42:56think they were looking for you to

42:57clarify one way or another. We were all

42:58a little surprised. Nobody expects a

43:00full concrete driveway. Uh so no issue

43:04there. And I I think it's also

43:05understood that the uh street light kind

43:07of solves the the foot candle problem.

43:09Though what I'm not positive on is

43:11whether they want you to revise the plan

43:13to reflect that or if we're okay with it

43:15as it is. And Mr. Kerry might want to

43:17comment on that.

43:19>> Um apologies. Can you clarify which

43:21which condition you're referring to?

43:24>> Uh one eye, I think, is what we're

43:26talking about.

43:26>> That Yeah, that is fine to struck strike

43:28one eye. Um, if I could respond on um

43:31items uh B and C um well really A, B,

43:35and C. Um those were how the conditions

43:38appear in the um zoning board decision

43:41that was filed with the clerk. So um I

43:43mean you know we could strike them here.

43:46I do they would still need to be um

43:48reflected on plans submitted for prior

43:51to release of a building permit for the

43:53zoning board decision. Um, so I mean if

43:55the applicant feels that those were

43:56added in error to the ZBA decision and

43:58that was a scrier's error, we can we can

44:00discuss that. But again, they they are

44:02already in the ZBA's decision and

44:03typically our practice is to carry those

44:05over to planning board site plan

44:06approvals.

44:14I'm looking at those now. They do they

44:16do appear in the ZBA decision. And I

44:18know we discussed those but

44:21we can we can perhaps address

44:23separately.

44:25Okay. Um so what I'm I I I think I'm

44:29understanding is BNC you guys are going

44:31to uh take administratively let's say uh

44:34and G and I were comfortable striking.

44:38Is that accurate?

44:41>> G and I I think yeah we're definitely

44:42comfortable striking. Um can you

44:44clarify? You are going to leave B and C

44:46in. I think that's what I understood. Is

44:48that what I understood?

44:52>> We were looking to remove them, but I

44:54think I think the point was that they do

44:56appear in the ZBA decision, which is I

44:59guess counter to what I told you before.

45:01That was my understanding of the

45:02discussion, but what ended up in the

45:05decision

45:06>> through the chair too it, you know,

45:08ultimately their requirement of the

45:09zoning board decision, they'll have to

45:10be addressed and it'll have to be

45:11reconciled. So, it for sake of um in the

45:15event that there were to be an error for

45:17some reason, if you'd prefer to strike

45:18them, they're still going to be

45:20obligated to do that unless for whatever

45:21reason that was an error in the zoning

45:23board decision, which I don't

45:24necessarily think it was, but in the

45:25event that it was, then we're not

45:27perpetuating that in two locations. So,

45:29if that's a a concern, then maybe that's

45:31the best course of handling that given

45:33that said that if they're correct,

45:36they're going to apply whether we put

45:37them in our decision or not. And if

45:38they're not correct, we're just going to

45:39make more problems. I think we should

45:41strike them.

45:44Um, so

45:46I think we're in agreement on what the

45:47conditions are. Um, is there anyone from

45:50the public wishing to speak on this item

45:51tonight?

45:56>> Seeing none in the room, anyone online?

46:00>> I'm not seeing any members of the public

46:01online.

46:02>> Okay. Uh, Mr. King, any comments from

46:05you?

46:06>> No, seems to make sense. Thank you. U,

46:08>> thank you, Mr. Delera.

46:10Uh, no comment either. Thank you,

46:12>> Mr. Tumi. Uh,

46:13>> no comments. Thank you,

46:15>> Mr. Rosende.

46:16>> No comments. Thank you.

46:18>> Okay. Uh, I think we're ready for a

46:20motion and it's BCG and I that we're

46:22removing.

46:25>> Right. I make a motion to approve item

46:29number 8, 9 Dalton Street with GB, CG,

46:35and I being removed.

46:38Second

46:39>> on the motion. Mr. King,

46:41>> yes.

46:41>> Mr. Delera,

46:42>> yes.

46:43>> Mr. Tumi,

46:44>> yes.

46:44>> I vote yes as well. Four to zero. Motion

46:46passes.

46:46>> Thank you very much. Good luck.

46:50>> Uh, next up, item number nine, three man

46:53street will be a public hearing for a

46:55definitive frontage subdivision plan.

47:02Uh, good evening, Mr. Chairman, members

47:04of the board. My name is Donald O'Neal.

47:05I'm a lawyer here in Worester here this

47:07evening in connection with the

47:10definitive frontage subdivision plan for

47:13three Main Street. Um we did secure

47:17approval from the zoning board for the

47:20um division of this property into two

47:22lots. It's a pretty sizable lot, 140 ft

47:26of frontage, almost 19,000 square ft.

47:29The lot configuration is 59.2 two for a

47:34proposed two family um lot um to be um

47:40house to be built and then 80.2 ft of

47:44frontage for the existing multif family.

47:47Um there's plenty of parking on the on

47:49the property area for parking which um

47:53and also to curb cuts. So, I did um I

47:58believe staff is recommending um an

48:02additional street tree to be planted

48:05consistent with the subvision rules and

48:07regulations of which I have no objection

48:09to. Um and the other condition aside

48:13from that, I would ask for waiverss of

48:15um all the subdivisional rules and

48:18regulations except those pertaining to

48:19ANR plans and be happy to answer any

48:23questions you might have. Okay, thank

48:25you. Uh comments from staff.

48:27>> This is Steve Kerry in the planning

48:28division. Um as applicant noted, this is

48:31definitive frontage subdivision plan. Um

48:34uh effectively an ANR plan um except

48:37that they um did receive relief from the

48:40uh zoning board for um to have less than

48:43the required frontage. This is to um

48:46essentially allow for um the existing uh

48:49multif family to remain on its own lot

48:51and for a um second lot, lot two um to

48:55have a two family home on it. Um lot

48:59two, the two family home is going to

49:00have a new address of one man street. We

49:02have that as a condition of approval.

49:03And then as the applicant noted, we are

49:04asking for a tree planting just south of

49:07the driveway um which obviously is not

49:09shown on the um plan here, the driveway,

49:12but u we would want to see the existing

49:14and proposed tree planting um in the

49:16front yard south of the driveway um to

49:18be make sure the subdivision plan is in

49:20accordance with planting requirements.

49:22Um and that's all I've got.

49:24>> Thank you, Mr. Kerry. Uh comments from

49:26DPW?

49:30>> No comments. Thank you. Thank you, Mr.

49:33Rodriguez. Uh, anyone from the public on

49:35this item tonight?

49:40No one's in the room. Anyone online?

49:47This is Steve Carry in the planning

49:49division. Sorry, I'm having some

49:50computer trouble with viewing the online

49:53participants. Um,

49:57there is no one with their hand raised.

50:00>> Okay. Uh, board members, Mr. Mr. King,

50:03>> no comments. Thank you.

50:05>> Mr. Delera,

50:06>> no comment. Thanks.

50:09>> Mr. Tumi,

50:10>> no comments. Thank you.

50:11>> Mr. Rosende,

50:12>> no comments. Thank you.

50:14>> Uh, I also have no comments. I believe

50:16we are ready for a motion, but we do

50:19need to close a public hearing.

50:21>> Make a motion to close the public

50:22hearing.

50:23>> Second motion. Mr. King,

50:26>> yes.

50:26>> Mr. Delera,

50:27>> yes.

50:28>> Mr. Tumi,

50:29>> yes.

50:29>> I vote yes. Four to zero. Hearing is

50:31closed.

50:32>> All right. Make a motion to approve new

50:34business item number nine subject to the

50:36staff conditions as written and

50:37discussed.

50:39>> Second

50:40>> on the motion. Mr. King.

50:42>> Yes.

50:43>> Uh Mr. Galler.

50:44>> Yes.

50:45>> Mr. Tumi.

50:46>> Yes.

50:46>> I vote yes. Four to zero. Motion passes.

50:48>> Thank you.

50:49>> Good luck. Uh next up item number 10 12

50:52New Bond Street 0 Ararat Street 0 and14

50:55Indian Hill Road aka Lot 2C Street. This

50:59will be a public meeting for a

51:00preliminary site plan.

51:08>> You're just in time. Or maybe you were

51:10out there, but

51:23>> Sorry about that. Um, so again, my my

51:25name uh is Andrew Steiner. I am a

51:28project manager with Bowler here this

51:30evening on behalf of the applicant new

51:32garden park and their preliminary site

51:33plan submission. I'm joined this evening

51:35by uh Julie Holstrm u with the WBDC.

51:39As you may remember, we've been in front

51:41of you before for this this site

51:42specifically. Um most recently, I think

51:45it was back in was October of last year

51:49for the um reconstruction of Sea Street

51:52in that definitive uh subdivision

51:53submission

51:55that was ultimately approved. um

51:57applicant is working on kind of

51:59finalizing those drawings um and

52:01anticipates kind of starting

52:02construction ultimately um probably

52:06later this year. But prior to kind of

52:08running through the the preliminary plan

52:10that's in front of everyone, I just

52:12wanted to kind of set the stage relative

52:14to why we're here. Um because ultimately

52:16the the purpose of this of this plan is

52:19to really try to establish a kind of a

52:22zoning framework um for a future end

52:25user to ultimately come in and develop

52:26these plans or further further enhance

52:29them I'd say because again there's been

52:31a lot of thought that's gone in into

52:32these. It's kind of been designed for a

52:35speculative advanced manufacturing use.

52:39Um

52:40but ultimately the the WBDC doesn't

52:43intend to construct these. that would

52:44ultimately be an end user would

52:47ultimately come forward further further

52:49advance the plans as part of a

52:50definitive filing and then ultimately

52:52construct construct the project.

52:56Um so again just in terms of the the

52:58existing conditions which you can see up

52:59on on this on the screen site is cons uh

53:03comprised of of four parcels

53:06um which is 12 New Bond Street 0 Arat

53:10Street 0 and 14 uh Indian Hill Road. In

53:14total it's just over about 20 29 acres

53:16of of land. Um again the site's been

53:20historically part of the larger uh St.

53:22Cobain uh campus which is spans over

53:25about 100 acres and has been um in

53:27operation since the since the 1900s and

53:30again the site's historically had

53:32manufacturing uses on it.

53:35As part of the proposed plan I know

53:37there's a overall site plan. Yeah, you

53:39can see that see that. Now there's

53:40there's three uh buildings which are

53:42denoted as A, B and C. The A building is

53:46closest to Arat Street. It's the the

53:48smallest of the ones that are shown.

53:50It's roughly uh 59 59,800

53:54uh square feet of uh building with uh 76

53:57um constructed parking spaces. B falls

54:02in the middle. Um it's 147,500

54:05square foot uh building with um 149

54:10parking spaces and uh the the last one

54:13being the the biggest building closest

54:15to uh New Bond Street in the most recent

54:18approval of the the restaurant uh depot

54:20project that is 210,000 square ft um

54:24with 233

54:27um parking spaces as shown. You can kind

54:30of see it on this plan and we have more

54:32detailed site plans. There's some kind

54:33of gray boxes on the bottom which denote

54:36kind of like a landbanked parking.

54:38Really the purpose of those is to show

54:41that

54:43kind of provide flexibility for again

54:45that end user to come in and modify this

54:47plan to fit their their ultimate parking

54:49needs because again the site's

54:51historically been fully developed. Um

54:53and then those areas have have

54:54ultimately been been disturbed.

54:58From a uh storm water perspective, this

55:01the site uh generally drains to the the

55:04top of the page, which is actually the

55:05the west. There's um some resource areas

55:08up there which ultimately flow to um

55:11Weaselbrook, which um

55:14uh

55:16crosses New Bond Street. Sorry, that

55:18took me too long to come to come up

55:19with. uh crosses New Bond Street by the

55:21the former admin building and the uh

55:23Abby Kelly uh charter school in terms of

55:26the the storm water regulations. The

55:28site um actually is constituted as a um

55:32redevelopment as that it reduces the

55:34amount of impervious area that's

55:36historic historically been there um by

55:38roughly 2500

55:40uh square feet. that um results in

55:44obviously an improvement in the um storm

55:47water runoff leaving the site, but also

55:49the water quality and and recharge

55:50associated with the with the storm

55:52water.

55:53And on top of that, and kind of see it

55:55on on this plan in the the loading the

55:58loading areas, which are the um kind of

56:00the dark the dark gray boxes, um there's

56:04additionally um proposed underground

56:07storm water management systems which

56:08will provide a level of um treatment

56:11which um is over what what's on site

56:15site today.

56:18Utilities in general would be served. Uh

56:21the three buildings would have all new

56:23utility connections which would

56:24ultimately be served by um the new uh

56:27connections on uh called Sven Pulson

56:30here um formerly formerly Sea Street.

56:34It's ultimately subject to change those

56:36locations depending on a on a final site

56:38plan, but um or final definitive plan,

56:41but again, those connections would be

56:42made in accordance with the the city

56:44standards as part of that definitive

56:46filing.

56:48Uh I know is as part of the the memo

56:51there was a we provided an just a

56:53general exhibit um for a dedication area

56:56just to kind of show placement and uh

56:58kind of the general location

57:01that would ultimately have to be f

57:02further refined as part of a uh future

57:05filing. But the

57:08calculations for for storm water and

57:11just in general impervious coverage in

57:14general accounts for that. So the the

57:17project would still be constituted as a

57:19as a redevelopment even with the

57:21development of that future future

57:23dedication area.

57:26So we've received some comments and

57:29we've we've kind of gone through um been

57:31coordinating with staff on on this. It's

57:33because again it's a bit of a unique uh

57:35submission being a a preliminary plan.

57:38We did receive some uh comments from the

57:41uh Worcester uh DPW water department

57:43which ultimately um requested approval

57:47of this plan uh contingent upon us

57:49setting up a meeting that that meeting

57:50is already we've already started that um

57:53that coordination

57:55but there's really again so that's kind

57:57of the project at a at a high level. U

57:59happy to go into any additional detail

58:01or answer any questions that you might

58:02have, but again I think there was some

58:06kind of conditions outlined in the in

58:08the staff memo which we want to um speak

58:10to more um you know pending any

58:13questions from the board and at a

58:15minimum I think we'd be looking to um

58:18have some wording changes but we're

58:19hopeful that that some of these would

58:20ultimately be able to be stricken um

58:24from from the recommendations given that

58:26these would have to be part of a

58:28definitive filing.

58:30anyway in the in the future.

58:34>> Okay. Thank you. Um I I'll just note for

58:37members of the public and my colleagues

58:39who uh may not have seen one of these

58:40before. So this is a preliminary site

58:43plan. Uh we've seen a number of site

58:44plans uh already tonight. Typically

58:46that's a a filing where an applicant

58:49comes before the board and explains um a

58:53number of things related to traffic and

58:54storm water um connections to

58:56infrastructure, things like that. uh to

58:58the board and the board weighs in on

59:00those and the public has the opportunity

59:01to comment.

59:03Sometimes uh projects do that in a

59:05preliminary way uh to often because

59:08they're big and complicated projects uh

59:10to get initial feedback before they

59:13spend a bunch of money developing their

59:15plans uh with their engineering firms

59:18further um only to come before us and

59:20have us say no you can't do that and

59:22have to change a bunch of things. This

59:24one's a little unique uh in that I think

59:26you guys are really early. Uh I hear

59:29what you're saying about um uh the

59:33applicants basically saying, "Hey, we'd

59:34like to

59:36um remove some language in the uh in the

59:41basically the the staff memo that has

59:44the conditions of approval, which are

59:46not really an approval in this case.

59:48It's just feedback uh that the applicant

59:50may wish to consider as they're

59:52developing their definitive site plan.

59:54Um

59:56I think that's a you know we can

59:58certainly talk about it. I hope we don't

59:59talk about it for too long. uh just

1:00:02because as you've noted um whatever

1:00:05happens in the hopefully ultimately very

1:00:08successful development of this area uh

1:00:12there's going to be a definitive site

1:00:13plan where all those things are going to

1:00:15get um either discussed if they're

1:00:17relevant or not if they're not. So, uh,

1:00:21I just would preface staff's comments

1:00:23and, uh, to my colleagues w with those

1:00:26items.

1:00:28>> Uh, through the chair, Michelle Smith

1:00:29and the city's planning division, you've

1:00:31highlighted in detail what the

1:00:33preliminary site plan uh, process is.

1:00:35Um, it's one that that we don't see all

1:00:37the time, but the board has seen before.

1:00:39Um, as you stated, for more complicated

1:00:41or larger sites or multi- um, lot sites

1:00:44that are being uh, kind of thought

1:00:46through the development scheme. So an

1:00:47example the table talk site the board

1:00:49had seen um basically a redevelopment

1:00:52plan um sort of showing the different

1:00:54phasing and sites as part of that. So

1:00:56similar here um so the applicant is

1:00:58seeking uh the board's consideration and

1:01:00feedback related to the potential

1:01:02construction of these three

1:01:03manufacturing potentially manufacturing

1:01:05buildings. Um each would be located on

1:01:08their own lot. Um the end lots have

1:01:11frontage at the moment and the middle

1:01:13lot as shown here um none of which

1:01:16exist. They're all one lot today. Would

1:01:17not have frontage until the CC Sea

1:01:20Street subdivision uh whatever its

1:01:22future name comes to fruition as uh that

1:01:26particular subdivision, the layout of

1:01:28that street. Once that's final, there'll

1:01:29be there'll be frontage legally, but

1:01:31until that time today, there is not. So,

1:01:33uh we have notes in here about um

1:01:35requiring the submission of the ANR and

1:01:36creating the frontage as part of that um

1:01:39as you might expect. Um, but basically

1:01:41this is about uh 417,000 square feet of

1:01:45potential square footage for uh advanced

1:01:48manufacturing ideally and or other

1:01:51potential uh tenants or uh owners in

1:01:55this location as part of the larger

1:01:56green tech park redevelopment. The board

1:01:58heard at their last meeting um

1:02:01discussion for another lot that's within

1:02:02the same area uh where there was a

1:02:04restaurant depot facility that was

1:02:05approved. Um not dissimilar from that

1:02:08there are a number of parking spaces

1:02:10that are proposed here. So in the the

1:02:12sort of max buildout as it's

1:02:14contemplated with the potential

1:02:15landbanked parking um which is

1:02:18essentially the future expansion

1:02:20typically not something we condition or

1:02:22do. You either build it or you don't.

1:02:23You design it in a way and we approve

1:02:24that and you build that um is typically

1:02:26how we handle that. So um you know it's

1:02:29been designed with the potential for

1:02:31that. they've calculated from a storm

1:02:33water perspective management of all that

1:02:34impervious surface in the calculations

1:02:37that they've provided as part of this

1:02:39this larger project. So a lot of our

1:02:41comments relate to sort of refining that

1:02:43and again um the the point of these

1:02:45comments being uh directive in the sense

1:02:48of what the the purpose of the plan is.

1:02:50So specifically you know the the board

1:02:52has the option to approve the

1:02:53preliminary plan. It can approve it with

1:02:55modifications that are requested or

1:02:56suggested or it can basically just

1:02:58specify these are issues you know and

1:03:00adverse um potential issues that need

1:03:03resolution. Uh essentially not approving

1:03:06it in that sense and saying these are

1:03:07the things we want you to resolve before

1:03:09the next um iteration with the

1:03:11definitive. Ultimately the preliminary

1:03:13doesn't allow anybody to build anything.

1:03:15Uh requires a definitive approval prior

1:03:18to to any construction. So um we have a

1:03:20lot of content in here. Um, most of this

1:03:22is intended to be educational for both

1:03:25the applicant owner uh and the potential

1:03:28future developers of these lots in terms

1:03:30of the typical expectations and requests

1:03:31that staff and the board uh make for

1:03:34these types of projects. So, more as a

1:03:35communication item to help highlight and

1:03:37and assist with those future owners

1:03:40tenants as they develop their plans and

1:03:42progress those plans into something um

1:03:44that would be submitted for a definitive

1:03:45trying to highlight the provisions of

1:03:47the code or the requirements that the

1:03:48board typically imposes that maybe

1:03:50aren't codified in the code or maybe in

1:03:52weird places that aren't easy to find.

1:03:54So, the intent of staff comments is to

1:03:56try to help facilitate that and make it

1:03:58easier to digest um for a successful

1:04:00application hopefully. Um and so uh one

1:04:04thing that I I do want to call attention

1:04:06to the the property if folks are

1:04:08familiar with obviously the former St.

1:04:10Cobain and prior to that Norton Company

1:04:13manufacturing campus as part of the

1:04:15larger redevelopment of the site there's

1:04:17a memorandum of agreement with the

1:04:18historic commission as well as MHC um

1:04:22based on the the loss of those buildings

1:04:24and so there is a requirement for a

1:04:25dedication area which would be proposed

1:04:28essentially as part of one of these lots

1:04:30um presumably and so we are looking for

1:04:32specifics on ownership maintenance how

1:04:35that would work who's going to be

1:04:36responsible ensuring that that isn't

1:04:38something that the city becomes

1:04:40responsible for wanting to understand

1:04:41that. So, as part of a definitive

1:04:43submission, we've called, you know,

1:04:44attention that we'd be looking for those

1:04:46specifics to better understand that and

1:04:47wanting to make sure that that area was

1:04:49included, for example, on things like

1:04:51storm water report um and calculations

1:04:53and that the report is reflective of

1:04:54that because it could change some of the

1:04:56the standards and specifications or the

1:04:58way that those forms need to be filled

1:04:59out. So, we have that listed out in our

1:05:02comments. Um, ultimately, as we've

1:05:05stated with our discussion about

1:05:06Restaurant Depot, the lot of parking,

1:05:08obviously the end user will sort of

1:05:09dictate the needs and demands of what is

1:05:12operationally happening and what's

1:05:14necessary. Um, whether these are fleet

1:05:16vehicle parking spaces or if they're

1:05:18customer parking spaces in some way in

1:05:20addition to employee spaces, you know,

1:05:22if it's more tractor trailer or if it's

1:05:24more automobile, um, standard personal

1:05:26automobile. Um so again a lot of our

1:05:28feedback is is general and broad and

1:05:30thinking of the potential future uses.

1:05:32So we have comments but not conditions

1:05:34relating to encouraging them to think

1:05:36about um potential electrification for

1:05:39fleet vehicles. You know if there is

1:05:40some need for charging of fleet vehicles

1:05:42to make sure that there's appropriate

1:05:44infrastructure installed or planned for

1:05:46in that regard. Um the building code

1:05:48requires a certain amount. Those don't

1:05:50have to be online. Um and then there's

1:05:52the reality of you know how an operation

1:05:54might work. If you look at um something

1:05:56like an Amazon, right, where they all

1:05:57have all the electrical vehicles,

1:05:59electric vehicles, um you'll see all the

1:06:01chargers, right? So, just thinking all

1:06:02the different end users that may have

1:06:04these uh types of needs and making sure

1:06:06that we've kind of planned for that. So,

1:06:09that's included in our comments. Um

1:06:11normal items like white roof or solar on

1:06:15on buildings. um ensuring that um we

1:06:19have an understanding and orientation of

1:06:21of the buildings as convenient as

1:06:24possible for all types of users and

1:06:26considering folks that are coming not

1:06:28just via automobile or truck uh

1:06:30depending on the use but that there

1:06:32might be employees that are taking

1:06:33public transit or walking or biking to

1:06:35work um that are working here and

1:06:38wanting to make sure that there are

1:06:39convenient routes for them that are

1:06:40provided from the surrounding street

1:06:42network into the facilities that they're

1:06:44located in. So, while I could go through

1:06:47all of those things, um I want to call

1:06:49attention to a few because I know we've

1:06:50had recent discussions on these and I

1:06:52think possibly some of these are items

1:06:53that the applicant would like to

1:06:54discuss, although I don't know for sure.

1:06:56Um so, we'll ultimately turn it back

1:06:58over to them to to clarify that. But, um

1:07:01specifically, we have uh called out as

1:07:04as conditions, if you will, for the

1:07:06revised plans um requesting that they

1:07:08reflect covered exterior bicycle parking

1:07:10andor interior bicycle parking, which is

1:07:13always our preference. um just for use

1:07:16of employees. So that's 1 C 1F. We have

1:07:19a request to incorporate compact spaces

1:07:21where appropriate for up to 25%. So

1:07:24that's the allowed by right.

1:07:26Understanding that not every use is

1:07:28going to have um a need or for that

1:07:31quantity of the overall supply um but

1:07:34perhaps of you know at least the

1:07:35employee count 25% can be provided um in

1:07:39compact to help reduce again impervious

1:07:40surface. Um we have uh pulled from our

1:07:44lengthy discussion about this at the

1:07:46prior meeting around rooftop mechanicals

1:07:49basically asking for those to be set

1:07:50back and not visible from the street and

1:07:52if they are visible from the surrounding

1:07:54street network with the exception of the

1:07:56highway so 190 um that they be screened

1:07:59to minimize the appearance. So we do

1:08:01have that carried forward um from the

1:08:04prior discussion. I know the chair

1:08:05wasn't here um but there was lengthy

1:08:07discussion around that for the

1:08:09restaurant depot site. Um there are a

1:08:11few locations where we're looking for

1:08:13additional trees based on the plan

1:08:15that's provided where it wouldn't comply

1:08:16with the requirements of the ordinance.

1:08:18So carrying forward the requirements

1:08:19that we have for planting of trees um

1:08:23and

1:08:25a requirement for the phototric plan to

1:08:27be adjusted reflecting the final layout.

1:08:30um putting together the putting some

1:08:33specifications on what we typically are

1:08:34looking for in a lighting plan, which is

1:08:36usually at least a one foot candle of

1:08:38light in areas where there's potential

1:08:40for pedestrian vehicle complex. Um and

1:08:42generally speaking, avoiding excess

1:08:44light over a 10 foot candles. Um you

1:08:47know, certainly exceptions can be made

1:08:49in in areas that maybe are exterior

1:08:51loading and require that type of

1:08:52accommodation, but generally speaking,

1:08:54that's what we're looking for. 3,000 uh

1:08:56Kelvin for lighting, 25 foot high max in

1:08:59a context like this, whether it's a a

1:09:01light pole or a wall pack. Um so again,

1:09:03some of the things that end up being

1:09:05discussion points at at subsequent

1:09:07planning board meetings, trying to kind

1:09:08of be clear about that upfront as an

1:09:11expectation. So all of that is

1:09:12essentially in line with what the board

1:09:14discussed and approved for the

1:09:15restaurant depot site. Um we have um

1:09:19again the dedication area cross

1:09:21easements a lot of the the sites that

1:09:24you see here have inner linkage um which

1:09:26may or may not be proposed but if it is

1:09:28proposed wanting to make sure they're

1:09:29appropriate easement areas demarcated

1:09:31and clarification about who would be

1:09:33responsible for maintaining uh those

1:09:36facilities. Um I mentioned updates to

1:09:38stormwater report um calling again

1:09:40attention to specific questions

1:09:42requiring test pit data of which um soil

1:09:46uh characterization we don't have. Um

1:09:48the frontage as I mentioned in the ANR

1:09:50and also you'll recall that there were

1:09:52discontinuences of prior streets within

1:09:55the larger campus including store

1:09:57street. There's a former private street

1:09:59right ofway um that sort of bisects this

1:10:01parcel. And so wanting to ensure that

1:10:03where that overlaps with any of the

1:10:05proposed buildings they have gone

1:10:06through the process to extinguish or

1:10:08provide evidence satisfactory to our law

1:10:09department that any of those rights of

1:10:11others have been extinguished which most

1:10:12most likely don't exist but wanting to

1:10:14have that documentation um to avoid any

1:10:17issues there for zoning compliance or

1:10:18otherwise. Um so those I think are are

1:10:22sort of the main pieces that I wanted to

1:10:24highlight. Um, I'm more than happy to to

1:10:28discuss any comments, questions, etc.

1:10:31But the applicant will ultimately, in

1:10:33addition to a definitive site plan from

1:10:34this board, require a notice of intent

1:10:37from the conservation commission u for

1:10:38any of the work given the location um

1:10:41within the city storm water protection

1:10:42zone, but also given the location for

1:10:44some of the work within 100 feet, I

1:10:46believe, of a wetland nearby. So again,

1:10:49happy to answer questions. Thanks.

1:10:52>> Okay, thank you, Miss Smith. Um, any

1:10:54additional comments on this from DPW?

1:10:58>> This is Leslie Rodriguez for DPW. We

1:11:00don't have any comment at this moment.

1:11:02Thank you.

1:11:03>> Okay. Thank you. Um, so what conditions

1:11:06uh would you guys like to discuss?

1:11:10So I I think we want to I guess further

1:11:14just to make sure that we have a clear

1:11:16understanding

1:11:20if all of these recommendations are

1:11:23adopted this evening. We now have

1:11:25preliminary site plan approval and we

1:11:29have a end user that comes back in for a

1:11:32definitive site plan approval. Is this

1:11:35preliminary site plan approval going to

1:11:37have to be used as you know the the the

1:11:40the Bible for them to say well we need

1:11:43to meet this we need to do that or again

1:11:46because we do not know who these end

1:11:49users are. We're essentially trying to

1:11:52the set the table um for for what we're

1:11:55trying to do here rather than kind of

1:11:57laying everything out. we're trying to

1:11:59make it a little bit easier um for for

1:12:01the next end user um to put the

1:12:03specifics to it. So, I guess we're

1:12:06before we, you know, kind of start going

1:12:08through and crossing things out, we just

1:12:10want to make sure that we have a clear

1:12:11understanding of when we get a

1:12:14preliminary site plan approval with

1:12:17these conditions, what does that mean

1:12:19for the definitive application when it

1:12:21comes down the road?

1:12:22>> Oh, I I think I can answer that

1:12:24question. Uh our our goals are probably

1:12:26aligned with and and when I say are, I

1:12:29mean yours as the applicant, us as the

1:12:32board and staff as as the folks who do

1:12:34the line share the work. Uh the what

1:12:38what a preliminary site plan approval

1:12:41does for you is lists the things we

1:12:43might care about is particularly in this

1:12:44context where as as I noted were almost

1:12:48earlier than we would even normally see

1:12:49it because you don't know who the tenant

1:12:52is yet uh or the owner or however this

1:12:54is going to work. Um, and so they're

1:12:56going to come here and maybe they're a

1:12:57high-tech manufacturing use. Maybe

1:12:59they're more of a uh similar to

1:13:02restaurant depot, like a I don't know

1:13:03what those are called, but logistics uh

1:13:06use. Um, the considerations are going to

1:13:09be different, but these are the types of

1:13:10things we are going to ask about uh and

1:13:13consider. um you know

1:13:17without picking any one particular topic

1:13:20but like how adequate are the pedestrian

1:13:22facilities given what type of use it is.

1:13:25Uh there's always going to be that given

1:13:27what type of use it is component to it.

1:13:29It's not a preliminary subdivision. Um I

1:13:33certainly hope this wouldn't be the

1:13:34case, but if they never read it, they

1:13:37would just be less informed entering the

1:13:39process of a subdivision. I I would I

1:13:41would suggest that most of this stuff,

1:13:43if not all of it, is already going to be

1:13:45in a definitive application that they

1:13:47put in. So, in I guess when we were

1:13:50looking at this,

1:13:52no offense intended, there's some

1:13:54redundancies here that we're saying like

1:13:57we know that this is this is just the

1:13:59the start of the picture and when we

1:14:02have that end user identified, the the

1:14:04the color of the picture is going to be

1:14:06filled in after that. So that's what

1:14:08we're So that's what we're trying to

1:14:11make sure that we have a a clear

1:14:13understanding of um and really trying to

1:14:16also

1:14:17set the expectations for the end users

1:14:19that are coming in here so that they

1:14:21don't look at a sheet of paper and say,

1:14:23"Oh my goodness, these are all of the

1:14:25items that we need to do." They're going

1:14:26to look at the definitive application

1:14:28and see what they need to provide to the

1:14:30city anyways.

1:14:32>> That's true. Um but there's hopefully if

1:14:35they look at this, it's a lot clearer.

1:14:37uh than just starting starting from

1:14:39scratch because sure

1:14:40>> there are the rules and regulations and

1:14:41then there's how the city might choose

1:14:44to interpret them or which rules and

1:14:45regulations they care the most about. Uh

1:14:47and I think that's well codified in a

1:14:50preliminary um and I keep saying

1:14:51subdivision. I'm sorry. Uh

1:14:53>> I was doing the same thing earlier.

1:14:54[laughter] You're in the same boat.

1:14:55>> Yeah. Uh it's it should be codified

1:14:58here. Um so I think that's the intent.

1:15:02Uh, and like I said, we can certainly if

1:15:04there are specific things that you're

1:15:05like, I I don't think this makes sense,

1:15:07by all means, let's talk about it. Uh, I

1:15:09I just think um hopefully we don't talk

1:15:13about it too much because who who knows

1:15:15what's going to happen.

1:15:16>> Sure.

1:15:16>> Yeah.

1:15:16>> Yep.

1:15:17>> No, absolutely. So, I mean, Andrew,

1:15:20please step in if you if

1:15:23>> I think just just in terms of that, I

1:15:24mean, again, I know this is the intent

1:15:26is to kind of outline the framework as

1:15:29as we've all been discussing. There's

1:15:32just again some I think on a high level

1:15:33some wording changes that that we we

1:15:35would recommend. Uh mainly again kind of

1:15:38like on the the first paragraph as

1:15:39you're looking right right above um one

1:15:43where it says you know the the plan

1:15:44shall shall require and again you kind

1:15:47of list out everything's listed out

1:15:49below that where it's really like we

1:15:51don't we don't know what those future

1:15:52plans are going to be. So again, we'd

1:15:54recommend um kind of a wording change

1:15:56where the the the plan shall explore the

1:16:00following modifications as part of a

1:16:02definitive sub sub see I did it too as

1:16:04part of a definitive uh submission uh by

1:16:07a by a future end user.

1:16:15>> Um I think I see your point which is

1:16:17that it might be clear that this was a

1:16:19preliminary approval if it

1:16:24In this case, because of the sort of

1:16:27extremely extra preliminary nature of

1:16:29this, uh, if we were if we we modified

1:16:33that that first clause slightly,

1:16:36I guess just how detailed about this are

1:16:38we going to get? Is there are there many

1:16:39more of these in this document that

1:16:41you'd like to change or

1:16:42>> I I I don't I don't think so. Um,

1:16:45there's just a couple others. Um, just

1:16:48quickly to to rattle off, I would

1:16:50request that item O be removed. There

1:16:53are no um no active RTN's on the site.

1:16:57Um, so I I don't think that that is a a

1:17:01relevant item to be um located on here,

1:17:03so that should be removed. Um, there's a

1:17:06couple of others, Q&R. Um, I would ask

1:17:09that perhaps we put in some language

1:17:11saying that that information would be um

1:17:14submitted prior to construction

1:17:18um because again we can't we can't

1:17:20provide uh phasing or sequencing of

1:17:23plans um without um knowing what's going

1:17:27to be built there. Um, and then items

1:17:32five, six, and seven, as as Miss Smith

1:17:34uh referenced, um, those items have been

1:17:37completed. Um, so I don't know that

1:17:39those necessarily need to be included in

1:17:41there. I mean, there obviously certainly

1:17:43no harm in being there, but um those

1:17:45items have been those have been

1:17:48addressed, I believe.

1:17:51>> I'm not sure where I'm looking at the

1:17:53same um document. looking at the old

1:17:56>> uh do we maybe change the numbering?

1:17:58>> Um am I understanding five referring to

1:18:01the survey?

1:18:03>> Correct.

1:18:04>> And then six with respect to the

1:18:06extinguishing. I I don't believe we have

1:18:08that. If I may be a miss, but I don't

1:18:11believe we have that. The survey, I

1:18:12think we have a digital version, but I

1:18:14don't think we have one that's sealed.

1:18:16>> Okay. And then for the um discontinuence

1:18:22um I I think um again that we were still

1:18:26looking for explanation for that related

1:18:28to because of the future reconfiguration

1:18:31of the adjacent right ofway. So these

1:18:33are all againformational

1:18:35items I think um with the intent of of

1:18:38clarifying that's information that staff

1:18:39and the board would want to understand

1:18:42it in the future. So I guess you know

1:18:44ultimately my recommendation would be to

1:18:46leave them. These are the comments that

1:18:48we put forward as sort of clarifications

1:18:50for the purpose and understanding that

1:18:52ha that staff have there was a

1:18:54preliminary plan submitted that staff's

1:18:57responsibility to review it and advise

1:18:58you on what you would need were you to

1:19:00proceed with this. I understand that the

1:19:02intention isn't necessarily to do that

1:19:04but we also don't want to end up in a

1:19:06situation where someone submits a

1:19:08definitive and then says well it wasn't

1:19:10in the preliminary comments. So the the

1:19:12the rationale for the approach is that

1:19:15that is basically the the process is

1:19:18effectively supposed to perpetuate these

1:19:21are the things that we can expect and we

1:19:23need for the submission. Obviously that

1:19:25may change. Um we're open to adjusting

1:19:27the the sort of front-end language I

1:19:29think to to clarify that. That's no

1:19:31problem at all. But I think the the

1:19:32whole point of the review to just strike

1:19:34all of these items would I mean I don't

1:19:38believe we have that information. we can

1:19:39remove O um related to the release

1:19:42tracking numbers. I would just say if

1:19:43there's no ref if there are none, you

1:19:45don't need to do anything the way that

1:19:46it's that it's worded. If there's a

1:19:48concern about the language because it's

1:19:49advertising something that like isn't

1:19:52actually there, I I think that's fine.

1:19:54Um but for the other items, I don't I

1:19:56don't believe we do have those. Um and

1:19:58again, I might be mistaken, but I think

1:20:00ultimately we would want that as part of

1:20:02the definitive. not a typical thing that

1:20:05would be required of most applications

1:20:07because those are unique site

1:20:09circumstances and nuances I think so I

1:20:11think it behooves the board to include

1:20:13them but ultimately it's the board's

1:20:15discretion you can decide how you want

1:20:16to handle this um but I would say if if

1:20:20fundamentally if there's something that

1:20:22comes in different than this you can

1:20:24basically throw this out the window

1:20:25because we're going to review it based

1:20:26on all the standards anyways so then the

1:20:29the question is like why are we here

1:20:31right um so I think The point was we

1:20:33reviewed it. These are the comments that

1:20:34we're advising on based on what's in

1:20:36front of here. If if the board doesn't

1:20:38feel that any of that's appropriate or

1:20:40disagrees with those comments and

1:20:41wouldn't want to see those things, I

1:20:43think the idea is to try to express, you

1:20:45know, points of conflict. So, for

1:20:47example, you know, the lengthy

1:20:48conversations we had about lighting and

1:20:50signage uh or screening rather at the

1:20:52prior meeting, the the idea is if

1:20:54there's a going to be something like

1:20:55that that's a potential sticking point,

1:20:57it should be discussed here so that it's

1:20:59not a surprise later. So again, the

1:21:01intent of these conditions were to try

1:21:03to to facilitate anything like that um

1:21:06coming forward. So I think you know if

1:21:09you modify the language on the front

1:21:10end, it's just a a language for

1:21:12recommendation. So um you can just say

1:21:14the the board if the board votes to

1:21:16approve this, your recommendation is

1:21:18that the definitive submission include

1:21:20the following and that's basically your

1:21:23recommendation.

1:21:24>> Yeah, I would say includes consideration

1:21:26of the following. Um

1:21:29because that probably gets us to the

1:21:31point of these are things you might have

1:21:33to think about. But if uh all the the

1:21:37streets and the subdivisions and

1:21:38everything is all done already,

1:21:40obviously some of these points don't no

1:21:41would no longer apply in that case.

1:21:43>> Uh so

1:21:45I'd be okay with that. Um do you guys

1:21:48have other specific things that you you

1:21:51want to discuss? I think there was just

1:21:54um item item 14 which again kind of

1:21:56references that the plan shall be in

1:21:58compliance with the the Worcester zoning

1:22:01ordinance which obviously that's that's

1:22:02the goal. I would just request language

1:22:04be added maybe to to the end of that

1:22:06except for waiverss have been requested

1:22:08and granted by the board by kind of a

1:22:10future future applicant again just

1:22:12trying to add flexibility for someone to

1:22:15come in in the future should should they

1:22:16need some relief in some way.

1:22:19>> I mean it's not it's not I would tell

1:22:20you two things. It's non-binding because

1:22:22as we've just discussed, but also the

1:22:24zoning ordinance makes provisions for

1:22:26modifications of the zoning ordinance.

1:22:29Uh so

1:22:30>> I don't really think you'd be in

1:22:31conflict. There'd be like a way to be in

1:22:33conflict with this and also get a

1:22:35building permit.

1:22:36>> Uh but I I don't I don't mind changing

1:22:40it if you like. [laughter]

1:22:46>> Um okay. Does that cover your um your

1:22:50concerns? We're

1:22:51>> all set.

1:22:51>> Yeah, those are those are the items.

1:22:53>> Anyone from the public wishing to speak

1:22:55on this item tonight?

1:22:59>> Are you guys all here on parking?

1:23:01>> I'm sorry.

1:23:02>> Yeah.

1:23:02>> Oh, okay. That makes I was like, these

1:23:04folks are all waiting. I'm like, uh,

1:23:07anyone online wishing to speak on this?

1:23:14Apologies. This is Steve Cary in the

1:23:15planning division. Um,

1:23:20>> there's no one online.

1:23:22>> Just staff and the board.

1:23:24>> Understood. Uh, board members, Mr. King,

1:23:28do you mind going first?

1:23:31>> In general, general on this one. Happy

1:23:33to support it. Definitely early, but

1:23:36yeah, no issues with making the proposed

1:23:38changes and then when everything comes

1:23:39back as definitive site plan, we'll

1:23:40re-review it for the conditions then.

1:23:43Thank you.

1:23:44>> Thank you, Mr. Mr. King, Mr. Delera.

1:23:47>> Yes. Uh, thank you. I agree with Mr.

1:23:50King. Um, I'm okay with it at this point

1:23:54and so I have no further comment. Thank

1:23:56you.

1:23:58>> Okay, Mr. uh, Tumi.

1:24:01>> Yeah. No, no real problems with this.

1:24:03Just look forward to it as it develops.

1:24:05>> Uh, Mr. Rosende.

1:24:07>> Uh, no comments. Thank you.

1:24:09>> Thank you.

1:24:10Um,

1:24:13yeah, I I also have no real comments. I

1:24:15think this is an important project for

1:24:16the city. Uh, and um, I look forward to

1:24:21what I'm sure will be more

1:24:22conversations. This is the uh, next in a

1:24:25series of many we've had already. So,

1:24:27um, keep up keep up the work. Uh, we'll

1:24:30see you back here soon. Um, that said, I

1:24:33think we're ready for recommendation.

1:24:34And, Mr. King, just a reminder, um, we

1:24:37want to say something to the effect of

1:24:39we're going to approve this, but with

1:24:41modifications to the introductory

1:24:42language consistent with our

1:24:44conversation.

1:24:45>> Great. I make a motion to approve the

1:24:48preliminary site plan subject to the

1:24:51items as discussed where the definitive

1:24:53submission shall include the

1:24:55consideration of the comments as

1:24:57mentioned and the changes to item number

1:25:0014 as discussed

1:25:02>> and striking O I believe.

1:25:05and striking O.

1:25:08>> Second on

1:25:09>> the motion. Mr. King,

1:25:11>> yes.

1:25:11>> Mr. Delera,

1:25:13>> yes.

1:25:13>> Mr. Tumi,

1:25:14>> yes.

1:25:14>> I vote yes. Four to zero. That motion

1:25:16passes. Good luck.

1:25:18>> Thank you so much.

1:25:18>> Appreciate it.

1:25:23>> All right. Next up is item number 12,

1:25:26which is a public hearing for a zoning

1:25:29ordinance amendment related to minimum

1:25:31parking requirements.

1:25:35Good evening, Mr. Chair, members of the

1:25:37board.

1:25:38Mark, for the record, Mark Borenstein.

1:25:40Uh the uh petitioner and proud property

1:25:44owner. Um the petition is pretty simple.

1:25:47We're I'm seeking to reduce the minimum

1:25:49off street parking requirements for

1:25:51single, two, three, and multif family

1:25:53dwellings. Uh we require way too much

1:25:57parking in the city of Worcester, as I'm

1:25:58sure the board would agree with. Um, I

1:26:01cannot tell you how many projects I have

1:26:04represented where we've had to seek

1:26:06zoning relief for parking. And so from

1:26:09my perspective, this uh petition would

1:26:12codify what we're already doing, which

1:26:14is looking at actual parking demand, IT

1:26:17demands, which are probably less than

1:26:19actually this petition. But um to quote

1:26:23DTM, I think their position and I would

1:26:26agree is uh this petition represents a

1:26:28modest measured step toward better

1:26:30aligning residential parking supply with

1:26:32actual demand while reducing the

1:26:34unintended consequences associated with

1:26:36the current twospace requirement. So I

1:26:39think it's fairly straightforward. Um, I

1:26:41re I would just want to acknowledge some

1:26:43of the staff comments regarding some of

1:26:45the uh perceived inconsistencies with

1:26:48the CCOD, recognizing that the CCOD does

1:26:51require um a similar number of parking

1:26:53spaces, some more for Shrewsbury Street

1:26:56um and uh guest parking spaces. Uh,

1:26:59similar to DTM's comment, I would

1:27:01recommend that either the planning board

1:27:03or some other division of the city seek

1:27:06um a um reconciliation of that um to the

1:27:09extent that the city council ordains the

1:27:11zoning amendment. So, happy to answer

1:27:13any questions that the board may have

1:27:15with respect to my personal petition.

1:27:18>> All right. Thank you. Uh and Miss Smith,

1:27:21maybe we could just start by saying our

1:27:23our role as planning board. This is a

1:27:25petition that you've made to the city

1:27:27council. They have referred it to us to

1:27:29hold hearing. Um, we're going to make a

1:27:31recommendation that they may or may not,

1:27:34you know, it's non-binding. They just

1:27:35have asked us our opinion. Uh, and

1:27:38likely it goes back to them, back to a

1:27:40subcommittee and back to them were to

1:27:42continue to move forward. Is that

1:27:43accurate?

1:27:45>> That's correct, Mr. Chair.

1:27:47>> All right. Uh, do you have comments on

1:27:49this?

1:27:50>> I do. Uh, so again, Michelle Smith and

1:27:52the city's planning division. So for the

1:27:54board, the first page of the staff memo

1:27:56that's provided shows you in red with a

1:27:58red line the changes that are actually

1:28:00proposed to the text through the

1:28:01petition. Um and then just reminds you

1:28:03of the role which is again that

1:28:04recommendation. So that you heard um the

1:28:08petition specifically includes reducing

1:28:10basically the standard base as I'll

1:28:12refer to it parking requirements

1:28:14citywide with the exception of certain

1:28:16overlay districts. Um the way that those

1:28:19overlay districts interface with the the

1:28:21underlying base parking requirements. Um

1:28:23so they would be reducing that from what

1:28:24is today two parking spaces for single

1:28:27two three and multif family dwellings

1:28:29down to one parking space for those same

1:28:32subset of uses. Obviously that is a

1:28:33subset of the various uses that we have

1:28:35a subset of the residential use

1:28:37categories that we have parkings for. Um

1:28:39but obviously we have parking

1:28:41requirements for many other uses all of

1:28:42which also have problems. Um, so in

1:28:46terms of the staff comments that are

1:28:48provided, you know, we've provided you

1:28:50with a summary of all the different

1:28:52plans and reports that we have uh that

1:28:54highlight the need to modernize parking

1:28:56and indicate that parking is is too

1:28:58high. That includes the I'm not going to

1:29:00belabor them, but hazard mitigation

1:29:02plan, housing production plan, Worester

1:29:03now citywide long range plan, um

1:29:06mobility action plan, uh a Worcester

1:29:08regional research bureau public parking

1:29:11um brief from 2024, as well as the Green

1:29:15Worcester um plan. So all of those have

1:29:18suggestions in one way or another and

1:29:20acknowledgement of the the reality of

1:29:22the disconnect between the parking

1:29:24demands that we actually have here in

1:29:26the city and what our zoning ordinance

1:29:29in fact codifies and requires. Um so

1:29:32just as example um this is slightly

1:29:34outdated um census data but from ACS

1:29:37data and uh 5-year estimates from 2022

1:29:40um just based on the timeline of when

1:29:41these plans were developed um about 58%

1:29:45of households rental and ownership have

1:29:47one or fewer vehicles. Um and then again

1:29:50specifically almost uh just shy of uh

1:29:5425% of renter occupied units do not have

1:29:57any vehicle at all. Um yet we are

1:30:00requiring two parking spaces for every

1:30:02single one of these units regardless of

1:30:03the number of bedrooms that it has. Um

1:30:06so I think there's broad consensus

1:30:08across planning documents across

1:30:10constituents that the requirements that

1:30:12we have are too high and no one is here

1:30:15to debate that. Um uh you heard DTM did

1:30:18provide comments u relative to the

1:30:20petition as well. Um and that's we are

1:30:23seeing trends all over the nation and in

1:30:26the region of eliminating parking

1:30:28requirements. The board will recall that

1:30:30our office introduced a um now almost a

1:30:33year ago anformational communication

1:30:35about parking which recently was

1:30:37discussed by the city council back in

1:30:39June and referred back to the full

1:30:40council in July. Um at which point they

1:30:44have asked the administration to develop

1:30:45a proposal for uh an overhaul of the

1:30:48parking requirements for the zoning

1:30:50ordinance which our office is working

1:30:51on. Um, which would holistically look at

1:30:55all uses, not just residential uses, but

1:30:57other uses where we see, you know, folks

1:30:59coming in for variances, including

1:31:01reusing storefronts and other things,

1:31:03uh, where folks end up with a in a

1:31:06parking pickle, um, for lack of a better

1:31:08way to describe it, and end up coming in

1:31:10and obtaining zoning relief. Um, so we

1:31:12are are working on that holistically,

1:31:14which would include reevaluating the

1:31:15overlay districts, um, as well as again

1:31:18these other use categories. As part of

1:31:20that proposal, we do anticipate

1:31:22submitting um a draft amendment to the

1:31:25text of the zoning ordinance by the end

1:31:27of the year. Um but there have been some

1:31:30other fund changes to the state law that

1:31:31we are currently working on reconciling.

1:31:33Um but that is is something that we are

1:31:36working on um and expect to reduce. As

1:31:39part of the discussion on

1:31:41thatformational communication, this

1:31:43board, this economic development

1:31:44committee of the city council and many

1:31:46members of the public also weighed in

1:31:47about their desires, many of which were

1:31:49for full elimination, but also many of

1:31:51which were reserved and had concerns

1:31:53about the need for nuance in proposals

1:31:56and recognizing that not every

1:31:58neighborhood is in fact the same. Um

1:32:00obviously that speaks to sort of the

1:32:02history of our community and using um

1:32:05overlay districts to help handle parking

1:32:07and parking demands. Specifically, we

1:32:09have used them um to reduce parking

1:32:12requirements. Um so specifically the

1:32:14commercial corridor overlay district

1:32:15which came out of other prior relic

1:32:18districts um known as different things

1:32:20in different eras. Um that district is

1:32:23intended to create flexibility with

1:32:26respect to parking and in fact reduce

1:32:28those requirements. So this particular

1:32:30proposal, the way that um it's been

1:32:33petitioned with the the language that

1:32:34it's included would not affect those

1:32:36overlay districts. Um so what would

1:32:39inevitably happen were this to proceed

1:32:41and move forward um the base the new

1:32:44base parking requirement right for these

1:32:46subset of residential units single two

1:32:48three and multif family would go from

1:32:50two to one. Um and then what we have on

1:32:53the books for the overlay district is

1:32:54not affected. And then the requirements

1:32:57in the overlay district now are actually

1:32:59more um they require more parking than

1:33:01what the base requirement would be. So

1:33:04for example um in the Shrewsbury Street

1:33:07uh sub area of the commercial corridor

1:33:10overlay which is kind of our higher more

1:33:13um parking oriented flexible parking uh

1:33:17for for the best way to attempt to to

1:33:19describe that. um you know CCOD

1:33:21generally basically is saying you need

1:33:24to have only 50% or up to 75% of what

1:33:28the typical base requirements are. Um

1:33:31the proposal would leave um that

1:33:33particular area essentially requiring

1:33:34almost 60% more parking than the base

1:33:36requirements. So there's an sort of

1:33:38asynchronization in that sense of moving

1:33:40this forward without addressing that

1:33:42kind of putting the CCOD in a sense at

1:33:46conflict with itself and what it's

1:33:47attempting to accomplish. it's no longer

1:33:48accomplishing that because these other

1:33:50requirements have been changed. So

1:33:52that's something that we intend to

1:33:53address fully with our proposal, but

1:33:56just want to indicate that this request

1:33:58does have some cascading effects to

1:34:00other areas of the regulations which

1:34:02aren't being addressed through this

1:34:04proposal and make sure that that is

1:34:06understood by the board um and

1:34:08acknowledged um in discussion where the

1:34:10board to move this forward in in

1:34:12whatever manner it sees fit. Um so so

1:34:16that that is is one piece that I wanted

1:34:18to highlight. The other piece that I

1:34:20think is important to highlight is that

1:34:22um we do have other incentives that are

1:34:24built in with the zoning code related to

1:34:26parking specifically for inclusionary

1:34:28zoning. And these are automatic

1:34:30incentives that are tied to projects

1:34:32that are called eligible developments

1:34:33which basically means someone's opting

1:34:35to provide affordable units that we

1:34:37require. um not doing a a payment in

1:34:39lie. They're actually building the units

1:34:40in their project and they are meeting a

1:34:43certain minimum percentage of those

1:34:44units at or below 60% AMI which is a a

1:34:475% requirement. Um so if they're

1:34:50providing those units, this is to

1:34:51incentivize folks to actually build the

1:34:53housing. Um they are eligible for these

1:34:56reductions and it comes in a layered

1:34:59form uh with a little bit of complicated

1:35:01math. Uh we have a lovely calculator

1:35:03that people get to use to figure it out

1:35:04so it simplifies it. Um but essentially

1:35:07it relates to how many affordable units.

1:35:09So the more affordable units, you know,

1:35:11the the greater the discount up to a

1:35:12certain point. Um so essentially that

1:35:14reduces the base parking requirements

1:35:17potentially up to half. Um so it it

1:35:20would have that. So today that brings it

1:35:22down to basically one space per unit.

1:35:24With this proposal, it would

1:35:25automatically change that. So it would

1:35:27come down to half a space per unit. Um,

1:35:29and again, that would be citywide with

1:35:31the exception of the overlay districts

1:35:34just based on the way that the language

1:35:36works in the zoning ordinance because we

1:35:38refer to percentages rather than than

1:35:40numbers. So, we would be able to bring

1:35:42that down um through that. That it's not

1:35:45always by right. Many ways it is

1:35:47typically at least 25% of that is and

1:35:49often a bit more. Uh but there the

1:35:53planning board sees all of those uh

1:35:55approvals where they don't meet that and

1:35:56they're looking to reduce that through

1:35:57inclusionary zoning special permits to

1:35:59reduce parking which you see lots of. Uh

1:36:01we don't have any on this evening but

1:36:03usually we do. Um so even even that

1:36:06again indicating you know that one space

1:36:08per unit is really not um what the

1:36:11market is is demanding where we're

1:36:12seeing that relief. So anyhow, so while

1:36:14this would affect, you know, the the

1:36:16areas where we allow residential uses,

1:36:18so all the residential zoning districts

1:36:20and business zoning districts,

1:36:21manufacturing zoning districts would not

1:36:23be affected because we don't allow

1:36:24residential uses in those areas except

1:36:26through one of the overlay districts.

1:36:28Um, and then again, the overlay

1:36:30districts would not be affected. And I

1:36:31want to call attention to that the BG6,

1:36:33the downtown district, we don't require

1:36:35any parking. We will still continue to

1:36:37not require any parking where this to

1:36:38move forward. That's unchanged. It's

1:36:40within one of those overlay districts.

1:36:42However, it has no requirements for

1:36:44that. Um, so it it would stay the way

1:36:46that it is. And I also want to clarify

1:36:48too when we're talking about this, you

1:36:50know, these are the parking minimums

1:36:52that we require that are off- streetet

1:36:54parking. So you can't count spaces that

1:36:56are on the street nearby, right? These

1:36:58are on private property that are

1:36:59counting towards zoning compliance. That

1:37:02zoning compliance and market demand are

1:37:04two very different things. And just

1:37:06because a project does not require

1:37:08something from a zoning perspective does

1:37:10not mean that parking is not provided.

1:37:13Um in fact we see in many areas within

1:37:16our one district that has no parking

1:37:18requirements the BG6 we see many

1:37:20projects that propose still parking at a

1:37:22ratio of 0.5 or 75 per unit because they

1:37:26have a market demand for that. those

1:37:28units depending on the project has a

1:37:30market demand and so they're not going

1:37:31to build a project that won't work for

1:37:34their tenants because they need tenants

1:37:36to make that financially sol solvent.

1:37:40[clears throat]

1:37:41So, I want to be clear, too, that

1:37:43changing the zoning requirements doesn't

1:37:45mean that what people provide will

1:37:47change other than any of those surplus

1:37:50and excess requirements, those parking

1:37:52spaces that maybe aren't being used or

1:37:55um the parking spaces that aren't being

1:37:57used and then when people find out, oh,

1:37:59I can have a second car for free, uh

1:38:01it's actually promoting the use of the

1:38:03automobile. Um that that uh effect is is

1:38:07not really what we're talking about.

1:38:08we're talking about the zoning

1:38:09requirements, the bare minimums of what

1:38:11someone must provide. Um, this also

1:38:14would not affect any of the maximums.

1:38:16Those would stay the same because those

1:38:17are only imposed within the CCOD. Again,

1:38:20an area that this change would have no

1:38:22effect on. So, I think ultimately we we

1:38:26can all agree that reduction of parking

1:38:28is is good. Um, something that the city

1:38:31wants. Um, the council, this board,

1:38:34community members have indicated they

1:38:35want to see more nuance. Um and we

1:38:37expect in the city's proposal that

1:38:39they'll be a bit more nuance and that we

1:38:41would address again all the use

1:38:43categories um comprehensively the

1:38:46overlay districts as well um and and put

1:38:48something forward within the next um

1:38:51before the end of the year um however

1:38:54many months are left uh we're now in

1:38:55August. Uh so that is is what I want to

1:38:59be clear on and and just the one concern

1:39:01that we want to reiterate and express is

1:39:03that you know through this particular

1:39:05change without addressing the overlay

1:39:07district the overlay district is really

1:39:09not performing the function right that

1:39:11it's intending to to serve and then

1:39:13there's sort of a further cascading

1:39:15effect. We're not necessarily just

1:39:16reducing it to one because of the way in

1:39:19inclusionary zoning is sort of

1:39:20automatically tied to that. So, just

1:39:22want to be clear and make sure that that

1:39:23is understood as the complexity of of

1:39:26the code. Um, and I'm happy to answer

1:39:28questions, I I did want to highlight,

1:39:30too, just for sake of interest, um, just

1:39:34analyzing the base parking requirements

1:39:36with a little bit of of research into

1:39:38prior zoning ordinances. Um, back in

1:39:411963, we actually only required one

1:39:44parking space per dwelling unit. Um we

1:39:46still didn't require any parking in the

1:39:48downtown um but we had one parking space

1:39:50per dwelling unit for all residential

1:39:52dwellings. Then come 1980 uh we changed

1:39:56that and started requiring two spaces

1:39:57for single family dwellings but we only

1:39:59required one and a half spaces for two

1:40:01family and multif family projects. Um by

1:40:041991 we had moved to a two parking space

1:40:07per unit count and we've been there

1:40:10since with again modifications through

1:40:12overlay districts and some of these

1:40:14incentives including inclusionary zoning

1:40:16um since that time. Happy to answer any

1:40:19questions.

1:40:21>> Thank you, Miss Smith. Um I guess

1:40:24without further ado, you folks have

1:40:25waited through our whole meeting. What

1:40:28why don't you tell us what you think?

1:40:31Sure.

1:40:36I'm Kevin Piala. I live on Pleasant

1:40:37Street in Worcester. Uh, so I was going

1:40:40to make comments about, you know,

1:40:42parking requirements for restaurants,

1:40:44too, and other things. Apparently,

1:40:46that's all pending. So, it's not really

1:40:48within the scope of here. Uh, a lot of

1:40:50us forget that all of the giant stock of

1:40:54parking isn't going to just go away

1:40:56because suddenly we reduce the minimums.

1:40:59Uh honestly, I expect you with your

1:41:02limited powers here are just going to

1:41:03make an advisement that this goes

1:41:05through and then it's up to the council

1:41:07who has very very different opinions

1:41:10often times. So I I just like to

1:41:14emphasize here that there's a lot of

1:41:17different aspects to this. There's

1:41:22what we require and then there's the

1:41:24reality of what's happening. And because

1:41:27we have choked up so far on this, we're

1:41:30drowning in parking across the city. And

1:41:33honestly, it just eats into your time as

1:41:36well as you have to keep telling people

1:41:37that no, this time they also don't need

1:41:40the parking again. This time you you can

1:41:44ignore the parking requirement. I I just

1:41:46hope that we can reduce all of that

1:41:48headache. That's all.

1:41:50>> Yeah. Thank you. Thank you for your

1:41:52comments.

1:42:02Franchesco Bavona, District 5. Um, I

1:42:06just wanted to express my enthusiastic

1:42:10support for any measure to reduce the

1:42:12ownorous parking requirements in the

1:42:14city. Uh, and my hope that this is not

1:42:18the end of the the conversation. And

1:42:21what I heard tonight uh indicates to me

1:42:24that there will be more coming

1:42:25hopefully. Uh

1:42:28I honestly would hope that one day uh

1:42:32Worcester joins the over 100 cities

1:42:34since 2017 that have eliminated their

1:42:36parking minimum requirements entirely

1:42:39and uh life has gone on fine for them.

1:42:42Uh and uh

1:42:46yes uh a anything to reduce the frankly

1:42:52completely excessive amount of parking

1:42:53that we have in the city would be great.

1:42:56So thank you.

1:42:57>> Thank you.

1:43:05I'm a Morrison Worcester resident and I

1:43:07too want to voice my support for this

1:43:09position uh this petition and also um

1:43:12just reducing minimum parking

1:43:13requirements in general. Thank you.

1:43:16>> Thank you.

1:43:18>> Uh is there anyone online wishing to

1:43:19speak on this item?

1:43:23>> Uh this is Steve carrying the planning

1:43:24division. Not seeing anyone with their

1:43:26with their hand raised online.

1:43:28>> Okay. Uh I think we can move on to board

1:43:30members. Mr. King, would you like to go

1:43:32first?

1:43:33>> Sure. uh in general happy to support the

1:43:36reduction of the or yeah the reduction

1:43:38of the parking requirements on this one

1:43:40understood the intricacies that will be

1:43:42involved between the CCOD and the

1:43:44standard conditions but happy to

1:43:46favorably recommend this to city council

1:43:47for review.

1:43:50>> Uh thank you Mr. King, Mr. Delera.

1:43:54>> Thank you Mr. Chairman. Um yes. So

1:43:57essentially this change would simplify

1:43:58the existing practice of what developers

1:44:01have been asking for and generally

1:44:03receiving through waiverss from the

1:44:04city's regulatory boards. So I support

1:44:07uh the intention of this proposal.

1:44:09>> Thank you.

1:44:11>> Thank you, Mr. Dero. Mr. Tumi.

1:44:13>> Yeah, I intend to support this. Thank

1:44:15you.

1:44:16>> Uh Mr. Rosende,

1:44:19>> I too would support this.

1:44:23>> Uh yeah. Um, thank you. I I I would as

1:44:27well in uh to your comment about

1:44:28eliminating parking entirely. I if

1:44:31that's what this petition said, I would

1:44:32support that too. Um, I would say to the

1:44:37city council in our recommendation or

1:44:40request that we say in our

1:44:41recommendation that oftentimes municipal

1:44:44uh progress moves very slowly. Uh and it

1:44:47seems like for a long time consensus has

1:44:50been building in the community of urban

1:44:52planning and um

1:44:56I don't know citizenry of of of cities

1:44:59that uh this has been uh too much and we

1:45:02need to we need to pull back the

1:45:04pendulum. Uh, I would hope we could move

1:45:06quicker than is typical uh on this on

1:45:10this process. And that probably means on

1:45:12the council level they should devote

1:45:14more resources

1:45:16uh than they currently have or request

1:45:18the city manager devote more resources

1:45:20so that we could expedite this. Um, that

1:45:23would be my comment. But Mr. King, I

1:45:25think we're ready for a motion.

1:45:27>> Make a motion to close public hearing.

1:45:30>> Second motion. Mr. King.

1:45:32>> Yes.

1:45:33>> Mr. Delera. Yes,

1:45:34>> Mr. Tumi.

1:45:35>> Yes.

1:45:36>> I vote yes. Four to zero. Hearing's

1:45:37closed.

1:45:39>> I'd make a motion to favorably recommend

1:45:41item number 12 to the city council.

1:45:45>> Second.

1:45:46>> Uh, Mr. King.

1:45:48>> Yes.

1:45:48>> Mr. Delera?

1:45:50>> Yes.

1:45:50>> Mr. Tumi?

1:45:51>> Yes.

1:45:52>> I vote yes as well. Uh, four to zero.

1:45:54That motion passes.

1:45:55>> Thank you.

1:45:55>> Good luck, Mark. Um, moving on to other

1:46:00business. Subdivisions. Sea Street. uh

1:46:03definitive subdivision plan, the request

1:46:05to set a form of shity

1:46:08>> uh through the chair. You heard this

1:46:09earlier this evening, a project along

1:46:11the street, but essentially you have a

1:46:13request in front of you to set the form

1:46:14of shy for this project. So they are

1:46:16looking to do a restrictive covenant um

1:46:18and then they'll proceed with uh

1:46:20finalizing plans uh and easements for

1:46:22recording and be able to create that as

1:46:24a road.

1:46:26>> We have a suggested vote I believe on

1:46:28the slides.

1:46:30>> Okay. Um

1:46:34just hasn't switched on the slides yet

1:46:36on my end.

1:46:37>> It's coming.

1:46:38>> Sorry. Steve caring the planning

1:46:39division trying to multitask.

1:46:42>> I believe if it's not going to work that

1:46:45we just requested that the form set the

1:46:47form of shy for the sea street

1:46:48subdivision as a covenant restrictive

1:46:50covenant.

1:46:52>> I would make that motion.

1:46:55>> A second.

1:46:56>> Uh on the motion, Mr. King.

1:46:58>> Yes.

1:46:58>> Mr. Gallera.

1:46:59>> Yes.

1:47:00>> Mr. Tumi. Yes,

1:47:02>> I vote yes. Four to zero. That passes.

1:47:04Uh Ann ours.

1:47:06>> Yeah, Steve car in the planning

1:47:07division. Um with some technical

1:47:09difficulties. Give me one second.

1:47:20Jesus.

1:47:28All right. Uh we've already endorsed uh

1:47:3114 C. Um so the first one and 14 A and B

1:47:35are uh not properly before the board. Uh

1:47:3914D is up for endorsement. This is for

1:47:42Chicasset Road. Um taking a parcel and

1:47:46um making it into four lots which have

1:47:49uh frontage on both Pocono and Chicasset

1:47:51Road. These are private streets, but um

1:47:53they have been um they are in adequate

1:47:56condition to provide uh frontage to

1:47:58these lots. Um the intention it seems

1:48:01like is to create um duplexes, two

1:48:03duplexes, one facing chess and one check

1:48:06checking um facing Pona Pocono Road. Um

1:48:09each would need to have 35 ft of

1:48:11frontage within the RL7 zoning district,

1:48:13which they do have. Uh 14E, this is

1:48:17essentially a um lot line adjustment

1:48:19after foundation has been poured. um for

1:48:21a um also for a duplex, a single family

1:48:24semi- detached. Um both lots do have 35

1:48:28feet of frontage. It's a little weirdly

1:48:30labeled on the northern um the the lot

1:48:33that's 59 picasset, but it does have um

1:48:3635 ft of frontage. Um and then the rest

1:48:40are actually not properly before the

1:48:41board either. So the only ones up for

1:48:43endorsement now is 14D and 14E.

1:48:47Move to endorse ANR's 14D.

1:48:52>> Second

1:48:52>> on the motion. Mr. King,

1:48:54>> yes.

1:48:54>> Mr. Dera,

1:48:56>> yes.

1:48:56>> Mr. Tumi,

1:48:57>> yes.

1:48:57>> I vote yes. Four to zero. That passes.

1:49:00Uh, in communications, there is a draft

1:49:03priority habitat map of rare species.

1:49:06Fun reading if you're so inclined. Um, I

1:49:09don't believe we need to discuss further

1:49:10unless anybody has anything on that. Uh,

1:49:13no board policies and procedures.

1:49:15Minutes are tabled to the next meeting.

1:49:17Is there a motion to adjurnn?

1:49:20>> Motion to adjurnn.

1:49:21>> Second.

1:49:22>> All in favor say I. I. I.

1:49:25>> We'rejourned. Thank you.