Indian Lake Dam Vegetation Management (149 West Boylston Drive)

At a glance

  • What: Notice of Intent CC-2026-056 (DEP# 349-1457) by the Department of Sustainability and Resilience to remove vegetation along the Indian Lake spillway and dam embankment.
  • Where it stands: Resolved at the Commission level. On 2026-08-24 the hearing was closed and an Order of Conditions issued, both 3-0.
  • Next: nothing pending in the record.

The proposal

  • Vegetation removal along the embankment, with a request for a waiver of performance standard 4.2.4.
  • Presenters: consultants from Pare Corporation (named in the minutes as Gregory or George LaCroix and Dave Presch or David Pretsch).

Decision and conditions

  • Approved as a limited project under 310 CMR 10.53(3)(i).
  • Special conditions cover wetland flagging, flood storage capacity, native seed mix, wood removal, dust, dewatering, equipment placement and spill prevention.

Discussion time

About 11 minutes across 1 meeting (from transcript timestamps; approximate).

Meeting Minutes
2026-08-03 - Conservation Commission 11

Log

  • 2026-08-24 - Conservation Commission - Pare Corporation reported changes since the last hearing (flood elevation BLSF raised from 542 to 542.4 ft; handheld tools behind the chain-link fence; designated stockpile area). Hearing closed and Order of Conditions issued, 3-0.
  • 2026-08-03 - Conservation Commission - First hearing: Pare Corporation described clearing the embankment (MassDOT owns the dam, the City maintains it); commissioners asked about monitoring after seeding, root-hole risk to an earthen dam, who inspects, fence access and truck staging. Staff awaiting a DEP file number; continued to August 24 (4-0).