| 2026 Public Murals | 12 | 31% |
| Public Art Master Plan | 8 | 21% |
| Other business | 6 | 15% |
| Coming Together Sculpture Repair | 5 | 12% |
| Apex Sculpture Walk | 3 | 8% |
| Downtown Window Painting | 3 | 8% |
| Bus Stop Art Installations | 2 | 5% |
- Monday, October 19, 2026.
- Meeting began about 9:17 on the recording and adjourned about 47:42.
- Tom Caldwell (chair) was absent; a member named Susan acted as chair.
- The town's staff liaison (first name Taylor in the captions) presented most items.
Other business
9:17-13:26, 39:04-40:06, 47:03-47:45
- September minutes approved by voice vote with a correction recording that one member was absent in September.
- Liaison introduced new member Christie Famolare, non-voting until her oath; another new member is expected in November after a recent Council vote.
- Marketing: new Instagram followers and over 2,200 views across Facebook and Instagram last month, mostly the sculpture walk call for artists and the mural review. Members offered to share calls in unaffiliated local Facebook groups.
- Augmented reality project (Brad): needs about two more weeks to finish a 3D model and web presentation documenting the handprint community piece in Kidstown.
- No public comment. Adjourned by voice vote.
Public Art Master Plan
13:08-21:09
- Consultant summary: engagement May to mid-July (316 survey responses, 11 interviews), draft revised through Oct 13, organized around six goals.
- Four funding items await confirmation before board review: 1% for art on capital projects of $500,000 or more, a named public art fund with 10% maintenance set-aside, an incentive menu for private development (no mandatory in-lieu fee under state law), and grants/philanthropy.
- Sequence: staff, then board review and vote (targeted November, contingent), then Town Council with any UDO or policy changes.
Apex Sculpture Walk
21:14-24:25
- Butterfly Enchanter location must shift 10-20 ft within the Nature Park near the Seymour-side playground; still needs Council approval.
- Applications open until Nov 8; two received so far.
2026 Public Murals
24:31-36:27
- Nature Park Amphitheater mural design, revised after public review, approved by voice vote and recommended to Council.
- Saunders Street retaining wall mural "The Song Beneath the Town" by Britney Flood, 207 ft front side, approved by voice vote.
- Council presentation planned Nov 10; artist could start the following Monday.
Downtown Window Painting
36:28-39:03
- Planned Monday Nov 30, 3:00-5:00 p.m.; three schools confirmed; supplies and a table needed.
Bus Stop Art Installations
40:07-42:16
- Planning department will present in November and wants the board to lead selection for two bus stop art installations before June 30; stops and medium not yet chosen.
Coming Together Sculpture Repair
42:18-47:00
- Insurer funds cover most of the repair; cause of damage unknown; may need removal; a member suggested relocating it from the children's play area.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:26And I said, "Oh, I should Maybe I should
00:27still have my phone. That's why I'll
00:28have a meeting on Wednesday. Stay with
00:30Sonia and Jerry and
00:31um
01:59Mhm.
05:49>> Mhm.
07:44>> Mhm.
09:17>> Hey.
09:18The culture Apex Culture and Arts
09:20Advisory Board meeting for Monday,
09:23October the 19th, will come to order.
09:27All right. First item, approval of the
09:31minutes for September 26th.
09:35Uh two No,
09:362026.
09:38And do we have a motion to approve the
09:42minutes?
09:43I'm going to just check for a minute.
09:44Okay.
09:45Bethany
09:47makes a motion. Do I have a second?
09:49>> I know we have one fix for or of the
09:51minutes, sorry.
09:53Um, so it sounds like Juliana was not at
09:56the September meeting. So
09:58I will adjust the number of votes and
10:01her um
10:04absentee on there as well. So can we
10:08approve the minutes with those
10:10contingencies?
10:11>> Okay.
10:12>> I'll make a new motion to approve with
10:13the adjustments to the minutes uh for
10:16the September 2016.
10:19>> Second.
10:21>> Okay. All in favor?
10:23>> Aye.
10:23>> Aye.
10:24Okay. Motion passes to approve the
10:26minutes
10:28with the contingency of fixing that.
10:31Okay.
10:34Okay. Next is the town liaison reports.
10:39>> All right. Well, thank you so much,
10:40Susan. Thank you for acting as chair in
10:43Tom Caldwell's absence.
10:45Um, I'd like to introduce Christie to
10:48you. She is our newest board member.
10:52Today she is a non-voting member, but by
10:55our next meeting she'll most likely have
10:58had her oath of office,
11:00um, if not right before that meeting.
11:02And so today she's non-voting, but once
11:04she has her oath she'll be able to vote.
11:07So welcome, Christie. We're very excited
11:09to have you on the board. Um, in
11:11addition to um Christie, we will have
11:15one new person starting. Um
11:19I don't have the information as to who
11:21that is yet. Um, council's working on
11:24this. I know they just did a vote.
11:27I believe at their last council meeting,
11:29so I'm sure we'll hear very quickly who
11:31that new person will be. They'll most
11:33likely be starting in the November
11:35meeting.
11:36Let's see here. Oh, and some marketing
11:39updates. We do have some new followers
11:42on Instagram, which is great.
11:44Um we are also over 2,200 views both
11:47across Excuse me, this past month across
11:50both Facebook and Instagram. So, that is
11:53good. Um those posts are primarily for
11:57the open call for artists for the
11:59sculpture art walk, as well as um
12:04the uh public review of the murals ended
12:08about halfway through the month review.
12:11So, that is
12:12pretty quick. Yes.
12:13>> Question. For the like call for artists,
12:15I know we post that on our website.
12:17>> Yep.
12:17>> Do we also post that to like the town
12:20Facebook group or our Facebook page? We
12:23do?
12:24>> Yes. Yes, so the town Facebook team also
12:27picks up that posting as well. Same with
12:30the Halie Cultural Arts Center. They
12:31pick those up as well.
12:32>> Okay. Yeah, cuz I was I can share those
12:34in the There's like some of the town
12:36unaffiliated town Facebook pages and a
12:38lot of things get shared there. So, we
12:40can probably share it there and get a
12:41broader reach.
12:42>> Yeah, absolutely.
12:44>> Thank you.
12:46>> Okay.
12:48All right. Next is chairperson's report.
12:50Tom is not here this evening, so um
12:55we don't have anything at this time. Uh
12:59I don't
13:01think there are any public con- comments
13:03tonight. I don't see anybody joining us.
13:07That's the next item.
13:08Uh So, the next item would be old
13:11business.
13:13And Taylor, you're going to let us know
13:16about the public art master plan.
13:20>> Absolutely. I have to get official and
13:22go in front of the screen.
13:25>> Don't close it down.
13:25>> I know, right?
13:28That's my luck.
13:30All righty. So, we're going to talk
13:32about the public art master plan
13:35progress, where we're at right now.
13:39Let me get my notes.
13:47Printouts in front of you as well.
13:50You'll see in front of you the
13:52printouts, as well as the screens in
13:54front of you the plan as well.
13:56So, um I asked our contractors for the
14:00public art master plan to give us a
14:03quick summary of where they're at, and
14:04here is what they came with.
14:06Um engagement ran from May through
14:09mid-July, 316 survey responses and 11
14:13stakeholder interviews and working
14:16sessions. The August funding and code
14:19memo set the framework.
14:21The full draft was written in September
14:24and revised through October 13th with
14:27population, peer city, and legal
14:30references against uh all checked
14:33against sources.
14:35The draft is named
14:37a lead and timeframe.
14:41Excuse [clears throat] me. The draft is
14:42also organized around six different
14:44goals, each with strategies and an
14:46action table.
14:48The remaining step before CAB review is
14:51confirming funding options with our
14:53budget staff.
14:58The plan is built around six goals,
15:01grounded in what residents and town
15:03leaders told CPG, art in the places
15:07people use every day,
15:10art that reaches every part of the
15:11growing town, and a program built to
15:14last.
15:15Goal number four, funding, is
15:18highlighted because confirming the
15:20funding options is the last step before
15:22CAB reviews the full draft of the master
15:25plan.
15:26Murals, which were 61%
15:29and functional art, which was 47%
15:33were residents top art types and, quote,
15:37keep it local,
15:39end quote, regarding talent was one of
15:42the most consistent survey requests.
15:48And lastly is our final step here.
15:51Four funding areas need confirmation
15:54before the draft goes to CAB.
15:57Number one,
15:58percent for art,
16:001% of construction costs on town capital
16:03projects of 500,000
16:06or more.
16:08Exclusions may be such as public safety
16:12apparatus and water, sewer, and storm
16:15water elements.
16:17And whether to adopt it as an ordinance,
16:20policy, or UDO amendment.
16:22Those conversations are also including
16:24our town attorney's office.
16:27Number two,
16:29a named public art fund with the grant
16:32and special revenues fund
16:34with a 10% maintenance and conservation
16:37set aside in every project budget.
16:42Number three,
16:44private development.
16:45North Carolina law does not allow a
16:49mandatory in lieu fee.
16:51So, the plan uses an incentive menu
16:54under UDO 8.4.
16:57And the town attorney needs to review
17:00any voluntary contribution options that
17:03we may propose.
17:05And number four here,
17:07grants and philanthropy, including
17:11United Arts Council for towns,
17:14capped at $5,000,
17:17NEA, and a donor program with the town
17:21match.
17:22Finances calculating what 1% would yield
17:26from the adopted fiscal year 2026
17:30to fiscal year 2030 CIP, capital
17:33improvement project.
17:35So, I know that was a lot of information
17:37all at once.
17:39Whittling it down, we had two full
17:42months, two and a half months of public
17:45survey. What What do you want to see?
17:48Um uh when it comes to public art. We're
17:50specifically talking about public art,
17:52not other forms of art that we oversee.
17:56We gathered that information with our
17:59contractors.
18:01And they reviewed that information with
18:04town staff, 11 different people, I
18:07believe I read.
18:09And so, those were individual
18:10one-on-ones. And then, they also had the
18:13opportunity to meet with some of you as
18:15well.
18:16To get your feedback and your opinions
18:19as well on what you'd like to see moving
18:20forward, what you've seen over time as
18:23well, history.
18:25So, they drafted up a funding document
18:29that assists in the creation of the
18:32public art master plan document.
18:35And so, that specific funding document
18:37is what's being reviewed with the
18:41working draft of the master plan.
18:44Once town staff is comfortable with
18:47where the funding document has left the
18:49master plan,
18:51then CAB will see the master plan draft
18:54for review and then, obviously, will go
18:56through um items. At that time, we will
18:59live stream the contractors in if you
19:02have any questions,
19:04um concerns, things like that. Um
19:08and then, we will bring that to a vote
19:10at that specific meeting.
19:12We're looking at November right now for
19:15that meeting.
19:16Obviously contingent on
19:18many different factors, whether or not
19:21town staff is comfortable with where
19:22we're going
19:24as a master plan.
19:26Um or if we need to bring it back for
19:28some more studies.
19:30As well as um if we meet a quorum for
19:34the November meeting and um just overall
19:37timelines of our contracts right now.
19:41I know that's a lot of information.
19:43Do you have any questions right now?
19:47>> So after we review it, assuming it gets
19:49to us um
19:52the
19:53is is this be Are we recommending it to
19:56town council to vote on it at that
19:57point?
19:58>> That is correct, yes.
19:59>> I just wanted to verify.
20:00>> Mhm. Absolutely.
20:03>> And then the when we when we recommend
20:05it for
20:06town council, you're saying that the
20:07town staff has already viewed it. Have
20:09they already They've already put it up
20:10against the budget aspects of that as
20:12well?
20:13>> That's correct. So we kind of have to we
20:16have to work from staff first, then goes
20:19to CAB, then to council. So that when
20:22I'm presenting to council, I'm saying
20:25this draft in front of you has been
20:27approved by the staff behind me as well
20:30as CAB is recommending us putting this
20:34forth. And that would include the plan,
20:37the actual master plan, as well as any
20:40UDO policy ordinance changes that may be
20:44required to come with that draft plan.
20:51All right, any questions?
20:54All right, are we comfortable with me
20:55moving on to the next topic?
20:57I see heads nodding. Okay, great.
21:01Obviously, if you have any further
21:02questions for the um consultation team,
21:05just let me know and I can always relay
21:07those to them.
21:09Okay.
21:11Let me get my paperwork here.
21:14So, the next thing we have on the agenda
21:17is our
21:19sculpture walk.
21:21I'm going to go like this for a
21:22second.
21:25Next one on the agenda is the sculpture
21:26walk. Um so,
21:29we will
21:31do do do do do we will slightly need to
21:35adjust the location for where we are
21:37recommending
21:39the butterfly enchanter piece that we
21:41have recommended for purchase. Okay? So,
21:44at the September meeting, it was
21:46proposed that um butterfly enchanter, if
21:50approved by council, would be moved to
21:53the nature park on the Seymour side near
21:56the playground.
21:58That specific location, when we were
22:01doing the um required planning board
22:04location underneath the ground, that's
22:07actually being pre-planned for a
22:08communications board.
22:10So, I'm proposing, and I talked to our
22:14staff, they're going to be doing some
22:15more locating underneath the ground,
22:17make sure that we're not um hitting any
22:20wires, any water lines, and whatnot. Um
22:22still within the same vicinity, just
22:25probably about 10 ft, 20 ft one way or
22:28another. So, we'll still be at the
22:30nature park on the Seymour side near the
22:32playground, um but it will not be in
22:34that one specific location right as you
22:37walk up to the playground.
22:40All right.
22:42Um and that will obviously still have to
22:44go to council once we get the final word
22:47as to what's under ground.
22:49All right.
22:50And as you know, and as we've talked
22:52about in our marketing section, the
22:55sculpture walk applications are still
22:57open. They will remain open um until
23:00November 8th.
23:02So, spread the word to all of our
23:04sculpture friends. Um I know that we
23:07have a long-running list of sculpture
23:09friends as well um that has got have
23:12gotten uh the word. So, that's exciting.
23:15Um so, we'll start seeing those come in
23:16in the coming weeks. Um as Tom and I
23:20lovingly joke, we always see them right
23:22at the last minute. So, it's always
23:24always coming through here.
23:27All right. Any questions about sculpture
23:28walk?
23:29>> I know we usually see a big influx at
23:31the end. Have you gotten
23:33a decent amount or
23:34>> We have two right now.
23:36>> Okay, yeah.
23:36>> We have two right now. Um we still have
23:39a few weeks left. Um but that is not
23:42abnormal.
23:43>> [laughter]
23:45>> I will say we uh
23:47there will be probably like the last 3
23:49days or so, I'll get about 30
23:51>> [laughter]
23:52>> all in my inbox.
23:54So, that's exciting. Yes, please.
23:56>> And where can you find this application?
23:58Where can I get information? I have
24:00people I can send it to.
24:01>> Absolutely. So, the application is
24:04primarily on the CAB website. It can
24:06also be uh found at all of our um social
24:10medias as well as flyers around town.
24:13So, we have a red and white flyer about
24:16the
24:17application process.
24:18>> Okay.
24:19>> Absolutely.
24:21All right. Any questions before we move
24:22on to murals?
24:25All right. Moving on.
24:31All right. Now, you will see you'll see
24:34a new presentation in front of you about
24:36the 2026 murals.
24:38As a refresher,
24:40we are going through the process of
24:42putting up a mural over at the Apex
24:45Nature Park Amphitheater, the base
24:47structure, as well as the Saunders
24:50Street retaining wall part one.
24:55So, a refresher about the location over
24:58at the Nature Park Amphitheater.
25:00You'll see in your presentation
25:02a red outlined
25:04um base structure for the amphitheater.
25:09Um the
25:10picture on the left is what we are
25:14calling the front side, and the picture
25:17on the right is what we're calling the
25:19back side.
25:22This structure, as you can see in the
25:24picture on the left, also has side
25:26panels as well. That will come into play
25:28as we talk about the mural.
25:31So,
25:32what has happened from now from the
25:36start of our mural process until now.
25:39We've hired an artist, started the
25:42design process,
25:44the subcommittee was comfortable moving
25:46the mural to public review. The town
25:50requires a 30-day public review for the
25:53draft um design for the mural,
25:57and then we collect all of that
25:58information, feedback from the public.
26:02We typically narrow it down to
26:05somewhere between two to six of the
26:08biggest points that come up. Sometimes
26:11it's like, "We love the mural." That's
26:13great. We We love that. Or, "We don't
26:15like the mural." Okay, well, that
26:17doesn't help me, you know? So, we
26:19whittle it down that way, and here's
26:22what we came up with.
26:24So,
26:25the Nature Park Amphitheater mural draft
26:28is such you see in front of you. The
26:31image on the left side is the front.
26:35This is the front that will face the
26:37audience in the amphitheater.
26:41The image on the right side is what will
26:44face um the back side of the
26:48amphitheater, which backs up to the
26:51trail, the pond, as well as the disc
26:53golf.
26:55Okay?
26:57Any questions? It has gone through many
27:00iterations.
27:01Um we have had
27:04windowpanes, we have had enormous bees,
27:08we've had little bees, we've had hidden
27:10birds.
27:11Um we've had just life-size
27:16flowers.
27:17Um the artist did a wonderful job of
27:19being able to incorporate
27:22the public's request. The public wanted
27:25to keep the whimsy of this design, but
27:28wanted a little bit more realism. They
27:31wanted to see the the pond in the
27:33background. So, this piece is kind of
27:37like a portal through the amphitheater.
27:41So, it looks towards the path or it
27:43looks towards the pond. Um so, this
27:46piece itself has has changed quite a bit
27:50um based on the public feedback. But,
27:53we're pretty confident that this
27:56reflects what the public was wanting as
27:59well.
28:01Do you have any questions about this
28:03piece itself?
28:04>> Assuming we approve, when when would we
28:07start or approximately?
28:08>> Absolutely. So, the timeline for both of
28:11the murals that we're talking about, if
28:13both of them are approved today, I will
28:15be going to council on November 10th and
28:19doing a very similar presentation. I
28:21will show them the location, I will show
28:24them the original design that went to
28:27the public, and I'll show them this
28:29after public review design.
28:32Um so, ideally,
28:34on November 10th, if the council
28:37approves the design, the artist can
28:40start as soon as that next Monday.
28:42And this artist had stated it would take
28:45about two, and a half weeks to finish.
28:48Mhm.
28:51Any questions? Any feedback?
28:56>> So, Taylor, would you talk a little bit
28:57about the side? So, I'm I'm seeing um
29:00>> Absolutely.
29:01>> the side as well.
29:03>> Absolutely. So, this next slide here is
29:05the the sides that you will see. These
29:09colors and gestures
29:12mix the two sides together. So, that's
29:14the idea. We didn't want it to be too
29:16much of a focal point, more of a
29:18pass-through between the two sides.
29:26All right. If we do not have any
29:28questions or any further feedback, I
29:30would like to raise this for a motion
29:32for approval to recommend to council.
29:37Do we have an open
29:38>> to approve with
29:39a side note that I liked the original
29:41before the bubble.
29:42>> [laughter]
29:45>> But, if this is what the public wanted,
29:47I will motion to approve.
29:48>> [laughter]
29:50>> Thank you, Aspen.
29:51>> I'll second.
29:53>> Okay.
29:54All in favor?
29:55>> Aye.
29:56>> Aye.
29:57Any opposed?
29:59Okay.
30:01Okay, wonderful. Thank you so much.
30:03Moving on to our next mural.
30:07Saunar Street retaining wall. So, I
30:09mentioned in the beginning of this
30:10presentation that this is part one. As
30:14y'all are familiar, the Saunar Street
30:16retaining wall is a relatively new
30:18structure. Um and it has, I believe,
30:21seven different sides. The idea is this
30:25mural will be the very start to a
30:29several-part series that we will do over
30:32the next several years. Um it will not
30:34always be with the same artist, so I
30:37will keep that caveat. The idea is that
30:40we will spread the wealth along with all
30:42of the artists will get a different
30:43image on each side, okay?
30:46So,
30:47what we're proposing today is this
30:50front-facing, the largest side. It is
30:52207 ft long and goes from about 6 ft on
30:57its furthest right side
31:00to about 10-12 ft on the left side.
31:06Same idea as the previous
31:09mural. We went through a process where
31:11we worked with a subcommittee that was
31:14contained business owners from downtown
31:16as well as economic development
31:19and worked with the artists to come up
31:21with some themes.
31:23That design went to public review for 30
31:25days. We received the public review.
31:28There was an outstanding amount of
31:29public review because this is a very
31:31prominent location, so we were excited
31:34to see that.
31:35Obviously, very highly successful with
31:38that public review. And here is the
31:42design.
31:43This is the design called the song
31:45beneath the town. This is by Britney
31:47Flood.
31:49This piece has fully incorporated all of
31:53the public feedback.
31:56So, the original design was quite dark.
31:59It had one very bright butterfly
32:04similarly in location that we have the
32:06butterfly on the right here,
32:09but the contrast levels were very off.
32:11And so, a lot of the public feedback was
32:14this this feels very dark. There is very
32:17very dark. We don't understand why it is
32:19so dark and this butterfly is so bright.
32:22So,
32:23that was one of the things that we came
32:25back with
32:26to our artist was
32:28number one, people want to see the North
32:30Carolina butterfly.
32:32North Carolina state butterfly, so we
32:34made the North Carolina state butterfly.
32:37We also wanted to see an adjustment in
32:38contrast to this mural, and that's
32:41exactly what Britney did.
32:43So, you'll see
32:46um many different representations of
32:48Apex in this space.
32:50Um most obvious, the train tracks as
32:53well as much local foliage
32:56um and obviously our state butterfly.
32:59Do we have any questions for this draft?
33:05It's very hard to get all of the detail
33:08in this small piece in what will be 207
33:11ft. It's incredible.
33:13>> It's a really big space. So, here they
33:15look small images, but really when
33:17they're on the wall, they're going to be
33:18pretty large. So, part of me thinks like
33:20it's it's too small, but I know that
33:22when it gets on the wall, it will not be
33:23That'll be a really big butterfly.
33:25>> Yes, [laughter] it will.
33:28At at least 7 ft tall.
33:31>> [laughter]
33:31>> At at least 7 ft tall. Um probably about
33:357 to 12 ft wide as well at this point.
33:38>> So, Taylor, so the way you described it
33:41on the if we're looking at the the red
33:43outline of the the retaining wall from
33:46the previous picture,
33:48on the right side, it's
33:506 ft high, and then on the left side,
33:53it's about 10 12.
33:56>> ft.
33:56>> Okay. Okay.
33:57>> Yes. So, it it very gradually gets
34:00larger as it goes towards the left.
34:02>> Okay.
34:03>> Yes.
34:04>> But left to right, it gets smaller.
34:05>> That's correct.
34:06>> So, so does that mean that the butterfly
34:08will be on the pan- the far right panel,
34:10which would be about 6 ft?
34:12>> That's correct.
34:13>> Okay.
34:14Okay.
34:17And it looks to be about seven
34:20ish
34:21panels.
34:23Maybe maybe more.
34:28Yep.
34:30Yeah, and one of the items that we had
34:33heard was not to make it so angular. One
34:36of the drafts had um
34:41a lot
34:43a lot of
34:45um big triangles with just open color,
34:49no imagery in it. Um and we went more
34:53towards a more organic feel while still
34:56allowing for these different images to
34:59have a very clean transition between.
35:06All right, any questions at this time?
35:10All right. I'm going to open it for a
35:12vote. The vote is to bring this design
35:16to council for further recommendation to
35:19put on the Saunders Street retaining
35:21wall.
35:22Do I have a first motion?
35:26>> I'll make a motion.
35:27>> All right, Susan.
35:28>> I'll second.
35:30>> All right, all in favor?
35:31>> Aye.
35:33>> All opposed?
35:35All right, passed. Wonderful. Both the
35:38Nature Park mural vote and the Saunders
35:41Street mural vote prove as you see it in
35:44your slides.
35:47Thank you so much.
35:49And let's see, Susan, you want to start
35:52us off on the next item here?
35:53>> Okay. Can I ask a question before you
35:55get out, Susan? Is that okay?
35:56>> Sure.
35:56>> Um for our like mural and sculpture
35:59applications, do we have like a checkbox
36:02in there that says like um
36:05do you want us to let you know when the
36:06next application period opens?
36:09Or anything like that?
36:10>> We do not have a checkbox, but we do
36:12typically take the email information
36:16from the previous year's mural call and
36:19send the new mural calls to them. Same
36:21with the sculpture art this as well.
36:24>> Okay. Thank you.
36:25>> Absolutely.
36:27>> Okay. Thank you.
36:28>> All right. Under old business, downtown
36:32window painting. That's a name.
36:34>> Uh yeah. We um are scheduled for
36:36November 30th, which is a Monday, from
36:393:00 to 5:00 p.m. I have heard back from
36:41three of the schools, so I'm going to
36:42touch base with there's one that I
36:43haven't heard back from. But um the
36:45three schools have said yes, and they're
36:47very enthusiastic about coming. Um we
36:49have a rain date of the following day,
36:51which I believe is the 1st of December.
36:54Um
36:55hopefully the weather will hold out. Um
36:57Taylor, I do have a list of a few things
36:59that I will need replenished. I don't
37:01think we've got anything for a while. Um
37:04and I'm hoping we can still have some
37:06snacks and things for the kids. Um I
37:08haven't promised that, but I I think
37:10that's a nice thing to be able to do. Um
37:13and um
37:15I think Brad has said he would and
37:17anybody's welcome to come and help out
37:18during that. Basically, it's just fun to
37:20be there and support the kids and take
37:22pictures. So, I can I think last year I
37:24forgot to take very many pictures. So, I
37:25do think we had the town staff came and
37:28took some pictures, too. So, um Taylor,
37:30are you going to reach out to um
37:32the fire station? Do I I think that last
37:35time you did that. Okay.
37:35>> I already have.
37:36>> done that in a while. Okay. And in the
37:39beginning days, like I had to do that,
37:40but yeah, it's really nice that that is
37:43already done. So, um
37:44but we will be there. I'll probably be
37:46setting up around 2:30, 2:35.
37:48>> Okay.
37:48>> Um cuz sometimes some kids get here a
37:50little bit earlier.
37:51>> And then it goes 3:00 to Is it 3:00 to
37:535:00?
37:53>> Okay.
37:54>> Do you need to do any initial setup the
37:56day before any organization?
37:58>> Um no, I mean basically, it's pretty
37:59straightforward.
38:00>> Okay.
38:01>> But yeah, I would usually start around
38:022:30 just to get the tables out and
38:05and set up and hopefully weather won't
38:08be a problem.
38:09>> Um I'm going to let you know about that
38:11date. I'm not sure right now, but um in
38:13years past, I I think we brought
38:15speakers and did like
38:16>> Yeah. The teachers bring their own
38:17speakers.
38:18>> Yeah.
38:18Okay. That was fun. Okay.
38:23>> And that's all have? Would you still
38:24want a table in front of the hallway as
38:27well in addition to the snack table?
38:29>> be great um because um
38:31I don't have a snack table so if you
38:32guys have
38:33>> [laughter]
38:34>> They have been um absorbed by
38:35businesses.
38:38>> No problem. We'll make sure that
38:39happens.
38:42Do you need volunteers for that other
38:44than us?
38:46>> No. No, the kids pretty much do
38:47everything. We just stand there to
38:49>> Okay.
38:50>> answer any questions usually, making
38:52sure they're safe, and teachers are
38:53there to but mainly to make sure that
38:55they're not running across the school.
38:57Yeah, things like that. The teachers
38:58too. Yeah.
39:03>> Okay.
39:04All right. Next is augmented reality
39:07with Brad.
39:08>> I need two more weeks to finish the
39:10model.
39:11It got a little more complicated than I
39:13expected. I started building it back
39:15last week and
39:18>> Okay. Just
39:19>> taking a little more time than I had the
39:21past the past week but
39:24um yeah, I'll I'll be sending that out.
39:27About two weeks.
39:28>> In two weeks. Okay.
39:29>> Sounds good.
39:29>> Briefly explain to me what that is.
39:31>> Um it's just as it's a
39:34digital documentation of cultural
39:36heritage. So, um making
39:40in this case three-dimensional model of
39:42something that will eventually have to
39:43come down. This is the in Kidstown.
39:45There's a um the community
39:48architectural piece that has the
39:49handprints of everybody that helped
39:51build it up. I just made a quick 3D
39:53model and I'm making a
39:55online
39:57uh web presentation of the 3D model and
39:59and the four panels of handprints.
40:01>> That's fine.
40:02Okay.
40:04>> Mhm.
40:06>> All right.
40:07Next is new business and bus stops.
40:11>> Okay. Your ball. Yes, thank you so much.
40:14So,
40:15um
40:15I put two items on new business with the
40:18intention that they will become old
40:20business with the next meeting so that
40:22we have some presentations. So, the bus
40:25stops, the planning department um wanted
40:28me to say this. Planning department will
40:30be coming in November to present about
40:33the bus stops. They would like to see if
40:35CAV would be interested {slash} willing
40:38to lead the artist selection and
40:41installation process for two bus stops.
40:44Um, two Excuse me, bus stop art
40:47installations this this fiscal year. So,
40:51before
40:52June 30th.
40:54Um, so planning will prepare a
40:57presentation at the November meeting and
41:00we will have the opportunity to discuss
41:03and ask them questions and get a lot
41:06more information, but they wanted to
41:07give you the heads-up that they are
41:09coming in November.
41:10>> Have the bus stops been chosen?
41:13>> I am not sure. I can get more
41:15information.
41:16>> I'm sorry.
41:17>> Absolutely.
41:18>> Thank you.
41:18>> We'll find [laughter] out in November.
41:19>> Yeah.
41:21>> Do we know if it's the Is it the bus
41:23stop structures, like the shelters
41:25themselves, or
41:27We don't We'll know. We'll find out next
41:29month.
41:30Or
41:30>> In in their email, they had mentioned
41:32that the medium had not been chosen yet.
41:36>> Okay.
41:36>> So, it
41:39I am not 100% sure how to answer that at
41:42this time.
41:43>> Okay.
41:43>> Um, it's possible that it could be some
41:46of the glass structures and or
41:50um similar to the current ground mural
41:55bus stop murals that we have right now.
41:58>> I would even when they come, I would
42:00probably propose that we leave it open
42:02to what medium and the artist can
42:05give some ideas.
42:07Cuz they're more creative than I am.
42:08>> [laughter]
42:09>> Absolutely. That's no problem.
42:12I think that's a great thing to bring
42:14up.
42:16All right.
42:17Okay.
42:18Great. Moving on to um the coming
42:21together piece. So, if you're familiar,
42:24I will refresh your memory. If not, um
42:27we have a stone sculpture that was um
42:33donated to us 2 years ago. This piece is
42:36called coming together. It was a part of
42:40our
42:4124 25 sculpture walk. It sat in front of
42:47the um the depot.
42:50And that piece was donated to us and
42:53moved over to the nature park um in the
42:56Excuse me, not the nature park, the
42:57Pleasant Park nature play area. Um a
43:01different part of nature. Um and this
43:04piece, like I mentioned, was donated to
43:06us 2 years ago. The piece is weathering
43:10some cracks and damage from use and
43:12time. Um this is pretty normal for this
43:16type of medium. Um and we have been
43:20granted funds from our insurer to
43:25um repair most of the issues with the
43:27piece. Not all of the issues with
43:31Um so, I'm working with the artists
43:34right now based on the allotment that we
43:37were given by our insurer to see what
43:39can be done about facilitating a fix for
43:43this piece.
43:44Um
43:45I know the artists was were unsure as
43:48two artists who created this piece.
43:51Um they were unsure if the cracks and
43:55the weathering was vandalism or if it
43:58was just from use and time. And we do
44:04not know. Um this The piece itself
44:07does not lend to one way or another. The
44:11insurer did not have any feedback on
44:14that. Um, but the intention is to get
44:17that piece repaired
44:19um, up to a certain level of function.
44:23Okay?
44:25Any questions about coming together?
44:27>> Is it still in it's still in the same
44:29location? It hasn't been moved.
44:30>> That is correct. It has not been
44:32decommissioned, it does not have it has
44:34not been removed.
44:36>> Do you anticipate if it that would need
44:38to be removed for the repairs or not?
44:40>> It's possible that it would need to be
44:42removed for the repairs.
44:43>> It's huge, as what I remember. Yeah.
44:44>> It's it's very large and so the piece
44:48itself it looks like a bench and it
44:50could functionally
44:52be used as a bench, but
44:56for the sake of art
44:59um, and the for the sake of how the
45:02artists represent it, it is a sculpture.
45:05Um, it's about
45:09ft long, maybe 6 ft long.
45:12Um,
45:13kind of organic looking, but it is it's
45:16like concrete stone and it's about 6 in
45:21maybe 8 in deep. Um, and that's just the
45:23top layer, not even the stand. It's
45:25extremely heavy.
45:27Um,
45:28it requires much of our equipment um,
45:31our
45:32parks operations equipment to be able to
45:34move it,
45:35um, but it's not impossible.
45:37We've done it before, we can do it
45:39again.
45:39>> Absolutely.
45:40>> But I wanted to give you guys the heads
45:42up because number one, it may it will
45:45need to be repaired, it may need to be
45:47removed and brought back and um, it will
45:50not affect our funding for any of our
45:53projects because insurance is should be
45:55able to cover most of the repairs.
45:59>> If we move it to to it, is it worth
46:02looking into moving it to a different
46:04location so that it's not potentially
46:06used as a play structure because that is
46:09>> Mhm.
46:10>> a very high traffic children area.
46:12>> Sure. It's possible. We will we can
46:15definitely review a new location for it.
46:19Um the biggest the biggest
46:24question is is is the
46:28repair needed because of use or is it
46:33because of vandalism or, you know,
46:36what will be the effect if we move it
46:38somewhere else um and where where will
46:40we move it?
46:41Um so there's definitely lots of
46:44unknowns in the air right now
46:47um but it's something that we're looking
46:48into as we move forward to see what we
46:51can do to repair it.
46:57Any questions?
47:00Okay.
47:03Okay, next uh announcements and
47:06petitions by board members. Any new
47:09announcements anybody has?
47:12We do have a new board member.
47:14>> We do?
47:15>> Yes, this is Christie Famolare, right?
47:17The Italian
47:18pronunciation. Welcome.
47:21>> Thank you.
47:24>> All right, anything else?
47:26Nope. Anybody? Okay.
47:29All right, I
47:31move that we adjourn the meeting
47:34for tonight. Do I have a
47:37motion to adjourn?
47:38>> Motion to adjourn.
47:39>> Okay.
47:39>> I'll second.
47:40>> All right.
47:42Meeting is adjourned.