2026-08-10 - Planning Board Meeting
Summary
Written from the auto-generated captions; names and numbers may be misheard.
- Captions begin shortly after the call to order; the meeting opened with a prayer and the Pledge of Allegiance. Staff had no items of information and no one signed up for public comment on non-agenda items.
- The consent item, minutes of the January 13, 2026 regular meeting, was approved.
- Public hearing on rezoning case 26 CZ05 for the 3.62 acre Olive Chapel Road site, from Wake County residential to rural residential conditional zoning. Staff described neighboring development, an existing house and driveway to be kept, streams along the southern and eastern edges, and neighborhood meetings held April 29 and July 15, 2026. Added conditions: a 70 foot wide undisturbed buffer along the southeast, a 5 foot wide sidewalk across the road frontage, and a 30 foot wide public sewer easement along the southern boundary. Staff asked that the word "wide" be added after the dimensions in conditions 13, 15 and 16 and that the board include this in its motion, and recommended approval.
- The applicant's engineer said about two-thirds of the site is lost to buffers and right-of-way, leaving about 1.2 acres usable. The plan is up to three lots including the existing house, with a cul-de-sac extending an existing street stub from the neighboring subdivision. He said the 70 foot buffer next to Army Corps land is shorter than the roughly 150 yard buffer suggested on earlier projects, but a longer one would leave no buildable room, and argued the stream and grade change make activity in that corner unlikely. A 25 foot right-of-way dedication, the sidewalk gap completion and a future sewer easement for properties to the east were offered in exchange. A board member confirmed that a sewer pump station sits in the lower corner and that the site would tie into a manhole in the existing street.
- No one spoke in the public hearing. The board approved the rezoning, with the added word "wide" in conditions 13, 15 and 16.
- New business: three Unified Development Ordinance amendments from a principal planner, approved together. First, renaming "accessory apartment" as "accessory dwelling unit" throughout, removing it from the use table and the setback encroachment table, and aligning the text with newly adopted state law; further standards under that law will come in the next couple of months. A board member noticed that the permitted markings were struck in the congregate living facility row of the use table, and staff said that was an error to be corrected before the Town Council. Second, raising the required unrestricted sidewalk width beside sandwich board signs from 3 feet to 4 feet to match federal public right-of-way accessibility guidelines. Third, fixing the application resubmittal language so applicants have up to one year to resubmit, rather than "no less than" one year.
- The meeting adjourned.
Issues discussed
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
01:40You're good?
01:42Is that your own computer?
10:17>> Well, ladies and gentlemen, welcome to
10:18the town of Apex planning board meeting.
10:20Today's date is August 10th, 2026.
10:23Um, we would now like to ask that you
10:25please bow your head in prayer.
10:28Lord, we lift the people of
10:30uh, we lift up the people of Apex. Every
10:32decision we make affects families,
10:35businesses, and future generations. Help
10:37us protect what makes this community
10:39special while guiding growth in a way
10:41that honors everyone. These things we
10:42ask in your name. Amen.
10:44>> Amen.
10:45>> Amen. Please stand for Pledge of
10:46Allegiance.
10:49>> I pledge allegiance to the flag of the
10:51United States of America, and to the
10:54republic for which it stands, one nation
10:57under God, indivisible, with liberty and
11:00justice for all.
11:06>> Okay, do we have any
11:08information from staff?
11:10>> There's nothing today.
11:11>> Thank you, Amanda.
11:13No items of information. We will now
11:14move into public comment. If you've not
11:16done so already, uh, to your left, you
11:18can sign [clears throat]
11:19to speak on any agenda or non-agenda
11:21items. The purpose of the public comment
11:24is to allow the public to speak on items
11:25that do not appear in this agenda under
11:27public hearings. Any member of the
11:29public wishing to comment on public
11:30hearing items will be called at the
11:32appropriate time later in the agenda.
11:35If there's a large number of speakers
11:36for one particular item, the planning
11:38board may ask a representative could be
11:41selected to speak for the entire group
11:42and limit the comments to 3 minutes.
11:45Do we have anyone to sign up on any
11:47non-agenda items? It does not appear so.
11:51Hearing none,
11:52we will close public comment
11:55and move on
11:57uh
11:58to consent item number one, minutes from
12:00the January 13th, 2026 regular meeting.
12:05Have any discrepancies? Any issues?
12:09Hearing none, I will make a motion to
12:10approve.
12:11>> Second.
12:12>> Second.
12:13>> Mark, all in favor say aye.
12:15>> Aye.
12:16>> All opposed?
12:17Motion carried.
12:19>> Who was the first?
12:21>> The chair.
12:22Yes, thank you.
12:25Okay, we will now move into the public
12:27hearing section.
12:29Please remember public hearing has the
12:30same 3-minute rule.
12:32Uh we will open consent item number one
12:34on the agenda, public hearing of
12:36possible motion regarding rezoning case
12:3826 ZZ053305
12:41Olive Chapel Road.
12:48>> Good afternoon, planning board and
12:50chair. Uh my name is Marissa Ste- Smith
12:52and I will be presenting the rezone case
12:54for 26 ZZ053305
12:58Olive Chapel Road.
13:00The project site is located on the
13:02western area of town, south of US 64 and
13:05approximately 1/2 mile from the border
13:07of Chatham County.
13:10The property is located along the south
13:12side of Olive Chapel Road.
13:14The property to the west is the Willow
13:16Hills PUD
13:17and to the east is the recently approved
13:20Lawrence property PUD.
13:22Land to the south is uh open space, Army
13:25Corps of Engineer.
13:27The 3.62 acre site includes an existing
13:30single-family home and a driveway off of
13:32Olive Chapel, and both will be retained.
13:36The site also includes mature trees,
13:39existing streams along the southern and
13:41eastern border, and the grade generally
13:43slopes from north what northwest to
13:46southeast.
13:48The existing zoning district is in the
13:50Wake County residential, and
13:53it is proposed to be rural residential
13:55conditional zoning.
13:57The current land use classification is
13:59rural density residential,
14:01and if approved,
14:03it would become rural transitional
14:06residential.
14:07Neighborhood meetings were held on April
14:0929th and July 15th of 2026,
14:13and due to the small nature of the
14:15project, it was not uh required to go to
14:18the Environmental Advisory Board.
14:20During the process, the applicant did
14:22agree to additional conditions, and
14:24these include adding a 70-ft wide
14:27undisturbed buffer along the southeast
14:29portion of the property,
14:30extending a 5-ft wide sidewalk across
14:32the project frontage of Olive Chapel
14:34Road,
14:35and recording a 30-ft wide easement uh
14:38Town of Apex public sewer easement along
14:40the southern boundary.
14:41Uh I did want to make a note that there
14:43will be a change to page four of the
14:45staff reports on these conditions 13,
14:4815, and 16. It will have the word wide
14:51added after the uh noted dimensions. We
14:54requested that the Planning Board also
14:56note this in their motion.
14:59The proposed rezone is reasonable and in
15:01public interest in that the rezone will
15:03allow for the existing single-family
15:05home to remain,
15:06and it will create a maximum of three
15:08lots, all that are generally consistent
15:10with those to the west.
15:12The proposed rezone will provide roadway
15:14frontage widening with a wide a sidewalk
15:16along Olive Chapel Road, and
15:18furthermore, the proposed rezone does
15:20include stricter architectural
15:22conditions than what is in the UDO.
15:25Planning staff recommends the approval
15:27of 26 CZ 05 as proposed by the
15:29applicant. And both applicant and staff
15:32are available for questions.
15:36>> Thank you, Marissa.
15:40Any questions for Marissa?
15:43>> Marissa, will the three homes be
15:45um
15:46going through the Willow rather than so
15:48that one will remain a single-family
15:50home entrance just for the house that's
15:51already there and then everyone else
15:53will go through
15:54Willow at Snow
15:57>> I believe the applicant has a slide that
15:59he'd like to present as well.
16:00>> Okay, great. Thank you, Marissa.
16:01>> Okay.
16:11>> Good afternoon.
16:13My name is Patrick Kiernan, Jones and
16:14Associates Engineering, 221 North Salem
16:16Street. Thank you all for your time
16:18tonight. Thank you, Marissa. And nice to
16:20finally meet you in person.
16:22Um
16:23I think this is a pretty short and sweet
16:25meeting, so I'll I'll try to keep that
16:26theme.
16:27Um
16:28Marissa kind of nailed all the main
16:30talking points. I wanted to share this
16:31exhibit
16:33um with you guys just to sort of
16:34highlight
16:35just how small of a usable acreage
16:40amount we have here. So, about 2/3 of
16:42the site is cut out by buffers, um
16:45right-of-way dedication, etc. Um so,
16:48what we're left with kind of in the
16:49middle, the white shaded portion is 1.2
16:52acres out of the 3.6 roughly that is
16:54being rezoned. Um
16:58as she said, we do intend on preserving
17:00the existing home along Old Chapel Road
17:03including the existing driveway. So,
17:06normally we don't really get into a
17:07whole lot of layout discussion with a
17:09rezoning, but on this one it it
17:12the design it sort of designs itself. We
17:14have an existing street stub at Snowbed
17:17Ridge.
17:18Um
17:19you know, it currently has, you know,
17:21future road extension signs on it. We
17:24have a perennial stream to our east um
17:26as well as an approved pod with no
17:28development, you know, to the east. So,
17:30we know that that road is not going to
17:31extend.
17:33It's going to end in a cul-de-sac.
17:34That's That's really the one design
17:35option that we have.
17:37Um beyond that, it's okay. We have
17:39enough area on the north side and the
17:41south side to match similar lot sizes as
17:44what Toll Brothers did next door in
17:45Willow Hills. So, that's really the long
17:47and short of our um our goal here. Um we
17:50are under the um size requirements for
17:53the
17:54um the road widening itself. We would be
17:57dedicating the 25-ft right-of-way
17:58dedication. And then um
18:02as Marissa said, we did agree uh my
18:04client did agree to go ahead and
18:05complete the sidewalk gap that would
18:07otherwise exist between Willow Hills and
18:09the Estates at All Chapel to our east,
18:11the Lawrence pod.
18:13Um so, those are sort of the, you know,
18:15extra components to this.
18:17The 70-ft wide understory buffer from
18:19Army Corps land um
18:21I know it is not the full 150-yd
18:24suggested buffer um
18:27that has been, I guess, implied um on
18:30previous projects. And I know that the
18:32Lawrence pod next door did I believe
18:34they did provide that. Turns out to
18:36about 450 ft of buffer.
18:38Um this project, given how
18:42small it is and I mean, 450 ft
18:45essentially is where the house is. So,
18:47we couldn't build a cul-de-sac. We
18:49couldn't do anything, really.
18:51At that point, it's okay. Let's Let's
18:53take a reasonable approach to this and
18:55and kind of look at this site
18:56specifically. [clears throat]
18:57The Willow Hills off the uh property a
18:59little bit, but down on the bottom left
19:01of the sheet, there is a home within
19:04Willow Hills, and I measured out the
19:06buffer that they have, and it's
19:07approximately 70 ft. So, that was sort
19:09of our okay, a compromise here. There is
19:11also this perennial stream and another
19:14uh tributary to the stream that really
19:16sort of cut I mean
19:18there's no wall there, but it's a it's a
19:20you know, major stream crossing going
19:23down into the reservoir.
19:24Um
19:25we believe that the intent of that
19:27suggested buffer is because it's
19:29technically game land.
19:32Because of the grade change that we'll
19:33have because of the creek, we don't
19:34anticipate
19:36you know, any necessarily you know, that
19:38those types of activities happening in
19:40this kind of
19:42corner of that game land there. So, we
19:45we believe it's a fair compromise in
19:46order to um provide the town the
19:49completion of the sidewalk gap and all
19:50those public facilities that we would be
19:52at you know,
19:53be adding.
19:54Um you know, the cul-de-sac as well, you
19:56know, kind of completing the Snowbird
19:58Ridge
19:59um landscape down there. So,
20:01that's sort of really the the long and
20:03short of it. I mean, it's it's a pretty
20:04simple um design. So,
20:07with that I'll see if you guys have any
20:08questions.
20:15>> Um
20:16I got [clears throat] to know the answer
20:16but
20:17in the lower left-hand corner
20:19is that a sewer pump station?
20:21>> It is. Yeah, I meant to label that.
20:22>> Okay. Is that
20:24Is there a Is the intent in the tying
20:25into that?
20:26>> So, we have um there's a manhole in
20:29Snowbird Ridge that we would just tie
20:30directly in like a normal subdivision.
20:33Um because of that pump station and
20:35because of a commitment from the
20:36Lawrence Pud to extend
20:40an easement across their southern
20:41boundary, uh we would be matching and
20:43doing the same and I've actually spoken
20:45with one of the property owners to the
20:47east of the Lawrence Pud at the
20:49neighborhood meeting. He specifically
20:50wanted to know
20:51would we be providing a corridor for
20:54future sewer? So, it's nothing planned
20:56right now. We're not building the sewer
20:57across our site. It would be um
21:01it would be interfering with some
21:03um well, really it would be deep and it
21:05would be
21:07to nowhere right now and it's not
21:09necessarily an upstream property that
21:10we'd be serving. It was just asked that
21:12hey, we don't close the door on them and
21:14make them, you know, come to my client
21:16later requesting an easement. We'll just
21:18go ahead and give you the easement so
21:19that it's sort of set up for them in the
21:21future. So, they were thrilled
21:22um that their
21:24you know, future route has been
21:25established.
21:33>> I have a question.
21:34>> Absolutely.
21:35>> So, the there's a um it looks like
21:37there's a blue line stream along the I
21:39guess that eastern property line.
21:42Um so, the buffer there that you're
21:44leaving is 70 ft in width. Is that what
21:45the proposed buffer is like?
21:47>> So, the green here, this is the actual
21:49perennial stream buffer. So, that's the
21:51100-ft buffer
21:52>> Okay.
21:52>> that is off of that blue line stream
21:54that you're seeing.
21:54>> Got you.
21:55>> The 70-ft is sort of a a number that we
21:57created internally just to, you know,
21:59allow for the construction of one home,
22:02not totally cut off that, you know, that
22:04side of the cul-de-sac altogether.
22:06Uh but it's not it's this blue is not
22:09necessarily related to a stream in
22:10general. It's it's it's the green that
22:12you you're referring to.
22:17>> And how many lots do you anticipate
22:18putting here?
22:19>> Total of three including the existing.
22:22So, we would essentially create a new
22:23lot line south of the existing home
22:26based on the setback requirements. Mhm.
22:32>> But we would be taking that home off of
22:34Well, it's up to them. They can be
22:35connecting it down to the cul-de-sac as
22:37well for utilities.
22:38>> All right. Looks good.
22:43>> Okay.
22:44Any other questions for Patrick?
22:49Hearing none, we will uh
22:52bring you back to the board.
22:53>> Thank you.
22:56>> Well, we're going to open public
22:57comment. Excuse me. I do not um
23:00I don't want to skip that one by any
23:01means, but I do not believe we'll have
23:02anyone here for public comment. Uh-oh.
23:08We'll open public comment. Hearing none,
23:10we'll close public comment, and we'll
23:11bring it back to the board for
23:12discussion and possible motion.
23:16>> It's pretty cut and dry.
23:18>> Yes, I was going to say the same words.
23:21>> Is that a motion?
23:22>> easy.
23:23>> It was a motion.
23:24Um for rezoning case CZ 26 CZ 05 with
23:28the word "white"
23:30put in
23:31>> What number did you say?
23:32>> 13 15
23:33>> and 16 after the dimensions.
23:35>> I believe that's what you all
23:36>> Is that right?
23:37>> Okay.
23:37>> All right.
23:38>> All right, we have a motion from Mary.
23:40>> Second.
23:41>> Second from Mark. All All in favor say
23:43aye.
23:44>> Aye.
23:44>> All opposed.
23:46Motion carries.
23:49Thank you. Then we will uh now go to new
23:51business.
23:53Item number one, Mr. Bruce.
24:10>> [cough and clears throat]
24:10>> Good evening, chair and board members.
24:12Just a couple of video amendments for
24:13you today. Nothing too substantive. Just
24:15a couple of cleanup items that we're
24:16going to go through and we'll walk you
24:18through those now.
24:20Uh principal planner three just for the
24:21record as well. So, the first amendment
24:23is going to be to sections 2.3.4F.
24:26Um and what this is is this is to change
24:28the the definite the classification of
24:30accessory apartments to accessory
24:31dwelling units. The accessory dwelling
24:33unit uh terminology has been used more
24:36widely in recent years as well as this
24:38is in our attempt to uh align ourselves
24:41with recently adopted uh state law,
24:43which has a new section for accessory
24:46dwelling units that we will be bringing
24:47before you guys in the next couple
24:49months to get that uh adopted to be in
24:50line with state law.
24:52The reason that didn't come before you
24:53today was they ratified it just a day
24:55after we were required to get you your
24:57information. So, it's being pushed off a
24:58little bit, but you'll see the same
24:59sections come up later on where we'll be
25:01adding some standards or adjusting to
25:03make sure that we're in compliance, but
25:04we'll go through the changes here.
25:07So, the first one under planned
25:08development districts, um we've crossed
25:10out accessory uh apartment and added
25:12accessory dwelling unit under section
25:14seven there in the very bottom.
25:16You'll see a theme.
25:18We have removed it from the use table.
25:20Um this was causing a little bit of
25:22confusion as accessory dwelling units
25:24are supposed to be accessory in nature,
25:26and so we should be referencing the UDO
25:28section for accessory uses, structures,
25:29and other areas where they're permitted.
25:31So, it has been removed from this
25:33section, but we have made sure that it
25:35is available and we will direct people
25:36to that other section where it should be
25:38located as well. So, that has been
25:39removed from there.
25:41So, originally since it wasn't in use
25:43table, it was required to be in our use
25:45classifications under residential uses.
25:48Because we've removed it, we also had to
25:50go into section 4.3.1
25:53and remove that section for accessory
25:55apartment, and we've now created a
25:57reserve section for future UDO
25:58amendments to go there as well. But with
26:00that, we have updated the accessory use
26:03section for accessory apartments by
26:05changing the name as we've talked about,
26:07and then also making sure that we added
26:09some language uh that would make it
26:11compliant with what was in the other
26:12section so it's appropriate moving
26:14forward. So, you can see that we've
26:16crossed out some sec- some language
26:18there and added the bold there to speak
26:20to um
26:21the floor of commercial uses and the MMR
26:24ex-residential districts and things like
26:25that. And again, we've changed the name
26:27where it's appropriate from accessory
26:29apartment to accessory dwelling unit.
26:34Again, further on in that section, it's
26:36uh it's been changed again from
26:37accessory apartment in section C, D, and
26:40E,
26:43as well as in F
26:44and G.
26:48And then um as far as it's been removed,
26:51accessory apartment has been removed
26:52from table 5.2.B,
26:54which it speaks to in permitted
26:56encroachments into required setbacks.
26:58Um these accessory dwelling units that
27:00are attached or just going to be subject
27:01to the the original setbacks of the
27:03principal structure itself, and so it
27:05was not needed to be there, so it's been
27:06removed as well.
27:10Um again, we've changed in uh the
27:12encroachments in the setbacks on 5.2.7.
27:15Uh for detached, we've uh changed the
27:18the terminology from accessory
27:19apartments to accessory dwelling units,
27:21so it's consistent.
27:25Um under 8.3.4 for our off-street
27:27parking loading locations, our
27:29residential driveways, again, there was
27:30a section under uh three for number of
27:33access points see
27:34we again we just changed the terminology
27:35from accessory apartment to the
27:36accessory dwelling units to be
27:37consistent.
27:40That's the first amendment uh before you
27:42today. Any questions about that?
27:44No.
27:44>> In 4.2.2, the use table,
27:47>> Mhm.
27:47>> I am getting the sense that this is an
27:49error, but it looks like all the P's are
27:51struck in congregate living facility, at
27:53least on the version that we have.
27:56Um
27:57Does anyone else see that?
27:58>> Good catch.
28:00>> Good catch. Thank you. Yeah, they must
28:01just inadvertently [clears throat]
28:02finger click. No.
28:04Nope, that is not supposed to be
28:05adjusted, so that'll be corrected for
28:06town council moving forward. Thank you
28:08for catching that.
28:10>> Good catch. I did.
28:13>> That would
28:16If there were no other comments or
28:18anything pointed out, I can move on to
28:19the second one.
28:21Okay, so this one is just about um
28:25changing the the required distance of
28:27unrestricted pedestrian movement um from
28:303 ft to 4 ft, um and we'll go over that
28:32here.
28:33So this is under signs and permitted
28:34signs location.
28:36Um for temporary signs, the sandwich
28:37board signs, which you'll see in front
28:39of different businesses and things like
28:40that to promote specials and other such
28:41things, um the UDO originally required
28:44only 3 ft of sidewalk width uh be
28:46unrestricted for pavement movement, but
28:49um for us to be in compliance with
28:51PROWAG, uh the guidelines for, you know,
28:54public rights-of-way access and
28:55easements and things like that, that
28:56does suggest 4 ft, and so we're moving
28:58into the more restrictive higher
29:00standards of the 4 ft unrestricted
29:02access along uh the feet of sidewalk.
29:04So, the signs will just have to go
29:05further back possible. And so, that's
29:07what we're proposing today.
29:11Any questions on that one?
29:14Nope.
29:15Okay, lastly number three. Um this one
29:17is just to kind of clean up a section
29:19that um
29:20funny enough
29:21has gone unnoticed for a while, and uh
29:24I'll show you what it what it was
29:25originally. So, this is just the
29:26determination of compliance. So, when an
29:28application comes into the town,
29:30we receive the submittal, we check for
29:32sufficiency, and then it goes into a
29:33review period. Um this speaks to how
29:36long the applicant has to respond to the
29:38comments that have been get to them
29:39after the first review period, and how
29:40long they have to resubmit after that.
29:42There's typically our practice has been
29:45this entire time 1 year. They have 1
29:47year to resubmit in order to keep the
29:48process moving forward. The original
29:50language spoke to they could resubmit no
29:53less than 1 year, which meant they
29:55wouldn't be able to submit until after a
29:57year had passed. Clearly, that's not
29:58what we've been practicing, and that's
29:59not what we want as far as helping our
30:01our business and commercial partners
30:03move forward. So, this section here is
30:04really just changing that to make sure
30:06that it is appropriate and in line with
30:07what we've been doing so far.
30:09So.
30:10That is the last amendment before you
30:11today. Any questions on that?
30:13>> No questions.
30:14>> Nope. Okay, thank you.
30:18>> All right, thank you, Bruce.
30:21I'll bring that back to the board for
30:22discussion.
30:25I think that one was very clear.
30:26>> Yes.
30:27>> Very easy.
30:28>> Very easy.
30:28>> Let's vote on it a minute by minute, or
30:30can we vote on it both at one time?
30:34Okay.
30:36Motion to approve.
30:38>> Do we have a second?
30:39>> Second, Christie.
30:40>> Second from Christie, motion from Jeff.
30:42All in favor say aye.
30:43>> Aye.
30:43>> All opposed.
30:45Motion carries.
30:47All right, we're going to need one more
30:48motion, guys.
30:50>> Motion to adjourn from Alyssa.
30:53>> To adjourn, got a second?
30:54>> I'll second, Mary.
30:56>> Second from Mary.
30:57All in favor say aye.
30:58>> Aye.
30:59>> All opposed.
31:00Motion carried.
31:02Thank you, guys.
31:03Thank you.
33:50>> Mhm.