2026-10-07 - Data Center Subcommittee Meeting
Summary
- The subcommittee met to review a working draft noise ordinance for data centers; no formal motions or votes were recorded. Staff presented (the presenter is identified only as Bruce in the captions, spelling uncertain) and two new subcommittee members were welcomed. See Data Center Noise Ordinance Draft.
- Noise basics: human hearing spans roughly 20 Hz to 20,000 Hz, and A-weighted readings can miss low-frequency noise, so C-weighted, Z-weighted and one-third octave band measurements were discussed. Data centers differ from other sources because they run continuously.
- Example source levels cited: substations, diesel generators (75-85 dB enclosed, 95-105 dB unenclosed), air coolers (80-95 dB) and cooling towers (70-90 dB).
- A data center noise study for Prince William County, Virginia was presented, with modeled increases such as 50.5 to 68.7 dB at one location; nearly all studied areas would have exceeded the existing ordinance at full buildout. The county reportedly updated its noise ordinance in May. See External Trends Affecting Apex.
- Health and wildlife: staff shared studies linking environmental noise to cardiovascular and other health effects (noting data-center-specific studies are limited) and North Carolina Wildlife Resources Commission advice, including a 150-foot natural buffer around wetlands and habitat and lighting controls.
- Mitigation options (absorption walls, reflective walls, louvers, barriers near the source, distance) were reviewed; vegetation does little, and the example shown achieved only about 8-10 dB of reduction.
- The draft would require a noise mitigation plan, compliance points toward each protected property or sensitive use within 3,000 feet, at the property line, and 25 feet from the nearest dwelling's exterior wall, continuous monitoring, an applicant-funded independent acoustical consultant, and no waivers by private agreement.
- The draft tiers facilities by total connected load at full buildout with no-segmentation language. Setbacks were bracketed as starting points, from 500 feet for the smallest tier up to 1,500 feet for the largest. A 55 dB limit for protected uses was discussed, and one member questioned whether high industrial limits suit continuous 24/7 operation.
- Generator testing, notification of neighbors, five-year maintenance records, quarterly surveys and public posting of monitoring data were discussed. A proposed South Carolina bill with penalties from $10,000 to $35,000 a day was cited against a very low North Carolina default, pending legal review. Water curtailment questions were tied back to Jonathan Jacobs.
- A member recommended obtaining ASHRAE Standard 90.4 on data center efficiency (about $178); staff said they would take the request to a supervisor.
- Next steps: staff will gather resident input on October 14 and report back; the next meeting covers public safety, fire and police; drafting is expected to continue before members' terms end in January. See Data Center Moratorium and Rules.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
01:10congress.
01:32Yes.
11:30order the October 7th data center
11:33subcommittee meeting. Now that we have
11:34established a quorum, welcome back
11:36everybody and let's go ahead and jump
11:41right in. Tonight we'll be talking about
11:43noise.
11:52This is a side thing, but they they put
11:55a little label on here saying to please
11:57stand in front of this podium when
11:58you're speaking. It's just it's been
12:00needed. It's funny. [laughter]
12:02People people will naturally stand over
12:04here. All right. Well, good evening,
12:06subcommittee members. It's nice to see
12:07you all again. It's nice to see the new
12:08members who have joined us, Kimberly and
12:10Romesh as well. Um, we've met on we've
12:13had a couple meetings already so far.
12:14The next one in our series is going to
12:16be on noise and how uh noise impacts are
12:18created at data centers and how to
12:19mitigate those maybe potentially.
12:22Additionally, in front of you there is a
12:24a pretty lengthy draft of a noise
12:26ordinance related to data centers in
12:28front of you. This is a just a working
12:29document. This is um not been vetted by
12:32any other departments or anything else
12:33like that. This is just kind of getting
12:34a feel for the subcommittee's desires
12:37and wants and to provide direction. Um
12:40this information will be posted online
12:41later on after the presentation. We'll
12:43go ahead and get started.
12:46So, do a quick little noise overview.
12:48We're going to talk about noise types
12:50and sources for data centers. So, we're
12:52just talking about noise types. I'm
12:54going to start off by letting you know,
12:55and it's probably pretty obvious, I am
12:57not an engineer, a mathematician, or
12:59anyone who deals with uh some of these
13:01complex things. So, I'm going be doing
13:02my best to kind of give you the layman
13:03understanding of some of these. So, if
13:05there's any questions I can't answer,
13:06I'll be happy to reach out to someone
13:07who can answer them for you. Um, but
13:09we'll try and get through this as best
13:10we can with all of our expertise in the
13:11room.
13:13So, talking about noise types, there's
13:14there's uh different uh hertz and
13:16frequencies and ranges that make up
13:18noise in general. Um the human range
13:20falls between 20 hertz and uh 20,000
13:23hertz as you can see here on the screen
13:24in front of you or on your screens in
13:26front of you. There's infrasound, which
13:28is sound that's it's too low for us to
13:29be able to audibly hear. Um but there
13:31may be some physical feelings from that
13:34as well. And then there's ultrasound,
13:35which is also beyond our normal range of
13:37hearing, but may be uh used in different
13:39areas and aspects. We'll focus more on
13:41infrasound today because this can be
13:44generated by large machinery and other
13:46powerful sources on sites and things
13:47like that which play kind of plays into
13:49the center. So we'll touch briefly on
13:50that.
13:53And when it comes to planning and kind
13:54of land use options and things like that
13:56and especially municipal um noise
13:59ordinances and things like that, most
14:00noise ordinances in the last probably 50
14:03years have looked at um looking at the
14:05decibel ranges and really looking at the
14:06decibel weighted scales for A, which
14:09really is a human focus centric. And
14:11this graphic just kind of illustrates
14:12what an A scale looks like. So, it looks
14:15at all the hertz, it looks at different
14:17hertz and ranges and provides um a
14:19weighted measurement, but really it kind
14:21of filters out all of the lower
14:23frequency noises that humans really
14:25don't pick up on and things like that.
14:27So, there's kind of there there are
14:28definitely gaps in it as well. More
14:30municipalities as uses like these hypers
14:33scale data centers and things like that
14:34are coming online and coming online
14:36closer to residential uses are starting
14:38to adopt more of a also measuring for
14:41the weighted seale as well. And so that
14:43takes into effect a little bit a bit
14:45more of the overall um frequency range,
14:49but sometimes there's still stuff
14:51lacking there. We'll talk about that a
14:52little bit later. And you have to really
14:54get into the nitty-gritty and kind of
14:55look at the octave band sound levels,
14:57which is kind of looking at each
14:58individual little band to see where the
15:00noise is actually being generated
15:02because sometimes you may be generating
15:04a lot of noise and it hurts way down
15:06here, but it won't show up if you're
15:07doing an A-weed measurement with the
15:09device on the side.
15:13So just looking at kind of a a generic
15:15layout of a data center and where the
15:18noise may come from. We have substations
15:20which can produce low hums, medium to
15:22low high frequency sounds. There'll
15:24obviously be the HVACs and the air
15:26handlers. There'll be generators,
15:28cooling towers, air chillers, and all
15:30things like that which are all going to
15:31make a variation of noise depending on
15:33the the the
15:36overall percentage of workload they're
15:38using. But the thing about data centers
15:40that we'll keep in mind is that
15:42especially the hypers scale data centers
15:43which we talked about they operate with
15:45the 59s they're always operational. It's
15:47247 and so that's kind of the
15:49differentiating thing between this and
15:51maybe another industrial user who also
15:53has um noise generating equipment but
15:56usually there's an operation hours
15:58unless it's something very specific.
16:02So just going to run through these real
16:03quick. Some of you have seen this stuff
16:04before. So substation noise again this
16:07can generate 80 to 100 dB um in the a
16:10weighted scale. I have a little graphic
16:12here just to show you kind of like this
16:14humming. This lower frequency noise is
16:16pretty dominant here between 20 and 200
16:18would be the low frequency and then it
16:20starts reaching the Aweed higher
16:22frequency there range. These can be very
16:25large um when you're talking about the
16:27data centers that one that was proposed
16:29here and others that are being proposed
16:31that are much larger. These facilities
16:33are having to build these substations on
16:35site and they can be massive and they do
16:37generate some noise itself.
16:40We talked about the air handling units.
16:42These are kind of what they look like.
16:43They can be um on they can move air
16:47around on the facility itself. They can
16:48be located on different places whether
16:50that's rooftop, on the ground, anywhere
16:52they need to be. They can generate the
16:54low frequency noise as well.
16:57Aircooled chillers, we talked about
16:58those. There's another illustration. Um
17:00they do produce different frequencies
17:02from different parts of the machine
17:03itself. So um you may have mid to high
17:06from the low to bottom areas and then
17:08mid to low to mid frequencies being
17:10generated from the uplast fans. A lot of
17:12the lower frequencies is going to be
17:14generated from the air moving and air
17:16cooling equipment on site as with the
17:18fan and stuff as well.
17:24Backup generators obviously they're
17:26they're going to be definitely um noise
17:28contributors. Um so this really goes
17:30into effect as well. I don't know if you
17:32guys have heard news. There's a lot of
17:33data centers that are coming online with
17:35um their own uh on-site generation
17:39power. So depending on how they're doing
17:40that, if they're using diesel generators
17:43to help provide some of the power, that
17:44means the diesel generators are running
17:45even more often than than they would if
17:47it was just for backup energy alone and
17:49cailment. So these potentially are
17:51producing a wide spectrum of frequency
17:53of noise on the site given its use.
17:57Again, cooling towers. Again, given the
18:00large amount of fans and that with
18:01moving air moving through them, they
18:03again are going to produce a lot of
18:04sound on the site, which we we've talked
18:06about before.
18:08Some of the just some typical of the
18:10decibel levels that are at some of
18:12these. So, diesel generators can, you
18:14know, anywhere between 75 to 85 when
18:16they're enclosed, 95 to 105 when they're
18:20un unenclosed. Air coolers, we're
18:22looking at um 80 to 95. cooling tower is
18:2670 to 90 dB and on and on. Um you can
18:29see the substation around 60 to 80 dB
18:33and that provided the uh the range of
18:35where these were all measured at
18:38and the construction noise and traffic
18:40and fuel deliveries as well. So all of
18:41these things u many of them will be
18:43going at the same time on any site
18:44whatsoever. So you have a lot of areas
18:46where a lot of loud noises are coming
18:48and it takes a lot of consideration and
18:49thought to try and minimize or prevent
18:51it.
18:54So the way the reason data center is
18:56different kind of touched on is that the
18:57continuous noise 247 for most of these
19:00facilities is really going to have an
19:01impact especially on people who maybe
19:03they don't hear it when they're at work
19:05or they're away or they're at school but
19:06when they get home and they're trying to
19:07relax or spend time with their family
19:10that constant noise is there and it can
19:11be a little detrimental to their health.
19:12Talked about the generators and the low
19:14frequency noises how those can impact it
19:16as well.
19:19And so talking a little bit about best
19:21ways to to manage it and why why there
19:24are issues that come up is the DBA
19:26obviously isn't even isn't capturing a
19:28lot of those lower frequencies. It's not
19:30being checked for measured. But even
19:32when you're doing DBA and DBAC sometimes
19:35there's a gap that still gets missed.
19:37And so that's why um you'll see when
19:39you're reviewing some of the material in
19:41front of you on the proposed language
19:43for a UDO amendment um it's actually
19:45talks about incorporating maybe all
19:46three or having the one-/ird octave band
19:49which allows you to see an even more
19:50detailed version of the noise being
19:52generated at each band of frequency.
19:57Uh we also have to consider when we're
19:58talking about noise that the weather and
20:00temperature can affect it as well. Um, I
20:02am not an expert on this, but
20:04essentially downwinds can help move
20:06noise and push it. Temperature can help
20:08adjust where the noise is. Relative
20:10humidity also plays a factor. So, that's
20:12also something that needs to be
20:13considered at any type of modeling or um
20:16testing it as well, like need to test on
20:18a clear day where there's no potential
20:20for wind, weather, or anything else to
20:21kind of give you a false positive or
20:23false result.
20:26So, there's a couple things. Um, some of
20:28these were were graciously provided or
20:30shared with us from uh residents in the
20:32town. I thought this one was really
20:34interesting. We talked about Prince
20:36William County in Virginia quite a bit.
20:38Um, this was a data center noise study
20:40report done by um uh PhD uh John Lever
20:44out there. He I believe it was a county
20:46commissioner, but he also taught uh at
20:47George Mason. He has a quite an
20:49extensive uh background. Um I have
20:52obviously not have the criteria to
20:54really measure or judge um John's
20:57material here but I thought it was a
20:58great thing to look at and kind of get
21:00an idea of all the work he did. Um this
21:02will be provided to you on the website
21:03and sent to you as well after this
21:04meeting so you can review it at your
21:05leisure.
21:08So some of the things he looked at he he
21:09took looked at all these different small
21:11areas and he studied them and he was
21:13trying to predict what the range of the
21:15noise would be with the builtout data
21:17centers and how that would increase
21:18given the area. So he looked at all
21:20these different areas. One thing that's
21:22interesting to note is that um for the
21:24summary of the tables, he also looked at
21:25the local noise ordinances, specifically
21:27Prince William County, and he wanted to
21:29see that what percentage of those areas
21:32that he reviewed would actually be
21:33violating their current noise ordinance
21:35if they were fully built out. So from
21:37his results and his studies, it looks
21:39like almost all but two would be 100%
21:43would be violating their own noise
21:44ordinance in place right there at the
21:45time. So best intentions, you had a
21:48noise ordinance. You wanted people to
21:49follow it, but things happen and
21:52unfortunately unforeseen circumstances
21:54and in the fast pace of this probably
21:55led them to have issues with that.
21:59Again, on this table six here, um this
22:01looks at a little bit more specific. The
22:03current noise with the added data
22:06centers and then the multiplier and then
22:08the closest data centers in feed. So
22:09here you can kind of see exactly how far
22:12away these data centers are and still
22:13how much of a a growth there will be in
22:16overall noise. So at the very top the
22:18clubhouse we're going from 50.5 to
22:20potentially 68.7. That's quite the jump.
22:23It's a lot of noise being generated. Um
22:25you can see some here are going up into
22:27the 70s from the generation and they're
22:30still very far away. So just creating a
22:32lot of noise in general and that's
22:34something to be aware of. He created
22:35some great illustrations and maps
22:38that uh I'm share with you now. So um
22:41the red is all currently operating data
22:42center buildings with road noise. So
22:44that's taken into effect and then the
22:46net noise is after buildout. So these
22:47are modeled and anticipated. So again
22:50you can kind of see how how much noise
22:52some of these are providing or creating
22:54addition. So you have the Carter wood
22:56area here which right now is about 44.1
22:59very quiet. Uh and then it's increasing
23:02to 65. So that's a pretty perceptible
23:04change that people will probably notice.
23:06Um you normal normal conversation is
23:09about 60 dB. Um, but when you're going
23:12from that much of a jump, it starts to
23:14feel louder and louder and louder.
23:18Here's another example of another small
23:19area that he looked at um with predicted
23:22noise intensities. Again, these are
23:23predicted, so it it's there could be
23:25some issues there, but it's still
23:27interesting. Again, you can see that
23:29even as far away as some of these are,
23:31which are almost almost a mile in some
23:32cases, there's still a very large
23:35increase in the amount of data center uh
23:37noise that was generated from what was
23:39originally there. Again,
23:42here's another example of of data
23:44centers with near a brickyard.
23:47And you can see that um if only the
23:49brickyard data center buildings were
23:50built, the the overall increase goes up
23:54a little bit, but then at total build
23:56out we're going up another two and a
23:58half, a little under two and a half
24:00decibels in these areas. So really
24:02contributing. So, and I believe that,
24:04you know, they're trying to achieve the
24:06best they can with their noise
24:07ordinance, but clearly just the volume
24:09and how much of this infrastructure is
24:11going in is just hard to calculate. I
24:13think most local municipalities don't
24:15have the expertise or the staff prepared
24:17to really kind of model these things out
24:18appropriately.
24:21Um, another example here, this will all
24:24be provided to you. It just kind of
24:25gives you a really good idea of distance
24:27required, how the noise
24:30so in in his uh report, it's very long.
24:33Um, so that's why I didn't print it out
24:34for you today. Uh, he did have a summary
24:35and recommendations. His summary
24:37included that the Prince William County
24:40government um do a better job at
24:42fulfilling its obligation to protect
24:43residents by having reliable noise
24:45projections um for these proposed uses
24:48and that North Virginia um should really
24:51find better opportunities and better
24:53more qualified staff to be able to kind
24:55of implement and make sure that the town
24:57and the counties themselves are
24:58protecting their residents. So you did
25:01provide recommendations here. Um they're
25:04not very specific. They're just things
25:06like you need to modernize or noise
25:08ordinances to be participate and expect.
25:10Yeah. Not not very specific, but I will
25:13point out that um Prince William County
25:15has taken some of this to heart and they
25:17did update their noise ordinance in May
25:19of this year and they're they're changed
25:21some things. One thing they're doing is
25:22they're now looking at that multiple
25:23band review so they can kind of see
25:26where these issues are coming from.
25:27They're increasing the distance and
25:28they've kind of taken away a lot of
25:30byight development as well. So they are
25:32working on trying to go in the right
25:33direction. But um
25:35>> are they are they trying to deal with
25:37the uh
25:39idea of multiple data centers being
25:42close to each other and multiplying that
25:45noise?
25:45>> Yeah, that's that's where it's going to
25:47have to I think us people like us who
25:50have not don't have any active data
25:51centers are going to have the the
25:52ability to kind of see the mistake that
25:54they made and work on that. I'm not
25:55sure. I'm hoping that they are because
25:57they obviously have a lot already on the
25:58ground and they need to do that. But as
26:00you can see in that in that work that
26:02it's about full buildout. It's not we're
26:04not allowing not potentially not
26:05allowing any type of phasing and then
26:07we'd have to consider all their uses
26:09potentially with a noise mitigation
26:10plan.
26:11>> And so the ordinances that they're
26:13tightening up are those are not being
26:15applied retroactively.
26:16>> They cannot usually I mean so if it if
26:19any new development there might be
26:21regulations and each state is a little
26:23different on what what they can do. um
26:26like if if we have a non-conforming use
26:28now um it would really depend on the
26:30complaints and things like that of what
26:32we can enforce but if they were approved
26:33and have been an operating users it's
26:34it's really difficult to go back and try
26:36and mitigate that but sometimes it's
26:38helpful sometimes you can go and have
26:39conversations with neighbors and there
26:41could be effects and works and also
26:43depends on where the power is vested is
26:45it a police power is it a planning power
26:47>> I guess I'm a little confused so on on
26:49let's you were talking about data center
26:51whe when they do a full build out
26:53they're going to exceeded the noise
26:56ordinance.
26:58Uh how can they do that? Uh
27:02I mean sure they get approval to do x
27:06number of buildings and stuff but
27:09that all come under overall noise
27:12ordinance
27:13>> thing. I mean that just because they
27:15they got permission to build more
27:17doesn't mean they have to or they can't.
27:20>> Yeah. Part of the problem is that a lot
27:22of jurisdictions weren't looking at
27:24noise being added to the area
27:25whatsoever. They would look for um what
27:28was required as part of your application
27:30submittal and they would review that. A
27:32lot of times when there's more
27:33complicated or um difficult to
27:36understand reports, they come from an
27:37engineer of some sort and they put their
27:39seal on it and they claim that's true.
27:40Um, one interesting fact about about
27:42John's report also is that he reviewed u
27:45an Amazon warehouse uh data center and
27:48he found the report to be um to be
27:51lacking credibility. He thought he
27:53thought there was flaws and he he points
27:55out as part of his report as well. So
27:57there's there's probably I'm not even
27:59going to say that they're deliberate,
28:01but you know there's incompetencies
28:02everywhere.
28:03>> Yeah.
28:07So um one thing to also consider about
28:09noise, it's not just annoying, but these
28:11constant noise annoyances essentially
28:13can impact our health and our lives. Um
28:15there's decades of research and
28:16systematic reviews that have kind of
28:18shown this uh correlation or this
28:21relation to noise of different varying
28:23frequencies and constant it constant
28:25presence on what that can do to our
28:26overall health. um some of the strongest
28:29evidence. It really speaks to kind of
28:30how environmental and transportation
28:32noise um not so much data centers yet
28:35because it hasn't been done is not there
28:36yet, but I think we're going to see if
28:38we continue this scope that uh these
28:40types of uses may also have the impact
28:43um especially since you know think about
28:45airports when they start being built and
28:46things like that and people weren't
28:47thinking about now you see all these
28:49sound barriers and things like that
28:50trying to mitigate it but there's still
28:52you know vulnerable populations that are
28:53around existing airports that still
28:55struggle.
28:56>> Yeah. So the the first point is health
29:00health impact right um I think there is
29:03a there is a talk about um the wildlife
29:08also impacted because of the the noise
29:12the
29:15this this animals listen to that you
29:18know the high frequency and uh their
29:21sleep and their behavior and their you
29:25know reproductive to you know
29:27capabilities all that impacted
29:30um anything on the on the wildlife also
29:33you know help
29:34>> yeah the North Carolina Wildlife
29:36Resource Commission put out something
29:37we're we're in talks with them as well
29:39because um during our conversations we
29:41discussed this and we realized that the
29:43high frequency noise is going to affect
29:44creatures like bats and things like that
29:46um and then there are opportunities and
29:48stuff like that but there isn't a lot of
29:49literature that they found yet on the
29:51low frequency noises and how that's
29:52going to affect them um but we've asked
29:55for more information from them to
29:56provide us with any kind of studies or
29:58research that shows this constant 247
30:01noise how that will impact. Um we will
30:03look at their their flyer or their their
30:05document that they provided as part of
30:06this. Um and their recommendations
30:08really come down to at this point in
30:09time um making sure that you have
30:12acceptable buffer and habitat for these
30:14areas and things like that. I don't know
30:16if it's enough after um reviewing kind
30:19of what other places are doing just for
30:21human impact. Um, I think that given
30:24some of our furry neighbors are a bit
30:26more sensitive to these type of things
30:27as well that it may need to be increased
30:29or continue to be looked at. And I think
30:30as more research comes out about that,
30:31we'll be able to address that a bit
30:33better.
30:33>> I was reading something the other day
30:35that indicated that
30:38there was more there were more studies
30:40documenting the adverse effects on
30:42wildlife than were on on humans. At
30:45least being able to correlate.
30:48>> I can find a lot on light. Um and I mean
30:51a lot of studies a lot of studies on the
30:53negative effects are done on animals
30:55like there's a lot of Yeah. So I mean a
30:58lot of these
30:59>> health research things are actually done
31:00on animals and then they're yeah
31:05>> so you're talking about in a laboratory
31:07setting versus wildlife.
31:09Well, I to be honest, I don't know how
31:12they conducted the studies. Uh, but it
31:15was a discussion about various studies
31:18that have taken place. Uh, the
31:22effect on on wildlife. Uh, they could
31:25document the impact better than they can
31:28on humans because it's a lot easier to
31:32isolate
31:34a stud.
31:38And there's there's a study that um the
31:40link is included to this one where um it
31:43was it was an old factory and there was
31:45a a methane um methane stack and
31:49essentially they went in and did a
31:51health assessment for it because people
31:53were reporting all sorts of symptoms and
31:54issues from it and um from the noise and
31:59they concluded that it's hard to really
32:00kind of track when you're in the open
32:02environment like that to really figure
32:03out what's causing this. Like we don't
32:05know what these people are exposed to
32:06elsewhere.
32:07But a lot a lot of the research is is
32:09done with laboratory animals and they
32:11are able to kind of extrapolate that
32:13information. Yeah. Um this has a lot so
32:17we provided you with a lot of um links
32:20and um citations for this time. You
32:24don't have to go through all of them but
32:25if you want to look through some of them
32:26they're they're very insightful. Um some
32:28of significant associations identified
32:29between um the environment and noise is
32:33it's a wide ranging. So we have you know
32:34cardiovascular disease and elevated
32:36blood pressure um all different types of
32:39mortality issues, diabetes, hearing
32:41disorders, neurological outcomes and
32:43other hormonal and reproductive issues
32:45I've seen in some of these studies as
32:46well. Um it's it's really interesting.
32:49Um and definitely it's kind of
32:50surprising that there hasn't been more
32:52talk about just general noise overall in
32:54general in the public. But um so like I
32:56said there's two pages of studies that
32:59we provided. Some of these were were
33:00provided by staff and some of them were
33:02provided by residents um in our
33:03community that they found that they
33:05thought was worth sharing and I think
33:06they were they were some high quality
33:07studies as well. So we'll share those
33:10with you. These will all be on the
33:11website as well as well as um provided
33:13to you guys later in an email back.
33:17Here's the wildlife section. So um like
33:19I said providing appropriate buffers and
33:22setbacks is is what they really
33:23recommend for habitat. Um, you know,
33:26they have like maintaining 150 foot
33:27natural buffer around wetlands and other
33:30important habitat areas. They're really
33:32they focus a lot on lighting. So, you
33:33know, minimizing the artificial lighting
33:36impacts. So, having cut off lights,
33:38maybe having dimmers, having them turn
33:40off, things like that is important. Um,
33:41I think we'll see more from them come
33:43out as uh data centers really start to
33:45roll through North Carolina. Um, I will
33:47continue to look in other jurisdictions
33:49to see if they're thinking about it.
33:50Unfortunately with data centers at the
33:52time it's kind of a human centric topic
33:54but I do think there is impact and just
33:56can't extra.
33:59So there's two pages you'll receive this
34:00document as well.
34:03So as far as mitigation goes um we kind
34:06of talked about how previous codes would
34:08look at the Aweed um measurements for
34:11noise ordinances and try and balance
34:12that. And then we're talking about
34:14adding the C- weighted so we can kind of
34:15capture more of those low frequencies so
34:17we can see what the A was missing. And
34:19then there's the Z or really that that
34:21really is just an unweighted scale. So
34:23it looks it looks across at all of them
34:25here to kind of see what's being
34:27populated by the noise that's being
34:28created in frequency. Um so it kind of
34:31looks like this. And so one third octave
34:32band provides a little bit more detail
34:35as well. So you could see kind of here
34:37the noise being generated is really
34:39generating a lot of decibb in between
34:41the uh 250 and 400 hertz range here. and
34:44it's generating some in the 40 range,
34:46but some in the 4,000K range as well.
34:49But it gives you a bit more
34:50understanding of the wire the noise is
34:52coming from versus just maybe focusing
34:54on um just the maybe the 250 or 250 to
34:59the 1,00. Sometimes looking at A is
35:02enough. Sometimes it's efficient
35:04depending on the use and the type of
35:05product or engagement.
35:09Um, so talking we talked to a uh a an
35:13engineer who works primarily for a large
35:15company. Um, I won't say their name, but
35:18he does a lot of work and we talked to
35:19him about like how do we try and
35:21mitigate this if if this is a use that
35:22maybe town council does want to see or
35:24even just any other type of industrial
35:26uses. Um, he really strongly talked to
35:29us about noise barriers and acoustic
35:31louvers and things like that to try to
35:32mitigate the sound. Um, these need to be
35:34as close to the source as possible.
35:37walls far away do very little and
35:39they're not as effective. Um, and then
35:41sound can travel and move around them.
35:43There are different types of barriers.
35:44Um, there's reflection barriers which um
35:48make bad neighbors I feel like because
35:50you're taking the noise and bouncing it
35:51off the wall and essentially sending it
35:53somewhere else. Um, I think that's an
35:55easy fix for a lot of people because
35:56they can probably get the measurement
35:57they need to on their property line, but
36:00then who knows what it's doing down the
36:01road and it's someone else's problem in
36:02a few years to fix. there's adding
36:04absorption or absorber walls. So these
36:07walls um are filled with different
36:09material. So they're able to kind of
36:10capture a bit of that noise as well. So
36:12less of it is able to to permeate and go
36:14beyond. There's defraction which again
36:17is kind of breaking up the sound into
36:18different areas. So a little bit of it
36:20goes a bunch of different ways. It
36:21reduces the intensity. And then lastly,
36:24distance is always a powerful thing. Um
36:26sound waves that can't be reflected,
36:28absorbed, or defracted may only be able
36:29to be addressed by separation from noise
36:31sources in the sensitive receptor. um
36:34some of the infer infrasound, the lower
36:36frequency sound, the waves are longer,
36:38they can bend, they can go around, they
36:41can go through different things. Um and
36:43so sometimes the effectiveness of the
36:44noise barrier really depends on multiple
36:46things.
36:48So the benefit is if um say we had an
36:51industrial use and we were we were doing
36:52all this testing or having them do
36:54provide the modeling and we saw that
36:56there were more low frequencies than
36:58anticipated we would know that maybe
37:00some of these uh walls like a reflective
37:02wall or things like that may not be the
37:03right solution there maybe need to look
37:05at different things as well in the
37:06process
37:08um benefits of noise barriers. So, it
37:10does reduce can help reduce the noise
37:12pollution. Um, with that can help
37:14improve the health and well-being of
37:15neighbors nearby and even employees. No
37:17one stops to think about employees. I
37:19know it's it's hard to have sympathy
37:20when you're getting paid, but um I
37:23visited some sites for some industrial
37:25uses and I I really have uh developed
37:27some empathy for people that deal with
37:29noise or smells or things like that. Um
37:31it does promote aesthetic appeal. You
37:33can't see as many of these noise
37:34generators. I don't know how much more
37:36attractive um these boxes are and I'll
37:38show you a couple pictures of the boxes
37:39themselves, but um it does it does look
37:42a little different. And then um there is
37:44some environmental impact if you
37:46incorporate maybe some green
37:47infrastructure or noise barriers. We'll
37:49talk a little bit about um relying on on
37:52plantings and green noise barriers as
37:54well in a minute.
37:57So blocking sound transmissions. Um this
37:59was taken by uh this table here is from
38:01the the highway federal highway um
38:04authority and it just kind of breaks
38:06down materials and the the approximate
38:07sounds transmission and loss values for
38:09common materials.
38:11So you can kind of see how it breaks
38:12down the thickness here of the material,
38:14the weight and then the overall
38:16transmission loss um the sound that's
38:18that's being displayed. Um we talked
38:20about this blocking the infrasound is
38:21very difficult to block. Um conventional
38:24sound proofing doesn't work as well.
38:26there's multiple pathways. Um, and this
38:29is where having some type of consultant
38:31is really going to come in handy who can
38:33actually look at what sound's being
38:34generated, where it's moving to, how
38:36it's going, how it's being affected by
38:37the environment and the weather in that
38:39area and uh try and really maximize
38:42protecting the the sensitive receptors
38:43in the area.
38:46So, so just some um some illustrations I
38:49I thought were helpful to look at. So,
38:50this is this is a chiller. You might see
38:53there's fans on the top. So noise is
38:55coming from the fans and coming from the
38:56bottom.
38:57So they their goal was to try and uh
38:59minimize the the sound being generated
39:02from this. And so one thing they did was
39:03an acoustic barrier with an absorption
39:06wall. And so these absorption walls are
39:08filled with different uh mediums inside
39:10and then to help absorb some of the
39:12sound itself.
39:15>> Does the lifespan of one of those walls
39:19is there a lifespan on them?
39:20>> I will have to find that out for you.
39:22Yeah.
39:22>> Um thean usually pretty rusty. The
39:25equipment will get replaced before the
39:27wall would, but
39:30that wall, what's going to happen is
39:33it's going to get the crap beat out of
39:34it when they're doing maintenance
39:36because they're not going to care. So,
39:38they're going to back into it, bump into
39:41it, hit it with a tool box, hit it with
39:44a part. So eventually they get all it's
39:47almost like a industrial garage door
39:50where it just you know the fork list has
39:52hit it a couple times and it's seen
39:55better days but over time they're not as
39:57effective just from getting abused.
40:00>> That's that's a great point. That's one
40:01reason that like wood and other
40:03materials that can crack or have porous
40:04material become ineffective as well. So
40:07that's a potential to happen. Sure. Um
40:09yeah, and then you'll see in this
40:11picture here, there's actually um
40:12additional covering to help mitigate the
40:14noise down here. Um one issue though
40:17I've read about is that when they do
40:18maintenance, they'll take them off and
40:19forget to put them back on. So it's on
40:22for the the initial and then it doesn't
40:24get back on. So then you have the noise
40:25be generated from that.
40:26>> All of these suggestions are separate
40:30from
40:32requirements on equipment. Correct.
40:34because you can specify
40:37covers and limitations on the equipment,
40:41but we're not going to talk about that.
40:44>> We're not. No, we're not. We're so that
40:46would be up to the the professional for
40:49doing the the the sound modeling or the
40:51the noise mitigation plan part of the
40:52part of the UD amendment to come up with
40:54what would be best to approach it
40:55because I don't think one problem we
40:57have in planning is if we get too we we
40:58get prescriptive and we say you have to
41:01do this when it's not the best option
41:02for doing what they need to do. Yeah.
41:04>> And things do change. Um, this is just
41:07really to help everyone understand like
41:09kind of what's being used out there now.
41:11Um, so these are louvers that move
41:13sound.
41:15Additional uh walls are just showing
41:17some concrete footings. This is how big
41:18some of these can look like and be
41:21more barriers that are showing a thicker
41:23louver there. The the acoustic pergola
41:26above top helps pass the noise. We'll
41:28see an example of what that looks like.
41:30So from from their uh their their
41:33presentation they provided that they
41:35were able to reduce sound. Um the
41:37pre-insulation is the red here. So you
41:39know it's at 80 frequency it goes up and
41:41then in the higher frequencies it goes
41:43down. So from the 80 to 70 they're able
41:45to reduce it about 8 to 10 dB um by
41:48using those things. What's important
41:50about that is with we saw all of the
41:52different things they did all these
41:54different materials and they were still
41:56only able to reduce it by eight or 10
41:57dB. So there there is a limit to how
42:00much you can actually reduce. You'll see
42:03products um product pages and details
42:05that'll promise a certain decibel range.
42:08It's almost never possible to obtain the
42:10highest level that they promote.
42:14So back to this. Here's a a large
42:18potential future data center
42:19development. Lots of buildings. You
42:21know, it doesn't look too bad. We have
42:22we have lots of uh wet ponds. We have
42:24some vegetation still on site. There's
42:26buffers all around it.
42:28problem. So, we're talking about noise.
42:31Look how close they are to the roads.
42:33There's some there's maybe 75 ft in some
42:35of these areas or more of vegetation,
42:37existing vegetation present. We from my
42:40uh conversations with sound experts. Um
42:43vegetation does very little to actually
42:45help. It needs to be earth. It needs to
42:46be actual strong materials in the way.
42:49And so, if if a site comes in like this
42:51and we might think like, okay, they're
42:52providing all this good stuff. they're
42:53not tearing up the environment too much
42:55as far as what they're leaving in place.
42:57Um, we really have to be mindful when
42:59we're drafting our details and our
43:01settings about proximity and um, how
43:04we're going to mitigate. If there's a
43:05site that comes in that's maybe
43:07constrained
43:08um, and they have an area where it's
43:10shorter, you know, it's really important
43:11for us to have these standards of like
43:13what the minimum distance is from our
43:15sensitive users and things like that in
43:16place. So, that's just an example kind
43:19of that.
43:21Um this is just a inverse square um
43:25reduction uh example. So as you move
43:28further away from the sound source
43:30itself you start to see a reduction in
43:32sound pressure so decibb. So obviously
43:35the further away you get you see the
43:36most reduction. So again that kind of
43:38reinforces making sure that these are
43:40properly distanced.
43:42Um and then what's left is going through
43:46the paper in front of you guys line by
43:48line. I want to stop though to see if
43:50there's any questions. We're probably
43:51going to have lots of conversations on
43:52this and if we don't get through all of
43:54this today, that's fine. We still have
43:56time dedicated to drafting.
43:57>> The earlier graph is based on,000 ft.
44:01What you saying the distance?
44:03>> Uh it's supposed to be I think it's what
44:06they Yeah, I believe it's
44:08>> 1,00 ft and it will reduce by 60.
44:12>> Maybe it's meters. I'll have to double
44:13check on that. I apologize. I thought it
44:14was on the graph itself. Okay.
44:24So it sounds like similar to air quality
44:27distance isn't really an important
44:30>> distance keeping people
44:33safe. Yeah,
44:37I think you know we're very good at
44:39engineering and one day you know someone
44:41will come up with something that really
44:42helps but does help to kind of put some
44:45space between you.
44:50>> One one question I've got about
44:51setbacks. Um
44:55we can make a setback two miles
44:58>> but if if the the noise
45:02can be 60 Let's say it's property line.
45:05It really doesn't matter how far back
45:08that setback is.
45:09>> Yeah.
45:12>> If you they can be as loud as they want
45:14to be up till they get that property
45:16line.
45:17>> Yeah. If you want to go ahead to
45:20section,
45:27start at section four.
45:36So, um, this is this is different than
45:38probably what we've discussed a little
45:39bit in the past, um, where we talked
45:42about measuring the sound maybe at the
45:43property line and maybe that might be
45:45the way it goes forward. But, um, having
45:48spoken to residents and looking at
45:50different what different places are
45:51trying to do. Um, some of these ideas
45:53actually came from legislation that was,
45:56uh, proposed and in the house for South
45:59Carolina. And so I thought these were
46:00interesting. Um so the first they have
46:03to provide this mitigation plan. Um one
46:06of the contents is they have to show uh
46:08the land use of every property within a
46:09mile. Um they have to show the
46:11prevailing winds, the temperatures,
46:12inversions and all things like that that
46:14might protect that might affect the
46:15sound traveling. Um, additionally on
46:18page
46:19on page one here, but I do have it
46:25broken down.
46:27There's a section called points.
46:42Okay. Points of compliance. Thank you.
46:44There we go. Uh it's still in four. It's
46:45on it's uh starts at D
46:48>> points of compliance.
46:51>> So uh there's there's there's four of
46:53these here. Um first one at least one in
46:57so that designate points of compliance
46:58at one at least in direction uh in which
47:00a protected property line so a sensitive
47:02user within 3,000 ft. Um there is no
47:04maximum the town may designate more if
47:06there seems to be problems with noise
47:08traveling and causing issues. Um on the
47:10facility property line facing each
47:12protected property and 25 ft from the
47:13exterior wall of the nearest dwelling or
47:15noise sensitive use. Um they can we can
47:18also set different locations as well of
47:20like areas that should be considered and
47:22measured um for these types of issues. I
47:25think just trying to do a band-aid of
47:28property line is easiest, but I don't
47:30know if it's it's it's appropriate in
47:33this text too. It also requires that
47:34they have that that constant monitoring
47:37system installed.
47:39um which would help alleviate some of
47:42the concerns I think with having staff
47:44to always be able to go out and respond
47:46and do the measurements perhaps they're
47:48not prepared or trained for where at
47:49least if you have the continuous
47:51monitoring is functioning properly you
47:53can send that information to a to an
47:54expert to review and they can provide a
47:57report maybe on an input on how to
47:59mitigate some of that stuff as well. Um,
48:02so being having to be able to really
48:03account for
48:05noise disturbances in a greater area
48:07outside of the property honestly sounds
48:08like is what you're concerned about,
48:10John. It's like
48:11>> Yeah. So, I think
48:12>> well, I mean,
48:14I guess my my
48:16what sort of hit me was uh you know, if
48:19if we're measuring the the the noise
48:21levels at the property line of the
48:24facility,
48:25>> uh
48:31seems like if we're trying to keep the
48:32noise down, if it's pretty far set back,
48:37noise can be pretty loud
48:40at the sight
48:41the building side,
48:42>> right?
48:43>> And
48:45that might create issues, other
48:48environmental issues, uh, particularly,
48:50you know, up in the air.
48:52>> Yeah. But also like where where the
48:54equipment is located is going to be a
48:55really big deal. It's much harder to to
48:58mitigate. I think rooftop equipment as
48:59well, uh, just given the way that the
49:01sand can travel and especially the the
49:03wind is less less to impede the wind up
49:04there. Um, you make great points and I
49:08think that's where this conversation is
49:10kind is kind of going like and because
49:13there's an there's not an understanding
49:14we we think we see the 60 dB pop up on
49:17the meter at the property line and we
49:19think it's good. We don't understand
49:20that how the the lower tonal noise is
49:22traveling and that goes much further and
49:24that's really impacting people's lives.
49:26Um, you can do that like kind of
49:28googling lawsuits and things like that
49:30related to this. A lot of times the ones
49:33that are currently I've seen in
49:34litigation are mostly related to um I'm
49:38gonna say shady um crypto money
49:40facilities because they they really just
49:42abuse their neighbors and they don't do
49:43a good job of being good neighbors. Um
49:45but I think you'll as these data centers
49:48get bigger and bigger we'll see
49:49different issues come up with them but
49:50in ways I will always be
49:52>> yeah
49:54so so for the sound generating the
49:56equipment right um the the data center
50:00itself and then u
50:03these uh generators diesel generators
50:06they often do the testing you know
50:09backup
50:10>> verification right
50:12>> are we seeing anything specific speak to
50:15um those generators specific rules for
50:19the sound because they they also under
50:22compliance basically oh you know
50:24generator is generator you know nobody
50:26cares right but we still have some
50:29regulations on
50:30>> there's there's language proposed
50:32language in this that would have them
50:33have to provide modeling for full
50:35buildout and full operation. So that
50:36means we want to see all of your blowers
50:39all of your coolers running at the same
50:41time at full full capacity. We want to
50:43see what noise is being generated from
50:44your generators if you have to run those
50:45at full capacity. Um that that's the
50:48intent here. That could change. Um
50:50you'll have input on that, but that was
50:52to capture that because you're right,
50:54they're they're going to be testing
50:55their generators every month um in
50:57different batches or pots probably
50:58depending on the size and then god for
51:01it'll happen. Curtailment will happen as
51:03we're trying to build generation and
51:04things like that. They're going to have
51:06to turn them on. And it may not be all
51:07these diesel generators. If there's
51:09opportunity for natural gas, there may
51:11be natural gas. Or if the the company
51:13can afford it, they may try and do some
51:15type of other um battery storage or um
51:19yeah, things like that.
51:33I I know the the color of the roofs or
51:38anything any restrictions on that you
51:41know we need a green roofs or anything
51:43like that it's a visual I know it's not
51:46a aostic related
51:48>> would you repeat that I'm sorry
51:49>> the roofs basically there are some
51:51regulations
51:53>> uh for roofs in general
51:54>> colors yeah
51:55>> um oh for colors
51:57Um, no, but we've we've talked about in
52:00planning in general, um, we're part of
52:03another subcommittee for for trees in
52:05urban heat island about um painting
52:08roofs or having different materials for
52:09roofs and stuff like that to help
52:10mitigate some urban heat island effects
52:11and things like that. Um, no. If there's
52:14anything specific that you think should
52:15be addressed for
52:17>> one of the policy other places I saw
52:19that I think that's one thing I can I
52:22can point to the reference that uh what
52:25I read.
52:26>> Oh, sure. Well, so cool roof and
52:29material restrictions regulations
52:32prohibit highly reflective material.
52:35>> Okay. Yeah.
52:36>> Okay. And that glare into surroundings.
52:40Okay. That's what they thought. So
52:42prevent those those uh you know
52:44reflective. Okay. And they also mandated
52:48a green roofs vegetation layers are
52:50highly reflective cool roofs. Okay.
52:53Combined with permeable asphalt to
52:56manage heavy thermal output and reduce
52:59storm water runoff.
53:01So
53:03So just I my reading and I thought you
53:06know that just
53:07>> Yeah. Oh does does it say um where's
53:09that from? Uh I think this is a part of
53:13the one thing and uh architectural urban
53:17design integration basically part of
53:19>> I mean I'm I love green walls and green
53:21roofs. Um I'm pro that uh I' I've got
53:25I've gotten so much push back about even
53:26putting solar on their roofs that I
53:29would have a hard time imagining they
53:30would put any type of living organic
53:32material in there.
53:33>> And I think a green roof does best when
53:35it's you don't have large structures
53:38blocking. you know, you want sort of a
53:40uniform vegetation and that needs to be
53:42kind of
53:42>> flat um to be able to maintain something
53:46like that.
53:47>> If we're talking about anything more
53:50than just a real small data set, I think
53:54you're you're going to have
53:56some issues with
54:02one of the things with that green roof
54:04you talking about wildlife stuff. being
54:08able to make use of that as well.
54:12I think they will have a hard time with
54:14with the noise coming out
54:17and the vibrations of the building
54:19itself.
54:21>> It' be really interesting to see how
54:22well the vegetation does on those roofs
54:24right there from all that all that
54:26onslaught of noise and heat that they
54:28like to eat. Curvy pavement is in the
54:32general EAB
54:35requirements or the you know our
54:37provisions that we can note
54:40they should do it but would they do it?
54:46>> I don't think anybody yet
54:48has agreed to that
54:50>> which is ridiculous because it's not
54:52complicated.
54:52>> No, it's it's not. and and we so our our
54:55firm sit at in Virginia. We have a lead
54:59platinum building and it used to be a
55:01really gross brown site and so we tore
55:05up we had to tear up half the parking
55:07lot anyway. It's all pvious. It collects
55:09all the water. They haven't had a single
55:11issue. And in fact, it's wonderful
55:13because I've been there. Every time I go
55:14to our office, it's rain and I can walk
55:16inside without stepping in pedals. My
55:18shoes don't get all wet.
55:19>> I don't know. There's like some weird
55:22stigma between like I have to maintain
55:24it. It's concrete exercise.
55:26>> You go down to the beach and I mean
55:28they've got impervious surf.
55:30>> Yeah.
55:31>> All over the place.
55:37>> I think it's becoming easier to clean.
55:39Like people are developing different
55:41machines that can make sure that they're
55:42Yeah.
55:43>> Well, it's not a new technology.
55:46So, at some point you just have to
55:48embrace it.
55:49>> Yeah.
55:50>> Yeah.
55:52So just want to walk through we'll walk
55:53through these just just briefly. Um so
55:57we kind of we talked about having tiers
55:58before the the tiers the the overall
56:01loads this may change and adjust as as
56:04we continue to learn more and maybe talk
56:05to some um more people in the industry.
56:07But just for the illustration purposes
56:09and get kind of moving forward we have
56:11them broken up into three tiers. Um we
56:14talked about before that maybe each of
56:15these tiers would trigger additional
56:17requirements on site. Um and so it's
56:19kind of how we move forward here.
56:22Um again, so we have a section no
56:24segmentation. So the tier is set by the
56:26total connected load at full buildout of
56:28all phases and all buildings under
56:30common ownership or control the same
56:31adjoining parcels. So trying to mitigate
56:34them building one thing and then coming
56:35in two years later without knowing
56:37what's happen. So well there will still
56:39be loopholes um but trying to mitigate
56:41that.
56:43Um one thing I I see popping up a little
56:45bit more now is like no waiverss by
56:47private agreement. So no agreement,
56:49easement or consent between the operator
56:51and any property owner, tenant or
56:53government raises a limit or shortens a
56:55setback in this article that may get
56:57removed by legal when they look at this.
56:59But essentially what it's saying is you
57:00can't buy an exception
57:06because there will probably be a
57:07different property owner at some point
57:08or different uses that want to go in.
57:10Yeah. Um this is
57:12>> are there any like uh for tier one tier
57:15two tier three the differences in the
57:18regulations whenever what we cannot you
57:21know allow what we cannot allow I don't
57:24know that
57:24>> yeah no no it's okay we haven't we
57:25haven't shared any of that language yet
57:27um we talked about doing that earlier on
57:29in a different meeting but there will be
57:30so like a tier like the smaller tiers
57:32are going to be kind of your smaller
57:33facilities so there'll be less
57:34generators less cooling towers on site
57:37and so they'll have some some basic
57:38standards like probably noise will a big
57:40one where they may still have to
57:41mitigate the noise on site, but maybe
57:43they can have smaller setbacks for for
57:45things like that or other site elements.
57:48Yeah. Which will change, but there's
57:49going to be a lot more um restrictions
57:51put on these higher tiers, these bigger
57:53facilities.
57:56So, these are some definitions. Um
58:00here
58:02we'll build out sound nighttime
58:04operations sensitive users operators
58:09properties
58:11explain the third octave band total
58:12sound
58:14uh the town acoustical consultant pops
58:16up a lot. Uh it's an independent
58:18acoustical engineer selected and
58:20retained by the town and paid from funds
58:22provided by the applicant or operator.
58:24uh the consultant may not have worked
58:25for the applicant or the operator an
58:27affiliate with it in the prior three
58:28years. Again, this one is probably going
58:30to get changed or amended. I don't know
58:32how easily it is uh in the current state
58:35of the field to find an engineer who
58:37hasn't worked for somebody.
58:39>> Um it's fairly easy.
58:41>> Oh, it is okay.
58:42>> Um there are firms that specialize only
58:45in doing the tax
58:47>> and stuff and the compliance part of it.
58:49Um, and just because to be fair, most
58:54people don't really care when they're
58:56designing. It's just one of those that
58:58it things get written and we assume
59:02we're good and then it's only when
59:04there's a problem afterwards. So, there
59:05are firms that will that can do it. Um,
59:09and I think there are probably enough
59:10that you could even just change some of
59:12the verbiage [clears throat]
59:14to where you have maybe you have
59:16agreements with multiples
59:18>> and so that way it's a oh well you
59:20worked with this one but we have two
59:22more we can pick from and that gives you
59:24a little bit of you know
59:26>> Yes. because I don't think I think a lot
59:28of the data center too the the design
59:32it's not coming from local engineering.
59:34It's coming nationally. So, they're
59:36going to either have someone on their
59:38staff or they're going to have a
59:39national firm they're working with. So,
59:42small businesses and places around
59:44Raleigh that do it would probably love
59:47to be the consultant and have projects
59:48that they can pick up.
59:50>> That's good. Yeah, I do appreciate the
59:51idea of having like a perhaps a
59:53revolving list or something there
59:54because yeah, different parties. Yeah.
59:58>> Um, under noise sensitive use, I see
1:00:00that at least on the paper version, it
1:00:02has conservation area in brackets.
1:00:05>> Oh, um, anything in a bracket is
1:00:08probably stuff that's open to change or
1:00:10an engine. So conservation area um that
1:00:13one I want to talk about more if it's
1:00:15going to be UDO specific resource
1:00:17conservation areas or if it's going to
1:00:19be more encompassing of like habitat
1:00:20recognized habitat or things like that.
1:00:22So right now it's just conservation area
1:00:24but it may change to be something more
1:00:25specific.
1:00:36So we talked about in the past uh
1:00:38presentations about doing different
1:00:40noise studies and things like that uh
1:00:42like uh premodeling kind of getting idea
1:00:44of what the ambient noise is or current
1:00:46noise is on the site and understanding
1:00:48how the use is going to impact that with
1:00:49its additional noise. Um that's still
1:00:52something that I think we should retain
1:00:53and have. The only thing that's changed
1:00:55here is instead of requiring the post
1:00:58construction study, you have the
1:01:00continuous study that goes on from the
1:01:02from the outgoing. So you're just
1:01:04constantly collecting data and if
1:01:05there's anything you have the ability to
1:01:06amend it. Uh this might be a cost
1:01:08barrier for some. I don't know what the
1:01:10cost is unfortunately of it. But um it's
1:01:12for smaller ranges, but they may not
1:01:14need as much of it as say a larger site
1:01:16that has to put um meters all over the
1:01:19place in different areas. So
1:01:21>> well, I think there needs to be
1:01:22continuous I I think that's a lot of
1:01:25people's opinion for for these larger
1:01:27facilities though.
1:01:39>> So I just wanted So the things in
1:01:41brackets may change.
1:01:43>> Things in brackets are probably going to
1:01:46be adjusted just because you'll see some
1:01:47of these like um they have like
1:01:50distances like 3,000 ft or something
1:01:52like that which is probably going to be
1:01:54changed or there'll be like u like size
1:01:56limitations and things like that that
1:01:58there will just have probably be changed
1:01:59through conversations with one you you
1:02:01guys yourself and then with other
1:02:03departments and other experts as well.
1:02:05It's just areas where we should have
1:02:06discussion. Yeah. So if you see
1:02:09something in a bracket that you're
1:02:10curious about, let's talk about it
1:02:11because that's why we're here. Yeah.
1:02:13>> Yeah.
1:02:13>> Um and so then there will be a a final
1:02:17version that where where those numbers
1:02:20are fixed. Oh, you you will have a Yeah,
1:02:23you guys will
1:02:24>> Okay. And then Okay.
1:02:25>> Yeah, this is this is a this is a first
1:02:26look at this. Um there was a really good
1:02:29uh recommendation from one of the
1:02:31residents that given we have two members
1:02:33that are going to be um off the board in
1:02:36January that getting any type of
1:02:38language in front of you, even if it's
1:02:40early draft language, would be
1:02:41beneficial. Um and so that was the
1:02:43intent of this is to is to start working
1:02:45on that, getting your input now. Um and
1:02:47then moving moving forward. Of course,
1:02:49we do have set aside time to do just
1:02:51drafting, but in case anything comes up
1:02:53and we don't want to miss the
1:02:55opportunity to talk to you.
1:03:03Does anyone have any um I know there's a
1:03:06lot to look at there. any main any big
1:03:09concerns when it comes to noise that you
1:03:12could talk about that maybe is addressed
1:03:13in there or not addressed in there
1:03:17that come to mind.
1:03:38Number eight, noise mitigation. Evidence
1:03:41of a reasonable expectation.
1:03:47That doesn't seem very
1:03:50>> what number.
1:03:51>> Um, let's see.
1:03:54>> C8. I'm sorry. C8.
1:03:56>> What section?
1:03:57>> Four.
1:04:02What is what is ev what what would
1:04:05evidence of a reasonable expectation be?
1:04:11Um
1:04:15I think this would be every intent of
1:04:18like going through everything that's
1:04:20required in section six and the other
1:04:21sections and showing that you have
1:04:22followed it to the the rule itself that
1:04:25you provided all the measurements and
1:04:27things like that. Um, I think that's
1:04:29kind of what we're looking at. It's like
1:04:30the intent. It's like I I don't think
1:04:32there's an intent here how it's written
1:04:34to provide them anything other than like
1:04:36a margin of like the three decibels,
1:04:37which is like below it at nine. Um, it
1:04:40wouldn't be like you tried your hardest
1:04:41to prove that you could do it, but you
1:04:43can't get below 10 dB of over the limit.
1:04:45That's not the intent. I think it's
1:04:47really kind of kind of emphasize and
1:04:48appreciate number nine a bit more that
1:04:50you made like you're three over. We
1:04:53understand that. But you made every
1:04:54attempt to kind of meet the intent and
1:04:55there is that that variation allowed.
1:04:59>> That language can change. Absolutely.
1:05:09>> We've got protected property
1:05:12>> in the definitions.
1:05:16I'll scroll.
1:05:19>> Where did the sound limit come from in
1:05:21section six?
1:05:23sound limits [clears throat] were taken
1:05:24from multiple they were they were
1:05:26influenced by multiple sources. They
1:05:27were taken from um Prince William
1:05:30County's new sound ordinance. They were
1:05:32taken from the South Carolina proposed
1:05:34bill. They were taking it from the
1:05:35Colorado oil and gas um noise ordinance
1:05:38they have specifically for that. Um some
1:05:40of them in the table that you'll see the
1:05:42day and nighttime um or the uh C
1:05:46weighted decibb they're in brackets at
1:05:4860. I think this number this number is
1:05:50definitely going to change and be
1:05:51varied. I just need to speak to someone
1:05:52who has a bit more expertise on kind of
1:05:54where that should be in that line
1:05:55because at this moment in time I I don't
1:05:56know exactly how that should be aligned.
1:05:59My concern is that some of these are
1:06:01real high and there is a stark
1:06:04difference between
1:06:07designing for equipment, industrial
1:06:10equipment that is not continuous versus
1:06:13a continuous noise of something at a
1:06:15data center because even industrial
1:06:17equipment there are very few things that
1:06:20are continuous and the impact of that
1:06:24noise and you know if you were to say
1:06:27hey our data center is going to be
1:06:28industrial, it can be at 80 all day
1:06:31long, 247.
1:06:34That impacts your hearing significantly
1:06:36more than if it was 80 and it happened
1:06:39over the course of an hour. And so those
1:06:41numbers
1:06:43are high. And as an engineer that has
1:06:46had people complain about chillers
1:06:50at a school on adjacent property and we
1:06:52went and measured and it was 50. I can
1:06:56only imagine if we have a data center
1:06:58with
1:07:0015 20 sitting there how well that's
1:07:03going to be for everyone all the time.
1:07:06>> So the the the dec table table table one
1:07:09uh in section six the that's for the
1:07:11receiving property. So that would be so
1:07:14like an industrial site next to another
1:07:15industrial site. So that still might be
1:07:17high and that's fair. Um but it wouldn't
1:07:19it wouldn't specifically be like they'd
1:07:20be allowed to do 80 next to a school or
1:07:22anything like that. That would be the
1:07:23more protected user which would be the
1:07:2455.
1:07:25>> Yeah.
1:07:27>> Well,
1:07:29I saw something from from Solar City who
1:07:32got some some stuff in which I was
1:07:34shocked to see
1:07:37pleasantly shocked. Uh their commercial
1:07:39industrial limits. They've got a
1:07:42different
1:07:44different category. They got 7 a.m. to
1:07:4610 p.m. in industrial. They got 65 dBA.
1:07:50>> Mhm.
1:07:51>> 70 DBC
1:07:54and then it's lower for, you know, 10
1:07:57p.m. to 7 a.m.
1:07:58>> Yeah.
1:08:03Even even being industrial, I think
1:08:05that's a little high.
1:08:06>> Sure. No, I I think that's fair.
1:08:13>> So So testing
1:08:16u the people nearby let's say today
1:08:22there is no as usual running and uh they
1:08:26want to test tomorrow
1:08:28the neighbor are they going to see
1:08:30increased in a sound because of
1:08:32generators
1:08:35uh do they is that a noticeable for them
1:08:37or do we need to inform the residents
1:08:40hey we are testing tomorrow you will see
1:08:42a little more noise them what is the
1:08:45operational data center operational
1:08:47sound is.
1:08:49I think
1:08:51should we inform them you know in
1:08:53advance like okay we will be testing on
1:08:56this day. Um there there is language in
1:08:59here about having to inform the town
1:09:01whenever you have to use your generators
1:09:03for something other than testing other
1:09:05than emergency situations and you have
1:09:07to inform them of what the emergency
1:09:08situation is to kind of prevent that. Um
1:09:11I think what happens and I don't I don't
1:09:13know how the would do this. I see your
1:09:15point. Um, we wouldn't be able to reach
1:09:17out to every property owner nearby and
1:09:19let them know that they're going to be
1:09:20testing their generators at a certain
1:09:22time. Just like the town doesn't reach
1:09:24out to anyone when the Sharon Harris
1:09:25alarm went off today. I mean, we might
1:09:27make a a Facebook post so no one gets
1:09:29scared, but
1:09:30>> Sharon Harris puts out
1:09:31>> they put out they put out. Yeah. So, it'
1:09:33be the property owner or the user, I
1:09:35think, should be a good neighbor and let
1:09:36people know. They should have the
1:09:38obligation to it shouldn't be up to the
1:09:40town to tell them when when they're
1:09:42going to be tested.
1:09:43>> It should be up to the the
1:09:46>> and testing generators has to happen on
1:09:48a regular cycle and so it should be
1:09:50similar to the Harris testing where it's
1:09:53a the third Wednesday of the month at
1:09:56this time we're going to do it you know
1:09:59unless there's some random active nature
1:10:02or something we can't test.
1:10:08But the the town will be informed about
1:10:11that.
1:10:12>> So we have it for for Yeah,
1:10:14>> I think I saw somewhere. But I'm I'm
1:10:16worried about uh the residents if they
1:10:19get or not.
1:10:22>> Yeah, they'll be there'll be set aside
1:10:24timing for when they can run them too.
1:10:26So during the day so they can't run them
1:10:27at night.
1:10:27>> Yeah, working days. I think they were
1:10:29talking a nonh holidays
1:10:33town holidays.
1:10:45Is there a proposal for a
1:10:49how far a detention center needed to be
1:10:54from a sensitive property?
1:10:57>> I think I think it landed on
1:11:01I don't remember if it was 1,000 or 1300
1:11:03ft. It was it was something in that
1:11:05line. The planning board amended it to
1:11:07to increase it.
1:11:08>> Okay.
1:11:08>> Um I I can look it up. I don't have it.
1:11:10>> I was just curious how that compares to
1:11:12like the minimum setbacks here in
1:11:13section 7.
1:11:21>> And these are in brackets again. So I
1:11:23think I think there there's room to have
1:11:24discussion like you know um that the 500
1:11:29ft for the tier one for like this is
1:11:31like a very small independent data
1:11:33center not necessarily like we talked
1:11:35about like the um internal or um
1:11:38enterprise data centers themselves that
1:11:40are part of another use. So this this is
1:11:43kind of the 1010 here is for that tier
1:11:44one to be kind of like we're building a
1:11:46very small data center focused um
1:11:49development
1:11:56The goal the goal is um to in previous
1:11:59sections like do the surveys and the the
1:12:01modeling out to a greater distance like
1:12:03we saw 3,000 ft to to understand the
1:12:05land uses around it to where the
1:12:07receptive users are. But then you can
1:12:08see the setback is is only the highest
1:12:10for the highest one was 1500 feet. Um so
1:12:13not not even it's only half of what that
1:12:14was. Um but you know that's that's just
1:12:17kind of a starting point where I think
1:12:21um where I've heard some people talk
1:12:22about uh the 500 not not quite being
1:12:25enough um and thousand since we don't
1:12:28have any on site. Let's let's go a
1:12:30little further.
1:12:46This train would probably exceed some of
1:12:48the standards that
1:12:51>> but it's a short burst,
1:12:52>> right? Yeah.
1:12:53>> Yeah. This would be akin to like putting
1:12:56grew up in a mil town with
1:12:58>> Yeah.
1:12:58>> They ran 247.
1:13:00>> Yeah.
1:13:02>> Seven miles from a smelting and that was
1:13:06247 too.
1:13:09>> I visited that that time often.
1:13:12I've experienced the noise.
1:13:20Growing up
1:13:27the low hum of that smelting plant you
1:13:30could
1:13:32it was it was
1:13:34I don't know how far away you could hear
1:13:36but
1:13:38it was pretty constant.
1:13:43Did did we do we have any data centers
1:13:46nearby and did we visit any time or the
1:13:50environment board or
1:13:52>> the environment board hasn't done any
1:13:53kind of trip or anything uh together
1:13:55they may have gone independently I think
1:13:56Melissa may have visited one on our
1:13:58travels um she could probably talk to
1:14:00you about it um but we haven't done any
1:14:01kind of major trips or anything to to
1:14:03one data centers um to really get a feel
1:14:06for we might have to go kind of far um
1:14:08so I'm not sure what the logistics with
1:14:10that would be like but um if you're
1:14:12traveling, I can try and find your data
1:14:14centers and I can uh you can add them to
1:14:16your stops on your Google Maps.
1:14:18>> Yeah.
1:14:18>> Yeah. Yeah.
1:14:19>> Yeah. Um there's there's nothing of of
1:14:22real substantial size nearby locally
1:14:25nearby. Um but there's there's some
1:14:29in Charlotte and the larger ones.
1:14:32>> Statesville. Yeah. And then um
1:14:37>> there's the maiden facility. Apple
1:14:39facility is really big. Um but there's
1:14:40nothing out there but cows already. So
1:14:42that's not
1:14:43>> I have a friend who designed some for
1:14:45Google after
1:14:47>> yeah be helpful.
1:14:52>> I noticed there was something in the
1:14:54room sort of reminded me of this about
1:14:56vibration is do data centers
1:15:01generally produce
1:15:04vibration like the
1:15:06it's not like a train per se but there
1:15:08is there is vibration generated from the
1:15:10movement of the fans and the generators
1:15:12are running. There's there's vibration
1:15:13generated from that for sure. Yeah. So,
1:15:15there could be potential vibration.
1:15:17That's where having the distance kind of
1:15:19helps with that. But, um
1:15:21>> the equipment will have to have and it's
1:15:24something that can be determined, but
1:15:28you can do vibration separation for all
1:15:32the equipment.
1:15:34fairly complicated slash expensive, but
1:15:36it, you know, especially the outdoor
1:15:38equipment because it's all sitting on
1:15:39concrete pad and that vibration when you
1:15:42add the number of it.
1:15:44>> Yeah. And and so there's you can
1:15:47basically have them put a springloaded
1:15:51concrete pad on top of the pad
1:15:54>> like an elevated platform made of
1:15:55materials to help mitate that.
1:15:57>> And does vibration typically dissipate
1:16:01rather quickly or does it soils or
1:16:05>> it usually is pretty quick
1:16:07>> and so and and like we'll do it for all
1:16:10the equipment in building because they
1:16:12travel because it's hard surfaces but
1:16:14with the soil outside it should be
1:16:16pretty
1:16:17>> okay
1:16:18>> stay right in there but it just again
1:16:19it's a lot of equipment and when you get
1:16:21everything vibrating if you were to all
1:16:23be on the same frequency at the same
1:16:25time the harmonics of it will make the
1:16:27impact bigger
1:16:28>> right so I noticed that it does say a
1:16:30data center facility shall not cause
1:16:33groundborn vibration that a person can
1:16:35perceive without instruments at any
1:16:37point on another property.
1:16:39>> They probably
1:16:40>> okay.
1:16:43>> Okay.
1:16:44>> Yeah, that's what
1:16:45>> that that was added out of concern from
1:16:47residents.
1:16:48>> And so if somebody was like, well, I can
1:16:50feel vibration that would then get
1:16:52looped into this the complaint system
1:16:54and mandatorily tested. Okay.
1:17:16So anytime if they change the equipment
1:17:20for a maintenance
1:17:23um do we need to still test from a
1:17:26costic uh you know ranges perspective
1:17:28from a compliance perspective? So that's
1:17:31that's also the benefit of having the
1:17:33continuous monitoring is that that the
1:17:35change of equipment would still be
1:17:37captured through that and we would be
1:17:38able to see if there's any variation in
1:17:40the noise being produced and whether
1:17:42they're still in compliance or whether
1:17:43they're exceeding that
1:17:46because that that's a great point and
1:17:47that's where I've gone back and forth on
1:17:49trying to figure out the best path
1:17:51forward for measuring is equipment is
1:17:53going to change without a doubt. It'll
1:17:55make it maybe more efficient, it'll be
1:17:56better, it'll be quieter, but it it may
1:17:58not it may be worse equipment or
1:18:00different equipment that has different
1:18:02properties. Um, and so if we
1:18:04overregulate exactly the type of
1:18:07enclosure or mechanical, we're going to
1:18:09miss something.
1:18:12>> Someone forwarded an article for the
1:18:15subcommittee on the new technology of
1:18:18cooling.
1:18:20Well, and the problem is is creating
1:18:23specifications, you end up soul sourcing
1:18:27technology
1:18:29and it
1:18:31>> ethically you shouldn't be doing that
1:18:33from an engineering standpoint.
1:18:35Engineers are going to fight you on
1:18:36that. Developers are going to fight you
1:18:38on it. So you just you can you we
1:18:41shouldn't say you have to use a certain
1:18:43technology. We could just establish
1:18:45these are the baseline efficienc.
1:18:51>> Yeah.
1:18:53>> Well, that's your guys's job. [laughter]
1:19:04>> Have we looked at Ashray standard 90.4?
1:19:09>> No, because I do not have access to the
1:19:12manual. I cannot I cannot get access to
1:19:15it.
1:19:15>> Would you like me to purchase it?
1:19:18>> Oh, I I don't want anyone to purchase
1:19:20anything, but
1:19:22>> not a deal. Um,
1:19:24>> well, we have a tiny bit of money left
1:19:26in the budget.
1:19:27>> Let me I let me reach out. I I
1:19:29>> if we if we need to purchase it, it's
1:19:30$178.
1:19:33Um, but I my thought is that
1:19:37that would probably be a fabulous
1:19:40>> Absolutely. this is our baseline and
1:19:43then we can decide what need to be above
1:19:45it especially because smarter people
1:19:47than all of us have done all that
1:19:49research and written it. I agree 100%
1:19:51and I have spent a lot of time trying to
1:19:53find um
1:19:54>> there will be no free copy of it
1:19:55actually very protective of their PDF.
1:19:58>> There is there is absolutely not a free
1:19:59copy of it. I I I can confirm.
1:20:02>> Yes.
1:20:03>> They also have a very strict rule that
1:20:05their stuff cannot be um used by AI. So
1:20:08therefore it can't be distributed that
1:20:10way either.
1:20:11>> Okay, that's good to know.
1:20:12>> And so it is illegal to upload any of
1:20:14their documentation to AI.
1:20:16If the board feels like having that
1:20:18material would be useful, I am happy to
1:20:20go to other people and and recommend
1:20:22that we we get that. I would I would
1:20:23like to have it. I just
1:20:24>> I think that would be
1:20:26>> I would recommend it and I am I am
1:20:28rowing when we get it to read it and
1:20:30make a presentation about it.
1:20:33>> That's wonderful. Thank you.
1:20:34>> I would recommend it.
1:20:36>> Absolutely.
1:20:37>> Try to get it.
1:20:39>> So if you don't know 90.4 Four is ashray
1:20:44standard for data center efficiencies.
1:20:47It is an offshoot of ashray 90.1 which
1:20:51is commercial building standard
1:20:52efficiency which is written to be used
1:20:56as a code. So um like North Carolina
1:20:59uses the international um energy code I
1:21:04can't think but the our energy code is
1:21:06IEC 2015. Um and so that says that you
1:21:10can use ashray 90.120.
1:21:13So it's backdated a little bit. Um and
1:21:16so Ashray decided that we needed a
1:21:19standard that's just data centers. So,
1:21:21they wrote one all about energy
1:21:23efficiencies and based off of where
1:21:26technology is, what they think the like
1:21:28minimum efficiency for everything should
1:21:31be. I haven't dug into it too much. Um,
1:21:33but usually there is some sound related
1:21:37stuff into it, but it'll deal with
1:21:39water, electricity, all equipment
1:21:41efficiencies, set points, all sorts of
1:21:44stuff. and they they specifically have
1:21:46recommendations just for HVX systems and
1:21:48cooling systems and like separately from
1:21:50data centers as well, which would be be
1:21:51great to actually have to. Um, so yeah,
1:21:54I will I will I hear your your input and
1:21:57I will take this to someone above me and
1:21:58let them know that we are interested in
1:22:00having access. Maybe maybe someone in a
1:22:01different department has access they
1:22:03could allow me to read their copy or
1:22:05something for not in their presence so
1:22:08it's not stealing [laughter] in their
1:22:10presence.
1:22:23So would all of this So we heard a
1:22:26little bit about people generating their
1:22:28own electricity prior getting connected
1:22:30to the grid. Um
1:22:34>> if that in fact happens, would all of
1:22:36this apply to that equipment?
1:22:38>> It it would all apply.
1:22:40>> Okay.
1:22:40>> Because it is measuring the sound for
1:22:41the site.
1:22:45I thought it was a 50 mega megawatt unit
1:22:49greater than 50 or more, right? They
1:22:51generate their own
1:22:54>> they generate their own the power. Um
1:22:58so they I'm not sure
1:23:01have to have supplemental sources.
1:23:03>> Yeah, especially if they're waiting on
1:23:05on new generation to come online from
1:23:07Duke. Some places are like bringing in
1:23:09generators or they're bringing in or
1:23:11connecting to gas lines or something
1:23:12else to kind of get going.
1:23:14>> Um, we heard from I mean I sound like
1:23:17that there was no movement on it, but at
1:23:19one point someone was talking about the
1:23:21small modular nuclear reactors like
1:23:23there's just a rush. They're trying to
1:23:25move as fast as they can and they don't
1:23:26want to wait 10 years in the queue.
1:23:29>> Yeah. I mean that's that's what they're
1:23:31>> that's the bottleneck.
1:24:03So during the humidity, right, during
1:24:06the humidity, the sound will be more. Is
1:24:08that what it says? How the weather
1:24:10changes the sound?
1:24:12>> That changes how the sound moves through
1:24:13the air, whether the temperature and the
1:24:15relative humidity. I I can't go explain
1:24:17it in great detail. Maybe our engineer
1:24:19could do it a little better than I can,
1:24:21but essentially it will affect the sound
1:24:22like whether where it where it's
1:24:23sitting, how far it travels and things
1:24:25like that as well.
1:24:27>> There there'll be a document included um
1:24:29that you guys will get a link to after
1:24:31this that you can read more into it. Um
1:24:33I will just publicly admit that
1:24:36>> waves travel differently in air than it
1:24:38does in water
1:24:40and that's that's the more humidity the
1:24:43starting to get water. Got it.
1:24:59and I apologize I couldn't have a an
1:25:02expert here to speak to you. Uh the the
1:25:04ones I've been I've been trying to use
1:25:05as a source were we're unfortunately not
1:25:07open to to coming in and speaking um
1:25:09from a professional standpoint. But um
1:25:12if at some point we need to reach out to
1:25:15someone maybe just there some additional
1:25:17questions or something like that, I'm
1:25:18I'm always happy to reach out to other
1:25:20people and see if we can get stuff done.
1:25:22And um just being respectful of
1:25:24everyone's time. If if if this is
1:25:26working for y'all and you're enjoying
1:25:27being able to ask questions as we read
1:25:29through this, that's wonderful. I'm
1:25:30happy to be here. If any of you would
1:25:32feel it'd be better to read this and
1:25:34come up with questions separately on
1:25:35your own, I that's fine as well. I just
1:25:38let me know what you're most comfortable
1:25:40with.
1:25:40>> Well, I mean, I think it's helpful to go
1:25:42over it, but absolutely suspect once I
1:25:46actually read it. I'm happy to
1:25:48>> Oh, yeah.
1:25:49>> Oh, yeah.
1:25:50>> I know. Sometimes when I'm in a meeting,
1:25:51I I'm like over I'm either very present
1:25:54or I'm very into the document.
1:25:56>> Yeah.
1:25:57>> So, is there a target date to complete
1:26:00and all that?
1:26:01>> So, we do have target dates um set on
1:26:03the calendar on the website. Um so, so
1:26:05we're ahead of that right now. This is
1:26:07this is kind of trying to get a little
1:26:08bit ahead of that. So, you have time to
1:26:10review this and provide input. Um, yeah,
1:26:13we're just trying to to move a little
1:26:14quicker knowing that we have two members
1:26:16that that are going to be leaving.
1:26:18>> I'll go through them.
1:26:24>> And this is electronically sent, right?
1:26:27>> It'll be electronic.
1:26:28>> It will be. Okay.
1:26:30>> Um, and just and just for you you
1:26:32members of the board, I'm happy to share
1:26:34a word document so you can make comments
1:26:35and notes if that's easier. The only
1:26:37thing we ask is that you don't do it
1:26:38collectively outside of the meeting
1:26:40because there's there's open meeting
1:26:41laws that we have to abide by
1:26:53and I noticed something about
1:26:55decommissioning. Um
1:26:58is that sort of just like there's no
1:27:01decommissioning plan that's going to be
1:27:02required. is just sort of if and when
1:27:04that happens, will there be any
1:27:07expectation expectations laid out for
1:27:10that?
1:27:10>> The decommissioning plan? Yeah. Like an
1:27:12inventory of essentially everything on
1:27:14site, how they plan to to to remove or
1:27:16mitigate the hazardous materials and
1:27:18things like that. Yeah. It'll be a whole
1:27:19thing
1:27:19>> that will be will that be required as
1:27:21part of like
1:27:22>> not Yes. As part of the as part of the
1:27:24ordinance or as probably a zoning
1:27:26condition.
1:27:26>> Okay.
1:27:26>> For reszonings. Yeah.
1:27:28>> Okay.
1:27:29And then at the the very end um of the
1:27:32of the document, you'll have like uh
1:27:34model zoning conditions. These are just
1:27:36some things that we could consider.
1:27:38Everything obviously in the ordinance
1:27:40itself that doesn't make it or we can't
1:27:42enforce through the ordinance could be a
1:27:43zoning condition if they agree to it. Um
1:27:46I could see there also being the
1:27:47opportunity to have probably development
1:27:49agreements for large data centers or
1:27:51things like that where there is there
1:27:53opportunities to partner with the town.
1:27:55Um so there will be some adjustment
1:27:57there as well.
1:28:04There was um in the South Carolina
1:28:07proposed bill there was uh the penalties
1:28:10were very high and I I know a lot of
1:28:12people would be very interested in that.
1:28:14Um, I removed the totals from your draft
1:28:17to be decided um until I can get legal's
1:28:20input on what's legal in North Carolina
1:28:22to be. But in South Carolina, the
1:28:24proposed bill was like started at
1:28:26$10,000 and went up to $35,000 a day for
1:28:30violations. So, it's much higher than
1:28:33usually your ordinance violations
1:28:38>> day.
1:28:41Sadly though, that's probably not
1:28:44actually that much money compared to the
1:28:46sale that we
1:28:47>> to be fair if you don't finish projects
1:28:50on time your daily penalty can be very
1:28:54high too. So [clears throat] it's just
1:28:56an incentive to actually spend the money
1:28:58and get things
1:29:00good for South Carolina.
1:29:02>> I I don't think it's passed yet, but it
1:29:04was introduced. Well, considering they
1:29:06still don't have an energy code that's
1:29:08been written in the past 20 years, I'm
1:29:11not
1:29:12>> I appreciate the dreamers like me.
1:29:14[laughter]
1:29:26>> Is there a general practice uh how they
1:29:28test frequent how frequently they test
1:29:32>> uh broken down in here? There are
1:29:37So there we have listed commissioning
1:29:39test. So before they even get their
1:29:41their CO, there's follow-up test and
1:29:45there's a continuous monitoring. Um they
1:29:49report any outages for the monitoring.
1:29:51There's quarterly surveys and then there
1:29:54there's also public reporting. So this
1:29:56states that the town shall post
1:29:57monitoring data and surveys results. So
1:30:00um it says results monthly. So
1:30:01essentially the goal here would be
1:30:03probably have a we have a website where
1:30:04you can go check out if if we move
1:30:06forward with that you check out sounds
1:30:08see what's going on uh and then keeping
1:30:11records and things like that.
1:30:15>> You say uh the operator shall keep
1:30:18equipment maintenance records
1:30:21for five years. That
1:30:25something y'all typically do?
1:30:27>> No, this is me being a little grabby
1:30:30with information.
1:30:31>> I mean, I understand the sound data. I
1:30:35got that. I'm just
1:30:36>> Well, they should have maintenance
1:30:37records because it's proof that they're
1:30:38actually keeping it up and what will
1:30:41happen on equipment if you don't
1:30:43maintain it, then now your compressors
1:30:45start doing weird wonky things and the
1:30:47sound they make is different and crazy.
1:30:49And at least if you have the data to
1:30:51say, well, you haven't maintained it,
1:30:53you have to fix it. Always good to know.
1:30:56>> I don't know. you might have more
1:30:58understanding this is are these
1:30:59equipment always bought outright or are
1:31:01they they financed or they leased or
1:31:03anything? Is there a reason that they
1:31:04would have to provide a maintenance
1:31:06record for that at all?
1:31:07>> No. Um but they should have a
1:31:11ease of warranty they should have that
1:31:13they're they're maintaining it. Um, and
1:31:16a lot, especially these data centers,
1:31:18um, I don't know if because they're
1:31:21staffed so lightly, I don't know if they
1:31:24actually will have someone on staff
1:31:26doing maintenance or if it's going to be
1:31:28contracted out.
1:31:29>> And so then they will have records
1:31:32because that's how they're going to
1:31:33build them. And so that really
1:31:36>> anybody who's running any type of
1:31:38facility should keep their maintenance
1:31:41records for a minimum of five years.
1:31:42>> I'm not saying they should they should
1:31:44already I'm just
1:31:45>> and and it should just
1:31:47>> Yeah, it should be an easy thing to have
1:31:49access to, especially now, you know,
1:31:51most people are keeping track of this
1:31:53stuff online and using some sort of free
1:31:56or extremely cheap software to just know
1:31:58who's doing what when.
1:32:00>> I think the intent was to if if there is
1:32:03something going wrong and they're like,
1:32:04we we haven't changed our operation at
1:32:06all. We're not sure why we're not
1:32:07meeting these levels. You know, we see
1:32:09like, okay, well, what's coming we think
1:32:11it's coming from this. Let's look at the
1:32:13maintenance. Oh, done maintenance on
1:32:14this.
1:32:34>> They don't like this mandatory trigger
1:32:37number one.
1:32:42Yeah, that that number is in brackets.
1:32:47>> So the
1:32:51>> that that's just a
1:32:54number.
1:32:55>> I can see somebody or a group or
1:32:57neighborhood playing that.
1:33:00>> Yeah, I I think other parties will read
1:33:03number two and just think we don't need
1:33:06>> Yeah.
1:33:07>> number one. Earlier you mentioned civil
1:33:10penalties for a violation in Charlotte
1:33:14or somewhere $35,000 per day. Is that
1:33:17what
1:33:18>> South Carolina proposed a bill that
1:33:20would uh have essentially fees that were
1:33:2410,000 20,000 and $30,000?
1:33:27>> We have not determined that one.
1:33:29>> We have not. We have to our legal
1:33:31department will have to confer what we
1:33:32are legally allowed to what the maximum
1:33:34is for that because right now the
1:33:38160
1:33:40160b I think it said is like
1:33:44if you don't have it stated in your
1:33:45ordinance it's like $50 a day. You can
1:33:48do a maximum of 500 for Yeah, it's it's
1:33:51very low.
1:33:52>> Very low. And it may have to be low and
1:33:54then that will remove a lot of teeth for
1:33:57enforcement but being able to monitor it
1:34:00will still help.
1:34:01>> That wouldn't show up on
1:34:04>> No. $50. No.
1:34:08So I see that there's a curtailment
1:34:10protocol thing for sound. Do you
1:34:14anticipate there being some kind of
1:34:16curtailment thing if there were large
1:34:18water user
1:34:21and and let's just say that there's an
1:34:24extreme drought and and we're getting
1:34:25down to a point where it's
1:34:28people having water versus data center.
1:34:30>> Oh, sure. Um we talked we we briefly
1:34:33talked about that with Jonathan Jacobs.
1:34:36We'll have to probably revisit that with
1:34:37him to see what he can do as part of I
1:34:39think it was a
1:34:41was it an it was a certain type of
1:34:43permit that they have to get through him
1:34:44where he can have different conditions
1:34:46part of that permit. It would probably
1:34:48be something we couldn't codify itself.
1:34:52>> That probably would be helpful to have
1:34:56>> in in this
1:34:58in the ordinance.
1:34:59>> Oh, I I'll have I'd have to check with
1:35:01him to see if it's
1:35:03>> possible.
1:35:07their permits and agreements are are
1:35:08also fighting in a different way. So
1:35:24is there a is there anticipation that uh
1:35:26how many data centers
1:35:30we might be looking in it?
1:35:32>> No. Um there's not I I I'm also not
1:35:36privy to conversations with economic
1:35:39development at this time. So I don't
1:35:40know if they're talking to anyone there.
1:35:42The one site where the original
1:35:45developer was looking at was pretty
1:35:48ideal from a data center perspective
1:35:50just given its proximity to like high
1:35:52voltage lines and the water reclamation
1:35:54facility nearby. Um,
1:35:58given the kind of conversations that
1:35:59this board has had in the past about
1:36:01having like very large minimum area
1:36:03sizes and things like that, it kind of
1:36:05limits the possibility of where data
1:36:07centers could potentially go. Um, but
1:36:10there's there's probably areas that
1:36:12still exist in Apex, but we're running
1:36:14out of area. We're running out of room
1:36:15for like a large facility.
1:36:23>> And I still think you wouldn't want
1:36:25guns.
1:36:27>> [laughter]
1:36:28>> Oh, for the hunting.
1:36:29>> Yeah, the game land. Yeah, that's
1:36:31adjacent to it. Sure.
1:36:56So, one section in the enforcement which
1:36:58I I'm not sure how well received it will
1:37:02be is e um later development is
1:37:05protected. Typically, this is not the
1:37:07case. meaning that if you build a home
1:37:09or subdivision next to one of these
1:37:11facilities, it's kind of like you should
1:37:13have known better. Um, this isn't here
1:37:17just as kind of a a first step that we
1:37:20want to protect everyone as much as
1:37:21possible, but with the understanding
1:37:22that this may be something that is also
1:37:25altered or removed as well. But,
1:37:29you know, we're talking about how we
1:37:30want to see our community develop and
1:37:31things like that, maybe we do want to
1:37:33have protections for future development.
1:37:38I would say so because I mean that sort
1:37:40of triggers you know down the road
1:37:42probably land use changes.
1:37:45>> It does. Yeah. You end up usually like
1:37:46you have a user adjacent or even
1:37:48sometimes across the street and it's
1:37:50kind of a undesired use or something and
1:37:53the property across the way can't get
1:37:54developed the way it was intended to and
1:37:56so someone will come in eventually and
1:37:57resone it to probably industrial as well
1:37:59and
1:38:00>> and then you're kind of inching forward.
1:38:02>> Exactly. Yeah.
1:38:15So next steps will be what?
1:38:19>> So next steps um you will kindly review
1:38:23and provide me feedback on that
1:38:25information. And um we will proceed.
1:38:26We'll have um we'll have our next
1:38:28neighbor our next resident call meeting
1:38:30uh next week on the 14th where I'll
1:38:32gather input and feedback from the
1:38:33residents and provide that to you later
1:38:35on. Um and then from there we will
1:38:38prepare for next month's uh meeting
1:38:40which will be public safety uh fire and
1:38:42police come and give a presentation. Um,
1:38:45I don't think that they will actually
1:38:47have a lot that needs to be codified,
1:38:48but anything that they do, I will meet
1:38:50with them and try and get you some draft
1:38:52language as well. And then we'll move
1:38:53closer and closer to starting the
1:38:55drafting period. Um, I'm going to try
1:38:57and get a real rush on it for you guys
1:38:59so you can really have a a strong sense
1:39:01of like what's being proposed so you can
1:39:03feel comfortable with that.
1:39:04Additionally, um when we do reach the
1:39:07end of your terms, if you would ever
1:39:10like to participate in the resident side
1:39:12of it to help things moving forward and
1:39:13provide your input, um since all these
1:39:15will be streamed moving forward, you'll
1:39:17be able to watch and you can ask your
1:39:19questions over them as well. That will
1:39:20be an opportunity as well.
1:39:22>> And then it will go out to public
1:39:23comment at some point.
1:39:25>> Oh, absolutely.
1:39:25>> Yeah. Yeah, I mean this is open to
1:39:27public comment um every EAB meeting if
1:39:30anyone would like to come and address
1:39:31the board about about the subcommittee
1:39:33stuff and then before this ever gets
1:39:35adopted or anything like that it'll go
1:39:37before before planning board and
1:39:39>> council
1:39:40so you'll be available to speak lots of
1:39:43times and I think everyone would would
1:39:45appreciate that. Yeah.
1:39:49So, do you have any additional questions
1:39:52right now for Bruce or
1:39:56what?
1:39:58>> I'm good.
1:39:59>> Okay. Shall we go ahead then?
1:40:03>> All right.
1:40:05629. Thank you so much, Bruce.
1:40:11I'm
1:40:12>> so glad you told me that.