2026-10-08 - Syracuse Landmark Preservation Board
Summary
Built from YouTube auto-generated captions; no agenda or minutes were read. Names and figures are as captioned and may be misspelled. Votes were by voice with no tally stated. Public commenters and private residents are not named.
- Minutes: the September 17 minutes were approved.
- CA-26-21, 931 Comstock Ave (Berkeley Park Preservation District): front porch roof restoration and railing, replacing a later-added low-slope roof with a hip roof matching the original profile. Several neighbors spoke in favor and none against. Approved as submitted. See 931 Comstock Avenue Porch Roof Restoration.
- CA-26-23, 403 Cedric Drive: gutter installation; the owners asked for a postponement, so the hearing is held to the next meeting.
- CA-26-24, 310 Highland Ave (Cedric Highland James Preservation District): front entrance redesign. The door had been replaced for lead-paint reasons before the owner knew a certificate was needed; staff worked with the contractor on a wood-framed door with etched glass resembling the original. Board members asked about the sash detail and recommended tempered safety glass. Approved as submitted. See 310 Highland Avenue Front Entrance Redesign.
- CA-26-25, 923-27 Comstock Ave: the mosque addition and site work, now in its third design. The architect said the building footprint was cut by about 50%, a secondary elevator and basement space were eliminated, the prayer hall grows by about 12 feet at the rear and side for just under 500 occupants, the rear height is about 36 feet, the exterior would move from EIFS to hard-coat stucco, and site lighting would change to lower bollards. Parking on the north lot, a former garden, remains the main point of contention, and the applicant asked for time to work with neighbors on landscaping.
- Opposition to CA-26-25: many neighbors spoke against, citing building height and mass at the rear, loss of the garden lot and mature trees, the amount of paving (opponents said about 39% against a 20% limit), only about 21 spaces against 67 required by zoning, illegal Friday parking on neighborhood streets, stormwater, a dumpster, and EIFS as a material. Neighbors also submitted visibility maps and written comments. The applicant's representative said the project is the minimum needed, including for funeral services, and promised a historically oriented landscape plan.
- Board discussion: members thanked the applicant for the reduced scale, asked for a stainless steel sample and for window color and trim consistency, and checked how heights were measured. A member suggested the district councilor mediate. The public hearing stays open (public comment closed for the day) and written comments go to the applicant. The next meeting is Thursday, October 29. See 923-27 Comstock Avenue Mosque Addition and 2026-10-29 - Syracuse Landmark Preservation Board.
- Adjourned.
Agenda
Agenda not yet posted.
Sources
- Video: https://www.youtube.com/watch?v=1XTjF6Edj4Q (City of Syracuse YouTube channel)
- Public meeting calendar: https://www.syr.gov/Boards-and-Commissions/Public-Meeting-Calendar
Video
Transcript
*These are auto-generated captions; names and numbers may be misheard.
Transcript
05:10Okay, good morning everybody. This is
05:12the Syracuse Landmark Preservation Board
05:14meeting of October the 8th, 2026.
05:17Present at today's meeting are
05:19>> Trish,
05:20>> Nicole Fragito,
05:21>> Ed Gregory,
05:22>> Jeff Romano,
05:23>> Hillary Donghue,
05:25>> Sam Prescott,
05:27>> and Kate. Any excused?
05:29>> Um Bob steering will be is on his way.
05:32>> Thank you. [clears throat]
05:34May I have a motion to accept the
05:36minutes of September the 17th, 20126?
05:39>> I move to accept the minutes.
05:40>> Do I have a second on the motion?
05:43>> We'll second.
05:44>> Second. Any modifications to the
05:46minutes?
05:49Okay. All in favor of the minutes as
05:52submitted? I
05:53>> oppose.
05:56Same. Thank you.
05:58>> [snorts]
05:59>> Motion carries. Public hearings. Excuse
06:02[clears throat] me. The board will now
06:04conduct the public hearings on today's
06:05agenda. First, the applicant or the
06:08applicant's representative will be
06:09invited to describe the proposed scope
06:11of work and present any material
06:13documentation regarding the proposal to
06:15the board. Next, persons wishing to
06:18speak in favor of the proposal will be
06:20given the opportunity to address the
06:22board. Then persons who wish to speak in
06:24opposition will be allowed to address
06:26the board. Finally, the applicant or the
06:29representative will be given opportunity
06:30to make closing comments to the board.
06:32Following public comment, the board may
06:34vote to approve, approve with conditions
06:35or deny the application just heard. The
06:38board may also include to excuse me,
06:39decide to hold this decision till the
06:41next public hearing. If the hearing is
06:43closed, no additional information will
06:45be allowed into the record except for
06:46information the board may request. That
06:49information will be available for public
06:51review with the board staff. Staff, will
06:54you please introduce the first
06:55application?
06:57>> Absolutely. Good morning. Uh the first
06:59application is CA-26-21.
07:02It's a certificate of appropriateness
07:04for 931 Comtock A. This is a front porch
07:08uh roof restoration and railing. Um and
07:13uh this is the property is within the
07:15Berkeley Park Preservation District.
07:19the applicant here.
07:22>> If you could please come up to the stand
07:24and introduce yourself.
07:28>> Bob Dy
07:30>> Deborah Bandolin. It's our house.
07:33>> Okay. Thank you. Good morning. Welcome.
07:35And what is uh can you describe your
07:37project for us, please? Sir,
07:39>> um the front low slope roof on the sun
07:42room
07:45and the
07:46>> [clears throat]
07:46>> um
07:49We're going to
08:16Brian Brian Cass
08:33shows.
08:39So we hired
08:43Search.
08:58We have the picture
09:00on the side. We have remnants of the
09:04post.
09:11built up.
09:26So all the restoration
09:41So all mold, all exterior molding is cut
09:43from
09:47>> interior
09:49>> and the interior.
09:53>> That's great.
09:55Any uh questions or
09:59discussion from the board?
10:01>> What did the drawing here?
10:21You did that.
10:32The original shutters.
10:45>> We're trying to keep everything
10:47original.
10:55wanted it.
11:04>> Beautiful. Okay. Uh any further
11:06questions or clarifications? Since this
11:08is a public hearing, I need to ask if
11:10there's anyone here uh wishing to speak
11:12in favor of this proposal to come
11:13forward at this time. [clears throat]
11:15Please come up to the podium and
11:17introduce yourself, sir.
11:19>> Rex Jardine, 112 Circle Road, a
11:21neighbor. This is an out of the park
11:23home run for Preservation District. I
11:26appreciate that they hired Crawford and
11:28Sterns who clearly know what they're
11:30doing and they're clearly doing
11:31everything right. 110% behind this
11:35project. They deserve a gold star.
11:37>> All right. Thank you very much. Anyone
11:39else here in the audience wishing to
11:40speak in favor of this project, please
11:42come forward at this time.
11:47>> Good morning. My name is Chris Capella
11:49Peters and I'm a neighbor and this is
11:51the kind of work that all of the
11:52neighbors hope we are all held to the
11:54same standard. Every property owner in
11:57park in Berkeley Park should be held to
11:59this standard. So, congrats to our
12:00neighbors for doing a great job. Thank
12:02you.
12:03>> Thank you very much.
12:09>> Mike Stanton, 315 Berkeley Drive up the
12:12hill, also in the historic district. Uh
12:14I want to also encourage you to Um, vote
12:18yes on this measure, please.
12:21>> Thank you very much.
12:24>> I approve of this project. I believe
12:26they've done their name.
12:28>> Oh, Don Peters from uh Circle Road
12:31>> uh resident and u you know I just
12:34appreciate that these people went to
12:35this great length to uh you know to do
12:38things in a proper way. Really
12:40appreciate it.
12:42>> Thank you very much.
12:44Anyone else wishing to speak in favor?
12:47If not, uh, is there anyone here
12:49speaking in opposition to this project?
12:51Please come forward at this time.
12:56Seeing none, thank you. Um, so we're
12:58going to close the public comment on
13:01this proposal and board. Um, thoughts,
13:05motion, where are we?
13:08Any questions, clarifications for the
13:11for the owners?
13:16No. Okay.
13:19>> Yeah. I just um I have clarification or
13:22just a question. So, it looks like it
13:24was a a [clears throat] flat roof
13:26>> and then at some point it was shimmed.
13:28>> Yep.
13:28>> And so, it was
13:29>> it was elevated at the house to draw the
13:31water away. So, that
13:34>> um addition, if you want to call it
13:35that, is going to be removed.
13:36>> Removed.
13:37>> And then
13:44>> complete remove.
14:02Will you be removing that little tent
14:04roof that
14:05>> Yes.
14:07>> What?
14:13>> No. Below that. Below that. little pent
14:15roof that attaches.
14:17>> No. Yes. That that component will that
14:20be replaced in in total as well?
14:21>> Already
14:25shingles.
14:26>> Yeah. Okay. So that's Okay. So that
14:29remains
14:31>> correct.
14:34>> Correct. It's a major contributing
14:36factor to the house.
14:37>> Okay. So that remains.
14:41>> Thank you. So what you're showing is a
14:44hip roof that's going in going in its
14:46place, but you're matching the profile
14:49that's of the original.
14:51>> Oh, yeah. Of the original portrait.
14:59>> Understood.
15:01>> Okay. And so, uh, the drawings that are
15:03showing the railings that return to the
15:05house, that current new post that is
15:09buried will be fully exposed because the
15:11roof is coming all the way down and
15:12being flat.
15:24It doesn't need to meet modern code for
15:26a deck.
15:28>> Okay.
15:30All right. Okay. Those are my questions.
15:38Right
15:48on the front.
15:59>> So, there's a gutter in place and that
16:01basically will shed forward away from
16:04the house and be caught and be captured
16:06for that.
16:18Okay. Um
16:20quality of wood sounds like it's
16:22exterior an ex exterior uh material. So
16:25that sounds good for the species
16:27selection. Uh if there's any other
16:30discussion if not please make a motion.
16:32>> I move to accept the application as
16:33submitted.
16:34>> I'll second.
16:35>> Second. Any questions or modifications
16:38to that? All in favor?
16:41>> Oppose?
16:43Abstain. Motion carries.
16:46>> Terrific project. Thank you so much for
16:48being great stewards.
16:50>> Beautiful house. Thank you.
16:52>> It's a phase.
17:11Great. Thank you.
17:12>> Thank you. Great. Thank you very much,
17:14folks.
17:16>> Okay, Kate. Next on the agenda, please.
17:18>> Um, actually, the next application,
17:202623,
17:22the property owners have asked um to
17:24postpone uh this application. for 403
17:29Cedric Avenue for uh I'm sorry, Cedric
17:31Drive for gutter installation. Um and uh
17:38they did so um a couple a couple weeks
17:42ago to to ask for that postponement. So
17:45um I think we the the board can can move
17:49forward and we'll we'll hold the public
17:51hearing at the next uh at the next
17:54meeting.
17:55>> When they have additional information,
17:57>> can we just hold. We need to vote.
17:58>> Do we need Do we need to to open it
18:01first and then
18:04just be held?
18:09>> Okay. So, 403 Cedric Drive. We're going
18:10to be on hold until next meeting.
18:13>> Yes. Okay. So, the next application is
18:17>> uh CA-26-24
18:19uh for 310 Highland Avenue. This is a
18:22certificate of appropriateness for front
18:25entrance redesign. The property is in
18:28the Cedric Highland James Preservation
18:30District.
18:33>> Is that applicant here? If they can
18:35please come forward.
18:36>> Let me see if this is the right one. I
18:38can't.
18:39>> Give us your name and address and speak
18:41about the project at hand, please.
18:43>> Hi, my name is Maryanne and I live at
18:46310 Highland Avenue, Syracuse, New York.
18:48>> You can pull that down.
18:49>> Oh, thank you.
18:49>> There you go.
18:51>> Um
18:52So, we ended up getting the door redone
18:55without um consulting with anybody, but
18:59I do have the glass here.
19:01>> Okay, great.
19:02>> Thank you.
19:05>> So, we got the door redone due to lead
19:07in the house, but um we w I wasn't aware
19:10that we had to um have a meeting for it.
19:13So, after talking to our contractor and
19:15talking to Kate, she helped me um go
19:17through with the contractor. She
19:19actually met up with the contractor and
19:21um to discuss what we need to do to turn
19:24the door back into the way that it at
19:26least similar to the way that it used
19:28to. Um so the glass that I just handed
19:31you guys is the glass that he does plan
19:33on using. And he did send me a few of
19:37the stuff that um like the wooden the
19:40trimson and all that he want he plans on
19:43using I think.
19:45>> Sorry. Yeah.
19:48For some reason that page isn't coming
19:49up
19:58>> of course very very helpfully the
20:00[laughter] page
20:03>> um it's yes it's page three and your
20:06application is
20:09>> proposed
20:12>> yeah sorry about that okay so the um
20:16this is the post door that he did create
20:19and
20:20[laughter]
20:22I'm sorry. Um, yes. So, he is going to
20:26use that glass to do the um the skylight
20:30and everything like that for to so that
20:32it can at least be similar to what the
20:34door used to be. There was glass on the
20:36frames. Um, and he is I'm not sure if he
20:41he probably is going to replace the
20:43door. I'm not sure if he said he would
20:45or not, but the wood he's going to use
20:48wooden frames for the door. So, that is
20:50not white like the way that it is. Um,
20:53so where the white is is going to be
20:55glass and then the frames is going to be
20:58wooden. Um,
21:04stuff that I think I have on my phone
21:06the the product the materials that he's
21:08going to use.
21:09>> Oh, the material material I think the
21:11material is
21:14Facing and trim. Construction materials
21:162x6 by eight number one ground contact
21:19crust treated southern yellow pine
21:21>> which would be for structural and
21:23support. Decorative finishing may
21:25include finger joint border round
21:27molding or trim and detailing around the
21:28panels and framing color tozo brown.
21:32>> Yes.
21:35>> Yeah. So,
21:37>> okay. Thank you very much. As this is a
21:40public hearing, are there any folks here
21:42in the audience wishing to speak in
21:44favor of this proposal to please come
21:46forward at this time?
21:50Hearing none. Seeing none, anyone here
21:52wishing to speak in opposition to this
21:53proposal at this time.
21:56Hearing none, seeing none, we will close
21:58public comment and open it up to board
22:01deliberation.
22:03board members.
22:05[clears throat]
22:07>> Just one clarification on your drawing.
22:09>> Yeah.
22:09>> Um
22:12I can see that you're going back with
22:14something approximating the original
22:16which I appreciate.
22:17>> Um it appears just looking at the
22:20sidelines basically the section of the
22:23wood right between the house and the
22:24glass. Right.
22:25>> Yes.
22:26>> Is a little
22:28>> narrow so it's not clear whether we're
22:30actually just seeing the frame. holding
22:33the glass as opposed to a a sash where
22:36you would actually have a frame
22:39manufactured that's holding the glass
22:41and then that gets
22:43>> So he does have a original picture of
22:46the way the door used to look. So he's
22:48going to make sure to make it look not
22:52exactly but at least close to the way
22:54that it used to look.
22:56>> Yes.
22:57>> And I'm just asking [clears throat]
22:58because we're
22:59>> Yeah.
23:00>> looking at the material that's provided
23:01today. So I I wanted to confirm that
23:03that was matched the intent.
23:10>> Any other questions or clarifications
23:12from the board?
23:13>> The only other comment I would have is
23:15I'm not clear whether the glass sample
23:17that you provided tempered which is
23:20basically a means of it's a type of
23:23safety glass. So anytime you've got
23:25glazing that close to the door and you
23:26have people moving things in and out
23:29possibly glass you have people
23:34Um it's important to make sure that you
23:35use that type of safety if
23:40>> you get small kind of brown granules as
23:42opposed to sh. So that's that's the only
23:45other comment I have is just a safety
23:49>> glass and you'll know because it has a
23:52stamp on it. Okay.
23:57>> Thank you. All right. Anybody else
23:59comment? There it is.
24:02>> [laughter]
24:07>> So yeah, so just to to reiterate
24:46Yeah. So, I'm going to um like I I did
24:50tell them he and I believe Kate as well
24:52told him that we do need it to look
24:54similar to the way the door used to look
24:56and he's more than aware of that and I
24:58will re like tell him that and tell and
25:01um we state that we need to make it look
25:04the way that it used to look so that at
25:05least we can fit to the standards that
25:08it the house used.
25:10>> Yeah.
25:12>> No, I think this is a positive reaction
25:14to our comments from before. So, I
25:16greatly appreciate um you coming back
25:18and presenting this. It replicates the
25:20existing panels as it was with the
25:22original design um and the etched glass
25:26for privacy but also for that trans that
25:28transparency that the original design
25:30had without replicating the original
25:32design. So, um we we I appreciate that
25:35coming to the board with that. So, thank
25:36you very much.
25:38>> With that, do I have a motion on the
25:39table?
25:41>> I'll motion to approve the project as
25:43submitted.
25:43>> Do I have a second? I'll second.
25:45>> Thank you. Any additional comments or
25:47modifications to the motion? All those
25:50in favor?
25:51>> I oppose. Abstain.
25:55Motion carries. Thank you very much.
25:56Good luck with the project.
25:59>> Terrific house.
26:11the last um you know what I'm going to
26:14get this up on the screen.
26:32We'll see if it comes up.
26:34let you be the Yeah, here you go. Okay.
26:37So, the
26:40>> the um next public hearing is CA-26-25.
26:46It's a certificate of appropriateness
26:48for 29 2 92327
26:52Comtock Avenue. Um this is an addition
26:56um to an existing facility and the site
26:58work. It is in the B uh Berkeley Park
27:01Preservation District.
27:04Uh Ben Larson, HomeK Architects.
27:07>> Good morning. Welcome.
27:09>> Um so this [clears throat] is uh our
27:11third iteration. Um we've tried to
27:15redesign the parking to on the north
27:17lot, which is going to be our main point
27:19of contention, I believe. Um because
27:23this this lot used to be designed as a
27:25garden uh lot. Um and we the facility
27:30needs additional parking uh and zoning
27:33would also require it. So we are trying
27:36to find that balance as to what would be
27:39acceptable to the district and uh and
27:42this board.
27:45There's a couple of options that we
27:47could do for this. Um there the we're
27:53considering larger tree plantings at the
27:56back row between the two uh streets
27:58between Comtock and Circle Drive to
28:01limit the vision lines for the neighbors
28:04for the building addition itself because
28:07it is an increased height uh due to
28:09religious needs and sight lines inside
28:11the building. Um
28:15but the the parking area out on the
28:18north, uh we're trying to work out how
28:22um what additional plantings might we
28:24might be able to do to to get this
28:27through. Um, and I I believe at this
28:31point this is probably going to need to
28:33be some more a more collaborative effort
28:37between um board members, uh,
28:39residences, um, people who live in that
28:43area to try and reach some type of
28:46consensus because as it is now, it
28:49appears to be a guessing game and nobody
28:52has the time for that. Um, but if we
28:56want to go on to the building sections
28:59and building plans, I mean, the parking
29:01area
29:04essentially represents a 4,000 square
29:06foot reduction in addition to green
29:08space from the uh original parking plan,
29:11which was property line to property line
29:13paving. Um, uh, you can see in the red
29:17line, that was the building addition
29:18that was previously proposed. We've uh
29:22listened to your comments and we've
29:23reduced that building footprint by 50%.
29:27Um we've uh taken that into account.
29:31We've consolidated spaces on the
29:33interior to achieve that uh which
29:35accounts for reductions in the uherary
29:39space as well as the uh women's space
29:42above.
29:44Um continue please.
29:58planting plans.
30:01>> Uh [clears throat]
30:02the the building floor plans.
30:07>> Yes, please.
30:10>> Yeah, [laughter] if we can find them.
30:18Okay. So, what this represents is
30:21essentially for theerary space a 12-oot
30:24expansion on the back and a 12t
30:26expansion on the side. That gets us to
30:29about just under 500 uh occupants for
30:32that space. Um we could go to the next
30:35plan. The the basement has been
30:37significantly reduced. As you can see,
30:39there's a lot less wasted space. Um,
30:46we've eliminated the secondary elevator
30:49which also helps with sight lines on the
30:52exterior as well as space spatial use on
30:54the interior. Um, the functions that are
30:58not addressed in the current building.
31:01Um, we really can't reduce those any
31:04further than we already have. Uh, such
31:07as the the body receiving and cleaning
31:10areas. Um, and the second bathrooms
31:13upstairs that serves the women's needs
31:15for services. Um, we could go to the
31:19elevations if you like.
31:24So, we've simplified the elevation from
31:28previous. Uh, this represents um a more
31:32traditional uh representation of what
31:35mosque architecture would look like. Um
31:38the materials for the exterior currently
31:41are proposed as Ephus. Um however, given
31:45some feedback on that, we would probably
31:48want to transition that into a hard coat
31:50stucco over an exterior finish
31:52insulation system. Um so there would be
31:55exterior insulation outboard of the
31:58sheathing. However, we would go
31:59transition the soft coat to a hard coat
32:02which is traditionally more durable.
32:04Um, we've incorporated some texture on
32:07the on the building, but we're also
32:09trying to keep that simple. Um, the dome
32:13is still there. However, we are still
32:15below I believe the back's elevation,
32:19which would be the highest point is at
32:2136 feet above grade and the front is is
32:26less. So,
32:29we can scroll down
32:32the elevations. These represent um
32:36artificial intelligence [laughter]
32:39renderings of the plane model that we
32:41have. So the lighting shown here is
32:45probably ideal for a modern neighborhood
32:48in Southern California, but maybe not
32:50appropriate for this. Uh we haven't
32:51really developed lighting uh plans other
32:54than the site lighting that is existing
32:57and washing into neighbors properties is
32:59going to be eliminated. We're going to
33:01go with more ballard type lighting and
33:05probably a lesser maybe look more like
33:07the lower image some lighting for the
33:09building for accents, but it's going to
33:11be minimal. Um, just enough to get some
33:13light in the space so you can see when
33:15you're walking around. um
33:19uh the neighborhood elevation. I
33:21apologize. I couldn't get the uh
33:24properties behind the uh street
33:28elevation in this uh with with any
33:30reliability on height uh because I I can
33:34measure heights, but I I can't I have no
33:36idea where they relate in relation to
33:37this plan. Um, so you can see that we're
33:41still
33:43uh below the site the elevation
33:45requirements for the zoning district.
33:49Um, and we've uh significantly reduced
33:53the the visual impact of the building
33:56itself. Um,
33:59now with regards to plantings and
34:01screenings, there's probably a lot more
34:03that we can do. um and especially in
34:06regards to uh compensating the district
34:08for the parking needs uh that the client
34:11has as well as zoning.
34:14So I I believe there's a collaborative
34:16effort to state again that we need to do
34:19here between this submission and
34:22possibly the next because we would like
34:24to continuation to uh explore that with
34:28uh yourselves and members of the
34:30community. So with that, thank you.
34:34Thank you very much.
34:37[clears throat]
34:40Back to the public hearing. If there's
34:42anyone here wishing here wishing to
34:45speak in favor of this proposal to
34:47please come forward at this time. I
34:49remind you we are requesting a threeinut
34:53limit on each presentation
34:57for each presenter.
35:01Please come up. State your name and
35:02address for the record sir.
35:04>> Um Dr. Muhammad Islamic society
35:06president uh 925 obviously come
35:09>> I just want to thank everybody the board
35:11uh the neighbors with their comments uh
35:13to reach this kind of at least building
35:15wise compromise. Um I know it took a lot
35:19of time everybody I'm really thankful
35:21grateful to everybody's comments uh but
35:24as um as uh uh Ben has mentioned is
35:28going to be now is nearly discussion uh
35:31between us and the neighbors uh and find
35:34out a way to um uh have this project uh
35:39move forward. And again, I thank
35:41everybody who came here today, whether
35:43in favor or uh bring more comments to
35:46even improve this project. Thank you.
35:49>> Thank you very much.
35:52Again, anyone else wishing to speak in
35:54favor of this proposal, please come
35:55forward at this time.
36:00Okay.
36:02For those wishing to speak in opposition
36:04to this project, please come forward at
36:06this time. And again, we are requesting
36:08a three minute limit on your
36:11presentation.
36:12And if I have your name and address for
36:15the record, please.
36:16>> Of course. Good morning. My name is Matt
36:17Kissling and with my wife, Jody Upton.
36:19We reside at 108 Circle Road. We've been
36:22here before. We stand before
36:24[cough and clears throat] you in
36:24opposition to the expansion as proposed.
36:28We ask you to deny the application
36:30because as before significantly alters
36:32the historic character of our house and
36:35the neighborhood in its size and overall
36:37plan and has not addressed the many
36:39issues raised previously in this chamber
36:41by us and our neighbors. Our rear
36:44property line is shared with the Islamic
36:46Society of Central New York. We have
36:48several specific concerns that impact
36:51the historic nature of our property
36:54which we raised with Dr. Muhammad when
36:56we met with and put forth our previous
36:58comments. I would like to reiterate them
37:01here for the record. I also have some
37:02questions just for clarification as we
37:04begin. Um S2 right at the very beginning
37:08of this proposal is that view facing
37:10east or north?
37:13My understanding S3 is that facing south
37:17or west and S4 is that view facing
37:20north. I asked those because I want to
37:24make clear that we live
37:26east of the mosque. I'm not an
37:29architect. I don't know the language or
37:31the lingo and I'm I did my best to read
37:33through this to understand. If you go
37:35back to the very beginning of the
37:37proposal, you'll see pictures,
37:39photographs.
37:40>> You're referring to the site photo the
37:42packet photos, not the not the drawing
37:44set
37:46>> right at the very beginning.
37:53I'm sorry, sir. S2.
37:54>> S2. Is that facing east or north?
38:00>> That appears to be facing north.
38:03>> Okay.
38:04>> Um,
38:04>> it's labeled as east. But
38:07>> if you go just to
38:10I think that's north. S3 is facing
38:13south. I believe
38:16as we look at this on page n on page
38:20nine of this um Kate if you can move to
38:22page nine you'll see the back out
38:25building the shed
38:27>> and if you look at that view what you
38:28can see in that particular view um keep
38:31going
38:32>> S8 is that
38:36um I had on page nine is that page nine
38:40>> is that S8 picture S8
38:42>> it might be it's the the ship said that
38:45looks at
38:49>> no you pass. I think it's S7.
38:55>> That one right there.
38:56>> Is that the picture say
38:59>> there's another picture of the shed that
39:01has
39:02>> Rex's house. The Jardines.
39:04>> B1 B1.
39:05>> That one right there. Thank you. Sorry I
39:07didn't put that in there.
39:09But you can note that there are a lot of
39:11trees that block the view and the noise
39:17on the other side of the shed.
39:20On page 44
39:22of this [clears throat] project,
39:25you can see that the mature trees in the
39:27neighborhood exist and there are no
39:29mature trees. I understand that the
39:32architect just said, "We would like to
39:34consider adding some more trees." That's
39:36a nice thing to consider. It's not in
39:38the proposal. Unless there is a robust
39:41landscape architectural design that will
39:44protect our privacy and our historic
39:47nature, we have a problem with that.
39:49Quoting from the Is that time? Am I
39:51time? Okay.
39:53>> We do have your we do have your comments
39:57and we will be sure to
39:59I'll be sure to share them um with the
40:02board as well as with the applicants.
40:03So, thank you. Thanks.
40:07Okay, Rex
40:11>> Rex Jardine, 112 Circle Road. I've
40:14delivered my written comments. They're
40:16lengthy. 17 points. I'll be brief. Uh
40:19building materials proposed. Um there
40:21are some new materials proposed. There's
40:23a stainless steel tile wall paneling,
40:26which is wonderful, but it only covers
40:28about 3% of the building. Everything
40:30else is for the record. Ephus is stuckco
40:34on styrofoam.
40:38You should be familiar with it. It's a
40:40short-lived material. Totally
40:42inappropriate for the neighborhood. I
40:44could not propose IUS for my building,
40:47my house, my home. Building heights
40:50front and rear. While I appreciate their
40:52efforts to downplay the elevations on
40:54Commtock, everybody across from there is
40:57sleeping and or driving or trying to
41:00drive 30 miles an hour. Yes, we have to
41:02stay below. They actually say there the
41:04increased roof height is concentrated to
41:06the rear.
41:09[clears throat] I live to the rear. Matt
41:11and Jod live to the rear. We're facing a
41:1330 foot high, 50 foot wide sheer wall,
41:17vertical with windows at the top. pretty
41:20imposing in a in a stark white. There
41:24are ways to break that down. It's
41:25currently broken down into an
41:27articulated
41:29um elevation there.
41:32Parking versus capacity. It's clear that
41:34the parking isn't working. I think they
41:37only have about onethird of the zoning
41:40required spaces, but just to put in
41:42perspective, originally designed in
41:441980, 108 worshippers. Regularly we
41:48count 300 cars at five square feet per
41:51person which would be appropriate for
41:53assembly. The Musala 440 persons. The
41:58expanded mezzanine for women 247 persons
42:02max plus any other occupants elsewhere
42:05in the building. So capacity around 687
42:0921 spaces. Everything else probably on
42:12the street.
42:14Dumpster. Um, are you allowed to have
42:17commercial dumpsters in an R1 historic
42:19district? I don't know. There is one.
42:216:42 this morning, it got emptied and
42:23banged on the ground. Used to be on
42:25Wednesdays, typically more often at 5 in
42:27the morning. A great wakeup call. Are
42:30they allowed? And why are they pushed
42:31against my property? There is a corral.
42:34It's called a out building, but it's not
42:36really a building. It's a dumpster
42:38corral.
42:41So, I hope you consider all of my points
42:44and I think they've outgrown this site
42:46and I hope that this board does not
42:48support the submission as presented.
42:54[clears throat and cough]
42:54>> Next person wishing to speak in
42:56opposition.
42:57>> Yeah, I'm Don Peters. I live at Circle
42:59Road.
43:01I provided, excuse me, I provided
43:04written comments for your review, but I
43:06would like to address a few more this
43:08morning. Uh the data on the tables
43:10provided on sheet L1 Z overall site are
43:14inaccurate. They're almost identical to
43:16the June submitt which had a larger
43:18building footprint and different uh site
43:22layout. As previously noticed, the
43:24architectural elevation datim is not
43:27coordinated with the site drawing and
43:30survey benchmark elevations making it
43:32difficult to verify the actual height of
43:34the building. The application references
43:36the building height at 36 at the back,
43:3933 at the at front of Comtock. Uh after
43:43coordinating these architectural
43:44elevations to the survey datam, it
43:46appears the elevation at the rear of the
43:48building is closer to 38 and it's also
43:51closer to 39 ft in relation to the
43:54budding property in the east. That would
43:56be a building that's 13 ft taller and
43:58more massive along the rear as Rex has
44:01pointed out than the existing building.
44:02The increase in building size is also
44:04noticeable on Comtock section. It is out
44:08of scale with the adjacent historic
44:09residential structures. Proposed
44:12materials are different enough that
44:13these buildings
44:16that they increase rather than lessen
44:18the property's inconsistent character.
44:20Expanded pavement and building coverage
44:22would create a negative impacts to the
44:24existing tree root systems and would
44:25cause decline and loss of screening.
44:28Proposed landscape plants outside the
44:30proposed fence are not accessible for
44:32maintenance. The species is a slow
44:34growing, marginally winter hearty here
44:36and would likely not grow to intended
44:38height. Dumpsters are not addressed in
44:40R1. I think we brought that up. Uh but
44:43are addressed as related to mixeduse
44:45development adjacent to residential
44:47properties suggesting that dumpsters
44:49might not be allowed in a residential uh
44:53area. Regardless, they require closer
44:55association to the buildings uh not to
44:58the neighborhoods. Storm water runoff
45:00would increase due to the increase in
45:02impervious surfaces and building
45:05coverage. No changes to the storm system
45:07are shown to mitigate this increase.
45:11A detention basin, sediment basin,
45:13buried holding tanks, and sediment
45:15separators might be necessary for this
45:17purpose, but none are shown. So, we
45:19won't know the impacts of the site until
45:21that work is done. Although not central
45:24to your review, parking requirements
45:26cannot be met for this project. they're
45:28using an R1 uh for what really is not
45:33really an R1 use. So that's a conflict,
45:36let's say, just in general of what
45:39numbers do you really use. So um so
45:42anyway, um parking requirements cannot
45:45be met for the project. Parking is
45:47continual problem along Comtock, the
45:49adjoining streets and neighboring
45:50properties. This situation will only get
45:52worse if the building is expanded to
45:54accommodate more people.
45:57These are these and other issues must be
45:59addressed for you to make an informed
46:01decision. At this time, um I would say
46:03that you should deny the project with
46:06prejudice.
46:08>> Thank you. Anyone else wishing to speak
46:09in opposition to this project, please
46:11step forward at this time.
46:26>> [clears throat and cough]
46:30>> You submit this too.
46:33>> Yeah.
46:50Uh, I'm hoping to get through this in
46:52three minutes. Uh, if you go to the
46:54second page,
46:55>> your name and address for the record.
46:56>> Yeah. Mike Michael Stanton, 3.5 Berkeley
46:59Drive, Syracuse. Thank you.
47:01>> Uh, the Islamic Society of Central New
47:03York has simply outgrown the Commtock
47:05site. When the building was first
47:08proposed back in 1979,
47:10uh what was described at the time as 30
47:13to 80 worshippers, most of whom would
47:15walk to and from the mosque. I think
47:17that was true at the time. Uh it's no
47:19longer true. Today, this facility draws
47:21hundreds of worshippers from across
47:23central New York. We count at least 200
47:25or more cars on Friday afternoons,
47:27mostly parked illegally on the
47:29neighborhood streets because uh there is
47:31no legal parking there. Going to the
47:34next page. Uh, this proposal will not
47:36solve the problems of Islamic Society's
47:38parking. City zoning allows no more than
47:4120% driveway and parking coverage. This
47:43proposal would pave nearly twice that
47:45area, 39.3%.
47:47Even with this massive amount of
47:49asphalt, the new plan would provide a
47:51total of only 21 parking spaces, less
47:54than onethird of the 67 parking spaces
47:57zoning requires based on the building
47:58square footage. Today, if you include
48:01illegal parking spaces, the Islamic
48:02Society offers more than 40 spaces.
48:04Really, more like 50 if you count the
48:06double parking they often do. In short,
48:09this proposal would nearly double the
48:10size of the religious building while
48:12effectively reducing by half the number
48:14of parking spaces.
48:17Going to what's page four at the bottom,
48:20the vacant lot to the north of the
48:22Islamic Society is a contributing site
48:24within the local historic district. For
48:27over 100 years, the vacant lot north of
48:29the Islamic Society has been either a
48:31garden or a green space. Uh we hear from
48:34folks that there was a gardener working
48:37all the time in this area uh 80 years
48:40ago to to keep the garden going. Paving
48:43over this area would be detrimental to
48:45the park-like setting of the historic
48:46district. As you know, in our district,
48:49it's not just uh changes to the
48:51buildings, but also to the landscape
48:52that we have to come to you for
48:54approval.
48:55Going to page uh five. You have to turn
48:59it vertically. Uh if you look even up to
49:02the top of the picture, you can see the
49:03number of illegally parked cars over the
49:05the uh bike lanes there. Illegally
49:09parked cars on Commtock and other nearby
49:11streets remains an issue. Going to page
49:15six.
49:19How do I do that?
49:24Yes. The Islamic Society now owns the
49:26former First Baptist Church in
49:27Jamesville, 10 minutes drive away. The
49:30Islamic Society now owns the former
49:32First Baptist Church. This 14 acre lot
49:35includes 135 parking spaces and a 14,000
49:40foot religious structure. It offers
49:42enormous expansion opportunity. Compare
49:45that with the two lots on Comstick,
49:47which combined are less than one acre.
49:49>> Mike, I'm sorry. Your time is up. So,
49:52>> thank you.
49:53>> Thanks. [clears throat]
49:58>> Anyone else here wishing to speak in
50:00opposition to the proposal? Please come
50:02forward.
50:07>> Hello, Stephanie Bartling. I live at 117
50:10Circle Road. I oppose this proposal for
50:13the following reasons. As a large
50:16non-residential building surrounded by
50:18historic homes, the mosque is already an
50:20outlier in style, scale, and activity
50:23level. The expansion makes this worse.
50:26The height and size of the expansion is
50:28out of character with the neighborhood.
50:30The drawings show heights similar to
50:32nearby houses, but the roof line is in
50:35congruent and overpowering.
50:38Amid slanted, buried roofs that peak in
50:41a single point. The addition is a large
50:43solid block that will loom over the
50:45neighborhood like a giant movie screen.
50:48The drawings also ignore Berkeley's
50:50hilly terrain. The moss sits at the
50:52lowest point, so most homes will look
50:55onto the addition. From our Circle Road
50:57home, we would definitely see this big
51:00large block. Berkeley would even have
51:03bigger um issues. Three big beautiful
51:06old trees by the proposed front driveway
51:09exit are unlikely to survive. The
51:12proposal claims moving the expansion and
51:14its height towards the back of the lot
51:16benefits the neighborhood, but it does
51:18not. It actually worsens our views and
51:22brings mosque activity closer to homes.
51:26And then, of course, we have the issue
51:28with parking. It this would hold 700
51:32people with fewer than 30 legal spots.
51:34And illegal parking is a contentious
51:38issue now in our neighborhood. At the
51:40last meeting, mosque leadership said
51:42Friday cars would decrease from the 175.
51:46It hasn't. It's around 250. Two weeks
51:49ago, I counted 250 cars for the service.
51:52200 parked illegally. It's a public
51:55safety issue. K turns block fire
51:57hydrants, parking on both sides, so
51:59emergency vehicles cannot get through.
52:02Traffic is compacted, so both bike lanes
52:05are impacted. And now people are parked
52:08more on Circle Road in SU lots. Uh two
52:11weeks ago, anybody on Circle on a Monday
52:14got a ticket. Yet the 200 cars that are
52:17parked on Friday do not get tickets.
52:19Generally, police have been out three
52:22times since our last hearing here. The
52:24city seems unable, unwilling, or afraid
52:27to enforce any mosque violations. We
52:30wrote city officials, including the
52:32mayor, about parking and got no
52:34response. We asked for occupancy numbers
52:36and we were asked to foil. When the
52:39mosque bodos the second lot gardens
52:41without permission, the neighborhood had
52:42to request a stop order. And in three
52:46periods, including in 2004, the mosque
52:49opened its extra lot uh for illegal
52:52parking. Um and we had to report that
52:54too. So be careful what you approve. The
52:57historic neighborhood is vulnerable and
53:00its future is in your hands. One circle
53:03grown owner just recently sold to an
53:05investor, which really doesn't happen on
53:07Circle, and the neighbors next to the
53:09mosque just quietly moved away. If
53:11approved, the expansion problems will go
53:13unadressed and neighbors will be left to
53:16come for themselves. This could set off
53:18a domino effect of residents leading and
53:20the district will become historic homes
53:22with no one who cares for them.
53:27>> Thank you.
53:29Next person wishing to speak in
53:31opposition, please come up and introduce
53:33yourself for the record.
53:37Uh I'm Cliff Davidson uh 333 Berkeley
53:41Drive and my wife Megan uh is also here.
53:45Um we are very much opposed uh to the
53:48proposed expansion of the mosque um for
53:52many of the reasons uh that have just
53:55been given. Uh, and I also want to point
53:57out that we have a history here. The
54:01status quo is already not acceptable and
54:05not within the law. Um, you've heard
54:09about the uh illegal parking. And we're
54:12not talking about one or two cars. We're
54:14we're talking about uh up to uh 200 cars
54:18or maybe even more than that. That's the
54:20status quo. So an expansion of this
54:24project would make that problem even
54:26worse. Uh so that is why we we're very
54:30much uh against this expansion. Thank
54:33you.
54:35>> Thank you.
54:38>> Again, anyone else here wishing to speak
54:40in opposition to the project, please
54:42come forward at this time.
54:49>> Morning again. My name is Christine
54:51Capella Peters. I live on Circle Road.
54:54Of the many preservation concerns
54:55previously identified regarding this
54:57project, only one has been affirmatively
55:00addressed, and that is building mass.
55:02Unfortunately, because of that narrow
55:04focus, the project remains inconsistent
55:05with the secretary's standards and
55:07therefore would have a negative impact
55:08on the historic district. Three primary
55:11issues remain. First, building size.
55:14While the current design would result in
55:16an overall smaller footprint, any
55:18mitigation that might generate is
55:20diminished by the increase in building
55:21height and combined with the loss of
55:23vegetation, as you've heard, the
55:25properties to the east would suffer the
55:26greatest impact from a taller structure.
55:29The design intentionally concentrates
55:31increased building height nearest to
55:32these properties. Second, pavement.
55:35Sadly, the current design includes even
55:37more paved area than the previous
55:39submissions when those relatively lesser
55:41amounts of pavement were specifically
55:44identified as wholly inconsistent with
55:46the residential character of the
55:47historic district. Similarly, an
55:50elaborate vehicular circulation pattern
55:52would only emphasize the site's
55:54non-contributing character when the
55:55proposal should seek to diminish it.
55:57Emergency access is again used to
55:59justify this driveway, but the building
56:01does not exceed the minimum distance
56:03from a public street that requires a
56:05designated fire lane, and providing one
56:08anyway only exacerbates adverse
56:10conditions.
56:12More importantly, given physical
56:13constraints, the applicant cannot
56:15provide the nearly 300 parking spaces
56:17necessary to meet the documented current
56:19demand for funeral services or weekly f
56:22Friday congregational prayer. nor can
56:24they provide even the 67 spaces called
56:26for by the zoning ordinance. In fact, no
56:31no number of on-site spaces can begin to
56:34address zoning requirements, current
56:36need, or likely increase demand with a
56:38larger facility. Therefore, it is more
56:40than reasonable to severely limit the
56:43amount of pavement and yield a project
56:44that's more responsive to the secretary
56:46standards as there would be no
56:48substantive increase to the applicant's
56:50larger parking problem or the pressure
56:52it already places on the neighborhood.
56:54And third, the landscape. The revised
56:56design eliminates contributing property
56:58in the historic district and leaves
57:01virtually no significant open space.
57:03There's no comprehensive plan that even
57:05loosely resembles the design landscape
57:07traditions of the historic district
57:09which could contribute to mitigation. In
57:12fact, most of the historic trees,
57:13hedges, and shrubs on the site will be
57:16lost due to construction activity and
57:19subsequent pavement and building
57:20coverage. These issues and several
57:23additional concerns are discussed in
57:24more detail in my submitted written
57:26remarks, which I hope will be made
57:28available to the applicant. It is
57:30critical that negative impacts be
57:32addressed in concert for it is their
57:34cumulative effect that must be
57:36mitigated. The modif modest revisions to
57:38the building preprint alone cannot
57:40overcome the remaining adverse project
57:43components. It is not simply about
57:46parking lot or the height of the
57:47building. It is all the things I and my
57:49neighbors have just listed. However,
57:52significantly reducing the amount of
57:54pavement, eliminating internal vehicular
57:56circulation, and providing a more
57:58detailed and complex landscape plan
58:00might help alleviate these conditions.
58:03At this point, I ask that you either
58:05leave the public hearing open and ask
58:07for revisions or to deny the
58:09application. Thank you.
58:12>> Thank you.
58:16One else here wishing to speak in
58:17opposition to this proposal, please come
58:19forward.
58:22Ever Vanderolin 931 Commtock.
58:26Um since uh the mosque was built in
58:291979, the site was never appropriate for
58:33this type of building and it still is
58:35not appropriate for this type of
58:37building. And the institutional
58:39encroachment onto our historic
58:43neighborhood has already cost us quite a
58:46few things. And two of them are we lost
58:49the house on 917 which is adjacent to
58:52the north side. We lost that in 2004
58:56when the family moved out because of all
59:00the commotion about buying the lot. As
59:02soon as they bought the lot, the family
59:04moved out because they did not want to
59:06raise their newborn
59:09daughter next to a city parking lot.
59:13Now, this month,
59:16since they since these plans were um
59:20presented to everyone finally, um the
59:23house next to me on the south side, 929
59:29Comtock,
59:30uh the after spending a lot of money
59:33fixing uh things just recently, they
59:36abruptly and quietly left. The house is
59:39empty and it is rumored it's being sold
59:42to someone in the mosque.
59:44>> You a doctor from the mosque? Doctor?
59:48>> Yes, I can buy. But is it you? Are you
59:50buying the house next to me?
59:51>> Thank you. Sorry. Yeah.
59:53>> Okay. Well, anyway.
59:55>> Anyway, um I ask that you vote no on
59:59this. And I am submitting um there needs
1:00:03to be extreme oversight because there is
1:00:05a long history of words not matching
1:00:08actions. And I have proof right here. I
1:00:10have photographs. Uh Stephanie mentioned
1:00:13that they they kept parking in the lot.
1:00:16I have over the years I have photographs
1:00:19um and I wasn't even really paying
1:00:21attention. I just happened to catch
1:00:23these, but from um you'll see on here
1:00:26from 2016, 2018 and as close as 2024,
1:00:31they open the gates and everyone's
1:00:33parking in in the lots. It's against
1:00:36code. We have to call code enforcement.
1:00:39So, there is a history. They even um
1:00:42gaslighted the board when they said that
1:00:46they needed to clean up the the lot for
1:00:50um playground equipment. They never
1:00:52planned on that. Then on um I've got the
1:00:54date here, June 27th, 2006, they started
1:00:58bulldozing the lot. They needed to
1:01:00flatten it out for the cars because it
1:01:02was too lumpy. We were able to stop
1:01:04that, but we did lose some trees. So,
1:01:07there is a history of words matching the
1:01:10actions and I have documented the parts
1:01:13I know. I do have a life so I don't
1:01:15catch everything but I just happen to
1:01:18have some of this and some of the stuff
1:01:20is that was really old is on some old
1:01:23computer and I don't have time to find
1:01:25it but I want to submit this whole
1:01:26thing. So
1:01:30[clears throat] thank you very much.
1:01:33We have anyone else in the audience here
1:01:35wishing to speak in opposition to this
1:01:36proposal? Please come forward at this
1:01:38time.
1:01:46I have your name and address for record,
1:01:48please.
1:01:49>> Gary Engelhart, 117 Circle Road.
1:01:53>> Okay, pull this up. Kate, if you could
1:01:54go to the back the bottom. Uh there are
1:01:57maps at the back. Yeah.
1:02:00Thank you.
1:02:02>> What is this document that we're
1:02:03loading?
1:02:04>> This is uh these are my public comments,
1:02:06but I'm just going to show you. If you
1:02:07could blow, if you could just uh uh zoom
1:02:10zoom that in, Kate, when you get a
1:02:12chance
1:02:14>> down
1:02:16at the bottom here. Oh. Oh. Oh. Well,
1:02:18maybe not.
1:02:20Okay, perfect. A little little less
1:02:23maybe. That's perfect. Good. Okay. So,
1:02:25thank you very much. Uh Gary Engelhart,
1:02:27117 Circle Road. I'm here uh to ask the
1:02:29board to deny the proposed mosque
1:02:31expansion because of the adverse effects
1:02:32on Berkeley Park neighborhood. Uh I
1:02:35detail this in my written comments which
1:02:36I've submitted. Uh but I want to
1:02:38emphasize the key issue here. Uh
1:02:40Berkeley Park's historic designation
1:02:41protects more than its houses. It
1:02:43includes uh it recognizes the the
1:02:45neighborhood's 1911 road system. Uh its
1:02:48narrow residential streets landscape,
1:02:50spatial organization, and importantly
1:02:51the fact that the neighborhood the
1:02:54streets and the houses in the
1:02:55neighborhood have differentiated
1:02:57elevations because it's built on a
1:02:59that's that's explicitly in in the uh
1:03:02historical listing. So uh uh uh my key
1:03:05point is is that the mosque will have a
1:03:07disproportionate visual impact within
1:03:09within the the the the district. Uh in
1:03:12to this end I've submitted uh four
1:03:14exhibits that compare the visibility of
1:03:16the mosque and its appro and it's a uh
1:03:19its approximate current height and the
1:03:21proposed height. Uh and these maps use
1:03:23the actual topography uh with along with
1:03:26building footprints and LAR data to to
1:03:29model vegetation and building heights
1:03:31and distinguish both first and second
1:03:33story observation heights. So let me
1:03:35just take you through it. So shown in
1:03:36purple is the is the on the lefth hand
1:03:38map is uh the the Berkeley Park district
1:03:41with uh streets outlined in green uh and
1:03:44and building structures outlined in
1:03:46black for reference. Uh the mosque is is
1:03:48shaded black so you can see where it is.
1:03:50And uh what you can see here is uh the
1:03:53areas shaded in yellow are areas that uh
1:03:56are nonstructure land areas like yards
1:03:59that would have a view of that have a
1:04:01view of the current mosque at at its at
1:04:03its peak. Uh and the houses shaded in
1:04:06red are the ones that can see that can
1:04:09see the mosque. This is this is in uh at
1:04:12at a twoft level of obs a 2 meter level
1:04:14of observation which is roughly a first
1:04:16floor observation uh with vegetation. Uh
1:04:20so this is the what you typically see
1:04:22for views uh in in the months from uh
1:04:25May through uh through October. If you
1:04:28go to the right hand side map you can
1:04:29see what the what the proposed view how
1:04:31the viewshed would change with the
1:04:33proposed structure which is much as
1:04:35other people have said is much more
1:04:36massive. It goes up to 36 between 36 to
1:04:3939 feet depending on on on the
1:04:42specification. And you can see that uh
1:04:45um there's a modest increase in in in
1:04:47both the land area as well as the number
1:04:49of houses that can that can that can
1:04:51view the can view the mosque. However,
1:04:54this changes uh dramatically if you go
1:04:55to the next figure Kate uh
1:05:00which is uh the next figure is uh if if
1:05:04this is uh when there's no vegetation.
1:05:06So this is uh you can think about this
1:05:08as the months of November through May.
1:05:10Now there's substantially more
1:05:12visibility. If you look at the on the
1:05:13left at the current at the current map
1:05:16uh you can see that the uh there are
1:05:19more red houses that are shaded. Those
1:05:20are those are focused on Circle Road,
1:05:23Berkeley and and Comtock and more yellow
1:05:26areas that are are shaded as well. Um
1:05:30there are in this view 34% of the land
1:05:32area uh 34% of the houses in in the
1:05:36Berkeley park under the proposed uh
1:05:38under the proposal would would have a
1:05:40view of the mosque and 21% of the land
1:05:42area.
1:05:43>> If you go hang on just I'm five more
1:05:45seconds
1:05:45>> times up.
1:05:46>> If you go to the
1:05:48>> Yeah. If you if you go to the the last
1:05:51the last figure where you'll see this uh
1:05:54at a five meter view which is roughly
1:05:56the second story of a house over 50% of
1:05:59the houses in the neighborhood would
1:06:02have a view of the new mosque during the
1:06:04winter months when there's no
1:06:06vegetation. It will dramatically change
1:06:08the character of the neighborhood. Thank
1:06:10you.
1:06:11>> Thank you.
1:06:12>> Thank you.
1:06:17>> Okay. Anyone else here wishing to speak
1:06:19in opposition?
1:06:22If not,
1:06:25opportunity for
1:06:30[clears throat] excuse me, opportunity
1:06:32for the presenter to come up and uh
1:06:35respond or add any additional
1:06:37information that you'd like to do at
1:06:38this point.
1:06:41>> Sure.
1:06:43You're the representative.
1:06:45Um,
1:06:47[clears throat]
1:06:48I'm not quite sure where to start, but I
1:06:51don't have too much time to start with.
1:06:52Anyhow, so Michael, I know this mosque
1:06:56and other people was built 1982
1:06:59[clears throat]
1:07:01and perpetual growth.
1:07:04Telling me to go to Jamesville, that's
1:07:06not acceptable. That building is not a
1:07:10mosque. That is education center. We
1:07:12took the noise from the neighborhood. We
1:07:15sent all the way there. The weekend is
1:07:17quiet because complaints was uh a few
1:07:20years back. The grass area I've been
1:07:23three years in the president. Never
1:07:25parked there. We parked only one time
1:07:27when we have to seal our parking lot. So
1:07:31we parked there for day and a half. Give
1:07:33us a break please. But also with all
1:07:37downsizing of the proposed building give
1:07:40us some credit. We try to compromise.
1:07:42This is the minimum that we can do. This
1:07:45is open way for our women, our sister,
1:07:49our ladies to come and be respected when
1:07:51they view their their loved ones. Have
1:07:55some compassion toward us. But also the
1:07:58parking understand and I was that your
1:08:02is fair and I told you that you want on
1:08:04paper, we'll put on paper for uh uh
1:08:08historic oriented landscape. We'll put
1:08:10in the paper and I promise you we'll do
1:08:14it. Yes, we need a few parking extras so
1:08:17when they come with their with their
1:08:19loved ones, the the the close family can
1:08:22view the the the body. We're not asking
1:08:25for 200. And you've been sending 300
1:08:28cards. If I if I put cars on KSTA
1:08:32completely from first stop sign north
1:08:36all the way to Calvin east Calvin sign
1:08:38you cannot put 300 cars there you can't
1:08:42and the police the police the city comes
1:08:45every week and people get ticketed I
1:08:48don't don't repeat so there are few
1:08:50things that we're going to take and work
1:08:53on and we're going to as I said it
1:08:55should be after there should be
1:08:56neighboring discussion to find a a
1:08:59common ground. So we're happy and the
1:09:02neighbors also happy. After all, you are
1:09:04my neighbors. We cannot keep doing that
1:09:07for a long time. Your kids, our kids,
1:09:11they we should not have this future sort
1:09:13of uh this kind of history affect the
1:09:16future. We're not asking too much. Thank
1:09:19you.
1:09:22>> Thank you. At this point, we'll close
1:09:25the public comment.
1:09:28Do we have any questions on the
1:09:30proposal,
1:09:32>> clarifications?
1:09:35You have
1:09:36>> I just wanted to say I think my
1:09:38understanding is that you'd like to hold
1:09:40the you'd like to ask the board to hold
1:09:42it open um
1:09:44for uh the public hearing open at this
1:09:47point. So to make no to take no action
1:09:49at this point um pending review of the
1:09:52the comment and further discussion. Is
1:09:54that correct? Okay. I just wanted to
1:09:56clarify that for the board.
1:09:58>> Okay. Um there's a question in the
1:10:00audience. Are we allowed to
1:10:09>> Yes. Yeah. Well, uh the board is able to
1:10:11open the com uh the public comment back
1:10:13up again. We've we've not closed the
1:10:15public hearing. It's just the the public
1:10:17comment for today. Thank you.
1:10:21>> Okay. So as I understand it, we'll keep
1:10:23this open at the request of the
1:10:25applicant for additional comments. Do we
1:10:28have a conduit to get these comments to
1:10:32the applicant within
1:10:35>> all all written comment will be provided
1:10:37to the applicants. Um
1:10:39>> I heard that was one of the biggest
1:10:41issues that from your from your side you
1:10:45saying that you'd like to hear all this.
1:10:46So
1:10:51I just want to make sure we've we've got
1:10:53that covered and we can provide that in
1:10:55short time so we can in another three
1:10:58weeks when we're back here we have a we
1:10:59have a a solution on hand or a final
1:11:02design on hand.
1:11:07>> However, it is a good opportunity if the
1:11:08board does have have comments or
1:11:10questions at this point.
1:11:16I guess I want to start by saying thank
1:11:18you for reducing the scale of the
1:11:20building addition. Um I think that's
1:11:22something we specifically specifically
1:11:24asked for last time and you met that.
1:11:32>> Any other board comments,
1:11:34clarifications, questions?
1:11:36>> I do have a couple of questions.
1:11:38[clears throat]
1:11:38>> Go ahead.
1:11:39Um just primarily as they pertain to
1:11:43materials
1:11:44um would it be possible to get a sample
1:11:46number one of the stainless steel that
1:11:48you guys proposing? It says it's pearl
1:11:51something like that. I can't tell from
1:11:53that.
1:11:55>> I also
1:11:57you know that these will be aluminum
1:11:59clad wood windows.
1:12:01>> Yes.
1:12:01>> With a clear anodiz. So is that
1:12:04replacing all of the existing windows as
1:12:06well? I was trying to
1:12:08>> um No,
1:12:09>> the application looks like the existing
1:12:10windows are white. Unless it's just
1:12:13>> Yeah, they're the existing windows
1:12:15currently are to remain.
1:12:18>> So, those are white,
1:12:20>> I believe. So,
1:12:21>> but the new ones will be anodized.
1:12:24>> Uh yeah, they'll be clear anodized.
1:12:26Yeah,
1:12:28>> I was I was I appreciated the intent
1:12:32with the the encapsulating everything in
1:12:34EIS. Number one, I'm so sorry that the
1:12:37building was never built with insulation
1:12:39>> in our climate that that somebody even
1:12:41did that. But so I appreciate at least
1:12:43the
1:12:44>> 80s
1:12:44>> thermal uh improvement for for occupant
1:12:47comfort, but also to try and provide a
1:12:50more unified appearance to the overall
1:12:53um property, but I would I would expect
1:12:56that
1:12:58something like would be done with the
1:13:01windows to create that enhance that more
1:13:03unified app. So,
1:13:05>> okay. Yeah, we can we can
1:13:07more of a color thing.
1:13:10>> Yeah. Yeah, there's not many left. We
1:13:12can do that.
1:13:13>> Um
1:13:15I also I noticed in your rendering you
1:13:17have a pattern in all the windows. Can
1:13:21you just is that just hypothetical? Can
1:13:25you speak to how you anticipate that
1:13:27would be affected? that is a result of
1:13:30trying to not have residential furniture
1:13:33inside the house when AI tries to render
1:13:35these things. Um, but it is
1:13:37representative of the interior screens
1:13:41that we want to put up that for the
1:13:43religious space that would resemble
1:13:45Islamic uh faith.
1:13:47>> And do you have an idea how that might
1:13:50be
1:13:52affected?
1:13:54>> They would be on the interior.
1:13:56>> So they These are like this is a
1:13:59>> film. It's a laser cut screen.
1:14:02>> I believe they we're looking at uh wood
1:14:05uh muttons carved interior applied.
1:14:10Um, I I would also like to see I mean I
1:14:14I understand some of the reservations
1:14:16about that were expressed about this,
1:14:17but I I appreciate that you also
1:14:20acknowledge that that there might be
1:14:23some concerns about that and sort of go
1:14:25a hard stucco. Um, would that be in a
1:14:28heavier texture than and would you still
1:14:31plan to retain all the insiz patterning
1:14:35on the property? The insiz pattern uh is
1:14:39intentional to express the from the
1:14:42outside the difference when between the
1:14:44religiousary space and uh the entry and
1:14:47then the rest of the building.
1:14:49>> Okay. But you would still maintain that
1:14:50even change in slight change in
1:14:52material.
1:14:53>> We would like to I'm just looking for
1:14:55clarification.
1:14:57Um
1:14:59[clears throat]
1:15:00I think that's it for the moment.
1:15:06Are you speaking to there's comments
1:15:08about the scale of material and the loss
1:15:11of the scale that currently exists on
1:15:13the building is that component is that
1:15:16as well in the language
1:15:22>> standpoint
1:15:31this might be a code thing but who's
1:15:33who's verifying
1:15:35because we keep hearing different from
1:15:37what the rendering has to what uh other
1:15:41people are are finding standpoint
1:15:46that
1:15:48>> that sounds like from a spatial
1:15:49standpoint what we're considering as
1:15:52consistent right
1:15:53>> yeah we're using the landscape
1:15:55architect's grade lines um and then
1:15:57we're importing those into our Revit
1:15:59model and then we're measuring directly
1:16:01from the model
1:16:04Only other thing is uh talked about
1:16:07lighting at the beginning but didn't
1:16:09have
1:16:12laid out if something that we can
1:16:14diminish.
1:16:16>> Yeah.
1:16:17>> Yeah. We definitely want to
1:16:20>> Yeah. eliminate the current elevated
1:16:22lighting that is washing the neighbors
1:16:24yards um especially in the winter time.
1:16:27And we wanted to go with a much warmer
1:16:29ballard mounted light fixture that would
1:16:31essentially shine down onto the
1:16:32sidewalk. Um, yeah, facing the interior
1:16:37of the property is what we want to do.
1:16:38We don't want anything washing out, but
1:16:40there there's always light always
1:16:43reflects, but the intent is to negate as
1:16:46much of that as possible.
1:16:50>> On the excuse me, [clears throat] on the
1:16:52lighting comment, I know originally you
1:16:55had um wall mounted. So now it's
1:16:58primarily ballard mounted. So it's a
1:17:00lower light.
1:17:01>> Yes.
1:17:01>> Less intense, less flooding.
1:17:02>> Yes.
1:17:05Does Okay.
1:17:07>> Well, some of it appears to be
1:17:10[clears throat] lighting on the building
1:17:11>> as well. So there's some shown on the
1:17:14renderings. Um Yeah.
1:17:18>> Yeah.
1:17:19>> Okay.
1:17:20>> Yeah. something washing the the wall of
1:17:22the building to try. But I mean that
1:17:25that's something that's we can take out
1:17:27too.
1:17:32Any other comments?
1:17:34Okay. I have the request to hold this uh
1:17:37hold this open until next meeting for
1:17:40additional uh we'll get you these
1:17:42additional comments to you to your team
1:17:44so you can internalize and and respond
1:17:47and next steps just vote to hold it open
1:17:51or that clarification.
1:17:57>> Okay.
1:17:58>> Can I just say one thing though? Um, it
1:18:01seems like there's a, you know, butdding
1:18:04of heads. So, sounds like you guys want
1:18:06to be able to meet together and mediate
1:18:08through that. And I'm sure there's
1:18:09probably some that don't want to be
1:18:11built at all, but I don't know if the
1:18:14council member, you guys, Eric, can be
1:18:15the mediator. You at least guys can get
1:18:17together and talk. Um, from that
1:18:20standpoint, it sounds like you want to
1:18:23discuss, but I think there's an issue
1:18:27with uh, and I think reaching out to
1:18:29your council maybe that he can be the
1:18:31mediator and you guys can work it out,
1:18:33but that's up to you guys.
1:18:39>> Yeah, I just wanted to make that
1:18:41comment. sounds like that's what you get
1:18:44>> and you can email me at my firm and I'll
1:18:47make sure you get included on the invite
1:18:50so we can try to work this through
1:18:52>> because I I mean we obviously sense it
1:18:55that there's there's this this
1:18:57disconnect and this potentially deep
1:19:00[clears throat] understand
1:19:01misunderstanding of what uh the
1:19:03requirements are for the Islamic
1:19:05religion. Uh connection to the cemetery
1:19:08is key. Um it's not that can be moved
1:19:13and with the negation of Jainsville
1:19:16Cemetery, this is the last remaining
1:19:18option. Um so in in respect of the
1:19:22Islamic religion,
1:19:25they need this expansion to uh
1:19:27facilitate their funerals. Um
1:19:32yeah.
1:19:39Okay. Thank you very much.
1:19:46>> So it will be held until and so the next
1:19:47meeting is believe the 29th
1:19:52of October.
1:19:54Thursday the 29th.
1:19:59>> Yes.
1:20:00>> Thursday the 29th. Okay.
1:20:01>> Thursday the 29th is it will be held
1:20:03open until then. So thank you everyone
1:20:05for for attending. Yeah. Thursday the
1:20:0829th will be the next Landmark
1:20:10Preservation Board meeting.
1:20:13>> Thank you.
1:20:14>> Thank you.
1:20:16>> And I have
1:20:17>> anything else left on today's agenda?
1:20:19>> Nothing else on the agenda?
1:20:23>> Nothing else.
1:20:24>> No.
1:20:25>> Okay. Can I have a motion to adjurnn?
1:20:29>> Second.
1:20:29>> Second.
1:20:30>> All right. All in favor?
1:20:32>> Oppos? Abstain. Motion carries.
1:20:35>> Oh, she left already.
1:20:37Great job everybody.
1:20:39>> Thank you very much.
```*
