2026-10-21 - Common Council Joint Parks and Recreation and Public Safety Committee
Summary
-
Meeting purpose: The joint committee heard city staff present a proposal affecting the existing community-built pump track at Light Art Park: convert the current pump track site into parking for the new public safety building, and build a new, city-maintained pump track nearby as part of the planned Westside Trail.
-
City presentation: Mayor’s office and Parks Department staff described recent investments in the Westside, improvements to Light Art Park, and the new public safety building. Staff said capital funding for a new pump track is already appropriated, and that the replacement track would be maintained by the city, unlike the current volunteer-built track.
-
Trail connection: Staff said the new pump track is meant to complement the Westside Trail, an east-west connection from downtown into the Near Westside and Tipperary Hill. The trail would reuse an abandoned rail bridge and include solar lighting.
-
Parking plans: Police and fire staff said the public safety building has parking needs beyond what existed at the original site. They presented a multi-site parking program and identified the pump track parcel as the preferred location for additional spaces. No engineer’s estimate for the parking lot was available; staff said costs would be determined through bidding.
-
Timeline: According to staff, the city began exploring locations and parking needs in summer 2025, started design work in spring 2026, received Planning Commission approval in late June 2026, and the Council later approved funds for a new pump track.
-
Council questions: Councilors asked about project cost, site selection, temporary versus permanent parking, alternative lots, the railroad bridge, public parking access, a possible bike hub, and whether the proposal reflects recreation priorities as well as public safety needs.
-
Public comments: Community members — including riders, a teacher, artists, and business owners — strongly opposed removing the community-built pump track. They described years of volunteer labor, the track’s value as a safe place for children, and its role in the surrounding arts district.
-
Trust and process: Several speakers said prior city promises, such as paving the track, were never fulfilled, and they feared the new pump track would become another broken promise. They said public input had not changed the outcome and asked for meaningful, community-led design.
-
Parking and site concerns: Speakers argued the proposed replacement track would sit on the park’s existing small parking area, leaving no public parking for the park or the new track. They pointed to underused or vacant lots nearby and asked the city to publicly evaluate those alternatives before removing the pump track.
-
Safety and access: Concerns were raised about traffic and emergency vehicle access at the busy intersection, and about the safety advantage of the current tucked-away location. A teacher described plans for a high school mountain bike club and said the existing location is accessible to downtown schools.
-
City response: Staff said the new pump track would be built “not if, but when,” and that the proposed park parcel is city-owned. They acknowledged the need for continued community engagement and said the concept would not be installed without further input.
-
Next steps: Written comments were accepted and are to be circulated to the Common Council and the Mayor’s Office. The chair closed after thanking staff and attendees.
Built from YouTube auto-generated captions; the agenda and minutes were not read. Names and figures are as captioned and may be misspelled.
Agenda
Agenda not yet posted.
Sources
- Meeting page: https://www.syr.gov/Departments/Common-Council/Committees/2026-Meetings/2026-10-21-Joint-Parks-Rec-and-Public-Safety-Committee-Meeting
- Video: https://www.youtube.com/watch?v=n4Np5g--3Go (City of Syracuse YouTube channel)
- Public meeting calendar: https://www.syr.gov/Boards-and-Commissions/Public-Meeting-Calendar
Video
Transcript
*These are auto-generated captions; names and numbers may be misheard.
Transcript
01:59Mhm.
03:54>> Mhm.
04:06>> I know, but I couldn't
04:09>> Two of us?
04:11>> We'll see you then.
04:12>> I think
04:13>> I'm sorry.
04:15>> Yeah, I'm sorry.
04:18>> Two.
04:19>> Okay, thanks.
04:29>> Were you
04:30>> Oh my
04:31god.
04:34>> Yeah, yeah.
04:37>> I'm here.
04:38>> They can't push that that way.
04:40>> No, I'm good.
04:48>> You got another water in that bag?
04:50>> I'm going to have mine in the car.
04:54>> Leticia?
04:55>> What?
04:56>> I saw Felicia.
04:57>> Oh yeah, you can see her.
04:58>> hello to you.
05:00>> Speaking of
05:01>> I was in the drunk store.
05:02She said
05:04>> I said hello.
05:06I said
05:19>> Donna's running a couple minutes late,
05:21so we're just Donna's running a couple
05:22minutes late, so we're just going to
05:24She'll be here in a minute.
05:31>> Coach Chip Kelly.
05:32>> And you're able to reach them?
05:33>> No, [clears throat] no.
05:35>> She asked
05:36We're just waiting two minutes and then
05:37we'll go.
05:38>> You want to do what you said?
05:39>> Or we already waited two minutes.
05:41>> You wait.
05:48>> 5:35.
05:57>> I used to work with him.
06:01Right there.
06:02>> [laughter]
06:04>> My unit is there.
06:09There are a lot of people in the United
06:10Way.
06:11That changed the hands.
06:16Yeah, that's right.
06:17Conner.
06:18Mhm, cuz they took the food.
06:33>> They don't know.
06:35>> Good morning.
06:36>> Huh?
06:38I had to go up to the walking clinic.
07:01>> Okay.
07:02Uh Counselor Morris should be joining us
07:04in just a minute or two, but we're going
07:06to kick off the meeting so we can get
07:07some introductions underway and start
07:10our presentations from city staff.
07:12I am Counselor Hannah Eranreich. I am
07:14the committee chair for the Parks
07:16Committee. I'd like to introduce
07:18Counselor Caldwell.
07:20What's your name again?
07:21Counselor Montalto, Counselor Hudson,
07:24Counselor Nave, Counselor Majok,
07:26President Rita Paniagua, and then we
07:28have uh Deputy Chief Milano,
07:31Commissioner Bird, and what's your name
07:33again?
07:34It was funnier the first time around,
07:36sorry. Eric Ennis, chief strategy
07:38officer for the city of Syracuse. Did I
07:39get it right that time?
07:41>> Uh development, but in in the mayor's
07:42office. That's all.
07:43>> So close. Sorry.
07:44>> That's fine.
07:45>> Um I do also want to just introduce our
07:47uh our structure for this evening. Uh
07:50city staff are going to start with a
07:52presentation about the project and where
07:54it started, where it's going, where is
07:56it now? Um we are then going to have
07:59questions from uh counselors who are
08:02assembled here. Uh and then we will be
08:04opening the floor to discussion. You
08:06will have 2 minutes to talk.
08:09Um and we will be giving you signs when
08:13your time is up. All right? If you have
08:15more to say after that, you are welcome
08:17to cycle back at the end after everyone
08:19has had a chance to speak. In terms of
08:22things uh the visual facilitation.
08:25If there is something that you hear
08:26somebody say up here or in the audience
08:30that you agree with, that you love, that
08:33you absolutely want to see in Syracuse.
08:34Donna, you're over here.
08:35>> Oh.
08:36Sorry.
08:37Sorry.
08:38>> Councilor Morris joined the meeting.
08:40That you love, that you want to see in
08:41Syracuse.
08:43Some jazz hands, okay? Right up here.
08:45Nice and tall and prominent.
08:47If you hear something that you generally
08:49agree with,
08:50thumbs up. Goes a long way. All right?
08:52You can do double thumbs up. Not
08:54restricting anybody.
08:55If you hear something that you
08:56absolutely disagree with, no no holds
08:59barred, thumbs down.
09:01Okay?
09:02And if you feel like we've made the
09:04point and we can move on, just a gentle
09:09We will do the same very respectfully.
09:12Is that okay?
09:13>> Give me a thumbs up just a new process
09:15that
09:15we're trying to create here.
09:17>> Uh not officially. These are just the
09:20visual facilitation techniques that seem
09:22to work for me in terms of meeting
09:23facilitation.
09:24>> Okay.
09:26>> It also helps because then people don't
09:28have to stand up and repeat something
09:30that somebody else has said. If you like
09:32it, it's right here. We've we've heard
09:35it and we can see that it's something
09:37that is echoed.
09:39>> All right, so Councillor Morris here.
09:41Meeting has just started.
09:43>> [laughter]
09:43>> Sorry I'm late.
09:44>> [snorts]
09:46>> And Eric, go ahead.
09:47>> Yeah, just well, good evening counselors
09:50and just want to say thank you for this
09:52opportunity and the opportunity to
09:53present, talk about the project and also
09:56thank you all for for being here and
09:58attending as well.
09:59So Eric Enison in the mayor's office
10:01joined here as well by Saisha Byrd, our
10:03Commissioner of Parks, as well as Chief
10:05Minor
10:06from Syracuse Police. Just briefly, I'm
10:08going to give a high-level overview and
10:09then really turn it over to my
10:11colleagues, but really just want to note
10:13that we recognize there's been an
10:14extensive amount of community dialogue
10:16that has been had around the pump track
10:18itself and also as the the new facility,
10:22the new public safety building as we
10:23have been really taking a close look and
10:25really doing a careful analysis around
10:28the the parking that is necessary as
10:30part of the operations of that facility
10:32and ultimately the the broader impact on
10:36the the broader neighborhood as a whole.
10:38I think one of the things I just want to
10:39point out is that there is an extensive
10:42amount
10:43of
10:44thoughtful and careful dialogue that is
10:46had both internally amongst the
10:47departments that have been a part of
10:49this process to look at that but then
10:50also externally
10:52with various stakeholders and
10:54understanding again that the the pump
10:55track itself is something that is a
10:56project that a number of people were
10:58involved with. So our goal and our
11:00intent tonight is that what we want to
11:02really be able to do is talk through the
11:03proposed plan, be able to answer
11:05questions, hear feedback and and
11:07dialogue. But that plan would include an
11:11establishment of a new pump track that
11:13would include a modern pump track as
11:14well as one that would be fully
11:15maintained, would be under the
11:17responsibility of the city. That is that
11:19the funds for such a new pump track that
11:21would be an amenity, an approved amenity
11:24is already within the city's capital
11:25plan. Those funds have already been
11:27appropriated and authorized. One of the
11:29other things too is that the intent of
11:31this and and the thought process behind
11:32it has been to complement what is a
11:34larger Westside Trail that is being
11:36planned and intended. The linkage of
11:39that is really intended to connect from
11:40downtown Syracuse into the Near Westside
11:42neighborhood and into neighborhoods
11:44further west including Tipperary Hill.
11:46>> Almost before we go any further in in
11:48slips my mind, you said it's been added
11:51into the capital project. What's the
11:52dollar amount of that?
11:54>> 300,000.
11:57>> So so 300,000 in case the mic didn't
11:59pick it up, but
11:59>> next year.
12:02>> It's in
12:04Ooh, I think it's next year's budget.
12:08>> Okay, thank you.
12:09>> already included [snorts] in the plan as
12:10part of being able to make that that
12:11capital project investment, which would
12:14be
12:15>> We have it
12:16We have it now. So it's in this year's,
12:18excuse me.
12:19>> This year?
12:20>> Mhm.
12:20>> Okay.
12:21>> Um but but yeah, so that being one of
12:23the parks capital projects that already
12:25that we have planned. Um
12:27it just as part of the Westside Trail
12:29that was a a study was undertaken by
12:31SMTC, the Syracuse Metropolitan
12:33Transportation Council, to really look
12:35at creating more connections on an
12:36east-west perspective and a Westside
12:38Trail was one of the heavy things that
12:40were considered as part of that plan.
12:42That pathway going through and being a
12:44part of Light bar Park. So the area and
12:46what we're going to talk about tonight
12:47with that proposal incorporates that
12:49Westside Trail traveling through as part
12:51of the overall project and the pump
12:54track location and and one of the things
12:56that we've been really considering would
12:57be the dimensions, the space which is
12:59available in there to be incorporated as
13:01part of the Light bar Park to overall
13:03complement a number of other investments
13:05that are happening.
13:06>> Eric, can I just have you reiterate that
13:07question so I make sure I understood it
13:08right. So this new track that you're
13:11planning is going to be incorporated
13:14into the existing trail the city already
13:15has.
13:16>> The trail way hasn't been established
13:18and built yet. The footprint of it has
13:20been identified. We're in the planning
13:21stages of what the final design looks
13:23like. The funding for the Westside Trail
13:25also has been secured. So in addition to
13:28the pump track, the funds for the
13:29Westside Trail have also been secured.
13:31>> Okay.
13:31>> But, things like lighting, things like
13:33the pathway of being able to incorporate
13:34the what was abandoned railroad bridge,
13:37the southern portion of that bridge,
13:39that is being incorporated as part of
13:40this plan. Also being incorporated as
13:42part of the improvements that we're
13:43talking about for the existing pump
13:45track location for parking, but also
13:47incorporating a new pump track.
13:48>> Okay.
13:49>> Um so, those the funds are there, but
13:50the planning and and [snorts] the final
13:52design is really what we've been
13:53continuing to work on work on advancing.
13:56>> Thank you.
13:57>> Um so, just briefly, uh one of the
13:59things to note is that this area that we
14:01are talking about has undergone a
14:02tremendous amount of change. And we know
14:04that there are pioneers and people that
14:05have been a part of adapting and
14:07converting buildings within this block.
14:09Uh and we recognize that there has been
14:11also additional complimentary
14:12development and investment. That
14:14includes the new public safety facility
14:15that was over a $30 million capital
14:17investment in upgrading what was a
14:19significantly dilapidated existing
14:22public safety structure. Um but, really
14:24the intent and design and thought behind
14:26that was to be an anchor for the
14:28surrounding area and for the larger
14:29Westside. Um in addition, there's 38 new
14:32condominiums that are now fully open.
14:34There is now home ownership
14:35opportunities on this stretch of of West
14:37Fayette Street. That was not uh just a
14:39few short years ago, that was not uh
14:42the the condominium and home ownership
14:44opportunity is a new one. And so, as
14:46we've looked at this, as we've looked at
14:47the ability to create on-street parking,
14:49that's a new amenity as well. There are
14:50a number of different things that the
14:52city has undertaken, but it's really
14:53intended to compliment the uh capital
14:55investment and private investment that
14:57is under uh been underway in this area.
14:59That also includes the Syracuse
15:00Developmental Center. That is as as the
15:02council is fully aware, $135 million
15:05project. We have 260 units now of uh
15:08various incomes under construction right
15:11now that only further leverages the
15:13entire area that we're talking about as
15:14part of that transformation. There's a
15:16number of other investments that we have
15:17here on the slide that the city parks
15:19department has been a a of and other
15:20upgrades. That includes um some of
15:22several playgrounds within the Westside
15:24neighborhood Skiddy Park. One of the
15:26things we also wanted to know is what
15:28the city has done around Lightbar Park
15:31and continue to do around Lightbar Park.
15:33So, I'll transition over to Commissioner
15:35Byrd.
15:35>> And some of those upgrades to Lightbar
15:37Park has been solar lighting, a
15:39pedestrian walkway,
15:42pathway restoration and ongoing
15:43maintenance, weeding, weed control.
15:47We provided tea panels and concrete
15:49pads. We will be providing three new
15:53sculpture pads so that we could add more
15:56art to to the art park,
15:58garden bed restoration,
16:01raised planter beds, and then a new
16:03flagpole.
16:05>> All right, Commissioner, thank you
16:06>> [clears throat]
16:07>> for that really quick. So,
16:09um
16:11I know you're a West Sider. You grew up
16:12on the West Side.
16:13>> I am a West Sider.
16:14>> [laughter]
16:15>> Um family ties.
16:16>> North Side now, but I grew up on the
16:18West and will always be West, right?
16:20>> Um have you had any conversation with
16:22anybody in that neighborhood and that
16:24footprint? You know, especially, you
16:26know,
16:27>> Um just kids at the Boys and Girls Club.
16:30You mean as far as pump track, would it
16:32be used, would they use it? Um first
16:35they have to have the equipments to use
16:37it, right? They've talked about RVs,
16:39little cars, remote control cars, but we
16:41got to ensure that our kids in the
16:42neighborhood have bikes to use it. Um
16:44and they're excited about
16:47the opportunity to use it um on a on a
16:50bigger scale.
16:52>> We this a lot of the information we're
16:54talking about this evening as well. We
16:55have presented to Westside TNT and had
16:57conversations with Westside TNT
16:59including the look potentially of what
17:01that pump track could look like as well.
17:03Um so, this is this is not a a new
17:05conversation about the the ability to
17:07incorporate that.
17:09>> And I I was at the you know, I have
17:10attended the Westside TNT meetings to
17:12talk about it.
17:14>> Yep.
17:15Next. Thank you, sir.
17:17>> So, this is the existing a photo of the
17:19existing condition of the the pump
17:21track. You know, I do give credit that
17:23community members came together to build
17:25this.
17:26This is is the current state. If you've
17:29never been able to see it or walk it or
17:31ride on it.
17:34Um
17:36In August of 2025, we started exploring
17:40locations and identifying parking needs.
17:44The design for this site
17:47started in spring of 2026.
17:50Public hearing and planning commission
17:51held a meeting on June 29th
17:54to talk about the pump track project.
17:57This project and and other projects that
17:59are included in Light Bar Park
18:02projects including fencing for security
18:05purposes, new lighting and pathway
18:07upgrades, design elements to complement
18:11the Westside Trail, and establish a new
18:14and modern pump track. So as Erica moves
18:17on to the next picture, this is the
18:19design that we have
18:22um
18:23we've been thinking about. We did
18:25present this to some of the members
18:28of the community to get their thoughts
18:30on the design.
18:33>> Let me ask you this question
18:34commissioner.
18:35>> Mhm.
18:36>> So [clears throat] when you talk about
18:38did you present it to some of the
18:39members? Did you present it to the
18:41existing members that had started the
18:44park?
18:44>> We did. Um there was two members that
18:48came to parks that we presented this
18:51model to.
18:52Mhm, this photo.
18:54>> And and then there is a a volunteer
18:56organization known as the stewards of
18:58Light Bar Park. So we have
18:59representatives that we have been in
19:01communication and had dialogue with. So
19:03that included the the ability to show
19:05the the actual conceptual plans that
19:07we're talking about but as well as
19:08talking about the fact that it is
19:10essentially based on the design you have
19:12here and that's West Fayette Street is
19:13to your left just to orient yourself.
19:15The railroad is to your right, but that
19:17is to be able to incorporate that as
19:19part of both the parking that's being
19:21proposed, approximately 72 spaces, but
19:23in addition to that, being able to have
19:25the dimensions and the configuration is
19:27there to build a modern, well-maintained
19:29pump track. And the city parks
19:31department
19:32Um the city parks department will then
19:34fully maintain, and they will be
19:35responsible for maintenance of the pump
19:37track when it's done.
19:38>> Currently, we are not.
19:39>> So, this I mean, based on the picture,
19:41right? So, this is pretty close to the
19:43track itself. Would there be Would there
19:46be anything there that prevent from,
19:48you know, people going too close to the
19:50tracks?
19:51>> So, there is There's fencing that
19:53delineate that that separates the rail
19:55itself. Yeah. So, so there And And
19:57that's been all part of our
19:58conversations with the railroad. I mean,
19:59as we've looked at both the leasing and
20:01then eventually being able to own this
20:02land, there is an area and a buffer from
20:05that rail. But, that's all This is all
20:06being accounted for as part of the
20:08design.
20:08>> Okay.
20:09>> And if memory serves me well, this is my
20:11last question, and I'll be quiet. But,
20:13if it was serves me well, when did you
20:16determine that it wasn't going to be
20:18just a temporary space?
20:21Because that's what we were told it was
20:23going to be temporary.
20:25>> So, when as we have looked at the that
20:28this is a as we go through the
20:30presentation, we will talk through
20:31There's a number of different locations
20:33where parking is being It's part of our
20:35a larger parking program. But, one of
20:37the things that we had talked about, and
20:39there had been a lot of conversations
20:40around the the public parking versus
20:43solely for city utilization or SPD. Uh
20:46so, a lot of the conversation and and
20:48even leading up until more recently, we
20:50know that one of the things the idea has
20:52been from several property owners and
20:53businesses in the community is the
20:55ability to provide more public parking.
20:57So, the conversation that we have had
20:58and we continued to consider as part of
21:00our analysis is where we have the
21:02ability to make public parking
21:03available, understanding and as I
21:05alluded to, there has been a lot of
21:07investment in this area, this stretch,
21:08and this corridor. It is There is a
21:11a number of different revitalization
21:12projects that have been underway.
21:14Um I point to the on-street parking, the
21:16parallel parking that's been made
21:17available. While during the workday, you
21:19will have people that are part of the
21:20public safety building using that
21:22building, on nights and weekends, those
21:24parking spaces are largely available for
21:27uh for more broadly the public, but also
21:28some of those buildings and some of the
21:30other economic development projects. So,
21:32some of that has been the temporary
21:33versus more uh permanent has really been
21:36around parking and making parking
21:38available not just for city utilization,
21:40but also for the public. And that is
21:42something we have had to look through as
21:44we have immediate needs for parking for
21:46the facility. We have some parking lots
21:48that have not yet been completed, and
21:49that's what some of the things we're
21:50going to talk through tonight. With
21:51that, when we talk about temporary
21:53versus more permanent, it it's really
21:55been the thought process about creating
21:56not just parking to service the public
21:58safety building, but where the public
22:00can benefit from parking as well.
22:04Okay.
22:05This is just a general question.
22:06>> that is secured for the whole Westside
22:08Trail project, how much
22:10how much is that? And where did it come
22:11from?
22:11>> So, we have uh there's been uh New York
22:13State support uh that is coming. I
22:15believe it's from DASNY, but I know that
22:17that was uh Assemblymember Rachel May,
22:19and that funding I think is a million
22:21dollars. That was part of a Crest grant.
22:23Um so, I don't I don't have the number
22:26right now off the top of my head around
22:27the total project itself, but it's over
22:29a million with the capital investment
22:30there. And the thing about the Westside
22:32Trail
22:33>> for the pump the new pump track?
22:34>> Correct. So, that's
22:35>> That's city that's our money.
22:36>> That's city funds being invested in
22:38that, yeah. So, that that 1 million I
22:39mentioned for the Westside Trail, the
22:41300,000 is then in addition to that. I
22:43think one of the other things, too, that
22:44we are are very much considering as part
22:46of the Westside Trail is solar lighting.
22:48So, there's already solar lighting
22:50that's been installed along uh within
22:53Light Bar Park. There will be additional
22:54solar lighting being installed as part
22:56of the pathway that would connect the
22:58pump track parking lot, but connecting
23:00it over to the public safety building.
23:02And that trail way, which is utilizing
23:04an old rail bridge, that will be
23:05available to the public. So, the public
23:07where upon completion, the public will
23:09be able to use that trail way, which
23:10will include new solar lighting to
23:12increase and enhance the overall
23:14lighting. Currently right now, because
23:16of the fact it is a long side railway,
23:18it is in the evenings, there's very
23:19little lighting whatsoever in that area.
23:21So, there's a a safety component as well
23:23that we're thinking about.
23:24>> I know I said one, but I got one more.
23:26>> Sure. It's okay, Council.
23:28>> What happens to what is it? Panchitos,
23:30what happens to their spot?
23:33Or are they affected?
23:34>> They have So, there is parking spaces
23:36already for Panchitos that they use, and
23:38that is separate property, that is
23:40private property, and not part of the
23:42the the rail property. So, they would
23:44continue to have parking spaces to
23:46service the business, the restaurant,
23:47and then there's apartments upstairs as
23:49well.
23:51>> I have a quick question, Eric.
23:52>> Sure.
23:53>> So, in terms of the business that came
23:54before the Council already, it's been
23:56two things. One has been the
23:57certification of a lease for a dollar of
24:00two different parcels from the railroad,
24:02one of which is this parcel, and the
24:03other one is across the Geddes Bridge,
24:06>> [clears throat]
24:06>> which there's also going to be turned
24:07into a parking lot for construction.
24:10>> Yep. Our intention would be we we call
24:12it the west of Geddes area, that
24:14terminology helps to explain it. But
24:15yeah, so one of the things that is being
24:17done right now as part of the Westside
24:18Trails, we're looking at the topographic
24:20conditions. One of the things is that
24:21area is, and I know there's a lot of
24:23people that are familiar with it, there
24:24is a grade, it's about 10, 12, 14 ft.
24:28So, one of the things we're working
24:29through is the geotechnical, the soil
24:32conditions, and the ability to establish
24:34parking there. And this is also been
24:36part of the public versus the private,
24:38and the ability that we want to utilize
24:40parking in that west of Geddes area. But
24:44there is a lot more information we're
24:45still collecting to be able to to
24:47incorporate parking there.
24:48>> And then the other business that came
24:49before the Council was also us signing
24:51off on a
24:53no more than $11,250
24:55$11,250 a year contract for a parking
24:59lot that already exists, which is just
25:01to the
25:02Let me get my directions right. East of
25:05the uh of Life Art Park.
25:07>> So, I think uh
25:08>> east
25:08>> south
25:09>> west, south, east
25:10>> Oh, I'm sorry. The space that you're
25:11talking about further
25:13>> space lot that is already in existence
25:15right next to Life Art Park. So, we are
25:17using that right now. We have a 1-year
25:19lease for that location.
25:20>> So, I I may jump to the because we
25:23actually have some visuals that can show
25:24the areas that we're talking about.
25:26Yeah, and and cuz there is an area we
25:27call Getis Plaza. That that's a retail
25:29plaza and that's
25:31>> West Fayette Street, if anyone wants to
25:32look on their phones.
25:38>> Yeah, the the Getis Plaza is what
25:40>> executed.
25:43I have it right here as concluded
25:45business.
25:47>> It was It was approved by the council.
25:49So, council, you are correct. Like, it
25:50was approved.
25:51>> approved.
25:51>> Ultimately, what that was being used was
25:53a if if ultimately if needed as part of
25:56a number of other
25:58um
25:58locations from a parking perspective.
26:00That location is further to the east.
26:02There was also going to be security
26:04enhancements and upgrades that would
26:05ultimately be needed there. So, those
26:06were some of the things that were being
26:07evaluated and considered as part of
26:09that. So, we did go before council to be
26:11able to essentially have that as a
26:13potential option. Um and I forget the
26:16exact date, but essentially yes, that
26:18was brought before council. It was
26:19authorized. There was a number of
26:20factors that were evaluated as part of
26:23that, which ultimately is not what why
26:25we did not proceed with executing that
26:27lease.
26:28>> Okay.
26:28>> Didn't we spend money to have that
26:30repaved and striped and everything?
26:32>> The Getis Plaza lot is maybe So, maybe
26:35that's
26:36>> next to Fowler High School.
26:37>> Yeah, yeah, yeah. Yes, the the retail
26:38plaza. So, maybe um do you see Deputy
26:40Chief Balana? I'm going to turn it over
26:42to him and then we can go in through
26:43some of those locations.
26:46>> So,
26:47just for a little bit of a broad
26:48overview of the parking needs of the
26:49police and fire departments.
26:51Historically, the patrol division within
26:53the police department was always housed
26:55at the public safety building. You can
26:56see this historical photo here shows the
26:58north parking garage. That no longer
27:00exists. That's where the modern
27:01courthouse and the DA's office is. That
27:03was knocked down. And in 2003, we,
27:06because of that, had to move our patrol
27:08division out to Erie Boulevard.
27:10>> [clears throat]
27:10>> Our patrol division is approximately 2/3
27:12of the police department. So, 2/3 of our
27:14department is not located with the
27:16administrative headquarters of the
27:18department, which is not best practice.
27:19That's best practice to have them in the
27:21same house. So, with this new public
27:24safety building on West Fayette Street,
27:25that enabled us to finally bring them
27:27all under the same roof once again.
27:32This is an assessment of the parking
27:34needs to recreate all of the existing
27:36parking that we had at 1153 West Fayette
27:38Street and just how the breakdown works
27:40out to 451 spaces.
27:44>> How many do you have there now?
27:46>> Uh currently, with the pump track,
27:49[clears throat] it would get us to 453.
27:51So, it would accomplish our goal, but
27:53that is also using leased property in
27:55Gatos Plaza.
27:57So, in the short term, the pump track is
27:59our only avenue to accomplish that
28:01number.
28:01>> How many spots do you see coming from
28:03the pump track?
28:04>> The pump track is 72 parking spaces.
28:09Included Included in the presentation as
28:11well. It goes location by location by
28:13location and shows each one of those
28:14spots. But, sorry, counselor. I didn't
28:15>> I'll be quiet.
28:16>> No, that's that's okay. I just We don't
28:18want to cut you off. I just wanted to
28:19note that that information's coming.
28:27>> So, in our assessment of our parking
28:29needs, we quickly realized that there
28:30was not enough parking existing around
28:321153 West Fayette Street. So, a team
28:34across numerous city departments, the
28:36the mayor's office, there was community
28:37engagement, many people involved was put
28:39together in order to identify
28:41opportunities to create more parking.
28:44Engineering uh was heavily involved in
28:45this as well,
28:47letting us know which space which areas
28:49were conducive to parking lots as well
28:51and which ones were not based upon soil
28:53and topographic reasons.
28:57And this is just an overhead to kind of
28:59orient you and show you what exactly
29:01we're talking about here. So, you can
29:03see 1153 West Front Street right in the
29:05center of the photograph there. The
29:07parking lot that
29:08is part of that property as well is
29:10right next to it. And then the areas
29:12that we identified to improve and create
29:14more parking are the Magnolia parking
29:16lot, which is immediately to the west of
29:18the public safety building, the curb cut
29:20that Eric spoke about earlier directly
29:22across the street,
29:23the Harbor Brook area, which was a green
29:26space between the existing 1153 parking
29:28lot and the Fowler parking lot, which is
29:30currently under construction as well,
29:32the Gaddis Plaza, where we have leased
29:34leased spaces currently, and then up in
29:36the top right of the graphic, the pump
29:38track.
29:39Now, numerous other places were
29:40considered as well. Uh any and every
29:42space within reasonable distance of the
29:45public safety building was explored, and
29:47these were the areas that were feasible.
29:50>> How much is it going to cost to develop
29:52the pump track space into a parking lot?
29:56>> We do not have an engineer's estimate
29:58just yet. That is forth It's coming very
30:00quickly. Uh I don't know if you have
30:02>> One of the One of the things that will
30:03be done is that it would be put out to
30:05bid, and then the bid would ultimately
30:06help inform the final cost associated
30:08with that. So, that design we have We do
30:10have the design and the site plan, and
30:12again, that's been approved by the
30:13planning commission, but it really will
30:14be once it goes out to bid and bid
30:16competitively in order to be able to do
30:18it as effectively and efficiently as
30:20possible.
30:21>> One of the determinants that you have
30:23said for this site is that it is the
30:25least cost-effective It is the most the
30:27least costly option.
30:29>> Yep.
30:30>> So, we We don't know how much it's going
30:31to cost.
30:33>> I think that some of the numbers There
30:35There is preliminary numbers that we can
30:37present that are based on conceptual,
30:39but one of the things that we certainly
30:41as well knowing that there will be a
30:42bidding process is that we want to make
30:44sure that that is competitively bid and
30:45that we are able to go with the lowest
30:47bidder as part of that process. Um
30:50>> We love bidding processes.
30:51>> Yes, we do.
30:52>> But we also really love recreation use
30:54and putting a parking lot in the middle
30:55of this one would really stymie that
30:57recreation use. So I do want to make
30:59sure that we are making sure we're
31:01hitting all of our priorities in terms
31:02of the sighting of this.
31:03>> Sure. I think some of the um I know this
31:06conversation will will continue as as we
31:08go through this. Um we recognize that as
31:11part of the Westside Trail, just going
31:13back to the Westside Trail, that is land
31:15that is owned right now by the railroad
31:17but that we've been able to have really
31:18productive conversations around leasing
31:20and then eventually owning that space.
31:22So part of the other conversation that
31:23we've had is that the ability for the
31:26parking to ultimately be future under
31:28city control for the long term and then
31:31also as we look at and and consider the
31:33future of like our park, the long-term
31:36ability to have a newly modernized pump
31:39track but one that is maintained and
31:41managed under parks. And so I think the
31:43combination of the Westside Trail, you
31:45will already have cyclists and
31:47pedestrians that will now have the
31:48ability to connect safely from downtown
31:50Syracuse into the Near Westside into Tip
31:52Hill. So the complimentary nature of
31:54that as well for cyclists, fat tire
31:56bikes to be able to use the pump track
31:59as well right alongside that trail.
32:01>> Sorry, you think we can get like a
32:03little
32:04hub
32:05and put it there with people coming in
32:08>> They can't hear you. So the question was
32:10um
32:11could we put a hub or a sent a shed to
32:15so that folks that don't have access to
32:18bikes have access bikes, skateboards.
32:21Yes, I mean that's something we I mean
32:23we thought, you know, as Commissioner of
32:25Parks, I fully support recreation.
32:28Right? We want to provide opportunities
32:30for all to use something like a new pump
32:33track. So
32:34>> Why? Cuz we are talking about on west
32:35side of the Sear's building, and there
32:37is several schools over there from
32:39Seymour to Blodgett within walking
32:41distance. And if we could create an
32:43opportunity for our young people to use
32:46and their families to use it. So, as
32:48we're creating whatever direction we're
32:49going into making
32:52the park beautification, let's make it
32:54where everybody can use it. And so,
32:57creating avenues like we do on like
32:58we're trying to do at the state.
33:01>> Mr. Anderson, before you move on, you
33:04said the conception when she asked you
33:06about bid, you said it had to go out
33:08RFP. I understand that, but you said
33:10conception.
33:12So, what's
33:16>> Yeah. I think and I think your your
33:18question, counselor, was really around
33:19the the the costs and the numbers behind
33:22that. And I think part of that is is the
33:24preliminary that there are initial
33:26numbers of what we anticipate and what
33:28we think. Um but part of it is that in
33:30order to be able to definitively know
33:32for sure, that that's why the going out
33:34to bid allows us to be able to confirm
33:35and verify what that number is. So, um
33:38that that is information that we can go
33:40back and make sure that we share what
33:42what some of those preliminary numbers
33:43are. But part of it is that the purpose
33:45of going out competitively to bid, it it
33:47just it just helps to make sure that we
33:49are minimizing that cost.
33:52>> So, we have dramatically interrupted
33:53your presentation several times. Would
33:55you like to resume so we can get these
33:56people out of here?
33:56>> I and I think that gets us to some of
33:58the locations here. So, I'll turn it
33:59back over to to the deputy chief.
34:01>> So, this will break down those locations
34:02more specifically. So, we entered into a
34:03lease with 220 South Gadsden Street for
34:06spaces within their lot. We did invest
34:09in resurfacing and painting those
34:10spaces, and we were able to get 85
34:12parking spaces out of that location.
34:15In the 1153 proper lot, there are 132
34:19parking spaces. Again, those two are
34:21leased. So, those are not city owned.
34:23Those are not
34:25Well, 1153 has a long-term lease, but
34:27the Gadsden Plaza is a 2-year lease with
34:28a 2-year option to renew.
34:31So, not a permanent plan. The Magnolia
34:33lot, which is almost done with
34:35construction, it needs a couple more
34:36weeks, that will add 107 spaces to our
34:38overall number.
34:42>> And why is the Magnolia not lot not
34:43being considered as your secure parking?
34:46>> It is.
34:46>> It is. So it will also be gated with
34:48lights.
34:50>> Yes.
34:50>> Okay.
34:52And you have 107 spots there.
34:53>> Correct.
34:55And then the Harbor Brook lot, which is
34:57also currently under construction and
34:58should be completed within the next 3
34:59weeks, that will be constructed as part
35:03of the 1153 lot. The access will come
35:05out of 1153 itself, and that adds 33
35:07spaces.
35:09The right-of-way that we constructed
35:10over the summertime added 23 spaces to
35:13West Fayette Street, which as Eric
35:15mentioned are available to the public as
35:16well.
35:17And then the pump track itself, as we
35:18mentioned earlier, adds 72 spaces.
35:21And that's how the total of 453 is
35:23reached.
35:29>> Is there a
35:30>> timeline on the pump track parking lot
35:32itself, uh, and how we arrived here
35:33today. Construction on the new public
35:35safety building occurred between
35:37December 2024 and March of 2026.
35:40In December of 2025 is when the council
35:42approved the city entering into a lease
35:44with the railroad in order to pursue a
35:46parking lot in this location.
35:48Uh, in January was when we obtained the
35:50Gatos Plaza lease that we are currently
35:52using to supplement our parking needs.
35:55In February of 2026, funds from
35:57engineering and design were approved,
35:59uh, for the design and layout of the
36:02pump track. Uh, CHA was the company
36:04doing that work, and throughout the
36:06winter and spring of 2026, and really
36:07ongoing, we've been working on the
36:09design with them.
36:11In June of this year, there was a public
36:12hearing with the city planning
36:13commission to approve the parking lot
36:15design.
36:16And in July of 2026, funds were approved
36:19by the common council to construct a new
36:20pump track.
36:22>> Can I just ask everybody with a show of
36:24thumbs up or thumbs down if you knew
36:25about the public hearing as part of the
36:27planning process. Thumbs up if you did,
36:29thumbs down if you didn't.
36:31Thank you very much.
36:33>> Um quick question.
36:35Erie place, we got a email from the
36:38owner of that building who was willing
36:40to lease that. We did we look at that
36:42and just why did we decide that was not
36:44going to work?
36:45>> Is that the 500 block of West Fayette
36:46Street?
36:47>> yes, the 225 spots.
36:49>> So, when we did a parking assessment a
36:51year ago in September of 2025, we
36:53realized that we were well over 200
36:55parking spaces shy of what we needed.
36:57So, we were entering into any agreement
36:59that we possibly could to secure
37:01parking. So, that is far too far away
37:03from the public safety building. It's
37:05almost 3/4 of a mile. We were if we did
37:07have to use that lot, we were working
37:09out a very complex shuttle system that
37:11would have to run nearly 24 hours a day
37:13to complement the 24-hour operations
37:15that are housed within the building. Uh
37:17and we were able to find these parking
37:19options that we've outlined here
37:21much, much closer and much more feasible
37:22than using that. That was secured as a
37:25stopgap in case we weren't able to find
37:26any other parking, but fortunately we
37:28were.
37:29>> And let me ask you this question.
37:30There's a building right behind the new
37:34public safety building
37:36and I knew it had I don't know if it's
37:37still for sale, but it had been for sale
37:39for years.
37:41So, was there not a way that maybe we
37:43could have looked at that building
37:45and been able to take it down and and do
37:48parking there?
37:49>> Is it a Is it a property on the same
37:51side of the street on Fayette?
37:53>> I think it's on Magnolia.
37:54I think I think it's on Magnolia.
37:56On the other side.
37:57>> Okay.
37:59Wha- one of the things that was done was
38:00we worked with the Department of
38:01Assessment to be able to look at and
38:03take stock of surrounding locations. I
38:05think that um I I can't speak
38:09can't speak to the exact building that
38:10you're talking about. So, I'm sorry. I
38:11think
38:12>> Okay. Um the the some of the factors
38:15that were also looked at and considered
38:16was overall did it have the space and
38:18the configuration to be able to meet the
38:20number spaces that we were again, I know
38:22we we had that number as an earlier
38:24slide around that 451 number. I think
38:26the other thing that we were looking at
38:27and examining was then cost and
38:29ultimately cost of either acquisition,
38:31considering leasing versus acquisition,
38:33and ultimately one of the things that we
38:36are are from our perspective in looking
38:38at is that this is already the city will
38:42be seeking to undertake and acquire the
38:44land from the railroad for the Westside
38:46Trail. As part of that conversation, the
38:48railroad has fully signaled their
38:49willingness to part ways with the
38:51additional land where the pump track is,
38:53too. So, the ability to have the land
38:55for those necessary 72 spaces already is
38:58part of real estate acquisition because
39:00of the Westside Trail and the ability to
39:02still have a new modern pump track all
39:06in the same
39:07area that we are talking about to be
39:09able to achieve those different goals.
39:11So, that was ultimately from a from a
39:13cost perspective and the ability to
39:15achieve these goals that we're talking
39:16about that ultimately this has been the
39:18the most preferred plan.
39:20>> And I was just wondering because it
39:21would have been an easier to me it would
39:22have been an easier walk for the police
39:25officers because it was right across the
39:28street, right behind the building.
39:30>> Okay.
39:31>> Mr. Ennis, so
39:33are you saying the uh
39:37the rails are going to be removed?
39:41So, the trains?
39:42>> There are the functional rail that
39:44exists today will continue to still
39:46operate. What it what is happening is
39:48that there is right now a very sizable
39:50portion of land that is owned by the New
39:52York Susquehanna and Western Railroad,
39:54but there is the area that's southern
39:56most. So, if I could maybe actually
39:58counselor, I can go back to the the map
40:00because if you follow my cursor, this
40:03area here there's active rail here.
40:05There is you you've may have driven
40:07under this or walked under this
40:08countless times. That is that is a
40:10abandoned rail bridge that is no longer
40:12active for rail. So, what we are talking
40:14about is this area where the pump track
40:16footprint is,
40:18uh and and alongside Light Bar Park in
40:20this area here near the Pancheros
40:21restaurant, that is land that the
40:23railroad has said they are willing to
40:25part ways with as part of an
40:27acquisition. So, that's the area
40:28basically 20 ft south of the rail. That
40:31>> So, they're going to part with that? But
40:34are there trains I
40:36Is there a train
40:36>> That area that we're talking about there
40:38is not active rail.
40:39>> Okay. So,
40:40if we're looking at that, if the bridge
40:43is unused, what are the uh prospect of
40:46removing that bridge?
40:48>> So, the bridge is actually a part of the
40:50Westside Trail, and so that actually is
40:52part of the recreationable recreational
40:54area.
40:54>> walking over it now?
40:55>> Yes. So, that was the thought. And that
40:56was the thought. And that will include
40:57new solar lighting, and that will
40:59include that pathway, and that pathway
41:00will be open and available for the
41:02public to use.
41:03>> Okay.
41:04>> Um another question, you and I have
41:05talked about this, Eric.
41:07There's an uh
41:08I think it used to be a used car sales
41:10place right on Erie and Geddes.
41:13And it's a band I mean, it's
41:15>> for sale.
41:15>> Sure.
41:16>> Um I know they're asking like 1.2
41:18million, but when I think about building
41:20a whole new parking lot when this
41:21already has blacktop, it's probably
41:23going to cost us more than 1.2 million.
41:25Where this one we could probably just
41:26top coat it
41:28and pay the 1.2 and whatever it cost top
41:30coat it and and then put a fence up.
41:33It just seems to me like that would be a
41:35least expensive option, and it would
41:38really only require the police to go
41:39over the bridge to that place.
41:42So, it's really not longer of a walk.
41:45>> So, we did we did assess that location
41:47that you were talking about, counselor.
41:49I think there was several things. The
41:50the acquisition cost is one of the
41:52factors. Uh in addition to that,
41:55the
41:56the ability to I understand what you're
41:58saying about the blacktop. I think what
42:00we were looking at was the cost to
42:01undertake the acquisition and the
42:03improvement ultimately to make that a
42:04viable parking area. Uh
42:07our our feeling and ultimately the the
42:09position that we have is that it is more
42:11viable and it is a better utilization of
42:13the pump track footprint. Part of the
42:15other thought process here, too, is with
42:17that location that we're talking about,
42:19that area has frontage on a heavily
42:21trafficked business corridor on Erie
42:23Boulevard. The area that we're talking
42:24about with the pump track is more set
42:26back.
42:27Um and so part of it, too, is that I
42:29think as we envision what the future of
42:30Erie Boulevard West looks like, it would
42:32be to have a building or a development
42:34to be part of that project and that land
42:36is part of that. So, I think if that's
42:38part of the long-term thinking that
42:39we're having here, too, is
42:41part of the acquisition, the ability to
42:43have that railroad controlled land is um
42:46it is a more viable path as opposed to
42:49what ultimately we hope will be a
42:50building that will be a part of that
42:52Erie Boulevard, a revitalized Erie
42:53Boulevard.
42:55>> Okay.
42:56Do other councilors have questions?
42:59>> I have just one quick question.
43:00If and when, you know, the construction
43:03of the new parking lot does happen,
43:05would we still be doing rentals
43:07like at Geddes
43:09and West and you know, with the 53 West
43:11Street, or do we do away with
43:14>> So, one of the I'm going to maybe I'll
43:15go first, but uh Deputy Chief, one of
43:17the areas that we are closely looking at
43:20is this what I've called the West of
43:21Geddes area, uh Council President. So,
43:23that West of Geddes area would have the
43:25ability
43:26uh
43:27overcoming again that some of the
43:28topographic and the geotechnical um
43:31pieces of information is to be able to
43:33add dozens of additional parking spaces
43:35in that land there. That the ability to
43:38create parking in that location would
43:40have the ability to then step back from
43:42some of these spaces that we're leasing,
43:44but Chief, I don't know if you want to
43:45add anything else.
43:46>> Nope, that's exactly accurate.
43:48>> Chief, I have one question for you.
43:49>> Yes.
43:50>> What are the weekly physical
43:52requirements for our officers?
43:55In terms of physical fitness,
43:56specifically running.
44:00>> Uh I don't know that I have a specific
44:01standard to reference, uh but in order
44:03[clears throat] to be a police officer,
44:04you have to be of reasonable physical
44:05fitness.
44:06>> Would a 3/4 of a mile jog on a regular
44:09basis be helpful to that?
44:11>> Well,
44:13not only the the physical requirements
44:16of traveling that far, but it's also the
44:18sensitive equipment that we have. So, if
44:20we have a officers traveling with
44:22firearms or other very sensitive stuff
44:24that the public's not allowed to
44:26possess, uh that opens that up to
44:29risk to that equipment. Also, if we're
44:31parking police cars that have modems and
44:34and computers in them that have access
44:35to all of our data, that have access to
44:37criminal records,
44:39and we put them significantly farther
44:40away from where we have a reasonable
44:42ability to to monitor them, to see them
44:44other than remotely, that creates a
44:46cybersecurity risk as well. It's also in
44:49the PBA's collective bargaining
44:50agreement that we have to provide them
44:52with on-site parking for the for
44:55for work. So, I think it would raise an
44:57issue with the collective bargaining
44:58agreement, as well. So, it's not just
45:00the physical fitness aspect of it.
45:03>> So, on-site is
45:05Gettysburg,
45:07too, right?
45:09>> I think that's open to interpretation,
45:10but as close as we can get them to the
45:12site for all of those reasons, not just
45:14to to satisfy the collective bargaining
45:16agreement, but also for cybersecurity,
45:18for physical security, um
45:20you know, for for the the wellness of
45:21our officers, for the wellness of their
45:23vehicles, as well. Cuz it is also a
45:24consideration that uh police officers
45:27commonly are targeted because of the job
45:29that they hold. So, we have to make sure
45:31that their vehicles are in a position
45:33where they're safe, and they can
45:34reasonably expect that there's some
45:35safety for their vehicles.
45:36>> I understand. But, we have 190 officers
45:39right now?
45:41190 officers 190 sworn or
45:43>> Three about 370 375.
45:46>> 375 out of the 451 spots that we're
45:50trying to develop?
45:51>> Well, it's the police and the fire
45:52department, and then civilian staff, uh
45:55all of the auxiliary vehicles that we
45:56have. So, multiple different categories.
45:59>> But, Chief, if I asked you how often the
46:02firefighters have to run
46:04per week, could you tell me?
46:10Okay. [laughter]
46:11So, if we So, I'm so sorry. I just
46:13wanted to disaggregate this. If we
46:16based on the collective bargaining
46:17agreement need to provide 371 spots,
46:21that is under the 351 spot category,
46:24which means that if I did my math right,
46:26which incidentally I've been doing
46:27fourth grade third grade math recently,
46:29so I'm not sure I'm doing this right at
46:31all. But, if we took out the 72 spots
46:34from this parking lot, we would have 381
46:36spots from our existing lots.
46:39So, if we took these out entirely, we
46:40would be able to satisfy the collective
46:42bargaining agreement provided the chief
46:44could give me a little bit of leeway
46:47on some of that as well.
46:49>> So,
46:50the police officers drive a personal
46:51vehicle to work and then get into a
46:53police car, so it's not just a
46:54one-for-one. So, that that inflates the
46:56number quite a bit. There's auxiliary
46:57vehicles, there's crime scene processing
46:59vans, there's tactical vehicles, uh
47:01there's additional vehicles that need to
47:03be parked. Um
47:05In addition to the police department,
47:06there's civilian staff. So, it's not
47:08just the 375 police officers. It's It's
47:11much larger than that 375 number.
47:13That's how we arrived at the 451
47:15[clears throat]
47:16needed spots.
47:17>> Plus, we do have the fire department
47:18there, too. I mean
47:19>> Exactly.
47:20>> The chief is there. How many How many
47:21spots do you use, Chief? The fire
47:23department.
47:25>> Well, when
47:26we when we did this plan, we requested
47:2836 spots.
47:29>> What did you
47:30>> Do you want me to
47:30>> just could you go to them? Thank you.
47:32>> Thank you. Sorry.
47:34>> I'm Michael Muns, the fire chief. So,
47:36when this plan was developed, we
47:38requested 36 spots. Currently, we have
47:4025 spots, so we're 11 short. Um and
47:43that's just for the people that work in
47:44our building. That doesn't count for
47:46when we have um meetings with our
47:48command staff or we're doing an
47:50orientation and having interviews and
47:52things like that. So, we're still short
47:54even with the 36 spots, but our plan was
47:57to have 36 spots right on the location
47:59and we're still short of that.
48:01>> Okay, thank you.
48:01>> Okay, you're welcome. The only other
48:02thing I just want to point out to is as
48:04we were evaluating looking at the Erie
48:07Erie Place Associates but that that 500
48:10Erie
48:11sorry 500 West Genesee Street. Part of
48:13it was based on the importance of making
48:15sure that officers are also arriving and
48:17showing up for roll call and I think one
48:19of the things that we've been thinking
48:19about is the distance the combination of
48:21how they're getting there
48:23shuttle walking or running. Some of the
48:26things too is that being able to make
48:27sure that the roll call and shifts are
48:29beginning.
48:30>> Sorry.
48:31>> Sorry.
48:32>> Not in the snow.
48:33>> But [laughter] but and I I think the
48:34biggest thing is just the the public
48:36safety aspect is a vital importance and
48:38that's a city-wide function. And so as
48:40we thought about as well the roll call
48:42and making sure that the ability we are
48:44centralizing and there's a lot of
48:45benefits and and public safety service
48:47agencies or public safety across the
48:48United States most law enforcement
48:50agencies have their roll call happening
48:52on site and the same place as the
48:54administrative headquarters for the last
48:5530 to 40 years in Syracuse that has not
48:58been the case. So that centralization is
49:00a vital importance but we just want to
49:01make sure that we are not having a
49:03situation where then deploy officers are
49:05not being deployed to be able to do and
49:07perform their jobs and making sure we're
49:09promoting public safety in the city of
49:10Syracuse.
49:12>> So one of the biggest concerns I've
49:14heard from a lot of the neighbors
49:16that have invested their time and stuff
49:18into this is there were a lot of
49:19promises made that were kept, okay? Um
49:23I'm just asking the question not taking
49:24a side here.
49:25Um
49:27So I guess
49:28when we're thinking about doing this,
49:30how are we going to make sure that what
49:32we're telling them now with the new pump
49:34track with the light park added, how are
49:36we going to assure them that those
49:38things are going to happen for them?
49:40Um and it's not going to be as they say
49:43another broken promise. So I just want
49:45to make sure that we can give them a
49:46certain assurance that what we're saying
49:48tonight is what we're going to do.
49:51Um and I did notice I didn't remember
49:52who it was from, but a teacher was
49:54thinking about getting a bicycle club
49:57together and wants to be able to use the
49:58pump track. So,
50:00I don't know. I think the design of this
50:01new pump track is pretty cool myself,
50:03but um, so I just want to ask that
50:05question.
50:06>> I mean, I would say I think one I
50:09invited um, friends of like two come to
50:12the to parks to talk about the pump
50:14track. That's one. Second, I was invited
50:16to um, Westside TNT to listen to talk to
50:19explain. Um, we secured the money. We
50:23made sure that we had the $300,000 to
50:25build this. We have the money ready to
50:27go. It's not a promise, the money's
50:29there. Um, I think everyone wants to see
50:32this project happen. They want to see
50:34the pump track happen. And so, my job is
50:37recreation. It's parks and recs. And so,
50:40I have a good team.
50:42I feel like I have a good relationship
50:44with with a lot of folks on the
50:45Westside.
50:46Um, I stand on my word.
50:49>> To put a finer point to it as well, just
50:51based on what the commissioner shared.
50:52It is not a matter of if the new pump
50:54track will be built, it's a matter of
50:55when. And just to speak to to your
50:59question, counselor.
51:00Um,
51:01there has been quite a bit of dialogue
51:03on this. And again, I mentioned both
51:04internally, but also externally. And I
51:07would say the vast majority of what we
51:09had been hearing was really around
51:10public parking and the ability to to
51:12have public parking be part of this
51:14improvement, not just private parking
51:16for SPD or for fire or for city
51:18operations. And so, that piece is
51:21something we continue to look at. I that
51:23is the vast majority. So, there's a
51:24planning commission that was already
51:25cited. There were two individuals who
51:27spoke at that public hearing that were
51:29representing and that had received
51:30likely a mailer notification.
51:32The conversation I went back and
51:34reviewed that again and looked at that
51:35recording. It is available. The the
51:38conversation was around parking. It was
51:40acknowledgement of the fact the pump
51:41track ultimately would be removed, but
51:43in the design was included. That was all
51:44part of that public hearing. It was the
51:46public parking component that continued
51:48to come up over and over again. I do
51:50cite the 22 to 23 parking spaces on
51:53Fayette as an example where the city
51:54invested. That was city dollars made
51:56available for that public parking
51:58nights, weekends, understanding during
51:59the work day it is used by by city
52:01operations. That piece is just that has
52:03been the vast majority of the dialogue
52:05that we have heard and whether it was
52:07the Westside TNT where this was
52:08presented or elsewhere, it has been more
52:10so about the public parking and ensuring
52:12public parking, less so the the loss of
52:15what right now is is a it's not a
52:18maintained pump track, but we want to be
52:20able to create a real asset and
52:21recreational destination.
52:23>> And Eric, I just I want to tell you that
52:25from what I heard and what we heard at
52:28the Westside the Parks Committee meeting
52:30in July on the Westside pump track was
52:33not at all about that. We heard that
52:35there was a um there's already a pump
52:38track in Canastota that would blow this
52:40design out of the water. That there is a
52:41pump track in Buffalo that is that
52:44people drive 2 and 1/2 hours to go to.
52:47And that is the kind of recreational
52:48activity that people want in Syracuse.
52:50That they want the Westside pump track
52:52to go into a recreational zone that then
52:55travels into the Creekwalk in downtown
52:58in a way that brings people and
53:00recreation spotlighted here. And the
53:03most impactful um pushback that I
53:07received both in writing and directly to
53:10me from community members was that no
53:13landscape designer in their right mind
53:15would put a parking lot here if they
53:17have designed recreational activities to
53:19the north and to the south, to the east,
53:21and to the west. So, I very much
53:23appreciate you and I very much
53:24appreciate all of the work that has gone
53:27into making sure that our public safety
53:29officers and our firefighters have
53:31exactly what they need
53:33to be all on the same page, but we also
53:36need to make sure that we are on the
53:37same page for our recreation and our
53:39planning. And I don't believe that we
53:41are.
53:42I really appreciate Josh Wilcox for
53:44putting this design together. It is
53:46small. It is crammed in here and it's
53:48not going to do what we need it to do,
53:51which is focus a tremendous amount of
53:53attention on the ability of Syracuse to
53:57have a grade A pump track. So, I am very
54:00concerned about that. I do want to thank
54:01you and I don't want to leave it like
54:03that, but I do want to get these people
54:05to the mic. Is there anything else on
54:06the public side for the city staff in
54:08terms of the presentation that we needed
54:10to bring in?
54:12Any other questions from counselors?
54:14No? All right. We are Nathan's going to
54:16come up here with the signs. Also, thank
54:19you children for coming and being so
54:20patient. We have brought some c a n d y
54:23into the building and it's to the back.
54:25It's not just for kids, but please do
54:27help yourselves. Um Nathan is our
54:30timekeeper today and again, you'll have
54:332 minutes at the mic. Please introduce
54:35yourself and uh
54:37and and where you live, your address.
54:40And then we will give you a little flash
54:42when we need to cut you off.
54:44Whoever's up in the mic first, please
54:46join us.
54:49Come up to the mic, please. Sorry, I
54:51know that it's
54:53Do we have a square footage for the lot?
54:56Sorry.
54:58Hello. Michael Genovese,
55:00city of Syracuse resident.
55:03Um
55:05>> Breaking things already, Michael.
55:07>> [laughter]
55:08>> Somebody
55:09>> [clears throat]
55:11>> Sorry, bro.
55:13>> Okay. Well,
55:16all right. So,
55:19I'm a big fan of parks. I'm a big fan of
55:22getting people out into the spaces. I'm
55:24a big fan of getting people
55:26to do things.
55:28A big part of what this pump track is
55:30doing, what Life has been doing, what
55:31the Near West Side has been doing, is
55:33trying to establish a zone and a
55:35district for bringing people into the
55:37city. I love the city. I'm not from
55:39here, but I will go to the mat and I
55:42will fight for this city and I will
55:44fight for the public cuz I think the
55:45public needs something here. And what
55:47you're doing
55:49you're sidestepping the fact that this
55:50is essentially a
55:52property grab. This is an opportunity
55:54for the city to come in, grab a piece of
55:55property, put a lot in it, going to put
55:57a fence around it, going to lock it out.
55:59It's going to be for the police. That's
56:01fine. If that's what your plan is, then
56:04say that. If we're going to put a
56:05building in that spot, then let's say
56:08that.
56:09If you want us to be doing things, we
56:11need it for a long term. We need to make
56:13sure that this is happening for the
56:14future cuz I'm old, getting older, and
56:18there are children who are coming up who
56:20need something to do in this city. And
56:22when everybody is fleeing from the
56:23south, when everybody is coming to our
56:25wonderful city, they want to be in a
56:27nice, wonderful, warm town, they're
56:29going to need things to do.
56:32They're going to need This warm This
56:33warm is not always warm,
56:35but but this is a critical component is
56:37parks, it's recreation, it's getting
56:39people out. These are the things that
56:41can run through our city and that are
56:42going to bring people in. They're going
56:43to give them something to do.
56:45If people are active, they have positive
56:47environment, they have a community that
56:49is supportive, and that goes to the
56:51kids, that goes to the money, all that
56:53stuff comes together, maybe we don't
56:55need as many police. Maybe we don't need
56:57as many parking spaces to accommodate
56:59all of the needs of that aspect. So, if
57:02we can try to think about how we move
57:05this forward and think about how we can
57:07establish a longer run and a larger
57:10investment in our future,
57:12we need to go about doing that. But
57:15saying one thing, sliding the other way,
57:17we don't need that. We need to make sure
57:19that this is happening for the right
57:20people the right time.
57:22Thank you all. Appreciate it.
57:27>> Hello. My name is Randy Hadzor. I just
57:29wanted to kind of continue breaking the
57:31ice. Uh I am from here. I grew up on
57:33Getter Street. I taught after school at
57:35Delaware.
57:37Um it would break my heart when the kids
57:38like after even after the after school
57:40activities, they were like they wanted
57:42stuff to do. Um growing up I didn't like
57:45skate or bike. Um I was able to do
57:48endurance athletics and travel and see
57:50that all these other cities all over the
57:52West Ball all over the country, they
57:53have this thing called a pump track and
57:55it has this like magical place where
57:57people can come together and you can see
57:59a toddler and you can see an experienced
58:01dude like launching 20 ft in the air and
58:04everyone's like congratulating each
58:06other. They're building community. I've
58:07had that type of experience through
58:09endurance sports where I've I do my
58:11business and I and I've made networking
58:13opportunities and that's like
58:15life-changing stuff. I, you know, got my
58:17library card at Monday Branch Library. I
58:19went to Finney's Pet Supply growing up
58:21and I've seen that the neighborhood
58:23change. It's for good and for bad and um
58:26you know, it's our home and so what I
58:29felt like I was in a position to make a
58:31part to to I know these skilled people.
58:34I know these passionate people that come
58:36to this town and so for them to come
58:38here and donate their skills and donate
58:40their time, I really appreciate the work
58:42of Eric Ennis early on with Adaptive CNY
58:44and the city to make this pump track
58:46happen in the first place. I appreciate
58:48the commitment to the 300 grand to make
58:50it proper. We needed to cap that thing
58:52with asphalt 3 4 years ago because it's
58:55um you can't expect volunteers to
58:57maintain the thing of that size and
58:58that's been the plan from the start. So,
59:01I appreciate the commitment there. Where
59:03I have issue is um
59:06taking something that the community
59:08built for themselves to house
59:11cars while they're sitting. You saw
59:13those satellite imagery of how much
59:15parking is in that neighborhood? It's
59:16crazy. So, I don't know. I I understand
59:20you can hire engineers to think but like
59:22I didn't know about the Magnolia lot and
59:24there's a 100 plus lots uh spots there.
59:27Like I saw that you lost a parking
59:29garage. Can you go vertical? Can you
59:31stack your cars? Like, you guys have
59:33resources we do not. So,
59:35um
59:36I appreciate the support for the local
59:40um
59:41project and everybody's hard work. There
59:43are people who could not come out today
59:44because they are so uh they feel so
59:46disenfranchised that all their hard work
59:48is just going to get bulldozed and um
59:51there's a lot of skepticism about what's
59:52really going to happen, but I appreciate
59:54that you guys can figure out how to make
59:56it happen to meet the needs of law
59:59enforcement, to meet the needs of the
1:00:00neighborhood, and um
1:00:02I really urge you to not take that site
1:00:05because it means a lot to a lot of
1:00:06people.
1:00:08>> Thank you.
1:00:11>> [applause]
1:00:15>> Can you guys bring up that slide of the
1:00:17overhead where you guys were picking the
1:00:19parking?
1:00:20So, I can roughly get
1:00:22>> Right [clears throat] up, Tommy.
1:00:22>> Josh Josh, real quick. Josh Wilcox,
1:00:24remember I love you. Um
1:00:26>> And you
1:00:27>> So, this points out something really
1:00:28This is right here.
1:00:29>> Real quick. Oh, sorry. Yes, hello. My
1:00:30name is Tommy Lincoln. I made bullet
1:00:32points so I wouldn't stray. Thank you
1:00:33for reminding me. Uh hello. My name is
1:00:35Tommy Lincoln and I own a business on
1:00:36the near west side. Um back in February,
1:00:40this parking lot was first brought up in
1:00:41a TNT meeting where we discussed the new
1:00:44uh pump track that Josh spoke in the
1:00:46meeting that he only had 6 hours to
1:00:47throw together uh to come up with that
1:00:49design. So, um
1:00:51in that meeting, there was opposition to
1:00:54the new pump track because there was no
1:00:55community engagement on the new design
1:00:58and whether it was going to be it would
1:00:59be used for bicycles and whether it was
1:01:01going to be used for skateboards. There
1:01:02was a lot of questions around it, but
1:01:04the relief was that the parking lot that
1:01:06was going to be built was going to be
1:01:07common use, not just for
1:01:10uh emergency vehicles or city official
1:01:12vehicles. Um this was good because the
1:01:14new pump track is going to eliminate the
1:01:16old art park parking lot. So, you're
1:01:18getting rid of the art park parking lot
1:01:20and putting up a new parking lot that
1:01:21nobody can use other than city
1:01:23officials. So, now there's no parking
1:01:25for the art park or the new pump track.
1:01:27So, now you're going to scramble again
1:01:29at that point to find more parking. Now,
1:01:31I understand with new buildings that
1:01:32they need parking for her permits and
1:01:34whatnot. It's It's very shocking that it
1:01:36was decision was made before you had
1:01:38proper parking to put this giant
1:01:40emergency facility in a like you guys
1:01:42had mentioned a neighborhood. Um so,
1:01:46as I go down my bullet points, uh
1:01:47through the parking lot where you're
1:01:48putting it now, the exit is tough and
1:01:51you're going to be coming out of there
1:01:52with emergency vehicles trying to go
1:01:53left or right when there's already lines
1:01:55of cars lined up at that light. There's
1:01:58accidents that happen there all the
1:01:59time. Parking lots that were brought up
1:02:02as a 500 West Street, they have over 200
1:02:04lots have been empty for over 4 years.
1:02:06It's a 2 and 1/2 if that 2 and 1/2 block
1:02:09walk to the new station from that
1:02:11parking lot. There are people in the
1:02:13city that walk much farther, probably
1:02:15some of you, to your office.
1:02:17I understand the the issue about
1:02:18security, but if you cannot secure
1:02:20police vehicles within a block radius
1:02:22from where you plan to build this lot to
1:02:24another lot that already exists, then
1:02:26there's a problem with security within
1:02:28the department that needs to be
1:02:29addressed before you even go and build
1:02:31this lot.
1:02:32The other lot that's empty on the other
1:02:34side of Erie and Geddes is also a very
1:02:36large lot. I know this because my my
1:02:38cousin had an upholstery shop there for
1:02:41years that I would visit and it was an
1:02:42abandoned lot where there's vagrants,
1:02:45there's uh graffiti artists, there are
1:02:47broken cars. Now that all those cars are
1:02:50removed, there is a lot of uh larceny
1:02:52and other things that happen on that
1:02:54side of Erie where a new lot there could
1:02:57add a lot to the neighborhood and stop a
1:02:59lot of other
1:03:00uh issues that police have to deal with
1:03:02on that side of Erie.
1:03:04Um
1:03:05Those are the lots. You can see on this
1:03:06lot here,
1:03:08uh
1:03:12The Westrock building is not a full lot.
1:03:14It's never a full lot. It's at 50%
1:03:16capacity. I know this because I walked
1:03:18to Recess Coffee, which is much farther
1:03:20than 2 and 1/2 blocks from my office.
1:03:22This lot could also be leased.
1:03:25People could use this lot. There's so
1:03:27many lots in this neighborhood, and you
1:03:28want to build another one. As somebody
1:03:30who came up with Mr. Ennis in the group
1:03:32of people that helped make things happen
1:03:34in this city,
1:03:36I would think that people would know
1:03:37better than to eliminate a community
1:03:39project to put up a parking lot when you
1:03:41were trying to scramble for 72 spots.
1:03:45Thank you. I APPRECIATE IT.
1:03:49>> [applause]
1:03:52>> NEXT UP AT THE MIC.
1:03:55>> [clears throat]
1:03:58>> HELLO, MY NAME IS JASON FOWLER. I have
1:04:00my lifelong city resident. I've been
1:04:02voting every election every year since
1:04:042004.
1:04:07Um
1:04:08this was the pump track when we got to
1:04:10put in was a big deal to us. You know,
1:04:11I've been a
1:04:13biking my whole life since I was like,
1:04:15you know,
1:04:165 years old.
1:04:18Uh I remember when the county was
1:04:20planning the skate park that's out at
1:04:23Onondaga Lake Park and
1:04:25what a huge deal that was. We had so few
1:04:27skate parks in the area at the time.
1:04:30And the thing that no one's mentioned is
1:04:32the
1:04:33the pump track when it gets if we get a
1:04:36paved pump track in the city,
1:04:38it's not just bikes that can use it. Any
1:04:40wheels can use it. Bicycles, scooters,
1:04:43rollerblades, rollers skates,
1:04:46you know, little kids on their striders,
1:04:48like their their walking bikes.
1:04:51These are all things that would open up
1:04:54that
1:04:54we don't have a space for them. They're
1:04:56currently crowding in the places like
1:04:59Onondaga Lake Skate Park or up at um
1:05:03Eastwood's behind Huntington, which is
1:05:05another skate park, and there's people
1:05:06there doing much more dangerous things,
1:05:08and those are much more dangerous
1:05:12spots for that kind of activity because
1:05:14there's more risk of collision cuz
1:05:16there's people going every direction.
1:05:18There's
1:05:19drops, there's gaps, there's things like
1:05:21that that a pump track doesn't have.
1:05:23They're rolling features.
1:05:25You know, you can walk one and it's it's
1:05:27a good workout that way, too.
1:05:30Um
1:05:32I work for the state. I work at Upstate.
1:05:34I've
1:05:35seen
1:05:37how government never plans for their
1:05:39people to have enough parking my entire
1:05:41career there. I've been there since
1:05:422007.
1:05:44You know, we what is now the Nappi
1:05:47building was initially supposed to be a
1:05:48six-floor full block parking lot so they
1:05:51could close all our outer lots.
1:05:53Our people are bused in from Sam's Club
1:05:56every day. Two shifts.
1:05:59Third shift, they're able to put in the
1:06:01lot or the the garages. But
1:06:05have we thought about maybe having
1:06:07the non-emergency people, the you know,
1:06:09the civilian employees, them shuttled
1:06:11in. That would be a weekday only thing.
1:06:14For most of it. You know, that's an
1:06:16option.
1:06:18And we as the state have done that for
1:06:20our people.
1:06:22Thank you.
1:06:23>> Thank you.
1:06:23>> THANK YOU.
1:06:31>> HI, I'M SHAWN SEYMOUR. I'M A SMALL
1:06:33BUSINESS OWNER from Central Square.
1:06:35Uh me and my kids use the pump track.
1:06:37>> You can lift it up.
1:06:38>> Yeah, it goes right to you.
1:06:39>> There you go.
1:06:40>> Um I more had a few questions. Um how
1:06:42many shifts are there in the in the
1:06:45police office? Are all 375 people there
1:06:48at all times?
1:06:49>> Nope.
1:06:50>> So, there are three primary patrol
1:06:52shifts. There's a morning, afternoon,
1:06:53and overnight shift, but there are
1:06:55different details and different units
1:06:57that deploy all throughout the day. So,
1:06:59>> All right.
1:06:59>> there are people coming and going at all
1:07:01hours.
1:07:02>> Is there a 375 cop cars to go with 375
1:07:05cops?
1:07:06>> Uh we have more than that, actually.
1:07:07>> Yeah. Wow.
1:07:09All right.
1:07:10Um, I guess the last question would be,
1:07:12uh, I think that would be more of a you
1:07:13question. Uh, what would be the cost of,
1:07:16you know, finishing the existing pump
1:07:18track as opposed to $300,000 to
1:07:22start a new one, and where would it be?
1:07:25Where would the new pump track be if you
1:07:26guys built a new pump track?
1:07:29>> I um, life So, we we do not have the
1:07:32cost. I think part of it is that we are
1:07:34talking about something that was
1:07:35approximately 2020 when when that was
1:07:37installed. But, I think that there is a
1:07:38uh it is years of degradation that
1:07:40happened. I know a previous speaker had
1:07:42talked about the fact of in theory that
1:07:43should have been asphalted over um
1:07:45several years ago. So, I I think that
1:07:47the cost implications
1:07:50to preserve it would need to be
1:07:52confirmed before we even talk about the
1:07:53numbers. And I think the biggest thing
1:07:55to again is then the parking that we
1:07:57need to be able to allocate that that
1:07:59would have to come from a different
1:08:00location. So, that that's there there
1:08:02are a series of complexities that would
1:08:04make sort of preserving or adding
1:08:06asphalt, there still is the need to make
1:08:08sure that we can support our public
1:08:10safety needs as well.
1:08:11>> All right. Fair enough.
1:08:13Thank you.
1:08:13>> No, thank you for your questions.
1:08:18>> Don't be shy. You got one You got one
1:08:20that's for you.
1:08:22She was right there.
1:08:26>> Hi, Hillary Donohue. Um, I live on
1:08:28Otisco Street.
1:08:30Um, it's I've lived on the west side for
1:08:33a while now, 15 years. And I've watched
1:08:36a group of residents and artists and
1:08:38locals um establish this piece of land
1:08:42as a park. They've done so much just,
1:08:45you know,
1:08:46backbreaking labor um getting this
1:08:48established as Laip Art Park. Um, they
1:08:51overcame a major hurdle a couple years
1:08:53ago, I think, when they got the city to
1:08:56um take ownership of the park um and
1:08:59start maintaining it as a city park.
1:09:01Um, and it's hard to see the city now
1:09:04thinking of it as an asset that they can
1:09:06turn around and put a parking lot on um,
1:09:09where a park had already been
1:09:11established.
1:09:12Um, there are a ton of surface lots in
1:09:14the area which have been pointed out.
1:09:16Um, this is this intersection is a major
1:09:18connector, you know, it's part of a
1:09:20neighborhood. It's an edge, but it's a
1:09:21part of a neighborhood and it's a major
1:09:23connector between several neighborhoods.
1:09:25Um, and a gated parking lot is not
1:09:29something you see in a connector of
1:09:31several neighborhoods. Um, a park fits
1:09:34that need. Um, all right.
1:09:36Thank you. Thank you.
1:09:42>> If you could put the picture back up.
1:09:43Um, three things. One, whoever the
1:09:46architect was
1:09:47>> yourself, please.
1:09:48>> David Lacko.
1:09:49>> Thank you.
1:09:49>> I run Split Rock Cyclopaths. It's up
1:09:52near OCC. Uh, we got 30 acres of bicycle
1:09:55trails, 1,500 members. So, it's a huge
1:09:58community.
1:09:59But, whoever
1:10:00did the planning for the police building
1:10:02which is this
1:10:04Is this it?
1:10:05>> Yeah. That is correct.
1:10:06>> Whenever they have to do the planning,
1:10:08they have to plan for parking and it's
1:10:10known what you guys need.
1:10:12>> Agreed.
1:10:13So, that should have been in the plan to
1:10:15begin with.
1:10:16Um,
1:10:17number two is you you made the concern
1:10:19that there'll be police cars parked
1:10:21far away from where you guys are. You
1:10:23don't put the police cars there, you put
1:10:24the employees' cars there. The police
1:10:26cars get right near your building as
1:10:28best they can in this shared lot. So,
1:10:30that would be a smarter way to handle
1:10:32that.
1:10:33Um, third thing is uh,
1:10:35west of Geddes, like you said,
1:10:37who owns that and why can't that just be
1:10:40developed? That's double the size of the
1:10:41pump track for parking.
1:10:43>> So, that is part of the railroad
1:10:45property that we're talking about.
1:10:47>> get it for free?
1:10:49>> The this is all part of the discussion
1:10:51around both the the area to the opposite
1:10:53side, the east of Geddes, I I I can call
1:10:55it, and then the west of God is so
1:10:56that's all part of that conversation.
1:10:58The area where the pump track is is a
1:11:01much flatter area and you do not have
1:11:03the same grade change that I was
1:11:05referencing earlier around the
1:11:07>> But many parking lots have a go around
1:11:08in an upper lot and a third lot up and
1:11:10it's not that expensive.
1:11:13As Rick was saying, we don't need
1:11:14$300,000 to make this right.
1:11:16About 15 grand is all it is. You can use
1:11:18the rest of that money to do that
1:11:20parking lot. And not disturb anyone and
1:11:22it's right next to where he wants them.
1:11:24>> Sure.
1:11:25As we are continuing to look in the long
1:11:27term, the ability to include parking
1:11:29there is very much one of the things
1:11:31that we are looking at as part of this
1:11:32entire analysis.
1:11:33>> Kind of dealing with today and not
1:11:35tomorrow.
1:11:36And all of our community.
1:11:39There's probably
1:11:4110,000 bicycles here.
1:11:44So.
1:11:45Thank you.
1:11:46>> THANK YOU.
1:11:47>> [applause]
1:11:57>> HI. UM MY NAME IS MICHELLE MACIEJEWSKI.
1:11:59I'M actually the teacher that emailed
1:12:01you guys.
1:12:02>> Hi Michelle.
1:12:02>> Hi. Um so yeah, I teach high school at
1:12:06ITC which is right here downtown near
1:12:09the On Center and you know, part of my
1:12:13teaching career is trying to get more
1:12:15recreation opportunities, lifetime
1:12:16activities for our high school students
1:12:18that they can then go on to do once they
1:12:20leave school.
1:12:21And as we all know, like we all grew up
1:12:23riding bikes.
1:12:24Um it's not just recreation and also can
1:12:26be a source of transportation. It can be
1:12:28a source of inspiration for others. It
1:12:30can be something that you do as a
1:12:32career.
1:12:33And so
1:12:34one of the things that I'm doing right
1:12:35now is working with CNY West mountain
1:12:37biking team which is part of
1:12:40separate group that just came out of the
1:12:43CNY Sharks and it is a mountain biking
1:12:45team
1:12:46that rides and competes around the
1:12:48state. And when I started talking about
1:12:50that with my students
1:12:52um they all got really excited about
1:12:53this idea that oh my gosh, we could we
1:12:55could ride mountain bikes. Where are
1:12:56there spaces we can ride? And we're
1:12:58discovering, you know, uh through
1:12:59talking that there's places where you
1:13:01can ride in the Southside, right?
1:13:03There's um the rail track. Uh one of the
1:13:05places that I had told them about was
1:13:07this pump track. And it is so
1:13:09conveniently located for not only our
1:13:11school, but also Fowler, any other
1:13:12schools that may start to grab onto this
1:13:14idea that we're developing in our high
1:13:16school downtown. Um it is so accessible
1:13:18to us. So, I don't know where this
1:13:20proposed Westside trail would be um with
1:13:23the pump track, um but I just know that
1:13:25right now where it is, it's very much uh
1:13:27oriented to be in a good spot for us and
1:13:29for other high schools. Um another thing
1:13:31that I really like about this existing
1:13:33pump track is that it was developed by
1:13:34the people here. And uh somebody
1:13:36mentioned the uh the skate park at
1:13:39Onondaga Lake. I don't know if anybody's
1:13:41ever ridden that. Uh its design is eh.
1:13:45Right? I don't think that people from
1:13:46the community designed it, right? I
1:13:48think it was hired for an outside
1:13:49contract.
1:13:50And so, it's not really as ridable as
1:13:52people think. And unless you're somebody
1:13:54who rides bikes, who rides um
1:13:56uh skateboards, who was going to be
1:13:58using something like a pump track, you
1:14:00might not realize that. And so, to put
1:14:02this out to other people to develop is
1:14:05sort of questionable to me. Um but also,
1:14:07again, like I said, my main concern is
1:14:09just that I I really want our students
1:14:10to have this space available as we
1:14:12develop this new program and try to get
1:14:13more kids excited about bikes. Thank
1:14:15you.
1:14:17>> [applause]
1:14:23>> Uh
1:14:24What? Okay. My name is Shayel Patel. I'm
1:14:26opposed to parking lot in the planned
1:14:28location of the pump track. I live in
1:14:29downtown Syracuse, which already has
1:14:31nearly 28% of land dedicated to parking
1:14:33in some capacity. I do not think we need
1:14:36more parking, especially here, along
1:14:37with the 110 spots on Magnolia.
1:14:40Uh there's a surface existing parking
1:14:42lot already, as pointed out, at uh
1:14:44Geddes, across from Geddes, which could
1:14:46provide an additional 200 uh potentially
1:14:48more if it was taken for the secure
1:14:50parking required.
1:14:52Um the SMTC 2024 Westside Study
1:14:55recommends connecting Light Art Park,
1:14:57the pump track, and Panchinos, along
1:14:59with using the abandoned rail bridge to
1:15:00allow pedestrians and cyclists to avoid
1:15:03the Geddes West via intersection, which
1:15:05has had 114 car crashes and is a part of
1:15:08the corridor with 1,055 total crashes
1:15:10from 2013 to 2017. It has been
1:15:13identified for improvements as part of
1:15:14the city's pedestrian safety action plan
1:15:16phase two and as part of the New York
1:15:18State Pedestrian Safety Action Plan. A
1:15:20parking lot on the pump track at that
1:15:22location would undercut that work and
1:15:23block future improvements, I believe.
1:15:26There are plenty of other plans and
1:15:27studies like the Bicycle Plan 2040, the
1:15:30Sustainability Plan 2040, the Land Use
1:15:32and Development Plan 2040, which would
1:15:34all uh prioritize pedestrian and bicycle
1:15:37use and would advise against this
1:15:38parking lot. But regardless of the
1:15:40numbers of studies and plans that are
1:15:42done and ignored, I personally bike the
1:15:44West Sibley
1:15:45Street because it's the least dangerous
1:15:47east-west connection from downtown, and
1:15:49I still get nearly hit by cars every
1:15:52single time. And the sidewalks and bike
1:15:55lanes start and stop without reason.
1:15:57It's poorly lit. Intersections don't
1:15:58have signals, and it's this way because
1:16:00of poor planning from individual
1:16:02decisions that add up to the problems
1:16:04we're now dealing with. This is one of
1:16:06those decisions. In February, staff
1:16:08rejected another site for being too far
1:16:10away and not connecting to Westside
1:16:11Trail for a parking lot. But the
1:16:13existing lots are closer or closer than
1:16:14the pump track. And the pump track is
1:16:16the connection's own uh connection to
1:16:20the west uh trail that the city calls
1:16:22for. I'm asking for this community to
1:16:24require that those existing lots be
1:16:25evaluated publicly before the pump track
1:16:28is removed. The city has already removed
1:16:30has already written the plan for this
1:16:31neighborhood, and I believe they should
1:16:32follow it.
1:16:35Thank you.
1:16:38>> [applause]
1:16:45>> HI, I'M RYAN COHEN. I'M A VOLUNTEER
1:16:47TRAIL BUILDER.
1:16:48>> to you. What's your name? What's your
1:16:49name?
1:16:50>> Ryan Cohen, uh Fayetteville, New York.
1:16:53Uh volunteer trail builder. Um
1:16:55so, the biggest problem that I see is
1:16:58that there's a proposed parking lot
1:17:02over [snorts] a pump track. And what's
1:17:04being promised and is $300,000 is
1:17:06already allocated for this for a new
1:17:09proposed site. But you don't have the
1:17:10new site secured in any way right right
1:17:13now, right? Like there's no there's no
1:17:14lease, there's no sale agreement for the
1:17:16new new pump track site. So, there's
1:17:19nowhere for a new There's parking lot my
1:17:22like plus one parking lot minus one
1:17:24park. No no security whatsoever for a
1:17:28future site.
1:17:29>> The just uh to answer your question, the
1:17:31land that we're talking about where the
1:17:33pump track would go and and was part of
1:17:35that image is city owned and controlled.
1:17:38So, the light park park is owned by the
1:17:40city.
1:17:41>> So, when you're saying that there's an
1:17:42issue with you need to lease it from the
1:17:45the railway?
1:17:46>> For the West Side Trail, that is what
1:17:47it's right now.
1:17:49>> But isn't that connected to the greater
1:17:52plan?
1:17:53Like would you build the pump track
1:17:55without building the the pathway?
1:17:57>> The the pump track could be constructed
1:17:59and would be constructed if for some
1:18:01reason the West Side Trail was not able
1:18:03to move forward. That that site control
1:18:04already exists. Now, these are two
1:18:06complementary projects, but they they
1:18:08are The West Side Trail is one project,
1:18:10the pump track is another project, but
1:18:11they complement each other. Um but just
1:18:14I wanted to answer your question about
1:18:15the site control piece.
1:18:17>> Okay.
1:18:18Well, it just feels really half-baked.
1:18:21It's like this is not a real plan. You
1:18:23know, there's no consideration for like
1:18:25public use of this. I mean, everyone in
1:18:28this room is looking at that and saying,
1:18:29"What am I going to do there?" You know
1:18:31what I mean? How do you How do you ride
1:18:32that?
1:18:33>> This is a concept. This is It would
1:18:35require community engagement. This was a
1:18:38uh a draft. No way would we just put
1:18:41this in. We would go to you all to do
1:18:44community engagement, understand what
1:18:45are the needs, what do you want, what do
1:18:47you you know, how do you ride it? We
1:18:51would come to you, the experts.
1:18:53>> I wish there was community engagement
1:18:54before there was a planning board
1:18:55meeting. You know what I mean?
1:18:57>> I mean, we did meet with TNT.
1:18:59>> I don't even know.
1:19:01I don't know what community is.
1:19:02>> Are you guys from
1:19:05>> Could you come up here?
1:19:07Introduce yourself.
1:19:08>> Sorry. Thank you.
1:19:08>> Okay. Thank you, Ryan.
1:19:10>> We don't want you to speak, but let me
1:19:12just say this, right? And please don't
1:19:14beat me up, okay? Because I'm going to
1:19:16ask a really ignorant question because I
1:19:19have no clue about the I don't have a
1:19:21bike. Never had a bike, okay? So, let's
1:19:23be real.
1:19:25It's down what? The block? That they're
1:19:28proposing moving it?
1:19:29>> Mhm.
1:19:30>> On the
1:19:31>> opposite side of Light Art Park. Same
1:19:35Yeah, same.
1:19:38>> Well, okay. Right, cuz I'm trying to
1:19:40understand because I'm I'm trying to
1:19:42understand um
1:19:45because [clears throat] it's all within
1:19:46that same little area, correct?
1:19:52>> Come [clears throat] on, Rick.
1:19:53>> Come on, Rick, so we can hear
1:19:54>> Where they're talking about putting the
1:19:55>> No, Rick, you have to speak into the
1:19:56mic. Sorry.
1:19:58Apologies, sir. Just give us 1 second.
1:19:59[clears throat]
1:20:00>> Where
1:20:02where they're talking about putting the
1:20:03police parking lot where the current
1:20:04pump track is, that's that side of the
1:20:06track of the park. Where they're talking
1:20:08about this track right now, that's where
1:20:11the current parking is for Light Art
1:20:13Park. So, if you have a police parking
1:20:15lot over here and a pump track pump
1:20:18track that goes over the current parking
1:20:21for the park over here, that equals zero
1:20:23parking for the park.
1:20:26So, this I think this is just what they
1:20:28had to come here with. I don't think
1:20:29this would be the location. I don't
1:20:31think there's a location selected yet.
1:20:33>> Wait a minute, come back cuz I'm trying
1:20:34to understand I'm trying to visualize.
1:20:35So, you're saying where Light Park is
1:20:38next to Fun Citos, right?
1:20:40>> No, Light is down the street.
1:20:41>> I mean not not like that. But, that
1:20:44Right diagonal, you're saying where
1:20:46they're going to move
1:20:48the new park, there will be no parking.
1:20:50Is that what you're trying
1:20:51>> Yeah, if they go over where the current
1:20:53pump track is with the police parking
1:20:55lot, only the police can use that. So,
1:20:57then this
1:20:58pump track here that they're proposing
1:21:00goes over the only parking
1:21:03that the park has right now.
1:21:07So, there will be no parking for the
1:21:09park or the pump track.
1:21:11>> Only parking for the public
1:21:13>> Okay, wait a minute. We got Just go We
1:21:15want to hear from everybody, but
1:21:16let's do it in order.
1:21:18So, that would be the only parking. And
1:21:20how many parking spaces is available
1:21:22now?
1:21:23>> It In Light Park Park? Um there's a
1:21:25couple handicap or couple ADA, and it's
1:21:29just a stone dust
1:21:30temp- It's just a stone dust parking
1:21:32lot.
1:21:33>> So, we really
1:21:35is
1:21:35>> That it The The ADA spots are paved, and
1:21:39the the other parts are still stone
1:21:41dust. There's probably
1:21:43I don't know.
1:21:45>> [clears throat]
1:21:45>> Ten
1:21:46Ten Ten spots, maybe.
1:21:48>> do you think you need?
1:21:49>> If we have a pump track there?
1:21:50>> Yeah.
1:21:51>> You can have people from all over. If If
1:21:53we have a pump track the way we're
1:21:54building it
1:21:55>> I want people from all over, but I also
1:21:57care about the people that live in this
1:21:58community. Syracuse I do, too. So, that
1:22:00is my first priority, people that are
1:22:02from the West Side, from the whole city
1:22:04of Syracuse that are paying for this
1:22:06pump track.
1:22:06>> That's the best part about
1:22:07>> I'm curious. That's why I
1:22:08[clears throat] want to know how many
1:22:09parking spots do you think overall do
1:22:11you think you would need?
1:22:12>> [clears throat]
1:22:13>> Um
1:22:15Here's I don't know how to tell, but
1:22:16I'll tell you this is the one thing
1:22:17about having a pump track in this
1:22:18location is that West Fayette Street is
1:22:21a funnel for the Near West Side, the
1:22:24Park Ave neighborhood, Tip Hill,
1:22:26Strathmore, and everybody else funnels
1:22:28right down through there.
1:22:30You can ride your bike here.
1:22:32It's awesome. You don't need your
1:22:33parents to drop you off. You want to go
1:22:35out to Onondaga Lake skate park? Your
1:22:37parents have to drop you off. You want
1:22:38to go over here? Your parents got to
1:22:40take you. You want to go over there? You
1:22:41got to go This stretch of West Fayette
1:22:43Street
1:22:45uh
1:22:46it's a corridor, and one of the best
1:22:48things about it is that it belongs to
1:22:50everybody and nobody at the same time,
1:22:52meaning anybody is welcome here. It's
1:22:54the best part. It's centrally located,
1:22:56and any kid in the city could just ride
1:22:58over to
1:22:59>> that's where I'm confused, because for
1:23:00me, it's only it's moving down the
1:23:03street, right?
1:23:06>> You're eliminating
1:23:08>> Wait, no. We can't have If you want to
1:23:11talk, just come up here so we can hear
1:23:12it, and then we can
1:23:14Well, then come to the mic. We're not
1:23:16yelling, or we're not going to listen.
1:23:17Come to the mic so you introduce
1:23:18yourself so we can hear.
1:23:20Thank you.
1:23:21>> The one difference between this site, so
1:23:23A, there's zero parking now for the
1:23:25entire art park if you put it on top of
1:23:27parking.
1:23:27Um the other thing is that the site was
1:23:30chosen in
1:23:31collaboration with Stewarts of Light Art
1:23:33Park, and we talked to everybody that
1:23:34would pick up the phone or answer their
1:23:36door. And the place that the current
1:23:39pump track is, it's back, it's
1:23:40protected. Your kids can go play.
1:23:43They're not going to wander into Fayette
1:23:44as people You tried People tried to put
1:23:46a stop sign in in there. Nobody stopped.
1:23:48So, like it's
1:23:50I appreciate the support, but it just
1:23:52doesn't make sense.
1:23:53>> Okay, come back. I got a question,
1:23:54right? So, both for anybody. I mean,
1:23:57anybody wants to ask a question, right?
1:24:01So, if if you
1:24:03First of all, let me tell you something.
1:24:04I am a sports person. I love activity. I
1:24:07am Nobody in this building is more of a
1:24:09a park person I am.
1:24:11Just letting you know that, right? So,
1:24:14and I rode bikes.
1:24:15I love it, right? And I And I want our
1:24:17children and I want our community to be
1:24:18active. So,
1:24:20that is a definitely a concern.
1:24:22But, I want to know from you guys, if
1:24:24the parking lot had to come over, is
1:24:27there anywhere else or something that
1:24:29you would guys want to come to agreement
1:24:32to say, "Okay, look."
1:24:34Right? We We just got to hash hash this
1:24:36out. Is there something that we can come
1:24:37to agreement so we can meet everybody's
1:24:39meet needs? What would that look like?
1:24:41>> And as as the as the commissioner said,
1:24:44this is a concept. So, when she said
1:24:46she's going to be coming back out and
1:24:48having a conversation, is there
1:24:50something that you guys would want to
1:24:51see moved or how you would want to shape
1:24:53it or or what?
1:24:56>> This won't fit where they're
1:24:58going to
1:24:58>> You can't do both here.
1:25:00>> You don't have to be stressed out
1:25:01between the four options.
1:25:02>> We've been planning this thing and
1:25:03working on this thing for 10 years.
1:25:05We're not going to be able to answer
1:25:06that tonight. We've taken into so many
1:25:08voices and so much consideration.
1:25:10There's it's impossible to give you a
1:25:11straight answer tonight. Um the support
1:25:14is appreciated, of course, but um it has
1:25:17evolved organically and that's the magic
1:25:19of it. Um
1:25:21I I want to let other people speak.
1:25:23>> I I have I have a follow-up question
1:25:26about
1:25:26>> what he's saying.
1:25:27>> I I I think Rick Rick
1:25:29>> Thank you for your patience. Just don't
1:25:30>> to ask you a question. So, so the
1:25:32current where the where the track is
1:25:34now, right? Where you guys are using,
1:25:36how many parking lot are there?
1:25:38>> Uh it's maybe like maybe like 10 spots.
1:25:41But, the other thing is that the park
1:25:42gets really squeezed there, right? So,
1:25:44if you put a pump track there, you're
1:25:46between um you're between the road and a
1:25:50and the the train fence. It gets really
1:25:52narrow.
1:25:52>> 10. And you would What you were saying
1:25:54is if if it was moved, not only is there
1:25:57a safety concern, but you would also
1:25:59lose the 10 parking spaces.
1:26:01>> Correct. Exactly.
1:26:04Yeah, and if my kids are going to be out
1:26:05there, I don't want them like
1:26:0715 ft away from West Bay Street cuz
1:26:09people get whipping down there pretty
1:26:10quick.
1:26:10>> So, safety and parking are a concern.
1:26:13>> nestled in that back area where like uh
1:26:15Randy was saying,
1:26:16we put a lot of thought into that. It
1:26:19All these guys All these people build
1:26:21tracks, ride tracks, do all this stuff.
1:26:23And uh we put a lot of thought into this
1:26:24that and most of us have kids now. And
1:26:28um
1:26:28uh
1:26:29that matters safety matters a lot to us
1:26:32and the fact that it's tucked back to
1:26:33where it is right now, that's that's
1:26:35what
1:26:37by design. [clears throat]
1:26:37>> a quick question.
1:26:38Rick, a quick question.
1:26:39>> come back to town hall at some point?
1:26:41>> Okay. Just a quick question for you. Um
1:26:43how many events are happening at Mike
1:26:45Park per year? And what kind of events
1:26:47are you having?
1:26:48>> Uh we do um
1:26:50it it takes a while, but we do basically
1:26:52um
1:26:53rotating um
1:26:55just uh public art, murals, or
1:26:57sculptures, or things like that. It was
1:27:00kind of dead during COVID and then in
1:27:02the last couple years
1:27:03um we started doing regular rotating
1:27:06events there. But it's not just about
1:27:08events. You're really about um creating
1:27:10a a space with a lot of public art and
1:27:13um
1:27:13getting people out to look at that, but
1:27:15having this pump track here, that's one
1:27:16of those things that will really help
1:27:18bring a lot of activity to the park and
1:27:20more people there.
1:27:21>> Okay. Thank you.
1:27:22>> Yeah, it's everything Every one of these
1:27:24components contributes
1:27:25>> I just was wondering how many things you
1:27:26do there a year.
1:27:27>> Uh but every every one of these
1:27:29components adds another thing to it that
1:27:31makes it better every time.
1:27:32>> Yeah.
1:27:33Thank you.
1:27:34Thank you for your patience, too.
1:27:36>> Hello, you guys. I'm Marty um
1:27:38Schweizer hand,
1:27:39uh your local skate rep.
1:27:42Um
1:27:44now I grew up with um no no skate parks
1:27:48and then um Onondaga
1:27:51town came through and built a um
1:27:54Liverpool skate park and it was supposed
1:27:57to be open for the skaters to
1:27:59um
1:28:00to facilitate uh companies come out and
1:28:03build and you guys didn't you guys had
1:28:06uh
1:28:07the
1:28:09uh utilities department handle that um
1:28:13and it failed. Um
1:28:15And then
1:28:17you guys
1:28:19took a little while to build Eastwood
1:28:22and
1:28:23we really enjoy it but it's too small.
1:28:26So we took it over and we built a DIY
1:28:30and I guess that's the way we got to do
1:28:32things around here to get
1:28:33things done the way skaters want it and
1:28:36the way bikers want it and the way the
1:28:37people want it. Um
1:28:40I don't know what else to say. Uh
1:28:42you guys already fumbled the money once
1:28:46with the Liverpool Park and you already
1:28:49fumbled the money
1:28:50once with
1:28:53Yeah, but you guys
1:28:56uh Okay, well you fumbled money on this.
1:28:58Um
1:29:03You guys you guys fumbled the money
1:29:05because you said you guys were going to
1:29:07pave it.
1:29:09You guys fumbled the money
1:29:10because you guys said you were going to
1:29:11pave it and you never did and now it's
1:29:14in shambles. So
1:29:17That's all I have to say. Thank you.
1:29:35When I was building it they were all
1:29:37saying that oh yeah we're going to have
1:29:39it paved and
1:29:42No, this one. The pump track. Yes.
1:29:46Um
1:29:48Probably like 3 years to I don't know
1:29:51how long it was.
1:29:53Well, the pump track came in in 2021.
1:29:56Right?
1:29:58That was the grand opening. Yeah.
1:30:00Um
1:30:02So it's really hard to to trust you guys
1:30:04with money that we know that you're
1:30:07going to just
1:30:08fumble, you know? And we we kind of know
1:30:12what we're doing here. We have
1:30:13connections in the skate companies, in
1:30:15the
1:30:16biking companies. We can get the people
1:30:19right to build this park.
1:30:22And you guys just
1:30:23>> So, I respect your comment and I really
1:30:25want to help. I really want to listen,
1:30:27but when you say you can't trust and you
1:30:30you fumbled and you're saying that we
1:30:31did it and we've never had a
1:30:32conversation. I take that really
1:30:34seriously because we've never had a
1:30:36conversation and I know nothing about
1:30:38you wanting to skate, right? So, this is
1:30:41why we have dialogue, right? But for you
1:30:42to say we fumbled and we're careless
1:30:44with money, I don't I don't think that's
1:30:46fair for to me or my colleagues because
1:30:48we care.
1:30:49>> I just want to know that we've been
1:30:51working closely over the last since I've
1:30:53been here the last 2 years to work with
1:30:55uh specifically the skaters.
1:30:58Um we've been working closely with Mike
1:31:01to A work on expanding the Eastwood
1:31:04skate park. Um and so, I just want to
1:31:07make sure that I know and mention that
1:31:08we have been listening. I have been, I
1:31:10know Josh has been. We've been sitting
1:31:13with um a group of folks planning out
1:31:16the expansion of Eastwood um skate park.
1:31:18We've also Excuse me, Kirk. Um we're
1:31:22going to build one in Kirk Park. Mike
1:31:24has been on our team instrumental. We
1:31:27have a ramp currently at Kirk Park so
1:31:30that kids in that community could
1:31:32utilize it. We could see, you know,
1:31:34we've been sitting back watching to see
1:31:36how many kids come out and played on the
1:31:38ramp with their skateboards and it's
1:31:40been amazing. And so, we are listening
1:31:42and we do support you all.
1:31:45>> Um I just want to stand up here and
1:31:47support what he's saying because um
1:31:49people like who are out creating good
1:31:52positive energy in the community, they
1:31:54don't have time to come to meetings.
1:31:56They don't like I want I'm
1:31:58I don't I don't want I said in one of
1:32:00the emails I sent cuz I didn't know if
1:32:01I'd be too shy to speak it, but like
1:32:03>> You're not shy. Let's go.
1:32:05>> people
1:32:07People who know how to do this, they
1:32:10don't spend their time going to every
1:32:12TNT meeting. They don't know where those
1:32:14calendars are. So, that was the role
1:32:16that I played for a little while to be
1:32:17like, "Hey, you. You got that skill. I
1:32:20know I know you want this for the town,
1:32:22and we're going to do it." And so, when
1:32:23he says "You guys fund with the money."
1:32:26Like, that's representative of the
1:32:28perspective of people who they people
1:32:31I don't want to speak for you, but like
1:32:32people don't get that support. So, they
1:32:34don't expect that support. And so, when
1:32:37the institutions that have these
1:32:39decision-making powers
1:32:41um continue to create subpar experiences
1:32:44for kids who are just trying to find
1:32:46something fun to do after school, like I
1:32:48feel like that was maybe more
1:32:50representative of what he's saying, not
1:32:52personally to you
1:32:53>> We don't We don't create
1:32:55that.
1:32:56>> No, I know. So, that's what I'm saying
1:32:57in the process. We don't create it at
1:32:59all.
1:32:59>> And that's what I'm saying, like
1:33:00>> I understand that.
1:33:01>> These folks
1:33:03These folks, like nobody wants to be
1:33:05here tonight. Like, we just want nice
1:33:06things for our community, and nobody
1:33:08knows who does what.
1:33:09>> So, I want to appreciate it. I do want
1:33:11to We have a couple more people who
1:33:12haven't spoken yet. Um
1:33:14>> So, one of the things I would like to
1:33:15say is us under breaking down how this
1:33:18process works. And the second is say
1:33:21everyone wants the community right. If
1:33:23nobody don't know me, you should get to
1:33:25know me. I'm one of the people that will
1:33:27fight for our kids. I want our kids to
1:33:29have I want the community
1:33:30[clears throat] to have. So, it's not
1:33:31that we're against any park. We want to
1:33:33see it right, but we want to come
1:33:34together and not say, "Well, no one's
1:33:36listening here, and we want this." Kirk
1:33:38Park want Eastwood want Mountain View,
1:33:41right? We've been trying to get things
1:33:42going there. we have so many
1:33:44parks, and we we have so much greenery
1:33:46and great places in our community. We
1:33:48want to work together, but we got to be
1:33:50able to talk together and not say, "You
1:33:52didn't do it." And that that And
1:33:53sometimes things happen that we don't
1:33:54always agree on, right? But if it fits
1:33:57the rest of the 130,000 people,
1:33:59sometimes that's what happens. So, I
1:34:01just wanted you to understand that, too.
1:34:04Thank you.
1:34:04>> Hello, Jeff Bulaski, business owner in
1:34:08the area over there. Uh the attraction
1:34:10to the area is that the art park and
1:34:14like Rick's building attracts artists. I
1:34:17own a recording studio. I have artists
1:34:19come.
1:34:20I have
1:34:21That's what it's about over there.
1:34:23I love the fact that the police moved
1:34:25over there, but something if there's 435
1:34:28spots needed
1:34:30or so,
1:34:32when I bought my building, I made sure I
1:34:34had parking spots.
1:34:37And
1:34:39I keep thinking about this Gettysburg
1:34:41Plaza. Now, when
1:34:44a few years ago, I believe that was up
1:34:46for sale. Is it still up for sale?
1:34:49The quick fix would be buy that,
1:34:52bulldoze that crap building,
1:34:54and there's your parking.
1:35:00>> Thank you, Jeff.
1:35:01>> Nobody cares about that plaza.
1:35:04>> Well, you guys don't.
1:35:06>> Well, what's in it?
1:35:07>> I don't know, but then we'll get another
1:35:09group to say different.
1:35:10>> You Are you talking about the one next
1:35:12>> I don't want to cut you off. I just it's
1:35:147:00 and I want to get permission from
1:35:16everyone to go another 5 minutes.
1:35:17>> What Are you talking about the plaza
1:35:19next to PSLA?
1:35:20>> Get Gettysburg Plaza right there. They
1:35:23They had the A&P in it at one point.
1:35:25That's all I had. 90% of it's vacant
1:35:27right now. Am I right, Rick? I mean
1:35:31A lot of it's vacant.
1:35:33Buy it and level it.
1:35:35And that would be the most perfect
1:35:37thing. And then in then in a few years,
1:35:39save up some money,
1:35:41build a second story structure to it.
1:35:43That would be the most awesome thing
1:35:46that you could do for this whole thing.
1:35:47Cuz the art park
1:35:49is represent- representative of what a
1:35:52lot of people are over there for. Thank
1:35:55you all. Peace.
1:35:56>> much.
1:35:57>> Thank you.
1:35:57>> Okay, we got we got a couple more
1:35:59people. We're going to go
1:36:0110 more minutes over if that is the
1:36:04consensus.
1:36:05>> going to be like 3 minutes. I'm going to
1:36:06tell you right now.
1:36:06>> Okay.
1:36:07I did want to just make one quick thing.
1:36:09>> Yeah.
1:36:10>> Um
1:36:11Brian, a couple sentences ago said that
1:36:14how is the current
1:36:16park into current pump track in terms of
1:36:18size? Is it good? Thumbs up? Is it too
1:36:20small? Thumbs down?
1:36:22>> Small.
1:36:23The current pump track?
1:36:24>> Current pump track.
1:36:25>> I I think I'd love for it to be bigger.
1:36:27>> Okay.
1:36:27>> Mhm.
1:36:28>> All right, thank you.
1:36:30>> [clears throat]
1:36:31>> Um
1:36:32when I say city, I'm not talking about
1:36:34you guys. I'm talking about
1:36:35administration, okay? You guys did
1:36:38nothing wrong here, okay?
1:36:39>> I don't need to be scared.
1:36:41>> [clears throat]
1:36:42>> Uh
1:36:43today is important.
1:36:45Uh today is important and it's about a
1:36:47lot more than just a pump track. Um
1:36:49after all these years of conversations
1:36:51on the community plan for a bigger,
1:36:53better paved pump track and an arts
1:36:55district, the city and SPD say, "Nope,
1:36:57we're going to build a police-only
1:36:59parking lot here."
1:37:00Uh I'm telling you this now, do not let
1:37:03them placate you with more promises.
1:37:06Uh you heard that the city has uh
1:37:09committed up to $300,000 towards a new
1:37:11pump track somewhere else.
1:37:13Pay attention to those words, up to
1:37:16300,000.
1:37:17We never asked for money to move our
1:37:19pump track somewhere else. We were
1:37:21already exploring ways to design, fund,
1:37:24and build a much bigger paved pump track
1:37:27with professional builder builders like
1:37:30VeloSolutions,
1:37:31uh community involvement, and
1:37:33fundraising right here. We were We were
1:37:36just waiting for the okay from the city
1:37:39to pull the trigger for us to start that
1:37:41process.
1:37:43We were not just hanging out. We were
1:37:46waiting to get the okay, and then we
1:37:48were going to launch this next big
1:37:50thing.
1:37:51Um
1:37:52the city has also told us that we're not
1:37:55really losing a pump track because
1:37:57they're just going to build us another
1:37:58one in a different location. Really?
1:38:01You really think they will? After
1:38:03everything that's happened over the last
1:38:054 years, why should we trust that the
1:38:07city now? They want us to give up
1:38:10everything we've worked for first, tear
1:38:13out our existing pump track, and then
1:38:15trust that they'll follow through on
1:38:17something somewhere else somewhere
1:38:19sometime later. Fool me once, shame on
1:38:22you. Fool me twice, shame on me.
1:38:24Would you like to know my favorite
1:38:26option for a new police parking lot?
1:38:28Right at the corner of Erie and South
1:38:30Street, 801 West Erie Boulevard, and
1:38:33I'll tell you why. Because if they build
1:38:35the parking lot right there, then maybe
1:38:38the city will finally make the
1:38:39improvements to the sidewalk under the
1:38:41South G Street underpass that they've
1:38:43been telling the community they were
1:38:45going to do for the past 20 years.
1:38:52And understand this.
1:38:54The location is part of the point. The
1:38:57The sculptured pump track, Light Bar
1:38:59Park, the surrounding studios,
1:39:00businesses, and the people that um are
1:39:03what make this place special. Moving one
1:39:06piece somewhere else does not preserve
1:39:08what we're trying to build together
1:39:09here. We're asking for the city to
1:39:12recognize that potential and study what
1:39:14it could mean for the whole region
1:39:16before making a permanent decision that
1:39:18takes part of that away.
1:39:21Our three goals. Number one, to stop the
1:39:23proposed police pump track from being
1:39:25built at 115 South G Street over the
1:39:29current pump track location. Number two,
1:39:32move forward with the community-led
1:39:34design and construction of a new paved
1:39:36pump track
1:39:37at its current [clears throat] location.
1:39:39The community must lead the planning,
1:39:42design, and development.
1:39:44Um and number three, request a formal
1:39:46economic
1:39:48impact study of creating
1:39:50a recognized Westcott Arts and Cultural
1:39:53District. We want to explore what a
1:39:55coordinated district could mean for the
1:39:57neighborhood, the city of Syracuse,
1:39:59Onondaga County, Central and Central New
1:40:01York as a destination.
1:40:03If the city and SPD push this
1:40:05police-only parking lot through over the
1:40:09objections of the people who live, work,
1:40:11create, and ride here, they will be sent
1:40:14they will be sending a clear message to
1:40:16the bike community, the arts community,
1:40:19local businesses, and neighborhood
1:40:20residents.
1:40:22Sit down and shut up.
1:40:24Giving us a public hearing means nothing
1:40:27if our input cannot change the outcome.
1:40:30I'm asking the counselor
1:40:31>> a public hearing because otherwise we
1:40:33would have had to advertise it in
1:40:34advance. You are over time, just putting
1:40:37that out, all right?
1:40:38>> One more thing. I'm asking the council
1:40:40to stop this parking lot at this
1:40:41location, insist on a serious review of
1:40:44the alternatives, and work with the
1:40:46community
1:40:47on the three goals above. We deserve
1:40:49more than another promise. We deserve a
1:40:52meaningful say in the future of our own
1:40:55neighborhood.
1:40:56>> Thank you very much.
1:40:58>> [applause]
1:40:59>> Okay, last couple speakers.
1:41:03Do you have something to say? Come up.
1:41:05I also want to point out while
1:41:06somebody's walking to mic that we did
1:41:08get written comments. They are going to
1:41:10be circulated to uh Common Council and
1:41:13Mayor's office.
1:41:15>> Hi, I'm Charlie Sam. I do art stuff.
1:41:17I've been part of the community,
1:41:19specifically that neighborhood, for
1:41:21about 30 years.
1:41:23For about 20 years, a group of us, I'd
1:41:27say between 10 and 20 people over the
1:41:30years, have been active in developing
1:41:32Light Art Park.
1:41:34The pump track in its current location
1:41:38and footprint is a part of the art park
1:41:42and is part of that. Currently, this
1:41:44plan that's being proposed would
1:41:47effectively eliminate the pump track.
1:41:51The proposed relocation and
1:41:54redevelopment at the other end of the
1:41:56lot is inappropriate. It would eliminate
1:41:59the current existing parking for Lipe
1:42:03Art Park.
1:42:04In addition to that, I believe that the
1:42:07construction of the police parking lot
1:42:09is not necessary at that location.
1:42:13Others have spoken very eloquently about
1:42:16the availability of other spots. Thank
1:42:19you.
1:42:20>> Thank you. Thank you.
1:42:22>> [applause]
1:42:23>> One second. Do we have any Do we have
1:42:24any speakers who haven't spoken yet?
1:42:27Come on up.
1:42:32A tall people around here. I'll just
1:42:34yank it down here. Yeah.
1:42:35Uh good afternoon. My name is Kira
1:42:37Crawford. I'm a city of Syracuse
1:42:39resident. I am an avid bike rider and
1:42:41user of the pump track where I have
1:42:43really enjoyed spending time. It's a
1:42:44great opportunity to learn and to be out
1:42:47in the community. And I also just want
1:42:49to express my gratitude for every single
1:42:50person in this room who shows up tonight
1:42:52because I know that everybody cares
1:42:54about the future of the city and the
1:42:56residents in it. And that means a ton.
1:42:58Uh
1:43:00So, I I wanted to A lot of people in
1:43:03here know the logistics of this pump
1:43:05track better than I do. So, I'm not
1:43:07really going to double down on any of
1:43:08those pieces. I do want to note the
1:43:09safety concern coming in and out of that
1:43:13driveway, that street, it is
1:43:16frightening. It is frightening. I had a
1:43:18kid who was walking around town there on
1:43:20a regular basis, and it was it was
1:43:22really scary.
1:43:24So, I do think that there are some real
1:43:25safety concerns that need to be
1:43:27considered when it comes to trying to
1:43:28turn out onto Gettys that are just one
1:43:30of the reasons that make this not a
1:43:32great idea. But the other things that
1:43:33I'm hearing are a bit around trust. It
1:43:36is also around process. And Councillor
1:43:39Caldwell, I heard you say, "We just want
1:43:41to be able to talk about this together."
1:43:44And I think that that is really in some
1:43:46ways the crux of the problem here,
1:43:49right? Because what I'm seeing and what
1:43:51I'm hearing is there is an unceremonious
1:43:54bulldozing of community that has been
1:43:56cultivated in this space.
1:43:59And and that is a really big deal. There
1:44:02are people who have poured days and
1:44:04hours and love into those spaces. There
1:44:06are places around the world where people
1:44:08would pay for that, right? It is
1:44:12it's more than just a track. It is about
1:44:15something the community has built for
1:44:17community.
1:44:19So,
1:44:22There's a There's a great place in
1:44:23Siena, Italy, where they have actually a
1:44:25track, it's a racetrack in the middle.
1:44:26And every single community has its own
1:44:28flags and its own colors. And people
1:44:30come out enthusiastically and
1:44:32energetically, not necessarily because
1:44:35of the race that happens one time a
1:44:36year, but it's because of the community
1:44:38that environment that it generates. So,
1:44:40I just want to say, if we could please
1:44:42keep that in mind, and it the adage
1:44:44that, you know,
1:44:46"If you want to go fast, go alone. And
1:44:48if you want to go far, we should be
1:44:49doing this together." If we could just
1:44:51please keep on that track, literally,
1:44:54figuratively, moving forward, be much
1:44:56appreciated. Thank you.
1:45:00Anybody else have a chance need a
1:45:02chance?
1:45:03>> I will note the $300,000 is earmarked
1:45:06and marked for Light Bar Park. It is not
1:45:08up to 300,000, it is 300,000 for Light
1:45:12Bar.
1:45:15>> Any other questions from counselors?
1:45:24>> My name is Andrew Bose. I've worked in
1:45:26downtown Syracuse for 30 some odd years.
1:45:28I live in Baldwinsville, New York. First
1:45:30thing I would like to say to everybody
1:45:31in this room, thank you so much for
1:45:33showing up because it's the people that
1:45:35show up that care. They're the ones that
1:45:37make a difference. Um, what I see, um,
1:45:42I've become more of a bike rider in the
1:45:44past 5 to 7 years than I was as a youth.
1:45:47I'm 66 now. I'm more fit now than I ever
1:45:50have been because of my activities by
1:45:53biking. I'm also a creek rat. I'm very
1:45:55busy and active within that corridor.
1:45:58So, in the face of this, what we see is
1:46:00a city taking away an organically grown
1:46:05piece of the community
1:46:07because this pump track is a core part
1:46:10of Lake Park, which was an organic
1:46:13creation from the community. The people
1:46:16that lived in that neighborhood, they
1:46:18put their sweat into this. And that's
1:46:20what makes it so difficult for when a
1:46:24agency, so to say, the police department
1:46:26has to come in and say, "Hey, we need
1:46:29this for our stuff. Sorry, we're going
1:46:32to do the best we can over here."
1:46:35Great. That's a great beginning. All
1:46:37right, but it's a long conversation.
1:46:40Right now, we already have police
1:46:42department vehicles parked offsite down
1:46:45on Erie Boulevard. How far away was that
1:46:48from the
1:46:50police department on State Street? Okay,
1:46:53there was quite a bit of distance
1:46:54distance there.
1:46:56Is there an opportunity to create a
1:46:59situation where uh we utilize the West
1:47:04Fayette and
1:47:06West Street
1:47:08lot right now that is a vacant lot.
1:47:12That's one large block away from the
1:47:15police department. Make that a secured
1:47:18lot. This has already got parking lots
1:47:20around it. It's not going to fight the
1:47:22neighborhood. It's a new idea. Yeah,
1:47:25transportation's going to have to be
1:47:26involved. One of the things we talked
1:47:28about, I think I heard from Eric saying
1:47:30that this parking lot may ultimately be
1:47:34for a building. Did I hear that correct?
1:47:37>> Was the reference to that was related to
1:47:40one of the ideas suggested around Erie
1:47:42Boulevard West
1:47:43>> Okay, I don't want to complicate the
1:47:45issues.
1:47:46Um,
1:47:47but it's not an easy solution, but the
1:47:50fact that everybody got in the room, got
1:47:51together, got to hear everybody's
1:47:53concerns is a really great step and
1:47:55thank you very much for taking the time.
1:47:57>> Andrew.
1:47:57>> Thank you.
1:47:59>> All right.
1:48:00>> I'm calling
1:48:01>> Yep.
1:48:02All right, with that we're going to
1:48:02close the meeting. Thank you all for
1:48:04being here today and joining us for the
1:48:06joint public safety and parks, I don't
1:48:08remember what we called this, meeting.
1:48:09Close enough. All right, thank you,
1:48:12everybody. If you have written comments,
1:48:14we will receive them. We did get, again,
1:48:16emails. Thank you all.