2026-09-23 - Common Council Study Session
Summary
Built from the video's auto-generated captions; names and numbers may be misheard. The page links the draft agenda book for the 2026-09-28 regular meeting, which was not read.
- Councilors walked through items for the 2026-09-28 regular meeting, including an announced public meeting on a citywide moratorium on battery energy storage systems. See Battery Energy Storage System Moratorium.
- A later item would amend that moratorium to allow small-scale accessory battery systems at residences while keeping the large-scale moratorium in place.
- An engineering contract amendment of $72,850 for added survey work on the Outer Eastwood sanitary sewer rehabilitation brings that contract to a total not to exceed $1,147,850.
- A $55,283 amendment would close out the Brookford, Guilford and Westminster pump station project; discussion covered contractor restoration problems and new contracts with 20-day restoration requirements.
- Water items included a $275,000 transfer for fire hydrant replacement, along with other capital equipment, security and valve repair transfers. The fire chief said changing hydrant threads to a national standard would be very costly, so adapters are used.
- Deer and tick management items included an agreement not to exceed $90,000 for the December to April season, a meat processing agreement, and a negative declaration for the program. See Tick and Deer Management Program.
- A $150,000 authorization for youth center furniture was discussed, along with a state reforestation grant application not to exceed $3 million with no local match.
- Other items included an agreement with an animal rescue for veterinary and lodging services in animal cruelty cases and a $10,000 uniform voucher program.
- Several items were noted as being held for more information, and some matters would be taken up in executive session. No votes were taken in this study session.
Agenda
Agenda not yet posted.
Sources
- Meeting page: https://www.syr.gov/Departments/Common-Council/Committees/2026-Meetings/2026-09-23-Study-Session
- Video: https://www.youtube.com/watch?v=8rMKQu0pSj8 (City of Syracuse YouTube channel)
- Public meeting calendar: https://www.syr.gov/Boards-and-Commissions/Public-Meeting-Calendar
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
05:29It is now 12:00. Thank you for joining
05:31us at our study session. Let's see. Uh
05:38the uh item number five, there will be a
05:40public meeting relative to the agenda
05:42item number 40 uh to adopt a citywide uh
05:47month's moratorum on battery energy
05:50storage systems.
05:52Moving on, council.
05:55Thank you, Madam President. Lesson to
05:57all today. Um, I have item A
06:05and 11
06:08council. Hey, Cory, you know, I need
06:10that um before Monday. Going to need the
06:13signed contract
06:14>> because we haven't gotten that.
06:15>> Need the sign TA?
06:17>> Yeah, okay. Before you all come,
06:19>> it wasn't submitted with the
06:20legislation. Okay.
06:21>> Not the sign.
06:22>> Okay.
06:25>> Y Thank you.
06:26>> Thank you. So, that's it. That's just
06:28about this. We're all set for this
06:30agreement.
06:30>> Yes. Yes. This is just um the local law
06:33because it's going to reflect the prior
06:35fiscal year. So that's why there needs
06:36to be a local law associated with the
06:38agreement.
06:40>> Okay.
06:41>> Okay. Yeah.
06:44>> All right.
06:44>> Thank you, counselor.
06:46>> Okay. Uh number 10. Uh we'll wait until
06:49Monday.
06:50>> Yep. We know Monday.
06:51>> All right. Uh and councelor Catwell
06:53again. So it's the same
06:55>> it's the same thing with the labor
06:56agreement. wage increase.
06:58>> Any questions from anyone? No.
07:01>> Thanks.
07:02>> I don't have any questions. All right.
07:04Thank you.
07:04>> Thank you. Thank you, Rashid. Councelor
07:07Monto for Councelor Majoke.
07:08>> Thank you, President Piaga. Councelor
07:10Majoke has items 12 through 23.
07:15>> Hello, Commissioner.
07:17>> Good afternoon, counselors. Uh 12 is a
07:20uh an agreement with the state to help
07:22out with uh uh our snow removal. Um this
07:27is during emergency uh situations where
07:31we have all hands on deck and we need
07:32help. So this doesn't mean that they're
07:35going to give us drivers or anything.
07:37They're just going to take over some of
07:39their routes like West Tennessee, Erie
07:41Boulevard, UAE,
07:44those state routes. And if we need salt.
07:49>> So, Commissioner, how many cloud drivers
07:51do we have on hand right now?
07:53>> I can tell you how many we don't have.
07:55>> Well, I know how many we don't have.
07:58[laughter]
08:00>> Um, I'll get that number to you. I'm not
08:02sure off the top of my head,
08:03>> but
08:06>> questions on that one. Okay. Well, for
08:08sure. If we do take over the state
08:10routes during these emergency events,
08:14are we compensated for for clearing
08:16them?
08:17>> No, they're going to help us out.
08:18>> They help us.
08:23[laughter]
08:27>> Help us.
08:29>> We need to have much better agreement
08:31now.
08:32[laughter]
08:34>> Okay. Anything else?
08:36>> 13.
08:36>> All right. 13. Uh this is to amend this
08:39ordinance here. Uh we we just forgot a
08:41vendor on the last time when we came and
08:44it was Fairbanks. We forgot.
08:46>> So we're just adding one more.
08:47>> Just adding another vendor. Yeah.
08:50>> 14.
08:57>> Hi Mary.
08:58>> Good afternoon councilors. Mary
09:00Robinson, city engineer. Item 14,
09:03requesting an amendment with an
09:04agreement with Barton and Ljudis for um
09:07some additional survey work needed for
09:09the Outer Eastwood sanitary sewer rehab
09:12project. This is a project where we're
09:14going to be uh lining sewers, doing some
09:18sewer separation, and um improving the
09:21sewers in that area.
09:24>> Have we started the project yet?
09:26uh we're in the design phase and we
09:28found some um
09:31existing conditions that we didn't have
09:33records of. So that's why we want to do
09:35additional survey work so that we have
09:37accurate information to put in our
09:39design documents
09:41um and don't have unanticip unfor as
09:44many unforeseen conditions.
09:48So we're asking to amend the contract by
09:51$72,850
09:53for a total not to exceed cost of
09:561,147850
10:01>> 15. Thanks Mary.
10:12>> Good afternoon counselors. Uh the first
10:14item we got number 15, we're looking to
10:17amend the contract with GHD for an
10:20additional 55,283
10:24um to close up these uh Brookford,
10:26Guilford, and Westminster pump station
10:28project um they're at the final end.
10:31We've had some extra cost due to doing
10:34additional lead service lines in the
10:36area with the leftover funding we had.
10:38So we have some additional costs for
10:41that project.
10:42Um,
10:44anything on that?
10:45>> We haven't expected and when it'll be
10:47completely done. What's the dream
10:49scenario?
10:50>> November 1st.
10:51>> Okay.
10:51>> That's my dream scenario. I was just up
10:53there today. Um, Guilford's complete.
10:56The only thing we'll have left on
10:57Guilford we'll do in the spring is plant
10:58some trees, decorate it up a little bit.
11:00Um, Brookford's in ready, you know, to
11:03be put online. Same with that. They just
11:05got to do a little paving up there. And
11:08um spring we'll do some tree planting,
11:11you know, decorated up and West Minister
11:13is being dug right now to be for the new
11:16pump station to be set underground. So
11:18that that project will be complete, too.
11:20I gave them to November 1st to have
11:21these all completed.
11:24>> Commissioner, while you're standing
11:25here, can I just ask a quick question?
11:27Are we doing a better job staying on top
11:28of the contractors? because I'm just get
11:30complaints all the time about how
11:32people's lawns are being left, how the
11:34streets
11:34>> being I know I know I know they pulled
11:36some crews from doing the drilling that
11:38tackle all the restoration. Um, we've
11:40been on top of them. I've been calling
11:42them every day. I've been going out to
11:44the job sites. My team have been going
11:45out to the job sites. Um, what happened
11:48was we kind of
11:50to keep moving forward with the lead
11:52service line replacements. We did a lot
11:53of service line on replacements during
11:55the winter months and I think they lost
11:57track of what they did during the winter
11:58months to go back and do the
12:00restoration. So areas have got got lost
12:03and then they're like working on you
12:05know completing the ones they were
12:06completing right away but forgetting
12:08about the ones that they did in say
12:10February. So, we've been going back over
12:13all them areas and sending them back to
12:15redo all the registration.
12:16>> So, there's no like there's
12:18[clears throat] not a like a written
12:20plan of what they did to where they're
12:21going and going back.
12:23I think they're they were trying to get
12:25so much done in a time frame because we
12:28gave them a time frame and they were
12:30trying to get so many service lines
12:31complete because we were required to get
12:33a certain amount requ [clears throat]
12:34complete through the you know our
12:36regulators that they were just moving
12:38forward replacing them and kind of got
12:40lost on the restoration but we're
12:42focusing more on the restoration now
12:44getting back into these neighborhoods
12:45and cleaning them up.
12:47on some um on some streets we have
12:50National Grid work and leadline
12:52replacement work and spectrum work. Is
12:55there any way that we can partner? So
12:57like National Grid is doing half of the
12:59you know they're repairing their
13:00sidewalks that they tore up but the
13:02leadline replacement folks haven't done
13:04theirs. Is there any way that we can
13:05partner just since somebody's there with
13:07asphalt or cement?
13:09>> So I believe we do road recon meetings
13:12>> on Wednesday mornings. I could speak to
13:15my team to try to coordinate with them
13:17on these meetings. Um it's hard to get
13:19everyone in the same area, right?
13:20National Grid kind of likes taking their
13:22property and doing their own thing and
13:25kind of
13:26>> so it's hard to work simultaneously
13:28together
13:30>> because we have such large scale
13:31construction going on in the same area.
13:33>> We pre didn't the city previously have a
13:35committee that facilitated that kind of
13:38inter agency collaboration?
13:40>> So we just
13:42the dig ones committee. Yes,
13:44>> we just got that back going. Okay.
13:45>> So, we they just picked that back up.
13:48>> All right. So, we senior staff just got
13:49more of that and and just um
13:52>> making sure the city line complaints are
13:54reaching you, right? When people are
13:56reporting that contractors are doing or
13:58not doing work
13:59>> and we have a direct line for them,
14:00right?
14:01>> Um we're building some, you know,
14:03moreformational packets to get to the
14:05residents so they can call direct so
14:07city line's not taking the load of the
14:08calls. Great.
14:09>> So, we're working on that right now.
14:11>> Okay. Thank you. So, I have off of the
14:13agenda, but um which I hate doing, but
14:15since you're there, one more thing, the
14:18JJ lane, you know, where they're
14:20dumping, you know,
14:22>> that's cleaned up. That's
14:24>> So, what I hear is that they spread it
14:25out instead of taking it out.
14:28>> I I know they showed me the receipts.
14:31They took out like 170 loads of
14:33material.
14:35>> Are you talking about burn?
14:36>> Burn it a
14:37>> Yeah, it's the material's gone, but they
14:39graded it and seated the whole thing.
14:41Did Did the property owner ask them to
14:43do that?
14:43>> I believe so. I I believe they said that
14:45was a contract they had with the
14:47property owner after their use that they
14:49had to grade it and seed it and turning
14:50into green space.
14:51>> Could that be a health issue because of
14:52what's in there?
14:54>> What? Excuse me.
14:54>> Could it be a health issue because of
14:57what we're dumping?
14:59>> Um to be quite honest, that's a private
15:02entity. They lease the property. The
15:04city has nothing to do with their
15:06contract with the property owner. That's
15:08something they negotiate. That's not
15:11anything we get involved in. I only got
15:13involved with it because you guys wanted
15:15it cleaned up and yeah,
15:16>> I pushed him to clean it up.
15:18>> Does the property owner understand that
15:19he can't lease that property to him to
15:22just dump material all over it or
15:25>> apparently he must not have or didn't
15:27care.
15:27>> Does he know now not to do it again or
15:29>> JJ loan JJ knows property owner?
15:33>> I haven't spoke with the property owner.
15:35I I don't know who the property owner
15:37is. I just know it was a lease contract
15:39between the contractor and them for a
15:41staging area. And normally staging areas
15:43are, you know, putting clean fill,
15:46putting, you know, pipe shoring
15:48materials and then when you're done,
15:50you're done, not a landfill.
15:52>> They're not cleaning them up. I got a
15:53call.
15:54>> Not a landfill. I I agree. They're using
15:56it as a landfill.
15:57>> Yeah, they're not cleaning it. But I
15:59want to ask another question in another
16:00vein. Um, and maybe Vinnie can help with
16:02that because when we talk about
16:04modernization and you're talking about
16:06not being able to keep track of what
16:07they did in the winter to now, is that
16:10any way we can, you know, correlate that
16:14in our modernization?
16:16>> Well, we kept track of what they did.
16:17So, we knew what they did for service
16:19line materials because they have to
16:20submit for payment apps. So, we know how
16:23homes they did and all that. That on
16:26their side of going back and doing the
16:28restoration is something they lost track
16:30of. We
16:31>> they lost track of it. The ones that get
16:33the complaints about it
16:35>> they and I'm working with them and
16:36enforcing them to keep better track of
16:38what they do and we're setting
16:40guidelines. So the new contracts going
16:42out are having more stringent guidelines
16:44of if you do a service line you have you
16:47know 20 days to have a full restoration.
16:51So same with like what we're looking to
16:53do with the procurement method. We're
16:54looking to eventually try to work with
16:56the state and change the way we do
16:58things. So when you come in, we give you
17:00a hundred service lines to do. You go
17:02out do a 100 service lines from start to
17:04finish. When they're complete, we'll
17:05give you 100 instead of giving 2,000
17:08service lines and saying here you go.
17:10>> So we don't we can't put any of that
17:12through our system that we can just push
17:14a button and see who's done what where.
17:17>> We we do have a update on our new
17:21construction map of where they've been
17:23and where they're working and what
17:24they're doing. It doesn't have like if
17:27it was complete restoration on it. This
17:29is just service. We only update that for
17:31service line replacements. So when they
17:33notify us and give us a list saying the
17:36service line's been replaced, that is no
17:38no longer it's a lead free home. So we
17:40update our inventory and our mapping as
17:44far as the sidewalk being poured, the
17:46grass seed putting down. We don't have
17:48that. You know what I mean? We we
17:50[clears throat] they don't bill us they
17:51don't bill us for it until it's complete
17:54restoration but
17:56>> we we don't implement that in the system
17:59which I get it needs to be something
18:00>> it needs to be because we need to have a
18:02final uh resolution on what happened
18:05instead of us getting the calls every
18:08week I totally agree all
18:09>> I think that we should we should have a
18:11some a committee meeting or something to
18:13discuss this a little bit more in detail
18:15because that's pretty irresponsible
18:17>> and this is and this is you know stuff
18:18like I that we're building out into
18:20accountability our new contracts giving
18:23them more stringent rules to they have
18:25to meet you know at the time when we
18:27first gave these contracts out we were
18:29under an EPA guideline to do this many
18:31homes in this amount of time and they
18:33were the biders they were the lowest
18:34biders to come in we gave them the
18:36project and we were looking just to be
18:38able to present
18:401100 lead free homes say here we've done
18:42you know we reached our goal we've done
18:44this many homes and the the mandate we
18:46were given you know getting quite a bit
18:49of money to do this work.
18:51>> We need to really think about how we're
18:54doing business before we release these
18:57things to how we're inspecting too.
18:59>> Every single day we sit down and come up
19:01with new plans, how to give these jobs
19:03out, how to bring in more contractors,
19:05how to divide them up equally among
19:07smaller businesses.
19:09>> So, so unfortunately for now because we
19:11need to move on in the agenda. I I I get
19:13you, but we need to move on, but we will
19:16then call a committee meeting so we can
19:18get in the deep of this.
19:19>> Okay.
19:20>> Okay. Thank you so much.
19:21>> Yep. Our next one is our um soil and
19:24water agreement, which is a you know um
19:28kind of a mandate for us to keep our
19:30filteration avoidance. Um it expired in
19:33July of this year, kind of fell through
19:35the cracks. We forgot about it. Um we
19:38just have to present it. Total cost,
19:40something we do every single year. It's
19:41to keep the waterershed protected for,
19:43you know, for our clean drinking water.
19:45Um, we're in contract with And County
19:47Soil and Water. Um, the next one is for
19:51special um, highaxes, repair couplings
19:55for large scale water manes. So, the
19:57city, we have a we have a lot of broken
19:59valves, broken manes in this city that
20:02require special couplings. Um, 16 and
20:05larger, 24 and larger. So, we're
20:08starting to tackle these larger scale
20:10projects to get some of these valves
20:12that have been broken in the ground for
20:14multiple years. We have a few on the
20:16conduit we're replacing right now. These
20:18couplings are needed to do that because
20:20of the different diameter and pipe.
20:22We're going from old to new. So, we need
20:24these specialized couplings and we'll
20:26still bidding them out, you know, put
20:27them out to three different vendors to
20:29see who can get them, you know, at a
20:30more costefficient price.
20:33Um the next is transfer our funds from
20:36our cash c cash capital amount in the
20:38amount of 500,000 for our capital
20:41equipment. Um as you know our equipment
20:43is getting older, things are getting
20:44outdated. You know we we have a lot of
20:46equipment we have to get. Um next one is
20:50transfer from our cash capital amount
20:52for our for 30,000 for our facility
20:55securities. You know we're we're putting
20:57new cameras in. We're doing new new
20:59things all through our system to to put
21:02some extra security measures.
21:05Um, ne number 20, transfer capital fund,
21:09a re rehabilitation of our gate houses,
21:12pump stations, and vaults. Um, so we had
21:15a sanitary survey. A lot of our vaults
21:16are old. A lot of the drains aren't
21:18working in our vaults, so we're just
21:19looking to go in and modernize them and
21:22repair them.
21:23Um 21 transfer funds from our cash cash
21:27capital amount for 30,000 for
21:30rehabilitation of our Skinny Atlas
21:31facility. So we have a lot of stuff
21:33going on out there with you know as you
21:35know the chlorine is going to be
21:36changing and we need a lot of updates
21:41>> 22 [clears throat]
21:43>> transfer uh number 22 transfer um 80,000
21:47to our cash capital amount for valve
21:50repair and replacement. they they kind
21:52of go with the highaxes, you know, as
21:55we're replacing the the valves. That's
21:56why
21:57>> I was gonna ask that question. So, is
21:59that amount included into the highaxes
22:02or that's added on?
22:03>> This is additional. This is for the
22:05valves themselves. So, the larger the
22:07valve, the more costly they are. I mean,
22:10eventually this project's going to be
22:11way more than that. We have about an
22:13estimate about 70 broken valves in the
22:16city, 16 and larger, that have been
22:18broken closed for years. Um, and as we
22:20are, we are a gravity system. So, we're
22:22looking to tackle these valves and
22:24replace them to make sure the flow
22:26directional flow is going in the right
22:27direction. Definitely with the 81
22:29project, you know, doing a lot of moving
22:32our mains and water mains. We got to
22:34make sure our systems flowing in the
22:35right direction.
22:38Um, the 23 is transfer um from our
22:42capital amount for 275,000 and that's
22:46for fire hydrant replacement, updating
22:48our hydrants. Quick question on that.
22:50Um, do we have any hydrants that are out
22:52of service right now? And if so, how
22:53many?
22:55>> I can get you that number, but we
22:56definitely have out of service hydrants
22:58right now.
22:58>> Okay. Yeah, I would love to know
23:00>> how many and where.
23:01>> The problem right now we're having is
23:02trying to keep them. You know, the the
23:05stockpiling of them. We're replacing
23:07them every day. We're repairing them
23:09every day. A lot of the projects are
23:12are, you know, going on in the city need
23:14hydrants. You know, just Brighton
23:15Avalone, they're doing that project. We
23:17just supplied them with a bunch of
23:18hydrants. So, it's all as all the things
23:20are developing and we're putting new
23:22mains in, new hydrants are going in,
23:24too.
23:24>> Okay. Didn't mean to steal that mic from
23:27I got excited.
23:28>> Um I believe I'd asked the chief about
23:31this before, but as we are replacing new
23:33hydrants, my understanding is that we
23:35have a different um
23:37>> right
23:38>> right on our hydrants in the city of
23:40Syracuse than they do in suburban
23:42locations. Is now the time to talk about
23:45changing that out? So we are on one
23:46system as opposed to having I know that
23:49it's not a problem that we carry both
23:53connectors and so do the suburban
23:55systems. But in the interest of
23:57efficiency is this the time to start
23:59thinking about changing out to one
24:01standardized system. The the only thing
24:04I could say about that on for the water
24:06department would be is
24:09for the next 30 years we'd have two
24:10systems then because
24:12>> at the end of that 30 years we would
24:13have one system and that seems like that
24:16might be a better situation.
24:21>> Michael Monza fire chief um those
24:23hydrants are all of our connections all
24:26of our fittings to change everything out
24:28would be extremely expensive. the other
24:30hydrants that are in the county, we
24:32could replace them and we could adapt to
24:34them, but our whole operation is built
24:36off of the hydrants that we do have. So,
24:38it would be very costly to change. We
24:41have, you know, 16 frontline state uh
24:44fire trucks. They have multiple
24:46couplings that go onto the hydrants. So,
24:49it would be very costly to change over
24:50our whole operation. And it's not a
24:52problem right now at all.
24:55And you don't believe that there's any
24:56impairment in terms of first response
24:58across again like your fire trucks get
25:00called if there's a big tower fire in
25:02Udica, right? Why are we not
25:04standardizing?
25:05>> Well, Syracuse was always like an
25:07innovator of these types of things
25:09decades ago. So, our whole city was
25:11built on these fire hydrants and really
25:14when we go outside the city, all of our
25:16firefighters are trained to when we go
25:18outside the city if we have to, they
25:20just take the Syracuse threads. There's
25:22like a thread and we put on this
25:24national standard thread that everybody
25:25else has and we hook it up to their
25:27hydrant. But it's it's a simple
25:31adjustment in our operations. It's not a
25:33time delay. But I understand your
25:35concern. But
25:36>> god forbid some other fire departments
25:38would need to come to our rescue. Do
25:39they have Syracuse threads?
25:41>> They should have Syracuse threads. Yes,
25:43>> they should have Syracuse threads. But
25:44if they didn't have Syracuse threats,
25:46>> if they didn't, they have adapters that
25:48go on there. they should have an adapter
25:50that goes on to hook up to their their
25:52threads.
25:53>> I understand that this would be a costly
25:55and timeconuming process to move it
25:57over, but if in the event we did it and
25:59had standardized universal threads
26:01across all things, do you think that
26:03that would be a more efficient system?
26:05>> It definitely would be efficient system.
26:08Probably not costefficient right now.
26:10>> Cost effective. Well, inertia
26:11[clears throat] is always less cost
26:12effective or more cost effective, right?
26:14>> Yep. But right now, it's not an issue at
26:16all. But I understand what you're
26:18saying. But the solution, there's not a
26:20problem for that solution. Right now, I
26:22would say that possibly it could happen,
26:24but right now that's not an issue. And
26:26we haven't seen that to be an issue.
26:28>> Will we be need I mean, we're changing
26:29out these hydrants. Are we going to be
26:31need to are we going to need to replace
26:33all the hydrants in the city? Are we
26:35replacing all the hydrants in the city?
26:36What is our time frame for that?
26:39>> Yeah, we're we're not replacing all the
26:40hydrants. We're replacing the
26:42substandard hydrants. So, we have a lot
26:45of substandard hydr hydrants that are
26:48not up the codes anymore. They're just
26:49old. Them are the ones we're tackling.
26:51We have a ton of new hydrants in the
26:52city already, K81s. We use a Kennedy
26:55hydrant. Um, and we're also leaning
26:57towards, you know, because we utilize
26:59them hydrants. We're putting on, they're
27:00called the high hydrant sensors that are
27:02letting us know when there's like leak
27:04detection or pressure loss in
27:06neighborhoods. we get, you know,
27:08firsthand updates on our phones and so
27:10we know something's going on before it
27:12gets out of control.
27:14>> Where are we in terms of the upgrades or
27:16modernization of the hydrants in terms
27:17of percentage?
27:18>> Um, we do these in-house. So, we do
27:20probably
27:24150 a year.
27:27150 a year replacements on hydrant
27:29replacements. And and the one thing
27:30about nice about Syracuse thread too is
27:33we have a lot of contractors that come
27:35into the city and come and and get hydro
27:39adapters from us. And that kind of
27:42mitigates them being able to use
27:44whatever they want. So they have to come
27:45into us to get the hydro permits. So
27:48they just can't screw anything on the
27:50hydrants and take our water. So it kind
27:52of it's awesome through obscurity.
27:54>> It is a little bit works, you know,
27:56because not everyone has Syracuse. My
27:59question, one quick I got one quick
28:01question.
28:02>> Let me ask you this. I know that there
28:03used to be two inspectors that would
28:06look out for like water mane breaks and
28:08things like that. Do we have still have
28:10inspectors that do that?
28:12>> Inspectors?
28:13>> Yeah, that we had on call.
28:16>> We have we have crews on call. We have
28:20um so we used to have a 24-hour
28:22operation of valve operators that were
28:24there 24 hours. We we can't find them
28:27positions. um we reduced and now they're
28:29on a standby basis. So they're on call.
28:32So as someone calls in a leak, dispatch
28:34will call them. They will come in, you
28:37know, check the leak out, shut it down,
28:39call in a crew if they need to for
28:40repair. They'll they'll, you know, see
28:42what's going on with the leak. Um but we
28:44still have them out there. We have, you
28:46know, we have superintendent on call. We
28:49have crew leaders on call. We have crews
28:50on call. We we have it's a 24-hour
28:52operation. just a lot of it's calling in
28:54now instead of just having people
28:56sitting and waiting for something to
28:57happen which has been more cost
28:59>> I have one last question I'm sorry on
29:00item agenda it's relevant to the agenda
29:03>> okay
29:03>> on item number 18 uh commissioner we
29:05have a $50,000 SUV why do we need the
29:08$50,000 SUV
29:13>> I think they just uh
29:18>> what is that purpose
29:20>> we need an SUV I'm not quite sure it's
29:23going to be 50,000. They got some
29:25quotes. I don't see it being $50,000.
29:28You know, I I think they're looking at
29:31the fleet management was looking at
29:33another Traverse. I'm not getting
29:34another Traverse. We don't I don't think
29:35we need one. I think we're going to go
29:37more with the Equinox.
29:38>> So, this is a take-home vehicle.
29:40>> This will not be a take-home vehicle.
29:41>> Not a take home vehicle.
29:42>> This is a vehicle in the yard for like
29:45our um sometimes our meter readers will
29:48use it. Sometimes our engineers will use
29:51it. We have shared vehicles in the yard
29:53and our team is growing and we have one
29:55shared vehicle. So, we're looking to get
29:57another shared vehicle for our
29:58engineers. We have a new PIO officer. We
30:01have a bunch of other people that would
30:03utilize the vehicle.
30:04>> Is it actionable to get a hybrid
30:06vehicle?
30:08>> We have no I mean a hybrid we could look
30:11into, but we have no we have no source
30:14of charging vehicles. That's why and
30:16>> we're working on that with fleet
30:17management.
30:18>> Yeah. And I don't know if we have anyone
30:20to work on them vehicles
30:22>> to be quite honest. I'm I'm just being I
30:24don't know if we have the mechanic skill
30:26that has has the knowledge of working on
30:29hybrids or electric vehicles. And that's
30:32why I know at one time I've been here 33
30:34years, we tried to shift to all
30:35different types of vehicles. We've tried
30:37natural gas, we got rid of that. We
30:39tried some electric, we got rid of that.
30:42And it always ends up going back to the
30:44same,
30:45>> you know, vehicles.
30:47>> Okay. Thanks, Commissioner.
30:48>> Thank you.
30:49>> Um, councelor Erin Reg.
30:52>> Thank you, Madam President.
30:54I think we can be relatively quick.
30:58>> Good afternoon, Sisha Bird, Commissioner
31:00Parks. We have 24 is to authorize the
31:04city of Syracuse to adopt a negative
31:06declaration basically saying that deer
31:10calling um in the deer and tick
31:12management program will not affect the
31:15environment. Okay.
31:1825 is an agreement with the United
31:20States Department of Agriculture, Animal
31:21and Plant Health Inspection Services to
31:25conduct um wildlife management um and to
31:28adopt the dare and tick management
31:30program or tick and dare management
31:32program from December um 26 to April
31:3627th not to exceed 90,000.
31:40Number 26 is an agreement with Marshm
31:43Mill Ranch to provide meat processing
31:45services for the deer that's called
31:49as part of our t um tick and dair
31:51management program.
31:5427 is a bond ordinance authorizing um
31:57the selling bond for furniture for 2627
32:02for our youth centers.
32:04>> This is part of the capital plan or not
32:06not part of the capital plan. I believe
32:09it is
32:11150,000. Some of our centers, we haven't
32:13purchased furniture for those centers in
32:15a long time and they they need some
32:17replacement. Um, and 28 is to go along
32:21with that is the authorization for that
32:24150,000.
32:2729
32:29is a application agreement to the New
32:32York State Department of Environmental
32:34Conservation Community Reforestation,
32:36also known as the core grant program,
32:39not to exceed three $3 million to work
32:41on the inner harbor to Anadaga Lake um
32:44along the creek shorelines to clean
32:46those up.
32:49>> No local match is required for that.
32:51>> You're requesting two-way council,
32:53right? You talked to her about it
32:54already. Yeah, we're going to talk after
32:56this. Yeah.
32:59>> Are you okay?
32:59>> Very much. That's it.
33:00>> Thank you.
33:01>> Okay. Thank you,
33:02>> Council Mo.
33:04>> Thank you, Madam President. I have items
33:0530 through 33.
33:10>> Councilors, uh, Rich, Deputy Chief. Good
33:13afternoon. Uh, C, uh, number 30, we're
33:15asking to pull um till the maybe the
33:18next session. We need to get some more
33:19information for you folks on that. Uh
33:2131. We're asking for permission to enter
33:23into an agreement with Forever Friends
33:25Animal Rescue. This is for veterary and
33:27lodging services for all of our animals
33:29involved in animal cruelty cases. This
33:32is companion uh request to the CNY
33:35Humane that I came before you before.
33:37Based on capacity, we need to split that
33:39up between two different vendors and
33:40these are the two vendors that will do
33:42that for us.
33:43And then the uh the second one that we
33:45have is for um a request um for Lewis
33:48uniform and United uniform to um be
33:51allowed to um replace our uh department
33:54uniforms that are damaged in the in the
33:55line of duty. Um they're both in the
33:57city and they both agreed to work on the
33:59voucher program that we have for it and
34:01that's 10 10,000.
34:02>> Keith, how many uniforms does that buy?
34:0410,000. It really depends and I'm sorry
34:06to answer it that way, but it could be
34:08um you know a pair of pants that are
34:10more expensive than you know you know a
34:13long sleeve shirt or a short sleeve
34:14shirt. It really kind of depends on what
34:16the what the damage is. A coat's very
34:18expensive for example. Um that sort of
34:20thing.
34:20>> Okay.
34:21>> Very expensive like $1,000.
34:22>> Oh no, no, no.
34:23>> Okay.
34:24>> Well, more expensive than a pair of
34:26pants.
34:26>> Could you ballpark the number of
34:28uniforms?
34:30>> Depends on jacket. But could anywhere
34:31between 200 to 500 depending on if it's
34:33a leather jacket. uh that sort of thing.
34:36>> Okay.
34:36>> Do they get uh
34:39like uh winter coats and success?
34:43>> We don't uh we don't issue any uh
34:45uniforms. Um they get a certain amount
34:47of money in their check to they're
34:48responsible for the upkeep of the
34:50uniforms.
34:50>> In the summer when you have officers on
34:52bicycles, they wear shorts. You have all
34:54of the head.
34:55>> Yeah. Yeah. They're allowed to wear
34:56those things as well. Yeah. Anything
34:57like a pair of shorts, for example, is
34:58going to be way cheaper to to replace
35:00than another part of a a uniform.
35:02>> Okay. Thank you.
35:03>> All right. Thank you.
35:08>> Anybody for 33?
35:13>> Hi, I'm Michael Monz, fire chief. Again,
35:15um this is the uh request to use
35:18identifier safety. Uh we just got um
35:21we're in the middle of purchasing brand
35:22new self-contained breathing apparatus.
35:25Those apparatus have a face piece and a
35:27hose that plugs into the air. And we
35:30need to just have identifiers on them to
35:32make sure that our name plates of our
35:34firefighters and are on the face piece
35:36and on the hose. So they're identified
35:38in a fire and um when they're storing
35:41their gear. So these they're a single
35:44source company that they're only allowed
35:46to be on these Scott SEBA
35:47[clears throat] packs that we bought.
35:49Does anybody have any questions?
35:52and councelor Anar, I got some more
35:54information with hydrants. I'll talk to
35:55you offline about it, but uh the fire
35:58departments outside the city. Our
36:00hydrants do have a orphice on it that is
36:03national thread. Most of them do. So,
36:05but I'll I'll explain that after
36:07offline. Thank you. Okay.
36:08>> Thank you, Chief.
36:10>> Thank you. Are you all set?
36:11>> It's all set. Thank you.
36:12>> Okay. Uh councelor Williams.
36:14>> Thank you, Madam President. I have items
36:1634 through 38.
36:20>> Good afternoon, counselors. Michael
36:21Layman, deputy commissioner with the
36:23assessment department. Item 34 is
36:25request for legislation to correct tax
36:27roles. This uh includes instances of um
36:31sidewalk uh fee uh improperly charged
36:34and then one uh senior exemption uh that
36:37was removed in error.
36:40>> Okay.
36:42>> Thank you.
36:45>> And then Joe, which items are we going
36:48to speak?
36:52All of them will be executive session.
36:55Okay, great. Thank you. Um, Mike, while
36:56I've got you, can you give us an update
36:58on the appraisal of the property in DIT
37:00that we
37:02authorized a couple months back?
37:05>> Uh, yes, we received the appraisal about
37:07uh a week and a half, two weeks ago.
37:09>> Um, and uh just been discussing with law
37:12uh to determine the next steps that are
37:14appropriate uh strategically.
37:15>> Moving along.
37:16>> It is moving along.
37:17>> Perfect. Thank [clears throat] you.
37:18>> Thank you. Is this executive session
37:19after today or or Monday?
37:24>> Okay.
37:27[clears throat]
37:27>> Um, may I note that Commissioner OJ
37:29isn't here today. If he needs to be for
37:31that present for that. Okay.
37:35>> Thank you.
37:35>> Thank you.
37:38>> So, all set. Thank you.
37:41>> Council Montto.
37:42>> Thank you. I have items 39 through 46.
37:4539.
37:47Thank you, councelor. Um, this is the
37:49city's requesting a license agreement
37:50with uh Penrose in Hanover. This is uh
37:53to do some environmental and structural
37:54testing at uh 57181 East Jennese Street,
37:58also known as the Johnson Center.
38:06>> Any questions? What counselor?
38:08>> I'm saying 138 units going in there
38:11>> possibly. Got to get get the pre-work
38:14done first. See if we can do it.
38:17uh 40. Thank you.
38:28>> Good afternoon, council. Jake Dishaw,
38:30deputy commissioner of code enforcement
38:31and zoning. Item number 40 is to uh
38:36amend our current
38:39uh moratorum to allow for
38:42buildings other than one and two family
38:44residential to have smallcale accessory
38:48uh commercial battery energy storage
38:50systems. Think of this as like a
38:52generator but instead of diesel it's
38:56batteries um smaller than the size of
38:58this table.
39:01The moratorium still will be in place
39:03for the big the large scale ones.
39:05>> Correct. Okay. It's not allowed right
39:07now. And um the moratorum right now goes
39:10through February. Although we've
39:12communicated to you all already. We
39:13expect to have a local law before you in
39:16the next
39:18four to six weeks I'm hoping. Um but you
39:21know there's some projects our our
39:23intent wasn't to regulate these ones
39:25that are connected to like a commercial
39:27building as like a power backup source.
39:29Um it was for the large scale ones that
39:31are connected to the grid.
39:34>> Okay, thanks Jake. Uh 41 will be ready
39:37for Monday.
39:40>> Uh 42 was held uh last time. Um this
39:45councelor Nav, this was the one with the
39:48regional market next door. Um,
39:51>> I think Officer Nav, you're all set with
39:53that one, right?
39:53>> I am fine. Yes, thank you.
39:55>> That one's okay, Jake.
39:56>> Got it. Uh, 43 is a special use permit
39:59to approve a New York State licensed
40:02retail cannabis dispensary at 2671 James
40:06Street. Uh, one person,
40:09>> can you clarify something for us just
40:10for the public's consumption here? So,
40:12something like 43 and also jumping ahead
40:15to 46. So if it's a bar or a cannabis,
40:19this these have been through planning.
40:21In both of these situations, they
40:22already have either a liquor license or
40:24a cannabis license. Correct.
40:27>> Um yes. So New York State Office of
40:30Cannabis Management or OCM has, you
40:33know, conditionally approved this
40:34location. Obviously, they have to go
40:36through um the local process. Uh we do
40:39have them under a special use permit
40:41requirement, which we can do as a local
40:44municipality. Um but we are a community
40:46that did not opt out of um cannabis
40:50sales. So, you know, we're regulating
40:52these with certificate of use, business
40:54certificate of use license and uh
40:56special use permits under the smoking
40:59establishment use. Um which actually
41:02helps us if there are, you know,
41:04problems or issues with the
41:05establishments. But uh all the legal
41:08establishments that exist in the city
41:10limits, we've had no issues with the
41:12legal ones that are approved
41:16uh as far as codes issues or police
41:18issues.
41:18>> So is the is a bar running along the
41:21same line? So as a liquor license, do we
41:23treat those the same way? Like by the
41:24time they get to us, they've already
41:26been through planning, they already have
41:27a liquor license. So if in the case that
41:30this council moves to not approve what
41:32you have are putting in front of us, is
41:34it too late by the time it gets to us,
41:38>> too late to not approve?
41:39>> Right. And Joe, it might be a question
41:41for you. [clears throat] I'm not sure.
41:43>> You guys not approve anything, but the
41:45issue is coming back together.
41:48>> Okay. Okay. Well, we'll deal with that
41:51executive.
41:51>> I I want to make one comment. So the one
41:54on North Salina Street if that's
41:55approved that's going to be the third
41:57one on North Salina Street and within
42:00walking distance of two others.
42:01>> We'll get to that one.
42:03>> Okay. But I just want to
42:04>> So 43 is the cannabis one and they
42:06already have a license to operate there.
42:08So um 44
42:11>> uh 44 is also a special use permit to
42:14approve a use for a contractor yard at
42:162910 Erie Boulevard East. Uh one person
42:20spoke in favor. This is for an energy
42:21savers like window installer uh who was
42:24having some issues with his vans and his
42:27uh material for windows being you know
42:29stolen or broken into. So he's basically
42:31fencing in an area of the property to
42:34secure his work vans, work vehicles and
42:37you know his material
42:41>> 46
42:43>> uh 45
42:44>> 45 um so this also falls under the
42:47definition of smoking establishment but
42:49it is not for cannabis or tobacco. This
42:52proposal is specific to smoking
42:54paraphernalia for hookas and tobacco
42:58tobacco uh in different flavors. Um
43:02shisha um I'm I'm not familiar myself
43:06but uh apparently there is a market for
43:08this. Um our conditions are explicit
43:11that no tobacco, no on-site consumption,
43:15no cannabis. Uh they will also require a
43:18certificate of use. So again, we'll have
43:21oversight with this potentially this uh
43:24land use approval for the special use
43:26permit and a certificate of use um if
43:29there are any issues.
43:31Just my my point was is that it's still
43:35smoking, but we have people on the north
43:38side in my district are very vulnerable
43:41because, you know, we we have areas by
43:43the church
43:45and we have uh
43:49uh a program people get their meals. So,
43:53I'm concerned that people who are on the
43:56borderline budgetwise
43:59that they don't it's like gambling. It
44:02you don't want to see them conveniently
44:04go smoke
44:06and throw away a lot of money which can
44:08be used for other things. And that's
44:10just my opinion because I'll hear from
44:12constituents.
44:15>> Understood.
44:16>> 46.
44:18Uh 46 is also a special use permit to
44:20approve a bar use type at 648 Bernett
44:24Avenue. One person spoke in favor at the
44:26city planning commission meeting. Uh
44:28this was a former bar. I believe it was
44:31known as Remy or Remy 2 in its past
44:34life.
44:34>> Um
44:37across from Noah Fisher.
44:40>> Yeah.
44:41>> Okay. I have
44:43>> questions for that in executive session
44:45for this one. Anybody else have
44:46questions?
44:48>> All right. M motion to go into executive
44:51sessional
44:53>> for legal advice.
44:54>> Second.