- The board's September meeting had been rescheduled; staff said a response on the Project Labor Agreement would go out the next day ahead of a meeting on October 8.
- Phase 3A covers Webster, Seymour and Nottingham. Construction is targeted to start in the third quarter of 2027. Webster and Seymour would be out of their buildings about two years and move back in the third quarter of 2029; Nottingham, a phased renovation, is targeted for completion in the third quarter of 2030.
- Swing space: Webster students move to Levy and Seymour students to Shay.
- Design development (about 50% drawings) is ongoing, with a state submission targeted for November 2026. The board has answered state Education Department questions on building budget calculations and was awaiting a response.
- Scope described for Nottingham: kitchen and cafeteria renovation, a small storage addition, new loading dock, conversion of a wing to career and technical education spaces, parking and drop-off reconfiguration, and a community health clinic.
- Scope described for Webster and Seymour: air conditioning, window and roof replacement, secure front entrances with ADA ramps, bus loops, and toilet room work; Webster also gets a four-classroom addition.
- The district asked to swap two schools between phases; the captions are garbled on which schools, and no vote was taken. Staff expect the change to be reflected in the RFP.
- Staff hope to release the RFP for the construction management role in the first quarter of 2027, or sooner.
- Workforce figures reported to date: minority 18.13%, women 14.86% (12% goal), city residents 17.56% (20% goal), city school district graduates 17.99% (2% goal).
- Resolution 19, authorizing monthly payments for September 2026, was approved.
- Public input sessions were noted for Webster (Sept 24) and Seymour (Sept 28).
Agenda
Agenda not yet posted.
Sources
- Video: https://www.youtube.com/watch?v=EuqOH6LPoCo (City of Syracuse YouTube channel)
- Public meeting calendar: https://www.syr.gov/Boards-and-Commissions/Public-Meeting-Calendar
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:00Second, um I want to let you know that
00:02we're continuing to work on the PLA.
00:05Unfortunately, our September meeting had
00:07to be cancelled because one of the
00:10trades folks had a conflict, but that's
00:12not going to slow us down. We're we're
00:14going to our council's preparing a
00:17response to their August proposal. We're
00:20going to transmit that response, I
00:22believe, uh tomorrow ahead of our
00:25meeting with them on October 8th.
00:27>> Okay. So, we're pushing to keep things
00:30on track.
00:31>> Thank you. Any questions?
00:34>> Yeah.
00:35>> How the attendance were for the uh
00:37Tuesday meeting?
00:41>> Question. I don't know if the program
00:42met
00:43>> the Tuesday public meeting was
00:45>> how was the attendance
00:51yourself? Okay.
00:54Okay.
00:57Good.
01:01>> Yes.
01:03>> Yes.
01:04>> Thank you.
01:05>> Yes. So, finally, um, we had a staff
01:08meeting on the ICO RFP. Um, I have to do
01:12some work on the contract because it
01:14requires kind of a specialty contract.
01:17It's not a typical service like
01:19architects.
01:20>> Okay.
01:20>> But with that and the other RFP
01:23documents, we we hope to get them out.
01:25um
01:29uh for first quarter. Thank you. I
01:32slipped my mind. Thank you.
01:33>> Or sooner if we're ready.
01:35>> So, we're we're pushing forward with
01:37that as well.
01:38>> All right. I like sooner if we're ready.
01:41[laughter]
01:43>> And that completes my report.
01:45>> Thank you.
01:45>> Thank you very much.
01:47>> Our report of the program manager.
01:52>> Good morning.
01:53>> Good morning. Um just an update on our
01:56SD submissions. Um SED came back with a
01:59few questions. We responded to those
02:01regarding the MCA calculations for each
02:03of the buildings which translate into um
02:07essentially the budget for the building
02:08and how much aid we'll receive. We have
02:10not received a response yet from them.
02:12Uh we're hoping to receive that here
02:14shortly. Um the architects are
02:17continuing through on DD phase. That's
02:21like the 50% uh of the drawings. Uh as
02:25mentioned, we had uh public meeting on
02:28Tuesday uh presented to the board last
02:30night and then uh Webster tonight and
02:34Monday will be Seymour for public input.
02:37And we have a copy of that board
02:39presentation here tonight that we can
02:41run through and give you an idea of what
02:42the projects inelail.
02:46Um,
02:48moving along in design development still
02:51anticipate submission in November. Um,
02:55and once we get the DD docs, the
02:58construction man construction manager
03:01will perform uh an estimate so we can
03:04reconcile the budget, make sure we're
03:05within budget. Um and then we move into
03:09the construction document phase and then
03:12uh following that would be the SED uh
03:14submission and we anticipate approval in
03:18May of 27. Following that we would then
03:21go into bid and award phase. Anticipate
03:25that to be about 3 months. Following
03:26that would start construction in third
03:28quarter of 27.
03:32As mentioned, uh we are working with the
03:34team on the ICO RFP and that's moving
03:39along well. Um architects and
03:42construction managers for the phase
03:44three projects would also um fall into
03:48first quarter of 27 issuing of the RFP
03:51and look to award those second quarter.
03:53So we would start on the next three
03:55buildings.
03:58Uh continue to meet with SEDD, met with
04:00them last week. Um, again, what we're
04:03hoping to get back is feedback on the
04:05MCAs
04:08and then project labor agreement next
04:10meeting is scheduled for um the 8th of
04:13October.
04:16Any questions?
04:17>> Questions?
04:22>> Okay, we want to roll into the
04:24>> uh we got Tom behind you. Um the school
04:28district did request that um we flip two
04:31schools from phase um one from C phase C
04:35to phase B. So we'd like to um flip
04:37blahit and Delaware. So the reason we
04:40requested that u we're having floor
04:42issues in the basement of Delaware. I
04:44mean in the basement of Blahetta. We
04:46actually had the same issue at Delaware
04:47which isn't that far away about 10 years
04:50ago when we replaced the floors there.
04:52So basically the floors are like rotting
04:54out from underneath. So we'd like to
04:56switch that phase. So the school
04:57district is formally going to ask the
04:59JSCB to do that. Make that switch
05:02modify.
05:03>> That is not is that today or
05:05>> that's not today. That that's but so
05:08you'll see that in the RFP. So
05:10>> So flipping means the the schools that
05:13were in line for now are going to win.
05:17>> So for phase B, it originally was
05:19Lincoln, Blahett, and Corkran. And now
05:22it's going to be Lincoln or no Lincoln
05:24Delaware and Corkran. Now it's going to
05:26be Lincoln, Blahett, and Corkran. So
05:28Corkran doesn't uh there's no swing
05:30space there. Uh we're flipping because
05:32of swing space uh both blahit and
05:35Delaware. We're going to flip uh going
05:37to swing it to Shay. So that's what
05:39we're doing. We're just changing the
05:40order of uh when the projects get done.
05:42>> Do we think this um construction on uh
05:45Delaware is going to fix some problems
05:47that we worked on 10 years ago?
05:50Oh, that's all resolved. That that was
05:52that was all resolved. So, we took the
05:54floor out there and that that project we
05:56have went really well. So, that that's
05:57all resolved. Delaware is just a little
05:59landlocked as we all know. So,
06:02>> can I ask a question? You said that
06:03you're the floor and blahit in the
06:05basement.
06:06>> Correct.
06:06>> I mean, when did we go through blah? We
06:09just went through blahit not too long
06:10ago,
06:11>> right? But we didn't have enough money
06:12to do everything we want to do. So, we
06:14got the outside of the structure all
06:16taken care of. We took care of um
06:18student bathrooms. We took care of all
06:20the ADA, we took care of power in there
06:22because we didn't have enough power in
06:23the building. Um, and then the school
06:25district spent additional money,
06:27replaced all the floors, so we did
06:29asbestous abatement. We've done a lot of
06:31roofing there. So, the building is
06:33solid. Um, but the next phase really we
06:36have to go in the building, gut the
06:38hallways to put air conditioning in,
06:40replace all the plumbing, all the
06:43electrical, and then we're going to want
06:45to um do things like take those floors
06:47out and reconfigure that basement floor
06:49level, which we really haven't used for
06:51like 10, 15 years now.
06:53>> But once we do this, will that be the
06:55completion of logic?
06:57>> Correct. Yeah. And I think it's going to
06:59really be a major major difference. I
07:02think it'll really uh outside it looks
07:04great, but there's parts inside that we
07:06still need a lot of work.
07:10>> Um,
07:12we're switching Delaware. I'm trying to
07:13get the schools. Okay. What What is
07:16proposed for Delaware that's going to
07:17have to wait now?
07:18>> Uh, Delaware is a it's a renovation like
07:21the other elementary schools. So, we
07:22need to replace the windows. They're
07:24going to want to add air conditioning
07:25because of the New York State law. We
07:27have to replace the mechanicals. It was
07:29last renovated um in the late '80s.
07:32>> So um it's got a pool that always
07:34requires work. Um so yeah, it's it's
07:37going to need masonry, roof, all those
07:39types of things. Yeah.
07:43>> Thank you.
07:45Any other questions?
07:48>> Um did we want to run through the the
07:50slideshow just to give you an idea of
07:52what um scope is included in each of the
07:54buildings?
07:56Uh first slide here is again just a
07:58recap of the timeline for the phase 3A
08:00buildings. Currently in the design phase
08:02completed pre-construct or sorry
08:04pre-esign schematic design in progress
08:07with design development. Uh the next uh
08:11phase after that would be construction
08:12documents. Again the stateed approval
08:16bidden award phase uh we do relocate two
08:19buildings. Webster moves into levy. Uh
08:22Seymour moves into Shea. Uh target start
08:27of construction is still third quarter
08:29of 27. Uh anticipate Webster and SE
08:32Seymour moving back in in third quarter
08:35of 29. Essentially they'll be out for 2
08:37years. And then Nottingham anticipated
08:40completion is third quarter of 2030
08:43which is a phased renovation.
08:46>> Webster and Seymour they're going where?
08:48>> Uh Webster's going to Levy
08:50>> Levy
08:50>> and Seymour is going to Shay
08:52>> Shay.
08:54And before you move any further, let me
08:56ask you about Nottingham. What What else
08:58are we doing to Nottingham?
09:00>> Um, we'll show that here a couple
09:02seconds while we
09:07>> Okay. because it's saying 2030, but I
09:09know that we did intensive
09:11>> work in
09:20uh the current work scope list at
09:22Nottingham High School include uh site
09:25work reconfiguration of the main parking
09:27lot, introducing a parent drop off loop,
09:30um
09:32creation of a new bus entrance off the
09:35bus loop, and we'll show that on the
09:36site. plans here in a minute. And then,
09:39um, building a new loading dock for the
09:41kitchen.
09:43Uh, select exterior window replacements,
09:46uh, exterior door replacements in select
09:48areas, uh, repointing of brick and stone
09:51because there are some bad areas on the
09:54exterior of the building that need to be
09:56touched up. Uh, um, for CTE and academic
10:00space and academic spaces and toilet
10:02rooms. Uh, pool improvements, mostly the
10:05locker room. There'll be some select uh
10:07pool equipment and electronics as part
10:10of the project as well. Um athletics
10:14entrance um kind of like a facelift to
10:17it. Um and then the kitchen cafeteria is
10:21a complete renovation and we'll show um
10:24a small addition for new freezer cooler
10:27and dry storage that ties into the
10:29loading dock.
10:32And then auditorium improvements. Um
10:34select improvements like sound,
10:36lighting, um
10:39some finishes in the space. Uh and the
10:43one thing that's not listed here is the
10:45um healthbased clinic. We've got a spot
10:48designated in the building for that as
10:50well.
10:53So this is just an overall plan of the
10:56building. The areas highlighted in blue
10:58here are the renovation areas. Uh
11:01starting at the top of the page, that's
11:02that athletic corridor we mentioned. Um
11:06primarily that's not a real
11:07reconfiguration or anything, but just a
11:09facelift to kind of spruce it up. Um
11:12just below that is the kitchen cafeteria
11:15area. That's the complete renovation.
11:18We're actually going to turn the
11:20cafeteria
11:21section currently runs north and south.
11:24We're going to turn that east and west
11:26and move it to the exterior wall to
11:27bring in some more natural light. Um the
11:30darker blue just in the upper right
11:32corner there, that is that uh small
11:34addition for storage, freezer, cooler.
11:38Um and then the lighter blue is proposed
11:41new loading dock
11:44below that. And then
11:45>> just a question on the cafeteria. So the
11:48renovations are within the current
11:50footprint or it's going to look like
11:52it's protruding out.
11:53>> Uh current footprint.
11:54>> Current footprint. Yep.
11:56>> And the cafeteria will be the same size.
11:58Okay.
12:03[cough]
12:06>> Sure.
12:09>> And even the dark blue is within the
12:11current footprint.
12:12>> Yes.
12:15>> In addition,
12:17>> is that a kitchen processed food for
12:19other schools as well?
12:20>> Yes.
12:21>> How many schools
12:25will be about 10 after this?
12:28We serve 25,000.
12:45>> How many now?
12:47>> It's going to be 10 about how many
12:50>> schools now? [clears throat]
12:52>> Okay.
12:54>> The kitchen is very inefficient.
13:06>> [laughter]
13:08>> And I
13:10had to say it was a long time ago.
13:12[laughter]
13:13>> Thanks, Mayor.
13:14>> Thank you.
13:16>> Jeez. [laughter]
13:21the the big blue square or in the center
13:25there's the the auditorium again that's
13:28uh select finishes um paint wall again
13:32air conditioning in this space also air
13:34conditioning in the cafeteria
13:37um lighting improvements uh a little bit
13:40of rigging um
13:43and then just to the right of that is
13:45that um health-based community health
13:48clinic that we talked about. And then
13:50there's a classroom that's also
13:52highlighted there that just gets a
13:54little bit reconfigurated so that we can
13:55fit in the health place health-based
13:58clinic. Uh continuing in that section of
14:01the building, uh we mentioned a new
14:04student bus entry point that's on the
14:06the left of that corner of that
14:07building. Um that will allow students to
14:11enter the building from the bus loop. So
14:15the busers come in during the morning,
14:16they can enter in there, kind of leave
14:19some of the congestion at the main
14:20entrance
14:23and over to the the pool edition. Uh
14:26highlighted there in blue is the locker
14:28room area, but there will be select work
14:31outside of that as well. Uh so it's a
14:34reconfiguration
14:36minor of the locker rooms to make it ADA
14:39compliant and then also uh increase the
14:42size of the toilet rooms for spectators
14:44when they come to events.
14:48>> Who go here are bust in
14:52this question number
14:58>> really? Wow.
15:00>> Okay. central.
15:04Then we have our
15:12very
15:19drive by 9,
15:21you'll see the queue
15:25of kids lined up trying to enter the
15:27school and it's very difficult.
15:31entries
15:36after
15:38we will shut that entry down
15:41>> that it will just be the main entrance.
15:43Okay.
15:43>> And we do that at many of our schools.
15:46It's a very efficient way in the
15:48building quick.
15:54>> Awesome. Thank you.
15:57And then to the far left of the page is
16:00the uh GW wing. That's a complete gut
16:03renovation. We mean by gut renovation,
16:05it's tear down just about everything
16:06that's in there. Um not all the walls
16:09will come out. A lot of the corridor
16:10walls will remain, but the interior
16:13walls and current classroom sizes will
16:15change.
16:22just a an overall view of the existing
16:26site plan. Um, a couple things to note
16:29here are um kind of the way that the
16:33parking lot is set up now is not ideal
16:35because when you let's say you park on
16:38the far left, you've got to walk through
16:39like um two or three lanes of traffic
16:43trying to find parking spots. Ideally,
16:45we would and we're going to rotate that
16:4890 degrees so that when you're walking
16:50to the building, you're walking with
16:51traffic.
16:53>> Um,
16:55>> yeah,
16:56>> that reconfiguration there. Um,
16:59you can see the bus loop there. We've
17:01got an entrance coming into that
17:03entrance we just talked about. Um, we've
17:06pulled that parent drop loop off away
17:10from the building to give a little bit
17:11more area for students to queue to go
17:14into the building. And then, um, their
17:17design here is to kind of separate the
17:21parking from like uh, student teacher
17:24parking and then also have an aisle in
17:27there so that it cuts down on people
17:30speeding through a parking lot. Um, you
17:33can see we've got the
17:36loading dock uh on an angle there so
17:40that uh trucks can be pulled in and
17:42pulled out easily. And then um again
17:46just paving
17:47more parking spots.
17:50Uh with this configuration, there is um
17:53a reduction in parking. Uh we're still
17:56working through those numbers, but it's
17:57probably 30 maybe 40 parking spots. But,
18:01uh, safety wise, this is probably a
18:04better a better layout.
18:05>> The two-way entrance.
18:08>> Yeah. And that's still in design. It
18:10>> Okay.
18:11>> This may change before we get to the the
18:13final.
18:14>> Okay.
18:15>> But, uh, yeah,
18:16>> one of the ideas is maybe you could have
18:18parents pull up the bus drive a little
18:21bit further,
18:22>> pull into the bus loop, and the parent
18:24drop off, sorry, sorry, and circulate
18:28that way and back up. It's interesting
18:29to watch people turn left on that exit
18:31right there. [laughter]
18:39>> Uh this slide here is just a blowup of
18:42the reconfiguration of the cafeteria
18:46and kitchen. Uh so in the red section
18:48there is the the cafeteria currently
18:51that runs north and south. We rotate
18:53that 90° to maximize the windows along
18:56that exterior wall. for natural light.
18:59Um, just above that, you'll see two
19:02small uh toilet rooms that are added
19:05into the cafeteria space. I think that
19:08is intended to allow a lot of
19:09flexibility for um events after school.
19:13You can essentially lock down the the
19:16cafeteria area and just let people into
19:18that section of the building. Uh just to
19:21the right of that uh or above that are
19:24two classrooms that we're able to create
19:27um with this reconfiguration. We are
19:30losing one classroom in the lower right
19:32corner but we're able to gain one
19:34classroom.
19:35So a net increase there which is good.
19:37And then we've to the right of that
19:39we've got the uh new servery.
19:43And then to the right of that is the new
19:44kitchen. Um, also able to separate the
19:48garbage from kitchen. Uh, currently now
19:51it's all kind of like intermingled.
19:54So able to create that dedicated garbage
19:58and there's a overhead loading dock
20:00there for to exit the building. And then
20:02>> yellow, dark gray, and lighter gray are
20:04all what we look at right now as the
20:06cafeteria.
20:08>> Uh,
20:09>> no.
20:09>> Nope. Cafeteria currently sits where the
20:12new servery like the tan
20:13>> Okay. And then the the shaded uh
20:16classrooms here.
20:19Um again, new loading dock and staging
20:23area for that for meals go
20:25[clears throat] coming back and going
20:26going out and then trays coming back in
20:29for the following day. Um there's a
20:31break room for the kitchen staff with
20:34two designated toilets.
20:38Any questions on cafeteria?
20:42>> [clears throat]
20:46>> Uh this is a blowup that the GW wing. Um
20:52we do in this um create five CTE spaces.
20:57Those are highlighted in blue. I believe
21:00currently there's programming for
21:02construction technology, creative
21:03expressions, natural resource, and then
21:06there's two future programs that can be
21:08added to the CTE.
21:11um toilet room renovations creating um
21:15in the gray section there. Um
21:20the orange are seven classrooms along
21:23that north face currently configuration.
21:27There's about five. So we're
21:30reconfiguring that to make seven. Um and
21:34then there's also two, three, four
21:35office spaces that are created for uh
21:38program.
21:41>> Are children still in the building
21:43during this construction?
21:45>> Yes, this is a phase renovation. So,
21:47we're going to work in one area,
21:48complete that, work on another area. So,
21:51we're working through those details.
21:52Now, um,
21:59uh, this slide here just to kind of give
22:01you a blow up of each of the three, um,
22:05CTE spaces. Now, the construction
22:08technology, that's a former gym. So,
22:11we've got a little bit more head space
22:12there. The idea is there to create a um
22:15a storage space um with stairs that go
22:18up to it, which is probably, you know,
22:2110 foot off the ground. That way they
22:23can clear floor space in the classroom
22:26area, teaching area with materials or
22:28tools that they're not using, put them
22:30up there for storage, bring them down
22:31when they need them. And underneath that
22:33would be like the lecture space.
22:37Um and the pictures here are just some
22:39um concept ideas, types of equipment
22:42that are used in these spaces that the
22:45design team is working with uh district
22:47staff to to see if it fits the program.
22:51Again,
22:54some uh studies or pictures that the
22:58architect has used on other projects for
23:01like um the green space um the
23:04hydroponics growing plants on a on a
23:07hydroponic uh construction lab, what
23:10that might look like. So
23:12>> just just a couple um concerns or
23:16recommendations from the meeting about
23:19what was presented that you can share.
23:21>> Um
23:25off the top of my head um one was one
23:27one concern was parking. Um,
23:31another concern, not necessarily a
23:33concern, but um, making sure we've a net
23:39zero, if you will, with number of
23:40classrooms.
23:42>> Um, the current layout, we're about even
23:44at the um, GW. We're about even on
23:49number of classrooms that are currently
23:50existing and then the num the ones that
23:52are taken away. by reconfiguring
23:55um it creates a little bit more
23:57flexibility because we've got um
24:01if you go back to the next slide
24:05one more.
24:07So between like creative expressions and
24:09future programming that's a a classroom
24:12there in green that can be either be
24:14used dedicated for creative expressions
24:16or it could be used for a future program
24:19or it could be used for a math class.
24:22So it gives a a little bit more
24:23flexibility with that. Hopefully that
24:25answers your
24:28>> Thank you.
25:15And that's part of the the phasing that
25:17we're looking at is if we need to fit
25:18out a space um for temporary use, what
25:22needs to be included in that power-wise,
25:24waterways.
25:26Yeah.
25:29Right. Right.
25:35Mhm.
25:40Wednesday.
25:51Uh any other questions on Nottingham?
25:54Okay, moving to Webster. Uh, current
25:57work scope is um site work, reconfigure
25:59the parking lot, add a bus loop, uh,
26:02relocate the pre play playground and
26:04loading dock. I don't know if anybody's
26:06been over there in the morning, but it's
26:07congested.
26:08Um, exterior window replacement, doors,
26:12uh, roofing, brick repointing, um, a new
26:15dedicated secure single point entrance,
26:18um, at the front of the building.
26:22um
26:24update finishes within the building.
26:26When we look at the plans, it's going to
26:28look kind of bland, but we're doing
26:31introducing air conditioning into this
26:33building, which requires all the
26:35ceilings to come out, which then we'll
26:37have new ceilings, new lighting. Um
26:41there is a four classroom addition
26:45um in planned for this building. It's uh
26:48two stories, so two classrooms on two
26:51separate floors, and we'll show that
26:53here in a minute. Uh mentioned the air
26:55conditioning controls will be upgraded
26:57as well. Uh plumbing, it's uh
27:00renovations to the existing toilet rooms
27:04and then adding toilet rooms for prek
27:06and kindergarten in the classroom, which
27:09is good. um probably will, as I
27:12mentioned, new electrical uh lighting
27:14and controls. Uh additional security
27:17cameras, fire alarm, PA clock systems
27:20will all be replaced.
27:22Uh ADA accessibility improvements into
27:25the building will be incorporated into
27:28the site so that there's ramps to get
27:29you into the the single point uh entry.
27:34and then some minor reconfigurations to
27:36the cafeteria serving line so that um it
27:40kind of will create a better flow in the
27:43space.
27:46>> Do we have any ideas about how bad the
27:48abatement is?
27:50>> Uh we just are receiving reports on
27:53that. It doesn't seem that terrible.
27:56Um
27:58>> absolutely. No doubt. Just will slow you
28:01down if there's more. That's all. Right.
28:11Uh the original building in the the main
28:14entrance here is a 1917 building. It's
28:18uh brick exterior construction but a lot
28:19of wood framing. Uh there was an
28:22addition in 1924 which is the next
28:24section of the building. Uh again wood
28:27framing for the roof structure and
28:29exterior masonry walls with wood
28:31framing. And then there was a 1984
28:34edition. That's the threetory uh at the
28:37end of the building. And we'll point
28:38that out here.
28:40Um so again,
28:43uh existing site plan. Uh
28:47we've got uh teacher parking in the
28:49upper
28:52left corner there. And then across that
28:55is the
28:571917
28:59section of the building that kind of
29:00runs north and south. And then off of
29:02that is the 1924 section
29:06which runs east and west. And then the
29:08lighter roof structure there that is the
29:111980s edition.
29:13Uh we got the playground currently in
29:15the lower left corner. And then there's
29:17a small uh bus loop off of Lisman.
29:26So the the current site plan looks at
29:29adding um relocating the playground,
29:33adding parking along Wadssworth,
29:36and then creating a bus loop, if you
29:39will, entry off of Listman that exits
29:41off of Birkshshire. Uh this will hold
29:45about 14 buses which is the current load
29:47for the building.
29:49And then um we would also add a loading
29:52deck. The loading dock currently is on
29:55the south section of that 1917 portion
29:58of the building which adds to
30:00congestion. We want to increase the the
30:03width of the street there to for a
30:06parent drop off to kind of separate
30:07parent drop off, bus drop off, and then
30:10um walkers come to the building too.
30:14>> Can you go to the previous slide just
30:25>> Thank you.
30:36That's the front facing part of the
30:39building
30:40>> is on Bossworth. Correct.
30:42>> That is now going to look like parking
30:44instead of the face of the building.
30:48Yeah, that's really different.
30:55Okay.
31:01Right.
31:04Similar.
31:23>> That neighborhood meeting is tonight.
31:26>> Yes.
31:27>> Yes.
31:29And then just noting the the purple box
31:32here is the two classroom edition which
31:34is actually four but it looks like two
31:35on the the plan here. Two stories. Um
31:42[clears throat and snorts]
31:43and then relocating the loading dock to
31:45the north side of the building so it's
31:48off of the teacher parking lot, not
31:50interfering with parent drop off or bus
31:52traffic.
31:59Um, this plan view is of the lower
32:02level. Um, again looks kind of bland
32:04because the 1917 and 1924 is all crawl
32:09space, but the 80s edition has that
32:11basement level which has classrooms um,
32:14which will include the two new addition
32:17uh, classrooms. The orange on these
32:20drawings indicate toilet room
32:21renovations or new toilet rooms as we
32:24get to the upper floors. And then the
32:26yellow um is instructional space that
32:29we're reconfiguring for programs that
32:31are held within the building. But the
32:34white areas do get touched um with new
32:38ceiling, lighting, and air conditioning
32:42windows as well. So that'll help
32:46with the uh natural light in the
32:48classrooms.
32:52This is the
32:52>> [clears throat]
32:53>> uh first floor plan. Um starting at the
32:56top with the second floor of the
32:59addition. Um again, we've got toilet
33:02rooms that we're renovating uh in the 84
33:05section. um dividing up a current uh
33:10configuration for offices slash um
33:13support spaces.
33:15And then if we move to the left, um the
33:19existing main office remains where it
33:21is, which is in
33:23the center. Um
33:30at the front of the building, we've got
33:32a 88 accessible ramp. Currently there
33:35isn't one. So that's not able to be used
33:37for a main entrance. Uh I think
33:39everybody comes in the back of the
33:41building now. So it'd be nice to move
33:42that to the front. Then we'll have a
33:44secure a vestibule
33:46and u enter people into the building
33:50that way.
33:52uh
33:53mentioned the kitchen, cafeteria,
33:56not major renovations in there other
33:58than air conditioning, but the cafeteria
34:00serving line uh we're looking at
34:03reconfiguring that so that it helps the
34:05flow through the the cafeteria. That was
34:09uh comments that we did receive at one
34:11of the public input meetings.
34:16Any questions or
34:21Uh again on the second floor um which is
34:25the top floor of the 80s edition. Uh
34:28toilet room reconfigurations and again
34:30new ceiling, lighting, air conditioning,
34:33windows in that section as well.
34:35[snorts]
34:50It would take a lot more from the budget
34:54to so adding the I agree it seems like
34:57it would be but we would have to take
34:59something else out if that makes sense
35:01because we're limited on the budget and
35:04the aability for the building. So in
35:06order to incur that cost, we would
35:08likely have to reduce scope in another
35:10area.
35:17Uh Seymour, um a lot of the same work
35:20scopes as uh Webster. Uh looking to
35:24expand the parking lot, reintor
35:25reorientate the playground. Uh add a
35:28dedicated uh bus drop by increasing the
35:32the width of the road. Uh window
35:35replacements, roofing replacements,
35:37select uh brick repointing and a new
35:40entrance at the front of the building
35:41that you see in the picture there. So
35:43that will become the single point entry
35:46um during the day or at the building.
35:49Um, as we mentioned, um, mechanical
35:53upgrades, air conditioning, whole new
35:56mechanical system,
35:59uh, which will then trigger new ceiling
36:00and lighting in all the spaces, um,
36:04plumbing, uh, new toilet room
36:06renovations, uh, adding toilet rooms to
36:09kindergarten, preK rooms that are
36:11connected to the classrooms, uh,
36:15electrical upgrades, mentioned the
36:18lighting, security, alarm or security
36:20camera, sorry, uh fire alarm, PA and
36:24clocks will all be replaced building
36:26wide as well. And then the ADA
36:28accessibility improvements in the toilet
36:30rooms and entering and exiting of the
36:33building.
36:34>> On which side? Because there's no ADA
36:36accessibility on the front.
36:37>> We're going to add that a ramp to the
36:39front of that now as part of the
36:41project.
36:48This slide again just uh overall the
36:51existing site conditions here. You can
36:53see we've got a small bus loop off of um
36:56Shard.
36:58Not quite big enough for the the amount
36:59of buses that they have here. A lot of
37:01them end up queuing out in the road
37:03which um adds to confusion, congestion
37:06during the morning. Um [snorts]
37:10>> are any of the DOT plans
37:13that include West Street?
37:16Uh I'm
37:17>> affect you at all?
37:18>> I'm not aware.
37:19>> Okay.
37:20>> It shouldn't, but um
37:22>> Okay.
37:25>> Okay.
37:30>> The the new site layout here, the
37:32existing parking lot stays the same. Uh
37:34we expand that pick up by I think like
37:3630 spaces or so. Uh we do reorientate
37:40the playground to keep it in the same
37:42area, but allows for that. um
37:46parking lot to be created and that
37:48existing bus loop goes away. Uh we would
37:51widen the street for a bus drop off on
37:54Shard and then into the main entrance.
37:58We would rework those stairs for that
38:00ADA accessibility into the building.
38:02>> But there's only one side for ADA
38:04accessibility, just front entrance.
38:06>> I believe you can enter in the the
38:11office Seymour. I believe that entrance
38:13is at grade as well currently.
38:27Oh, that's true. On the the west side,
38:29which is currently the the single point
38:31entry, right at the the end of that new
38:34parking lot, there is a ramp there as
38:36well.
38:40uh first floor uh layout here. Again,
38:44the orange represents either new toilet
38:47rooms in classrooms or renovated
38:50toilets. Um we are creating a couple new
38:53toilet spaces up near the gymnasium so
38:56that we can move the current toilet room
39:00from its current reo location to create
39:02some more storage for the kitchen.
39:05Um the yellow represents um support
39:08spaces that are created. Taking a little
39:11bit out of the library to create uh two
39:14support spaces
39:16and then in the green at the front is
39:18the the main entrance and secure
39:20vestibule
39:22uh for single point entry.
39:24>> Students are staying here.
39:26>> Uh no these students get relocated as
39:28well. They really
39:31>> uh again all the other classrooms
39:34configuration wise don't change but they
39:36do to get new windows, lighting uh and
39:39air conditioning.
39:45Uh second floor, not any real
39:48modifications to the existing building
39:50footprint, but um renovating and
39:53creating a couple creating one new
39:55toilet room and then renovating the
39:58other toilet rooms.
40:02And
40:04that's it essentially. Um any questions,
40:07concerns?
40:07>> Oh, exciting to see what's about to
40:09happen.
40:10>> Yeah. Yeah.
40:12>> Thank you.
40:13>> Awesome. Thank you. Thank you. Thank
40:15you.
40:17Uh report of the
40:20>> diversity officer Charl.
40:23>> Yes.
40:25[clears throat]
40:30>> Thank you. Okay.
40:36Here you go.
40:37>> Good morning. Cheryl Pace, assistant
40:39director of the division of equity,
40:40compliance, and social impact.
40:45Um, the first thing that I'll be going
40:46over is the EEO data.
40:50I'll give you a chance to
40:53get the document first.
40:56Same thing. Yeah.
41:01>> So, from the last report, um, we have
41:04received, uh, payment applications from
41:06Labella and Kadini. So, they're listed
41:08here as well and included in the
41:10professional service hours. Um so just
41:13to go over uh where we currently sit
41:15with the minority percentage um we are
41:18currently at 18.13%
41:21um towards the goal. Uh
41:24for the uh women percentage uh we are at
41:28uh 14.86
41:30and that's to a 12% goal. And then for
41:34the uh Syracuse or sorry city resident
41:37um goal of 20%, we are currently sitting
41:40at 17.56%.
41:42And then for the Syracuse City School
41:44District graduate goal of 2%, we are
41:47currently at 17.88%.
41:50Or I'm sorry.99.
41:53Um again [clears throat]
41:55as mentioned last time these goals will
41:56fluctuate as we onboard more of the
41:58contractors and they start submitting
42:00their hours. um because it is based on
42:02the total hours that they are submitting
42:04in their payment applications. Um
42:06depending on each payment application,
42:08the hours will go up and down for this.
42:12Are there any questions on the EEO data?
42:17Okay. And then the second page is just
42:19the uh percentage towards the um MWBE
42:23goals uh for the business enterprises.
42:26So again, we now have all of the
42:29contractors listed um including CNS. We
42:32haven't received or processed their
42:34payment applications yet. So they're not
42:36included in the payment totals today. Um
42:39but right now uh towards the MB Eagle um
42:43Turner and uh
42:47sorry for the MB Eagle um we have uh for
42:52Webster Kadini and for Seymour Kadini
42:55has contributed towards the MB Eagle
42:57with their payment application so far.
43:00So for Webster, uh they have contributed
43:02$17,252.50
43:06towards the MB Eagle, which puts them
43:08right now at um 5% towards the overall
43:1318% goal. And then for Seymour, Kadini
43:16has contributed $16,156
43:19towards the MBE goal, uh which puts them
43:22at 5% towards that goal as well. So, we
43:25currently sit at um 1% towards the eight
43:29overall 18% goal, but that's just
43:31because those are the first few payment
43:33applications that have been processed
43:34with MWBE participation.
43:37>> And again, this line that says value in
43:40NA is because we have not processed CNS.
43:42>> Correct. Okay. They haven't submitted
43:43any payment applications yet. So,
43:45there's nothing towards the goal. Um for
43:47the ones that say zeros, we have
43:49processed payment applications. They
43:50just haven't done any MBE participation
43:53yet.
43:54Okay. And that's Labella. That would
43:57include Labella.
43:58>> Uh that was for Kadini that has
44:00contributed so far. Labella, we've
44:01processed the payment application. They
44:03just haven't um had any participation
44:05yet from an MBE.
44:08>> Do we know what the scope participation
44:11is that they've submitted a utilization
44:13for?
44:14>> Yes. Um if you'd like, I can uh provide
44:17the utilization plans to go out to the
44:19board so you guys can see. um some of
44:20them just haven't been engaged yet just
44:22due to the scope of their work doesn't
44:24come in until later stages.
44:26>> Okay.
44:27>> For the WB Eagle um Turner has
44:31contributed um 225,335,000
44:35sorry 225 335,000
44:39um and49 cents towards that goal. So
44:42towards the 11.67 67 uh or sorry 87%
44:46that they have on their utilization
44:48plan. They have contributed 10% so far.
44:50Um
44:52Nottingham uh Labella has contributed
44:5513,000 um 25 uh towards the overall 12%.
45:00So they are currently at 4% WBE
45:02participation. For uh Kadini, for
45:05Webster, they've contributed $10,300
45:08towards the 12% goal and currently sit
45:11at 4%. And then for their uh for kadini
45:16for Seymour they have contributed 10,900
45:20towards the 12% goal and sit at 5%. So
45:23the overall achievement so far towards
45:25the goal is 7% for WBE.
45:29>> Um Charerelle remind me what's the
45:31software that contractors are using now?
45:33For contract management, we are using
45:35B2G now and we are currently exploring
45:38options for uh certified payroll. Uh B2G
45:42now does also have a um software e
45:44comply which would create a single sign
45:46on for contractors. So they wouldn't
45:48have to log into two separate systems
45:51and they would also be able to do um
45:54exports that match the format that is
45:57required now by the department of labor
45:59so that it would make it easier for them
46:01to follow the process that the
46:03department of labor has outlined as
46:04well. So we're exploring that right now
46:06as an option. Um, still a few more
46:08conversations need to be had, but then
46:10we would be presenting the information
46:11to the board to understand which
46:13software we think is a best fit
46:15>> and any ICO ICO selected would have to
46:18use those.
46:19>> Yes. And we want to um make sure that
46:21the software stays um on our side and
46:24there would potentially be access
46:26granted limited access just to be able
46:28to do the compliance piece. um not
46:30actually have like administrative access
46:32but just um able to process uh either
46:35certified payrolls or contract
46:36management but we would have the data.
46:38Yeah.
46:39>> Okay. Perfect. Thank you.
46:41>> You're welcome.
46:42>> Any questions?
46:46>> All right. Thank you.
46:46>> Thank you.
46:49>> Uh no, that's Thank you. But just
46:51quarterly report
46:52>> resolution uh uh agenda item six
46:55resolution.
46:56>> Yes, we have one uh resolution today. Um
46:58before that a quick update that I forgot
47:01to mention. I'm in the process of u our
47:04annual renewal of our your director and
47:06officers liability insurance. So
47:09submitting that application and hope to
47:11have a proposal from the insurance
47:13broker at the next board meeting.
47:15>> Thank you very much.
47:16>> You're welcome. [laughter]
47:18Good thing to have.
47:19>> Yes, sir.
47:20>> And uh with that being said, we have
47:22resolution number 19 which would
47:24authorize our monthly payments for
47:26September.
47:29So move
47:31>> second. Any abstensions? Any objections?
47:35None hearing. All in favor?
47:38>> So move.
47:40>> Any other items?
47:41>> That uh completes our agenda for today.
47:44>> That concludes our agenda for today. Uh
47:47just a taste of where we're going in as
47:49far as the meeting time. You guys got
47:51too comfortable with 10 minutes.
47:53[laughter]
47:55>> Great question.
47:56>> Yes. Yes, great presentation. Thank you
47:58for the update. Um, I'll entertain a
48:01motion to adjurnn.
48:01>> So, move.
48:02>> Second.
48:03>> Second. All approved. I
48:05>> I So move. Thank you all.