2026-09-15 - Conservation Commission
Summary
Written from the YouTube auto-generated captions, with an AI-drafted first pass that was fact-checked against them; street names and some spellings are garbled in the captions and are corrected only where the context makes them clear. The captions run 2 hours 20 minutes, and votes were often spoken without a count.
- Wetlands requests for determination: a retaining wall repair at 190 South Quinsigamond Avenue (lake drawdown, hand work reusing the stone); a shed and fence at 5 Oak Meadow Circle (staff noted earlier earth disturbance and a stockpile near the wetland); and a collapsed retaining wall and tree removal at 20 Tamarack Lane. The commission asked for engineer or surveyor plans showing existing conditions, grades, erosion controls and restoration, and continued all three to October 20. A continued request for Mitchell Drivetrain Service (384 Hartford Turnpike, after-the-fact tree removal, regrading and asphalt millings) was heard without the applicant, and staff said updated stormwater information had not arrived.
- 40 Westview Avenue (single-family home, nearest work about 51 feet from the wetland): the hearing closed after discussion of saving trees by adjusting the limit of disturbance. The order of conditions added a wildflower seed mix on the slopes and a site walk before erosion controls go in to see whether more trees can be excluded. See 40 Westview Avenue Single-Family Home.
- 255 Gulf Street (single-family home, driveway and drainage): the hearing closed after discussion of an arborist letter, native replanting, moving a stone trench out of the 30-foot buffer, and removing ledge by hammering rather than blasting. The order of conditions kept buffer trees cut high where possible and requires a return to the commission before any blasting. See 255 Gulf Street Single-Family Home.
- 92 Cherry Street (inground pool and site work): the hearing closed after the commission asked that the fence be moved outside the 30-foot buffer to protect the native-vegetation restoration area; the order of conditions includes that. See 92 Cherry Street Inground Pool.
- The mixed-use development on Hartford Turnpike (captioned 525): a continued hearing covered wetland replication monitoring, three waiver requests, a conservation restriction, vernal pool hydrology, stormwater detention over shallow bedrock and no expected blasting; commissioners raised vernal pool concerns and the hearing stayed open. See 526 Hartford Turnpike Mixed-Use Development.
- 957 Boston Turnpike (car dealership with a wetland crossing): the applicant supplied the missing culvert detail, a 4-by-20-foot culvert, and agreed to remove fill on both sides of the stream. The hearing closed and an order of conditions was issued with minimal salting near the crossing, culvert work in dry weather, three years of restoration monitoring with a 75 percent success rate, and a wetland scientist on site during removal. See 957 Boston Turnpike Car Dealership Site Plan.
- 331-335 Maple Avenue (retail and residential): no applicant attended; staff said the state environmental review comment period ends September 25 with a decision expected in early October, and the matter was continued. See 331-335 Maple Avenue Retail and Residential Development.
- Certificates of compliance: an invalid certificate for 6 Cheryl Drive (the work was done under a later filing) and a complete certificate for 19 Jackson Street (single-family home).
- Enforcement: at 47 Lear Street North the new retaining wall sits farther into the lake than approved, and the owner's surveyor is to bring an existing-conditions plan next meeting (47 Lear Street North Retaining Wall Enforcement Order). At 101 North Quinsigamond Avenue there was no substantive update and staff will take the long history of non-compliance and fines up with the state environmental agency (101 North Quinsigamond Avenue Enforcement Order). At 33-69 Green Street the contractor reported the impact areas cleaned, slopes seeded with erosion matting, driveways paved and sod planned; the commission accepted written updates in place of monthly appearances (33-69 Green Street Enforcement Order).
- The commission voted to send a letter of support for a Community Preservation Committee request to plant trees for the town's 300th anniversary, with a pilot of about 50 trees at Dean Park and the Maple Avenue fields (Tree Centennial Pilot Project).
- Announcement: the Spirit of Shrewsbury event is on September 26.
Issues discussed
- 40 Westview Avenue Single-Family Home
- 255 Gulf Street Single-Family Home
- 92 Cherry Street Inground Pool
- 526 Hartford Turnpike Mixed-Use Development
- 957 Boston Turnpike Car Dealership Site Plan
- 331-335 Maple Avenue Retail and Residential Development
- 47 Lear Street North Retaining Wall Enforcement Order
- 101 North Quinsigamond Avenue Enforcement Order
- 33-69 Green Street Enforcement Order
- Tree Centennial Pilot Project
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
01:15[clears throat] Good evening. I'd like
01:17to call the meeting to order. Uh first
01:19item on the agenda is to review and
01:21approve minutes and we do not have any.
01:25The second item on the agenda is to sign
01:27bills.
01:28>> There's just one bill from the community
01:29advocate.
01:3711.
01:56Okay, we are um on to meetings and
01:59hearings.
02:01Bob, do you want to read this one
02:02because I've recused myself from this?
02:05>> It's going to be continuated continued
02:07public meeting regarding requested
02:09termination of applicability for the
02:11file of Mitchell drivetrain service of
02:13384 Harford Turnpike shoes brief the
02:16after the fact approval for removal of
02:18trees regrading and laying asphalt
02:21millings at 50 Clue Street. Is there
02:23somebody here from Mitchell drivetrain?
02:28We'll just hold this.
02:29>> Aaliyah, I was going to ask were we
02:32because we did briefly mention that um
02:36because he was having to do storm water
02:39for the permit, do you think it would be
02:42safe to issue a positive and just have
02:44him submit that NOI with the storm water
02:47or was that not part of his
02:51plan? I um because we had not heard from
02:55him, I I had not heard from him
02:56separately and we had not received
02:58updated uh storm water information.
03:00>> Okay.
03:00>> Um I can reach out to him this month and
03:04see if um [clears throat] let him know
03:06that that probably the the work that he
03:09is proposing or has already completed is
03:11something that's a little bit larger
03:13than a request for determination.
03:14>> Yeah. Um and that it might be speed the
03:18process up a little bit if he if he
03:20scooches forward with a notice of intent
03:22filing.
03:22>> Yeah.
03:22>> And then we can issue a positive at our
03:24next
03:25>> and then
03:25>> cycle them out.
03:26>> Yeah. Perfect.
03:27>> So okay.
03:30>> Uh but I guess continue for now.
03:33>> Yeah.
03:34>> In his absence.
03:37>> Okay.
03:39Okay. Okay. A new public hearing. Hereby
03:41notice is given in accordance with the
03:43provision of general laws chapter 131
03:45section 40 of the town of Shoesby
03:47wetland bylaws and regulations that
03:49David Batada behalf of Lake View Landing
03:53Trust 135 Elm Street Worcester Mass has
03:55filed a request for termination of
03:57adopability for a retaining wall repair
04:00190 South Sigma Nav. There's someone
04:03here from 190. Thank you Mr.
04:17Good [clears throat] evening.
04:18>> Good evening. I'm Joe Graham. I'm the
04:20engineer um that presented the the RDA
04:23to you tonight. Um the proposed plan at
04:26at the this condo association
04:29is to repair an existing retaining wall
04:33um and
04:36utilize the the current draw down of of
04:39the lake in order to do repairs to the
04:42existing retaining wall um that can be
04:45shown in the photos. The existing
04:46retaining wall has slumped a little bit
04:50into the lake and the goal is to repair
04:52that in kind reutilize as much of the
04:56existing rock as possible. Um, and we
05:00feel that this is a repair aspect of of
05:04the work and we're requesting
05:05determination of that. Um if not we will
05:08file a notice of intent but we will the
05:11goal here is to replace in kind the
05:14length of that retaining wall um to
05:17install um a silt boom obviously during
05:20that aspect of work to make sure that we
05:22are doing this work in accordance um and
05:25also
05:27um I think one of the questions had come
05:29up during review of whether or not there
05:32would be mortar in in the joints of the
05:35retaining wall. Um, we would like to
05:38we're proposing to utilize mortar for
05:41the structural integrity of that
05:43retaining wall so it does not slump. If
05:45you notice on one of the ladder
05:47pictures, it's uh somewhat slumped or
05:50you can see right where that green line
05:51is. Uh, yeah, right there you can see
05:53it's slumped into the lake a little and
05:56we want to utilize the a repair
06:00technique that would, you know, prevent
06:01that in the future. We obviously want to
06:04also be cognizant of the aesthetics of
06:06the wall and um and the the lake shore
06:10and
06:12we would um rake the mortar joints back
06:14so it would present itself as a drylaid
06:17um retaining wall to try to match in
06:19kind as as best as possible.
06:23Um so that's the anticipated scope of
06:25the work. Um, we plan on, you know, it's
06:28a lot of hand work by a mason to
06:31reinstall and to work with the existing
06:33stones, but we're looking to do that.
06:35Um, and instead of bringing new rock
06:38stones in and and creating a larger
06:41disturbance.
06:43Um we anticipate this work to to be
06:46done, you know, prior to, you know,
06:49obviously the getting closer to the end
06:51of the the good weather, but um this
06:54year, you know, um imminent upon
06:58approval um
07:01and we're happy to answer questions.
07:03>> So,
07:05how will you um
07:08treat the concrete slab that's above it?
07:11The concrete slab that is above it looks
07:13like it was a previous type of repair.
07:16Um, now it looks like it was somewhat of
07:19a stop gap for what could have been
07:22slumping and fines running behind the
07:23wall. We believe that um that concrete
07:28slab um has deteriorated and and should
07:32be removed and that the utilizing the
07:35the stones and the mortar and um
07:40that uh
07:42for for the wall um we'll render the we
07:45won't need to utilize a concrete slab on
07:48top. Um,
07:51>> so you're going to remove the concrete
07:52by hand,
07:54>> correct? Yes. This is uh a lot of hand
07:57work to to chip that area out.
07:59>> And then
08:00>> then you rebuild the the existing walled
08:03in kind.
08:04>> Correct.
08:04>> In its same location,
08:05>> the same footprint.
08:06>> How do we know that it's going to go
08:08back into the same area? How do we know
08:10it's not going to move out or do we have
08:12a survey of this?
08:13>> Yep. That'll be my job. I'm sorry. I'm
08:15I'm Robert O'Neal. um the licensed land
08:18surveyor for the project that we'll
08:20provide a before and after location of
08:22the wall.
08:24>> Okay.
08:28>> Um Emily,
08:30>> I do not have any questions for this
08:33project.
08:35>> The only question I have is you're
08:37taking all that cement out all the way
08:39back to the other wall, correct? It's
08:40all coming out. What's going to be put
08:42back in there to stop stuff from running
08:44into the lake after that's taken out?
08:46>> Yep. Um, as you can see, much of the
08:48stone that has slumped into the lake. We
08:50anticipate that the bulk of that would
08:53be able to be reused as um structure for
08:56the for the rock wall. If if not, um
09:00we're hoping to minimize right new new
09:02stone being put in. But we will uh in
09:05order to maintain the the level grade in
09:07that area, um we anticipate, you know,
09:11minor um new new stone to be installed,
09:14but
09:16Um
09:18not not significant amount I guess is if
09:22that answered your question. Sorry.
09:24>> Yes.
09:26>> How do you how do you anticipating
09:28getting all the materials to here?
09:30>> Um this will all be so previous repairs
09:32were um actually done on the the far end
09:36of of this photo where there we repaired
09:39the stairs and the landings. So
09:41everything will have to be hand
09:43wheelbarreled down that hill in that
09:45area and and put in. Um
09:49>> and and just to get back to your survey,
09:51Bob, do you have a a a pre an existing
09:55condition survey?
09:56>> Yes.
09:56>> Provided in this packet?
09:58>> I I don't know if Joel,
10:00>> we did not provide a
10:03existing condition survey, but we do
10:05have one um because we have some history
10:07in that this site. So we can provide
10:09that um as a post certainly can provide
10:12that.
10:12>> Okay. Um Diane,
10:15>> no I don't have any questions.
10:18>> What do you have any questions?
10:20>> Um yes. Yeah, I would recommend a
10:22special condition related to providing
10:24that preervey before the before work
10:27begins. Um and then I also had a
10:30question about um yeah, currently it is
10:32kind of slumped. Are you
10:36maintaining a bit of of an angle with
10:38the construction? Are you planning to
10:41prop it back straight?
10:42>> Correct. We are planning to prop it back
10:44as as straight as we, you know, possibly
10:46>> can get it. Are you anticipating that
10:47any additional uh back fill will be
10:50necessary to keep it?
10:52>> I don't think we're moving it that much.
10:54Um that would that would factor in.
10:57>> Okay. And then yeah, with the with the
10:59removal of a couple of inches of um that
11:03concrete on top, it sounds like there's
11:06the proposal of additional rocks going
11:08up there. But are you are you
11:10anticipating that you'll have that much
11:12rock material to make up for the what is
11:14it? Three or four inches of
11:16>> Yes. Uh throughout the the length of the
11:18wall, if further down in that that
11:20photo, I don't know if this one does it
11:22justice, some of that concrete has
11:23deteriorated and it's no longer, you
11:25know, three or four inches. is much less
11:27and as you can see right it's it's kind
11:29of undulating throughout that we want to
11:32maintain a level of grade so there's no
11:34tripping hazards or no hazards along the
11:36edge
11:37>> okay um I might also recommend a special
11:39condition related to if there is any
11:41excess that is going to be above the
11:43wall once the wall has been completed
11:44that it be removed from the site just so
11:46that it's not um over topping
11:49>> okay
11:52>> I think that's all for me
11:53>> um with with respect to removal of the
11:55concrete How much concrete are you going
11:57to remove? Cuz it's quite extensive.
12:00>> It is I mean it's about 3 and 1/2 ft
12:04wide by 4 in thick. It will it will take
12:07a it will it will take an effort to to
12:10remove that but um we will do do that by
12:13hand.
12:13>> So you're not removing that just looking
12:16at the pictures all the way back to the
12:17existing poured concrete wall where
12:20these where these chairs are sitting.
12:22You're not going to remove that?
12:24>> No. No. I'm sorry. So, it's just a
12:26there's a level cap of that concrete uh
12:29back near where the grills are and in
12:32the in the the chairs. That's more of a
12:34gravel stone area. It's there's a cap
12:37mostly on the wall.
12:38>> So, so where this this picture here, it
12:40shows shows the concrete pad going back
12:42to the um pound footing the the major
12:46wall. So, that's staying. You're not
12:49removing that,
12:50>> right? This is just solely on that
12:52retaining wall edge. So, one of the
12:55pictures shows the existing wall
12:57underneath that concrete cap. So, are
13:02you going to put the new wall in front
13:05of the concrete cap or where? Because
13:08the a concrete cap is should be the face
13:11of wall.
13:12>> Correct. Yes. Yes. That if I think I
13:15understand. Yes. That that concrete cap
13:18is will be that face of wall that same
13:21alignment. Um, but as I said, that that
13:26concrete cap goes back about threeish
13:29feet um from
13:34um from this photo you can see here. And
13:37we would be maintaining that front edge
13:39so we're not impeding on the lake, but
13:41um
13:43relaying and redefining that that wall.
13:46As you can see, it's severely slumped in
13:48that that area.
13:53I don't know if I
13:54>> So with the with the existing conditions
13:57plan then you're going to show
14:01a proposed plan and we should have a
14:03proposed plan and you should show the
14:05extent of where that cap is going to be
14:07disturbed the disturbance.
14:08>> Yep.
14:09>> So we should have the existing
14:10conditions plan the proposed and then an
14:14asbuilt.
14:16>> Yep.
14:17And the the asbuilt should meet the
14:20existing conditions plan pretty much. It
14:22shouldn't extend any more into the lake
14:24than than what the face of the wall.
14:26>> Correct.
14:29>> Um Aaliyah, do you do you want to wait
14:32to get the existing conditions planned
14:34next for next meeting or do you want to
14:37>> Yeah, that might be more feasible.
14:38>> Do you want to do this as an or do you
14:40think this is sign this is okay?
14:47Do we have do you feel comfortable with
14:49control and whatnot if we get this
14:51information?
14:56>> I think we do have an understanding of
14:59it. It does sound like it is anticipated
15:00that that a pre and post plan will be
15:03submitted um which is usually our
15:06biggest requirement for uh for these
15:08undertakings just to ensure that the
15:10wall is not you know moving into our
15:13resource areas. Um, I think it would
15:16make sense to
15:18either ex Yeah. Extend that extend this
15:21hearing until we receive one of those
15:23pre-plans or is just issue a um close it
15:26issue a positive determination or
15:27request an NOI. I don't know what the um
15:32I don't know if any other commissioners
15:34have any. I guess my thought is
15:38>> Emily. [clears throat]
15:39>> Yes. Sorry. Um, I guess I have I'm just
15:42looking at there is a proposed plan, but
15:45I'm not seeing um
15:48grades in the location of where the wall
15:51is being placed. So maybe that
15:53information could be helpful when um you
15:57know when an asbuilt comes in and to
15:59compare pre and post grading um because
16:04there is a zone a flood plane associated
16:08with Lake Quincig. I don't know what the
16:11uh that elevation is. Um that would be
16:14my only kind of hangup would be just
16:17ensuring that there's no changes to what
16:20would be considered bordering land
16:22subject to flooding.
16:26>> So yeah, in the at minimum it may be
16:29good to continue the hearing until we've
16:30received the existing conditions plan.
16:33um if you're able to add the flood plane
16:36elevation um to the plan just to ensure
16:38that the wall is currently meeting the
16:39flood plane elevation for the for the
16:41lake um and that any
16:44restoration is not going to further
16:46impede on that um
16:50>> right so there would be an existing
16:52conditions plan uh with elevations
16:56um a proposed wall plan limit of work
17:00shown wall cap disturb urbance
17:04>> and then an asbelt and with all the
17:07elevations and to show exactly where
17:09this is placed and it's got to got to be
17:12it's got to be built back in the exact
17:14same position that it is.
17:15>> Okay.
17:15>> So, can you come back to us next month
17:17with that?
17:19>> Yes. Yep.
17:20>> And then um we'll that's and if you have
17:24any questions in the meantime, just
17:25reach out to make sure we get all this
17:27information. Otherwise, I know you need
17:30time. The draw down is going to happen.
17:32um sometime in late late October,
17:35November. So,
17:36>> you should have time to get this to us
17:38so we can um so you can do your work.
17:41>> Yeah, I got most of that information
17:43right now. But yes, absolutely.
17:45>> Yeah. Put all the information you think
17:47we're we're asking for on that so we
17:49have it and um we can look back at it
17:53when you complete your work and make
17:54sure it's exactly what you said you were
17:56going to do.
17:57>> Okay.
17:57>> Okay.
17:58>> Definitely.
17:58>> All right. So, we're going to continue
18:00this till you're going to continue this
18:03till October 20th.
18:04>> Yes, please. Please.
18:05>> Okay.
18:06>> Thank you.
18:07>> Thanks so much.
18:08>> Thank you.
18:19>> Okay. Bet.
18:22>> Okay. Notice hereby given in causes with
18:25the provisions of general law chapter
18:27131 section 40 of the town of Shoesby
18:29wetland bylaws and regulations that
18:32Kirish Shawwami
18:34vendar sorry for killing that five oak
18:38metal circle Shrewsbury has filed
18:39[clears throat] a request for
18:40termination of
18:42the installation of a shed and fence at
18:44five oak metal circle here. Okay,
18:51>> good evening.
18:55Um
18:56I'm trying to install a
18:58>> Can you state your name and address
19:00please?
19:00>> My name is Krishna Swami Wanka Chaman
19:02and I'm a property owner of five work
19:04circle.
19:05Um what we're trying to do is to install
19:08a shed and then a partial um encumbrance
19:14of like my property of the fence for
19:16just to make my dog to play safe in the
19:19backyard. So there is already a flatten
19:22quite enough flattened u land that I
19:25have in backyard. So we are just
19:27installing
19:29tough shed fabricated by tough home home
19:32depot. So
19:35I'm just like asking because it's it's
19:37just in the proximity of the petlands
19:40that is there in my property but there
19:42is about like more than 28 to 30 ft in
19:45the the side that I'm trying to install
19:48which is um Yeah.
19:52>> So all you're doing is installing a
19:56shed? installing a shed and putting a
19:58fence around
19:59>> and a fence
20:00>> partial because I'm not my property goes
20:02all the way down to that in but I'm not
20:04putting a fence over all that.
20:06>> You're not doing any earth work. You're
20:08not doing any grading. You're not
20:10cutting any trees?
20:11>> No, not part of this one.
20:13>> Okay. Um Emily,
20:17>> um
20:18where what is the is the fence location
20:21the two or what is the fence location? I
20:25guess is
20:25>> the fence location is going to be um my
20:28property line on the left and going all
20:31the way back to that shed just behind
20:34that shed. So it's going to go against
20:36towards my my property. So,
20:40anything just behind the f fence is what
20:43I behind the shed is what is my fence is
20:46going to be along my property lines and
20:48then it goes back to my property. So
20:51that it just makes sure there is a safe
20:53um
20:55like safely encumber so that my dog can
20:58play without getting into any of the
21:00wooded area.
21:03How far away is the shed from the B or
21:07not the shed rather uh the fencing away
21:10from the BBW or is it
21:12>> I don't think I understand exactly where
21:16the fence will be on the Is it the south
21:20edge
21:22>> um
21:22>> that it's proposed?
21:24>> Yeah, the behind the shed you mean
21:28behind the shed?
21:30Uh
21:33on the
21:35So it's installed you're proposing to
21:37install it along the the rear property
21:39edge.
21:39>> Yes.
21:40>> Where else? In order to make a
21:42container.
21:43>> It's stopping right there like know
21:44where I I marked it there which is there
21:46is a quite enough of um my property line
21:50goes but I'm not using that because it's
21:53it's too much to fence it. I really
21:55don't need that area to be fenced. So,
21:57I'm basically like making sure the
22:00amount of uh place that I wanted to make
22:03my dog to play around. So, I just don't
22:04want it to go all the way down to that
22:06line, which is far into the woods. I
22:10don't want to go that way. That far.
22:11>> It's very difficult to We don't know
22:13what line you're referring to. So, are
22:14you going to be putting a fence between
22:16your neighbors in on your back property
22:19line?
22:19>> Only on the back for a for a
22:23for a like 80% of my property line.
22:27And there is a
22:28>> there is a survey being done.
22:31>> Can you can you walk up to the screen
22:32and just show us?
22:34>> Sure,
22:35>> please.
22:38>> So,
22:48>> okay.
22:50>> And my property goes all the way down to
22:52here.
22:52>> Right.
22:54So, the shed will be proposed on the
22:56exterior of the fence.
22:57>> Yeah.
22:58>> Okay.
22:59>> Or inside the fence?
23:00>> Inside the fence.
23:01>> Inside the fence.
23:02>> Inside. Because I'm going to come here.
23:05>> Okay.
23:05>> Yeah. Where else?
23:06>> You had indicated the fence was going to
23:08go up against the back of the house on
23:09that
23:10>> like here. So, the fence go like here
23:14and then come to here. So, that this
23:16this section is covered.
23:24Okay.
23:25>> So, can you provide us with a a plan
23:28showing exactly where the fence is going
23:30to go?
23:30>> Yeah, sure.
23:31>> We'll I don't know if Emily's
23:34comfortable or anybody else, but we can
23:36approve it conditionally.
23:38>> Yeah.
23:38>> Whether with you get bringing a plan to
23:41Leah showing just what you just showed
23:42us.
23:43>> Yeah. What?
23:44>> Right. That's what I wanted to
23:46>> Emily. Do we have more questions? I
23:49guess my only question would be how far
23:52off that fence is from the wetland
23:54itself.
23:56>> Uh about 15 to 20 ft.
23:59>> Okay. And then what type of fence will
24:03it be?
24:03>> Chain link.
24:04>> Chain link fence.
24:08I don't I guess maybe I don't know if
24:14the commission is comfortable with
24:16conditionally approving it. I kind of
24:18want to know where exactly it's going.
24:21Um like even just on a like a GIS like
24:27map.
24:27>> Yeah, I can provide them.
24:29>> Um so but that those were my questions I
24:33had.
24:36>> Yeah, I think I'd like to see like a
24:38actually plan where the fence is going
24:39to be and exactly how far if it's 15 20
24:41feet. I don't want to find out it's
24:43going to be 10 feet from the wetland.
24:44You know what I'm saying? You don't want
24:45>> Yeah, it is far away from It's
24:46definitely more than 20 ft from the
24:49wetland.
24:52>> Did you visit the site, Aaliyah?
24:54>> I Yeah, I was able to stop by the site
24:56this afternoon. I
24:58um it did look like some some dirt or
25:02earth work had been done. Why is the
25:04rear yard missing all of its grass?
25:06>> It was all um what would say like it's
25:09all um the moss was there. None of the
25:13grass was growing. So we just like know
25:15script the the layer and just put the
25:18>> Yeah. So with the proximity of that to
25:21the resource area that's something that
25:22that requires conservation commission
25:25approval. You can't disturb the earth
25:27without so that that probably would be
25:30something that that could be added to
25:31this. Um and that area should be a
25:35special condition might be associated
25:37with either stabilizing it.
25:40Um,
25:42>> yeah, I I anticipate that receding is
25:43probably part of the plan. Um, but
25:46stabilizing it with erosion control in
25:48the interim so that there's not
25:49>> Yeah.
25:50>> way to the resources.
25:51>> Yeah, he's going to do the hydro
25:52seeding. So,
25:54>> um, it also looks like maybe a stockpile
25:57of material was made up against the
25:59wetland. Do you have um like some of the
26:02that dirt
26:04was moved to the edge? Why the what
26:07happened was like know during last
26:09winter one of the tree fell down from
26:12the other side
26:14>> so we have to like know move all that
26:15stuff to the to the right side so so
26:18that because it's it's it was on behind
26:21my property a lot and it was causing a
26:24lot of and in order to lay the fence we
26:27have to move that dirt to the to the
26:29right side. Uh, it is currently located
26:32pretty in pretty close proximity to the
26:36resource area. So, I might recommend to
26:39the commission that that be removed.
26:41>> Um, that's stockpiling material, dirt or
26:45vegetative material in the wetland is
26:47not is not something that's approvable
26:49by the commission.
26:50>> I can move that to the front side of the
26:54>> Yeah, that would be removed. Yeah, it's
26:56it is a I'm not sure how high the pile
27:00is and how much it goes slopes down, but
27:02it is you can see the the green beyond
27:05the um that green, that really bright
27:09green is is resource area. So, it goes
27:12right down the slope.
27:14>> Was that something you use a machine to
27:16move back there? Did they use a machine
27:18to take that off and push it back?
27:19>> Yeah, they probably used a machine last.
27:22>> Oh,
27:23>> all right. So, no,
27:25>> we're going to need a plan um that shows
27:27the fence.
27:28>> Okay.
27:29>> We're going to need a plan that shows
27:31erosion control barrier.
27:32>> Okay.
27:33>> We're going to need some sort of
27:35restoration plan for removing the fill
27:37within the area.
27:39>> Yep.
27:40>> That was where it was placed.
27:42>> Yep.
27:42>> And um anything else?
27:45>> Do we have a 15 foot notice or
27:49>> We sure do.
27:50>> Yeah. So, maybe confirming that that 15
27:54feet hasn't been
27:56it looks like it's like right up against
27:59the wetland edge.
28:01>> Yeah, I I it
28:04>> yeah I I'm not especially good with
28:06distances but it but it is in pretty
28:08close proximity to the resource area. So
28:10I'm not sure if it does fall within the
28:1215 foot. I definitely would recommend a
28:14a condition related to removal of this
28:17material from
28:19>> Right. And I wouldn't want to see it
28:22planted with like lawn or
28:25>> Yeah.
28:26>> grass. It should have
28:30>> no disturb. It should be like
28:31naturalized.
28:34Yeah, let me see if
28:37>> we probably should get has the
28:40delineation of this wetland. Are there
28:42any wetlands flags or anything on this?
28:45>> Um, and
28:46>> there are not current wetland flags on
28:48on this this property was um let me see
28:53there was the construction of this house
28:55was completed in
28:57>> 2018.
28:58>> 2018. So there is a plan associated with
29:00the house at that point with the the
29:01wetland flagged at that point for this
29:03scale of work that would probably be
29:05sufficient. I'll share that instead for
29:08the commission to consider.
29:09>> Yeah, that red line is the where the
29:12fence is going in the previous photo.
29:15>> The red line. Oh yes. Yeah.
29:18Um
29:20okay. Yeah. We'll we'll go back to the
29:22the proposed fence line in a second. So
29:24there is Yeah. the
29:26the resource area goes to the is at the
29:29it's it kind of slopes off at the at the
29:32yard edge. So, there is kind of a
29:34defined where the yard is and where the
29:37resource area starts because it there's
29:39a pretty good slope that I'm not sure if
29:41that was constructed or if that was the
29:43way that it was, but um
29:46it does the elevation change does help
29:48in kind of delineating those two
29:50separate spaces. Um,
29:56>> when did we pass our bylaw?
29:59>> Uh, 2023.
30:02>> So, just this looking at this, we should
30:04have a a plan, a new plan showing the
30:08wetland delineation.
30:11It should show where this fill was
30:13placed.
30:14It should show where the fence is going
30:17to be installed
30:20and where the
30:23shed is going to be placed because it's
30:25it's very vague on what he submitted. We
30:28can't really tell and there were many
30:29questions especially with the fill
30:31that's been placed. We don't know how
30:32close it is. We don't know if it's in
30:34the 15. We don't know if it's in the 30.
30:36We we don't know. There's too many
30:38unknowns. So, we need we need that all
30:41those items answered. Yeah, we can
30:43finish that all that stuff
30:48>> before we can I think before we can act
30:50on that. Correct.
30:51>> I would tend to agree with that.
30:57>> Diane, do you have anything?
30:58>> No.
31:05>> All right. So, with that being said, if
31:08you ask for a continuence, you can get
31:10us that information for our next
31:11meeting.
31:12>> Okay?
31:12>> And then
31:14um provide it to Aaliyah ahead of time
31:16for review. That way, if she has any
31:19questions, you can get the appropriate
31:20information back to her prior to the
31:22next meeting, which is October 20th.
31:24>> Okay.
31:24>> Okay.
31:25>> Yeah.
31:26>> Thank you.
31:26>> Thank you.
31:27>> Thank you.
31:39Notice hereby given in accordance with
31:40the vision of general law chapter 131
31:43section 40 of the town of shoes we
31:45wetland bylaw regulations that lean and
31:48zella 245 winch street frame mass is
31:52file request for termination of
31:54applicability repair of a concrete
31:56retaining wall at 20 Tamarack Lane.
31:58Someone here
32:10Hi, I'm Leanne Manzella. This is Tony
32:12Lori, um our contractor.
32:16Um, we're here tonight to seek approval
32:19to take out a concrete wall that has
32:22already fallen into the lake, to
32:24establish a retaining wall to prevent
32:27further land from falling into the lake
32:30and eroding, and to possibly take down
32:33some trees that are um either dead or
32:36diseased within the buffer zone.
32:39Um, I do have some packets that I wanted
32:42to give you so you can see pictures that
32:46will certainly better explain
32:50the vision. And then there's also a
32:51packet for from the landscape. Thank
32:54you. And if you don't mind sharing the
32:56top one is the pictures that you could
32:58share.
33:01Thank you.
33:10If you'd start on page four,
33:14Page four shows the house with the scope
33:17of work that really needs to be done.
33:22As you can see, the 100-year-old wall is
33:26clearly not doing its job. And one of
33:29the trees in question um is on the far
33:32left side. It's a very You can It's very
33:34bare and brown and um
33:38dead.
33:42>> Okay.
33:42>> Page five and six shows closer pictures
33:46of the concrete wall that is in the
33:49water.
33:55and you'll see some pages um following
33:57that um where LEC was out December of uh
34:022023
34:04and um we had them out there to try to
34:08advise us on how to remove the concrete
34:10at that point. Um but there's se several
34:13pictures that I think you can clearly
34:14see with the water uh lowered um where
34:18they are falling in the water.
34:30Okay.
34:30>> Okay. Um I'm going to turn that over to
34:33you if you want to talk about the kind
34:35of work that um
34:37>> so I put that
34:38>> Yeah. Um I put together a package just
34:40to show the wallstone that I want to use
34:44and it's been used in uh a lot of lakes
34:46and rivers through the United States.
34:50It's locally made in Chabe, Mass. Um
34:53solid
34:55um six by
34:5816. So each block is about 2/3 of a
35:02square foot, 6 in in height. They weigh
35:05about 82 lbs each. And they're solid.
35:09There's no core inside that you have to
35:11fill with gravel, which has been the
35:14trend. Um
35:17that way with the water with the waves
35:18if the if it comes in land at all um the
35:22stone won't get absorb the water won't
35:24get absorbed into the stone. It'll go
35:26around it or through any of the gaps.
35:31Um
35:33the site will be excavated.
35:35There'll be um when the lakes drain
35:38down, we can we can use a machine to get
35:41right in the front to unload block and
35:44stone.
35:45Um, we'll have a mini excavator to
35:47excavate
35:49behind the face of the where the wall is
35:52going, probably five feet to give us
35:54enough room to work and to put in a silk
35:58fence or a waddle or whatever is um
36:02needed to retain the soil on the back of
36:03the slope.
36:06Um it's approximately three feet high
36:10with one block underneath the grade of
36:13the um the bed of the lake with
36:18landscape fabric and rip wrap on an
36:21angle down toward the water.
36:26Um
36:27geog grid
36:29is not recommended anything under four
36:32feet.
36:33um it may or may not be installed
36:37depending on um
36:41determination here like what you guys
36:43think we should do.
36:46>> Okay,
36:50>> Emily.
36:51Um
36:53I guess similarly to the previous
36:56application that we looked at, I think
36:59we need more information about existing
37:02elevations and
37:05where the high water mark is and
37:09it looks pretty the slope is pretty bare
37:13if this these are recent photos. So I'm
37:17assuming there's been erosion
37:20>> um into the lake. So, in the meantime,
37:23stabilizing the bank of that slope so
37:26that there's not further erosion into
37:29the lake. Um, these are some of my
37:34thoughts is that there might need to be
37:36a little bit more
37:38information on existing conditions.
37:43>> Okay, Bob.
37:46And besides putting a wall in, you there
37:47going to be drains in that to stop the
37:49>> Yes, there'll be a drain at the bottom
37:51and it'll um and it'll be curved at each
37:53end and where the curve comes out, the
37:55the 4-in pipe will be coming out in the
37:58and open-ended so it won't get clogged.
38:01>> Okay. And stone behind that also
38:03>> stone with landscape fabric and um
38:07uh at least three feet uh with um clean
38:11stone like washed wash stone behind it.
38:15and then fabric holding back the the uh
38:18soil that's there now.
38:21>> Okay, I agree with the elevation trying
38:23to figure out the difference the
38:24elevation what's going to come down but
38:25yes no other questions. Thank you.
38:27>> All right, so what we'd probably be
38:29looking for is a um an existing plan
38:33showing existing conditions where the
38:35existing wall is now where it fell into
38:38the lake all of that. We would like to
38:40see where that is on a plan, existing
38:43conditions plan by an engineer, by a
38:45surveyor.
38:46We'd like to see your proposed wall
38:50where that's going to be installed and
38:53elevations
38:55of that wall. If it's 3 ft, whatever the
38:58elevations are of the wall, and it
39:01should be designed by an engineer.
39:05We've had too many of these walls fail
39:08and fall into the lake a year or two
39:10later.
39:12And then the other and then we'd want an
39:15asbuilt condition too. So the asbuilt
39:17and the existing condition should mirror
39:19each other where the existing wall is
39:21and the new wall is going to be placed
39:23should be in the same location.
39:25>> Um and I noticed that you have on one of
39:27your plans regrading of the slope. What
39:30are those elevations of that
39:33regrade?
39:36What?
39:36>> What? What are they?
39:37>> We're going to I want to We want to see
39:39what the elevation. Are you taking that
39:40down or are you moving it? Are you
39:43making it level? How much earth work is
39:46going to be done with that?
39:48>> Okay. There's a there's an existing
39:51driveway that's coming out and I don't
39:54know if you can see it or not, but it
39:55kind of dips down and a lot of the
39:57material on the right hand side will get
40:00graded over toward the driveway area. So
40:02that grade will come down quite a bit.
40:05>> So
40:05>> you take you take out that asphalt.
40:07>> It's coming out.
40:09>> What What driveway are you talking
40:11about?
40:11>> To the left.
40:14>> I see. All right.
40:15>> Right here.
40:16>> Oh, that's right.
40:17>> That's coming out. So So where it says
40:19regrade this entire slope, you taking
40:21Are you taking it down a foot, two feet,
40:25five feet?
40:25>> Yeah, probably two feet.
40:27>> We'd like to see exactly what those
40:29elevations are. Then what are you going
40:31to do to stabilize it? Are you what
40:34plantings are you going to put back? Is
40:36it going to be long? Is it going to be
40:38flowers? What are you going to do?
40:40>> Okay.
40:43>> And then I guess sorry.
40:45>> Well, can Diane Diane?
40:48>> So, um,
40:50actually the stabilizing it is really
40:52important if it's going to be graded
40:55like that. And so, you have to stabilize
40:57it right away,
40:58>> right? And um
41:01if you're putting in plants
41:04um like shrubs,
41:06shrubs would probably hold the soil
41:08pretty well. Um then you doing that this
41:12fall in like October, November would be
41:15a good idea.
41:17>> Okay.
41:18>> There's a whole planting list that is
41:20available.
41:23Um,
41:25could we stabil We could use like rip
41:27wrap too, right?
41:30>> You come back to us with one.
41:31>> Yeah. Well, we'll have the engineer come
41:33up with a design.
41:34>> I don't know if rip wrap. We probably
41:36want to see some some sort of plantings
41:38on that.
41:39>> Okay. I mean, we could stabilize it with
41:41um like a landscape mesh with maybe u
41:45hydra seed.
41:47come back to us with a with a plan that
41:49shows what you'd like to do and the
41:51board the commission will look at it.
41:54>> I think at the very least in the
41:56meantime it needs to be stabilized that
41:59>> so would you like to see like a waddle
42:01installed or a
42:02>> orion control blanket or a silk fence or
42:05something to that effect?
42:06>> Okay. So before you've even received a
42:08permit, it would be good to stabilize
42:10the existing slope just so that no um
42:14you know whatever dirt that is loose at
42:17this point in time there's some level of
42:19of stability. But if you're able to
42:21install either yeah like a blanket on
42:23top of the slope um or across the the
42:27entirety of the slope or if you're able
42:28to install uh a silt fence would be pref
42:31preferable over a waddle situation at
42:34the base.
42:35>> Yeah.
42:36>> Okay. Yeah, the installation of a of sil
42:39fence at the edge. Um, it might want to
42:42be installed behind the existing
42:46wall just so that it's not, you know,
42:48getting
42:48>> Well, there's no wall, so it's going to
42:50go right up against the bank.
42:53[snorts]
42:54>> What do you mean there's no wall?
42:55>> Well, the wall's falling over. Yeah, I
42:57Yeah, but behind where it is where it is
43:00laying just so that it's not in the
43:01water because it will it will any any
43:04continued wave action will tear it to
43:06shreds pretty quickly and it also won't
43:08be able to catch anything. So, just
43:10putting it um interior to the
43:14laid down wall.
43:16>> Have you done that before? Have you have
43:18you done what she's described?
43:20>> Yes, we have. Yeah.
43:20>> Okay. Y
43:25>> yeah. So that would be a temporary
43:27measure while we wait for the more Yeah.
43:33>> You have more to add question.
43:35>> Yes. Yeah. I
43:36>> one of the questions the trees are taken
43:38down on that side. Is that also going to
43:39be regraded? Are you going to tear those
43:41stumps out or you going to leave the
43:42actually the trees cut up a little bit?
43:44The dead trees. You're looking only a
43:46couple dead trees. You said three of
43:48them, right?
43:50There's one that's very obvious. Um,
43:53that one there.
43:54>> Yeah. Yeah.
43:55>> That should come down before it falls
43:58in.
44:00>> What were the other trees? You said two
44:02or three.
44:02>> I don't know if they're there.
44:05Once that comes down, there could be
44:07something behind it. And I just wanted
44:09to to leave that open um just in case it
44:11was the case.
44:17How uh would they propose to get in to
44:20access that tree? Because it's kind of
44:22you got to go over a lot of vegetation.
44:25>> It's a little it's a funky
44:27>> I do think when the lake is drained um
44:29there probably is enough room um there,
44:33you know, to stand it um you know and
44:36take it down in parts. I mean, I think a
44:39tree expert would, you know, be doing
44:41that, not me.
44:42>> Yeah.
44:46So, when you take down a tree, if if
44:49it's actually like down to a stem, it's
44:53not going to hold the soil very well.
44:56>> Um, at least the dead roots are holding
44:59the soil to a certain extent.
45:01So, uh, if if you had a way of a plan
45:05for stabilizing that
45:08while it's on route to becoming
45:10something else, that would be good. Are
45:12you like leaving it four or five feet
45:14high?
45:15>> Yeah.
45:16>> Okay.
45:22>> Okay. So, um if you don't do you have
45:25any more questions over there?
45:26>> No, I don't believe so.
45:27>> So, you know what we're looking for? Uh
45:31>> as an existing conditions plan,
45:34>> y
45:34>> proposed
45:36>> proposed wall plan and an asbelt with
45:41great with elevations.
45:44>> Well, the asbuilt will obviously be the
45:46a special condition for at the
45:48>> Well, we want them to come back. The
45:50asbelt will be at the end, but that's
45:52all part of it. And then come back um
45:55with grading a grading plan on that
45:58slope. how what elevation you're going
46:00to bring the slope down to, how you're
46:02going to stabilize it, and what
46:03plantings are you going to use.
46:07>> Okay.
46:13Anybody have any other questions? And
46:16we'll continue to October 20th.
46:18>> October 20th.
46:19>> Thank you.
46:20>> Thank you.
46:23>> Okay.
46:25We have a continued
46:27public hearing guiding the notice of
46:29intent uh by Madish Nest LLC 38
46:34Appaloosa Drive, Shrewsbury for the
46:35construction of a single family home and
46:38associates I work at 40 Westview Avenue.
46:43>> Hello.
46:43>> Hi, Mr. Chairman. I'm James Tetro from
46:45Expedited Engineering here representing
46:47Moish Nest LLC. uh and we were before
46:50you uh last month uh but unfortunately D
46:54did not have a file number assigned yet.
46:56Now they have just want to uh re uh
46:59refresh everybody's memory. Uh it's a
47:02lot of 27,000 square feet on the east
47:04side of West View A. Um the proposed
47:09house construction is pretty much the
47:10center of the lot. There are some 2:1
47:13slopes uh to be stabilized with an
47:15erosion control mat rated for use even
47:17on one. The nearest work to any wetlands
47:20which were flagged in July by Scott
47:22Jordan of Ecotech is 51 ft here. It's
47:26about 66 feet from I'd say the middle of
47:29the uh of of the backyard there. This
47:32property all slopes down from
47:35essentially from uh south to north uh
47:38from this butter toward that butter. Uh
47:41we did a a deep hole uh in the front
47:45here. Uh propose an infiltration
47:47structure to receive roof runoff and we
47:50propose uh uh trenches on the sides of
47:52the driveway to receive uh runoff from
47:55the driveway itself. Um
47:58I guess I'll try and answer any
48:00questions if there are any. I I think we
48:02were in pretty good shape at the last
48:04meeting, but um obviously just D hadn't
48:06given a a file assignment yet. Emily.
48:10>> Uh, I guess my one question would be did
48:13D have any comments?
48:15>> No, actually I should have pointed that
48:17out. They issued the uh assignment with
48:19no comments at all.
48:20>> Great,
48:21>> Bobby. No, no questions.
48:24>> Diane,
48:27>> um,
48:30uh, there was a question that was
48:31raised. Is possible, uh, to find a way
48:34to prevent future tree removal in the
48:3615t zone. Uh oh yeah. Um well, we're not
48:42actually anywhere in the 15 foot zone on
48:44this property. I [snorts] guess you're
48:46not.
48:46>> Um so maybe at the very corner of the
48:50property here,
48:51>> but otherwise 15t is not even intruding
48:54onto this land. So
48:56>> that's just not something we could
48:57really do.
48:59>> Great.
49:01We um had also had regarding tree
49:03removal. We had had a discussion about
49:05potentially walking the erosion control
49:06line to see if there were any additional
49:08trees that could be preserved.
49:09>> Yeah.
49:10>> Um and moved to the
49:12>> outside Yes. outside of the limit of
49:15disturbance. Um
49:17>> Yeah.
49:17>> But I think that would be something that
49:18would be feasible for town staff to do
49:21as a special condition with the
49:22applicant prior to this.
49:24>> And we would have no objections. And I
49:25have to say after the meeting last
49:27month, we had a very nice conversation
49:28with the abuters on this side, the Vegas
49:31uh who were very uh congenial about the
49:33the whole issue. And we what I said to
49:35them is what I'll say to you is is that
49:37one of the benefits of having an erosion
49:39control mat that can be used on slopes
49:41as steep as one to one is if you find a
49:43tree say there was a tree here uh that
49:46you could probably save if you move the
49:48limit just a little bit just a few feet
49:51>> that mat will still be adequate for it
49:53if if you know you can get out of
49:55altering a significant amount of the the
49:56roof structure.
49:58>> Yeah. Yeah. So, we would have no
50:00objection to trying to scout if there
50:02are some significant trees to to try and
50:05keep.
50:06>> Had there been a request to um
50:10change the erosion proposed erosion
50:12control line at all or had we resolved
50:14to that? I'm sorry if I
50:15>> um
50:17>> maybe we had talked about wrapping it
50:18and I think it went back up but I mean
50:20this drains to
50:22>> that way. Okay.
50:23>> Yeah.
50:24>> Okay. And when we would certainly expect
50:28a condition that um after installing the
50:30line, we would have to have it inspected
50:32by the commission's agent to determine
50:35if there's anything more needed to be
50:36done or if you know if it's up to snuff.
50:39>> Yeah, we would probably similarly go out
50:41for an um a storm water erosion control.
50:45Is this does this require us?
50:47>> Yes, it does. Uh we have a total
50:48alteration of 19,700 square feet.
50:51obviously way over the town's threshold
50:53of 5,000 for a storm water permit
50:55filing.
50:55>> Okay. Yeah. So, we can we'd be able to
50:58coordinate that ECB walk at the same
51:00time, but we'd probably I would probably
51:02be out there before then to determine
51:03where those trees can be preserved. Um
51:09I think that was it. We had also
51:12recommended a special condition related
51:14to um I think it was included on the
51:16plan but seeding the slope with um like
51:18a wildflower mix or a erosion control.
51:21>> It it it is on the plan actually. Yes.
51:23Um specifically the New England plants
51:25wildflower seed.
51:27>> Beautiful. Okay. Yeah. So I think just
51:30cementing that into
51:33time with a special condition related to
51:36making sure that that gets installed
51:38would be
51:38>> it. It makes perfect sense on this slope
51:40where it's two to one. It would be very
51:41hard to mow and if you can just have it
51:43be wild flowersowers and be pretty on it
51:45left on its own.
51:46>> Yeah,
51:47>> that that'd be the best.
51:49>> In fact, the ideal thing would be if it
51:52were not mowed at all.
51:53>> Well, right. That's
51:55>> and and if there's no intention to do
51:57that by a homeowner and it and he runs
51:59into the happy circumstance where it
52:00flowers and looks beautiful without his
52:02doing anything, that's that's the best.
52:04Yeah,
52:06>> I think that's all the comments I
52:08>> Anybody in the audience have any
52:10questions regarding this? Okay, any
52:12other questions or comments from the
52:14commission? Okay, we'll close this
52:16hearing.
52:21All right, we have a continued
52:23uh public hearing regarding a notice of
52:26uh intent filed by Sammy Ventriia, 119
52:30May Beth Street, Springfield, Mass for
52:32the construction of a single family
52:33home, driveway, utility connection,
52:36drainage systems, and associated site
52:37work at 255 Gulf Street.
52:41>> Good evening.
52:42>> Good evening. Sammy Ventilia, homeowner,
52:44255 Gulf Street.
52:52Go ahead. What do we got?
52:55>> Uh so this is the second meeting for uh
52:59our permit uh to continue forward. As
53:02you know, we abut wetlands behind us. Um
53:07so a couple things. So we do have an
53:09approved storm water management permit
53:11uh that was approved a couple weeks ago.
53:13Um I uh per our last meeting regarding
53:16the trees at the back of the the
53:18property uh on one of the documents I
53:20shared I have the letter from the
53:23arborist where they addressed each
53:25individual tree to come down which was a
53:27request at the last meeting. Uh so we
53:29provided that uh very detailed uh in
53:32terms of the reasoning for each tree.
53:34Uh, also regarding those trees coming
53:36down, uh, I believe Diane had asked, uh,
53:39to make sure that the trees inside of
53:41the 15 foot buffer are left with, I
53:44forget the term, the the higher cut. Um,
53:47so we'll be doing that. We'll also be
53:50replacing the trees coming down by
53:52replanting new trees with with native
53:54trees uh, as time goes on. So, the goal
53:58was really just to cut down the trees
53:59that are necessary just because as as
54:01you'll see in the arborous letter, uh
54:03they're just old, tall, and a danger to
54:07our property and the neighboring
54:08property.
54:11>> Okay,
54:13Emily.
54:14>> Um
54:16I don't believe I have any questions
54:19related to to this.
54:22>> Bobby,
54:23>> I have no questions.
54:25Diane,
54:35>> question.
54:37>> Oh, yeah.
54:38>> Um, I believe I do believe that the hard
54:41copy plans that you were reviewing in
54:43front of you are the outdated plans. So,
54:45a revised set was submitted with the uh
54:47revised location of the stone trench.
54:49One of the requests of the commission
54:50was that it be moved outside of the
54:5230-foot buffer zone. Um, so that has
54:54been relocated so that it kind of
54:55follows the edge where necessary, but
54:58has been entirely located outside of
54:59that buffer zone. Um,
55:04I think that resolved most of the plan
55:07revisions requested by the commission.
55:09Um, the arborist report kind of resolved
55:12the rest of them related to the tree
55:13removal proposed.
55:14>> Yep.
55:15>> Um, it sounds like they were marked
55:16really well on site, so if you're able
55:18to scooch out there, you'll see
55:20well-numbered trees. I got the poison. I
55:23have to prove it.
55:24>> Yes.
55:25>> Yourself. Um, in terms of special
55:28conditions, I'd recommend a special
55:30condition related to replacing trees um
55:32on the property for the trees that are
55:34proposed to be removed. Um, and leaving
55:37the stumps high um where where feasible
55:41as well. Um, they had also the it sounds
55:45like there's a small outcropping of
55:46ledge present on site. I'd recommend a
55:48special condition related to um the It
55:52sounds like hammering was going to be
55:54sufficient. No blasting was proposed.
55:55>> Oh, no blasting. No.
55:57>> Yeah. Um that hammering
55:58>> and even the hammering was minimal.
56:00>> Okay. Yeah. So hammering where hammering
56:03is the approved method of ledge removal.
56:05If for some reason
56:08>> we find that that is not going to be
56:09suitable, the applicant should come back
56:11to the commission prior to doing any
56:14explosives.
56:16Um,
56:21uh, I would also recommend a special
56:23condition. We've received the the new
56:25copies of the plan. That's what we're
56:27looking at. The revised plan on on
56:30virtually. U, but receiving a hard copy
56:32of the revisioned revised plans would be
56:34something that I think would be
56:36sufficient after fully sufficient after
56:38the fact as a condition. Um,
56:44that's what I got so far. Okay. Any um
56:46any questions from the audience? Any
56:49questions or concerns from the
56:51commission? Okay. We'll close this
56:53hearing.
56:54>> Thank you.
57:03>> 92 Cherry.
57:12All right. It's going to be a new public
57:13hearing.
57:16Not by notice is hereby given in
57:19accordance with the provisions of
57:20general laws 131 section 40 be wetland
57:24bylaws and regulations
57:30>> silk and gregios Antonio 92 cherry
57:35street mass has filed not intent for
57:37construction of an ingground pool and
57:39associated site work at 92 cherry
57:41street.
57:42>> Good evening. How are you today? My name
57:44is Basilica Harry Antony. I am the owner
57:46of 92 Cherry Street in Shbury.
57:51Um I'm here to um propose uh we are
57:54looking to put a small pool in our
57:57backyard and have a small patio and um
58:02complete some sight braiding as
58:04necessary. Some of the work in a buffer
58:07zone. So, Cornerstone from engineering
58:11um they did prepare a plan for us uh
58:14where the fences and the pool and also
58:19some of the side work will uh will be.
58:29>> So, can you just tell us what you're
58:32going to be doing? How where the patio
58:34is? How much material are are you going
58:36to remove material from the site? Is do
58:39you need to um bring material in for
58:42this?
58:44>> Um so can I just show you?
58:46>> Yes. So the pool will be uh right here
58:49which is just only this part on a buffer
58:52zone and then all this one will be
58:54fences uh right around the pool and also
58:58just because we are in a buffer zone and
59:01then also it's our um uh our neighbor
59:04property so we don't own that you know
59:06like side of it. So, we just wanted to
59:08make sure, you know, like there is no um
59:12like just to put like for privacy around
59:15the property. Um
59:20that's
59:21>> okay. All right. That um Emily,
59:25>> I do do not. It seems pretty
59:27straightforward to me.
59:30>> Bobby,
59:30>> no questions.
59:32>> Diane,
59:32>> no questions.
59:34Alia,
59:36>> um the larger Texas has proposed stairs
59:39and walkway. Is that
59:42>> is that just a aformational signage for
59:44the
59:45>> Okay, that those are all Yeah.
59:48>> So, all right. So, here is our deck and
59:50then here is our stairs. So, we just
59:53want to move these stairs to this side
59:55so we can just walk from our deck to
59:58the, you know, like to the pool. And
1:00:01we're just going to rotate this um these
1:00:04stairs to that side. So just kind of you
1:00:06know like it's a instead of like having
1:00:08more stairs on this side and having like
1:00:11the fences and like door it will put
1:00:14like a door to this side and just easier
1:00:19access.
1:00:20>> Yeah, absolutely. Okay. Yeah, there's
1:00:22just the the large label. So I wasn't
1:00:24sure if that was
1:00:24>> Yeah, I just um told them to put it
1:00:26there just in case. We don't know like
1:00:28when it's going to happen, but the pool
1:00:31we are hoping to put it um this fall if
1:00:34you know like if everything goes well.
1:00:36But the patio probably will not be able
1:00:38to completed this fall. It's just going
1:00:40to be very late for
1:00:42>> Okay. So the the patio is just proposed
1:00:44inside of that inner fence line at the
1:00:48All right. Okay.
1:00:49>> Um and then the there's a fence line
1:00:52proposed along the property line. the
1:00:54commission had um with the determination
1:00:56of applicability that was issued, we'
1:00:58requested that all of the um area within
1:01:01that 30 foot uh within the 30- foot
1:01:04buffer zone was restored with native
1:01:05vegetation. I don't know um if it would
1:01:09make sense to to possibly ex exclude
1:01:12that from the fence area just so there's
1:01:13not an uh an inclination to return it to
1:01:18yard area or if something else would be
1:01:22amendable to the commission to just make
1:01:24sure that that it remains vegetated as
1:01:26approved
1:01:28>> in any way you can just are you talking
1:01:30about the like all the way at the end
1:01:33>> um right up in this corner
1:01:37here. It It looks like a offense is
1:01:39proposed. Is that correct?
1:01:41>> Right here.
1:01:41>> Yeah.
1:01:42>> Okay.
1:01:42>> Yeah. So that the determination of
1:01:44applicability that was issued uh related
1:01:46to vegetating that area.
1:01:50>> Oh, right here. Right.
1:01:51>> Yeah.
1:01:51>> Yeah. Okay.
1:01:52>> So, um it it just within the 30 foot.
1:01:54So, it's just that one little clip of a
1:01:56corner.
1:01:56>> Oh, right here.
1:01:58>> Yes. Yeah. So, I I don't know.
1:02:03I guess it it could be up to the
1:02:04applicant too if if they would prefer to
1:02:06have that vegetated area within the
1:02:07fence line. Um and just with the
1:02:10understanding that they are going to
1:02:11keep it vegetated um if that would be
1:02:15preferable and feasible on your property
1:02:17or if it would just be easier to exclude
1:02:19it from the from the yard area.
1:02:22>> Um the only um thing why we wanted to
1:02:25put it is just to kind of um because we
1:02:28don't know what's happening with the
1:02:30other neighbors. So like uh their their
1:02:33plans is a lot so I am not sure. So it
1:02:36just a kind of you know like privacy I
1:02:38mean if they have you know like if they
1:02:41building a house behind us you know like
1:02:43it will be you know like very our house
1:02:45it will be just you know like kind of
1:02:48their cars walk like driving by our
1:02:50property. So that's how we wanted just
1:02:53to kind of you know like block it and
1:02:56kind of like more for privacy than
1:02:58anything else. But wherever you
1:03:00>> I understand that I understand the
1:03:01installation of the fence. I'm just
1:03:03saying with the fence located where it
1:03:05is, you will have a small corner that
1:03:06will be vegetated with native
1:03:07vegetation.
1:03:09>> Would you prefer that that be interior
1:03:11to your yard because it there might be
1:03:13an inclination to to mow it or include
1:03:15it in the yard area which would not be
1:03:18in line would not be in compliance with
1:03:20the order that you have or would it make
1:03:24more sense to move the fence? We can
1:03:26just move the fence wherever it for you
1:03:29is
1:03:30>> why don't
1:03:31>> whatever you propose.
1:03:32>> The easiest thing probably for us to
1:03:34describe is just move the fence to
1:03:36>> to 30 foot
1:03:38>> the along the 30 foot buffer.
1:03:39>> Okay.
1:03:40>> Okay. So we'll make that a condition so
1:03:41it's easily understood and we'll just
1:03:44move in that one section where it
1:03:46protrudes into the buffer. We'll move it
1:03:48out of the buffer.
1:03:49>> Okay.
1:03:49>> Okay. No problem at all. Thank you.
1:03:53>> Anything else? Uh yeah, I think that
1:03:55would that's it for me.
1:03:56>> Any questions from the audience? Any
1:03:58other questions from the commission?
1:04:00Okay, so we can close this.
1:04:03>> Thank you so much.
1:04:03>> Thank you.
1:04:04>> Thank you.
1:04:07>> All right, this next one um I'm going to
1:04:09um recuse myself from this.
1:04:12>> Have a great night. Thank you.
1:04:14>> [snorts]
1:04:17>> This be a continued public hearing
1:04:20regarding the notice of intent filed by
1:04:22Tom Corbett on behalf of Go Ventures
1:04:24Capital Group, one Merkantile Street,
1:04:26Sweet 630, Worester Mass, for the
1:04:29construction of a mixeduse development
1:04:30including 12,000 square ft of commercial
1:04:32development and two residential
1:04:34apartment buildings as well as
1:04:36associated parking, sidewalks, storm
1:04:39water infrastructure, utilities,
1:04:41landscaping and demolition. of existing
1:04:43infrastructure at 525 HP turnpike.
1:04:48>> Uh good evening. Tom Corbett with Go
1:04:50Venture Capital Group. Uh here with me
1:04:52tonight is Andrea Kendall with LEC to my
1:04:54left and just to her left is Jack
1:04:57Deninger with Fussen O'Neal. Uh both the
1:05:00design engineer and the environmental
1:05:04consultant for the project. Um so the
1:05:08last time we met was July 20th 21st
1:05:12maybe. Um we continued last month uh due
1:05:16to quorum and I think in the 21st of
1:05:20July we left with maybe a couple items
1:05:22that we needed to address, right? Um so
1:05:24we were still working through um the
1:05:27conservation restriction and what that
1:05:29looks like. Um give you a little update
1:05:32in a minute on that. Um and then there
1:05:34was a question around uh waiver requests
1:05:37uh related to what you guys would
1:05:38actually be voting on. Um so we've
1:05:41submitted um a memo in that regard uh
1:05:45that kind of outlined everything there.
1:05:47I believe it even gave in information on
1:05:50the uh replication area meeting the 2:1
1:05:54uh what have you. Um, and then I think
1:05:57there was still some outstanding
1:05:59questions around the hydraology of the
1:06:01vernal pool and we're prepared to talk
1:06:03about that tonight with you all. Um, so
1:06:06I think since the last time we'd met as
1:06:08well, um, we've submitted some
1:06:10materials. Um maybe a repeat here, but
1:06:14um we submitted the bylaw waiver
1:06:17request. Um and then a memo from LEC on
1:06:21the monitoring protocol for the wetland
1:06:23replication
1:06:24as well as a revised site plan, storm w
1:06:28um storm water drainage analysis,
1:06:31um [snorts] a revised landscaping plan
1:06:34as well. Um, and I think with that I
1:06:39will pass it to Andrea.
1:06:42[laughter]
1:06:44Um,
1:06:46I'll just quickly go over the the
1:06:48wetland um wetland restoration and
1:06:51replication monitoring protocol. This
1:06:54was um somewhat excerpted from the NOI
1:06:58narrative and then augmented a little
1:07:00bit um uh to be a little bit more
1:07:02complete. Uh this was submitted with the
1:07:06two MEPA per D request. Um so we thought
1:07:10we would submit it as well um to the
1:07:13conservation commission. In in general
1:07:16it it the intent of it is to comply with
1:07:19the provision uh regulations
1:07:23um this the state clean water act and
1:07:25the federal
1:07:27um clean water act as well. Um
1:07:31and ultimately it will comply with any
1:07:35conditions in this in the permits the
1:07:38order of conditions the water quality
1:07:40and the department of army permit. Um
1:07:45it will include [clears throat]
1:07:49uh uh analysis of the uh species
1:07:54composition and relative abundance of
1:07:56the vegetation. the vegetative cover and
1:07:59the percentage of non-native species. It
1:08:02will also identify um plant mortality
1:08:06and replanting efforts if that becomes
1:08:09necessary. We will document um um photo
1:08:13documentation of the wetland restoration
1:08:16replication area at at um kind of
1:08:18stationary points um pre-established
1:08:22and then document the soil and
1:08:24hydraologic data. um and go into detail
1:08:28with that. We'll also include the
1:08:31wetland determination form or forms as
1:08:34may be required. Um and then we'll
1:08:37provide a summary of the necessary
1:08:40maintenance activities. Generally, we
1:08:42anticipate um these monitoring efforts
1:08:45will occur for two years, perhaps less
1:08:48if everything um uh jump gets off to a
1:08:52good jump start. Um and then um Each
1:08:55year we'll be providing um these
1:08:57monitoring reports to the to the
1:08:59commission and to the each of the
1:09:01agencies as well until we uh meet that
1:09:04compliance recommendation. Are there any
1:09:06questions on that?
1:09:10>> Excuse me.
1:09:11>> Um in terms of the waiver request, I
1:09:14just wanted to go over with the
1:09:16commission um the [snorts] the the three
1:09:20waiver requests. One is for relief of
1:09:23work within the um 15 foot no
1:09:25disturbance zone. The other is for the
1:09:2730 foot no structures structure and then
1:09:30um relief from um actually impacting uh
1:09:35the BVW and the IBW. So as it relates to
1:09:39the 15 foot um and 30 foot um there are
1:09:45uh um two aspects of work that are
1:09:49unavoidable.
1:09:50um relates to the stream c the pond and
1:09:54wetland crossing and the um and
1:09:58associated impacts to the BPW and bank
1:10:02and and land underwater. Um there are no
1:10:05other alternatives um to access the
1:10:09upland portion of the site. Um and this
1:10:11qualifies as a limited project uh under
1:10:14the rags. Um and that uh no other
1:10:18aspects of the work um once we get over
1:10:22uh um over the the crossing is is within
1:10:26the any of those no disturb or structure
1:10:29setbacks. So this is the only the only
1:10:32uh portion of that. Um
1:10:37[clears throat]
1:10:38uh let's see
1:10:42and clearly we need to work adjacent to
1:10:45the wetland in order to establish the
1:10:47wetland replication area. So there's no
1:10:50choice in in that respect. The second is
1:10:54to permanently alter the BVW and IVW.
1:10:58stated, you know, these are uh the c the
1:11:00crossing um as it relates to the IVW.
1:11:04Um
1:11:06well, I'll go back to the BVW. The the
1:11:08the footprint of where the uh crossing
1:11:10is located represents the most narrow uh
1:11:13portion of the pond. It also um overlaps
1:11:17with the existing cart path. So, that
1:11:19was the uh the alignment that resulted
1:11:22in the least amount of impacts. Um we
1:11:24are under uh 5,000 square feet. So um uh
1:11:30so that complies with the with the
1:11:32bylaw. Um in terms of the IBW
1:11:37uh that impact um
1:11:42also results in the least amount of
1:11:44impacts to the project. So um through
1:11:46the ZBA the the client um uh uh got
1:11:52approval to increase the height of the
1:11:54buildings and with that they were able
1:11:57to concentrate the development within um
1:12:00the existing available upland area
1:12:02without utilizing a second crossing uh
1:12:05to get to um the the northernmost
1:12:08portion of the site. So that um by
1:12:11eliminating that that aspect of the
1:12:14project they were able to avoid um
1:12:17further impacts to the wetland and
1:12:18stream system. Um and then um the the
1:12:23resulting uh configuration of the
1:12:27building and all the other um uh
1:12:29associated parking and whatnot. So that
1:12:32impact was was unavoid that IBW impact
1:12:36was unavoidable. um we are providing 2
1:12:39to one um replication for both IVW and
1:12:43BVW in that single location adjacent to
1:12:46the pond. So um we we are complying with
1:12:51that on top of the um 10 point about
1:12:5410.9 acres of CR um as other appropriate
1:12:57mitigation for the project and that is
1:13:00summarized in detail in um
1:13:03in your letter.
1:13:06>> Yeah. And I'll pedal back a little bit
1:13:07to the CR um just to keep you privy. Uh
1:13:11we've been going through the MEEPA um
1:13:13process. We've had um the comment period
1:13:16extended. Um and that comment period
1:13:20ends on the 29th, I want to say. Um and
1:13:24we expect a certificate by October 9th.
1:13:27Um so through our discussions with MEPA,
1:13:29I think we were touching on this maybe
1:13:31at the last hearing. I can't remember if
1:13:32it was here or planning board. My
1:13:34apologies. So, I just want to make sure
1:13:35we're getting it out there. Um, there
1:13:37was a question as to how the open space
1:13:42was going to be um preserved and how
1:13:45long that was going to be preserved for.
1:13:47We had a discussion um that the
1:13:53open space restriction where we would be
1:13:56the holder of that land wasn't really
1:13:58suitable in the eyes of MEPA and EA um
1:14:01as far as longevity, right? because
1:14:03there's always that like 30-year mark
1:14:05where it can go back. Um, so we did
1:14:08agree to align our project with the CR
1:14:12utilizing the EA template. Um, so that
1:14:16we I did provide that at least I
1:14:18provided the template to Aaliyah um
1:14:20earlier maybe last month um just seeking
1:14:24any further input from the uh commission
1:14:26here on rules. I'm I assume that the EA
1:14:30template um is pretty suitable to the
1:14:32commission. Um but at the same time, if
1:14:34there was any further concerns uh that
1:14:37they saw that you guys saw um and would
1:14:40want included into that CR um happy to
1:14:43do so. Um so we're are ongoing uh drafts
1:14:47of that document. Um LEC has provided
1:14:51some input into that that I passed along
1:14:54to Aaliyah today that's been again
1:14:56further revised. that was all submitted
1:14:58to MEPA on Friday of last week. Um, so
1:15:02we'll have to go through the EA office
1:15:04and uh get that CR all squared away. In
1:15:08regard to the holder, I've been talking
1:15:12to Greater Worcester Land Trust, Colin
1:15:14Novik over there, and I've been talking
1:15:17to Sudbury Valley trustees. We haven't
1:15:19nailed down a holder as of yet. It's
1:15:22kind of a process. Um, they have board
1:15:24meetings that they have to flex this
1:15:25stuff to. Um so those those uh meetings
1:15:28are happening this month uh for both
1:15:30entities and we hope to solidify um a
1:15:34holder of the CR momentarily I guess. Um
1:15:37so outside of that um
1:15:43planning board went well last time they
1:15:46closed that hearing. We expect a
1:15:47decision on October 1st. Um mass dot not
1:15:53quite your preview but just keep you up
1:15:54to speed. [clears throat] NASDAQ um
1:15:56approved our ICE stage one uh for our
1:15:58intersection controls um progressing the
1:16:01project through further uh
1:16:03investigations into the control measures
1:16:05for that intersection that will be
1:16:07installed at the frontage. Um and I
1:16:11guess now we can talk through some
1:16:13vernal pool hydrarology. I know there's
1:16:15some questions out there just we've
1:16:17talked through it a little bit over
1:16:18time. We've been here nine months I
1:16:20think. Uh, so we just want to kind of u
1:16:24touch on that and how the roof drains
1:16:26and water is getting
1:16:28>> supposed to be going. We'll leave that
1:16:30to Jack.
1:16:30>> Yeah. So I just want to high level give
1:16:32you a quick overview of the storm water
1:16:34management in case that hasn't been
1:16:36discussed in in too much detail. Um, but
1:16:39in existing conditions along the
1:16:40frontage of Route 20, the storm water
1:16:42runoff from the existing site is able to
1:16:44either flow overland to Route 20 or to
1:16:47the pond untreated. proposed conditions
1:16:50again where that commercial building
1:16:51will be in the parking lot associated
1:16:52with it. We'll be collecting that storm
1:16:54water, treating it with water quality
1:16:56units, sending it to subsurface
1:16:58detention, and then discharging it
1:16:59towards the pond for water quality and
1:17:02uh peak flow attenuation. As for the
1:17:05residential buildings up at the top of
1:17:07the hill, again, the existing condition,
1:17:09storm water flows um either to the north
1:17:11or towards the east to adjacent wetland
1:17:14resource areas. In proposed conditions,
1:17:16we're collecting all of the storm water
1:17:18runoff in the parking lots, treating
1:17:20that in water quality units similar to
1:17:22the commercial building, sending it to
1:17:24subsurface detention for peak flow
1:17:26attenuation, and discharging it towards
1:17:28the wetlands. Um, it's worth noting that
1:17:30we're proposing detention for this site
1:17:32in particular uh because of the presence
1:17:35of surficial rock extensively throughout
1:17:37the site. We also performed 20 storm
1:17:40water test pits on the site and all 20
1:17:42test pits um had shallow bedrock. Uh
1:17:46that is um within the Massachusetts
1:17:49stormwater handbook that is noted as
1:17:51something that um you you can propose
1:17:54detention in lie of infiltration due to
1:17:58surficial rock and shallow bedrock.
1:18:00Infilt infiltration and groundwater
1:18:02recharge is not practical in sites such
1:18:05as that. as it relates to the vernal
1:18:07pool. Um, so we have segmented the
1:18:10parking area that's adjacent to it to
1:18:13stay uh to to not discharge towards the
1:18:16vernal pool. So like I said, the storm
1:18:18water will be collected in rather than
1:18:19being able to flow towards the vernal
1:18:21pool. We're treating that, detaining it,
1:18:22and sending it further downstream. The
1:18:24storm water runoff that will be going to
1:18:26the vernal pool is either from roof
1:18:28areas or existing adjacent um vegetated
1:18:31areas. So the buildings are essentially
1:18:33serving as a barrier uh to the vernal
1:18:36pool. Um the vernal pool itself um our
1:18:42portion of the storm water runoff from
1:18:44our site is only a small portion of the
1:18:47contributing drainage area. Um in fact a
1:18:50good portion of the receiving drainage
1:18:52area for that vernal pool is in the land
1:18:55located as part of the conservation
1:18:56restriction that is being proposed as
1:18:58part of this project. There's also an
1:19:00intermittent stream that connects on the
1:19:02west side of that vernal pool um and
1:19:04goes to the upland wetland resource
1:19:06areas and upgradient land that does flow
1:19:10towards or flow into that intermittent
1:19:13stream and into the vernal pool. Um the
1:19:15vernal pool itself also has another
1:19:18intermittent stream that leaves it uh
1:19:20which then conveys storm water runoff uh
1:19:22to the north of our site and then back
1:19:24around between uh the the freightard
1:19:27property and into the pond interior to
1:19:30our site. So I um and I guess one final
1:19:34thing on the on the um hydraology for
1:19:38the vernal pool itself within our
1:19:40smaller portion of that um area that we
1:19:43are disturbing as it relates to its
1:19:45larger watershed area. We've designed
1:19:48that area to match the proposed
1:19:50conditions to match the two-year volume
1:19:53two-year storm event volume. um the
1:19:56proposed
1:19:58peak flow volume going to that is the
1:20:01same as the existing peak flow volume
1:20:03going to that for the two-year design
1:20:04storm. Um so again segmenting it from
1:20:08the paved areas and then also matching
1:20:11the peak flows for the or the peak
1:20:13volumes for the two-year event for our
1:20:14smaller contributing portion of the
1:20:17runoff area.
1:20:21What if there I mean how [clears throat]
1:20:24often do we now have two year storm
1:20:27events?
1:20:30>> I know that technically it's every two
1:20:31years
1:20:32>> on average but in reality how often do
1:20:36we now have that?
1:20:38>> I don't know if I can properly answer
1:20:41that question. I don't know if there's
1:20:42any factual I what we we could do is
1:20:45look at the
1:20:46>> So the two-year storm is how many
1:20:48inches? The two-year storm is a 3.24
1:20:50inch storm event, I believe, is what it
1:20:52is for this for the Noah rainfall data
1:20:54for our property,
1:20:56>> which is a pretty significant uh
1:20:58rainfall event.
1:20:59>> It is. They're happening more
1:21:00frequently.
1:21:01>> Yeah, they sure are. I agree. Yeah. The
1:21:03two years becoming more of like a
1:21:05monthly.
1:21:05>> Yeah. And actually oftentimes
1:21:07communities are now um ad adopting like
1:21:10higher percentile storm rainfall event
1:21:12into like their local bylaw. So to your
1:21:14point with with climate change it's it's
1:21:17certainly happening more frequently
1:21:19actual actually to the amount that it is
1:21:21that's hard to say. Um there are rain
1:21:24gauges that you can you know see over
1:21:26historic periods of time and see how
1:21:27often maybe that threshold has been hit
1:21:29can be can be found but yeah it it does
1:21:33appear that way. Yeah, and I think it's
1:21:36worth noting um the goal is to maintain
1:21:39that water level uh within the vernal
1:21:41pool. Um in short of us having complete
1:21:44elevations, we know that there's an
1:21:46inflow from the northern vernal pool uh
1:21:49evidenced by the intermittent stream and
1:21:52then we know that there's a natural
1:21:54outfall uh with this vernal pool
1:21:57evidenced by the intermittent stream.
1:22:00So, trying to balance that um conveyance
1:22:03of water. Uh we're not going to meet
1:22:05anything over the 2-year event. Uh but
1:22:08at that point, we're talking six, seven
1:22:10inch rain event um where it's naturally
1:22:13going going to overflow uh out of the
1:22:16vernal pool.
1:22:19Emily.
1:22:23>> So the
1:22:26thought process behind maintaining the
1:22:29hydraology is that the
1:22:33area of development
1:22:36doesn't contribute as much to the
1:22:38hydraology as the portion which will be
1:22:42ultimately conserved.
1:22:44>> Yeah. So I'd say for our portion of the
1:22:47site, the portion that we're disturbing,
1:22:50right outside of the overall watershed
1:22:52limits for that vernal pool, the portion
1:22:54that we're disturbing, we're trying to
1:22:56for the two-year storm event, we're
1:22:57trying to say the existing volume based
1:23:00on, you know, our storm water
1:23:01calculations is the same amount of
1:23:04volume of runoff as proposed conditions
1:23:07for just our portion of the site. The
1:23:09remaining portion that does discharge
1:23:11and drain into the vernal pool, we are
1:23:13not we are not touching. And there's
1:23:14even areas outside of our property that
1:23:17are discharging to it to it. But to the
1:23:20conservation restricted land again that
1:23:22also helps the benefit there is it's
1:23:25we're not developing that portion and
1:23:27that portion is maintaining ex existing
1:23:30state.
1:23:32So in terms of what we are need to
1:23:34disturb as part of our project, we are
1:23:36maintaining or we're we're matching I
1:23:38shouldn't say maintaining we're matching
1:23:39the two-year volume uh of runoff
1:23:44going to the vernal pool
1:23:47>> on the portion that's being developed.
1:23:49>> Yes, exactly. Which is right a segment
1:23:52of the larger receiving. So we ran a a
1:23:55USGS stream stats report for that
1:23:57contributing drainage area which the
1:23:59portion of our developed limits is a
1:24:01fraction of what the larger overall
1:24:04wershed boundary for that vernal pool is
1:24:06based on the USGS stream stats output
1:24:11>> somewhere around 10%.
1:24:13roughly.
1:24:16>> Um, and then I guess I don't know in
1:24:21July did we go over the overall
1:24:24landscaping
1:24:26plan or was that something that came
1:24:29along in August that we didn't get to
1:24:31discuss?
1:24:31>> Um, you've had landscaping plan. We just
1:24:34updated it. So, our updated landscape
1:24:36plan that was submitted back in August,
1:24:38maybe on the 10th. Um,
1:24:39>> yeah, I think that's what I was looking
1:24:41at. It's the most up-to-date one I have.
1:24:43>> Yeah. So, this one here is based on
1:24:46[clears throat] a redesign of the
1:24:47commercial building out front.
1:24:49>> Um, so through the planning board
1:24:51discussions, we increased our commercial
1:24:53space. We made the footprint of the
1:24:55building smaller and went up a story.
1:24:58Um, so that kind of created a redesign
1:25:00in the landscape around the parking and
1:25:02what have you. Um, with that.
1:25:05>> Okay. Um [snorts]
1:25:11um
1:25:13I guess I don't necessarily have
1:25:15questions. I guess I have reservations
1:25:18about
1:25:20ultimately this development not having
1:25:23adverse effects on the vernal pool. I
1:25:25know that you guys have done a
1:25:26substantial amount of leg work to kind
1:25:28of
1:25:30justify the take that it will not
1:25:34ultimately have adverse effects. Um,
1:25:39just putting it out there that it is I'm
1:25:42still concerned about, you know, how the
1:25:44proximity of the development to the the
1:25:47vernal pool. Um, and I know that, you
1:25:52know, I guess I
1:25:56would love to see like a bit a larger
1:26:00vegetated buffer, but at this point it's
1:26:02I don't know if, you know, I feel like
1:26:04we've we've talked about it at at
1:26:06length. Um
1:26:09I am of the opinion that I would like to
1:26:13wait until uh the MEEPA comment period
1:26:17is over and the certificate is issued. I
1:26:21also would like to look at the planning
1:26:23board's decision. Um and then I um and
1:26:28in between that time frame um I had some
1:26:33conditions that I think could be
1:26:36beneficial that I'd like to submit to
1:26:38you all for review um related to pres
1:26:42how that 15 foot barrier will be
1:26:45preserved as far as the tree health and
1:26:49um
1:26:51just preserving the robustness of that
1:26:53area to the maximum extent that we can.
1:26:57Um, but those are my thoughts um
1:27:02on on the the project at hand.
1:27:07>> Couple questions I had. Um, you still
1:27:09have the access coming through the
1:27:11church property, correct? You can get
1:27:12into that prop. See, actually, is that
1:27:14something you're going to you plan on I
1:27:15said you said you had no access to the
1:27:17other side. You do have the access. You
1:27:19can do a lot of your work right through
1:27:20the church parking lot. What are you
1:27:22taking stuff out, getting machinery in
1:27:24there? Yeah. Doing that side of stuff.
1:27:26>> Yeah. So, so we've been in discussion
1:27:28with Yes to your to the question of the
1:27:30emergency access that's going to be
1:27:32installed. That's an agreement with us
1:27:34and the church um shown here on the
1:27:36plan.
1:27:38>> I guess not that one very well.
1:27:39[laughter]
1:27:40>> Maybe not the highlight the landscaping,
1:27:42but
1:27:43>> yeah, it's uh
1:27:44>> I think it is in Is it included? Is this
1:27:46it? Right. Um
1:27:47>> you can see the hatched area.
1:27:48>> Got really zoomed very quickly. You see
1:27:50the hatched area next to that big uh
1:27:52what is that? A QCO tree or something?
1:27:54>> Yes, right here.
1:27:55>> I can't see your mouse.
1:27:56>> Oh, my mouse disappeared. Okay,
1:27:58[clears throat] cool.
1:27:58>> Yeah, right there in that corner closest
1:28:00to the church. So, that's where the
1:28:01access will be. That's a natural
1:28:04>> kind of match and grade um for proposed
1:28:07and existing conditions. Um so with that
1:28:11um we've been continually accessing the
1:28:14site to the the rear of the site from
1:28:16the church today um to do these
1:28:18prospective borings and uh test pits. So
1:28:21we have a pretty good relationship with
1:28:23Steve at the church and he's very easy
1:28:25to work with in that regard to get um
1:28:28equipment in and out of our site without
1:28:30crossing um currently.
1:28:32>> Okay. So the access I'm saying when
1:28:34you're doing a lot of the access you're
1:28:36gonna have you said you were gonna have
1:28:37a problem with the access you couldn't
1:28:38get you can actually set up do a lot of
1:28:40your access in the upper part of that
1:28:42property on the other side of the stream
1:28:45and above side the pond the wetlands
1:28:47like I said I still want to see a bridge
1:28:49that's not raised over there which I
1:28:50understand you can't you don't want to
1:28:51do you can't do it
1:28:53>> yeah we just can't do the bridge it's
1:28:55like another $2 million delta
1:28:57>> yeah but I mean it's going to preserve I
1:28:59think there's going to be a lot of
1:28:59damage done
1:29:00>> so
1:29:02even If we did do a bridge, we're still
1:29:04excavating that whole entire cart path
1:29:08because there's a force main sewer line
1:29:10under there as well. Um, and it's
1:29:12actually
1:29:14So, what we're doing is in increasing
1:29:17the or I guess enhancing the the
1:29:21culverted portion of that roadway now um
1:29:24and raising it up. There's no like
1:29:27there's no pond really on the up the up
1:29:30gradient side um of the cart path. I
1:29:34know the delineation kind of shows
1:29:35otherwise when the water was impounded
1:29:38um due to the beaver dam, but if you
1:29:40went out there today, it's like a
1:29:42stream. So there's no like equalizing
1:29:44portion of this pond and this culvert.
1:29:46That's not ever how it was designed. Um,
1:29:49so I guess I don't see the benefit of a
1:29:51bridge um long term with the impacts um
1:29:56that we have to do regardless of a
1:29:58bridge installation. The means and
1:30:00methods to get there are the same
1:30:03just a cost of massive amount of money.
1:30:07>> That was the first question. And second
1:30:08one is that rock are you going to be
1:30:10blasting in there?
1:30:11>> Oh yeah.
1:30:12>> Are you going to have to actually do
1:30:13blasting in that property?
1:30:15>> Uh we don't believe that we were going
1:30:16to. So this is predominantly a fill. Um
1:30:19so we don't have too many areas of large
1:30:21cut involving rock. We've minimized that
1:30:24um to the greatest extent that we
1:30:26possibly could by doing all these
1:30:27exploratory holes and finding how deep
1:30:30it is to really balance our
1:30:32>> our earth work in the sense of in
1:30:34relation to rock. So we've trying to
1:30:37avoid rock as best as we can throughout
1:30:39this whole design process over the last
1:30:41nine months. And we've brought
1:30:42elevations up a couple times over. The
1:30:45northernmost corner furthest away from
1:30:47the vernal pool is where the rock really
1:30:49excavation piece is up along the church
1:30:52property line which is more relative to
1:30:55um the driveway um than anything. Um and
1:30:58it's all pretty well weathered. Uh we
1:31:01don't anticipate blasting.
1:31:02>> Okay.
1:31:03>> My concern if you have to do blasting in
1:31:05here potentially you're going to
1:31:06actually drop down.
1:31:08>> All it's going to take is one fracture
1:31:09and you're going to drop down vert pool.
1:31:10going to lose all that water potentially
1:31:12down lower. That's my concern. If you
1:31:14start doing blast and you guys are going
1:31:16to do more damage, so that's why I
1:31:18wanted to make sure that wasn't going to
1:31:19happen.
1:31:20>> Yeah, it's not our intent to blast at
1:31:22this time. I think if we have to visit
1:31:23that, we clearly need to come back to
1:31:25you all. Um that is our understanding.
1:31:27Um right now it is our intent to hammer.
1:31:29Uh we've gotten proposals on on that
1:31:33work already. Um and included hammering
1:31:36only.
1:31:37>> Okay. based upon what we've found on
1:31:39site so far. Okay,
1:31:43I'm all set. Anything else?
1:31:48>> Uh, will there be signage, you know,
1:31:51wetland resource area, no dumping, that
1:31:54kind of stuff?
1:31:55>> That's on the plan.
1:31:56>> It's on the plan.
1:31:57>> Mhm. Yeah. So, we made those changes
1:31:59back in what, July? Maybe.
1:32:01>> Sounds about right.
1:32:02>> Yeah. We added some um low salt and no
1:32:06dumping wetland areas um along the back
1:32:09side of the parking lot for the
1:32:12commercial um and as well as at the end
1:32:14of the fire access lanes uh to the on
1:32:19the sides of the buildings.
1:32:21>> So I just want to say that the concerns
1:32:23that Emily voiced I have them as well.
1:32:28>> Okay.
1:32:30Um it might be beneficial to also
1:32:34include signage at the rear of the
1:32:36buildings um less related well related
1:32:39to the to the resource areas but also to
1:32:41the fact that it will be conser a
1:32:42conservation restricted area
1:32:44>> so that folks are aware of
1:32:46>> kind of where that starts and and um
1:32:49>> yeah I think um
1:32:50>> of that I've dealt with Colin in the
1:32:53past and I believe they like to put like
1:32:55medallions on the trees. Yeah.
1:32:57>> Yeah. Yeah. I don't I don't think we'd
1:32:59need to have in terms of a special
1:33:01condition. I don't I think that would be
1:33:04kind of up to whatever the the grtor
1:33:07grantee situation, whatever they would
1:33:09be amendable to. Um but just yeah having
1:33:11it
1:33:12>> agreed
1:33:13>> as something that is um considered to to
1:33:15whatever their language would recommend
1:33:18in terms of yeah conservation area or
1:33:20wetland area or and any any of very
1:33:24important rules like no dumping or
1:33:25something that should be mentioned on
1:33:27that.
1:33:29Um
1:33:32yeah, there would probably be additional
1:33:34special conditions related to the
1:33:35conservation restriction and just making
1:33:37sure that we're receiving the um rules
1:33:40and regulations associated with that and
1:33:42the the kind the yeah what the
1:33:48what the future relationship will be to
1:33:50maintain that conservation restriction
1:33:52with the you know the holder of it and
1:33:54making sure that that tenants of this um
1:33:57building are being kind to their
1:33:59conservation area um or the you know the
1:34:02keepers of the building are also being
1:34:04kind um and being kind neighbors to that
1:34:07area. Um
1:34:10>> yeah and I think I'll add if I could
1:34:11sorry um in that regard to the tenants
1:34:15um with many of our projects we have a
1:34:17very extensive info packet um things of
1:34:20that nature um that would be including
1:34:23kind of the sensitivities of the site in
1:34:25general um it will relate down to all
1:34:28the way to the commercial um operations
1:34:30as well. So it's pretty extensive in the
1:34:32way that we put things forward and our
1:34:35policies that we have.
1:34:36>> Awesome. Yeah. And yeah, something like
1:34:38a similar um something that might want
1:34:40to be included in something in a packet
1:34:42like that or in um in the order as a
1:34:45special condition or an addendum to the
1:34:46order would be the operation and
1:34:48maintenance plan for um obviously the
1:34:51the
1:34:53storm water infrastructure because those
1:34:55have a standard operation and
1:34:56maintenance plan. Just also any
1:34:58operation and maintenance that would be
1:34:59included in you know um general trash
1:35:02pickup along along resource edges and
1:35:06property edges and um yeah any other
1:35:09similar operation and maintenance that
1:35:10would that would keep the resource areas
1:35:14sp and span
1:35:15>> most definitely
1:35:17was an area for like going to sound kind
1:35:19of strange but the animal for like the
1:35:21dogs and everything going to be
1:35:23contained so I'm not having spreading
1:35:25stuff around the whole
1:35:27Yeah.
1:35:27>> Yes. And in regard to dog poop, I don't
1:35:30know if you were here at that meeting,
1:35:32we have a very strict policy. We DNA
1:35:35test every dog and animal that's on
1:35:37site. Um, so if we do find dog feces on
1:35:41site, which our property manager is on
1:35:43it, and they so they receive a fine. I
1:35:46forget the amount off the top of my
1:35:48head. I will say a hundred bucks. It's
1:35:50probably more. Um, but as soon as they
1:35:52receive that first fine, we never have
1:35:53offenders again. So they're they're
1:35:56trained in a sense to uh pick up their
1:35:58dogs poop pretty
1:35:59>> is there an area you have like a fenced
1:36:00in area you're going to have for the
1:36:01dogs be able to go or not?
1:36:03>> Uh we don't have a fenced in area for
1:36:05the dogs. No.
1:36:06>> Okay.
1:36:06>> No
1:36:08I know that's been some additions on
1:36:09some of the other places in town of
1:36:11having the dog
1:36:13>> area for that but that's
1:36:14>> becomes smelly. Um
1:36:16>> oh yeah it does we have that on our
1:36:18Brook Street project in in Worcester. um
1:36:21it becomes messy. Um and the runoff from
1:36:24that is not so pleasant either. So
1:36:27that's where we we uh poop uh pick up
1:36:30the poop kind of thing.
1:36:32>> Okay.
1:36:32>> Yeah.
1:36:35>> Anything else?
1:36:36>> No, I think that's
1:36:37>> we be asking for a continuence for next
1:36:39month.
1:36:40>> Uh uh if we need to, I guess. Um
1:36:43>> well, you have to we're waiting to get
1:36:45back from the planning board and some
1:36:46other things. Correct.
1:36:47>> Yeah, planning board meeting is closed.
1:36:49>> Yeah. I want to read the decision. I
1:36:51want to see the certificate and um I
1:36:54have proposed uh conditions that I can
1:36:59provide to you prior to our next
1:37:02meeting.
1:37:02>> That sounds good. I will uh ask for a
1:37:04continuence to October 20th.
1:37:06>> Thank you.
1:37:07>> Thank you.
1:37:08>> Thank you.
1:37:09>> Does anyone anyone else have any
1:37:11questions in the audience?
1:37:13>> Thank you.
1:37:26Okay, we have a continued public hearing
1:37:29regarding notice of intent filed by PGM
1:37:31realy Holdings LLC 421 Washington Street
1:37:35Auburn Mass for the demolition of
1:37:37existing building and structures and
1:37:38construction of a car dealership service
1:37:41center wetland crossing and pocket area
1:37:43957 Boston turnpike. There's someone
1:37:46here for that. I think they are joining
1:37:48us on the line.
1:37:51>> Good evening.
1:37:53>> Good evening. Brian Mar here with Marti
1:37:55Engineering.
1:37:57Um, so last time we were in front of you
1:38:00guys was at your August meeting. Um, at
1:38:04that meeting there was there was one
1:38:07outstanding item that Graves Engineering
1:38:09had asked for additional detail
1:38:12uh and clarification on the proposed
1:38:15culvert uh for the project.
1:38:18And the only reason at that time at the
1:38:20August 18th meeting we hadn't uploaded
1:38:22it yet to the town uh website was we
1:38:26were just waiting on comments from Mass
1:38:28DOT. Um, we wanted to make sure when we
1:38:31uploaded the plans that, you know, there
1:38:34weren't any potential
1:38:36modifications masked out required that
1:38:38would have impacted any any buffer zone
1:38:41um impact. So, um,
1:38:45so we did upload the plans back on
1:38:47September 1st. There were no changes
1:38:49mass DOT required that impacted
1:38:51wetlands. Uh, so the additional
1:38:55information that Graves had asked for on
1:38:57the culvert are on that plan.
1:39:00Uh it's basically sheet 22. Um Grace
1:39:04wanted us to note all of the details of
1:39:08the covered dimensions just to ensure
1:39:10that we were meeting the stream crossing
1:39:12standards [clears throat] which we are
1:39:15um which we actually significantly
1:39:17exceed what's required by the mass
1:39:20stream crossing standards. So uh that
1:39:22details on the plan now uh it's been
1:39:25uploaded. It's in your possession. So
1:39:27there was really no other items that
1:39:29were required. Um the stream crossing
1:39:32standards require that the width of the
1:39:34cauldron be 1.2 times the bank full
1:39:37width. Um let me I can if I can share
1:39:41the screen I can just show you the
1:39:42detail.
1:39:43>> Yes. Let me give you sharing rights. I
1:39:46don't um I I don't get
1:39:50um
1:39:53notification always that that things
1:39:55have been uploaded to open gov. So, I
1:39:56did not realize that they that you had
1:39:59supplied
1:40:01um new plans there. Um
1:40:04>> Okay.
1:40:06>> Sorry. Let me Why can't I make you a
1:40:09host?
1:40:19>> Okay. You should be able to share that
1:40:21out your co-host. Um,
1:40:27>> yeah,
1:40:31>> it does look like those were just
1:40:32uploaded uh yesterday by
1:40:37Yeah, on September 14. Let me see if
1:40:39anything else was uploaded.
1:40:48So if you can see the screen here, the
1:40:50color detail shows it's a 4 foot by 20
1:40:53foot culvert. Um
1:40:56the stream crossing stands require 1.2
1:40:59times a bank full width which is 84 in.
1:41:02Uh so 101 in would be required which is
1:41:06just over 8 feet. Uh we're providing a
1:41:0820 foot wide culvert. Um and then the
1:41:12openness ratio
1:41:14is the end area divided by the length.
1:41:16So with a 4x 20 culvert it's an open or
1:41:20end area of 80 square feet. Uh then
1:41:23divided by the length of 33 feet we have
1:41:25a 2.42 ratio and only82 is required. So
1:41:30it's significantly larger than what is
1:41:32required. So we do uh exceed the mass
1:41:35stream crossing standards. So, um, so
1:41:40that is the only deal, like I said, that
1:41:42was outstanding and I believe at the at
1:41:44the meeting last month, uh, the
1:41:46commission,
1:41:49um, just stated that they wouldn't be
1:41:50able to close the hearing and vote on it
1:41:52until, uh, this detail was provided and
1:41:54the plan was uploaded to the town. So,
1:42:00>> so yeah, so we have received that. We
1:42:02also had had there was a question
1:42:03related to the um material that has been
1:42:07filled in the area by the crossing.
1:42:11There's like um
1:42:14was that either added to the plans or um
1:42:21yeah I guess would the applicant be
1:42:22amendable to removing that material as
1:42:24it is?
1:42:26>> Yes.
1:42:27>> Yeah. I think the the area was we
1:42:29absolutely conditioned that the area I
1:42:31believe you were talking was
1:42:33>> was up in this vicinity over here.
1:42:35>> Uh there's also there's significant
1:42:38material downstream of the crossing.
1:42:42>> Yeah. Right. Right along there you can
1:42:45Yeah.
1:42:46>> Yeah.
1:42:46>> Yeah.
1:42:48We we we would be amendable to cleaning
1:42:50up whatever we need to clean up for that
1:42:52site. We're going to be
1:42:54>> um pulling back. You can see the the
1:42:57existing uh limit of what was out there
1:43:01now is we're pulling back was like I
1:43:04guess we're pulling back the limit of
1:43:06what was previously
1:43:09um used as their staging area for
1:43:12landscape materials.
1:43:15>> Um so let me see if I can
1:43:18make it a little clearer for you.
1:43:29And so basically the tree line that you
1:43:31see back here is what's existing and
1:43:34there's landscape materials all the way
1:43:35back through here. We're pulling that
1:43:37back. It'll all be vegetated as well as
1:43:39on this side. So you know we're
1:43:42absolutely agreeable to any condition
1:43:43about about removing that material.
1:43:48Yeah, I'd recommend any special
1:43:50conditions related to that in terms of
1:43:52um
1:43:54we might want to see uh monitoring of
1:43:56the restoration of that area just to
1:43:58ensure that that they are seeing that
1:44:00all the material is removed and that a
1:44:02um that there's getting significant
1:44:05vegetation growth back in that area. um
1:44:08especially where it is getting close to
1:44:10the to the zero and 15 and 30 that they
1:44:14are seeing native vegetation returned
1:44:16there.
1:44:18>> Okay.
1:44:19>> Yep. Um okay. Uh Emily.
1:44:25>> Um
1:44:27so the work Aaliyah I guess my question
1:44:33um is within the buffer zone
1:44:38only or there resource areas. Oh I guess
1:44:41there would be resource area impacts
1:44:43associated with the crossing.
1:44:45>> It did. Yeah, there are there are we
1:44:47obviously resource area impacts proposed
1:44:49with the with the expansion of the
1:44:51crossing. Um
1:44:54it would s it does seem that that
1:44:56material was um this was all included in
1:45:00um
1:45:02ecoteex report as well. They had they
1:45:04had detailed um Mr. Machete just so that
1:45:06you are are able to follow along. Um,
1:45:10>> yes,
1:45:10>> they had that
1:45:11>> it had been noted that there were
1:45:13>> it probably was a large pile of fill
1:45:15that was kind of pushed towards the
1:45:17stream and then the stream plowed
1:45:18through it. So, there's uh piles of
1:45:22sandyish material, fill material located
1:45:25on both sides of the stream um that
1:45:30yeah would would need to be removed. So
1:45:32it
1:45:35and then yeah seeing restoration of
1:45:36those areas would be it's it is an act a
1:45:40pretty active stream channel and with
1:45:41the installation of the wider culvert it
1:45:45it will be able to do its thing a little
1:45:48easier. Um, but making sure that
1:45:51>> is there specific restoration protocol
1:45:55that they've put forth or
1:45:58>> I don't know if they've um submitted a
1:46:01rest like a restoration plan for that
1:46:03area or a um have you guys included
1:46:06something for how the covert will be
1:46:09installed so that water is like the how
1:46:12the stream will be impacted during the
1:46:14installation of the culvert. Yeah, I
1:46:16mean it it is an intermittent stream, so
1:46:18it's not a it's not a very active, you
1:46:21know, stream that's continuously
1:46:24flowing. Um,
1:46:25>> okay.
1:46:25>> You know, our wetland consultant will
1:46:27certainly be on site for this and if you
1:46:29condition that, you know, we can put
1:46:31forth reporting. Uh, there's not a
1:46:33construction sequencing
1:46:37um, you know, detailed on the in the
1:46:40plan set. Um but we do have restoration
1:46:44plantings uh as part of this impact.
1:46:48It's a very small wetland impact we have
1:46:50but the landscaping plans do show the
1:46:52the wetland mitigation plantings um you
1:46:56know around I guess at the base or kind
1:46:58of around the base of the culbert at the
1:47:00bottom of the slope. We're proposing it.
1:47:03>> Okay.
1:47:05How will you how do you plan to uh
1:47:08remove
1:47:10uh the stuff that was left behind that
1:47:13you have inherited?
1:47:16>> Um well I guess I guess I mean during
1:47:19construction once they're in there you
1:47:21know they'll they'll be
1:47:22>> with like or with hand shovels. How do
1:47:25you intend to do that?
1:47:28>> Uh I guess likely the extent of it it's
1:47:31it's all within and right up against our
1:47:33limit work. I mean building the roadway
1:47:35through it or expanding the roadway,
1:47:37building the culvert, we'll have we'll
1:47:39have machinery that will be able to work
1:47:41from uh you know the proposed crossing
1:47:44to reach in and remove it. Um you know
1:47:47and and wherever hand works required
1:47:49it'll be hand work and if like I said if
1:47:52if you know you want to condition it
1:47:54that you know the wetland consultants on
1:47:56site when this work takes place you know
1:47:58we'd certainly be available to that.
1:48:03Um, Bob, do you have any questions?
1:48:04>> No, I have no questions.
1:48:06>> Uh, Diane, do you have any more?
1:48:09>> No.
1:48:11>> Emily, do you have any more questions?
1:48:13>> I do not.
1:48:15>> Anybody [clears throat] from the
1:48:15audience?
1:48:18Aaliyah, do you have anything else?
1:48:20>> Um,
1:48:21just some recommended some additional
1:48:24recommended special conditions, but we
1:48:25can get into that upon closing if that's
1:48:28>> okay.
1:48:29>> Recommendation.
1:48:30>> All right. So, um, if we don't have any
1:48:32more questions, uh, I guess we can, uh,
1:48:34close this hearing.
1:48:39>> Okay.
1:48:41>> Thank you.
1:48:41>> Thank you. Thank you.
1:48:43>> All right. We have a continued public
1:48:45hearing regarding notice of intent filed
1:48:47by Sam Adams on behalf of Spectacular
1:48:50LLC, 378 Maple Lab, Shbury for the
1:48:53construction of eight commercial retail
1:48:56buildings, five residential use
1:48:58buildings, associated drives, parking
1:49:00areas, and utilities at 331 335 Maple
1:49:03Avenue. Is there anybody here for this
1:49:04hearing?
1:49:08I did want to note that I saw them
1:49:10earlier this evening at their um they
1:49:12had a remote consultation for the MEPA
1:49:14process. Um so they
1:49:18are um their comment period will end on
1:49:22October 20 or good god September 25th.
1:49:25Um they're anticipating a uh decision
1:49:28thingy in early October. Um,
1:49:32if there are any comments or questions
1:49:34that you would like to submit to the
1:49:36MEPA process, feel free to um, reach out
1:49:38to me. I can direct them to them. Um,
1:49:42other than that, I have not heard any
1:49:44updates from this project.
1:49:47>> Okay. Okay.
1:49:50So, we'll see them next month, I would
1:49:52assume. All right. New and old business.
1:49:56discuss and sign orders of conditions
1:49:58and
1:50:00um IDAS and we did not get through any
1:50:02IDAS tonight. So, our first closed
1:50:08uh meeting hearing was 40 Westview A.
1:50:11Somebody like to make a motion on 40
1:50:12Westview A.
1:50:16>> Do we have any special conditions for
1:50:18this one or is just
1:50:20>> I would recommend special conditions
1:50:22related to God. Sorry, let me find that
1:50:25sheet of paper. Um, where I wrote them
1:50:28down. Where are we? When are we? There
1:50:31we are. I would recommend special
1:50:33conditions related to a the wild wild
1:50:36flower mix proposed on the slopes. Um
1:50:39and then also a uh prior to the
1:50:42installation of the erosion control that
1:50:45um town staff walk the site with the
1:50:47property um owner or contractor to um
1:50:51see if additional if if additional trees
1:50:54can be excluded from the limit of
1:50:55disturbance.
1:50:57>> So may you like to make uh glue that in
1:50:59a motion? I would make a motion that we
1:51:02issue an order of conditions for D file
1:51:05number 285205040
1:51:07Westview Avenue with uh the described
1:51:11um as described by Aaliyah
1:51:16special conditions.
1:51:17>> Is there a second?
1:51:18>> Second.
1:51:19>> All in favor? I. All right. On to um 255
1:51:25Gulf Street. Somebody like to make a
1:51:28motion? Those
1:51:32uh do we have special conditions for
1:51:34that one or
1:51:35>> Yeah, it was um special condition on
1:51:37this one. The Gulf was a 15t buffer
1:51:39zone. Trees we left cut about 8 ft above
1:51:42if possible. We want restoration of the
1:51:46trees.
1:51:48Um the wall make sure the wall was moved
1:51:50out of 30 buffer zone which sounds like
1:51:52they put on their plan.
1:51:53>> Yep.
1:51:54>> And if any for any reason the hammer is
1:51:56not working on the rock and they have to
1:51:58blast it to come back to us. Yep. Yep.
1:52:00And that hammering was approved as the
1:52:02method for ledge removal.
1:52:05>> I make a motion that we issue an order
1:52:08of conditions for D file number 2852049
1:52:13with the um for 255 G Street with the
1:52:18special conditions as described by Bob.
1:52:22>> Is there a second?
1:52:23>> Second.
1:52:23>> All in favor?
1:52:24>> I. All right. Uh, somebody like to make
1:52:28a motion that we issue an order of
1:52:30conditions for 92 Cherry.
1:52:36>> Okay. The conditions on this one,
1:52:38>> um, this one was related to moving the
1:52:40fence to along the 30 foot buffer.
1:52:43>> Yeah, we stored on native vegetation in
1:52:46an area and then to move the fence
1:52:48outside the 30 buffer zone that we gave.
1:52:50>> Yep. That was the only one I had.
1:52:53Make a motion that we issue an order of
1:52:56conditions for D file number 285205192
1:53:02Cherry Street with the aformentioned
1:53:06special conditions.
1:53:07>> Is there a second? Second. All in favor?
1:53:11>> I. All right. And then
1:53:16>> we did we issue
1:53:17>> we had
1:53:18>> we issued one for 957 Boston turn.
1:53:22>> Right. So, would somebody like to make a
1:53:24motion regarding 957 Boston Turnpike?
1:53:27>> Um,
1:53:28>> I had some recommended special
1:53:30conditions related to this one. Um we uh
1:53:33we may the commission may want to
1:53:35consider um uh similar condition to 525
1:53:40Hartford Turnpike in that the salting be
1:53:43minimum or minimized um especially in uh
1:53:47along the crossing um and within the 100
1:53:51foot buffer zone.
1:53:53Um that the work on the Culver crossing
1:53:57should be conducted during dry
1:53:59conditions.
1:54:00um and any dewatering
1:54:05if dewatering would be necessary that a
1:54:09plan for that be submitted to the
1:54:10commission prior to it.
1:54:14Um
1:54:15I would recommend a restoration
1:54:17monitoring period
1:54:19to ensure that it would be similar to
1:54:21what we require for replication
1:54:24um which is three years of monitoring
1:54:26and a 75% success rate.
1:54:29Um, we might also, the commission might
1:54:31also consider having a wetland scientist
1:54:34on site during um removal of material
1:54:37and restoration of those areas.
1:54:41Uh, and then lastly, h I would recommend
1:54:45a special condition related to removing
1:54:47material within the resource area and
1:54:49within any upper upland within that 15t
1:54:52buffer by hand.
1:54:55Uh, just so that there's minimal
1:54:56disturbance to those areas.
1:55:01That's it for me, Bob.
1:55:04>> All right, we have a motion.
1:55:07>> Make a motion that we issue an order of
1:55:11conditions for DP file number
1:55:122852046-957
1:55:15Boston Turnpike with the special
1:55:18conditions as described by Aaliyah.
1:55:20>> Second.
1:55:21>> All those in favor?
1:55:23>> I
1:55:23>> I Okay. um on to uh discuss and sign
1:55:27certificate of compliance.
1:55:29>> Let me see what I've got. Okay, pass
1:55:32those down. Where did I put those? Okay,
1:55:36that's the confusing.
1:55:44I would recommend the issuance of the
1:55:47certificates of compliance for uh
1:55:48285-1663.
1:55:51That's for six Cheryl Drive. This wasn't
1:55:54uh the the applicant is requesting an
1:55:55invalid certificate of compliance. Um it
1:55:58sounds like this was a proposal for the
1:56:00construction of a single family home and
1:56:02the uh applicant filed a second order,
1:56:07second notice of intent that work was
1:56:09completed under. Um so it was like a
1:56:11slightly different proposal. Uh for some
1:56:14reason it was not close out during that
1:56:17process. Um so there this this no work
1:56:21was completed under this order. Um so
1:56:26that would be 285-1663
1:56:29for an invalid certificate. And then the
1:56:32second uh certificate of compliance I
1:56:34would recommend the issuance of is
1:56:35285-1665.
1:56:37That's for 19 Jackson Street. This was
1:56:40also the construction of a single family
1:56:42home. Um they have completed the single
1:56:44family home. Um, and it uh was
1:56:48constructed to the plans. I included
1:56:50some images on um the
1:56:55Google Drive of that home and it
1:57:01being stable. It's been several
1:57:02obviously several years since that was
1:57:04constructed. So, it's very very stable.
1:57:06>> Did we get a aselt plan for it?
1:57:09>> Yes. Yep.
1:57:12We also received a narrative from the
1:57:15>> engineer. Yeah.
1:57:16>> Certifying.
1:57:19>> I'll make a motion that we issue an
1:57:22invalid certificate of compliance for DP
1:57:25file number 28516636
1:57:29Cheryl Drive.
1:57:31>> Second.
1:57:32>> All those in favor?
1:57:36>> You got two or you have one?
1:57:37>> We've got 162.
1:57:39>> Okay. Let me give you one for 1665.
1:57:42>> All right. Somebody make a motion on one
1:57:441665.
1:57:47>> Make a motion that we issue a
1:57:49certificate of compliance for D file
1:57:52number 285166519
1:57:54Jackson Street as a complete
1:57:57certificate.
1:57:58>> Second.
1:57:58>> All those in favor?
1:58:00>> I.
1:58:04>> Moving into updates. I had um I met with
1:58:09uh the property owner and surveyor for
1:58:1147 Lear Street North um this afternoon
1:58:14to discuss
1:58:16um next steps and kind of walk the
1:58:20surveyor through um what why the
1:58:24enforcement order was issued and what
1:58:25needs to happen. um he is putting
1:58:28together a surveyed plan of what was
1:58:32existing conditions and what is what is
1:58:35existing conditions. So what what the
1:58:38existing conditions were prior to the
1:58:39installation of the new retaining wall
1:58:42further into the lake than was approved.
1:58:44Um and then he'll also submit a plan of
1:58:47the where the current retaining wall is
1:58:49so that we can kind of determine what
1:58:51kind of impacts have been had.
1:58:53[clears throat]
1:58:53Um I we we talked pretty extensively
1:58:57about what the next steps are going to
1:58:58be and I did make it clear that the
1:59:00expectation from the commission is that
1:59:02the wall be removed. Um
1:59:06so
1:59:09they'll yeah they'll be doing
1:59:12he wasn't sure if he would be doing some
1:59:14of that work under the enforcement order
1:59:15or if he would be filing a new notice of
1:59:16intent [clears throat] like
1:59:19stabilization and and final form
1:59:21situation.
1:59:22Please have them come to the next
1:59:24meeting.
1:59:24>> Yes. Yeah. They [clears throat] prepared
1:59:26to have
1:59:26>> they need to come to the next meeting
1:59:28and they need to be prepared to give us
1:59:31a plan to show how they're going to
1:59:33remove the wall and restore it to the
1:59:35conditions that were approved under the
1:59:37original order.
1:59:38>> Yes. Yeah.
1:59:39>> So that's
1:59:39>> Yeah. The surveyor is prepared to come
1:59:42it Yes. had was was provided the next
1:59:44meeting date and is prepared to present
1:59:46at that point in time with the previous
1:59:48existing conditions and the current
1:59:50existing conditions. The conditions that
1:59:52were approved under the existing order
1:59:54are what are what we approved.
1:59:56>> Yes, it does not seem so the the plan
2:00:00that was approved under the order of
2:00:02conditions um did not approve obviously
2:00:05we did not approve work on the retaining
2:00:07wall that is adjacent to the to the to
2:00:10the pond. Um so it was there is the
2:00:14wetland delineation line on those plans
2:00:16but there is not the retaining wall that
2:00:20was existing. So they are going to
2:00:22submit a plan of where
2:00:24of where the retaining wall was.
2:00:26>> There was no retaining wall existing.
2:00:28>> There was a small like there's yeah
2:00:30there was a small um
2:00:32>> not in the water.
2:00:34Let me see if I can get um
2:00:40which address is this?
2:00:42>> This is 47 Lear Street North.
2:00:44>> There was one out of the water probably
2:00:47back about 8 or 10 feet. This is in the
2:00:49water. There was nothing
2:00:51>> and they filled in and they filled in,
2:00:53>> right?
2:00:54>> Sorry, one sec. Let me share my screen.
2:00:56>> There's a lot of stuff that washed into
2:00:57the lake.
2:01:00So, this is in um April of 2024. There
2:01:04is an existing small wall along it was
2:01:07like a like probably like a cinder block
2:01:09size modular block if that would be
2:01:12considered a modular I don't know a
2:01:14cinder block size block wall along the
2:01:17water's edge. Um that is that you can
2:01:19see there was also it seems like some
2:01:21small stair situation going on. Um then
2:01:25we go to
2:01:28Um let's go just back to April of this
2:01:30year. We can see obviously it has
2:01:34>> out. Yeah. And the wall has gotten
2:01:37larger. It is. So it was previously that
2:01:39kind of you know concrete cinder block
2:01:41sized block. Now it is something more
2:01:43similar to like those I don't know 3x4s.
2:01:46Is that what they're
2:01:47>> that that size? So
2:01:49>> PCL walls at least three. It looks like
2:01:51it was in it looks like um I also
2:01:54included some images of that in the let
2:01:56me see if I can go to those images
2:01:58because it might be helpful in terms of
2:02:01there was one picture that
2:02:03>> is that stabilized pretty good down here
2:02:05now but we had because the banking
2:02:07because it was pretty much they dug it
2:02:09all up when he went down with a machine
2:02:10they built the whole road in here to get
2:02:12down here from the the banking. So, they
2:02:14have installed a silt fence along along
2:02:17the edge of the new existing retaining
2:02:20wall. Um, it definitely could use some
2:02:23maintenance at this point in time and
2:02:24could be extended. Um, it looks like it
2:02:27had been um shifted slightly. So,
2:02:33>> So, with the enforcement order, did you
2:02:35tell them to remove this wall?
2:02:39>> Yes. Yeah, I had um
2:02:43I think it
2:02:46this point becau be because there is so
2:02:50much backfill located on site. The
2:02:53concern with just yinking the wall was
2:02:55that fill would then make its way into
2:02:57the resource area. I that neither
2:03:01situation is something that we want to
2:03:03see. We don't want to see the wall in
2:03:04the water. We don't want to see
2:03:06additional fill just yonked into the
2:03:07resource area. Um, so I had requested
2:03:12that they just kind of like cease and
2:03:14desist until they talked to us about
2:03:17what their plan was to remove the wall
2:03:20and remove the fill so that it's not
2:03:23we're not replacing one issue of the
2:03:25wall being located in the resource area
2:03:27with a with the issue of material loosey
2:03:31goosey being located in the resource
2:03:33area.
2:03:34So, we have to understand that they'll
2:03:36be at the next meeting here in front of
2:03:39us. Yes,
2:03:39>> they will be here.
2:03:40>> Yes, Dave.
2:03:43>> Okay. And they should be have a plan
2:03:46>> provided to us to remove that wall.
2:03:48>> Yes.
2:03:49>> Okay. That's all we want to see.
2:03:51>> Yeah. As just a Yeah. Just an aside that
2:03:54you can see I'm you can see my lovely
2:03:56little fees. I am standing in front of
2:03:58the you can see the small block wall
2:04:01that was um
2:04:04>> yeah is it's kind of a a reddish bricky
2:04:07color and then obviously the the new
2:04:09wall is located in front of that. Um, so
2:04:13it
2:04:13>> so they didn't take out the old
2:04:15>> They did. Yeah, I think they stabilized
2:04:17the old wall by installing a new wall,
2:04:21which is that the issue is that you're
2:04:23now 3 feet more into the resource area,
2:04:26>> but they've also dug that banking out
2:04:27and made a road down there that wasn't
2:04:29there before.
2:04:30>> Yes. Yeah. It's [sighs]
2:04:31>> made that bank unstable.
2:04:34>> Si similarly, that was another thing
2:04:36that we discussed is that additional
2:04:37material was brought in. It had when the
2:04:40commission approved the PL there wasn't
2:04:43when the commission approved this
2:04:44project there really wasn't any
2:04:48throughout our extensive discussions
2:04:49with the applicant there was no there
2:04:52was not extensive work proposed down
2:04:54there. Um, so there wasn't really
2:04:58>> correct
2:04:58>> when we approved there wasn't a need to
2:05:00install a ramp to get down to the lower
2:05:02level with a large vehicle like with a
2:05:04large piece of machinery and there was
2:05:06no need to install that much fill. Um
2:05:09I'm not really sure uh where the dis you
2:05:12know obviously disconnect occurred but
2:05:14twixed the issuance of our order and
2:05:16none of that work being approved and
2:05:18where we are currently with addition of
2:05:20Phil and the addition of a retaining
2:05:23wall that should not be there. Um
2:05:26so that it was also
2:05:29the applicant would like to remove that
2:05:30material. Um,
2:05:34but I I I
2:05:37also told them to pause on that until
2:05:39they talk with you guys just so that
2:05:41it's it's kind of a concerted effort and
2:05:45not a we're going to remove the material
2:05:47and then put the material back there if
2:05:49if they're going to propose additional
2:05:50work in the future.
2:05:53I just didn't want like a bunch of
2:05:54instability occurring. Yeah, that
2:05:56message they need to come back to us and
2:05:58and show us a plan to restore it back to
2:06:01what was approved.
2:06:02>> Yes.
2:06:03>> So, they need to understand that
2:06:04completely because
2:06:06>> um this has been happening way too much
2:06:09and we have people here volunteering
2:06:12their time and we issues the these
2:06:14orders of conditions and nothing's
2:06:16enforced.
2:06:17>> Yeah.
2:06:17>> So, if they they need to come back and
2:06:20it needs to be enforced and they need to
2:06:21do what they said they were going to do
2:06:24in the original order. Mhm.
2:06:25>> So we expect them here next meeting.
2:06:27>> Okay.
2:06:27>> Is there a possibility we can make them
2:06:29start from scratch since they did all
2:06:31this excessive work start all the stuff
2:06:33that we already looked approved make
2:06:35them re apply for it seemed they've done
2:06:38so much.
2:06:39>> So yeah that kind of that was one
2:06:44that is definitely a route forward
2:06:46especially if they are if they would
2:06:49like to propose additional work that
2:06:51would be permittable. Obviously, this is
2:06:53in violation and would not be
2:06:54permittable because it is further into
2:06:56the resource area than can be permitted.
2:06:58If they wanted to
2:07:01receive a permit for work that would be
2:07:05permitted, um they it wouldn't at this
2:07:09stage it wouldn't make sense to they
2:07:12currently have an open order. It would
2:07:15not make sense to file an an amendment
2:07:17for that order because um
2:07:19>> No, this is above and beyond an
2:07:21amendment. This could be a new
2:07:23application.
2:07:24>> Exactly. And so Yes. Yeah. And I had I
2:07:26had described that to the applicant
2:07:28today as well of this is, you know, this
2:07:30is beyond the existing limit of
2:07:32disturbance. This is beyond what can be
2:07:34conducted under an amended order. So it
2:07:36might just be something that it would
2:07:37make sense to close out the existing
2:07:39order and start fresh with Yeah. with
2:07:42>> I I wouldn't start fresh. I would I
2:07:44would want this removed and I would want
2:07:45it restored to original condition.
2:07:48>> First.
2:07:48>> Yeah.
2:07:49>> Then if they want to start over from
2:07:50square one, fine. But this needs to be
2:07:52removed and restored to the original
2:07:54condition.
2:07:55>> Mhm. Agreed.
2:07:56>> First.
2:07:56>> Yeah.
2:07:57>> And this is happening way too much.
2:07:59>> Mhm.
2:08:00>> So the the removal of the wall and the
2:08:04excess material could be conducted under
2:08:06this enforcement order. 100%
2:08:08>> to resolve that and then a new notice of
2:08:10intent could be filed for the
2:08:12>> whatever
2:08:13>> potential future work.
2:08:14>> Yeah.
2:08:14>> Whatever they want to do. But
2:08:15>> okay, perfect. I will update the um
2:08:20surveyor and applicant and I will let
2:08:22them know. Um he is anticipating coming
2:08:24to our next meeting.
2:08:28>> All right. Um 101 North Sig. [snorts]
2:08:32Um I think I had that I did not have an
2:08:36update for that one. Um I had received
2:08:39the I had received a response to the
2:08:41enforcement order from the applicant. Um
2:08:44that is available for review but I had
2:08:47not heard from them since then. So I
2:08:49will be um reaching out to D again and
2:08:53then also following up with the property
2:08:55owner to see if
2:08:56>> Yeah, please. I mean this has been going
2:08:58on for many many years. It's
2:09:01They have not responded to any of our
2:09:03concerns. They have not restored the
2:09:05area. They have not they've done more
2:09:07work in excess of what was approved. Um
2:09:10this is another example of people not um
2:09:13>> listening
2:09:14>> following the the order.
2:09:16>> Exactly.
2:09:16>> So um I I really would like you to reach
2:09:18out to D and get their opinion and see
2:09:20if they have some enforcement on this as
2:09:22well.
2:09:23>> Yeah. and and would like to know what
2:09:25that would mean next year,
2:09:26>> especially if there's this like history
2:09:29of non-compliance. D has the ability to
2:09:32leverage fines. So like that might be
2:09:34enough to get these people to be like,
2:09:37"Oh, this is something that we
2:09:39>> are I don't know, you're forced to deal
2:09:41with now. Yeah, you are facing
2:09:44>> like large penalties." But I don't know
2:09:46what the the story is with this this
2:09:50like ridiculous.
2:09:51>> Yeah, it does seem that
2:09:53Similar orders of conditions are issued
2:09:55every time. It is just for the
2:09:57reconstruction of the retaining wall and
2:09:59then there's continued failures
2:10:00obviously off of those constructions. So
2:10:03>> So will they be can you ask them to come
2:10:05to the next meeting as well?
2:10:06>> Yes.
2:10:06>> Thank you.
2:10:08>> When was that response that AI
2:10:11generated?
2:10:13um um
2:10:16I think in
2:10:19late July they provided that but I've
2:10:22not heard from them since then. I' I've
2:10:25emailed them back um after that response
2:10:28and have not heard since then. So um
2:10:31>> AI response
2:10:33>> well it was 27 pages and and pretty
2:10:35repetitive. So I don't want to presume
2:10:38that but
2:10:40>> and
2:10:40>> I'll presume.
2:10:41>> And you when you're speaking with D, can
2:10:44you provide them with all your
2:10:45correspondence that goes back many years
2:10:47with Absolutely. with these with this
2:10:48applicant or this person and then you
2:10:50know tell them we're at
2:10:52>> Yeah, I'll kind of lay out the full
2:10:55situation.
2:10:55>> They're not responding to anything we do
2:10:57and it's been an ongoing issue.
2:10:59>> Yeah, we've we've issued fines before
2:11:00and they just haven't responded to those
2:11:02either.
2:11:02>> And it's impacting neighbors. It's
2:11:04impacting the resource area. Yeah. And
2:11:06this has been going on for years and
2:11:07years and years.
2:11:08>> Yes.
2:11:10Um and then lastly, we have an update
2:11:12from well, I have two updates. The the
2:11:15updated agenda also includes um the I'll
2:11:19I'll need a motion from you guys
2:11:20regarding a um I'm just going to I'm
2:11:23going to pop them in front of you just
2:11:25Mike and then um we'll go back to 33 to
2:11:2869 Green Street. The uh
2:11:31Diane can probably speak to this a
2:11:33little bit more, but in front of this uh
2:11:35community preservation committee at this
2:11:36time is a request for funding for a 300
2:11:40tree um for 300 for Shrewsberry's 300th
2:11:44anniversary. Um this has been a project
2:11:48that's been in the works for a couple of
2:11:50months. It will include a lot of town
2:11:52departments. It will include a lot of
2:11:53[snorts] um different groups within the
2:11:55town including Dian's um climate action
2:11:58group Tipping Point as well as um
2:12:00volunteers from across the town.
2:12:03Um and it will the the proposal right
2:12:07now is a pilot project within um Dean
2:12:09Park and Maple A fields uh just to get a
2:12:13a a foot in the water in terms of um
2:12:17figuring out what it takes to plant
2:12:19several trees on town properties and
2:12:22then then slow launching into 300 old
2:12:25trees.
2:12:26>> Did I miss any details?
2:12:27>> Uh this pilot project is only 50 trees.
2:12:31you go,
2:12:32>> which is significant enough.
2:12:33>> Yeah.
2:12:34>> Um and they would like they would
2:12:37probably like a letter of support from
2:12:39the conservation commission. Um I don't
2:12:41know if we would be amendable to
2:12:43>> Yeah,
2:12:43>> absolutely.
2:12:44>> One of the areas we're looking at right
2:12:45now is along Dean Park pond. Um,
2:12:50we haven't met with enough people to
2:12:54know what we can do, but the uh the west
2:12:57side of the pond um has some trees in
2:13:02some places. Some of them are really
2:13:03significant and phenomenal, but a lot of
2:13:07a lot of it is just simply grass right
2:13:09up to the bank. Um, and so whatever we
2:13:13could do with trees that that could help
2:13:15with that, we'd love to do.
2:13:17>> Excellent. Would somebody like to make a
2:13:19motion with regards to these trees?
2:13:23>> Uh, a motion for the letter of support
2:13:27for the pilot project. Is that what
2:13:29we're looking for?
2:13:30>> Yes, sir.
2:13:30>> Second.
2:13:31>> All those in favor? I
2:13:33>> Very good. Very good.
2:13:36>> Uh, okay. Then your update for 3369.
2:13:40>> Yes, we should have um we have Mike
2:13:42here. Um, I'm wondering if was Scott
2:13:46able to make it this evening? And there
2:13:48he is. He magically appears from my
2:13:50peripheral vision.
2:13:52>> I will stop sharing so they can talk.
2:13:56>> Good evening. I can give a quick update
2:13:59if you'd like. Uh just for the record,
2:14:00Scott Morrison from BHB.
2:14:02>> I was on site back in uh late August,
2:14:06evaluated the three areas, the impact
2:14:08areas that had occurred. They went in,
2:14:11cleaned all that material up. Um some of
2:14:14the natural vegetation's already
2:14:15starting to sprout back. I would
2:14:17anticipate later this fall once the
2:14:20leaves fall I would anticipate you know
2:14:22kind of those areas wouldn't even be
2:14:24visible at that point.
2:14:27I also conducted a site inspection on
2:14:29Monday um yesterday of this week took
2:14:33some photos that slope that we had
2:14:36reported had been seated stabilized with
2:14:39erosion control mat the grass is all
2:14:41growing all through that. Um so there's
2:14:44significant growth there. They've
2:14:46extended that further around the back.
2:14:50Um I think if you go
2:14:53>> keep going
2:14:56>> green everywhere as far as the I can
2:14:58see.
2:14:59>> Yeah. So if you go to the the next one,
2:15:01it'll show how green it is from the
2:15:03street. So if you look there, that whole
2:15:06slope, you know, was seated, stabilized,
2:15:09matted, got some significant growth. If
2:15:12you roll back one slide, they've
2:15:14continued to to expand that around that
2:15:18slope that's got grass kind of poking up
2:15:20through there. I would anticipate given
2:15:22the weather and conditions, this area by
2:15:25the end of next, you know, by next month
2:15:27will be look similar to the other photo.
2:15:31Um, I did walk the lower section along
2:15:34the erosion control barrier. There were
2:15:35no evidence of any further breaching.
2:15:39Those slopes have, as you can see,
2:15:41really kind of filled in with
2:15:43vegetation.
2:15:44>> What's that rip wrap?
2:15:46>> The rip wraps at the That's the outlet
2:15:48of the storm water basin.
2:15:50>> Okay.
2:15:51>> Um
2:15:51>> is this um the one that had the failure?
2:15:54>> Yes, that is.
2:15:55>> Is this has the rip wrap been replaced
2:15:57here?
2:15:58>> Not yet.
2:15:58>> Okay.
2:15:59>> So, is that going to stay or come out or
2:16:02is that the design? I guess I'm having
2:16:05Yeah,
2:16:06>> that that is part of the permanent uh
2:16:10design for the project.
2:16:11>> Um it's been contaminated basically, so
2:16:14it needs to be removed and replaced.
2:16:16>> Okay.
2:16:17>> Um along with the outlet structure
2:16:19itself.
2:16:20>> Okay.
2:16:21>> Um that should be happening this fall.
2:16:24>> Okay.
2:16:26>> I should tell you that that structure is
2:16:29no longer connected to the pond. that's
2:16:31been disconnected so that it can't do
2:16:33what it did in that one storm that we
2:16:35had.
2:16:36>> Right.
2:16:38>> Oh, I appreciate your efforts. It, you
2:16:41know, it it it looks much better than
2:16:42what it did. You can see the the growth
2:16:46all over. It's it's looking much better
2:16:48and we appreciate your efforts.
2:16:51>> And they've they started to pave the
2:16:53driveways. Um that's was gone going I
2:16:57think this week.
2:16:58>> Some pictures of that. Um,
2:17:00>> and then into next week they anticipate
2:17:03solding around those houses. So as you
2:17:06you know by the end of next week you'll
2:17:08have significant
2:17:09>> this is the entry as you come into the
2:17:11site for the town houses on the right
2:17:13hand side um with the first two
2:17:17buildings buildings now have been paved.
2:17:19And this uh photo to the right is the
2:17:23right side of the first unit uh along
2:17:25Green Street with the rip wrap and the
2:17:27the grass. And um so sod will be placed
2:17:32between the house and that um swale that
2:17:35you see at the bottom of the slope and
2:17:38that will be fully stabilized at that
2:17:40time.
2:17:43>> The only thing holding that up is is
2:17:45power. They can't power sprinklers or
2:17:48anything like that. without having
2:17:49power. So, they don't want to plant the
2:17:51side before they can sprinkle it.
2:17:55>> All right.
2:17:56All right, everybody. Well, thank you
2:17:59for your updates.
2:18:00>> Yeah. The only thing I was just going to
2:18:01suggest which I I mentioned is that if
2:18:04we can rather than appear next next
2:18:07month if we can just simply provide
2:18:09another update. Um presumably that would
2:18:13be kind of the closing update before we
2:18:15get into the winter months where you
2:18:16know I think as much as possible will be
2:18:18stabilized at that point. If the
2:18:20commission's amendable we can simply
2:18:21just provide
2:18:22>> you already amendable to that.
2:18:23>> Yeah, I think that's fine as long as we
2:18:25get an update and nothing. Yeah, just
2:18:27[snorts] keep providing these updates
2:18:28with the pictures and and whatnot as as
2:18:31much as you can and um to Aaliyah and
2:18:35it's nice to see this um so it gives us
2:18:37something to go back and work on.
2:18:39>> Absolutely.
2:18:39>> All right. Fair enough.
2:18:40>> Yeah, I think that would be good. Yeah.
2:18:42If um if you're able to provide in the
2:18:45next update as well if you know
2:18:47depending on how winter is how quickly
2:18:50winter decides to set in this year. um
2:18:53either in the next update or the
2:18:54following update just how how the site
2:18:56is being prepared for winter so that it
2:18:58it can kind of keep itself contained
2:19:02through the winter season.
2:19:04>> Yeah, I would say just continue the
2:19:06updates up until as long as you can
2:19:08before snow flies. Then if snow flies
2:19:11and there's nothing then come spring,
2:19:12you know, just start them again just so
2:19:15we have something.
2:19:16>> Sure.
2:19:20>> Okay. Well, thank you.
2:19:20>> Perfect. Thank you very much.
2:19:22>> Thank you.
2:19:24>> Anything else to come before us tonight?
2:19:26>> Um
2:19:28I The Spirit of Shrewsbury will be held
2:19:31on um
2:19:33>> 26th.
2:19:34>> The 206th
2:19:36>> can confirm. Yes, the 26th. Um if you
2:19:38guys I I will be there if you guys want
2:19:41to come hang out.
2:19:43>> Is it a Saturday?
2:19:44>> It is a Saturday. It will be held.
2:19:47>> Actually, I don't know where it'll be.
2:19:49Where it will be held?
2:19:50>> Uh
2:19:51Oh, I don't think they're doing it at
2:19:53St. John's again. That was a problem. I
2:19:56think they're going back
2:19:58>> to Oak Meadow. Oak. Yeah. Oak Middle,
2:20:00not Oak Meadow. Oak Middle.
2:20:02>> So setup is like starting at 8 or 7:30
2:20:06or 8, but the the whole thing is 10 to
2:20:093.
2:20:09>> Yes. Yeah. Yeah. See, it'll be on
2:20:12October or September. Good. 26. Okay.
2:20:15I'm going to stop talking.
2:20:16>> Is there a motion to adjurnn?
2:20:18>> Motion to adjurnn.
2:20:19>> Second.
2:20:19>> Second. I all in favor I All right.