Time on topic (from transcript timestamps; approximate, includes side talk):

Topic Minutes Share
76 Church Street PFAS Treatment Facility 30 61%
10 Rotary Road Garage Variance 10 20%
Other business 5 10%
14 Rotary Road Garage 4 8%
  • Thursday, October 15, 2026, 6:00 p.m. meeting chaired by Robert Tetro.
  • Only four members sat (the vice chair was at work, one member is away until November and another was absent), so the chair seated alternates Mr Adamiak and Mr Shea as full voting members alongside Mr Cussy; with four sitting, all four had to vote yes for any approval, and applicants were offered a continuance.
  • None was needed: all three hearings were approved and the meeting adjourned about 49:20 into the recording.

14 Rotary Road Garage

1:48-5:30

  • ZBA 26-17: special permit under section 8.3.1 to extend a pre-existing non-conforming single-family house (RB district) with a roughly 576 sq ft attached two-car garage, kept in line with the existing building.
  • Applicant Jeffrey Pike; no abutters spoke. Members saw no setback problem (existing 6.1 ft and 5.8 ft side setbacks are not reduced).
  • Approved with standard conditions; the four sitting members voted yes.

10 Rotary Road Garage Variance

5:48-16:09

  • ZBA 26-18: variance from the minimum front yard setback (sections 5.4 and 9.5) for a roughly 1,245 sq ft three-car detached garage in the front yard of a house on the same street (RB district); applicants Tony and Amy Defeudis (spelling as heard).
  • The applicant said the road bends, so about half the garage would sit inside the 30 ft setback, at roughly 17.5 ft from the property line; moving it closer to the house would hurt parking and turnaround on the existing circular driveway and leave boat trailers visible from the street. Intended for personal use (two cars, a boat, a golf-cart-type vehicle).
  • The chair noted that the state recently lowered the burden for variances (same four tests, easier standard). He read the section 9.5 findings (soil, shape or topography, hardship, no substantial detriment to the public good) and the board found them met because of the way the road turns; it is a private road and the lot backs onto the Upper Stoneville Reservoir.
  • Approved with standard conditions. No abutters spoke.

76 Church Street PFAS Treatment Facility

16:48-46:56

  • ZBA 26-19, applicant the Auburn Water District: a variance from the minimum parking requirement (section 6.3.2 J), a special permit for more than 15% or 2,500 sq ft of impervious surface in zone two of the aquifer and watershed protection district (4.3.5.1 and 9.3), and a special permit for new construction in the flood plain overlay district (4.1.7 and 9.3), for a roughly 3,950 sq ft PFAS treatment building next to the Church Street wells, with storm water, utility and driveway work. The chair, an abutter, asked for a plain-language explanation for viewers and said it would be voted as three separate motions.
  • Engineers Katie Carrera and Matt Tibbetts of Tata & Howard (spellings approximate) explained that the site's wells exceed the EPA 4 parts per trillion limit for PFOA and PFOS (Massachusetts uses 20 ppt for six compounds), so treatment is required. Four carbon filter vessels, a separate chemical room (potassium hydroxide, sodium hypochlorite, phosphate blend, with containment and sprinklers), a backwash holding tank discharged to the sewer, and a longer paved driveway so fire trucks and chemical deliveries can turn.
  • Spent carbon is taken off site to a state-approved facility (described as burned); the district will arrange disposal. Chemicals are the same ones already used. Bulk potassium hydroxide is filled from a truck port, not moved by forklift.
  • Parking variance: no dedicated spaces are proposed because operators only check the site once or twice a day and the district office is across the street.
  • The building sits in the flood plain overlay because of Dark Brook, and a notice of intent is before the Conservation Commission plus a land disturbance permit. The chair advised that Mass Pike plowing can throw slush and treated snow onto the area.
  • All three motions approved. Bid early 2027, construction likely from summer 2027, about a year and a half.

Other business

0:05-1:46, 47:00-49:23

  • Minutes of 9/17/2026 continued to next month because of absences.
  • Next meeting Thursday, November 19, 2026. The chair said he will be absent then (a library fundraiser, Friends of the Auburn Public Library storytelling event that evening).

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:05[music]

00:05>> Evening everyone and welcome to the

00:06Thursday, October 15th, 2026 6:00 p.m.

00:10edition of the Auburn Zoning Board of

00:11Appeals. My name is Robert Tetro and as

00:13the chair I'm calling this meeting to

00:15order.

00:16Uh just let me get through my

00:18uh responsibilities here this evening

00:20quickly. So, if anybody has any

00:21electronic devices, if you could turn

00:23them down to either a silent or vibrate,

00:24we would appreciate that. Is anyone

00:26recording the meeting this evening?

00:28Okay, hearing none, seeing none. You are

00:30allowed to record, that's not a problem.

00:31You just have to declare yourself,

00:32that's part of that rule. So, as you can

00:34see we're missing a couple of people

00:36this evening. I was just notified that

00:37Vice Chair Marron would be stuck at his

00:39employment, so he's not going to be with

00:40us this evening. I was aware that uh Ms.

00:42Roach was not going to be here. She was

00:44not here last month, she won't be here

00:45this month, but she'll be rejoining us

00:47in November.

00:49Um and also I see that Ms. Bush is not

00:51with us this evening, so I'm going to

00:52bring Mr. Adamiak and Mr. Shea up as

00:54full voting members. Now, before we

00:56begin any of the hearings this evening,

00:57I just want to let you know since there

00:58is only four of us here,

01:00we have to have a super majority, which

01:02means all four have to vote in favor for

01:04it to pass.

01:05So, what I'm going to recommend doing is

01:06we're going to open the hearings, we'll

01:07hear them and as applicants, if you

01:10would like to continue it until next

01:12month, I would definitely give you that

01:13option.

01:14Uh

01:15generally speaking, I don't think you

01:16have to worry about anything, but I'm

01:17not going to speak on behalf of the

01:18board and again you you have feel as

01:20though it's necessary, you can wait

01:21until next month to get a decision, we

01:23can continue it.

01:25So,

01:25before I begin, uh I think we have

01:27everything taken care of. So, if you

01:29want to just join me in rise for the

01:30salute to the flag.

01:35I pledge allegiance to the flag of the

01:37United States of America and to the

01:38republic for which it stands, one nation

01:41under God, indivisible, with liberty and

01:43justice for all.

01:46Okay, thank you very much.

01:48So, our first hearing this evening is 14

01:51Rotary Road, map 22 parcel five ZBA

01:5426-17,

01:57requesting a special permit to extend,

01:59alter, change a pre-existing

02:01non-conforming structure under section

02:038.3.1.

02:05The applicant, Jeffrey Pike, seeks the

02:07zoning relief described as above for the

02:09property at 14 Rotary Road, which is

02:11located in the residential RB zoning

02:13district. Currently on the premises is a

02:16single-family dwelling. The applicant

02:18seeks to construct a 500 plus or minus

02:20576 square foot attached garage. Do I

02:23have a motion to open the hearing?

02:25>> Motion to open hearing.

02:26>> a second?

02:26>> Second.

02:26>> All in favor? Any opposed? Hearing none,

02:29seeing none. Is the applicant present?

02:31>> Yes.

02:31>> If you'd like to approach the lectern,

02:33please, sir, and give us an overview of

02:34what you'd like to accomplish.

02:38>> Okay. I'd I'd like to just construct the

02:39two-car garage attached to the building

02:42um and keep it in the same line that

02:43it's that the existing building is in.

02:46>> Okay. Um

02:49So, you're looking to build a 576 square

02:51foot garage. You're not going to be

02:53interfering with any setbacks or

02:54anything like that. Is that correct?

02:56>> No, no.

02:57>> Okay.

02:58And I have the plan at least submitted

03:00here.

03:05And do we have any abutters that would

03:06like to speak on this matter at all?

03:09Hearing none, seeing none. Okay, I'm

03:10going to turn it over and I guess we'll

03:12take it to you, Mr. Cussy, first. Any

03:13questions?

03:14>> Um

03:15I don't have any questions. Um

03:18It's staying in line with the existing

03:19building. Uh

03:21where it's located on that Rotary Road.

03:24It's not interfering with anything. Uh

03:26So,

03:27I have no questions. I'm I'm good.

03:30>> I noticed you mentioned that you had

03:31driven past this today.

03:32>> I did.

03:33>> And you're comfortable with the area?

03:34>> I am.

03:35>> Okay.

03:36>> Yeah, I am. So, it's uh yeah.

03:38It's not going to interrupt with anybody

03:40or anything, so.

03:42>> Okay. Mr. Damiac, sir, do you have any

03:44questions or concerns?

03:45>> Uh no questions or concerns. I I

03:47reviewed the materials that you had

03:48presented and uh they're It's

03:50straightforward.

03:53>> [snorts]

03:53>> No? Okay, wow. This is an easy one I

03:56feel like. I have no questions or

03:57concerns. I'm confident with it. It

03:59seems like a pretty cut and dry. You

04:00have a 60.7 ft

04:03um

04:05setback on one side. It's the other side

04:08it would be at least it doesn't really

04:09say but you got 188.4 to the rear. And

04:13you're going from basically what you

04:15have a 6.1 ft and a 5.8 ft in the

04:18existing home that's already there.

04:21And it doesn't appear as though you'd be

04:22extending any further into that at all.

04:24Is that correct?

04:24>> Correct.

04:25>> Okay.

04:27So, do I have a motion to close the

04:28public portion of the hearing then?

04:30>> I'll make a motion to close the the

04:31hearing.

04:31>> Do I have a second?

04:32>> Second.

04:32>> All in favor?

04:33>> I.

04:34>> All right, one more time around.

04:36Mr. Koski, any concerns or questions?

04:37>> None.

04:39>> None.

04:40>> No questions.

04:40>> Okay, do I have a motion on the I'm

04:42going to read this again one more time.

04:45On the

04:46first hearing which is 14 Rotary Road

04:48map 22 parcel 50 DBA 2617, a special

04:52permit to extend, alter, change a

04:54pre-existing non-conforming structure

04:56under section 8.3.1.

04:58Do I have a motion to approve, deny?

05:01>> I'll make a motion to approve.

05:03>> With standard conditions?

05:04>> With standard conditions.

05:05>> Do I have a second?

05:06>> Second.

05:06>> All right. Mr. Shay?

05:08>> I.

05:09>> Just to make sure. You approve? You

05:11approve?

05:12>> I vote to approve.

05:13>> That was easy. Okay.

05:15>> Yeah.

05:15>> Hey, [laughter] thank you.

05:16Thank you very much for that.

05:17>> Absolutely. Good luck. You can be in

05:18contact with the building inspectional

05:20department and they'll take care of the

05:21rest of your paperwork.

05:22>> I'll see you soon.

05:22>> Thank you.

05:23>> Do I have a motion to close the first

05:24hearing?

05:25>> Motion to close.

05:26>> Do I have a second?

05:27>> Second.

05:28>> All in favor?

05:28>> I.

05:28>> I.

05:29>> Okay.

05:30So, we have to stay on time. It's 8:10.

05:35And we'll give Mr. Pike a minute to

05:37leave. But actually we don't even have

05:38they're not listed as times anymore

05:40which is convenient. They're only listed

05:41as numbers. So, that's actually great.

05:43Normally we'd have to wait 15 minutes in

05:44between. So, I'd would to hold you up

05:45for a few. So, I like this.

05:48So, our second hearing this evening is

05:5010 Rotary Road. It just happens to be on

05:51the same street. Map 22 parcel 3, ZBA

05:552618,

05:57seeking a variance for relief from the

05:58minimum required front yard setback

06:00section 5.4 and 9.5. Applicant Tony and

06:04Amy Defeudis

06:06seeking the zoning relief described as

06:07above for the property at 10 Rotary

06:09Road, which is located in the

06:10residential B RB zoning district.

06:13Presently on the premises is a

06:15single-family dwelling

06:17plus or minus 1245 square feet detached

06:19garage in the front yard of the property

06:21and to conduct associated site

06:23improvements. Do I have a motion to open

06:25hearing?

06:26>> Motion to open hearing.

06:27>> Do I have a second?

06:27>> Second.

06:29>> All in favor?

06:29>> I.

06:30>> I.

06:30>> Any opposed?

06:31Hearing none, seeing none, is the

06:32applicant here?

06:34>> Yes.

06:34>> Hi. If you'd like to approach the

06:35lectern and go over what your plans are

06:37and what you'd like to accomplish,

06:38please.

06:42>> So, if you're looking right at the the

06:44drawings in the front yard, I think you

06:46said attached. It'll be a detached

06:48garage construction, but right in the

06:50front of the yard, we'd like to put a

06:52three-car garage.

06:54Um we're making it so big so I can fit

06:55some boats and

06:57>> I like to get boats

06:58>> and toys, so I want to get all that

07:00stuff in. The reason I wanted to push it

07:02back or seeking relief from the frontage

07:05setback was right where the road turns.

07:08Um most of the garage would be in the

07:0930-foot

07:11um setback rule,

07:12but right where the road turns about

07:14halfway through where the garage would

07:16sit, it turns and it starts to get

07:17closer and closer where I believe I

07:19showed 17 foot six um roughly to the

07:23property line.

07:24Um so, I was hoping to be able to keep

07:27that cuz if I bring it closer to the

07:29house, it makes vehicle parking really

07:32hard in between the house. I'd have to

07:34um modify the driveway, the existing

07:37driveway,

07:38and anything I was going to store like

07:40boat trailers and things like that would

07:42have to go behind it. So, it would be

07:44visible from the street. So, my biggest

07:46concern is to get things in between the

07:48house and the garage so everything's not

07:50visible from the street.

07:51>> Okay.

07:53Do we have any abutters that would like

07:54to speak on this matter?

07:57Okay, hearing none, seeing none.

07:59Um I'll go around the the horn again. To

08:01you, Mr. Kussy.

08:02>> Yeah, um

08:04once again, I mean, it's a variance, um

08:06which is a little tougher than a special

08:08permit. Um

08:11yeah, I mean,

08:12I went by there today and I can see

08:14where you uh if you were to move it

08:16closer to the house, you're going to

08:17lose

08:18turnaround points and

08:21and access. So, uh

08:23once again, the road is uh it's not

08:25really interfering with anyone

08:27um

08:28by my feeling.

08:30Um

08:31so, I'm on the fence.

08:34I'm on board with it.

08:35>> Okay.

08:36>> I'm okay with it.

08:37>> And just so you're aware, too, last

08:38month we were notified by the town side

08:40that

08:42the threshold to approve a variance has

08:44been dropped a little bit. I think

08:45that's the best way to describe it. We

08:47discussed it at the last meeting. And

08:48really, they didn't change the standards

08:50as far as the four principles that we

08:52always use, but they did change the

08:54language as such that it would be

08:57less of a burden for the applicant to

08:58get a variance approved.

09:00Right. So, it's pretty a little bit

09:01easier now standards.

09:03>> that was a state

09:04>> Okay, I just wanted to make sure you

09:05were aware of that.

09:05>> So, this because of the location, um

09:08the road, um

09:09the road, that's that's you know, it's

09:11not going to interfere with anybody uh

09:13that I see. Uh so, that's my feeling

09:16with it.

09:16>> Okay. Mr. Adamiak.

09:19>> Uh so, just looking at the site plan, so

09:20it the garage will be in front of the

09:22house?

09:23>> It would be in front of the house,

09:24correct.

09:24>> And do you have a driveway going from

09:26the front of the house to the

09:28road at the

09:29>> Right now, yeah, it's a it's a C

09:31driveway that goes from one side in

09:33front of the house and then back out the

09:35other. And this would be right in the

09:36center of that.

09:37>> Oh, okay. Okay. I didn't I didn't see it

09:39on the um

09:40site plan, but uh

09:42yeah, it looks like you were where these

09:44houses are pretty like set back from

09:46main roads anyway. You're like your own

09:47little cul-de-sac back there. I'm

09:49actually surprised number 12 isn't here

09:52tonight

09:52>> [laughter]

09:53>> with a project because it seems like

09:55>> Right.

09:56>> the three of you would be in a row, but

09:57um I have no other questions. Thanks.

10:00>> Mr. Chaser?

10:02>> What are your plans with the garage?

10:04What are you going to use it for?

10:05>> So, it would be mine and her vehicle in

10:07the first two bays and then the boat and

10:10we have a small like a golf cart um

10:14recreational vehicle to go up and down

10:15the hills and that for that would go in

10:17the third bay.

10:19And that would be it. Just strictly

10:20personal.

10:24>> Good.

10:25>> And you know, I don't really have any

10:26questions. I'm looking at your plan here

10:28and I can see that you have Upper

10:29Stoneville Reservoir

10:30basically to the rear of the property,

10:32but I think obviously

10:34it's it's too close anyway, but you

10:35certainly don't want to block your view

10:36of the reservoir. I can understand that.

10:38And then you have this large front yard

10:40where again just for the record for the

10:42folks watching at home, you're looking

10:43at 48.5 ft to one side, you're looking

10:46at 55.8 ft to the other side and then

10:50anywhere from almost 17 at 17 6 and 3/4

10:54you got 30 ft and then 40 and 1/2 ft.

10:56So, again my concern if I had any would

10:59be Rotary Road and its view

11:02as people are traveling, you know,

11:04either way on it and I don't see really

11:05an issue with that at all at least from

11:06my point of view.

11:07>> Yeah, it's uh

11:09No, it's

11:10We're back far enough from the road I I

11:12believe. Yeah. I don't see any issues.

11:14>> All right. Okay. Um again, one more

11:17time. No abutters that are interested in

11:19speaking on this matter at all?

11:21Hearing none, seeing none. Do we have a

11:22motion to close the public portion of

11:23the hearing?

11:23>> Motion to close the hearing.

11:25>> Do I have a second?

11:26>> Second.

11:26>> All in favor?

11:27>> Aye.

11:27>> Okay, public portion is closed. One more

11:29time around, Mr. Cusick, do you have uh

11:31comments or concerns?

11:32>> No.

11:33>> Okay.

11:34Mr. Adamek.

11:35>> Given that it's a variance, is there

11:37anything in particular that we need to

11:38take into consideration when in our

11:40discussions or I don't I know that

11:43typically or one of the meetings we just

11:46talked about what the variance

11:47requirement is. I don't know if we need

11:49to discuss that.

11:51>> It's pretty straightforward. It's it's

11:53top I think

11:54>> it's changed but I can't remember what

11:55it is.

11:56>> topographical if I'm not mistaken which

11:58if you would agree.

12:01>> Yeah.

12:02>> I will read them in just for the record.

12:04>> The note of the state is giving relief

12:06so

12:07in this situation I think because of the

12:08location.

12:14>> I just want to make sure I find the

12:15right page here too. It's been a little

12:17bit.

12:30>> And that is a private road also so

12:32>> Right. Exactly. It's a private road.

12:34>> State highway is pretty much

12:40>> Hang on now. Now I can't find it of

12:42course because I'm

12:43under pressure trying to look for it.

12:45>> Yeah, we have

12:47wanted to get it out of the way here.

12:54Okay.

12:59>> So it falls under

13:01as we had mentioned 5.4 and 9.5.

13:05So I'll read through those first.

13:08Just to get them into the record.

13:24And it is one here to make sure

13:26everything is correct here.

13:27It's under HB.

13:30Or RB draft, excuse me. So, 5.4

13:33dimensional regulation tables.

13:38And 9.5.

13:41Or that first, actually.

13:531.3

14:00That's the table.

14:01Okay, 9.5. Our variance is here. It's

14:04page 102 if you're following along with

14:05me, or I apologize. So, the mandatory

14:07findings for a variance, before the

14:09grant of any variance from the

14:10requirements of this bylaw, the board of

14:12appeals must specify that it's owing to

14:15the circumstances related to the soil

14:16conditions, shape, or topography of the

14:18land, or structures, and especially

14:20affecting such land or structures, but

14:22not affecting generally the zoning

14:24district which it is located, or a

14:26literal enforcement of the provisions of

14:27this bylaw would involve substantial

14:30hardship, financial or otherwise, that

14:32desirable relief may be granted without

14:34substantial detriment to the public

14:36good, and without nullifying or

14:38substantially derogating from the intent

14:40and purpose of the bylaw.

14:41So, that's really it right there. We

14:43just have to make sure that it's owing

14:44to circumstances related to soil

14:45conditions, shape, topography of the

14:47land, and structures, and especially

14:50affecting such land or structures, not

14:51affecting generally the zoning district

14:53which it is located, a literal

14:55enforcement provisions of this bylaw

14:57would involve substantial hardship,

14:58financial or otherwise, and that

15:00desirable relief may be relief, excuse

15:02me, must be granted without substantial

15:04detriment to the public good, and

15:06without nullifying substantially or

15:07derogating from the intent and purpose

15:09of the bylaw. So, that's our standards,

15:11and I think we meet all of those.

15:12>> Yeah, the way the road turns,

15:14>> Right.

15:15>> and uh yeah, and it's not going to

15:17be in a any detriment to the uh

15:19neighborhood or safety uh

15:22conditions. There's nothing, so.

15:24>> Mhm.

15:24>> Yeah.

15:24>> I would agree. Okay, so with that being

15:27said, is that good for you, Mr.

15:28>> That's great. Thank you. I appreciate

15:29that. Thanks.

15:31>> Let me go ahead and read this back in

15:32again as we always do.

15:34So, do I have a motion on the second

15:37hearing this evening, 10 Rotary Road,

15:39map 22 parcel 3, ZBA 26-18, a variance

15:44for relief from the minimum required

15:45setback

15:47from the front yard setback, excuse me,

15:48section 5.4 and 9.5.

15:52>> Yeah, I'll make a motion to approve with

15:53standard conditions.

15:54>> Okay.

15:55>> Do I have a second?

15:56>> Second.

15:58>> I vote to approve.

16:00Good luck. You're all set.

16:01>> Thank you very much.

16:02>> Congratulations. You can contact the

16:03Department of Inspectional Services and

16:04they'll give you the paperwork and give

16:05you the next steps.

16:07Okay. Good luck.

16:09Do I have a motion to close the number

16:10the second hearing?

16:12>> Motion to close. Second here.

16:13>> Second here.

16:13>> Okay.

16:17Let me just shuffle some paperwork for a

16:18minute and we'll get the last one done.

16:40>> It's not like driving by.

16:42>> Okay.

16:43>> I take it you must be here for number

16:45three.

16:46>> [laughter]

16:46>> Okay.

16:48So, we have our third hearing this

16:50evening, 76 Church Street, map 48 parcel

16:53100 and 101,

16:55and Ridgewood Drive rear, map 40 parcel

16:5740, ZBA 26-19.

17:00They're seeking a variance for relief

17:01from the minimum parking requirement,

17:03section 6.3.2J,

17:05if you want to look that one up.

17:08Special permit to allow

17:10greater than 15% or 2,500 square feet of

17:13impervious surface on a lot within zone

17:15two of the aquifer and watershed

17:18protection overlay district sections

17:204.3.5.1

17:22and 9.3

17:24and a special permit to allow new

17:25construction in the flood plain overlay

17:27district section 4.1.7 and 9.3. The

17:31applicant, the Auburn Water District,

17:34seeks the zoning relief described as

17:35above for the property of 76 Church

17:38Street and Ridgewood Drive rear to

17:40construct a 3950

17:42square foot plus or minus water

17:44treatment facility adjacent to the

17:47existing well buildings and to conduct

17:49associated site improvements such as

17:51storm water upgrades, utility

17:53connections, and driveway improvements.

17:56Do I have a motion to open the hearing?

17:58>> Motion to open the hearing.

17:59>> And just so you are aware, we will have

18:01require three separate votes for this.

18:03We have a variance and two special

18:04permits. So, whichever way they go, they

18:07will be conducted in separate. So, is

18:09the applicant here?

18:11If you would like to approach the

18:12lectern,

18:13give us an overview of what you're going

18:14to discuss with us this evening. Now,

18:16can I just ask at the beginning, I'm

18:18also a butter. I wanted to make sure

18:19you're aware of that, so I would receive

18:21the butter's notices as well.

18:23But, I also received

18:25I had three conversations with three

18:27different neighbors in the last week or

18:29so, and I was kind of surprised that

18:31nobody really understood what P Fast

18:33chemicals were.

18:34So, would you mind beginning with a

18:36little bit of an explanation on what

18:37those are because this is also going to

18:39get replayed on the town

18:41uh YouTube channel, and a lot of people

18:43will probably have some questions that

18:44you might be able to answer.

18:46Thank you.

18:48Do I have a motion to open the hearing?

18:49Just want to make sure I did that.

18:50>> Uh yeah, motion to open the hearing.

18:51>> Second.

18:52>> Second.

18:52>> All in favor?

18:53>> Aye.

18:53>> Okay. Just want to make sure I did that

18:55already.

19:02Thank you.

19:11Oop.

19:18>> Perfect.

19:20This is just a site plan.

19:23So,

19:24thank you for having us tonight. Katie

19:27Carr with Tata and Howard. So, Tata and

19:28Howard is the engineer on the project.

19:30So, we're working with the Upper Water

19:32District who's the applicant on this

19:33project. We also have Matt Tibbetts with

19:35Tata and Howard.

19:36>> Hello.

19:37>> Um so, yeah, we're happy to give you

19:38guys a bit of a background on the

19:39project, why we're doing it, what the

19:41purpose of the facility is. Um but yes,

19:45it is ultimately So, this is the Church

19:46Street PFAS water treatment facility. Um

19:50so, the purpose of this facility is to

19:52remove PFAS from the water.

19:54It is um

19:56a hot topic right now. Um I am

19:58surprised, you know,

20:00seems like everyone these days hears

20:01about it. Um

20:03there essentially are six PFAS compounds

20:08that are found in

20:10many areas of life, drinking water being

20:12one of them.

20:13If it gets into the ground, it can get

20:15into our drinking water.

20:16Um

20:18MassDEP has set a limit on There's six

20:22PFAS compounds. I can't pronounce them

20:24all. They are long names. But MassDEP

20:26has a limit on the summation of the six

20:29PFAS compounds.

20:31Their limit is 20 parts per trillion.

20:33I guess just to bring it back a step.

20:35You might have also heard it called the

20:36forever chemical.

20:38That is because the compounds the PFAS

20:40compounds can't break down. Um

20:43so, the goal is to ultimately remove it

20:46from the water. Um it's it's

20:50it can have cancerous effects. Um it's

20:52not good in high levels. We're kind of

20:54in a shifting spot right now where the

20:56state Massachusetts has their own

20:59regulations for PFAS. And like I said,

21:01the 20 parts per trillion is

21:03it's a very small amount, a few grains

21:04of sand in an Olympic-size watering

21:07pool. Um the national standard is

21:10actually less than that. So, EPA has a

21:13maximum contaminant level of four parts

21:15per trillion for two of the PFOs

21:18compounds, PFOA and PFOS. Um

21:22So, right now at this location, the

21:24Church Street wells for the water

21:25district, they have PFOA and PFOS levels

21:29above the national EPA uh contaminant

21:32level of four parts per trillion.

21:35>> Can I interrupt for 1 second? I'm sorry.

21:36I just want to make sure you said four

21:38parts per trillion, correct? Because

21:40normally the standard is I I worked in

21:41the biotech industry and I understand a

21:43little bit of this stuff, not quite to

21:44your level, but normally this is parts

21:46per billion, correct? So, we're talking

21:48about parts per trillion now. Just so

21:50everybody understands how

21:52strict these standards are. Go ahead. I

21:54apologize.

21:55>> They're Yes, they're very strict in the

21:58drinking water world. Um they're not as

22:00strict in everything else. You You can

22:03find these in nonstick cookware. Um if

22:06you go to the grocery store and

22:08buy a cake, you know how it comes on

22:10that kind of like that black plastic

22:13that's clean like that that has PFOs

22:16that's regulated by a different

22:17government entity. So, there's there's

22:19different levels here, but it is very

22:20strict when it comes to drinking water.

22:22Um and yeah, the national uh level is

22:25more strict than the Massachusetts

22:26level.

22:28Massachusetts might take on that that

22:29level itself soon. Um

22:33So, that's kind of where we're at with

22:35PFOs. This site specifically is above

22:38that EPA maximum contaminant level. So,

22:40the district is required to

22:43construct treatment to remove PFOs from

22:46the site.

22:47>> And can I just ask too, for the folks at

22:49home really also, are these considered I

22:51know they're forever chemicals, and

22:52which means they don't break down and

22:53once they're inside you, they're inside

22:55you, they stay there. But are they

22:56considered carcinogens technically?

22:59>> I don't know if they would fall under

23:01the

23:01You're testing me. I don't know if they

23:02would fall under the category of

23:03carcinogens, but I know they can have

23:06carcinogenic effects. I so.

23:10>> Okay.

23:10>> There are multiple

23:12it's

23:13also depends younger folks it's a little

23:16bit more dangerous to have higher

23:17levels. We we worry about babies. Um

23:22but but yeah, it's it's it's the big one

23:24right now.

23:25>> Sure.

23:27>> So, it's it's a concern everywhere. It's

23:29concerning here in Mass. Um and it's

23:32just it is a requirement for for these

23:35folks to get that out of the water if it

23:37is above the

23:38um

23:40either contaminant level national or

23:42state.

23:43So,

23:45that's the purpose of the facility is

23:47PFOs removal. Um

23:49right now at the site there's three

23:52existing wells, Church Street wells 1,

23:532, and 3. Um

23:55if you're familiar with the site, wells

23:571 and 2 are on that 76 Church Street

23:59parcel. Well 3 is actually across the

24:01street. It's right next to the water

24:03district's office, which is actually I

24:05guess right around the corner.

24:06Um

24:07those wells are in their own individual

24:10well pump buildings. So, there's like

24:12three little buildings. Um and those

24:15buildings also contains just some

24:16chemical feed addition right now. And

24:18that's the extent of treatment at the

24:19site right now.

24:21Um

24:22so, this new facility is being proposed

24:25to remove PFOs. That is the ultimate

24:27goal of the facility.

24:29Since we are constructing this new

24:30building on site, we're also going to be

24:32moving the chemical feed from the

24:34individual buildings into this new

24:36building now and just we're going to

24:37have all the treatment in this one new

24:39building. It's going to streamline it.

24:41Um

24:43Also, if you've seen the site between

24:45the existing well 1 and well 2 pump

24:47buildings,

24:48um there is some empty space right now

24:50that is kind of just used for storage.

24:52That the new building's going to go

24:53right there in the middle of the two

24:54buildings um where there's where there's

24:57the empty space, it it does need to be

24:59central to the three wells.

25:01Three wells are now going to be rerouted

25:03with piping through the new treatment

25:05facility and then ultimately into the

25:07water mains in the street to feed the

25:09water district. Um

25:12So, that new facility will contain uh

25:16the way we remove PFAS typically is

25:18through filtration. So,

25:21it's large filters filled with a carbon

25:23media.

25:24Um and that's how we remove the the

25:26PFAS. So, there's going to be four

25:29carbon filtration vessels within this

25:31new building.

25:32Um

25:34There's going to be separate room for

25:35chemical storage and chemical feed. Like

25:37I said, all the chemicals are moving

25:38over to this new room now.

25:40Um there will be a bathroom in the new

25:42facility. There's a separate electrical

25:45room in the new facility.

25:47Pumps, water piping,

25:49valves, appurtenances, electrical

25:51equipment, um

25:54HVAC equipment, and there's sprinklers

25:55in the new building as well.

25:59And

26:01in addition to the building itself,

26:02there is um you know, good amount of

26:04site work. There's There is a lot of

26:06infrastructure to put in.

26:07Um there's a good amount of water piping

26:09we need to install just to connect those

26:11wells now to the new facility and then

26:12back out into the street. So, a lot of

26:14the work on site is going to be

26:16installing water mains, installing

26:17piping,

26:19um

26:20we are modifying, extending the existing

26:24driveway.

26:25Uh right now, there's kind of a short

26:28paved driveway that has a really harsh

26:31turning angle onto the site. Um it's

26:34really not well suited for large

26:37vehicles, including fire trucks. And

26:39they also need a large vehicle to be

26:41able to get onto site for chemical

26:43deliveries.

26:44So, we're extending that paved driveway

26:48up north just to kind of wrap around

26:49that north side of the well one

26:51building. And it's going to have a much

26:53wider turning radius. These trucks can

26:55get on site with without making a

26:56five-point turn.

26:58Um

26:59and then as that driveway kind of opens

27:01up onto the site, it's going to be a

27:02gravel driveway all around that new

27:04building.

27:06Um we be beyond the the paved driveway

27:09and then the gravel driveway around the

27:11building, everything else besides that

27:13is just going to remain grass. So,

27:15anything that's disturbed during

27:16construction will be loam and seeded at

27:18the end.

27:20Um

27:21there is stormwater design um included

27:24as well. You'll see some areas. We do

27:27have a a buried con- a corrugated metal

27:30pipe infiltration system on site

27:33for infiltrating and treating

27:34stormwater.

27:35Um

27:36we

27:38are submitting a notice of intent

27:39through conservation commission

27:41um and MassDEP and a land disturbance

27:44permit through the DPW as well.

27:48We do have the Dark Brook on site. The

27:50Dark Brook runs on the the eastern

27:52border of this site. Um so, because that

27:55Brook is there, we do fall within the

27:59town's um aquifer or sorry, um

28:03flood plain overlay district.

28:05Um so, because we are constructing a new

28:07building within that overlay district,

28:09that does trigger the requirement for

28:10the special permit um which is why

28:12that's on there.

28:14Because this is a well site, we are also

28:17within the um aquifer and watershed

28:20protection district. We're in the zone

28:22two um district for that. And the

28:25building itself is almost 4,000 square

28:28feet. So, we do meet that um greater

28:30than 2,500 square feet uh construction

28:33within the aquifer and watershed

28:35protection overlay district.

28:39As far as the requested variance goes,

28:42so we do um

28:46under section six of the zoning bylaws,

28:50um 6.3 for parking uses,

28:53this facility doesn't quite fall

28:55perfectly within um a a

28:58parking use type here, but I think we we

29:01classified it as an industrial facility.

29:03Um so, the bylaw states that an

29:06industrial facility must have

29:08um one space for each 2,000 square feet

29:11of net floor area

29:12plus

29:14um one space per employee on the largest

29:16shift.

29:18However, this facility is not an

29:20occupied facility. Water District

29:23personnel are not going to be staying

29:24here. There's not an office here.

29:26There's not a lab. Um

29:28so, what will be happening is operators

29:31with the district will be visiting the

29:32site once or twice a day just to check

29:35on operations of the facility. They're

29:37not going to be staying there.

29:38Um

29:39there's really not

29:41uh

29:42the the largest shift um with, you know,

29:44the space per employee on the largest

29:46shift

29:47um

29:48doesn't quite apply here, we think, just

29:50because of that reason.

29:52Also, with this being 76 Church Street,

29:54it is right across the street from the

29:56Water District office at 75 Church

29:58Street. The Water District office is

30:00where personnel, you know, stay

30:03throughout the day. Um they have parking

30:05there. So, the thought being they do

30:07have the parking right across the street

30:08at the Water District office, and also

30:09they're not going to be staying at this

30:11facility full-time. They're just going

30:12to be poking in to check on things.

30:15So, that is the basis of our request

30:18um for a variance for the parking

30:20requirement.

30:23Uh

30:24>> So, you're actually going to have a less

30:26parking, is that what you're saying?

30:27>> Less parking at this new facility. So,

30:30there's not currently any dedicated

30:31parking spots on the site now.

30:33>> Right.

30:33>> Um we're just not proposing any new

30:36dedicated parking spots. We

30:38There are There's ample room for

30:40employees to be able to park on the

30:42site. We just don't have any dedicated

30:43spots. Um Um, but there's none there's

30:46none there now on site.

30:48>> Okay.

30:50Um, well, we certainly don't have any

30:52about it cuz we're the only ones in the

30:53room, but I have to ask anyway to make

30:55sure that nobody wants to cut me any

30:56comments on that. Uh,

30:58I think we've covered at least the part

31:00about the variance for now. So, if if

31:03you are comfortable with everything, I

31:04can go around and ask the members of the

31:06board if they have any questions and

31:07then we can kind of bring it back to you

31:08if you'd like.

31:09>> I Yeah.

31:10>> Do you have any other questions or

31:11concerns, sir?

31:11>> I don't. I'm good with the So, this is

31:14on the parking.

31:16>> So, we can discuss all of it, but yeah,

31:17this is on the parking for now.

31:18>> So, I don't have any questions on the

31:20parking. Yeah.

31:21>> Mr. Dean.

31:21>> Questions on the parking.

31:22>> Mr. Chair.

31:23>> Good with it.

31:24>> Okay. So, I think for the parking, I

31:26don't really have any questions on it. I

31:28just like to maybe since we you've

31:29already covered it and rather than go

31:31back to it later. So, this is basically

31:33a high-pressure filtration facility if

31:35I'm not making a mistake, correct?

31:36>> That's correct.

31:37>> And it's going to be media filters and

31:39that media will at some point be changed

31:42out, I'm assuming.

31:43>> That's correct.

31:43>> And so, is that considered a hazardous

31:45material once it's dirty?

31:47>> So, that

31:47>> to call it dirty.

31:48>> Yes, that is completely taken off site

31:51and that it that media, once it's spent,

31:54which

31:55we won't really have a good idea of how

31:57often it does get spent until it's up

31:59and running. Um, but once that media is

32:01spent, it gets hauled off site and

32:03burned.

32:04Um, so, there are MassDEP approved

32:06locations that can handle that. So, it

32:09has to go to one of those approved

32:10facilities. It's not dumped on site or

32:12anything, it's taken off site.

32:13>> And you had mentioned chemicals that

32:15would be on site.

32:16>> Yes.

32:16>> Can you just touch on those a little

32:18bit, what they are? Are they water

32:19treatment chemicals, I'm assuming?

32:20>> Correct. Yep, there So, right now, the

32:23district uses um, potassium hydroxide,

32:25which is KOH, um, sodium hypochlorite

32:28for disinfection and then there's also a

32:30phosphate blend for corrosion control.

32:32Um, the KOH is for pH adjustment. They

32:35use those chemicals now.

32:37They're going to be using the same

32:38chemicals with the new facility.

32:40We will have them in a separate chemical

32:42room. It's going to be its own room with

32:44a door and its own ventilation. It kind

32:45of helps things out.

32:47Um

32:48the quantity of KOH that we have cuz KOH

32:52is considered a corrosive material. That

32:54does trigger requirement for us for fire

32:56protection. So, we do need to sprinkler

32:58the building because of that. Um so,

33:01that is kind of the one effect it has on

33:02the new facility. Um but, it is It's the

33:05same chemicals they're using now.

33:07It you know, it has to meet MassDEP

33:09approved

33:10sizing containment. There needs to be

33:12certain containment. It's like 110% of

33:14the volume of actual chemical storage.

33:17Um

33:18>> So, the first one's a water softener,

33:20basically, right?

33:21>> Yeah.

33:22>> Yes.

33:22>> Right. I'm familiar with that. I used

33:23sodium hydroxide in one of my past

33:26careers.

33:26>> Yep.

33:27>> Um the second one is bleach, basically.

33:30>> Chlorine, a disinfectant.

33:31>> or less, yep. Chlorine, yep. And then,

33:33the third one, again, I'm sorry.

33:35>> It's a phosphate. It's a poly It's a

33:37orthopolyphosphate blend.

33:39>> Okay.

33:39>> It helps with corrosion control. So, it

33:41kind of lines the inside of the water

33:42pipes to help

33:43>> Sure.

33:44>> prevent corrosion of the interior pipes.

33:46>> Okay.

33:47And uh again, from my familiarity with

33:49these, they're going to be probably in

33:5055-gallon plastic drums, most likely.

33:54>> Now, you're testing me. So, um

33:56the KOH is the the larger chemical is a

33:59larger quantity of the chemical.

34:01We There's bulk tanks where the majority

34:03of it gets stored and then there's a day

34:04tank and you have to transfer from the

34:06bulk tank to the day tank every day.

34:08Um KOH, we have two 1,000-gallon bulk

34:12tanks, I believe.

34:14>> 1,000 and 150.

34:15>> Okay.

34:16>> Sure. I'm familiar with those, too.

34:17>> Yep. Yep. And those will have a like a

34:19chemical fill station. So, when those

34:21bulk tanks get empty, they'll have a

34:23chemical fill truck come on site and

34:25fill it from the fill port.

34:27Um hypochlorite and phosphate are not as

34:29much quantity.

34:31Hypochlorite might be the bulk. Well, so

34:34we have drums, drum storage for

34:35hypochlorite and phosphate.

34:37>> That's what I thought. Usually they're

34:38pumped in the drum

34:39the top is opened, the pipe get the the

34:42siphon goes into it, it gets screwed on,

34:44and then it gets pumped in as required

34:45basically, and then they get changed out

34:47depending on like you said, it really

34:48depends on how often it gets used up.

34:50>> That's right.

34:51>> When it goes out they change the drum.

34:53>> Or water more chemicals. Um but yeah,

34:55because the hypochlorite and phosphate

34:56are not as high of a necessary quantity,

34:58those are stored in drums for both. I

35:00think you're I think it is 55 gallons.

35:02>> For the for the sodium hypochlorite,

35:04yeah.

35:04>> Okay.

35:04>> And you had mentioned the thousand liter

35:06drums. So, would there be a fork truck

35:09on site? I'm just curious. Is that how

35:10they're going to unload and load it cuz

35:11it had I know from the plant that I

35:13worked in that had this, it was

35:15basically it was an we used acid that

35:16was basically to control the pH of the

35:18outgoing water flow.

35:19>> Okay.

35:20>> So, we would bring it in through fork

35:22truck, bring it into the basement of the

35:23facility,

35:25make sure it was safely transported, and

35:26then bring the empties out. So, is there

35:28going to be some kind of a procedure

35:29like that? I would assume.

35:30>> So, for the large KOH bulk tanks, those

35:32stay in there. That

35:34>> Ah, okay.

35:34>> During construction we do need to bring

35:35them on site with something, some kind

35:37of equipment to to set them, but once

35:38they're there, they're there unless they

35:40fail. Those get filled through a port.

35:42There's a going to be a port on the

35:44exterior of the building where a a

35:46chemical

35:47fill truck can

35:49connect to the port and fill it up that

35:50way. So, they don't need to replace

35:52those bulk tanks when they get out.

35:53>> So, this is basically tanker transfer,

35:55if you will.

35:56>> Yep.

35:56>> Right. Okay, that's I I prefer that

35:58truthfully. I think it's a safer

36:00process. I'm familiar with that as well,

36:02and it's

36:03it it's the cleanest and most safest way

36:05to do it. The tanker pulls up, it's like

36:06filling a gas station. Tanker fills up,

36:09they put the hose to it, it goes in the

36:10facility, they pump out as much as they

36:12need based on the delivery requirement,

36:15and then they can break that down and

36:16and move on. You have a lot higher risk

36:19of spill or incident take place if you

36:22have a fork truck when you're moving a

36:23thousand liter tank around, you know.

36:25So, I just again, these questions are

36:28for the board but also for the folks are

36:29going to be watching this at home cuz I

36:31have a lot of curiosity about it, so.

36:33>> Go right ahead, please, sir.

36:35>> You had made mention that

36:37when the filters get dirty, they would

36:39have to be changed out

36:41and it would be considered

36:44hazardous material.

36:47>> Yes.

36:47>> And that's correct?

36:48>> Yes. Um so, there's a couple of

36:50distinctions. Um one so, those filters

36:54do the P FOS is absorbed to the carbon

36:56media. So, when I say the carbon media

36:58is spent that's what that's when the

37:01media has to be hauled offsite and and

37:04sent to an approved facility.

37:06It does it's a filter, right? So, same

37:08with like our water filters at home, it

37:10will accumulate sediment on top of the

37:12media through normal flows through the

37:15facility. So, those filters

37:18couple times a year maybe will have to

37:20be backwashed.

37:21>> Mhm.

37:21>> Um

37:23so, in that case water is just the flow

37:25is reversed. It goes from the bottom up

37:27to the top and we just basically

37:28backwash the water. Um just to get any

37:30built up sediment on top out of the

37:32filter. So, we do have um a holding tank

37:36for the spent wash water.

37:38Backwashed. Um

37:40and that holding tank anytime a filter

37:43is backwashed, that backwash water will

37:44go into the holding tank and then from

37:46there water in the holding tank is

37:48pumped into the sewer in the street.

37:50So, that's not a dirty filter. Um that's

37:54just a backwash process, but

37:56>> No, but what what I'm getting at is

37:59when the filter gets dirty, you would

38:01made mention that it's considered a

38:04hazardous material and would have to

38:06be taken offsite.

38:08Um

38:10who is going to be in charge of changing

38:13these filters? Okay, is it somebody from

38:15the water department? Is it a private

38:18concern that comes in? Is it somebody

38:20that's going to be

38:22what do you all have met trained to do

38:25this?

38:25>> No, when I said it's not a hazardous

38:28material. It's just a P fast. So the

38:30state won't let P fast go back into the

38:32ground. It's not a hazardous material. I

38:35if I said that word I I didn't mean the

38:36hazardous.

38:38It's just it has it's going to have P

38:39fast built up in that media. So we can't

38:42dispose of the P fast cuz I'm adding to

38:44the problem.

38:46Yeah, yeah, I get that.

38:48>> Worked in that field.

38:50So the bell went off and the light came

38:53on. Who's going to who's going to change

38:55all this stuff?

38:56>> Yeah, and it will be the water district

38:58in charge of coordinating disposal of

39:00that spent media, but it would have to

39:02be a disposal company that's approved

39:04through the state.

39:05>> So just again, I think I can add for the

39:07folks watching at home and people are

39:09going to watch this on the replay. This

39:11is basically what it comes down to is a

39:13giant pool filter if you will because

39:15you're going to have a media inside the

39:16filtration tanks. As you said it can be

39:18backwashed just like a pool filter at

39:20home and if it needs to be, you know,

39:22sometimes the pool filter can last the

39:24whole summer and you don't change it

39:25out. Sometimes it gets dirty and you

39:26have problems and then they got to they

39:28got to change it and that comes through

39:29with different types of testing

39:30materials and different types of

39:32observations. Correct?

39:34>> Correct. Yeah, it's a good analogy.

39:36>> I just wanted so again a lot of people

39:38have pools in town they'll understand

39:40what we're talking about. Makes it a

39:41little bit easier to understand.

39:43Okay, um

39:46>> So what's the same Oh, excuse me.

39:47>> No, go right ahead.

39:48>> Is this the same facility that they're

39:50building down in the sand pit? Are you

39:52involved in that?

39:52>> No, is that's the South Street? So they

39:55Okay, so we're not involved in that, but

39:57we do know that that's going on. That's

39:58that that facility is for P fast

40:01removal, but also iron and manganese

40:03removal. So they have a couple of

40:05different filters at that facility.

40:07>> I just happened to see the building the

40:08other day. I was like

40:09>> Yeah, that one's under construction now.

40:11Then this new building is actually going

40:13to like the exterior of it is going to

40:14mimic how that new facility is going to

40:16look. So the X series is going to look

40:17the same at this building.

40:22>> Okay, I think we've covered those. Mr.

40:23Damiac, do you have any questions or

40:24concerns just on that particular matter?

40:26>> I don't, no.

40:27>> Okay. So, can we just touch briefly uh

40:29just to make sure we understand so the

40:31impervious surface is basically the

40:33footprint of the building. Is Is that

40:35correct?

40:37>> Yes, the building um but the driveway

40:39we're also adding impervious area with

40:40the extended driveway. Um so, the 3,950

40:45sq ft number, that is the building

40:48size. Yes.

40:50>> And then the impervious surface

40:51remaining is the upgrading of the

40:52driveway. Again, I Again, living right

40:55down there now, I see what happens and

40:56they go in there and it's not a problem,

40:57but you do have the brook that runs

40:59through. I see occasionally the state

41:01DEP goes in there and takes water

41:03samples. They park there as well. Uh we

41:05had some recent with the um

41:07road resurfacing, we had some

41:09construction vehicles parked in that

41:11similar area. So, that's the area that's

41:13going to get tired and the rest you said

41:14is going to be gravel. Is that correct?

41:16>> Yeah, so it's the same spot that

41:17connects to the street as where the

41:19existing It's just going to extend.

41:21Right now, it kind of loops in

41:23right before that well one building.

41:25Now, it's going to go through the back

41:26of it. So, it is going to be a larger

41:28driveway with more pavement because of

41:29that. Um but right now, the the great

41:33the ground around that area right now is

41:36like a sandy kind of gravel and it is

41:39going to just stay. It's going to be

41:41improved gravel area around the building

41:43itself.

41:45>> So, that's good there and then we have

41:46the flood plain overlay district which

41:48we are already aware of because we deal

41:49with that anyway and it's because it's

41:51in zone two aquifer.

41:52>> Right.

41:52>> And they're going to be building a

41:53building for the purpose of It's

41:56building a building in the zone two

41:57aquifer to protect the zone two aquifer.

41:59Right? If you want to look at it like

42:00that, right? I think that'd be the best

42:02way to describe it.

42:03>> Yeah, I agree.

42:04>> [laughter]

42:05>> Okay. Uh anything else you want to add

42:07before I close the public portion of the

42:08hearing?

42:10>> Um no, nothing on our end unless there's

42:12any other questions.

42:14That sums it up.

42:15>> Any other further questions?

42:16>> I don't have any, do you?

42:17>> Okay. So, do I have a motion to close

42:18the public portion of the hearing?

42:19>> Motion to close the public hearing.

42:21>> Will I have a second?

42:21>> Second.

42:22>> All in favor? Aye. Okay, I'll just go

42:24around one more time. I think they did a

42:25pretty good job of explaining it. I

42:26think we have a good grasp for the folks

42:28at home that to me

42:32it seems like a no-brainer, even though

42:33we have to go and cover everything,

42:35because we're going to have a building

42:36that's going to be filtering our water

42:37and improving our water

42:38>> Right.

42:39>> and three wells down there. And just so

42:41we're clear there, if you're driving

42:43down Church Street or coming up past the

42:45water department, it's across the

42:46street. It's where that green fenced-in

42:48area is. There's two pump buildings

42:50there, and the third is over behind the

42:52building. It's a you if you were to take

42:54that road into the back of the driving

42:55range.

42:56>> Right.

42:56>> So, those are the three pump buildings

42:58they're referring to that will get tied

42:59in.

43:00So, do you have any questions or

43:01concerns about that at all?

43:02>> all right. I think it's an improvement

43:03to the

43:04existing buildings and property. So.

43:06>> Absolutely. I agree.

43:09>> Yeah, no, I mean, it's it's for the it's

43:11for the public good, and I and I know

43:13that in your materials and what you've

43:14said before, you've you've filed a

43:16notice of intent with the Auburn

43:18Conservation Commission, and then

43:19there's a land disturbance permit

43:21involved, so there's other processes

43:23involved here, too. Other over sites.

43:25>> Correct.

43:26>> Jay?

43:27>> I'm good.

43:28>> Okay. I would I agree, and the only

43:30thing I would just advise you on from

43:32I've lived down there for almost 35

43:34years now, and what I can tell you is

43:37the Mass Pike is they're plowing the

43:39snow, or sometimes it could be a

43:42combination of snow, water, ice, it gets

43:45thrown over the guardrails down in that

43:47direction. So, it just and I've seen it

43:49personally lots and lots of times. So,

43:52it just might be something in terms of

43:53the plan,

43:54um, you know, in terms of the building,

43:56it's something you might be aware need

43:57to be aware of, because you I would hate

43:59to see a really nice building built down

44:01there, and all of a sudden they starting

44:02to throw slush and and

44:05chemically treated snow melting on top

44:07of all that area down there, so just so

44:09you're aware.

44:10Um so if I have no other concerns and we

44:13have no other issues with the discussion

44:15part of it, what I'll do is break this

44:16down into three votes.

44:18So the first one is 76 Church Street,

44:21map 48, parcel 100 and 101, and

44:24Ridgewood Drive rear, map 40, parcel 40,

44:27ZBA 26-19.

44:29The first is for a variance relief from

44:31the minimum parking requirement section

44:336.3.2.j.

44:36Do I have a motion on the variance?

44:38>> Yeah, I'll make a motion to approve with

44:40standard conditions.

44:41>> Do I have a second?

44:42>> Second.

44:43>> Okay. And uh all in favor? All right.

44:46Any opposed? Hearing none, seeing none,

44:47that's all set. And we have the same 76

44:50Church Street that I've already read,

44:52and I'll save you from having to listen

44:54to me reading it again.

44:56A special permit to allow greater than

44:5815% or 2,500 square feet of impervious

45:01surface on a lot with zone two of the

45:04aquifer and watershed protection overlay

45:06district section 4.3.5.1

45:09and 9.3. And for the record, that would

45:11be the footprint of the building and the

45:13improvement of the driveway going into

45:16it,

45:17and it would not include the gravel

45:19driveway. But so we are a granting a a

45:22greater than 15% impervious surface for

45:24the overall project. Do I have a motion

45:27on that first special permit?

45:29>> Yeah, I'll make a motion to approve with

45:30a

45:31standard second.

45:32>> Second.

45:34>> And all in favor? All right.

45:36Any opposed? None. And I vote, for the

45:38record, to approve. Uh third vote this

45:41evening, which would be the second

45:42special permit, again 76 Church Street,

45:45to allow new construction in the flood

45:47plain overlay district section 4.1.7 and

45:509.3. Do I have a motion on the second

45:53special permit?

45:54>> Yeah, I'll make a motion to approve.

45:56>> And do I have a second?

45:57>> Second.

45:58>> All in favor? All right. Any opposed?

46:00Hearing none, seeing none, and I vote to

46:02approve. So, you're all set. Good luck.

46:04We appreciate it. The only thing I think

46:06I could ask is, do you have a time frame

46:08on when they might start and when they

46:09might finish?

46:11>> Yes, uh estimated, but yes. Um so, we're

46:14probably going to go out to bid early

46:16next year. Um so, construction will

46:18likely start around the summer of next

46:20year, 2027. Um ideally about a year and

46:24a half of construction.

46:26>> Oh, okay.

46:29Okay.

46:30>> What was that?

46:31>> We're going to have better water.

46:33>> You'll have better water.

46:34>> [laughter]

46:34>> You're getting She's guaranteeing that.

46:37>> I'm excited to see that, and I think

46:39it's going to be a great improvement for

46:40the town overall.

46:41>> Yeah, absolutely.

46:42>> Excellent. Thank you very much for your

46:43presentation. I'm sorry about that.

46:44>> Thank you.

46:45>> Yeah, thanks for the science lesson. I

46:46appreciate it.

46:47>> Yeah.

46:47>> Do I have a motion to close the third

46:49hearing this evening?

46:50>> I'll make a motion to close.

46:52>> All in favor?

46:53>> Aye.

46:53>> Aye. Second. Do I have a second?

46:54>> Second.

46:54>> All in favor?

46:55>> Aye.

46:56>> Aye. Thank you very much. So, uh three

46:58hearings for this evening are closed.

47:00Uh the next thing we have any discussion

47:03Any discussion from the town side?

47:05Hearing none, seeing none. Uh we have

47:07the minutes from 9/17/2026.

47:10Um

47:11what I would like to do with that, if I

47:12could, is make a motion to continue that

47:15until next month because we have Mr.

47:16Maron who's not here. Um Ms. Bush was

47:20also here for You weren't here.

47:22>> Right.

47:22>> So, that I think it might be easier if

47:23we just let the minutes continue to next

47:25month,

47:26if that's okay. So, I do a motion to

47:27continue this the minutes until next

47:29month.

47:30>> I'll make a motion to continue till next

47:31month.

47:32>> Do I have a second?

47:33>> Second.

47:33>> All in favor?

47:34>> Aye.

47:34>> Aye. Excellent. And our next meeting is

47:3711/19/2026.

47:39So, that's going to be November 19th,

47:41and as I spoke earlier, um just for the

47:43record, I will not be here next month. I

47:45was invited to speak at a fundraising

47:47event for the Friends of the Auburn

47:49Public Library to support the library.

47:52So, what they're going to talk about is

47:54it's It's like a stories from the stage.

47:57And what they do is they've they've

47:59selected five people and they invited us

48:01to go in there and tell an off-the-cuff

48:0320-minute story that might be

48:05inspirational. It could be family

48:07history. It could be something that you

48:09did. I did hear that I I don't want to

48:11spoil any surprises, but I did hear

48:14about two or three of the

48:16speakers that are coming in and a they

48:18sound really interesting.

48:20>> Huh.

48:20>> There's um

48:22I I'll say is there's an expedition

48:24involved, which is pretty cool. There's

48:26uh some town history involved, which I

48:28also think is pretty cool. And I'm not

48:30going to spoil anything. And I don't

48:31even know what I'm picking yet, so I'm

48:33stuck.

48:34>> [laughter]

48:34>> So, um

48:36if you're interested, that is November

48:3719th at 6:00 p.m. That will be at the

48:40Patchogue Church and it's for sponsored

48:43by the Friends of the Auburn Public

48:44Library and it's to support the public

48:46library. So, if anybody's interested in

48:49attending that, you can contact either

48:50the Friends of the Auburn Public Library

48:53or the library themselves and you can

48:55get tickets or I'm sure they would

48:56probably allow you possibly to pay the

48:59night of the event, but there will be

49:01refreshments, snacks, and drinks. So,

49:03they would like to get a head count of

49:05people that would be interested in

49:06attending, so they can at least know

49:08what type of hors d'oeuvres and what

49:09types of

49:10>> Can't be here yet. You're too

49:12>> I know, unfortunately. I know

49:14>> [laughter]

49:14>> I'm putting a plug in for the folks at

49:15home, too.

49:16>> Yeah.

49:17It's

49:18>> So, do I have a motion to adjourn?

49:20>> Motion to adjourn.

49:21>> Do I have a second?

49:21>> Second.

49:22>> All in favor.

49:23>> Aye.

49:23>> Aye.

49:23>> Excellent.

49:29>> [music]