2026-10-15 - Zoning Board of Appeals
Summary
Based on auto-generated captions; names, addresses and details may be misheard.
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| 76 Church Street PFAS Treatment Facility | 30 | 61% |
| 10 Rotary Road Garage Variance | 10 | 20% |
| Other business | 5 | 10% |
| 14 Rotary Road Garage | 4 | 8% |
- Thursday, October 15, 2026, 6:00 p.m. meeting chaired by Robert Tetro.
- Only four members sat (the vice chair was at work, one member is away until November and another was absent), so the chair seated alternates Mr Adamiak and Mr Shea as full voting members alongside Mr Cussy; with four sitting, all four had to vote yes for any approval, and applicants were offered a continuance.
- None was needed: all three hearings were approved and the meeting adjourned about 49:20 into the recording.
14 Rotary Road Garage
1:48-5:30
- ZBA 26-17: special permit under section 8.3.1 to extend a pre-existing non-conforming single-family house (RB district) with a roughly 576 sq ft attached two-car garage, kept in line with the existing building.
- Applicant Jeffrey Pike; no abutters spoke. Members saw no setback problem (existing 6.1 ft and 5.8 ft side setbacks are not reduced).
- Approved with standard conditions; the four sitting members voted yes.
10 Rotary Road Garage Variance
5:48-16:09
- ZBA 26-18: variance from the minimum front yard setback (sections 5.4 and 9.5) for a roughly 1,245 sq ft three-car detached garage in the front yard of a house on the same street (RB district); applicants Tony and Amy Defeudis (spelling as heard).
- The applicant said the road bends, so about half the garage would sit inside the 30 ft setback, at roughly 17.5 ft from the property line; moving it closer to the house would hurt parking and turnaround on the existing circular driveway and leave boat trailers visible from the street. Intended for personal use (two cars, a boat, a golf-cart-type vehicle).
- The chair noted that the state recently lowered the burden for variances (same four tests, easier standard). He read the section 9.5 findings (soil, shape or topography, hardship, no substantial detriment to the public good) and the board found them met because of the way the road turns; it is a private road and the lot backs onto the Upper Stoneville Reservoir.
- Approved with standard conditions. No abutters spoke.
76 Church Street PFAS Treatment Facility
16:48-46:56
- ZBA 26-19, applicant the Auburn Water District: a variance from the minimum parking requirement (section 6.3.2 J), a special permit for more than 15% or 2,500 sq ft of impervious surface in zone two of the aquifer and watershed protection district (4.3.5.1 and 9.3), and a special permit for new construction in the flood plain overlay district (4.1.7 and 9.3), for a roughly 3,950 sq ft PFAS treatment building next to the Church Street wells, with storm water, utility and driveway work. The chair, an abutter, asked for a plain-language explanation for viewers and said it would be voted as three separate motions.
- Engineers Katie Carrera and Matt Tibbetts of Tata & Howard (spellings approximate) explained that the site's wells exceed the EPA 4 parts per trillion limit for PFOA and PFOS (Massachusetts uses 20 ppt for six compounds), so treatment is required. Four carbon filter vessels, a separate chemical room (potassium hydroxide, sodium hypochlorite, phosphate blend, with containment and sprinklers), a backwash holding tank discharged to the sewer, and a longer paved driveway so fire trucks and chemical deliveries can turn.
- Spent carbon is taken off site to a state-approved facility (described as burned); the district will arrange disposal. Chemicals are the same ones already used. Bulk potassium hydroxide is filled from a truck port, not moved by forklift.
- Parking variance: no dedicated spaces are proposed because operators only check the site once or twice a day and the district office is across the street.
- The building sits in the flood plain overlay because of Dark Brook, and a notice of intent is before the Conservation Commission plus a land disturbance permit. The chair advised that Mass Pike plowing can throw slush and treated snow onto the area.
- All three motions approved. Bid early 2027, construction likely from summer 2027, about a year and a half.
Other business
0:05-1:46, 47:00-49:23
- Minutes of 9/17/2026 continued to next month because of absences.
- Next meeting Thursday, November 19, 2026. The chair said he will be absent then (a library fundraiser, Friends of the Auburn Public Library storytelling event that evening).
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:05[music]
00:05>> Evening everyone and welcome to the
00:06Thursday, October 15th, 2026 6:00 p.m.
00:10edition of the Auburn Zoning Board of
00:11Appeals. My name is Robert Tetro and as
00:13the chair I'm calling this meeting to
00:15order.
00:16Uh just let me get through my
00:18uh responsibilities here this evening
00:20quickly. So, if anybody has any
00:21electronic devices, if you could turn
00:23them down to either a silent or vibrate,
00:24we would appreciate that. Is anyone
00:26recording the meeting this evening?
00:28Okay, hearing none, seeing none. You are
00:30allowed to record, that's not a problem.
00:31You just have to declare yourself,
00:32that's part of that rule. So, as you can
00:34see we're missing a couple of people
00:36this evening. I was just notified that
00:37Vice Chair Marron would be stuck at his
00:39employment, so he's not going to be with
00:40us this evening. I was aware that uh Ms.
00:42Roach was not going to be here. She was
00:44not here last month, she won't be here
00:45this month, but she'll be rejoining us
00:47in November.
00:49Um and also I see that Ms. Bush is not
00:51with us this evening, so I'm going to
00:52bring Mr. Adamiak and Mr. Shea up as
00:54full voting members. Now, before we
00:56begin any of the hearings this evening,
00:57I just want to let you know since there
00:58is only four of us here,
01:00we have to have a super majority, which
01:02means all four have to vote in favor for
01:04it to pass.
01:05So, what I'm going to recommend doing is
01:06we're going to open the hearings, we'll
01:07hear them and as applicants, if you
01:10would like to continue it until next
01:12month, I would definitely give you that
01:13option.
01:14Uh
01:15generally speaking, I don't think you
01:16have to worry about anything, but I'm
01:17not going to speak on behalf of the
01:18board and again you you have feel as
01:20though it's necessary, you can wait
01:21until next month to get a decision, we
01:23can continue it.
01:25So,
01:25before I begin, uh I think we have
01:27everything taken care of. So, if you
01:29want to just join me in rise for the
01:30salute to the flag.
01:35I pledge allegiance to the flag of the
01:37United States of America and to the
01:38republic for which it stands, one nation
01:41under God, indivisible, with liberty and
01:43justice for all.
01:46Okay, thank you very much.
01:48So, our first hearing this evening is 14
01:51Rotary Road, map 22 parcel five ZBA
01:5426-17,
01:57requesting a special permit to extend,
01:59alter, change a pre-existing
02:01non-conforming structure under section
02:038.3.1.
02:05The applicant, Jeffrey Pike, seeks the
02:07zoning relief described as above for the
02:09property at 14 Rotary Road, which is
02:11located in the residential RB zoning
02:13district. Currently on the premises is a
02:16single-family dwelling. The applicant
02:18seeks to construct a 500 plus or minus
02:20576 square foot attached garage. Do I
02:23have a motion to open the hearing?
02:25>> Motion to open hearing.
02:26>> a second?
02:26>> Second.
02:26>> All in favor? Any opposed? Hearing none,
02:29seeing none. Is the applicant present?
02:31>> Yes.
02:31>> If you'd like to approach the lectern,
02:33please, sir, and give us an overview of
02:34what you'd like to accomplish.
02:38>> Okay. I'd I'd like to just construct the
02:39two-car garage attached to the building
02:42um and keep it in the same line that
02:43it's that the existing building is in.
02:46>> Okay. Um
02:49So, you're looking to build a 576 square
02:51foot garage. You're not going to be
02:53interfering with any setbacks or
02:54anything like that. Is that correct?
02:56>> No, no.
02:57>> Okay.
02:58And I have the plan at least submitted
03:00here.
03:05And do we have any abutters that would
03:06like to speak on this matter at all?
03:09Hearing none, seeing none. Okay, I'm
03:10going to turn it over and I guess we'll
03:12take it to you, Mr. Cussy, first. Any
03:13questions?
03:14>> Um
03:15I don't have any questions. Um
03:18It's staying in line with the existing
03:19building. Uh
03:21where it's located on that Rotary Road.
03:24It's not interfering with anything. Uh
03:26So,
03:27I have no questions. I'm I'm good.
03:30>> I noticed you mentioned that you had
03:31driven past this today.
03:32>> I did.
03:33>> And you're comfortable with the area?
03:34>> I am.
03:35>> Okay.
03:36>> Yeah, I am. So, it's uh yeah.
03:38It's not going to interrupt with anybody
03:40or anything, so.
03:42>> Okay. Mr. Damiac, sir, do you have any
03:44questions or concerns?
03:45>> Uh no questions or concerns. I I
03:47reviewed the materials that you had
03:48presented and uh they're It's
03:50straightforward.
03:53>> [snorts]
03:53>> No? Okay, wow. This is an easy one I
03:56feel like. I have no questions or
03:57concerns. I'm confident with it. It
03:59seems like a pretty cut and dry. You
04:00have a 60.7 ft
04:03um
04:05setback on one side. It's the other side
04:08it would be at least it doesn't really
04:09say but you got 188.4 to the rear. And
04:13you're going from basically what you
04:15have a 6.1 ft and a 5.8 ft in the
04:18existing home that's already there.
04:21And it doesn't appear as though you'd be
04:22extending any further into that at all.
04:24Is that correct?
04:24>> Correct.
04:25>> Okay.
04:27So, do I have a motion to close the
04:28public portion of the hearing then?
04:30>> I'll make a motion to close the the
04:31hearing.
04:31>> Do I have a second?
04:32>> Second.
04:32>> All in favor?
04:33>> I.
04:34>> All right, one more time around.
04:36Mr. Koski, any concerns or questions?
04:37>> None.
04:39>> None.
04:40>> No questions.
04:40>> Okay, do I have a motion on the I'm
04:42going to read this again one more time.
04:45On the
04:46first hearing which is 14 Rotary Road
04:48map 22 parcel 50 DBA 2617, a special
04:52permit to extend, alter, change a
04:54pre-existing non-conforming structure
04:56under section 8.3.1.
04:58Do I have a motion to approve, deny?
05:01>> I'll make a motion to approve.
05:03>> With standard conditions?
05:04>> With standard conditions.
05:05>> Do I have a second?
05:06>> Second.
05:06>> All right. Mr. Shay?
05:08>> I.
05:09>> Just to make sure. You approve? You
05:11approve?
05:12>> I vote to approve.
05:13>> That was easy. Okay.
05:15>> Yeah.
05:15>> Hey, [laughter] thank you.
05:16Thank you very much for that.
05:17>> Absolutely. Good luck. You can be in
05:18contact with the building inspectional
05:20department and they'll take care of the
05:21rest of your paperwork.
05:22>> I'll see you soon.
05:22>> Thank you.
05:23>> Do I have a motion to close the first
05:24hearing?
05:25>> Motion to close.
05:26>> Do I have a second?
05:27>> Second.
05:28>> All in favor?
05:28>> I.
05:28>> I.
05:29>> Okay.
05:30So, we have to stay on time. It's 8:10.
05:35And we'll give Mr. Pike a minute to
05:37leave. But actually we don't even have
05:38they're not listed as times anymore
05:40which is convenient. They're only listed
05:41as numbers. So, that's actually great.
05:43Normally we'd have to wait 15 minutes in
05:44between. So, I'd would to hold you up
05:45for a few. So, I like this.
05:48So, our second hearing this evening is
05:5010 Rotary Road. It just happens to be on
05:51the same street. Map 22 parcel 3, ZBA
05:552618,
05:57seeking a variance for relief from the
05:58minimum required front yard setback
06:00section 5.4 and 9.5. Applicant Tony and
06:04Amy Defeudis
06:06seeking the zoning relief described as
06:07above for the property at 10 Rotary
06:09Road, which is located in the
06:10residential B RB zoning district.
06:13Presently on the premises is a
06:15single-family dwelling
06:17plus or minus 1245 square feet detached
06:19garage in the front yard of the property
06:21and to conduct associated site
06:23improvements. Do I have a motion to open
06:25hearing?
06:26>> Motion to open hearing.
06:27>> Do I have a second?
06:27>> Second.
06:29>> All in favor?
06:29>> I.
06:30>> I.
06:30>> Any opposed?
06:31Hearing none, seeing none, is the
06:32applicant here?
06:34>> Yes.
06:34>> Hi. If you'd like to approach the
06:35lectern and go over what your plans are
06:37and what you'd like to accomplish,
06:38please.
06:42>> So, if you're looking right at the the
06:44drawings in the front yard, I think you
06:46said attached. It'll be a detached
06:48garage construction, but right in the
06:50front of the yard, we'd like to put a
06:52three-car garage.
06:54Um we're making it so big so I can fit
06:55some boats and
06:57>> I like to get boats
06:58>> and toys, so I want to get all that
07:00stuff in. The reason I wanted to push it
07:02back or seeking relief from the frontage
07:05setback was right where the road turns.
07:08Um most of the garage would be in the
07:0930-foot
07:11um setback rule,
07:12but right where the road turns about
07:14halfway through where the garage would
07:16sit, it turns and it starts to get
07:17closer and closer where I believe I
07:19showed 17 foot six um roughly to the
07:23property line.
07:24Um so, I was hoping to be able to keep
07:27that cuz if I bring it closer to the
07:29house, it makes vehicle parking really
07:32hard in between the house. I'd have to
07:34um modify the driveway, the existing
07:37driveway,
07:38and anything I was going to store like
07:40boat trailers and things like that would
07:42have to go behind it. So, it would be
07:44visible from the street. So, my biggest
07:46concern is to get things in between the
07:48house and the garage so everything's not
07:50visible from the street.
07:51>> Okay.
07:53Do we have any abutters that would like
07:54to speak on this matter?
07:57Okay, hearing none, seeing none.
07:59Um I'll go around the the horn again. To
08:01you, Mr. Kussy.
08:02>> Yeah, um
08:04once again, I mean, it's a variance, um
08:06which is a little tougher than a special
08:08permit. Um
08:11yeah, I mean,
08:12I went by there today and I can see
08:14where you uh if you were to move it
08:16closer to the house, you're going to
08:17lose
08:18turnaround points and
08:21and access. So, uh
08:23once again, the road is uh it's not
08:25really interfering with anyone
08:27um
08:28by my feeling.
08:30Um
08:31so, I'm on the fence.
08:34I'm on board with it.
08:35>> Okay.
08:36>> I'm okay with it.
08:37>> And just so you're aware, too, last
08:38month we were notified by the town side
08:40that
08:42the threshold to approve a variance has
08:44been dropped a little bit. I think
08:45that's the best way to describe it. We
08:47discussed it at the last meeting. And
08:48really, they didn't change the standards
08:50as far as the four principles that we
08:52always use, but they did change the
08:54language as such that it would be
08:57less of a burden for the applicant to
08:58get a variance approved.
09:00Right. So, it's pretty a little bit
09:01easier now standards.
09:03>> that was a state
09:04>> Okay, I just wanted to make sure you
09:05were aware of that.
09:05>> So, this because of the location, um
09:08the road, um
09:09the road, that's that's you know, it's
09:11not going to interfere with anybody uh
09:13that I see. Uh so, that's my feeling
09:16with it.
09:16>> Okay. Mr. Adamiak.
09:19>> Uh so, just looking at the site plan, so
09:20it the garage will be in front of the
09:22house?
09:23>> It would be in front of the house,
09:24correct.
09:24>> And do you have a driveway going from
09:26the front of the house to the
09:28road at the
09:29>> Right now, yeah, it's a it's a C
09:31driveway that goes from one side in
09:33front of the house and then back out the
09:35other. And this would be right in the
09:36center of that.
09:37>> Oh, okay. Okay. I didn't I didn't see it
09:39on the um
09:40site plan, but uh
09:42yeah, it looks like you were where these
09:44houses are pretty like set back from
09:46main roads anyway. You're like your own
09:47little cul-de-sac back there. I'm
09:49actually surprised number 12 isn't here
09:52tonight
09:52>> [laughter]
09:53>> with a project because it seems like
09:55>> Right.
09:56>> the three of you would be in a row, but
09:57um I have no other questions. Thanks.
10:00>> Mr. Chaser?
10:02>> What are your plans with the garage?
10:04What are you going to use it for?
10:05>> So, it would be mine and her vehicle in
10:07the first two bays and then the boat and
10:10we have a small like a golf cart um
10:14recreational vehicle to go up and down
10:15the hills and that for that would go in
10:17the third bay.
10:19And that would be it. Just strictly
10:20personal.
10:24>> Good.
10:25>> And you know, I don't really have any
10:26questions. I'm looking at your plan here
10:28and I can see that you have Upper
10:29Stoneville Reservoir
10:30basically to the rear of the property,
10:32but I think obviously
10:34it's it's too close anyway, but you
10:35certainly don't want to block your view
10:36of the reservoir. I can understand that.
10:38And then you have this large front yard
10:40where again just for the record for the
10:42folks watching at home, you're looking
10:43at 48.5 ft to one side, you're looking
10:46at 55.8 ft to the other side and then
10:50anywhere from almost 17 at 17 6 and 3/4
10:54you got 30 ft and then 40 and 1/2 ft.
10:56So, again my concern if I had any would
10:59be Rotary Road and its view
11:02as people are traveling, you know,
11:04either way on it and I don't see really
11:05an issue with that at all at least from
11:06my point of view.
11:07>> Yeah, it's uh
11:09No, it's
11:10We're back far enough from the road I I
11:12believe. Yeah. I don't see any issues.
11:14>> All right. Okay. Um again, one more
11:17time. No abutters that are interested in
11:19speaking on this matter at all?
11:21Hearing none, seeing none. Do we have a
11:22motion to close the public portion of
11:23the hearing?
11:23>> Motion to close the hearing.
11:25>> Do I have a second?
11:26>> Second.
11:26>> All in favor?
11:27>> Aye.
11:27>> Okay, public portion is closed. One more
11:29time around, Mr. Cusick, do you have uh
11:31comments or concerns?
11:32>> No.
11:33>> Okay.
11:34Mr. Adamek.
11:35>> Given that it's a variance, is there
11:37anything in particular that we need to
11:38take into consideration when in our
11:40discussions or I don't I know that
11:43typically or one of the meetings we just
11:46talked about what the variance
11:47requirement is. I don't know if we need
11:49to discuss that.
11:51>> It's pretty straightforward. It's it's
11:53top I think
11:54>> it's changed but I can't remember what
11:55it is.
11:56>> topographical if I'm not mistaken which
11:58if you would agree.
12:01>> Yeah.
12:02>> I will read them in just for the record.
12:04>> The note of the state is giving relief
12:06so
12:07in this situation I think because of the
12:08location.
12:14>> I just want to make sure I find the
12:15right page here too. It's been a little
12:17bit.
12:30>> And that is a private road also so
12:32>> Right. Exactly. It's a private road.
12:34>> State highway is pretty much
12:40>> Hang on now. Now I can't find it of
12:42course because I'm
12:43under pressure trying to look for it.
12:45>> Yeah, we have
12:47wanted to get it out of the way here.
12:54Okay.
12:59>> So it falls under
13:01as we had mentioned 5.4 and 9.5.
13:05So I'll read through those first.
13:08Just to get them into the record.
13:24And it is one here to make sure
13:26everything is correct here.
13:27It's under HB.
13:30Or RB draft, excuse me. So, 5.4
13:33dimensional regulation tables.
13:38And 9.5.
13:41Or that first, actually.
13:531.3
14:00That's the table.
14:01Okay, 9.5. Our variance is here. It's
14:04page 102 if you're following along with
14:05me, or I apologize. So, the mandatory
14:07findings for a variance, before the
14:09grant of any variance from the
14:10requirements of this bylaw, the board of
14:12appeals must specify that it's owing to
14:15the circumstances related to the soil
14:16conditions, shape, or topography of the
14:18land, or structures, and especially
14:20affecting such land or structures, but
14:22not affecting generally the zoning
14:24district which it is located, or a
14:26literal enforcement of the provisions of
14:27this bylaw would involve substantial
14:30hardship, financial or otherwise, that
14:32desirable relief may be granted without
14:34substantial detriment to the public
14:36good, and without nullifying or
14:38substantially derogating from the intent
14:40and purpose of the bylaw.
14:41So, that's really it right there. We
14:43just have to make sure that it's owing
14:44to circumstances related to soil
14:45conditions, shape, topography of the
14:47land, and structures, and especially
14:50affecting such land or structures, not
14:51affecting generally the zoning district
14:53which it is located, a literal
14:55enforcement provisions of this bylaw
14:57would involve substantial hardship,
14:58financial or otherwise, and that
15:00desirable relief may be relief, excuse
15:02me, must be granted without substantial
15:04detriment to the public good, and
15:06without nullifying substantially or
15:07derogating from the intent and purpose
15:09of the bylaw. So, that's our standards,
15:11and I think we meet all of those.
15:12>> Yeah, the way the road turns,
15:14>> Right.
15:15>> and uh yeah, and it's not going to
15:17be in a any detriment to the uh
15:19neighborhood or safety uh
15:22conditions. There's nothing, so.
15:24>> Mhm.
15:24>> Yeah.
15:24>> I would agree. Okay, so with that being
15:27said, is that good for you, Mr.
15:28>> That's great. Thank you. I appreciate
15:29that. Thanks.
15:31>> Let me go ahead and read this back in
15:32again as we always do.
15:34So, do I have a motion on the second
15:37hearing this evening, 10 Rotary Road,
15:39map 22 parcel 3, ZBA 26-18, a variance
15:44for relief from the minimum required
15:45setback
15:47from the front yard setback, excuse me,
15:48section 5.4 and 9.5.
15:52>> Yeah, I'll make a motion to approve with
15:53standard conditions.
15:54>> Okay.
15:55>> Do I have a second?
15:56>> Second.
15:58>> I vote to approve.
16:00Good luck. You're all set.
16:01>> Thank you very much.
16:02>> Congratulations. You can contact the
16:03Department of Inspectional Services and
16:04they'll give you the paperwork and give
16:05you the next steps.
16:07Okay. Good luck.
16:09Do I have a motion to close the number
16:10the second hearing?
16:12>> Motion to close. Second here.
16:13>> Second here.
16:13>> Okay.
16:17Let me just shuffle some paperwork for a
16:18minute and we'll get the last one done.
16:40>> It's not like driving by.
16:42>> Okay.
16:43>> I take it you must be here for number
16:45three.
16:46>> [laughter]
16:46>> Okay.
16:48So, we have our third hearing this
16:50evening, 76 Church Street, map 48 parcel
16:53100 and 101,
16:55and Ridgewood Drive rear, map 40 parcel
16:5740, ZBA 26-19.
17:00They're seeking a variance for relief
17:01from the minimum parking requirement,
17:03section 6.3.2J,
17:05if you want to look that one up.
17:08Special permit to allow
17:10greater than 15% or 2,500 square feet of
17:13impervious surface on a lot within zone
17:15two of the aquifer and watershed
17:18protection overlay district sections
17:204.3.5.1
17:22and 9.3
17:24and a special permit to allow new
17:25construction in the flood plain overlay
17:27district section 4.1.7 and 9.3. The
17:31applicant, the Auburn Water District,
17:34seeks the zoning relief described as
17:35above for the property of 76 Church
17:38Street and Ridgewood Drive rear to
17:40construct a 3950
17:42square foot plus or minus water
17:44treatment facility adjacent to the
17:47existing well buildings and to conduct
17:49associated site improvements such as
17:51storm water upgrades, utility
17:53connections, and driveway improvements.
17:56Do I have a motion to open the hearing?
17:58>> Motion to open the hearing.
17:59>> And just so you are aware, we will have
18:01require three separate votes for this.
18:03We have a variance and two special
18:04permits. So, whichever way they go, they
18:07will be conducted in separate. So, is
18:09the applicant here?
18:11If you would like to approach the
18:12lectern,
18:13give us an overview of what you're going
18:14to discuss with us this evening. Now,
18:16can I just ask at the beginning, I'm
18:18also a butter. I wanted to make sure
18:19you're aware of that, so I would receive
18:21the butter's notices as well.
18:23But, I also received
18:25I had three conversations with three
18:27different neighbors in the last week or
18:29so, and I was kind of surprised that
18:31nobody really understood what P Fast
18:33chemicals were.
18:34So, would you mind beginning with a
18:36little bit of an explanation on what
18:37those are because this is also going to
18:39get replayed on the town
18:41uh YouTube channel, and a lot of people
18:43will probably have some questions that
18:44you might be able to answer.
18:46Thank you.
18:48Do I have a motion to open the hearing?
18:49Just want to make sure I did that.
18:50>> Uh yeah, motion to open the hearing.
18:51>> Second.
18:52>> Second.
18:52>> All in favor?
18:53>> Aye.
18:53>> Okay. Just want to make sure I did that
18:55already.
19:02Thank you.
19:11Oop.
19:18>> Perfect.
19:20This is just a site plan.
19:23So,
19:24thank you for having us tonight. Katie
19:27Carr with Tata and Howard. So, Tata and
19:28Howard is the engineer on the project.
19:30So, we're working with the Upper Water
19:32District who's the applicant on this
19:33project. We also have Matt Tibbetts with
19:35Tata and Howard.
19:36>> Hello.
19:37>> Um so, yeah, we're happy to give you
19:38guys a bit of a background on the
19:39project, why we're doing it, what the
19:41purpose of the facility is. Um but yes,
19:45it is ultimately So, this is the Church
19:46Street PFAS water treatment facility. Um
19:50so, the purpose of this facility is to
19:52remove PFAS from the water.
19:54It is um
19:56a hot topic right now. Um I am
19:58surprised, you know,
20:00seems like everyone these days hears
20:01about it. Um
20:03there essentially are six PFAS compounds
20:08that are found in
20:10many areas of life, drinking water being
20:12one of them.
20:13If it gets into the ground, it can get
20:15into our drinking water.
20:16Um
20:18MassDEP has set a limit on There's six
20:22PFAS compounds. I can't pronounce them
20:24all. They are long names. But MassDEP
20:26has a limit on the summation of the six
20:29PFAS compounds.
20:31Their limit is 20 parts per trillion.
20:33I guess just to bring it back a step.
20:35You might have also heard it called the
20:36forever chemical.
20:38That is because the compounds the PFAS
20:40compounds can't break down. Um
20:43so, the goal is to ultimately remove it
20:46from the water. Um it's it's
20:50it can have cancerous effects. Um it's
20:52not good in high levels. We're kind of
20:54in a shifting spot right now where the
20:56state Massachusetts has their own
20:59regulations for PFAS. And like I said,
21:01the 20 parts per trillion is
21:03it's a very small amount, a few grains
21:04of sand in an Olympic-size watering
21:07pool. Um the national standard is
21:10actually less than that. So, EPA has a
21:13maximum contaminant level of four parts
21:15per trillion for two of the PFOs
21:18compounds, PFOA and PFOS. Um
21:22So, right now at this location, the
21:24Church Street wells for the water
21:25district, they have PFOA and PFOS levels
21:29above the national EPA uh contaminant
21:32level of four parts per trillion.
21:35>> Can I interrupt for 1 second? I'm sorry.
21:36I just want to make sure you said four
21:38parts per trillion, correct? Because
21:40normally the standard is I I worked in
21:41the biotech industry and I understand a
21:43little bit of this stuff, not quite to
21:44your level, but normally this is parts
21:46per billion, correct? So, we're talking
21:48about parts per trillion now. Just so
21:50everybody understands how
21:52strict these standards are. Go ahead. I
21:54apologize.
21:55>> They're Yes, they're very strict in the
21:58drinking water world. Um they're not as
22:00strict in everything else. You You can
22:03find these in nonstick cookware. Um if
22:06you go to the grocery store and
22:08buy a cake, you know how it comes on
22:10that kind of like that black plastic
22:13that's clean like that that has PFOs
22:16that's regulated by a different
22:17government entity. So, there's there's
22:19different levels here, but it is very
22:20strict when it comes to drinking water.
22:22Um and yeah, the national uh level is
22:25more strict than the Massachusetts
22:26level.
22:28Massachusetts might take on that that
22:29level itself soon. Um
22:33So, that's kind of where we're at with
22:35PFOs. This site specifically is above
22:38that EPA maximum contaminant level. So,
22:40the district is required to
22:43construct treatment to remove PFOs from
22:46the site.
22:47>> And can I just ask too, for the folks at
22:49home really also, are these considered I
22:51know they're forever chemicals, and
22:52which means they don't break down and
22:53once they're inside you, they're inside
22:55you, they stay there. But are they
22:56considered carcinogens technically?
22:59>> I don't know if they would fall under
23:01the
23:01You're testing me. I don't know if they
23:02would fall under the category of
23:03carcinogens, but I know they can have
23:06carcinogenic effects. I so.
23:10>> Okay.
23:10>> There are multiple
23:12it's
23:13also depends younger folks it's a little
23:16bit more dangerous to have higher
23:17levels. We we worry about babies. Um
23:22but but yeah, it's it's it's the big one
23:24right now.
23:25>> Sure.
23:27>> So, it's it's a concern everywhere. It's
23:29concerning here in Mass. Um and it's
23:32just it is a requirement for for these
23:35folks to get that out of the water if it
23:37is above the
23:38um
23:40either contaminant level national or
23:42state.
23:43So,
23:45that's the purpose of the facility is
23:47PFOs removal. Um
23:49right now at the site there's three
23:52existing wells, Church Street wells 1,
23:532, and 3. Um
23:55if you're familiar with the site, wells
23:571 and 2 are on that 76 Church Street
23:59parcel. Well 3 is actually across the
24:01street. It's right next to the water
24:03district's office, which is actually I
24:05guess right around the corner.
24:06Um
24:07those wells are in their own individual
24:10well pump buildings. So, there's like
24:12three little buildings. Um and those
24:15buildings also contains just some
24:16chemical feed addition right now. And
24:18that's the extent of treatment at the
24:19site right now.
24:21Um
24:22so, this new facility is being proposed
24:25to remove PFOs. That is the ultimate
24:27goal of the facility.
24:29Since we are constructing this new
24:30building on site, we're also going to be
24:32moving the chemical feed from the
24:34individual buildings into this new
24:36building now and just we're going to
24:37have all the treatment in this one new
24:39building. It's going to streamline it.
24:41Um
24:43Also, if you've seen the site between
24:45the existing well 1 and well 2 pump
24:47buildings,
24:48um there is some empty space right now
24:50that is kind of just used for storage.
24:52That the new building's going to go
24:53right there in the middle of the two
24:54buildings um where there's where there's
24:57the empty space, it it does need to be
24:59central to the three wells.
25:01Three wells are now going to be rerouted
25:03with piping through the new treatment
25:05facility and then ultimately into the
25:07water mains in the street to feed the
25:09water district. Um
25:12So, that new facility will contain uh
25:16the way we remove PFAS typically is
25:18through filtration. So,
25:21it's large filters filled with a carbon
25:23media.
25:24Um and that's how we remove the the
25:26PFAS. So, there's going to be four
25:29carbon filtration vessels within this
25:31new building.
25:32Um
25:34There's going to be separate room for
25:35chemical storage and chemical feed. Like
25:37I said, all the chemicals are moving
25:38over to this new room now.
25:40Um there will be a bathroom in the new
25:42facility. There's a separate electrical
25:45room in the new facility.
25:47Pumps, water piping,
25:49valves, appurtenances, electrical
25:51equipment, um
25:54HVAC equipment, and there's sprinklers
25:55in the new building as well.
25:59And
26:01in addition to the building itself,
26:02there is um you know, good amount of
26:04site work. There's There is a lot of
26:06infrastructure to put in.
26:07Um there's a good amount of water piping
26:09we need to install just to connect those
26:11wells now to the new facility and then
26:12back out into the street. So, a lot of
26:14the work on site is going to be
26:16installing water mains, installing
26:17piping,
26:19um
26:20we are modifying, extending the existing
26:24driveway.
26:25Uh right now, there's kind of a short
26:28paved driveway that has a really harsh
26:31turning angle onto the site. Um it's
26:34really not well suited for large
26:37vehicles, including fire trucks. And
26:39they also need a large vehicle to be
26:41able to get onto site for chemical
26:43deliveries.
26:44So, we're extending that paved driveway
26:48up north just to kind of wrap around
26:49that north side of the well one
26:51building. And it's going to have a much
26:53wider turning radius. These trucks can
26:55get on site with without making a
26:56five-point turn.
26:58Um
26:59and then as that driveway kind of opens
27:01up onto the site, it's going to be a
27:02gravel driveway all around that new
27:04building.
27:06Um we be beyond the the paved driveway
27:09and then the gravel driveway around the
27:11building, everything else besides that
27:13is just going to remain grass. So,
27:15anything that's disturbed during
27:16construction will be loam and seeded at
27:18the end.
27:20Um
27:21there is stormwater design um included
27:24as well. You'll see some areas. We do
27:27have a a buried con- a corrugated metal
27:30pipe infiltration system on site
27:33for infiltrating and treating
27:34stormwater.
27:35Um
27:36we
27:38are submitting a notice of intent
27:39through conservation commission
27:41um and MassDEP and a land disturbance
27:44permit through the DPW as well.
27:48We do have the Dark Brook on site. The
27:50Dark Brook runs on the the eastern
27:52border of this site. Um so, because that
27:55Brook is there, we do fall within the
27:59town's um aquifer or sorry, um
28:03flood plain overlay district.
28:05Um so, because we are constructing a new
28:07building within that overlay district,
28:09that does trigger the requirement for
28:10the special permit um which is why
28:12that's on there.
28:14Because this is a well site, we are also
28:17within the um aquifer and watershed
28:20protection district. We're in the zone
28:22two um district for that. And the
28:25building itself is almost 4,000 square
28:28feet. So, we do meet that um greater
28:30than 2,500 square feet uh construction
28:33within the aquifer and watershed
28:35protection overlay district.
28:39As far as the requested variance goes,
28:42so we do um
28:46under section six of the zoning bylaws,
28:50um 6.3 for parking uses,
28:53this facility doesn't quite fall
28:55perfectly within um a a
28:58parking use type here, but I think we we
29:01classified it as an industrial facility.
29:03Um so, the bylaw states that an
29:06industrial facility must have
29:08um one space for each 2,000 square feet
29:11of net floor area
29:12plus
29:14um one space per employee on the largest
29:16shift.
29:18However, this facility is not an
29:20occupied facility. Water District
29:23personnel are not going to be staying
29:24here. There's not an office here.
29:26There's not a lab. Um
29:28so, what will be happening is operators
29:31with the district will be visiting the
29:32site once or twice a day just to check
29:35on operations of the facility. They're
29:37not going to be staying there.
29:38Um
29:39there's really not
29:41uh
29:42the the largest shift um with, you know,
29:44the space per employee on the largest
29:46shift
29:47um
29:48doesn't quite apply here, we think, just
29:50because of that reason.
29:52Also, with this being 76 Church Street,
29:54it is right across the street from the
29:56Water District office at 75 Church
29:58Street. The Water District office is
30:00where personnel, you know, stay
30:03throughout the day. Um they have parking
30:05there. So, the thought being they do
30:07have the parking right across the street
30:08at the Water District office, and also
30:09they're not going to be staying at this
30:11facility full-time. They're just going
30:12to be poking in to check on things.
30:15So, that is the basis of our request
30:18um for a variance for the parking
30:20requirement.
30:23Uh
30:24>> So, you're actually going to have a less
30:26parking, is that what you're saying?
30:27>> Less parking at this new facility. So,
30:30there's not currently any dedicated
30:31parking spots on the site now.
30:33>> Right.
30:33>> Um we're just not proposing any new
30:36dedicated parking spots. We
30:38There are There's ample room for
30:40employees to be able to park on the
30:42site. We just don't have any dedicated
30:43spots. Um Um, but there's none there's
30:46none there now on site.
30:48>> Okay.
30:50Um, well, we certainly don't have any
30:52about it cuz we're the only ones in the
30:53room, but I have to ask anyway to make
30:55sure that nobody wants to cut me any
30:56comments on that. Uh,
30:58I think we've covered at least the part
31:00about the variance for now. So, if if
31:03you are comfortable with everything, I
31:04can go around and ask the members of the
31:06board if they have any questions and
31:07then we can kind of bring it back to you
31:08if you'd like.
31:09>> I Yeah.
31:10>> Do you have any other questions or
31:11concerns, sir?
31:11>> I don't. I'm good with the So, this is
31:14on the parking.
31:16>> So, we can discuss all of it, but yeah,
31:17this is on the parking for now.
31:18>> So, I don't have any questions on the
31:20parking. Yeah.
31:21>> Mr. Dean.
31:21>> Questions on the parking.
31:22>> Mr. Chair.
31:23>> Good with it.
31:24>> Okay. So, I think for the parking, I
31:26don't really have any questions on it. I
31:28just like to maybe since we you've
31:29already covered it and rather than go
31:31back to it later. So, this is basically
31:33a high-pressure filtration facility if
31:35I'm not making a mistake, correct?
31:36>> That's correct.
31:37>> And it's going to be media filters and
31:39that media will at some point be changed
31:42out, I'm assuming.
31:43>> That's correct.
31:43>> And so, is that considered a hazardous
31:45material once it's dirty?
31:47>> So, that
31:47>> to call it dirty.
31:48>> Yes, that is completely taken off site
31:51and that it that media, once it's spent,
31:54which
31:55we won't really have a good idea of how
31:57often it does get spent until it's up
31:59and running. Um, but once that media is
32:01spent, it gets hauled off site and
32:03burned.
32:04Um, so, there are MassDEP approved
32:06locations that can handle that. So, it
32:09has to go to one of those approved
32:10facilities. It's not dumped on site or
32:12anything, it's taken off site.
32:13>> And you had mentioned chemicals that
32:15would be on site.
32:16>> Yes.
32:16>> Can you just touch on those a little
32:18bit, what they are? Are they water
32:19treatment chemicals, I'm assuming?
32:20>> Correct. Yep, there So, right now, the
32:23district uses um, potassium hydroxide,
32:25which is KOH, um, sodium hypochlorite
32:28for disinfection and then there's also a
32:30phosphate blend for corrosion control.
32:32Um, the KOH is for pH adjustment. They
32:35use those chemicals now.
32:37They're going to be using the same
32:38chemicals with the new facility.
32:40We will have them in a separate chemical
32:42room. It's going to be its own room with
32:44a door and its own ventilation. It kind
32:45of helps things out.
32:47Um
32:48the quantity of KOH that we have cuz KOH
32:52is considered a corrosive material. That
32:54does trigger requirement for us for fire
32:56protection. So, we do need to sprinkler
32:58the building because of that. Um so,
33:01that is kind of the one effect it has on
33:02the new facility. Um but, it is It's the
33:05same chemicals they're using now.
33:07It you know, it has to meet MassDEP
33:09approved
33:10sizing containment. There needs to be
33:12certain containment. It's like 110% of
33:14the volume of actual chemical storage.
33:17Um
33:18>> So, the first one's a water softener,
33:20basically, right?
33:21>> Yeah.
33:22>> Yes.
33:22>> Right. I'm familiar with that. I used
33:23sodium hydroxide in one of my past
33:26careers.
33:26>> Yep.
33:27>> Um the second one is bleach, basically.
33:30>> Chlorine, a disinfectant.
33:31>> or less, yep. Chlorine, yep. And then,
33:33the third one, again, I'm sorry.
33:35>> It's a phosphate. It's a poly It's a
33:37orthopolyphosphate blend.
33:39>> Okay.
33:39>> It helps with corrosion control. So, it
33:41kind of lines the inside of the water
33:42pipes to help
33:43>> Sure.
33:44>> prevent corrosion of the interior pipes.
33:46>> Okay.
33:47And uh again, from my familiarity with
33:49these, they're going to be probably in
33:5055-gallon plastic drums, most likely.
33:54>> Now, you're testing me. So, um
33:56the KOH is the the larger chemical is a
33:59larger quantity of the chemical.
34:01We There's bulk tanks where the majority
34:03of it gets stored and then there's a day
34:04tank and you have to transfer from the
34:06bulk tank to the day tank every day.
34:08Um KOH, we have two 1,000-gallon bulk
34:12tanks, I believe.
34:14>> 1,000 and 150.
34:15>> Okay.
34:16>> Sure. I'm familiar with those, too.
34:17>> Yep. Yep. And those will have a like a
34:19chemical fill station. So, when those
34:21bulk tanks get empty, they'll have a
34:23chemical fill truck come on site and
34:25fill it from the fill port.
34:27Um hypochlorite and phosphate are not as
34:29much quantity.
34:31Hypochlorite might be the bulk. Well, so
34:34we have drums, drum storage for
34:35hypochlorite and phosphate.
34:37>> That's what I thought. Usually they're
34:38pumped in the drum
34:39the top is opened, the pipe get the the
34:42siphon goes into it, it gets screwed on,
34:44and then it gets pumped in as required
34:45basically, and then they get changed out
34:47depending on like you said, it really
34:48depends on how often it gets used up.
34:50>> That's right.
34:51>> When it goes out they change the drum.
34:53>> Or water more chemicals. Um but yeah,
34:55because the hypochlorite and phosphate
34:56are not as high of a necessary quantity,
34:58those are stored in drums for both. I
35:00think you're I think it is 55 gallons.
35:02>> For the for the sodium hypochlorite,
35:04yeah.
35:04>> Okay.
35:04>> And you had mentioned the thousand liter
35:06drums. So, would there be a fork truck
35:09on site? I'm just curious. Is that how
35:10they're going to unload and load it cuz
35:11it had I know from the plant that I
35:13worked in that had this, it was
35:15basically it was an we used acid that
35:16was basically to control the pH of the
35:18outgoing water flow.
35:19>> Okay.
35:20>> So, we would bring it in through fork
35:22truck, bring it into the basement of the
35:23facility,
35:25make sure it was safely transported, and
35:26then bring the empties out. So, is there
35:28going to be some kind of a procedure
35:29like that? I would assume.
35:30>> So, for the large KOH bulk tanks, those
35:32stay in there. That
35:34>> Ah, okay.
35:34>> During construction we do need to bring
35:35them on site with something, some kind
35:37of equipment to to set them, but once
35:38they're there, they're there unless they
35:40fail. Those get filled through a port.
35:42There's a going to be a port on the
35:44exterior of the building where a a
35:46chemical
35:47fill truck can
35:49connect to the port and fill it up that
35:50way. So, they don't need to replace
35:52those bulk tanks when they get out.
35:53>> So, this is basically tanker transfer,
35:55if you will.
35:56>> Yep.
35:56>> Right. Okay, that's I I prefer that
35:58truthfully. I think it's a safer
36:00process. I'm familiar with that as well,
36:02and it's
36:03it it's the cleanest and most safest way
36:05to do it. The tanker pulls up, it's like
36:06filling a gas station. Tanker fills up,
36:09they put the hose to it, it goes in the
36:10facility, they pump out as much as they
36:12need based on the delivery requirement,
36:15and then they can break that down and
36:16and move on. You have a lot higher risk
36:19of spill or incident take place if you
36:22have a fork truck when you're moving a
36:23thousand liter tank around, you know.
36:25So, I just again, these questions are
36:28for the board but also for the folks are
36:29going to be watching this at home cuz I
36:31have a lot of curiosity about it, so.
36:33>> Go right ahead, please, sir.
36:35>> You had made mention that
36:37when the filters get dirty, they would
36:39have to be changed out
36:41and it would be considered
36:44hazardous material.
36:47>> Yes.
36:47>> And that's correct?
36:48>> Yes. Um so, there's a couple of
36:50distinctions. Um one so, those filters
36:54do the P FOS is absorbed to the carbon
36:56media. So, when I say the carbon media
36:58is spent that's what that's when the
37:01media has to be hauled offsite and and
37:04sent to an approved facility.
37:06It does it's a filter, right? So, same
37:08with like our water filters at home, it
37:10will accumulate sediment on top of the
37:12media through normal flows through the
37:15facility. So, those filters
37:18couple times a year maybe will have to
37:20be backwashed.
37:21>> Mhm.
37:21>> Um
37:23so, in that case water is just the flow
37:25is reversed. It goes from the bottom up
37:27to the top and we just basically
37:28backwash the water. Um just to get any
37:30built up sediment on top out of the
37:32filter. So, we do have um a holding tank
37:36for the spent wash water.
37:38Backwashed. Um
37:40and that holding tank anytime a filter
37:43is backwashed, that backwash water will
37:44go into the holding tank and then from
37:46there water in the holding tank is
37:48pumped into the sewer in the street.
37:50So, that's not a dirty filter. Um that's
37:54just a backwash process, but
37:56>> No, but what what I'm getting at is
37:59when the filter gets dirty, you would
38:01made mention that it's considered a
38:04hazardous material and would have to
38:06be taken offsite.
38:08Um
38:10who is going to be in charge of changing
38:13these filters? Okay, is it somebody from
38:15the water department? Is it a private
38:18concern that comes in? Is it somebody
38:20that's going to be
38:22what do you all have met trained to do
38:25this?
38:25>> No, when I said it's not a hazardous
38:28material. It's just a P fast. So the
38:30state won't let P fast go back into the
38:32ground. It's not a hazardous material. I
38:35if I said that word I I didn't mean the
38:36hazardous.
38:38It's just it has it's going to have P
38:39fast built up in that media. So we can't
38:42dispose of the P fast cuz I'm adding to
38:44the problem.
38:46Yeah, yeah, I get that.
38:48>> Worked in that field.
38:50So the bell went off and the light came
38:53on. Who's going to who's going to change
38:55all this stuff?
38:56>> Yeah, and it will be the water district
38:58in charge of coordinating disposal of
39:00that spent media, but it would have to
39:02be a disposal company that's approved
39:04through the state.
39:05>> So just again, I think I can add for the
39:07folks watching at home and people are
39:09going to watch this on the replay. This
39:11is basically what it comes down to is a
39:13giant pool filter if you will because
39:15you're going to have a media inside the
39:16filtration tanks. As you said it can be
39:18backwashed just like a pool filter at
39:20home and if it needs to be, you know,
39:22sometimes the pool filter can last the
39:24whole summer and you don't change it
39:25out. Sometimes it gets dirty and you
39:26have problems and then they got to they
39:28got to change it and that comes through
39:29with different types of testing
39:30materials and different types of
39:32observations. Correct?
39:34>> Correct. Yeah, it's a good analogy.
39:36>> I just wanted so again a lot of people
39:38have pools in town they'll understand
39:40what we're talking about. Makes it a
39:41little bit easier to understand.
39:43Okay, um
39:46>> So what's the same Oh, excuse me.
39:47>> No, go right ahead.
39:48>> Is this the same facility that they're
39:50building down in the sand pit? Are you
39:52involved in that?
39:52>> No, is that's the South Street? So they
39:55Okay, so we're not involved in that, but
39:57we do know that that's going on. That's
39:58that that facility is for P fast
40:01removal, but also iron and manganese
40:03removal. So they have a couple of
40:05different filters at that facility.
40:07>> I just happened to see the building the
40:08other day. I was like
40:09>> Yeah, that one's under construction now.
40:11Then this new building is actually going
40:13to like the exterior of it is going to
40:14mimic how that new facility is going to
40:16look. So the X series is going to look
40:17the same at this building.
40:22>> Okay, I think we've covered those. Mr.
40:23Damiac, do you have any questions or
40:24concerns just on that particular matter?
40:26>> I don't, no.
40:27>> Okay. So, can we just touch briefly uh
40:29just to make sure we understand so the
40:31impervious surface is basically the
40:33footprint of the building. Is Is that
40:35correct?
40:37>> Yes, the building um but the driveway
40:39we're also adding impervious area with
40:40the extended driveway. Um so, the 3,950
40:45sq ft number, that is the building
40:48size. Yes.
40:50>> And then the impervious surface
40:51remaining is the upgrading of the
40:52driveway. Again, I Again, living right
40:55down there now, I see what happens and
40:56they go in there and it's not a problem,
40:57but you do have the brook that runs
40:59through. I see occasionally the state
41:01DEP goes in there and takes water
41:03samples. They park there as well. Uh we
41:05had some recent with the um
41:07road resurfacing, we had some
41:09construction vehicles parked in that
41:11similar area. So, that's the area that's
41:13going to get tired and the rest you said
41:14is going to be gravel. Is that correct?
41:16>> Yeah, so it's the same spot that
41:17connects to the street as where the
41:19existing It's just going to extend.
41:21Right now, it kind of loops in
41:23right before that well one building.
41:25Now, it's going to go through the back
41:26of it. So, it is going to be a larger
41:28driveway with more pavement because of
41:29that. Um but right now, the the great
41:33the ground around that area right now is
41:36like a sandy kind of gravel and it is
41:39going to just stay. It's going to be
41:41improved gravel area around the building
41:43itself.
41:45>> So, that's good there and then we have
41:46the flood plain overlay district which
41:48we are already aware of because we deal
41:49with that anyway and it's because it's
41:51in zone two aquifer.
41:52>> Right.
41:52>> And they're going to be building a
41:53building for the purpose of It's
41:56building a building in the zone two
41:57aquifer to protect the zone two aquifer.
41:59Right? If you want to look at it like
42:00that, right? I think that'd be the best
42:02way to describe it.
42:03>> Yeah, I agree.
42:04>> [laughter]
42:05>> Okay. Uh anything else you want to add
42:07before I close the public portion of the
42:08hearing?
42:10>> Um no, nothing on our end unless there's
42:12any other questions.
42:14That sums it up.
42:15>> Any other further questions?
42:16>> I don't have any, do you?
42:17>> Okay. So, do I have a motion to close
42:18the public portion of the hearing?
42:19>> Motion to close the public hearing.
42:21>> Will I have a second?
42:21>> Second.
42:22>> All in favor? Aye. Okay, I'll just go
42:24around one more time. I think they did a
42:25pretty good job of explaining it. I
42:26think we have a good grasp for the folks
42:28at home that to me
42:32it seems like a no-brainer, even though
42:33we have to go and cover everything,
42:35because we're going to have a building
42:36that's going to be filtering our water
42:37and improving our water
42:38>> Right.
42:39>> and three wells down there. And just so
42:41we're clear there, if you're driving
42:43down Church Street or coming up past the
42:45water department, it's across the
42:46street. It's where that green fenced-in
42:48area is. There's two pump buildings
42:50there, and the third is over behind the
42:52building. It's a you if you were to take
42:54that road into the back of the driving
42:55range.
42:56>> Right.
42:56>> So, those are the three pump buildings
42:58they're referring to that will get tied
42:59in.
43:00So, do you have any questions or
43:01concerns about that at all?
43:02>> all right. I think it's an improvement
43:03to the
43:04existing buildings and property. So.
43:06>> Absolutely. I agree.
43:09>> Yeah, no, I mean, it's it's for the it's
43:11for the public good, and I and I know
43:13that in your materials and what you've
43:14said before, you've you've filed a
43:16notice of intent with the Auburn
43:18Conservation Commission, and then
43:19there's a land disturbance permit
43:21involved, so there's other processes
43:23involved here, too. Other over sites.
43:25>> Correct.
43:26>> Jay?
43:27>> I'm good.
43:28>> Okay. I would I agree, and the only
43:30thing I would just advise you on from
43:32I've lived down there for almost 35
43:34years now, and what I can tell you is
43:37the Mass Pike is they're plowing the
43:39snow, or sometimes it could be a
43:42combination of snow, water, ice, it gets
43:45thrown over the guardrails down in that
43:47direction. So, it just and I've seen it
43:49personally lots and lots of times. So,
43:52it just might be something in terms of
43:53the plan,
43:54um, you know, in terms of the building,
43:56it's something you might be aware need
43:57to be aware of, because you I would hate
43:59to see a really nice building built down
44:01there, and all of a sudden they starting
44:02to throw slush and and
44:05chemically treated snow melting on top
44:07of all that area down there, so just so
44:09you're aware.
44:10Um so if I have no other concerns and we
44:13have no other issues with the discussion
44:15part of it, what I'll do is break this
44:16down into three votes.
44:18So the first one is 76 Church Street,
44:21map 48, parcel 100 and 101, and
44:24Ridgewood Drive rear, map 40, parcel 40,
44:27ZBA 26-19.
44:29The first is for a variance relief from
44:31the minimum parking requirement section
44:336.3.2.j.
44:36Do I have a motion on the variance?
44:38>> Yeah, I'll make a motion to approve with
44:40standard conditions.
44:41>> Do I have a second?
44:42>> Second.
44:43>> Okay. And uh all in favor? All right.
44:46Any opposed? Hearing none, seeing none,
44:47that's all set. And we have the same 76
44:50Church Street that I've already read,
44:52and I'll save you from having to listen
44:54to me reading it again.
44:56A special permit to allow greater than
44:5815% or 2,500 square feet of impervious
45:01surface on a lot with zone two of the
45:04aquifer and watershed protection overlay
45:06district section 4.3.5.1
45:09and 9.3. And for the record, that would
45:11be the footprint of the building and the
45:13improvement of the driveway going into
45:16it,
45:17and it would not include the gravel
45:19driveway. But so we are a granting a a
45:22greater than 15% impervious surface for
45:24the overall project. Do I have a motion
45:27on that first special permit?
45:29>> Yeah, I'll make a motion to approve with
45:31standard second.
45:32>> Second.
45:34>> And all in favor? All right.
45:36Any opposed? None. And I vote, for the
45:38record, to approve. Uh third vote this
45:41evening, which would be the second
45:42special permit, again 76 Church Street,
45:45to allow new construction in the flood
45:47plain overlay district section 4.1.7 and
45:509.3. Do I have a motion on the second
45:53special permit?
45:54>> Yeah, I'll make a motion to approve.
45:56>> And do I have a second?
45:57>> Second.
45:58>> All in favor? All right. Any opposed?
46:00Hearing none, seeing none, and I vote to
46:02approve. So, you're all set. Good luck.
46:04We appreciate it. The only thing I think
46:06I could ask is, do you have a time frame
46:08on when they might start and when they
46:09might finish?
46:11>> Yes, uh estimated, but yes. Um so, we're
46:14probably going to go out to bid early
46:16next year. Um so, construction will
46:18likely start around the summer of next
46:20year, 2027. Um ideally about a year and
46:24a half of construction.
46:26>> Oh, okay.
46:29Okay.
46:30>> What was that?
46:31>> We're going to have better water.
46:33>> You'll have better water.
46:34>> [laughter]
46:34>> You're getting She's guaranteeing that.
46:37>> I'm excited to see that, and I think
46:39it's going to be a great improvement for
46:40the town overall.
46:41>> Yeah, absolutely.
46:42>> Excellent. Thank you very much for your
46:43presentation. I'm sorry about that.
46:44>> Thank you.
46:45>> Yeah, thanks for the science lesson. I
46:46appreciate it.
46:47>> Yeah.
46:47>> Do I have a motion to close the third
46:49hearing this evening?
46:50>> I'll make a motion to close.
46:52>> All in favor?
46:53>> Aye.
46:53>> Aye. Second. Do I have a second?
46:54>> Second.
46:54>> All in favor?
46:55>> Aye.
46:56>> Aye. Thank you very much. So, uh three
46:58hearings for this evening are closed.
47:00Uh the next thing we have any discussion
47:03Any discussion from the town side?
47:05Hearing none, seeing none. Uh we have
47:07the minutes from 9/17/2026.
47:10Um
47:11what I would like to do with that, if I
47:12could, is make a motion to continue that
47:15until next month because we have Mr.
47:16Maron who's not here. Um Ms. Bush was
47:20also here for You weren't here.
47:22>> Right.
47:22>> So, that I think it might be easier if
47:23we just let the minutes continue to next
47:25month,
47:26if that's okay. So, I do a motion to
47:27continue this the minutes until next
47:29month.
47:30>> I'll make a motion to continue till next
47:31month.
47:32>> Do I have a second?
47:33>> Second.
47:33>> All in favor?
47:34>> Aye.
47:34>> Aye. Excellent. And our next meeting is
47:3711/19/2026.
47:39So, that's going to be November 19th,
47:41and as I spoke earlier, um just for the
47:43record, I will not be here next month. I
47:45was invited to speak at a fundraising
47:47event for the Friends of the Auburn
47:49Public Library to support the library.
47:52So, what they're going to talk about is
47:54it's It's like a stories from the stage.
47:57And what they do is they've they've
47:59selected five people and they invited us
48:01to go in there and tell an off-the-cuff
48:0320-minute story that might be
48:05inspirational. It could be family
48:07history. It could be something that you
48:09did. I did hear that I I don't want to
48:11spoil any surprises, but I did hear
48:14about two or three of the
48:16speakers that are coming in and a they
48:18sound really interesting.
48:20>> Huh.
48:20>> There's um
48:22I I'll say is there's an expedition
48:24involved, which is pretty cool. There's
48:26uh some town history involved, which I
48:28also think is pretty cool. And I'm not
48:30going to spoil anything. And I don't
48:31even know what I'm picking yet, so I'm
48:33stuck.
48:34>> [laughter]
48:34>> So, um
48:36if you're interested, that is November
48:3719th at 6:00 p.m. That will be at the
48:40Patchogue Church and it's for sponsored
48:43by the Friends of the Auburn Public
48:44Library and it's to support the public
48:46library. So, if anybody's interested in
48:49attending that, you can contact either
48:50the Friends of the Auburn Public Library
48:53or the library themselves and you can
48:55get tickets or I'm sure they would
48:56probably allow you possibly to pay the
48:59night of the event, but there will be
49:01refreshments, snacks, and drinks. So,
49:03they would like to get a head count of
49:05people that would be interested in
49:06attending, so they can at least know
49:08what type of hors d'oeuvres and what
49:09types of
49:10>> Can't be here yet. You're too
49:12>> I know, unfortunately. I know
49:14>> [laughter]
49:14>> I'm putting a plug in for the folks at
49:15home, too.
49:16>> Yeah.
49:17It's
49:18>> So, do I have a motion to adjourn?
49:20>> Motion to adjourn.
49:21>> Do I have a second?
49:21>> Second.
49:22>> All in favor.
49:23>> Aye.
49:23>> Aye.
49:23>> Excellent.
49:29>> [music]