2026-08-20 - Sewer Commissioners

Summary

Written from the auto-generated captions; names and numbers may be misheard.

  • Short meeting (about 31 minutes). Approval of minutes and reorganization of the board were put off to the next meeting because a member was absent.
  • Pete Borea (Assistant DPW Director and Sewer Superintendent) introduced the town engineer, who will attend sewer meetings. She briefed the board on the Water Street culvert: the two corrugated pipes will be replaced with a 5-by-8-foot four-sided box culvert (soils differed on each side, ruling out a three-sided one), and the sewer main will run inside it, sleeved in ductile iron and covered with stream-bed material. The design was being submitted to the state for 25 percent review; because the span exceeds 10 feet it is treated as a bridge. Construction was hoped for next spring but could be the spring after, depending on funding and permitting.
  • Sewer reviews of two site plans: 481 Washington Street (a roughly 6,000 sq ft building including a Dunkin' with an exterior grease trap tying into an existing 8-inch main; members raised concern about the Elm Street exit and Route 20 traffic, which belongs to the Planning Board and state) and 190 Washington Street (a change from one 100,000 sq ft building to five buildings of about 9,000 to 20,000 sq ft; use unknown, so grease traps or oil separators may be required; flow goes to a private pump station; connection fees apply).
  • Special town meeting requests from sewer retained earnings: $99,000 for a replacement sewer truck (the 2014 truck's steel body is rotting; the new one gets an aluminum body) and $170,000 to replace pump one at the Pinrock pump station, which has a one-year lead time, with the other pumps rotated over five or six years. Retained earnings were to be certified by the state in September.
  • Upper Blackstone: no updates; staff toured the plant's industrial pretreatment program. No new sewer connections of note and no budget report yet for FY27.
  • Sword Street force main, phase one: six bids were received against an engineer's estimate of about $3.3 million for about 2,700 feet of lining with five access pits; the low bid was just over $2.4 million from a construction firm that will subcontract the lining. The engineer was reviewing the bids. Staff expected some valve and bypass work this fall and the main digging and bypass in spring to avoid open pits on Route 12 over winter.
  • Fire station easement (Prospect Street): staff were seeking easements from Home Depot and the owner of 39 Prospect Street; slow progress.
  • After the South Bridge Street pump station failure, staff are writing emergency action plans for the three biggest stations (Pinrock, Holstrom and Sword Street) showing where tanker trucks would be placed; a possible collapse near the brook on the Goddard Drive gravity main easement is to be checked by camera, and the town meeting funding may shift to Goddard Drive ahead of Sword Street phase two. The next meeting was set for roughly four to six weeks out.

Issues discussed

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:05the [music] meeting to order

00:07water sewer commissioners

00:09that

00:11um

00:13first order second order approval of

00:16minutes.

00:17>> Yeah. So, we're going to have to pass

00:18over that cuz uh Paul didn't have time

00:20to get those done. So, we'll have those

00:21for you next meeting. Okay. What time do

00:25you have

00:26>> business?

00:27>> 4:35.

00:31Actually, we got uh we got the April

00:3330th minutes,

00:36don't we? Still on the table from last.

00:39We we had a table from last time because

00:41Bob wasn't here. Bob Bob and I were at a

00:44meeting the meeting before that.

00:45>> Yeah,

00:46>> in May set the May meeting

00:48>> in May.

00:49>> Yeah,

00:51>> they were approved in May.

00:52>> There was a set of minutes approved in

00:54May. So,

00:56>> March 19th, April 30th is the one that's

00:59on the head.

01:01>> Okay.

01:03>> All right. Again, new business, the

01:06public comments.

01:09>> Perfect.

01:11Reorganization of the board.

01:13>> Yeah, we'll have to hold that off till

01:14next meeting if that's okay when Wayne's

01:16here. Yep.

01:17>> Yeah, it' be best.

01:17>> We have to have no choice. We

01:20>> We could nominate him for everything.

01:21[clears throat]

01:25uh abments that's support

01:30replacement

01:32placement.

01:32>> So, if you guys don't mind, I'll

01:33introduce Emma Williamson who's a town

01:35engineer. Uh she's been working with me

01:37on some sewer stuff. So, figur it would

01:39be helpful for her to start coming to

01:40some sewer commission meetings and kind

01:42of provide you guys with information as

01:44well from the town engineer side of the

01:46DPW. Okay.

01:48>> As well as what I have going on.

01:49>> That's awesome.

01:50>> So, um Okay,

01:53>> thank you.

01:53>> So, M Mark, so Em has been working on

01:56that Water Street Culver project.

01:58>> Okay.

01:58>> Um, here's a utility plan that doesn't

02:02clearly show the sewer line, but it

02:04shows the sewer line and where it's

02:06going to be placed in reference to the

02:08culbert. So, they're going to replace

02:10they're going to be replacing the two

02:12corrugated metal pipes there with a 5ft

02:14by 8t box culbert,

02:16um, foursided box culvert. And because

02:19of that, the sewer main is going to have

02:21to be run inside of the box cover and it

02:24will be covered with material to match

02:27that of the stream bed. So it won't be

02:29exposed, but it will be at it'll be at

02:31this a similar grade to what it

02:33currently is now.

02:34>> Okay.

02:36>> Yeah. Just to provide a little more

02:37context, when they went out and did the

02:39soil testing, the soils were different

02:41on either side. So, we couldn't move

02:43forward with the three-sided box culbert

02:45and had to switch to a four-sided

02:48um to meet the structural requirements.

02:52>> Right. Uh this won't have much cover on

02:55it, will it? So, I

02:57>> No, it's proposed to be encased in

02:59ductile iron.

03:01>> It's got to be a ductile iron pipe.

03:03>> Yeah.

03:04>> Okay.

03:06should still be insulated though cuz

03:07it's what M3P

03:10>> Yes. I installed that. What? It's going

03:12to So, the PVC is going to be insulated

03:15in ductal iron.

03:16>> Yes.

03:16>> Oh, it's going to be duct.

03:18>> It's going to be in sleep. Yes. Sleep.

03:20>> All right.

03:20>> Yeah. So, like Pete said, that's in the

03:22stream bed material.

03:24>> So,

03:24>> and then it's covered with the stream

03:26bed. So, it's not exposed to the running

03:27water.

03:28>> Gotcha.

03:29>> To the stream flow. The stream flow will

03:31be above it.

03:32>> All right.

03:35So, um, yeah, I just want to kind of

03:37provide you guys some of this for

03:38information and kind of review so you're

03:42don't get surprised if somebody starts

03:43asking you questions on the street.

03:49>> Some new drainage

03:52sewer itself. There's no water down

03:54there, right?

03:56>> No, not comes in from Sun Street for

04:00those couple houses there.

04:07What's the time frame?

04:10>> Um, so we are just submitting to Mass

04:12Dot for the 25% review now, which is why

04:15we wanted to bring it up at this meeting

04:17in case there were any concerns we could

04:19address them early. Um, ideally

04:22construction next spring, but it may be

04:24the spring after depending on funding

04:26and how the permitting goes.

04:31>> What's the the DT you what are you

04:34getting from them?

04:36>> Since the um span of the culbert's more

04:38than 10 ft, it's considered a bridge.

04:41So, they have to review it.

04:44>> You'll have a fun time with that, I bet.

04:46[clears throat]

04:47>> Yeah. Luckily, it's just the central

04:48office and not Boston because it's a

04:51small bridge and not 20 ft plus.

04:55>> Well, just I've had some other

04:57experiences

04:59other projects.

05:01Okay, that sounds good. But again,

05:03you're looking two years out

05:06construction actually to get everything.

05:09>> Yeah, because of the unknown approvals

05:10and what might get triggered. You're

05:12looking unfortunately, it's a one to

05:13two-year time frame from the start of

05:16next construction.

05:17>> Well, you got to go through all 25% 75%

05:20final.

05:21>> Yeah.

05:22>> Wait three months for comments,

05:25you know. Okay. It is what it is.

05:29Oh,

05:29>> be nothing left by then. Excavation will

05:32be easy. [laughter]

05:35>> Uh, any more sight plan?

05:38>> Sure. So, the first one I have for you

05:40guys is for 481 Washington Street. It's

05:44right at the intersection of Elm Street

05:46and Route 20. I guess it used to be an

05:49old gas station and now it's like a used

05:51car lot.

05:52>> Used car lot slash uh convenience store

05:56or something. So, they're going to be

05:57looking to uh construct a 6,000 foot

06:01building. I believe right now 2,000 of

06:04that 2,000 square feet of that

06:05approximately is um allocated for Dunkin

06:08Donuts. So, you show that you'll see

06:10they're proposing a um a grease trap,

06:13exterior grease trap tying into the

06:15existing 8 in PVC sewer main [snorts]

06:20that's goes through an easement on their

06:21property.

06:28They seem they're going to be tying into

06:30an existing lateral existing stub.

06:35>> This one's

06:36>> they're going to have in and out on uh

06:43>> it shows an exit over here on Elm

06:45Street.

06:45>> Yeah, I am.

06:46>> That ain't going to work.

06:47>> Well, I only look at it as far as sewer

06:49goes.

06:50>> Yeah. I'm sorry.

06:52>> I didn't look at it as far as track. I

06:54understand that

06:54>> doing site work. You know what I mean?

06:56>> Yeah. They're going in front of planning

06:57board for site plan. So traffic will be

06:59addressed through planning board.

07:01>> That that's not going to fly there.

07:03[snorts]

07:04>> Only for the fact that there's only a

07:05blinking light there.

07:06>> Mhm.

07:06>> So there's no means no means of egress

07:09safely out of that place. And and they

07:11should make this being route 20 a right

07:13hand turn only.

07:14>> It is a right-hand turn on to 20 only.

07:17>> Only. Yeah.

07:17>> Yeah. I don't know if it's on this site

07:19plan, but it's on one of their plans.

07:22>> Yeah,

07:22>> but I only printed the utility sheet.

07:24>> Yeah. Yeah. Yeah. They shouldn't they

07:26shouldn't have an exit there.

07:30>> That's not my board.

07:31>> No. And that's going to be mass that's

07:33on route 20 anyway. So, Matt, they're

07:34going to be in front of Mass DOT for

07:36their changing

07:37>> for anything they change with access.

07:40>> Yeah. But if they don't change,

07:42>> they can mass dot won't let you get away

07:44with saying we're not changing. review

07:46change any type of traffic intensity for

07:49the parcel.

07:50>> They're going to review

07:51>> any change of use.

07:52>> Yeah, they're going to believe they've

07:54already submitted for their curb cuts.

07:57>> Oh,

08:01>> and that cuts through there that cuts to

08:03the back side of the rail tracks.

08:06>> The BP gas station. Is this the site I'm

08:09thinking of?

08:09>> Yeah.

08:10>> Yeah.

08:12Change

08:12>> every other month. changed signs

08:15>> in the last 10 years.

08:17>> Three different ones.

08:18>> Sewer.

08:20>> Just quickly, Pete, the sewer I see that

08:22I assume goes left to right.

08:25It comes off of 20 and it heads into the

08:29property.

08:31>> I am not 100% sure on that.

08:34>> Okay.

08:36I just wondering which way it ran cuz

08:38it's coming down the hill on the 20

08:40comes into this structure. must be that

08:42must be going that direction.

08:46So I mean

08:47>> yeah I mean the the contours show the

08:49elevation running away from Route 20. So

08:51yes, I would say it [snorts] flows away

08:53from Route 20 through the easement.

09:03Pretty straightforward sewer wise.

09:09Yeah, I'm seeing it comes down 220.

09:12>> Oh, from there.

09:14>> Yeah. And it goes down um

09:17school street.

09:19>> Yes.

09:21>> Okay. Our GIS shows it going towards 20

09:25>> coming from up above. From the

09:26neighborhood behind.

09:27>> Yeah.

09:29Yeah. That goes on picks up all of

09:31Riverside and Oakland Drive and all

09:33that.

09:34>> Up behind there.

09:34>> Up behind there.

09:42All righty.

09:44It's not a good spot for this.

09:46>> What's that?

09:47>> It's a very busy road and people coming

09:50down the hill especially with that green

09:52light.

09:53>> They're off to the races. [snorts]

09:56>> All right. Very good. What's What's

09:58next, Peter?

09:59>> Next one is another site plan from 190

10:02West Wister Washington Street from

10:05Eastland Partners. They have a current

10:07site plan approval to do a 100,000

10:09square foot building uh one single

10:12building. They want to change that and

10:14do I think the five buildings that are

10:17shown ranging from I think it's 9,000

10:20square ft up to 20,000 square ft.

10:25So it's a very it's it's preliminary

10:27where we don't know the use. So my

10:30approval was was fairly straightforward

10:32in that they already had an approval for

10:34the 100,000 square foot building through

10:36that site plan that happened years ago

10:39>> and that without knowing the use um

10:43it's [snorts] hard they may be required

10:44to have grass grease traps or oil water

10:47separators depending what types of uh

10:49commercial use happens in those

10:51buildings

10:52>> always with [snorts] with trucking

10:54involved

10:55>> you know

10:56>> but it's hard to know if they're going

10:57to do like I

10:59garage bays or just office space or

11:02whatever.

11:03>> What's this only? Is it highway business

11:06or something?

11:07>> I don't know.

11:08>> I would imagine

11:09>> right in that area. [snorts]

11:14>> So,

11:15>> so that's the site. So, their saw is

11:17going to run down

11:19to where uh

11:22>> there's a current culde-sac and there's

11:24a pump station down there owned by

11:27um whatever building is down there.

11:29>> Ross Trucking is down there.

11:31>> There's one of those and there's another

11:32building down there too. I think it's

11:34two Commerce Drive.

11:36>> Okay.

11:36>> There's a pump station in between the

11:38two of those that's owned by must be

11:40either both of them or one of them.

11:42>> Yeah.

11:42>> And this is going to flow down to that

11:44and then get pumped up to the guard

11:46drive. easement from there.

11:48>> From there. Yeah.

11:52>> So again, fairly straightforward just

11:55letting the um applicant know that or

11:58and the planning board know depending on

12:00the type of use they may be required to

12:02do additional infrastructure.

12:04>> Absolutely.

12:04>> To accommodate the flow.

12:07>> These would be subject to connection

12:09fees.

12:09>> Yes. Oh, most definitely.

12:11>> All right.

12:12>> Yep. They [snorts] got plenty of money

12:13>> and those are based I mean no matter no

12:15matter who it is they're going to be

12:16based on connection fees and that title

12:19five flow and stuff like that.

12:21>> Yeah.

12:22>> All right.

12:25>> Great. Thank you.

12:27>> No thank you. Next item

12:31special town meeting with articles.

12:33>> Yeah. So we have special town meeting

12:35coming up. There are a couple things I'd

12:37like to present and ask for. One is um

12:40to see if town meeting will flow to

12:42appropriate $99,000 from sewer retained

12:45earnings for the purchase of the new

12:47sewer truck. Um the current S2 is a 2014

12:52um that has been gotten quite a bit of

12:55use out of it.

12:56>> Mhm.

12:57>> Is it a plow truck too?

12:58>> It is a plow truck also. Yes.

13:01>> They [snorts] just have a tendency to

13:02beat trucks up.

13:04>> Um I think any type of use Yeah. beats

13:07the truck. I don't think it's

13:09>> the personnel beating the truck up. I

13:11think it's just the use that beats the

13:12truck up. So,

13:14>> yeah, it's definitely in need of

13:16replacement. The road,

13:17>> this the steel body beats the truck up.

13:19>> The steel utility body is rotting away.

13:21So, this truck we're ordering with an

13:23aluminum utility body to match the

13:25aluminum pickup body cuz we've seen

13:28those don't rot away last longer. So, if

13:31you're looking to get 15 years out of

13:32it, we will hopefully stay away from the

13:35bodies rusting away.

13:36>> Yeah.

13:37>> Yeah.

13:38>> Um the frame seems good.

13:41>> So, and secondly, we're asking for

13:44$170,000 from sewer retained earnings to

13:47replace pump one at the Pinrock pump

13:50station that we've talked about before.

13:52>> Yeah.

13:52>> This will give us the funding that give

13:54us to order that, but knowing it's a

13:56one-year lead time. So try and get that

13:59ordered and and get that coming so we

14:02can get that replaced and then rebuild

14:04the current pump one and then rotate

14:06through pumps 2, three, and four over

14:07the next five or six years.

14:09>> Yeah. All right. Good.

14:10>> So

14:11>> perfect. [snorts]

14:12>> Excellent.

14:13>> That station cannot go down.

14:15>> No, most definitely not. So um and again

14:18that'll be this will be pending what we

14:20end up getting seeing for retained

14:22earnings, but that won't be certified

14:24through Mass DO until September or so.

14:27Yeah,

14:27>> but we will know what's certified before

14:29town meeting.

14:30>> All right,

14:31>> good.

14:33>> All right, onward upwards clean water.

14:36>> Yeah, there's no updates from Upper

14:38Blackstone

14:39that I'm aware of. Emma and I just did a

14:42tour with them uh last week to talk to

14:45get some information on their uh

14:48pre-treatment program, their industrial

14:50pre-treatment program, and they gave us

14:52a tour and stuff, and it's pretty

14:53informative to see everything they do

14:55there and how they do it. So

14:57>> at that scale,

14:59>> yeah,

14:59>> it's a big operation.

15:00>> It's it's [clears throat] a big

15:01operation.

15:02>> Small footprint for I think it's a small

15:04footprint for the flow that they manage.

15:06But

15:08>> it started out and next thing you know,

15:09Milbury's pumping all their sewer in.

15:12Then they're taking the sewer from

15:13Holden and

15:14>> you know

15:15>> we're taking sew from Oxford.

15:17>> Yeah.

15:18>> So you know it's not just the Wister,

15:20it's eight other towns, you know.

15:22>> Right.

15:24>> Okay. [snorts] Um, next billing

15:27schedules.

15:28>> You guys have those for a year.

15:32>> Yeah. The last building I went up there,

15:34the boss building. I worked there for a

15:35year and a half.

15:36>> Oh, no kidding.

15:42>> It's amazing how everything there gets

15:44treated naturally.

15:46>> You know what I mean?

15:47>> Yeah, that was your comment that there

15:48was so few chemicals being used.

15:51>> It's unbelievable. treat.

15:52>> Yeah, minimal chemicals until

15:56>> Yeah. disinfection at the end,

15:57>> right?

15:59>> And have the chlorination, but other

16:00than that,

16:03>> we put all new furnaces in there and we

16:05did a bunch of work.

16:08>> That was that Walsh.

16:10>> What's that?

16:10>> Walsh. Was that Walsh?

16:12>> No. No. Um, actually it was um

16:18Smith, I think, was the engineering

16:20company overseeing it. They bought out

16:24somebody else. I forget who it was. I

16:27worked for Nickson. Nickerson was the

16:29subcontractor. They do all sewer and

16:30water treatment facilities. They're out

16:32of Connecticut. That's where I work

16:34though. But they are

17:06is the uh solo thing uh panning out for

17:10a while there. We were on the negative

17:12side of getting any views out of it.

17:14>> No, I believe it's it's helping us.

17:18Any questions, Mark, on the billing

17:20schedules, concerns?

17:23>> No.

17:24>> Okay.

17:27>> Uh, new tour connection, but there's

17:30nothing going on.

17:31>> Been none since your last meeting.

17:37>> Yeah, we haven't done I mean, there's

17:39been minimal work. Maybe three or four

17:41hours for our guys working for anything

17:43to do with

17:44>> DPW. Okay,

17:46>> that's good. So,

17:58>> all right. Next, uh,

17:59>> the budget report. The being just

18:02starting the FY27 budget, the reports

18:05aren't catching up yet. So, I'll have

18:06one for you for your next meeting.

18:09>> Very good.

18:12All right. Number nine, current project,

18:14Sword Street Force Main.

18:15>> Yeah. So, the Sword Street Force Main,

18:17we actually went out to bid. So, the bid

18:20results are in front of you. We received

18:21six bids. Um, the engineers estimated

18:25cost was approximately 3.3 million for

18:29the phase one of Sword Street, which is

18:31approximately 2700 ft of lining. So,

18:35it'll be um I think it's five access

18:38pits coming out of the pump station and

18:41going up uh Route 12 from Sword Street

18:44North to the bank.

18:46and getting us off to that side street,

18:48installing some new valves and

18:50bypassing. So, that will get us through

18:53>> the historically um the historic area of

18:57where you've had most of your breaks, I

18:59believe, and get those lined

19:02>> stretch definitely.

19:03>> Yeah. So, again, approximately 2,700 ft.

19:06Um the low bidder was actually about

19:08900,000 under the engineers estimate at

19:11just over 2.4 million. And now it's Rard

19:14Ricardi brothers. I think they've done

19:17some work for the town before. I think

19:18they're out of Framingham.

19:19>> No, they're wor actually West I think

19:22they might be in West Bo.

19:24>> They they bid the uh the lining.

19:26>> Yeah. So none of the It's interesting

19:29because of the digging none of the

19:31lining companies bid it. So Insich Form

19:33didn't bid it themselves. National Water

19:35Man, any of the lining companies, it the

19:38the construction companies bid it

19:41>> and they're going to sub out the lining

19:42to the bigger companies to the lining

19:45companies.

19:45>> To the lining companies. Yeah.

19:46>> So, it's kind of a I think a a mix and

19:49match of

19:51>> is it a lining project or a construction

19:53project, right?

19:54>> In order to get the access pits to do

19:56that lining. So, I think they can line

19:58comfortably 600 ft at one time without

20:02having to get access. So that's why we

20:04have to do the access pits for that for

20:06that length.

20:08>> And going under the railroad tracks in

20:10the brook is going to be pretty

20:11interesting because we're going to try

20:13and um take out of commission the

20:17gravity main and run a temporary force

20:19main from the pump station through the

20:21gravity main into a pit and then bypass

20:25from there the rest of the sewer main

20:27while they do the lining. So

20:30it's going to be an Yeah, it's going to

20:32be an interesting process. I want to see

20:33that one.

20:34>> You will. [snorts]

20:36>> There's a lot of flow going out of that

20:38station.

20:38>> Um, but they're going to anything coming

20:40from Route 12 will be captured before it

20:43gets to the pump station. So, the only

20:45flow going to the Sword Street pump

20:47station will be coming from the private

20:49resonance up and above it, I guess, east

20:52of the pump station. So, that pump

20:54station does anywhere from, say, 250 to

20:57400,000 gallons a day, right?

20:59>> It's not the biggest, it's not as big as

21:01Holstrom. So, um, yeah, it'll be

21:04interesting to see how they do it. The

21:06engineer kind of left it up to the

21:08contractor on means and methods for

21:11bypassing.

21:13>> So,

21:16>> so Ricardi Brothers was pretty cheap,

21:18huh?

21:18>> They were. They seem to have pennied a

21:20lot of the paving issues, which is

21:22interesting. I mean, you can kind of

21:23look at it if you want and and see.

21:25>> Yeah. I'm not It's interesting to see.

21:28But so, the the engineer is going to be

21:30review. currently reviewing these. We're

21:32meeting on Monday to get their

21:34assessment of the bids and their review

21:36of the contractors themselves and a

21:39recommendation from them and for your

21:42next meeting. I don't know if you guys

21:45if that has to come in front of the

21:46commission for approval or if that just

21:49goes from us to Dory.

21:53But I'll follow up on that and depending

21:55on where we land,

21:57>> we were hoping to have this project done

21:59this construction season,

22:02>> but I'm not looking to have my first

22:04project with the work on Route 12 get

22:07jammed up and have to go into winter

22:08with open pits on Route 12.

22:10>> I ain't going to plug. So, they're going

22:12to probably start some of the work and

22:13get some of the valving in place to

22:15bypass from the pump station and then

22:17come spring start with the, you know,

22:20digging the the pits and starting with

22:22the bypass. You know, that that'll give

22:24them time to get a good bypass plan in

22:26place.

22:27>> Yeah.

22:27>> And figure out the best way to do it.

22:29>> Very good.

22:31>> So, they'll probably do some some of the

22:32light lifting this fall and start next

22:34spring for this project

22:37>> because there's still going to be quite

22:38a quite a bit of flow coming. [snorts]

22:40Yes.

22:42>> Always is.

22:44>> All right. Old business

22:47home station.

22:48>> Yeah. So, I'm still working with the

22:49property owners there in that area,

22:51whether it be I'm I reached out to Home

22:54Depot and got in touch with one of their

22:55land use attorneys. So, hopefully we can

22:58get an easement from them and from the

23:00property owner um at 39 Prospect Street.

23:04Still working with him as well. So, uh,

23:07that is definitely a work in progress.

23:09And,

23:10um, yeah, emails, returns from Home

23:14Depot aren't extremely quick.

23:16>> They are.

23:17>> They are not.

23:18>> Well, I was wonder they they seem

23:20receptive though.

23:22>> It was a very quick conversation. It

23:24took me probably a month to get from the

23:26store manager in Auburn to an attorney

23:28to talk to. So,

23:31>> he didn't say no right away, but I also

23:33emailed him a um possible plan and I

23:38haven't heard back from him and that was

23:39probably a month ago also. So, yep,

23:43we're in that hurry up and wait phase

23:45unfortunately.

23:46>> Lo, I went to a project in West Bro and

23:49they wouldn't let a guy come do an east

23:51through the property.

23:52>> What?

23:52>> And it was a it was different dynamic

23:55than that. was private owner of

23:58property.

23:59>> And

23:59>> so

24:00>> the kicker was the force made for the

24:02sewer plant went right by this property,

24:05but they couldn't tie it and they

24:07couldn't grab it. They they were trying

24:09to figure out a way to get it to

24:11somewhere gravity and one of them was

24:13going through the parking lot, but

24:15Lowe's said no. So

24:17>> the only good thing is this isn't going

24:18through any part of their parking lot or

24:20any part of their

24:22>> operational portion of their property.

24:24So

24:24>> over the wall. Yeah. So hopefully that

24:26that's a plus for us. But

24:29>> we've had to uh

24:32in five and we've had to walk that

24:35>> brush rises. Yeah.

24:36>> It's a long [snorts] walk.

24:40>> Okay. Um next item day of the next

24:43meeting.

24:47>> Send out an email and see available

24:49dates. So Wayne's not here also. So

24:53>> fill it out. Nobody knows yet.

24:57>> We'll try and do something the next four

24:58to six weeks. Maybe end of September,

25:00beginning of October.

25:02>> Yeah.

25:02>> Does that work?

25:03>> Oh, it's, you know, we're not really

25:05overwhelmed with things.

25:07>> No. So,

25:08>> no. Things are going okay.

25:10>> Yeah. The four to six weeks sounds good.

25:11>> Okay.

25:12>> I'll I'll make out with that u that

25:14break

25:16>> at Hol at not Holston, but South Bridge

25:19Street Court.

25:19>> Yeah.

25:20>> As good as could be expected.

25:21>> Yeah.

25:22>> Yeah. That's your second

25:24most volume pump station,

25:26>> right?

25:26>> So, learned a little bit,

25:28>> right?

25:28>> Uh came up with a emergency action plan

25:31if that pump station goes down again.

25:34>> Yeah.

25:34>> So, I found an older emergency action

25:36plan for Pinrock. Uh worked through that

25:40and I came up with I'm working on

25:42creating emergency action plans for

25:44Pinrock, Holstrom, and Sword because

25:46those are your three biggest stations.

25:48that way there. If they go down it, we

25:50know to get 12 trucks and put the three

25:54trucks here, three trucks here, four

25:56trucks there.

25:57>> So, no, no matter who's here, the

26:00blueprint is in place.

26:02>> I mean, pinrock is just going to be I

26:04don't want to say open prey, but it's

26:06>> We have a plan. It's 30 trucks. It's a

26:09lot. You know what I mean? You have to

26:11shut down Holstrom. You have to shut

26:12down Sword Street. You have to bypass at

26:15Pinrock and bypass the other two. pin

26:17rod should be all set now because we put

26:19that bypass line in. So,

26:21>> but if the pumps go down, if some if

26:23there's a catastrophic failure

26:25>> in the pumps.

26:26>> Yeah.

26:27>> At the station,

26:28>> right?

26:28>> That fine rock station you 30 trucks.

26:32>> Yeah.

26:32>> I don't know where you're going to put

26:33them.

26:34>> Well, again, I think once you shut down

26:36Holstrom and Sword, that probably

26:38eliminates maybe hopefully half of the

26:41flow.

26:41>> Yeah. So then you only have to

26:43accommodate half of the flow going to

26:44pinrock which you could get from

26:46manholes coming from the um garter drive

26:49easement.

26:50>> Yeah.

26:50>> And because you you're not getting

26:51trucks into the pinrock pump station

26:53parcel.

26:54>> No.

26:54>> So you're going to have to grab it

26:56upream at manholes and that was kind of

26:59the trickiest part to identify those.

27:01>> Yeah.

27:01>> Pull was okay. Sword street was a little

27:03bit easier because it's a lot less flow.

27:06>> Those structures are they available that

27:09you were going to pull out of? I've

27:11identified a few of them. Um, and I

27:14think again if the station goes down and

27:16it starts searchcharging into the

27:18collection system, those those

27:20structures will be pretty much reserved

27:23capacity and you'll be able to you won't

27:25be drawing off of a half a pipe of flow.

27:28You'll be drawing out of a submerged

27:30manhole with enough flow coming into it

27:32that Well,

27:33>> I'm just talking about they're

27:34accessible. Yes. Some what I've

27:36identified, some of them are accessible

27:37on uh different portions of the um the

27:41trailer park property that's there.

27:43>> I I tried to look through our GIS and

27:46identify manhole covers that we can get

27:49tractor trailers up to and the the

27:518,000galon tankers up to suck out of.

27:54>> Very good.

27:56>> Y how's that uh easement

28:00>> that's been as far as maintained? Um,

28:04we've got that collapse on that on that

28:07easement there on that on that force

28:09man. Has anybody gone up to

28:12>> Goddard is gravity main?

28:15>> Gravity main.

28:16>> There's a there's a there's a break in

28:17the pipe up there by by the brook.

28:20>> So I we have been up there. We've

28:23maintained it where there's

28:26>> you're talking about where the two pipes

28:27come in together where it crosses the

28:29brook.

28:30>> Yeah.

28:31Okay. I mean, I I looked at it. I didn't

28:33see any evidence of a

28:35>> They came there's not a break there.

28:37There's a collapse on the top of the

28:39plate.

28:39>> And it's and it's not it's not that was

28:43going to be part of the project when

28:44they when they go up there to do the

28:46lining and all that other stuff along

28:47with the access road we talked about.

28:50>> Yep.

28:50>> Uh

28:51>> so that's again I kind of let that sit

28:54and let that be part of So after we get

28:55through Sword Street.

28:57>> Yeah. the funding, town meeting funding

29:00was for Sword Street and Goddard Street.

29:02>> Yeah.

29:02>> So, I think we'll see what we have left

29:03based on this and then pivot to Goddard

29:08Drive instead of doing phase two of

29:10Sword

29:11>> which gets you up through Jerome AB and

29:13stuff like that. I think GDDARD would be

29:15a better more of a priority to help with

29:18the infiltration.

29:19>> Yeah. So use the funds and that's when

29:22again during that design and talking

29:24with the engineer I believe that the

29:26design of God is probably 50% done.

29:29>> Yeah, that sounds about right.

29:30>> And I can ask him about that collapse

29:33and if they're aware of it and what

29:35they've kind of done, but I've been

29:36focusing mostly on Sword Street with

29:38them.

29:38>> Yeah.

29:39>> To kind of get this project going.

29:40>> Yeah. Because that's that's going to be

29:41a major

29:43>> to to do that if it's under the stream

29:45bed where those where the granite is for

29:47the crossing.

29:48>> Yeah.

29:48>> Yes. That's going to be

29:50>> right

29:50>> not not simple.

29:51>> And we we had

29:54this has happened a couple years ago.

29:56They they found it when they came in. Um

29:59summer time was the best time to go up

30:00there while there was no flow in that in

30:02that seasonal brook to go up to do

30:04anything to maybe put a repair on that

30:06or something. Judges something for the

30:08time being. And uh

30:11even Nick said it didn't it wasn't that

30:14that much of a concern as far as

30:17collapsing, but to that they were going

30:19to monitor it and keep an eye on it. So

30:21>> Okay.

30:22>> I I think something that that we should

30:24keep an eye on, you know, send send the

30:26boys up with the camera and and

30:27>> Yeah, we should be able to get that. I

30:29know they they did some um easement

30:31maintenance, so we should be able to get

30:32the van down there.

30:33>> Yeah.

30:34>> To get [snorts] that done. just just to

30:36keep an eye on.

30:37>> It's been a while, too, since they

30:38looked at it. Be good to take another

30:40eyes on it.

30:41>> Yeah.

30:42>> I' Every couple of months I' I'd be

30:45taking a peek at that.

30:46>> Okay.

30:48>> Just to make sure cuz if that collapses

30:50and shuts off that easement.

30:53>> Yeah, that's understood. [clears throat]

30:56[laughter]

30:57>> Yep. Understood.

30:58>> That one won't be fun.

31:00>> Motion to adjurnn.

31:02>> We're all set. Make a motion.

31:05All in favor?

31:06>> I.

31:07>> Those opposed.

31:09>> Thank you, gentlemen.

31:10>> Thank you much.

31:16>> [music]