- Short meeting (about 31 minutes). Approval of minutes and reorganization of the board were put off to the next meeting because a member was absent.
- Pete Borea (Assistant DPW Director and Sewer Superintendent) introduced the town engineer, who will attend sewer meetings. She briefed the board on the Water Street culvert: the two corrugated pipes will be replaced with a 5-by-8-foot four-sided box culvert (soils differed on each side, ruling out a three-sided one), and the sewer main will run inside it, sleeved in ductile iron and covered with stream-bed material. The design was being submitted to the state for 25 percent review; because the span exceeds 10 feet it is treated as a bridge. Construction was hoped for next spring but could be the spring after, depending on funding and permitting.
- Sewer reviews of two site plans: 481 Washington Street (a roughly 6,000 sq ft building including a Dunkin' with an exterior grease trap tying into an existing 8-inch main; members raised concern about the Elm Street exit and Route 20 traffic, which belongs to the Planning Board and state) and 190 Washington Street (a change from one 100,000 sq ft building to five buildings of about 9,000 to 20,000 sq ft; use unknown, so grease traps or oil separators may be required; flow goes to a private pump station; connection fees apply).
- Special town meeting requests from sewer retained earnings: $99,000 for a replacement sewer truck (the 2014 truck's steel body is rotting; the new one gets an aluminum body) and $170,000 to replace pump one at the Pinrock pump station, which has a one-year lead time, with the other pumps rotated over five or six years. Retained earnings were to be certified by the state in September.
- Upper Blackstone: no updates; staff toured the plant's industrial pretreatment program. No new sewer connections of note and no budget report yet for FY27.
- Sword Street force main, phase one: six bids were received against an engineer's estimate of about $3.3 million for about 2,700 feet of lining with five access pits; the low bid was just over $2.4 million from a construction firm that will subcontract the lining. The engineer was reviewing the bids. Staff expected some valve and bypass work this fall and the main digging and bypass in spring to avoid open pits on Route 12 over winter.
- Fire station easement (Prospect Street): staff were seeking easements from Home Depot and the owner of 39 Prospect Street; slow progress.
- After the South Bridge Street pump station failure, staff are writing emergency action plans for the three biggest stations (Pinrock, Holstrom and Sword Street) showing where tanker trucks would be placed; a possible collapse near the brook on the Goddard Drive gravity main easement is to be checked by camera, and the town meeting funding may shift to Goddard Drive ahead of Sword Street phase two. The next meeting was set for roughly four to six weeks out.
Issues discussed
- Sewer Projects
- Sword Street Force Main Rehabilitation
- Pump Station Emergency Action Plans
- Water Street Culvert Replacement
- 481 Washington Street Drive-Through Development
- 190 Washington Street Warehouse Development
- New Fire Station at 10 Prospect Street
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:05the [music] meeting to order
00:07water sewer commissioners
00:09that
00:11um
00:13first order second order approval of
00:16minutes.
00:17>> Yeah. So, we're going to have to pass
00:18over that cuz uh Paul didn't have time
00:20to get those done. So, we'll have those
00:21for you next meeting. Okay. What time do
00:25you have
00:26>> business?
00:27>> 4:35.
00:31Actually, we got uh we got the April
00:3330th minutes,
00:36don't we? Still on the table from last.
00:39We we had a table from last time because
00:41Bob wasn't here. Bob Bob and I were at a
00:44meeting the meeting before that.
00:45>> Yeah,
00:46>> in May set the May meeting
00:48>> in May.
00:49>> Yeah,
00:51>> they were approved in May.
00:52>> There was a set of minutes approved in
00:54May. So,
00:56>> March 19th, April 30th is the one that's
00:59on the head.
01:01>> Okay.
01:03>> All right. Again, new business, the
01:06public comments.
01:09>> Perfect.
01:11Reorganization of the board.
01:13>> Yeah, we'll have to hold that off till
01:14next meeting if that's okay when Wayne's
01:16here. Yep.
01:17>> Yeah, it' be best.
01:17>> We have to have no choice. We
01:20>> We could nominate him for everything.
01:21[clears throat]
01:25uh abments that's support
01:30replacement
01:32placement.
01:32>> So, if you guys don't mind, I'll
01:33introduce Emma Williamson who's a town
01:35engineer. Uh she's been working with me
01:37on some sewer stuff. So, figur it would
01:39be helpful for her to start coming to
01:40some sewer commission meetings and kind
01:42of provide you guys with information as
01:44well from the town engineer side of the
01:46DPW. Okay.
01:48>> As well as what I have going on.
01:49>> That's awesome.
01:50>> So, um Okay,
01:53>> thank you.
01:53>> So, M Mark, so Em has been working on
01:56that Water Street Culver project.
01:58>> Okay.
01:58>> Um, here's a utility plan that doesn't
02:02clearly show the sewer line, but it
02:04shows the sewer line and where it's
02:06going to be placed in reference to the
02:08culbert. So, they're going to replace
02:10they're going to be replacing the two
02:12corrugated metal pipes there with a 5ft
02:14by 8t box culbert,
02:16um, foursided box culvert. And because
02:19of that, the sewer main is going to have
02:21to be run inside of the box cover and it
02:24will be covered with material to match
02:27that of the stream bed. So it won't be
02:29exposed, but it will be at it'll be at
02:31this a similar grade to what it
02:33currently is now.
02:34>> Okay.
02:36>> Yeah. Just to provide a little more
02:37context, when they went out and did the
02:39soil testing, the soils were different
02:41on either side. So, we couldn't move
02:43forward with the three-sided box culbert
02:45and had to switch to a four-sided
02:48um to meet the structural requirements.
02:52>> Right. Uh this won't have much cover on
02:55it, will it? So, I
02:57>> No, it's proposed to be encased in
02:59ductile iron.
03:01>> It's got to be a ductile iron pipe.
03:03>> Yeah.
03:04>> Okay.
03:06should still be insulated though cuz
03:07it's what M3P
03:10>> Yes. I installed that. What? It's going
03:12to So, the PVC is going to be insulated
03:15in ductal iron.
03:16>> Yes.
03:16>> Oh, it's going to be duct.
03:18>> It's going to be in sleep. Yes. Sleep.
03:20>> All right.
03:20>> Yeah. So, like Pete said, that's in the
03:22stream bed material.
03:24>> So,
03:24>> and then it's covered with the stream
03:26bed. So, it's not exposed to the running
03:27water.
03:28>> Gotcha.
03:29>> To the stream flow. The stream flow will
03:31be above it.
03:32>> All right.
03:35So, um, yeah, I just want to kind of
03:37provide you guys some of this for
03:38information and kind of review so you're
03:42don't get surprised if somebody starts
03:43asking you questions on the street.
03:49>> Some new drainage
03:52sewer itself. There's no water down
03:54there, right?
03:56>> No, not comes in from Sun Street for
04:00those couple houses there.
04:07What's the time frame?
04:10>> Um, so we are just submitting to Mass
04:12Dot for the 25% review now, which is why
04:15we wanted to bring it up at this meeting
04:17in case there were any concerns we could
04:19address them early. Um, ideally
04:22construction next spring, but it may be
04:24the spring after depending on funding
04:26and how the permitting goes.
04:31>> What's the the DT you what are you
04:34getting from them?
04:36>> Since the um span of the culbert's more
04:38than 10 ft, it's considered a bridge.
04:41So, they have to review it.
04:44>> You'll have a fun time with that, I bet.
04:46[clears throat]
04:47>> Yeah. Luckily, it's just the central
04:48office and not Boston because it's a
04:51small bridge and not 20 ft plus.
04:55>> Well, just I've had some other
04:57experiences
04:59other projects.
05:01Okay, that sounds good. But again,
05:03you're looking two years out
05:06construction actually to get everything.
05:09>> Yeah, because of the unknown approvals
05:10and what might get triggered. You're
05:12looking unfortunately, it's a one to
05:13two-year time frame from the start of
05:16next construction.
05:17>> Well, you got to go through all 25% 75%
05:20final.
05:21>> Yeah.
05:22>> Wait three months for comments,
05:25you know. Okay. It is what it is.
05:29Oh,
05:29>> be nothing left by then. Excavation will
05:32be easy. [laughter]
05:35>> Uh, any more sight plan?
05:38>> Sure. So, the first one I have for you
05:40guys is for 481 Washington Street. It's
05:44right at the intersection of Elm Street
05:46and Route 20. I guess it used to be an
05:49old gas station and now it's like a used
05:51car lot.
05:52>> Used car lot slash uh convenience store
05:56or something. So, they're going to be
05:57looking to uh construct a 6,000 foot
06:01building. I believe right now 2,000 of
06:04that 2,000 square feet of that
06:05approximately is um allocated for Dunkin
06:08Donuts. So, you show that you'll see
06:10they're proposing a um a grease trap,
06:13exterior grease trap tying into the
06:15existing 8 in PVC sewer main [snorts]
06:20that's goes through an easement on their
06:21property.
06:28They seem they're going to be tying into
06:30an existing lateral existing stub.
06:35>> This one's
06:36>> they're going to have in and out on uh
06:43>> it shows an exit over here on Elm
06:45Street.
06:45>> Yeah, I am.
06:46>> That ain't going to work.
06:47>> Well, I only look at it as far as sewer
06:49goes.
06:50>> Yeah. I'm sorry.
06:52>> I didn't look at it as far as track. I
06:54understand that
06:54>> doing site work. You know what I mean?
06:56>> Yeah. They're going in front of planning
06:57board for site plan. So traffic will be
06:59addressed through planning board.
07:01>> That that's not going to fly there.
07:03[snorts]
07:04>> Only for the fact that there's only a
07:05blinking light there.
07:06>> Mhm.
07:06>> So there's no means no means of egress
07:09safely out of that place. And and they
07:11should make this being route 20 a right
07:13hand turn only.
07:14>> It is a right-hand turn on to 20 only.
07:17>> Only. Yeah.
07:17>> Yeah. I don't know if it's on this site
07:19plan, but it's on one of their plans.
07:22>> Yeah,
07:22>> but I only printed the utility sheet.
07:24>> Yeah. Yeah. Yeah. They shouldn't they
07:26shouldn't have an exit there.
07:30>> That's not my board.
07:31>> No. And that's going to be mass that's
07:33on route 20 anyway. So, Matt, they're
07:34going to be in front of Mass DOT for
07:36their changing
07:37>> for anything they change with access.
07:40>> Yeah. But if they don't change,
07:42>> they can mass dot won't let you get away
07:44with saying we're not changing. review
07:46change any type of traffic intensity for
07:49the parcel.
07:50>> They're going to review
07:51>> any change of use.
07:52>> Yeah, they're going to believe they've
07:54already submitted for their curb cuts.
07:57>> Oh,
08:01>> and that cuts through there that cuts to
08:03the back side of the rail tracks.
08:06>> The BP gas station. Is this the site I'm
08:09thinking of?
08:09>> Yeah.
08:10>> Yeah.
08:12Change
08:12>> every other month. changed signs
08:15>> in the last 10 years.
08:17>> Three different ones.
08:18>> Sewer.
08:20>> Just quickly, Pete, the sewer I see that
08:22I assume goes left to right.
08:25It comes off of 20 and it heads into the
08:29property.
08:31>> I am not 100% sure on that.
08:34>> Okay.
08:36I just wondering which way it ran cuz
08:38it's coming down the hill on the 20
08:40comes into this structure. must be that
08:42must be going that direction.
08:46So I mean
08:47>> yeah I mean the the contours show the
08:49elevation running away from Route 20. So
08:51yes, I would say it [snorts] flows away
08:53from Route 20 through the easement.
09:03Pretty straightforward sewer wise.
09:09Yeah, I'm seeing it comes down 220.
09:12>> Oh, from there.
09:14>> Yeah. And it goes down um
09:17school street.
09:19>> Yes.
09:21>> Okay. Our GIS shows it going towards 20
09:25>> coming from up above. From the
09:26neighborhood behind.
09:27>> Yeah.
09:29Yeah. That goes on picks up all of
09:31Riverside and Oakland Drive and all
09:33that.
09:34>> Up behind there.
09:34>> Up behind there.
09:42All righty.
09:44It's not a good spot for this.
09:46>> What's that?
09:47>> It's a very busy road and people coming
09:50down the hill especially with that green
09:52light.
09:53>> They're off to the races. [snorts]
09:56>> All right. Very good. What's What's
09:58next, Peter?
09:59>> Next one is another site plan from 190
10:02West Wister Washington Street from
10:05Eastland Partners. They have a current
10:07site plan approval to do a 100,000
10:09square foot building uh one single
10:12building. They want to change that and
10:14do I think the five buildings that are
10:17shown ranging from I think it's 9,000
10:20square ft up to 20,000 square ft.
10:25So it's a very it's it's preliminary
10:27where we don't know the use. So my
10:30approval was was fairly straightforward
10:32in that they already had an approval for
10:34the 100,000 square foot building through
10:36that site plan that happened years ago
10:39>> and that without knowing the use um
10:43it's [snorts] hard they may be required
10:44to have grass grease traps or oil water
10:47separators depending what types of uh
10:49commercial use happens in those
10:51buildings
10:52>> always with [snorts] with trucking
10:54involved
10:55>> you know
10:56>> but it's hard to know if they're going
10:57to do like I
10:59garage bays or just office space or
11:02whatever.
11:03>> What's this only? Is it highway business
11:06or something?
11:07>> I don't know.
11:08>> I would imagine
11:09>> right in that area. [snorts]
11:14>> So,
11:15>> so that's the site. So, their saw is
11:17going to run down
11:19to where uh
11:22>> there's a current culde-sac and there's
11:24a pump station down there owned by
11:27um whatever building is down there.
11:29>> Ross Trucking is down there.
11:31>> There's one of those and there's another
11:32building down there too. I think it's
11:34two Commerce Drive.
11:36>> Okay.
11:36>> There's a pump station in between the
11:38two of those that's owned by must be
11:40either both of them or one of them.
11:42>> Yeah.
11:42>> And this is going to flow down to that
11:44and then get pumped up to the guard
11:46drive. easement from there.
11:48>> From there. Yeah.
11:52>> So again, fairly straightforward just
11:55letting the um applicant know that or
11:58and the planning board know depending on
12:00the type of use they may be required to
12:02do additional infrastructure.
12:04>> Absolutely.
12:04>> To accommodate the flow.
12:07>> These would be subject to connection
12:09fees.
12:09>> Yes. Oh, most definitely.
12:11>> All right.
12:12>> Yep. They [snorts] got plenty of money
12:13>> and those are based I mean no matter no
12:15matter who it is they're going to be
12:16based on connection fees and that title
12:19five flow and stuff like that.
12:21>> Yeah.
12:22>> All right.
12:25>> Great. Thank you.
12:27>> No thank you. Next item
12:31special town meeting with articles.
12:33>> Yeah. So we have special town meeting
12:35coming up. There are a couple things I'd
12:37like to present and ask for. One is um
12:40to see if town meeting will flow to
12:42appropriate $99,000 from sewer retained
12:45earnings for the purchase of the new
12:47sewer truck. Um the current S2 is a 2014
12:52um that has been gotten quite a bit of
12:55use out of it.
12:56>> Mhm.
12:57>> Is it a plow truck too?
12:58>> It is a plow truck also. Yes.
13:01>> They [snorts] just have a tendency to
13:02beat trucks up.
13:04>> Um I think any type of use Yeah. beats
13:07the truck. I don't think it's
13:09>> the personnel beating the truck up. I
13:11think it's just the use that beats the
13:12truck up. So,
13:14>> yeah, it's definitely in need of
13:16replacement. The road,
13:17>> this the steel body beats the truck up.
13:19>> The steel utility body is rotting away.
13:21So, this truck we're ordering with an
13:23aluminum utility body to match the
13:25aluminum pickup body cuz we've seen
13:28those don't rot away last longer. So, if
13:31you're looking to get 15 years out of
13:32it, we will hopefully stay away from the
13:35bodies rusting away.
13:36>> Yeah.
13:37>> Yeah.
13:38>> Um the frame seems good.
13:41>> So, and secondly, we're asking for
13:44$170,000 from sewer retained earnings to
13:47replace pump one at the Pinrock pump
13:50station that we've talked about before.
13:52>> Yeah.
13:52>> This will give us the funding that give
13:54us to order that, but knowing it's a
13:56one-year lead time. So try and get that
13:59ordered and and get that coming so we
14:02can get that replaced and then rebuild
14:04the current pump one and then rotate
14:06through pumps 2, three, and four over
14:07the next five or six years.
14:09>> Yeah. All right. Good.
14:10>> So
14:11>> perfect. [snorts]
14:12>> Excellent.
14:13>> That station cannot go down.
14:15>> No, most definitely not. So um and again
14:18that'll be this will be pending what we
14:20end up getting seeing for retained
14:22earnings, but that won't be certified
14:24through Mass DO until September or so.
14:27Yeah,
14:27>> but we will know what's certified before
14:29town meeting.
14:30>> All right,
14:31>> good.
14:33>> All right, onward upwards clean water.
14:36>> Yeah, there's no updates from Upper
14:38Blackstone
14:39that I'm aware of. Emma and I just did a
14:42tour with them uh last week to talk to
14:45get some information on their uh
14:48pre-treatment program, their industrial
14:50pre-treatment program, and they gave us
14:52a tour and stuff, and it's pretty
14:53informative to see everything they do
14:55there and how they do it. So
14:57>> at that scale,
14:59>> yeah,
14:59>> it's a big operation.
15:00>> It's it's [clears throat] a big
15:01operation.
15:02>> Small footprint for I think it's a small
15:04footprint for the flow that they manage.
15:06But
15:08>> it started out and next thing you know,
15:09Milbury's pumping all their sewer in.
15:12Then they're taking the sewer from
15:13Holden and
15:14>> you know
15:15>> we're taking sew from Oxford.
15:17>> Yeah.
15:18>> So you know it's not just the Wister,
15:20it's eight other towns, you know.
15:22>> Right.
15:24>> Okay. [snorts] Um, next billing
15:27schedules.
15:28>> You guys have those for a year.
15:32>> Yeah. The last building I went up there,
15:34the boss building. I worked there for a
15:35year and a half.
15:36>> Oh, no kidding.
15:42>> It's amazing how everything there gets
15:44treated naturally.
15:46>> You know what I mean?
15:47>> Yeah, that was your comment that there
15:48was so few chemicals being used.
15:51>> It's unbelievable. treat.
15:52>> Yeah, minimal chemicals until
15:56>> Yeah. disinfection at the end,
15:57>> right?
15:59>> And have the chlorination, but other
16:00than that,
16:03>> we put all new furnaces in there and we
16:05did a bunch of work.
16:08>> That was that Walsh.
16:10>> What's that?
16:10>> Walsh. Was that Walsh?
16:12>> No. No. Um, actually it was um
16:18Smith, I think, was the engineering
16:20company overseeing it. They bought out
16:24somebody else. I forget who it was. I
16:27worked for Nickson. Nickerson was the
16:29subcontractor. They do all sewer and
16:30water treatment facilities. They're out
16:32of Connecticut. That's where I work
16:34though. But they are
17:06is the uh solo thing uh panning out for
17:10a while there. We were on the negative
17:12side of getting any views out of it.
17:14>> No, I believe it's it's helping us.
17:18Any questions, Mark, on the billing
17:20schedules, concerns?
17:23>> No.
17:24>> Okay.
17:27>> Uh, new tour connection, but there's
17:30nothing going on.
17:31>> Been none since your last meeting.
17:37>> Yeah, we haven't done I mean, there's
17:39been minimal work. Maybe three or four
17:41hours for our guys working for anything
17:43to do with
17:44>> DPW. Okay,
17:46>> that's good. So,
17:58>> all right. Next, uh,
17:59>> the budget report. The being just
18:02starting the FY27 budget, the reports
18:05aren't catching up yet. So, I'll have
18:06one for you for your next meeting.
18:09>> Very good.
18:12All right. Number nine, current project,
18:14Sword Street Force Main.
18:15>> Yeah. So, the Sword Street Force Main,
18:17we actually went out to bid. So, the bid
18:20results are in front of you. We received
18:21six bids. Um, the engineers estimated
18:25cost was approximately 3.3 million for
18:29the phase one of Sword Street, which is
18:31approximately 2700 ft of lining. So,
18:35it'll be um I think it's five access
18:38pits coming out of the pump station and
18:41going up uh Route 12 from Sword Street
18:44North to the bank.
18:46and getting us off to that side street,
18:48installing some new valves and
18:50bypassing. So, that will get us through
18:53>> the historically um the historic area of
18:57where you've had most of your breaks, I
18:59believe, and get those lined
19:02>> stretch definitely.
19:03>> Yeah. So, again, approximately 2,700 ft.
19:06Um the low bidder was actually about
19:08900,000 under the engineers estimate at
19:11just over 2.4 million. And now it's Rard
19:14Ricardi brothers. I think they've done
19:17some work for the town before. I think
19:18they're out of Framingham.
19:19>> No, they're wor actually West I think
19:22they might be in West Bo.
19:24>> They they bid the uh the lining.
19:26>> Yeah. So none of the It's interesting
19:29because of the digging none of the
19:31lining companies bid it. So Insich Form
19:33didn't bid it themselves. National Water
19:35Man, any of the lining companies, it the
19:38the construction companies bid it
19:41>> and they're going to sub out the lining
19:42to the bigger companies to the lining
19:45companies.
19:45>> To the lining companies. Yeah.
19:46>> So, it's kind of a I think a a mix and
19:49match of
19:51>> is it a lining project or a construction
19:53project, right?
19:54>> In order to get the access pits to do
19:56that lining. So, I think they can line
19:58comfortably 600 ft at one time without
20:02having to get access. So that's why we
20:04have to do the access pits for that for
20:06that length.
20:08>> And going under the railroad tracks in
20:10the brook is going to be pretty
20:11interesting because we're going to try
20:13and um take out of commission the
20:17gravity main and run a temporary force
20:19main from the pump station through the
20:21gravity main into a pit and then bypass
20:25from there the rest of the sewer main
20:27while they do the lining. So
20:30it's going to be an Yeah, it's going to
20:32be an interesting process. I want to see
20:33that one.
20:34>> You will. [snorts]
20:36>> There's a lot of flow going out of that
20:38station.
20:38>> Um, but they're going to anything coming
20:40from Route 12 will be captured before it
20:43gets to the pump station. So, the only
20:45flow going to the Sword Street pump
20:47station will be coming from the private
20:49resonance up and above it, I guess, east
20:52of the pump station. So, that pump
20:54station does anywhere from, say, 250 to
20:57400,000 gallons a day, right?
20:59>> It's not the biggest, it's not as big as
21:01Holstrom. So, um, yeah, it'll be
21:04interesting to see how they do it. The
21:06engineer kind of left it up to the
21:08contractor on means and methods for
21:11bypassing.
21:13>> So,
21:16>> so Ricardi Brothers was pretty cheap,
21:18huh?
21:18>> They were. They seem to have pennied a
21:20lot of the paving issues, which is
21:22interesting. I mean, you can kind of
21:23look at it if you want and and see.
21:25>> Yeah. I'm not It's interesting to see.
21:28But so, the the engineer is going to be
21:30review. currently reviewing these. We're
21:32meeting on Monday to get their
21:34assessment of the bids and their review
21:36of the contractors themselves and a
21:39recommendation from them and for your
21:42next meeting. I don't know if you guys
21:45if that has to come in front of the
21:46commission for approval or if that just
21:49goes from us to Dory.
21:53But I'll follow up on that and depending
21:55on where we land,
21:57>> we were hoping to have this project done
21:59this construction season,
22:02>> but I'm not looking to have my first
22:04project with the work on Route 12 get
22:07jammed up and have to go into winter
22:08with open pits on Route 12.
22:10>> I ain't going to plug. So, they're going
22:12to probably start some of the work and
22:13get some of the valving in place to
22:15bypass from the pump station and then
22:17come spring start with the, you know,
22:20digging the the pits and starting with
22:22the bypass. You know, that that'll give
22:24them time to get a good bypass plan in
22:26place.
22:27>> Yeah.
22:27>> And figure out the best way to do it.
22:29>> Very good.
22:31>> So, they'll probably do some some of the
22:32light lifting this fall and start next
22:34spring for this project
22:37>> because there's still going to be quite
22:38a quite a bit of flow coming. [snorts]
22:40Yes.
22:42>> Always is.
22:44>> All right. Old business
22:47home station.
22:48>> Yeah. So, I'm still working with the
22:49property owners there in that area,
22:51whether it be I'm I reached out to Home
22:54Depot and got in touch with one of their
22:55land use attorneys. So, hopefully we can
22:58get an easement from them and from the
23:00property owner um at 39 Prospect Street.
23:04Still working with him as well. So, uh,
23:07that is definitely a work in progress.
23:09And,
23:10um, yeah, emails, returns from Home
23:14Depot aren't extremely quick.
23:16>> They are.
23:17>> They are not.
23:18>> Well, I was wonder they they seem
23:20receptive though.
23:22>> It was a very quick conversation. It
23:24took me probably a month to get from the
23:26store manager in Auburn to an attorney
23:28to talk to. So,
23:31>> he didn't say no right away, but I also
23:33emailed him a um possible plan and I
23:38haven't heard back from him and that was
23:39probably a month ago also. So, yep,
23:43we're in that hurry up and wait phase
23:45unfortunately.
23:46>> Lo, I went to a project in West Bro and
23:49they wouldn't let a guy come do an east
23:51through the property.
23:52>> What?
23:52>> And it was a it was different dynamic
23:55than that. was private owner of
23:58property.
23:59>> And
23:59>> so
24:00>> the kicker was the force made for the
24:02sewer plant went right by this property,
24:05but they couldn't tie it and they
24:07couldn't grab it. They they were trying
24:09to figure out a way to get it to
24:11somewhere gravity and one of them was
24:13going through the parking lot, but
24:15Lowe's said no. So
24:17>> the only good thing is this isn't going
24:18through any part of their parking lot or
24:20any part of their
24:22>> operational portion of their property.
24:24So
24:24>> over the wall. Yeah. So hopefully that
24:26that's a plus for us. But
24:29>> we've had to uh
24:32in five and we've had to walk that
24:35>> brush rises. Yeah.
24:36>> It's a long [snorts] walk.
24:40>> Okay. Um next item day of the next
24:43meeting.
24:47>> Send out an email and see available
24:49dates. So Wayne's not here also. So
24:53>> fill it out. Nobody knows yet.
24:57>> We'll try and do something the next four
24:58to six weeks. Maybe end of September,
25:00beginning of October.
25:02>> Yeah.
25:02>> Does that work?
25:03>> Oh, it's, you know, we're not really
25:05overwhelmed with things.
25:07>> No. So,
25:08>> no. Things are going okay.
25:10>> Yeah. The four to six weeks sounds good.
25:11>> Okay.
25:12>> I'll I'll make out with that u that
25:14break
25:16>> at Hol at not Holston, but South Bridge
25:19Street Court.
25:19>> Yeah.
25:20>> As good as could be expected.
25:21>> Yeah.
25:22>> Yeah. That's your second
25:24most volume pump station,
25:26>> right?
25:26>> So, learned a little bit,
25:28>> right?
25:28>> Uh came up with a emergency action plan
25:31if that pump station goes down again.
25:34>> Yeah.
25:34>> So, I found an older emergency action
25:36plan for Pinrock. Uh worked through that
25:40and I came up with I'm working on
25:42creating emergency action plans for
25:44Pinrock, Holstrom, and Sword because
25:46those are your three biggest stations.
25:48that way there. If they go down it, we
25:50know to get 12 trucks and put the three
25:54trucks here, three trucks here, four
25:56trucks there.
25:57>> So, no, no matter who's here, the
26:00blueprint is in place.
26:02>> I mean, pinrock is just going to be I
26:04don't want to say open prey, but it's
26:06>> We have a plan. It's 30 trucks. It's a
26:09lot. You know what I mean? You have to
26:11shut down Holstrom. You have to shut
26:12down Sword Street. You have to bypass at
26:15Pinrock and bypass the other two. pin
26:17rod should be all set now because we put
26:19that bypass line in. So,
26:21>> but if the pumps go down, if some if
26:23there's a catastrophic failure
26:25>> in the pumps.
26:26>> Yeah.
26:27>> At the station,
26:28>> right?
26:28>> That fine rock station you 30 trucks.
26:32>> Yeah.
26:32>> I don't know where you're going to put
26:33them.
26:34>> Well, again, I think once you shut down
26:36Holstrom and Sword, that probably
26:38eliminates maybe hopefully half of the
26:41flow.
26:41>> Yeah. So then you only have to
26:43accommodate half of the flow going to
26:44pinrock which you could get from
26:46manholes coming from the um garter drive
26:49easement.
26:50>> Yeah.
26:50>> And because you you're not getting
26:51trucks into the pinrock pump station
26:53parcel.
26:54>> No.
26:54>> So you're going to have to grab it
26:56upream at manholes and that was kind of
26:59the trickiest part to identify those.
27:01>> Yeah.
27:01>> Pull was okay. Sword street was a little
27:03bit easier because it's a lot less flow.
27:06>> Those structures are they available that
27:09you were going to pull out of? I've
27:11identified a few of them. Um, and I
27:14think again if the station goes down and
27:16it starts searchcharging into the
27:18collection system, those those
27:20structures will be pretty much reserved
27:23capacity and you'll be able to you won't
27:25be drawing off of a half a pipe of flow.
27:28You'll be drawing out of a submerged
27:30manhole with enough flow coming into it
27:32that Well,
27:33>> I'm just talking about they're
27:34accessible. Yes. Some what I've
27:36identified, some of them are accessible
27:37on uh different portions of the um the
27:41trailer park property that's there.
27:43>> I I tried to look through our GIS and
27:46identify manhole covers that we can get
27:49tractor trailers up to and the the
27:518,000galon tankers up to suck out of.
27:54>> Very good.
27:56>> Y how's that uh easement
28:00>> that's been as far as maintained? Um,
28:04we've got that collapse on that on that
28:07easement there on that on that force
28:09man. Has anybody gone up to
28:12>> Goddard is gravity main?
28:15>> Gravity main.
28:16>> There's a there's a there's a break in
28:17the pipe up there by by the brook.
28:20>> So I we have been up there. We've
28:23maintained it where there's
28:26>> you're talking about where the two pipes
28:27come in together where it crosses the
28:29brook.
28:30>> Yeah.
28:31Okay. I mean, I I looked at it. I didn't
28:33see any evidence of a
28:35>> They came there's not a break there.
28:37There's a collapse on the top of the
28:39plate.
28:39>> And it's and it's not it's not that was
28:43going to be part of the project when
28:44they when they go up there to do the
28:46lining and all that other stuff along
28:47with the access road we talked about.
28:50>> Yep.
28:50>> Uh
28:51>> so that's again I kind of let that sit
28:54and let that be part of So after we get
28:55through Sword Street.
28:57>> Yeah. the funding, town meeting funding
29:00was for Sword Street and Goddard Street.
29:02>> Yeah.
29:02>> So, I think we'll see what we have left
29:03based on this and then pivot to Goddard
29:08Drive instead of doing phase two of
29:10Sword
29:11>> which gets you up through Jerome AB and
29:13stuff like that. I think GDDARD would be
29:15a better more of a priority to help with
29:18the infiltration.
29:19>> Yeah. So use the funds and that's when
29:22again during that design and talking
29:24with the engineer I believe that the
29:26design of God is probably 50% done.
29:29>> Yeah, that sounds about right.
29:30>> And I can ask him about that collapse
29:33and if they're aware of it and what
29:35they've kind of done, but I've been
29:36focusing mostly on Sword Street with
29:38them.
29:38>> Yeah.
29:39>> To kind of get this project going.
29:40>> Yeah. Because that's that's going to be
29:41a major
29:43>> to to do that if it's under the stream
29:45bed where those where the granite is for
29:47the crossing.
29:48>> Yeah.
29:48>> Yes. That's going to be
29:50>> right
29:50>> not not simple.
29:51>> And we we had
29:54this has happened a couple years ago.
29:56They they found it when they came in. Um
29:59summer time was the best time to go up
30:00there while there was no flow in that in
30:02that seasonal brook to go up to do
30:04anything to maybe put a repair on that
30:06or something. Judges something for the
30:08time being. And uh
30:11even Nick said it didn't it wasn't that
30:14that much of a concern as far as
30:17collapsing, but to that they were going
30:19to monitor it and keep an eye on it. So
30:21>> Okay.
30:22>> I I think something that that we should
30:24keep an eye on, you know, send send the
30:26boys up with the camera and and
30:27>> Yeah, we should be able to get that. I
30:29know they they did some um easement
30:31maintenance, so we should be able to get
30:32the van down there.
30:33>> Yeah.
30:34>> To get [snorts] that done. just just to
30:36keep an eye on.
30:37>> It's been a while, too, since they
30:38looked at it. Be good to take another
30:40eyes on it.
30:41>> Yeah.
30:42>> I' Every couple of months I' I'd be
30:45taking a peek at that.
30:46>> Okay.
30:48>> Just to make sure cuz if that collapses
30:50and shuts off that easement.
30:53>> Yeah, that's understood. [clears throat]
30:56[laughter]
30:57>> Yep. Understood.
30:58>> That one won't be fun.
31:00>> Motion to adjurnn.
31:02>> We're all set. Make a motion.
31:05All in favor?
31:06>> I.
31:07>> Those opposed.
31:09>> Thank you, gentlemen.
31:10>> Thank you much.
31:16>> [music]