2026-08-12 - Conservation Commission
Summary
Written from the auto-generated captions; names and numbers may be misheard.
- Chair Michael Garland opened the hybrid meeting; Megan Langley, Ricky Aris and Natalie Bickford were among the members present, with the Public Works Director Joanna Paquin joining remotely.
- A homeowner on Riverside Drive asked to remove a dying maple about 8 feet from a pond and trim overhanging oak branches; after the hearing closed the commission issued a negative determination with conditions: cut the stump flush without digging, haul off all debris and chip it at the street, keep refueling and debris away from the pond.
- The commission opened the notice of intent hearing for a 6,400 sq ft multi-tenant commercial building with a drive-through at 481 Washington Street (Route 20) on a former gas station lot, work in the buffer zone to a wetland. Members asked about leftover underground fuel tanks (cleanup timing not known to the engineer), added pavement in the 100-foot buffer (nearest about 62 feet), and the Elm Street intersection; the hearing was continued to August 26 at 7:10 so members can visit the site.
- A long discussion of erosion on South Street and Church Street: the road contractor, J.H. Lynch, had not filed a notice of intent, relying on its stormwater permit, and its silt controls proved ineffective in July storms (one near 4 inches). Town staff said the contract requires following local rules, that the town did not control the contractor's methods, and that stronger controls such as double-row silt fence were needed. The contractor said work would finish by mid to late September.
- The chair said an enforcement order and fines against the contractor were warranted, but members preferred to wait for an outside assessment. A motion, amended by Megan Langley, passed to hire a consultant to evaluate any resource impact, how the contractor's stormwater plan was not followed, and to recommend erosion controls for similar future projects. A consultant had not yet been chosen.
- The town's wish to reinstate the revoked blanket order of conditions was sent to the August 26 agenda; the commission said the town must come in with its arguments. A later note said paving or milling within 72 hours may be exempt, but drainage work is not.
- Extended the order of resource area delineation for 100 Milbury Street (Auburn Industrial Development Corp); the wetland line has not changed and the owner has not decided on a use.
- Minutes of July 22 approved. A member recorded the view that the contractor, who controlled the means and methods, was responsible for filing and installing erosion controls. Another member reported a storage site off Route 20 with silt-filled straw wattles and sediment reaching a wetland; the commission agreed to send that owner a copy of its earlier enforcement order rather than issue a new one.
Issues discussed
- South Street and Church Street Erosion Review
- 481 Washington Street Drive-Through Development
- DPW Wetlands Review Procedures
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:05[music] Uh good evening. This is the uh
00:08August 12 26 open meeting of the AR
00:10conservation
00:12which is being operated as a hybrid
00:14format under chapter of the act of 2022.
00:18The public can join the meet remotely
00:20telephone by24-5-3412
00:26and then entering access code 65-782-37.
00:32They can join via computer at
00:36meetgo.com
00:41conference room one. All supporting have
00:45been provided to the commissioners and
00:47are also available on the town's
00:49website. The public is encouraged to
00:51follow along using the posted agenda. My
00:53name is Michael Garland. I'm chairman of
00:55the commission. And before we start, let
00:56me confirm who is here. When I call your
00:59name, please respond the affirmative.
01:00Megan Langley
01:01>> here.
01:02>> Clammo here.
01:03>> Ricky Aris, Mark Kit
01:05>> here,
01:05>> and Nat Bickford
01:06>> here.
01:07>> All right. Please also be advised this
01:09meeting is being recorded by Arban Cable
01:11Television. If anyone is going to um um
01:16participate in the meeting or for
01:19sign item sheet that Miss Bigfford has,
01:22uh please sign your name and also
01:23identify yourself by your name and also
01:25who you represent. So item on our agenda
01:29for this evening is a 7 p.m. public
01:31hearing. Um, Enman, a request for
01:34determination of applicability to remove
01:36a damaged tree and remove uh branches
01:39overhanging the single family home at 14
01:42my drive. Is there a motion open?
01:44>> Motion open.
01:45>> Is there a second?
01:46>> Second.
01:46>> Is there any discussion? All those in
01:48favor say I.
01:50>> I vote. Is that
01:53>> please join us?
01:57Yes.
01:59Sweet.
02:05So, Miss 14 Riverside Drive in Auburn.
02:08>> I do.
02:09>> And you submitted a request for
02:10determination of applicability because
02:12you want to take down
02:16It looks like you want to take down a
02:17tree and then remove some oak. Is that
02:20right?
02:20>> Correct.
02:21>> Okay. Um, can you just describe the
02:24maple tree? Is it Is it dying? Is it
02:26dead?
02:27>> It's been dying for like years. There
02:29was an explosion on that property uh 30
02:3335 40 years ago.
02:34>> Okay.
02:35>> Big explosion and how is remaining and
02:39it's slowly shedding
02:42large pieces.
02:44>> So if there's a strong um windstorm
02:48>> I'm I'm afraid.
02:50>> Yeah.
02:51>> Yep.
02:52>> Right. Uh and if I also read in your
02:54application that you are going to hire a
02:56professional tree cutter to do this for
02:58you. Maple tree.
03:00>> Okay. The maple tree is gonna be cut and
03:02that
03:03>> that's the name of the coloring company.
03:04Oh.
03:04>> Oh, sorry. Maple tree.
03:07>> Is maple tree cutting a maple tree is
03:09going to cut the maple tree
03:10>> and the branches and the oak.
03:12>> Okay. All right.
03:14>> Yeah, the squirrels use the oak tree
03:15like a highway.
03:17>> Squirrels will do that. Um,
03:19>> it's like right on my roof.
03:21>> Okay. All right.
03:22>> So,
03:22>> and when do you think you would want to
03:24have this work done?
03:25>> As soon as I can.
03:26>> Okay. [clears throat] And um any what's
03:31or know how will the tree dis um cutting
03:34company dispose of the maple tree
03:36they're going to cut down?
03:38>> I I never asked but I assume I guess I
03:41shouldn't assume.
03:42>> I assume they'll take it with them.
03:44>> Okay. Or maybe Okay.
03:46>> Yeah. No place really to dump it in my
03:49yard. So
03:50>> Well, they're [clears throat] not going
03:51to We don't want them to put it in the
03:53pond either.
03:53>> No, no, no, no, no. [cough]
03:55[clears throat]
03:55>> Okay. I know
03:58crap in that pond already.
04:00>> You're right.
04:03>> I did go up for a site visit. This was
04:04back in June. Um that maple tree, as you
04:06can see in one of the pictures, is like
04:088 ft off of that like where the water
04:10line is.
04:11>> Um it is Yeah. not in great shape. Um
04:14definitely poses a threat. And that oak
04:15tree, as you can kind of see from like
04:17that first page of pictures, like a lot
04:19of those branches kind of overhang that
04:21house and also pose a threat. I know um
04:24like vista pruning is considered like a
04:26minor activity um but like the full
04:28cutting of that maple tree is definitely
04:29something that you guys would need to
04:31consider.
04:31>> Sure.
04:33>> The oak branch is a dead
04:34>> but like given its proximity to the pond
04:38definitely want
04:40>> I understand.
04:42>> Okay. Um I appreciate that you follow
04:45the rules. Some people don't. I know.
04:46>> Um
04:48>> I have no more uh questions for Miss
04:50Enman. Does anyone else have any
04:51questions? No.
04:53>> Um, do you know know if they would be
04:55just like leaving the roots intact? Like
04:57just cutting it, leaving the roots
04:59intact? I was being perfectly honest. I
05:02that so I don't know,
05:05but um I've already estimate of what it
05:08will cost to have it taken down. So
05:10they've already looked at it.
05:11>> Okay, that's fine. Other than that.
05:15Okay.
05:18Um, if there is there any comment from
05:20the audience
05:24there being none, is there a motion?
05:27>> I make a motion to close.
05:28>> Is there a second?
05:29>> Second.
05:30>> Any discussion?
05:32>> All those in favor say I.
05:34>> I.
05:34>> Opposed. It's a vote. Okay.
05:38We will no likelihood render a decision
05:40uh tonight and you will be notified.
05:42>> Okay.
05:43>> So, thank you for coming in. We
05:44appreciate it.
05:45>> Thank you. how follow what the next
05:47steps are. Okay, next I
05:50>> basically came for like
05:51>> do I have to go or not? And
05:53>> okay, we appreciate everything.
06:04>> The next matter on our agenda is 705
06:06public hearing. Matthew Doyle with
06:08Brandon Realy Group 2 LLC. a notice of
06:11intent for a proposed new commercial
06:15uh to be 481 Washington Street. Is there
06:18a motion to open?
06:20>> A motion to open.
06:21>> Is there a second?
06:21>> Oh, second.
06:22>> Any discussion? All those in favor say
06:24I.
06:25>> I. I.
06:26>> Opposed? It's a vote. Is there anyone
06:28here on behalf of Brandy Realy? Yes.
06:32Yep.
06:50Good evening. Uh, good evening
06:51everybody. My name is Alex Wood. I am a
06:54civil engineer at EIT with Thompson Lon
06:56Associates and I'll be our applicant at
06:5941 Washington Street. Okay.
07:27Great to the chair if I may. We just
07:30have a three presentation to describe
07:32the project.
07:33>> Sure. Please proceed.
07:34>> Thank you. We have brought with us um
07:38the plan set here. Um so right now we're
07:39looking at the existing conditions of
07:41the site. Um so the address is 481
07:44Washington Street. It is bounded by
07:46Washington Street, Route 20 um and Elm
07:49Street. And the lot area is
07:51approximately 1 1/2 acre. On the
07:54existing lot, there are structures such
07:56as um concrete pads and bolards and
08:00gasoline pumps used to uh stand there
08:03anymore. Um there's also a convenience
08:06store building located on the site. Um a
08:09storage shed, some existing parking
08:11spaces, the existing impervious cover is
08:14approximately 19,000 square ft.
08:17Uh the applicant has filed a notice of
08:20intent um for work within the 100 ft
08:22buffer zone for wetland resource area
08:25located on the easterly portion of the
08:27site.
08:33And this is the um proposed conditions.
08:37Um the applicant using to construct a
08:406,400
08:41ft² multi-tenant commercial building. It
08:44would feature a Duncan restaurant with
08:46drive-thru as well as additional
08:49business or retail use. Uh the site will
08:52feature parking uh drive-thru as well as
08:56associated grading, storm water
08:58improvements to mitigate runoff and
09:00landscaping improvements.
09:02Um there is no proposed um impervious
09:05pavement within 50 ft of the resource
09:07area and there is no um proposed work at
09:10all um within 25 ft of the resource
09:13area.
09:14The proposed building roof will be
09:17routed to subsurface infiltration um for
09:19mitigation of runoff
09:22and paved parking areas will enter a
09:25system of great inlet water quality
09:28separators as well as uh catch basins
09:31with deep sump and um hoods which then
09:34go into water quality units prior to
09:36inflation effectively achieving uh the
09:40that's required.
09:42The site is located within a zone 2 to a
09:45public water supply um and the aquafer
09:47and watershed protection overlay
09:49district. Uh in terms of zoning, it is
09:52located within the general industry um
09:54district.
09:56Uh so given the zone two and the
09:58proximity to the wetland resource
10:01u and the proposed condition which will
10:03result in an impervious cover of
10:05approximately 35,000 square ft for
10:09measures will control the outflow
10:11leaving the site such that the post
10:13development has a lesser peak rate of
10:15flow than the pre-development conditions
10:17and the quality is um achieved per
10:21standard 4 of the Massachusetts D
10:23standards for um total suspended salt.
10:25college removal as well as the local
10:28Auburn um bylaws
10:30and discharge is only expected for the
10:32subsurface chamber system for the
10:34100-year storm and it will be controlled
10:37um and we don't anticipate in our
10:41calculations any discharge from the
10:42system in the two 10 or 25 year storms
10:45that were tested.
10:48Construction period erosion and
10:50sedimentation controls will be utilized
10:53such as sill fences
10:55a sight entrance mat. Um and then
10:58permanent uh features are cited for the
11:01slopes in the proposed condition. So the
11:04slope on the easterly side towards the
11:06wetland resource area um in the area
11:09we're creating. I'll flip over to the
11:12grading plan. A conservation seed mix is
11:17stabilizing that side.
11:20So that that is this slope here and
11:23other site slopes uh are designed at 3:1
11:28horizontal to one vertical and will be
11:30uh stabilized accordingly um per the
11:32details provided in the set.
11:36Um existing trees will be protected to
11:38the maximum extent predictable
11:40uh and additional new tree plantings are
11:42proposed per the landscape plan. The
11:45applicant has also applied to the
11:46planning board and the zoning board of
11:48appeals. And uh with that, I'd be happy
11:51to answer any questions. Thank you.
11:54>> Are there any underground um tanks still
11:58on site at the property?
12:00>> So, from what we are aware of um from
12:01the owner on site now, what we've been
12:03told is that there are um tanks in the
12:06vicinity of this region of the site
12:08alongside Route 20 on the Westley
12:10portion.
12:11>> Mhm. and we are not in um the cleanup of
12:14those activities, but we are aware that
12:16the applicant is um consistently
12:18pursuing that um with owner um of the
12:22>> I'm not I'm not sure I understand. Are
12:24they going to remove them or are they in
12:26negotiations to remove them?
12:27>> Um I'm not sure what the final
12:29mitigation strategy is for the tanks. um
12:32we're not in that phase of work, but
12:34obviously we would that to be handled
12:36prior to going in and doing any earth
12:38work or installing, you know,
12:39infiltration infrastructure. We of
12:41course would want to validate the uh
12:43conditions in the field there proposing
12:45mitigation like that.
12:46>> So that's something that's being lean
12:49petroleum.
12:50>> Correct.
12:52>> Um have they and they haven't given you
12:55any idea what the timeline would be for
12:57the removal of those tanks? Uh we aren't
13:00privy to what the timeline is for the
13:02removal of it. Um at this point we're
13:04just seeking the local approvals for the
13:06itself.
13:06>> I understand that. But you can't get
13:08started until the tanks removed.
13:10Correct.
13:10>> Certainly. Um prior to excavating the
13:14and installing anything. We certainly
13:16understand that. Yes, that would be a
13:17requirement.
13:18>> Okay. And then as a result of um this uh
13:22proposal, are you going to be increasing
13:24the amount of impervious area at the
13:25site? Um yes the impervious um overall
13:29coverage will be increased but in terms
13:31of the net impervious runoff um there
13:33will be a substantial decrease from the
13:35existing condition as the existing
13:37pavement um follows a natural
13:39hydrarology path into the street
13:42infrastructure um and there are existing
13:45um drainage structures including one in
13:47the mass uh DOT u state highway layout
13:51here but we are proposing to rather and
13:56any flow towards the street. We're
13:57proposing on-site mitigation to direct
14:00that flow back into the site to be
14:02treated and then infiltrated. So, we
14:04believe that the proposed condition will
14:06offer reduction in the peak rate of flow
14:09and we'll have
14:11water quality treatment by use of the
14:13hydrodnamic separators.
14:16>> Okay. And what would the schedule be to
14:18clean those
14:20>> in terms of the existing site to get
14:22that out? Well, I'm saying as part of
14:24your proposal, um there would be some
14:26sort of maintenance schedule. Correct.
14:28>> M maintenance for the um drainage
14:30infrastructure. Yes. If I understand
14:31correctly,
14:31>> yes. Um yes. So water report, we have
14:34outlined u a construction period as well
14:36as a long-term operation and
14:38maintenance. We have provided um a
14:40cleanup schedule for routine and
14:42detailed what the responsibilities of
14:44the site owner will be to maintain a
14:46functioning and healthy system. Okay.
14:52I don't have any other questions at this
14:54time. Uh would open this up to other
14:57members of the board.
15:00>> Um
15:02yeah, mine is about the tanks as well.
15:07This
15:09resurface [clears throat]
15:10subsurface storage tanks to be filled
15:12with
15:14I'm not sure um what the DP directive is
15:18on that. Um, I thought in
15:20[clears throat] most cases the preferred
15:22method was to just remove them, you
15:25know. Um, but that's something we see if
15:28they have a specific protocol on those.
15:31Um, you wouldn't happen to know how how
15:34long ago those um the the gas pumps were
15:38discontinued, would you?
15:40>> Um, I I don't that I know that since
15:42we've um seen the site, which is within
15:44the past year they they've been gone.
15:46Um, I don't know the exact date when
15:47they were
15:48>> Okay.
15:49It's were removed like 5 years ago. It's
15:52more recent than that as far as you
15:54know, right?
15:54>> Um but it's hard for me to say. I'm I'm
15:56not
15:58>> Okay.
16:01>> Any other questions from the board?
16:03>> What's the total amount of So like the
16:06[clears throat] vegetated area that's
16:07going to be cleared?
16:09>> Sure. What's the dominant is that mostly
16:11like woods or just kind of scrub or
16:15>> so um that primarily that region would
16:18be um on the plan here we can see
16:22actually let's let's we go to the
16:24erosion control plan
16:27which is sheet um C12.
16:35So off of the existing site, off of the
16:38uh curb and and paved area here, the
16:42existing tree line is is being
16:44effectively pushed back um as you saw on
16:46the other sheet to you know about to to
16:49the work line here as shown by where the
16:52sil fences will be. Um in terms of the
16:54dominant vegetation, I mean it's you
16:57know pretty standard. It's it's wooded
16:59for sure. Um
17:01we're proposing plantings on and slope
17:04stabilizing features but yeah
17:06effectively that will be maintained uh
17:08we won't we aren't proposing to make any
17:11alterations um as
17:14that vegetation toward the resources
17:25you're going to build to the um the
17:27buffer zone.
17:29to the buffer zone itself or to the
17:31resource area if I just want to picture.
17:33>> How about each each? Sure. So, uh in
17:36terms of buffer zone, uh there's impact
17:39within the 100 ft zone in terms of the
17:42proposed impervious surf.
17:48So, flipping on over to the grading plan
17:51here.
17:52>> What sheet is that?
17:53>> This is sheet U C3.
17:58So within the 100 foot buffer zone um
18:00the impacts included pavement um to a
18:03nearest point of disturbance
18:06approximately 62 ft. It's actually it's
18:08not shown with dimension um and the
18:11infiltration measures are sit u 50 ft or
18:15greater outside uh from the resource
18:18area and then grading itself is situated
18:21greater than 25 ft away. So alterations
18:24within the 25 ft buffer there is u
18:28minimal grading um and a storm water
18:31discharge within the 50t and then there
18:33is pavement within the 100t
18:39>> and is that replacing existing pavement
18:41or pavement? Uh the new pavement is uh
18:47it yes if I understand your question it
18:49it is an expansion like the the existing
18:51pavement on site is not in uh the 100
18:53foot buffer zone. This is all part of
18:55the expansion for the parking use.
18:57>> Okay.
19:03>> Any other questions from the board?
19:06Any questions from New?
19:08>> Yeah. Where where was the corner of Elm
19:12and Tony?
19:13>> What's there now?
19:15>> So, uh the ex the existing site there's
19:17a convenience store located about here
19:20and there's a car
19:22>> and there's a stop sign and it's fourway
19:24crossover.
19:25>> Yeah.
19:26>> Yeah. Yeah. That's this intersection.
19:28>> Good luck. They they are lined up now
19:31past the railroad tracks to get out of
19:34that street. And I live off of that. I
19:36live on Riverside which is going towards
19:39Milbury. Good luck. They use it as a
19:41shortcut.
19:42>> Really?
19:42>> The tracks trailers coming through. Yes.
19:44Yeah. It's a pig study. Let me tell you
19:48it's good luck.
19:49>> I appreciate
19:52I I appreciate you hearing it too. It's
19:54like whoa. Yeah. It's over the years.
19:58Let me tell you.
20:00>> Uh, so when are you going back to the
20:02planning board?
20:03>> Uh, the continuous date. I I believe
20:04it's in the early September. I believe
20:06it's September off the top of my head.
20:08>> Okay. I I'm familiar with the driven
20:11past it from too many years, but um I I
20:14think I would like to take a look and I
20:16didn't have a chance to get out there
20:17before tonight's meeting. So um would
20:21you asend to continue the public hearing
20:23this matter to our next meeting which is
20:24on August 26th?
20:26>> August 26th. Uh
20:28>> that's a two weeks
20:30>> as long as um you know unless the
20:33commission would be amendable to
20:34incorporating a site as a condition of
20:36you know as a part of order of the order
20:38of conditions. Um if you don't see a way
20:40other than to come back then we would be
20:42amendable.
20:42>> Yeah. We've never done that.
20:44>> I understand. I figured I would ask for
20:46the on and that's fine. And again
20:49>> it's it's we understand we would be
20:51>> we want to you know put eyeballs on it
20:53and u I think a site visit would be
20:55helpful in this case. And you don't have
20:58to come if you don't want to. That's
20:59fine because we all have different
21:02responsibilities. We can we don't have
21:03to go out there as a that's always fun.
21:06But um I'm sure we can get out there
21:08before our next meeting.
21:10>> That that would be great. And I'm sure
21:11the applicant would be amendable to
21:13that. But uh in the meantime on on
21:16behalf of the applicant um if the
21:17commission has any u further questions
21:20or anything, you email us. Our email is
21:22on the application.
21:24>> Okay. Very good. Um, Matt, do we have
21:26anything currently scheduled for August
21:2826th?
21:29>> Uh, yes, we do have a couple events.
21:31>> Okay.
21:31>> So, what would be a good time for this
21:33um continue hearing? 7:10.
21:36>> I can do Yeah, I can do 710.
21:38>> All right. So, can I have a motion to
21:40continue the public hearing for uh
21:42Branded Realy Group 2 LLC
21:45um to August, 2026 10.
21:50>> So, moved.
21:50>> Is there a second?
21:51>> Second.
21:52>> Is there any discussion? All those in
21:54favor say I. I.
21:55>> I. Opposed. It's a vote.
21:58>> All right. We will um see you in two
22:00weeks and we will get out to the site
22:02before then.
22:04>> Right. We greatly appreciate it. Thank
22:05you. Have a great night.
22:06>> Thank you.
22:44Okay.
22:48So the next matter for discussion
22:51relates to
22:53work that is is being continues to be
22:57done on South Street and Church Street.
23:00I noticed that we have um remotely
23:03members
23:06Joanna Pinuin. Hello Joanna.
23:10[clears throat]
23:11Good evening.
23:14And I see
23:18sign in.
23:21>> And who? Okay. So, um, gentlemen, I
23:25presume you're here.
23:26>> Correct.
23:27>> And who do you represent?
23:28>> JH Lynch.
23:29>> Identify yourselves, please.
23:31>> I'm, uh, Greg Lynch Jr., vice president
23:32of JH Lynch.
23:33>> And you are, sir?
23:34>> Jonathan Cardos, your general counsel
23:36for JH Lynch.
23:37>> What [clears throat] firm are you with?
23:38>> Uh, Lynch.
23:40>> Okay.
23:41>> I work You look very familiar, though,
23:42sir. Did you uh practice in Rhode Island
23:44by any chance?
23:45>> I do practice in Rhode Island.
23:47>> Okay.
23:47>> Well, thank you. I guess that's good,
23:48right?
23:50And Mr. Lynch, you and I spoke three.
23:52>> Yes.
23:54>> So, um in the 3 weeks that have um gone
23:59by since our conversation and since I
24:01had a chance to observe the site
24:03conditions, uh I've been able to obtain
24:06more information uh from the town. Um, I
24:10had an opportunity to look at um the
24:13SWIP that was filed.
24:15Uh, and I have um I have many questions.
24:18Um, so Mr. Lynch, I I'll be honest with
24:22you. I was back when we had a
24:24conversation on July 22nd. I asked you
24:27about emergency control measures and you
24:29offered to install them when they should
24:32have been installed before
24:35being done on South Street and Shirt
24:36Street. And um again in doing my
24:40research and kind of wrapping my head
24:41around this um my understanding and and
24:45I would also invite the town to jump in
24:46if I get any of these facts wrong. My
24:49understanding was that um town of
24:51Barburn uh put out to bid uh
24:54infrastructure um improvement or
24:56replacement which out of necessity would
24:59require uh the roads to be uh redone if
25:03for lack of a better term
25:04>> on South Street and Church Street. Um
25:08Lynch was the low bidder started to do
25:10the um I believe in June and that that
25:14work continues. Um [clears throat] what
25:16I don't understand is that since
25:20since Lynch was the contractor
25:22uh why Lynch did not file with the board
25:26with our commission of intent. I know JH
25:29Lynch has been in business for many many
25:31years. I know this is the type of work
25:33that you routinely do for municipalities
25:37and again for the life of me I don't
25:38understand why no notice of intents.
25:43Now, it's been said to me, well, you
25:46know, have anticipated um the rainstorms
25:50that we had um in July and I believe
25:53over the weekend there was I think on
25:55Friday night there was a and my attitude
25:57or my response to that is I don't
25:59believe it. Um when it rains it pours
26:02and literally it does that. The storms
26:05that we had were not even from my
26:07vantage point significant storm events.
26:09There were periods of intense rain but
26:12in terms of actual uh quantities uh they
26:15were not significant but because of the
26:18volume of those or the um I guess the
26:21intensity of those storms it caused with
26:24um with was being in there in their um
26:29condition where um the infrastructure
26:31had been installed but had not been um
26:35were certainly not in a position where
26:37they there was aer
26:39uh any sort of uh finished condition. Um
26:44there there was erosion. I have to
26:47believe believe that uh silts got into
26:51um into wetlands. Um there's a wetland
26:54crossing on South Street. There's
26:55another one on Church Street. These are
26:58um I think very obvious. And um I mean
27:02aside from
27:04uh I believe causing delays for you uh
27:08and my understanding is that it has also
27:11uh caused uh the the town to uh incur
27:16additional expense because of of their
27:19their need to um remediate problems uh
27:22on both of those those roads. And so
27:27I guess what I would like to know is why
27:31and just having a SWIP, and I understand
27:34you got your permit from D, but just
27:35getting a SWIP does not to my mind um uh
27:40remove your responsibility to file a
27:42notice of intent with our town. And um
27:45and again,
27:47given the fact that Lynch, this is what
27:49Lynch does and has done for many years,
27:51I am just at a complete loss why he
27:53didn't do it. And so if you can provide
27:55me with an explanation, I am all ears
27:58right now.
28:00>> Well, uh, we haven't done work in this
28:02town for, uh, seven years now.
28:04>> And, uh, I believe the town would
28:07usually take care of that kind of a
28:08situation for us. We've been doing a lot
28:10of resurfacing work in this town before.
28:12Uh, this is a very decently large
28:14drainage project and, um, I I believe I
28:18figure the SWIP would take care of the
28:19notice of intent on that aspect of the
28:21project.
28:22>> How so, sir? when you say that that the
28:25SWIP share the notice of intent, did you
28:28file the SWIP with us? Because I didn't
28:30see it. Uh the other thing is is that I
28:33mean the the town although the town's
28:35the owner of the project, they delegated
28:37the means and methods to you. Correct.
28:40The means and methods of the work
28:42>> and telling us what to do. Yes. So your
28:45position is that it was the town's
28:46responsibility to file a notice of
28:49intent with with this commission
28:51regarding the work that you controlled
28:55and it's a simple answer. Yes or no?
28:57>> I I'm not aware.
28:58>> All right. Did you give any
29:01consideration now? All right. I'll back
29:04up a bit. You told me that you hadn't
29:06done any work in town for seven years.
29:08There certainly have been in other towns
29:11and I suspect you do most of your work
29:13in central Mass or Eastern Mass
29:15>> typically all over Massachusetts.
29:17>> Do you ever file notices of intent with
29:19other municipalities?
29:21>> To your knowledge?
29:22>> To my knowledge? I'm not sure.
29:24>> You don't know?
29:25>> No.
29:26>> Okay.
29:30Now when we spoke on July 22nd, you put
29:33in some I believe some silt socks, some
29:36erosion control measures uh which were
29:38ineffective. Would you agree with me
29:40that they were not effective
29:41>> at keeping everything at bay? I would
29:43say it was not 100% effective. Correct.
29:45>> Okay.
29:58What's the status of the project now?
30:00When do you think you're going to
30:02So the project is currently in binder.
30:04We are doing burm in a way typically
30:07don't to make sure we are keeping
30:09erosion at bay. We have burmed around
30:12the entire area of the south street
30:14culvert and we're going to continue
30:15tomorrow to continue bming
30:17>> and to making sure we're keeping all
30:18erosion at bay. And then we're going to
30:20come back in. We're going to do some ADA
30:22ramps. Then we're going to do the
30:25sidewalks, top the road. All the
30:27drainage structures are all going to be
30:29live and we [clears throat] should be
30:30able to stripe it and get out of there.
30:32I have no uh current date for you right
30:34now, but uh we're we're certainly making
30:37headway.
30:38>> So, this is August 12th. You think
30:40you'll be done by the middle of
30:41September? 30 days at the end of
30:43September?
30:45>> I think that would be a reasonable
30:48expectation.
30:50>> All right. So again, just so I'm clear
30:52in this, um, you you cannot offer me an
30:56explanation why
30:58your position is that Lynch didn't know
31:01it had to file a notice of intent with
31:02us.
31:03>> I was not aware.
31:04>> Okay. So I'm going to turn this over to
31:07our town members, Mr. Roto.
31:11>> Greg, can you hear me?
31:13>> Yes, I can. So um we had a meeting uh on
31:18Monday to discuss this. Uh what's your
31:21position on who was required know of
31:23intent for this project?
31:27>> So it was my understanding I'm not sure
31:30if Joanna you want to jump in here.
31:35>> Sorry. Yes. Thank you. Uh so uh
31:38typically for a um for a roadway
31:41reconstruction project, a um a roadway
31:44resurfacing project, that's considered a
31:46minor project. So, it uh typically
31:50doesn't require a notice of intent and
31:53um it was our understanding that well it
31:57was our agreement with Lynch that um
32:00they were going to be filing a SWIP um
32:03in addition to any and all um
32:06appropriate permitting um any you know
32:10appropriate permits um that you know
32:12that they would deem um
32:17appropriate for uh for the work that
32:19they're doing. Um
32:22like like the board said, we um we don't
32:25have control over their um their their
32:30work or um you know, how they they
32:34perform the work. We we tell them what
32:36is required but how they're going to be
32:38doing it and um and what um
32:44what exposure that they you know they
32:46have for um for with respect to um soils
32:50and wetlands. Uh that would be you know
32:53that would be up to them.
32:56>> Was there any discussion about notifying
32:58our commission regarding uh the work?
33:01because again the first time I saw the
33:03SWIP was when I received it from Miss
33:05Vei last week and and again my position
33:09is and again a SWIP um is filed when
33:13more than one acre um in a project is
33:16going to is going to be disturbed and
33:17clearly that qualifies for both of these
33:20streets. So
33:22um
33:25was there any discussion about
33:27implementing erosion control measures
33:29for those two streets given the fact
33:31that there are well and resources
33:33located uh at each
33:37>> I don't know if you wanted
33:38>> yes so yes at the beginning of the
33:40project before we began um that was the
33:42directive u before we saw cut or work on
33:44any drainage we asked that they controls
33:48at the sensitive areas um They I know
33:51Lynch had installed uh sediment control
33:54at catch basins. Um but as we know that
33:58was that was inadequate at the time. Um
34:01at the beginning of the project they
34:02were focusing on drainage installation.
34:04Uh the road was not reclaimed at that
34:06point. So they it had the silt sacks
34:09placed and the road would the any
34:11disturbance was contained within the
34:13roadway curving. Um
34:17some maybe oversightes on on DPWZ.
34:20Absolutely. I I think we've spoke to
34:22during this meeting on uh our past
34:24meeting on Monday. We're going to
34:26bolster our communication with um the
34:29commission and we're going to uh kind of
34:31work towards setting up some guidelines
34:32that this doesn't happen again. Um now
34:35to the means and methods,
34:37there were some uh scheduling decisions
34:40made by Lynch that kind of left them
34:43exposed to this erosion issue. Um,
34:46removing the sidewalk and reclaiming
34:49both roads at the same time wouldn't
34:51have been my recommendation. I would
34:53have recommended that they stabilize
34:55their road one road at a time. Um, but
34:58again, I I I don't have control of means
34:59and methods. So, that's kind of what
35:01we're we're dealing with. And then in
35:03most uh responses
35:06with the rainstorms we've had,
35:07unfortunately, were not enough to stop
35:10the sediment and erosion uh issues.
35:14Do you think um
35:17>> through the chair?
35:18>> Please,
35:20>> Greg, can you just reference some of the
35:22contract language that alerts the
35:24contractor for the um local and state
35:27permits that might be required?
35:29>> Yes. Just a second.
35:31>> I don't think it has to be verbatim, but
35:32we do have a general clause in there.
35:34Correct.
35:34>> Yes. So, we have several different
35:36section contract at state that they have
35:38to familiarize themselves with all
35:39state, local, and federal permits. Um,
35:42and obviously local would be reaching
35:44out to conservation commission. Um, I'm
35:46just pulling up
35:47>> which section is that in the contract?
35:50>> Uh, let me just find that for you here.
35:57So, it's going to be
36:05at the section seven. At the end of
36:07section seven,
36:10there's mention of the permits. Um,
36:16let's get to the right spot here.
36:20>> Okay. So, your contract requires the
36:24contractor to be familiar with local
36:27bylaws, regulations.
36:28>> Correct.
36:29>> Correct.
36:29>> As well as following their SWIP. Um,
36:33and
36:35>> well,
36:35>> yeah. The contractor is required to
36:37inform himself of all applicable local,
36:39state, and federal rules and concerning
36:41the maintenance of environmental quality
36:44and to conduct his operations in
36:45conformance with the intent of such
36:46rules. Um, good.
36:48>> So, I I I go back to minimizing
36:50disturbance would have been the best way
36:53to have avoided this.
36:56>> Uh, you're familiar with the SWIP, Mr.
36:58Verto?
37:00>> I am. Do you believe that um Lynch has
37:03complied with this in the work they've
37:05done on South Street and Church Street?
37:08>> Uh I believe
37:10>> and if not tell which courts they
37:12haven't complied with.
37:14>> Um so I the no I don't believe that they
37:17followed their SWIP according to how it
37:19was written. Um I believe that there
37:22should have been stronger erosion
37:23controls around the resource areas such
37:25as double row silt fence. Um I don't
37:29believe that um I I did receive SWIP
37:33inspection reports from Lynch after
37:35those rain events. Um so they did follow
37:37that portion where they would uh
37:39identify the issue and come up with a
37:41remediation. Um unfortunately those
37:43remediations were were were not enough.
37:46So
37:47>> under the contract swip reports due
37:49before um I let me question this way.
37:54When are SWIP reports of that nature
37:56usually generated?
37:59>> Prior to the beginning of the work.
38:01>> Okay. You didn't receive any, correct?
38:04>> I did not receive it until after the
38:06work, but we had directed the contractor
38:08to do the uh minor disturbing activities
38:12prior to this. Um once we had received
38:14the SWIP, they had began on their road
38:17reclamation. So, they didn't begin their
38:18road reclamation until after we received
38:20the SWIP.
38:34Okay.
38:36Um,
38:38car for rebuttal.
38:40>> Um, not really a rebuttal. I think we're
38:42all trying to work together on this
38:43project, but
38:44>> uh swept reports are due after a quarter
38:47inch of rain or after seven calendar
38:50days in a dry period or less than a
38:52quarter inch of rain, I would say. And
38:55uh I fill them out and I keep them on me
38:58at all times. Believe that's in there,
39:00too. And then uh if any corrective
39:03actions are necessary, I will write up
39:05the corrective action form, show the
39:08work that was completed,
39:10and then uh I'll submit them. And
39:15and if and if I may too, um the rain
39:17event we had on I believe it was the
39:1930th, it was um it was almost 4 inches
39:23of rain. So that that was a substantial
39:25rain event that we we had received. Mhm.
39:27>> Um,
39:29>> so
39:31>> on July 21st, any idea how much room we
39:33got?
39:35>> And we could find out
39:36>> closer closer to an inch, I believe.
39:38Okay.
39:39>> All the other events we had were closer
39:40to an inch.
39:41>> Understood.
39:44>> So, um, m Mr. Lynch, you talked about
39:47preparing a corrective action form,
39:49>> correct?
39:49>> Did you prepare one after we spoke on
39:51July 22nd?
39:52>> Correct.
39:53>> Okay. And did you uh produce that to Mr.
39:56or anyone else for the town.
39:58>> Uh, it was not requested. Have it at any
40:00time.
40:01>> Okay.
40:04>> But I believe I did email it to me.
40:06>> You did. Thank you.
40:07>> All right. Um,
40:08>> may I ask you a question?
40:09>> Yeah, I was going to say I don't have
40:10any other questions, sir. Thank you.
40:12But, um, I'm going to, uh, turn this
40:14over to other members of the board if
40:15they have any questions.
40:17>> U, those corrective action forms,
40:20>> what's the normal procedure for who
40:21those would go to?
40:24Uh, I'm just told to keep all inspection
40:26forms on site. On like a larger mass
40:29project, they might have a thing called
40:31like an environmental monitor and then
40:33the environmental monitor will ask for
40:34collection of those at different rates
40:36of time.
40:43>> Any other questions from the board?
40:45>> Uh, my question is more of a
40:46hypothetical. Let's say let's say we
40:49rewinded time. What would have been the
40:52best erosion control at that time for
40:54that situation? Because clearly what
40:56happened didn't work. So what's the next
40:58method if it was to happen again? It may
41:00not happen at the same street obviously,
41:02but if it was to happen, what plans
41:07do you think would be in place? That's a
41:09very good question. I think uh it's kind
41:12of a tricky situation, at least at the
41:13South Street Culver. It's a curb
41:15retaining wall. So to actually like
41:17entrench any silt fence at that location
41:20would be a
41:22very very difficult task in order to
41:24keep the roadway open because you'd have
41:25to put the silt fence almost in the road
41:28in order for it to lock in the curb
41:30retaining wall. And then uh anything
41:33outside of that at the at the lower
41:36junction there is is still pretty
41:38difficult. So, you know,
41:42>> I'm not the best person in regards of
41:44road closure.
41:45>> Sure.
41:45>> But does that sound like that may have
41:48solved the situation like closing half
41:50the road?
41:51>> I don't know. I mean, the fact that
41:52matters is that that road I live off of
41:55South Street and
41:56>> uh that road has been closed off
41:58periodically since June while they were
42:00installing the um the new culverts and
42:02uh the other infrastructure. So, um, and
42:05they've been able to, they've been
42:07deterring people. Um, but again, I'm not
42:09an engineer, so I think that's probably,
42:12you know, best left to someone with more
42:13expertise than me. It's been suggested
42:16to me that the erosion that we saw after
42:18the storm event, I think on 7:30, um,
42:22might have been, um, reduced or maybe
42:24even alleviated, um, with the
42:26installation of check dams. But again,
42:28I'm not so
42:30>> uh, Mr. the rotor uh stated earlier that
42:33it probably would have been a better
42:34practice to do one road at a time. I I
42:37may have
42:37>> No, he did say that.
42:39>> Um is that something maybe we can
42:41implement as maybe have oversight with
42:46what was it? Uh means and methods. Is
42:47that the term used in this case? The
42:50problem here is that the project was
42:52well underway and we had we were never
42:54given notice and so the the suggestions
42:57that we could have made uh or changes
43:01that we could have um uh suggested um
43:04>> never got the opportunity
43:05>> we did not get the opportunity to and I
43:08mean we're dealing with a professional
43:10contractor that that does um this type
43:13of work has it has done this work for
43:15years and we have you know a DPW staff
43:18that is professional and and I believe
43:21um uh knows what the processes are and
43:25um I mean as far as I'm concerned um
43:29that this this situation just should not
43:32have happened and it gives me pause
43:33because um I think people um should have
43:37known better and they didn't and I think
43:40because of that I think you know my my
43:42my concern strictly um from the vantage
43:45point of the of the commission is that
43:48we I don't know if um any saltation got
43:51into the the streams um on Sher Street
43:54and South Street. In order for us to to
43:57make that determination, we now have to
44:00hire a contractor, someone else, a
44:03consultant, and we have to spend our
44:05money to um to determine that. And
44:08that's something we should not have to
44:09do. So, um that's what I'm I'm happy
44:14about. Um,
44:18any other questions?
44:20>> Yeah, I do. So, I know there's other
44:23paving going on in town and stuff and
44:26there anything in the near future we
44:29need to look at before, you know, roads
44:32get
44:33>> we may have to,
44:34>> you know, I don't know what the plan is.
44:36I've seen it online and stuff, but
44:38>> Mhm.
44:38>> just, you know, cuz they're going to
44:40probably pop up in other areas if we're
44:42doing the same work in on other main
44:44roads or small roads, whatever, whatever
44:46it may be.
44:48>> I will tell you that in uh years past
44:50when Bill Coyle was here, he would
44:52actually give us a list of the streets
44:54where uh work was going to be done. Uh
44:57and that was under their blanket order
44:59conditions. Um,
45:02we, as you will recall, uh, at our last
45:04meeting, we revoked that blank order
45:06conditions. I can tell you that the
45:08town, uh, wants it to be to be
45:11reinstated and I believe that may be
45:12subject to a filing in our meeting on
45:15August 26th. I'm not sure. I think
45:17that's a separate issue in honesty, but
45:20I mean, this shouldn't have happened.
45:22It's very simple. this is, you know, um
45:26and and and and I I want to ensure that
45:28it doesn't happen again. And I don't
45:30care who the contractor is. I this
45:32should not have happened. And um and
45:36I'll just leave it at that. So, um any
45:39parting words from the town?
45:42>> Through the chair, if I may. Um, I just
45:45wanted to say that um, we haven't had a
45:49project that has overextended itself
45:52like this um, in a long time.
45:55>> Um, and every project that um, that we
45:58do um, we evaluate lessons learned. So,
46:03I can tell you that uh Greg has um
46:06already put in um additional clauses in
46:08the next construction project saying
46:11that anything that um gets pulverized,
46:15any road that gets pulverized is going
46:16to be paved within 3 days to prevent
46:19this because ultimately the fact that
46:22these sites have been open for so long
46:25um and have been subjected to all these
46:28storms is is why we're, you know, we've
46:31had so much struggle. Oh,
46:33>> okay.
46:37>> Got to ask one question.
46:38>> Sure.
46:39>> Why wouldn't you normally bind your
46:41flush this especially given the weather
46:44knowing right that two or three days out
46:48there's projected storms?
46:50So why wouldn't Lynch
46:53put down binder flush and have to pull
46:56it out later
46:58just to prevent this? Just curious if
47:00that I haven't seen the contracts, not
47:02sure, but got to ask.
47:06>> So, our hope would be that if the um if
47:10the road has already been pulver
47:11pulverized, then um then they can get
47:15that road ready to put down binder and
47:18um stabilize it. Um unfortunately, there
47:22were many roads that were open and um
47:25waited to it's it's lumped together. So,
47:29um, and I and I understand that there's,
47:32you know, coordination crews and
47:33everything, but, um, we've we've had
47:37conversations with, um, with lunch
47:39saying that we we do need to be a
47:43priority in, um, in their list of
47:45projects.
47:47>> Thank you,
47:51>> Peter. Any comments?
47:54>> I do believe Mark has his hand up.
47:57>> Okay.
47:59Mr. Arnold,
48:02>> we can't hear you, sir.
48:09>> Nope.
48:11>> No, he's here for the next um he's got
48:13something on for the OAT, so I don't
48:15think he's involved with this. Um
48:18okay, we can't hear him anyway. So,
48:23>> is that Can you hear me now?
48:24>> We can hear you now. Are you
48:27>> I'm speaking as a citizen of Auburn in
48:29this situation.
48:31>> Um 150 Bernett Street.
48:34>> Um uh so just two points of
48:37clarification as a citizen and also as a
48:39consultant. Um there are some road
48:41surfacing projects that can be exempt
48:43from filing notice of intent, but those
48:44are resurfacing that are done within 72.
48:48Um that's in um the exempt clause in um
48:51310 CMR 1005
48:54sorry 102. Um but drainage improvements
48:58are not exempt um from following notice
49:01of intent. Um so that's just a point of
49:03clarification debate gives the DPW some
49:06just of clarity in terms of where that
49:07is. And then the second question I had
49:09is was there any evaluation of impacts
49:12to the buffer zone and or the riverfront
49:15area because um that is a perennial
49:17river that flows um through Church
49:19Street. And so I was just curious if if
49:21Lynch had looked at that in any way to
49:24see if there were any impacts that do
49:26need to be remediated. Um because
49:28regardless of if they filed the notice
49:30or not, the question is has there been
49:31an impact beyond their approved limits
49:32of work that would require um any type
49:35of restoration? And I'm just curious if
49:37that was done.
49:39>> There's been no discharges to the Church
49:40Street cover there.
49:41>> You didn't answer his question though.
49:43>> Oh,
49:43>> his question was, did you do an
49:45evaluation of impacts?
49:46>> Absolutely. And the swift inspection
49:48reports.
49:50>> And if the town has those,
49:52>> they should. And if they want the rest
49:53of them, I can give them the rest of
49:54them.
49:56>> Okay. All right. Um,
49:59>> so they shouldn't have the most. I
50:00apologize. I want to clarify. I believe
50:02I sent Greg the first couple, but I have
50:04not sent him the most recent.
50:06>> Okay.
50:06>> Conspection reports.
50:07>> All right.
50:11All right. Um I again I have no other
50:14comments. I want to thank you for coming
50:15tonight. I want to thank members of the
50:17DPW for participating as well and um we
50:22will have a further discuss.
50:26So all right, thank you.
50:38Council, can you leave your card? Of
50:40course. Thank you.
50:52>> You can give it to Miss Great Pretty.
50:53>> I only got four, so that's fine.
50:56[laughter]
50:57>> Thank you.
50:59I know.
51:28How does he make this decision? Yes.
51:34[clears throat]
51:40[clears throat]
51:43So, um, Mr. Arnold, you've been very
51:46patient, um,
51:49waiting. Uh, I presume you're here for
51:50the Ora for Milbury Street,
51:53>> correct, sir?
51:54>> Okay. So um
51:57just give us a brief rundown on why
52:01>> yes um so this is an extens so let me
52:04just sorry let me restart that Mark
52:06Arnold with GDRD consulting uh soil
52:08scientists uh here on behalf of Auburn
52:10Industrial Development Corp for this
52:12request to extend the order of resource
52:14area delineation ORAD for 100 Milbury
52:17Street. Um so we are requesting an
52:20extension of the O-rad um that was
52:23issued on this property um to delineate
52:26um the bordering vegetated wetlands that
52:28were located in the southeast corner of
52:30the parcel. Uh the O-ra um is about to
52:34expire uh this fall and um we are still
52:38um um looking to see how the property
52:41might be developed. again may require
52:43not of intent in the future, but we'd
52:45like to have the wetland line um kept in
52:48place so that way um that doesn't have
52:49to be reviewed at a later date. Uh so
52:52that's the the purpose of our extension.
52:53I can show the the commission a plan if
52:56they'd like. Um and also Ariel just to
52:59kind of explain it. We did walk I have
53:01walked the line um uh in the past month.
53:04Um it's a very pretty distinct wetland
53:07line. Um open wet meadow um surrounded
53:10by um upland shrubs that are very thick.
53:14So uh wetland line hasn't changed at all
53:16since we delineated it and all the flags
53:19are present in the field.
53:22>> Okay.
53:24Um and um the applicant hasn't decided
53:28what it's going to do with the property.
53:33>> Correct. Okay. All right.
53:36>> All right. I don't have any questions.
53:37If there are any questions,
53:39>> I do not have any questions.
53:41>> Okay.
53:44>> All right, sir. Thank you very much
53:46again. I appreciate your patience uh
53:47while we were had the other discussion.
53:51>> No, no, no. It sounded like you were
53:53having a very good discussion. I think
53:54it was good for all parties.
53:56>> Thank you. All right. Have a good
53:58evening.
53:59>> Thank you. Have a good night.
54:09So,
54:12um
54:18I I have a copy of the contract. I I did
54:21not
54:23go through it with a fine tooth comb. Uh
54:25but based on um Mr. the wrote his
54:28representation
54:30uh and just I mean
54:33I again I'm just I guess dumbfounded is
54:37the right word uh why they in
54:39[clears throat] a file with us. Uh
54:41ignorance is is not an excuse in this
54:43case and it's certainly not an excuse
54:45when it's actually
54:47contract that the um the contractor has
54:50to be familiar with um with our bylaws
54:53and our regulations. anyone and I
54:56suspect and I would be very surprised if
54:59Lynch had any projects where they did
55:01not file a notice of 10. I believe they
55:04have and so um I I don't have an an
55:09adequate explanation for this. I really
55:10don't. And um and I think given the fact
55:15I mean if I approach this um not as a a
55:19member of uh the conservation commission
55:21but as um as an attorney evaluating
55:26um a potential breach of contract case,
55:29it would be my that they breached the
55:31contract. They did not do what they were
55:33supposed to do. They did not file with
55:35us. It doesn't appear based on what Mr.
55:38Roto represented that they provided um
55:40any swip reports prior to the start of
55:42work. Um
55:45so and and again when I spoke to Mr.
55:49Lynch on July 22nd and asked him about
55:52erosion control measures and his
55:53response was well yeah we can put them
55:55in. No I mean I'm sorry it doesn't work
55:58that way. We they should we shouldn't
56:01have to ask for them. they should have
56:02been they should have come before us
56:04with a plan [clears throat]
56:06with um showing what controls were going
56:09to be. So um
56:15I think in this opinion and I'm more
56:19than happy to have a discussion about it
56:21but I think they an enforcement order
56:23needs to be issued against Lech and I
56:26think they need to be fined.
56:29Um that's number one. Two is that we
56:32don't know what the well in impact has
56:33been. We don't know if there is a well
56:36in impact. It's possible that there
56:37isn't but we don't know.
56:40[clears throat] And I think in order to
56:43approach this fairly I think we need to
56:45find out and we need to hire someone to
56:49to evaluate it and hopefully we will
56:52find out that in fact there was not uh
56:55an environmental impact. But again, we
56:56don't know. And I think given storm,
56:59we've had some storm events. There's no
57:02question the storm event on July 30th
57:03was was the the most rain we got from a
57:07single uh storm, but um there have been
57:10several events. Um I um there was a
57:14situation that was described to me uh by
57:16Miss Puin um uh that occurred I guess
57:19over the weekend on I think there was a
57:21storm on Friday that
57:22>> Friday problems. you know, when I drive
57:25on Church Street, I see I can see
57:27sediment in the road and not South
57:31Street, but on on Church Street, I think
57:32it's quite evident. So, um I would love
57:37to have some conversation, discussion
57:38with you about what what you'd like to
57:41do about this because I frankly think
57:43this is unacceptable. I really do.
57:47>> I guess I'm not I mean, I am all for
57:49like if we want to hire somebody to do
57:51an evaluation of the been an impact, I
57:53mean, I'm all for that. Um I'm curious.
57:56I don't know how they determine that
57:59after, you know, they have to have a
58:01baseline for that.
58:02>> They'd have to go in there. I mean, if
58:03there's silt in there, they'll see it.
58:04>> Yeah.
58:05>> You know, you're right. I mean,
58:06determining a baseline may be difficult.
58:08>> I mean, I'm definitely all for that. I
58:10would think if we are going to hire
58:11somebody to do um an evaluation like
58:15that. One thing I would like to see come
58:17out of it would be also their
58:18recommendations for
58:21um like erosion control measures in
58:24future similar circumstances that we can
58:27use as information we can recommend on
58:30other projects.
58:31>> Mhm.
58:33>> Okay.
58:34>> I agree. I agree everything's
58:36>> and then maybe wait until we get that
58:38report be before
58:40>> we start flying them.
58:41>> Yes.
58:42>> I mean I think that's fair. We don't do
58:45>> PPW.
58:48>> Well, I I think
58:49>> I mean when you
58:50>> the situation is
58:52>> they were doing they were doing this
58:54they were doing this
58:55>> you know and I I honestly believe I
58:57think there was question of breakdown
58:59communication
59:00>> you know and I suspect there's still uh
59:03and that's fine. Um yeah I mean again I
59:06think there was um I think there was
59:08poor communication. And I think the DBW
59:10could have done a better job of
59:12supervising um the crews that are out
59:14there.
59:16You know, I'll I'll be honest with you.
59:18Until you mentioned that, I did not did
59:19didn't did did not hear the term binder
59:22flush and I don't know what that is. Can
59:24you elaborate?
59:24>> Yeah, they could have paved that prior
59:26to the
59:28>> They could have especially
59:30>> Well, that's right.
59:32>> Take it back up,
59:34right? It's a cost.
59:37But it would have prevent
59:39>> You're right.
59:39>> Well, you know,
59:41>> pay it cost for consultation to
59:43determine.
59:44>> So, just a very a very thin binder coat,
59:46right?
59:46>> Thin binder coat. Sure.
59:48>> Yeah. And they could have put it down in
59:50a couple hours.
59:51>> Sure.
59:51>> Yeah.
59:52>> Okay.
59:54There's no There's no way. Yeah. There's
59:56absolutely no way to normally that
59:59right. If you know you're getting
1:00:02rained.
1:00:02>> Yeah. of course
1:00:03>> you you get a projection of so you go
1:00:07okay we're going to stop at noon time
1:00:09we're expecting storms at 4 4 in the or
1:00:11whatever you need
1:00:12>> and the forecasting has done pretty good
1:00:13>> this is a company that as you mentioned
1:00:15that does this work all over central
1:00:17mass all over Massachusetts
1:00:20>> absolutely no reason right a good
1:00:22foreman a good super
1:00:26>> let's put some binder down
1:00:28>> okay yeah
1:00:30>> that was prevent that's even better than
1:00:32the silt fence.
1:00:33>> Yeah.
1:00:33>> And the fact that you know the excuse
1:00:35that retaining wall in a culvert and we
1:00:38can't put it down.
1:00:39>> Okay. Then you could have put behind it
1:00:41down
1:00:42>> an inch. Give me something.
1:00:46There was no thought in my opinion.
1:00:48There was no thought given to putting in
1:00:50a rose control measure.
1:00:52>> Yeah.
1:00:53>> Until we called them.
1:00:55>> Absolutely.
1:00:55>> And that you know that's pretty pretty
1:00:59craven. Uh my question, this binder
1:01:01coat, could that work for the scenario
1:01:05on 20 across the street from Shell? I
1:01:08don't know that location. Oh, the
1:01:10storage unit
1:01:11>> cuz I know we have a road.
1:01:13>> I don't know. I mean,
1:01:15>> can I be there?
1:01:16>> When I to your point, I'm going to cut
1:01:18you off, but I drive by there every day.
1:01:21I don't see any activity there.
1:01:22>> So, I have seen some It does look like
1:01:26>> changing. Uh-huh.
1:01:27>> I don't actually see them out there, but
1:01:28I see things changing. Like there's a
1:01:30retaining wall now and stuff. So, like I
1:01:33see things, so it's probably
1:01:37>> um
1:01:37>> Yeah, but you're right. It doesn't seem
1:01:38like they've alleviated the u the
1:01:40>> That's the site under the rightway.
1:01:42>> Yeah.
1:01:43>> Electric right away.
1:01:44>> Oh, no.
1:01:45>> No,
1:01:46>> it's on the corner of Old Con Washington
1:01:48Street.
1:01:50>> Okay.
1:01:51>> Yeah.
1:01:52>> So, I Yeah. Street work is primarily
1:01:58going with this, right? This is
1:02:01>> this is what
1:02:02>> Yep. I just don't know how the binder
1:02:04works,
1:02:04>> right? Onsite property work.
1:02:07>> Yeah. With runoff that's maybe your
1:02:09reinforced
1:02:12set fence.
1:02:13>> Yep.
1:02:14>> In that other case,
1:02:17>> these are street C. This is
1:02:19>> Yeah,
1:02:20>> this is water sewer and storm drainage.
1:02:22Yeah,
1:02:23>> find them.
1:02:25>> I'm watching one Hope app. They're doing
1:02:27gas lines again and you know and every
1:02:30night they repave it. Next morning they
1:02:32rip it up.
1:02:33>> Don't have a choice.
1:02:34>> Yeah, they didn't do that here.
1:02:37>> You don't have a choice to leave it like
1:02:38that.
1:02:40>> I have a question about what um Arnold
1:02:44was saying.
1:02:47He's This is just for my understanding.
1:02:49said re he said repaving
1:02:52projects are exempt exempt of what done
1:02:55within
1:02:56>> I think
1:02:58>> if they if they're done within 72 hours
1:03:00and if there's no drainage involved
1:03:02>> within 72 hours of like tearing it
1:03:06>> start you're not you're not dig you're
1:03:08not digging the dirt back so it's more
1:03:11>> the way I took what Mark was saying and
1:03:13I wrote it down too we're going to take
1:03:14a look at it but if if I've got a grind
1:03:17crew out that's just gonna
1:03:19mill the pavement an inch and a half or
1:03:21an inch
1:03:22>> and then
1:03:23>> right I want pave you know I want you
1:03:25paving back within 72 hours or you
1:03:29unless you material
1:03:30>> yeah right
1:03:31>> okay
1:03:32>> when you're digging when you're
1:03:33disturbing the earth
1:03:33>> but in no instance is there an exception
1:03:35if there's dash involved so
1:03:37>> yeah no I thought I was um I was glad he
1:03:40said that he jumped in and said that
1:03:42>> yeah 310
1:03:43>> could you fade drainage scenario
1:03:46>> 10 I didn't write it down 102 I believe
1:03:49>> 10:02
1:03:50102 and 105 I'll find it.
1:03:54You think it's 10.02?
1:03:57>> 10.02.
1:03:58>> That's that's it.
1:03:59>> Okay. I can't read my hands.
1:04:03>> Um All right. So,
1:04:07hold off. I think we need to evaluate
1:04:09how much damage has been done and then
1:04:12at that point once we have an evaluation
1:04:14we can take um potentially consider
1:04:16further action.
1:04:19I do have a question for you, Mr. Chair.
1:04:21Um because you were beginning to talk
1:04:23about doing an enforcement order. Now,
1:04:24LA last time we met, you all signed an
1:04:27enforce directed at DPW.
1:04:29>> That's right.
1:04:30>> Um are we keeping that one or what's
1:04:32this what what's the status?
1:04:34>> Well, we issued that before we had
1:04:37further information. I we had a
1:04:40discussion and I thought there was a
1:04:42consensus that we wanted to revoke the
1:04:44blank additions and um the town is u and
1:04:48I believe if they want to jump right in
1:04:51tell you that they're not happy I think
1:04:54u given the fact that we voted on it um
1:04:56I think they need to file um a request
1:04:59for reconsideration. Oh look they're
1:05:02back.
1:05:05>> So I read your mind, didn't I?
1:05:09Good evening.
1:05:09>> Or we read yours.
1:05:10>> Assad. I said or we read yours.
1:05:13>> Maybe you did. So, uh I think I told you
1:05:16on Monday that um we had voted to revoke
1:05:19the the blanket order. Um I think the
1:05:23procedurally the right way to do it is
1:05:24to um is to get on the agenda for our
1:05:29next meeting. Uh present, you know, all
1:05:31the arguments why us to reinstate it and
1:05:34then we can we can act on it, you know.
1:05:36And I know you got and I just so we're
1:05:39clear here. Um and what I asked was I
1:05:42don't know that there how many projects
1:05:44uh that you're working on uh have any
1:05:47sort of well and impact or you would
1:05:49normally need to file because it's
1:05:51within [clears throat] 100t of a buffer
1:05:53zone, that sort of thing. Um but anyway,
1:05:58so that that's that. Um, but I think
1:06:04I mean I would like to see
1:06:08any documents that Lynch has filed with
1:06:10you, the SWIP reports that they they say
1:06:13they have filed. Um, I mean, you know,
1:06:16he talked about a correction action
1:06:18form. Well, I presume there are
1:06:20correction action forms. Uh certainly I
1:06:24would I presented that there was a
1:06:26correction action form that he prepared
1:06:28after I had a conversation with him on
1:06:30July 22nd. I don't know if you received
1:06:33it. Um
1:06:36but I think we need to assess um uh has
1:06:40been um siltation that's gone into um
1:06:44the perennial stream um at Church Street
1:06:47and um and the stream that runs um under
1:06:51South Street even though
1:06:54I don't think I've ever seen that stream
1:06:56dry up. I mean I it doesn't have the the
1:06:58velocity of water um the stream under
1:07:01tertiary does but I don't recall ever
1:07:03seeing it dry up either. So I think it's
1:07:05perennial as well. I might be mistaken.
1:07:07I'm not sure but in any event um
1:07:12all right so in that case is there any
1:07:15any further discussion about this?
1:07:19Is there a motion?
1:07:24Would the motion be to close the public
1:07:27hearing for this?
1:07:27>> Well, it's not public hearing. It was
1:07:29just for discussion. it would be to
1:07:31whether or not uh weire a consultant to
1:07:34evaluate not not only to evaluate and I
1:07:37think to Megan's point which is a good
1:07:38one I would say evaluate any potential
1:07:42um um you know problems or uh or u uh
1:07:47consequences that have resulted from um
1:07:50not installing erosion control measures
1:07:52but also maybe even have um the
1:07:57consultant and this is where the DPPW
1:07:59would be helpful. Have the consultant
1:08:01evaluate um how Lynch uh did not comply
1:08:06with the requirements of the script.
1:08:09>> Can I take that motion repeating it?
1:08:11>> Yes.
1:08:12>> So,
1:08:13>> can can I
1:08:14>> Oh, he gets credit for it.
1:08:17>> Can I um make an amendment to that?
1:08:21>> Sure. Uh that that we also request for
1:08:23the consultants to make um
1:08:26recommendations
1:08:28for
1:08:30future for erosion control measures on
1:08:32future projects of similar
1:08:35>> school
1:08:36>> similar.
1:08:37>> Yeah. Okay. So
1:08:40>> I second that amendment to the first
1:08:43motion.
1:08:44>> All right. So we've got a motion. Well,
1:08:46wait. You can't. His It was your motion.
1:08:49She amended it. Um, I'm just going to
1:08:52restate it and then we'll go from there.
1:08:54Well, I can't. You have to make the
1:08:56motion. So, we have uh Ricky's motion uh
1:09:00revised by Megan. Is there a second?
1:09:02>> Second.
1:09:03>> Uh, is there any further discussion?
1:09:06All those in favor say I.
1:09:08>> I. I.
1:09:08>> I.
1:09:09>> It's a vote. Okay. All right. And now we
1:09:13have to figure out who we want to use.
1:09:15So, we have I mean there are a number of
1:09:16consultants that we could use. Um
1:09:21uh we lately we've been using Welsh
1:09:23engineering out of man. Um this might be
1:09:27a decent project though for Ecotech but
1:09:30we can find someone. We haven't approved
1:09:33we haven't approved contract of uh
1:09:35consultants.
1:09:36>> I wouldn't know off the top of my head.
1:09:37Let me take a look.
1:09:38>> Okay. In the past we've also used
1:09:40Margaret Washburn
1:09:42>> that name.
1:09:43>> So all right we'll come up with someone.
1:09:46Um,
1:09:47okay.
1:09:51But they're not going. Okay. Um, we have
1:09:53some other business to take care of. So,
1:09:56um,
1:09:58with respect to the, um, the request for
1:10:01determination filed by Miss Enman, is
1:10:04there a motion?
1:10:08>> Um,
1:10:11>> not needed. Okay. Um, I make Sorry. Uh,
1:10:16what was
1:10:18>> take down?
1:10:19>> Yes. I'm just trying to find the address
1:10:21or whatever. Oh, okay. 14% drive,
1:10:23>> right? Um,
1:10:24>> I have four special conditions
1:10:27>> in mind.
1:10:28>> Oh, you want to issue positive
1:10:30termination?
1:10:31>> Yeah.
1:10:32>> Okay.
1:10:33>> Um, posit.
1:10:37>> Yeah.
1:10:38So if if you if you special conditions
1:10:42that should be imposed, we're making uh
1:10:45Ms. Emman file a notice of intent. Now,
1:10:48this is removing a tree.
1:10:49>> Oh.
1:10:49>> And so what I'm going to suggest to you,
1:10:51and we've done this in other
1:10:52circumstances, and that's fine, is that
1:10:55if we we can issue a negative
1:10:57determination, but also impose
1:10:58conditions like,
1:10:59>> okay,
1:11:00>> sure the tree doesn't end up in the
1:11:02brook or the wherever it is. Um
1:11:05>> the pond, pond,
1:11:06>> the pond. Thank you. The pond. Um,
1:11:08>> so something
1:11:10to interrupt, but something affect
1:11:13her contract because she's not aware of
1:11:15it, right? She's kind of going with what
1:11:16they're
1:11:17>> That's right.
1:11:18>> what they're telling her. How about we
1:11:19say, "Right, the trees got to be removed
1:11:22from the property."
1:11:22>> Yep.
1:11:23>> Right. Any of the branches, any of the
1:11:27debris, any of the slash
1:11:29out to the street and chipped and taken
1:11:32away. Just my
1:11:35not gone through this before. So it's we
1:11:38essentially set your uh tree contractor
1:11:41must haul the tree you know cut the tree
1:11:44flush
1:11:45as flush as possible
1:11:48to the ground 3 4 in off I mean
1:11:50something to that effect
1:11:52>> you don't want to dig in the stump
1:11:54>> right now and then you know let that
1:11:56roted degrade
1:11:58>> naturally
1:11:59>> naturally yeah
1:12:00>> so no disturbance so you know and uh the
1:12:03tree gets hauled off and all slashing
1:12:05debris chips
1:12:08>> and I I just
1:12:09>> and we've done that before.
1:12:10>> Okay.
1:12:11>> You know, I mean that way that we what
1:12:13we do is that in in exchange for giving
1:12:15her a negative determination so she
1:12:17doesn't have to find her intent, she
1:12:19still has to do the other things that
1:12:21we've asked her to do.
1:12:22>> Right.
1:12:23>> So, um then is there a motion? Motion
1:12:28for a negative determination
1:12:31for
1:12:32the request to remove the tree at 14
1:12:36Riverside Drive with the con condition
1:12:40of removing the tree roughly 4 feet uh 4
1:12:43in down to the to the grade. Um hauling
1:12:47off all debris and chipping at the
1:12:49street, not near the pond. as well as if
1:12:52there is smaller machine being used at
1:12:56that location to get to the top of the
1:12:57tree all refill uh refueling that
1:13:00machinery should be done.
1:13:02>> Okay. And also ensuring that nothing
1:13:04ends up in the pond
1:13:05>> and ensuring nothing ends up
1:13:07>> Okay. All right. Uh is there a second to
1:13:10that motion?
1:13:12>> Is there any discussion? All those in
1:13:14favor say I. I.
1:13:16>> I. Opposed. It's a Okay.
1:13:22And then with respect to um the ORAD for
1:13:26Milbury Street, is there a motion?
1:13:34>> And this is a request to extend it.
1:13:37>> Um I make a motion to extend the order
1:13:40of conditions for 100 Malberry Street.
1:13:42>> The ORAD.
1:13:44>> The ORAD.
1:13:44>> Yes.
1:13:45>> Sorry.
1:13:46>> No, it's okay. It's for I thought it was
1:13:48>> order of resource area delineation.
1:13:50>> Order of area delineation for 100
1:13:54street.
1:13:54>> Second.
1:13:55>> Is there any discussion?
1:13:57>> All those in favor say I.
1:13:59>> I.
1:14:00>> Opposed to vote. Okay.
1:14:04>> And then finally
1:14:06um we have minutes from July 22nd.
1:14:10I believe you were going to discuss the
1:14:12silk language about silk fences to add
1:14:15for special um special condition. Um
1:14:23>> the chicken wire. Yeah,
1:14:24>> chicken wire. It's on there. We can
1:14:25discuss that if you'd like.
1:14:26>> Okay. Mostly I just wasn't sure if you
1:14:28was glass.
1:14:29>> We can do that, but I think that's going
1:14:31to require some actual writing.
1:14:33>> Okay. Okay.
1:14:33>> Okay. So, uh I don't know what our
1:14:35agenda is going to look like for the
1:14:3626th. Um I would just continue that item
1:14:42into to our next meeting.
1:14:43>> Yeah.
1:14:44>> Can we actually
1:14:46um move that item after the person
1:14:50reviews and gives us some
1:14:51recommendations for other erosion
1:14:53control?
1:14:53>> Yeah, we can do that.
1:14:54>> I mean if you want we can just um yeah
1:14:57we can continue that indefinitely.
1:15:00Okay. And then um
1:15:05All right. So, I guess then we can turn
1:15:07to the the minutes for July 22nd.
1:16:08I don't know.
1:16:32Um, I have no changes to make to the
1:16:34meeting minutes for July 22nd.
1:16:38>> I make a motion to accept the meeting
1:16:40minutes for July 22nd.
1:16:42>> Is there a second?
1:16:43>> I second.
1:16:44>> Any discussion?
1:16:45>> All those in favor say I.
1:16:46>> I. post the vote. And
1:16:51I want to go on record. Um I stated in
1:16:54at our last meeting that I said that I
1:16:58thought it was DPW's respons
1:17:02be installed. I mean I think that
1:17:07I think insure um is big.
1:17:12I think based on on the information that
1:17:14we have obtained since that meeting, I
1:17:17my opinion is that it was up to Lynch to
1:17:23um file notice of attempt with the
1:17:25commission and I believe ultimately
1:17:27their responsibility was to install the
1:17:30ro control measures. And I say that
1:17:32because as I indicated when I spoke to
1:17:34Greg Lynch on July 22nd and I asked him
1:17:37um to put them in, he he did or he put
1:17:40in something. So um
1:17:46I think um there's blame on both sides
1:17:49here, but I think um once it since they
1:17:52controlled the means and methods of
1:17:54construction, I think they had an
1:17:56obligation to uh file with us and they
1:17:58didn't do it.
1:18:00So that's all I'm going to say about
1:18:02that.
1:18:04And if there is no other
1:18:06>> I do
1:18:07>> you have something
1:18:08>> I just was going to So I emailed you and
1:18:11Nat that picture of Triton storage,
1:18:14>> right?
1:18:14>> So and this was taken yesterday. Um they
1:18:18had put some straw waddles socks to try
1:18:22to catch the sediment. I mean they're
1:18:24totally full of sediment now.
1:18:26>> Okay.
1:18:26>> But you can see that there's sediment on
1:18:28both sides of it. So, it's clearly
1:18:29getting washed down into there, I
1:18:32believe. Even though it's really hard to
1:18:34see what's actually going on down there
1:18:36because very heavily vegetated.
1:18:38>> Okay.
1:18:38>> There's a few inches of sediment. It's
1:18:40on the road. It's in that or it's kind
1:18:44of funneling down towards the wetland
1:18:46and that's all like it's broken up. The
1:18:48pavement's broken up there, too. So,
1:18:49it's just kind of generally a mess. I'm
1:18:51not saying the pavement's there problem.
1:18:53But,
1:18:53>> do you think we need to issue an
1:18:54enforcement order? So, what was the LA I
1:18:57What was the last thing that was a
1:18:59letter that we sent them? What did we
1:19:02>> I mean, I'm going to have to go back now
1:19:04and and search my memory. We did issue
1:19:07an enforcement order to them back in
1:19:11>> Oh, boy. That might have even been back
1:19:14in 24 or 25.
1:19:15>> I thought we sent them something very
1:19:17recently. You said you were going to
1:19:18send a letter recently,
1:19:19>> but did we?
1:19:21>> I'm going to say we didn't.
1:19:22>> Well, I mean, I didn't. I
1:19:24>> No, no, no.
1:19:25So, I'm thinking um
1:19:30>> I mean they were responsive when Tom was
1:19:33working with them, but like I was under
1:19:36the impression that they had had a
1:19:37letter sent to them recently, which is
1:19:39why I was like feeling pretty miffed
1:19:40that they're ignoring. Well, I mean, I'm
1:19:41still miffed that they're ignoring it,
1:19:42but
1:19:43>> Well, I understand. I think um now what
1:19:47I'd ask you to do is
1:19:49>> [clears throat]
1:19:49>> um
1:19:51we issue an enforcement order to them.
1:19:53I'm gonna say 24, maybe early 25. I'm
1:19:56not certain of that, but I know they
1:20:00came in here and um and I think what I
1:20:03would do instead of issuing my my
1:20:06suggestion is instead of issuing a new
1:20:09enforcement order, just um enclose a
1:20:12copy of the last enforcement order and
1:20:14saying we are seeing a repeat of the
1:20:16condition made us have to send you an
1:20:18enforcement order the last time. please,
1:20:20you know, you need to take steps to
1:20:22remediate this condition immediately.
1:20:25Something along those lines.
1:20:28Um hopefully you can find it.
1:20:32>> So, um it's
1:20:35>> I mean I can check I mean I I can check
1:20:38the emails at my office, but I I just
1:20:41don't memory of when that was.
1:20:43>> I can dig a dig dig to the files.
1:20:45>> All right. Okay. See, is that agreeable?
1:20:48>> Yeah. I just wanted to I understand. I
1:20:50think they should too.
1:20:51>> So that's
1:20:52>> and I'm you know I don't they have there
1:20:54has not been a there for a long time and
1:20:57I'm just wondering what the story is
1:20:59with with them. You know
1:21:00>> where do you where did you see them
1:21:01sweeping? Was it on Washington Street?
1:21:03>> Old common right there at that uh right
1:21:06there at that entrance.
1:21:08>> When was it? Oh at the entrance.
1:21:10>> At that entrance point on the street.
1:21:12They were sweeping the street.
1:21:13>> Okay. Cuz it's further. Yeah. It's where
1:21:14the actual inlet is at the bottom of the
1:21:17hill.
1:21:17>> Yeah. Where you need to sweep. That's
1:21:18where all the sediment is collect.
1:21:20>> Yeah, I've seen the sediment sitting
1:21:21there too.
1:21:22>> That was specific to this property like
1:21:24street supers on I think it's street.
1:21:26>> No, just a guy out there actually
1:21:28sleeping with a broom.
1:21:29>> Okay. [laughter]
1:21:29>> Yeah,
1:21:31>> from the from the site
1:21:32>> down the home a little bit.
1:21:34>> Okay. Um is there any other is there any
1:21:38new business?
1:21:40Uh there being none, is there a motion
1:21:42to adjurnn?
1:21:43>> Motion to adjurnn.
1:21:44>> Is there a second?
1:21:45>> I second.
1:21:47>> Any discussion? All those in favor say
1:21:49I. I.
1:21:50>> No one ever opposes.
1:21:53Uh, all right. It's a vote. Thank you
1:21:54everyone. Um, thanks for staying a
1:21:56little bit later.
1:21:57>> This conference is no longer being
1:21:59recorded.
1:22:05>> [music]