2026-09-09 - Conservation Commission
Summary
Written from the auto-generated captions; names and numbers may be misheard.
- The vice chair ran the hybrid meeting with four members present; the conservation agent was out sick and the chair on vacation, so every vote was by roll call and the major items were put off to September 23.
- Continued hearing on a notice of intent for a new commercial building at 481 Washington Street (Route 20) with a drive-through coffee shop and convenience store, on a former gas station site with a wetland behind it. The applicant said the petroleum company that owns the site will remove the tanks and contaminated soil and control the cleanup, with a deed restriction barring excavation, outdoor recreation, day care and medical uses. The engineer said the lot would get a stormwater system where there is none now (rear and front infiltration systems sized for a 50-year storm), the peer reviewer had been answered point by point, and a membrane roof is planned. The curb cuts on Route 20 are right-in, right-out only and need state approval after local permits. Test pits could not be dug in the contaminated front area, so the applicant asked that confirmatory testing after the cleanup, and a ban on snow melting directly toward the wetland, be conditions. The Zoning Board of Appeals meets September 17 and the Planning Board September 22, and the purchase contract carries a roughly 90-day permit window ending in October. The hearing was continued to September 23 at 7 p.m. by roll call; the order of conditions would be drafted at that meeting.
- Erosion at a Rocklin Road property (address as heard): there has been no word from the state since the June 11 walk-through; the agent had contacted at least four outside wetland consultants, two of whom cited conflicts of interest and one did not respond. A neighbor said the temporary stabilization failed and runoff is reaching the wetland and their property. Members said the owner had been asked to make a temporary fix while an appeal is pending, promised to press for better protection, and carried the matter to September 23.
- Public works discussed how to review its projects: small in-house road maintenance under a reinstated and updated blanket order of conditions, and larger bid projects through a request for determination before bidding, with the contractor's erosion plan and stormwater plan provided before work starts. Two determination requests are on the next agenda; the open question is whether the old blanket order can be amended or needs a new notice of intent.
- August 26 minutes approved by roll call. A National Grid pole replacement on Rocklin Road was noted for information. A member reported that a business at 512 Washington Street (heard as 510) appears to have spread gravel into or near an unflagged wetland and cleared trees (Planning Board matter); members agreed a site visit and a wetland consultant are needed.
Issues discussed
- 481 Washington Street Drive-Through Development
- Rocklin Road Erosion Enforcement
- DPW Wetlands Review Procedures
- 512 Washington Street Parking Lot Expansion
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:06All right, welcome to this Wednesday,
00:09September 9th, 2026 open meeting of the
00:13town of Auburn Conservation Commission
00:15is being operated as a hybrid format
00:17under chapter 22 of the acts of 2022.
00:21The public can join the meeting remotely
00:23by telephone
00:2514086503123
00:30with access code 645782
00:35357
00:36or the public can join via computer
00:40atme.go.com
00:43Auburn conference room 1. All supporting
00:46materials that have been provided to the
00:48members of this body are available on
00:51town's website. The public is encouraged
00:53to follow along using the posted agenda.
00:56As a pre preliminary matter, I am
00:59Rickyman, vice chair of the conservation
01:02commission.
01:04Please permit me to confirm that all
01:05members and persons of the agenda are
01:08participating remotely in presence and
01:10can hear me. Uh I'm going to call upon
01:13the members of the board. Uh Megan
01:15Langley
01:16>> here.
01:17>> Um Michelle Coros
01:18>> here.
01:19>> Mark Slamos
01:20>> here
01:21>> and Mark Kish
01:22>> here.
01:23>> Um unfortunately today we do not have uh
01:27land coordinator with us. Um we will
01:31proceed.
01:32>> Um please take notice that everyone who
01:35wishes to speak on the matter before us
01:37tonight needs to fill and sign in the
01:39signing sheet up front. Um and then
01:42please note that each vote taken in this
01:45meeting will be conducted by roll call
01:46tonight. And um please note that this
01:50meeting is also being recorded by Auburn
01:52Cable Television.
01:54Um and if there's anyone remote um
01:57please state your name and anyone in
01:59person, please state your name and the
02:01address you are from as well. Um, I'm
02:04going to call the matter uh call the
02:08matter in this list on the agenda for 7
02:11PM applicant Matthew Dole with Brandic
02:15Realy Group 2 LLC for the notice of the
02:18attempt of the purchase of a new
02:19commercial building with Dunkin Donuts
02:21with a drive-through food service and
02:25convenience store at 481 Washington
02:28Street. Um, can I get a motion open? I'm
02:31negoti
02:39all
02:42>> in favor say I.
02:44>> I.
02:44>> I.
02:45>> I.
02:46>> And it's a go.
02:49Anyone for
02:51>> Hi. I'm Rob Brona. Um, Brandon Realy
02:53Group 2. Um Patrick will run through all
02:58the details, but in general what we're
03:00doing is buying this uh basically a
03:02brown field which is in the actual
03:05protection zone. Uh it's got a wetland
03:07behind it, very irregularly shaped lot
03:10uh walking. We've done this before with
03:13other petroleum companies. We made a
03:15deal with Getty Petroleum which is the
03:18my understanding this is sitting area.
03:20It's publicly traded. uh they're very
03:23worried about uh they're the deep pocket
03:25about liability. So, what they've done,
03:28and we've done this before, but old gas
03:30stations, the lots are too small,
03:32antiquated. Um, we'll buy them, we'll
03:36get all our permits. If we get them
03:37within a certain period of time, then
03:39they will come in and do the
03:40remediation. They'll hire their LSP.
03:43They demand that they control that
03:44process. They also deed restrict
03:46property so that we don't do excavation.
03:49We can have a basement, it's going to be
03:50a slab with a vapor barrier under it. um
03:54can't be used for outdoor recreation,
03:56daycare, medical facility, anything like
03:58that. Um they also require that if
04:02there's any other kind of environmental
04:04contamination or any other like DEB acts
04:06or the town acts, they have the right to
04:09come back in and they may knock down our
04:11building if they need to. That's
04:12something we had to agree. Um, but our
04:16experience over multiple sites is that
04:18this cleans up the neighborhood, creates
04:21a brand new building as opposed to what
04:23was an eyesore before. Um, and again,
04:27particularly in a an environmentally
04:29sensitive area, it's a benefit to the
04:31community to do it. Um, and again,
04:34there's a wetland right on this
04:35property, too. Um, and and it is
04:38contaminated. There's a D file on it.
04:41Um, and I know there were questions
04:44Getty realy. I spoke to the person we're
04:46dealing with here, Wall Street people.
04:47They weren't going to come with them.
04:49But they did send an email and they
04:51respond to the peer review saying,
04:52"Well, no, we're not going to leave the
04:55tanks in place and fill them with
04:56gravel. We're removing them and we're
04:58going to remove any contaminated soil
04:59that the LSP finds that we find." and
05:03they won't turn it back over to us till
05:06uh the town of Auburn and uh D clear
05:10because as you know the fire department
05:11has to observe the tanks being removed.
05:14They have to be manifested. They have to
05:15dispose the property properly. Um we've
05:18done this ourselves through a site we
05:20own in Kelly Square in Worcester. Um and
05:24and it worked pretty well and DP is I
05:27mean they're on it. There's somebody
05:28there. Um the city had somebody there in
05:31Worcester. Um, and in the other states
05:34where we've done it, it's every state
05:36has a little bit different requirement,
05:38but all goes pretty much the same way.
05:40Uh, we will end up presuming we get we
05:43get our permits and we close with a
05:46clean site or a much cleaner site at
05:48that respect. Uh, as determined by the
05:51town. That's the general overview. If if
05:54there aren't any more questions, I'll
05:56turn it over to Patrick. Um, you did
05:58make a comment in regards of you're not
06:01allowed to use the site for daycare,
06:03medical, and something else.
06:07Why could you use it for food?
06:10Why could it be used for like open
06:11source food like Dunkin Donuts purposes,
06:14but not those other things? Because the
06:16food's not nothing's going to deal with
06:19ground and that's going to take place on
06:22an impervious surface in a building
06:25that's monitored by the health
06:26department
06:28>> where kids could go outside
06:30or kids could go outside, right? Like a
06:33daycare, the kids could go outside and
06:35play,
06:35>> right? You get into dirt and digging
06:38things like that.
06:39>> It's the no digging.
06:41>> Yeah. Got it. because um we are
06:43increasing the impervious surface but a
06:46lot of it we can't get near because of
06:48the buffers. There will still be
06:51dirt, mud,
06:53>> y
06:55from the board.
06:57>> You just said you're increasing the
06:58impervious service. I thought there was
07:00a net decrease in service. Am I wrong
07:02about that?
07:03>> No, I I can get into that during my
07:05discussion of this model. essentially
07:07doubling the
07:08>> Okay, I guess I'm fixing that up.
07:11>> But we're also adding extensive storm
07:13water management, but there's none there
07:15now.
07:15>> Okay,
07:18>> any other questions from the board?
07:19Mark,
07:22Michelle, anyone from the audience?
07:30Mr. Chair, for the record, I'm Patrick
07:31Healey. I'm the civil engineer for the
07:33project. I'm vice president of Thompson
07:35Listing Associates in Boilston. So,
07:38we've been working with Brandon Realy
07:41for 25 odd years now on multiple sites.
07:44So, we have, you know, experience with
07:46their Dunkin Donuts, the drive-thru
07:48needs, the parking needs, the peak hours
07:50of demand, and all that kind of thing.
07:52We typically work with the consulting
07:54traffic engineer, which in this case was
07:56Kimborn Associates, McFale. Um, so we've
08:01worked with them. We've also worked with
08:03Gddard Consulting, Hello City.
08:05>> Sorry, could I pause you for one second?
08:06>> Yes.
08:06>> So, we need to turn this off for
08:18>> So, we worked with Goddard Consulting
08:20LLC. They were the uh the wetland
08:23scientists who delineated the wetland.
08:26They they have the vast experience with
08:28that as well. Um, so the site we're
08:30looking at here is at the corner of
08:32Washington Street and Elm Street. I know
08:34you saw this at a previous hearing. So
08:36the impervious areas now are pretty much
08:38the front quarter of the site and in the
08:41proposed condition there'll be more
08:43impervious here.
08:55So, it'll be a about a 6,000 square foot
08:58building, parking lot with the
09:00drive-thru lane coming around the
09:02building this way and uh storm water
09:04system under the rear portion of the
09:07parking lot here and a smaller system in
09:09here. So, as this as the building will
09:12be laid out, it'll be higher than
09:14Washington Street. So, there'll be a
09:16high point right about in here. So,
09:18everything from here back goes to the
09:20rear storm water system. small portion
09:22of the site similar to what's there
09:24today will now go to a storm water
09:27treatment collection infiltration system
09:29which doesn't exist today. Right now it
09:31all just runs off into the state
09:33highway.
09:34So um we had a peer review conducted by
09:37Graves Engineering. Uh I saw a couple of
09:40you looking at that when I walked in. So
09:42this week we did provide a a full
09:44response to Graves Engineering going
09:47through their uh comments point by
09:49point. So, I would just like to
09:51summarize some of the things that they
09:52asked for and how we addressed it.
09:55Emergency contact information has been
09:57added to the plan.
09:59Uh, we don't have building plans at this
10:01point. Those will be designed after the
10:03permits are received.
10:05Um, we have added a freestanding sign
10:08onto the plan which wasn't shown
10:10previously. That's here in front of the
10:12site.
10:18We've provided truck turning exhibits
10:20showing how large trucks can come into
10:22the site, service the uh dumpster at the
10:25back or make deliveries and then exit
10:27the site. So the way this is designed is
10:29the two curb cuts on Washington Street
10:32Route 20 are right in only and right out
10:34only. So any traffic that wants to go to
10:37Helm Street either north or south or to
10:40Washington Street West would have to use
10:42the existing curb cut here on Helm
10:44Street. So the way the traffic, you
10:47know, calculations and projections are
10:49made, 80% of the traffic comes in here
10:52and out here. There's a small amount
10:54that goes the other way. The site is uh
10:57arranged so that it can take the once a
10:59week tractor trailer deliveries at the
11:01rear of the site. that that truck would
11:03come in here, go around the
11:05drive-through lane, and go out. Those t
11:07those uh deliveries are typically made
11:09at off peak hours. So, they're not
11:11showing up between, you know, 7 and 9:00
11:13a.m. when the drive-thru is the busiest.
11:18um at the infiltration system at the
11:20front of the site. Um given that the
11:23area is still protected by that D
11:26consent order, we were not allowed to
11:28conduct soil test pits in the front of
11:30the site for that infiltration system.
11:33We would ask that that be made a
11:34condition of approval. Graves
11:36Engineering understands the conditions
11:38under which you know we're held and is
11:40satisfied that that could be done prior
11:42to installation. The real issue here is
11:44not the type of soil since we're in a
11:47groundwater, you know, contributing
11:49area. It's all sand deposit. The real
11:51issue for us is the separation of that
11:53infiltration to groundwater. So, we
11:55would have to conduct a test after that
11:57cleanup is conducted to determine the
11:59seasonal high groundwater elevation so
12:02we can appropriately site the or confirm
12:05that we have adequate separation
12:07[clears throat] from the infiltration
12:08system to the ground.
12:10So the test pit that you did form was in
12:13the back.
12:14>> We did test pits in the rear of the
12:15seven test.
12:16>> And the test pit the D is referring to
12:19is what you just described for the
12:21front. It's a contaminated area.
12:27So the test pits that we did conduct are
12:30here, here, and here.
12:32>> Mhm.
12:33>> And we have not tested in this area. So
12:35because that entire paved area is part
12:38of that, you know, use limitation, we're
12:40not allowed to do that until after the
12:43cleanup has been conducted.
12:45>> So you're looking for that to be as
12:47condition.
12:47>> I would suggest that would be an
12:48appropriate condition.
12:58I think the the email from getting
13:01petroleum or leus covers the next entry
13:04which is specific to the underground
13:06storage tank removal and process um
13:09involved in that where there was some
13:12misunderstanding of the notes that we
13:14had that the tanks would be filled with
13:16crush stone. That's not the case. The
13:18tanks have to be fully removed,
13:20inspected, nearly soil tested and all
13:22that and then be placed with either wash
13:24film or clean fill in those excavated
13:27areas. So we clarified that with the
13:30revised
13:37uh we've added a construction sequence
13:39to one of the plans here.
13:42Um it's important we've done a number of
13:45projects where Graves is a review
13:46engineer. So although we have these
13:48things in the documents, they like to
13:50open to the current sheet so there's no
13:53confusion on the contractor's part when
13:54they show up in sequences on the plan
13:58sheet. So, we've added a sheet to the
13:59plan set that shows that
14:03uh Grapes has reviewed our hydrarology
14:05and storm water report and found that
14:07we've adequately addressed the um DNP
14:10storm water standards and the town of
14:12Auburn specific standard relative to
14:14phosphorus removal. So we still after we
14:17receive approval from the planning board
14:19conservation commission, we still have
14:21to get that storm water permit from the
14:23Auburn DPW for the major uh site
14:27disturbance permit and they will again
14:29review our calculations at that point to
14:31verify that we adequately address the
14:34town standards.
14:38Uh we added some notes to the plan
14:40showing which drain structures have the
14:43storm sector pre-treatment devices in
14:45them.
14:57So specifically there's there's one
14:59structure before this infiltration
15:01system and one before this infiltration
15:03system. So the one in the front here,
15:06the the catch basins actually are great
15:08inlet storm water treatment units. So
15:11they not only provide separation of
15:12floatables, they also help us with our
15:15TSS removal. And in the back there are
15:18two catch basins that come into a common
15:20uh TSS removal pre-treatment device
15:23prior to the infiltration the subsurface
15:25system. So the way this these systems
15:28are designed,
15:30they can handle everything too,
15:31including a 50-year storm. So there
15:33would be some overflow discharge from
15:35larger storms. So say you would get up
15:37to six inches of rainfall that would be
15:39fully contained from the impervious
15:41areas in those infiltration systems and
15:44then beyond dock there would be some
15:45overflow. So in the front that would
15:48overflow this catch basin into the state
15:50highway and in the rear there's a
15:52there's an overflow pipe here that comes
15:53up to a head. So the way this is
15:56situated it's at the very top of that
15:59sort of storm water box that's
16:00underground. So only when the system
16:02gets up to a certain level would there
16:04be discharge from that.
16:10There was a question about sight
16:11distance here at the driveway because
16:13there is a there's a fence on the
16:15Abutters property. So our traffic
16:17consultant confirmed that a car at the
16:20stop line 8 ft from the gutter of the
16:22existing street does have over 400 ft of
16:25set distance in this other direction. So
16:28that's not a restriction. Uh as far as
16:30traffic safety,
16:33we adjusted one of the parking spaces
16:35for the wheelchair accessible vans
16:38and um added a a detail to show how that
16:43um ramp system gets to the sidewalk.
16:47And we've added some notes
16:48differentiating the types of curbs on
16:50the site. So, there is some granite
16:52curbing around the inside loop of the
16:54building up against the sidewalks and
16:56the drive-thru lane. And then there's
16:58buminous curb outside loop. And then
17:01there's some granite curbs here right at
17:03the curb cuts from the state highway.
17:05Because this is on a state highway,
17:07we're subject to mass DOT standards. You
17:09have to apply to mass DOT for change of
17:12use and alteration of those curb cuts.
17:14So, that all has to meet the state of
17:16curb cut standards. You applied for
17:18that?
17:20>> I'm sorry. Have you applied for those
17:21curve cuts?
17:22>> I can't do that until we have all local
17:23permits and needs
17:26and then we added on the previous plan
17:29some widths to the side
17:31to clarify.
17:33So I think we've adequately addressed
17:35the gate graves engineering uh peer
17:37review. I expect they will issue a
17:39letter back to their planning department
17:41acknowledging that prior to the next
17:43planning board meeting.
17:45Um, on sheet C3, you have uh these
17:48rectangular squares with numbers on
17:51them. I'm assuming that's the elevation
17:52of the pavement.
17:54>> Yes, these are the proposed grades.
17:56>> Yep. It seems that the elevation changes
17:58as it gets closer to the neighbors
18:00homes.
18:02Is it a possibility to have the water
18:04flow flow a different direction in that?
18:08>> So, this this neighbor's home actually
18:09sits higher than our parking lot. So
18:11there will be a slope coming down from
18:13the neighbors lot into our parking lot
18:15here. And then we have the catch basins
18:17here to collect that runoff.
18:19So for example, if you were here, the
18:21elevation is 524
18:24at the neighbor's property. And our the
18:26low point of our catch basin is 522.5.
18:30So it's a foot and a half.
18:35>> Okay.
18:36Is there any plan for snow snow removal
18:40or what you're going to be doing with
18:42them?
18:42>> Yes, we have designated a couple of
18:44areas on the site plan for snow removal
18:46or snow storage. I know DP had a comment
18:51about that. We had snow storage here on
18:54that slope that I was talking about
18:55where that would melt and come down into
18:57the parking lot, but there is another
18:59area here that's kind of off the edge of
19:01the pavement. you know, we would have to
19:04not have that according to what DP is
19:06saying and we'd have to remove any
19:08excess snow that doesn't fit in this
19:10area where we can melt it and get it
19:12into this formal treatment system. So we
19:15would be open to condition the
19:17permission ceasef to to put that
19:20as one of our uh conditions of approval
19:23stating that the snow area cannot melt
19:26and run off directly to the wetland that
19:28if large storms create snow such that it
19:31can't be stored rather be removed from
19:33the property done that in other strain
19:36sites.
19:40I think there was one other comment that
19:42DDP had made in it um
19:45file
19:47was
19:59any other comments from the board?
20:02>> Um I have a question. Um, so I know that
20:05there is the stipulation with the bill
20:07of sale about the 90 days that you have
20:10to get the permit. When does that clock
20:14run out?
20:16>> Well, sometime in October.
20:20>> Do you know early in October or late?
20:23>> I don't know the exact date right now. I
20:24don't have the contract.
20:26>> Okay. Just curious what
20:28>> we have.
20:28>> And is that getting like permits like
20:30from all like that's
20:32>> all three boards
20:33>> the land use boards not the specific
20:35like street opening permits card those
20:37those are specific
20:39just approval for the use and the storm
20:42water system. conservation commission
20:44planning and
20:46>> zoning board of appeals for the for
20:47[clears throat] the drive-thru uh use
20:49for the
20:50>> two special permits and a varian
20:53just those final three
20:54>> those are three permits we're looking to
20:56get by the dead
20:57>> and they seemed my opinion um the ZBA
21:02seemed amendable to granting them but
21:06they had advertised only one of the
21:08things we're asking for instead of all
21:09three sort of abundance of caution and
21:12due process process they wanted to
21:14continue and readvertise. So that's
21:16where we all
21:17>> right. Yep. And from my understanding
21:19yesterday because of that planning board
21:22wants to wait for the next meeting as
21:24well.
21:24>> Right. Understood. And that still falls
21:27within our time frame so we can work
21:29with you.
21:30>> So our board of appeals meeting is right
21:32on the 17th.
21:34>> 17th
21:34>> September 17th
21:36>> and then we'll go back to the planning
21:37board on the 22nd. Y
21:39>> hopefully wrap everything up.
21:41So these are the additional comments
21:43that I got from DP. So one was asking
21:46about the roof composition. So we expect
21:48this is going to be a membrane roof, not
21:50a metal roof. So that should alleviate
21:52the concerns about what type of metal it
21:54is and whether pre-treatment is
21:56necessary.
21:58And then um
22:00they questioned our worksheets for the
22:02credit on the TSS removal efficiency.
22:05Um, but as you know, the town of Auburn
22:07has a stricter TSS removal level and the
22:11total phosphorus removal uh percentages.
22:13The D doesn't have any standards. I
22:16would defer to the town storm water
22:17engineer to confirm that we meet the
22:19standards on that. Reeves has been
22:21satisfied with what we provided. We
22:24provided, you know, our typical D
22:26spreadsheet showing how the TLS is
22:28calculated. uh but they were asking for
22:31a separate calculation of pre-treatment
22:34versus overall treatment. We think
22:36that's covered by our spreadsheet since
22:38that's how we always do it using their
22:40prescribed method. So it's you know kind
22:43of surprised to get a comment from DP.
22:46So we're not following the procedure and
22:49is a very clearly laid out procedure in
22:52the handbook that I'm required to do to
22:54show storm water compliance.
23:00And then the other one was that uh same
23:02test pit question that we raised making
23:04that a condition of approval for the
23:06confirmed confirmatory test pit and the
23:09uh snow storage.
23:13So the commission's open to having those
23:15two items as in special conditions.
23:18We're certainly open to having them.
23:22I'd be happy to answer any questions.
23:26Any
23:28questions from any more questions from
23:30the board
23:32audience?
23:37Um
23:39I will have to say I'm not the normal
23:41chair so I'm not confident enough to
23:44finalize this. You did answer all of our
23:47questions and Grace has come back with a
23:51lot of comments. Um, but because we're
23:53waiting for ZVA and our head chair is
23:55usually more talented than I am, if you
23:58guys don't mind if we wait till the next
23:59meeting,
24:00>> which is the next
24:02>> the 23rd, I believe, which is the day
24:04after planning board. So, should be
24:07>> September 23rd.
24:08>> Yeah.
24:11>> All right. Can I get a motion to have
24:15I guess the Dunkin Donuts move to
24:18September 23rd? Uh, I make a motion that
24:20we continue the hearing for 481
24:22Washington Street to uh September 23rd.
24:27>> Yes.
24:27>> At 7 p.m.
24:29>> Yes.
24:31>> Okay. I have a second.
24:32>> I'll second that.
24:34>> All those in favor?
24:35>> I I
24:37>> All right.
24:37>> Thank you, Mr. Chair.
24:39>> We have a draft order of conditions
24:41written prior to that meeting.
24:43>> I'm sorry.
24:44>> Would you expect to have a draft order
24:46of conditions prior to that meeting?
24:48Who drafted that that meeting?
24:51>> We drafted it at the meeting. I I just
24:52haven't been here so I don't know how
24:53you
24:54>> Yeah, we usually do it.
24:57>> Assuming that Yeah. Like the most of the
24:59questions have been answered which I
25:00feel like you've answered most of our
25:02questions. Then we we do it that
25:04evening.
25:04>> That that evening we do the order
25:06condition. You could have it that next
25:08day, right?
25:09>> So you would have the 24th.
25:11>> Yeah. Roughly.
25:11>> Do you want us to do a draft for you?
25:15>> I don't think so. Yeah. No, you're
25:17right.
25:18>> Sometimes don't have staff. So,
25:19>> that's okay.
25:22>> N's not here tonight because she had to
25:24go home sick. You're catching us on a
25:25bed. [laughter]
25:29>> Her chairman's her chairman's on
25:31vacation. Natt went home sick. Yeah,
25:33it's been a day. So, yeah.
25:35>> Thanks for your time. Thank you. Thank
25:37you.
25:38>> Thank you.
25:41rate.
25:45Next order of business updates on
25:48environmental consultant for for
25:5347 Rock and Road. Um
25:58I don't have any update on that. You
26:00guys
26:00>> I don't have an update unless Nat had
26:02one button.
26:05Um
26:05>> I don't think I saw anything in the
26:08thing in my note. Nope.
26:12>> Would anyone in the audience have No.
26:15>> Nope. All right. I'm not No, I guess
26:18with uh touch grace.
26:19>> I was just going to say like if you guys
26:21>> did you guys get did you get notified by
26:24anybody at D?
26:26>> Yeah. Neither did we like unless
26:29>> we haven't heard anything since June
26:3011th. So we had a walk around.
26:32>> Okay.
26:33>> We expected that because that she told
26:36us it might take three, four, five
26:37months,
26:38>> right? But our concern tonight was at
26:43couple meetings back through the chair,
26:47>> he suggested getting an outside
26:49consultant to help the property owner
26:53stabilize the parking lot in the
26:55driveway that came down the side. And my
26:58question is, has somebody been hired? We
27:00have been we've gone through what four I
27:04know Nat has
27:06tried to contact at least four different
27:08consultants.
27:10>> They have not either responded or said
27:13that they have had a conflict of
27:15interest. Actually, two of them have
27:17said they had a conflict of interest.
27:19Um, one didn't respond and the other one
27:23I think retired. I don't know if Nat has
27:27reached out to anybody else or if she
27:31has been able to contact anybody or I
27:35don't know what the status of that is
27:38and um Nat's not here. So, I can't speak
27:42to that one way or the other. The last I
27:45knew that was the status on that and I
27:47know that Nat was actively working on
27:49it. Um we couldn't get anybody. I don't
27:54know if that's because it was summer.
27:56Um, but that's where we are.
28:00>> Who have we used in the past for similar
28:02situations?
28:03>> What was her name that I I believe um
28:11I believe she's retired and she was the
28:14one that hasn't responded. Um,
28:17>> are you talking about the town engineer?
28:19>> No, no, no. The wetland scientist. Um,
28:22the consultant. I can't remember her
28:25name.
28:29>> Emily.
28:29>> I don't know.
28:30>> That came up last.
28:32>> Oh, maybe it's not Emily. Hold on. Maybe
28:35it's in our notes. Hold on one second.
28:39>> I know. It's Walsh injured.
28:43>> I Walsh, I believe, is the one that said
28:45that they had a conflict, but they have
28:48>> conflict. Yeah, they were.
28:57Does anybody have any other notes?
29:00>> No.
29:02>> There might be a notes.
29:25At that same meeting, everybody's
29:27talking about hiring a consultant and
29:29all. Later on, it was mentioned that
29:33this had to be done within 7 days.
29:37Destabilization of the parking lot and
29:40the surrounding driveway, the 10 back
29:42behind it. They were going to do the
29:44weren't they going to do the
29:45stabilization?
29:46>> Well, they they started to do something
29:49themselves,
29:50not a professional engineering firm or
29:53the land surveyor
29:55and the first time around my property
29:58got inundated with the money.
30:00>> We saw that.
30:01>> Yeah,
30:02>> that's actually these notes right here.
30:05Um,
30:11>> it was my understanding that they
30:12couldn't proceed on the construction of
30:15the project because of
30:19>> whatever you guys put in place.
30:22>> And I think I could be wrong, but I
30:25think you guys were supposed to kind of
30:28figure out what the appeal was
30:30officially for
30:32because as far as Well,
30:34>> I you guys filed the appeal and then I
30:37believe you stated that it wasn't to
30:39stop um conservation from doing what we
30:43needed to do was for something else, but
30:45it seems there was some discrepancy with
30:48that.
30:48>> Okay, I'm just going to read this real
30:50quick.
30:52Mr. Garland informed Mr. Daly that the
30:54source of the issues cannot be addressed
30:56because of the appeal. The enforcement
30:59order is asking for a temporary fix to
31:01the erosion concern while the appeal is
31:03still pending. The commission does not
31:06have answers on how long the D will take
31:09to process the appeal or what D will do
31:13regarding the appeal. At the time at the
31:16time, all the commission can do is keep
31:18an eye on the situation. Mr. Garland
31:21stated that the applicant has been asked
31:24to implement a temporary fix. stated the
31:27applicant has been asked to implement a
31:30temporary fix. So
31:35yes, we have asked the applicant. So if
31:38they are attempting
31:42themselves to fix it, that's what we've
31:46asked them to do that they're doing what
31:48we've asked them to do.
31:51Um
31:53>> they did some work right after that
31:57meeting.
31:57>> Okay. Then that's what they were
31:59supposed to do.
32:00>> It failed.
32:01>> Okay.
32:01>> That's why this is continuing on.
32:03>> Correct. I believe the issue is
32:07they need the appeal to be removed so
32:09they can actually do the work that's
32:11supposed to permanently fix this. That's
32:13what they said.
32:15>> True.
32:16>> No, I'm sorry. That's not what we were
32:18told. Well, it says attorney B clarified
32:21the project had gotten the OC appeal
32:24caused the the whole process to fault
32:27until the D gives then a direct order to
32:31continue. The appeal would have to be
32:33withdrawn for the project to go forward.
32:35Until then, temporary measures are in
32:38place to stop the erosion from entering
32:40the wetland.
32:42This is this is the meeting minutes from
32:46June 24th, 2026. And I believe you
32:49wasn't present during that meeting.
32:51>> You were not present for that meeting.
32:53You you two were.
32:54>> Yeah.
32:57>> The way we Well, I shouldn't say we the
32:59way I understood that was that they were
33:01told by the D
33:03that when they did the walk, they
33:05couldn't touch any of the other
33:06property. They couldn't do anything else
33:08on that property except for
33:12parking lot in the back by Mr.
33:14Chandler's job. At that meeting, uh, the
33:17town sent him an order saying that he
33:19had to do the work within seven days. At
33:22that meeting, Mr. Garland, I believe,
33:24said that he have to do the work. At
33:27Tony Bro said, "We're not doing the work
33:29until the appeal is dropped.
33:33>> They can't do the work until the shop."
33:36>> They could they can do that one of the
33:41>> the temporary.
33:42>> I don't know. I wasn't at the I I All I
33:44know is that Nat said when she was here
33:47that the um DP person got very
33:53um
33:56closed off and was only working with you
33:59at that point and Nat.
34:01>> Is that correct? That's correct.
34:02>> Okay. All right.
34:04And so I don't know what was said
34:06between you and Nat and the D person and
34:10I don't remember her name.
34:13>> So I I don't know. But at this point we
34:16can we can go back and forth and we can
34:19do everything that we can to go back to
34:21them and ask them if they can try and
34:23stabilize that because I want that
34:25wetland protected just like you do. So
34:28that that's what I want. We all at this
34:31board volunteer our time every other
34:34Wednesday to try and make sure that the
34:36wetlands are protected for the people in
34:38Auburn. So I appreciate you coming in
34:41and letting us know that that isn't
34:43protected. So we are going to go and ask
34:46them to pri try and protect that better.
34:49So we will go and do that. Okay. Okay.
34:52>> Can I just explain what happened on that
34:54day? Sure. The walkthrough.
34:55>> Yes.
34:57So the three of us were invited by the
34:59DP to go through the walkthrough.
35:01>> Mhm.
35:01>> Two people from the town who were
35:04unwanted by us.
35:06>> Okay.
35:07>> Showed up
35:08>> and kind of caused a little trouble. So
35:11that's when she said, "I'm only taking
35:13one, Mr. Ch."
35:15>> I get it.
35:15>> So that's what happened.
35:16>> All right.
35:18All right. But I appreciate I do
35:20appreciate what you're doing. I I
35:22totally get it. But and we all have had
35:26frustrations with
35:30neighbors and things that have happened
35:32within our neighborhoods. I get it. And
35:35we'll do everything that we can to
35:37protect that wetland. I promise you
35:39that.
35:40>> How did the Walsh engineering explain
35:43that they might have a
35:44>> I don't know if I'm I don't quote me on
35:46Walsh. I know that it was two. I know
35:49that it was two. I don't know if it was
35:51I don't know who it was.
35:53>> I don't know the specifics.
35:54>> I don't know the specifics. So, do not
35:56quote me on Wall. I don't know. I do not
35:58know if it was Walsh. I don't I know
36:01that it was two that said that they had
36:03a conflict of interest. I don't know
36:04which two it was.
36:06>> Right. And we could we could check with
36:07N as far as defenders list.
36:10>> She she will be better suited to answer
36:13that question than I will.
36:15>> I I don't have the answer.
36:17>> I have notes here. I think Walsh was
36:19originally hired by his town
36:22>> to do a review of the project.
36:24>> Okay.
36:25>> I have this.
36:26>> Okay.
36:26>> That's where the conflict is.
36:28>> Yeah.
36:28>> Yeah.
36:28>> This is from almost a year ago.
36:31>> So maybe they can't do what
36:35>> that a little bit.
36:41>> One last thing. We know that you're
36:42trying.
36:43>> Okay.
36:43>> Okay. Okay.
36:44>> We we don't
36:46>> we don't think that way at all. Okay.
36:48Okay.
36:49>> That's all.
36:50>> We are we're doing the best we can.
36:52Okay.
36:57>> Will this discussion be carried over to
36:59your next meeting?
37:01>> Yes.
37:05>> Nat's not here and she was part of that
37:07meeting.
37:08>> We will be able to speak when you get
37:10back after everybody's vacation is.
37:12>> Yeah.
37:13>> It's on September 23rd.
37:15>> Okay.
37:16She'll be able to speak to it better
37:17than we can because we didn't do it.
37:21>> Okay.
37:22>> Thank you.
37:22>> All right. Thank you.
37:23>> Thank you. Good luck.
37:26>> Good night. Thank you.
37:32>> I guess discussion DP project review.
37:36>> See, I think Greg Roto is with DPW.
37:40>> Oh.
37:40>> Oh,
37:40>> DPW.
37:44Good evening.
37:45>> Good evening.
37:46>> Nice to see everyone again. Yes.
37:47>> I'm Pete Boria. I'm the assistant DPW
37:50director and sewer superintendent and
37:52with us online is Greg Roto, town
37:54engineer.
37:54>> And this is in in regards of the whole
37:57street scenario or is for something
37:59else?
37:59>> No, this is for your agenda item of the
38:01DPW discussion.
38:03>> Plank conditions.
38:05>> I'm sorry.
38:08>> Conditions. I think this
38:09>> that wasn't the agenda item. It was just
38:11a discussion. Is it
38:13>> about how we can be better aligned? Is
38:16that
38:16>> it says DPW project review procedures?
38:20>> Yeah.
38:20>> So is that I think some of our
38:22discussion at the last meeting was about
38:25you know future projects that
38:27>> could have um impact on wetlands and
38:30stuff and to give us a heads up or if
38:34you guys need to do anything above and
38:36beyond your standard conditions.
38:38>> Sure. So, as we're talking about it
38:40internally, we're looking at two
38:42parallel tracks. One is for small road
38:45maintenance projects that our own DPW
38:48personnel will do themselves. And those
38:52smaller again road maintenance items
38:55will be done hopefully when our blanket
38:57order is reinstated. And if we can
39:00discuss that at the next meeting, that'd
39:01be great. Uh we have the um current
39:05order with the activities under that and
39:08we'd like to [clears throat] kind of
39:09discuss those and maybe make some
39:11changes so it's more reflective of what
39:13we currently do today. And for the
39:16bigger projects that we have to go out
39:18to bid for we found or we've discussed
39:21and we think the cleanest way for us to
39:22approach that is to do an RDA with you
39:26before we go out to bid. That way there
39:28we know if it rises to the level of
39:31needing a notice of intent so that we
39:33don't bid a project and then have it
39:35stall while we wait for that notice of
39:37intent process. So we'll go ahead and
39:40submit the RDAU with the with the
39:43project scope of work. we won't
39:45necessarily have an erosion control plan
39:48or a SWIP because that will be part of
39:50the contract bid documents that the um
39:53the the winning contractor will have to
39:55provide before they get a notice to
39:57proceed. So, what we've been working on
39:59is a standard operating procedure for us
40:01internally that kind of spells out the
40:04steps for us to do that with you. So,
40:06it's a checklist item. It's step by step
40:09of what we're going to do to make sure
40:11that for the bigger scale projects that
40:14we use a subcontractor for such as you
40:17know full depth reclamation, mill and
40:18pave or any type of road work that
40:21happens within resource area. We'll put
40:23the bid documents together before we go
40:26out to bid. We'll file and we'll do the
40:27RDA. will come in front of you, let you
40:30know the areas that we're going to be
40:31working on, and then let you know.
40:34Again, the awarding contractor will
40:36prepare a SWIP under their NIFTY's
40:38permit and an erosion control plan that
40:40will be submitted to you before any type
40:42of notice to proceed for them to to
40:45start work will take place. And again,
40:48hopefully when we discuss that in the
40:50future, we weren't we didn't provide any
40:52of that tonight because that wasn't
40:54really what the agenda item mentioned,
40:55but um we're ready. We have two RDAs on
40:59your next meeting. If we could ask that
41:02to add another item to reinstate the
41:04blanket order that we previously had
41:07with maybe some adjustments to reflect
41:09our current activities. Then also talk
41:12about the SOP that we're preparing for
41:15um external subcontracted bid work.
41:19Hopefully you guys find that um
41:22amendable to to where we currently are
41:24and the best way to move forward.
41:31>> That's great.
41:32>> Yeah,
41:32>> I think so too.
41:33>> Fantastic.
41:34>> Yeah, I think that sounds good.
41:36>> Yeah.
41:37>> Excellent.
41:37>> Yeah.
41:38>> Thank you.
41:40Um, a question I will have for I guess
41:44for Mike when he gets back.
41:48So, reinstating,
41:52can the blanket order of conditions be
41:56reinstated [snorts]
41:58or does it actually procedurally require
42:00a new notice of intent in order for us
42:04to reinstate it? like does DPW
42:10>> have to apply
42:12this? This is a question I don't know.
42:14Do they have to file a new notice of
42:16intent? Cuz
42:18>> that's something. So, I'm just putting
42:20that out there. There is like I think a
42:21question that needs to be answered.
42:23>> I think that it would have to be
42:24reapplied for because I think that that
42:26was a blanket for everything. I think
42:28that we would have to put addition or we
42:30could reinstate it with additional
42:33>> I think the billate the blanket with the
42:36additional comments that we have.
42:37>> Yeah.
42:39>> But you're looking for some adjustments
42:41to do. We
42:42>> we're looking
42:42>> You all have the copy some changes. We
42:45have a copy of the current blanket order
42:47that we'll provide to you with some
42:49highlighted items that maybe we don't we
42:51don't necessarily need under there or
42:53that we don't utilize
42:54>> and maybe some different terms again
42:57that we currently use that'll be
42:59beneficial as far as applying for a new
43:02notice of intent. That would mean we'd
43:04have to start the process over, get a
43:06new D number and and pretty much do that
43:09all over again, which fortunately
43:11>> it's going to be months or weeks or
43:13whatever.
43:14>> Yeah. So
43:15>> that's not something I'm saying I want
43:16to happen. I just, you know, sometimes
43:18the red tape gets
43:20>> hopefully Mike and Nat can clarify that
43:23before we come back for your next
43:25meeting.
43:25>> I would hope that you could just
43:27>> adjust the existing.
43:30>> That's what it
43:32>> That'd be great. Amend it. And if you
43:34want to add a couple um conditions with
43:37it,
43:38>> is that blank available anywhere to see
43:41ahead of time?
43:42>> It's recorded, but yes. So I we're going
43:44to try and get you in again if you're if
43:47you're amendable to that course of
43:49action, we will get you copies of that
43:52blanket order with some highlighted
43:53items and stuff well before your meeting
43:55for that to share with you so you can
43:57>> that could be email package. Yes.
43:59>> Yeah. We'll get it like through here.
44:01>> That would be awesome.
44:01>> Yeah.
44:02>> Yeah.
44:02>> Yes.
44:06>> From my understanding the blanket order
44:08condition was for all the major
44:09projects.
44:10>> It was for all projects.
44:12>> All projects. Okay, it's a little
44:15confusing I guess.
44:16>> And then now now we are trying to adjust
44:19it a little bit so that it works better.
44:21But yet you guys will still come forward
44:22to in front of us with an RDA
44:26>> for the larger
44:27>> for the larger
44:28>> larger projects. Yes, we'll cover in
44:30front of before we go out to bid.
44:32>> Got it.
44:32>> And the blanket
44:34>> funny. Sorry.
44:36>> Yeah, I was just going to say the
44:37blanket order would cover the smaller
44:39project. Is that blanket or will cover
44:41the I'll call it roadway maintenance. We
44:43don't do any full depth reclamation on
44:44our own. We don't do any mill and pave.
44:47We don't the biggest thing we're doing
44:48is maybe a cross culvert. We're not
44:50doing a big drainage project to be
44:53consistent with what triggers the RDA
44:56and the subcontractor. We could keep it
44:58consistent with a swip where anything um
45:01up to an acre of disturbance. Once you
45:03get over that acre of det disturbance,
45:05it requires a swip to be done. We could
45:08have we could follow that, but I don't
45:10think we're even going to have any
45:11projects that'll come close to that.
45:13Correct, Greg.
45:15>> Yeah, correct. We we we won't be able to
45:17do much um if it's too large of a
45:20project, we're bidding it out.
45:23And that's why I'm trying to really
45:25clarify it to just pair it down to that
45:28roadway maintenance that lets us clean
45:31the catch basins, maybe rebuild the
45:32catch basin, replace a cross culvert, do
45:35the road work, you know, maybe repair
45:37some sidewalks or add some sidewalks in
45:40some small areas that might be in a
45:42resource area that we'll have to again
45:45let Natt know what we're doing. If we
45:47need to provide an an erosion and
45:49control plan for our small project, we
45:51can do that. Do the sitewalk with NAT
45:53before the con, you know, once the
45:55erosion control is in place and just
45:57really get that procedure back back in
45:59place so that we're, you know, we're
46:01working hand in hand through all of
46:03these projects. And then the bigger
46:05projects again will be where the RDAs
46:07are done for that work again before we
46:10go out to bid so that we know when we go
46:13out to bid, we can hit the ground
46:14running after the bids are received. We
46:16don't have to worry about a notice of
46:17intent. But and like I said, we in the
46:20past we've had the SWIP and the erosion
46:22control plan as part of our bid
46:24documents. It might not just have made
46:26its way to you guys where now it will.
46:29>> Okay.
46:30>> I like it.
46:32>> Yeah.
46:33>> Right.
46:35>> Awesome.
46:36>> And again, we'll try and get that to you
46:38fairly soon so you have plenty of time
46:39to redo it for you next week.
46:41>> Yeah.
46:43>> Yeah.
46:43>> 23rd.
46:44>> Great.
46:45>> That's awesome. Thank you. Okay,
46:46perfect. Excellent.
46:48>> Thank you.
46:48>> Thank you all.
46:49>> Thank you.
46:50>> Have a good night.
46:51>> Thanks.
46:51>> Take care everybody.
46:53>> Thank you.
46:56>> All right.
46:58Next thing, um, actually, next thing is
47:01meeting minutes.
47:03I reviewed it. I didn't have any
47:06comments, but also Matt's not here. I
47:09don't know how that works either. that
47:12we should review those meeting minutes
47:14next time she is here.
47:16>> Yeah, I'd say everything is questioned
47:17till next week.
47:18>> We have to vote on that.
47:23>> I don't think we voted on
47:26voted on postponing the approval of the
47:29minutes. I don't think we've ever voted
47:31on that before. [laughter]
47:33>> I was joking
47:35like it was a very informal.
47:38>> Yeah, we voted on accepting it.
47:39>> I was just I was joking. [laughter]
47:42Well, she has them in the packet, but
47:44she doesn't have it on the thing this
47:46year. She doesn't have it on the agenda.
47:48>> Yeah.
47:49>> So, that's really
47:51>> There is an 826 26,
47:56>> right?
47:58No. Um,
48:01>> oh Jesus, I didn't write on your note.
48:05>> We can vote on it.
48:07>> Okay. Can I get a motion to have the
48:10meeting minutes for 82626
48:13moved to September 23rd,
48:162026?
48:20>> I'd say we
48:22I meant we could vote on
48:23>> approving approval.
48:26>> Uh everyone
48:27>> I'm okay with I'm okay with reviewing
48:29them and approving them or amending them
48:31if you all are. I'm I'm still looking at
48:33just a few things.
48:34>> Okay.
48:42is we're we're missing Mike, but we
48:44don't need
48:45>> Are you allowed to approve? Oh, you was
48:47remote. Okay,
48:47>> I'm remote. Yeah. So, we're Are we okay
48:50voting?
48:50>> Yeah, that's
48:52>> you got enough of us. Matt Matt doesn't
48:55vote. Cool.
49:24Thanks.
49:58I don't have
50:05>> anybody need more time or
50:06>> I'm all set. Nope.
50:08>> Okay.
50:09>> Can I get a motion to accept the meeting
50:11minutes of August 26 26? So moved.
50:14>> Second.
50:15>> I'll second.
50:17>> All right. All those in favor?
50:19>> I
50:19>> I
50:30uh I
50:32believe this National Grid Rocklin Road
50:35pole replacement project.
50:38Uh we do have the information on that in
50:41our packets.
50:42Mhm.
50:52>> I will say I am not very informed on how
50:54that procedure happens.
50:56>> Basically, they just let us know.
50:58>> Okay.
51:00>> And there's not a lot we can do about
51:01it. So
51:07>> I have new business. Um
51:11um yesterday at the planning board uh um
51:16there was a project on
51:22510 Washington Street. There's a
51:24commercial property there. I'll pass
51:26this apple truck and trailer. They are
51:30expanding their lot to add some gravel
51:32for some storage outside. It's been
51:34impacting some of the neighbors. has
51:36come back to us on the planning board
51:38side with some issues and they're trying
51:40to get a permit because they were kind
51:42of doing some work without permission.
51:44There's a wetlands directly behind them.
51:47>> Um in 2023 all the trees and wetlands
51:50were intact and as of now most of the
51:53trees are gone and the wetland has been
51:55impacted with gravel, a large amount of
51:58gravel um and some things like that.
52:01There was a wetland consultant who
52:03actually lives on the same street who
52:04was at the meeting yesterday. And again,
52:07the wetlands is not flagged. So, it's
52:10kind of one of those things where we
52:12need, in my opinion, we should get a
52:15um consultant out there to review the
52:18wetlands, see how bad the damage was
52:20done. But it was done. They own it, but
52:25it's it's no longer there. It been
52:28tremendously impacted. Uh,
52:32so here's a
52:36here's a sketch of
52:39this way.
52:42Um, this is Washington Street. This is
52:44the building and there's the wetland
52:46line here. And they want to go past
52:47here. So, they already added the gravel.
52:51And then on this sheet, this is the
52:52before and after.
52:55So you're saying that there's there's
52:58actually like gravel and stuff in the
53:00wetland, not just in the buffer.
53:02>> Cor in the wetland spot.
53:04>> Okay.
53:04>> So they like they filled it either.
53:06>> I believe so.
53:09But again, it's not flagged. So whether
53:11or not it is wetlands, it's kind of
53:16tough to determine how much gravel it
53:19is. It is.
53:22>> Where's that mirror up there?
53:24Huh?
53:25>> What's that? That's a production
53:27company.
53:28>> I'm not 100% sure.
53:31>> The name is
53:32>> a before and after
53:34avenue.
53:40>> So, it seems like I mean very first step
53:43I would think would be like having Nat
53:45go out there
53:47and visit. I don't know. Have she been
53:49looped in on that?
53:50>> She has not. Um, there was a discussion
53:53with someone in conservation was out
53:55there.
53:56>> It was a female. Um, it could have and
53:58the guy said someone named Emily.
54:01>> There's the town engineer, I think. Is
54:03it No, maybe that's Emma.
54:04>> Yeah. Yeah.
54:05>> Emma. I think it might be Emma.
54:07>> I don't know if that's
54:09>> It's a Emma. Emily. It's very close. Uh,
54:12I I didn't recognize the name.
54:14>> Yep.
54:17>> But I just wanted to bring it to you
54:18guys.
54:20Uh this is something we would probably
54:22want to visit also.
54:24>> Yeah.
54:25>> Where is it next to?
54:27>> It's like um it's west of comes just a
54:32little little west on the same side.
54:35>> A little tiny truck in
54:38I've noticed it before.
54:40>> Yep.
54:44>> People go trash all the I just don't get
54:47it.
54:47>> Yeah. like why why
54:52>> all right so I um I believe Rose may
54:55Rose which is a part of the planning
54:57board probably not uh not on a daily so
55:02hopefully she communicated but I'll
55:03email not
55:04>> pass information along
55:08>> all right
55:10do we go try and go out there Saturday
55:12or do you want them go out there
55:17>> I can ask that and then
55:18>> I have like a million things to do on
55:20Saturday.
55:20>> Yeah, I I have a I'm not going there.
55:23>> Okay, good. How about Saturday
55:24afterwards? Maybe
55:26>> maybe the Sunday afterwards or maybe
55:28midweek we can all just do it for
55:32>> um
55:33>> Sunday. I could probably do Sunday.
55:35>> Definitely.
55:37>> I have a witch thing I'm going to I'm
55:39very excited about.
55:40>> I can do it tomorrow and send
55:41information videos to everyone as well.
55:45>> Do that.
55:45>> Yeah, we'll wait. Okay.
55:47>> So, you're saying that the the people
55:49that own the property, they they
55:52you know, they own up to doing it, but
55:54they didn't realize it was what?
55:56>> Um
55:56>> because it wasn't flagged.
55:58>> Yeah, it wasn't flagged. I believe it's
56:00on their property. Um
56:04and they just been removing some dead
56:05trees. Apparently, there were dead trees
56:07per that 2023 that seemed very alive to
56:10me. And now there's very
56:12>> Yeah.
56:13>> They don't look dead at all.
56:14>> So,
56:15>> I don't really understand. And then
56:16[clears throat] there's a wetland
56:17consultant from Ecotech that does live
56:20on that street.
56:22So I don't remember his name, but
56:27not I would reach out to Natt and uh and
56:30then I'll take videos and pictures and
56:32get back to everyone.
56:35>> Adjourning time.
56:37>> Can I get a motion to adjourn the
56:38meeting?
56:38>> We adjourn the meetings.
56:40>> Second.
56:41>> I second.
56:42>> All those in favor? Hi.
56:44>> Hi.
56:44>> Hi.
56:46>> Thank you. [music]
