2026-09-09 - Conservation Commission

Summary

Written from the auto-generated captions; names and numbers may be misheard.

  • The vice chair ran the hybrid meeting with four members present; the conservation agent was out sick and the chair on vacation, so every vote was by roll call and the major items were put off to September 23.
  • Continued hearing on a notice of intent for a new commercial building at 481 Washington Street (Route 20) with a drive-through coffee shop and convenience store, on a former gas station site with a wetland behind it. The applicant said the petroleum company that owns the site will remove the tanks and contaminated soil and control the cleanup, with a deed restriction barring excavation, outdoor recreation, day care and medical uses. The engineer said the lot would get a stormwater system where there is none now (rear and front infiltration systems sized for a 50-year storm), the peer reviewer had been answered point by point, and a membrane roof is planned. The curb cuts on Route 20 are right-in, right-out only and need state approval after local permits. Test pits could not be dug in the contaminated front area, so the applicant asked that confirmatory testing after the cleanup, and a ban on snow melting directly toward the wetland, be conditions. The Zoning Board of Appeals meets September 17 and the Planning Board September 22, and the purchase contract carries a roughly 90-day permit window ending in October. The hearing was continued to September 23 at 7 p.m. by roll call; the order of conditions would be drafted at that meeting.
  • Erosion at a Rocklin Road property (address as heard): there has been no word from the state since the June 11 walk-through; the agent had contacted at least four outside wetland consultants, two of whom cited conflicts of interest and one did not respond. A neighbor said the temporary stabilization failed and runoff is reaching the wetland and their property. Members said the owner had been asked to make a temporary fix while an appeal is pending, promised to press for better protection, and carried the matter to September 23.
  • Public works discussed how to review its projects: small in-house road maintenance under a reinstated and updated blanket order of conditions, and larger bid projects through a request for determination before bidding, with the contractor's erosion plan and stormwater plan provided before work starts. Two determination requests are on the next agenda; the open question is whether the old blanket order can be amended or needs a new notice of intent.
  • August 26 minutes approved by roll call. A National Grid pole replacement on Rocklin Road was noted for information. A member reported that a business at 512 Washington Street (heard as 510) appears to have spread gravel into or near an unflagged wetland and cleared trees (Planning Board matter); members agreed a site visit and a wetland consultant are needed.

Issues discussed

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:06All right, welcome to this Wednesday,

00:09September 9th, 2026 open meeting of the

00:13town of Auburn Conservation Commission

00:15is being operated as a hybrid format

00:17under chapter 22 of the acts of 2022.

00:21The public can join the meeting remotely

00:23by telephone

00:2514086503123

00:30with access code 645782

00:35357

00:36or the public can join via computer

00:40atme.go.com

00:43Auburn conference room 1. All supporting

00:46materials that have been provided to the

00:48members of this body are available on

00:51town's website. The public is encouraged

00:53to follow along using the posted agenda.

00:56As a pre preliminary matter, I am

00:59Rickyman, vice chair of the conservation

01:02commission.

01:04Please permit me to confirm that all

01:05members and persons of the agenda are

01:08participating remotely in presence and

01:10can hear me. Uh I'm going to call upon

01:13the members of the board. Uh Megan

01:15Langley

01:16>> here.

01:17>> Um Michelle Coros

01:18>> here.

01:19>> Mark Slamos

01:20>> here

01:21>> and Mark Kish

01:22>> here.

01:23>> Um unfortunately today we do not have uh

01:27land coordinator with us. Um we will

01:31proceed.

01:32>> Um please take notice that everyone who

01:35wishes to speak on the matter before us

01:37tonight needs to fill and sign in the

01:39signing sheet up front. Um and then

01:42please note that each vote taken in this

01:45meeting will be conducted by roll call

01:46tonight. And um please note that this

01:50meeting is also being recorded by Auburn

01:52Cable Television.

01:54Um and if there's anyone remote um

01:57please state your name and anyone in

01:59person, please state your name and the

02:01address you are from as well. Um, I'm

02:04going to call the matter uh call the

02:08matter in this list on the agenda for 7

02:11PM applicant Matthew Dole with Brandic

02:15Realy Group 2 LLC for the notice of the

02:18attempt of the purchase of a new

02:19commercial building with Dunkin Donuts

02:21with a drive-through food service and

02:25convenience store at 481 Washington

02:28Street. Um, can I get a motion open? I'm

02:31negoti

02:39all

02:42>> in favor say I.

02:44>> I.

02:44>> I.

02:45>> I.

02:46>> And it's a go.

02:49Anyone for

02:51>> Hi. I'm Rob Brona. Um, Brandon Realy

02:53Group 2. Um Patrick will run through all

02:58the details, but in general what we're

03:00doing is buying this uh basically a

03:02brown field which is in the actual

03:05protection zone. Uh it's got a wetland

03:07behind it, very irregularly shaped lot

03:10uh walking. We've done this before with

03:13other petroleum companies. We made a

03:15deal with Getty Petroleum which is the

03:18my understanding this is sitting area.

03:20It's publicly traded. uh they're very

03:23worried about uh they're the deep pocket

03:25about liability. So, what they've done,

03:28and we've done this before, but old gas

03:30stations, the lots are too small,

03:32antiquated. Um, we'll buy them, we'll

03:36get all our permits. If we get them

03:37within a certain period of time, then

03:39they will come in and do the

03:40remediation. They'll hire their LSP.

03:43They demand that they control that

03:44process. They also deed restrict

03:46property so that we don't do excavation.

03:49We can have a basement, it's going to be

03:50a slab with a vapor barrier under it. um

03:54can't be used for outdoor recreation,

03:56daycare, medical facility, anything like

03:58that. Um they also require that if

04:02there's any other kind of environmental

04:04contamination or any other like DEB acts

04:06or the town acts, they have the right to

04:09come back in and they may knock down our

04:11building if they need to. That's

04:12something we had to agree. Um, but our

04:16experience over multiple sites is that

04:18this cleans up the neighborhood, creates

04:21a brand new building as opposed to what

04:23was an eyesore before. Um, and again,

04:27particularly in a an environmentally

04:29sensitive area, it's a benefit to the

04:31community to do it. Um, and again,

04:34there's a wetland right on this

04:35property, too. Um, and and it is

04:38contaminated. There's a D file on it.

04:41Um, and I know there were questions

04:44Getty realy. I spoke to the person we're

04:46dealing with here, Wall Street people.

04:47They weren't going to come with them.

04:49But they did send an email and they

04:51respond to the peer review saying,

04:52"Well, no, we're not going to leave the

04:55tanks in place and fill them with

04:56gravel. We're removing them and we're

04:58going to remove any contaminated soil

04:59that the LSP finds that we find." and

05:03they won't turn it back over to us till

05:06uh the town of Auburn and uh D clear

05:10because as you know the fire department

05:11has to observe the tanks being removed.

05:14They have to be manifested. They have to

05:15dispose the property properly. Um we've

05:18done this ourselves through a site we

05:20own in Kelly Square in Worcester. Um and

05:24and it worked pretty well and DP is I

05:27mean they're on it. There's somebody

05:28there. Um the city had somebody there in

05:31Worcester. Um, and in the other states

05:34where we've done it, it's every state

05:36has a little bit different requirement,

05:38but all goes pretty much the same way.

05:40Uh, we will end up presuming we get we

05:43get our permits and we close with a

05:46clean site or a much cleaner site at

05:48that respect. Uh, as determined by the

05:51town. That's the general overview. If if

05:54there aren't any more questions, I'll

05:56turn it over to Patrick. Um, you did

05:58make a comment in regards of you're not

06:01allowed to use the site for daycare,

06:03medical, and something else.

06:07Why could you use it for food?

06:10Why could it be used for like open

06:11source food like Dunkin Donuts purposes,

06:14but not those other things? Because the

06:16food's not nothing's going to deal with

06:19ground and that's going to take place on

06:22an impervious surface in a building

06:25that's monitored by the health

06:26department

06:28>> where kids could go outside

06:30or kids could go outside, right? Like a

06:33daycare, the kids could go outside and

06:35play,

06:35>> right? You get into dirt and digging

06:38things like that.

06:39>> It's the no digging.

06:41>> Yeah. Got it. because um we are

06:43increasing the impervious surface but a

06:46lot of it we can't get near because of

06:48the buffers. There will still be

06:51dirt, mud,

06:53>> y

06:55from the board.

06:57>> You just said you're increasing the

06:58impervious service. I thought there was

07:00a net decrease in service. Am I wrong

07:02about that?

07:03>> No, I I can get into that during my

07:05discussion of this model. essentially

07:07doubling the

07:08>> Okay, I guess I'm fixing that up.

07:11>> But we're also adding extensive storm

07:13water management, but there's none there

07:15now.

07:15>> Okay,

07:18>> any other questions from the board?

07:19Mark,

07:22Michelle, anyone from the audience?

07:30Mr. Chair, for the record, I'm Patrick

07:31Healey. I'm the civil engineer for the

07:33project. I'm vice president of Thompson

07:35Listing Associates in Boilston. So,

07:38we've been working with Brandon Realy

07:41for 25 odd years now on multiple sites.

07:44So, we have, you know, experience with

07:46their Dunkin Donuts, the drive-thru

07:48needs, the parking needs, the peak hours

07:50of demand, and all that kind of thing.

07:52We typically work with the consulting

07:54traffic engineer, which in this case was

07:56Kimborn Associates, McFale. Um, so we've

08:01worked with them. We've also worked with

08:03Gddard Consulting, Hello City.

08:05>> Sorry, could I pause you for one second?

08:06>> Yes.

08:06>> So, we need to turn this off for

08:18>> So, we worked with Goddard Consulting

08:20LLC. They were the uh the wetland

08:23scientists who delineated the wetland.

08:26They they have the vast experience with

08:28that as well. Um, so the site we're

08:30looking at here is at the corner of

08:32Washington Street and Elm Street. I know

08:34you saw this at a previous hearing. So

08:36the impervious areas now are pretty much

08:38the front quarter of the site and in the

08:41proposed condition there'll be more

08:43impervious here.

08:55So, it'll be a about a 6,000 square foot

08:58building, parking lot with the

09:00drive-thru lane coming around the

09:02building this way and uh storm water

09:04system under the rear portion of the

09:07parking lot here and a smaller system in

09:09here. So, as this as the building will

09:12be laid out, it'll be higher than

09:14Washington Street. So, there'll be a

09:16high point right about in here. So,

09:18everything from here back goes to the

09:20rear storm water system. small portion

09:22of the site similar to what's there

09:24today will now go to a storm water

09:27treatment collection infiltration system

09:29which doesn't exist today. Right now it

09:31all just runs off into the state

09:33highway.

09:34So um we had a peer review conducted by

09:37Graves Engineering. Uh I saw a couple of

09:40you looking at that when I walked in. So

09:42this week we did provide a a full

09:44response to Graves Engineering going

09:47through their uh comments point by

09:49point. So, I would just like to

09:51summarize some of the things that they

09:52asked for and how we addressed it.

09:55Emergency contact information has been

09:57added to the plan.

09:59Uh, we don't have building plans at this

10:01point. Those will be designed after the

10:03permits are received.

10:05Um, we have added a freestanding sign

10:08onto the plan which wasn't shown

10:10previously. That's here in front of the

10:12site.

10:18We've provided truck turning exhibits

10:20showing how large trucks can come into

10:22the site, service the uh dumpster at the

10:25back or make deliveries and then exit

10:27the site. So the way this is designed is

10:29the two curb cuts on Washington Street

10:32Route 20 are right in only and right out

10:34only. So any traffic that wants to go to

10:37Helm Street either north or south or to

10:40Washington Street West would have to use

10:42the existing curb cut here on Helm

10:44Street. So the way the traffic, you

10:47know, calculations and projections are

10:49made, 80% of the traffic comes in here

10:52and out here. There's a small amount

10:54that goes the other way. The site is uh

10:57arranged so that it can take the once a

10:59week tractor trailer deliveries at the

11:01rear of the site. that that truck would

11:03come in here, go around the

11:05drive-through lane, and go out. Those t

11:07those uh deliveries are typically made

11:09at off peak hours. So, they're not

11:11showing up between, you know, 7 and 9:00

11:13a.m. when the drive-thru is the busiest.

11:18um at the infiltration system at the

11:20front of the site. Um given that the

11:23area is still protected by that D

11:26consent order, we were not allowed to

11:28conduct soil test pits in the front of

11:30the site for that infiltration system.

11:33We would ask that that be made a

11:34condition of approval. Graves

11:36Engineering understands the conditions

11:38under which you know we're held and is

11:40satisfied that that could be done prior

11:42to installation. The real issue here is

11:44not the type of soil since we're in a

11:47groundwater, you know, contributing

11:49area. It's all sand deposit. The real

11:51issue for us is the separation of that

11:53infiltration to groundwater. So, we

11:55would have to conduct a test after that

11:57cleanup is conducted to determine the

11:59seasonal high groundwater elevation so

12:02we can appropriately site the or confirm

12:05that we have adequate separation

12:07[clears throat] from the infiltration

12:08system to the ground.

12:10So the test pit that you did form was in

12:13the back.

12:14>> We did test pits in the rear of the

12:15seven test.

12:16>> And the test pit the D is referring to

12:19is what you just described for the

12:21front. It's a contaminated area.

12:27So the test pits that we did conduct are

12:30here, here, and here.

12:32>> Mhm.

12:33>> And we have not tested in this area. So

12:35because that entire paved area is part

12:38of that, you know, use limitation, we're

12:40not allowed to do that until after the

12:43cleanup has been conducted.

12:45>> So you're looking for that to be as

12:47condition.

12:47>> I would suggest that would be an

12:48appropriate condition.

12:58I think the the email from getting

13:01petroleum or leus covers the next entry

13:04which is specific to the underground

13:06storage tank removal and process um

13:09involved in that where there was some

13:12misunderstanding of the notes that we

13:14had that the tanks would be filled with

13:16crush stone. That's not the case. The

13:18tanks have to be fully removed,

13:20inspected, nearly soil tested and all

13:22that and then be placed with either wash

13:24film or clean fill in those excavated

13:27areas. So we clarified that with the

13:30revised

13:37uh we've added a construction sequence

13:39to one of the plans here.

13:42Um it's important we've done a number of

13:45projects where Graves is a review

13:46engineer. So although we have these

13:48things in the documents, they like to

13:50open to the current sheet so there's no

13:53confusion on the contractor's part when

13:54they show up in sequences on the plan

13:58sheet. So, we've added a sheet to the

13:59plan set that shows that

14:03uh Grapes has reviewed our hydrarology

14:05and storm water report and found that

14:07we've adequately addressed the um DNP

14:10storm water standards and the town of

14:12Auburn specific standard relative to

14:14phosphorus removal. So we still after we

14:17receive approval from the planning board

14:19conservation commission, we still have

14:21to get that storm water permit from the

14:23Auburn DPW for the major uh site

14:27disturbance permit and they will again

14:29review our calculations at that point to

14:31verify that we adequately address the

14:34town standards.

14:38Uh we added some notes to the plan

14:40showing which drain structures have the

14:43storm sector pre-treatment devices in

14:45them.

14:57So specifically there's there's one

14:59structure before this infiltration

15:01system and one before this infiltration

15:03system. So the one in the front here,

15:06the the catch basins actually are great

15:08inlet storm water treatment units. So

15:11they not only provide separation of

15:12floatables, they also help us with our

15:15TSS removal. And in the back there are

15:18two catch basins that come into a common

15:20uh TSS removal pre-treatment device

15:23prior to the infiltration the subsurface

15:25system. So the way this these systems

15:28are designed,

15:30they can handle everything too,

15:31including a 50-year storm. So there

15:33would be some overflow discharge from

15:35larger storms. So say you would get up

15:37to six inches of rainfall that would be

15:39fully contained from the impervious

15:41areas in those infiltration systems and

15:44then beyond dock there would be some

15:45overflow. So in the front that would

15:48overflow this catch basin into the state

15:50highway and in the rear there's a

15:52there's an overflow pipe here that comes

15:53up to a head. So the way this is

15:56situated it's at the very top of that

15:59sort of storm water box that's

16:00underground. So only when the system

16:02gets up to a certain level would there

16:04be discharge from that.

16:10There was a question about sight

16:11distance here at the driveway because

16:13there is a there's a fence on the

16:15Abutters property. So our traffic

16:17consultant confirmed that a car at the

16:20stop line 8 ft from the gutter of the

16:22existing street does have over 400 ft of

16:25set distance in this other direction. So

16:28that's not a restriction. Uh as far as

16:30traffic safety,

16:33we adjusted one of the parking spaces

16:35for the wheelchair accessible vans

16:38and um added a a detail to show how that

16:43um ramp system gets to the sidewalk.

16:47And we've added some notes

16:48differentiating the types of curbs on

16:50the site. So, there is some granite

16:52curbing around the inside loop of the

16:54building up against the sidewalks and

16:56the drive-thru lane. And then there's

16:58buminous curb outside loop. And then

17:01there's some granite curbs here right at

17:03the curb cuts from the state highway.

17:05Because this is on a state highway,

17:07we're subject to mass DOT standards. You

17:09have to apply to mass DOT for change of

17:12use and alteration of those curb cuts.

17:14So, that all has to meet the state of

17:16curb cut standards. You applied for

17:18that?

17:20>> I'm sorry. Have you applied for those

17:21curve cuts?

17:22>> I can't do that until we have all local

17:23permits and needs

17:26and then we added on the previous plan

17:29some widths to the side

17:31to clarify.

17:33So I think we've adequately addressed

17:35the gate graves engineering uh peer

17:37review. I expect they will issue a

17:39letter back to their planning department

17:41acknowledging that prior to the next

17:43planning board meeting.

17:45Um, on sheet C3, you have uh these

17:48rectangular squares with numbers on

17:51them. I'm assuming that's the elevation

17:52of the pavement.

17:54>> Yes, these are the proposed grades.

17:56>> Yep. It seems that the elevation changes

17:58as it gets closer to the neighbors

18:00homes.

18:02Is it a possibility to have the water

18:04flow flow a different direction in that?

18:08>> So, this this neighbor's home actually

18:09sits higher than our parking lot. So

18:11there will be a slope coming down from

18:13the neighbors lot into our parking lot

18:15here. And then we have the catch basins

18:17here to collect that runoff.

18:19So for example, if you were here, the

18:21elevation is 524

18:24at the neighbor's property. And our the

18:26low point of our catch basin is 522.5.

18:30So it's a foot and a half.

18:35>> Okay.

18:36Is there any plan for snow snow removal

18:40or what you're going to be doing with

18:42them?

18:42>> Yes, we have designated a couple of

18:44areas on the site plan for snow removal

18:46or snow storage. I know DP had a comment

18:51about that. We had snow storage here on

18:54that slope that I was talking about

18:55where that would melt and come down into

18:57the parking lot, but there is another

18:59area here that's kind of off the edge of

19:01the pavement. you know, we would have to

19:04not have that according to what DP is

19:06saying and we'd have to remove any

19:08excess snow that doesn't fit in this

19:10area where we can melt it and get it

19:12into this formal treatment system. So we

19:15would be open to condition the

19:17permission ceasef to to put that

19:20as one of our uh conditions of approval

19:23stating that the snow area cannot melt

19:26and run off directly to the wetland that

19:28if large storms create snow such that it

19:31can't be stored rather be removed from

19:33the property done that in other strain

19:36sites.

19:40I think there was one other comment that

19:42DDP had made in it um

19:45file

19:47was

19:59any other comments from the board?

20:02>> Um I have a question. Um, so I know that

20:05there is the stipulation with the bill

20:07of sale about the 90 days that you have

20:10to get the permit. When does that clock

20:14run out?

20:16>> Well, sometime in October.

20:20>> Do you know early in October or late?

20:23>> I don't know the exact date right now. I

20:24don't have the contract.

20:26>> Okay. Just curious what

20:28>> we have.

20:28>> And is that getting like permits like

20:30from all like that's

20:32>> all three boards

20:33>> the land use boards not the specific

20:35like street opening permits card those

20:37those are specific

20:39just approval for the use and the storm

20:42water system. conservation commission

20:44planning and

20:46>> zoning board of appeals for the for

20:47[clears throat] the drive-thru uh use

20:49for the

20:50>> two special permits and a varian

20:53just those final three

20:54>> those are three permits we're looking to

20:56get by the dead

20:57>> and they seemed my opinion um the ZBA

21:02seemed amendable to granting them but

21:06they had advertised only one of the

21:08things we're asking for instead of all

21:09three sort of abundance of caution and

21:12due process process they wanted to

21:14continue and readvertise. So that's

21:16where we all

21:17>> right. Yep. And from my understanding

21:19yesterday because of that planning board

21:22wants to wait for the next meeting as

21:24well.

21:24>> Right. Understood. And that still falls

21:27within our time frame so we can work

21:29with you.

21:30>> So our board of appeals meeting is right

21:32on the 17th.

21:34>> 17th

21:34>> September 17th

21:36>> and then we'll go back to the planning

21:37board on the 22nd. Y

21:39>> hopefully wrap everything up.

21:41So these are the additional comments

21:43that I got from DP. So one was asking

21:46about the roof composition. So we expect

21:48this is going to be a membrane roof, not

21:50a metal roof. So that should alleviate

21:52the concerns about what type of metal it

21:54is and whether pre-treatment is

21:56necessary.

21:58And then um

22:00they questioned our worksheets for the

22:02credit on the TSS removal efficiency.

22:05Um, but as you know, the town of Auburn

22:07has a stricter TSS removal level and the

22:11total phosphorus removal uh percentages.

22:13The D doesn't have any standards. I

22:16would defer to the town storm water

22:17engineer to confirm that we meet the

22:19standards on that. Reeves has been

22:21satisfied with what we provided. We

22:24provided, you know, our typical D

22:26spreadsheet showing how the TLS is

22:28calculated. uh but they were asking for

22:31a separate calculation of pre-treatment

22:34versus overall treatment. We think

22:36that's covered by our spreadsheet since

22:38that's how we always do it using their

22:40prescribed method. So it's you know kind

22:43of surprised to get a comment from DP.

22:46So we're not following the procedure and

22:49is a very clearly laid out procedure in

22:52the handbook that I'm required to do to

22:54show storm water compliance.

23:00And then the other one was that uh same

23:02test pit question that we raised making

23:04that a condition of approval for the

23:06confirmed confirmatory test pit and the

23:09uh snow storage.

23:13So the commission's open to having those

23:15two items as in special conditions.

23:18We're certainly open to having them.

23:22I'd be happy to answer any questions.

23:26Any

23:28questions from any more questions from

23:30the board

23:32audience?

23:37Um

23:39I will have to say I'm not the normal

23:41chair so I'm not confident enough to

23:44finalize this. You did answer all of our

23:47questions and Grace has come back with a

23:51lot of comments. Um, but because we're

23:53waiting for ZVA and our head chair is

23:55usually more talented than I am, if you

23:58guys don't mind if we wait till the next

23:59meeting,

24:00>> which is the next

24:02>> the 23rd, I believe, which is the day

24:04after planning board. So, should be

24:07>> September 23rd.

24:08>> Yeah.

24:11>> All right. Can I get a motion to have

24:15I guess the Dunkin Donuts move to

24:18September 23rd? Uh, I make a motion that

24:20we continue the hearing for 481

24:22Washington Street to uh September 23rd.

24:27>> Yes.

24:27>> At 7 p.m.

24:29>> Yes.

24:31>> Okay. I have a second.

24:32>> I'll second that.

24:34>> All those in favor?

24:35>> I I

24:37>> All right.

24:37>> Thank you, Mr. Chair.

24:39>> We have a draft order of conditions

24:41written prior to that meeting.

24:43>> I'm sorry.

24:44>> Would you expect to have a draft order

24:46of conditions prior to that meeting?

24:48Who drafted that that meeting?

24:51>> We drafted it at the meeting. I I just

24:52haven't been here so I don't know how

24:53you

24:54>> Yeah, we usually do it.

24:57>> Assuming that Yeah. Like the most of the

24:59questions have been answered which I

25:00feel like you've answered most of our

25:02questions. Then we we do it that

25:04evening.

25:04>> That that evening we do the order

25:06condition. You could have it that next

25:08day, right?

25:09>> So you would have the 24th.

25:11>> Yeah. Roughly.

25:11>> Do you want us to do a draft for you?

25:15>> I don't think so. Yeah. No, you're

25:17right.

25:18>> Sometimes don't have staff. So,

25:19>> that's okay.

25:22>> N's not here tonight because she had to

25:24go home sick. You're catching us on a

25:25bed. [laughter]

25:29>> Her chairman's her chairman's on

25:31vacation. Natt went home sick. Yeah,

25:33it's been a day. So, yeah.

25:35>> Thanks for your time. Thank you. Thank

25:37you.

25:38>> Thank you.

25:41rate.

25:45Next order of business updates on

25:48environmental consultant for for

25:5347 Rock and Road. Um

25:58I don't have any update on that. You

26:00guys

26:00>> I don't have an update unless Nat had

26:02one button.

26:05Um

26:05>> I don't think I saw anything in the

26:08thing in my note. Nope.

26:12>> Would anyone in the audience have No.

26:15>> Nope. All right. I'm not No, I guess

26:18with uh touch grace.

26:19>> I was just going to say like if you guys

26:21>> did you guys get did you get notified by

26:24anybody at D?

26:26>> Yeah. Neither did we like unless

26:29>> we haven't heard anything since June

26:3011th. So we had a walk around.

26:32>> Okay.

26:33>> We expected that because that she told

26:36us it might take three, four, five

26:37months,

26:38>> right? But our concern tonight was at

26:43couple meetings back through the chair,

26:47>> he suggested getting an outside

26:49consultant to help the property owner

26:53stabilize the parking lot in the

26:55driveway that came down the side. And my

26:58question is, has somebody been hired? We

27:00have been we've gone through what four I

27:04know Nat has

27:06tried to contact at least four different

27:08consultants.

27:10>> They have not either responded or said

27:13that they have had a conflict of

27:15interest. Actually, two of them have

27:17said they had a conflict of interest.

27:19Um, one didn't respond and the other one

27:23I think retired. I don't know if Nat has

27:27reached out to anybody else or if she

27:31has been able to contact anybody or I

27:35don't know what the status of that is

27:38and um Nat's not here. So, I can't speak

27:42to that one way or the other. The last I

27:45knew that was the status on that and I

27:47know that Nat was actively working on

27:49it. Um we couldn't get anybody. I don't

27:54know if that's because it was summer.

27:56Um, but that's where we are.

28:00>> Who have we used in the past for similar

28:02situations?

28:03>> What was her name that I I believe um

28:11I believe she's retired and she was the

28:14one that hasn't responded. Um,

28:17>> are you talking about the town engineer?

28:19>> No, no, no. The wetland scientist. Um,

28:22the consultant. I can't remember her

28:25name.

28:29>> Emily.

28:29>> I don't know.

28:30>> That came up last.

28:32>> Oh, maybe it's not Emily. Hold on. Maybe

28:35it's in our notes. Hold on one second.

28:39>> I know. It's Walsh injured.

28:43>> I Walsh, I believe, is the one that said

28:45that they had a conflict, but they have

28:48a

28:48>> conflict. Yeah, they were.

28:57Does anybody have any other notes?

29:00>> No.

29:02>> There might be a notes.

29:25At that same meeting, everybody's

29:27talking about hiring a consultant and

29:29all. Later on, it was mentioned that

29:33this had to be done within 7 days.

29:37Destabilization of the parking lot and

29:40the surrounding driveway, the 10 back

29:42behind it. They were going to do the

29:44weren't they going to do the

29:45stabilization?

29:46>> Well, they they started to do something

29:49themselves,

29:50not a professional engineering firm or

29:53the land surveyor

29:55and the first time around my property

29:58got inundated with the money.

30:00>> We saw that.

30:01>> Yeah,

30:02>> that's actually these notes right here.

30:05Um,

30:11>> it was my understanding that they

30:12couldn't proceed on the construction of

30:15the project because of

30:19>> whatever you guys put in place.

30:22>> And I think I could be wrong, but I

30:25think you guys were supposed to kind of

30:28figure out what the appeal was

30:30officially for

30:32because as far as Well,

30:34>> I you guys filed the appeal and then I

30:37believe you stated that it wasn't to

30:39stop um conservation from doing what we

30:43needed to do was for something else, but

30:45it seems there was some discrepancy with

30:48that.

30:48>> Okay, I'm just going to read this real

30:50quick.

30:52Mr. Garland informed Mr. Daly that the

30:54source of the issues cannot be addressed

30:56because of the appeal. The enforcement

30:59order is asking for a temporary fix to

31:01the erosion concern while the appeal is

31:03still pending. The commission does not

31:06have answers on how long the D will take

31:09to process the appeal or what D will do

31:13regarding the appeal. At the time at the

31:16time, all the commission can do is keep

31:18an eye on the situation. Mr. Garland

31:21stated that the applicant has been asked

31:24to implement a temporary fix. stated the

31:27applicant has been asked to implement a

31:30temporary fix. So

31:35yes, we have asked the applicant. So if

31:38they are attempting

31:42themselves to fix it, that's what we've

31:46asked them to do that they're doing what

31:48we've asked them to do.

31:51Um

31:53>> they did some work right after that

31:57meeting.

31:57>> Okay. Then that's what they were

31:59supposed to do.

32:00>> It failed.

32:01>> Okay.

32:01>> That's why this is continuing on.

32:03>> Correct. I believe the issue is

32:07they need the appeal to be removed so

32:09they can actually do the work that's

32:11supposed to permanently fix this. That's

32:13what they said.

32:15>> True.

32:16>> No, I'm sorry. That's not what we were

32:18told. Well, it says attorney B clarified

32:21the project had gotten the OC appeal

32:24caused the the whole process to fault

32:27until the D gives then a direct order to

32:31continue. The appeal would have to be

32:33withdrawn for the project to go forward.

32:35Until then, temporary measures are in

32:38place to stop the erosion from entering

32:40the wetland.

32:42This is this is the meeting minutes from

32:46June 24th, 2026. And I believe you

32:49wasn't present during that meeting.

32:51>> You were not present for that meeting.

32:53You you two were.

32:54>> Yeah.

32:57>> The way we Well, I shouldn't say we the

32:59way I understood that was that they were

33:01told by the D

33:03that when they did the walk, they

33:05couldn't touch any of the other

33:06property. They couldn't do anything else

33:08on that property except for

33:12parking lot in the back by Mr.

33:14Chandler's job. At that meeting, uh, the

33:17town sent him an order saying that he

33:19had to do the work within seven days. At

33:22that meeting, Mr. Garland, I believe,

33:24said that he have to do the work. At

33:27Tony Bro said, "We're not doing the work

33:29until the appeal is dropped.

33:33>> They can't do the work until the shop."

33:36>> They could they can do that one of the

33:41>> the temporary.

33:42>> I don't know. I wasn't at the I I All I

33:44know is that Nat said when she was here

33:47that the um DP person got very

33:53um

33:56closed off and was only working with you

33:59at that point and Nat.

34:01>> Is that correct? That's correct.

34:02>> Okay. All right.

34:04And so I don't know what was said

34:06between you and Nat and the D person and

34:10I don't remember her name.

34:13>> So I I don't know. But at this point we

34:16can we can go back and forth and we can

34:19do everything that we can to go back to

34:21them and ask them if they can try and

34:23stabilize that because I want that

34:25wetland protected just like you do. So

34:28that that's what I want. We all at this

34:31board volunteer our time every other

34:34Wednesday to try and make sure that the

34:36wetlands are protected for the people in

34:38Auburn. So I appreciate you coming in

34:41and letting us know that that isn't

34:43protected. So we are going to go and ask

34:46them to pri try and protect that better.

34:49So we will go and do that. Okay. Okay.

34:52>> Can I just explain what happened on that

34:54day? Sure. The walkthrough.

34:55>> Yes.

34:57So the three of us were invited by the

34:59DP to go through the walkthrough.

35:01>> Mhm.

35:01>> Two people from the town who were

35:04unwanted by us.

35:06>> Okay.

35:07>> Showed up

35:08>> and kind of caused a little trouble. So

35:11that's when she said, "I'm only taking

35:13one, Mr. Ch."

35:15>> I get it.

35:15>> So that's what happened.

35:16>> All right.

35:18All right. But I appreciate I do

35:20appreciate what you're doing. I I

35:22totally get it. But and we all have had

35:26frustrations with

35:30neighbors and things that have happened

35:32within our neighborhoods. I get it. And

35:35we'll do everything that we can to

35:37protect that wetland. I promise you

35:39that.

35:40>> How did the Walsh engineering explain

35:43that they might have a

35:44>> I don't know if I'm I don't quote me on

35:46Walsh. I know that it was two. I know

35:49that it was two. I don't know if it was

35:51I don't know who it was.

35:53>> I don't know the specifics.

35:54>> I don't know the specifics. So, do not

35:56quote me on Wall. I don't know. I do not

35:58know if it was Walsh. I don't I know

36:01that it was two that said that they had

36:03a conflict of interest. I don't know

36:04which two it was.

36:06>> Right. And we could we could check with

36:07N as far as defenders list.

36:10>> She she will be better suited to answer

36:13that question than I will.

36:15>> I I don't have the answer.

36:17>> I have notes here. I think Walsh was

36:19originally hired by his town

36:22>> to do a review of the project.

36:24>> Okay.

36:25>> I have this.

36:26>> Okay.

36:26>> That's where the conflict is.

36:28>> Yeah.

36:28>> Yeah.

36:28>> This is from almost a year ago.

36:31>> So maybe they can't do what

36:35>> that a little bit.

36:41>> One last thing. We know that you're

36:42trying.

36:43>> Okay.

36:43>> Okay. Okay.

36:44>> We we don't

36:46>> we don't think that way at all. Okay.

36:48Okay.

36:49>> That's all.

36:50>> We are we're doing the best we can.

36:52Okay.

36:57>> Will this discussion be carried over to

36:59your next meeting?

37:01>> Yes.

37:05>> Nat's not here and she was part of that

37:07meeting.

37:08>> We will be able to speak when you get

37:10back after everybody's vacation is.

37:12>> Yeah.

37:13>> It's on September 23rd.

37:15>> Okay.

37:16She'll be able to speak to it better

37:17than we can because we didn't do it.

37:21>> Okay.

37:22>> Thank you.

37:22>> All right. Thank you.

37:23>> Thank you. Good luck.

37:26>> Good night. Thank you.

37:32>> I guess discussion DP project review.

37:36>> See, I think Greg Roto is with DPW.

37:40>> Oh.

37:40>> Oh,

37:40>> DPW.

37:44Good evening.

37:45>> Good evening.

37:46>> Nice to see everyone again. Yes.

37:47>> I'm Pete Boria. I'm the assistant DPW

37:50director and sewer superintendent and

37:52with us online is Greg Roto, town

37:54engineer.

37:54>> And this is in in regards of the whole

37:57street scenario or is for something

37:59else?

37:59>> No, this is for your agenda item of the

38:01DPW discussion.

38:03>> Plank conditions.

38:05>> I'm sorry.

38:08>> Conditions. I think this

38:09>> that wasn't the agenda item. It was just

38:11a discussion. Is it

38:13>> about how we can be better aligned? Is

38:16that

38:16>> it says DPW project review procedures?

38:20>> Yeah.

38:20>> So is that I think some of our

38:22discussion at the last meeting was about

38:25you know future projects that

38:27>> could have um impact on wetlands and

38:30stuff and to give us a heads up or if

38:34you guys need to do anything above and

38:36beyond your standard conditions.

38:38>> Sure. So, as we're talking about it

38:40internally, we're looking at two

38:42parallel tracks. One is for small road

38:45maintenance projects that our own DPW

38:48personnel will do themselves. And those

38:52smaller again road maintenance items

38:55will be done hopefully when our blanket

38:57order is reinstated. And if we can

39:00discuss that at the next meeting, that'd

39:01be great. Uh we have the um current

39:05order with the activities under that and

39:08we'd like to [clears throat] kind of

39:09discuss those and maybe make some

39:11changes so it's more reflective of what

39:13we currently do today. And for the

39:16bigger projects that we have to go out

39:18to bid for we found or we've discussed

39:21and we think the cleanest way for us to

39:22approach that is to do an RDA with you

39:26before we go out to bid. That way there

39:28we know if it rises to the level of

39:31needing a notice of intent so that we

39:33don't bid a project and then have it

39:35stall while we wait for that notice of

39:37intent process. So we'll go ahead and

39:40submit the RDAU with the with the

39:43project scope of work. we won't

39:45necessarily have an erosion control plan

39:48or a SWIP because that will be part of

39:50the contract bid documents that the um

39:53the the winning contractor will have to

39:55provide before they get a notice to

39:57proceed. So, what we've been working on

39:59is a standard operating procedure for us

40:01internally that kind of spells out the

40:04steps for us to do that with you. So,

40:06it's a checklist item. It's step by step

40:09of what we're going to do to make sure

40:11that for the bigger scale projects that

40:14we use a subcontractor for such as you

40:17know full depth reclamation, mill and

40:18pave or any type of road work that

40:21happens within resource area. We'll put

40:23the bid documents together before we go

40:26out to bid. We'll file and we'll do the

40:27RDA. will come in front of you, let you

40:30know the areas that we're going to be

40:31working on, and then let you know.

40:34Again, the awarding contractor will

40:36prepare a SWIP under their NIFTY's

40:38permit and an erosion control plan that

40:40will be submitted to you before any type

40:42of notice to proceed for them to to

40:45start work will take place. And again,

40:48hopefully when we discuss that in the

40:50future, we weren't we didn't provide any

40:52of that tonight because that wasn't

40:54really what the agenda item mentioned,

40:55but um we're ready. We have two RDAs on

40:59your next meeting. If we could ask that

41:02to add another item to reinstate the

41:04blanket order that we previously had

41:07with maybe some adjustments to reflect

41:09our current activities. Then also talk

41:12about the SOP that we're preparing for

41:15um external subcontracted bid work.

41:19Hopefully you guys find that um

41:22amendable to to where we currently are

41:24and the best way to move forward.

41:31>> That's great.

41:32>> Yeah,

41:32>> I think so too.

41:33>> Fantastic.

41:34>> Yeah, I think that sounds good.

41:36>> Yeah.

41:37>> Excellent.

41:37>> Yeah.

41:38>> Thank you.

41:40Um, a question I will have for I guess

41:44for Mike when he gets back.

41:48So, reinstating,

41:52can the blanket order of conditions be

41:56reinstated [snorts]

41:58or does it actually procedurally require

42:00a new notice of intent in order for us

42:04to reinstate it? like does DPW

42:10>> have to apply

42:12this? This is a question I don't know.

42:14Do they have to file a new notice of

42:16intent? Cuz

42:18>> that's something. So, I'm just putting

42:20that out there. There is like I think a

42:21question that needs to be answered.

42:23>> I think that it would have to be

42:24reapplied for because I think that that

42:26was a blanket for everything. I think

42:28that we would have to put addition or we

42:30could reinstate it with additional

42:33>> I think the billate the blanket with the

42:36additional comments that we have.

42:37>> Yeah.

42:39>> But you're looking for some adjustments

42:41to do. We

42:42>> we're looking

42:42>> You all have the copy some changes. We

42:45have a copy of the current blanket order

42:47that we'll provide to you with some

42:49highlighted items that maybe we don't we

42:51don't necessarily need under there or

42:53that we don't utilize

42:54>> and maybe some different terms again

42:57that we currently use that'll be

42:59beneficial as far as applying for a new

43:02notice of intent. That would mean we'd

43:04have to start the process over, get a

43:06new D number and and pretty much do that

43:09all over again, which fortunately

43:11>> it's going to be months or weeks or

43:13whatever.

43:14>> Yeah. So

43:15>> that's not something I'm saying I want

43:16to happen. I just, you know, sometimes

43:18the red tape gets

43:20>> hopefully Mike and Nat can clarify that

43:23before we come back for your next

43:25meeting.

43:25>> I would hope that you could just

43:27>> adjust the existing.

43:30>> That's what it

43:32>> That'd be great. Amend it. And if you

43:34want to add a couple um conditions with

43:37it,

43:38>> is that blank available anywhere to see

43:41ahead of time?

43:42>> It's recorded, but yes. So I we're going

43:44to try and get you in again if you're if

43:47you're amendable to that course of

43:49action, we will get you copies of that

43:52blanket order with some highlighted

43:53items and stuff well before your meeting

43:55for that to share with you so you can

43:57>> that could be email package. Yes.

43:59>> Yeah. We'll get it like through here.

44:01>> That would be awesome.

44:01>> Yeah.

44:02>> Yeah.

44:02>> Yes.

44:06>> From my understanding the blanket order

44:08condition was for all the major

44:09projects.

44:10>> It was for all projects.

44:12>> All projects. Okay, it's a little

44:15confusing I guess.

44:16>> And then now now we are trying to adjust

44:19it a little bit so that it works better.

44:21But yet you guys will still come forward

44:22to in front of us with an RDA

44:26>> for the larger

44:27>> for the larger

44:28>> larger projects. Yes, we'll cover in

44:30front of before we go out to bid.

44:32>> Got it.

44:32>> And the blanket

44:34>> funny. Sorry.

44:36>> Yeah, I was just going to say the

44:37blanket order would cover the smaller

44:39project. Is that blanket or will cover

44:41the I'll call it roadway maintenance. We

44:43don't do any full depth reclamation on

44:44our own. We don't do any mill and pave.

44:47We don't the biggest thing we're doing

44:48is maybe a cross culvert. We're not

44:50doing a big drainage project to be

44:53consistent with what triggers the RDA

44:56and the subcontractor. We could keep it

44:58consistent with a swip where anything um

45:01up to an acre of disturbance. Once you

45:03get over that acre of det disturbance,

45:05it requires a swip to be done. We could

45:08have we could follow that, but I don't

45:10think we're even going to have any

45:11projects that'll come close to that.

45:13Correct, Greg.

45:15>> Yeah, correct. We we we won't be able to

45:17do much um if it's too large of a

45:20project, we're bidding it out.

45:23And that's why I'm trying to really

45:25clarify it to just pair it down to that

45:28roadway maintenance that lets us clean

45:31the catch basins, maybe rebuild the

45:32catch basin, replace a cross culvert, do

45:35the road work, you know, maybe repair

45:37some sidewalks or add some sidewalks in

45:40some small areas that might be in a

45:42resource area that we'll have to again

45:45let Natt know what we're doing. If we

45:47need to provide an an erosion and

45:49control plan for our small project, we

45:51can do that. Do the sitewalk with NAT

45:53before the con, you know, once the

45:55erosion control is in place and just

45:57really get that procedure back back in

45:59place so that we're, you know, we're

46:01working hand in hand through all of

46:03these projects. And then the bigger

46:05projects again will be where the RDAs

46:07are done for that work again before we

46:10go out to bid so that we know when we go

46:13out to bid, we can hit the ground

46:14running after the bids are received. We

46:16don't have to worry about a notice of

46:17intent. But and like I said, we in the

46:20past we've had the SWIP and the erosion

46:22control plan as part of our bid

46:24documents. It might not just have made

46:26its way to you guys where now it will.

46:29>> Okay.

46:30>> I like it.

46:32>> Yeah.

46:33>> Right.

46:35>> Awesome.

46:36>> And again, we'll try and get that to you

46:38fairly soon so you have plenty of time

46:39to redo it for you next week.

46:41>> Yeah.

46:43>> Yeah.

46:43>> 23rd.

46:44>> Great.

46:45>> That's awesome. Thank you. Okay,

46:46perfect. Excellent.

46:48>> Thank you.

46:48>> Thank you all.

46:49>> Thank you.

46:50>> Have a good night.

46:51>> Thanks.

46:51>> Take care everybody.

46:53>> Thank you.

46:56>> All right.

46:58Next thing, um, actually, next thing is

47:01meeting minutes.

47:03I reviewed it. I didn't have any

47:06comments, but also Matt's not here. I

47:09don't know how that works either. that

47:12we should review those meeting minutes

47:14next time she is here.

47:16>> Yeah, I'd say everything is questioned

47:17till next week.

47:18>> We have to vote on that.

47:23>> I don't think we voted on

47:26voted on postponing the approval of the

47:29minutes. I don't think we've ever voted

47:31on that before. [laughter]

47:33>> I was joking

47:35like it was a very informal.

47:38>> Yeah, we voted on accepting it.

47:39>> I was just I was joking. [laughter]

47:42Well, she has them in the packet, but

47:44she doesn't have it on the thing this

47:46year. She doesn't have it on the agenda.

47:48>> Yeah.

47:49>> So, that's really

47:51>> There is an 826 26,

47:56>> right?

47:58No. Um,

48:01>> oh Jesus, I didn't write on your note.

48:05>> We can vote on it.

48:07>> Okay. Can I get a motion to have the

48:10meeting minutes for 82626

48:13moved to September 23rd,

48:162026?

48:20>> I'd say we

48:22I meant we could vote on

48:23>> approving approval.

48:26>> Uh everyone

48:27>> I'm okay with I'm okay with reviewing

48:29them and approving them or amending them

48:31if you all are. I'm I'm still looking at

48:33just a few things.

48:34>> Okay.

48:42is we're we're missing Mike, but we

48:44don't need

48:45>> Are you allowed to approve? Oh, you was

48:47remote. Okay,

48:47>> I'm remote. Yeah. So, we're Are we okay

48:50voting?

48:50>> Yeah, that's

48:52>> you got enough of us. Matt Matt doesn't

48:55vote. Cool.

49:24Thanks.

49:58I don't have

50:05>> anybody need more time or

50:06>> I'm all set. Nope.

50:08>> Okay.

50:09>> Can I get a motion to accept the meeting

50:11minutes of August 26 26? So moved.

50:14>> Second.

50:15>> I'll second.

50:17>> All right. All those in favor?

50:19>> I

50:19>> I

50:30uh I

50:32believe this National Grid Rocklin Road

50:35pole replacement project.

50:38Uh we do have the information on that in

50:41our packets.

50:42Mhm.

50:52>> I will say I am not very informed on how

50:54that procedure happens.

50:56>> Basically, they just let us know.

50:58>> Okay.

51:00>> And there's not a lot we can do about

51:01it. So

51:07>> I have new business. Um

51:11um yesterday at the planning board uh um

51:16there was a project on

51:22510 Washington Street. There's a

51:24commercial property there. I'll pass

51:26this apple truck and trailer. They are

51:30expanding their lot to add some gravel

51:32for some storage outside. It's been

51:34impacting some of the neighbors. has

51:36come back to us on the planning board

51:38side with some issues and they're trying

51:40to get a permit because they were kind

51:42of doing some work without permission.

51:44There's a wetlands directly behind them.

51:47>> Um in 2023 all the trees and wetlands

51:50were intact and as of now most of the

51:53trees are gone and the wetland has been

51:55impacted with gravel, a large amount of

51:58gravel um and some things like that.

52:01There was a wetland consultant who

52:03actually lives on the same street who

52:04was at the meeting yesterday. And again,

52:07the wetlands is not flagged. So, it's

52:10kind of one of those things where we

52:12need, in my opinion, we should get a

52:15um consultant out there to review the

52:18wetlands, see how bad the damage was

52:20done. But it was done. They own it, but

52:25it's it's no longer there. It been

52:28tremendously impacted. Uh,

52:32so here's a

52:36here's a sketch of

52:39this way.

52:42Um, this is Washington Street. This is

52:44the building and there's the wetland

52:46line here. And they want to go past

52:47here. So, they already added the gravel.

52:51And then on this sheet, this is the

52:52before and after.

52:55So you're saying that there's there's

52:58actually like gravel and stuff in the

53:00wetland, not just in the buffer.

53:02>> Cor in the wetland spot.

53:04>> Okay.

53:04>> So they like they filled it either.

53:06>> I believe so.

53:09But again, it's not flagged. So whether

53:11or not it is wetlands, it's kind of

53:16tough to determine how much gravel it

53:19is. It is.

53:22>> Where's that mirror up there?

53:24Huh?

53:25>> What's that? That's a production

53:27company.

53:28>> I'm not 100% sure.

53:31>> The name is

53:32>> a before and after

53:34avenue.

53:40>> So, it seems like I mean very first step

53:43I would think would be like having Nat

53:45go out there

53:47and visit. I don't know. Have she been

53:49looped in on that?

53:50>> She has not. Um, there was a discussion

53:53with someone in conservation was out

53:55there.

53:56>> It was a female. Um, it could have and

53:58the guy said someone named Emily.

54:01>> There's the town engineer, I think. Is

54:03it No, maybe that's Emma.

54:04>> Yeah. Yeah.

54:05>> Emma. I think it might be Emma.

54:07>> I don't know if that's

54:09>> It's a Emma. Emily. It's very close. Uh,

54:12I I didn't recognize the name.

54:14>> Yep.

54:17>> But I just wanted to bring it to you

54:18guys.

54:20Uh this is something we would probably

54:22want to visit also.

54:24>> Yeah.

54:25>> Where is it next to?

54:27>> It's like um it's west of comes just a

54:32little little west on the same side.

54:35>> A little tiny truck in

54:38I've noticed it before.

54:40>> Yep.

54:44>> People go trash all the I just don't get

54:47it.

54:47>> Yeah. like why why

54:52>> all right so I um I believe Rose may

54:55Rose which is a part of the planning

54:57board probably not uh not on a daily so

55:02hopefully she communicated but I'll

55:03email not

55:04>> pass information along

55:08>> all right

55:10do we go try and go out there Saturday

55:12or do you want them go out there

55:17>> I can ask that and then

55:18>> I have like a million things to do on

55:20Saturday.

55:20>> Yeah, I I have a I'm not going there.

55:23>> Okay, good. How about Saturday

55:24afterwards? Maybe

55:26>> maybe the Sunday afterwards or maybe

55:28midweek we can all just do it for

55:32>> um

55:33>> Sunday. I could probably do Sunday.

55:35>> Definitely.

55:37>> I have a witch thing I'm going to I'm

55:39very excited about.

55:40>> I can do it tomorrow and send

55:41information videos to everyone as well.

55:45>> Do that.

55:45>> Yeah, we'll wait. Okay.

55:47>> So, you're saying that the the people

55:49that own the property, they they

55:52you know, they own up to doing it, but

55:54they didn't realize it was what?

55:56>> Um

55:56>> because it wasn't flagged.

55:58>> Yeah, it wasn't flagged. I believe it's

56:00on their property. Um

56:04and they just been removing some dead

56:05trees. Apparently, there were dead trees

56:07per that 2023 that seemed very alive to

56:10me. And now there's very

56:12>> Yeah.

56:13>> They don't look dead at all.

56:14>> So,

56:15>> I don't really understand. And then

56:16[clears throat] there's a wetland

56:17consultant from Ecotech that does live

56:20on that street.

56:22So I don't remember his name, but

56:27not I would reach out to Natt and uh and

56:30then I'll take videos and pictures and

56:32get back to everyone.

56:35>> Adjourning time.

56:37>> Can I get a motion to adjourn the

56:38meeting?

56:38>> We adjourn the meetings.

56:40>> Second.

56:41>> I second.

56:42>> All those in favor? Hi.

56:44>> Hi.

56:44>> Hi.

56:46>> Thank you. [music]