Rocklin Road Erosion Enforcement
At a glance
- What: Erosion from a property off Rocklin Road (address as heard in captions) reaching a wetland, with a temporary fix required while an appeal is pending and an outside consultant being sought.
- Where it stands: carried to 2026-09-23; no word from the state since a June 11 walk-through.
Log
- 2026-09-09 - Conservation Commission - A neighbor said the temporary stabilization failed; the agent had not found a consultant (from auto-captions).