At a glance
- What: Steve Chambers raised a missing section of sidewalk on a road under reconstruction (name as heard: "Bankro Street", possibly Bancroft Street; unverified) that would serve about 150 homes, two condominium associations and a church, and crosswalks that lead nowhere on Auburn Street near Perry Street (as heard).
- Where it stands: the Town Manager and Joanna Paquin will report on cost, funding and timing at the next meeting. The extra section is outside the sidewalk priority plan and needs a survey and design.
Main points
- The priority plan is a guide, not a limit; members argued for extending sidewalks while contractors are mobilized.
- Constraints: driveway slopes, rights of way, DPW workload.
Discussion time
About 18 minutes across 1 meeting (from transcript timestamps; approximate).
| Meeting | Minutes |
|---|---|
| 2026-10-13 - Select Board | 18 |
Log
- 2026-10-26 - Select Board and Housing Authority Joint Meeting - Agenda: DPW on Bancroft Street sidewalks and a sidewalk prioritization plan. Outcome not yet recorded.
- Select Board and Housing Authority Joint Meeting - October 26, 2026 - Posted agenda (read 2026-10-23) lists sidewalks on Bancroft Street, which matches the street heard as "Bankro Street" in the October 13 captions (the name is from the agenda; the earlier match is still an inference). No transcript yet.
- 2026-10-13 - Select Board - Member item discussion; staff to report back.