15 Hard Scrabble Road Gravel Wetland

At a glance

  • What: a subsurface gravel wetland to treat storm water at an industrial recycling facility at 15 Hard Scrabble Road (captions render it "Hearts / Hogs Gravel Road").
  • Where it stands: Conservation Commission hearing closed October 14 and an order of conditions voted, with special conditions. Planning and state approvals are in hand.
  • Next: drainage easement across the road, Article 16 at the Special Town Meeting - October 27, 2026.

The proposal

  • Replaces a pond that behaves like a dry pond; the facility has struggled with storm water discharge results under its EPA multi-sector general permit (TSS, aluminum, copper, lead, zinc, pH, chemical oxygen demand).
  • The applicant's consultant, "Mr. Walsh" (full name not caught), cited removal of about 96% of TSS and 60% or more of zinc.
  • Estimated 4 to 6 months of construction; likely to start in spring.

Decisions

  • Standard conditions plus listed special conditions, with maintenance changed to semiannual or more often; condition 7 added for pipes crossing the road.
  • Ricky Aris chaired this item temporarily; Michael Garland was reinstated afterward (reason not stated in the captions).

Discussion time

About 19 minutes across 1 meeting (from transcript timestamps; approximate).

Meeting Minutes
2026-10-14 - Conservation Commission 19

Log