  • Chair Jonathan Boucher called the meeting to order at 7:00 PM. The minutes of the previous meeting and the findings of fact for two earlier applications were approved by unanimous roll call.
  • The Land Development Code amendment removing the floor area ratio limit in the Downtown Development District was recommended to the City Council as "ought to pass" on a 7-0 roll call. There was no public comment. See Downtown Floor Area Ratio Removal.
  • The board took up a major site development, stormwater and conditional use application at 1187 Union Street from RH Foster Energy LLC (engineer Haley Ward): a new car wash, gas station and convenience store at Union Street and Griffin Road, replacing the former Captain Nick's site and the existing car wash. The application was found complete on a unanimous vote.
  • Discussion covered traffic and access. Curb cuts drop from seven to four: one full-movement entrance on Union Street as far from the intersection as possible, a right-in-only entrance closer to it, and two on Griffin Road. The car wash and store sites are now connected, so customers no longer have to go out onto Griffin Road to reach the next lot. A Maine DOT traffic movement permit is required, with restriping, a teardrop island and a left-turn extension discussed. The buffer will be replaced, and the stormwater narrative was found to name another town ("Thomaston") in error.
  • There was no public comment. After a roll call on each finding under the Land Development Code (erosion control, parking, loading, utilities, lighting, fire protection, stormwater, district standards, shopping and personal services district conditional uses, and conditional use criteria), the board granted the land development permit, stormwater permit and conditional use by a unanimous roll call, on two conditions: approval of the Maine DOT traffic movement permit, and correction of the stormwater narrative to reflect that the parcels are in Bangor. See 1187 Union Street Car Wash and Convenience Store.
  • Other business: the board will not meet on election day, so November has one meeting, on November 17, and December has two. Officers (chair and vice chair) are elected at the first meeting of the new year; the current chair described the role and said they are willing to serve again if no one else is interested.
  • Planning Officer Anja Collette gave an update on the Land Development Code rewrite: roughly halfway through the new articles with the consultants, zoning map changes nearly drafted, and an airport overlay district being developed with the airport's consultants. A public draft is aimed for early next year, and the changes required by state laws LD 1826 and LD 2173 will likely be pulled out and adopted in the current code in the spring, with state review because of grant funding. A public workshop on the growth boundary change is set for the following Thursday at 6:00 PM at Rangeley Hall, where abutters along Kittredge Road are expected to attend. Board vacancies remain open.
  • A member asked about park-and-ride commuter lots. Staff said the housing study found 80% of people who work in the city live outside it, tied to a shortage of affordable and available housing, and that historic traffic counts have been roughly flat since 2000. The meeting adjourned at 7:57 PM.

Agenda

Agenda PDF posted; see Sources.

Sources

Video

Watch the video

Transcript

*These are auto-generated captions; names and numbers may be misheard.

Transcript

00:36Good evening and welcome to the

00:38applicant staff, board members and

00:39members of the public. This is the

00:41October 20, 2026 meeting of the city of

00:43Bangor's planning board. It is 7:00. My

00:47name is Jonathan Boucher. I'm the chair

00:48of the board. Uh board members are

00:50volunteers from the Bangor community and

00:52other board members in attendance this

00:53evening include Ted Brush, Trisha Hayes,

00:56Greg Hopson, Ken Hin, vice chair Janet

01:00Jonas, and Russ Woodford. Uh city staff

01:02members in attendance this evening

01:03include planning officer Anya Collette,

01:06assistant solicitor Grace Ennis, city

01:09engineer Jefferson Davis, planning an

01:11and as well as planning analyst Matthew

01:13Altiero. And we thank them for their

01:15help in preparation for tonight's

01:16meeting.

01:18We're going to start with old business,

01:19uh which includes the minutes from the

01:21October 6th, 2026 meeting.

01:24Ask to see if there's any modifications

01:25or comments.

01:28I would like to hear a motion.

01:30Uh

01:32Yes. Member Hin.

01:34And a second?

01:34>> Second.

01:35>> Member Hopson. A roll call vote. Member

01:37Brush.

01:38>> Yes.

01:38>> Member Hayes.

01:39>> Yes.

01:40>> Member Hopson.

01:40>> Yes.

01:41>> Member Hin.

01:41>> Yes.

01:42>> Jonas.

01:43>> Yes.

01:43>> Member Woodford.

01:44>> Yes.

01:44>> The chair votes yes.

01:46Our next item is the adoption of

01:48findings for uh 511 Main Ave and 6

01:52Bangor Mall Boulevard.

01:54Ask to see if there's any discussion

01:57or if there's a motion.

01:59Member Brush.

02:01>> I have moved I move that we

02:04adopt the

02:06permits for the

02:08511 Main Avenue and 6 Bangor Mall

02:11Boulevard.

02:13>> Thank you in a second.

02:16Oh, member Jonas in a roll call vote.

02:17Member Brush.

02:18>> Yes.

02:18>> Number Hayes.

02:19>> Yes.

02:19>> Number Hobson.

02:20>> Yes.

02:21>> Number Hinn.

02:21>> Yes.

02:22>> Number Jonas.

02:22>> Yes.

02:23>> Number Woodford.

02:23>> Yes.

02:24>> The chair votes

02:25>> Yes.

02:26>> That brings me to the introduction of

02:27new business and our discussion of what

02:30the planning board does.

02:32The planning board

02:34has two main roles. First, we review

02:36amendments to the land development code,

02:38which typically include either changes

02:39to the zoning districts

02:41or changes to text within the code. Our

02:43review of these amendments includes

02:45adherence to the comprehensive plan as

02:46well as considering any applicable

02:48concerns from the public. Our vote on

02:50these items is in the form of a

02:51recommendation to the city council as to

02:53whether the item ought to pass ought to

02:54pass or ought not to pass.

02:56The city council makes the final

02:57decision on zoning and land development

02:59code changes. There's one item on the

03:01agenda that is an amendment change.

03:05An amendment,

03:07I should say.

03:08Secondly, the board serves as the

03:09regulatory authority for land

03:11development permits, commonly known as

03:12site plan review. Site plans are

03:14reviewed to ensure compliance with the

03:16city code as to parking, driveways,

03:17storm water management, lighting,

03:19landscaping, and buffering,

03:21a building location, environmental

03:22impacts, shoreland zoning as may be

03:24applicable. We also ensure the plan

03:26meets the dimensional requirements for

03:27the project zoning district. We review

03:29larger site plans that trigger site

03:31location development for the main DEP as

03:33well. Under their requirements, some

03:35uses are conditional

03:37uses

03:38>> [clears throat]

03:39>> that have specific recommendations and

03:41requirements

03:42um we that we use to review the

03:44projects.

03:46State statute also outlines the

03:47requirements for subdivision review and

03:49the city has additional standards as to

03:51roadway and utility specifications. The

03:54board ultimately endorses a plan that

03:55will go to the registry of deeds if the

03:57plan is approved. There is one item on

03:59the agenda that that is a land

04:00development permit.

04:03And further information on the city's

04:04codes and standards and the

04:05comprehensive plan may be found on the

04:07city's website.

04:10As for how we will be

04:12dealing with each item, for land

04:14development permits we'll first consider

04:16and vote on the applications readiness

04:18for review and any concerns for

04:20conflicts of interest. And for all items

04:22the applicant and or their

04:23representative should then come forward

04:25to the podium and provide a brief

04:26introduction to the proposal.

04:28And then they should

04:30stay at the podium while we consider any

04:31questions at the staff and or board

04:33member from other staff or board

04:35members. And for code amendment staff

04:37may make the presentation.

04:39Once the item has been presented the

04:40applicant may be seated and we'll allow

04:42time for public comment.

04:44For public comments the person should

04:46come to the podium and introduce

04:47themselves, state if they are Bangor

04:48resident and or an abutter to the

04:50property and indicate if they are for or

04:53against the proposal. And it's also

04:54helpful if you present your thoughts

04:56based upon the city's codes and

04:57standards and the comprehensive plan as

04:59these are the primary documents used by

05:01the board to make our decision.

05:03All comments and discussion should

05:05remain respectful and considerate of

05:06others and once public comments are

05:08completed we will close the item for

05:10public comment. Board will then

05:12deliberate

05:14on the proposal using the applicable

05:15standards and for clarity when

05:17considering land development proposals

05:19the code standards are typically read

05:21and voted on separately. The final

05:23decision is then read and voted on and

05:24if the applicant disagrees to the land

05:26development permit decision that the

05:28board has made they may appeal the

05:30decision to the superior court of Maine.

05:32Once a project that you're interested

05:34has been reviewed you may leave the

05:36meeting but please be respectfully quiet

05:38so as not to disturb the review of other

05:40agenda items.

05:43Okay.

05:45So our first item for tonight

05:47is

05:48an amendment

05:50to the code and it's to amend the land

05:52development code by amending the That's

05:54repetitive. Okay, 1 second. Let me re-

05:56re- reread this. To amend

06:00land development code section 165

06:02attachment 2 schedule A urban

06:04development area to remove floor area

06:06ratio or FAR from the downtown

06:08development district DDD.

06:11And the applicant will be

06:14>> Anja banker?

06:16>> Anja, would you like to go ahead?

06:18>> Yeah.

06:19So, I'll just re-review things for those

06:22who are here and those who are watching.

06:23But, what we're proposing is to

06:25eliminate the floor area ratio limit

06:27from downtown development district

06:29basically because it's kind of an

06:31outdated standard that

06:34was originally used to

06:37um limit like building form and bulk and

06:40um neighborhood character and things

06:42like that and it doesn't really

06:44effectively do that. Um we have historic

06:48districts covering most of downtown and

06:49also what's called a facade district

06:51that um really controls building form

06:54and appearance and things like that.

06:56Um

06:57And generally in the downtown

06:59development district we're not as

07:00worried about height. Um and that's

07:03really what this limits and there's

07:05existing or development that would like

07:08to happen to add some stories to

07:09buildings that this does limit and we do

07:13have existing historic buildings that

07:14are over this limit.

07:16Um

07:17And based on some comments that we did

07:20receive from council and maybe planning

07:22board last time, we did talk with the

07:24fire department and airport about, you

07:26know, whether height limits are needed

07:29in downtown.

07:30The fire department basically said that

07:32the taller building gets, the more that

07:35they

07:36already have to integrate into that

07:38building design for fire protection um,

07:42they weren't really worried about, you

07:44know, fire response and things like that

07:46with

07:47very tall buildings like skyscrapers.

07:49Um, and like we talked about previously,

07:51there's not at this time demand for

07:53skyscrapers in the city, so we're not

07:54really concerned about having that

07:56that result from this. Um,

07:59and then as far as the airport, their

08:01main we've been meeting with them, um,

08:04to talk about the new land development

08:05code and their needs with that. And

08:08they're more so concerned about areas

08:10within the runway approach, um, which is

08:13pretty far away from downtown. So,

08:16they're definitely concerned about

08:16height limits there. Um, downtown is

08:19like the very

08:21foremost, um, northeast corner of where

08:23they would be

08:25looking at limitations, but, um,

08:28height limits that, you know, we're

08:30talking about with them would be far

08:32more than what we're seeing demand for

08:34in the city. And if we were to by some

08:36chance get a skyscraper request, we

08:39would definitely talk with the airport,

08:40you know, um,

08:42and make sure there's no concerns there.

08:44Um,

08:45so I think that covered everything and

08:47I'm happy to answer questions.

08:51>> Any questions from the board?

09:02All right, thank you. Um, so at this

09:04point we'd open it up for public

09:05comment.

09:07If there's anyone who'd like to come

09:08forward and speak,

09:11we're discussing whether or not to

09:13remove the, uh, floor area ratio in the

09:16downtown development district.

09:21So, we'll close public comment. Any

09:23final discussion

09:24amongst board or for questions for city

09:26staff?

09:29Not, I'd look for a motion on the

09:31proposal.

09:32>> a recommendation to council.

09:34>> So, So that's a good call. We are

09:36talking about phrasing this motion in

09:38the form of ought to pass and we vote

09:40yes or no on ought to pass.

09:43It's easier to vote yes or no on

09:44affirmative

09:45what phrasing on a

09:47an affirmative

09:49um motion rather than doing double

09:52negatives.

09:53So

09:54if someone would like to make the

09:56motion, please make it in the form of

09:57ought to pass and we can vote up or down

09:59on that. Member Huen.

10:01>> Yeah, Chair, I move that uh

10:03uh

10:03we [clears throat] recommend that that

10:06uh this amendment ought to pass. It's

10:08amending the land development code

10:10um section 165 attached

10:12schedule A urban develop uh area to

10:15remove floor area ratio FAR from the

10:18downtown development district.

10:21Um

10:24>> Thank you, Member uh thank you, Member

10:25Huen and a second.

10:26>> Second.

10:27>> Yeah, Member Jonas in a roll call vote,

10:29Member Brush.

10:29>> Yes.

10:30>> Member Hayes.

10:30>> Yes.

10:31>> Member Hobson.

10:31>> Yes.

10:32>> Member Huen.

10:32>> Yes.

10:33>> Member Jonas.

10:33>> Yes.

10:34>> Member Woodford.

10:34>> Yes.

10:35>> The Chair votes yes.

10:38That brings us to our second item which

10:40is the land development permit

10:41application for a major site development

10:43conditional use for proposed uh

10:45car wash, gas station, and convenience

10:47store at the property located at

10:49um

10:511187 Union Street map lots

10:54R 24-001-A

10:57and R uh 24-001-B

11:01and uh R 24-001-C

11:04in the shopping and personal service

11:06district SNPS. The applicant owner RH

11:09Foster Energy LLC.

11:11Uh the staff has indicated the

11:12completeness of this application and is

11:14ready for board review. Fees are

11:15documented and paid and the applicant

11:17standing is confirmed.

11:18Does the board have any concerns about

11:21um

11:22Does the board board members have any

11:24conflicts of interest or any concerns?

11:32Then otherwise, I'd like to hear a

11:33motion to accept the completeness.

11:35Remember Jonas?

11:37>> Chair, I move the board finds the

11:39application was deemed complete today on

11:40October 20th, 2026

11:43The applicant paid all applicable fees

11:45per exhibit three in our packets, and

11:47the proposed project is a major site

11:48development and a conditional use.

11:50>> Thank you. And a second?

11:52>> Second.

11:53>> Remember Hobson and a roll call vote.

11:55Remember Brush?

11:56>> Yes.

11:56>> Remember Hayes?

11:57>> Yes.

11:57>> Remember Hobson?

11:58>> Yes.

11:59>> Remember Hume?

11:59>> Yes.

12:00>> Remember Jonas?

12:00>> Yes.

12:01>> Remember Woodford?

12:01>> Yes.

12:02>> And the chair votes yes.

12:04With that, I'd like to turn it over to

12:05the applicant or representative to come

12:07up to the podium and give their

12:08presentation, please.

12:12>> Uh good evening. Sean Thies with Haley

12:13Ward representing the applicant R.H.

12:15Foster tonight.

12:17Um

12:19Matthew, could bring the plan up on the

12:21screen.

12:25While he's doing that, I just I guess

12:27one one point of point of clarification.

12:29You mentioned this was a land

12:30development permit and a conditional

12:31use.

12:32Does it We also have to include that

12:34it's a storm water permit as part of the

12:36planning board approval, or is that

12:37staff or

12:38>> It's

12:39We just lump it in with the

12:40>> Okay. Just wanted to make sure we

12:41weren't missing something.

12:44Um

12:46So, this is uh property at the corner of

12:48Union Street and Griffin Road um owned

12:51by R.H. Foster. There's currently uh

12:54it's three parcels that they own.

12:56There's the one directly on the corner.

12:58There's currently convenience store, gas

13:00station.

13:01Um the next property up on Griffin Road

13:04is uh

13:05it's currently closed, but it's a

13:07self-serve car wash.

13:09And then, the project the property to

13:12the east along Union Street, it was uh

13:14formerly Captain Nick's restaurant that

13:17R.H. Foster purchased. So, three lots

13:19combined show uh create the square that

13:22you're seeing here

13:23on the plan.

13:25Um what they're proposing is a uh

13:28approximately 7,100 square foot new

13:31building for the convenience store

13:34with um

13:36six fuel dispensers across the um

13:39across the front parallel with Union

13:40Street.

13:42Uh to the right of the new store,

13:44there's a uh diesel island uh with a

13:46canopy.

13:47And then on the back lot where the

13:50current uh car wash is, that would be

13:52replaced with a automated car wash um

13:56two bays um sort of like a tunnel, but

13:59um you pull in and the equipment moves.

14:01It's not a tunnel that the pulls the car

14:03through.

14:04Um

14:06the parking proposed on the left-hand

14:08side of the building and then uh some

14:10vacuums related to the car wash

14:12and uh maneuvering space around the back

14:15of the the store for uh a loading area.

14:19There's currently

14:21for the three lots combined uh seven

14:24curb cuts along Union Street and Griffin

14:27Road.

14:28We're cutting that back to uh four.

14:32Um there's two full-service [snorts]

14:35When I say full-service, right-in,

14:37right-out um proposed on Griffin Road,

14:40one full-service on Union Street, and

14:43one right-in only on uh Union Street.

14:47Um

14:49there'll be new

14:50new water sewer services connected uh to

14:53both the car wash and the store.

14:57We've got a uh

14:58dumpster area with a emergency

15:00generator,

15:02um some underground propane tanks to

15:04serve uh the generator, the car wash,

15:07and the new store.

15:09Um

15:10sidewalk connections out to the

15:12sidewalks on both Union Street and

15:14Griffin Road.

15:17Um

15:18as you can sort of see on the where

15:20we've pulled the pavement back from the

15:24frontages of both streets, so they'll be

15:26creating some more green space between

15:29the buffer yards on

15:31between the paved areas and the streets.

15:33Um

15:35This requires a

15:37storm water permit from the main DEP,

15:39which the city now has delegated of

15:41review authority on. So, in the back

15:43right corner, there's a um

15:45It's actually two underdrain soil

15:47filters that'll collect the storm water

15:49from the site, treat that prior to

15:52leaving the site.

15:55There's It's only a minimal amount of

15:57new impervious area, but it's viewed as

16:01a redevelopment project uh through DEP,

16:04so that requires treatment of the

16:06majority of

16:08the impervious area on site, even though

16:09a lot of it's existing.

16:13Um

16:15What else? I think that's

16:18It's about it. I'll

16:20happy to answer any questions that the

16:22the board has.

16:23>> Thanks.

16:24Any um city comment uh comments from

16:27city staff?

16:28>> Um I don't have anything special. I just

16:31now Shawn has made me paranoid, so when

16:33you do get to your final decision, just

16:35to be safe, maybe just say it's storm

16:36water permit, too. So.

16:41>> Okay, one second. I'm just taking a note

16:43for us as we

16:44when we come to the decision.

16:47Um and then

16:50questions from the planning board?

16:52Remember again?

16:53>> Yeah, you're going to put propane tanks

16:55in it. You don't have natural gas out

16:56there, or is it

16:58propane better?

16:59>> The applicant sells propane, so they uh

17:03just as they normally put propane tanks

17:05in to serve their stores, rather than

17:06purchase natural gas from a different

17:09Exactly, yeah.

17:15>> Any other questions? Remember Brush?

17:17>> Yeah, do you anticipate any change in

17:19the traffic pattern from the current

17:22usage?

17:23>> So, there is we are doing a traffic

17:26movement permit with main DOT. Um

17:29based on the increased store size and

17:32the changes that we're proposing,

17:34um

17:35it does generate more trips for a

17:38facility like this, the majority of the

17:40trips are um pass by, meaning it's

17:43vehicles that are already on the road,

17:46um but they will be coming to the site

17:47as opposed to um

17:50somebody coming from across town, say,

17:52to specifically go to this store. That's

17:54a different type of trip and in this

17:56case most of them are are pass by, so we

17:58are working with DOT to go through that

18:00process, but um there's currently

18:03n- no concerns really raised as far as

18:06what the traffic uh impacts would be

18:08from the project.

18:11Member Jonas?

18:13>> Okay, so I have a bunch of questions for

18:15you.

18:15>> Okay.

18:16>> I'm going to piggyback on the one um

18:17that Member Brush just asked regarding

18:19the traffic patterns because I actually

18:20drive by that area

18:23multiple times a week um and

18:25I think that there um and I think that

18:27the

18:29traffic study really does raise a big

18:31question about increasing the amount of

18:33particularly in the afternoon in the um

18:35in the commuting hours about the amount

18:37of traffic that's going to go through

18:38that intersection in any particular

18:40direction. So, I think we do really need

18:42to take a strong look at that. Um I also

18:45think there might be opportunities based

18:46on the traffic study to do a little work

18:49in the traffic pattern, particularly um

18:52as you're going

18:54west on Griffin Road into that

18:56intersection, they um

18:58the laning the lane lines do tend to get

19:01a little bit bottlenecked, I've noticed

19:03um and particularly in the dark in the

19:05winter when the lines aren't very clear,

19:07it's it's a difficult intersection to

19:09navigate if you're not familiar with it.

19:11Um I also recognize that that is the

19:13closest gas station to the airport,

19:16which means it probably gets a

19:17significant amount of additional traffic

19:20going to and from because as we heard,

19:22um, we know that Bangor's rental car

19:24market is really strong in the summer.

19:26So, I think that it also warrants maybe

19:28we need to look at that. Um, and that's

19:30not really so much for you as it is for

19:31us to consider as the city.

19:33Um, but I do have a question. Um, maybe

19:34this is for staff about reusing the

19:37existing buffers. One of the buffers,

19:39the one that's in front of the currently

19:41disused car wash, most of those trees

19:43appear to not be very well or healthy.

19:46Where Are those intended to be replaced?

19:48Or would we require that?

19:51>> um, a lot of that is being replaced. We

19:52have a pretty extensive landscape plan

19:54though

19:55>> You do. You do.

19:55>> in your packet. Um,

19:58and I

19:59think it's shown there, um, those

20:01plants, the the ones in front of the car

20:03wash are being replaced.

20:05>> I thought I thought that's what I saw I

20:06saw, but then when I went back to the

20:07other plan, I wasn't really that clear.

20:09So,

20:10>> I don't think I think there's some on

20:11the, um,

20:13near the intersection, if I remember

20:15right, that we were going to, uh, keep

20:17more some shrubs and stuff in that area,

20:19but, um, a lot of it's, uh, new.

20:21>> Yeah. I guess my my big concern is that

20:24we have a process to be sure that if

20:25there's an existing buffer that's

20:28not healthy, that we do have the means

20:31to require that to be replaced. And

20:33that's part of the final

20:35review, right? The

20:37>> Um, well,

20:40yeah, I mean, you should definitely part

20:42of your purview here. Um,

20:44if you But it sounds like Shawn, they're

20:46already proposing

20:47>> Yeah.

20:48>> Yeah, I remember in the in the staff

20:50review we got from the city forester,

20:53there was one tree that we were

20:54proposing to keep and they had made a

20:56comment that, um,

20:58>> It's the ash tree.

20:58>> that it was, um, in poor health. So, uh,

21:01when we revised the plan, we

21:03removed that and replaced it with a new

21:05tree.

21:06>> And I'm specifically concerned about the

21:07ones in front of the where the vacuums

21:09are going in front of the car wash cuz

21:10they are just not healthy.

21:12>> Yeah.

21:12>> Okay.

21:13Um

21:14>> [sighs]

21:16>> Um the other thing I wanted to say is I

21:17I'm kudos for um explaining the

21:19catchment um the graphs and and the

21:23diagrams and everything. It really

21:24helped understand how you determined

21:25where the storm water needed to run off.

21:27It was actually really pretty

21:29readable. So, thanks for that. And then

21:31the um last thing I wanted to bring up

21:33was um

21:34I found it and then staff caught it,

21:35too. I would just want to be sure for

21:36the record. Um there was a reference to

21:39the town of Thomaston when referring to

21:41the um lots

21:44in the storm water narrative. Probably

21:46needs to be fixed for the record.

21:48>> Okay.

21:49>> Thanks.

21:52>> I'll talk a little bit about traffic and

21:54your concerns there. So, um

21:57we did have you know, we had a scope

21:58meeting with the DOT um and we talked

22:00about all this stuff, but um you know,

22:03the way that the site that was proposed

22:06vastly improved site circulation and

22:08site access at those intersections.

22:09They're pulling the existing access um

22:12away from the intersection of Griffin

22:14and and Union Street. Um they're getting

22:17rid of the [snorts]

22:19um

22:20the act the exit that's closest to Union

22:22and Griffin.

22:24Um right now it's shown as a right right

22:25in, so that's that's not a problem

22:27there.

22:28Um

22:29the Griffin side um the lane striping is

22:32is really not there worried. That's

22:34that's the city, but um on Union Street

22:37um we we already talked about restriping

22:39Union Street to help um navigate some of

22:42this, so

22:43um

22:44I think we're going to do like a

22:45teardrop island north of the

22:46intersection coming inbound, so it gets

22:49people to

22:50um

22:50you know, get get some alignment coming

22:52into town a little bit better. And I

22:54think the city is going to also

22:57um extend the left turn

22:59from the intersection.

23:00Um

23:01so, you have a dedicated

23:03turn right there. So, I think I think I

23:05have no concerns with this project going

23:07in. Yes, it's increased traffic.

23:09Majority of it is passed by traffic

23:11anyway, as Shawn said. So, in that

23:15just the improvements to the access

23:16getting them away from the intersection,

23:19I think I think is is pretty good for

23:20this project. So, the staff doesn't have

23:23really any concerns and the DOT doesn't

23:24either. So,

23:28>> Thank you. Any other questions?

23:32>> I just wanted to comment on that um

23:34wording if I thought it was fixed in the

23:36revised narrative.

23:37>> I thought it was. I thought you had

23:38mentioned it. So, I just assumed that we

23:40had fixed that, but I left it

23:42back through and check the storm water

23:43narrative to

23:44>> I maybe just to be safe um

23:47you could just condition that it's fixed

23:49in the narrative for um

23:51when it gets to building permits.

23:53>> Yeah, I I I know that I think it was

23:54Matt actually fed that information back,

23:56but when the packets got to us it didn't

23:58include an update for that page. So,

24:01>> Um, all right. We'll just condition it

24:03just in case.

24:06Thanks.

24:08>> With the wording we can say that we can

24:10firm confirm that the the naming has

24:13been updated corrected from Thomaston.

24:15Something to that effect.

24:17And then the storm water plan was the

24:18second piece that we captured before

24:19that we're going to reference that um

24:24We'll have to ask about the wording on

24:25that one.

24:26>> It would just be So, would you say land

24:28phone and permit for major site

24:30development?

24:30>> Yeah, in the introduction.

24:31>> and then storm water permit like you

24:33did.

24:33>> So, when we're reading the decision we

24:34just list that as

24:36with another comma and then storm water.

24:43So, that's just adding to the

24:44description and then the other one's an

24:46actual condition with the condition that

24:49Then it was taking notes.

24:52Um, all right.

24:54Can we Can you reiterate for me the curb

24:57cut comment you made you made cuz you

24:59were saying we're at seven curb cuts and

25:00we're going to four? I'm just trying to

25:02understand that. I was wondering if I

25:05misunderstood you.

25:06>> There's currently, I believe

25:09I believe it's four on Union Street and

25:11three on

25:12Griffin Road.

25:13So, there was I think one at Captain

25:16Nick's and then maybe three into the RH

25:18Foster one.

25:19Um

25:20two at the car wash and one into the

25:25existing RH Foster convenience store on

25:27Griffin Road.

25:29So,

25:31we're replacing all those with

25:34the one full movement on Griffin Road,

25:37which I mean Union Street, which is as

25:38far away from the intersection as we can

25:41get it. It's essentially what was the

25:42entrance to Captain Nick's will become

25:45the entrance into the

25:47the main entrance into the development

25:49off Union Street. Then, we have the

25:51right in only that is closer to the

25:54intersection.

25:56And then on Griffin Road,

25:59we have the two shown on the plan there.

26:01One is sort of is a direct entrance to

26:04the car wash.

26:06And then the the other one is a

26:09mainly an entrance into the store.

26:11Um

26:12but it could also access the car wash

26:14through that or serve as a

26:16exit from the car wash. And then

26:18currently, they're they're not

26:19connected. So, if anybody's at the car

26:21wash,

26:22if they wanted to go to the store, they

26:23have to go out onto Griffin Road and

26:25then come back in to the next lot. Um

26:28Now, that's all connected. So, you can

26:30go directly back and forth between the

26:32car wash and the convenience store.

26:35>> So, should we do those all as like

26:36traffic traffic calming

26:38uh efforts, right?

26:40To avoid

26:41>> Yes, and improvements to the overall

26:43flow. Less Less conflict points with

26:46people

26:47exiting the site onto Union Street and

26:49Griffin Road.

26:50>> But, it's not working.

26:53Any other questions before we uh um

26:56open up public comment?

26:57All right, thank you. Appreciate it.

27:02Any other staff comments? You guys? No,

27:04okay.

27:06So, at this point I'd like to open

27:07public comment on this item. If anyone

27:09like to come up and speak or if there's

27:10anyone on the Zoom who would like an

27:12opportunity to speak about it.

27:18Um seeing no one, we will close public

27:20comment.

27:21But before [clears throat] going to the

27:22motions and standards, um I'll just ask

27:25one more time if board members have any

27:26other questions, comments before we move

27:29on to our review.

27:34And we are going to turn to our

27:37um applicable provisions and findings.

27:41And um I'd like to start with

27:45part one that the project meets the

27:46requirements of articles two through 12.

27:51Do I have a motion on number one? Member

27:52Hune?

27:53>> Sure, I find that the board finds I move

27:56that the board finds that based on

27:57exhibits two and 14, the applicant

27:59satisfied section 165-33.1

28:03of the land development code regarding

28:05best management practices of erosion and

28:07sediment control.

28:08>> Thank you. In a second.

28:10Member Brush. I'll roll call vote.

28:12Member Brush.

28:12>> Yes.

28:13>> Member Hayes.

28:13>> Yes.

28:14>> Member Hobson.

28:15>> Yes.

28:15>> Member Hune.

28:15>> Yes.

28:16>> Member Jonas.

28:16>> Yes.

28:17>> Member Woodford.

28:18>> Yes.

28:18>> Chair votes yes. Item two.

28:22Number Hobson.

28:23>> Chair, I move that the board finds that

28:24based on exhibit two and 33, the

28:26applicant satisfied section 165-62

28:30of the land development code regarding

28:32finding adequate visual clearance on

28:34corner lots, section 165-64's

28:38requirements for side yard width, and

28:40section 165-65's

28:42requirements for yard space for group

28:45buildings, and section 165-68's

28:48requirements of minimum lot frontage.

28:50>> Thank you and a second, member Jonas in

28:53a roll call vote. Member Brush?

28:55>> Yes.

28:55>> Member Hayes?

28:55>> Yes.

28:56>> Member Hobson?

28:57>> Yes.

28:57>> Member Hyun?

28:58>> Yes.

28:58>> Member Jonas?

28:59>> Yes.

28:59>> Member Woodford?

29:00>> Yes.

29:00>> And chair votes yes. Item three?

29:02>> Chair.

29:03>> Jonas?

29:03>> Chair, I move the board finds that based

29:05on exhibit two and 33, the applicant

29:07satisfied section 165-72

29:09of the land development code regarding

29:11the required number of parking spaces,

29:14section 165-73's

29:15requirements regarding parking area

29:17location and screening, and section

29:19165-74's

29:21requirements regarding parking area

29:23design, construction, and maintenance.

29:26>> You and a second?

29:28Second, member Brush in a roll call

29:29vote. Member Brush?

29:30>> Yes.

29:30>> Member Hayes?

29:31>> Yes.

29:31>> Member Hobson?

29:32>> Yes.

29:32>> Member Hyun?

29:33>> Yes.

29:33>> Member Jonas?

29:34>> Yes.

29:34>> Member Woodford?

29:35>> Yes.

29:35>> And chair votes yes. Item four?

29:38Member Brush?

29:39>> This is chair. I move the board finds

29:41that based on exhibit two and 33,

29:44the applicant satisfied land development

29:46code section 165-76

29:50regarding the required number of loading

29:52spaces,

29:54section 165-77's

29:56requirements regarding loading space

29:59sizes, and section 165-78's

30:03general requirements for loading spaces.

30:06>> Thank you and a second.

30:08>> I'll second.

30:08>> Member Hobson in a roll call vote.

30:10Member Brush?

30:11>> Yes.

30:11>> Member Hayes?

30:12>> Yes.

30:12>> Member Hobson?

30:13>> Yes.

30:13>> Member Hyun?

30:14>> Yes.

30:14>> Jonas?

30:15>> Yes.

30:15>> Member Woodford?

30:16>> Yes.

30:16>> And chair votes yes. Item five?

30:20Member uh Hayes?

30:22>> I move the board finds that based on

30:24exhibits two, 19, and 30, the applicant

30:27satisfied section 165-79

30:32>> [clears throat]

30:32>> of the land development code regarding

30:35providing the necessary utility services

30:38required, section 165-80's

30:41requirements regarding providing

30:43adequate water and sewage services and

30:47what section 165-83's

30:50requirements regarding providing

30:52adequate electrical service.

30:54>> You in a second. Member Brush in a roll

30:56call vote. Member Brush?

30:57>> Yes.

30:58>> Member Hayes?

30:59>> Yes.

30:59>> Member Hobson?

31:00>> Yes.

31:00>> Member Hune?

31:01>> Yes.

31:01>> Jonas?

31:02>> Yes.

31:02>> Woodford?

31:03>> Yes.

31:03>> The chair votes yes.

31:06Um moving on to item six.

31:09Member

31:10uh member Hune?

31:12>> Chair, I move that the board finds that

31:13based on exhibits two and 13, the

31:15applicant satisfied section 165-81

31:19of the land development code regarding

31:21providing adequate lighting and

31:22preventing light pollution and trespass.

31:25>> Thank you in a second. Member Brush in a

31:27roll call vote. Member Brush?

31:29>> Yes.

31:29>> Member Hayes?

31:30>> Yes.

31:31>> Member Hobson?

31:31>> Yes.

31:32>> Member Hune?

31:32>> Yes.

31:33>> Jonas?

31:33>> Yes.

31:34>> Member Woodford?

31:34>> Yes.

31:35>> The chair votes yes. Item seven.

31:39Member Brush?

31:41>> Mr. Chair, I move the board finds that

31:42based on exhibits two and 31, the

31:45applicant satisfied

31:47section 165-82's

31:49requirements regarding having adequate

31:53fire protection.

31:56>> Thank you in a second.

31:57Member Hune in a roll call vote. Member

31:59Brush?

31:59>> Yes.

32:00>> Member Hayes?

32:00>> Yes.

32:01>> Member Hobson?

32:01>> Yes.

32:02>> Member Hune?

32:02>> Yes.

32:03>> Member Jonas?

32:03>> Yes.

32:04>> Member Woodford?

32:04>> Yes.

32:05>> The chair Item eight.

32:07>> Here.

32:07>> Member Hobson?

32:08>> Chair, I move that the board finds that

32:10based on exhibits two, 30, and 32, the

32:13applicant satisfied section 165-84

32:16of the land development code regarding

32:18providing adequate storm drainage and

32:20storm water offset.

32:21>> Thank you in a second.

32:22>> Second.

32:23>> Member Jonas in a roll call vote. Member

32:24Brush?

32:25>> Yes.

32:26>> Member Hayes?

32:26>> Yes.

32:27>> Member Hobson?

32:27>> Yes.

32:28>> Member Hune?

32:28>> Yes.

32:29>> Member Jonas?

32:29>> Yes.

32:30>> Member Woodford?

32:30>> Yes.

32:31>> The chair votes yes. Uh item nine.

32:33>> Here.

32:34>> Member Jonas?

32:34>> Chair, I move the board finds that based

32:36on exhibits 2 and 30, the applicant

32:38satisfied section 165-85

32:41and section

32:42165-86

32:44of the land development code regarding

32:45providing information on sanitary flows

32:48in compliance with sewer regulations.

32:50>> Thank you. And a second?

32:51>> I'll second.

32:52>> For Hobson on a roll call vote, member

32:53Brush.

32:54>> Yes.

32:54>> For Hayes.

32:55>> Yes.

32:55>> For Hobson.

32:56>> Yes.

32:56>> For Huen.

32:57>> Yes.

32:57>> For Jonas.

32:58>> Yes.

32:58>> For Woodford.

32:59>> Yes.

32:59>> The chair votes yes. That completes part

33:01one and brings us to part two that the

33:03project meets the district site

33:04development standards under article 19.

33:08There's one item here. I'd look for a

33:09motion.

33:12Member Huen.

33:13>> Yeah, chair, I move that the board finds

33:15that based on exhibits 2, 21, 22, 25 to

33:1926, 30, and 33, the applicant satisfied

33:22section 165-135

33:25of the land development code regarding

33:26height limit, floor area ratio,

33:29impervious surface ratio, and buffer

33:31yards.

33:32>> Thank you. And a second? Member Brush on

33:33a roll call vote, member Brush.

33:35>> Yes.

33:35>> For Hayes.

33:36>> Yes.

33:36>> For Hobson.

33:37>> Yes.

33:37>> For Huen.

33:38>> Yes.

33:38>> For Jonas.

33:39>> Yes.

33:39>> For Woodford.

33:40>> Yes.

33:41>> The chair votes yes. That completes part

33:42two and brings us to part three that the

33:44project meets the requirements of

33:46section 165-101,

33:49shopping and personal service district

33:50SNPS. Uh there are Yep, we'll start with

33:53item one.

33:55For Hobson.

33:56>> Chair, I move the board finds that based

33:58on the findings made in parts one and

33:59two of this document, the project meets

34:02the requirements of section 165-101B

34:05for uses within the shopping and

34:07personal services district SNPS.

34:10>> Thank you. And a second? For Jonas on a

34:12roll call vote, member Brush.

34:14>> Yes.

34:15>> Member Hayes.

34:15>> Yes.

34:16>> Member Hobson.

34:17>> Yes.

34:17>> For Huen.

34:18>> Yes.

34:18>> For Jonas.

34:19>> Yes.

34:19>> For Woodford.

34:20>> Yes.

34:20>> The chair votes yes. Brings us to item

34:22two.

34:23>> Okay.

34:23>> Remember Jonas.

34:24>> Chair, I move the board finds that

34:25provided the project is found to meet

34:27the requirements of section 165-9 in

34:29part five below, and based on exhibits 2

34:32and 34, the project meets the

34:34requirements of section 165-101D

34:37for the conditional uses of retail auto

34:39service, drive-in business, and gasoline

34:42service station within the shopping and

34:44personal service district or SNPS.

34:46>> Thank you, and a second.

34:48>> Second.

34:49>> Hopson, and a roll call vote. Member

34:50Brush.

34:51>> Yes.

34:51>> Member Hayes.

34:52>> Yes.

34:53>> Member Hopson.

34:53>> Yes.

34:54>> Member Hume.

34:54>> Yes.

34:54>> Member Jonas.

34:55>> Yes.

34:55>> Member Woodford.

34:56>> Yes.

34:56>> The chair votes yes. That completes part

34:58three. That brings us to part four, that

35:00the project meets the requirements of

35:02165 of section 165-114,

35:05land development approval standards.

35:07For a motion on item one.

35:10Member Hayes.

35:11>> I move the board finds that based on

35:13exhibits 2, 8, 28, and 30, the applicant

35:17satisfied land development code section

35:20165-114B's

35:23requirement that the proposed parking

35:25and loading layout are arranged in a

35:28reasonable and safe configuration,

35:30including the provision for safe

35:32pedestrian travel to all on-site uses.

35:36And section 165-114C's

35:39requirement that all proposed access

35:42drives are reasonably necessary and

35:44safe.

35:46>> Thank you, and a second.

35:47>> Second.

35:48>> Yeah, member Woodford.

35:50And a roll call vote. Member Brush.

35:51>> Yes.

35:52>> Member Hayes.

35:52>> Yes.

35:53>> Member Hopson.

35:54>> Yes.

35:54>> Member Hume.

35:55>> Yes.

35:55>> Member Jonas.

35:56>> Yes.

35:56>> Member Woodford.

35:57>> Yes.

35:57>> The chair votes yes.

36:00Item two.

36:03Member Brush.

36:05>> Mr. Chair, I move the board finds that

36:09provided the project is found to meet

36:11the requirement of section 165-9

36:15I I think I

36:16>> I think it'd be we're on part four, item

36:18two.

36:20>> Sorry.

36:21>> Excuse me.

36:21>> Should be page five of eight. I'm

36:23looking at it.

36:25>> Mr. Chair, I move the board finds based

36:27on exhibits 2, 9, 10, 15, 16, 30, and

36:3232, the applicant satisfied land

36:34development code section 165-114D's

36:39requirements that the proposed

36:41development will not have unreasonable

36:44adverse effects on abutting or

36:47downstream properties or protected

36:49resources such as wetlands, lakes,

36:53streams, or brooks.

36:55And that all downstream channels or

36:57municipal stormwater collection systems

37:00have adequate capacity to carry the flow

37:04without significant negative effects.

37:08>> Thank you. And a second?

37:10>> Second.

37:10>> Member Hayes. Roll call vote. Member

37:11Brush?

37:12>> Yes.

37:13>> Member Hayes?

37:13>> Yes.

37:14>> Member Hobson?

37:15>> Yes.

37:15>> Member Hume?

37:16>> Yes.

37:16>> Member Jonas?

37:17>> Yes.

37:17>> Member Woodford?

37:18>> Yes.

37:18>> And the chair votes yes.

37:20Um

37:22Item three.

37:23Member Hume?

37:24>> Chair, I move that the board finds that

37:26based on exhibits two and 13, the

37:28applicant satisfied land development

37:30code section 165-114E's

37:33requirements that all outdoor lighting

37:35shall be designed, installed, and

37:37maintained to avoid unreasonable adverse

37:40effects from light pollution.

37:42>> And a second?

37:43>> Second.

37:43>> Member Hobson. And a roll call vote.

37:45Member Brush?

37:45>> Yes.

37:46>> Member Hayes?

37:46>> Yes.

37:47>> Member Hobson?

37:47>> Yes.

37:48>> Member Hume?

37:48>> Yes.

37:49>> Member Jonas?

37:49>> Yes.

37:50>> Member Woodford?

37:50>> Yes.

37:51>> And the chair votes yes. Item four.

37:54Member Brush?

37:56>> Mr. Chair, I move the board finds that

37:57based on exhibits two and eight, the

38:00applicant satisfied land development

38:02code section 165-114F's

38:06requirements for landscaping.

38:08>> Thank you. And a second?

38:11Member Hume. And a roll call vote.

38:12Member Brush?

38:13>> Yes.

38:13>> Member Hayes?

38:14>> Yes.

38:14>> Member Hobson?

38:15>> Yes.

38:15>> Member Hume?

38:16>> Yes.

38:16>> Member Jonas?

38:17>> Yes.

38:17>> Member Woodford?

38:18>> Yes.

38:19>> And the chair votes yes. Item five.

38:22Member Hume?

38:24>> Chair, I move that the board finds that

38:25based on exhibits two and 30, the

38:27applicant satisfied land development

38:29code section 165-114G

38:32requiring buildings to be situated to

38:34avoid unreasonable adverse effects on

38:37adjacent properties or public

38:39rights-of-way.

38:40>> Thank you. In a second.

38:41>> I'll second.

38:42>> Member Hobson and a roll call vote.

38:43Member Brush.

38:44>> Yes.

38:45>> Member Hayes.

38:45>> Yes.

38:46>> Member Hobson.

38:46>> Yes.

38:47>> Member Hume.

38:47>> Yes.

38:48>> Member Jonas.

38:48>> Yes.

38:49>> Member Woodford.

38:49>> Yes.

38:50>> Chair votes yes. Item six.

38:55Member Hayes.

38:57>> I move the board finds that based on

38:59exhibits two, four, nine through 11, and

39:0232, the applicant satisfied land

39:05development code section 165-114K

39:10requiring that site developments needing

39:13approval under 38 MRSA section 420-D

39:18meets the standards of 38 MRSA section

39:22420-D1

39:25as amended and the requirements of the

39:27Department of Environmental Protection

39:30regulations chapters 500, 501, 502.

39:35>> Thank you. In a second. Member Jonas and

39:37a roll call vote. Member Brush.

39:39>> Yes.

39:39>> Member Hayes.

39:40>> Yes.

39:40>> Member Hobson.

39:41>> Yes.

39:42>> Member Hume.

39:42>> Yes.

39:43>> Member Jonas.

39:43>> Yes.

39:44>> Member Woodford.

39:44>> Yes.

39:45>> Chair votes yes. That completes part

39:46four and brings us to part five that the

39:49project meets the criteria for a

39:50conditional use under section under

39:55uh section 165-9A.

39:57>> Sure.

39:57>> Item one. Yeah, member Jonas.

39:59>> Chair, I move the board finds that based

40:01on the findings made in parts one

40:02through four of section four of this

40:04document, the applicant satisfied land

40:06development code section 165-9A

40:09part one's requirements regarding not

40:11requiring a variance of development or

40:13other standards.

40:14>> Thank you. In a a

40:15>> I'll second.

40:16>> Member Hobson and a roll call vote,

40:17member Brush?

40:18>> Yes.

40:19>> Member Hayes?

40:19>> Yes.

40:20>> Member Hobson?

40:20>> Yes.

40:21>> Member Hyun?

40:21>> Yes.

40:22>> Member Jonas?

40:22>> Yes.

40:23>> Member Woodford?

40:23>> Yes.

40:24>> And the chair votes yes. Item two.

40:26>> Chair,

40:26>> member Hobson.

40:27>> Chair, I move the board finds that based

40:28on exhibits 2, 18, and 30, the applicant

40:31satisfied land development code section

40:33165-9A2's

40:36requirements regarding not creating

40:38unreasonable traffic congestion or

40:40hazardous conditions on contiguous or

40:43adjacent streets with the condition that

40:45the applicant's traffic movement permit

40:47application is approved by the Maine

40:48Department of Transportation.

40:50>> Thank you, and a second.

40:52>> Second.

40:52>> Member Brush, in a roll call vote,

40:54member Brush?

40:54>> Yes.

40:55>> Member Hayes?

40:55>> Yes.

40:56>> Member Hobson?

40:57>> Yes.

40:57>> Member Hyun?

40:57>> Yes.

40:58>> Member Jonas?

40:59>> Yes.

40:59>> Member Woodford?

41:00>> Yes.

41:00>> And the chair votes yes. Item three.

41:03Member Hyun?

41:04>> Chair, I move that the board finds that

41:05based on the findings made in parts 1 to

41:08through 4 of section 4 of this document,

41:12the applicant satisfied land development

41:13code section 165-9A3's

41:17requirements for providing and

41:18maintaining adequate

41:20and appropriate utilities, fire

41:22protection, drainage, parking, and

41:25loading, and other necessary site

41:27improvements.

41:28>> Thank you, and a second.

41:29>> Second.

41:30>> Member Jonas, in a roll call vote,

41:32member Brush?

41:32>> Yes.

41:33>> Member Hayes?

41:34>> Yes.

41:34>> Member Hobson?

41:35>> Yes.

41:35>> Member Hyun?

41:36>> Yes.

41:36>> Member Jonas?

41:37>> Yes.

41:37>> Member Woodford?

41:38>> Yes.

41:38>> And the chair votes yes.

41:39>> Mhm.

41:40>> Item four.

41:40>> Chair,

41:41>> member Jonas.

41:42>> Chair, I move the board finds that based

41:43on exhibits 2, 8, and 24 through 26, the

41:46applicant satisfied land development

41:48code section

41:49regarding

41:52the proposed use being appropriate for

41:54the location in which it is sought

41:56because it conforms to the general

41:57physical development pattern of the

41:59immediate area.

42:00>> Thank you, and a second. Member Brush?

42:03In a roll call vote, member Brush?

42:04>> Yes.

42:05>> Member Hayes?

42:05>> Yes.

42:06>> Member Hobson?

42:06>> Yes.

42:07>> Member Hyun?

42:08>> Yes.

42:08>> Member Jonas?

42:09>> Yes.

42:09>> Member Woodford?

42:10>> Yes.

42:10>> And the chair votes yes.

42:12Which brings us to the decision and I

42:14wanted to make sure that we were

42:17aware of the changes that we discussed

42:18up to this point that when we're reading

42:20this we would read that it's a land

42:22development permit for major site

42:24development, that it's a storm water

42:26permit and a conditional use

42:28and that therefore etc. But then also

42:30that we add the condition related to the

42:33reference to

42:35the Thomaston

42:37reference in get updated, corrected or

42:41that we confirm that it has been cuz it

42:43may already have been corrected.

42:46Is what it sounds like, right?

42:48Um

42:50Any additions?

42:52Any other corrections?

42:53>> So it's written correctly here.

42:55>> Well, I don't believe it is written

42:57correctly. We got to include when we're

42:59reading the major site development, we

43:01have to include storm water permit and

43:02conditional use. That's the first piece

43:05and we have to read the second the the

43:08bullet there about the application

43:09needing the traffic movement and then we

43:11have to include a condition to uh

43:15to confirm that Thomaston has been

43:17updated and removed

43:20um from

43:22>> water narrative.

43:22>> From the storm water narrative, that's

43:24what I was looking for.

43:26>> Or that it or that it reflects Bangor.

43:28>> Yeah, ultimately that it references

43:30Bangor instead of

43:32uh another town in the storm water

43:34narrative.

43:35Any questions about that? Is any any

43:37brave individuals wanted to

43:40hit that on?

43:43>> I'll I'll

43:43>> So it's member Jonas.

43:45>> Since I'm the big mouth, um

43:48Chair, I move the board finds that the

43:49project meets the requirements for a

43:51land development permit and a storm

43:53water permit for a major site

43:54development and conditional use and

43:56therefore the board grants the land

43:58development permit for the proposed

43:59project project with the following

44:01conditions.

44:02>> Did you mention the storm water permit

44:03in there or did I miss

44:04>> I think I did.

44:05>> You did.

44:05>> Okay, sorry.

44:05>> I stuck it in after Linda built me.

44:07>> Okay.

44:08>> [laughter]

44:09>> Um the applicant must receive approval

44:11for their traffic movement permit

44:12application from the main Department of

44:14Transportation. And secondly, that the

44:17um storm water narrative be corrected to

44:20reflect that the parcels are located in

44:22the city of Bangor.

44:23>> Thank you. And a

44:24>> Second.

44:25>> Member Hobson, in a roll call vote,

44:27member Brush.

44:28>> Yes.

44:28>> Member Hayes.

44:29>> Yes.

44:29>> Member Hobson.

44:30>> Yes.

44:30>> Member Hume.

44:31>> Yes.

44:31>> Member Jonas.

44:32>> Yes.

44:32>> Member Woodford.

44:33>> Yes.

44:34>> The chair votes yes.

44:35Thank you for your application. Uh you

44:37can reach out to our office man office

44:39for more guidance.

44:45Which brings us to other business.

44:48Um

44:51It's a couple items that didn't make it

44:52on here, but uh that I think we wanted

44:53to just remind about the upcoming

44:55election.

44:56Uh the first item is about the election

44:58for the planning board.

45:00But there's also we wanted to make sure

45:02people were aware of this upcoming

45:03schedule change. That we're not going to

45:06be meeting on election day.

45:09So I'm just going to say that first of

45:10all. Do you know when our next meeting

45:12is going to be offhand?

45:14November 17th.

45:18Um

45:21Any

45:21>> That's the third Tuesday.

45:24>> So we're just going to skip the the

45:25first meeting. We're only going to have

45:26one meeting in November.

45:28Okay.

45:29And then we'll have two meetings in

45:31December.

45:32Which will bring us to the new year and

45:35at the beginning of the new year, our

45:36first meeting we have uh an election of

45:39officers. And I wanted to make sure we

45:41were talking about it here instead of um

45:44sort of doing it the day of or something

45:45like that because this way we at least

45:47know what's coming uh coming as far as

45:49it as it's concerned. Um

45:52Planning officer Collette, would you

45:53like to talk through it at all?

45:56>> Um well, there's not much to it. You

45:58guys um just think about who you would

46:01want to nominate for chair and vice

46:03chair. Um Um, and you can also nominate

46:05yourselves if you want. So,

46:08just to get you thinking about it before

46:09the new year.

46:12>> And then, so when we get the nominees,

46:14we then do the the vote, and I was going

46:17to just give a little rundown on what

46:18it's been like being uh the chair this

46:20past term so far cuz this is my first

46:23time doing it. And I wanted to if anyone

46:26was interested in taking it on, I wanted

46:27to explain what it's been like.

46:29But basically, Anya will send me

46:31uh

46:32uh

46:33a sneak peek of what's coming, and then

46:35I'll have an opportunity to ask any

46:36clarifying questions about it. But

46:38basically, I build out using a template,

46:40I build out a sort of an agenda uh

46:43where I put in each item and the details

46:46that we that we have in the bulleted

46:48section of our uh agenda.

46:51And then there's some template language

46:53that I read out, and that takes a while.

46:55>> [clears throat]

46:55>> My experience has been it's a lot of

46:57talking. It's It's really the big

46:59responsibility here. You don't have to

47:01read the uh

47:03the applicable provisions and findings,

47:05which is a

47:07which is I guess a a counter balance,

47:09but there's that section in the

47:11beginning to read. And the prep work is

47:12not a

47:14a huge lift in addition to just reading

47:15the general packets. It's not a lot.

47:18Um, but I just print that out and I have

47:20that handy so that I can read it.

47:23And

47:25other than that, that's the biggest

47:27responsibility um

47:29the roll call vote and trying to keep

47:30consistent and trying to give There's a

47:32couple reminders throughout the script

47:33here that give us a chance to remind

47:35people that if we have fewer than

47:38voting members, then we have to give

47:40them the opportunity to not come before

47:42us, that we need a minimum of four yeses

47:45on

47:46one scenario versus majority in the

47:48other.

47:49And there's a couple little things like

47:50that to keep straight, but as you know,

47:52our our city staff do so much to

47:55um assist and keep us

47:58um, aware of these as we're going.

48:02Um, if anyone's uncomfortable being

48:04nominated, uh, or nominating themselves,

48:07I was going to if you guys want to let

48:09me know that you're interested, or let

48:11uh, I'm happy to nominate any one of you

48:13guys and putting it up for

48:15um,

48:17putting it out there. I'm happy to serve

48:18again next year if there's no no

48:20interest. Uh,

48:22but I did want to open it up. I don't

48:23want to to uh, I think everyone should

48:25have an opportunity to see what it's

48:26like from this position, and it's it's

48:28interesting. It's different from being

48:31um, a voting the um,

48:34from not being the chair. It it is a

48:36different experience.

48:38But, um,

48:39it's a good one. I mean, it's it's it's

48:41interesting, for sure.

48:43Anything else? And then, as the vice

48:45chair, I was that one year, and you've

48:47been it this year.

48:50Any comments?

48:51>> Um, no, because I mean, we coordinated

48:54the one time that you weren't going to

48:55be here, and I only made one mistake

48:57when I asked Crystal about something

48:59that she wasn't here for.

49:00It was just cuz

49:02I didn't have the

49:04sooner enough to go through it and

49:06actually do that. But, that's that that

49:07was just

49:08I mean,

49:11there's really no additional preparation

49:13and as long as you coordinate with the

49:15chair if they're not going to be here,

49:16or or an

49:17occasionally I would let him know if I'm

49:19not going to be around, too, just

49:20because

49:23>> There's always mistakes to be made. You

49:25just

49:25>> Oh, I'll find them.

49:27Yeah. And our staff is fantastic, you

49:29know, we

49:31We I think we know every time we go out

49:32and speak with other planning board

49:33members around the state, we realize how

49:35fortunate we are to have a staff that we

49:36do

49:38get pulling things together for us.

49:41>> I wanted to talk about that well in

49:42advance of the January election, just so

49:45that we

49:46um,

49:48felt like we had an opportunity for

49:49follow-up questions.

49:50>> Michelle's chaired three times. I don't

49:52need to do it again.

49:55>> I'd like to say on the record that

49:57you've done a great job this year.

49:58>> I was I was going to turn to see if

49:59there was any feedback or any changes

50:01that we'd want either for myself or for

50:02a future chair to be aware of and we can

50:04always turn to these type of questions

50:06but Thank you.

50:08Um

50:10Yep.

50:11I appreciate it.

50:12Let me think. Um any other topic there

50:15Anya before we move down to

50:17All we had underneath this was land

50:19development code update just to get a

50:21status update on how things are going.

50:22>> Yeah. Um

50:24We are making good progress. We are

50:26about halfway through all the new

50:28articles with the consultants. Um

50:31Some of the remaining articles are very

50:32short so probably won't take us any time

50:33to go through. So

50:35Um

50:36But there's still a lot to work through

50:38um and we still have to look at the

50:39zoning map

50:41which um I have almost finished like

50:44making my proposed changes so

50:47um

50:49And then I alluded to this before but we

50:52are also working with the um the airport

50:54has their own set of consultants that do

50:55like airport planning.

50:57So we're working with them to create a

50:59overlay district that would go around

51:01the airport and limit uses um depending

51:04on the area it is like in proximity to

51:06the airport like whether it's in that

51:08runway zone or outside of that.

51:11Um and it would need you know all new

51:12language and stuff so I'm going to be

51:14having a series of meetings with them

51:16over the next few months to talk about

51:17all that.

51:18Um

51:20And so there's a lot of moving parts

51:21here.

51:22Um

51:25But we're still aiming to have a public

51:27draft ready by early next year.

51:30Um I will say at this point

51:33like we were hoping to um

51:36lump in some of the changes we have to

51:38make with LD 1826 and 2173 with the new

51:41code.

51:43And we're definitely integrating the

51:44state laws into the new code but with

51:46the timing, since I don't anticipate

51:48having the new code done

51:50um

51:51until like the end of next year, we

51:53probably will have to take out

51:56um all the changes because of these

51:58state laws and um put them in our

52:01current code in the spring, work on

52:03doing that in the spring. Um and we have

52:05to show that

52:07that new draft to the state as well

52:09um

52:11to get their review since we've gotten

52:12grant money from them to make these

52:14changes. So, I guess

52:18be on the lookout for that next year. Um

52:22but that's where we're at right now, so.

52:27>> You want to talk about your upcoming

52:28public event?

52:31>> Yeah, um we are we are coordinating a

52:33public workshop on the growth boundary

52:35change we talked with you all about

52:37earlier in the month. We're doing that

52:39next Thursday at 6:00 p.m. over at

52:42Rangeley Hall. I don't know if you all

52:44know where that is.

52:45Um

52:47we have gotten I've gotten an email

52:49feedback just from one of abutters so

52:51far. Um we had a pretty extensive

52:53conversation about like the whole

52:55process of

52:57you know

52:58what comes first as far as growth

52:59boundary change, zone change, and then

53:01land development permit, and

53:03what all of it

53:04you know what results from that. So, I

53:08um

53:09you know, I do anticipate what we will

53:11hear from abutters along Kittredge Road

53:14um which I anticipated. So, we're just

53:16there we're going to be there to answer

53:18questions from people and just get their

53:19feedback, and we will go from there.

53:22We'll hear what they say as well.

53:26>> Thank you. And are we are still looking

53:28for additional candidates for the

53:30planning board?

53:32We still have open positions.

53:33>> So, I don't know if anyone's applied yet

53:35since our last conversation cuz um I

53:38don't really get clued in when Lisa gets

53:39applications. So, I don't know where

53:41that's at.

53:43Um typically, I find out about it um

53:46when I look at the council agenda and

53:47then

53:47>> [laughter]

53:48>> they're appointing people. So,

53:50yeah.

53:53>> Any other comments or questions?

53:56Good job, Liz.

53:57>> Um

53:58>> Oops.

53:59>> I have I have a question and I'm not

54:00really sure that this is the right forum

54:02for it, but I'm going to ask it anyway.

54:04Um after

54:06um being out and about in Bangor over

54:08the last couple of weeks and then

54:10reviewing the traffic study around this

54:12um

54:14property that we just that application

54:16that we just approved, um I'm wondering

54:20with the increased traffic that we're

54:22seeing on our major arterials, if there

54:24might be

54:26the possibility of building commuter

54:28lots somehow in the outskirts of Bangor

54:30to help alleviate some of the traffic

54:32and the parking issues and the things

54:33that we're having. And that might be a

54:35question I need to

54:37send to our council

54:39person. I don't know if it's really a

54:40land use issue, but

54:42>> you want them to do?

54:43>> Like a park and ride?

54:44>> Is that what she mean?

54:45>> Yeah, like a park and ride. Like a yeah.

54:46>> Okay.

54:47So,

54:49I honestly think

54:50and this is more just coming from my

54:54perspective as a planner and looking at

54:56the demographic info and the commuting

54:58um statistics of people

55:00um within the city and outside the city,

55:05I I think that a lot of what we're

55:07seeing is because we don't have enough

55:09housing that's affordable within the

55:11city and we have people living outside

55:14of the city that commute in.

55:16I do think that's a lot of what we see

55:18and maybe Jeff has a different

55:19perspective, but um I will say there's a

55:22there's a statistic that was in our

55:24housing study that showed that 80% of

55:27people that work in city limits live

55:29outside of the city and commute in.

55:31>> Yeah.

55:31>> Yeah.

55:32>> Huge.

55:32>> And there's and they do tie that to the

55:35lack of affordable housing that we have

55:37in the city for people who work here.

55:40Um

55:40>> And avail- lack of affordable, but also

55:42available housing.

55:43>> Available housing, yeah.

55:45But, I will say our housing study did

55:47pinpoint that what we're most lacking is

55:49deeply affordable housing to people that

55:51make very low incomes.

55:53Um and there's all kinds of factors

55:55contributing to that. But, you know,

55:58and the zoning is only one piece of it,

56:00you know.

56:02So, yes, we hope that like creating more

56:05allowances for density and affordable

56:07housing will help out with that

56:09shortage, but there's so many other

56:10factors, construction costs, and

56:12contractor availability, and things like

56:14that that affect housing availability.

56:16Um

56:18you know, and the city and the state's

56:20working on on things that do affect

56:22that, and it's going to be a long

56:23process. So, I don't know that

56:26I don't know that there's an easy an

56:28easy fix.

56:29But, yeah.

56:30>> Well, I mean,

56:31the historic traffic data hasn't really

56:33changed since 2000.

56:35But, if you look at the total numbers,

56:37it's it's the same. It might move from

56:39pocket to pocket. So, you know, Broadway

56:42we see a lot because of the commuters.

56:44But, the historic traffic numbers have

56:45not really changed since 2000. So,

56:48um

56:49and then, you know, maybe

56:52you know, the last couple years

56:53post-COVID, you know, certainly COVID

56:55everything dropped dramatically, but um

56:58yeah, that's So, that's something that,

57:00you know,

57:00we've always kind of talked about. You

57:02know, I've been consulting in this area

57:04since 2005. And, you know, I worked with

57:06the traffic engineers the whole time.

57:09And, um it never changes except for the

57:12little pocket to pocket that you'll see.

57:14So, of course, now Broadway is busy,

57:16Union Street. But, because, you know,

57:18people come commute for work. I mean,

57:20our population was what? 30,000? This is

57:22approximate. And we ballooned to 90,000

57:25during the day.

57:27So, that tells you we have a lot of

57:28commuters. But, that and that's been the

57:30same

57:31forever.

57:32>> [laughter]

57:32>> You know, that's been the same since

57:342002, so

57:35um yeah. But no, we do certainly have

57:38quarters that we need to look at.

57:39Broadway's is a major one.

57:42>> The average two is two, I noticed when I

57:44tried to make a left turn out there

57:45yesterday morning.

57:46>> Yeah, I can see that.

57:49Oh.

57:50>> I don't see any documents to sign. Well,

57:52before we do that, are there any other

57:53comments or discussion?

57:56Okay, so there are going to be documents

57:57to sign, so we'll stay around for that.

57:58Any final comments or questions before

58:00we wrap up?

58:03All right. Well, thank you. It's 7:57

58:05and uh we are adjourned.

```*