2026-09-21 - Finance Committee
Summary
Built from the posted agenda and the auto-generated captions; names and numbers in captions may be misheard. No minutes are posted.
- Airport partial roof replacement (Building 100): staff recommended awarding the bid; moved and seconded with no substantive discussion. See Airport Roof Projects.
- Sewer software replacement: staff proposed replacing the legacy pipe-inspection software used with the city's sewer CCTV van with a newer system recommended through the Greater Augusta Utility District. Councilors asked about cybersecurity; staff said the data is gravity sewer only, not CSO or SCADA controls. The committee recommended approval.
- Loan workout agreement: a one-year renewal for a homeowner who kept up required payments; recommended with little discussion.
- 290 Pearl St: staff recommended taking possession after a prior workout agreement was not maintained and the owner was largely unresponsive; the committee voted to forward it to the full Council.
- 103 Maine Ave: the $1.4M bond order would let the city exercise its right of first refusal, retained in its 2009 sale to the owner for $1.5M, after an agreement to sell to Northeast Pain Management for $1.35M. It is meant to house public health. Councilors asked about lost property tax (about $30,000 a year at the $1.759M assessed value), bonding versus cash, utilities and building age; alternatives 50 Cleveland St and 120 Venture Way were considered. The committee voted to forward it to the full Council for a public hearing. See 103 Maine Avenue Purchase and Bond Order.
Agenda
Agenda PDF posted; see Sources.
Sources
- Agenda: https://bangormaine.gov/AgendaCenter/ViewFile/Agenda/_09212026-921
- Video: https://www.youtube.com/watch?v=3lUAw1iMqOE (City of Bangor YouTube channel, 39:54)
- Agenda Center: https://bangormaine.gov/AgendaCenter
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:18All right, you are live. Good evening.
00:20Welcome to the regularly scheduled
00:21finance committee meeting. It is
00:23September 21st, 2026. The time is 7:02
00:28p.m. I am chairing tonight's finance. I
00:30am councelor Dean. on finance with me
00:32tonight. We have council Carson,
00:34councelor Foon, councelor Morer,
00:37councelor Beck will be returning in just
00:39a moment. We also have council chairs
00:43and council fish at the table. We are
00:45joined by our student manager
00:49there.
00:50And first up we have bids and purchases.
00:53>> Yes. So the first item is u from the
00:57airport. They're looking for approval to
01:00award a bid for some roof
01:03[clears throat] work um building 100
01:06looking to go with the low bidder
01:10and this one just requires committee
01:12approval.
01:16Any questions? Councor Carson staff
01:18recommendation of
01:20>> second.
01:21>> We are joined by councelor vet. We are
01:24discussing the bids and purchases of our
01:26rooster roof replacement. We have a
01:29[clears throat] motion and a second.
01:35We'll move ahead with staff
01:38recommendation.
01:42Next up, we have sewer software
01:44replacement. This one isn't so simple to
01:46explain. So, I'll proactively invite um
01:50Amanda Smith up to help with this one.
01:54So, looking to award some software and
01:57Jeff two for one.
02:00Some software and I'll allow them to
02:02take it away.
02:06>> Smith, director management. I'm gonna
02:08let Jeff take it and I'll answer
02:10questions if you don't mind. Y so um
02:14engineering and water quality
02:15departments um we've been evaluating our
02:18new pipeline assessment certification
02:20program um currently u the legacy system
02:24is IT pipes um which has required vast
02:27amount of uh administrative overhead and
02:29manual data in integration and it just
02:31hasn't been working for our crews um
02:34Amanda's the sewer [clears throat] crews
02:36they use this to um [snorts] video and
02:39um assess all the sewer lines in the
02:41city, we have a consent decree that we
02:43have to do a certain amount every year.
02:45Um, you know, they have their own TV van
02:47that you you'll see throughout. Um, and
02:50you know, they pop manhandle covers,
02:51they put a little robot in, and then
02:53they they check to see the condition,
02:55age, and all that and the classification
02:57of the um pipe itself. And we use that
03:01[clears throat]
03:02uh review to do our small projects,
03:05repairs, and big capital plant projects.
03:08Well, I'll just jump in and say we
03:11wanted to ensure that we have the
03:14appropriate software as well in place
03:16before we bring to you our proposal for
03:20our new CCTV van. And if you recall
03:23during budget, we talked about how this
03:26is going to be speced out to be a much
03:28more advanced um CCTV system and
03:31ultimately replace the two bands that we
03:34currently so we'll be operating one and
03:37we really need a software that can
03:39support that.
03:41>> So um I'm actually going to bring John
03:44Miller back up here because he's the one
03:45who spearheaded this um campaign
03:50>> at my system. Um, and you can talk about
03:52the full quotes that we received. Um,
03:55kind of what Seward AI is and why we
03:58decided to go with it.
04:00>> Sure. So, do you want me to like explain
04:02what the software does, what it's used
04:03for?
04:04>> Yeah.
04:04>> Okay. Um, so effectively what it's used
04:06for when a man just talking about CCTV
04:09in the CCTV van and what that is is
04:11that's basically a box truck with a
04:14computer in the back and they have a big
04:16spool of cable with a little looks like
04:18a remote control car with a camera on it
04:19and they drive it through all the sewer
04:21pipes, all the storm water. Um, and
04:24essentially an operator is able to
04:26control it and make a note of all of the
04:29defects in the pipes. Um, so anytime
04:31they see cracks or root balls or um, if
04:35there's a service coming in that's got a
04:37lot of water that's infiltrating or any
04:38other issues like that, they log them
04:40and then that's used for QA of the
04:43entire system so we understand what's
04:44going on and prioritizing work and that
04:46sort of thing. Um, and our current
04:48system like Jeff had mentioned, there's
04:49a lot of administrative overhead. um
04:52it's just difficult to work with and
04:53unfortunately the company's uh technical
04:55support is also we end up helping them
04:58more than they help us often um and uh
05:02so we've been looking for a new piece of
05:04software to use um this recommendation
05:07uh came from the Greater Augusta Utility
05:09District I is that where you had
05:11originally heard about okay uh and we
05:13spoke with them um they're very happy
05:14with it they've been using it for a
05:16little while now and we talked to a
05:18couple of other municipalities around
05:19the country who've used it as well and
05:20it's pretty well received. Um, and
05:23essentially what the software does is it
05:26as the [snorts]
05:28the little camera is driven through the
05:30pipes, all that video is recorded, all
05:32of the observations for the defects, all
05:34those things are logged and essentially
05:36it all just gets saved into a database
05:38and then when the truck gets back to the
05:40depot, that information is uploaded and
05:42it becomes effectively a part of the GIS
05:44so that we can go and click on a pipe
05:46segment on a map and understand what its
05:48condition is, view the video, um, and
05:51you know, use that as a part of just
05:53better understanding our sewer network.
05:55Um, so there's a few different software
05:58packages. Um, there's not a lot of
06:01players in this space, but there are a
06:02few. Um, it pipes one of the bigger
06:05ones. Um, but they're also kind of a
06:07legacy. Um,
06:10that they've been around for a while.
06:11They're kind of a headache to work with.
06:13Um, so we talked to a couple of others
06:15in exploring this in addition to to
06:17talking with Super AI. Um, and what we
06:20found was that
06:23while largely they do the same things,
06:27uh, we found that sewer AI has the best,
06:31um, kind of fit and finish general
06:33overall overall performance. Um,
06:37one thing that's a little bit confusing
06:39about it is that is the name itself, a
06:42sewer AI, right? And it's it's not
06:44really AI. Um, so one thing that all of
06:47these software packages have in common
06:49that's going to be a very big step
06:51forward for the city is that they use
06:54machine learning to analyze the images.
06:56Um, and that's been something that we've
06:58been doing for, you know, 20 30 years.
07:00And so effectively what we can do is
07:03after those videos are saved locally, we
07:06can upload them into their system and
07:09they can scan these videos and look for
07:11defects that the operators may have
07:13missed. So, one of the big advantages,
07:16there's a few big advantages here, but
07:17probably the biggest is that operators
07:20are spending less time in the middle of
07:22roads doing these captures. They can
07:25just go straight in, drive through it,
07:27capture the video. They're still making
07:30remarks. They're still catching the
07:31biggest defects. Um, but smaller or more
07:34complex ones are going to be caught by
07:36this system. Um, and then it's not
07:38entirely automated. Um so part of our
07:41requirement is that we use uh NASCO
07:43certified uh systems and software. And
07:47for this machine learning defect
07:49detection to be NASCO certified, the
07:52companies who do it, they still have
07:54another operator go back through and
07:55validate all of the defects found by the
07:58software. So it still has a pair human
08:00eyes on it before we treat it as
08:02authoritative data. Um and then once
08:05that's complete, it gets sent back to us
08:07and then we can use it for um you know
08:10for analyzing our pipe system for just
08:12better understanding what's going on. Um
08:16and then the the software also has some
08:18very useful capabilities as far as risk
08:21modeling. So we're able to specify that
08:24some of our pipe segments are a lot more
08:26critical than others. um you know, so
08:28they have a they serve a very large
08:31population or maybe they're adjacent a
08:33hospital or a school or something like
08:34that and we want to be able to
08:37prioritize if there are issues there or
08:39if there's a pipe that's maybe upstream
08:40of that that we may not otherwise
08:43immediately realize is connected. Um
08:46this software allows us to do
08:48essentially risk modeling. So, um, you
08:51know, when we're budgeting or just
08:53trying to figure out what work we want
08:54to do over a year with, um, all of the
08:57data that's loaded into this
08:58environment, um, we can have a a pretty
09:01good understanding of what our network's
09:04condition is right now and, um, you
09:07know, better be able to kind of
09:08forecast, figure out how we want to
09:09allocate for funds for work that needs
09:11to be done.
09:14I was just gonna say in that particular
09:15component that ability to do that
09:17modeling and forecasting um is one of
09:20the biggest things that set sewer AI
09:22above the others. The others were really
09:23just database programs that allowed you
09:26to view videos and see lists of problems
09:28in a pipe segment. If we wanted to
09:31synthesize the results into a report or
09:33a model, we have to do it manually,
09:34which is what we're doing now. Uh and
09:36it's just a very timeconuming, very
09:38tedious process.
09:40in the city. We don't use of course
09:42super AI but um public works has a
09:44violytics program that it's a camera
09:47that we that we use when I drive over
09:49the roads. It captures it from the video
09:51that they have and we use that to assess
09:53the roadway. So this is this is nothing
09:55new. Um I know the the AI can be scary
09:58but
10:01>> I just wanted to address but Carson had
10:06>> Yes. Um so one clar two questions
10:09clarifying question and then second one
10:10if it's okay but the clarifying question
10:13is um you mentioned all of this data
10:16that's received there's an operator that
10:18reviews all of that that's with the
10:20company
10:21>> that so that that would be with okay
10:23>> y
10:23>> um my second one and this is just more
10:26generally related to security both cyber
10:29security but other types of security
10:31wastewater infrastructure sewer
10:33infrastructure is like the top of the
10:35list for people who want to attack
10:37cities, whether it be cyber or
10:39otherwise. And so with a cloud-based
10:42platform, right, where things are we're
10:44going to be taking videos of our very
10:46precious infrastructure and that's going
10:48to be uploaded and then there's, right,
10:49a downloading process and there's a
10:51company. I'm wondering about the risks
10:54associated with a cyber attack or
10:56violent attacks on our sewer system that
10:58could be facilitated by the fact that
11:00all of this data, this would be very
11:02comprehensive data to somebody who would
11:05want to use it. the wrong way. So what
11:06protections does this company have in
11:09place or that we would have in place as
11:11a city to ensure that this very valuable
11:14data and I can see a thousand reasons.
11:16I'm very excited about this by the way
11:18but that this value the data be for us
11:20and nobody else and not to be used um in
11:24a horrific way. I'll just pop in very
11:28briefly to differentiate we we have what
11:32will be excluded from this is anything
11:35that has equals associated with it. So
11:38um our combined sol overflow controls
11:40anything that has automated um or
11:43controllable gate um pumps things like
11:46that that is still completely separate
11:49and that belongs to our SCADA server
11:52which is not on the internet per se and
11:56not this will strictly be gravity
11:59>> sewer lines. You're essentially seeing a
12:02pipe like this and it's just going from
12:04one segment to the other at the end. I
12:06don't know. Not really sure how you
12:08could use that to attack us. We already
12:11have all the lines on our GIS that
12:13anyway that shows those same line
12:15segments on ground. So, it's just it's
12:17essentially just a one circular pipe.
12:19So, I don't you know I'm not
12:22>> Yeah. No, that's a it's a very big
12:25concern right now. It's been more and
12:26more aggressive lately. So, we had our
12:28entire system through our consulting
12:31years to carve out anything that could
12:34potentially be a concern. it will not be
12:37to this [clears throat]
12:40>> counc
12:44motorized um
12:47is going to significantly impact the
12:50time um you know it'll make it a lot
12:53quicker to be able to assess these pipes
12:56and where you need to focus your
12:58priorities do you have any idea of how
13:01much time you're going to save
13:03>> so we already have the robots we use
13:05those. Now, we already camera and record
13:08it. Um, and [clears throat] right now
13:09that that system, you know, this new
13:12system takes that data quicker and can,
13:15you know, tell if it's a longitudinal
13:17crack or where that crack is, if it's a
13:193:00 or 8:00. It just helps us collect
13:21that that data faster. So, her crew in
13:24the field doesn't have to be out, you
13:26know, in that in that van in a busy
13:28roadway in the middle of the roadway um
13:30trying to get every tiny little crack
13:31from there. They're they're seeing it's
13:34helping save you plan. Okay, got it.
13:37Okay, thank you for that.
13:39>> If I'm not mistaken,
13:42>> we have always exceeded the minimum
13:44requirements by quite a bit even before
13:47we [clears throat] propose this.
13:49>> Yes, we'll just be able to do it more
13:52efficiently with less disruption to
13:54traffic.
13:55>> Yeah, [clears throat]
13:56>> we're still her crew is still looking at
13:58it was NASCO certified. um we have staff
14:01in house that are NASCO certified that
14:03still they'll still be working together
14:05to help u capital plan and it doesn't
14:09take that
14:09>> one of the real time savers is is really
14:11on the back end because it it's going to
14:13help take a lot of the subjectivity out
14:15when we sit down and do our capital
14:17planning every year and there's there's
14:19often disagreement with prioritizing
14:21[clears throat]
14:22where to spend that finite amount of
14:24money that we have every year. This is
14:26really going to help make it a much
14:28easier, more objective conversation.
14:33>> Back.
14:33>> Um, so this
14:35approvals for the first year. Um, how
14:38did that work for the additional year?
14:40That, you know, does it just
14:41automatically renew or does it come back
14:43before this committee like a sole source
14:46approval or how do we if we approve this
14:49piece today, how how does it come back
14:52to us in the future?
14:55>> Yeah. [clears throat]
14:56So, we're not locked into a contract for
14:57one thing, and that's that is a big
14:59differentiator from what we were using
15:00previously. We were in a set five-year.
15:03Um, so with this one, we'll get uh it's
15:05either 60 or 90 days notice before it
15:08expires where we will have the
15:10opportunity to engage with the company
15:11and kind of determine how we want to
15:13continue um whether or not we want to go
15:15with another vendor or whether or not we
15:16want to stick with them. Um, one
15:19particular thing that we made sure of
15:21for all of the companies that we looked
15:22at closely was that uh we would retain
15:25ownership of the data. So even though it
15:27is in the cloud and it's processed in
15:29the cloud, um, as long as our, uh,
15:32contract with them is valid for the, you
15:35know, the one-year period, we can always
15:36get a full export of the raw data back
15:39locally that we can do whatever we want
15:40with. So whether or not we go with
15:42another vendor or go back to it pipes or
15:44whatever, um, we can do that. Um and
15:47then yeah in that that window we can
15:49choose if we want to to stick with them
15:52um or if we want to you know go with
15:54somebody else. Yeah we have we have a
15:56lot of freedom there.
15:59>> And this is something you budget yearly
16:01for
16:02>> anyway.
16:05>> We have no further questions putting in
16:07a motion [clears throat]
16:08>> recommendation second.
16:12Any questions, concerns,
16:16full council?
16:19>> No. Nope. This will be it.
16:21>> Just recommendation.
16:23>> Even better.
16:25>> Recommended. Approved.
16:27>> Thank you.
16:34>> Good night.
16:38Next up, we have a one agreement for 250
16:41H app unit
16:45city manager. You want to answer this
16:47one?
16:48>> Yes. So, this one's pretty
16:50straightforward. We have a homeowner who
16:52has been under a workout agreement with
16:54the city and making the required
16:57payments and is looking to continue
17:00under that same agreement for another
17:03year. Um,
17:06and I'm happy to have our treasurer up
17:09to answer any questions if you have
17:10them.
17:14If any questions regarding this one,
17:18>> just a general question. What's the
17:20interest rate we getting on it?
17:26I know is every year
17:32the current
17:34tax year that's for the current year.
17:37>> Yeah.
17:44You have any other questions regarding
17:45this work out here?
17:51Seeing none, could I entertain a motion?
17:56that we recommend approval work
17:58agreement renewal 250 Hen unit one H for
18:02Angela
18:04second
18:06motion we have a second do not have any
18:09concerns we will go with staff
18:10recommendation for another
18:18nice to see things working
18:22>> unfortunately that is not always the
18:24case so the Next item um is a
18:26recommendation to take possession of a
18:29property 290 Pearl Street that
18:31previously um was within a workout
18:34agreement that has not been successfully
18:36maintained and so now we are
18:38recommending
18:40um that we take possession of the
18:42property. Do you have anything to add on
18:44that?
18:46Not
18:46>> really. I believe the memo covers the
18:49details of what happened throughout this
18:51past year with it.
18:56Fish. Um,
18:59Mr. Tenant was going to offer to list
19:03the property. Um, was there a suggested
19:07list price? It just seems odd that she
19:09had a chance to sell it and maybe
19:11>> we didn't get into that detail.
19:15>> He tried to reach out to her a few times
19:17and was only able to contact once.
19:20>> So, unfortunately, you think she could
19:21have sold it, but something lose it off.
19:30>> Unfortunately, we don't like to see
19:31these things happen, but since she was
19:34not responsive to any of our mailings
19:37and
19:38>> and this is the second property, it is
19:41>> Oh, it is. Okay.
19:46>> Any other questions, concerns?
19:49I entertain a motion.
19:51Move that we forward to the full council
19:55the recommendation of [clears throat]
19:58taking possession of 290 Pearl Street
20:01motion and a second we doubt.
20:14>> Thank you.
20:17And lastly, we're going to discuss the
20:19issuance of the bond for the purchase of
20:24103 main app. Yes. So, you have quite a
20:30lengthy memo on this topic in your
20:33packet
20:35that was sort of precipitated by the
20:37public input that we've sort of already
20:39received on this item. So, the
20:42underlying item is the U bond order
20:46authorization for $1.4 million for the
20:50purchase of 103 Main Avenue. The history
20:54of this property is that um it was some
20:58time ago part of Dao Air Force Base and
21:00then was given to the city. Um there's
21:04one 14,000 square foot building on the
21:07property and then an almost 5,000 square
21:11foot out building. Um all on just over
21:153.5 acres. We sold the building to PCHC
21:20for 1.5 million in 2009. Um and they
21:24committed to make substantial and did
21:26make substantial renovations to the
21:28building following the purchase. Um, in
21:32the deed, the city retained a right of
21:34first refusal. Um, NPCHC has an offer um
21:40and an agreement to sell the property
21:42to, um, Northeast Pain Management for
21:45$1.35
21:48million.
21:49We met previously and discussed
21:53sort of the costs and benefits of
21:54exercising that right of first refusal
21:57and you all authorized me to exercise
22:00that right of first refusal. And so the
22:04process where we are in now is
22:06authorizing an actual bond for that
22:09purchase.
22:12If we complete that purchase, um the
22:14intention would be to move the city's
22:17public health department to that
22:19location from their current almost
22:2212,000 square feet of leased space
22:26located at 103 Texas Avenue. The annual
22:30rent for that spa uh space is currently
22:33$142,000
22:35and is set to escalate over the course
22:38of the next three years. So, we just
22:41renewed that lease. Um,
22:45interestingly on this leased property,
22:47we are basically responsible for all of
22:50the maintenance and upkeep of the
22:52building. Um, except for roof repairs,
22:57the heating system, the electrical
22:59system, and maintaining utility feed uh,
23:02feeds. We're also responsible for snow
23:05removal, parking lot maintenance,
23:07repairs, sidewalks, entrances, etc.
23:12And so we have the figures here um of
23:15the amount of maintenance repair costs
23:17that we have expended on that building
23:19in the last [clears throat] two fiscal
23:21years. Um 25,000 and then 15,000 in the
23:26most recent two years respectively.
23:29Um
23:32it also has some comfort challenges for
23:35our staff. Um it's a very old outdated
23:40uh building. There is um some air
23:44quality issues that we've had to manage
23:47by installing
23:49scrubbers or purifiers. Um there's lead
23:52pipes, so we have to purchase drinking
23:55water for staff. Um, so needless to say,
23:59there's a number of challenges with the
24:01building in addition to the fact that
24:03it's quite expensive leased space. Um
24:07and so when evaluating sort of the costs
24:09and benefits of exercising our right or
24:12first refusal, that was the primary
24:14driver was the opportunity to, you know,
24:17in a worst case scenario break even but
24:21own the building that our staff is
24:23occupying and have them in appropriate
24:25space for them to do their work.
24:33Some other notes about the purchase. Um,
24:36the city doesn't have or at least to my
24:38knowledge the staff that I'm working
24:40with don't really have any ideas or
24:43thoughts for the 4,800
24:45square foot out building. Um, I believe
24:48it's primarily being used for sort of
24:50maintenance and storage right now. I
24:52think the one thing um that we'd have to
24:55be cognizant of for any future plans is
24:57that there is an adjacent daycare. So,
25:02we certainly wouldn't want to plan to
25:03use it for anything that would be
25:05inappropriate for the neighbors. um
25:09using that space
25:13about sort of the the other potential
25:16costs. Um we're not anticipating
25:20significant
25:22bid out costs for this space primarily
25:25because it's being used now exactly how
25:29our staff will use it um should they
25:33move into it as office space. Um,
25:37it will be slightly larger than the
25:40space they're in currently, but not
25:42large enough to contemplate really any
25:44new uses. It will really just be all of
25:47our existing programs moving over to
25:49that new space. Um, and then the other
25:52additional costs that we may incur or
25:54will incur will be moving costs. The
25:57move from Penquist to City Hall was
25:59about $20,000.
26:01It was a several day move. Um, I mean
26:05it's hard to judge, but my back of the
26:07envelope is that we will be looking at
26:09about half of that to move the public
26:11health staff just by way of the fact
26:14that there's far less heavy equipment to
26:16move, for example, all of the printing
26:19equipment that we had to get into our
26:21basement. Um and as was the case when we
26:24moved to city hall um staff basically
26:28moved everything that they could and
26:29then all the movers did was the truly
26:31heavy step.
26:34Some of the public comment that we've
26:35received has been about the possibility
26:37of other buildings and I think this has
26:41been driven by um primarily the
26:43interests of the purchaser um who has
26:46plans for this new space serving
26:48patients and expanding operations. Um
26:52the two other than vacant land, the two
26:54city properties that we have looked at
26:58um or we we really didn't look at this
27:01first one, 50 Cleveland Street, which is
27:02the former DAO Air Force Base. And the
27:05reason we didn't look at that property
27:06is because it's already um
27:10slated for a council approved project um
27:13which is a central kitchen project. That
27:15being said, the central kitchen project
27:17is a full tear down because of the
27:20condition of that building. So, I don't
27:22think we we wouldn't really be looking
27:24at a renovation. We'd be looking at a
27:26complete new build. Um, which I wouldn't
27:29anticipate saving much or anything. The
27:33second property
27:35that has been evaluated is 120 Venture
27:38Way, which until recently was a daycare
27:42um until Penquist relocated to their
27:44brand new daycare. Um we did view this
27:48property several months ago to determine
27:50whether it would be feasible to move
27:52public health here. Um and we determined
27:55that it was not a good option. I think
27:57really because it has been fit out to be
27:59a daycare with little short toilets and
28:02sinks and countertops and big huge
28:04classrooms. Um really every surface
28:07would need to be um would need to be
28:11touched to make it office space. It
28:13would be pretty substantial. Um you know
28:16if we put a million dollars into it,
28:18could we get it there? Maybe.
28:20Unfortunately, the nature of a 30-day
28:22right of first refusal is it doesn't
28:24necessarily allow you to do that robust
28:27analysis. But I think more importantly,
28:29I'm not sure who I would assign that
28:31task to um to to plan that transition
28:36right now given the priorities of our
28:38public health department. Um, so I would
28:40not recommend at this point asking our
28:43engineer or our public health director
28:46to undertake a substantial top to bottom
28:49building renovation to make it work for
28:51them. Um, certainly folks are interested
28:54in the property tax impact. Right now
28:57that property is not taxable um because
29:00PCHC is a nonprofit um and it will
29:03remain not taxable where the city to
29:05purchase it um
29:08were the property to sell to a
29:11for-profit entity. You might use two
29:13different measuring points to estimate
29:15the cost impact. one is the current
29:17assessed value at 1.759
29:20million um which represents about a
29:22$30,000 a year loss and potential future
29:26property tax revenue or if you use the
29:29sale price it would be 23,000.
29:32I think the other relevant fact is that
29:35the p the buildout of a new public
29:38health department um is a component of
29:41the parks and wreck um new facility
29:44buildout that you all have talked about
29:46quite a bit over the last year and the
29:49public health portion of that project is
29:52roughly 4 million. And so that
29:55relocating public health to a new
29:58building would eliminate that component
30:01of the project entirely.
30:05With that, I'm happy to answer
30:06questions. Thank you. I read this cover
30:09to cover all the questions. I appreciate
30:12that. I'm sure the public will also
30:14appreciate. I had one question on
30:20it. The document
30:23speaks to the finance director numerous
30:25times. The finance director is an
30:27interim finance director. Does that
30:28change this document at all?
30:32>> The uh the bond document. Yes.
30:34>> No. No. For for purposes of any legal
30:38document, our finance director is the
30:39finance director who actually happens to
30:42be listening tonight. Um Jody Vney is
30:45our um acting finance director and is
30:49managing both our finance department and
30:51the airport and has come to listen and
30:54learn this evening as well.
30:56>> Thank you. Appreciate that.
30:58>> Councilor Fish, I believe you're first.
31:00>> Um
31:02how old is the building at 103 Lane A?
31:06Do we see any significant
31:09maintenance um issues coming up within
31:12the next three four years? Yeah. So,
31:16it's at least the what 40s.
31:21Um it is an old building and I I think I
31:24put this in the memo. I would never want
31:27to represent to you that this is a
31:29riskfree
31:31proposition. Any $1.35 million
31:35real estate transaction has risk and the
31:39nature of a 30-day right of risk refusal
31:42means that we can't do the level of due
31:44diligence that you would want to do for
31:47a private commercial real estate
31:49transaction of this gravity right so
31:52there is inherent riskman
31:56our public health director has been in
31:58the building and believes it to be in
32:01good condition there is nothing that we
32:03are aware of that would be an issue but
32:07the process doesn't contemplate us doing
32:10the level of due diligence that even I
32:12did when I bought my home. So there is
32:15inherent risk in the transaction.
32:19>> Yes, of course. Um the lease that we now
32:23have relocated
32:25um is that when we we just signed a new
32:28lease, is that for three years or long?
32:30>> It's a three-year lease, but we have the
32:33ability to get out of it with 12 months
32:36notice. And so what we would be doing if
32:39this if council determines that we do
32:41want to finalize the purchase, we'd be
32:43providing notice. Um a component of the
32:47underlying
32:49deal that we are accepting is to give
32:53the seller a sixmonth note cost lease
32:57back. And so for 6 months, the city will
33:01not have access to that property. We
33:04will be closing the sale with cash on
33:07hand and then going out to the bond
33:10market at some point in the spring
33:14to pay ourselves back. And so I would
33:17not anticipate that we would start
33:19making payments
33:22on that bond even in next fiscal year.
33:24It would be the fiscal year after when
33:27we would start making payments. So I I
33:30guess to answer more directly, I don't
33:33anticipate there would be any period of
33:35overlap where we would be both paying on
33:38the lease and paying on the bond.
33:42>> That was a good question first. Did you
33:45hand up?
33:45>> Oh, I don't think so. I did not. I may
33:47have. I forgot.
33:49>> That was a bad human.
33:51>> I just don't know if I'm reading this
33:53wrong. This is one of those things that
33:54feels like too good to be true. But on
33:57the one hand, I'm looking at rent
33:59142,000 and climbing up to 150,000, but
34:02then I'm only looking at the potential
34:04$30,000 in incoming property taxes. And
34:07that just feels like the savings on the
34:09rent just blows that out of the water.
34:12Makes us an incredible deal.
34:14>> I think the thing that to be fair to
34:16account for is utilities. And so the two
34:20so under currently the um
34:24lesser pays for utilities currently
34:26because they're not separated. So they
34:28can't we can't pay for our own
34:30utilities. We will be assuming utilities
34:32on this building and it is
34:36utilities aren't cheap, right? And so I
34:39I would prefer to think of this as you
34:42know at the worst case scenario it's
34:44just a break even. I think that's a fair
34:47way to analyze it. Not analyze it as a
34:51tremendous savings.
34:52>> Sure.
34:52>> Worst case scenario is it's a break
34:54even, but at the end of the day, we own
34:56the building. We're not wasting money
34:59leasing.
35:00>> Well, even if
35:02>> Yes.
35:02>> Yeah. I mean, even a break even, I mean,
35:04we still are coming out ahead. And I
35:06think as much has been made about look
35:08at the taxes we're foregoing and I'm not
35:11seeing that as the big issue is it had
35:15been made out to be based on this memo.
35:19>> I was just going to comment that I don't
35:21see it as a in the worst case scenario I
35:23still don't see it as a break even
35:25because we own the building whereas now
35:28we're paying right releasing and we're
35:31paying rent into a pot of money that we
35:33never see ever again. whenever you're
35:36they're going to want more.
35:39>> Oh gosh. As you know, I'm
35:42[clears throat] an advocate of keeping
35:44Bangor land as much as we can and I
35:48think it's in a great location as
35:50opposed to where our public health is
35:52now. Um, you know, I was hoping that
35:55maybe you tell me they'd have an
35:56opportunity to expand there, but it
35:58sounds like at least the space is
35:59efficient enough and it takes um this
36:03part of the equation off of the wreck,
36:06you know, problem we have so that we can
36:08continue to try to, you know, cut that
36:10budget down and see what we can do now
36:12to try to find out how we can solve the
36:14problem with that. But um yeah, I feel
36:18bad that you know it's um kind of put
36:21pain management
36:23proposition, but it is a first right
36:25refusal. And I know how I felt when I
36:27was at 500 Main Street where the slots
36:29are now. I opened up a little business
36:32called Remax Advantage. And I think uh
36:34just uh signed a 10-year lease and a
36:37year into it, I got the call, you know,
36:39get out of my lease and I was scurrying
36:41around to find a place. you know, at the
36:43time I had 20 agents and three employees
36:46and it didn't feel very good. So, I can
36:48imagine how they feel, but um you know,
36:51there's lots there contributing a lot of
36:53money and I bought a building and it all
36:55worked out. So, um I think that this is
36:58good for the city to pay more for.
37:01>> I would concur that I think this will be
37:04great for us. I just may say one thing.
37:07Um, I know the public is very interested
37:09in in why we want to do this and I think
37:12maybe now they understand the right of
37:14first refusal where it's been explained.
37:16The one thing I think the public does
37:17not understand is that the city does
37:20have money to purchase this property,
37:22but by going up to bond, we're actually
37:25helping public works by allowing them
37:28more grant funding. Isn't that one of
37:31the big reasons? That's one of the
37:33reasons why I think it's smart to bond
37:35this rather than paying cash because um
37:38we you as you know public health is
37:41substantially grantf funded and a huge
37:43component of the way they pay for their
37:46building and their electricity is
37:48through including their costs in um in
37:52those grant funding formulas and using
37:54some of those dollars to pay for
37:56portions of those costs. So, I think
37:58having um this bonded will allow them to
38:01include those amounts within the grant
38:03calculation when they determine those
38:05administrative expenses.
38:09>> Did I see your hand up?
38:12>> And this actually is related to one of
38:14the other properties in your memo that's
38:17currently fitted now for W pikes. But as
38:21just the thought is that as the state
38:24continues to roll out new programs that
38:26impact the school system, right, we're
38:28taking on three-year-olds and other
38:30things. I suspect
38:33um and also with the urgent need of
38:34child care being a a a question, I
38:37suspect that we'll find a use for that
38:40space probably sooner rather than later.
38:42particularly
38:44like I I wouldn't want us to rush to
38:46encourage anybody to remodel that when
38:49there's such an urgent need for services
38:52for children.
38:57>> We have any other comments on this?
39:01What do you look forward to see?
39:02>> So, we need a a committee recommendation
39:06um to include in the council order to
39:08council.
39:11I would like to move that this committee
39:14um forward this recommendation for the
39:16full council or to the full council um
39:19to hold the appropriate public hearing.
39:22>> Second.
39:23>> We have a motion. We have a second. Any
39:25doubt?
39:27We have commitment to move this to full
39:31council
39:34process. No, other than I want to pat us
39:38on the back because I think this is the
39:40earliest we've been done. It is pitch
39:42black out but it is seven [laughter]
39:46o'clock. Yes.
39:49>> With that I believe finance is
39:51adjourned. Good night everyone.
```*