Piedmont Natural Gas LNG Facility Rezoning
At a glance
- What: Piedmont Natural Gas and Duke Energy request to rezone 1,600+ acres from rural agricultural to conditional heavy industrial for an LNG facility.
- Where it stands: on October 20 the Planning Board recommended approval 4-1 of REZ-26-23 (RA-1 and RA-2 to CZ-HI) with added conditions, after about 4 hours 45 minutes of presentation, questions and some 25 public speakers, nearly all opposed.
- Next: Commissioners' public hearing November 9 at 6:00 PM; residents have asked for a larger venue, a postponement and independent studies. A special use permit is still needed for the LNG storage facility; the Energy Reliability Center is allowed by right once rezoned.
The proposal
- Three above-ground tanks, 4.4 BCF, over $2 billion, about $4 million a year in tax, 40 to 55 jobs.
- Horizontal drill under the Yadkin, Williams Transco easement.
- Construction mid-2028, operation around 2031.
- Duke also proposes combined-cycle units CC4 and CC5 (1,365 MW each); Energy United would serve load (peak about 800 MW).
Planning Board packet (October 20)
- Application REZ-26-23 dated 9/18/2026, Piedmont Natural Gas Company (signed by Vice President Neil Moser) with owner Duke Energy Carolinas.
- 1,616.51 acres at 3714 Giles Road, Tyro Township (Tax Map 6 Lot 1, PIN 5776-04-82-6694), RA-1 and RA-2 to CZ-HI.
- Per the Planning Director's written interpretation of September 16, the Energy Reliability Center is permitted by right and the LNG storage facility needs a Class B special use permit in CZ-HI.
- The narrative gives the tract as 1,616 acres in one place and 1,661 in another.
Site and design
- Development would cover about 500 acres.
- Three LNG tanks up to 200 feet tall and 300 feet across.
- 200-foot perimeter buffer; tanks set back 175 feet.
- 24 percent built-upon cap under the watershed ordinance.
- Access from Giles Road and Callahan Hill Road.
- The facility would serve proposed 1,360-MW plants CC4 and CC5 in Davie County.
Applicant requests and estimates
- A five-year vested right under G.S. 160D-108.1.
- 45 to 55 employees averaging $135,000.
- Over $4 million a year in county property tax.
Planning Board hearing (October 20)
- Applicant team: attorney Katherine Ross, Neil Moser (Piedmont), a Duke Energy representative on need, Piedmont operations, an air-quality consultant (air permit applications filed in October), an acoustical consultant (design target of a day-night level of 55 at the property line; about 54 at the nearest home) and local counsel on the Land Development Plan.
- Board concerns: ERC close to Callahan Hill Road homes, construction noise and traffic on a tar and gravel road, lighting, water for construction, berms, preserving farmland on the unused acreage.
- Public comment opposed: Land Development Plan policies on farmland and Yadkin water quality, spot zoning, missing studies, emergency response and EMS capacity, air quality (a fine-particle monitor near the limit), noise, dark skies, river and paddle trail, traffic, property values, and the claim that the power is for data centers.
- Staff (Lee Crook) recommended approval, citing changing conditions, access to the Transco pipeline, the 1995 Becky Hill Road precedent and the large buffers.
- Vote: 4-1 to recommend approval with the amended conditions (dissenter not identified in the captions).
Conditions offered or added at the Planning Board
- Lighting down-shielded and light pollution eliminated to the extent practical, with a third-party lighting report within 90 days of approval and staff approval of the plan.
- 300-foot vegetated buffer along the eastern line by Callahan Hill Road, with a 20-foot berm extending about 100 feet past the ERC corners (subject to permits).
- Callahan Hill Road emergency access only in operation; Giles Road entrance built first after erosion controls; staff-approved traffic plan, daylight hauling, road left equal or better.
- Site locked to the dashed area on the plan; farming and forestry on the rest to be explored.
- 200-foot natural buffer, 200-foot height cap, tanks 175 feet from property lines, 55 sound level at the line, post-construction sound survey.
- Gas line to cross the Yadkin by horizontal directional drilling about 100 to 200 feet below the river.
Status and next steps
- Planning Board recommendation: approve with conditions (4-1, October 20).
- Public hearing before the Commissioners set for November 9 at 6:00 PM.
- Open houses planned for January.
- Residents asked for a larger venue and a postponement.
Sources
- 2026-10-20 - Planning Board (video auto-captions and posted agenda packet)
- Application REZ-26-23 and site plan in the October 20 packet
Discussion time
About 335 minutes across 2 meetings (from transcript timestamps; approximate).
| Meeting | Minutes |
|---|---|
| 2026-10-20 - Planning Board | 284 |
| 2026-10-01 - Board of Commissioners Info Meeting | 51 |
Log
- 2026-11-05 - Board of Commissioners Info Meeting - Agenda lists a presentation by Piedmont Natural Gas on the proposed LNG facility (scheduled; outcome not yet recorded). 2026-11-09 - Board of Commissioners Meeting is the scheduled hearing date.
- 2026-10-26 - Board of Commissioners Meeting - Several public speakers raised traffic, air and water, well and health concerns ahead of the November 9 hearing; no board action.
- 2026-10-20 - Planning Board - Applicant presentation, Board questions and about 25 public speakers (nearly all opposed); conditions added on lighting, an ERC buffer and berm, and Callahan Hill Road access; staff recommended approval and the Board voted 4-1 to recommend it; Commissioner hearing November 9.
- 2026-10-12 - Board of Commissioners - Speakers on Duke, Piedmont and data center plans in public address.
- 2026-10-01 - Board of Commissioners Info Meeting - Duke, Piedmont and Energy United presentation; Duke NCUC carbon-plan order expected by year end.
- 2026-09-28 - Board of Commissioners - Hearing set for November 9; speakers asked for larger venue and postponement; a speaker asked for an emergency response study.
- 2026-08-04 - Planning Board - Crook mentioned a proposed gas facility on the Davidson side and power plants in Davie as energy investment tied to the same regional grid and water (minutes call it a compressed natural gas facility).