2026-10-26 - Budget Review Committee

Summary

Built from the city's posted agenda and minutes and YouTube auto-generated captions (names and figures may be misheard).

  • Committee met at 7:30 PM after the Board's special hearing. A fire commissioner spoke in public comment in support of the fire resolutions; the chair asked members not to repeat questions already answered at the hearing.
  • Communications on file: a letter from the library director on R-26-067 and three letters from the Board of Fire Commissioners chair on R-26-068, 069 and 070.
  • R-26-064 (capital equipment bond, not to exceed $5,173,428, as amended): recommended for final passage by voice vote, with at least one no. Members asked why some projects are bonded in full (ERP, DPW garage) and others only for design (library, fire station). The Director of Administrative Services said building projects are now phased so construction authorization follows completed design, and only the amount actually spent is sold as debt. Members also noted the bonds add to the budget base under the spending cap. See Capital Bond Resolutions Fall 2026.
  • R-26-067 (library design, up to $3M): recommended for final passage by voice vote, with at least one no. Total project costs cited from memory were about $54M for the DPW garage, $35M for the fire station and $45M for the library. Several members said they would move to table it at the full Board because the library staff contract is unresolved; others said the building and the contract are separate matters and that tying them could raise legal problems. Members who toured the library described leaks, ventilation problems and a single working restroom. See Library Renovation Design.
  • R-26-068 (fire training facility, up to $1.5M): recommended for final passage by voice vote. Supporters said relocating the current facility would cost more, and that it is used by other departments through mutual aid. Michael B. O'Brien Sr spoke in support.
  • R-26-069 (Pine Hill fire station design, up to $1M): recommended for final passage by voice vote.
  • R-26-070 (fire station deferred maintenance, up to $1M): recommended for final passage by voice vote.
  • R-26-071 (ERP replacement, up to $9M): recommended for final passage by voice vote. Staff said 10 proposals were received and about four would be invited to demonstrate; the $9M figure compares with $7.5M bonded for the 2009 system, and an outside project manager would be hired. Current software costs about $1.2M a year; the CFO estimated about $15M over 10 years and an alderman calculated about $18.6M. Tim Sennott said he would vote no, wanting to know more about what the $9M buys. John Sullivan objected that it was not placed in the regular budget; others replied that budgeting it outright would mean a very large tax increase and that the current system is obsolete by 2029.
  • No ordinances or tabled items. The committee adjourned at about 10:17 PM.

Agenda

Agenda PDF posted; see Sources.

Sources

Video

Watch the video

Transcript

*These are auto-generated captions; names and numbers may be misheard.

Transcript

01:59Mhm.

02:37>> All right.

02:38>> That's how it usually

02:39>> Maybe not today.

02:40>> as that turns to okay.

02:42>> There was warm.

02:43>> Ready?

02:44>> I'm ready.

02:45>> Mute, unmute. Oh, yeah.

03:17>> Here we go.

03:18>> Okay, will you call the roll?

03:21>> Alderman Elijah Michael B. O'Brien is

03:23present.

03:24>> Alderman Elijah Shana Kelly.

03:27>> Here.

03:28>> Alderman Elijah Alicia Gray.

03:30>> Here.

03:32>> Alderman Derek Teebo.

03:33>> Here.

03:35>> Alderman Paula Johnson.

03:36>> Present.

03:37>> Alderman Tim Senate.

03:39>> Here.

03:40>> Alderman Richard Dowd.

03:41>> Present.

03:43>> Okay, have everybody in attendance. Also

03:45here

03:46is

03:48Alderman Clemens.

03:54>> Cleary

03:56Yeah, I can only write so fast, so.

03:58>> [laughter]

03:59>> Alderman Cleary

04:04Alderman Revane

04:09>> [clears throat]

04:09>> And Alderman Wilshire

04:17Um

04:18Alderman Sullivan

04:25Uh and

04:27Alderman Kelly is already here. Also

04:30with us tonight is Don Enwright, CFO,

04:34Jenna McCormick

04:36of the library, I think she still may be

04:39here.

04:39>> Yep.

04:40>> Uh

04:42Fire Chief Steve Buxton and Mr. Tim

04:46Cummings, administrator service

04:48director.

04:49>> I think it's our deputy

04:50>> And Miss Gray from the The Gray from the

04:53National School Department.

04:59Okay.

05:02>> Did you get the deputy chief?

05:04>> Oh.

05:05I guess, yeah. Excuse me, I'm sorry,

05:07Adam.

05:09Assistant Chief Adam Pouliot from the

05:11National Fire Department.

05:13>> All right. First item on the agenda is

05:15public comment. You have 3 and 1/2

05:17minutes. If you want to speak, you must

05:19mention your name and city.

05:28>> Good evening, everyone. I'm Tom Kelly

05:31Board of Nashua Fire Commission.

05:34I'm going to speak to the four

05:35resolutions being presented to you

05:36tonight that were also presented in the

05:38last meeting.

05:40The Board of Fire Commissioners

05:41recognizes that every capital request

05:43competes for limited [clears throat]

05:45taxpayer resources. Our responsibility

05:47is to distinguish between

05:50what would be nice to have and what is

05:51genuinely necessary to maintain a safe,

05:54effective, and professional fire

05:56department. These four initiatives

05:58represent essential investments in

06:00public safety,

06:02infrastructure, and operational

06:03readiness.

06:05All four initiatives have uh initiatives

06:08have been

06:09approached and thoroughly balanced

06:11operational necessity with responsible

06:14capital planning and stewardship of

06:16taxpayer resources.

06:18The Board of Fire Commissioners, as by

06:21the documents contained in your packet,

06:23support these resolutions and

06:24respectfully encourage the committee's

06:27favorable consideration.

06:29Thank you.

06:30>> Thank you.

06:31Anyone else for public comment?

06:35Seeing none, moving on. Communications.

06:39Uh we have from Jennifer McCormack,

06:42Library Director,

06:44recent referral from the Board of

06:46Aldermen Resolution R-26-067.

06:51Also, further communication from

06:54Kevin Burgess, Board of Fire

06:56Commissioners Chairman, on Reason is

06:59R-26-068.

07:02Also, another letter from Kevin Burgess,

07:05Board of Fire Commissioners Chairman,

07:08Reason 26-069.

07:12And further communication from Mr. Kevin

07:15Burgess, Board of Fire Commissioners

07:17Chairman, Reason 26-070.

07:22There being no objection, I'll accept

07:23the communication and place them on

07:25file. Unfinished business?

07:28>> Uh none.

07:29>> New business resolutions. Before we get

07:31into the resolutions, if we could try to

07:33the best of our ability to refrain from

07:35asking the same questions that were just

07:37answered in the public comment or or

07:39anything that was asked and answered. Um

07:42if you want to elaborate on it, fine,

07:44but to move things along uh

07:47And if you have new things, of course,

07:48bring them up.

07:50First is R 26064,

07:52Alderman Bryan.

07:53>> Thank you. Uh

07:5620 uh 26064

07:59uh

08:01amended is authorized in the mayor and

08:03city treasurer to issue bonds not to

08:05exceed 5,173,428

08:11dollars for the purchase of capital uh

08:14equipment.

08:15>> Okay, motion. Go ahead.

08:16>> Yeah, Mr. Chairman, I'd like to make a

08:18motion to recommend final passage.

08:20>> Okay, the motion on the floor is to

08:22recommend final passage to the full

08:23board of R 26

08:26oh

08:2864 as amended.

08:31Discussion? Alderman Kelly.

08:33>> Um thank you. It's a weird place to put

08:35this, but I'm going to ask it. Um so if

08:37my question is to um Director Enright

08:40Oh, you're not you're not a director.

08:41Sorry.

08:42>> [snorts]

08:42>> Um

08:43So I have the bond plan that we worked

08:46through the summer in front of us.

08:47And for example, I I I looked at this

08:51trend and I thought it was interesting.

08:52So

08:54you're asking for the full amount for

08:55ERP. That's actually a million dollars

08:57less than we talked about. Um we

09:00approved the full amount for DPW garage,

09:03but then you look at like your request

09:04for the library, it's a 44

09:06million-dollar project, but we're only

09:07asking for three.

09:09Um and our colleague one of the

09:11colleagues in our chamber also asked

09:12like why are we bonding a million for

09:14fire deferred maintenance where the

09:16actual overall request is 7 and 1/2

09:19million. So why were some projects

09:21requested full and some requested

09:24partial?

09:28>> Director Cummings.

09:28>> Yeah, thank you. I know that was

09:29directed at CFO Enright, but I thought

09:31it might be better for me to answer that

09:33specific question. Uh Tim Cummings,

09:35Director of Administrative Services. And

09:37and the answer to the question is it

09:40hearkens back to something we heard a

09:42couple years ago where we heard that

09:45school building projects and then also

09:47municipal building projects, general

09:49government building projects, really

09:51there was an appetite to have a better

09:53understanding and clarity of what the

09:54construction cost number would be before

09:58we authorized funding. And so we we

10:01started out developing this incremental

10:03or phased approach for the building

10:05projects, doing design, getting a better

10:08understanding of what the building

10:10project would be once we've completed

10:11design and then authorize a authorizing

10:14the construction projects

10:16um, based off of the design as as

10:18developed. So that that is why the not

10:21only the fire station, but the library,

10:24the DPW garage, all have taken a phased

10:27approach to the to the building

10:29projects. Instead of us authorizing the

10:32uh, construction or the total project

10:34cost at all at all at once. Thank you.

10:37>> Follow, please.

10:38>> just one amplification. During the

10:40design phase, you do all the different

10:41levels of drawings to the effect you get

10:43to the construction drawings. The

10:46contract that is going to make the

10:47building uses the construction drawings

10:50to actually price out what the project

10:52is going to cost from a construction

10:54standpoint. I think that's what Director

10:56Cummings was trying to point out. Go

10:57ahead.

10:58>> I understand the design process. I'm

11:00just I was requesting why some were

11:02asked in full and some were asked for

11:04just that first design phase. And I

11:06understand we're trying to transition to

11:08that, but the point was made that we

11:09didn't want to start bonding a million

11:11dollars. So you're asking us for a

11:12million dollars in a couple of these

11:14scenarios where the total picture is

11:17you're actually asking for seven and a

11:18half or whatever. So I do think that

11:20that has to be

11:22addressed when people are asking I

11:24thought we were going to bond a a

11:25million and a half or I thought we

11:27weren't going to do this when the total

11:28project cost isn't a million and a half.

11:30>> I if I if if

11:31>> Yes, Director Cummings.

11:32>> That's an excellent point. I was

11:33actually sitting in the seat thinking

11:35about that when I heard the

11:36conversation. I mean

11:38I'm making this up but certainly we

11:41could authorize 10 million dollars over

11:43a 10-year period and do 1 million

11:46dollars of

11:47a debt selling

11:51for

11:52certain deferred capital maintenance

11:54program. I mean that is that is one way

11:57we could look to do it to your point.

12:00You know if if they are saying the

12:02numbers like 7 7 and a half million I

12:04think um

12:06um

12:07schools is probably something more like

12:10nine nine and a half million. We could

12:12ask for that all up front and know that

12:14that's for a certain period of years

12:17and we would be looking to to authorize

12:20that money and knowing that the money

12:21would be spent over over that period of

12:24time. There's a couple constraints I

12:26just want to kind of point out. One, we

12:28can only um

12:31spend the money so fast. So you

12:32certainly could authorize the money but

12:34we can only

12:35do so many projects in a in a year. So

12:38that's one thing that we need to be

12:39cognizant of.

12:42And the second is is the numbers do

12:44change and they do fluctuate and by us

12:45taking this approach it actually gives

12:47you more control and you you could

12:49actually be a little bit more

12:50deliberative in how you want to approach

12:52it but certainly we could come at it the

12:55from from from the other way and we

12:56could we could look at doing that if

12:57that's of of interest. Thank you.

13:00>> Follow up.

13:01>> Just a response

13:02I think that this is an interesting way

13:04of going about it but we also could end

13:06up bonding money for a project that no

13:08longer has an appetite and now we have

13:10to rebond that money to do the design

13:12phase because it's pushed out 10 years.

13:17>> Alderman Clements

13:18>> Thank you. Well, to that to just to that

13:21very last point. I mean if we have a

13:22design we can always implement it later.

13:26Well, cuz we have the design. Uh that

13:29wouldn't change.

13:30But,

13:31uh in my my uh point was though, even if

13:34we were to do like, for example, the

13:36whole

13:38uh fire station, if we were to

13:40completely

13:41bond that out, including the

13:44um

13:45the design, isn't it true that we

13:48wouldn't

13:50bond the we wouldn't take out the entire

13:52bond, right? We'd only take out the

13:53portion that we were

13:56financing for the

13:58uh

13:58architectural design, correct?

14:04>> Uh that's correct. I mean, there's a

14:05fundamental difference of between

14:07authorization, Tim Cummings, director of

14:09administrative services. Uh there's a

14:10difference between um

14:13uh

14:15authorizing the the the the bond and

14:17then selling of the debt, and we would

14:19only sell what we use.

14:21>> Right. So, so whether we do this in two

14:23different phases or not, we'd still be

14:26in the same

14:27situation, essentially.

14:29>> There's one of the point I want to make

14:31that uh

14:32I'll state and then have uh Ms. Enerate

14:35baptize it.

14:36Um

14:37If we authorize a large amount of money,

14:40and as soon as we start spending it,

14:43as soon as we cuz well, first of all,

14:45most of the time we pay our invoices out

14:47of cash, and then when we need the cash

14:49replacement, we issue the bonds in the

14:51most favorable time to buy the bonds.

14:54But, once we buy the bonds on a large

14:56project, there's a certain amount of

14:58time we have to sell that entire bond.

15:02So, it's safer doing it the way we're

15:04doing it than to authorize the entire

15:06amount, cuz we'll start we'll have to

15:09sell those bonds

15:12uh sooner than we want to.

15:15And she's nodding her head, if you So,

15:20any other questions? All of them clean?

15:21>> Uh thank you, um Mr. Chairman. Um

15:25>> on to what, um, Director Cummings had

15:28add, I remember sitting here in this

15:30chamber when, um, people have come up

15:32and said,

15:34"How can you ask for 15 million or 20

15:36million dollars when you haven't even

15:38done the design and you haven't done

15:39this and so on."

15:41Um, and I don't want to,

15:43you know, kind of

15:45put salt in a wound, but I think the

15:47Performing Arts Center is kind of one of

15:48those things that happened. We got an

15:50initial, this is what we guestimated to

15:53be cost. We said this is what the good

15:55fund was going to be and it ended up

15:56being a little bit higher because when

15:58actual design came through, it was

16:01proven that way. So, I don't want to go

16:03down that road again. I would rather

16:04have, um,

16:06design cost, pay for that, and then move

16:09forward with whether or not we really

16:11want to go forward. I know some people

16:13say, "Well, you've already spent a

16:13million dollars." Well, yeah, I've spent

16:15a million dollars or two million dollars

16:17or or whatever it is that I've spent,

16:19but I haven't spent the 20 million or

16:21the 9 million or the 3 million. So, um,

16:24I think it is the better way to do it.

16:26So,

16:26>> Any other questions? Alderman Sullivan.

16:28>> More of a comment, but just to play

16:30devil's advocate on cuz I am in favor,

16:32actually. I thought about this.

16:35I'd rather have one conversation as

16:36opposed to four.

16:39But,

16:40when you look at how we budget and the

16:42way that we supplemental supplementally

16:44appropriate,

16:46if I mean, what we're doing and what

16:48we've done over the past couple of weeks

16:50is we've added to the budget.

16:53So, when we come back in fiscal year 28,

16:56the denominator is higher and when you

16:58apply that for the spending cap, you're

17:00going to have more room under the cap.

17:02>> [clears throat]

17:02>> That's what we're doing.

17:04So, that

17:06that to me is kind of a

17:08uh, a byproduct of why I don't like

17:11doing this.

17:13But, you know, to play devil's advocate,

17:15I, you know, I I guess I would rather go

17:18and stair-step it as opposed to doing

17:20this because then

17:22it's going to give you a lot of room

17:23under the cap.

17:24And then, when you have the room, then

17:26you're probably going to use it. So,

17:29just playing devil's advocate on that.

17:31So.

17:32>> Any other questions?

17:36Seeing none,

17:38the motion on the floor

17:40is to recommend to the full board

17:42passage of R-26

17:46>> I'm sorry.

17:49>> Yes. R-26064

17:51as amended.

17:53All those in favor signify by saying I.

17:56>> I.

17:56>> Opposed?

17:57>> Nay.

17:58>> Motion carries.

17:59R-26067,

18:01Alderman O'Brien.

18:03>> Yes. R-26067

18:06authorizing the mayor and city treasurer

18:08to issue bonds not to exceed $3 million

18:10for the design and

18:11for the design and other ancillary costs

18:14to renovate the Nashua Public Library.

18:17Mr. Chairman, I'd like to make a motion

18:19to recommend final passage.

18:21>> Motion on the floor is to recommend to

18:23the full board final passage of R-26067.

18:26Discussion? Alderman Tibbetts.

18:28>> Thank you, Mr. Chair. So, um

18:31I got to tour

18:33uh the library, which a lot of us have

18:35as well, recently. I was with Alderman

18:38uh President Wilshire uh when I toured

18:40it last week.

18:41Um and I go there weekly. I've been

18:43going there, you know, over 50 years.

18:45It's as old as I am, almost exactly. Um

18:48so, um I know how important it is. My

18:51kids go all the time. I think just

18:53touring it and going into places where I

18:55haven't gone, you know, basement, uh

18:57locked rooms, um

18:59I think unfortunately, I think the

19:01presentation doesn't even or the

19:03presentations we've had doesn't even

19:05give enough credit to how bad the

19:06building is, to be honest. Um you know,

19:09just like the DPW building, it's a place

19:12where people work. People go to.

19:15As someone said, you know, we have

19:17the unsheltered that often go there to

19:20get out of the heat or out of the cold

19:22during the day was when the library is

19:23open. So, it is definitely 100% a need.

19:28It's not a To me it's

19:30It's got a shelf life that's that's

19:33ending very soon. And and if

19:36you're going to um

19:38not want to fix it, then it's going to

19:40just close down. We're not going to have

19:41a library in the city cuz

19:43at some point you're not going to be

19:44able to use that building. You're just

19:45not.

19:46They're already down to like one working

19:48bathroom. The HVAC is a mess. I think

19:50the the stuff that will be done will

19:52will save us money. I don't think there

19:54was enough of that being said cuz

19:56whatever system that boiler or that

19:58heating The thing that's down in the

20:00basement

20:02that's not going to be there when they

20:03redo it. And I think that's going to

20:05save a lot of efficiency when it comes

20:07to heating

20:08and cooling and electricity that we're

20:10just not seeing on screen as far as, you

20:12know, what the savings would be.

20:14Um

20:15So, that being said

20:17as important as I think it is to pass

20:19this, I'm going to vote to pass this

20:21tonight cuz I think it's critical that

20:23we get this to the Board of Aldermen

20:25to vote on it. But I have one issue with

20:29going forward with it right now is that

20:32hopefully if if not me, someone else

20:34will table this tomorrow because I can't

20:39justify spending money on a building.

20:42And don't get me wrong, it's not just

20:44the building, it's a place where people

20:45are inside the building and they work.

20:47So, it's a home

20:49for people who work there 40 hours, 30

20:50hours a week, what what not. Um

20:53but with the contract of the employee

20:55workers being out there, I can't justify

20:58spending money here when I don't see

21:01that contract being

21:03finished and done. And

21:06I don't know what the contract's about

21:07as far as what side's what. That's not

21:08our job as alderman to get involved

21:10with.

21:11But I would I would want to see them

21:13both sides come to an agreement on a a

21:15workable contract for them.

21:17And then I'd be happy to vote on this

21:20going forward. So, I'm not saying I

21:22wouldn't I'd vote against it, but I I

21:24would rather see it tabled tomorrow

21:26night. That's my outlook on it. And

21:28again, it's it's I want this building.

21:30I've always wanted this building. I've

21:32been a pro

21:34supporter of this as you know for the

21:35whole time we've had it. So, that's kind

21:37of where I'm going with it. And I just

21:39wanted to put that out there cuz if

21:40somebody says to table it tomorrow,

21:41we're obviously not going to be able to

21:42talk about it. So, I just wanted to put

21:44that out there. Thank you.

21:46>> Alderman Clements.

21:47>> Thank you, Mr. Chair. Yeah, I I agree

21:49with my colleague from Ward 8. I think

21:52it's a worthwhile project. I think it

21:54has to be done. However,

21:56um

21:58this is the second time that the library

22:00employees have been through a similar uh

22:03contract dispute. Uh one of the major

22:05sticking points is that they're not

22:08getting retroactive pay, which would

22:11break a precedent here at this

22:13level.

22:14And I think they I don't think that

22:17delaying a contract uh should ever be a

22:21reason for somebody not to get paid. So,

22:25for those reasons, I'm going to also

22:27support the table it tomorrow.

22:30>> Okay, I have to call on committee

22:32members first.

22:33Alderman Greg.

22:35>> Uh thank you, Mr. Chair. [clears throat]

22:36So, I I understand I have the same

22:38frustrations with the Since we're

22:40already talking about this, but the same

22:42frustrations with the lack of contract.

22:44I think that we um should be having

22:46that. I'm disturbed by some of what I'm

22:48hearing from those negotiations, but

22:50saying that we don't want to move

22:51forward on the library because we don't

22:53have a contract. They both have library

22:55in the name, the library workers and the

22:56library building, but they're actually

22:58two separate things. It's like saying,

23:00"Well,

23:01if you didn't eat your dinner, then your

23:03brother's not going to get to have

23:04dessert. You know, they are

23:07Yes, they're in the same family, but

23:09these are two totally different

23:10projects. If we get a contract, we also

23:12need to have a building for them to be

23:14working in. Installing that doesn't

23:16doesn't help much. So, I think that it's

23:18our duty, for sure, to encourage

23:22those that are working on this contract

23:23to come to an agreement from the city

23:25side and make sure that we are

23:28doing right by our

23:30library workers, but I think also doing

23:32right by them is not holding up the the

23:35building. Thank you.

23:37>> Ms. Johnson.

23:38>> Thank you.

23:40First of all, I don't even know why

23:41we're talking about the contract. It

23:42didn't even come before us, and we

23:43shouldn't even be talking about anything

23:45that they're sending to us because we

23:47have nothing to do with it. When it

23:49comes to us, they keep sending us

23:51information, and we shouldn't even

23:52really be reading it because whatever's

23:55going on with them is going on with

23:57them.

23:58Um so, that's number one. Number two,

23:59I'd like to thank the director McCormick

24:02for the great um tour

24:04on Friday myself and Alderman

24:07Morgan went on.

24:09I understand the frustrations with that

24:11building and the same thing with the DPW

24:14building. They were built in the '70s,

24:15and my question was was really a

24:17rhetorical question was where was a

24:19building inspector to oversee all these

24:21two buildings that is a mess

24:23with the ventilation and the window

24:25problems and all this. Um and then you

24:27must wonder, this was in the '70s, where

24:30was the building inspection and probably

24:32private homes, and other buildings um

24:35that went on in the city.

24:37But, here is my problem.

24:39It said the amount of bonding that's

24:42going through.

24:44And I'm looking and I know and I said

24:46these three projects are worthwhile

24:48projects, but we have all these little

24:49projects that are in between that raises

24:52everything.

24:53I've got to think about the people who

24:55who paying the bills for all of this.

24:57Can they afford their taxes to keep

24:59climbing? Because you could do anything

25:01you want, you can improve all these

25:03buildings, but if people can't afford to

25:05pay their taxes, what happens?

25:08And through the chair, Mayor, I ask

25:10either

25:11um CFO Enright or Director Cummings, I

25:14just would like to get a question on

25:16these three big projects, what the cost

25:19is going to be.

25:20>> What's the question so they can decide

25:22which one of you

25:22>> Okay, I don't care either one of them.

25:24Doesn't matter to me. Whichever one of

25:26them wants to come up. The total of

25:28these three projects and how many years

25:31is going to take to do the bonding each

25:33project. So, we're starting one in 2027.

25:36We know we started DPW in 2026. Is it

25:40going to be 2027 that we start the

25:42library or the fire station or both? And

25:45what is the total cost? Is that going to

25:46be over the 25 to 35 million dollars

25:49that they said we can only bond in a

25:52year?

25:54>> Somebody want to address that? Director

25:55Cummings.

25:56>> I want I want everybody to hear this.

25:59Thank you. I appreciate it.

26:01I know I keep asking.

26:02>> Dawn Enright, CFO. Um this is all within

26:06um the guidelines from the ad hoc

26:08committee and um it is within the the

26:12plan that um that we are going forward

26:16with

26:17um and it was presented to you um last

26:21month.

26:22And um

26:24these projects were there.

26:27>> Okay, can I have the answer? Yeah. I'd

26:29like to know what is the total cost of

26:31these three projects. That's the

26:32question.

26:35I know it was presented, but now we're

26:36talking about bonding some of this money

26:39again and I'd like to know what is the

26:41total cost

26:42for everybody who's watching this

26:44tonight and it goes in the minutes.

26:47>> So, Director Cummings.

26:48>> Thank you. So, I'm going to do this from

26:50memory. Uh I believe the total project

26:52cost for the uh

26:54for the DPW garage fleet maintenance

26:56building is is total project 54 million,

26:59the total project cost for the fire

27:01station 35 million, and then the uh

27:04library renovation 45 million. Those are

27:07all total project cost numbers that

27:09we've been uh working with today. Thank

27:13you.

27:14>> [snorts]

27:14>> Follow up?

27:15>> Yeah.

27:16So, how are we spreading out this

27:17bonding?

27:19Over the years. So, it's not going to be

27:22over that

27:2325 to 30 million that we can afford.

27:26>> Councilman Cummings.

27:27>> Thank you. So, I don't have that in

27:29front of me this evening, but certainly

27:30I would refer you back to the ad hoc

27:32meeting of August 11th where we had our

27:36debt service schedule where it showed

27:38you how uh we would be uh fitting in the

27:43the selling of the debt over 5-year,

27:466-year uh type horizon, and it met the

27:50the various policy directives that we

27:52were discussing at the time, and as CFO

27:54Andry had mentioned is all being done

27:56according to plan. Thank you.

27:58>> May I just say something? I'm sorry if I

28:00don't remember a lot of this because I

28:02just lost my husband on August 6th, so

28:04some of this is

28:06it's like blurred to me, so I'm trying

28:08to get some of the questions answered

28:09now. I do apologize.

28:11>> Okay.

28:12>> Also, one thing I just wanted to mention

28:14was when we're talking about bonding,

28:17we try to keep the debt service payment,

28:20which is the interest and principal we

28:21pay on all of our bonds in a certain

28:23band, a level.

28:26So,

28:27it's not like if we pass a 10

28:29million-dollar bond, that's a direct 10

28:31million impact on the tax rate

28:33immediately. No, it's it's over time.

28:36And and so, you want to look at the debt

28:39service and keeping that within a an

28:41acceptable range, and as I understand,

28:46where we could be bonding as authority

28:48with the city of Nashville. We're not

28:50even close to that. So,

28:52we're well within the bounds of

28:55what we're allowed. In fact, we're well

28:57below it.

28:58So, we have to keep our infrastructure

29:01going. And yes, over the years we've

29:03neglected our infrastructure and that's

29:05caused us a lot of issues now. So,

29:09you can't ignore them too long or they

29:11just become far more expensive.

29:14I think if there's anything else I'll

29:17Did you already speak all of them

29:18including all of them and Cleo and then

29:19all of them and T.O.?

29:20>> Uh uh thank you

29:22Mr. Chairman. Um

29:23>> Oh, I'm sorry. I forgot Revon before.

29:27Go ahead.

29:27>> Was I okay? Sorry.

29:29Um I want to make a couple of comments

29:31here of of things that have been made.

29:34First off, I I was on that ad hoc

29:36committee and we worked really hard um

29:39and nothing happens all within 1 year.

29:42It's spread I think all the way out into

29:44the I was just again my documents all

29:45the way into the

29:47deep into the 2030s. Um and and there's

29:51delay of projects not that everything's

29:53happening at once, but um

29:55comment about the building inspection. I

29:57agree having having gone through that

29:59it's we wonder, but I can tell you for

30:02having a home

30:03um and a father who built homes

30:06what it was acceptable building code in

30:10the 1970s is not acceptable here in

30:122026.

30:14So, um I think everybody did their job

30:17in the 1970s even if it really doesn't

30:20meet the 2020s

30:22um building code.

30:24That's what I wanted to say. I've also

30:25been sitting here doing a whole lot of

30:27work and trying to crunch some numbers

30:29and and so on. And um we talk about how

30:32much every bond will cost in the end.

30:35So, I was I was looking at what my house

30:38cost

30:40after a 20-year um mortgage and um

30:44the two is, mine was probably I probably

30:47paid, um, close to 70% more than what I

30:52purchased it for. Um, now with a an

30:55interest rate of like 7.33%,

30:57we'd be looking at, um, 90%.

31:00Um, my mortgage over 20 years.

31:04If I were to do try to do a, uh, home

31:07equity or something like that, we'd be

31:09looking at a lot more than that cuz

31:11we're looking at like 8.something%

31:14um, and we're looking at close to 90% of

31:17what I paid over what I paid,

31:20um, for that mortgage. When I look at

31:22what the city's percentage is of paying,

31:24we're paying about 60%, 62%

31:28over what we were doing. So, I think the

31:30city is doing the right way. And with

31:33comments that have been made, um, Mr.

31:35Chairman is that, um,

31:37you know,

31:38why are we doing this all at once? And

31:40the problem is that we delayed too long.

31:42I'm not going to judge those who came

31:44before me, um,

31:46because I don't know what what budget

31:47constraints they were under.

31:49But if we delay it now, it's going to be

31:52even more later.

31:53And I want to speak specifically to the

31:55library. I too went on a tour of the

31:57library, and I want to say that, um,

32:02I respect all of our employees that are

32:05there. And I don't want them, just like

32:07the DPW, I don't want them working in

32:09those conditions. When I saw that we

32:11have, um, books and things pulled away

32:14from the walls because there's leaks,

32:17and they're not just trying to protect

32:19the assets that we have, we're trying to

32:20protect the employees. And one of the

32:21questions I asked was, is it safe for

32:24employees to work here? And, um,

32:26um,

32:27the director very specifically, and

32:29Director McCormick very specifically

32:31said to me that they've had, um,

32:33environmental health come in and do

32:34testing because they do care about the

32:36employees,

32:37So, doing this um, is going to benefit

32:40the employees. It's going to benefit the

32:42the children. I mean, we talking about

32:44like a hundred kids that come in I think

32:46like about a week or every week or so.

32:48We need to think of their health. We

32:50need to think of the employees health.

32:51This is something that truly needs to

32:53get done. So, we've all gotten emails of

32:56people saying you can't spend this much

32:58money and not give a contract.

33:01They are apples and oranges. I do agree

33:03that I want to see a contract before we

33:05pass this. However, that being said,

33:08this is as much for the employees. This

33:10building is much for the safety and

33:13well-being of the employees when giving

33:15them a good work environment as anything

33:18else. So, this is not an either or. This

33:21is an and.

33:23So, thank you. Mr. Chairman.

33:26>> Thank you, Mr. Chairman.

33:28I will agree with Alderman Tibo and

33:30Alderman Cummings that I will be voting

33:32to table.

33:34Uh

33:36>> Clemens.

33:37>> That

33:38Oh, I said Cummings. Yes.

33:40>> That's okay.

33:41>> I was going to let it go, but she won't.

33:43>> I won't.

33:43>> [laughter]

33:44>> No promotions.

33:47My apologies. My goodness.

33:49Uh

33:50but I will be voting also to table

33:52uh when this goes before the full board.

33:55Thank you.

33:56>> Okay. Alderman Tibo.

33:58>> Thank you, Mr. Chair. I mean, I think

34:01yeah, I think it's naive to

34:03um say that money and money that is city

34:06money

34:07is not

34:09uh related in some way. It doesn't

34:11matter if it's related related. We're

34:12still spending money whether it's giving

34:14employees contracts or whether it's

34:17building a new library. I'm a 100% for

34:19the new library. I believe strongly that

34:21we should be be giving and I I don't

34:23know if it's pay or if it's benefits or

34:25what what it is, fair contracts,

34:27whatever they may be.

34:28And

34:29if we you think that then

34:33I mean, we probably shouldn't be here

34:34supporting our city because we're trying

34:36we're a good steward not only to the

34:37city and city buildings, but for the

34:39people that work in the city, whether

34:41they're firemen, policemen, library

34:43workers, whatever. And um I I think

34:47you know, the the the point was made

34:49earlier that this

34:51doing this right now this minute is the

34:53word was urgency. I think urgency get a

34:56contract for people is pretty urgent,

34:58too. They're they're putting food on the

34:59table for their people. There's their

35:01families, you know, and I I think, you

35:04know, I support both and I think you can

35:06support both. And if we if this

35:09you know, renovation doesn't go in next

35:12week, it doesn't start next week. I'm

35:13sorry, but that's that's how I feel and

35:16and I think, you know, I I thought they

35:17were close today in getting it done. It

35:19sounds like it wasn't, I guess. Um so,

35:22until I hear that we're on the right

35:23direction for that, I'm I'm going to

35:25vote to table it. It's simple as that.

35:27If you don't vote that way, that's fine.

35:29You can have any opinion you want.

35:31>> Alderman Wheeler.

35:33>> Fine.

35:34I don't agree

35:36that one has anything to do with the

35:38other and I don't think we should be, as

35:40a board,

35:42telling them what to do with their

35:44contracts.

35:45Holding up a project

35:48because there's no contract is not the

35:51right way to govern. I'm sorry. They're

35:53all good projects, very good projects,

35:56all worthwhile, all worth

35:58our support. But I'm not going to tell

36:01somebody, "Unless you pass that

36:02contract, I'm going to hold up your

36:03project." That is not the way to govern.

36:06I don't think your constituents are

36:07going to be happy with that.

36:09>> That's not how I see it.

36:10>> Alderman Kelly and Alderman

36:12>> Thank you. I'm going to go back to my

36:13previous point because I'm trying to

36:15make sure that I don't misunderstand

36:17this. Because what I am looking at in

36:20this budget is that we approved, let's

36:23take the two projects that are the

36:24closest and we approved

36:26a certain amount of money

36:28for looking at the DPW garage design.

36:32It's about $3 million.

36:33Then last week when I was unable to make

36:35here, we agreed to $43.3 million

36:38to finish that project

36:41in total.

36:43We agreed to do a million dollars in

36:45library design

36:47in 2025.

36:49The full project cost is $44 million.

36:52You're only asking for $3 million, which

36:54means that the library trustees and

36:55everybody's going to have to come up

36:56every year to continue asking for what

36:59we need to get this project done. And

37:01I'm concerned that that's going to be a

37:03tripping point every time. So, please

37:05tell me if I'm misunderstanding the

37:06math, but why would we ask for the full

37:08amount for DPW and not the full amount

37:10for the library?

37:13>> Director Cummings.

37:15>> Yes, thank you. Tim Cummings, director

37:17of administrative services. So, we are

37:20following the exact same model

37:23that we followed for the DPW garage and

37:25and fleet maintenance facility. If my

37:28recollection is correct, we originally

37:30asked for repurposing of about $2.2

37:33million to start the design of the DPW

37:38garage and fleet maintenance facility.

37:40Then we asked for an additional $5

37:43million

37:44or or thereabouts, and then we revised

37:47it down to about $3 million.

37:50And that was all done over the last

37:53couple of years as we worked through the

37:55design. And then when we understood what

37:58the total construction project's cost

38:00was going to be at $43 million, you saw

38:03our bond authorization request come

38:06through

38:07this fall for for that for that project.

38:11Similar type trajectory we're on here

38:13for the library and also for the fire

38:18station. With the library, we initially

38:21asked for a million dollars. Now that

38:23was to start the design.

38:25Then we are now asking for 3 million

38:28dollars to finish the design and then we

38:31will be asking for construction money

38:34for the total for the total construction

38:36project cost when we when we know what

38:39that number is.

38:41Similarly with the fire station, we

38:44are just now starting the design for the

38:47for the fire station and so we are going

38:48to be looking for a million dollars and

38:51that million dollars is going to start

38:52the initial design but also be able to

38:54work through the very specific details

38:56of actually having site control over the

38:59land to be able to have confidence to

39:01actually move forward with the design

39:03because that will be the second request

39:05that we ask is then we'll be asking for

39:07additional money to complete the design

39:10and then we will come back for a third

39:12time and ask for money for construction.

39:15I would not represent to you it would be

39:17responsible for us to be asking for 35

39:20million dollars today using the fire

39:22station as an example when we don't even

39:25have site control on the area where we

39:27would be looking to do the specific

39:30project. So we are taking this

39:32deliberative and incremental approach

39:35in trying to be good stewards of of of

39:38the projects and and and the taxpayers

39:41money. Thank you.

39:42>> All right.

39:43I'll set up with Kelly.

39:44>> I think you need to update as excel

39:46documents but yes, I'll stop.

39:50>> Let's see.

39:52Do I have anyone else in the other end?

39:55>> I'd put my hand up but I'm

39:56>> I was going to Brian.

39:57>> Did you did you did you want

39:59>> I I'm all set.

40:00>> I'll go with Brian.

40:01>> Yeah, I I would just like to say as

40:0435 year

40:06union member

40:08I support

40:10their contract and I support the

40:13collective bargaining agreement with the

40:16city I urge caution

40:19with tying a vote.

40:22And what I'm cautioning you on is an

40:25unfair

40:26labor practice.

40:29We have a legal set here to negotiate.

40:34Do you want every union

40:36in this city that comes to impasse or

40:39some problem to appear in this chamber,

40:42call you up personally?

40:44That is not your job.

40:47Our job is to sit collectively and see

40:50if we can what was negotiated can be

40:54properly funded, that we can supply that

40:57need.

40:58To jump in at this particular

41:00stage,

41:02you are putting

41:04uh a grinding, you know,

41:07a grind wheel on a chain and jumping off

41:10a bridge with it.

41:12You're not part of the process. You can

41:16jeopardize the legality of it. I wish

41:19the uh corporate counsel was here. You

41:22may hear that

41:24tomorrow night.

41:26And myself, although I am a strong union

41:28man,

41:30and I support any labor organization in

41:34their

41:35negotiations as well as they should,

41:38but I'm not going to take municipal

41:40building and tie it into that. It's

41:42apples and oranges.

41:45They need back into negotiating, and our

41:48job is to sit back

41:50and monitor.

41:52There's a whole way that they can go

41:54through. They can stop filing. They can

41:56go on strike. There's other different

41:58things.

42:00But to get us involved into that, it's a

42:02way too early and maybe

42:05maybe be illegal. Thank you.

42:09>> Oh,

42:10just

42:11one thing. I've negotiated numerous

42:13contracts, many in the school

42:15departments.

42:16There's two sides to every story.

42:18We don't know any of the details, nor

42:20should we know any of the details, and I

42:23would not

42:25anybody that called me tell me any of

42:26the details because

42:28that's not our job.

42:30So, there may be hang-ups

42:32uh in in what's being asked from either

42:35side. We don't know. We won't know till

42:38we actually get the contract in hand.

42:42But, I think uh

42:43Alderman O'Brien is somewhat right that

42:45if if we try to leverage one side or the

42:49other into moving into

42:51a contract that the other side doesn't

42:53want, we're going to be in trouble

42:57legally.

42:59Alderman T- Alderman Sennett first.

43:01Thank you, Mr. Chairman. I I stepped

43:03back a moment ago because I have a habit

43:05of tripping over my own words, and I

43:07didn't want to uh

43:09wind up eating my own foot. But, I I

43:11want to thank my colleague at large,

43:12Alderman O'Brien. He

43:14articulated ultimately what I wanted to

43:16say um better than I think I possibly

43:19could have

43:20done never

43:21having been part of a labor

43:23organization, but having long supported

43:26the um

43:27the rights of workers to organize.

43:29Um

43:31I I was sitting here getting an

43:33uncomfortable feeling with the

43:35discussion, and and Alderman O'Brien uh

43:38very um

43:39eloquently articulated why

43:42um

43:43I would caution my colleagues to take a

43:45step back uh from the conversation and

43:47consider it from that perspective. Um

43:51Ooh, both things can be true.

43:54Uh multiple things can be true really in

43:56this discussion. We can support the need

43:59and the urgency uh for the library

44:02renovations. We can sit here

44:04individually and support

44:07the organized workers of the library in

44:09their pursuit of a fair contract.

44:13Um but

44:15exercising undue influence over that

44:17from this position, I think is a very

44:19slippery slope that we are

44:22um best to avoid. Thank you.

44:27>> All right, Holden Johnson's on the

44:28committee.

44:31>> Holden McNeal

44:31>> I am too.

44:32>> [laughter]

44:33>> I'm sorry.

44:34>> His name was up

44:35>> We were going all over the place

44:36earlier, so I mean

44:37>> It doesn't matter, I suppose. Um

44:39I just want to be clear that I didn't

44:41say I would vote against it.

44:43Just tabling and

44:45um I could table it for any reason. I I

44:47could ask to table it for any reason.

44:48Maybe I don't like the money. Maybe I

44:49think that the money should come down.

44:51Um it doesn't have to be for that

44:52reason, but I think, you know, my

44:54constituent constituents

44:57wouldn't be angry cuz I get a lot of

44:58constituents that don't want me to spend

45:00$43 million on whether it's a DPW garage

45:04or a

45:06uh a fire station or even the library.

45:08So, there's plenty of constituents out

45:09there that don't all go, "Hey, go spend

45:12you know, $200 million on buildings."

45:14It's just that's that's the

45:16We we think that all constituents think

45:18one way, and that's just not true.

45:20Whether it's in Ward 8 or Ward 1,

45:22they're like, you know, it's it's all

45:24over the place. I mean,

45:25you know, I just feel that when we spend

45:28money

45:29whether it's in people or building

45:32we have to go back to our constituents

45:33and say, "This is why we spent this

45:35money." And I'll tell you when they go

45:36back and say we spent we're going to

45:38spend $50 million on a library, some

45:40people don't think that. Some people

45:41come back with what we heard tonight in

45:42public comment. Oh, it's just a place to

45:44home the homeless, you know, and stuff

45:46like that cuz I hear that all the time.

45:48And that's a lot of money if that's all

45:50the library is.

45:51Cuz we're already planning other things

45:53to take care of that or to help with

45:54that. So,

45:56um

45:56you know, when we spend money, we got to

45:58go back, and I hear it I hear it from

46:00everyone. So, I mean, we even hear that

46:02that other city employees are paid too

46:04much, whether it's police or fire, and I

46:06don't believe that. Um so, I I think

46:08when we spend any dime, doesn't matter

46:11what we're spending it on, we still have

46:12to make sure we're voting the right way

46:14on things. And I want the library. I

46:16wanted the library for a long time.

46:18There's people in this chamber that will

46:19not vote for this.

46:21Whether they say, you know, I I don't

46:22want to vote for small ones, but they're

46:24not going to vote for big bonds, either.

46:25So, we know that there's there's people

46:27that aren't going to vote for this.

46:29>> Are you planning to vote for it?

46:31>> But not maybe not tomorrow.

46:33So.

46:34>> Alderman Johnson.

46:35>> Thank you. I don't want Alderman O'Brien

46:38to fall over, but I agree with you 100%.

46:41>> [laughter]

46:41>> Oh, I love you, darling.

46:43>> I love you, too.

46:45But that's why I said at the beginning,

46:48we shouldn't be talking about contracts.

46:49We don't know how they're negotiating.

46:51We hear one side, and we shouldn't even

46:53be reading those emails, either, because

46:56it's not fair. And it really isn't. Um

46:59but whether I vote for it I I don't vote

47:02for the library, I have to weigh in with

47:04all the small bonds and with the larger

47:06bonds. And I'm sorry, because I hear

47:08from my constituents, also. You know, I

47:12take care of this little ward called

47:14Ward 5. Well, it's not that little. I

47:16mean, we have a nightmare with West

47:18Hollis Street. But, you know, I hear

47:20from everybody. I send out emails

47:23every week. And so, you know, this is

47:26something you have to think about, and

47:28you have to prioritize, and I say it all

47:30the time. But I just wanted to say to

47:33Alderman O'Brien, you're right on. You

47:35were right on with your comments.

47:38>> Any other discussion?

47:39>> I have experience.

47:40>> That might not happen again with us

47:42agreeing. It's okay.

47:42>> Alderman Clemens.

47:44>> Uh thank you. Uh this wouldn't be the

47:46first time that I have not voted for

47:48building project because of a

47:51labor dispute that hadn't been resolved.

47:53Um I've done it before in the past, and

47:56I intend to do it again.

47:58Um

47:59and that's just my perception of

48:03justice, I guess.

48:06>> Anyone else?

48:08All right. The motion before us is for

48:11to recommend to the full board final

48:12passage of R-26-067.

48:15All those in favor signify by saying I.

48:18>> I.

48:19>> Opposed?

48:19>> Nay.

48:20>> Motion carries.

48:22R-26-068

48:24authorizing the mayor and city treasurer

48:26Oh, go ahead. Make the motion.

48:28>> I'll move them over.

48:29>> Well, you were doing such a fine job.

48:31>> [laughter]

48:31>> Uh before us tonight is R-26-068

48:36authorizing mayor and city treasurer to

48:38issue bonds not to exceed $1,500,000

48:43for the design, construction, and

48:44equipment of the fire training

48:46facilities. Mr. Chairman, I would like

48:49to make a recommendation

48:51to uh recommend final passage.

48:54>> Motion on the floor is to recommend to

48:55the full board final passage of

48:57R-26-068.

48:58Discussion.

49:01Alderman Sente.

49:02>> Uh thank you, Mr. Chairman. I I think

49:04the most um

49:06poignant uh

49:08note that I took out of um

49:10Chief Buxton's remarks regarding this

49:12during the uh public hearing

49:14is that with the current facility that

49:17we have, the the cost to move it

49:20would be more than the cost of this.

49:24I mean

49:24>> [snorts]

49:25>> you know, that that's some of the

49:26concern that I had heard um from some of

49:29my constituents in Ward 7 is that, you

49:31know, we we have this, why can't we just

49:33move it? It's going to be relatively

49:35within the same

49:37you know, space, and

49:40you know, to be able to have something

49:42newer, presumably better, and with a

49:44longer shelf life, you know, at a at a

49:47better cost. That to me, that is the

49:49sell. Thank you.

49:51>> Anyone else?

49:53Alderman O'Brien.

49:54>> Yeah, I just want to just briefly say

49:56that this is very important.

49:58Uh I can say from my experience fighting

50:01fires is a highly dangerous field. I

50:03think you all know that.

50:06So, you need a training facility cuz it

50:08simulates conditions that these guys are

50:11going to go into. Off

50:13you know, females, too, you know,

50:15there's brothers and sisters on the job.

50:18And I think we held a big responsibility

50:21to make sure that we have

50:24a great fire department, a greatly

50:27highly trained fire department.

50:30If you have a highly trained fire

50:32department,

50:33you kind of beating the odds against

50:35some tragedy with a line of duty death.

50:37So, this is to me pretty important. You

50:41need to train the best to, you know,

50:44get them out of trouble and just stuff

50:46like that. So, I support this. So, thank

50:48you.

50:49Thank you, Alderman

50:50>> years ago, the alderman used to go out

50:51and

50:52try to formulate the same jobs the

50:55firemen do. I remember climbing a 24-ft

50:57ladder with a hose over my shoulder in

50:59that old cement building to fight fires

51:02up there. I found out just how difficult

51:04that damn job is.

51:06And

51:08and the mayor was with me and and I

51:10other aldermen were using the jaws of

51:11life and other things. And you you you

51:13realize just how difficult the firemen's

51:16jobs are.

51:18They need to train.

51:20And we've approved the new building for

51:22the for the DPW and that's going where

51:25the fire training thing is now. We have

51:28to move it and it is used by other

51:30departments. So, when they ask for it

51:32and uh

51:33it's part of that whole mutual aid

51:35thing. So, it's very important.

51:38Alderman Johnson.

51:39>> Thank you.

51:41This was the issue with the [cough]

51:42Creek Drive

51:43>> Sorry.

51:43>> residents

51:44that um they came to a

51:47an understanding that they didn't put

51:48the road in, that they just laid the

51:50pipe from Teak Drive into the landfill.

51:54My problem is with this, and I have all

51:57respect for our firefighters. Again,

52:00it's a small amount that we're putting

52:01into everything, but I just want to let

52:03you know that um

52:05I had asked to see all the emails that

52:09was concerning this. I asked back August

52:1231st, and I haven't gotten all of them.

52:15Mr. Perrin has tied me up up until

52:18[snorts] October 30th because I wanted

52:20to understand why did we pay an outside

52:22attorney $8,700

52:25to take on this.

52:26And so, I'm just letting everybody know

52:29that I've asked for information, too,

52:31that got hung up in this the right to

52:33know law.

52:34And I don't think that was right.

52:36So, I'm just letting everybody know it

52:38does happen to aldermen, too.

52:40Not that I'm taking any constituent

52:42sides.

52:43>> All right. Motion on the floor is to

52:45recommend to the full board final

52:47passage of O-26-068.

52:50All in favor signify by saying aye. Aye.

52:54Opposed?

52:54>> Nay.

52:55>> Motion carries.

52:57All right.

52:57>> Also before us tonight is O-26-069,

53:02authorizing mayor and city treasurer to

53:04issue bonds not to exceed $1 million for

53:08design and other ancillary costs to

53:11replace the Pine Hill Fire Station.

53:14Mr. Chairman, I would like to make the

53:16motion to recommend final passage.

53:18>> Motion on the floor is to recommend

53:20final passage of O-26-069

53:24to the full board.

53:27All in favor?

53:28>> Thank you, Mr. Chair. Um when I first

53:30ran for office 5 years ago, 5 and 1/2

53:32years ago, I sat down with the fire

53:34union union, and when uh two things they

53:37mentioned to me is maintenance and

53:40another fire station. And I was hoping

53:43that someday we'd have another fire

53:44station up on Amherst Street further up.

53:46Um

53:47obviously that's not going to happen,

53:48but we're going to take this at least

53:50Pine Hill and make it bigger. So, I

53:51think it's critical. I'm going to speak

53:54to both the this and the next one so I

53:55don't have to speak again. Um

53:57I think it's critical. We toured it.

53:59Some of us have toured it. It's it's

54:01where people live. It's not just a place

54:03where people work. They live there. They

54:05sleep there. They eat there.

54:07Um and you know, we have to keep our our

54:10city buildings up where people work. And

54:12that's why we're in a state we're in

54:13where we're you know, I will shame

54:15boards before me because it should have

54:18been done at some point and it just

54:19wasn't and now we're playing catch-up.

54:21You know, Alderman Bryan says it all the

54:22time, kick the can down the road. Well,

54:24that's what happened. And now we're

54:25we're trying to fix these buildings that

54:27are 50, 60, maybe 100 years old

54:30depending on what building we're fixing.

54:31And so, we uh I love the design of the

54:34new what it what it's going to look

54:35like. Um I think it's it's worth uh

54:38doing and uh the next one as far as

54:40deferred maintenance, I think yeah, we

54:43need to just like the schools, we need

54:44to make sure we keep our buildings so

54:46they don't get to a situation where we

54:48have to spend hundreds of millions of

54:49dollars to to either do a new one or to

54:52expand it or to fix it. We always have

54:54money in there to to do something. So, I

54:56believe strongly in both of these. I'm

54:58going to support both of them. No

54:59issues.

55:01>> Any other discussion on this? Alderman

55:02Kiley.

55:03>> Uh thank you, um Mr. Chairman. Um

55:07I'm obviously not on this committee um

55:10and I will support it when it gets to

55:11the Board of Aldermen assuming that it

55:13does

55:14um

55:14get through this this particular

55:16committee. Um I looked at the map and

55:19you know, I see that it's a large

55:21district. It's it's in much need. Um and

55:25I can't see why we wouldn't, you know,

55:27start to move forward to that. And

55:29again, I want to reiterate that this was

55:31part of the um ad hoc committee. We

55:34agreed on it. We've been listening over

55:35and over again for the need for this

55:38fire station, for training facility,

55:40for, you know,

55:43uh uh capital project maintenance and so

55:45on. Um and I want to make a comment. The

55:47reason I will not shame another board is

55:49simply because I don't know what

55:51financial constraints they were put

55:52under, whether it be the spending cap or

55:54something. So, I know something got

55:57pushed aside. Look at all those years

55:59that we didn't have the um

56:01our roads to be paved and then suddenly

56:03we had to play catch-up. Again, I'm not

56:05blaming anybody because

56:07I know that there are things that we're

56:09missing.

56:10Um but we're at the This is where the

56:13poop hits the fan right now is um and

56:16we're making these big bond decisions

56:19even though

56:20I have this knot in my stomach and for

56:22those who who don't really care, but I

56:25would say it anyways, I will be

56:27struggling to pay my taxes, too. So,

56:29it's not just

56:30um

56:31everybody It's not just certain people

56:33and um

56:35it is. It's going to be rough and um I'm

56:38sorry for that, but I also have to think

56:40about what the city needs and we can't

56:42kick the can down any longer. So, I hope

56:45it does get a positive um outcome. Thank

56:47you.

56:48>> Any other discussion?

56:50Motion before us is to for recommend the

56:52full board final passage of our 26069.

56:56All in favor signify by saying I.

56:59>> I.

56:59>> Opposed?

57:00>> Nay.

57:01>> Motion carries.

57:03Also before us tonight is uh - 26070

57:08authorizing mayor and city treasurer to

57:10issue bonds not to exceed $1 million for

57:13deferred capital maintenance of fire

57:16stations. Mr. Chairman, I would like to

57:18make a recommendation of uh final

57:21passage.

57:22>> Motion on the floor is to recommend

57:23final passage to the full board of our

57:2526070. Discussion?

57:30I can tell you when I years ago

57:33uh I took a tour of all the facilities

57:35and the firemen at that time they were

57:37repairing their own toilets. The Conant

57:39Street fire station didn't have much

57:41money to patch the holes in the roof so

57:43they were using buckets to catch the

57:45water.

57:47It's about time that they had the money

57:49to take care of the places they actually

57:50live in. So,

57:53if there's no other discussion, all

57:55those in favor signify by saying I. I.

57:58Opposed?

57:59>> Nay.

58:00>> Motion carries.

58:02O 26071

58:03>> Yeah.

58:04>> Also before us is O 26071

58:08authorizing the mayor and city treasurer

58:10to issue bonds not to exceed $9 million

58:14for the replacement and modernization of

58:16the citywide enterprise resource

58:18planning

58:19ERP system.

58:21>> I would like to make a motion, Mr.

58:23Chairman, to recommend final passage.

58:25>> Motion on the floor is to recommend to

58:27the full board final passage of O 26071.

58:30Discussion.

58:32Alderman Senate.

58:33>> Thank you, Mr. Chairman. Um I wanted to

58:36ask a question through you to whomever

58:38is available to answer it. Um

58:41it had started to be answered in the um

58:45in the public hearing phase. I just want

58:46to take it a step further. We had

58:48learned that of the 10 proposals that

58:50we've received um I believe it was as

58:53recently as uh today that it was stated

58:56that they'd narrowed it down to four

58:58that they would like to bring in for

58:59demonstration purposes. My question

59:02prior to that was whether or not the

59:05proposals that we have before us could

59:07be a

59:08um

59:09could

59:11be used to establish a more narrow scope

59:13by narrowing them down to I had put

59:15three to five to get us

59:18uh closer to a target cost. Um I

59:22understand that the proposals that were

59:24received drove the

59:26um drove the ask for the bond. I'm just

59:29I'm trying to wrap my head around where

59:32this 9 million came from better than I

59:35currently have a grasp on.

59:39>> Is that right?

59:43>> Don Enright, CFO.

59:45Um,

59:46so when we started the process 14 months

59:48ago, we um, we

59:51were surveying the the climate and

59:54getting information from different

59:56places of in terms of what it would cost

59:59to do this. And the first place that we

1:00:01looked was um,

1:00:03back in 2009, how much did we pay for a

1:00:07uh, a new system in 2009?

1:00:10The amount that was bonded was 7.5

1:00:12million. So, in thinking about that, we

1:00:16said, well, obviously it's going to cost

1:00:18um, more than the 7.5 million, but we

1:00:21want to be reasonable. And the we did

1:00:26some more research and we found that um,

1:00:29we anticipated that the 9 million or the

1:00:3110 million would be a reasonable amount.

1:00:33As you remember from the ad hoc

1:00:35committee, that was what we had um,

1:00:37originally um, put in the plan because

1:00:40that's what we were thinking it was

1:00:42going to come in at.

1:00:44As we talked to the different vendors,

1:00:46um, it came to light that there was

1:00:48probably a good chance that we were

1:00:49going to be able to get a great product

1:00:51for for less than the 10 million. So, we

1:00:54put in for the 9 million. And as I

1:00:56stated, as today's we have 10 uh,

1:01:00proposals on the table and we are

1:01:02looking at three to four to commit and

1:01:04do the demonstration and they all came

1:01:06in within the 9 million budget.

1:01:10>> Follow up, Senate.

1:01:13Is there urgency

1:01:15Oh.

1:01:16Is there urgency behind authorizing this

1:01:19bond now

1:01:21prior to

1:01:23you getting these products in front of

1:01:24your end users and

1:01:27determining what the best one is. Could

1:01:29this be brought back with more

1:01:31specificity

1:01:33to say that we want to authorize, you

1:01:36know,

1:01:37just say it stays $9 million

1:01:39to to

1:01:41implement and um

1:01:44you know, implement and train everybody

1:01:47on, you know, I know we're not using

1:01:50Lawson. We'll just say, you know, Lawson

1:01:512.0.

1:01:53Something to that effect. Is that a

1:01:55possibility or is

1:01:58I

1:01:59I just I feel like we're at we're at a

1:02:02position where we're we're not quite at

1:02:04the funding level yet and I'm I'm trying

1:02:06to wrap my head around it.

1:02:08>> Thank you for the question, Don and

1:02:10right CFO. Um

1:02:12could we come back? We will be coming

1:02:14back before you with a contract to to be

1:02:18able to solidify the contract. But in

1:02:21order to get to that point, we do have

1:02:23to engage with a

1:02:25with a project manager. So without

1:02:27without the funding, we couldn't engage

1:02:30with the project manager to be able to

1:02:32go forward in that.

1:02:34Did I leave anything out?

1:02:36Thank you.

1:02:37>> Hold on, Senate. Thank you. That project

1:02:39manager stage, that would come after the

1:02:41selection of the um

1:02:43of a product?

1:02:46>> Kind of simultaneously.

1:02:47>> Contemporaneously.

1:02:48>> Yeah, we're we're working at it together

1:02:52right now because there are there are

1:02:54steps in the in the selection process

1:02:57that we want to make sure that we do not

1:02:59miss and a project manager would be able

1:03:01to help with the selection process. Most

1:03:04of the um ERP projects actually you

1:03:08start with the project manager in the

1:03:09writing of the RFP.

1:03:12Um we were fortunate enough to be able

1:03:13to utilize um the RFP that was used back

1:03:17in 2009

1:03:20and um our our educated staff to be able

1:03:24to come forward and be able to do that,

1:03:26but it at this stage of the game I think

1:03:28it would

1:03:29we would be remiss to to to wait any

1:03:32longer.

1:03:34>> Follow up. Yes, um

1:03:37so this project manager would be an

1:03:39outside consultant.

1:03:40>> Yes.

1:03:41>> Okay, thank you. So

1:03:43if we authorize 9 million and they do a

1:03:45great negotiating job and get it down to

1:03:478.5 or 8 million

1:03:50we can de-obligate what's not going to

1:03:52be spent.

1:03:53>> I know.

1:03:55>> Alderman Sullivan?

1:03:56>> Yes, uh my question on the ERP uh

1:04:00I don't think I've heard it discussed

1:04:02and if I missed it, my apologies, but

1:04:05total cost of ownership for this

1:04:08software

1:04:09we know what that is.

1:04:15>> Don Inman, right, CFO. We are we are

1:04:17anticipating $9 million or less for the

1:04:21total implementation in 2 years of

1:04:24annual um service contract.

1:04:27>> Follow up.

1:04:28>> Follow up.

1:04:29>> So the contract you're going to sign

1:04:32is for 2 years?

1:04:34>> It's going to be the implementation and

1:04:37then on top of that it's going to be two

1:04:39it the cost will be covered for 2 years.

1:04:42We're anticipating having a contract

1:04:44signed for 10 year

1:04:46>> 10 year?

1:04:47>> I believe that's what we're looking for.

1:04:49>> 10 year contract.

1:04:51>> And some of the contracts we're that

1:04:53it's that's replacing we do annual fees

1:04:56on, so we won't be doing that anymore,

1:04:58either.

1:04:58>> I understand that.

1:05:00But

1:05:01what I'm saying is if you're going to

1:05:03have it for 10 years, is it going to

1:05:05cost us $9 million over the 10 years?

1:05:08>> No, it it's going to replace the um

1:05:12replace the cost that we're spending

1:05:14right now on all the different

1:05:16softwares, which is about one 1.2

1:05:19million dollars that's in the general

1:05:20fund budget today, is going to cost that

1:05:23or less annually.

1:05:25>> Okay.

1:05:27Follow up.

1:05:27>> So, if I hear you correctly, it's 9

1:05:30million dollars

1:05:32plus

1:05:33approximately

1:05:351.2 1.2 1.2 * 8.

1:05:39Right?

1:05:39>> Correct.

1:05:40>> Okay. So, when I say total cost of

1:05:42ownership, it's 9 million dollars

1:05:46plus

1:05:471.2 every year for the next 8 years.

1:05:50>> Okay.

1:05:51>> But, we're also saving

1:05:54>> Yes, you are correct. We are currently

1:05:56paying 1.2.

1:05:59>> I understand that. I just All I'm asking

1:06:01is

1:06:02that

1:06:03when we when we look at the 9 million

1:06:05dollars

1:06:06>> Yeah.

1:06:07>> it's it's 9 million metaphor. It's 9

1:06:11million dollars to buy a car.

1:06:13But, every year I got to put gas in it.

1:06:15I got to repair it. I got to do oil

1:06:16changes. Cost of ownership.

1:06:18>> Yeah.

1:06:18>> So, what I'm trying to understand is

1:06:21what's the what's the total cost of the

1:06:23lifespan of this software that we're

1:06:25going to use?

1:06:26>> We're looking at about 15 million.

1:06:28>> Okay. Thank you.

1:06:29>> For 10 years.

1:06:30>> Yep.

1:06:31>> Alderman Kelly.

1:06:32>> I have a follow up to that question from

1:06:34Alderman Sullivan.

1:06:36So, you're saying that the 1.2 is

1:06:38actually what we're paying now. So, why

1:06:40are we authorizing 2 years when it's

1:06:43already in your budget?

1:06:45>> The reason why we're having the 2-year

1:06:46overlap is because um for continuity of

1:06:49operations, there is going to be an

1:06:51overlap of some of the functionality.

1:06:54>> Okay. So, we'll be continuing the other

1:06:56contract until

1:06:58>> Yes.

1:06:58>> the term Okay. Thank you.

1:07:00>> Any other questions? Alderman Clements.

1:07:03>> Not a question, but uh I was on the

1:07:05board when we replaced last ERP system,

1:07:08>> [laughter]

1:07:09>> which was the admin system, and that was

1:07:1135 years old at the time.

1:07:14And we definitely It was older than me

1:07:16at the time.

1:07:18And uh, we definitely don't want to get

1:07:19us into a situation like that again.

1:07:22Um, so this is This is something I

1:07:25definitely support, and I appreciate the

1:07:27fact that the work

1:07:29is was being done 14 months ago

1:07:33uh, to look into it.

1:07:36And [clears throat] it you know, it's

1:07:37definitely

1:07:39something that you have done

1:07:42proactively and not reactively. And so,

1:07:45I just wanted to point that out and

1:07:47thank you for that.

1:07:49>> Alderman Teeloh.

1:07:50>> Thank you, Mr. Chair. I just wanted to

1:07:51say that when I did the math for that,

1:07:53it's 18.6 million, not really 15, cuz

1:07:55you're talking

1:07:571.2 for 8 years, added on to the 9

1:07:59million, so it comes out to unless I'm

1:08:01doing the math wrong, and it could be,

1:08:03it's 10:00, but 18.6.

1:08:05So.

1:08:06So, it's almost basically double.

1:08:08>> Alderman Sennett.

1:08:09>> Yeah, just to um,

1:08:11I I guess pile on to uh, Alderman

1:08:13Teeloh's point there. I mean,

1:08:15your your

1:08:17annual maintenance and service contract

1:08:18for an ongoing piece of software,

1:08:21I I

1:08:22maybe I'm wrong.

1:08:24I I deal with it every day.

1:08:26I I think that

1:08:28estimating that if it's 1.2 in year

1:08:32three, that it's going to be 1.2 in year

1:08:34eight, I think that's optimistic.

1:08:37Um,

1:08:38in my experience, which is only 13

1:08:41years, but take it for what it's worth,

1:08:44those go up every year. And And that's

1:08:47through the process of renegotiation

1:08:50with long-term vendor partnerships. It

1:08:53That That is the reality of the

1:08:55situation as I've seen it. And I I just

1:08:58want us to be aware of that as we look

1:08:59forward at this.

1:09:02Thank you.

1:09:03>> Alderman Klingy.

1:09:05>> Uh thank you uh Mr. Chairman. Um I've

1:09:07often sat here at this board and um

1:09:11people have asked the question if we do

1:09:12nothing, what would the cost be?

1:09:15So right now we know that the cost of

1:09:17just maintenance is about 1.2 million

1:09:20dollars every year. I whether it goes up

1:09:23next year, goes up the following year or

1:09:24so on. So that's kind of a sunk cost

1:09:26that we're going to be paying that

1:09:28regardless. So while I do appreciate I

1:09:31think looking at the big picture of what

1:09:33the total cost is, I think we have to

1:09:35remember that that 1.2 million dollars

1:09:37or

1:09:38whatever it is in in 5 years from now is

1:09:41still going to be

1:09:43a given if we do nothing today. Um and

1:09:47the cost of the inefficiency is what

1:09:50we're kind of looking at I think more

1:09:51than more than anything. So

1:09:54um I I love looking at that big picture.

1:09:56I think so on, but I think the reality

1:09:58of it is we're already going to be

1:09:59sinking money in whether we do nothing

1:10:02or we approve this bond. Um I just don't

1:10:05want to over inflate what the cost of

1:10:07this is cuz we're already putting a cost

1:10:09out. So thank you.

1:10:13>> You get some of that on Alderman?

1:10:14>> Yep.

1:10:14>> Alderman

1:10:15>> Yeah, thank you Mr. Chair. I mean I

1:10:16think I think generally it's it's still

1:10:19I'm I'm voting for it. So I'm not I

1:10:21wasn't putting numbers out there to say

1:10:22I'm not voting for it, but I think to

1:10:24look at it in a in a in a bigger picture

1:10:26in a global picture of cost of ownership

1:10:29I think is a good thing. I mean cuz

1:10:31that's what we're we're taking cuz

1:10:32there's

1:10:33we don't want it something to be a

1:10:34hidden cost, right? And yeah, it's 9

1:10:36million, but you're still paying the

1:10:38fees that we would pay with the other

1:10:39one. So we want to make sure that that

1:10:41if we're going back to people that we're

1:10:43aware of the hidden cost of this stuff

1:10:45because we're approving 9 million, but

1:10:47we're really approving more than that

1:10:48technically.

1:10:49Um so I think it's important that that

1:10:51that we ask those questions. And so even

1:10:53though I'm supporting it and maybe the

1:10:55people aren't, I I still think it's

1:10:57important to ask those questions. I

1:10:58think that's what our job is.

1:10:59>> I've heard for the longest time, and I'm

1:11:01talking at least years, how inefficient

1:11:04our current software packages are.

1:11:07And this is going to be far more

1:11:09efficient, and I have to believe there's

1:11:11further savings and benefits to the city

1:11:14than than we even are looking at right

1:11:17at the moment. So,

1:11:19any other questions?

1:11:21All right, seeing none.

1:11:24Motion on the floor was to recommend

1:11:25final passage to the full board of R

1:11:2726071.

1:11:29All those in favor signify by saying I.

1:11:31I. Opposed?

1:11:33>> Nay.

1:11:34>> Motion carries.

1:11:38New business ordinances?

1:11:39>> There are none.

1:11:40>> Table in committee?

1:11:41>> There's nothing.

1:11:42>> Uh

1:11:43I'd like to move public comment up and

1:11:45then put general discussion and remarks

1:11:46by aldermen together after that if

1:11:48nobody has any objections.

1:11:51All right.

1:11:53Uh public comment?

1:11:55Seeing none, we'll go right into

1:11:59combination general discussion and

1:12:00remarks by aldermen. I want to start by

1:12:02saying that

1:12:04I want to apologize to everybody that

1:12:06was in this meeting earlier, and to the

1:12:09people who were listening on TV for the

1:12:12remarks that were made by a member of

1:12:14the audience. Uh we had one of our

1:12:17employees here with his young daughter.

1:12:19That was

1:12:20not very nice.

1:12:23And and

1:12:25I think that people should condemn that

1:12:27type of activity. All right.

1:12:30Alderman Devo?

1:12:32>> Thank you, Mr. Chair. I mean, you took a

1:12:33lot of the words out of my mouth there.

1:12:34Um first thing I wanted to say is you

1:12:36made a great point just a minute ago

1:12:38when we were talking about the

1:12:40uh the ERP, and I think

1:12:43and Alderman Sullivan's done this all

1:12:44the time where he says it all the time.

1:12:45It's like if we could get

1:12:48detailed savings or or a

1:12:51what's the word you use all the time? We

1:12:53do it in business cost benefit analysis

1:12:54on something, right? And we don't often

1:12:57get what the savings is and

1:12:59you know,

1:13:00and whether I you know, believe the

1:13:02numbers on the DPW garage or not, they

1:13:04were there. Like there was hey, 25 to 40

1:13:07million dollars of savings in this. And

1:13:09so, you know, when we do these projects

1:13:11or we do these big bondings, it would be

1:13:14nice to if if there was any way to do it

1:13:16and sometimes I I get it. There's not.

1:13:19But to see what the savings of something

1:13:21like this could be and then you could

1:13:22take that money off in in theory what

1:13:24the bonding is.

1:13:26But my other point was yeah, what we saw

1:13:28in the chamber was disgusting.

1:13:30And the worst you know, what was what

1:13:33was bad about it is when

1:13:35the person was told that there was a a

1:13:36kid in the audience, they said, "It's my

1:13:38right. I don't care."

1:13:40It may be someone's right to do

1:13:42something. Someone may be able to

1:13:44actually do something. Doesn't mean they

1:13:46have to.

1:13:47And that's to me an issue. And you know,

1:13:51what's almost as disgusting is we can't

1:13:52do anything about it. And I think that's

1:13:54that's also terrible. And

1:13:56I feel bad for for the employee that

1:13:58brought their their child here to to

1:14:00listen to government and to support

1:14:02their father when he was here trying to

1:14:04do his work. So, I I think that was it

1:14:07was just it was it was despicable and I

1:14:09wish

1:14:10at least they'd have some respect for

1:14:11someone like that as opposed to I I know

1:14:14you'll never have respect for us. That's

1:14:16fine. But to have respect for the child

1:14:18that was in the audience, I think they

1:14:19at least deserve that.

1:14:21>> Thank you. Any others? All in Senate?

1:14:23>> Thank you, Mr. Chairman. Um

1:14:25just on the last piece of legislation

1:14:27that we just had up just now. Um

1:14:29you know, it's I know it's sort of off

1:14:32the cuff for me to vote no where I'd

1:14:34voted for everything else tonight, but

1:14:36I I just want to note that I I

1:14:37understand the need for a modernized and

1:14:40a more efficient ERP. I mean, I I work

1:14:43with them daily. I'm in the middle of a

1:14:45re-implementation right now. I don't

1:14:47know what program I'm going to be

1:14:49ultimately using next year. Um

1:14:51and that's where I sort of landed on

1:14:54that is

1:14:55again

1:14:56recognize the need, horrified to hear

1:14:59that AP is touching a invoice 12 times

1:15:02before it's paid. My God.

1:15:04Um

1:15:05but [clears throat] nevertheless it just

1:15:07with something like this we we had a

1:15:09discussion uh regarding an old piece of

1:15:11legislation uh

1:15:14maybe year and sh maybe not even 6

1:15:16months ago uh regarding vehicles for the

1:15:19street department and there was a

1:15:20question about, you know, what we were

1:15:22getting and

1:15:23I just

1:15:24as I consider that and I consider it in

1:15:26comparison to this, I just I want to be

1:15:27a little closer to understanding what

1:15:29I'm getting for my $9 million

1:15:31um

1:15:31before I I commit that bond. I

1:15:35that's just where I landed on that one.

1:15:37So, I just I wanted to put that out

1:15:39there uh for understanding. Thank you.

1:15:41>> Councilman Sullivan.

1:15:42>> Thank you. I

1:15:44to that point

1:15:45the

1:15:47and I brought it up in the public

1:15:48hearing. I it's a principal thing with

1:15:51me. We knew we had an issue

1:15:54for 15 months. I understand that there

1:15:57are budget constraints and there's

1:15:59there's uh a certain guideline that that

1:16:02the administration wanted all to to

1:16:04stand by. But knowing that we need

1:16:08something

1:16:09that touches every single department in

1:16:12the city to make it more efficient, to

1:16:14not include it in a budget

1:16:18to me just

1:16:20doesn't sit right.

1:16:22And I think that

1:16:23you know, however we pay for it, we pay

1:16:25for it.

1:16:27But it's a question of prioritization.

1:16:29It's a question of financial

1:16:31responsibility to stand there and say

1:16:34we need this. We understand that there's

1:16:37going to be uh some pain. If we can't

1:16:40fit it in the budget, how do we fit it

1:16:42in the budget? How do we try to

1:16:45you know, finagle and move things around

1:16:47to fit it in the budget.

1:16:49You know, we we we hear it I'm I know

1:16:51I'm not on the budget committee anymore,

1:16:52but 4 years I heard you budget your

1:16:56where where your values are and where

1:16:57your priorities are and to not include

1:16:59it in the budget to supplementally

1:17:01appropriate it

1:17:03in October, almost November into the

1:17:05fiscal year, really just it it's just a

1:17:08principle thing with me and I just

1:17:09wanted to say that.

1:17:11>> Councilman Clements

1:17:13>> Yeah, I'm I I guess I'm perplexed

1:17:16uh

1:17:17by the last comment. Um

1:17:20And the And the And the reason being is

1:17:22that

1:17:24you know,

1:17:25the

1:17:27if we were to add $9 million to the

1:17:29budget,

1:17:31I mean, that that's going to raise taxes

1:17:34by

1:17:36an enormous amount.

1:17:39Like

1:17:40that's that's going

1:17:41>> 3 and 1/2 percent.

1:17:42>> I I I I think it's more than that. I I

1:17:44think it's where every $2 million is 2%?

1:17:47>> So, 2 4 6 8 10, you're talking about 10%

1:17:53budget increase

1:17:54if we were to just for an ERP system.

1:17:58I mean, that's that's why we're bonding

1:18:00it.

1:18:03I I I mean, if we if we didn't if we

1:18:05just went out and budgeted all of this

1:18:07stuff, you'd have a 100% tax increase.

1:18:10That's why you have to bond some of this

1:18:12stuff. I don't And the other thing is

1:18:14too it it it we're not [snorts] at the

1:18:16point yet. I mean, the presentation was

1:18:18very clear. We're not at the point yet

1:18:20where we're under the gun to do this.

1:18:23We're doing it early so that we're not

1:18:25in that position

1:18:27come 2029 when the when the system is is

1:18:31obsolete.

1:18:33So, I I I'm just

1:18:36not sure

1:18:38where that was lost in the in in the

1:18:40presentation, but that's that's what I

1:18:42got out of it is that we're being

1:18:43proactive.

1:18:45We've been working on this for 15

1:18:47months. We know that the end game of

1:18:49this software is 2029. So, we're doing

1:18:52it years ahead of time to make sure that

1:18:55we get something in place that's going

1:18:58to be viable for

1:19:00the foreseeable future. I That's what I

1:19:02got out of the presentation tonight. And

1:19:05as far as the math,

1:19:07yeah, adding it to last year's budget

1:19:08would have been an astronomical ask to

1:19:11to the taxpayers. I mean, you're talking

1:19:13about a 10% increase just for one thing.

1:19:17I mean, that's crazy.

1:19:18So, I I Maybe I misinterpreted what was

1:19:20said

1:19:21about the budgeting, but

1:19:24that's why we're bonding it. That's why

1:19:25we're bonding all of this stuff.

1:19:28>> And if you had to do it in the budget,

1:19:30you would lose one hell of a lot of

1:19:31employees cuz that's the only way you

1:19:33could cover

1:19:35to come out even without adding it.

1:19:38Anyone else?

1:19:41Alderman Cleary.

1:19:42>> I thank you, uh Mr. Chairman. Um I kind

1:19:44of want to echo some of the other words,

1:19:46and I'm glad that they've

1:19:48they're coming in early on this because

1:19:50they said that there has to be an

1:19:51overlap process. And like many of my

1:19:54colleagues here, I've worked in IT as

1:19:56well, and I know that when you're

1:19:58transitioning from one to another, you

1:20:00don't just push a button and it happens.

1:20:02You have to slowly bring things in, and

1:20:05usually it's department by department

1:20:07because IT cannot handle trying to do

1:20:09all those fixes. So, I don't know that

1:20:11it's going to take 1 year or 2 years or

1:20:156 months. But whatever it's going to

1:20:17take, it allows us to be able to

1:20:19transition over and do it as such. But,

1:20:22um

1:20:23to to the other comments about um

1:20:26putting it in the budget, um

1:20:29the the ask should be, if we did put

1:20:31this in the budget, what else would we

1:20:33have to cut? Um whether it be employees

1:20:35or something else like that. That's what

1:20:37I would have wanted to know and I think

1:20:39that this is a priority

1:20:41um because we're going to lose the

1:20:43system. I think all of the items that

1:20:44were here are priority, which is why we

1:20:46did the ad hoc meetings and why we sat

1:20:49and we deliberated and talked about

1:20:52whether or not this is something we

1:20:54could afford, when can we afford to

1:20:57start it, when and so and so it was

1:21:00There's a timeline that everything kind

1:21:01of fell under. Um and I do appreciate

1:21:04though, you know, the saying let's stop

1:21:06Let's stop um

1:21:08doing the things that we're doing. Let's

1:21:10stop creating bonds and so on, but

1:21:12that's also part of the process of

1:21:13having good credit is to maintain a

1:21:16certain bond level,

1:21:17um but drop things off at the same time.

1:21:19I don't know whether or not we're

1:21:20necessarily dropping things off fast

1:21:22enough, but we are dropping them off so

1:21:24that we maintain an an even keel each

1:21:26year. Thank you.

1:21:28>> Okay.

1:21:29Follow me, Connie.

1:21:30>> Uh thank you. I I just also wanted to

1:21:32comment on the process to getting here

1:21:34and how the ad hoc committee has in

1:21:36previous years and this year really

1:21:37worked through all these projects, but

1:21:39what I was trying to get at with my

1:21:40questions that I know everybody was

1:21:41annoyed by is that we have a lot of

1:21:44perspective. We've sat in these

1:21:45meetings, we've gone to ad hoc, we've

1:21:48gone to the library trustees meetings

1:21:49and there can be people people who come

1:21:51to a public meeting who've never heard

1:21:53this and now they're wondering why we're

1:21:55we're bonding $44 million, right? So

1:21:57that's where I think there's an

1:21:59opportunity for us and I'm not saying

1:22:00why won't you to spend hours and hours,

1:22:02but how can we lay out what we've done

1:22:04to date in a little bit more clarity for

1:22:06people so that they understand that

1:22:08actually we did this step and then we

1:22:09did this step and then we did this step

1:22:11and by the way now we're here because I

1:22:13think sometimes people get one glimpse

1:22:15of one meeting and they say, "Well,

1:22:19what is this all about?" And I'm like, I

1:22:20can add up 100 hours where we talked

1:22:22about this and that's why we are here.

1:22:25Um so I just think that there has to be

1:22:27some give and take. I don't want 5-hour

1:22:29meetings for every single project every

1:22:30single time cuz a lot of us have seen

1:22:32these many times. But especially at the

1:22:34public hearing, how do we bring them

1:22:36along in terms of how we got here, how

1:22:39we might have been changing things like

1:22:41to Director Cummings' point about we're

1:22:43now doing it so that we just do the

1:22:44design first. So we have a more accurate

1:22:47but bond budget. We just started doing

1:22:49that. So not everybody follows that um,

1:22:52when they're looking at a spreadsheet.

1:22:53So if we're asking questions, sometimes

1:22:54it's to help everyone else understand

1:22:57how we got here.

1:22:59That's all.

1:23:00>> Alderman Senate, you have a motion?

1:23:02>> Motion to adjourn.

1:23:04>> Motion is to adjourn. All in favor

1:23:05signify by saying I.

1:23:07>> I.

1:23:07>> I.

1:23:08>> I actually didn't do remarks, but okay.

1:23:09>> Motion carried.

1:23:12>> 10:00, say a time.

1:23:14>> Okay.

1:23:16>> Let's say a time, 10:17.

1:23:2110:17.

1:23:24>> [laughter]

```*