2026-07-15 - Planning Board Meeting
Summary
Built from YouTube ASR auto-captions (no speaker labels; names and figures are often garbled).
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| Hayden Enterprises Gas Station Special Permit | 40 | 26% |
| Blue Sky Towers Bond Road Cell Tower | 30 | 19% |
| New England Power Company Snake Hill Road Substation | 24 | 16% |
| Planning Board Online Records and Website Practices | 15 | 10% |
| Flint Road Football Field Lighting | 13 | 8% |
| 360 West Worcester Road Contractor Bays | 11 | 7% |
| Other business | 14 | 9% |
New England Power Company Snake Hill Road Substation
0:18-24:10
- Public hearing on New England Power Company's site plan for a permanent electrical substation (Snake Hill Substation No. 2235) at 29 Snake Hill Road to serve the Amazon warehouse, replacing the temporary substation approved in 2023.
- Applicant counsel and engineers described a roughly 49,300 sq ft yard, an 864 sq ft control house, 8-ft fencing with barbed wire, a 750-foot driveway extension and about 150,000 sq ft of disturbance.
- Board members asked about security, future growth, decommissioning of the temporary station (the fenced compound would remain for storage), wildlife fragmentation, and screening/lighting.
- A Snake Hill Road neighbor called the company a good neighbor.
- Hearing continued to August 12 pending Graves Engineering peer-review items such as a lighting and landscaping sheet.
Hayden Enterprises Gas Station Special Permit
32:49-72:25
- Continued hearing on a gas station / convenience store / drive-thru with five apartments on Worcester Road (Route 20).
- Consulting engineer Al Chua reviewed neighbor concerns (fence, arborvitae plantings, lighting, double-wall tanks, oil/water separators) and announced a hydrant pressure test on the 21st.
- Traffic reviewer Bob (MDM Traffic) said the driveway design is subject to MassDOT, likely requiring a narrower or scored-apron entrance, an extended island, a snow management plan and a gate on the gravel connection to Old Worcester Road.
- Hours of about 5 a.m. to 11 p.m. were floated, and a decommissioning bond was suggested.
- Hearing continued to September 2.
360 West Worcester Road Contractor Bays
73:10-84:00
- Continued Jesse Properties hearing for a seven-bay contractor rental building at 360 West Worcester Road (former mini-golf site).
- Discussion of parking (18 spaces versus 14 or 28 required), no unregistered-vehicle storage, the old public-supply well, and the peer reviewer's request for a defined list of allowed uses.
- Continued to August 12.
Blue Sky Towers Bond Road Cell Tower
84:47-114:20
- Continued Blue Sky Towers / Verizon cell tower hearing at Bond Road, discussed at length.
- Topics: 22 Graves comments, four waiver requests, 91 Bond Road address, removal bond, a decommissioning trigger the board floated at roughly 10 years without a carrier, test borings versus a requested extra basin test pit, and town communications space on the pole.
Flint Road Football Field Lighting
114:26-127:50
- The recreation commission raised adding lights to the Flint Road football field for November-December practices.
- The board suggested a modest site plan modification with a public hearing in mid-September and agreed to waive fees and peer review.
Planning Board Online Records and Website Practices
138:37-153:35
- The board met new planner/planning director Gillan (his first meeting), who discussed posting application materials, naming conventions and agenda format.
- Members were wary of putting engineering reports and personal data on the public web and favored the SharePoint share drive.
- Jane (Planning Board Clerk) and Dylan (Quinn Engineering) appear in procedural roles.
Other business
25:03-30:45, 130:51-138:30
- Approved a reduced-frontage lot for a single-family home (Elliot Berling application, map 70) after plan revisions.
- Votes: ANR for 140 Bond Road (rear) accepted; one-year extension for a North Sturbridge (North Nage) Road reduced-frontage special permit to July 17, 2027; a 61D lot release; all hearings above continued.
Sources
Video
Transcript
Transcript
0:07um being a little after 6:30
0:10um we're going to open the July 15th um
0:132026 um talking board meeting. Um the
0:18first thing on the agenda is the public
0:21hearing for the New England Power
0:23Company. Um, notice of public hearing.
0:26Children board in accordance with
0:28section 2003.26W
0:31and 207.2G of the child and resilient
0:34bylaw. The child board will hold a
0:36public hearing on Wednesday, July 15,
0:382026 at 6:30 in the planning board
0:41office. um in person at the George
0:44Kinsky Municipal Building, 57 Main
0:46Street, Chelton 1507 on the request of
0:50New [clears throat] Power Company 170
0:52dated by Wall Fans, Mass 02451 to
0:56install an electrical substation to
0:58provide power to the Amazon warehouse
1:00facility located at 53 Road. The
1:03property is located at 29 Snake Hill
1:05Road. Um assesses 44, block B, lot 9.
1:10The property is in the agricultural um
1:12R60
1:14um in zone the A R 60 district. Copy of
1:20the site plan application are available
1:21for inspection at the planning board
1:23office in the town clerk's office during
1:25the business hours. Any person
1:27interested or wish to be heard should
1:29appear at the time and place designated.
1:35Then I will open up the
1:37congratulations.
1:38Thank you madam chair. My name is Jody K
1:41from the law firm of Babin Dwey here
1:43tonight with several members of the
1:44project team project manager Ryan Fun
1:48Ryan from civil environment and Alison
1:52Miller nailed it. Um, so Indones
2:00um, so we're here tonight as you
2:02mentioned for a special permit for the
2:04construction and installation of an
2:06electric substation along Snake Hill
2:08Road and Carpenter Hill Road to be known
2:10in
2:12known and as the Snake Hill substation
2:15number 2235. Uh so in 2023, the
2:20applicant sought and obtained a special
2:22permit for a temporary substation um in
2:25support of the phase Amazon facility
2:27construction and is now seeking to build
2:29a more permanent uh substation. Once the
2:32new substation is fully built out, the
2:35infrared substation and feeder will be
2:37removed and retired. So the property uh
2:40if you flip through to the
2:43next slide um is currently comprised of
2:47the temporary modular integrated
2:49transportable substation and the related
2:51equipment and facilities um known as
2:53carpenter hill substation and a 1
2:56megawatt ground mounted solar array that
2:58is currently owned and operated by
2:59national project is necessary to support
3:03the electrical load needed for the new
3:05Amazon robotics location warehouse
3:08Surface Road and to maintain the overall
3:11reliability of electric service within
3:13the town. So, some specific project
3:16details. Uh the project work well
3:19actually if you uh go through some of
3:21the additional slides, there's some
3:23photos of the temporary substation and
3:26what it looks like currently
3:30as well as the intended design of the
3:32project.
3:34Um so what the project scope entails is
3:36a approximately a 49,300 foot substation
3:40yard uh which will include um related
3:44equipment facilities and a control house
3:46building that's about 840 square ft
3:49sorry 864 ft. Um that is just there to
3:53house some of the equipment protected
3:55from the weather. Um some chain link
3:57security fencing which is national grid
3:59standard. um 8 ft with one foot of
4:01barbed wire for security purposes. Um an
4:05approximately 750 foot extension of the
4:07existing gravel access driveway to
4:09access the new permanent uh substation.
4:13Um a retaining wall, bathroom structure
4:15for the employees that are there. Um
4:19various underground systems, storm water
4:21and drainage facilities. Um because this
4:24will continue to be an unmanned
4:25facility. Um we don't anticipate any
4:28impacts to noise traffic like as a
4:31result of the project. Um and then just
4:35for some background information uh we
4:37have been in constant communication with
4:39the town about this project with the
4:41buddies who are actually here tonight
4:43about this project and will continue to
4:45do so and are happy to answer any
4:49questions as stage but we are still
4:52working through some of the comments.
5:04Latest from July 15th
5:08here
5:22have more copies of these
5:36Yeah, I mean you want copies for
5:38everyone.
5:41Yeah, we'll make copies. Well, we want
5:43to see we used to have
5:47no
5:47packets.
5:50Okay.
5:56Well, she's getting
5:58it.
6:01Um, this is also to support country
6:04growth.
6:06What do you expect for future growth?
6:09More renewable energies or
6:13it continues to snow the snow street.
6:19There's two substations in the area.
6:22street substation and there's the hill
6:24substation
6:26and so future growth can you give us any
6:30idea
6:31I don't have the numbers off the top of
6:32my head we have plenty of applicants
6:34that are applying to
6:37build um they're in study right now but
6:40I don't have anything
6:44it would be building that would be
6:46connecting into the new substation yes I
6:48don't know exactly where they would be
6:55because we're [clears throat] being
6:56approved by renewable. So,
6:59um it's nice to know what's coming down.
7:03Now, originally when Amazon came to the
7:05town, we had asked if they were doing
7:07solar and they said not at this time and
7:10now because they weren't prepared for
7:12the energy needs,
7:15we're building more substitutions for
7:17them. So, it's unfortunate that Amazon
7:20didn't also
7:23become like states pushing. So
7:30pretty much anybody can tie in this
7:34um meaning that if there was another
7:36another fund
7:39facility this is another opportunity
7:41then additional fund.
7:51Where's the temporary substation
7:54on the map? It's south.
7:57It's right up north, right? Yeah, it's
8:00it's south of the solar array.
8:02Solar
8:06unit,
8:08the cleared area.
8:11Does that substation go all the way? Is
8:14it connected to the Carpenter Hill
8:17substation? Now that temporary port,
8:20so the temporary one is connected in
8:22through our W123
8:24uh transmission line.
8:25Yeah.
8:25The W123 runs from Still Street to Cover
8:28Hill substation.
8:29Yeah.
8:29We're going to be tapping E173 which
8:32runs parallel to the W123
8:35and also goes from street to Hill.
8:37So you're using W123 right now
8:41currently for the for the temporary.
8:43Yes.
8:43And you're disconnecting that? We will
8:45disconnect it in the future after this
8:47new permanent is online
8:49and use one.
8:51Correct.
8:54This is
8:5915 vol
9:03which is 173.
9:05Correct.
9:14What's the 132? What's the slash? Drop
9:18it down to 13.2.
9:19Yeah. And then it distributes,
9:22correct? Yeah, it steps down. Yeah. So,
9:24you take in on the high on the 115, then
9:26it steps it down to 13.2.
9:32You said this is going to be an unused
9:33station,
9:35correct? Correct.
9:36Will there be any security around this
9:39at all? Do we need security around this?
9:42The uh typically the so the 8 foot high
9:45up fence with the one foot of barge wire
9:48there's gates just a substation which
9:50will be blocked unless there's
9:52maintenance coming. Um, in my
9:54experience, there hasn't been any major
9:56further.
9:57I mean, you know, like because anybody
9:59could come up with a set of wall
10:00cutters, whether it's an 8 foot high or
10:02a 20 foot high or 3 foot high to get in.
10:06I'm not picking at it, but I'm just
10:08wondering,
10:09you know, this is coming in. Should
10:12there be also security, you know, should
10:14be a security company watching over
10:17something.
10:23No.
10:24Have you had problems with any of the
10:26other substations?
10:27No.
10:34So the the other substations that are in
10:37the areas and carbon hill are also unb
10:42Sure.
10:45I think if there was a need for it, we
10:47would certainly want to ensure our
10:49equipment.
10:51very dangerous.
10:57Excuse me. Did I interject?
11:01So, we look AC right under it on Snake
11:03Hill. We live right across the street
11:04and we always keep a close eye on the
11:07premises.
11:08So, we're just going to we just the
11:10typically what we do is we let the board
11:11ask questions and then we'll we'll open
11:13it up and all the public can make as
11:14many comments as as they want.
11:17Um,
11:22not that we don't want you to ask
11:23questions.
11:26Madam Chap, do you have a
11:28decommissioning plan for this site? It's
11:32not part of what we've submitted right
11:35now, but the decommissioning plan would
11:36be after the permanent substation is
11:39fully built and commissioned, we will
11:42then take an outage to be able to cut
11:44over the old into the new. Decommission
11:48the old. Right now, the old one has a
11:52block wall, retaining wall that's called
11:54holding up the substation
11:56fenced in. They're going to remove
11:58everything, leave the
12:00compound itself with the fence,
12:03but otherwise everything will be removed
12:05as soon as it's permanent.
12:07Why leave the compound with the fence?
12:09Sorry.
12:10Why leave the fence up?
12:12Um, not restore to potential potential
12:15storage for for other projects or for
12:17for maintenance uh pieces with this
12:20project.
12:21I I seem to recall that that the plan
12:23was to completely remove it according to
12:26the
12:28substitution and I thought it was going
12:29to go back to the settings what I
12:31remember but we can look that site make
12:34sure
12:35yeah I don't know if the plan was to
12:37complete or remove it
12:38I can look into it
12:41will you pull the um the temporary the
12:45paperwork from the temporary ones um not
12:47not right now but for the next meeting
12:48so we know what the what the
12:50commissioning details are and stuff.
12:52Thank you.
12:55Um so Are you continuing to lease or own
12:58the temporary substation property?
13:03New England Power owns the whole
13:05Yep. The whole the whole lot. So there's
13:06no lease.
13:07Yeah. So you're continuing to own it. So
13:11do something else there.
13:13Correct.
13:16Do you have a um decommissioning plan
13:20for the new substation? Can we get a
13:23decommissioning plan for the new
13:24substation?
13:26to to remove the substance.
13:27Yeah. What's the
13:29substance?
13:33Oh, I I have to get back to you on that.
13:35I don't think it's been considered that
13:37we would ever approve it.
13:38Yeah. Just
13:41Yeah. I mean, we we typically have um we
13:44do asset condition reports to determine
13:46the um the life expectancy of equipment
13:51after it's been commissioned. Um, and we
13:54typically don't decommission the whole
13:56substation. We um replace failing
14:00materials before they're going to fail
14:02and it turns into an emergency. Um, so I
14:06I don't think we have necessarily a
14:08decommissioning plan for the permanent,
14:10but we definitely have maintenance that
14:13happens and they try to determine, you
14:16know, does anything need to be fixed?
14:18Yeah.
14:22How about I mean do we should we
14:24entertain uh conditions on storage of
14:30old equipment or
14:33removal
14:34replace equipment instead of
14:38so it's not going to end up being a junk
14:40I don't think we've done that before and
14:42I don't see problems with any of the
14:45other you know that's that's usually
14:47recyclable material
14:52Um
14:55question.
14:58Um how much how much of is left to do
15:01for the grace report to satisfy that?
15:03How long do you think it's going to take
15:04it to get everything you need for
15:08oh the the peer review report for this
15:09project? Yeah. Um, I mean, I I don't
15:13want to speak for the the entire civil
15:16team, but I didn't I don't think we
15:18identified any glaring issues with it
15:20upon our review. It's just a matter of
15:21providing the civil plan updates. Um,
15:24like a a sheet showing the lighting, uh,
15:28the landscaping, which is mostly
15:30[snorts] just like receding of of the
15:32substation. Um, so items like that, the
15:35more cleanup items that we just have
15:37time to address for this meeting. But,
15:40um, I think we're we're hopeful that by
15:42the next meeting, we'll have a clean
15:43fill out.
15:44Okay. I'm looking at it now. So, most of
15:46it's been acknowledged by by Graves and
15:49just
15:52I have a question again. I'm sure the um
15:55looks like it's twice the size of the
15:57temporary. Is that correct?
16:00Just by the I'm looking at the your
16:05This this new substation here is going
16:07to be just under 50,000 square feet. I
16:09don't know what the split is of the
16:12temporary substation.
16:13It's it is fairly small.
16:16Um and you own the whole parcel.
16:20Um what keeps happening in town is um
16:24wildlife fragmentation as we're taking
16:26large tracks of land,
16:28removing all the trees and fencing it
16:30in. So everybody's complaining bears all
16:33over, but again, is there any way
16:38to maybe designate some open space that
16:40you're not going to expand upon to kind
16:44of help the town keep some kind of its
16:46charm of wildlife and healthy corridors?
16:52So I know generally speaking u we are
16:55the company is subject to um like safety
16:58codes regulations that kind of prevent
17:01us from committing certain things. You
17:03know we certainly wouldn't want to
17:04encourage people to walk through the
17:07property.
17:08Yeah.
17:10Um
17:11otherwise I'm I I have concerns that
17:14there's going to be build out from there
17:17all the way to room 20 because there are
17:18some large parcels and some the state
17:21owns the building rights on some. So
17:24my understanding is that there are some
17:26challenging wetland um on this property.
17:30We have a conservation hearing tonight
17:32actually um that we're going through
17:35that process. I don't know if it's
17:37usable. I know as a general practice we
17:40don't like to say that we'll never do
17:42it.
17:45We don't like having things forced to we
17:48would be right back here before you
17:50again if we were to expand. So you would
17:52have the opportunity at that point.
17:59Is this a retain in front uh between you
18:02and the solar field?
18:05Yep. That's a retain wall on the fence.
18:08And just that any other retaining wall
18:11around the property or just that one
18:12between you and the solar?
18:14Uh that's definitely the most
18:15significant one. Um there might be
18:18depending on where the design goes. A
18:21couple more this area here. Um but more
18:25of a head head wall.
18:26Yeah.
18:29Uh yeah.
18:32Um yeah. So we're working through um
18:34working through that design now. So
18:36don't have the final answer there but um
18:40it will definitely involve some sort of
18:41this is for the temporary
18:43but it should be less significant than
18:46well this is what the original
18:54Y this is for the temporary
18:57temporary substation this is a follow on
19:02what is on station currently temporary
19:05most recently received
19:08this month July
19:14you don't have a copy of the grace sheet
19:15the latest
19:16for the phase three I don't have a copy
19:19on
19:21this is just a completion
19:22is that the completion review of uh the
19:26final completion review number two
19:28for the temporary
19:30so that's going on at the same time
19:32we're um you know we're working on
19:34closing that one out. I think the only
19:36remaining uh item is the rain garden,
19:40but we're working as
19:47Sorry, I wish I had it with me, but we
19:50haven't really had the opportunity to
19:52have a full response to those.
19:54You just consume it.
19:55Yeah, I mean,
19:57well, we can get some input from
19:59So, let's take some um Are we all Do we
20:01have any more questions from the Let's
20:04take some audience questions, comments,
20:06concerns. Um,
20:09name.
20:11Yeah. And just when you speak, just
20:13please let us know your name and your
20:15address for the record.
20:17Rain and Kendra underw
20:21State Hill Road. Um, we've lived through
20:24the solar project and the temporary
20:27project in 2023.
20:30Not that we like change, but we've got
20:32to say that for has been a good
20:34neighbor. They've been very considerate
20:37of um things that are happening when the
20:41road's going to be closed and and we
20:43appreciate that.
20:46So, as as much as we hate to see the
20:48wildlife disturbed,
20:50we have to go with the change.
20:53I mean, honestly, I haven't we haven't
20:54seen the graves report, so I can't we
20:56can't talk about this screening or what
20:59what have you guys seen. Um I don't I
21:01don't have anything yet, but we we go in
21:03the future so we can see what what you
21:08appreciate that that um that you're kind
21:11of overseeing too. I mean
21:13it's hard to see the change but um
21:15they've been very very considerate.
21:21Any other questions?
21:24So
21:27I don't have a very so I don't know if
21:29what's open but when do you want to come
21:31back?
21:32Uh the next available meeting in August
21:35the 19th I think.
21:38So
21:39do you do you have um the amount of
21:42clearing that you're going to do? It's
21:43tough to tell from these
21:45the uh limit of disturbance.
21:46Yes. Yes. Is it
21:50more?
21:51It's a It's a bit small on the plan, but
21:53it's also on here. It's
21:54okay.
21:55A little over 150,000 square ft of
21:58disturbance.
22:00Okay.
22:00Yeah.
22:02Isn't all tree clearing?
22:08I was just kind of uh curious what the
22:11visuals would be like from from Cap Hill
22:13or or
22:16Yeah. I mean, I want to see what our
22:18like what any others are seeing and make
22:20sure that they're not looking at a big
22:22building or anything like that. So, we'd
22:23like to if so, we would want some
22:26screening and stuff, but it
22:27it does look like it's deep into the
22:28woods. Just
22:29it's very far back. It's I mean, we're
22:32extending it from where it is now,
22:34basically an extra 750 ft in. So, it's
22:37going to be pretty far away. The only
22:39building is going to be that control
22:40house, which is only
22:4124 ft in height. Just clearing for the
22:44the access not around the access,
22:46right?
22:48How high it goes.
22:50That's a good question.
22:52I believe the terminal structure might
22:55be 50 ft. Not sure. So, so we can get
23:01back to you.
23:02I know there's one expansion going on
23:03now where in some spots, some of the old
23:06wooden ones, they're going up 25 ft.
23:09So, just for the neighbors to know
23:13how far lighting or anything like that.
23:15I just haven't I typically we see a plan
23:19or something. We kind of did this a
23:22little bit off day. Um so we'll be more
23:25prepared for the next meeting. Um,
23:30we'll be able to go through Graves
23:31comments in
23:34one of the missing items from the GRE
23:36report was having like some form of
23:38lighting sheet that shows what it is,
23:39but it's going to be like typical cast
23:41lighting like for the substation itself
23:44like the substation here. It's not going
23:45to be like holes everywhere.
23:51So when
23:54August 12 make a motion to continue the
23:57applications for a New England Power
23:59Company site planill road to the 12th of
24:02August.
24:03Second
24:11we're going to do
24:19Oh, you're
24:21I just have my notes.
24:30Take care.
24:41Do I have a notice for the
24:47put
25:00in section 25.13
25:03and 27.2
25:06dialogue. public will hold a public
25:08hearing on Wednesday, July 15th, 2026 at
25:126:35
25:14p.m. in the cleaning boat office with
25:16George King Street building 37 Main
25:18Street and Mass on the application of
25:20Elliot Berling sign
25:2396 number six road 57 for approval of
25:28one proposed reduced frontage lot
25:30totaling five five acres to construct a
25:33single family home on said lot of AF
25:36Putinham um child mass assess map 70
25:39block 8 lot 8.5 8.6
25:42and 15 said property is zoned
25:45agricultural. Copies of agree permit
25:48application are available for inspection
25:50at the planning board and town clerk's
25:52office during regular business hours.
25:56How you doing?
25:58Jason Newboy, DC engineering and survey.
26:00Um I do have new plans. Basically, we
26:03talked to Dylan yesterday and um Kurt
26:07informed us that at the May change
26:09setback.
26:11Um just changed that on the plan. It
26:13showed a um 30 foot signed
26:28line.
26:30Yep. And then the 200 road.
26:33Um also this this did go to Graves
26:37and they had a couple of comments.
26:42One was to just show proposed house
26:44location. Uh the note about the lot
26:47can't be further subdivided.
26:49And then you just had a question about
26:50the the requirement note that we had on
26:53there.
26:57Okay. Thank you.
26:59But basically, um, they're cutting out
27:02the lot where the house is now, which I
27:04believe is 93
27:07and they're going to have 5 acres
27:08remaining with the 50 foot minimum
27:12frontage
27:14and the access strip is 163 ft, which I
27:17believe it can be up to 600.
27:24That's 75 ft here.
27:28Uh, yes.
27:30Actually, there's another little strip
27:32of 12, too.
27:35So, there's like Yeah, there's like
27:36almost 90.
27:42What's it WC?
27:44Uh, what's the
27:49That's not a property.
27:52It's just a
27:53Yeah.
28:00Is that
28:01utility?
28:07Yeah. Yeah, that is right in front of
28:08us.
28:12But that won't drive.
28:14Yeah.
28:22So, did you say that 93 was going away?
28:25Is that
28:26That's that's on the Yeah, that Yeah.
28:28So, we did an ANR on this like maybe a
28:31month and a half ago because in the back
28:33that lot 99.1 was added to this whole
28:36thing to make this so that it' be 5
28:37acres. Um, but now yeah, they're cutting
28:40out the house which I think the house is
28:41about ready to
28:42go to market at this point.
28:45Okay. Yeah. Well, I got
28:47this was added from the neighbor
28:50to this piece and they get to 5 acres.
28:54get over here.
28:55Yes.
28:56Yeah.
28:57Yeah. That farm is the minimum area,
28:59but it's not that
29:01it's on a contract as a purchase and
29:03sale. Okay.
29:04Yeah. All right.
29:05But they don't it's kind of contingent
29:07on this on this because they're not
29:08going to buy it if they
29:10So they haven't done an ANR to split
29:13this out yet.
29:14Um well, it would all be done like on
29:16this plan.
29:16Okay. So this is Okay.
29:19Which split that one out.
29:23There's two things that's happening.
29:24They're splitting this lot off of this
29:26and creating
29:27one as well.
29:32Yeah,
29:37that's another that's a separate parcel
29:39owned by the same person in front
29:42of that in that piece.
29:44It's just a landlock piece.
29:51Yeah.
30:05[clears throat]
30:10Any questions?
30:16Other questions?
30:22Make a motion to approve the uh reduced
30:25frontage lot for early game
30:32number
30:33one.
30:36Second.
30:45You want to sign the mail?
30:46Yeah, we can come back tomorrow.
30:50We can
30:52do it. I mean, unless you really want to
30:54come in here and visit the planet,
31:04we'll walk
31:06around.
31:20You want to get it?
31:30I didn't want to catch
31:35you already.
31:36Yes. Thank you. I think that went around
31:39first.
31:40Thanks.
31:53for you. Okay.
32:14Perfect.
32:28Thank you.
32:29Good night.
32:43We have session to local birth report.
32:46I will we are um
32:49we have a continued public hearing for
32:52um Hayden Enterprises
32:55uh LLC for the special commit for the
32:57proposed gas station um convenience
33:00store located on Wester Road.
33:07Yes, you meet with
33:29Okay. Uh, good evening, uh, madame
33:31chair, members of the board. For the
33:33record, my name is Al Cuba. I'm a
33:35consulting engineer with offices at 112
33:37State Road in Dartmouth, Massachusetts.
33:40This is our second time here. security
33:42call back in June on June uh 17th we
33:46came to this board. It was the first
33:48meeting and I as I indicated at that
33:50time it was kind of an introductory
33:52meeting to introduce the project and get
33:54some feedback from the neighbors and and
33:57the residents. Uh so just a quick recap
34:01uh I know you have a new uh planner and
34:05also you have a monthly hearing tonight.
34:08just take a couple minutes just to walk
34:10you through the projects uh and also
34:14bring you up to speed to what happened
34:15between the last meeting and and and and
34:19tonight. So, basically, we're here for
34:21the uh proposed gasoline filling station
34:24with a convenience store and drive-thru
34:26with five residential units on top. And
34:30the project is located at the
34:32intersection of Worcester Road and Old
34:34Worcester Road. I do have an aerial
34:36mapping here showing also the
34:39surrounding uh residents and I have some
34:41distances too because I was here last
34:43time and I know that some of the
34:45residents were here that were concerned
34:46about this project.
34:48Uh so the the the uh
34:50can I turn this towards the camera?
34:52Oh, absolutely. I'm not sure. I think
34:54that's what I did last time but
34:56just
35:00beautiful. You should see this
35:03watching TV.
35:05This is this is the site. So the site is
35:08is is located in the community business
35:11and it's about 4.7 acres. Uh most of the
35:152 and 1/2 acres in the front was uh
35:18graded and uh and uh uh uh associated
35:23with the gravel operation on sites which
35:26has been going on for decades. I believe
35:29uh access to the site is via existing
35:32gravel driveway from older road. Uh as I
35:37had indicated before about 2 and a half
35:40acres of the site um were disturbed. Uh
35:45the uh uh the proposal is for the
35:47gasoline station as I indicated last
35:50time too a gasoline filling station is
35:52allowed use as of right in the district.
35:55We're here for the drive-thru, special
35:57permit, and the mixeduse with the
35:59apartments on the second floor. Uh, let
36:02me just quickly go through some of the
36:04concerns that the residents had at the
36:07last time. I think they were concerns
36:09about lighting, concerns about
36:11screening, concerns about noise,
36:13concerns about environmental. Uh, so
36:17with this sketch, I could tell you that
36:19the closest resident to this is about 44
36:23450 ft. This guy is for 580 and they all
36:27numbered the addresses. This guy is 525.
36:31A big portion of the of of vegetated
36:34area separates the project from the
36:36residents, but I understand we're not
36:38here winter time and we lose this. So we
36:42we we propose to
36:45uh
36:50provide and I sent the memo to the to
36:52the board last to the planning board
36:55last time. I'm not sure if you got my
36:56memo, but basically what we've proposed
37:00to shield the residents from the
37:02activities on site. We propose a fence
37:05all along the the south and the east of
37:09the of the property. It's going to be 6
37:12foot high um wood fence, cedar white
37:16cedar fence. We do have a small retainer
37:20wall in the back in order to not to do
37:23any grading within the uh buffer of the
37:27wetland and also we have guardrail we
37:31have some planting arboritis in the back
37:34behind the fence. So, we understand in
37:36the winter time you lose the the the the
37:38the
37:40buffer with the leaves and so at least,
37:43you know, they're concerned about the
37:44lighting and people turning with the
37:46drive-thru and so that's not going to
37:49happen. Uh, also there were concerns
37:51about the lighting from the gas station.
37:53I would just indicate that at the last I
37:57think with this package and the last
37:58package we did submit the photoometric
38:01uh uh projection of the project there'll
38:04be no spillage of light on adjacent
38:07properties or streets. We comply with
38:09the zoning bylaws. Uh there was concerns
38:11about the traffic. Also, I do have the
38:14traffic engineer here tonight and I will
38:16leave it up to the traffic engineer, but
38:18the traffic engineer was working with
38:20your traffic engineer and I'm not sure
38:21if your traffic engineer is here
38:23tonight. I I'm hoping Okay, great. So
38:25they can I'm yeah I think I believe most
38:28of the concerns been addressed but they
38:30can they can uh uh
38:34uh confirm that uh the uh
38:38uh traffic lighting environmental uh
38:41there was also concerns about uh uh the
38:46uh environmental and I indicated last
38:49time that you know all the tanks would
38:50be double wall tanks [clears throat]
38:52with 24-hour monitoring and also on the
38:55on the storm water uh system. We do have
38:58installed in emergency valves in case
39:00there's a large spill on site that those
39:03valves can closed off and then will
39:06prevent any any
39:08oil from going either into the ground or
39:11the uh and just to let you know also the
39:14all the catch bases on site are are
39:17equipped with with oil water separators
39:19and they have a 4ft sump. are each
39:22something hold about 350 to 400 gallons
39:25of gasoline in case there's a any any
39:29spillage on site. Uh we do have also you
39:33probably have your report from the civil
39:36peer review. Uh at the first excuse me
39:39the first submission I think there was
39:41about maybe 46 comments.
39:44Not all the comments are addressed.
39:45[clears throat] there's still some com
39:46comments open but I would say 75 to 80%
39:49of the comments were addressed and we
39:51anticipate to resolve all the rest of
39:53the comments at the next submission.
39:55Uh also there was a concern about the
39:57water system and and because of the the
40:01residents were concerned about the
40:02pressure I did a uh schedule a pressure
40:07test and it's it's on the 21st at 9:00.
40:11So based on that
40:13from the hydrant
40:14from the hydrant. Yes. At the the
40:17hydrant at the end of uh
40:21old wuss.
40:23Yeah. Because this is where we're tying
40:24to the line. So depends on the on the
40:27pressure test results. If we don't have
40:30good pressure, the pumps are gone. We're
40:34not going to have that. So that's not
40:35going to be a concern. We we take safety
40:38very we don't take it lightly.
40:41We understand and uh
40:42what what pressure are you looking for?
40:44What's the requirement?
40:46I I think normally it's normally 40 40
40:49PSI is the minimum that most of the
40:51state and towns go by. But I I it's not
40:54my specialty. I hired the mechanical
40:56engineer. He's going to do this test and
40:58he's coordinating with the fire
41:00department. So depending on that, if we
41:02have a good pressure,
41:04we'll keep the promise. We don't have
41:06good pressure. I think we probably take
41:07those out. Right. Uh and again uh uh the
41:14uh
41:16uh we'll be complying with all uh there
41:20was few comments that were left open to
41:22the fire department and I think the
41:24traffic engineer will will speak to that
41:26and mass DOT because as you know route
41:2920 is under jurisdiction of mass DOT so
41:31if there's any changes on on the traffic
41:34uh patterns or any changes to the curb
41:37cuts We will have to come back to the
41:39support with the revised place.
41:41Do you have any feedback from Mass Dot
41:42yet?
41:43Uh not yet with Mass Dot, but uh you
41:45know ultimately Massdot will not act on
41:48the application until we have all the
41:51local approval. So we can probably uh
41:56uh condition
41:59um in the is there a slow down lane to
42:02turn into the curb cut or to turn into
42:05the facility or
42:06not at this time but this is going to be
42:08reviewed. I think this is will be part
42:09of mass DOT review. So
42:12I mean that is a lot of heavy traffic
42:14along there and
42:15to get traffic slow traffic out of the
42:17way to turn it would
42:19right and I think the traffic
42:21consultants probably best answer this
42:23question but I think it's that would be
42:25reviewed under the the curbcut the
42:27location of the driveways this you know
42:29confirming the site distance and the
42:31speed and the width and you know all
42:34that will probably be reviewed by Mass
42:36or whoever has juris jurisdiction over
42:39the
42:41Uh at this I mean at this time I would
42:43like to answer any questions but uh as I
42:46indicated the traffic engineers here too
42:49and he would be able to answer any
42:52questions.
42:53Can we [clears throat] um I don't think
42:55we've seen the report the traffic report
42:57or or is there something you can you can
42:59talk about?
42:59Sure. Um just by way of introduction I'm
43:02Bob Misho. I'm the managing principal of
43:05MDM Transportation Consultants. We've
43:07done a number of reviews through the
43:09years for Charlton and so we've uh
43:11conducted a thorough review of this
43:13project. Uh we've suggested additional
43:16information and analysis which has been
43:18provided to us. Um I don't need to go
43:21through point by point but I'll hit the
43:23highlights. Um
43:25we uh we've cited and Mr. Chu has
43:28correctly pointed out that the driveway
43:30designed and orientation will be subject
43:32to mass DOT review. Um it is Masio Key's
43:36preference to have um as few driveways
43:39as possible on State Highway. Uh and so
43:42at in part of our earlier commentary,
43:45[clears throat] we inquired about the
43:47status of this connection, this gravel
43:49path to Old Worester Road, which uh
43:52would allow, if it were formalized, um
43:55[clears throat] one means of getting to
43:56the signal to be able to make a left
43:58turn in particular. Um I suspect DOT
44:02will ask the same question. Uh but our
44:04understanding of the plan is that that
44:07uh will remain a gravel way uh for
44:09emergency egress or access purposes. Um
44:14we would defer to the fire department on
44:16their specific requirements for the
44:17gravel path if it's to be used for that
44:20purpose. We want to make sure that the
44:22structural loads, the H20 loading that
44:24is required is is met for that gravel
44:26way. And we would discourage the use of
44:29the gravel way by uh suggesting that it
44:31be gated on the old West Wister Road
44:33side so that it's not confusing for
44:35anybody. Uh you know, no one um suggests
44:39that might be used as a shortcut. Um so
44:42that that remains kind of an open issue,
44:43but um I think as the driveways have
44:47been most recently modified, um it does
44:50partially at least dress address some of
44:52our initial comments. Um we noted that
44:56in the initial [clears throat] design um
44:58the driveways were intended to be enter
45:00only on the west driveway and exit only
45:02on the on the east driveway. And because
45:05of the orientation of the signal, we
45:07were concerned that the easterly
45:09driveway uh would require that vehicles
45:12get to the so-called U-turn lane uh to
45:15cross over several lanes in a rather
45:17short distance, particularly because the
45:20queueing from that signal goes back to
45:21250 ft. Um, and so the design change
45:25that was made was to convert the
45:28westerly driveway to a right and right
45:29out. So it afforded the ability for
45:31somebody to make that turn further
45:34downstream and and and um we we
45:38acknowledge that that's a benefit. Um
45:40the commentary that DOT might have on
45:43that is that the width of the driveway
45:46because it's designed for those larger
45:48WB67 sweeps is very wide. Um, and it
45:53would encourage higher entering speeds.
45:56Um, and because you've got a mix of
45:59traffic, uh, people who may be living
46:01here getting to the driveway or leaving
46:04from a pump to get to the driveway,
46:06crossing over those [clears throat]
46:07higher speed volume vehicles.
46:09Um, there's u a potential that DOT would
46:13request that the width of the driveway
46:16be tightened a little bit and there are
46:18ways to do that. Um there's score
46:20concrete mountable features that could
46:22be introduced that still allow for the
46:24larger sweep but encourage passenger
46:27vehicles to to be more careful if they
46:29come in. Um so we're we're deferring u
46:33to mass DOT's ultimate determination
46:35here. Um, I think the the access as it's
46:38laid out is reasonable
46:41um subject to additional changes that
46:43DOT will most likely ask for. Um, as it
46:47relates to circulation, we just want to
46:49make sure that the fire department um is
46:51comfortable with um the vehicle type
46:54that was used, it's a 48 foot long uh
46:57tower vehicle. I believe it's
46:59reasonable. Um it does show that it has
47:01adequate ability to get into and out of.
47:04Um the one concern really relates to
47:07wintertime conditions is the snow
47:09storage. It's not typically something
47:11that we comment on uh because we're
47:13we're kind of confined to access and
47:15circulation. Uh but the storage areas
47:18are actually contained within the paved
47:20areas of the site and they're rather
47:23narrow frankly. Um, so we're just
47:25questioning the practicality of certain
47:28snow storage areas, um, in the volume,
47:32the actual volume of snow that they
47:33could contain, uh, and whether or not,
47:36uh, there there might be a practical
47:38outcome of those storage areas kind of
47:41being larger than they're shown on the
47:43plan, uh, which could impair
47:45circulation. So, we're suggesting that
47:47there be a snow management plan here so
47:49that snow be removed from the site to
47:51the extent it has any potential in
47:54circulation. Um, and you don't want to
47:56have snow melt happening during winter
47:58time when these large uh, you know,
48:00masses of snow just freeze thaw
48:03situations happen. It's it's not ideal.
48:06Um, we understand the applicant can uh
48:09confirm whether or not there's any
48:11ability to have those snow storage areas
48:13on landscaped areas off of the paved uh,
48:17area. There may be some environmental
48:18sensitivities to that. I don't know. uh
48:21that that's this may be part of the snow
48:23management uh plan that we're suggesting
48:25we produce um as it relates to um other
48:29aspects to the project. They've
48:31addressed our series of comments related
48:34to adjusting trip generation and and
48:36distribution assumptions. We're
48:38comfortable with the analysis. We
48:40believe that there's ample capacity uh
48:42to accommodate this particular use as um
48:45a substantial number of the vehicles
48:47that would be using it are in fact it's
48:49known as pass by especially for the uh
48:52coffee component. Uh we did suggest
48:55formally designating uh resident spaces
48:58so that they're not parked by commercial
49:00entity use. They've done that. Um and uh
49:06uh you know as far as the drive-thru is
49:08concerned, they have ample on-site
49:10storage capacity for that queuing area.
49:12We do not expect it to influence the
49:15[clears throat] parking field. They
49:16believe they can stack at least 10 and
49:18perhaps closer to 12 vehicles around the
49:21periphery of the building in the
49:22landscape area before those vehicles
49:24would would have any influence on the
49:26circulation site itself. Um so uh
49:29generally uh you know they've been
49:31responsive to the comments but for those
49:33series of remaining questions uh and uh
49:36certainly uh you know anticipate some
49:39change to the driveways basically in
49:41place
49:42is it so as far as a slow down lane pull
49:45into that something DOT would
49:48um you know it's they in in very unique
49:51circumstances would require a
49:53deceleration lane uh for commercial
49:55properties along Route 20. It's not
49:57common.
49:58Um, but they may require uh what's
50:00called a transition taper. Uh, which is,
50:03you know, angling the curb radius in
50:05such a way that it facilitates a higher
50:08speed movement that gently decelerates.
50:11Um, the issue there is going to be the
50:13width of the driveway. You don't want to
50:16have this, you know, a vehicle coming in
50:18at 50 miles an hour slowing down to 30
50:21in in this kind of an environment. So
50:24that is a likely uh likely change that
50:28would see.
50:29So that's that's one of my concerns in
50:31that area. You do get some high-speed
50:32vehicles that are exceeding the limit
50:35there coming into that light. Now we do
50:37have a light there to slow people down,
50:39but that's a little bit before and it's
50:41it's always been a problem,
50:42right?
50:43And I'd hate to see something happen
50:45there.
50:45Yeah, it's we have you know we've
50:47designed many sites like this throughout
50:49the Commonwealth. Webster most recently
50:51actually had a very similar
50:53circumstance. Um, and what happened
50:56there is we've extended the island
50:59feature more in inbound to the site. So,
51:01it provided better separation between
51:04inbound and outbound vehicles. So, those
51:06types of changes could be things that
51:08DOT suggests as part of that
51:10modification to address that issue.
51:17This miss shot. There's a that's a
51:19controlled signal intersection to the
51:22right.
51:22Yes.
51:23How many feet?
51:24600 something 700 ft down.
51:27Yeah. The driveway itself, the easterly
51:29driveway is 350 ft from where the signal
51:32is.
51:32Okay.
51:34Is there any possibility to make the the
51:39sole uh entrance and exit to the side
51:43street rather than 20
51:46to to exit cars onto the side street and
51:49then pull into the gas station?
51:51Uh well there's a couple of issues. I
51:53think I we we've responded to that
51:55comments. We looked at this. I mean it
51:57we like to have a side entrance. It
52:00helps us in the business too. But the
52:03problem is if you've been to the site, I
52:05mean we have an issue with the grades.
52:08We have a grades about 10% slope. So in
52:12order to make it work with heavy
52:14equipment, I mean heavy vehicles has to
52:17be large enough.
52:19So you're talking about impact to the
52:21wetlands and we have to deal with the
52:23storm water because we can't leave it
52:25gravel. Obviously it has to be paved.
52:27Sure.
52:28And then at the end what do we collect?
52:30We don't collect the water. We don't
52:32have enough root. We have to collect it.
52:34We have to treat it. You can't put a
52:36structure because basically you're right
52:38at the at the water elevation. So it's
52:42it's an issue for it's an impact on the
52:45wetlands. I have a meeting tonight with
52:47with the conservation and I was going to
52:49just test, you know, see what they're
52:54feeling about this too. But it has to be
52:57at least 24 ft wide or maybe 26 ft
53:00because of that kind of you know traffic
53:03and then uh it has to be paved and we
53:06have to deal with with uh you know I I
53:10think that was the recommendation that
53:12it was from Mr. Mishaw to do a a full
53:16exit full enter exit driveway here. That
53:19helped a lot with what we wanted to do.
53:21And again, you know, with
53:24we still have to go through a massive
53:26that side road is someone who uses
53:29anybody on this side of Hamilton uses
53:31that road all the time
53:33and it is um in the morning they if if
53:37that was an exit there'd be no way they
53:41they'd sit there because there'd be a
53:42line of cars trying to get all
53:46it wouldn't it wouldn't work. And then
53:49the just the visual part of when people
53:53turn from 20 onto that
53:55um onto older it you wouldn't you would
53:58you wouldn't get out. It wouldn't it
54:01wouldn't I can tell you from personal
54:03experience.
54:03No I mean with the revised place I I
54:06didn't mention this before but we do
54:08have the gates because that was actually
54:10one of the recommendation from the peer
54:12review. So nobody will would access from
54:15the public would be able to access the
54:17uh uh uh old wor.
54:20We certainly don't want people pulling
54:22up and going around in in the in the
54:24We do. We left it as an option for the
54:26fire department. If the fire department
54:28doesn't want doesn't need it, we'll be
54:30glad to just uh seat it and leave it
54:33there and you know put a gate at the
54:35bottom and nobody can access it through
54:37you. So really it's not uh for us it was
54:41more problematic with with with also
54:43with permitting because of the wetlands
54:46and because of the grades it would
54:48requires you know retaining walls and
54:52you know and impacted the wetlands and
54:56so what does the drive drive through
54:59support what type of business
55:00the drive-thru?
55:01Yes. uh would support I mean we don't
55:04have anybody yet in in mind but
55:06what's what's the intention in coffee?
55:09Yeah. Connect a coffee shop. Yeah.
55:11It's like what we do with every
55:13McDonald's or you know it's going to be
55:16fast food.
55:17Yeah. Yeah. I mean we have like 1100
55:19probably,000 square feet. This is
55:21typically what you see with every gas
55:23stations, you know, like a coffee shop
55:24and we don't have a tenant yet, but we
55:28usually do if we if we have the
55:30permitting rather than coming back to
55:31the plane board and we're here. So, you
55:34know, that's good. So, we can condition
55:37that to be
55:38absolutely
55:39in through the chair. How about
55:41operating hours? Is that something?
55:44I'm sure neighbors don't want to open
55:45it.
55:46No, this is not going to be a 24. I
55:48mean, I have my uh the hours will be
55:51probably 5:00 in the morning till maybe
55:5310:00 at night.
55:5511 or 11 or summer time, maybe 11 or
56:00Yeah. 11:00
56:01just in case
56:045 to 11.
56:06You also mentioned um some visual screen
56:09some on the [clears throat]
56:11south
56:12south side. It's not listed on any of
56:14the plants. You have a landscaping plan.
56:16Should I miss it?
56:19I see the
56:19Houston red. We have 25 of them on the
56:22first uh the uh
56:28it's on the on the land.
56:31Uh
56:32this is the landscape schedule, but
56:34there's nothing here.
56:35Uh I
56:37What's the date?
56:40I just know it was a concern of the
56:42above.
56:43Yeah. No, no, we we do have it. I don't
56:45know if you have the has updated plan.
56:49Uh my plan shows 30 25
56:52the eastern red seed.
56:55And what is the size at
56:58planting? Uh be 2 in I believe 6 to 8 ft
57:01high.
57:02Okay.
57:03Cuz as you know we takes a long time.
57:05I know. No, we know those are fast
57:07growing. You know we're we do this.
57:10Okay. Trust me. I know.
57:11And with the fence it's going to help.
57:13And the reason I didn't go with the I I
57:15I I wanted the wood because the wood
57:18drove this sound better. And as I
57:20mentioned, I think the closest resident
57:22to these to this speaker is about 450
57:26ft. So uh between the vegetation and the
57:29fence and you know I would we don't
57:31anticipate any he would probably you
57:34would hear the traffic from route 20
57:36before you can hear the the speaker from
57:38and also can be controlled too could be
57:41conditioned that you know you can't go
57:43over 65 dB or whatever the the zoning if
57:47you have a zoning bylaws for for sound
57:51we can comply if you don't have we
57:53comply with the state but we can
57:55definitely limit the hours on the the
57:57drive-thru
57:58condition and as I said as Mr. Misha,
58:02you know, all the recommendation with
58:04moving the uh this the snow storage
58:08areas or expanding that we don't have I
58:10mean that's not we don't have any issues
58:11meeting any of those
58:13conditions with the conservation that's
58:15the the snow areas in
58:18well they're outside the 100 foot
58:19buffer. So that's a you know you know
58:22but we can expand them outside the 100
58:24foot buffer and then we want to make
58:26sure the reason we like them in the
58:28pavement because they're being treated
58:29you know once you have them you know
58:31they're going through the storm water
58:33and you know they
58:36but again we can we can work with you or
58:39work with you know you know
58:43conservation
58:48never mind were there EV chargers. Uh
58:52uh we no that was a comment. We have uh
58:54we have couple of EV charger ready uh
58:57for we won't be installing probably the
58:59C you know but they'll be ready. We'll
59:01do all the yeah the installation around
59:04on the review. It doesn't say it says no
59:06charges.
59:07You may have the old uh you probably
59:09have the old uh because
59:12graves
59:13July 15th. Oh no. Uh
59:16code
59:24just
59:25we we do show a couple on the parking
59:27out though. I know we we did
59:31for the res.
59:33No no no.
59:40And there was a question there was a
59:42also a comment about the air machine. I
59:46think we added one too. So um
60:06yeah, I'm not I'm not sure. I don't I
60:08don't see I know we added couple
60:10station. But again, we have this is the
60:12second we have to address the comments.
60:15So,
60:16so that the two the stations to the
60:18right are diesel fuel. Is that
60:20Yes, those diesel, right?
60:23I'm trying to find it.
60:28Just get it today. It's
60:30Yeah, I did get them this noon time in
60:34the afternoon. So, I I just
60:37went through them fast and I we don't
60:39anticipate issues with I mean some of
60:42them are drafting errors or maybe typos
60:55I think we might want to consider maybe
60:57a decommissioning bond on this for the
61:00life of the project
61:03what we stand what we normally do
61:06[clears throat] um for
61:08I think It's up to the property owner to
61:10this isn't something that it's going to
61:12be a day.
61:15I don't think we've done that to any
61:16property
61:18that every
61:22business
61:33that was my mistake. You did add two.
61:36I thought we did, but I
61:39Graves said they didn't have them
61:44for air fill stations.
61:49Couple of things to
61:52that's just a a question.
61:56So I just wanted to make sure that it
61:58it's going to be added that it's on the
61:59plan. That's all.
62:04you're okay with the other comments our
62:06engineer has come up with to to satisfy
62:08these comments. I noticed some
62:10contingency on concom.
62:19Okay.
62:22And then board of health is separate. So
62:25the board of health
62:27we did the perk and they witnessed it in
62:29the past. So we don't see
62:31you know any issues. Good. Good luck to
62:34Tom and
62:37welcome back when any updates you have.
62:41Do we have any questions from
62:44the audience?
62:48questions
62:54road based on your experience and I know
62:58this is going to be DO's burden but
63:00coming over that hill would you foresee
63:03a benefit to advanced notification of
63:05the status of that light um that's often
63:09done in cases where you don't have
63:12visibility to the signal for for what
63:15it's essentially about 600 ft So, um,
63:18that's certainly something that could be
63:20raised with DOT as a question. Uh, it's
63:22the signal signal ahead indicator that
63:25you mentioned. [clears throat] It's
63:26typically an installation that goes over
63:28the highway on a mast arm and is
63:31activated so that you have advanced
63:33warning.
63:36And then if someone is lucky enough to
63:38get across those to get to the left hand
63:41turn lane, it's an existing lane long
63:43enough
63:45to to harbor enough vehicles
63:48the left turn lane.
63:49Yep. To reverse direction and also is
63:51the radius at the intersection that's
63:54presently there big enough.
63:55Yes. So, um there is what they call a
63:57bow out there currently uh to
63:59accommodate commercial vehicle U-turns.
64:02uh those exist at the industrial park
64:04road on one end and Carol Hill Road on
64:07the other. Um so th those are sufficient
64:09for that purpose. Um we expect that uh
64:12highspeed diesel refuel vehicles would
64:16exit this get to that U-turn position
64:19use that bulb to reverse direction and
64:21that's the intention of the design. Um
64:24the length of that lane is sufficient
64:26based on the capacity analysis. The
64:29concern that we raised was that um you
64:32know there's very little distance
64:33between where that driveway is and
64:35getting to that U-turn, right? There's
64:37only basically 100 ft or so uh to get
64:40over two moving lanes of traffic. Um so
64:44that will be something that DOT is going
64:47to be aware of and will likely comment
64:49on. Um, the applicant's, you know,
64:53current design at least partially
64:55addresses that by allowing an
64:57alternative way to get to that U-turn by
64:59that right in right out driveway. Um,
65:02that's great for uh uh standard vehicle
65:05types. The larger vehicle types are
65:08going to have to use that easterly
65:09driveway. There's no way for them to
65:12circle back and do that by maneuver.
65:16Um, but that that's something that DOT
65:19is going to be very focused on in their
65:21commentary.
65:23You got a 50 plus foot
65:27trailer going across that sucker with 60
65:30foot lanes total.
65:33Yeah, it's definitely a challenge, you
65:35know, and again, it's it's it's clearly
65:38in their in their wheelhouse to to come
65:41up with a solution for that. Um, you
65:43know, so I uh I don't know ultimately
65:46what they'll make the applicant do. I
65:48think that what's shown here is
65:50reasonable accommodation for for the
65:52intended Randy uses. Um DOT could
65:56request a further evaluation of the
65:58connection to Old Worcester Road. U they
66:01may very well say what why can't you
66:03define why you can't use that
66:05connection. Um because ultimately if
66:08that were designed as a connection
66:10notwithstanding the concerns that you
66:12have about the queueing from the signal,
66:14it does afford a better and and perhaps
66:17safer way to get back to the west
66:19through the signal.
66:20And if that were to happen, would you
66:24think that a one in and two out out on
66:27the road, they'd have to widen that
66:28sucker so there's a left and a right
66:29hand turn lane and a straight lane at at
66:31the intersection?
66:32Um it cut down on the amount of traffic.
66:34Yeah. So, um the the capacity analysis
66:38shows yes, there's queuing that happens
66:40on Old Wester Road, uh but the the
66:43amount of delay is actually within
66:45acceptable bounds, right? And um their
66:48trip generation estimates um assuming
66:52you have almost exclusively
66:55uh tractor trailers that would use that
66:57connection most likely. Um the amount of
67:01additional traffic there I don't think
67:02would necessarily trigger the need for a
67:04wide additional
67:06and how far off of that intersection is
67:08nasty per go 100t from the whatever they
67:13they they've got a long reach believe it
67:16or not um anything that would have
67:18potential influence or impact to state
67:20highway even if it's a side street
67:23driveway um is within their purview. So
67:26more than likely if that was the case
67:28and suggested by them, they'd have
67:29perview over that any changes made
67:32beyond that driveway coming up.
67:34Yeah. Because that would affect state
67:36highway, right? So any potential
67:38widening to your point
67:39would require that they sight off on it.
67:47If I may just add that there's wetlands
67:50on both sides of the gravel. So, if it
67:52was on one side, we would probably look
67:55into maybe shifting the road away or
67:58something. But really, we don't have
68:00much room. But again, I'll have a better
68:04idea tonight after I leave this room
68:06when I go through conservation, too.
68:08[clears throat]
68:09Um, I might add, you know, during the
68:11consultation process that the applicant
68:13will have with DOT, um, one of the
68:16potential outcomes might be, well,
68:17rather than having that serve as a
68:19two-way driveway, it could serve as an
68:21exit driveway for [clears throat]
68:23purposes of getting people to the
68:24signal. So, it wouldn't necessarily have
68:27to be a 24 foot wide uh, pave way. There
68:31are options for one-way conditions that
68:34um, most likely DT would ask them to
68:37consider. uh and they would need to
68:39demonstrate the environmental
68:40constraints or other constraints that
68:42might exist that might not make make it
68:45feasible but that that's part of that
68:47process that they
68:52miss. Does it help to maybe move the
68:54entrance even further west and and use
68:58the property as a bit of a slowdown lane
69:02into
69:02Yeah, I I think um there are ways to
69:05design the driveway in its current
69:07location um that would achieve slower
69:10speed. So for instance um you know right
69:13now this thing's 32 feet wide, right?
69:15That's that's wider than this room. Um
69:18so um the reason it is because in the
69:20gray area you've got this larger sweep
69:22vehicle.
69:23Uh we're designing one of these actually
69:25in TR right now. Um and BT's commentary
69:28to us was provide
69:30uh mountable scored concrete aprons that
69:34flank this driveway so that the
69:36effective width of the driveway
69:38is 14 to 16 feet
69:40and a tractor trailer can still get over
69:42this thing. They want to come in. So,
69:45uh, the other aspect is that this island
69:47feature could be drawn into the site
69:49further than is currently shown. So, you
69:52don't have a C circumstance where
69:53someone comes in going very quickly to a
69:55pump position.
69:57You'd have to make a full 90° turn and
70:00at a slower speed and then proceed. So,
70:02there those are the types of design
70:04enhancements that, you know, likely to
70:06come out of that consultation process.
70:08Um, and we we've suggested some in our
70:11commentary.
70:12I mean, one of my concerns is just rapid
70:14slow down in the travel lane to make
70:17that speed in that's that's
70:19additionally speed into the parking lot
70:22but rapid slow down in that area
70:25for some of us aren't aware of it is
70:29because other people don't slow down
70:32they don't they they go up to that light
70:33and then they slam on there but it's
70:38I don't know why it's just
70:40so D has very specific commercial
70:43driveway design standards. And some of
70:46those standards have this what's known
70:47as a taper, right? Uh it's not a full
70:50lane. Uh but it it eases, you know, it
70:53allows you to go from 40 45 miles an
70:56hour down to 30 relatively easily and
70:59gently. Uh and then once you're into a
71:02site, then there are other design
71:04features like the extension of the
71:05island that would then allow you to go
71:08from 30 down to 15. Should be we
71:12continue until maybe the next meeting or
71:15um
71:17then
71:17will you be ready by August 12th or do
71:20you want to get into September?
71:23First meeting in September is the
71:25Oh, is it August 12th or August?
71:28Um [clears throat] our next meeting
71:30we have one in August and it's the 12th
71:33and then the next
71:35September 7th or September 2nd or
71:37September 16th.
71:45It may take you a couple of meetings
71:47through Cong to get
71:52September
71:54the first or the second.
71:55No, the f the first meeting is on
71:57second.
71:59Oh, on the second.
72:00Yeah.
72:02[clears throat]
72:03Uh
72:04yeah. So, there'll be another meeting
72:06with Kong Con on the 19th if we do that.
72:09Yeah, we let's let's do this September
72:112nd.
72:12Um, any other comments from
72:16the public? Nope. We make a motion to
72:19continue this public hearing um till
72:22September 2nd. Second.
72:25All in favor?
72:27Thank you. Good luck.
72:31Anybody
72:34can come in and look at
72:39your comments. Appreciate
72:40it.
72:46Thank you.
72:52[clears throat]
73:08Yes.
73:10So, we have a um the continued public
73:13hearing for adjusting and just
73:15properties. the um
73:18the approval to remove the mini golf
73:20structure and construct a pre-fabricated
73:237200 foot metal building
73:27at 360 was
73:34you an engineer for the project
73:44this
73:45is kind of an interim site plan. I just
73:47wanted to go over some of the changes
73:49that made
73:51you want.
74:18So this is um
74:22Oh, gotcha.
74:24So this is a proposed contractor bay
74:27rental building, seven seven bays on the
74:31360 West Worester Road site, which is a
74:33former mini golf site.
74:36And uh we had a preliminary hearing, got
74:39comments from Graves, addressed a bunch
74:41of those. Still have some water that we
74:43have to deal with. One of the big issues
74:45was working with the fire chief on the
74:48access to the site. So, we had more of a
74:51curve linear roadway coming in here. We
74:53eliminated that, bringing in a, you
74:56know, a straight shot for the fire
74:58apparatus and we met with the chief this
75:01afternoon before the meeting. So, we
75:03still need to do a little work on the
75:06curves for the access around the
75:08building. So, we're doing that. But, uh,
75:11we did add some drainage behind the
75:14building. That was one of the comments
75:15that Graves was concerned that off-site
75:17drainage would interfere with our
75:19infiltration system. So, we took care of
75:21that going that way. Um, we relocated
75:26the existing building that, you know,
75:29sort of the name can be like a rental
75:31building. There was some additional
75:32parking here.
75:35We expanded the parking lot.
75:37There's two criteria for the parking for
75:39the building. One says 14 spaces, the
75:42other says 28 spaces.
75:45We have 18 spaces here now. Kind of
75:49shooting toward a middle ground. Two of
75:51them are handicapped if we require that.
75:55Why is there multiple criteria?
75:57I'm sorry.
75:58What what creates the multiple criteria
76:00for parking?
76:00Well, there there's two different
76:02building designations. You could say
76:04this might fall under this one or it
76:06might fall under that one. It doesn't
76:07have it doesn't fall specifically under
76:09[clears throat] any of the, you know,
76:11things listed in the town right. So,
76:13okay.
76:15So,
76:15and you've been working with on that?
76:17Yeah. So, so we did expand. We
76:20originally had a 14 the spaces. We're up
76:22to 18 now. And a couple additional
76:26spaces down through here.
76:29the uh drainage system. We we built that
76:33up a little bit here and uh this one is
76:36pretty much the same we had in the
76:37initial plan
76:39and we've been working Ecotech the
76:42environmental consultants been
76:44discussing with conservation about the
76:46roadway change. I just need to get them
76:48the updated numbers on that. But um
76:51according to them, we we have excess
76:54restoration area. So we don't they don't
76:57see a problem. But uh that they are
76:59working with conservation to you know
77:01bring that up to date
77:03and uh we've done some other
77:05miscellaneous plan changes but we're
77:08going to be doing some more but okay
77:10again we just wanted to you know bring
77:12the board up to date where we are and uh
77:15you know unfortunately we met back in
77:17May
77:18and I was going for knee surgery in June
77:21and it was a lot worse than I thought it
77:23was. So not much happened in June. So
77:26Okay. Okay. But uh we're going to finish
77:29this up. I'd like to get it back to
77:30Grace before the end of the month.
77:32Okay. So that we could move forward in
77:34the in the August meeting.
77:36Okay.
77:37I don't know if anybody in the board has
77:39any specific questions or
77:41you were talking it's mainly going to be
77:43now for construction related vehicles.
77:45It's mostly your buildings here.
77:47I'm sorry.
77:48Most of your uh rental spaces are going
77:50to be construction related. Did you see
77:53what he said?
77:54We're looking at at small building
77:56contractors, electricians, plumbing, you
77:59know, like that. Somebody that, you
78:01know, would come in,
78:04use these bays for storage for his
78:06material, come in, pick up things,
78:08leave, go back to work.
78:09Okay.
78:10It's not open to the public, so there's
78:13not a lot of traffic going in here.
78:16And uh, you know, interim during the
78:18day, obviously, people could come back
78:20and forth, but we don't see this uh a
78:22high volume traffic situation. So the
78:25reason I'm asking are so you've got the
78:2818 parking spaces. Uh now these parking
78:32spaces are there are going to be for
78:34registered vehicles only not somebody
78:36storing a bulldozer or veo or
78:39Yeah. I mean you know whoever renters
78:41you know they may have a truck that they
78:43want to park outside or they may want to
78:45park it inside a unit at night
78:47but they employees come in they have
78:50someplace to park during the day and
78:51then they leave.
78:53It's not overnight parking for, you
78:56know, unregistered vehicles, per se.
78:58Okay, that's that's question. Oh,
79:00because somebody takes a truck off the
79:02road or we're going to put it back on or
79:04they and it sits in the parking lot and
79:06see it for a long time.
79:07No, the applicant will make sure that
79:09that doesn't
79:10Okay, that's what they're saying.
79:12It's not a junkyard,
79:14though. That I I know what you're
79:16saying. That does tend to happen.
79:20We have a bylaw that allows No more than
79:22two unregistered vehicles in people's
79:24yards.
79:29Okay.
79:30Any other questions?
79:33There's seven bays. [clears throat]
79:35Seven bay. Yeah, there's a large bay at
79:37each end and five smaller bays in
79:39between.
79:41Small office space in there. I think we
79:43talked about that.
79:43Yeah,
79:45each bay has a small office.
79:47Refresh my memory.
79:48Toilet system. Yeah, that's one of the
79:51other things. There was a question about
79:52the well that's on site
79:54and it turned out it actually was at one
79:56time a public water supply that's been
79:58discontinued
80:00and uh been working with the state to
80:02get it formally removed.
80:05Okay.
80:05And we talked to people at the board of
80:07health
80:08and uh you know they gave us a lot of
80:10the background information.
80:17Oh yeah, yeah, yeah. Hotel
80:2225
80:26people 15 more days a year.
80:27That's right. There was a hotel on that
80:29property.
80:29Yeah.
80:31Just you guys, my partner and I, we're
80:32probably going to keep half the building
80:33for ourselves anyway from my employment
80:35company and his business. That's kind of
80:37our intention.
80:37Okay.
80:38But we wanted to do the whole building.
80:39So if we ever sold in the future, it's
80:41set up.
80:43Okay.
80:44Yeah. So I saying it's more small
80:47contractor, not landscapers, not auto
80:50repair,
80:51not retail, not not public access.
80:54No, there's no no public in
80:57any of that stuff. All special permit
80:59anyways.
81:00Okay.
81:01Actually, I sent a couple building to I
81:03believe Jane, did I send that to you?
81:06Which one?
81:06I sent you similar units, similar stuff.
81:09Yeah, the one right brand new one right
81:11in where?
81:12Right in Lester on Stafford Street.
81:13Okay. It's a brand new building. I got
81:14you.
81:15That's kind of like a potion stamp.
81:16There's like no parking at all and you
81:18can't go behind a building at 8 ft. This
81:20is nothing like that. At least just an
81:21idea of what it looks like.
81:23This type of units are very high demand.
81:31So you're working with fire.
81:33Great. So you're good. Do we have any
81:36comments?
81:37We had one meeting with conservation.
81:40Yeah, conservation had the initial
81:42meeting and then you know, put it in
81:44advance until the board.
81:48Yes. So, right now,
81:49so echo echo techch is still working
81:51with them, you know, verbally to keep
81:54them updated.
81:56So, the comments I received from is says
81:59this office echoes the comment
82:00engineering. I have an honor actually
82:02received the comments from Engineering,
82:04but uh lacking specified use of the
82:06building. Compliance with allowed uses
82:08sufficiently [clears throat] of parking
82:09spaces cannot be evaluated. The main
82:12concern is just knowing what the uses
82:13are in there. And there are are
82:16different ways that this can be
82:17approached where you talk about things
82:18that are special permit. If the board
82:20knew kind of what that range of uses
82:23are, you could permit that with certain
82:25conditions to address certain uses. You
82:28know, if there was automotive as a use
82:31that you wanted to pursue, maybe you
82:33have to make sure that all people have
82:35oil capture or something like So if a
82:36tenant wanted to be like automotive say
82:38we even allowed that that have to be on
82:39them do it for a special permit
82:40directly. We we don't want that property
82:42anyways
82:43potentially. So it it could be and that
82:46would be up to the board as well.
82:47It could be a condition that that
82:48doesn't have somebody
82:51you'd be okay with conditioning.
82:53Absolutely.
82:54We don't want that.
82:56And that a potential use that may you
82:58may have and you may like to pursue but
83:01might not be right from the get-go as
83:03part of the special permit process. The
83:05board could allow a certain type of use
83:07and then maybe not requiring a full
83:09special permit review when that comes
83:11in. There's different ways of approach
83:12that and I'll I'll work with you folks
83:14and kind of how best to approach that.
83:16Sounds good.
83:17Appreciate it.
83:18Um
83:20so um when when do you when will you be
83:24ready to come back?
83:26I assume you have a meeting the 2nd of
83:28October the next morning.
83:30No, we have we have one we have 12
83:33August 12th. August 12th or September
83:362nd.
83:37You want to shoot for August 12th and we
83:39can always continue and we can push it
83:41off again.
83:42Yeah. If we get it to graves hopefully
83:43we can get some comment back and and
83:45Okay. you know, get it into more of a
83:47finalized phase. Okay.
83:50U make a motion to continue the public
83:52hearing for Jessie Jesse Properties to
83:54August 12th.
83:57I second the motion.
83:59All in favor?
84:00I I
84:02Okay, thank you very much.
84:04Thank you.
84:18Thanks.
84:24Appcate
84:33Skywars.
84:47when when you're ready when you're um
84:49just continuing uh a public hearing.
84:54Glad you're back where I'll explain you
84:56have cell phone coverage in that area.
84:59Madame chair, members of the board,
85:02staff, uh good evening. For the record,
85:04my name is Eron Wall. I'm councel for
85:07Sky Towers. Uh with me this evening is
85:10Jesse Marino uh from the proter design
85:12group. He's our project engineer
85:15and fresh out of the conservation
85:18commission meeting we have Jeff Mason
85:21from Lucas Environmental Group and also
85:24joining us this evening I think a
85:26resident right?
85:26Yeah.
85:28Joe Oi
85:29from Smart Link on behalf of Verizon
85:32Wireless.
85:34Hi Joe.
85:36I think the last time that we were here
85:39was in April. He presented the uh full
85:42application.
85:44We've had three peer review rounds uh
85:47with Brave Engineering. Uh the advice
85:51that we have had along the way uh Jane
85:54has been uh so very helpful. Um is that
85:59we've continued three times.
86:01I appreciate the board's willingness to
86:03let us continue so that we could address
86:05the uh comments from uh Graves uh
86:08because Jane said you want to come back
86:11when it says acknowledged.
86:13Yeah.
86:15Otherwise, we'll send you out again.
86:17[laughter]
86:17That's right. So, I think we uh the
86:22[clears throat] most recent report I'm
86:24guessing that you folks all have that
86:25from uh Graves. It should be a July July
86:2913th.
86:30I'll print it right now.
86:35Are they all acknowledged?
86:37They they are all acknowledged.
86:40Well, actually, let me retract that.
86:42They're all acknowledged. Uh there are
86:4422 uh different comments um from Graves.
86:49Uh the very last comment number 22 uh we
86:53had submitted the onm plan and was not
86:57yet signed by the land owner of Blue Sky
87:00Towers. So, I have fresh signatures.
87:10We've got fire department.
87:12Yeah, we we've spoken um already um
87:35I need those.
87:52So,
87:57so um I think there were that was the
88:00one comment from uh Graves review that
88:04was outstanding.
88:06There were uh four waiver requests in
88:11the uh comments that of course uh he
88:15deferred to you folks. And then I think
88:18there's uh the last time we were here we
88:21talked about a removal bond and we
88:24recently submitted and I'm not sure if
88:26you folks have I I did bring copies of
88:30that but I think Jane said she might
88:32have distributed
88:34um Jesse put together an estimate with
88:36regards to what it would cost to take
88:39that
88:40take that down. Um, so from our uh
88:44review from from uh Graves from uh
88:48Michael who's been uh just so you know
88:51in the interim from when we uh were here
88:54in April, we did after each of his peer
88:58review comments uh he was gracious
89:01enough to schedule a Zoom meeting with
89:04uh Jesse and I and another engineer to
89:06go through those comments so that
89:08hopefully we're able to, you know, based
89:10upon the acknowledged
89:11uh we could get through those comments.
89:14So, I'm not sure if you want to review
89:16those. Jesse, I think, is prepared to
89:19to talk through those or I'll be like
89:23address them.
89:29Can you remind me of
89:32I normally have these plans ahead of
89:35time, so we're off. It's we're a little
89:37little off, but the waiverss, what were
89:40they?
89:41Um so yeah I had
89:45uh I think I distributed the list of uh
89:49wavers but there are four four waiverss
89:53like I can go through those
89:57I have if I sorry but okay
90:00I mean I did want it to
90:07I think we did chat about those briefly
90:10at the last meeting with
90:12a long time ago.
90:13It was a [laughter] long time ago.
90:14We agree.
90:15There's four. Two of them are pretty
90:17easy sight related ones. Um if I recall,
90:20one was um had to do with a fence
90:22height, I believe. Uh so we have a six
90:24foot chain fence, but for security,
90:26there's some barb wire on it.
90:28Because we're so far away from the road
90:30and butters, I don't really think
90:32there's an opportunity for the folks to
90:34see a lot of that. So that's on there.
90:35And the tower itself is fully gated
90:37around.
90:38It is gated. Yeah. Okay. How about the
90:39access road to get into there? Is there
90:41anything there or
90:44I don't recall if we have a
90:47good question. Sometimes
90:48we don't. Yeah.
90:51Look at that. It's a pretty
90:54rural road of knowing some of the utes
90:57in the area.
91:01Three utes.
91:02Yeah. When they're
91:05We have an access gate. It's it's a
91:07little bit further into the site, but we
91:09could certainly push it back.
91:11Um it's kind of uh
91:14sort of by the tree line instead of
91:16having way
91:16as long as long as it's in within sight
91:19of the road.
91:20Yeah, there's So the the Beagle Club has
91:22some some areas that they can get access
91:24to here. So the idea we put this access
91:27sort of by the
91:28this way this way. I think one of the
91:30other things is a maybe a landscape plan
91:32and because we're
91:34800 still feet off the road behind those
91:36trees,
91:38we uh we don't have a formalized
91:40landscape,
91:41but realistically there isn't really
91:44that much tree clearing because back in
91:46I don't know 2122 they did some uh tree
91:50thinging and clearing and we're pretty
91:53much sticking to those areas. I mean
91:56there will be some but not
91:59acres of clear cut or anything like
92:01that.
92:04Any other questions from the door?
92:08Any question from the public?
92:11Um,
92:13we should close the hearing, right?
92:16There's a few plan changes we could go
92:17over if you're interested.
92:19Yeah. I mean, let's if this plan changes
92:21something different than what we saw
92:22before.
92:23Real minor stuff. Let's just go over it.
92:26So
92:26in between last time and this time um
92:29Curtis I believe is the building
92:31commissioner assigned a 911 address.
92:34Okay.
92:35So the underlying property is 103. So
92:37one of the now that the
92:40if the tower is built it'll be known as
92:4291 bond road.
92:43Okay.
92:44So how you guys want to deal with that
92:46on the permit maybe it's an AKA or what
92:49have you. But um
92:52that was a comment that
92:54the the lot numbering didn't change.
92:58No, I think it's just because it's a a
93:00leased
93:01premises and it it needs its own
93:0491 address,
93:07but not the lot itself, right? So, it's
93:09it's a little bit different than you
93:11normally see, but I just wanted to make
93:13that point um on that. Uh so, that was
93:17one of one of the one of the updates. um
93:21through the through the
93:27conservation process. Um
93:30there was a peer reviewer and there was
93:33a uh a wetland flag uh that was that was
93:36added in this region here. Didn't affect
93:39too much, but it it expanded a small
93:41area and changed the buffer. As far as
93:43our impacts, pretty much the same, but
93:45that was a change here. Um and again we
93:49have Lucas environmental here that we
93:51could talk about that if there's a
93:52question on that but um it's pretty
93:54minor. It was a something that I believe
93:56they did on the walk through and wanted
93:58that changed.
94:00Um one of the comments um from Graves
94:04and you talked about it last time but
94:06you wanted a detail of it was to provide
94:10a paved apron by the street. Um so now
94:14we we have done that. There's a 20 foot
94:16wide cave apron here and there's a
94:18detail later on in the sheet that uh
94:21describes that
94:23um
94:28in this location here at the crossing.
94:30Um based on um peer review by Ecotech
94:35and discussions over at Conscom, there
94:38were several minor tweaks that were made
94:40to that. Um, one was the location of the
94:43covert. Before we kind of had it uh a
94:46little bit east, they wanted it more
94:48central, so it was moved back. Um, and
94:52um, we also uh, one of the comments was
94:55to provide uh, grades on the top and
94:57bottom of the wall. Uh, we've done that
94:59as well and we were able to um, optimize
95:03this area, kind of reduce the wall. We
95:05we were like five or six feet before,
95:07now we're down to about four feet. So,
95:09that's good. Might allow us to use a
95:11smaller block, a little bit easier to
95:13build. Um, we were able to do that with
95:15minor changes to grading. We're still
95:1710% or under on the on the driveway, so
95:20no big change there. Um, um, we were
95:23able to do that. Um, [clears throat]
95:26there was um
95:30some a slight modification. It was
95:33basically a a uh
95:36a permit that was done for uh land or
95:39for tree clearing in 2021 and through
95:42the process uh there um the peer review
95:46ecert um determined that there may have
95:49been some small impact on that on this
95:52existing sort of crossing here. So there
95:55was a sort of a friendly uh enforcement
95:58order that was put forth basically to uh
96:02have the land owner, it's not really
96:04blue sky at the land owner that they
96:06have to uh create a uh um a mitigation
96:10area about 260 square feet. So pretty
96:12small area. We show that where that area
96:15is on here. Previously it was an area
96:18that we had uh a rip wrap pad and stuff.
96:20So overall the impacts are that you saw
96:23are pretty much the same. That that uh
96:26pad was changed out for basically a a
96:30small planting plan and and some weather
96:32mitigation. Um
96:36on that um
96:40we also there were six test fits that
96:42were done uh well I should say five test
96:45bits and one probe here. So a
96:47professional geotech company came here
96:50uh and and provided borings. Uh they did
96:53it for for the tower uh itself. Uh the
96:57access drive so we can make sure uh uh
97:00that the retaining wall is designed
97:01appropriately for uh the the vehicles
97:05that would be used there. Um and also uh
97:08in the storm water basin here. So um all
97:11of that was done um on that. Um,
97:18further on, there were just some
97:23minor updates made. Again, we talked
97:26about the pavements in a little detail
97:28of what that would look like. Um, the
97:31driveway section, we talked about it
97:33last time. They wanted to know what the
97:36different aggregates were um for when uh
97:39the driveway was 6% or under or uh
97:43greater than 6%. There's a little bit
97:45different aggregate there for that. Um,
97:49one is a uh when it's flatter, it's a
97:53one inch minus. When it's a little bit
97:57uh steeper, we're using a little bit
97:59bigger rock so it doesn't wash up.
98:01Nothing nothing bigger than
98:03realistically too much. So, it's still
98:05not uh anything too large there. Um,
98:12one of the other comments that uh,
98:14Graves had had was um, in our basin, our
98:17storm water feature. Um, they wanted to
98:21have us provide a monitoring well. Um,
98:25so we show the location of the
98:27monitoring well in there and we provide
98:30a detail and that's just for maintenance
98:32purposes. I would add that he um had
98:36suggested uh
98:40possibly a condition uh of approval um
98:43before this was built to uh test the
98:45area for season, you know, seasonal high
98:47groundwater. Just so you know, there
98:49they did these two borings and I believe
98:52the report was sent to you. They didn't
98:54have any groundwater to about 10 ft.
98:56This is an outwash area. It's all kind
98:59of sands and gravels in that area. So um
99:02don't believe there's any real concern
99:04for that. So we're not concerned with
99:06that at all. We provided uh an
99:08explanation of that and also there was
99:10some uh we provide some uh information
99:14and some currently a vai on uh the
99:17people that did the testing. So um uh
99:20you know their qualifications and what
99:22have you. So um they were able
99:25[cough and clears throat] as well. But
99:26we do also have that monitoring well
99:27down to that 10 ft and like I said that
99:30boring depth. They didn't run into any
99:33groundwater, which makes sense because
99:34we're up on a null here and we're still
99:36a few feet higher than that wetland
99:39area. So, so all that all that uh checks
99:42out makes sense to us. The other thing
99:44is that the borings are done in April.
99:46As anybody knows, April uh is a pretty
99:49high groundwater season. So, if you're
99:51going to see high groundwater, you would
99:53generally see it in in those in that
99:56time frame. Um,
99:59so that is basically the the changes
100:02 | that were there on the drawing. So, not
100:04 | a huge change from
100:07 | 30,000 foot uh foot view, but basically
100:11 | some items that were uh requested by
100:14 | grades to to clean up.
100:22 | Couple questions through the chair. So,
100:24 | so who is the [cough] responsible
100:26 | [clears throat]
100:26 | party? Sorry, I like that.
100:28 | So, within the lease area, so both of
100:30 | them are are on there because in this
100:33 | situation, um, Blue Sky Tower has a
100:36 | lease with the underlying menu and in
100:39 | that lease, they allow um it's allowed
100:42 | that we can maintain the uh the features
100:48 | and the compound here on the site. So uh
100:50 | what we've done on that is to
100:52 | acknowledge that there is an agreement
100:54 | between both parties. We have both
100:55 | parties signed. But what that means is
100:58 | that blue sky portion of the easement
101:01 | driveway and compound would be the
101:03 | responsibility of them.
101:06 | So blue sky is responsible and it is
101:08 | something like you know the maintenance
101:09 | contract.
101:11 | They have some they have their own
101:12 | people that do some of it but they also
101:14 | hire out to uh folks to things need to
101:17 | be done.
101:19 | But not the legal club. It's
101:21 | correct.
101:22 | Maintenance on the hook for that.
101:25 | They would not be it's it's them
101:26 | acknowledging it because no
101:31 | infection.
101:46 | I'm not sure of the answer to that, but
101:48 | they own more than a thousand towers
101:49 | now, and I think it's something that
101:52 | they'll hold on part of their portfolio.
101:54 | Yes.
101:56 | There was a comment in there that Graves
101:57 | wanted to have some additional um
102:00 | maintenance uh timelines
102:05 | about and uh some things to to uh
102:10 | check and then on the maintenance plan
102:12 | as it as it related to the uh gravel
102:14 | driveway. So that was that
102:17 | pretty minor stuff. Yeah,
102:18 | normally that's kind of centered around
102:20 | all the best management practices and
102:22 | the storm water features, but because of
102:24 | the driveway in this case, he wanted
102:26 | some of that added which which was
102:27 | added.
102:28 | Yeah, I see it. Thank you.
102:30 | Yep.
102:32 | So, one thing that that um Graves did
102:35 | comment for comment 20 was additional
102:38 | test pits in the basin.
102:40 | Yeah, I don't think that's necessary at
102:42 | all, but um we're not opposed to that as
102:46 | a condition. I just think that
102:50 | in this case, we had a whole
102:52 | professional geologist go out there and
102:54 | do multiple borings for the purposes of
102:56 | structural and this and and nothing was
102:59 | found to 10 ft, but we're not opposed to
103:02 | that. I just
103:05 | I think in our explanation here, I can I
103:07 | can read it. Um
103:09 | it's nothing to dwell on if that's what
103:10 | you want to do. Just
103:12 | really an extra step. But um so the guys
103:14 | that did it, one's a professional
103:15 | geotechnical engineer, one's a
103:17 | geologist. Um it was also overseen by
103:21 | one of the other vice presidents. But
103:23 | basically um we give them the resumes.
103:26 | So the kinds the kinds of seasonal high
103:30 | ground water we would see modeling in
103:32 | these features would be something that
103:35 | would have more uh silts and clays in it
103:37 | or or uh uh like sandy loms, till this
103:41 | is more outwash. So you don't really get
103:43 | those features in that. And if you do
103:45 | see them in there, they're not usually
103:47 | an accurate representation. And that's
103:49 | what they were trying to say. Um that
103:52 | the standard solar mining is unreliable
103:54 | in these grand soils anyway. And that
103:56 | estimating seasonal high with those it
103:59 | doesn't it lacks the the type of
104:02 | features that you'd use to provide it
104:03 | there anyway. So their point was water
104:06 | wasn't even observed at one of the worst
104:08 | times of the year to 10 feet below
104:10 | grade. We're only
104:14 | we're uh
104:17 | pretty much acade
104:19 | of of uh
104:24 | excavation.
104:25 | So we we have 8 foot. So there's plenty
104:29 | of of buffer in there. So that's why I
104:31 | don't think in this case it's it's
104:33 | necessary. But
104:36 | we want to monitor well.
104:37 | We do well.
104:40 | Yeah, we do. Yeah, we do. Yep. So, um
104:44 | you know there's we can look here too. I
104:46 | have a copy here for it. But for
104:47 | example, at the tower itself, the the
104:51 | boring went a little bit deeper
104:54 | and uh
104:57 | got here. I can kind of read it off.
105:00 | They um
105:03 | yeah, so at that depth, the observed
105:06 | groundwater at this location 674 was
105:09 | some 14 and 1/2 ft down.
105:12 | Okay.
105:13 | And um where we are
105:16 | um
105:19 | here um
105:22 | you know we're still another 8 ft to
105:25 | that sort of location. So I think
105:27 | there's plenty of buffer there but again
105:29 | if that's something that the board sees
105:30 | fit that's fine. I think originally it
105:34 | stemmed from um sometimes KNCOM has um
105:38 | in their
105:40 | some of their conditions or bylaws that
105:41 | they wanted to be witnessed but um in
105:45 | this case um
105:48 | um I don't believe they've asked for
105:51 | that and um we went ahead and and got
105:54 | the sort of the full monty here with the
105:56 | uh uh to provide the the entire uh
106:01 | structural review of the soil itself. So
106:04 | we have everything we need to move
106:06 | forward with the with the structural
106:09 | onation.
106:12 | I think it's more the swale and that is
106:14 | the
106:15 | concern in the report. Was it wet and
106:18 | flowing during the April testing period
106:21 | down here? No, I think in these areas it
106:23 | still was 2 and 1/2 3 ft down to even
106:26 | there.
106:26 | Even here. Yeah. So
106:28 | it wasn't even flowing.
106:30 | It doesn't flow across here. There might
106:33 | be some areas of steam water, but you're
106:35 | down at 665 664 here.
106:40 | Um, okay.
106:42 | So, that's still 4 ft below where we
106:44 | are.
106:47 | Okay. Make sure we had a copy of that.
106:49 | And again, if that's what you want us to
106:52 | do, we can we can certainly do it. But
106:53 | just um in this case I think
106:58 | with all that considered we're still
107:00 | four four and a half
107:00 | feet
107:07 | had some questions on the decom.
107:12 | Yep. Scratch that. So um in here it says
107:18 | the responsibility kit carrier specific
107:21 | tower ground equipment has the
107:23 | responsibility of the carrier.
107:25 | Yeah. So if if the tower is ever to be
107:28 | not in use the carrier would already be
107:30 | gone otherwise the carrier was there.
107:32 | Yeah.
107:32 | It'd be it'd be operating. So the idea I
107:35 | think and this there's not a lot of
107:37 | detail in the bio, but I believe if if
107:40 | there is no carrier, there's no Verizon
107:43 | and and uh Blue Sky has the tower
107:45 | sitting up there with nothing on it, the
107:47 | idea is that this bond will cover
107:50 | removing that and there's no carrier
107:52 | there.
107:54 | Okay. So if if you lose if they lose the
107:57 | carrier for a period of time, is there a
107:59 | period of time on that? I mean normally
108:01 | that's something I think a discussion of
108:03 | how long that period might be but I mean
108:06 | that that's something we could we
108:08 | condition
108:11 | something something that I mean if it
108:13 | sits there for more than a year or two
108:16 | what's reasonable
108:17 | one one or two years would definitely
108:19 | not be reasonable from a tower
108:20 | standpoint it's a huge investment to
108:22 | build this in the first place
108:24 | and if they're they're going to want to
108:26 | the government's going to be auctioning
108:27 | off more frequencies in the future.
108:29 | Yeah,
108:31 | this guy would probably want 20 years,
108:33 | but I would think 10 would be in a
108:34 | reasonable ballpark if I were to speak
108:36 | on their behalf.
108:37 | So, it would be reasonable to have a
108:39 | condition there if the carrier was
108:41 | absent from the power for more than two
108:43 | years. It would
108:44 | 10 years.
108:44 | 10 years.
108:45 | 10 years.
108:46 | I would say 10 would be more reasonable.
108:47 | Absent from like removed.
108:50 | Yeah.
108:51 | Yeah. I mean, I could see that their
108:53 | technology is changing and
108:55 | last forever.
108:56 | Okay. Okay.
108:58 | I would just think it then would be a
109:01 | new carrier within two years easily.
109:04 | You just don't know. They don't want to
109:06 | take down a structure that they spent,
109:08 | you know, three,000 building.
109:10 | Yeah, I hear it.
109:11 | I think some time limitation is
109:13 | certainly reasonable.
109:15 | What that
109:16 | I think in addition 10 years
109:17 | 10 years 10 years
109:19 | at least a a meeting about
109:24 | Yeah. What I also see right I see
109:26 | discussion within that time period. So
109:28 | we all start with
109:30 | what's going on.
109:31 | What's going on,
109:33 | right? Yeah. A trigger to have a
109:34 | discussion and
109:36 | what's going on
109:36 | possible decommissioning.
109:39 | Okay.
109:40 | Um and remind me what So there's uh a
109:44 | power supply in there, transformer,
109:48 | battery.
109:49 | That stuff would come out. Um what would
109:51 | stay is so what we're thinking is the
109:54 | compound itself the tower would come
109:57 | down the fence this would be reveitated
110:00 | um um but the storm water in this access
110:04 | I mean obviously that gets them if the
110:06 | tower isn't here there is a significant
110:08 | amount of upland area that's permitted
110:10 | that the that the beagle um folks could
110:15 | use so we weren't planning to take that
110:17 | part out
110:18 | um and this stuff is all outside the
110:20 | buffer that would be able to do. So, you
110:21 | just come in there and recede and and do
110:24 | that. Basically, the things that would
110:26 | you people would see from a distance,
110:27 | the height, the this, the
110:30 | um that's what's on here. You want
110:32 | something else,
110:33 | you can talk about our contracts. We'll
110:36 | discuss maybe 6 in below grade or
110:38 | something along those lines.
110:41 | What's the equipment? Are these uh
110:44 | transformers in there for the power
110:46 | supply?
110:46 | Yeah. So um and and tell me more about
110:49 | the batteries that are required
110:52 | concrete pad
110:54 | we can
110:55 | batteries are only provided by the
110:56 | carriers that wouldn't be a blue sky. Um
110:59 | then the batteries are contained in
111:01 | equipment cabinets that are self
111:03 | ventilated and everything. So the
111:04 | carrier is not there. You're not going
111:05 | to have any batteries on.
111:06 | So so what we would in this what's what
111:09 | would be included uh is the meter center
111:12 | the uh transformer.
111:14 | Yeah. Um
111:16 | the batteries as you say he's exactly
111:18 | right. There's no um really here unless
111:21 | the tower is to be lit and it's not the
111:24 | land the the uh blue sky doesn't even
111:26 | have a meter here. They don't have
111:27 | anything that generates power so on. No
111:31 | batteries in that. That would be the the
111:32 | carrier stuff
111:33 | in a cabinet in that
111:35 | and like I said the thinking here is
111:37 | that if there's no carrier if there's no
111:42 | transmission of and it's just an empty
111:44 | power that's when you would trigger the
111:46 | the
111:46 | size of that cabinet.
111:48 | Yeah. The size of the cabinet is like
111:50 | refrigerator size I would say.
111:52 | And that would have the batteries in it.
111:54 | But if there's no carrier, if there's no
111:56 | trans um there's no Verizon, AT&T,
111:59 | T-Mobile, etc. and you're not um
112:01 | tricking them transmitting any
112:04 | yeah radio not a big container sized
112:08 | anymore.
112:09 | No, as a matter of fact, Verizon just
112:10 | changed their footprint to go from a
112:12 | 12x20 concrete pad 12 in in thickness to
112:16 | a pad just for the generator 4x8 a pad
112:20 | just for the cabinets 8 by7. They're
112:22 | trying to cut costs everywhere.
112:24 | So, it's just shrinking and shrinking.
112:26 | They don't realize that that doesn't cut
112:27 | any cost, but that's the difference.
112:30 | You still have to come here. You still
112:32 | have to get it. You still have to
112:35 | suddenly get a bonus from the
112:37 | It's a materials issue.
112:41 | They go back and forth every couple
112:42 | years.
112:43 | They really do.
112:43 | They really do. But um yeah, so um
112:46 | they're actually one other good thing is
112:47 | they're going to do they call this
112:49 | allin-one cabinets. So instead of four
112:51 | having two cabinets, they're basically
112:52 | going to one.
112:54 | Um if anything that you see here, like
112:57 | he said, it will be likely smaller than
112:59 | this at the time.
113:01 | Yeah,
113:03 | that was pretty recent that they made
113:04 | that
113:05 | yesterday or today.
113:07 | There you go.
113:08 | This one's not going to change because
113:09 | I'm not spending engineering money to
113:11 | redraw the plans. They're going to build
113:12 | it that way.
113:13 | Well, yeah, we're talking kind of stuff.
113:16 | We got just got the lease finalized,
113:18 | too.
113:18 | Sometimes they get a little cute and
113:19 | say, "Oh, we want a little pad here,
113:21 | little pad here." But like you said, you
113:22 | still have all those same
113:24 | still have to buy concrete. You still
113:25 | have to have the guys there for a day.
113:27 | You still have to form it. You still
113:29 | have to put rebar in it. You still have
113:30 | to finish it. So if there's another
113:33 | extra yard,
113:34 | another
113:37 | doesn't save, but
113:38 | we do what the client asks.
113:42 | And uh just another condition was uh we
113:45 | might add, so it's okay if we ask you to
113:47 | carry town communications on the pole.
113:52 | That's
113:52 | that was one of the comments in the
113:53 | review and we've agreed to that. Y and
113:56 | maybe a rack space obviously.
113:59 | Yeah, I'm sure there would be
114:00 | some ground space.
114:01 | Some ground space and something on
114:03 | there. Sure. Yep. That's that's very
114:05 | common. Y
114:06 | I think it has to be correct me if I'm
114:09 | wrong, but it has to be in a location
114:11 | that doesn't interfere with who's over
114:13 | there, but
114:14 | yeah, not the lowest on the tower. Maybe
114:17 | a little bit higher. True.
114:26 | Okay, over here is this is game road
114:28 | down over here. You can see that
114:31 | right up here is the uh cultural art
114:33 | center 31 is the entrance of the parking
114:35 | lot up top driveway down here. Um
114:41 | so
114:42 | these are the only
114:44 | correct cuz this is Flint Road and that
114:46 | is right there on
114:49 | Yep. So culture lessons right here at
114:51 | the top.
114:52 | So it it would probably be good to to
114:54 | condition hours. I mean
114:56 | so just to keep So we got generally
115:00 | football practices for the kids would be
115:03 | Monday through football season just
115:05 | starts now. The majority of when the
115:07 | lights we need is daylight savings.
115:09 | Mhm.
115:10 | So that happens in what October switch
115:12 | over.
115:13 | Season ends December 1st
115:16 | and nothing goes past 8:00.
115:19 | So,
115:20 | so lights up by 8:30 most and the league
115:24 | has been very child football has been
115:26 | very lucky with Nicholas College as
115:28 | well. They're doing one night a year.
115:30 | They work great with it. They free of
115:31 | charge.
115:32 | Okay.
115:32 | Open brains
115:34 | very good as a community
115:36 | what Nicholas College does, but just
115:38 | want to be able to have it. I mean, it's
115:39 | the kids home field
115:41 | and uh want them to be able to uh have
115:44 | that opportunity.
115:46 | So,
115:46 | and they're using this up the parking
115:48 | lot.
115:49 | Yep. Up top. And then
115:52 | because of one of the Amazon upgrades
115:54 | that Amazon provided to the
115:56 | the band.
115:57 | No, not the band stand. They they paid
116:00 | down here.
116:01 | The lot down here made it ADA compat
116:05 | parking down below
116:07 | and then um new snack shack.
116:10 | So,
116:10 | it's really beautiful.
116:11 | Where's Where's the band going? Is that
116:13 | supposed to go down? Suppose it would be
116:16 | filled [clears throat]
116:17 | in this area up top here.
116:21 | Center.
116:21 | Yes.
116:28 | The there is telephone poles hanging
116:32 | down here.
116:33 | um as you come down.
116:36 | As far as safety purposes,
116:38 | that would be a likely possibility
116:41 | to do that, especially for safety
116:43 | because there's not enough parking
116:45 | spaces down below. So, if you have
116:47 | practice down near any of these fields,
116:50 | park up top, walk down the paved
116:54 | walkway, driveway area,
116:55 | and if you if you're going to have
116:56 | people there at night, you got to
116:57 | provide them
116:58 | without a doubt. No, like the standard,
117:01 | you know, like walkway lights.
117:03 | Yeah, you don't need
117:06 | I would say the parking area maybe
117:10 | lights and the walkway.
117:14 | Because there is a practice field up top
117:16 | here that they do have lights
117:18 | already that they commonly use. Those
117:20 | were I don't know what year those were
117:22 | installed.
117:22 | The Mayor Farm one field like the
117:25 | whatever.
117:28 | Okay. Is that the parking area or is
117:30 | that
117:32 | It's actually the field is right
117:38 | on
117:39 | property.
117:43 | So, so as the recreation commission
117:45 | we're just providing looking to provide
117:47 | more opportunities in the town fields.
117:50 | We already have like our issue is is
117:52 | that once it gets because there's season
117:54 | once it gets dark there's no place to
117:56 | practice there's no place to have even
117:58 | you know that big um uh disclosure I'm
118:01 | also a recreation kind of but um
118:05 | right
118:06 | the just it's they don't have practice
118:09 | hours like it's you know how we don't
118:12 | have parking you don't have fields like
118:14 | at least we can kind of in increase the
118:16 | amount of time they can spread out their
118:19 | pockets
118:21 | So even if we're um a slice of any
118:26 | lights, we provide provide a uh
118:28 | lighting, looms, stuff like that just to
118:31 | provide.
118:32 | So what do we need for that's what I
118:34 | mean the reason is what what do they
118:35 | need? What do we what does the
118:36 | recreation commission need to um submit
118:41 | as for a plan? Um especially since the
118:45 | the the form, you know,
118:49 | I I think for sure that the the whoever
118:53 | is there now, the buyer,
118:54 | correct?
118:55 | It is a new person. So,
118:57 | yeah, I know that this house has been
118:59 | vacant for many years.
119:01 | Wait, this one is
119:02 | Oh, yeah.
119:03 | One of these two is is vacant.
119:05 | I know that for a fact.
119:07 | Right across from Flint, right?
119:08 | Correct. Right on Flint Road. Yeah.
119:10 | Is it 8 foot stock fence?
119:12 | Yes, that is. Yes, it is. And it's it's
119:16 | pretty grown. I'm not
119:17 | when leaves fall off the trees and
119:19 | [clears throat] that's when football
119:20 | season is
119:22 | you can look at you can look you drive
119:23 | down Flint Road look to the right and
119:25 | you look down the football.
119:26 | Okay.
119:27 | So
119:28 | so it's whatever the board feels that
119:31 | want to be submitted.
119:32 | Have you done any outreach at all? Just
119:34 | have you talked to the neighbors? I mean
119:36 | somebody complain somebody must have
119:37 | complained about the first time you get
119:38 | that condition.
119:40 | Yeah. And I don't think that that
119:41 | neighbor does not live there anymore.
119:42 | That's why the strategic part is to have
119:44 | the light shine away from those houses
119:47 | to take that off the table.
119:49 | But like I said, if you condition it to,
119:50 | you know, the maximum V30
119:52 | correct in only the months of November
119:54 | and December.
119:56 | And there's so much more technology. The
119:59 | lights are so much more kinder than they
120:00 | were back 20 how many I don't know how
120:02 | many years it was. A lot of years ago,
120:04 | right? Um, so it'll be it'll be um
120:08 | 9:00
120:10 | so you can clean up the field,
120:12 | right?
120:13 | So would we need a public hearing?
120:18 | I think probably just
120:20 | probably
120:22 | Yeah. And do revision or
120:26 | modification.
120:28 | What about
120:31 | notifiers and
120:32 | notified letters and to have in the
120:34 | newspaper
120:37 | just for hopefully
120:39 | wave any fees.
120:41 | I think yeah um yeah I mean we can look
120:45 | at the cost I think can can you can you
120:48 | cover the cost of the advertisement? I
120:50 | mean
120:52 | advertisement won't be that bad because
120:54 | what was that 100 foot
120:58 | 300t radius
120:59 | what is the average mailer cost? It just
121:02 | went up 1098 per round.
121:06 | Okay.
121:08 | I mean I I I think it's Yeah. Congress
121:11 | got to come out of the
121:15 | Yeah. Whatever the advertising is for a
121:16 | special
121:18 | what would the cost be for I mean I
121:20 | don't think we need to do
121:22 | this be the paper twice. Sound50
121:25 | $160.
121:26 | All right. So, we're talking a couple
121:27 | hundred bucks, few hundred bucks.
121:29 | And you you can wave the site from
121:33 | Yeah. Yeah.
121:34 | We can wave our fees.
121:36 | Um I don't think we'll need
121:39 | I don't think we'll need a peer review.
121:44 | This was a
121:46 | baseball.
121:47 | Yeah, possibly.
121:48 | But there was a thing cuz they didn't
121:50 | want kids going down there. I get it.
121:52 | It was a drinking spot for
121:54 | Oh, yeah. It's very dark.
121:55 | You know, it's beautiful. really nice
121:56 | down there. So,
121:57 | they did a good job.
121:59 | So, power coming down here somewhere.
122:01 | There's already I mean there's there's
122:02 | power to the snack shack and there's
122:04 | power to here. There's a scoreboard
122:06 | right here. There's power too.
122:07 | Look, baby drive down there when you're
122:09 | born. It's it's really um
122:11 | Yeah. It's pretty cool.
122:12 | So, you don't have there's no big site
122:14 | work. You just got to
122:16 | it's more or less with the would be
122:17 | light post and then the electrical. And
122:20 | I mean from the football side of it,
122:22 | there's great grants available from the
122:23 | NFL as far as the huge sport program
122:25 | that they have available. So it's all a
122:27 | matter of exploring that and seeing what
122:29 | the options are.
122:30 | See what you get from donations from
122:31 | kids.
122:32 | Yeah. Any advertisers? No, we're lucky.
122:34 | I mean, I think back years ago, McGee
122:36 | Toyota undoubtly was a huge donator
122:39 | and um I think uh there's been other
122:43 | silent donators who play in the league.
122:50 | I have to go down and see that.
122:53 | So, so I'm sorry. Um recreational cover
122:57 | costs. Um we'll wave our fees. Yeah,
123:02 | I don't think we need a peer review. Uh,
123:04 | we can look at the Noancy site plan.
123:07 | Literally just
123:08 | draw the lights.
123:10 | Yeah, I think we need some lights. And I
123:11 | we probably need some model and make the
123:15 | light.
123:16 | Yeah. Make the model light.
123:18 | The looms. Yeah. I think we just need to
123:19 | make sure that for safety nothing.
123:23 | Oh, I absolutely that's why little
123:26 | there'll be a little bit of engineering
123:28 | but
123:29 | but I include the path and if you need
123:33 | to add something to the parking lot, you
123:35 | know, add those.
123:36 | Okay.
123:37 | The whole time if you want to light up a
123:39 | piece of the practice field
123:42 | that thing up too.
123:43 | Okay.
123:47 | Yeah. Cuz I know what they the kid they
123:48 | do with the schools because they they
123:50 | practice at Harris School. They've been
123:51 | using the mobile lighting. go behind.
123:54 | Yeah.
123:54 | So, and so when daylight savings time
123:57 | hits is it I mean generally they
123:59 | practice down here at least one team
124:01 | does and they move up top once daylight
124:02 | savings. So
124:04 | just provide more area.
124:05 | Yep.
124:06 | If you shine lights this way. What's
124:08 | No, that's not that's not this isn't
124:10 | part of it. It's only on this plane.
124:14 | That's it.
124:16 | Um because I mean because there's no
124:19 | electricity close to here because you
124:22 | got
124:22 | it's a good amount of distance traveled
124:24 | there.
124:25 | It's really just a warm field, right?
124:26 | It it is and then a Yeah, without a
124:28 | doubt.
124:29 | Good.
124:30 | So
124:31 | any more room to put anywhere the fields
124:33 | here?
124:33 | So
124:35 | I think this is an upland area. You'd
124:38 | have to do a crossing here.
124:40 | That would be uh an option.
124:43 | An option. So baseball
124:46 | cuz the original plan was a suck.
124:47 | We need fields and parking desperately
124:49 | in this town.
124:51 | So, I mean I mean parking's tough here
124:53 | because for games they got to park at
124:56 | um that elementary school and walk down
124:59 | that that that lifethreatening path that
125:01 | Yeah, it's tough.
125:03 | Is this field flat over here?
125:05 | Yeah, dead flat. Can't miss it.
125:09 | Can't miss it.
125:10 | You see you'll see the post telephone PS
125:13 | with the lights on.
125:13 | Yeah.
125:16 | Now you need a field trip.
125:18 | Now you definitely need to go take a
125:19 | field trip down there.
125:20 | Yeah, you always drive by.
125:22 | I've never been down to that field. I
125:24 | mean, my kids were all out by the time
125:25 | that was built.
125:26 | You never know it was there unless
125:28 | you I've seen it completely.
125:30 | Just ignore the red tower thing.
125:33 | I I did look over and go, go, go, go,
125:34 | go, go, go, go, go, go, go.
125:35 | Just pretend that that's not there.
125:37 | Everything else is beautiful.
125:39 | What are the plans to put a field? You
125:41 | just
125:42 | I mean I mean money for you. like
125:44 | anything. Yeah,
125:45 | that and I guess what field to put there
125:48 | because like the other thing is is like
125:51 | parking. It's
125:53 | uh it's tight it's tight parking
125:55 | but over for all downtown. I mean, it's
125:57 | not just it's it's like behind the
125:59 | library, there's just no there is no any
126:02 | someday if we ever have the opportunity
126:04 | to to pull like we've had
126:06 | [clears throat] a million times and we
126:08 | never to pull some of those houses down
126:10 | on Main Street that are just there and
126:12 | make it extra parking. It would be very
126:15 | helpful.
126:16 | Pull off
126:18 | here.
126:18 | It's a wetland. I wish.
126:19 | Is it? Is it?
126:20 | It's all right here.
126:21 | Yeah. So, you get down the hill.
126:23 | That's wetland.
126:24 | That's all wetland right here. You got a
126:26 | wetland right here.
126:29 | A lot of wetland in Charlton.
126:31 | A lot of behavior.
126:32 | It's a lot of wetland.
126:33 | The um I mean the other option is now to
126:35 | start looking for, you know, down on the
126:38 | other side of Shelton for other fields
126:40 | and other um possibilities.
126:45 | Anyways, this solves this gets us one
126:47 | step closer to to giving the um the
126:49 | residents um more more recreation space,
126:52 | more field space because
126:56 | Okay, I'll get this um some more flight
127:00 | areas posted on this and then I'll uh
127:02 | get that paperwork on the uh on some
127:05 | lighting.
127:05 | Yeah, hopefully it's not too much.
127:09 | Okay.
127:10 | All right. Thank you guys very much.
127:11 | Question for you. Uh what's the timeline
127:13 | you're looking to get submitted in and
127:14 | on the agenda? Um
127:17 | probably uh the September meeting
127:19 | because I heard it when I sent outside
127:20 | September
127:21 | just and if something changes
127:22 | September
127:23 | I'll come in
127:23 | just so we have um
127:25 | remember it's going to take a couple
127:26 | weeks to post it in the in the paper
127:29 | that I mean
127:31 | football season it won't be
127:33 | Oh thank you very much I appreciate it
127:35 | thank you very much I mean it won't be
127:38 | this we're looking to get this this done
127:41 | so
127:41 | okay just more or less to get that part
127:43 | of the site so it isn't allowed
127:46 | use down there on that site.
127:47 | So, if you're going to do a public
127:48 | hearing on you're not going to do a
127:50 | public hearing on the second because
127:51 | that means the mailings have to go out
127:53 | this week. So, you want to do like
127:54 | midepptember.
127:57 | Okay. Okay. All right. That'll give you
127:58 | some time.
127:59 | Look at them pushing,
128:01 | you know. Keep it moving. I don't I
128:03 | don't blame you.
128:04 | Depends how fully it's going to slow
128:06 | down in your planning board member.
128:08 | [clears throat]
128:09 | Gillan is our brand new planner. This is
128:11 | his first meeting.
128:12 | Oh, nice.
128:13 | Jump it on in. Jump right in. Can't be
128:16 | afraid. Huh? I love it.
128:17 | He's got experience coming from the
128:19 | city.
128:24 | So, he knows what to do.
128:25 | Great. Welcome.
128:27 | First three days, he's already jumping
128:29 | in
128:29 | between the batteries and this, you
128:31 | know, it's um
128:33 | can't be.
128:34 | Okay.
128:34 | Can't be afraid. All right. I appreciate
128:36 | you guys. Thanks again.
128:40 | Good seeing you. Don't be a stranger.
128:42 | Yes. Thanks. Definely.
128:43 | All right. So, do we have We have the
128:45 | Kazowski Liam's myar signing. I don't
128:48 | know what
128:52 | this is.
128:53 | No, this is
128:54 | is it because we didn't sign it last
128:55 | time?
128:56 | Uh, it's possible. This is for the time
128:57 | being.
128:58 | This is actually
129:02 | Yeah.
129:03 | And then we have
129:14 | pen will travel.
129:17 | Could you please sign the paper copies,
129:19 | too, cuz I need to get into certain
129:21 | departments.
129:21 | Yep.
129:22 | Thank you.
129:27 | Uh
129:28 | July 15th.
129:34 | This buy you a stamp.
129:37 | Let us buy you a stamp. Especially
129:46 | good that we get up and get out of our
129:47 | seats.
129:50 | Need the sugar.
130:02 | Huh?
130:04 | Did you go back for two weeks and I came
130:07 | back and I'm like, it's hotter here.
130:10 | Like,
130:11 | you're not looking for sympathy, are
130:12 | you? No.
130:14 | You're not going to get me. How was it?
130:16 | Amazing. We by accident was there were
130:19 | there for a live volcano. I have videos
130:21 | of the volcano. Really?
130:22 | Wow.
130:22 | Did people have it on their bucket list?
130:24 | It was just like, we'll go on that day.
130:26 | Yeah, we
130:28 | got to feel the heat from the
130:31 | people.
130:36 | take a two week vacation.
130:49 | Yep. You want both papers?
130:51 | Paper. Yes, please. There's a couple
130:54 | pages.
130:55 | Oh, all the paper.
130:56 | Was there any issues with 140 bond or
130:58 | that one's good to sign as well?
131:02 | Um,
131:08 | they have to review it and then Is that
131:10 | just an ANR? It's an ANR, but you should
131:12 | look it over.
131:14 | But there's no issues with it.
131:16 | Yep.
131:25 | Just create one.
131:28 | Another
131:32 | one for your review and then signature
131:35 | after a vote.
131:42 | This is blind.
131:43 | Yep.
131:44 | Y
131:53 | it really is good to move around.
131:56 | Yeah.
131:58 | I've already taken the record for the
132:00 | longest one I've had in East Hampton,
132:02 | but that's cuz they adjourned at 8:30
132:03 | whether there was stuff left on the
132:05 | agenda or not.
132:06 | I think we've had till 11 before I
132:08 | think.
132:09 | Yep. They said wishing you arrived.
132:12 | We did 11 before. So
132:14 | yeah, we had 11 before, but
132:16 | that was rare.
132:17 | Well, you ever had to stop and then be
132:18 | continue like a town meeting and they
132:21 | had to do that?
132:24 | Yeah.
132:26 | So, they're just breaking this lot up.
132:50 | Three papers, one by.
132:53 | Yeah, perfect. Thank you.
133:04 | Did I miss the signature?
133:25 | anything.
133:28 | We got all the stuff.
133:29 | Yeah, just the boat, right? Yeah.
133:38 | You guys have one job.
133:45 | I'm the only one that's got retire on
133:46 | this one. I like the I feel like the
133:48 | baby
133:50 | [cough and clears throat]
133:51 | You can vote on that an
134:29 | Y no comments from uh the building
134:32 | office on this
134:36 | 75act.
134:40 | 140 and 34 and check.
134:44 | Exactly. Because you're not going to
134:45 | spare one.
134:46 | Not in
134:57 | make motion to accept the ANR for uh 140
135:01 | Bond road rear builders.
135:04 | A second
135:05 | for a motion. I'm sorry.
135:08 | It's good night. Hi. Hi.
135:16 | It's weird to have like an easy one.
135:18 | We've been getting like these crazy
135:20 | ones.
135:26 | [clears throat]
136:21 | going through here.
136:35 | chocolate.
137:05 | the extension. We have an extension
137:07 | request when they when they
137:09 | [clears throat] want what is the they
137:11 | have they have a letter to us.
137:12 | I have the pre-len letter here. So it's
137:15 | uh dear Mr. Miss Miss Given, at the July
137:19 | 15th, 2026 Charlton Planning Board
137:21 | meeting, the board reviewed your
137:22 | attached request dated July 1 to extend
137:25 | the approval period for your North Serge
137:27 | Road reduced project special permit um
137:31 | to extend that uh plan approval period
137:34 | uh of one year to July 17th, 2027. Um
137:39 | yeah, they make a request.
137:42 | Make a motion we extend the given down
137:45 | in North Nage Roadage lot to July 17th,
137:50 | 20 27th. Second.
137:53 | All in favor?
137:54 | I I
137:55 | I
137:59 | approved. Um, we have a uh a lot release
138:06 | a 61D lot release from St. Mark.
138:11 | I [clears throat] make motion that the
138:12 | pending board recommends board action.
138:16 | Second motion.
138:18 | All in favor?
138:19 | I
138:19 | I
138:25 | unknown business at time posted.
138:27 | Yeah, I'll just give you guys some
138:29 | updates here. number one. Uh just kind
138:31 | of jumping into this meeting to see how
138:33 | you guys run business. One quick lesson
138:36 | learned here. I'll make sure to have
138:37 | Graves packages printed out and ready
138:40 | for you every meeting. Uh in terms of
138:43 | getting information out to you uh for
138:45 | the time being going forward, I'm just
138:47 | going to as it's received send it out.
138:49 | Um
138:51 | as I kind of get a little bit of a
138:53 | better feel for applicants kind of
138:54 | what's needed.
138:55 | Okay. I may try to organize it better so
138:57 | I'm not just you're not just constantly
138:59 | getting emails from me. That way be a
139:01 | little more organized, but just expect
139:04 | emails coming out for
139:06 | um
139:06 | we do have we do have a share drive.
139:08 | Okay.
139:09 | If you can you're more than welcome to
139:10 | get in there and organize that and and
139:13 | post things to specific meetings that
139:15 | would be nice to have. Then then we can
139:16 | always look back
139:18 | on a specific date and and what was what
139:20 | was
139:22 | uh Hey there. If you bear with me as I'm
139:25 | development, I'm [clears throat] just
139:25 | gonna pull this up here. I'm going to
139:27 | show you and format here. I can totally
139:32 | willing to work on
139:35 | this so much at this hour, but let's
139:37 | see. [laughter]
139:49 | Are you connected?
139:50 | I'm about to be.
139:52 | [clears throat and cough]
139:53 | go through Windows here and it's a
139:55 | little slower than I would like.
139:56 | Remember when we got this TV and it was
139:58 | so much cheaper to just go buy a brand
140:00 | new TV than wanted a smart
140:05 | get it and then we're like, "Oh, why
140:06 | don't just get a TV?"
140:08 | Well, I uh don't get to navigate this at
140:11 | this hour. So, I'm going to show you all
140:12 | here on my computer. Okay, pretty
140:15 | simple. Um, so [clears throat]
140:24 | what I'm going to be doing here,
140:27 | um, I may try to make this a little
140:29 | clearer, but the idea is as I receive
140:31 | materials, post them directly to the
140:34 | website, right at this top link here.
140:36 | The idea is
140:41 | try to organ organize everything by
140:44 | year.
140:46 | This is this is a public page here.
140:48 | Yeah, this is a public page.
140:50 | I'm getting network errors here. Kind of
140:53 | isn't displaying it. But right now,
140:55 | what's in here is we have uh what's the
140:59 | name of that project for for next week
141:01 | for the next meeting?
141:02 | Yeah, those two new ones that came on.
141:05 | We have
141:06 | we have two projects in here. I'm going
141:08 | to figure out what's going on with the
141:09 | website, why it's not loading the moment
141:11 | I care to show somebody what's happening
141:13 | with it.
141:13 | But for the next
141:16 | it'll be all submitted materials and I
141:17 | plan on organizing in such a way with
141:20 | between each meeting everything that was
141:21 | submitted both from uh engineering
141:24 | reports uh
141:25 | resubmitting
141:26 | years ago. We were submitting we were
141:29 | making sure that every you know all the
141:30 | site plans because it just it's so much
141:32 | easier for the you know for the public
141:34 | to access to be able to see what we're
141:36 | looking at
141:36 | for big projects. Yeah.
141:38 | You know for and we we always can
141:42 | request everything anything electronic
141:44 | from you know most most of NGOs do their
141:46 | stuff on on
141:49 | so here here you are. I have this one
141:50 | here. This is going to be 123 Worcester
141:52 | Road. The initial submission and this is
141:55 | everything I've received from the
141:56 | applicant. So we have you know the the
141:59 | application here
142:02 | you can see all that. Um so as I receive
142:06 | any new applications I'm getting in I'm
142:08 | requesting electronic that way I can
142:10 | also just upload them here.
142:12 | I'm open to
142:14 | different formats but this is the
142:16 | general idea.
142:17 | Okay.
142:18 | The big thing is naming conventions. So
142:21 | um what is
142:22 | SPR 26? That is just how we're titling
142:27 | our special permit.
142:29 | Special permit
142:29 | 2026 and then it's the second one for
142:32 | this fiscal year. I may I'm not married
142:36 | to this naming convention. That's just
142:38 | what I've inherited and I'm likely going
142:40 | to change it to something a little
142:41 | clearer.
142:42 | The address and owner's name. It's kind
142:46 | of handy to put on there or maybe just
142:48 | an address. I mean
142:50 | Yep. and it has the address immediately
142:52 | after but it's going to have a standard
142:54 | that way it's always ordered by when it
142:57 | was submitted.
142:58 | Um
142:59 | I like that. That's what we do in work
143:00 | because it's the only way.
143:02 | Exactly. And then you can keep adding to
143:03 | it.
143:04 | And do we do we keep this on the only
143:06 | the only thing that concerns me about
143:08 | having a public
143:10 | website is everything's searchable from
143:13 | any Google document anywhere. So, you
143:17 | know, so this is and I'll just sorry to
143:20 | cut you off. I just I just I've
143:21 | experienced a problem. I know you're
143:22 | you're about to say where I've gotten
143:24 | requests. You know, Google my name comes
143:25 | up and my address.
143:26 | Uh we do have discretion of just when I
143:29 | see something that's like
143:30 | public names, people's things. I'll
143:32 | generally black out cell phone numbers
143:34 | of developers. If somebody wants that,
143:36 | they can submit a public records request
143:38 | and we can give it to them. But it just
143:40 | makes it that it's not immediately
143:41 | available. I think that I mean we I
143:45 | I mean permits I guess I I think plans
143:48 | need to go up like you know
143:50 | plans and some information.
143:52 | Um I mean I don't know even I mean
143:55 | typically we don't put
143:57 | um our graves reports up there.
144:00 | That's so sure that's true.
144:02 | I don't know.
144:02 | So that that kind of stuff is is what
144:04 | we've been using the share drive for. So
144:06 | it's it's only [clears throat]
144:06 | accessible by you control the access to
144:09 | it. So it's only accessed by members. I
144:11 | mean, I don't know if there's anything
144:12 | ever anything ever confidential. Um, and
144:15 | I'm I'm all for um, you know, public
144:17 | access. Yep.
144:18 | Um, I just always worry about having too
144:21 | many versions of too much data out there
144:24 | and the cost of sharing because I'm
144:26 | auditing that right now. Um, so it's um,
144:31 | I'm more worried about providing client
144:33 | data to the worldwide web for any search
144:35 | engine anywhere that wants to, you know,
144:38 | mine data. I prefer with name statuses.
144:42 | I prefer to have [clears throat]
144:44 | you know uh enough information out there
144:47 | on what the planning board is doing so
144:49 | people can know then they can come to us
144:52 | to get more information. That's that's
144:54 | kind of I'd like to kind of firewall
144:56 | that stuff.
144:57 | Yeah. I just don't wait. I just
144:59 | they with AI now search engines going
145:01 | out there and everything's
145:03 | like fall under what like I mean I've
145:05 | never looked at uh you know what we f
145:08 | you know we have all this data
145:09 | [clears throat] the data protections we
145:11 | have around names and addresses and
145:12 | phone numbers are a big deal. Mhm.
145:15 | Um,
145:17 | so I think projects uh that kind of
145:19 | information can go on what we would
145:21 | normally put on our public site, but for
145:25 | grave reports and engineering reports
145:27 | and things like that, I think we're
145:28 | better off firewalling that providing
145:32 | access here for people that want to been
145:33 | here, but not providing all that data
145:36 | out to
145:37 | and it's for exactly what you said
145:38 | because you're going to have bots going,
145:39 | you know, you're going to have just it
145:41 | it collected for for whatever purpose
145:44 | purpose that um
145:45 | well, it's just like what we did tonight
145:47 | with the gas station.
145:49 | Yep.
145:49 | You can't put all the information out
145:50 | there about everybody's name and stuff.
145:54 | So, that's just that's my concern with
145:56 | with with doing it on the publication.
145:58 | Mhm. And I can I can just put a note of
146:01 | so specifically something like if you'd
146:03 | like engineer
146:04 | if you want more information contact
146:06 | please email
146:07 | and honestly typically if somebody asks
146:09 | me for something and makes a request
146:12 | I'll I'll mean I've given it to them
146:15 | like as they walk out of the meeting or
146:18 | I will email it to them directly and
146:20 | you'll find that most of the quest
146:22 | requests do come through right they
146:23 | people go right to the board member that
146:25 | they know and they ask for it. So, um
146:28 | I mean the only other thing just put the
146:30 | final uh
146:32 | final decision.
146:32 | Yeah, the final decision with conditions
146:35 | in it or something like that just so we
146:36 | know.
146:37 | I mean, Jane, the biggest request that
146:38 | people want to see are the plans, right?
146:39 | Like that's
146:41 | people want to know what's happening
146:43 | where
146:45 | I think it will be old
146:48 | a file that says decision and appendix
146:52 | that would have final plans
146:54 | and condition. Yeah, that's great.
146:56 | And I mean, all of this stuff is public
146:59 | information. So, is the owner, the
147:01 | street address, you know, so
147:03 | it's public information, but putting it
147:05 | out
147:05 | Yeah.
147:07 | out in the the worldwide web in that
147:09 | written form is a little hard. Slows
147:11 | them down a little bit.
147:12 | Could be um Yeah. Could be problematic.
147:15 | Yeah.
147:16 | Uh, I'll also be changing the format
147:19 | here a little bit of the agenda one, but
147:23 | make it easier for myself and the public
147:26 | of generally trying to keeping all the
147:28 | information that you need, name,
147:29 | address, all those things. Um, I also
147:32 | want to start including the general uh
147:35 | what bylaw it's being reviewed under.
147:38 | Uh, one that would help me just kind of
147:40 | get up to speed with what's in the
147:42 | bylaw. And then anytime any member of
147:44 | the public is interesting, well, how is
147:46 | this allowed?
147:47 | All the bylaws that are necessary are
147:50 | referenced and they can look that up.
147:53 | Um, and then decisions as well. I'm
147:57 | want to try to get that a little bit
147:59 | more industry standard where it would
148:01 | be, you know, [clears throat] you have
148:03 | basic information, then you have legal
148:06 | description, procedural history, and
148:08 | then you go right into waiverss,
148:09 | conditions, anything like that. Sure.
148:14 | Try to make sure we're even in a
148:15 | position where we have, you know,
148:16 | defensible decisions because I think as
148:18 | we get to the point where, you know, we
148:20 | may have appeals come in, we want
148:22 | decisions to be
148:24 | covered any issues with decisions except
148:27 | for maybe BDD, but
148:30 | a big there's been quite a few. Yeah,
148:32 | you know, there's been a few here and
148:34 | there. And we also I mean we have legal
148:37 | counsel so whenever we need them they're
148:39 | always available for um question.
148:45 | So I'm just thinking about the the
148:48 | public facing website and then as Don
148:50 | mentioned we've got the shareepoint
148:52 | and it would be good to use the same
148:55 | naming convention I think. So in the the
148:58 | the SharePoint we have like meetings you
149:02 | know January, February, March
149:04 | and then I guess you could put you know
149:07 | SPR 26-34
149:10 | or something like that. Yeah.
149:12 | And then you could put all the graves or
149:14 | ports and all of that in there because
149:16 | you got to put them somewhere anyway.
149:19 | And you can talk to it about the the
149:21 | link to to the shareport. They can get
149:22 | your name on it if you probably have it
149:25 | or I could add you.
149:25 | Yeah. But that would be great because we
149:28 | haven't been doing that. That would be
149:29 | great to just stuff everything in the
149:31 | SharePoint. Otherwise, it just sits on a
149:34 | laptop somewhere. So yeah,
149:35 | and so you know um the town the we have
149:39 | our own sort of Facebook page that Dawn
149:42 | that Dawn created because we never um
149:44 | just just for communicating publicly
149:46 | just just and and and um and because a
149:52 | lot of a lot of old people now like
149:54 | that's where they get their true
149:57 | our information um spun around at least
150:00 | you know people talk but we our our
150:03 | children website
150:05 | actually actually the most um user
150:06 | friendly or nice looking or anything.
150:08 | But so good luck.
150:09 | I just got a message on the um
150:11 | complaining board asked us if you want
150:12 | to monetize it now because we've got
150:14 | enough followers.
150:15 | Is that right? You know, we can start
150:18 | monetizing and use that money.
150:20 | That whole 35 would be like,
150:22 | "Hey, I finally got that ESA postcard in
150:24 | the mail."
150:25 | I know. I saw that.
150:26 | Everybody did. [laughter]
150:28 | Yeah. Yeah.
150:32 | If we if we join Like I I want us to be
150:35 | more out there and pushing our pushing
150:38 | our stuff. I mean even if I don't know
150:40 | it might be
150:42 | nice to do little sort of like this is
150:45 | what happened. I've been reading some of
150:46 | the like short little posts or is that
150:49 | too much only because you have me on all
150:52 | the community. I mean you
150:54 | me everywhere on these community pages
150:56 | saying
150:58 | heads up this is happening. Heads up.
151:00 | Um, I usually post the agendas.
151:02 | Put a link to us in advance or
151:04 | something.
151:04 | Yeah,
151:05 | that's a good idea. If you're interested
151:07 | in what happened, here's a link to the
151:09 | YouTube. Watch the meeting.
151:11 | You could do a show at the studio and
151:13 | then I could put on YouTube also. You
151:14 | can do
151:14 | Oh, yeah. with with with Paty. Sit down.
151:18 | Yeah, right. That's what everybody
151:18 | wants.
151:19 | Sit down.
151:21 | We could have a sit down with our
151:23 | planning director and get his name up
151:25 | there.
151:25 | Who used to do that? We used to do those
151:27 | We used to do those interviews. Who used
151:29 | to do that?
151:29 | They used to select me used to do stuff
151:31 | like that. They would go over whatever
151:33 | the
151:33 | cooler than the select me. Oh yeah, it's
151:35 | not hard. But like we could be cooler
151:37 | than that.
151:37 | Dick.
151:40 | I I've got to get going. So um good.
151:44 | Is there anything else that
151:46 | all of you have? It's I've got the
151:47 | damage cell number. Shoot me a text
151:50 | anytime. Give me a call. Um
151:53 | if any of you guys want to meet private
151:55 | meetings, let me know. I'll make myself
151:57 | available. That's totally optional.
151:59 | If you got if you have questions on us,
152:01 | let us know.
152:01 | Yep. We'll do. Uh
152:03 | yeah, normally I'll be in here. I mean,
152:04 | the chair comes in earlier to kind of
152:06 | just so
152:08 | I have a clue. But any of us have a clue
152:10 | when we're when we're um
152:13 | it it's good to have uh any materials we
152:17 | might need for the meeting, plans, if
152:19 | they've got extra set of plans that we
152:21 | can look at instead of trying to oversee
152:23 | everybody. um bridge reports, any other
152:26 | reports from from the engineering
152:28 | reports just so we've got something to
152:29 | look at.
152:30 | Typically, everybody comes in a little
152:31 | early.
152:32 | And once again, if there's time to get
152:35 | those ahead of schedule onto the
152:37 | SharePoint, give us time to review it if
152:40 | we have time before we get because
152:42 | trying to
152:43 | go through everything and stuff. So,
152:44 | it's
152:45 | sometimes trying to print them out on
152:47 | the fly. Yeah,
152:48 | a lot of times you a lot of times they
152:49 | give them to you so last minute too that
152:52 | I know that's not
152:52 | but if they come in early stick for the
152:54 | meeting and and you know at our leisure
152:56 | we can we get a report. Do you have any
152:59 | vacation coming up or we need to know
153:01 | about it?
153:01 | Yes, I have one vacation um same time as
153:06 | Jane after our August meeting we are
153:08 | both out that
153:09 | um and then after that it's I'm I'm
153:12 | here.
153:14 | I'm I'm off I think several weeks in
153:17 | September. I might miss both meetings in
153:19 | September.
153:22 | Going someplace nice. Yellowstone.
153:25 | Wow.
153:27 | Very nice.
153:28 | Buying another trailer and driving out
153:30 | there.
153:31 | Flying this stuff. [laughter]
153:35 | Okay. Um I'll make a motion we
153:40 | second.
153:43 | Thank you, Dylan.