2026-09-22 - Conservation Commission Meeting
Summary
Built from ASR auto-captions (no speaker labels; names and numbers may be misheard).
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| Lot 5 Smith Road Land Disturbance Waiver Denial | 31 | 24% |
| Other business | 29 | 23% |
| New England Power Company Snake Hill Road Substation | 22 | 17% |
| 35 North Main Street Duplex Subdivision | 22 | 17% |
| Hayden Enterprises Gas Station Special Permit | 12 | 9% |
| Wake Surfing Bylaw - South Charlton Reservoir | 10 | 8% |
| 84 Glen Echo Shore Road Storm Water Violation | 1 | 1% |
84 Glen Echo Shore Road Storm Water Violation
0:08-0:48
- Opened with a public inquiry about stormwater runoff at 84 Glen Echo Shore Road.
- The conservation agent (Rose Conway) asked for and received a motion, passed by voice vote, to issue a stormwater violation letter to the owner whose driveway discharges onto the abutting property.
Hayden Enterprises Gas Station Special Permit
2:35-14:33
- Closed the hearing and issued an order of conditions for the Worcester Road gas station / drive-thru / five-apartment project.
- The applicant's engineer summarized the previously disturbed 4.75-acre site, double-walled fiberglass tanks with 24-hour monitoring, oil/water separators and spill shut-off valves, and an emergency-only gate onto Old Worcester Road.
- Special condition: no land disturbance begins until the land disturbance application is filed; possible return if MassDOT's curb-cut review forces changes.
- A resident of Stevens Road asked about leak history from the former gas station where the CVS now stands.
New England Power Company Snake Hill Road Substation
14:33-36:40
- National Grid substation at Snake Hill Road: Peter Defusco and Alison Milman of BSC Group described a redesigned three-sided open-bottom box culvert that eliminates stream-bed and bank impacts, reduced wetland fill, tree-clearing justification, and a July 28, 2026 Army Corps 404 approval (to be re-verified for the new culvert).
- The agent will require supplemental test pits near the basin before the land disturbance application.
- One commissioner asked for more time to review the DEP comments, but the commission voted to close the hearing, with the order to follow in a week or two.
Lot 5 Smith Road Land Disturbance Waiver Denial
41:51-72:40
- The applicant's representative (David Saddowski) requested a waiver of the town's land disturbance permit because the lot disturbs only about 14,300 sq ft.
- The agent argued the lot is part of a common plan of development (older ANR subdivision) exceeding one acre and recommended denial.
- After a heated exchange, including a commissioner (Mitch Dunn) moving to grant the waiver (no second), the commission voted to deny the waiver, then closed the hearing and issued an order of conditions requiring a land disturbance permit application before disturbance.
- Most contentious item of the meeting.
35 North Main Street Duplex Subdivision
82:20-104:21
- James Dro of Expedited Engineering presented the redesigned proposal for GM Properties: nine by-right duplex lots (7 on North Main, 2 on Stevens Road) in place of the earlier 30-40 unit townhouse plans rejected by the Planning Board.
- Closest work is 15 ft from wetlands; discussion of filing fees (riverfront surcharge, building rather than single-family fee category).
- An abutter, Ashley (32L Stevens Road), raised concerns about density and septic proximity to wetlands.
- Hearing continued to October 28.
Wake Surfing Bylaw - South Charlton Reservoir
116:30-126:43
- Under old business a South Charlton Reservoir resident questioned why the wake-surfing matter was not on the agenda.
- The commission and agent explained that the study proposal must first go to the Lakes and Ponds committee and nothing will be discussed or voted until findings return.
Other business
0:48-2:35, 36:40-41:50, 72:40-82:20, 104:21-116:30
- August 19 minutes approved.
- Continued to October 28: 360 Worcester Road (commercial building near the mini-golf site, tied to the Planning Board schedule), 11 Sunset Drive (deck/swim spa near Gluck Lake), and 80 Richardson Corner Road.
- Order of conditions voted for 18 Oxbow Road (Chris McClure for the owner, clean-fill grading of about 23,000 sq ft behind a Route 20 garage).
- Routine closings: a septic replacement at 55 Oxbow Road along the Little River, and a single-family house at Lot 5 on Gul Road for PMD Development.
- ANRAD confirming wetland boundaries at Lot 8 Daniels Road for C.R. Hansen Construction (boundaries accepted after joint field walk with the town peer reviewer, with a potential, uncertified vernal pool).
- Minor amendment approved for 933 Sturbridge Road (Route 20), enlarging the culvert scour-protection apron at McKin Street Brook by about 1,000 sq ft at MassDOT's request.
- Certificates of compliance for 11B Colum Drive, 59 Pumpkin Lane (complete), another Pumpkin Lane file (invalid, never commenced), and Rams Road.
- Adjourned.
Sources
Video
Transcript
Transcript
0:02Yes,
0:02>> you guys are ready. This meeting is now
0:05called to order. First item, public
0:08inquiries.
0:1084 Glen Neco Shore Road storm water
0:13runoff. What's that about?
0:15>> I brought this to the commission last
0:16time was a complaint about storm water
0:18runoff. I say that would be waiting for
0:21a nice storm to go and look at it to see
0:23if the water was indeed running towards
0:25the abing property and it was. So, I was
0:28going to ask the commission to make a
0:29motion to uh for me to issue a letter of
0:32storm water violation to the property
0:36owner who has the driveway impeached and
0:39discharged onto the abing property.
0:42>> Oops. So, I need a motion. I'll make
0:44that motion.
0:45>> I need [snorts] a second.
0:46>> Second.
0:47>> All in favor?
0:48>> I
0:48>> I.
0:50>> Next. Approval of minutes August 19,
0:542026.
0:56I need a motion to approve the minutes.
0:57>> Motion to approve the minutes.
0:59>> Second.
0:59>> Second.
1:00>> All in favor?
1:01>> I.
1:02>> Eyes have it. All right. Public
1:05hearings. First one, D number 128-203
1:10360 Worester Road. The applicant has
1:13filed an NOI for the construction of a
1:15commercial building, paved driveway,
1:17parking lots, storm water infiltration,
1:20and associated site work within 100 ft
1:22of the buffer zone of BVW. Where we at
1:25with that?
1:25>> So, we'll be continuing it to when does
1:28planning board continue to?
1:30>> 10:21.
1:31>> So, we'll continue till 10:28.
1:33>> 28. Okay. So, uh 1028.
1:36>> I need a motion to continue to 1028.
1:38Motion to continue.
1:39>> Second.
1:40>> Second.
1:41>> All in favor?
1:42>> All right. Is this the the one the
1:44planned?
1:45>> Yes.
1:46>> Gas station with the
1:47>> No.
1:47>> Oh, sorry.
1:49>> No. Yeah. That's where the uh uh a
1:52little it was a little a mini golf.
1:55>> Oh, the miniature golf course. Okay.
1:57>> All right. Next item. D number 128 2018
2:0211 Sunset Drive. The applicant has filed
2:05an NOI for the construction of a deck
2:08with a swim spa, permittable paver
2:11patio, fence, and retaining wall within
2:14100 ft of Gluck Lake.
2:16>> We will be continued to October 28th.
2:2328th is fine.
2:24>> I need a motion to continue the 28th.
2:26>> Motion to continue.
2:27>> Second.
2:28>> Second.
2:29>> All in favor?
2:30>> I. [snorts]
2:33>> All right.
2:35Next on the list is DP number 128 2015.
2:39Just says Worester Road. The applicant
2:42has filed an NOI for the construction.
2:44Uh of
2:45>> we have a man approaching the deis
2:48of a five fuel pumps, two diesel
2:51stations, two 20,000galon underground
2:54tanks associated with a gas station and
2:56drive-thru and propose proposed
2:59convenience store with five residential
3:00units above it. All work is within 100
3:03ft of BBW. This is the one we've been
3:05seeing for months, correct?
3:07>> Since August.
3:09>> Since August. We're just waiting on
3:11planning board some storm water but it
3:13looks like everyone has been addressed.
3:15How are you?
3:16>> Good. Okay. This is fine. Yeah.
3:19>> You presented before, right?
3:21>> Yeah. Yeah. I I just wanted to go
3:22quickly over what
3:25from the last meeting at the last
3:26meeting. No, there was no changes on the
3:28plan but uh I guess the board was
3:31waiting for the planning uh board
3:34>> this was waiting to close. Yes. and they
3:36did
3:37>> close and they approved the the all the
3:39special permits and the uh
3:41>> I don't know if you want me to go
3:42through I can just
3:43>> you can just give a an overview to
3:45refresh everyone's mind
3:46>> excuse me if we is there anybody in the
3:48audience that wants to see these plans
3:50>> absolutely
3:52>> nobody okay
3:53>> so basically uh at the last presentation
3:56I I stated that the property is about
3:584.75 acres and uh it's located in the in
4:02the commercial business district a gas
4:04station was allowed use as of right, but
4:06we applied for a special permit for the
4:09drive-thru and the apartments, the five
4:12apartments on the second floor. Uh, this
4:15site, uh, approximately 2.5 acres of
4:18this site was previously disturbed with
4:20the with the gravel processing
4:22operation. I'm sure you're all familiar
4:24with the site. It's been there for 25,
4:2630 years. And uh so we we filed for
4:30notice of intent in conjunction with the
4:32planning board and part of the uh
4:35process review process. We had we hired
4:38traffic consultants. We also hired the
4:40environmental consultants through your
4:42office that reviewed the the projects.
4:44They had some comments. D had few
4:46comments too. I addressed those with
4:48with Rose and I I sent the memo uh and
4:52they sent the revised plans to uh D. All
4:55the storm water was reviewed by
4:58>> Graves engineer review
5:00>> uh by yeah uh uh
5:02>> Graves
5:03>> Graves Engineering and there was like I
5:05believe originally 36 38 comments all
5:08the comments addressed there's couple
5:09minor comments that we had to did part
5:12of the planning board conditions that we
5:16just revised those couple minor plans on
5:19they they mostly like drafting errors
5:22not nothing to do but we got the okay
5:24from uh the storm water and I I'll be
5:27applying for this for the storm water.
5:29>> Oh, that's fine. This I won't hold this
5:30back. I'll just have a special condition
5:32there.
5:33>> I heard that and really it didn't have
5:35you know I went online I downloaded the
5:37application. Everything's reviewed.
5:40>> It's straightforward at this point.
5:41>> Straightforward. So just to refresh your
5:44memories basically we're in the buffer.
5:47Uh there's a small portion of the
5:48drive-thru that is between the 50 foot
5:51buffer and 100 foot buffer that we will
5:53be altering. And again, this is areas
5:56that previously degraded or developed or
5:59altered. There's no new alteration with
6:02this project. And we kept the the scope
6:05we kept the the the limits of the
6:07alteration to within the existing uh
6:11previously disturbed areas. And we
6:13actually uh uh claim some of this area
6:17that was previously graveled. And this
6:19will be turned into a green space. And
6:21again, this is all between the 50 and
6:23the 100 foot buffer. Uh all this snow
6:26storage out of the 100t buffer, fuel
6:30operations, fuel tanks, buildings, storm
6:33water, septic, all outside the 100 foot
6:36buffer. And also we propose a 6-foot
6:41fence all along the southerntherly side
6:44of the property from the mo the this the
6:48north west corner all the way to
6:53this end here.
6:54>> Is there a curb mot?
6:56>> What's that?
6:56>> Is there going to be curbing?
6:58>> Oh yeah, we have we have curbing but
6:59also we have a small retaining wall but
7:01we have some landscape but we do have
7:04also a fence. So that's would prevent
7:06any
7:08probably debris going to the back of the
7:10river and also we did that so some of
7:13the residents that live to the south the
7:16you know to prevent any glare to to
7:18lighting I mean and this was all part of
7:21the site review so um and we with the
7:25storm water I don't want to go into a
7:26lot of details but you know right I I
7:28think I mentioned this at the last
7:30meeting you know there's nothing there
7:32now you know whatever your operating
7:34machines with hydraulics and there's no
7:36treatment, you know, whatever.
7:37>> It's an improvement.
7:39>> It is, you know, we we truly did the you
7:43know, a good job to to make sure because
7:45we understand the the the sensitive area
7:48here and uh so everything will be
7:51collected, treated that we have shut off
7:53valves for emergency spills and all
7:55that. So uh and also I think I mentioned
7:59at at that time that that's the existing
8:02gravel driveway currently uh used for
8:06access in the property off of old
8:08worcester road will be closed with two
8:10gates only emergency personnel and curb
8:14cuts we have to go to do mass if there's
8:17any changes on the plans from we'll have
8:19to come back that's what the planning
8:21board and the planning board approved it
8:23>> uh at the last meeting I think They sent
8:26me a copy of the draft condition. Yes, I
8:28think you got a copy to it. So, I think
8:31we're good to go. So,
8:34we kindly ask your approval tonight so
8:37we can continue on.
8:40>> So, the total disturbance within the
8:41buffer zone, we're talking about less
8:43than 30,000 square feet and near the BVW
8:47around 40 ft. Uh it was delineated and
8:50it was also our alley uh confirmed the
8:54lines. Uh findings have been confirmed.
8:58Uh
9:03something
9:09no is another project. No, that's it.
9:11And the only special condition outside
9:13of the uh original conditions that we
9:15usually issue is just a special
9:17conditions that the lane disturbance
9:19should not started until the lane
9:22disturbance the lane disturbance
9:24application is filed. So which is a
9:26little bit so I don't have any concerns
9:28of the project has met all storm water
9:30has been reviewed by graves approved by
9:32planning board. Uh uh questions and
9:36comments from D have been uh
9:40>> addressed
9:40>> addressed. Peer review comments have
9:43been addressed.
9:45>> Board members have any questions.
9:48>> I guess we talked a little bit about
9:49that access way on the side. You said
9:51that's going to be chained closed just
9:54for emergency.
9:55>> It'll be a gate. Yeah. And only
9:57emergency personnel will have access to
9:59the box. whatever it be fired, police or
10:02so be another means of eagerness to the
10:04fire department. I guess it's there.
10:06Might as well use it.
10:08>> That's what our feeling. But again,
10:10we're going back to DOT. There was a
10:12discussion with the planning board.
10:13Maybe make this or here maybe one way
10:15out or something. But the the residents
10:18did not did not like that. So, we're not
10:20going that route.
10:22>> It would impact the wetlands in the
10:24area. So unless and only when DOT
10:26actually requires that to be changed, we
10:30will remain like that. If they do, then
10:32he'll come back to us with a different
10:34plan.
10:35>> Okay. Any
10:36>> And these are underground tanks as well.
10:38You said the storage tanks.
10:42Um are they double walled? Are they
10:44steel?
10:45>> Double walled with
10:47>> Vita root protection 24-hour monitoring.
10:50This is this is fire codes. Yeah. Okay.
10:53Yeah. Absolutely.
10:56>> I just have one question. Um, for the
10:58revision that you were talking about for
11:00the DOT, um,
11:02>> what is the is that already in motion?
11:06>> The DOT,
11:07>> there's no revision. Yes. So, he will
11:09apply for the curb cut with the states.
11:12So, states have different requirements.
11:14So, sometimes when they go to the state,
11:16they can come back with their
11:18requirements that will impact what has
11:20been approved. If that is to happen,
11:23they will come back and he will come
11:25back and show the commission what
11:26possible change is going to have to be
11:29made in order to comply with the state
11:31requirements and then we work together
11:34then. But there's nothing in the works.
11:35Nothing has been so correct.
11:37>> Perfect.
11:38>> Any members of the audience have a
11:40question?
11:41>> I just do just out of curiosity. Um I'm
11:43Ashley Rzbow 32L Stevens Road. Um, I
11:47just learned about this project, but I
11:49was part of the properties that got
11:51affected by the old uh gas station where
11:53the CVS is now where the gas leaked into
11:56the water and then um Exxon had to come
11:59and replace we connected to sewer. Is
12:01there any plan like should that happen
12:03in that area for you guys like how that
12:06would be handled on this side here? Like
12:10do you guys kind of remember what I'm
12:12talking about with this?
12:15I I can't tell you what happened there
12:18because obviously I don't know. It could
12:20have been an old tank with like steel
12:23old in the old days they used to put
12:24steel tanks in the ground and they rot.
12:26We all know that. So now the rules are
12:28different regulations. So
12:30>> which is great. I just was
12:31>> so double wall fiberglass tanks
12:34>> and with 24-hour monitoring
12:37>> and all the piping same and also I
12:40mentioned on the storm water. I don't
12:41know if you're familiar with storm
12:42water. storm water is when you if you it
12:46collects the runoff when from the rain
12:48but in case there's some debris or
12:52pollutant on site let's say you have an
12:54oil spill or something from a car that
12:56leaks.
12:57>> So we take that into deep some catch
13:00basins then we take it through oil water
13:01separators you know treat it before we
13:03discharge to the to the wetlands. Uh and
13:06also if there's any large leak like a
13:09catastrophic leak, let's say uh
13:12something broke with with the pump or
13:15the pipe or uh that leak uh 500 gallons,
13:20something like that which will be all
13:21contained in the in the drainage system.
13:23There's also a uh shut off valves that
13:26all employees will be trained to the
13:29locations are shown on the plans with
13:31the signage and all the you know we do
13:33this on my client operates about 15 gas
13:36stations in the commonwealth of
13:37Massachusetts and this is something that
13:39we do so you can shut those valves off
13:42and then prevent any water going into
13:44the ground you know.
13:45>> Okay. That's are well known facility.
13:48>> Oh yeah. and and this was all reviewed
13:49by Europe review and uh you know so we
13:52this has been going on for like three
13:54four months back and forth we made like
13:56three four different revisions on the
13:57plane so
13:58>> yeah I just want I just it was just I
14:01completely understand you know this is
14:04absolutely
14:07>> be recommended to close the public
14:08hearing and issuing the order of
14:10conditions I need that motion
14:12>> I'll make that motion
14:13>> second
14:13>> second [snorts]
14:14>> all in favor
14:15>> I
14:15>> approved
14:17>> thank you very much Thank you. I will be
14:19talking. I mean,
14:20>> yeah, we I'll we'll talk next week.
14:22>> Yeah. Thank you so much.
14:23>> Thanks for the presentation.
14:24>> Well, thank you for your help.
14:26>> Oh, of course.
14:27>> We exchanged emails, but I didn't
14:29realize this is you. So, [laughter]
14:32>> thanks.
14:33>> All right. Next, we have D number
14:35128-2029
14:39Snake Hill. The applicant has filed an
14:42NOI for the construction of a new
14:43substation to provide power to an Amazon
14:46warehouse within 100 ft of the BBW.
14:48>> I'm guessing that's you.
14:50>> How are you, Alison?
14:51>> I'm well. How are you?
14:52>> Good. Good.
14:53>> And you presentation?
14:55>> Oh, sure. Yes. Um, do you Oh, Dale, she
14:59just put it. Did you just put it there?
15:01>> Oh, no. I have it on my laptop. Do you
15:03need it on a flash drive?
15:04>> Yes.
15:05>> Thank you. Yeah.
15:07>> Why is there a flash drive there? What
15:08is that?
15:10see the flash drive. Can you see what's
15:13in there
15:16through the
15:20>> I actually think it's hers.
15:22>> Alison, did you ever take yours last
15:24time?
15:27>> Yeah,
15:27>> I have several. I'm just going to pop
15:29this.
15:30>> Yeah, just left it here.
15:32>> I think that's the one that's there, but
15:35if there are revisions anyway, so it
15:36Yeah, let's eject that day if you don't
15:38mind.
15:41While Ellison's getting the media ready,
15:43I'll introduce the project if that's
15:44okay with everybody.
15:45>> Yes, sure.
15:46>> All right. Good evening. My name is
15:48Peter Defusco. I'm a lead environmental
15:50scientist with National Grid. I'm the
15:52applicant for the project.
15:55Um, we kick this off on July 15th for 29
15:59Snake Hill Road where we're building the
16:00new substation to support the Amazon
16:02warehouse. This is a transmission
16:04substation. So, we'll be building um
16:09a fence enclosed facility on our
16:11existing property. It will loop into
16:14overhead transmission infrastructure.
16:17There's an overhead transmission line to
16:19the north behind where this structure is
16:21proposed.
16:23To the east is Carpenter Hill Road. Um
16:25the way the property flows, it's a large
16:28hill and then an intermediate bench
16:29where we're proposing the station and
16:31then another hill downward sloping west.
16:35Thank you.
16:36>> To the south is Snake Hill Road.
16:39Um coming from the station, we'll have
16:41distribution lines going underground in
16:44the access driveway and then to the
16:47roadway where it connects to existing
16:49distribution poles.
16:53We had some
16:55D comments uh which were reviewed and
16:58submitted. We were also peer-reviewed by
17:00Mr. R. Allen um before he retired. It
17:02was nice to get out there in the field
17:03with him on June 30th uh where we
17:07addressed uh Mr. Allen's comments as
17:09well.
17:11And with that, I will hand it over to
17:12our representative for the project, BC
17:14Group.
17:15>> Hi, my name is Alison Milman. I'm here
17:17on behalf of the applicant as a
17:19representative from BSC Group.
17:21>> Okay. So I had given a presentation the
17:23last time uh and this is uh an update to
17:27basically what we've presented on and uh
17:30you [clears throat] know the responses
17:31that we've provided as well as um some
17:34changes to the plans. We provided
17:36responses to our DP reviewer as well as
17:38the peer reviewer as um as Pete had
17:41mentioned.
17:47So, as Pete said, this is a new
17:48substation with distribution and
17:50transmission line upgrades. Um, these
17:53are the this is the scope of work. This
17:54is the um to refresh your memory. Um,
17:57it's an existing 64 approximately acre
17:59lot. Um, it's mainly forested. Um, it
18:02does contain an existing substation and
18:05transmission um facilities within the
18:07site. Um, and as well as a solar site.
18:10Um and the the proposed scope is to
18:14build a new substation tie it into the
18:15transmission as well as a distri ex
18:17existing distribution system. Um and all
18:20of these um you know activities are
18:23supporting that new substation and uh
18:26transmission facilities.
18:29Okay. So that's the site location 29
18:32road. Okay. So now we're getting into
18:34the meat here. These are the changes um
18:37that have been realized since I I
18:39initially uh presented to the
18:41commission. Um so uh one of the the big
18:45changes that I'd like to present is is
18:47the culvert design has significantly
18:49changed. So originally it was an
18:50extension of the existing corrugated
18:52metal pipe. Uh but now they are
18:54proposing um a box culvert concrete
18:57three-sided box cover c cover c cover c
18:59cover c cover c cover c cover c cover c
18:59cover c cover c coververt with a
19:00concrete sides um open bottom
19:04um and so that that has changed our
19:06impact substantially so I would say our
19:09our bank impact now is only associated
19:11with 315 linear feet of tree removals
19:14because the uh new box the preset box
19:17cover culvert will span the stream banks
19:20um our border vegetative wetland impacts
19:22have decreased to 256 square ft of fill.
19:26Um 28,000 square feet of tree removals
19:30and then land underwater. We've uh
19:32removed impacts to those because we are
19:34not putting anything into the bottom of
19:35the of the stream. It will be completely
19:38spanned um with the box cover. So it's
19:41only associated with tree removals and
19:43those trees are mostly canopy canopy
19:45cover not growing in the actual stream
19:48bed.
19:49So again, the culvert was re-evaluated
19:52to to address the mass stream crossing
19:54standards. Um, and then the other, you
19:57know, the other avoidance and
19:58minimization measures that I had
19:59presented to you before is that we, you
20:00know, the company was able to site the
20:02new proposed substation outside of any
20:04wetland. We're looking at very small 100
20:06foot buffer zone impacts only associated
20:08with that new facility.
20:13Okay. So this is um plan sheet C7 from
20:17VHB's design plan. Um and this shows the
20:19new proposed culvert design uh that was
20:22submitted to the commission. Um you'll
20:24see here that you know we have the the
20:26wing walls associated with the the new
20:29box culvert. Um and there's only a small
20:32amount about 200 square feet of now is
20:35proposed within to be a permanent impact
20:37within the adjacent wetland. So there's
20:39a fring there's a bordering wetland to
20:41that intermittent stream. Uh but we no
20:43longer have any impacts to the stream
20:45bed or the stream bank associated with
20:47the culvert. Um and you'll see here
20:49below in the schematic that the culvert
20:51will span and it'll have an open bottom.
20:53Uh they're proposing to have a cobble
20:56bottom to kind of mimic the substrate
20:58upstream and downstream um and to
21:00provide a more natural um you know
21:03water a waterway crossing than what was
21:05originally what's what's there now and
21:08what was originally proposed.
21:15Okay. So, I'll go through our responses
21:16to the pre-review um that we've
21:19submitted to the commission. Uh we have
21:21increased the bordering vegetated
21:22wetland, a small section there that's on
21:25the um southern side of the intermittent
21:27stream that was flagged and added to the
21:29plans and that resulted in a minor
21:31increase in the in the BVW tree clearing
21:34numbers.
21:36[clears throat]
21:39Uh another comment from the peer
21:41reviewers that they recommended the
21:43monitoring frequency of every week and
21:45then after a quarter inch of rain or
21:46more. Uh our response is that that was
21:49already the plan. The the project will
21:50trigger the need for a construction
21:53general permit authorization under
21:54through the EPA. So we'll be preparing a
21:56storm water pollution prevention plan
21:57and submitting a notice of intent and
21:59that will automatically require uh with
22:02>> the monitor
22:02>> the weekly and the post drain
22:04inspections. Correct.
22:06And then um copies of the monitoring
22:08reports will be sent to the commission.
22:10Um if that's included in in the order
22:12that's an interest
22:16I keep wanting to change it on my
22:17laptop. It's so funny. Um
22:20[clears throat]
22:21now we're going into the D comments. I'm
22:23skipping. There was a redundant comment
22:24about the covert between the peer
22:26reviewer and the DP. So I'll just
22:27address that when we address DP
22:29comments. Um there was a question about
22:32the finger-like um
22:36wetland flag. Okay. So 6 associated with
22:39the proposed work on the stream crossing
22:40is not accounted for on page three. Um
22:42and then I had responded that originally
22:45yes it was included and I just kind of
22:47spelled out the math. Um and then I
22:50referenced the fact that you know we did
22:52have a peerreview and that we did add
22:53additional wetland based on that peer
22:55review.
22:58We've submitted updated plans to DP as
23:00well.
23:01Uh there was a question by the DP
23:03reviewer about the impact to a
23:05finger-like projection of wetlands. So
23:07um this is an existing cart path where
23:10there's a wetland that basically bleeds
23:11over into the into the cart path that's
23:14proposed to be upgraded and used um for
23:16the substation access. Um so it's less
23:20than 500 square ft. Um it meets the uh
23:24folk compliance of 310 CMR 10.554.
23:28uh which precludes the need to provide
23:30replication for this very small amount
23:32of wetland fill that's along the
23:34existing road. [clears throat]
23:41D commented on the test pit information
23:43that VHB had provided um in their storm
23:46water report. Uh VHB's response is here.
23:50Um but an analys you know in a summary
23:53um they will be doing supplemental test
23:54pit locations if needed immediately
23:57prior to construction to confirm um
23:59their their assessment um but they they
24:02did take representative test pits
24:04already and they are using they have
24:05used those as basis for their design
24:07>> but they will be they will be doing at
24:10the location the test bits I don't need
24:13that to be done now but this should be
24:15provided before the land disturbance
24:18application is submitted
24:20Okay,
24:20>> that that would be a condition that I'm
24:22going to be putting in the order, a
24:23special condition cuz the test bits must
24:26be done at the closest to the location
24:29of the basin and they have not.
24:32>> Okay.
24:33>> So, I think I got that response.
24:38>> You call if the planning board also put
24:39a condition.
24:41>> Yes, I that's why [clears throat]
24:42because I we we we work together to make
24:44sure then uh who am I talking to back
24:47and forth? Uh
24:50so I just want to make sure that that is
24:52addressed now so I don't need to go
24:53back.
24:58Yes. So uh VHB will work with national
25:02agree to schedule additional test pits
25:04as soon as possible as necessary. So uh
25:07that's one of the special conditions I
25:09will have on the order that it that will
25:12be necessary and and should be done
25:14prior to disturbing which means during
25:17the process of the uh lane disturbance
25:20application.
25:22>> Okay. So we should submit the we should
25:24intend to submit the results of their
25:25test pits with the land disturbance
25:27application.
25:27>> Yes. Okay.
25:28>> So just when do you think you'll be
25:30starting the project? Is there a
25:32timeline to start the project?
25:35It's fall, right?
25:37>> Yeah.
25:37>> Is it just fall?
25:39>> Yeah. What part of the project are we
25:41talking about?
25:42>> Disturbance. Any anything that relates
25:44to disturbance
25:45>> this fall? Fall winter.
25:46>> Oh, okay. Okay. So, yes, you have time.
25:48Yeah. So, you should just make sure that
25:51those test bits are kind of scheduled
25:54[clears throat]
25:54as you file the land disturbance because
25:57the land disturbance, the storm water
25:58has already occurred. Uh the storm water
26:01management review has already occurred.
26:03Yes. So it will be a fast it once you
26:06file within 30 days and last I will be
26:09ready to be issuing the permits. So
26:11those test piece must occur prior you
26:13filing or during the process because all
26:15what I need is really to go for
26:17advertisement and that doesn't come from
26:19the commission. I approve that myself.
26:22So just try to schedule those test bits
26:26uh as you're filing it
26:29but we can discuss that further.
26:32Do you have a concern? You you sound you
26:34look
26:36>> No. Yeah, you look [clears throat] a
26:37little bit
26:38>> No. Do you have a question?
26:39>> In my head, the only thing I'm wanted to
26:41make sure we cover is if it's already a
26:42planning board condition,
26:44>> then the redundancy sounds
26:46>> unnecessary, but if if it needs to
26:48happen for your land disturbance permit,
26:49which I understand is a
26:51>> any so they they did that because we
26:54worked together.
26:55>> So I told them that because when Graves
26:57review, he reviews our regulations as
27:00well. Yeah. So, but because I'm also
27:02issuing a permit to you, I'll have that
27:04as a special condition under my order.
27:07>> Okay.
27:07>> So, uh but redundant or not, it should
27:10be listed on all permits. So, we avoid
27:14work to commence before that step is
27:17taken.
27:18>> Okay.
27:18>> So,
27:19>> so the jurisdiction would be to both.
27:21>> Yes. So,
27:24>> um
27:24>> or would it fall under
27:25>> storm water juris under the conservation
27:28commission?
27:28>> Okay. So when Graves reviewed under
27:30planning board, I asked the planning
27:33board to to the review to also be for
27:35our storm water bylaw and regulations
27:38which our commission has jurisdiction
27:40over. Got it. And the reason I do so is
27:42so when you come to us, I don't ask you
27:44to go for peer review again.
27:46>> Yes. So all the pre-review is completed
27:48at the same time would because you'll
27:51have to it'll take longer and you cost
27:53you more because the same set of plans
27:55would have to go back to Graves
27:57Engineering for then him to review just
28:00our uh bylaw.
28:01>> I I understand. Yes. Thank you for
28:03clarify
28:06>> thank you.
28:06>> Yeah.
28:12>> Okay. Uh, another DP comment was on the
28:14stormwater VHB storm water report. The
28:16standard for calculations were not
28:18included. Um, and then we've submitted
28:20VHB's revised storm water report to
28:22provide the pre-treatment upstream of
28:25the infiltration basins. Um, and they've
28:27updated the TSSE removal calculations in
28:30that report and was submitted to the the
28:32commission for review and as well as the
28:34DP.
28:40Okay. Okay, so this this gets into the
28:41stream crossing standards and how the
28:43original proposal to extend the existing
28:45corrugated metal pipe did not meet the
28:48uh mass stream crossing standards. Um
28:50and we have now received an updated
28:53design from VHB for a three-sided box
28:55cover culvert. Um and that this design
28:57does meet the Massachusetts stream
28:59crossing standards to the extent
29:00practicable.
29:07Okay, so this this slide really talks
29:09about our responses to the mass DP
29:11comments about alternatives analysis
29:14that was conducted um to reduce impacts.
29:18There was a you know the big question
29:19here was about the amount of tree
29:21clearing that's being proposed within
29:23regulated resource areas. And so, um,
29:26Pete and I worked with the transmission
29:29line engineering group as well as the
29:31their forestry group, um, to provide
29:33responses. The responses are pretty
29:35verbose, but I've broken them down what
29:37I think are the key points in in in
29:39bullets on this slide. Um, and that they
29:42looked at, you know, connecting to the
29:44existing transmission line with the new
29:46tap line at different locations um, um,
29:49within that that property along that
29:51line. Um however if they had shifted it
29:55um farther away um it would result in
29:58because of the longer distance a midspan
30:01structure that would land into a
30:02wetland. So then we'd all now we would
30:04have a permanent impact you know
30:06associated with that. Um and as well as
30:09um there was some ground and wire
30:10clearances issues um with the other
30:13alternative locations.
30:16Um and then their response was that they
30:19you know through their analysis the
30:20current design minimizes impacts to the
30:22extent practical within the confined
30:24transmission line right away. Um and
30:27then our forestry representative at
30:29National Grid uh reviewed and she said
30:31that tree removals are necessary to
30:33accommodate all all necessary uh aspects
30:36of the of the work. And something to
30:38keep in mind is that, you know, leaving
30:40strips of trees that are that have grown
30:43up in interior forest, excuse
30:45[clears throat] me,
30:48pretty much um vulnerable to the
30:50elements and they've never that they've
30:52never experienced before being an
30:54interior forest tree. Um they are
30:56high-risisk failure because they just
30:58aren't they didn't develop the ability
31:00to withstand uh heavy winds, ice, things
31:02of that nature that you know uh exterior
31:04trees do. Um and so that would be
31:06putting facilities at a risk of damage
31:08if if they only if they got a carved out
31:11um tree [clears throat] clearing areas
31:12and and left strips of trees um on the
31:16property. So that was the reasoning
31:17behind behind the the total area of tree
31:20clearing.
31:21[clears throat]
31:26Okay. Um another DP comment was about uh
31:29401 and 404.
31:32and we [clears throat] are uh you know
31:33we're we're at less than 5,000 square
31:35feet of impacts uh you know with our
31:37order of conditions we that'll satisfy
31:39the 401 requirements. Um and then the
31:42404 application was approved by Army
31:44Corps um on June 2020 um I'm sorry uh
31:49July 28th 2026.
31:51>> Do you mind just sending me that if you
31:53don't mind?
31:54>> Sure.
31:54>> Yes, thank you.
31:55>> Yep, I can do that. Uh and then we will
31:57be needing to resubmit uh for
31:59reverification with the updated culvert
32:01design, but we wanted to get through the
32:02course the local review process first.
32:08>> Do you want the permit or the
32:09application?
32:10>> Oh, just the permit.
32:11>> Okay. Okay.
32:13>> It's all um a portal.
32:14>> Yeah, I now too. So,
32:17>> okay. So that summarizes um you know the
32:20changes that have happened since we last
32:21we last uh presented to the commission
32:24on this project and at this time unless
32:26Pete has anything he'd like to add. I
32:28think we're we'll deal with any
32:29questions that there might be.
32:31>> Do you have any questions for us?
32:33>> Uh can you start the public or or the
32:36commission if you don't mind? I just
32:37need to look at something that I forgot.
32:39>> Any commission members have questions?
32:43Any audience members before turning over
32:46to Rose?
32:51>> Okay, that's it. No, I don't have any
32:53questions. I think everything has been
32:55>> We need to continue this now.
32:56>> No,
32:57>> I'm ready to close an issue. I'm just
32:59going to have a couple uh probably a
33:01week or two to finish the special
33:03conditions to issue the order, but
33:05>> I'm ready to close. Okay,
33:07>> hang on. Do you have a question? I still
33:09need further review because it is slopy
33:11there and there's a lot of trees being
33:13taken down.
33:16>> I don't have a reason for do further
33:19review.
33:19>> I do.
33:20>> I
33:21>> I'd like this I'd like more information.
33:22That's all I'm asking.
33:23>> The information you can pro I can
33:25provide the information now.
33:27>> That's fine.
33:27>> Yeah. What is it the question?
33:29>> Oh, the D comments. I need to I'd like
33:31to review all that stuff.
33:33>> Okay. Well, this application has staying
33:35with us for a bit now in my office. So I
33:38can't hold the public hearing to be
33:39closed. I can give you the information
33:42to you right now. So you related to the
33:44question from D. We can discuss that now
33:57>> about the trees
33:59>> the m for the clear tree clearing.
34:01>> Yeah. So what's your question?
34:04>> I have several questions. I would need
34:06some time to go over the the questions
34:07for the D. I wasn't aware when would you
34:11roughly did you receive these? When did
34:14you receive these?
34:15>> The dates there.
34:17>> We usually we usually have this
34:19discussions during the meeting.
34:21>> So the qu the answers are here. So the
34:24the GP say that
34:28>> Nick what day?
34:30>> September.
34:32>> September 4th.
34:35So if you are if you have well we can
34:38discuss that outside the meeting because
34:39it appears that would be something else
34:42uh related that we can't uh discuss for
34:44uh further going forward but uh to hold
34:48the project from being approved because
34:50it
34:51>> well it's a good size projectable
34:54>> question. You can ask a questions and
34:56they're here to respond. I just saying
34:58to continue the project because you have
35:01a question about the clear that has been
35:03already responded has been peer-reviewed
35:05has been already peer-reviewed by two
35:07professionals. It's just I feel that we
35:10have in my opinion enough information to
35:12close the public hearing tonight. So if
35:15you disagree with that we can vote and
35:17the commission can make a decision. So,
35:19but I won't have any additional
35:21information to give it to you other than
35:23they what I already have and they won't
35:25have any additional information to
35:26provide other than they already have
35:28been provided.
35:30It would just be a matter of you reading
35:32a document which I have in front of you
35:34right now. So, I'm happy to uh I'm ready
35:39to make a recommendation to close the
35:40public hearing issue the order
35:42conditions
35:43so you can vote.
35:46>> So, we have a DP.
35:47>> Yes. Do I have a motion?
35:49>> I'll take that motion.
35:51>> Second.
35:52>> Second. All
35:53>> in favor?
35:57>> In favor?
35:58>> Yeah.
36:00>> Yes.
36:01>> Nice to have it.
36:02>> All right. Thank you so much. Yeah. I
36:04will contact you and I'll let you know
36:05when the permit is.
36:07>> All right. Thank you. I just got in a
36:08couple weeks.
36:14that.
36:15>> Oh, it just looks like
36:18that you had additional questions. Yeah,
36:20that's why I asked. [laughter] It
36:22>> was nice seeing you guys. All right,
36:24have a good night. [clears throat]
36:25>> It was what?
36:28>> He was like thinking deeply and I was
36:29like, there's a question there.
36:31[laughter]
36:32>> Have a good night.
36:34>> Okay, next DP number. This is an old
36:37one. 128-1971
36:4080 Richardson Corner Road. Is that you,
36:42Chris?
36:44>> No.
36:44>> Where are we?
36:46>> The applicant has filed an NOI for the
36:49proposed extension widing of an exist
36:51existing farmer's wall and fill within
36:5415 ft of the BDW.
36:57>> We will be continued to
37:00>> 28th.
37:01>> I need a motion to continue.
37:02>> October 28th. So
37:04>> 20th.
37:05>> Oh, is it October?
37:06>> October
37:07>> 28th. Yes. Sorry, I
37:09>> Okay, I need a second. Second.
37:11>> All in favor?
37:13>> I.
37:17>> All right.
37:19Next, we have D number 128-202418
37:23Oxbow Road. The Afghan has filed an NOI
37:27for clearing, filling, and grading work
37:29within 100 ft of the buffer zone.
37:33That is you.
37:35>> Yes.
37:38>> All right. Good evening. Chris Mccclur
37:39with B Engineering
37:42here on behalf of the applicant, Mr. Ron
37:46Royer, who fortunately could not be with
37:49us tonight. If it was, it would be on
37:52this side of the fence for a little bit.
37:55Um so, um John owns property on Route
37:5920. Um he's got frontage on Oxbow Road
38:03and also on Route 20. Um it's adjacent
38:06to the self- storage area there. A few
38:09years back that area was reszoned for
38:11all commercial and that included all of
38:13our bronze lot. Um so he's got a home
38:17here and then he has access both of curb
38:19cut through mass DOT and also a driveway
38:22access on on Oxwell Road. Ryan's looking
38:25to take advantage of current um material
38:29that is available in the town and I'll
38:31bring in some clean fill um to fill up
38:34an area of this land that is u well
38:37basically it's he wants to level the
38:39land in behind um well be the front side
38:41of this property on Route 20 and the
38:43back side of this garage. Um the
38:46wetlands were delineated by uh Glen
38:48Kabowski. Uh we are proposing to um to
38:52put some um erosion control sediment to
38:55protect the wetss. Um give ourselves a
38:58couple of feet of space in between the
39:00PW and the slope and then um and then
39:05create a 3 to1 slope up to where we can
39:08um get a flat area for grading in that
39:10backyard. Um graded area is
39:13approximately 23,215.
39:15I don't have um the disturbance within
39:18the 150, but you can see here um it's
39:22probably I would probably say like
39:2417,000 give or take um within the within
39:28the 100. Um [clears throat]
39:31he has no plans for any development if
39:34he did uh first and for have to go
39:36through site plan uh approval. Um he
39:39would also have to um go in front of a
39:42mass as the applicant just discussed. So
39:45I would be oh we did as you heard we
39:49were issued a math EP file number and uh
39:52we responded to a couple of their
39:55comments and the narrative and I um CC
39:58arose on that and really it's um
40:00construction phasing is what they were
40:03concerned with. Okay, the source really
40:05um goes deep. What are you going to do
40:07to protect it as you part? Um and and we
40:10have done projects such as this many
40:12times in the past. So uh we show uh we
40:16show erosion controls as as the um slope
40:20comes up continues to maintain that
40:22protect it um get um you know salt
40:25control on there and then and not just
40:28wait till it's you know erosion controls
40:31on the bottom and then wait till you
40:32finished up on the top um intermediate
40:34uh phasing of the [clears throat] uh
40:36erosion control to prevent sediment from
40:38migrating down the hill during the
40:40construction. So
40:42that's all I really have. If you have
40:44any questions, I'd be uh happy to answer
40:46them as best I can.
40:48>> Board have any questions?
40:51>> You have any questions?
40:53>> What is the slope from the wet line up
40:55to the finished?
40:56>> This is up to the west. So trying to get
40:59trying to get as much area for him as as
41:02we can and we do that. Um using that
41:06I've been over there and looked at that.
41:07It looks looks good.
41:11[clears throat]
41:12>> Do you have any questions?
41:13>> No. My concern was just for the slope
41:17interruptors that we was address to
41:19avoid an erosion going to the welllands.
41:21But I don't have any question. There's
41:23really no besides the lane disturbance
41:25which is less than an acre, right?
41:27>> Yeah.
41:27>> Okay. Have there's no construction being
41:30proposed. So,
41:32>> and DP number.
41:33>> Yeah. I'll be recommended to close and
41:35issue the order conditions. Want to make
41:37a motion?
41:39>> Second.
41:39>> Second.
41:40>> All in favor?
41:41>> Eyes have it.
41:45>> Thank you, guys.
41:45>> Sure.
41:46>> Thank you.
41:50>> Next.
41:51DP number 128-2025,
41:55lot five, Smith Road. The applicant has
41:58filed an NOI for the construction of a
42:00single family home driveway well septic
42:02system within 100 ft of the bordering
42:05vegetated wetland.
42:08>> Is that you?
42:09>> Yes. Good evening, Mr. Chairman, uh
42:11board members and general public. My
42:12name is David Saddowski. I'm the
42:14principal of DJing Associates. We're out
42:16of Clinton, Massachusetts. I'm here
42:19representing the applicant uh Quickly
42:21Way Construction. They've done four or
42:23five other projects in [clears throat]
42:25Charleton. Uh three over on Berry Corner
42:27Road and a couple other locations too
42:30over by the golf course on Berry Corner.
42:32>> Just not to interrupt you, is that the
42:34revised plan? Yes.
42:35>> Do you mind if I have so pass to the
42:37commission?
42:38>> No, sir.
42:39>> I only had the PDF. Thank you.
42:44>> I have two of them folded up.
42:45>> Okay, that's perfect. Okay, appreciate.
42:47Thank you.
42:48>> Yeah, I submitted those 1117s of color.
42:53Um wetlands were delineated by Art
42:55Allen.
42:57Scott Jordan delineated the wetlands for
42:59Michael Deck and um Haley Ward did a
43:03peer review on the storm water. Um D
43:07came back with only one comment that was
43:09talked about uh sweeping the driveway.
43:11We added a storm scepter and a also a uh
43:15a French drain in the driveway so that
43:17we could pick up any types of uh silts
43:19or whatever. We're taking the roofs and
43:21we're recharging them 100% into a cult
43:26system. Uh we do have some u during the
43:30um land disturbance part we do have some
43:32pits where um prior to putting the BMPs
43:36in place silts can be collected. There's
43:39um 14,300
43:43square [snorts] ft of area that could be
43:44disturbed as a result of this project.
43:46We need a septic system and we need uh
43:49you know we're constructing a house. All
43:52of that's within the buffer. There's no
43:54wetlands to be filled as a result of the
43:56project. There's no stream crossing.
43:58There's no wetland crossing. We have
44:00frontage on um Smith Road. I had asked
44:04for one waiver since we were under an
44:06acre. I asked for a waiver land
44:08disturbance permit.
44:09>> Can we just first if you don't mind just
44:11finish the wetland area? Sure. Yeah. So,
44:14uh, what's the closest point of
44:15disturbance for the welllands, if you
44:18don't mind?
44:19>> No, I have to get my glasses.
44:20>> It's okay. I can get my my ruler. Oh,
44:23you can. Okay.
44:30>> So, on the plan shows offsets. Um, it's
44:3420 it's 19 feet to the rip wrap. It's um
44:3921 and a half ft to the um there's going
44:42to be one culvert head to protect the
44:44overflow pipe.
44:46Um it's 33 feet the closest to any of
44:49the structures or 31 ft to any of the
44:51structures. There's a small twoft
44:53retaining wall.
44:55>> Okay.
45:00>> And that's associated with the
45:03>> the back corner of the of the structure
45:05>> of the structure. Okay.
45:06>> Yeah. You can see it's it's labeled on
45:08the plan.
45:09>> Yep. Yep. Okay. Perfect. Yeah, that's
45:11all my question. So, as far as the
45:14wetlands protection act, he has met
45:18requirements. I don't have a concern
45:19with that. So, this project is part this
45:23parcel is project of is part of a uh ANR
45:27plan that is considered a common plan of
45:30development. So
45:33David as the um
45:37representative for the applicant
45:39requested us to waiver to wave him
45:44complying with storm water and filing
45:46lane disturbance application. That's the
45:48>> I have explained to David that is part
45:51of our lane of our bylaw and our lane
45:54disturbance I mean in your rules and
45:56regulations that under section three on
45:59the lane disturbance permit and
46:00procedures. Number two,
46:03development or redevelopment involving
46:06multiple separate activities in
46:08discontinued locations or on different
46:10schedules if the activities are part of
46:13a larger common plan of development.
46:15that all together not individually
46:18disturbs more than 43,560
46:21square foot or more land. So Mr. David
46:24appears that it is a interpretation
46:26situation and as he interpret that he is
46:29not
46:31uh he does not need to comply with our
46:33bylaw or regulations and he requested me
46:35for a waiver. I of course has the
46:37authority as as I have for the storm
46:40water as um the agents and he disagreed
46:46with my uh response and they told he
46:49could come in front of the commission
46:50and request the waiver to the
46:52commission. But my recommendation is
46:54clearly to deny. This is a storm water
46:56rules and regulations that came straight
46:58from our bylaws and is in place for us
47:01to comply with MS4 uh permit with APA
47:05and the town has been complying with
47:07that for the past I don't know four
47:10years. So, but he give him the time to
47:13make his case if he'd like to proceed.
47:16>> Certainly. Uh I think I I did comply
47:19with the storm water. Uh it's the land
47:22disturbance that I'm talking about. Um,
47:25if we want, why don't we just say this?
47:27When Charleston was formed, there was 10
47:28firearms. Every time a piece of property
47:31is taken out, that would be subdividing
47:33from a common piece. That would mean
47:34everyone would have to do a land
47:36disturbance permit. Um, this subdivision
47:39was approved before in 2002. There was
47:4220some lots. It went nowhere. Um, it sat
47:45forever. They've got four back lots and
47:48every one of those is over 10,000 I mean
47:5010 acres.
47:52Um, ours is a 1.7 acres up in the front.
47:55We're not in common. We don't touch any
47:57parts of that in the back, but under I
47:59mean the Smith family owned that whole
48:01street. Anytime a lot gets cut out, they
48:03should do a land disturbance under that
48:05interpretation that it's in common
48:07because at one point it was part of the
48:09same.
48:10>> That's not what she said.
48:11>> I know it's not what she said, but
48:12that's what I'm trying to say is if
48:14you're going to if you're going to take
48:15a piece of land, all the disturbance is
48:17back there and we have a small piece up
48:19here and we're not in common. We don't
48:21own any of the back. We don't touch any
48:23of the back. And we have no influence on
48:26what type of driveway they put in, what
48:27type of access, what type of buildings,
48:29what type of anything. They should all
48:31do the disturbance because they're
48:32disturbing over an acre each. I don't
48:34feel with us only disturbing 14,300
48:38that we qualify for it. Under your
48:40chapter 175, section 9, waiverss, it's
48:45allowed to give a waiver. Has this
48:46commission ever given a waiver?
48:48>> Yes. for specific components of the
48:52requirements not for the entire I'm
48:55sorry I did not hear you saying Mr.
48:57Chairman my apologies.
48:58>> No I I'll let you answer the question.
49:02Waivers are there to for for example
49:05there has been situations where an
49:07applicant was trying to comply with the
49:10regulations and unfortunately they
49:12[clears throat] found ledge and
49:13unfortunately their basin had to be
49:15minimized or the swale had to be changed
49:18locations or it it was just no way of to
49:22implement such a part of the
49:25requirements. That waiver is not to be
49:27requested to completely wave the bylaw.
49:33>> That's what you're requesting. You
49:34request for the commission to wave
49:37>> for you to filing a lane disturbance
49:39application which is part of the bylaw.
49:42So if there is any component in that
49:44lane disturbance application that for
49:46some reason for for due to site
49:49constraint that cannot be met. That's
49:52when you're going to come in front of
49:53the commission would be my my
49:55recommendation. Bring some such
49:58constraints to the commission. Explain
49:59why it's not work. what you be what you
50:02will be proposing uh in lie of that of
50:06that lack of compliance and then the
50:09commission will vote on a waiver but
50:11you're requesting to not to file the
50:14permit
50:16at all. So that's not what the waiver is
50:19related to. So that's my response.
50:22>> All right. Through the chair, um I have
50:24the section right here on waiver. It
50:25doesn't say anything about complying
50:27with ledge or whatever. We're going to
50:29do the storm water that it's not like
50:31we're throwing the whole bylaw out. All
50:33I'm talking about is the land
50:35disturbance part of the of the actual
50:40work that we would have to do. There's
50:41enforcement. There's certainty. There's
50:43waiverss. I'm just wondering if it says
50:44that the waivers are available. It
50:46doesn't say the it lists the condition.
50:49It just says the waiver is available. I
50:51just feel that we're disturbing 14,000
50:53square ft of land. We don't meet the
50:5543,000.
50:57>> Oh my An acre is 43,560.
51:00Do you have something to add, Bros? Oh,
51:02>> correct me if I'm wrong. The whole
51:04point, if I'm understanding you right,
51:06is we've had this happen when the storm
51:08water management got implemented. Is
51:10when it got implemented, it
51:14put it four or five developments. What
51:17was happening is the first two or three,
51:19correct me if I'm wrong, weren't
51:21complying with the storm water. Then the
51:23last person that developed a lot got
51:25saddled with the storm water management
51:27for the whole development.
51:29>> This is the last it were you were five
51:31lots left on this common plan of
51:34development. So he as he said it was
51:37first back in 2002 but the laws have
51:40just been split and the regulations have
51:43been placed. Back in 2002 we didn't have
51:46we're not enforcing the regulations. We
51:47didn't have regulations when we had the
51:49bylaw which is not being enforced. So
51:51this common plan of developments is just
51:53brand new and there are four and the
51:56total four is falls within being a
51:59development or redevelopment that
52:01involves multiple and separate
52:04activities in discontinu locations on
52:07different schedules meaning well my
52:09strategy is here the next one might come
52:11back next year and it doesn't matter
52:14what matters is that combined
52:18it will disturb more than an acre and
52:20this is in place. Why? Because even
52:22though his lot doesn't disturb an acre
52:24and he doesn't need to comply with it in
52:26his mind, it might still affect the lot
52:29the boarding lots and then the body lots
52:31going to have the same thought process
52:32and that's why this town have complaints
52:34over complaints over complaints of storm
52:37water runoff. My is dividing diver
52:40diverting the water into my
52:42>> I understand that. But my point is one
52:44of the things we ran into if I remember
52:46is when this went into enforcement there
52:48were some situations if I maybe I'm
52:51misremembering that the last person
52:55>> the last developer the last piece was
52:57saddled with handling
52:59>> right so that's why we're avoiding that
53:01>> does that make sense
53:03>> so what was happen
53:04>> that's how it was left I believe how
53:06many lots do you have there together all
53:09all together
53:09>> we have one lot it's 1.7 acres and we're
53:13disturbing 14,000 square ft. And through
53:15the chair, we're going to
53:17[clears throat] comply with storm water.
53:18It's not we're going to have any runoff
53:19going into anyone else's lot or
53:21impacting anything. We're recharging the
53:23roof 100%. We're recharging the driveway
53:26100%. Anything in peries on the lot is
53:29being recharged 100%. Being handled by
53:31the storm scepter and TSS removal is
53:34over the applied number. We need storm
53:37water. I'm just talking about the land
53:39disturbance.
53:42It's not like I'm avoiding your bylaw or
53:44doing anything like that. There's files
53:46with the federal government that you
53:47have to do when you disturb over an
53:48acre. We're not doing that.
53:50>> And we're not requesting you to file
53:52with EPA. No one is. I
53:55>> I I just, you know, I read through your
53:57documentation. I read through your
53:58waivers. The waivers asked before.
54:01>> And what does the waiver say? Would you
54:02like to read what says on the waiver?
54:04>> Yeah. Could you w read that waiver to
54:06us?
54:06>> Sure.
54:09Did by the way did anyone look at my
54:11application I filed in August or look at
54:13the plans before tonight?
54:15I just seeing the correspondences going
54:18back and forth here last
54:19>> yes that was sent to the commission in
54:21the past
54:22>> the this is how it starts a the
54:24conservation commission
54:27not the storm water management the
54:29conservation commission may wave strict
54:31compliance with any requirement of this
54:33bylaw or the rules and regulations
54:36>> promulgated here where such action is
54:39allowed is not is in the public interest
54:43and is not inconsistent with the purpose
54:45intent of this bylaw. Um, the applicant
54:48may submit a written request, which I
54:50did, to be granted such a waiver. Such a
54:52request shall be accompanied by an
54:54explanation or documentation supporting
54:57the waiver request. And I said that
54:58we're disturbing only 14,300
55:01square ft and demonstrating that strict
55:04application of the bylaw does not
55:06further the purpose or objectives of
55:08this bylaw. And we're not. We have an
55:10erosion and sedimentation control plan
55:12that I submitted. I submitted a storm
55:14water plan. We've done storm water
55:16calculations. Anything we're disturbing
55:18on the site, we're recharging 100%.
55:21We're meeting all the requirements.
55:23All waiver requests shall be discussed
55:25in a decision will be made by the
55:27conservation commission.
55:29>> And here we are
55:30>> within 30 days of receiving the waiver
55:32request. If in the com the conservation
55:35commission's opinion, additional time or
55:37information is required for review of
55:39the waiver request, the commission may
55:42continue a consideration of the waiver
55:44request to a date certain announced at
55:47the meeting. In the event the applicant
55:49objects to a continuence or fails to
55:52provide requested information, the
55:53waiver request shall be denied. That's
55:55all that's in the waiverss, not what was
55:58said earlier.
55:59>> What was said earlier? You said that I
56:01have to have a specific information.
56:02Something on the site wasn't working.
56:04>> I said it has happened in the past. You
56:06asked does
56:07>> No, you said you said about you said
56:09does the commission grant a waiver? And
56:12I said yes, they do. And here's an
56:14example. And that's the example I gave
56:16because that's what happened in the
56:18past.
56:18>> All right. Anyways, that's that's the
56:20section on waivers. I just feel this
56:2214,000 square feet being disturbed
56:24[clears throat] here. We don't need a
56:25land disturbance. We need storm water
56:28and we need to meet all the regulations.
56:29We recharge 100%. It was reviewed by
56:33Haley Ward and they said that we we
56:35complied with the storm water foland
56:41disturbance permit application is
56:43required as part of the regulations. We
56:46have uh
56:48requests for every applicant that is
56:51part of a common plan on development or
56:53that disturbs more than an acre. The
56:55fact that he does not disturb more than
56:57an acre on his parcel does not mean that
57:01he really he can be granted a waiver
57:04>> to not submit
57:05>> should not submit the application
57:07because again as part of our lane
57:10disturbance permit procedures you must
57:13file a permit and again I'm not going to
57:15read for the third time because his
57:18project combined part of AD&R plan
57:20develop together disturbs the one acre
57:24it's like no one is the waiver is not to
57:28wave a link disturbance application. The
57:31waiver is set there to wave requirements
57:34of the lane disturbance application that
57:37he may then prove that you know it
57:41whatever uh back in back information he
57:44can provide. I absolutely request the
57:48commission to deny his request because
57:50it will set a you might as well throw
57:53the regulations away because the lane
57:55disturbance applications is what I have
57:57in order to monitor in order to enforce
58:00it all storm water propo that's being
58:03proposed if I don't have that
58:05application that don't issue that
58:06permits I have no grounds or authority
58:09to review any of this to not do site to
58:12not request for as build for all storm
58:15water uh uh components that have been
58:17proposed to not I need the operation in
58:21many maintenance plane for every restor
58:24that they are proposing it's part of the
58:26permit is just it's
58:29>> so through the chair so the gentleman's
58:34offer to guarantee to recover 100% of
58:37any storm water
58:38>> it's not the storm water
58:39>> it's not the storm water that's what the
58:42saying is storm water
58:43>> it's the permits It's it's the permit
58:46process.
58:47>> It's part of the applica to submitted an
58:51application from link disturbance. That
58:53application is where is as an order
58:56conditions. I writeed the the conditions
58:59of the all the storm water that has been
59:01proposed management I'm sorry the storm
59:04water management if it's a cold if it is
59:06a swale if it is a basin that is under
59:09that permit. That permit is storm water
59:12related only. I do s inspections before
59:15it started. Every time they dig, before
59:18they bury any storm water they are
59:19proposing, I'm there to check. I need
59:21that permanent order to make sure that
59:23they are in compliance.
59:25>> I will never it
59:28in my recommendations should be denied.
59:30I don't have if the board can't grant a
59:34waiver.
59:35>> We have presented to us. We have I we
59:38have already been oh this waiver I I
59:40asked him I told him you may going from
59:43the commission as is written my
59:44recommendation is going to be no because
59:46you're requesting to wave a permit
59:48application
59:50>> not a part of the require the
59:53requirements within the application he's
59:55asking to the application complete
59:58application to be waved heard of yes
60:01>> I'm asking for just the land disturbance
60:03part of it not the storm
60:04>> a land disturbance application ation
60:08land disturbance permit application.
60:11That's what you request to be waved.
60:14We can't wave for you filing
60:18an application that's required for
60:21review of storm water. If you in the
60:23process of filing the link disturbance
60:26permit application, you encounter
60:29components that you may not fulfill,
60:32then you may come and say, "Listen, in
60:34the process of filing this application,
60:36Can I give an analogy? This Yeah, I'll
60:38make sure. I don't know if this is the
60:39right analogy. This is what I'm asking
60:40for clarification for the board.
60:42>> If if we if you were going to build a
60:45house, I this is the best analogy,
60:47right?
60:48>> And you're saying, okay,
60:50I'm going to comply with the the
60:52electrical portion of building the
60:53house. I'm in compliance. Why do I need
60:56a permit to actually build the house? Is
60:57that kind of like
60:58>> the same thing? No, he's the he just
61:01needed a order conditions, right?
61:04He just filed for a notice of intent
61:06because he needs the order condition.
61:10It's he's asking for a order conditions
61:13to be
61:15>> approved without filing the application.
61:17>> I need the application. The application
61:20is part of the process. I I do not
61:23understand the reasoning behind it and I
61:26feel that we're never going to agree. I
61:28don't know what how he is um
61:34perceiving
61:35but again the waiver is there which we
61:38have granted we had on Highland Highland
61:42uh road with Chris Hansen there was a
61:46gentleman across the street who
61:47discharged water towards uh the property
61:51is against to discharge water to a
61:54different property.
61:56Chris Hansel was filing for a land
61:57disturbance application at the time
61:59could not comply. I recommended the
62:03commission to file uh to grant a waiver
62:06for the water to continue being
62:07discharged. Chris Hansen agreed to uh
62:10retreat the water because there was no
62:12way there was no other way.
62:14>> It was at some point, right?
62:16>> Yeah. I just think it's ridiculous
62:18if we was to give him a waiver and they
62:21have say five lots like we had before or
62:23whatever it was and
62:27each one individually meets the storm
62:29water less than 43,000 ft but the guy at
62:32the end the last lot is responsible for
62:35all five
62:35>> is not and that's why we try to avoid we
62:38don't want that happening so that's why
62:41we enforce for each one of them because
62:44we don't want the last lot be
62:46responsible each lot as a separate in
62:48>> and we're doing it
62:49>> and he's not disturbing 43,000 square
62:52ft.
62:52>> You're not following the intent of the
62:55law. Mitch,
62:56>> could I could I summarize? All right.
62:59>> Basically, we're going to meet the storm
63:01water. It's not like we're asking you
63:03understand. We understand that
63:06we're not going to have anything. All
63:08we're talking about is a land
63:08disturbance
63:11permit.
63:12>> I'm going to summarize and I'll be done.
63:14You guys can vote. Yep.
63:15>> All right. Every single back lot has to
63:18file a land disturbance because they're
63:20all disturbing over an acre. Their
63:22driveways are 500 ft long to get back
63:24there by by 20 ft wide. They just by
63:27having a driveway, they need a land
63:29disturbance. Every single other one
63:30does. This is not being left on anyone
63:33out there. It's not like there's 20
63:34something lots. They're all one of
63:37them's 17 acres. They're disturbing
63:38three and a half acres.
63:40>> It's not the
63:41>> Anyways, I I just like the commission
63:43vote. Thank you,
63:44>> Mitch. To answer your question, that's
63:46correct. That's why each one is being
63:48treated individually, but you must
63:50remember it is part of a plan. So, each
63:54one of them must have their own
63:55individual permits.
63:58So, I can monitor the storm water of it.
64:01If I don't have a permit application, I
64:03can't. Well, his his disturbance on that
64:06particular lot, if it was by itself,
64:10>> if it's not, well, you're wrong. It's
64:13not.
64:13>> It's part of a bigger plan.
64:14>> I know it's not by itself, right?
64:16>> I think it's ridiculous,
64:17>> but that's the bylaw plan
64:20>> and we have no
64:23>> that's the bylaw unfortunately. That's
64:25straight from EPA. So, that's why I mean
64:29the the bylaw has been here before we
64:30did the regulation to start. would have
64:32to try to meet the intent of the bylaw
64:35>> and that's the intent.
64:36>> Well, I don't we would not be meeting
64:39the intent if he would come with the
64:41lane disturbance permit application.
64:44>> All making it prohibitive for some
64:47people to build.
64:48>> We're not prohibiting. We're noting
64:50>> we're giving him the permits. I'm just
64:53close to I'm ready to recommend
64:56>> I'm recommend to close and issue the
64:58order conditions storm water part of
65:01most of it has been provided. Now all I
65:03need is the lane disturbance permit
65:05application. So I have the authority to
65:08go to the site and inspect the erosion
65:10control the to the storm water
65:13management part of it. He's asking to
65:15not file for a permit.
65:19That's what his waiver is asking because
65:22he sees through the chair not to file a
65:25permit.
65:26>> You have any right to go on the site.
65:28Once I come for an NOI, you can go on
65:29the site anytime you want and you can
65:31monitor anytime you file permit.
65:33>> Yes, I filed an NOI already and that
65:36allows her to go on. Any commission
65:37member can go on. Okay.
65:38>> That's B. That's an erroneous statement.
65:41It is not
65:42>> go on the site because I found an
65:43>> to inspect the erosion to to inspect the
65:47storm water management that has to be
65:49approved under the ling disturbance
65:51permit application.
65:53That's what I said. Yes, I can go on the
65:55site to inspect erosion controls. I can
65:56go on the site to inspect runoff, but I
65:59need the permits that has been issued
66:02just for the storm water components
66:04because that's not under our order or
66:06conditions. We have a bylaw and a
66:09regulation that requires you to file for
66:11a permit. So a storm water manage can be
66:15>> well looked under that.
66:17>> You write special um you write special
66:19considerations into every order of
66:22conditions. Write a write a thing that
66:24says that you can go inspect the storm
66:25water management part without have to
66:27file a land decision tomorrow. Makes
66:28>> sense to me.
66:29>> Why don't you make that a special
66:31condition anytime inspection?
66:33>> I would do not write that condition.
66:35>> Why not? because it's against the laws
66:38that we here to obey for it is I'll be
66:40happy to work I'll be happy to to I'm
66:43not writing that I says that that I can
66:46put something about storm water but I'm
66:48not going to write what I supposed to be
66:50right on a lane disturbance permit
66:52application
66:53[snorts] it's a permit that must be
66:56filed
66:56>> it's only an extra three or 4 thousand
66:585,000 I know
66:59>> it's $100
67:01>> the permit fee application $100 twice a
67:04year there's all types of different
67:05things that have to be done out of every
67:06of those.
67:07>> And and why is that? Because if someone
67:10come here and file for a link
67:13disturbance permit application and
67:15comply with the requirements of the lane
67:17disturbance application, I know and the
67:19commission knows that that system will
67:22be there and if it does fail, I have
67:24authority to say repair, maintain, how
67:27is it working, is it treating, is it
67:29keeping the water safe? But I am not
67:31doing that because that is not under the
67:33Wellins Protection Act. It's under my
67:35bylaw and my bylaw has to be issued
67:37>> with the EPA. You didn't write the
67:39bylaw.
67:39>> He it has the town wrote it,
67:42>> right? So you're it's your
67:43interpretation cuz you didn't write it.
67:44You are you are implying
67:47I am done. I'm done. My recommendation
67:50is to deny the recommendation.
67:51>> If you compose and write it, then you
67:53know the intent. If you copy it from a
67:55website, you don't.
67:56>> I don't know who copied from a website.
67:58So, I think this just should be over
68:00now.
68:00>> One one question through the clear.
68:02You're denying the
68:04>> I'm denying his request
68:06>> to wave
68:07>> to wave the permit
68:08>> the lack to wave for him to not apply
68:13for a permit,
68:14>> okay,
68:15>> for the storm water.
68:16>> Now, what if the board wants to vote
68:18against your denial?
68:20>> Then I I really don't know.
68:22>> I don't know either. So you're going to
68:25open it up Pandora's box because
68:26>> you're setting a precedence for everyone
68:29to stop who has file disturbance
68:32application filing is separate. There's
68:33no precedent. You can't get one thing.
68:35>> Can she answer Can she answer his
68:37question or are we going to keep
68:38interrupting? Sir,
68:39>> please
68:41>> go ahead.
68:42>> Well, I've said I says uh I I think it's
68:46ridiculous that we can't if she denies
68:50it.
68:51>> She's I recommend you understand what
68:54she's denying.
68:54>> I'm recommending the commission to deny
68:57based on the fact number one. It's part
69:00of a regulations that he must file a
69:02permit.
69:03>> Okay. But number two,
69:04>> if it's illegal for us to vote for him
69:06in his favor, why why are you
69:09recommending
69:11>> we have to?
69:13>> Because at the end of the day, it's it's
69:14the at the end of the day is the
69:16commission's decision. But I'm here to
69:19aim you to the where the regulations are
69:21made.
69:22>> Are we going to comply with the regs or
69:24not? That is the
69:25>> you're pretty much we are the enforcing
69:27>> it doesn't have to come to us
69:29>> and and
69:30>> her word is final.
69:32>> Yeah.
69:32>> No, nothing final. Instead of the word,
69:34she explained to me why we're not.
69:35>> It's not my word. Cuz as a building
69:37inspector, do you think you should
69:38inspect different parts of a building
69:40inspection or you do you wave did you
69:42wave like electrical inspections or
69:43plumbing inspections because you thought
69:44that was it was a burden on a a builder
69:47to like well I don't want to have to do
69:48the plumbing because that's going to add
69:49more to the cost of building out. So I'm
69:50just curious as a building inspector did
69:52you do that?
69:54>> I I wasn't even listening to to what you
69:57say.
69:57>> That shows you how engaged you are in
69:59being a commissioner then.
70:00>> So Meech is is is
70:02>> you're quite you're quite engaged
70:04yourself, aren't you?
70:05>> I am.
70:05>> Okay. All right. So it is it is the
70:08authority of this commission
70:11>> to to enforce our bylaw and regulation
70:13as written.
70:15>> We may issue waiverss
70:18if it is part of the requirements of
70:21such permit that the applicant may not
70:24comprise. He has not a choice.
70:26>> We grant him a waiver based on what he's
70:28told us. I will completely disagree
70:31because that goes against our bylaw.
70:34>> Oh, I'm just telling you that I
70:36disagree.
70:37>> It goes against our bylaw, Mitch. It
70:39goes against our regulations.
70:41>> People have filed. I have J boys here
70:44who have filed.
70:45>> I'm sitting here talking and thinking as
70:47a 50-year builder. I know what they're
70:50up against.
70:51>> Uh
70:53it may not be right in your mind, but
70:56>> it's not my mind, Mitch. It's what the
70:59regulation says. It's a bylaw.
71:01>> I would make a motion to give him a
71:02waiver.
71:03>> Okay.
71:03>> Period. If nobody wants to second it,
71:06fine. I don't care.
71:08>> Do you have a second?
71:10>> I'm sorry.
71:11>> Do we have any seconds
71:12>> to to not to give him a motion to give
71:15him
71:16>> to to violate precedent and and just
71:19wave
71:19>> violate wave the permit?
71:21>> No. Yep.
71:23>> No seconds.
71:24>> Motion does not carry. Do I have a
71:25motion for denial?
71:28I'll make that motion. Do
71:29>> we have a second?
71:32>> Second.
71:33>> All in favor?
71:34>> I I
71:38have it.
71:38>> Did you have a majority? I
71:40>> Yeah, they're alternates. They can't
71:41vote.
71:42>> Oh, what? They're winking or
71:45>> I didn't hear anything.
71:46>> They cannot.
71:48>> Did you catch that part? I can repeat
71:50it.
71:51>> It has been denied.
71:52>> So, you had four eyes,
71:54>> three people. There was no need because
71:57they the your motion didn't carry.
72:02>> And again, it
72:03>> you win again.
72:05>> I don't win, Mitch. It's a revelation.
72:07>> That's enough. I'm It's done.
72:09>> Okay.
72:10>> It's done.
72:11>> I'll be waiting. I'll be issuing
72:13>> I apologize for the board.
72:15>> I'll be Shouldn't do that.
72:16>> That is That is
72:17>> I apologize for some of the board as
72:18well.
72:19>> Mhm.
72:21I'll be issuing the order conditions and
72:23the one of the conditions will be that a
72:26lane disturbance permit application must
72:28be filed prior to commencing
72:29disturbance.
72:32Thank you.
72:35>> We can move forward.
72:36>> Did you guys vote to close the hearing
72:38yet?
72:38>> No, we can now move forward to close.
72:40>> I think that's the formal thing to do if
72:42we're going to go by regulations.
72:43>> Well, it has been a little elevated
72:45meeting, so we're not expecting that. So
72:48I request recommend the commission to
72:50close the u public hearing and issue the
72:52order conditions.
72:54>> Issue the denial.
72:55>> No
72:56>> no this is the order.
72:58>> I need that motion
73:00>> to close the public hearing and issue
73:02the order conditions.
73:03>> Motion made.
73:04>> Second.
73:04>> Second.
73:05>> Second.
73:06>> All in favor?
73:07>> I
73:08>> I have it.
73:09>> Thank you very much for your time. Good
73:12luck.
73:14D1282025.
73:17That's what we just voted on, right?
73:21>> 128202255
73:23Aqua Road. The applicant has filed the
73:25NOI for the installation of a new septic
73:28to replace a failed one within 100 ft of
73:31the BVW.
73:34>> Do a waiver chill J for your lane
73:36disturbance.
73:39Cuz if you're going to be bring it to
73:41everybody, then we might start it now.
73:44>> Thankfully, I don't need one for this.
73:46>> We'll need for the next one.
73:48>> Yeah.
73:53[clears throat]
73:55>> This is pretty straightforward, Jay.
73:58>> Yeah.
74:04Papers.
74:05>> Thank you. Yep.
74:13Um so 55 Oxbow Road is a existing house.
74:18Um it's it's located along the Little
74:20River on Oxbow Road and has a field
74:23septic system. Um so we're proposing a
74:25new leechfield in the back of the house.
74:28The house is here, the street is here.
74:30Uh the new leechfield will be in the
74:31back. Um it's it's in the same area as
74:35the existing system now. Basically out
74:37of the back of the house there's a
74:38cesspool and a leech line that that does
74:41head out from there. So we proposing a
74:43new leash field here. The river is in
74:45the back here. Um
74:49erosion controls around the bottom of
74:51the system. We're not in the flood
74:52plane.
74:54We are in the riverfront zone, but again
74:56there's no other other place on the
74:58property for the the new leashfield to
75:00go. Um D did have did have a comment
75:06about the um
75:08the 50 foot setback um and that
75:11replacement systems are allowed in that
75:14and they had a question regarding the
75:16delineation as well.
75:18>> Uh I did go out today and check the
75:20delineation. Basically uh there's a
75:23stone wall that kind of runs along the
75:24edge of the river. Um it's about a twoft
75:27drop down into the river. So, I hung
75:29river fl or bank flags along that area
75:32as well. And I did write up a narrative
75:34and sent that off to back to D as well
75:37as to Rose with some photographs.
75:45>> DP had questions. Um there was no
75:48flagging. He flagged today. There's not
75:51much BVW there as he said is really the
75:54river which is well defined. Um the
75:56pictures we're seeing today
75:58>> [clears throat]
76:10>> I mean, you know, it's well defined. You
76:12have the stone and you have the river.
76:14There's no [clears throat]
76:19>> Wish they were all like that.
76:20>> H
76:21>> wish they were all like that.
76:22>> I know.
76:24>> So DP is fine. He submitted the comments
76:27today. Um, so we have to wait.
76:30>> No, there they usually don't make
76:32comments on on um
76:36>> on revisions. They just request the
76:38commission to
76:41>> request additional information from the
76:43applicant, which I did. So I would
76:46imagine they would never, you know,
76:48intervene on a sept septic repair
76:52because of a flag or something like
76:54that. So it was a recommendation. So
76:56>> So you recommend clothes?
76:57>> Yeah.
76:58>> I also did send them the photographs.
76:59They
77:00>> He did send the P the photographs and
77:02the and the and the letter explaining
77:03that there is no other place to be
77:05there's no other location to be placed
77:07in that system.
77:10>> Any questions from the board?
77:13Any questions from the audience?
77:16We have a motion to close.
77:17>> Motion to close. Second. Second. All
77:20>> in favor? I have it.
77:26Why do his should have switched his
77:29plan? Uh his your next is
77:32>> Oh, actually there's one in between,
77:34right?
77:34>> Yeah, you have. Are you okay to wait?
77:36>> Yeah. Oh, yeah.
77:37>> Yeah. Um how does the commission feel if
77:41we move forward with J? Because the next
77:44one is 35 North Main Street
77:46>> and it might take a bit. Are you opposed
77:48to that?
77:49>> It's just a single family home. Yeah.
77:52Does the commission to swapping so Jake
77:54can present his next project? Mitch,
77:57>> no, I have no problem.
77:58>> You have no problem? Okay. Because it'll
77:59be because I know your pro it's going to
78:01take a bit. So,
78:02>> all right, Jay, go ahead.
78:04>> Okay. So, I got
78:05>> I only worked till eight.
78:07>> Is it what?
78:08>> I only worked till 8.
78:10>> So, the next this is for D number
78:12128-2023
78:14lot 5 road. The applicant has filed an
78:17NOI for the construction of a single
78:19family home driveway and associated work
78:21with 100 feet of the BBW.
78:23>> Oh, okay. Got it. Okay.
78:30>> I don't know where that goes. Okay.
78:34So just to start this it it clearly
78:37trigger our uh wetlands and also is part
78:41of a common plan of development that all
78:44together disturbs more than an acre. So
78:46it does require a land disturbance
78:48application. So he has already provided
78:52a storm water uh has been peer reviewed.
78:55Now that we go through the process that
78:56we have been going through the past
78:58three years, once this is issued, Jay
79:00comes back to the commission and files
79:03his lane disturbance permit application
79:05so he can start disturbing.
79:07Go ahead, Jay.
79:09>> Um, so this property on the road is lot
79:12five.
79:14Uh, it's owned by PMD Development and
79:17they're looking to do a house on the
79:19property. Uh, it is a 4 acre lot or just
79:22over 4 acres. So, the house is proposed
79:25in this area here with a driveway that
79:26would go down to Gul Road. The septic
79:29system is in the front and the well is
79:31in the back. Uh, the BBW is it comes
79:34from the back and it it comes down here
79:37and then it goes back up. Um,
79:40this this property had a NRA filed
79:43probably two years ago or was it less
79:46than that? Some somewhere around that.
79:47>> Yeah, it's on here.
79:48>> Um, which was reviewed by Art, correct?
79:50Art Allen who?
79:51>> Yeah. So back in the day they request
79:53confirmation of the uh area of the
79:57>> this was a larger a large parcel that
79:59they split up into eight nine lots I
80:02think it was.
80:03>> Yeah. So it was issued back in 2023.
80:06>> 23. Um so we we located the the flags
80:10that were out there still and that's
80:12what's shown on this plan here. So the
80:14house the house uh everything the house
80:17driveway septic system and well is all
80:19outside the 50oot buffer zone. That's
80:21the line that comes down right through
80:22here and and through here. So everything
80:25is outside of the 50 other than some
80:26grading, but we do have erosion controls
80:29um at the bottom of the slope around the
80:31edges of the grading. Um and as Rose
80:33said, this this does have storm water
80:35that had gone to Haley Ward for peer
80:37review. Um and D also did issue uh a
80:41number and they had a few questions. Um
80:46>> you want me to go through those or few
80:48comments?
80:49>> D's comments. It was they were
80:51questioning a flood zone which is
80:52actually on lot four. There's no flood
80:54zone on this property. I did send them
80:56the um overall map that shows the flood
80:58flood zone line to show them that it's
81:00off of our property. Uh they wanted a
81:03TSS removal sheet to go along with the
81:05storm water which I did send them and
81:07gave a copy of that to Rose. Uh and they
81:09had a question about the the wetland DVW
81:13data forms which they should have
81:16because it was part of the ENRAD.
81:17>> Yep. Um and they also did recommend the
81:20commission a perpetual uh condition for
81:24the on andm activities
81:26which would be you probably do that
81:28anyways don't you?
81:29>> Yes. And that's the opera operation
81:31man's plan and that's also a go under
81:34the lane disturbance. So they just don't
81:36know that you're filing disturbance.
81:38Yeah. Um,
81:41but other than that, if you have any any
81:44questions,
81:47you all set.
81:48>> I don't have any questions.
81:50>> Questions from the board.
81:53>> Audience.
81:54Are you recommending
81:56>> closing the public hearing issues?
81:59>> I need a motion. Motion moved. Second.
82:02>> Second. All
82:03>> in favor? I. Nice to
82:04>> have it.
82:09Now, do you want to do the
82:11>> the Yeah,
82:13>> the north main street.
82:15>> Yeah.
82:16>> Thank you.
82:16>> You okay?
82:17>> I'm just like,
82:19>> yes.
82:2335
82:25North Main Street. The applicant has
82:27filed a NOI for the construction of nine
82:30duplexes within the riverfront. There's
82:33no wetland alteration storage with this
82:36project.
82:39>> Um,
82:43>> yep.
82:54>> [snorts]
83:03>> This is the one that's had multiple
83:04variations, right?
83:06>> Yeah. Uh, it's
83:09Am I speaking off the record when I
83:11>> just a general comment? You don't have
83:13to go into any specifics.
83:14>> Um, uh, the I'd say the primary
83:18difficulty previously was with the
83:19planning board side of things. they just
83:23didn't really want the type of
83:26development that was proposed before
83:28with first 40 then 36 then 33 units um
83:32but which were I think in compliance
83:34with the village zoning district but
83:37at any rate um so
83:40>> this is where we're at now
83:41>> yep so the applicant looked at okay what
83:43is uh and allowed by right use um and
83:47that's what is proposed now are uh nine
83:50duplex lots
83:51um on the same site.
83:54>> So you've gone from 30 or 40 units down
83:56to 18.
83:58>> Yes.
83:59>> And I would and [laughter] I would just
84:01note as a as a as a quick item, not
84:04trying to be huffy or anything. Uh there
84:06is riverfront area, but actually only
84:08one of the proposed buildings is is
84:11itself is actually in the riverfront
84:13area.
84:15And we uh
84:19>> I thought that plan was pretty nice when
84:20you last
84:24I'm not I'm not an impartial party.
84:26>> Of course. Is so where is this with the
84:29planning board?
84:30>> We Oh, we just had
84:31>> Oh, they just started
84:32>> a meeting. Yeah, we just had a meeting
84:34with the planning board uh last week.
84:36>> Um and
84:39there's a lot to do still.
84:41>> Yeah, he's just really reintroduced. say
84:43their response to that this plan is uh
84:47favorable relative to the previous one.
84:50>> It's probably a fair
84:51>> Yeah, it's a fair statement.
84:52>> Yeah, the bar was slow.
84:56Um so I'm James Dro from Expedited
84:59Engineering here representing GM
85:00Properties was the owner of the property
85:03and uh as we were just saying the uh
85:06this is uh site at 35 North Main Street.
85:09The existing house uh is in this area
85:13and was the subject of a uh previous
85:16filing for a development uh of uh multif
85:21family town houses pursuant to the
85:23village zoning district. The planning
85:25board
85:27just did not really want that uh
85:29development and and so the applicant
85:32withdrew uh filings and came back and
85:35said, "Okay, what is a use by right?" Um
85:38and and in this village zoning district
85:40uh a duplex is a used by right. So we uh
85:44have drawn up a division of the site
85:47into nine separate lots uh seven on uh
85:52North Main Street, two at L Stevens. Um
85:56I would just uh
85:59characterize I think what was said
86:01before was correct. There's no wetland
86:03alteration proposed at all. Now, we had
86:05a uh a temporary alteration proposed to
86:08bring sewer from units over here uh to
86:12the uh existing sewer in North Main
86:14Street. Now, we are proposing to serve
86:16these two uh lots, the septic systems in
86:20the back of the property. The seven lots
86:23here would be ser served by connection
86:25to the sewer. We actually uh already did
86:28get a vote from the uh water and sewer
86:31commission that they would accept uh
86:33this discharge. Um I would note that the
86:38wetland boundary is was the subject of
86:41uh previous anor delineation which was
86:44then uh extended by the states what it
86:48was permit extension act or whatever
86:50exactly it was called and then we had an
86:52extension uh here. Um the site
86:57I'll orient it the well route 20 is is
87:01out this way and the site uh gets
87:04drainage from a much larger area than
87:06the site itself. Um and what we're
87:10proposing to do now for drainage uh here
87:13is um we essentially have have lots in
87:17pairs or or or a group of three. Um,
87:21this duplex would have a driveway that
87:22goes down. The driveway edge would be
87:25would would have curb. There'd be a
87:27catch basin collecting all the runoff on
87:28the driveway and we would discharge all
87:31the roof runoff from this building to
87:33that catch basin. Um, the same thing
87:36next door. This duplex would have a
87:39driveway that goes downhill and there'd
87:40be curving all around this pavement.
87:43There's a catch basin which would
87:45collect all the runoff. The runoff from
87:47these two catch basins would go to a
87:49manhole through a storm water filter
87:51unit and then to an ingground detention
87:54area. Um I think there are three lots
87:58together. Uh this lot with again the
88:02paved area being captured by a catch
88:04basin. This lot the paved area being
88:06captured by a catch basin and this lot
88:09pavement being captured by a catch
88:10basin. These three send their collective
88:14run off through a drain anhole through a
88:16storm water filter unit and to inground
88:18detention.
88:19These two units uh these two lots I'll
88:21say I should say are paired similarly um
88:25downhill to uh the back of these units
88:28catch basin at the low point of this
88:31parking area. Downhill uh to the back of
88:34these units catch basin low point of
88:37parking area. They both send their
88:39discharge to a drain manhole. Again,
88:41storm water filter unit and again
88:43inground detention. Um, and the reason
88:45we set it up this way is we wanted to
88:47have the inground detention uh outside
88:51of we didn't want to have it under a
88:52parking area. Uh, if we could at all
88:55help that. We also have actually in this
88:57area some of the the better soil that we
88:59have. Um, and so just thought it was
89:03would be it made more sense. Also, the
89:06uh those storm water filter units, the
89:09very whether it's a CDS
89:12um unit or any of these other things are
89:14are pretty expensive, and you really
89:15don't want to be buying, you know, nine
89:18of them uh for for a property. That's
89:21probably getting yourself a bill of
89:23somewhere in the area of 80 to $100,000.
89:26So, um but that's how the drainage is
89:30being handled here on these two lots.
89:33drainage is being collected run through
89:36a CDS uh filter unit and then going to a
89:40a leeching trench. Um the same thing
89:43over here. Run off from this driveway
89:47and this other piece of driveway being
89:50collected by a catch basin going through
89:52a CDS storm filter unit going to an
89:54infiltration trench. Um, so we're going
89:57to have um meet all the TSS removal
90:01requirements
90:02um in the in the DP stormage management
90:05standards. Um we're not just as before.
90:10The way that the drainage essentially is
90:12working is that you have this 6acre
90:15site. You have a I'll get the exact
90:18number wrong. Another 64 65 acres north
90:22of this. It picks up drainage all the
90:24way to Route 20, but not of any of Route
90:2720 itself. If you were at uh the the uh
90:30uh CVS and you look uh immediately on
90:33the east side of it and there's those
90:35odd piles of stuff, not sure just what
90:39all of them are. That area is draining
90:42here.
90:44It's the the uh drainage area coming to
90:48the culbert that the actual pair of
90:50culberts that leave the site is much
90:52much larger than this site. And by
90:56dealing with the TSS and getting some
90:58infiltration, uh all of this is is a
91:01little bit out of sync with that much
91:02bigger I'll call it wave of water uh uh
91:05coming from offsite. Um
91:09I guess I would uh just know to cut we
91:12you know we had uh feedback on I I won't
91:15get too much into the sort of the
91:16planning board items.
91:18>> Yeah I I don't I guess my biggest
91:20question did you mention the biggest
91:22change from the other project and the
91:25>> sure and how
91:27>> Oh yeah
91:28>> greatly scaled down
91:29>> the scaled down. Okay.
91:30>> Yeah. Yeah. It's not actually a hugely
91:33different total alteration. I think we
91:35only dropped a couple tenths of an acre
91:37or two or three tenths. I think the
91:39alteration now is expected to be 2.3
91:42acres. I think we were at 2.5 or 2.6
91:45before. And part of that because you
91:48have a uh you're going to have a septic
91:50system out here that you're going to end
91:51up pumping to. And while this is all
91:54just going to be grass in the future
91:56over a over a pump line and grass over a
91:59>> less septic system leeching area, it's
92:01still al altered area,
92:02>> right? Uh but it is it is less
92:04impervious and and you know there were
92:06units proposed here and
92:08>> you know you
92:09>> and that's was the buffer was very
92:11minimal the retaining walls.
92:13>> Yes.
92:14>> Correct. So what is your closest point
92:16to disturbance to
92:17>> well all on on these lots we've actually
92:20put in proposed multiple retaining walls
92:24one two three on on four lots to stop
92:28before the 25 foot line. Uh on this lot
92:32the we've got the two unfortunately the
92:34leeching trench to get the TSS removal.
92:37Other than that uh we're stopping at 15
92:39ft is the nearest point.
92:41>> Um again we tried to get uh 25 but it's
92:45it's tough there. Uh there's just not
92:48there's also there one of the good
92:50things in a way on this side is you have
92:54a lot of elevation drop. So, it's it's
92:56relatively easier to uh to put in a uh
93:02to fill a bit and put in an infiltration
93:04structure. Here, we're kind of stuck
93:07with the relatively flat topography that
93:11we need to have uh an infiltration
93:13trench that gets close to the wetlands.
93:17Uh what else I would note? Uh we got uh
93:21DP comment which was actually really
93:23just about the uh the money.
93:26>> They were not comments. So they were
93:28well it was a issue a DP file number was
93:31not issued.
93:32>> Correct.
93:33>> It was just a initial uh looking over
93:36the application that Rebecca called me
93:38and we discussed. So she puted that in
93:40an email. So she's ready to issue the
93:43comments when that has been addressed in
93:45a new file. uh uh NOI transmitter form
93:49is sent to them.
93:51>> Yeah.
93:51>> Yeah. What uh what the what was issued
93:55on the on their website is she not she
93:57said well you should have we included we
93:59said there are uh eight buildings within
94:02the 100 foot uh buffer zone at $500 per
94:05building and other charges it was $4,000
94:07something dollars. And her comment was,
94:10well, there's there's work on some of
94:13these lots within the riverfront area,
94:15and you should have upped the fee for
94:18that by 50%. For instance, the uh
94:21building here on lot 7 that's partly
94:24within the the riverfront area. Uh I
94:27think we had said, well, okay, this is
94:28one of eight buildings within 100 feet.
94:31That's $500. And her point is uh if
94:34you're working within a riverfront area,
94:36you should it's 50% greater fee. So that
94:39should have been uh 750. So I I I think
94:42there's a total there's three lots where
94:44that was the case.
94:45>> Uh three times 250 750 more. So you're
94:48going to get a uh town another check for
94:51375 and the state also another check for
94:53375.
94:54>> Okay. That was just fee related. Uh
94:56there was something I have to bring to
94:57the commission and uh so the application
94:59was filed on the single family homes.
95:02That was Rebecca's comments.
95:03>> Okay.
95:04>> They are not single family home.
95:06>> I Okay. In in what way were we filing it
95:08under?
95:09>> The NOI came uh the the the fee was as
95:12if you're building proposing single
95:14family homes.
95:15>> Okay.
95:16>> Uh I thought it was just building,
95:18>> right? So building that is $1,000.50
95:22per
95:22>> Oh, okay.
95:23>> Yeah.
95:24>> Oh, so she's Okay. So understood.
95:26>> Yeah. So that in that was an additional
95:29comment to the river area. So but she
95:32what she's saying is that the those are
95:34not single family homes. It should be
95:36under category
95:38uh 3B.
95:41>> I'm sorry, it's a big schedule, but I
95:44can send that to you. So, she would like
95:46to have the NOI revised to uh represent
95:49those numbers
95:51>> in addition to those three units that is
95:53within the river front area. Okay.
95:55>> So when that I just want to make sure
95:56the commission is okay with the
95:58different the change because usually
96:01>> it's called called nickel and dimeing
96:03[laughter]
96:04>> and again there's
96:05>> Massachusetts.
96:06>> So there is a schedule for transmitt fee
96:08every time someone file with us. So it
96:10goes under that category. It's if it's
96:12for a single family home there is a
96:15price. If it's for it's for a building
96:17there's a different category. is for a
96:19beach enra engracement or you're just
96:21putting sand on your beach or if you're
96:23living in front of the balik it's a
96:24different category and goes on there's a
96:26different five different schedule and
96:28like and five less within them so it's
96:31many of them so he file on the single
96:33family home which he's not proposing
96:35single family home should be under
96:37buildings
96:37>> okay
96:38>> and that's a different fee yeah if that
96:40makes sense
96:41>> so there have been an official NOI
96:43submitted for this
96:44>> yes okay he just submitted yeah
96:47>> um okay Uh
96:49>> yeah, that's a fee issue. Yeah, we can
96:51discuss up there.
96:52>> Okay. Um what else did I want to say
96:55here? Uh
96:57just trying to think of I guess I would
97:00just uh leave it at that and try and
97:02answer any questions. I I one other just
97:05quick thing I would note is that uh even
97:07though this is not a multif family uh
97:09project anymore, we're still I think
97:11have the requirement to run sidewalk uh
97:14passes. So we'll end up having a a
97:17sidewalk coming just off the wetland
97:21over here. Um it's a requirement that
97:24just have to do for um the village
97:26district. It's not not by choice.
97:28>> Okay.
97:30>> That stream that comes down through
97:32there, I think we class that as a
97:34intermittent.
97:36>> Which stream?
97:37>> Yeah. Yeah. The
97:38>> Oh, yes. It's actually through this
97:41site, but we the reason we show the 100
97:44and 200 foot bounds out is it's still
97:47officially uh perennial beginning at the
97:50next property.
97:51>> Yeah.
97:52>> One of the actually I think the the
97:54woman who lives here at the next
97:56property was at the the planning board
97:58site.
97:59>> So are the flags is still in place?
98:02>> I don't know that they're all still in
98:03place now. It's been it's been a while.
98:05>> Yeah. So, I'm trying to do a sign
98:07inspection again next week uh to just
98:11look at this filing and the location and
98:14so if you could make sure that at least
98:18uh call me to confirm if they are in
98:22place and if they're not a time when
98:24they will be they should be in place for
98:26the next review.
98:28>> Fair enough.
98:28>> Yeah. Yeah. I was planning for next week
98:31to get this rolling. Um but if they're
98:33not there, they just let me know when
98:35they are.
98:35>> Okay. [clears throat] Yeah.
98:36>> Uh and just big picture, we're continued
98:39on the planning board side out to
98:40October 21st. Um you know, the
98:43>> So our next meeting will be the 28th.
98:46Yeah.
98:46>> So hopefully we have things addressed by
98:50then.
98:50>> We've got a comment letter from Graves
98:52Engineering uh that was done uh and
98:56actually does touch on some of sort of
98:58the there's always overlap.
99:00>> Yes, of course. There's always overlap
99:02in oversight between planning board and
99:03conservation commission where they're
99:05both looking at some of the same things
99:07>> and and uh but we've got that. Um did I
99:11believe the applicant dropped off a
99:12check now for the peer review?
99:14>> He did for the peer review. He was doing
99:16the river phone area. I told him to hold
99:17off because I know there was something
99:19else to discuss with you. So when you
99:21come up with that number he can drop it
99:23off all together. Yeah. I'm not
99:25concerned with the fees but I just
99:26needed the peer review to start.
99:28>> Right. And you know we will try and and
99:32integrate both the responses to, you
99:35know, what the planning board said and
99:37what their outside reviewer said and you
99:40folks and and audience members and the
99:42outside peer all the different parties
99:45into a a first.
99:47>> Yeah, perfect.
99:48>> I'll I'll just try and answer any
99:50questions.
99:50>> Okay. Yeah. Any questions?
99:52>> I say board members have questions.
99:57>> You guys here from the audience have
99:58questions? Yes. Hi, Ashley Brisb 32L
100:00 | Stevens Road. Um, no
100:03 | >> further.
100:04 | >> Yeah, I'm I'm a corner.
100:05 | >> Okay.
100:06 | >> No, right on the top. That's me.
100:09 | >> Um, so, um, I haven't been able to see
100:12 | the new plans yet, so this is great that
100:14 | you brought that. Um,
100:16 | >> I know the closest point to the wetlands
100:20 | in the last plan was about 25 ft.
100:24 | Correct. In that corner. Was that
100:25 | >> No.
100:26 | >> Where was that?
100:26 | >> No. We also we also in the last plan had
100:29 | uh a couple of leeching trenches
100:31 | proposed which were going to go right
100:33 | close to the
100:34 | >> So I'm just I'm just saying you said the
100:35 | closest point right now is 15 ft. What
100:37 | was the closest point before that?
100:40 | >> Well, if you leave out the leeching
100:42 | trenches, it's that's probably about
100:44 | what the closest point was before.
100:46 | >> Okay. Yeah, because I know that that was
100:48 | like the biggest issue is that we were
100:50 | just so close that
100:51 | >> I would say that the primary difference
100:53 | and and benefit maybe from the
100:55 | conservation commission uh point of view
100:58 | of this plane versus the previous one is
101:01 | that we've gotten better separation on
101:03 | the north main street line
101:05 | >> than than there was before
101:07 | >> because their their buffer through the
101:09 | wall retain wall was five feet in a few
101:11 | [clears throat] locations. one was right
101:13 | there.
101:14 | >> And I I just I'm just trying to with all
101:16 | these reiterations and everything, it
101:18 | was the back section, those two lots off
101:20 | L Stevens Road,
101:22 | >> that that was the that was the
101:25 | >> what I gathered was the contentious
101:28 | point, not just between
101:31 | >> there were a couple other points. Um
101:33 | >> there were few location maybe over here
101:36 | and over here that were also,
101:38 | >> right? And I think it was just like the
101:40 | the density of all of that behind in
101:43 | that particular corner where you guys
101:45 | have everything going on to me. Now the
101:49 | buildings have kind of adjusted and the
101:50 | road is out which is great. Um and it's
101:52 | that's a huge improvement overall. Um
101:55 | but I feel like that's still really
101:57 | dense and still kind of right up against
101:59 | that wetland border with a lot going on.
102:01 | Now you have a septic thrown in and I'm
102:04 | I know now we don't have the sewer
102:06 | coming in through that where you do the
102:08 | temporary thing and like that's great
102:10 | but now the septic's pretty close to the
102:13 | wetland border so it's just
102:15 | >> that's 25 ft.
102:17 | >> Yeah.
102:17 | >> Actually this the leeching areas by
102:20 | title 5 have to be 50 feet off wetlands.
102:22 | That's
102:23 | >> I'm just trying to make sure with like
102:26 | sewage and things. close to so they they
102:30 | have they relate unrelated to uh
102:34 | conservation they have to meet
102:36 | requirements from the board of health so
102:38 | they meet need to meet their setbacks
102:40 | >> I I would just note that both of these
102:42 | systems will be pump systems you're
102:44 | going to have septic tanks out back of
102:47 | the units you're going to have pumps and
102:49 | you're going to pump it it's really pump
102:50 | only pumping up a couple feet
102:52 | >> but to these areas and what you have
102:55 | when you have that kind of system is you
102:56 | have an alarm on the pumps. If they ever
103:00 | don't go off and the water is has risen
103:02 | in the pump chamber above a certain
103:04 | point, you get an alarm going off.
103:07 | >> Never want to hear it, but
103:11 | >> there should be a flashing light. Uh,
103:14 | sometimes it does, sometimes it's set up
103:17 | on the back of a house. Sometimes it's
103:19 | set up in in a basement such that it,
103:21 | you know, the noise and the light makes
103:23 | it possible for
103:24 | >> it's appropriate on your notes first
103:26 | before anybody else cuz you do Yeah.
103:30 | >> People have some questions.
103:34 | >> Just that that corner right there.
103:42 | >> Yeah.
103:44 | you making.
103:45 | >> We're going to continue at this point.
103:47 | It's just
103:48 | >> I know.
103:48 | >> I know.
103:50 | >> This is going to be continued. So, we're
103:51 | going to have more time.
103:52 | >> Yeah. No.
103:53 | >> Yeah. If if there aren't any other
103:54 | questions, I mean, I will ask uh the
103:56 | commission to please continue. Um we,
103:59 | you know, we have a lot of procedural
104:01 | things to square away with the the fees,
104:03 | etc.
104:04 | >> And we have review from, you know,
104:08 | >> we got storm water going, we got EOTA
104:10 | going. Yes. So we I think we'll have a
104:13 | lot of more information on the next
104:15 | meeting. So since the planning board uh
104:18 | meets on the 21st, I'll be recommending
104:21 | to continue to the 28th.
104:24 | >> Make sense?
104:24 | >> So I need a motion to continue the 28th.
104:26 | >> Motion to continue 28.
104:28 | >> Second.
104:29 | >> Second.
104:30 | >> All in favor?
104:32 | >> I continue.
104:35 | >> Thank you for your time.
104:36 | >> Thank you.
104:38 | Next we have a
104:39 | >> Oh, we already waited lot five.
104:41 | >> It'll come back now. I forgot.
104:43 | >> Sorry.
104:44 | >> Yeah, we're down.
104:47 | >> We're on the I think it's
104:50 | >> it says D number
104:53 | and had DV numbers.
104:54 | >> Yeah, they did.
104:55 | >> Yep.
104:55 | >> All right. D number 128-2021
104:58 | lot 8 Daniels Road. applicant has
105:01 | submitted an abbreviated notice of
105:03 | resource area delineation for review and
105:05 | confirmation of the wetland boundaries.
105:09 | >> Okay, Joe, how are you?
105:12 | >> Oh, well, thanks. It's doing well. Thank
105:15 | you.
105:15 | >> Great. Uh, do you mind just doing a
105:17 | quick uh narrative I mean overview what
105:19 | the project is uh the intent and where
105:24 | we're at at this time?
105:27 | Thank you.
105:29 | Uh I'm the wetlands consultant for uh
105:32 | Chris Hansen, CR Hansen Construction uh
105:36 | services. Um he owns lot 8 Daniels Road.
105:42 | I think it's like a 12
105:45 | 1/2 acre parcel. Um I was contracted to
105:50 | uh flag the uh all the wetlands on the
105:53 | property. Um, I flagged uh two for
105:57 | vegetated wetlands. One in the center,
105:59 | which is the
106:01 | A wetland uh BBW. There's a smaller BBW
106:06 | closer to Daniel.
106:07 | >> He doesn't have the plan. I'm sorry. I
106:09 | thought he was showing the plan.
106:10 | >> That's BB BBW. And then there's a an
106:13 | area um toward the central center
106:18 | portion of the property on one of the
106:20 | boundary.
106:22 | Uh this is flagged as an isolated
106:24 | wetland um which does have a a potential
106:28 | burn pool located within it. Um it also
106:32 | is possibly an isolated land subject to
106:34 | flooding. And that's basically how we
106:36 | elected is that it's a it's a isolated
106:40 | vegetated wetland that is a possible um
106:44 | isolated land subject to flooding um and
106:47 | a potential veral pool. So public areas
106:52 | were flagged. Uh the review consultant
106:55 | for the town
106:58 | uh reviewed the line. We made some
107:00 | changes. Um we met on the site on the
107:04 | 17th I think it was. Um and we walked
107:08 | walked the boundaries. Again we were in
107:11 | agreement. We made some field changes.
107:14 | Those were reflected on the ANRAD plan
107:17 | that was prepared by uh Alpha Omega uh
107:20 | engineering.
107:22 | Um and
107:25 | we're just looking for um agreement on
107:28 | the boundaries that are shown weapon
107:31 | boundaries that are shown on the plans.
107:36 | >> Tom,
107:38 | >> does anyone have any question?
107:41 | which is
107:41 | >> so he's not proposing any construction
107:44 | or disturbance. He's just asking
107:46 | confirmation of the boundaries and what
107:49 | type of resources are within the parcel.
107:52 | So he delineated the board of vegetating
107:54 | wetlands. There are some other resources
107:57 | that was also puted there. So we had
107:59 | their peer review going over there were
108:02 | you know some difference of opinions. We
108:05 | all gathered together on the parcel to
108:08 | agree. There were some coverts. there
108:10 | was some BVW. So that has all been
108:13 | revised and put it on the plan. So what
108:16 | we'll be doing tonight is agreed that
108:18 | that delineation
108:21 | >> exactly
108:22 | >> is depict what's on the field and then
108:25 | what is when somebody actually chooses
108:27 | to develop or to disturb they are going
108:30 | to take that as agreed upon. So they
108:34 | won't have to be delineating the wetland
108:37 | again if they choose to separate those
108:39 | that that part. suing different lots.
108:41 | Does that make sense?
108:43 | >> So when they come over the that has
108:45 | already been agreed, the line have been
108:46 | agreed on, it has already been have a
108:49 | documentation uh proving that
108:52 | >> it saves them time.
108:53 | >> Yes. And they don't they don't need
108:55 | because sometimes this can be this or
108:57 | red which is what we issue can is value
108:59 | for three years. They can push for
109:01 | another three years. So some people
109:03 | might not you know develop right away or
109:06 | they might not sell the loss or divide
109:07 | the loss. So that's on the record. It's
109:10 | there. It's done. So I don't have any
109:13 | concern has been again peer reviewed by
109:16 | two scientists. So
109:19 | >> do you just need a motion?
109:20 | >> You just I just need the motion to
109:22 | accept the boundaries as uh depicted on
109:25 | the plan.
109:26 | >> Do I have that motion?
109:28 | >> How many how many uh uh Oh, never mind.
109:32 | >> I tried.
109:33 | >> Sorry. How uh 12.11 acre. Okay.
109:38 | >> 12.8.2.
109:40 | Yeah. 12.1.
109:41 | >> Yeah.
109:43 | >> Was there a vernal pool in there also?
109:45 | You said.
109:46 | >> Yeah.
109:46 | >> Isolating.
109:47 | >> It's potential. It has not been
109:49 | certified.
109:50 | >> Okay.
109:51 | >> So, it cannot be certified at this time
109:53 | of the year either because they have to
109:54 | be certified at different times. So, and
109:56 | again, they can either do that at
109:59 | different time the commission requires
110:00 | or when someone comes to file and it's
110:03 | the time to be that's when we do that.
110:06 | But right now I can't force them to
110:09 | certify whether I mean to determine
110:12 | whether is a veroo or not because
110:14 | there's no way of certifying that at
110:16 | this time of the year.
110:17 | >> Well, I just know they're usually on the
110:19 | plans if they've already been certified
110:21 | because they have to be on the deed.
110:23 | >> Yeah. So, yes. And then they will have
110:25 | to ask for permit and permission for a
110:28 | different department for the states in
110:30 | order to allow because they're protected
110:32 | areas but it's a potential. So nobody
110:34 | has certified.
110:35 | >> Okay.
110:36 | >> Yeah.
110:37 | >> Okay. Do I have a motion to accept the
110:40 | deliation?
110:40 | >> Motion made.
110:42 | >> Second.
110:43 | >> Second.
110:43 | >> All in favor?
110:44 | >> I have it.
110:47 | >> Thank you.
110:49 | >> Thank you, Roach.
110:50 | >> Yeah, of course. I'll contact you next
110:52 | week. Thank you. You mind passing that
110:54 | over, please?
110:55 | >> Sure.
110:56 | >> Thank you. And it says we have a request
110:58 | for minor amendment to DP number 1281
111:02 | 933 Serbridgeidge Road Route 20.
111:04 | >> Thank you for
111:05 | >> No.
111:08 | >> Okay. What is that?
111:10 | >> Minor amendment.
111:12 | >> Uh
111:15 | sorry this has been a bit
111:17 | >> keep pushing this one. So they they have
111:21 | they had the order condition that was
111:23 | approved by us but as always sites like
111:26 | that when the construction is over 20
111:28 | they need to go to DOT. So that's an
111:32 | example of what could happen with the
111:35 | gas station.
111:36 | >> So they did all the permitting D uh
111:39 | local permitting.
111:42 | I think even
111:46 | EPA and now when they went to do they go
111:49 | well I need this to be changed. So
111:52 | because the state road we need to kind
111:54 | of work together with them. So they had
111:58 | to
111:59 | uh wind the PL uh the bridge the that
112:03 | they had proposed for the covert at
112:06 | Mckin Street Brook to improve the
112:08 | protection uh of scour protection is
112:12 | what's called. So it it was a little it
112:14 | has to be full width to flush to
112:17 | gradient stone rip wrap apron that's
112:19 | keyed into the stream bed and extend
112:22 | beyond the wing walls. I know that's
112:24 | kind of Let me see if there's a Oh,
112:26 | there's a plane here.
112:29 | So, there has not been it won't impact
112:31 | the area that had been. So, he did in
112:33 | red. So, the black is what was uh first
112:37 | approved and the red is what's the
112:39 | changed
112:40 | >> quite a bit.
112:40 | >> The permanent impact will increase
112:43 | approximately 1,000 square ft. Um
112:47 | however the the grades flood storage
112:50 | calculations and the compensatory
112:53 | storage will remain unchanged
112:59 | and
112:59 | >> that's to comply with the route 20
113:00 | >> that's to comply with D. I mean we could
113:02 | if the commission choose to to have him
113:05 | um file for a full amendment. I don't
113:08 | see the the the need for it but it it
113:11 | can be a possibility. You have the the
113:13 | authority to do so.
113:28 | have to be further away. [laughter]
113:32 | >> Need the magnifying glasses there.
113:33 | >> Are you recommending?
113:35 | >> I'll be looking to Yes. A a motion to
113:38 | approve the change under a minor
113:40 | amendment.
113:42 | >> Need a motion.
113:43 | >> Motion.
113:43 | >> Second. Second.
113:45 | >> All in favor?
113:46 | >> I
113:49 | >> Okay. Certificates. Certificate of
113:53 | compliance. First one is D1281727
113:59 | >> 11B
114:01 | Colum Drive.
114:03 | >> Yeah. So this was issued few years ago.
114:06 | There was some change uh that it was uh
114:10 | submitted by the engineer who did the
114:12 | final sign inspection. Uh there was
114:15 | additional
114:17 | uh it was the the order conditions was
114:20 | for a pool install. The the location of
114:24 | the pool shifted and they also installed
114:26 | a shed. Uh but it was all within the
114:29 | buffer, not the the the BVW was not
114:32 | altered by any means. So that was the
114:34 | only difference. So, I would still
114:35 | recommend uh issuing a complete educator
114:38 | compliance.
114:39 | >> Need a motion.
114:39 | >> Motion made.
114:40 | >> Second.
114:41 | >> Second.
114:42 | >> All in favor?
114:42 | >> All right.
114:43 | >> Nice to have it.
114:46 | >> Next, we have D128-189259
114:50 | Pumpkin Lane, formerly lot one.
114:55 | >> Yeah. So, that's our famous pumpkin lane
114:57 | construction that we had issues back a
115:00 | few years ago. uh they just never filed
115:03 | for educator compliance. That educator
115:05 | compliance itself was related just to
115:07 | the driveway. So I'll issue a complete
115:10 | certificate compliance. Do
115:11 | >> you need a motion? [snorts]
115:13 | >> Motion.
115:14 | >> Second.
115:15 | >> Second.
115:15 | >> All in favor?
115:16 | >> I [clears throat]
115:20 | DP number 128-187257
115:24 | Pumpkin Lane.
115:26 | >> I might have switched it. So that was to
115:31 | the first one that we approved was
115:32 | associ it never commenced. Yeah.
115:36 | >> So so that is uh uh invalid certificate
115:41 | of compliance. So
115:42 | >> with 1892.
115:43 | >> Yes.
115:44 | >> So same
115:46 | >> same. Yeah. Yeah. I just need the motion
115:47 | to show an invalid instead. I apologize.
115:51 | >> Motion ago.
115:52 | >> Thank you.
115:52 | >> Second. [laughter and gasps]
115:53 | >> Second.
115:54 | >> All in favor. Not that would matter, but
115:57 | just to be on the record. And the 57
116:00 | pumpkin lane was associated with the
116:01 | driveway.
116:02 | >> Are we set with 57?
116:05 | >> Yeah.
116:05 | >> Okay.
116:06 | >> That's a a complete certificate.
116:09 | >> DP128-20118
116:12 | Rams Road
116:13 | >> that was associated with the
116:14 | installation of a septic system just few
116:16 | months ago that I would recommend issue
116:19 | with complete certificate compliance.
116:21 | >> I need a motion.
116:23 | >> Second.
116:23 | >> Second.
116:24 | >> All in favor? All right.
116:25 | >> All right.
116:27 | >> Okay.
116:28 | Enforcement violations.
116:29 | >> Nope.
116:30 | >> Old new business.
116:32 | >> No.
116:33 | >> So, I can make
116:35 | >> Oh, I'm sorry. [laughter]
116:38 | >> Old new business, but I had a couple
116:41 | questions and a couple comments on the
116:43 | way last time.
116:47 | >> It It's just not on J's agenda. So, we
116:49 | we're not discussing tonight.
116:52 | >> All right. I know I talked I didn't come
116:53 | to the last meeting,
116:54 | >> right? But I thought that is not all in
116:56 | your business.
116:57 | >> Uh
116:58 | >> we're not discussing it tonight. No,
116:59 | it's all not on the agenda for a purpose
117:02 | because we're waiting for uh I think I
117:04 | put that on email for you.
117:06 | >> Um I didn't get no response because
117:08 | there was a lot of inaccurate statements
117:09 | and it was vote based on some of those
117:11 | statements.
117:11 | >> We will be reviewed that as I explained
117:13 | to you it was just a initial
117:16 | >> discussion
117:17 | >> discussion. So we are kind of aware of
117:20 | what's happening. Everything is being
117:22 | reviewed and that's why we chose to not
117:24 | have on the agenda to discuss because we
117:26 | like to review each item, each comment
117:29 | and each information that was provided
117:31 | to us and additional information that
117:33 | we're requesting prior to continue
117:35 | discussing based on information that may
117:38 | may not be reliable. So
117:41 | >> old old business on the agenda why is it
117:44 | on the agenda
117:46 | >> because we don't have new information to
117:48 | >> discuss
117:52 | about like other boards that I'm on
117:55 | that's
117:56 | >> so you can you can require the request
117:58 | the commission to discuss uh all their
118:00 | old business I'm just trying to explain
118:02 | to you that the commission is reviewing
118:04 | everything that has been commented and
118:07 | submitted to us and we had not closed
118:09 | should be they are not closed. I don't
118:12 | believe they should be making a
118:13 | decision.
118:14 | >> We don't have anything yet about South
118:16 | Charleston to even look at other than
118:18 | what residents have been providing.
118:20 | >> So we we did have a discussion about
118:23 | having a
118:24 | >> somebody go and look at
118:26 | >> we're having someone to conduct a study.
118:28 | Yes,
118:28 | >> I understand that you
118:30 | >> there might have been things said and
118:32 | things that were not said in the last
118:33 | meeting and we're taking off
118:35 | >> or not we're all taking it's just not
118:38 | it's not on the agenda and I just feel
118:41 | that being such a um
118:44 | >> contentious
118:44 | >> contentious subject to have just one
118:47 | party here to have a discussion over it
118:49 | would be unfair that's my take
118:52 | >> that's fine so it's not so I don't have
118:54 | to because honestly I was going to
118:56 | someone was going to be where you go,
118:57 | folks. That's our fear because last week
118:59 | >> there was a vote and it was based on
119:02 | >> there was no vote.
119:03 | >> No, there was a vote that there was a
119:04 | vote move to study. One person voted
119:07 | against it which is totally fine. It
119:08 | doesn't agree with me. You might have
119:10 | >> tons of reasons.
119:11 | >> Yeah,
119:11 | >> that could have happened that last week
119:13 | it was voted to not go to study based on
119:16 | some truly inaccurate
119:19 | some misstatements. How deep it is,
119:21 | where it's conducted. I sent you an
119:23 | email video show
119:26 | that was my fear. I'm like, "Holy crap,
119:27 | that could have got voted down based on
119:29 | it."
119:30 | >> Yes. And that's why I request the study
119:32 | to give time. So, yeah. So, everyone has
119:35 | actually the time to
119:38 | >> to review what has been sent to us and
119:42 | any additional information
119:43 | >> and I do appreciate that. I get that you
119:45 | all do more than just this. So, what I
119:46 | sent you all is it's a ton. I get that.
119:48 | >> It's a lot.
119:49 | >> No. And I I acknowledge I love tri but
119:52 | so if I want to talk to you about some
119:53 | of your comments like you were saying
119:54 | how the other
119:55 | >> the other someone said the other lakes
119:56 | and ponds weren't aware of this the
119:58 | lakes and ponds commission twice voted
120:00 | unanimously so the other lakes are aware
120:02 | of it and then you said something about
120:04 | you can't move
120:05 | >> I didn't say that it will they will
120:07 | >> no one of the opposition was saying oh
120:09 | you better tell the lakes the other
120:11 | lakes are aware of it yeah
120:12 | >> but then you also said something about
120:13 | getting permission or getting the
120:15 | approval of the lakes and ponds which
120:16 | that confused me only because
120:19 | get approval. No, approval for what?
120:21 | >> No, you made a comment. I watched the
120:23 | video that well, we have to run this by
120:24 | the other. We got to get approval from
120:26 | the boards of the other lakes first. To
120:28 | me, it should be like citizens
120:31 | >> if they choose to conduct their own
120:34 | study.
120:34 | >> No. And and it keeps going just south
120:36 | reservoir, but like does nothing prevent
120:38 | it from going down any other lake
120:40 | tomorrow?
120:40 | >> Understood. I think the the focus is
120:42 | Southton. So we wanted to we wanted to
120:45 | focus on that lake first because then
120:46 | the next potential lake is Glenn Eko.
120:48 | >> It will just be a precedence. You know
120:51 | what I mean?
120:51 | >> No.
120:52 | >> Yeah. So that's what I mean.
120:54 | >> Like so any taxpayer account we control
120:58 | pay for we have a highrisisk dam that
121:00 | the femur and core engineer stuff I sent
121:02 | you shows
121:03 | >> and and I feel like it should be
121:05 | everybody not just people. It is and
121:07 | that's why it's all being under review
121:09 | and that's why that it goes to the board
121:10 | of select if the commission approves and
121:12 | that's why it goes to the town meeting.
121:14 | So because as you say everyone in town
121:16 | should be looking at it and voting on it
121:19 | not just lake residents. You're correct.
121:21 | It's just it's a law and it's new and
121:24 | it's it you know a lot of people feel
121:27 | that it should come from the state from
121:29 | the local authority. So, it's a
121:30 | contagious and we're just trying to take
121:32 | our time since we don't have to rush for
121:34 | this town meeting to make sure that we
121:37 | have enough information to make the best
121:39 | decision and have that push to our to
121:41 | the next level.
121:42 | >> I'll keep So now I know if it's not
121:44 | listed on the agenda because the house
121:46 | is a long meeting. You all do a walk
121:48 | away. I don't think anyone realizes I've
121:50 | learned that these last couple meetings
121:52 | appreciate.
121:52 | >> So, yeah. So, and uh yeah, it could it
121:54 | could have let's say we have 15 people
121:56 | here for some reason. They asked the
121:58 | commission to discuss under old business
122:01 | because you have some additional
122:03 | information to submit it that would
122:04 | impact everyone's decision. Yes.
122:08 | >> I would be recommend the commission to
122:10 | open that.
122:10 | >> What happens? They come in a group. So
122:12 | you saying if it was eight or 10 of them
122:14 | then
122:15 | >> but it was but it was on the per it was
122:17 | on the
122:18 | >> No but you just said if there's a group
122:20 | like a bigger a larger number here
122:23 | tonight when it came to old
122:25 | >> if if you had if if you all had
122:28 | additional information that had not been
122:30 | submitted to us that would impact any of
122:34 | the decisions. So we agreed that that
122:36 | day that we would be continue this
122:39 | meeting to be discussed until I had uh
122:43 | the study
122:45 | sub this uh a proposal is sent to the
122:48 | lakes and pon committee for them to
122:50 | approve and then bring in front of the
122:52 | commission. So that's why it wasn't on
122:54 | the agenda because that will be your
122:55 | next step is to have that proposal
122:58 | approved and then have the findings
123:00 | coming back. And when that finds come
123:02 | back, that's why I will notify everyone.
123:04 | Once I have those findings, the
123:06 | commission should be ready to make that
123:08 | decision and that should be a meeting
123:09 | that will be posted.
123:12 | >> Does that answer your question?
123:14 | >> But I still a little bit of confusion
123:16 | like that when you said there's like 10
123:17 | or 15 people here than they could have
123:19 | and they had more information they
123:21 | could. So now my fair is I got to come
123:23 | down.
123:23 | >> But do you have that's not what I meant
123:26 | people?
123:27 | >> I mean I'm not talking about the amount
123:29 | of people. I'm talking about because of
123:30 | the amount of new information that would
123:32 | be brought into the commission.
123:34 | >> By all means do you have new information
123:36 | to provide to the commission or the what
123:39 | has been submitted tonight?
123:42 | >> So you're not talking to refute like 20
123:44 | foot comment that was made last week
123:45 | that we only
123:46 | >> No, because we are aware of that. It's
123:48 | on the paper for some locations. What I
123:52 | what I I feel that the way I say it
123:55 | might have you might have interpreted in
123:57 | a different way. What we have was a bad
124:00 | matric study that shows in some
124:02 | locations some some depth but not
124:05 | entirely of the lake
124:07 | >> not close to 20 ft. That was what was it
124:09 | was voted on that was stated it was 20
124:11 | ft deep and then you all made a vote
124:12 | based on it.
124:13 | >> That's my we didn't make a vote based on
124:15 | that. vote
124:17 | >> to go to his his concern is that if
124:20 | there's
124:22 | >> I get what he's saying that we voted to
124:24 | to go forward with the study
124:26 | >> but people were saying that well you
124:28 | don't really need that cuz it's 20 ft
124:29 | that you know there's they're giving out
124:31 | they were throwing out numbers that
124:32 | aren't currently yes
124:34 | >> so we were fortunate that we did proceed
124:36 | with the that's his concern was that we
124:38 | did
124:39 | >> if I'm sitting out there and I did read
124:40 | and it is like 20 feet is the going
124:42 | standard so if I'm sitting up there and
124:43 | I hear no it's 20
124:45 | You know, yeah, we only do it right
124:47 | here. I didn't point it to you, but I
124:48 | can show you videos,
124:49 | >> but we all know
124:51 | >> I might have said even if there were
124:54 | >> but the study wasn't just for the death.
124:56 | The study was for much more.
124:58 | >> I'm saying my favorites could have got
125:01 | >> it would not it would never I it'll
125:03 | never allow that because even if there
125:04 | was an air that might have been 20 ft
125:06 | somewhere, we know that the entire lake
125:08 | does not does not have at the same
125:11 | depth. We know that. We're aware of
125:13 | that. Is does is anybody aware of that?
125:16 | >> So that that would never happen. It
125:19 | would just wouldn't but the voting for
125:21 | the study was not just related to the
125:23 | death of the lake was related to erosion
125:26 | was related to the bed was related to
125:28 | invasive species was in comparison that
125:31 | we're requesting requiring requesting to
125:33 | compare the difference of you know of of
125:36 | jet skiing or or any other activities.
125:39 | So that was not the reason for the vote
125:41 | for
125:42 | >> No, I understand that. I was just saying
125:44 | like if if someone was influenced by
125:45 | certain things said they were inaccurate
125:47 | chance.
125:49 | >> Do we answer that? Cuz no disrespect is
125:50 | getting kind of
125:51 | >> Yeah. No. And I'm sorry.
125:52 | >> Yeah. Yeah.
125:53 | >> So I know you're concerned what was said
125:55 | and what was but that voting had nothing
125:57 | to do with you know numbers or or
126:02 | >> Okay. Yeah.
126:03 | >> Thanks. I want
126:05 | >> No, no, of course. Yeah. No, you have
126:07 | the right. So as again when I said a
126:09 | large group of people I meant the new
126:11 | information they would be bringing from
126:12 | the commission not because they there
126:14 | will be more people
126:15 | >> it's not on the agenda I don't have to
126:16 | worry about
126:17 | >> no correct we are not going to be
126:19 | discussing it's not going to be voted
126:20 | until I have more information I will
126:23 | actually bring to the less importance
126:24 | committee first
126:26 | >> when I saw new business that's just what
126:27 | I was
126:28 | >> yeah no of course yeah by all means yeah
126:30 | thank you
126:30 | >> yeah of course yeah of course
126:34 | >> are we ready to make a motion
126:36 | >> yes the marriage Motion to adjurnn.
126:38 | Motion to
126:39 | >> second.
126:39 | >> Second.
126:40 | >> All in favor?
126:43 | >> Thank you for
