2026-11-02 - SPLOST and TSPLOST Oversight Committee

Summary

  • Staff gave the committee an update on the TSPLOST 2026 implementation plan, which is on the November 4 Mayor and Commission agenda. Money does not begin arriving until October, but smaller projects can start early. Staff intend to deliver the program mostly with in-house staff rather than a consulting program-management firm; a county engineer and project managers have been posted but not yet hired.
  • SPLOST 2028: the current SPLOST is expected to run out near the end of 2028, so a May 2028 ballot question is needed to avoid a funding gap starting January 2029. A pre-referendum plan goes to the commission in the December cycle, with an appointed review committee and community project submissions expected again; decisions on the review committee are expected in April. A 10-year program is projected at about $452 million, described as a rough projection.
  • The Judicial Center has grown from its original scope, so architect and project-management change orders are coming, along with parking planning; a construction-manager contract is expected around February. Remaining SPLOST 2020 money for the old courthouse covers only basics such as elevators and HVAC; a renovation is planned for SPLOST 2028. Future use of the old courthouse is undecided.
  • Committee members who served on the earlier SPLOST review committee said the process felt like box-checking because the commission had already decided on large projects (the judicial center, an arena and a housing project) after the committee had spent months on them. They urged that predetermined projects and their cost be disclosed at the start so the committee can work with the rest of the funds. Staff called the feedback helpful and asked for more by email.
  • Staff were asked by the commission to explore consolidating the two mayor-appointed committees into a single commission, and to review the 60-plus boards and commissions. Members urged that appointments come from all commissioners to give broad district representation, and that the group have a clear charge.
  • Project updates: Riverbank park at College Square is open with closeout work left; the mental health facility is expected to open early next year; a library site is being cleared with opening targeted around the next school year; Memorial Park is targeted for summer camp season; the West Broad Street roundabout (two lanes) is to be built by GDOT over nearly two years; Prince Avenue pilot changes may be made permanent next summer.
  • Recent agenda items: Stonehenge sidewalks, a Jefferson River Road multi-use path, a Whitehall roundabout, annual paving, public safety vehicles, SPLOST 2020 energy projects, and fire station zoning and schematic design on the November 4 agenda. Neighbors of the fire station site raised screening concerns; staff added screening near the building. Extra land from the site purchase has no planned use yet. See Fire Station 5 Replacement.
  • SPLOST 2020 affordable-housing funds: a recommendation on remaining funds from the request for proposals is on the November 4 agenda. The MLK Greenway gap is a TSPLOST project with GDOT funding, a pledge ordinance expected in December and completion about 2031. The Athens in Motion plan and Vision Zero action plan were recently approved, and airport layout plans are starting. See TSPLOST Projects.
  • Meeting schedule: members noted this meeting moved off the usual third Monday; staff prefer end-of-month and hope to present an annual report in late January or early February. Early in the meeting members discussed correcting prior minutes to note that a quorum was lacking. The meeting adjourned by motion.

Agenda

Agenda items not yet read.

Sources

Video

Watch the video

Transcript

*These are auto-generated captions; names and numbers may be misheard.

Transcript

00:13I've got it, Rodani.

00:24So, one of them was specifically for the

00:28Taste Blast. I don't know if that one

00:31but the joint one I would think we would

00:33be able to go ahead and do the three for

00:35the March 30th, April 27th, July 27th.

00:43>> Technically, it's

00:4630th.

00:50The second

00:55>> We just couldn't take an official.

00:57>> Balance before

01:11If you change those minutes

01:13>> Mhm.

01:32>> And you change the wording to be real

01:34clear so somebody could blame me.

01:36>> It should be were not. Yes, I can add

01:38that.

01:42It It is. I can see that. Yes, I will

01:46fix that.

01:54Well, it says you didn't have a quorum

01:56but they still were approved. Yeah.

02:00No, that's what we want y'all to do.

02:02That's good. Thank you.

02:06July.

02:31Yes, ma'am.

06:07>> Mhm.

08:05>> all the details

08:07and we needed the money.

09:20>> to the arch.

09:23That we don't know yet, but that's

09:24something that we'll consider.

09:27Uh there are some smaller ones in there

09:29that we're going to be looking for an

09:30opportunity to accomplish the things we

09:32can really even though money doesn't

09:34start rolling in technically till

09:36October, but we can understand that we

09:38can keep going

09:39quite early.

09:40And we will be staffing up so that we're

09:42you know historically what y'all are

09:44used to is

09:45after a referendum we'll turn around and

09:47kind of contract for program and project

09:50management with a consulting firm

09:52professional services.

09:54Uh we won't be doing that after T-SPLOST

09:562022-2026. The intent is as much as

09:59possible

10:00uh to accomplish that within house

10:02staff. So we're in the process of hiring

10:04and getting the team on board so that

10:07they can implement it T-SPLOST 2022-2026

10:09at you know,

10:11um

10:12there'll be limitations on that. I don't

10:14know that we'll be able to do it

10:15completely, but that that was

10:17that's our intent, anyway.

10:18>> Yeah, cuz you and Nat said in another

10:19meeting, we've hired a county engineer

10:22and added some other staff, so that

10:25could be

10:25>> We've posted. We haven't hired yet.

10:26>> Okay.

10:27>> You know,

10:28>> But you I mean, it's approved, so that

10:30That's what you're talking about.

10:31>> That's what we're talking about. County

10:33engineer, some project managers and some

10:35other staff that we're just hiring

10:37internally that we think will support

10:39that work.

10:41All right. So, T-SPLOST 2026, if you

10:44have any questions about that, um you

10:45know, we can talk about it, but the

10:47implementation plan that's on the mayor

10:49commission's agenda is just what I

10:50wanted to point out to y'all tonight.

10:53Next is SPLOST 2028.

10:57So, So, we got to do this again.

11:00>> [laughter]

11:01>> Uh

11:03I think at the December vote cycle is

11:07when the commission will see kind of a

11:08pre-referendum plan.

11:11We think that

11:13um

11:14the current SPLOST program will expire

11:17towards the end of 2028.

11:19Meaning, we would in order to avoid a

11:22gap in funding, we would need to uh earn

11:25revenue starting in January of 2029,

11:28which means a

11:30May of 2028 ballot question.

11:33So, backwards planning from that May of

11:362028 ballot. Uh and now is the time to

11:39get started. Uh that pre-referendum

11:41process might look a little bit

11:42different

11:44than it has in the past.

11:46Uh

11:47But there are two things that I expect

11:49to remain.

11:50Um that y'all are going to need to. One

11:52is the opportunity for community

11:54submissions.

11:56Second is the kind of appointed review

11:59committee. I don't know what shape

12:00that's going to take yet. Uh we're

12:02probably going to make make decisions on

12:04that uh appointed review committee in

12:07April.

12:08But this coming This coming April. So,

12:10just be aware of that.

12:13I'll probably have more for you after

12:15the actual other

12:17pre-referendum plan. That way I'll

12:19know that what I'm telling you is what

12:21they've actually asked me to do.

12:23Um the the most impactful piece

12:27we have shared this with the commission

12:30that they're wrestling with is it's

12:32obviously how we're going to plan

12:35the judicial center.

12:37It's partly funded through SPLOST 2020.

12:41It's a significant portion that needs to

12:43bridge into the next one.

12:45Um you know, there is a plan for it.

12:48They have some decisions to make kind of

12:50later next year on how they're going to

12:53do that.

12:54How we're going to do that as a team and

12:58uh you know, what that means for SPLOST

13:002028.

13:02They've got some options in front of

13:03them. One of them is actually on their

13:05agenda for Wednesday as well.

13:07Uh just takes the next step. And

13:13our financing structure.

13:16And there's a couple of other items that

13:18are in that same agenda. One is So, it's

13:22gone from essentially a $79

13:24[clears throat]

13:25project to a much larger project. That

13:27means change orders for the architect,

13:29project management.

13:31We're also starting to build in plan for

13:35uh parking solution. So far, it's been

13:38about the judicial center and just the

13:39judicial center.

13:41We know that we don't want our judicial

13:43center solution to move forward.

13:45Um so,

13:46that's becoming more and more a

13:48component of uh

13:50you know, they've asked me to kind of

13:51build that in.

13:53So, probably ask the architects to help

13:56us with that as well.

13:57Same project management.

14:01>> Josh, are you saying that

14:04the

14:06that

14:08change orders didn't happen for

14:09architecture and project management

14:10because the project got bigger and it's

14:12going to straddle two SPLOSTs?

14:14>> Um really just for the first one the

14:16loan is enough. Uh So, typically

14:20um

14:21design firm contracts and project

14:24management fees to some degree based on

14:27the value of managed work.

14:29Um, and so for sure and not always for

14:32design firms, but in this case

14:34uh there's so much of a change from the

14:37the the originally imagined project to

14:40the one that we have now

14:42that yes, change order is just a very

14:44appropriate.

14:48And then next next in that project will

14:50be um

14:52construction manager um contract as

14:54well. Bring them on board uh earlier in

14:57the design phase, so you'll probably see

14:59that in February.

15:02>> Is there going to be enough money to do

15:03the renovation of the old courthouse or

15:06is that

15:08going to need to be

15:10up as well?

15:11>> Great question. Glad you asked. So,

15:13there are two answers to that.

15:16One thing is that there is some money

15:20reserved for the current

15:22Sparks 2020 project

15:25that is designated for

15:28the existing courthouse.

15:31Really just enough to make sure the

15:33elevators working, HVAC is working. It's

15:35fundamental. So, make sure

15:36>> that we got elevators. Hopefully they'll

15:38work for a while.

15:39>> We would have to We would hope.

15:40>> [laughter]

15:42>> That was horrible.

15:43>> You got it.

15:45Uh

15:46it was. Yes. Hopefully we're on the

15:48other side, but it's that sort of thing

15:51that this money will be for.

15:54Um

15:55what they're not enough money for is

15:57what anything you would call a

15:58renovation.

16:00Some security upgrades probably.

16:05Renovation is one that we have built

16:07into the pre-referral process for Sparks

16:092028.

16:11The commission has indicated to us yes,

16:12they want that.

16:15And so that would be one that would be

16:17positive in the next program.

16:19>> Have they figured well, I know this is

16:22early.

16:23But tentatively have they been thinking

16:25about what they want to use that space

16:27for cuz I don't know if everything they

16:29originally wanted to get in the judicial

16:32center is actually going to be able to

16:34get go into the judicial center.

16:38>> So

16:38>> Because it's got a much smaller

16:40footprint than I think they wanted. It's

16:43just going to be up in heat.

16:45>> Depends on who you ask.

16:46>> Okay.

16:47>> Um the the expectation is that it will

16:50be ACC go functions. Exactly what

16:54functions

16:56uh you know, remains to be seen.

16:58Um

17:00We do anticipate that the judicial

17:02functions of the judicial center will be

17:04sufficient.

17:05>> Right. I mean, I know that was the main

17:07thing, but I also know there was a

17:09debate about moving out of Clark of

17:10Court functions.

17:11>> Yeah.

17:12>> Through the judicial center and that's a

17:14whole lot of space.

17:15>> Yes.

17:16>> With all of her land

17:18the stuff. So that's why I'm just trying

17:22to get clarity on where stuff's going.

17:25>> As we all are for sure. I think the

17:27space allocation

17:29uh work that is all under under

17:32>> They're doing that again.

17:33>> now.

17:35It's basically a never-ending process.

17:37>> Well, I mean, they did two humongous

17:39studies.

17:43I would have thought that would have

17:46There's enough to kind of give them an

17:48idea.

17:48>> You know, keep this in mind cuz they you

17:50know, there was a plan think about

17:52costing.

17:53There's no plan for costing. There were

17:54probably five or six different

17:56iterations of what

17:57>> See, I never really kept up that much of

17:59that. As long as that building was being

18:01preserved and taken care of.

18:03>> what you care about. Okay. Okay.

18:05>> Well, I don't want the face of town to

18:07get totally warped so it doesn't look

18:10like

18:11an interesting place anymore.

18:14>> And but if you think about the timing

18:17next SPLOST program that revenue start

18:20January 2029.

18:22We anticipate might run for 10 years.

18:25So if we're going with that renovation

18:28to take place, how many years is it

18:30between now and when it would actually

18:32be open for services? You know, now is

18:35probably not the time that we would be

18:37saying what would [clears throat] be in

18:38that facility. That will come time for

18:40that.

18:41Uh now is an

18:46So our estimate right now is 300 Uh yes,

18:49we do have an estimate.

18:50Uh again, it's a projection and you

18:53know, we're using uh

18:55>> It's kind of sky high.

18:56>> 2%

18:58uh you know, inflationary factors for

19:00revenue.

19:02Uh

19:03we anticipate a 10-year program would be

19:05worth $452 million.

19:11The year we're working with right now,

19:13you know, we continue to just watch

19:14revenues and try to anticipate and it's

19:16nearly impossible we just have to Keep

19:18best we can.

19:20>> That covers both the courthouse

19:23and

19:25the abandoned facility the old What what

19:27does that number represent?

19:28>> That's We don't know yet.

19:30>> [clears throat]

19:30>> That's the size of the SPLOST.

19:31>> That's That's a guesstimate projection

19:35out of the sky paper. That's just

19:38hyperbole. It might be.

19:40>> And and what I'm sharing tonight with

19:43you all is uh the kind of referendum

19:45process that we would follow to kind of

19:47determine what we what what that $452

19:50million would be used on and it's what

19:52we're putting in the agenda cycle. I

19:54think we'll vote on it in September.

19:57Um

19:58after that, you know, we'll know a

19:59little bit more about

20:01what comes next.

20:02>> Well, cuz see this is

20:042020 is getting finished

20:07considerably sooner than I thought it

20:08would.

20:13>> And unlike unlike T-SPLOST, there is no

20:15possibility of um

20:18the SPLOST program becoming a

20:20time-limited program. It will be dollar

20:22limited. It's dollar limited. Right. It

20:24will stay funded.

20:27>> I was going to say I know that um

20:31Well, our committee work feels like a

20:33long time ago because this is pre-COVID,

20:35but my memory of the process and it's

20:38possible that that you all have done now

20:41two

20:43I think since tomorrow's, right? And so,

20:47it's possible this process has already

20:49been updated, but I I know for me at

20:51least just speaking for myself that one

20:54of the problems I sensed from the group

20:56was that

20:58I can't remember what the bucket of

21:00money was. I can't remember what the

21:01number of projects were, but we were

21:03sort of told here's the bucket of money,

21:05here's the number of projects

21:07deliberate

21:09make it work.

21:10And

21:12I remember at the time one of the things

21:14that felt sort of disingenuous to me was

21:17that we didn't actually have a choice

21:18about several of those projects, but yet

21:20we're still given

21:23them as if they were really something

21:25that we could actually

21:27not include should we as a committee not

21:30want to. That wasn't true. That was

21:31never true. And it's possible that that

21:34process is update. In other words, they

21:35were going to do that anyway. Right. And

21:38I don't really have a problem with and

21:41this is probably sort of a controversial

21:43thing that I don't want to agree

21:44something like I don't really have a

21:45problem with the commission deciding

21:48no, we're doing these six. So, for

21:51example, like we're going to do these

21:53six projects. So, actually

21:56take those off the slate of projects you

21:57all are considering or or do something

21:59different with them cuz they're not in

22:01the pool, right? That the commission has

22:02already decided ahead of time we're

22:04doing these projects. And also then

22:06remove that amount of money from the

22:08bucket and let the committee work

22:10with some real

22:13like with the process just being I think

22:16one of the things that frustrates me

22:17about some of this public engagement we

22:20do in committee work we do is you kind

22:22of go through all this and you give a

22:23lot of time and actually, it was people

22:25checking boxes, and

22:28we needed not to have deliberated over

22:31those things if we

22:33could have known that the committee that

22:34the commission was just

22:36set, right? So,

22:39I don't know what's possible in the eyes

22:40of law. I don't know what's possible. I

22:43mean, I think that those would still

22:44have to go up in the referendum even if

22:45the commission has decided ahead of

22:47time. But, I think the idea being like

22:49that the committee has approved

22:51the suggested the list, and the mayor

22:53and commission have added, subtracted,

22:55whatever.

22:56But,

22:58at least for the committee who spent so

23:00much time on that, like

23:02let's not pretend on that one, right?

23:05Let's just

23:06>> with you, Sarah, cuz I think and I think

23:07this is a little bit different than what

23:09you're saying cuz it sounds like they're

23:10being very transparent and up front

23:13with the committee's projects. But, the

23:15issue that I had was that

23:19we did not find out that was even an

23:20option until pretty far down the

23:23>> Yeah.

23:24>> And then and that I I mean, I had a

23:27whole conversation with the county

23:28manager after cuz I was very upset about

23:30that.

23:31>> Yeah.

23:31>> Cuz we spent a ton of time,

23:34and it just sort of I I did not like the

23:36way that was done. And so, I think I

23:39totally agree with you. If there are

23:40some things they're going to go ahead

23:41and define, which is their right to do,

23:43I mean, at the end of the day, they make

23:45those decisions.

23:47Mayor and commission, but

23:49I did not like how that was handled

23:51either, and

23:52it felt a little bit like a bait and

23:53switch. I don't think it is um

23:56respectful of people's time because

23:59this group of people spent a lot of

24:01time. I mean, we

24:02basically saw each other more than our

24:04families.

24:05>> You're welcome.

24:08>> So, I I guess that would be I totally

24:10agree with you. I think that I was very

24:12angry about that, actually. So,

24:15>> But, I think by the time like our

24:17committee

24:20I don't remember the details anymore,

24:22but I kind of remember that the end of

24:23our committee like there were several

24:25members of the committee who just kind

24:26of had it, right? They didn't engage in

24:28the education piece that you do after

24:30your between the end of the committee

24:32work and the referendum itself. And in

24:34some ways I think people were spent.

24:37Their energy was kind of spent and we

24:39could have saved a little time not

24:41discussing those projects. They weren't

24:43So anyway, I'm just saying the same

24:44thing over and over but you get my

24:45drift. And to the extent that, you know,

24:48I don't know how much

24:50I I don't know how much how changeable

24:51that process is but it's just something

24:54right now

24:55I'm just very sensitive about as these

24:59uh residents get put on committees and

25:01commissions and things like

25:04don't pretend when we're not actually

25:06going to listen. Like let's just take

25:08those projects the question already

25:09knows they want to do off the table and

25:11discuss everything else.

25:14>> And then also

25:15I think we've got the committee's got to

25:17be educated cuz if you're going to have

25:19to educate on the whole package. You've

25:22got to understand why those packets

25:25are in there but you don't have to spend

25:27time debating them.

25:28>> Right. It could be the very beginning of

25:30the process that

25:31>> Maybe the end because you're not going

25:33to spend as much time on those. You're

25:34just going to listen and do those at the

25:36very end and say, "Okay, this is where

25:38the rest of the money's going."

25:40>> Yeah. And it could be that somebody

25:42someone from SPLOST or the county

25:45manager or somebody comes and says

25:47"We are doing these five projects and

25:49here's why." Because I think the SPLOST

25:51committee still has to be kind of

25:54ambassadors in a way so we need the

25:56SPLOST committee to know why. So I get I

25:59get that that may have been why they

26:00were included but I think there's a

26:02better, more efficient way to do that.

26:05>> So people know why.

26:06>> Yeah, exactly. We still have to sort of

26:08be

26:09convinced as the ambassadors we're then

26:11expected to be. So

26:14>> So if I'm thinking about ways to do that

26:16better if you had that information

26:19earlier in your involvement, do you

26:21think that would have mattered to you?

26:23Would that made it have made a

26:24difference for you?

26:25>> absolutely.

26:26>> Absolutely.

26:26>> known that the commission had

26:27predetermined five projects and that the

26:30general amount was known. Like let's say

26:32we had 500 million. I don't know what we

26:34had. But if they know that they want

26:36five projects and those are worth 200

26:38million dollars, then we have the rest

26:40of the projects and 300 million to work

26:43with.

26:44>> Yeah.

26:44>> Right? Because that was also something

26:46that's kind of

26:47you know,

26:49>> Because it was like 80 million or more

26:51off the top in the midstream when we

26:53were already well down the way. And I I

26:56think it's not and I mean I don't know

26:58if this is for a fact, but it does sound

27:00like that was not what they were

27:01thinking.

27:02>> I think they changed their mind and

27:04decided to do this.

27:06And maybe that will still happen. I mean

27:08that's up to them. But

27:10um

27:11but it it I think this is a better

27:13approach that they're already thinking

27:16about things that are priorities.

27:17>> Okay. It is

27:21I think I kind of knew the judicial

27:23center was going to have to happen

27:24because of the problems with the

27:26courthouse. And

27:27I think they were pretty convinced they

27:29were going to do the arena because they

27:31presented it to us for the ball park

27:33amount.

27:34>> What were the other Do you remember what

27:36the other one

27:36>> Well, the homeless, the redo the the

27:40north village.

27:41>> Or no. Oh, right there behind us. That's

27:43the Bethany

27:45buying that and redoing it into a

27:48>> What else was on that

27:49>> Civic center and the sport court number

27:52two.

27:53>> The arena and the courthouse and the

27:55and the home

27:56>> There was a third? Okay.

27:57>> That was on there, too. That was one of

27:59the things

27:59>> That was that was the smallest of the

28:00three, right? As far as the dollar

28:02amount.

28:02>> Probably. It was only 44 million dollars

28:05or so.

28:05>> We were kind of coalescing around no to

28:07the arena and they came and said, "No,

28:08no, we're actually not.

28:10>> Oh, we said that after we had already

28:12done the master plan.

28:13>> Right. But it seems like we were there

28:15was a Anyway, not important. [laughter]

28:17But yes, those three those are the big

28:18three.

28:19>> Yeah.

28:19>> I'm going to do Had we Had we tempered

28:21our expectations and come in knowing,

28:22"That's fine. They can have those three.

28:23Wonderful. We get the rest of the pot to

28:25advise

28:25>> It's the difference It's just kind of

28:27like 300 million to me.

28:28>> Mhm.

28:30>> That's a significant amount of Just a

28:32significant amount of money.

28:34>> Well, for Texas since there were 98

28:36projects.

28:38>> I guess that's the the other

28:39>> And only one of them was basically

28:41worthless.

28:42>> Right, just that one.

28:43>> Yeah, just that one.

28:44>> The tower on the grain.

28:45>> [laughter]

28:46>> It feels nice to feel shot

28:49not and I that was a lot of projects to

28:53guess the number. I don't know if you

28:54>> presentations were

28:56>> I love that 10 years later we are

28:57whatever we all know exactly what we're

28:59talking about.

29:01>> I had some troubles on this here.

29:02>> It's still pretty warm often.

29:04>> [laughter]

29:05>> Let me say let me say this and then

29:07because I do want to get y'all out of

29:08here. You know, um

29:11these are great insights and believe it

29:13or not they are helpful. You know, to

29:14y'all it might feel like well, this is

29:16just therapeutic for us to it it is

29:18actually helpful. I don't know that

29:20there's anything we can you know, I

29:21don't know.

29:22Uh but if I if I'm an honest

29:24>> say these are their priorities that they

29:26know they're they want to fund.

29:28>> Sure.

29:29>> If floss passes, I mean that's

29:32perfectly open and above board.

29:34>> They decided to decide that these are

29:36the projects that the mayor commission

29:37wants. This is the pot of money. This is

29:40what y'all have to deal with and

29:41separate the money from that.

29:43>> Yeah, just do that from sure.

29:45>> Sharing these insights here tonight is

29:46certainly helpful. What's also helpful

29:49is

29:50if you're at home these thoughts come to

29:52mind, shoot me an email.

29:56Y'all have a lot of experience here.

29:59You've been through it.

30:00You know what comes out, you know, in

30:03terms of the product. Um and we're about

30:06to go through this again and it would be

30:08nice

30:09to have some lessons learned.

30:11>> Yeah.

30:11>> I mean at least have the opportunities

30:13to work on that. Again, maybe I maybe we

30:16can

30:17>> Didn't we do an evaluation though after?

30:20Didn't we go through that kind of? We

30:22had a follow up thanks though.

30:26>> But then COVID happened. That was all

30:28that was right. Whatever they might have

30:30done exit maybe it was.

30:32>> could be well, I think they got

30:34information from us but so there's

30:36probably a report somewhere, but it's

30:38not like everything stops around here.

30:40>> Well, I guess the other thing too is

30:42just to be up front with the next

30:44committee that

30:47and they've already maybe got some

30:48things that they're already thinking

30:49about prioritizing and taking that off

30:51the top and then the

30:53the mayor commission can do that?

30:56Because that was also news to us.

30:59We had no idea that that was the case.

31:00>> Oh, we had no idea.

31:02>> Well, it's just that you're smarter than

31:03I am.

31:04>> [laughter]

31:08>> birthdays than me, so you know better.

31:11>> I have had more birthdays than me by a

31:13long shot.

31:14>> We didn't know the process there would

31:15be changes. I think midstream we did not

31:17quite realize. I thought we would have a

31:19chance to finish our work. And then it's

31:22anybody's guess what will happen after

31:24we're done, but you know.

31:29>> We're also about to have

31:31mayor

31:33three new commissioners.

31:33>> That's interesting.

31:34>> So, talking to those folks would be a

31:36process

31:37of learning and understanding the whole

31:39process and what happened history that

31:42you will share with them. So,

31:45um

31:45a number of different factors come in

31:47here.

31:48All I can tell you right now is that

31:50these sorts of insights and observations

31:52are actually helpful.

31:54Um just share them with either Ashley or

31:56me and

31:57uh

31:57that's probably the best route.

32:01Um all right.

32:045:51.

32:05Uh

32:08last year uh

32:11mayor commission did ask us to kind of

32:13at some point review makeup of boards,

32:16forums, and commissions, all of them cuz

32:17there's like over 60 and it's just it

32:20got out of control.

32:21Um

32:23the one thing that they asked for here

32:25is part of what we've already kind of

32:27been doing. That is when we meet

32:28together.

32:29Uh second is we know one of the known

32:32things is this is the mayor appointed

32:35two mayor appointed committees. I think

32:37they asked us to explore the option of

32:39it being single

32:41number one single commission to

32:43appointed kind of not just by the mayor.

32:46All of that is to be seen.

32:49The one thing that

32:50the one outcome that

32:52I would be looking for in whatever

32:54happens.

32:56Obviously

32:57it's going to it's going to be different

32:59from what it has been.

33:01If it's not something that you all see

33:03value, if it's not something that you

33:06all think is a good use of your time

33:09and you know, it probably isn't going to

33:11work out.

33:12Probably will end up with low

33:13participation and engagement and that's

33:15not what we're looking for. So, more of

33:18exactly what you've been offering to me

33:20tonight on you know, what what we might

33:23be able to do better even post

33:24referendum. So, I'm talking about post

33:26referendum here.

33:27That would also be helpful to me.

33:29>> I will say I think it is very important

33:32that everybody is not appointed by the

33:34mayor.

33:35It needs to come from all the

33:37commissioners.

33:38>> Right.

33:40>> Because otherwise you're not going to

33:42get a broad spectrum of the community.

33:45>> Right. So, that and and that is the idea

33:48of a commission, right? Is that

33:50appointed by the full

33:53by all of them receiving.

33:55But then but then the the second

33:56question is okay, what is the charge?

33:58What are what are we what is our

34:00responsibility? What is it that we're

34:02supposed to be doing? And if you all

34:04have any insights or observations on

34:06that

34:07it could also be useful to me.

34:09All right.

34:10>> That was pretty clear, didn't it?

34:12I thought our charge was pretty clear

34:14from our

34:15>> on the this

34:16>> Yeah, on the small committee. Yeah.

34:19>> But so it it so

34:21it might have been clear whether or not

34:22you all think that is what you

34:24if that's a valuable thing for the

34:25community, if that's a valuable thing

34:27for your time

34:29then that's also good. So, just tell me

34:31like it the way it is.

34:32>> Because I think and

34:34if I'm hearing you right, you're

34:35pointing out that it's a clean slate,

34:38right? All bets are like it is. There

34:39there there's no we can't take for

34:41granted that they'll just start with a

34:42template of what happened last time.

34:44They might, in the absence of any

34:45feedback from us,

34:47do try some different things. Maybe they

34:49keep some parts of it. Is that what

34:50you're saying? Like we sound like we're

34:51like

34:52>> clean slate.

34:52>> It needs like 22 people.

34:54>> They've asked they've they've asked us

34:56for two for us to explore how to go from

34:59two mayor-appointed committees to a

35:01single commission.

35:02>> Got you.

35:02>> Uh we know we're going to have a new

35:04mayor. We're going to have you know

35:05we're going to have some new members on

35:06the commission. What that will look

35:07like, you know, that's clean slate is

35:09the way to look at it.

35:10>> But but if we don't say anything,

35:12they'll just do what they think. But if

35:13we have any feedback, the good, the bad,

35:15the ugly.

35:15>> If if you're going to sell this

35:17>> It's not going to hurt. Got it. Sharing

35:18is not going to

35:19>> If you're going to sell this to the

35:20community,

35:22it's going to have to have broad

35:24representation from every district. And

35:27it can't be people who think alike.

35:32Right?

35:33>> And so we email that to you? Is that

35:34what you're saying? Sure, email it to

35:35you. Got it. All right.

35:36>> If you have um

35:39insights or stuff some anything you can

35:41you can think might be helpful.

35:43>> Cuz every district has different issues,

35:45you know.

35:47We all have

35:48different things we're aware of. I mean,

35:50Shenice and I were both from District 1,

35:53but what she was concerned about and

35:55what I was concerned about were entirely

35:59different.

36:00And it's not that we disagree that both

36:02of them didn't need attention. It's just

36:04that

36:05we brought different viewpoints to the

36:07table even though we're from the same

36:10district, appointed by the same

36:12commissioner.

36:14And I think that's what you've got to

36:15have when you're trying to evaluate

36:17these projects.

36:18>> Perspectives.

36:19Good.

36:20All right.

36:22So,

36:23let's see. I think that's first three

36:24items. Staffing So, we're continuing I

36:27think I talked to talked about this

36:28already. Some internal hiring. The

36:31mayor's office is doing some hiring as

36:32well.

36:34Um I'll keep y'all updated about that

36:35progresses.

36:37Uh and then recent activity. So, we have

36:40the Riverbank Cutty for College Square.

36:41If you haven't been out there, um you

36:43know, we're pretty proud it. It's It's

36:45not, you know, it is open. There is

36:47still some work to be done out there,

36:49just some closeout activities. So, the

36:51Georgia Power has some work to come back

36:53and do,

36:54um,

36:55but, uh, it's open. Folks can enjoy it

36:57and I think there's been already been

36:59all sorts of events out there and I

37:01think folks have enjoyed this park.

37:03We're happy with that. Um, if you've

37:05been out,

37:06uh, if you miss the bridge and seeing

37:08the construction of the mental health

37:10facility,

37:12to the to the eye right now, it looks

37:14like it's, you know,

37:15pretty coming along quite nicely. There

37:18is still a lot of work to to to go on,

37:20kind of it's

37:21it's

37:23Uh,

37:24but we do anticipate it being, uh, open

37:26early next year,

37:27um, and and ready for Advantage to use.

37:31Um, if you've been in the long Barnsley

37:33Olds, you've probably seen, uh, some

37:36>> The library.

37:36>> clearing for the library, which I'm also

37:38very proud of.

37:39>> was really happy when they really made

37:41those did the fence with the big signs

37:44cuz people have been going

37:46I can't figure out where it's going cuz

37:48you'd give them the parameters, they'd

37:50go, "There's no place there to put it."

37:52And I'd go, "There really is."

37:55>> Yeah.

37:56>> So, I was really happy when they finally

37:58tore up enough earth

38:00that they've got a fence and everybody

38:02can see where it is.

38:06>> So, and we're still targeting, you know,

38:08being open kind of around the time frame

38:10that the next school season is is

38:12opening up.

38:14The Memorial Park, if you've been down

38:16there, a lot of activity going on down

38:17there as well. And again, hope to be

38:19open by summer camp. So, that won't

38:22affect summer camp programs.

38:25Roundabout, uh, West Broad Street.

38:31Construction, you can expect to see

38:32construction really any day. We are not

38:36sure, uh, you know, GDOT manages the

38:38construction piece.

38:39They get out there when they get out

38:41there.

38:42What I will tell you is that they'll be

38:43out there for a while.

38:44>> Yeah, thank you. So, it's kind of a like

38:47a almost two years I think. Fall of

38:492028.

38:53>> What's the final thing on how many lanes

38:56there will be in that roundabout?

38:59>> It's going to be a two-lane roundabout.

39:01Which is what you know most of the ones

39:03that we ones that I don't know most of

39:04the ones that we've been to so far are

39:06single-lane roundabouts. So this will be

39:07different.

39:12>> Are you going to make sure that the end

39:14drivers get it all the area

39:17I think they need chance to roundabout

39:18driving.

39:21>> [laughter]

39:22>> Now I think somebody's going to have to

39:24bring this up.

39:27>> Prince Avenue as well we we found that

39:30we will have to bring a construction

39:32solicitation to the to the public.

39:35But we expect that this point probably

39:38target summer months this coming summer

39:40months to make a Prince

39:43Avenue

39:44a pilot program permanent.

39:46We'll be researching and making all that

39:48and then permanent.

39:51One thing I would like to get in the

39:53habit of sharing with you you know it's

39:55been July since we met last time is are

39:58are some of the agenda items that have

40:00gone through the cycle already or over

40:02the past few months.

40:05>> [clears throat]

40:06>> It's actually a fact but I just feel

40:07like they're ones that you know maybe

40:09y'all have been aware of in the past

40:10maybe you haven't.

40:13So T-Splost projects Stonehenge

40:18T-Splost projects so essentially some

40:20sidewalks along Old Monroe Road.

40:23If you're familiar with where Stonehenge

40:25is a preliminary plan went through.

40:28Jefferson River Road got a multi-use

40:31path planned out there needs some extra

40:33help from the land agent and the design

40:35firm that is contracts went through the

40:38agenda cycle.

40:39We talked about roundabouts. We know

40:41we've already got a roundabout at at

40:43Whitehall and South Milledge.

40:45It

40:47one of the Botanical Garden that was on

40:49the agenda cycle

40:51I think a month a month or so ago. That

40:54one I think is partly Shelby County

40:55funded so it was a sprawl. It's just

40:58that if you as a driver you know there's

41:00going to be a roundabout at the

41:01Whitehall Botanical Garden and one of

41:03the T spots 2026 projects as well

41:05involved there where the

41:07>> the track

41:07>> track facility softball facility is.

41:10That one is T spots. You know you'll

41:12probably see that in the coming through.

41:14>> Oh I can hear the comments now.

41:17>> [laughter]

41:19>> Uh the annual paper management program

41:21you know this is something we do every

41:23year bring next year research thing

41:26plans to them you'll see that I think

41:28next month.

41:30We've been purchasing a lot of public

41:31safety vehicles and fire apparatus

41:34lately.

41:35Um spots 2020 some of the energy

41:38projects so lighting in Southwest Clark

41:40Park

41:41and then solar trackers both at

41:44facilities building and jail.

41:47I think that one is going on Wednesday's

41:49Wednesday's vote is the solar tracker

41:51facility

41:52probably at the jail.

41:54Um

41:56Or for Wednesday so fire station both

41:59the zoning and schematic.

42:01Uh

42:02you know Wednesday's vote

42:03>> I read in here that the planning

42:05commission recommended the approval.

42:09>> And no public commentary there nor at

42:11the agenda setting. And I think it's on

42:13at least schematic is on the consent

42:15agenda.

42:16>> Well I think I gave it up.

42:18>> [laughter]

42:19>> No I I'll I'll let me share I mean you

42:21were you

42:22No you were at the judicial center

42:24public engagement. We did have some

42:25impacted property owners

42:27one impacted property owner meeting

42:30all the impacted property owners showed

42:32up.

42:33They all wanted to talk about the

42:35project and I think they left feeling

42:37this my impression.

42:39Uh I think they left feeling better

42:41about the project.

42:42>> Good cuz they were not nice at all.

42:45>> We we

42:46>> But those of us on the site selection

42:48committee

42:48>> We implemented some of the things that I

42:50think they were looking for in

42:53the site plan.

42:54>> Well, since we're talking about that,

42:55it's more land than they needed for the

42:57fire hall cuz the owner said they

42:59wouldn't sell it unless they sold the

43:01whole piece.

43:01>> That's right.

43:02>> Uh

43:03they are very happy, by the way.

43:05That couple is very happy. But um

43:09what are we going to do with that extra

43:11land? Can they Can the county use it for

43:13storage or can it go into the green

43:16space

43:17allocation, you know?

43:19Cuz it's going to be off the tax rolls

43:21regardless.

43:22>> The answer we've been giving everybody

43:24given

43:24>> So you don't know yet.

43:25>> And well, as we want to get the fire

43:27station built.

43:28>> Okay.

43:29>> Uh

43:29and

43:30>> Well, I mean, I'm just asking cuz

43:32you know

43:32>> The one of the um

43:35I mean, I I will share we have been

43:37exploring you know, with the

43:39sustainability office and with the

43:41community arborist, you know, are there

43:43opportunities out there for, you know,

43:46not construction something like

43:49>> So I'm assuming a tree farm.

43:52A tree farm.

43:53>> And we don't know yet. We haven't

43:54approached that.

43:56>> The county used to do a lot with its own

43:58trees and plants and shrubs and I don't

44:00know if they're still doing that.

44:03>> We're going to get that We'll get it

44:05built and then probably that will come

44:06up at some point.

44:07>> And in fact, the property owners you

44:09said that there were some

44:10things in the site plan that that

44:13that were seen as

44:14sort of positively viewed by them that

44:16were response to their feedback. Like

44:18what would be an example of

44:19>> One is that they wanted the screening a

44:20little bit differently. So the screening

44:23yeah, the vegetative screening.

44:24Um there was a lot of conversation about

44:26that and

44:27uh kind of where

44:29you typically put screening is along the

44:32edge of the property right along the

44:34property line. It might be a better spot

44:36for

44:37uh you know, for doing

44:38landscape screening.

44:40Um

44:41so we did add some that's up closer to

44:43the building.

44:44Given the given the terrain.

44:46>> Yeah.

44:46>> Um you know, there was a a better way to

44:48do screening.

44:50Um

44:51and we're thinking in response to

44:53what they had to share with us.

44:55>> See, at the beginning they were

44:57convinced it was going to be one of the

44:58big

45:00firehouse with the tower.

45:03And that didn't help. And in the

45:06original thing

45:08the original stuff, they used the word

45:11development.

45:14And they used it in a way so that it

45:17sounded like all around there was going

45:19to be developed and that's not what it

45:22was intended to be. It was just poor

45:24choice of wording. So, everybody on the

45:27east side, when we hear the word

45:29development

45:30we go into knee-jerk

45:34rapid

45:35angry mode and I'm one of those. So, I

45:39totally get it.

45:41So,

45:42you know, there were just some things

45:44from the get-go that were

45:45misunderstandings

45:48that got everybody's panties in a wad

45:52unnecessarily.

45:53You know what I'm saying?

45:55Is that

45:57Yeah.

45:57>> Cuz they were trying to point out that

45:59if they cuz they only needed a small

46:02percentage and a lot of the properties

46:04that fell into this area that needed

46:08that it needed to happen in

46:11were much larger tracts than what they

46:13were trying to say

46:15when they wrote it down

46:18was that it would allow for the for the

46:21property owner to do whatever they

46:23wanted to do, but they used the word

46:25development.

46:28So, it sounded like all of a sudden they

46:30were going to change it from AR

46:33zoning to massive

46:35other kind of zoning that would allow

46:37all kinds of development. And so, people

46:39just got upset cuz they didn't

46:41understand.

46:42>> And I totally understand.

46:43>> the site for a fire station.

46:45Yeah, they wanted it to be like this is

46:47going to open the door to rapid

46:49>> That's exactly what they thought. That's

46:51exactly

46:52>> And they didn't really get that it was

46:54going to be a a

46:55building

46:57with a relatively small footprint

47:00that would just be modern and up-to-date

47:03and functional.

47:05So, I mean, it There were just so many

47:08misunderstandings, misperceptions.

47:11And people were really angry. I mean,

47:14really angry.

47:19>> So, the

47:19>> It does.

47:20>> Um so, for the First Nation uh next up

47:23to be in the zoning schematic is all

47:25there on the agenda for Wednesday.

47:27Another item that you will see SPLOST

47:292020 we just mentioned the Bethel

47:31Redevelopment.

47:32SPLOST of that uh has been used

47:35uh on all of downtown Athens, but not

47:37all of it.

47:39This summer uh we

47:42overtook the

47:43the request for

47:45proposals of what to do with the

47:47remainder

47:48or some some of the remainder.

47:50>> The remainder of the funds?

47:51>> Of the SPLOST 2020 affordable housing

47:53funds.

47:54Uh that recommendation has come to us um

47:57on our agenda for doing so tonight as

47:59well.

48:00>> Has that Can that be combined with the

48:02million dollars

48:05that they just

48:10No, that Oh, I don't know cuz they were

48:12talking about they had allotted million

48:14dollars to help deal with the

48:16homelessness situation since Advantage

48:19closed their center there on North

48:21Avenue.

48:24>> Here, enough with that.

48:26>> I don't know either. That's why I'm

48:27trying to get it figured out.

48:31Oh, okay.

48:32>> I'm talking about the affordable housing

48:34SPLOST project.

48:35>> It's two different funds.

48:37>> Okay. Okay.

48:39>> But for y'all, the awareness that you

48:41know

48:43project and the recommendation in front

48:45of you

48:47uh

48:47as well as the MLK Greenway. That was I

48:51think it was a it's a T-SPLOST project,

48:53but it's in the middle of the Greenway

48:54from

48:565th Avenue is there's just a a gap in

48:58the greenway all the way down to

49:01um

49:02East Broad

49:04>> street.

49:05>> First Street.

49:07Uh

49:08and

49:09that one has become

49:11uh sort of iterative project between

49:14GDOT and us.

49:20In some of the design efforts, we became

49:23aware that the

49:26river slope kind of appeared towards

49:29North Avenue could use some

49:31improvements.

49:32Uh

49:33but the way that GDOT's um TAP program

49:36uh transportation alternative program

49:39uh funding works

49:41by the little bit, we do a little bit of

49:43work, they fund a little bit more, we do

49:44a little bit of work, and then we get to

49:45the construction.

49:47And the advantage is that uh it is

49:50significant amount of money. Uh and so

49:52we are looking at doing some powerful

49:54improvements there along with the river.

49:57That'll be coming uh a pledge ordinance

49:59for them.

50:00Will be coming forward uh I think in

50:02December.

50:03>> Is that cuz that area is kind of close

50:06to the railroad and the bridge, the big

50:09bridge?

50:10>> Who knows why?

50:11>> The North Avenue.

50:11>> But it certainly is

50:14uh

50:15I would expect the designers to tell us

50:17that you know

50:19the road is very close to it.

50:21>> Is it up

50:21>> up towards North Avenue, so

50:23>> What's the timeline on that again?

50:25>> It's long it's a drawn out time because

50:27we're working on GDOT's plan development

50:28process. I think construction is out

50:312031.

50:35Completion by 2031.

50:37>> Sorry, I didn't hear.

50:38>> 2031.

50:39>> 2031.

50:40>> Um it will

50:43It'll be in the agenda cycle at some

50:44point. I will share that.

50:45>> Yeah, I was wondering why that was going

50:47to take so long cuz it's not a big big

50:49space. Now I understand better.

50:51>> Uh

50:52for this one, the explanation is I won't

50:54call it an excuse. I'll say the

50:56explanation is you know GDOT

50:58doesn't really care that it's a it's a

51:00greenway

51:01and

51:01>> not an interchange.

51:03The plan development process is the plan

51:05development process. The TAP program is

51:07the TAP program. We can do what we need

51:09to to meet our requirements.

51:13Uh and then just a couple of other

51:14policy items that have been put in place

51:16that I don't know if y'all care about

51:18these but I do want to share them.

51:20Athens in Motion Plan recently updated

51:23is significant for us cuz it helps guide

51:25future investments.

51:27Uh

51:28the Vision Zero Plan as well.

51:31That action plan was approved and so now

51:33we've got some documents in place that

51:35can help guide investments.

51:37The airport has layout plans that we're

51:39beginning to develop.

51:41Um and again it doesn't directly uh it's

51:43not a master plan and directly have any

51:45projects in it uh but it is important.

51:47>> Hey thanks Jared. Are they interviewing

51:49for a new airport manager yet?

51:50>> Uh so I'm not familiar with where they

51:52are in the process but yes uh it is a

51:53vacancy that will be filled.

51:55>> Yeah, he's retiring.

51:57>> Oh good.

52:01>> [clears throat]

52:01>> So that's all I have for y'all tonight.

52:04Uh

52:05if y'all have something for me that's

52:08happy to try to entertain it otherwise

52:11if there's just something that you're

52:12curious in and you want me to bring next

52:14time that's fine. Depending how our

52:17internal hiring goes I hope

52:20uh to be able to bring you a sort of

52:22annual report at the next meeting which

52:23I think will be in late January early

52:25February or something like that.

52:27Um

52:28and uh you know I don't know if I don't

52:30know if we've been doing that in the

52:32past but I'd like to produce an annual

52:34report for y'all to be

52:36>> Well you kindly give us one every time

52:38you send us all that

52:39>> Every time you say I know I know. Well

52:41no one one that's easily digested.

52:43>> Well that's not but but it's very

52:45informative and I learned a lot about a

52:47lot of those key slots things that I'd

52:49never seen before. That was really

52:51interesting when I was waiting through

52:52all that stuff this morning so.

52:56>> I really appreciate you

52:58>> Is he going to start doing this early in

53:00the month as opposed to later as we when

53:02we to?

53:03>> Uh

53:06>> We've just kind of been doing it

53:08off of

53:09>> They say this, if there's a preferred,

53:11you know, it's hard to find a preferred

53:12time for

53:13everybody that's on this record, but if

53:15there is one,

53:16I'll probably

53:19find a way to meet that.

53:20>> A preferred time or No, I just it's

53:22because I am pretty busy with a variety

53:25of things.

53:25>> Yeah.

53:26>> And I kind of had the end of the month

53:28as my time to

53:29>> Okay.

53:29>> There were I would write oversight just

53:31in case question mark.

53:33>> Okay. Okay.

53:34>> And um so when the announcement came for

53:37November 2nd, I was surprised.

53:38>> So for your routine, it's yeah, yeah,

53:40yeah. You built it in your routine at

53:42the end of the month. That works better

53:43for you. I got it.

53:44>> It's always been the third Monday.

53:47Yeah, but but the third Monday is what

53:50we've done for a long time.

53:52>> Okay.

53:53All right, if that works for folks then.

53:54>> Well, who knows?

53:56>> Yeah, but that's what it's been

53:57historically, right?

53:58>> Although look, we've got more people

54:00here today.

54:01>> Yeah, what's up?

54:02>> How was the chief boss's meeting?

54:04>> Psycho.

54:05>> Um so it was the same day, just at a

54:08different

54:09>> An hour and a half earlier.

54:10>> Okay.

54:11>> From before.

54:11>> Yes.

54:12What they met back-to-back.

54:14>> Right.

54:14>> But on the same day.

54:15>> Which is easier for staff cuz they're

54:17not having to get to two.

54:19>> And honestly, I don't care if we have it

54:21early in the

54:22I just like to

54:23>> Okay.

54:24>> Yeah, kind of have that

54:25>> But we save some time for it.

54:31Cuz nobody I'm this group does anything

54:33else you do.

54:34>> Yeah.

54:35>> [laughter]

54:37>> Um I do appreciate y'all being here and

54:39I do want to make this time useful for

54:41y'all and valuable so that you look

54:43forward to the next time you come. You

54:44know, I I look forward to these

54:46Um so you know, again, that's the sort

54:49of feedback if you have so I'll take it.

54:51I will take it absolutely.

54:52>> I do have a question for you, but for

54:54after the meeting.

54:55>> Okay.

54:56>> Do we need to adjourn or what?

54:57>> Yes.

54:58>> Oh, yeah.

54:59>> I motion to adjourn.

55:00>> Second.

55:00>> All right.

```*