2026-10-14 - Building and Fire Code Board of Appeals

Summary

Based on auto-generated captions; names and numbers may be misheard. Roll-call and voice votes were mostly not tallied aloud except the main vote.

Time on topic (from transcript timestamps; approximate, includes side talk; shares are rounded):

Topic Minutes Share
Chartell Arms Fire Repair Appeal 42 91%
Other business 4 9%
  • Wednesday, October 14, 2026, Building and Fire Code Board of Appeals.
  • Captions begin at 0:50 and run to adjournment at about 46:10.
  • There was no recess or closed session.
  • Six members answered the roll call (a quorum); one member was absent.

Other business

0:50-3:25, 45:12-46:10

  • The chair welcomed the newest member, Robert Crisp, a fire specialist.
  • Officers were elected. A member nominated Kyle (roll call renders the name "Kylin Barter"; see Kylin Barter) as chair, seconded, and the voice vote carried. Tommy Willis was nominated and seconded for vice chair, also by voice vote. The captions do not record the tallies.
  • Minutes of the last meeting approved on a motion by Patrice Zimmerman with a second.
  • No continued cases and no new business from staff or members; adjourned on a motion and second.

Chartell Arms Fire Repair Appeal

3:26-45:12

  • Only new case: appeal of a code official's decision requiring a fire-damaged five-unit apartment building in Mesta Park to meet new-construction fire suppression and alarm requirements under section 302.7 of the 2018 International Existing Building Code, as adopted by the city.
  • Staff (a city staff member named Scott, surname not captioned) took a neutral position, giving no recommendation, since the code's exception lets this board decide whether the work is "of a minor nature". He explained the permit was triggered when an inspector visiting for a gas meter reset saw fire repairs, and acknowledged a permit is occasionally found unnecessary, but rarely.
  • The owner's representative argued the work was minor on four measures: fire limited to one vacant unit's bathroom and attic (reported loss about 1.8% of value), repair area about 4-5% of floor area, about 25 square feet of roof decking (about 1.1% of roof) replaced as a result of the fire with a roof replacement already contracted, and restoration with no layout change. A sealed engineer's reports concluded the damage was not "substantial structural damage". He also asked, in the alternative, whether a permit was needed at all, and for relief under city code section 12-1331 given the tenants in four of five units.
  • Robert Crisp pressed that cutting and replacing gable bracing and ceiling joists is structural work, not cosmetic, and asked what the city's own amendments say. Another member and staff worked through the amendments (section 105.2.2 on repairs exempt from permits); staff noted inspectors are not engineers and look at char depth.
  • A member asked about smoke detectors; the owner described quarterly tenant photo checks tracked in a database.
  • Tommy Willis moved to approve the appeal and treat the work as of a minor nature because the board believes it does not meet the criteria for substantial structural damage; Patrice Zimmerman seconded. After a prompt to state reasons for the record, the motion was restated. Roll call: Kylin Barter, Tommy Willis, Board Member McGrder, Patrice Zimmerman, Board Member Weber and Robert Crisp all yes; Board Member Burton absent. Unanimous; appeal granted, so the fire suppression and alarm upgrades are not required while the building permit proceeds.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:50You ready? Ready, Scott?

01:00>> Um, well, I was going to welcome

01:01everybody to u the building and fire

01:05code board of appeals. This is

01:07Wednesday, October 14th, 2026. And

01:11before we get started, I thought I'd

01:12introduce our newest member, and welcome

01:15him aboard, Robert Crisp, fire

01:17specialist.

01:19Welcome aboard.

01:24So, can we have a roll call, please?

01:28>> Here.

01:31here.

01:32>> Bur

01:34>> present.

01:34>> Austin Burton, he was absent. Patrice

01:38Zimmerman

01:39>> here.

01:40>> And Weber

01:41>> here.

01:42>> And Robert Christ.

01:43>> All right, we do have a quorum.

01:45>> That's great. Um,

01:49so it seems like every time we have this

01:51meeting, we have the election of the

01:53board chair.

01:57>> Do we have any nominations from the

01:59floor?

02:01I'd like to make a motion to nominate

02:04Kyle for

02:08>> chair.

02:09>> Chair.

02:11>> Do I have a second?

02:14>> All in favor?

02:16>> I

02:18>> um do we have

02:20>> Jim second?

02:21>> Yeah, Jim. Jim.

02:24And then, uh vice chair. Uh do I have

02:27any nominations from the floor for vice

02:29chair? I think I can nominate in this

02:32case.

02:32>> I'll nominate Tommy.

02:35Tommy Willis. I have a second.

02:38>> Second.

02:41>> And all in favor?

02:43>> I

02:46>> welcome aboard.

02:49[laughter]

02:50[clears throat]

02:52>> So, uh I believe everybody's received

02:54the minutes from the last meeting. Do we

02:56have any u notations or corrections? If

03:00not, do I hear a motion to approve the

03:04minutes?

03:06>> Motion to approve.

03:08>> Second.

03:10>> Second.

03:15>> Patrice and Ann.

03:19>> All in favor? Hi.

03:21>> Hi.

03:26>> So, we only have one new case today.

03:29Uh, it's case number B OB 2026 00001.

03:36the appeal of Jacob Jacob Dearman

03:39property owner from a decision of the

03:42code official for compliance with

03:44chapter 3 supplemental section 302.7

03:48of the international existing building

03:50code 2018 as adopted by the uh city of

03:55Oklahoma City pertaining to the

03:57requirement for upgrade and compliance

04:00with all fire protection and suppression

04:02requirements

04:03of the IBC as it relates to the property

04:06located at 7:32 Northwest 18th Street.

04:12Scott, do you want to give us the staff

04:15analysis, please?

04:17>> I'll summarize here. I take it

04:19everybody's had a chance to read it. Is

04:22that correct? Um, in in summary, and of

04:26course the applicant here will be able

04:27to correct anything that's mis

04:29misstated, but um, we have an existing

04:32building uh, used as an apartment

04:34complex for however many years. Uh,

04:37there was a fire that occurred at one

04:39point uh, damage to the interior of the

04:42roof, the attic area uh, over at least a

04:45few units. And, uh, the work to our

04:48knowledge was completed, repaired by a

04:50prior tenant, a prior owner. Um the new

04:53owner came in uh

04:56I don't know unknowingly knowingly

04:58whichever um saw the work. Of course we

05:01still have to release the electrical

05:03meter which required a fire status check

05:07uh which required a fire status check

05:09inspection. Our inspectors went out to

05:10the job site, noticed the work that had

05:13been done, the fire damage that had

05:15occurred and uh had concluded that a

05:18building permit would be required to uh

05:21you know make the repairs even after the

05:23fact of course. Um you know regardless

05:26that was sold previously. Um, now since

05:29then, of course, we have our, you know,

05:31billing code, billing permits been

05:33submitted. Our staff has taken a look

05:35through this and done the review. And

05:37under the 2018 existing billing code,

05:39section 302.7, which should be up on

05:43your screen, um, anytime a building

05:46permit is pulled, that area of work, uh,

05:50what we define as a fire area, as

05:51mentioned in the code, has to be brought

05:53up to full compliance with chapter 9 of

05:55the IEB, excuse me, of the IBC, uh, the

05:59international building code 2018 as it

06:00for new construction. So that requires

06:02compliance with chapter 9 which kicks in

06:04fire suppression systems, alarms, um you

06:07know, anything else there included. Fire

06:10suppression being the number one I think

06:11issue in this case. Um

06:16let's see. Is there anything else on

06:18there? I know you'll have plenty of

06:19arguments on your side, but u um

06:23staff are going to take more of a

06:24neutral stance in this. We did not

06:26provide a recommendation for approval or

06:28denial being that our existing building

06:30code itself under the exceptions allows

06:32the board of appeals to determine

06:34whether or not this uh you know may

06:38identified as work of a minor nature as

06:40under one of our exceptions there. So,

06:43um, take a look at that. Uh, it'll kind

06:46of be on the board to decide, of course.

06:49I'll be willing to answer any more

06:51questions I can. Uh, but we don't have

06:54any recommendation at this time. One way

06:55or the other.

06:57>> Can I ask you um, how was it determined

07:01that a permit was needed? Was it just

07:03the opinion of an observer on the site

07:05at the time or

07:07>> Yeah, it would have been the uh

07:10interpretation of our building

07:12inspector. I forget the gentleman's name

07:14which one went out, but there was a fire

07:16status check that was required. The

07:18gentleman went on the job site, took a

07:20look at the attic area, the damage to

07:23whatever extent there was and determined

07:25in his notes that a building permit

07:27would be required. And that's what

07:29kicked this off. So, [clears throat] has

07:32the city

07:34um ever had an occasion where

07:38um someone thought a permit was required

07:41and then it was determined through

07:43internally or in another fashion that

07:47the permit was not required. Has that

07:49ever happened?

07:50>> That has happened. Uh being full upfront

07:52and honest, we see thousands of permits

07:54a year. Um there are various occasions

07:57they are fairly rare but there are

07:59occasions in which uh you know whether

08:02the the facts of the matter have changed

08:03once we get into the review or otherwise

08:06it's it's eventually determined you know

08:09that a bill permit would not be

08:10required. So that that has happened. Uh

08:12we're not going to deny that. It is very

08:14rare.

08:18>> So does anybody have any questions for

08:20the city before we call the applicant

08:22up?

08:25Is the applicant present?

08:28Would you uh approach approach the uh

08:31podium and state your name and address

08:33for the record and then tell us um how

08:37you're involved in this?

08:39>> Sure. My name is Jacob Dear. Um my

08:42address is the address of this property

08:44or where I live. Which one?

08:46>> Where you live?

08:47>> 436 Northwest 16th, Oklahoma City,

08:50Oklahoma 73103.

08:53And and are you the owner?

08:55>> I am uh the managing u sort of partner

09:01of a small LLC that owns the

09:04>> You want to tell us a little bit about

09:05your project or your application here?

09:08>> Yes. Um

09:11good afternoon, chair, members of the

09:13board. My name is Jacob Dearman. Um I am

09:18obviously like I just said, one of the

09:20owners of 732 Northwest 18th. I'm also a

09:23professor at Oklahoma City University

09:25Miner School of Business. Um, I'm a

09:28little bit nervous. I teach class all

09:29the time, but I'm a little bit nervous

09:30being here. This is an unusual sort of

09:32setting for me, so I apologize if I

09:34stutter or something. Um, so the current

09:37property under that sort of that we're

09:40looking at right now is an existing

09:42three-story five unit residential

09:44building built in 1915. It's Chartell

09:48Arms. It's in Messa Park. It's right

09:50across the street from the park. Many of

09:51you may may be familiar with that. It's

09:53got it's a white structure with black

09:55awnings and some gray paint. Um the fire

09:59and restoration work uh occurred before

10:02I acquired the property. The fire

10:04occurred on October 31st, 2025. We had

10:08put it under contract in September and

10:10we're to close in November, but the

10:14um the fire occurred and that pushed

10:16back closing until December 29th, 2025.

10:22So after the city advised me that the

10:24proper building permit had not been

10:26obtained, I sought to rectify the

10:28situation. I submitted the commercial

10:30permit application, sealed record

10:32drawings, and requested engineering

10:34documentation.

10:36Uh,

10:38I respectfully request um that the board

10:41approve the completed document work as

10:45work of a minor nature under the city

10:47adopted 2018 IEBC section 302.7

10:51exception one. I also ask that this

10:54approval resolve comments two and three.

10:58I will present evidence for work of a

11:00minor nature in four distinct

11:03categories.

11:05One is area,

11:07two is structural,

11:09three is roof, and four is restoration.

11:14So area, structural, roof, and

11:16restoration.

11:19And it

11:21while I'm no expert in this, it may be

11:24that this didn't even qualify for a

11:27permit. So I would ask that you would

11:29consider that as being experts

11:32uh there to to provide evidence for this

11:36work of a minor nature. Um I will refer

11:39to several different reports. One is the

11:41engineering reports, the fire incident

11:44report which was just handed out to you.

11:46Um

11:48the record drawings, the roofing letter,

11:52and the restoration email. The email's

11:54also in that attachment.

11:57Okay, so beginning with area on evidence

12:00for work of a minor nature. The fire

12:03incident report states the fire was

12:06contained to the ceiling and the attic

12:08space of the bathroom in apartment 4.

12:12This apartment was vacant. Notice that

12:14the incident report says the ceiling of

12:17the bathroom space, just the bathroom.

12:21The report, the fire incident report on

12:23page two lists the estimated property

12:25losses at 20,000 against an estimated

12:29property value of 1.1 mil 1.13 million.

12:34The estimated loss therefore according

12:37to this document is about 1.8%

12:40of the total value.

12:44If you look at the architectural

12:45drawings, they're going to include the

12:47bedroom.

12:49that bedroom that gets included there.

12:51The based on my understanding was when

12:55the firefighters needed to access the

12:59attic space, they cut a hole in the

13:01ceiling to access that. So, that part

13:04was another part where a ceiling joist

13:06had to be repaired. And so, that is a uh

13:10that is also included in the rendering.

13:12But even if we include for that unit

13:15both the bathroom part of the hallway

13:18and the bedroom that amounts to about

13:20four to 5% of the total building area if

13:23we include uh the basement

13:28on the structural side as we turn from

13:30the area to the structural side. The

13:33fire incident report states that

13:35occupants of the unaffected apartments

13:38were allowed to return to their

13:40apartments,

13:42implying that there was not a

13:44significant enough structural concern

13:46about the integrity of the building to

13:48keep individuals out that they were

13:50allowed uh to go back in and to reside

13:53in their in their doiciles.

13:56The structural engineers report

14:00also confirms this. And I should note

14:03that in that structural engineers

14:04report, he refers to it as unit five,

14:06but it is apartment 4. Okay, so I'm

14:09going to quote him. It's going to say

14:11five, but it's really four.

14:14He states, "Unit 5 was on the third

14:16floor and was the only unit affected by

14:19structural fire damage. The charred

14:21damage appear to be isolated to the roof

14:24structure above unit 5 only.

14:28Also, the structural damages observed

14:31were determined to be limited to the

14:32southeast corner of the structure. He

14:34also states, furthermore, charring does

14:37not completely reduce the structural

14:39capability of the structural member

14:40unless it is fully consumed. As such,

14:43some structural integrity would remain

14:45with charred members.

14:47And then finally,

14:49based on my interpretation of 2018 IEBC

14:53section 202

14:55and the damage observed to the

14:57structure, it is my opinion that the

14:59building damage did not meet the

15:01definition of substantial structural

15:04damage. Okay.

15:09So turning from structure to roof,

15:12trademark exteriors did the roof work.

15:16That roof work was contracted prior to

15:19the fire and was part of the closing

15:21process that that roof was going to be

15:23replaced prior to us taking ownership.

15:26So, it was already under uh already sort

15:29of under contract. Okay. And the

15:33trademark exteriors restoration letter

15:35states this. Prior to the fire, the roof

15:37had already been contracted for

15:39replacement as part of a real estate

15:42transaction and the installation had

15:45been scheduled.

15:46Once the fire related claim was

15:48scheduled, we were able to proceed with

15:51the roof replacement. The original scope

15:54of work remained substantially

15:56unchanged. In another part, and yet

15:59another part of the letter, the roof

16:01decking was thoroughly inspected from

16:03both the attic and the rooftop after the

16:07existing shingles were removed. Based on

16:09the these inspections, it was determined

16:11that only approximately 25 square ft of

16:14roof decking required replacement as the

16:17result of the fire. The remainder of the

16:20roof decking did not require replacement

16:22due to fire related damage.

16:26The roofer stated, not in his letter,

16:28but he did state if you look at the

16:30invoice, he bought 2500 square feet of

16:34shingles. 25 squares. And he said that

16:38there was 2,200 that roof size was 2200

16:41square f feet. So, we're looking at 25

16:44square feet relative to 2200, which is

16:47approximately 1.1% of the total area.

16:52So, that's that's the roof. And then on

16:54the restoration piece,

16:58Justin Brower in the email that you have

17:00at the back of that handout stated that

17:03the purpose was to restore the unit to

17:06its previous condition.

17:09He also states no walls removed or

17:11reframed and no changes were made to the

17:14existing floor plan or layout of the

17:17unit.

17:22He did note that we installed the

17:24bracing uh recommended by the structural

17:26engineer.

17:29And he his description of the work was

17:31that the repairs were relatively minor

17:33and consisted primarily of localized

17:35restoration cosmetic work.

17:41And the record drawings that were

17:42provided by the architect shows that or

17:45documents that the existing layout

17:47really did not change.

17:51And so across these four categories, the

17:53work was limited and restorative in

17:55scope. I respectfully ask uh the board

17:59to approve the completed documented work

18:02as work of a minor nature. The fire

18:05related decking replacement once again

18:07was 1.1% of the total roof area.

18:11The estimate of the affected area

18:13according to the drawings is between

18:15four to 5% of the total floor area

18:18including the basement. The report's

18:20estimated loss was approximately 1.8% of

18:24the estimated property value. The

18:26structural damage was localized. The

18:29engineer found that it did not meet the

18:32definition of substantial structural

18:33damage according to code and the work

18:37restored the existing layout

18:40and kept the occupancy the same.

18:44So I ask that the board resol would um

18:49define this as work of a minor nature

18:52and if that is not viable to consider

18:55whether a permit should have even been

18:57pulled and if not that then finally I

19:01would request relief under the Oklahoma

19:04City Municipal Code section 12-1331.

19:09We have seven tenants that occupy four

19:11of the five units. the installation of

19:14such systems would be um

19:18difficult um for them uh in their daily

19:22lives. Thank you so much for considering

19:25this case. I really appreciate your

19:27valuable time and consideration and I in

19:31advance apologize if I have not followed

19:33typical protocol because this is not

19:35what I do for my daily uh daily job.

19:37Sorry.

19:38>> So what what do you teach?

19:40>> I teach economics. Um, but right now

19:43this semester I'm teaching econometrics

19:45and business calculus.

19:46>> You did a very good job today,

19:48>> huh? Okay.

19:49>> You did a great job.

19:50>> Thank you.

19:50>> Um,

19:53so

19:54the fire was on the 31st of uh on

19:57Halloween I guess of uh 2025.

20:02You had or and that you did not own the

20:05property at that time.

20:07>> That is correct. We placed it under

20:08contract in September though.

20:10>> Oh, you did. It was under contract.

20:12>> Now, we were going to close in November

20:14because it was expected that rates would

20:16go down and then we could lock in the

20:17lower rate. That's why.

20:19>> And and who initiated the repairs, the

20:21original owner is that?

20:22>> Okay. So, the the person that's owned

20:24this property prior to me was uh an

20:27individual who had owned it for decades.

20:30>> He is currently sick. And the person

20:34that was taking care in of his external

20:37affairs including like his real estate

20:40properties was a um healthc care uh

20:44professional um that was managing sort

20:47of his estate. So this was well outside

20:50of his scope of normal work and

20:52expertise and he had I don't as far as I

20:55know he had no real estate holdings of

20:57his own and the other individual um was

21:01not in a capacity to deal deal with it.

21:04>> So so you hired the work to be done?

21:07>> No I I did not know he did. Okay. Um but

21:10I would say that the process in this

21:14case was difficult even for a real

21:16estate professional of which the

21:19previous owner the person that was

21:21managing the previous owner's estate uh

21:23was not right and the work that was done

21:27was done

21:29u prior to or subsequent to the initial

21:33study that was done by the structural

21:35engineer.

21:37Do you know do you know the chronology

21:39of all that or not?

21:42>> I believe the structural engineer the

21:44structural engineer came out did his

21:46assessment and then Justin came in and

21:49did his work

21:50>> and then the structural engineer has

21:52stated that he believes that the his

21:54recommendations were followed in the

21:56repair.

21:57>> That is correct. Yes. I had him as part

22:00of p pulling the permit um that was

22:03requested by the city. I had him come

22:05back out and give his assessment on the

22:08work that was done and that he believed

22:10it was followed. Um, and then I also had

22:13him write up whether he believed that

22:15the structural damage reached the level

22:17of that was called substantial in the

22:19building code and he said he did not.

22:24>> I have a question

22:25>> u in bringing this case forward.

22:29Was it due to you requesting a permit?

22:33because uh I see a a decision of the

22:36code official for non-compliance.

22:38Did they come out to do an inspection of

22:40of a permit or how did that come about?

22:43>> Yeah. So, how did this get on my radar

22:44to begin with? Yes.

22:46>> Um the gas meter on unit 2 had been

22:49turned off for over a year. And when the

22:51gas meter has been turned off for over a

22:52year, then you have to have the plumbers

22:54come out and pressurize it. And then

22:58once they pressurize, they call the

22:59city. the city issues a permit and then

23:01you can install a gas meter. So that was

23:04my request is for unit 2 to have a gas

23:07meter and then somebody

23:10I don't know if there's

23:11miscommunication. I'm not exactly sure

23:13what happened. An individual from the

23:15city showed up and then they went up to

23:17unit four and then took a look and then

23:20turned it turned around and said that

23:22you'll need to pull a pull a building

23:25permit or remodel permit or something.

23:27And so that's how that got started. So I

23:29called for another permit. It was

23:31brought to my attention that there was

23:33an outstanding permit that should have

23:34been pulled under the previous owner

23:36that was not. And so I went through the

23:40process of um doing everything they

23:43asked me to do, you know, filing for

23:45that remodel permit, getting the

23:47drawings and uh getting the structural

23:50engineers report.

23:51>> So this is for a building permit,

23:53approval of a building permit, correct?

23:56>> Today?

23:57>> Yes.

24:02So if you look at exception 302.7

24:06there is an there is a let me

24:12I have it somewhere

24:14>> and while he's pulling that up I'll I'll

24:16say as well um

24:20>> it is common practice and it's most

24:22likely I I don't have any proof one way

24:24or the other of course on this but it is

24:26common practice when our inspectors go

24:28out in the field. Uh you mentioned

24:30Justin was out there for the gas meter

24:31reset.

24:32>> Yeah.

24:33>> If he saw any damage or what looked like

24:36to him was repaired work, he they it's

24:40our common practice to notify staff,

24:43have a building inspector come out, take

24:44a look to determine whether the building

24:46improvement was required as well. We we

24:48work together across trades in that in

24:50that manner.

24:51>> Okay.

24:52>> So that's most likely. I can't prove

24:53that one way or the other because I

24:54don't have any evidence regardless, but

24:57uh that's likely what happened in this

24:59case. So,

25:00>> okay.

25:00>> Okay.

25:01>> I was I was sort of surprised. I'm not

25:03sure what the normal process flow is

25:04there, but as you can see on the screen,

25:07it says that there the exception

25:10exceptions. The first sentence under one

25:13for work of a minor nature were approved

25:15by the board of appeals. That's an

25:17exception to 302.7.

25:21So, I'm I'm asking for the

25:25um this exception to be recognized as a

25:27work of a minor nature in this case as a

25:30as my first request

25:33>> and then that would that would permit an

25:36approval of the permit.

25:38>> Okay.

25:41>> Yeah. No, I would I was just yeah

25:43summarize what each what you're saying

25:45is the ask here is is

25:48>> our job is determine whether it's work

25:50of a minor nature. Right. Right. So

25:51that's what we got to decide and Scott

25:55in in the staff recommendation because

25:56because that exception has to be

25:58approved by us. It says therefore staff

26:01makes no recommendation of approval or

26:02denial of this appeal. So our job is to

26:05weather approve or deny if this is work

26:07of a minor nature.

26:08>> Okay.

26:08>> Exactly right.

26:09>> Yeah.

26:10>> Right.

26:10>> That's correct. So Scott,

26:13if um if it is work of a minor, we do

26:17approve this as work of you know minor

26:20nature.

26:24>> Does the permit go away?

26:26>> Uh well the build excuse me the building

26:28permit would still uh you know work

26:31itself through the process by

26:33determining this work of a minor nature.

26:36You would negate the application of

26:37302.7. So, the building permit would

26:40move forward. It's just that we would

26:42not uh we would not be able to require

26:45fire suppression upgrades, fire alarms,

26:48those kind of fire safety standards.

26:50>> That was going to be my next question.

26:51>> Yeah.

26:52>> Okay.

26:52>> So, we would have a building permit.

26:54It's just they would they would get

26:56relief from those requirements.

26:57>> Okay.

27:02>> Anybody else have questions for either

27:04the applicant or the city?

27:07>> I have a question. Another one.

27:09>> Do you require your uh occupants to have

27:12uh smoke detectors in in their

27:14apartments?

27:15>> Yes, that is correct.

27:16>> And that you go in yearly and make sure

27:19the batteries are good and all that

27:21stuff.

27:21>> Yes. And in fact, um one of the things

27:24that I've been working on is for them to

27:26be able to take pictures of their smoke

27:27alarms. I'll ask them a few questions if

27:29they tested it and then it will take

27:31that and put it in Terso database. and

27:33that I can give you the phone number if

27:35you guys wanted to to mess around with

27:37it. Um, but you can text it and then

27:40there's going to be a and then there's a

27:41geocoded portion of it where you can

27:43display it on a map. So that way I can

27:45ask them every 3 months to take pictures

27:48of it. Does it work? Answer all these

27:50questions. If they're not answering

27:51those questions, if they're not doing

27:52it, then I can follow up.

27:54>> Got. So, I'm building systems to make

27:56this more robust in terms of uh having a

28:00pipeline of data for the fire marshall's

28:03office and make it easily accessible for

28:06them to look across all the units on my

28:08on my property.

28:09>> Excellent,

28:11>> Mr. Chris.

28:13>> Yes.

28:18>> Hello. Oh, here we go. Okay. All right.

28:20I haven't seen any language with the

28:23supplement from the building code or the

28:26uh fire code because the language that I

28:29think that's in there and what the

28:31inspector that went out on site looked

28:33at is that cosmetic

28:35um remodel is kind of like carpet

28:39replacing sheetrock paint. But whenever

28:41you get into the structural members

28:43whenever there's damage in that that's

28:45what he's looking at as far as requiring

28:47a a building permit. So looking at some

28:50of the pictures in here and it stated

28:53that it was the language that the

28:57engineer said was

29:00basically

29:02to what he can access. That was the

29:05pictures. So we didn't get a thorough

29:07picture of the damage. But even with the

29:10pictures that's shown, you can see that

29:12it was structural damage to more than

29:15just the shingles and roof covering.

29:17They got into the decking, support

29:19members, trusses.

29:22>> I do not believe that the trusses were

29:24actually affected by this. It was the

29:26gable embracing that was the uh

29:29structural member that was probably the

29:30largest structural member that was

29:32affected. There were some ceiling joists

29:34as well.

29:35>> Correct. And all of that will be

29:36considered structural members. And that

29:38will make that inspector that came out

29:40there to look at it and say that a

29:42building permit should have been pulled

29:44and this is not cosmetic.

29:47Right. That is my understanding as well.

29:48>> Correct. So that's why a building permit

29:50was recommended for that

29:53>> instance. Yes.

29:54>> So so the work that's been done does not

29:57look like it's cosmetic because cosmetic

30:00is all the small stuff we just talked

30:02about with the shingles and roof

30:04covering r carpet paint. But whenever

30:08you're talking about removing and

30:10cutting, replacing and repairing

30:12structural members, that's going to

30:14require building permit.

30:16That's correct. And that's why my

30:18question is to the work that was done to

30:22classify as work of a minor nature.

30:24That's my primary one. The the other

30:26question of whether a permit should been

30:28pulled in the first place. Um that was

30:30the explanation as to why the permit had

30:33to be pulled is because there was a

30:34structural engineers report that

30:36indicated gable in bracing as well as um

30:41the ceiling joist. So that's that's why

30:43the permit had to be pulled. If the

30:45permit's pulled, I um the question

30:48before you is the work that was done

30:50according to these documents, does it

30:52fall

30:55under work of a minor nature to allow

30:57for the exception or to allow for relief

30:59from um section 302.7?

31:02>> Okay. And that's why I was wanting to

31:04look at the language of either the

31:05supplement or the FAR code or what the

31:09inspectors, code inspectors go by on

31:11judging what a permit requires because

31:16um in our language I would think that as

31:19far as

31:21whenever that permit is required to be

31:23pulled then you will have to bring it up

31:25to code.

31:27So, Robert, um, what we were handed here

31:30today when we got to the dis was this

31:34was just supplementary information that

31:38was given to us that was on top of the

31:41original packet of information Scott

31:43sent us. And that's the original packet

31:46of information there. And I think if you

31:47look through that, you'll find three

31:49reports from a structural engineer who

31:51is u they're signed and sealed. and he

31:55did an analysis of the um the work that

32:00was the initial damage, then the work

32:02that was done, and then a final report.

32:06And in each of those cases, he

32:07references uh and I forgot what section

32:10it was though that lists the list area,

32:14list snow load. It's at the very front

32:18of the document. If you go up, what

32:21we're looking at here on our screen, if

32:23you'll go Oh, there they are. He lists

32:25the things in blue on your screen right

32:27there.

32:28>> Um,

32:31he he addresses each one of these

32:33issues, which are the exceptions.

32:35U, this is what what determines whether

32:39something is a sub substantial

32:42structural damage. So he's he's as a

32:46professional engineer, he's gone ahead

32:47and made the assessment uh and

32:50documented in three separate reports.

32:52Uh, and that's why when I started, I

32:55asked Scott if they've ever had uh a

33:01determination that a permit was required

33:03and then have subsequently find that it

33:06isn't required because I think what this

33:08documentmentation is showing us is that

33:11the structural engineers believes that

33:13there was no uh basis for claiming that

33:16there was sub substantial structural

33:18damage uh and that it should have always

33:21been considered minor and should have

33:22never required a permit to begin with.

33:25>> Right.

33:25>> And I think that's what what the full

33:27report what that full packet of

33:29information tells us.

33:31>> Would you agree with that, Scott?

33:33>> Yeah, I would agree with that. Um,

33:35>> yeah, and I've read all of that,

33:37>> but I didn't look at the supplement

33:38because I know with the city, we look at

33:41the building code and then we come up

33:43with our own supplement. Either be

33:44stringent than what's in here or what.

33:47And what he's not talking about is what

33:50did the city of Oklahoma City come up to

33:52as far as a supplement to this language?

33:55>> So, so I guess that would be a question

33:58for Scott. Scott, is there anything in

34:00the supplemental uh the amendments to

34:02the code that the city has adopted that

34:06would uh essentially change anything

34:10that was listed in this engineers

34:12report? I have a copy of the city's

34:15codes and it is basically the exceptions

34:18are the same and let me give you copy of

34:22this and let you read it.

34:25>> And which which section are you looking

34:26at?

34:27>> Chapter 3.

34:28>> Chapter 3

34:29>> 55.

34:31>> Are you looking at 302.7?

34:35>> No, I think they're looking at the

34:37>> uh 302 section 302 fire protection. Yes.

34:41302.7 fire protection. Yes. So it's on

34:43record. Okay.

34:45>> Okay. So 105 is where I would be

34:48concerned.

34:49>> Section 105. What is that talking about?

34:53>> So um to that point, uh Robert,

34:57hopefully you're bringing that up. um

35:00are amendments to the existing building

35:02code under chapter 4 repairs says says

35:07for 40 section 401.1

35:10is amended to add the following

35:11sentence. It says this classification

35:12shall only apply to work exempt from a

35:15building permit per section 105.2.

35:18So for us to define the work as a repair

35:21if that's where you're going

35:23>> um it has to be exempt uh from section

35:26105.2 2 and 105.2 of the six building

35:31code uh was amended. There are no

35:35exceptions for electrical, gas,

35:37mechanical, or plumbing, which we're not

35:39really arguing today. It's just the

35:40structural. Uh for the structural the

35:44work exempt from a building permit on on

35:45the building side is of course sidewalks

35:47and driveways, painting, papering,

35:49tiling, carpeting and cabinets,

35:50countertops, similar finish work, uh

35:52motion pictures, shade cloth structures,

35:55um awnings and movable cases. So none of

35:58that applies. None, you know, you're not

36:00exempt from any of those, of course. Um

36:02but then 105.2.2 Two, repairs states,

36:07"An application or notice to the code

36:08official is not required for repairs to

36:10structures and items listed in section

36:12105, those that I just mentioned.

36:14Provide that any such repairs do not

36:16include any of the following." So, it

36:17says, you know, the cutting away of any

36:19wall partition or portion thereof. So,

36:22if you're doing any work that requires

36:24the cutting away of a wall, partition or

36:25portion thereof, it is not exempt from

36:27getting a permit, which I think

36:29everybody understands. Um it goes on to

36:32say the removal or cutting of any

36:33structural beam or load bearing support.

36:36Um could be maybe up for argument there

36:38based on the engineering engineers

36:40report. Um the removal of change

36:43requirement of any means of egress or

36:45rearrangement of the structure additions

36:48alterations uh etc. I mean the rest are

36:50really non-applicated situation. So it's

36:52it's mainly the cutting away of any wall

36:54partition portion thereof or the removal

36:56or cutting away of any structural beam

36:57or loadbearing support that u you know

37:01would kind of kick in the build the

37:02requirement for a building permit in

37:03this case. U but that's

37:07also partly up for discussion here based

37:09on this engineer and cut supports. was

37:12cutting sports throughout the whole

37:18>> Hey Jim,

37:19>> we can't have conversations like that

37:21that are not part of the public

37:25>> you have to

37:26>> speak. I was pointing Jim

37:30with the pictures in here that if you

37:33look at the pictures that's in the

37:34document, there's a lot of cutting and

37:38replacing structural loadbearing members

37:48and that's to me not cosmetic.

37:57So, um, Scott, when it comes to substant

38:01substantial structural damage, then

38:05how does that weigh into, uh, what the

38:09is that wasn't a city amendment? That

38:11was um you

38:14Robert, you were quoting

38:17um were was that from the city

38:19amendments that you were

38:22>> Well, I was wondering what the city

38:23amendments was because that wasn't pro

38:25provided in here and I know that

38:27inspectors with the city. They go by the

38:30city amendments and supplements that

38:33pretty much states something to the

38:35effect of if there's damage to

38:36structural members, a building permit

38:38must be pulled.

38:39>> Yeah. And to that point, I'll state for

38:44the understanding of the board here, um,

38:46our inspectors, regardless of trade,

38:48they are not, you know, licensed

38:50engineers, structural or otherwise. U,

38:53you know, none of our staff that I'm

38:54aware of are. Um, what we are looking

38:58for, uh, what they're trying to look for

39:00on a fire restoration is to determine

39:02whether or not, you know, is there the

39:05what do you call it? the the

39:06alligatoring [snorts]

39:08that you'll see the charring of a of a

39:10member of wood and is the

39:13does that exceed the depth of of an

39:15eighth of an inch and uh for the life of

39:18me I cannot recall where where that come

39:19from. There was an old historical um

39:22reference for that. I just can't think

39:24of it off the top of my head at the

39:25moment. But so that's the extent of what

39:27they're looking at. We are not

39:29engineers. Um, you know, obviously a

39:32structural member can look perfect and

39:35still have, you know, structural faults

39:38and failures that you can't see. So,

39:42just

39:44take that with a grain of sand. We we

39:45only we can only go so far as

39:47inspectors.

39:53>> Do you have

39:55you have the full packet?

39:59>> Yeah.

40:02There it is.

40:02>> There isn't another full packet around

40:04here anymore.

40:08>> A printed one.

40:09>> Yeah, that's a full packet,

40:10>> right?

40:16>> Yeah. Um, so I'm looking at the um the

40:18staff analysis and it just Scott if you

40:22want to add anything to this. It says,

40:23"The applicant structural engineer

40:24reports that the observed fire damage

40:26were localized above one unit, that

40:28repairs adequately addresses the

40:29engineer's earlier recommendations that

40:31the damage did not meet the IEC

40:34definition of substantial structural

40:35damage. The applicant estimates the

40:38ceiling and framement repair area at

40:39approximately 210 ft or 4.7% of the

40:42building reported area. That estimate

40:44does not include the full roof

40:46replacement or interior finish work. So,

40:49I mean, me not being a structural

40:50engineer, I based my analysis over the

40:52staff analysis. Can is there anything

40:54that you'd like to add to that staff

40:56analysis?

41:00>> Not at this time. I mean, I think I've

41:02stated everything.

41:08>> Well, I'm I'm ready to make a motion.

41:11I'm going to make a motion

41:15that we approve his request.

41:20Let's see how I want to word this.

41:24Hold one second, please.

41:30>> Yeah. Uh so make a motion for approval

41:33of the appeal

41:36to deter to uh

41:39constitute this work of a minor nature.

41:42Does that work for everybody?

41:44>> Okay.

41:46>> So I have a motion.

41:49We have a motion on the floor. Do we

41:51have a second?

41:52>> Second.

41:53>> Patrice.

41:56>> Uh apologize for the late notice here.

41:58Um, with that motion, please include the

42:02uh reasons for for granting or denying

42:04it. So, have some part of the

42:08>> My reasoning is just looking I mean,

42:12>> is this going to go in it?

42:13>> Do I do I need to summarize it?

42:16>> Okay.

42:16>> Yeah, we

42:17>> This will be part of our

42:18>> restate the motion with the explanation

42:20for for it. Yeah.

42:27>> Yeah. This will teach me. [laughter]

42:31Okay.

42:33So, I want

42:36to

42:45>> Yeah. I want to make a motion to approve

42:48the request for appeal and to consider

42:51this

42:53work of a minor nature because it does

42:56not meet the the the criteria the three

42:58criteria to be considered

43:04>> major major.

43:12>> Yeah. Well, it's not

43:25Read me what you got.

43:29>> Um, I'll read what I've taken down here.

43:32Greater

43:33>> Tommy had a motion to approve the

43:34request of appeal

43:35>> to determine this as a work of a work of

43:38minor nature

43:39>> uh under the uh

43:43interpretation that this does not meet

43:45the three conditions to be considered as

43:47I'm assume you're going for what do we

43:49say structural significantly

43:52substantial what was that what was that

43:54again

43:54>> substantial damage

43:57>> I was looking for the correct technical

43:58term but I couldn't come up with it

44:00>> structural damage

44:01>> substantial structural damage

44:03But it encompasses more. I think it

44:05encompasses more than structural damage.

44:07It encompasses the whole the whole

44:08process. That's why I didn't want to say

44:10structural, but it'll work.

44:16>> So, you want to read that back before we

44:18ask for a second?

44:20>> Okay. Uh so Tommy Willis to approve

44:22requested appeal uh to consider this a

44:25work of a minor nature uh as it does not

44:28uh as they the board believes it does

44:30not meet the three criteria to be

44:32considered substantial structural

44:34damage.

44:37>> Patrice seconds that.

44:42Okay.

44:42>> So you want to have a roll call vote

44:44please? Yeah.

44:49Kylin Barter,

44:51>> yes.

44:52>> Tommy Willis,

44:53>> yes.

44:54>> Jim McGrder,

44:55>> yes.

44:56>> Austin Burton, absent. Patrice Simmer,

45:00>> yes.

45:01>> Annne Whipper,

45:02>> yes.

45:03>> And Robert Crisp,

45:04>> yes.

45:05>> All right, vote is unanimous. Motion

45:07passes.

45:08>> Congratulations. Um, your appeal is

45:11granted.

45:12>> Thank you so much. I appreciate it.

45:16>> Thank you. Appreciate it. So, uh, our

45:20next order of business, uh, we have no

45:23continued cases.

45:25Um,

45:27other business, Scott, I don't think

45:30there we don't take new business unless

45:32it's u on the agenda, correct?

45:35>> Yes. Well, I mean, you guys can bring up

45:38any other business you may have, but we

45:39have none to offer from our side.

45:44>> Hearing nothing, uh, we'll move on to

45:46adjournment. Do I have a motion for

45:47adjournment?

45:50>> Motion to adjurnn.

45:53>> Second.

45:54>> Second.

45:55>> Second.

45:55>> Ann and Tommy.

45:59>> And with that, we're adjourned.

46:00>> Uh do

46:01>> Oh, we need to vote. All in favor?

46:03>> I.

46:05>> Okay.

46:06>> With that, we're adjourned. Thank you

46:07for your time today, everybody.

46:10>> Thank you.