Based on auto-generated captions; names and numbers may be misheard. Roll-call and voice votes were mostly not tallied aloud except the main vote.
Time on topic (from transcript timestamps; approximate, includes side talk; shares are rounded):
| Topic | Minutes | Share |
|---|---|---|
| Chartell Arms Fire Repair Appeal | 42 | 91% |
| Other business | 4 | 9% |
- Wednesday, October 14, 2026, Building and Fire Code Board of Appeals.
- Captions begin at 0:50 and run to adjournment at about 46:10.
- There was no recess or closed session.
- Six members answered the roll call (a quorum); one member was absent.
Other business
0:50-3:25, 45:12-46:10
- The chair welcomed the newest member, Robert Crisp, a fire specialist.
- Officers were elected. A member nominated Kyle (roll call renders the name "Kylin Barter"; see Kylin Barter) as chair, seconded, and the voice vote carried. Tommy Willis was nominated and seconded for vice chair, also by voice vote. The captions do not record the tallies.
- Minutes of the last meeting approved on a motion by Patrice Zimmerman with a second.
- No continued cases and no new business from staff or members; adjourned on a motion and second.
Chartell Arms Fire Repair Appeal
3:26-45:12
- Only new case: appeal of a code official's decision requiring a fire-damaged five-unit apartment building in Mesta Park to meet new-construction fire suppression and alarm requirements under section 302.7 of the 2018 International Existing Building Code, as adopted by the city.
- Staff (a city staff member named Scott, surname not captioned) took a neutral position, giving no recommendation, since the code's exception lets this board decide whether the work is "of a minor nature". He explained the permit was triggered when an inspector visiting for a gas meter reset saw fire repairs, and acknowledged a permit is occasionally found unnecessary, but rarely.
- The owner's representative argued the work was minor on four measures: fire limited to one vacant unit's bathroom and attic (reported loss about 1.8% of value), repair area about 4-5% of floor area, about 25 square feet of roof decking (about 1.1% of roof) replaced as a result of the fire with a roof replacement already contracted, and restoration with no layout change. A sealed engineer's reports concluded the damage was not "substantial structural damage". He also asked, in the alternative, whether a permit was needed at all, and for relief under city code section 12-1331 given the tenants in four of five units.
- Robert Crisp pressed that cutting and replacing gable bracing and ceiling joists is structural work, not cosmetic, and asked what the city's own amendments say. Another member and staff worked through the amendments (section 105.2.2 on repairs exempt from permits); staff noted inspectors are not engineers and look at char depth.
- A member asked about smoke detectors; the owner described quarterly tenant photo checks tracked in a database.
- Tommy Willis moved to approve the appeal and treat the work as of a minor nature because the board believes it does not meet the criteria for substantial structural damage; Patrice Zimmerman seconded. After a prompt to state reasons for the record, the motion was restated. Roll call: Kylin Barter, Tommy Willis, Board Member McGrder, Patrice Zimmerman, Board Member Weber and Robert Crisp all yes; Board Member Burton absent. Unanimous; appeal granted, so the fire suppression and alarm upgrades are not required while the building permit proceeds.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:50You ready? Ready, Scott?
01:00>> Um, well, I was going to welcome
01:01everybody to u the building and fire
01:05code board of appeals. This is
01:07Wednesday, October 14th, 2026. And
01:11before we get started, I thought I'd
01:12introduce our newest member, and welcome
01:15him aboard, Robert Crisp, fire
01:17specialist.
01:19Welcome aboard.
01:24So, can we have a roll call, please?
01:28>> Here.
01:31here.
01:32>> Bur
01:34>> present.
01:34>> Austin Burton, he was absent. Patrice
01:38Zimmerman
01:39>> here.
01:40>> And Weber
01:41>> here.
01:42>> And Robert Christ.
01:43>> All right, we do have a quorum.
01:45>> That's great. Um,
01:49so it seems like every time we have this
01:51meeting, we have the election of the
01:53board chair.
01:57>> Do we have any nominations from the
01:59floor?
02:01I'd like to make a motion to nominate
02:04Kyle for
02:08>> chair.
02:09>> Chair.
02:11>> Do I have a second?
02:14>> All in favor?
02:16>> I
02:18>> um do we have
02:20>> Jim second?
02:21>> Yeah, Jim. Jim.
02:24And then, uh vice chair. Uh do I have
02:27any nominations from the floor for vice
02:29chair? I think I can nominate in this
02:32case.
02:32>> I'll nominate Tommy.
02:35Tommy Willis. I have a second.
02:38>> Second.
02:41>> And all in favor?
02:43>> I
02:46>> welcome aboard.
02:49[laughter]
02:50[clears throat]
02:52>> So, uh I believe everybody's received
02:54the minutes from the last meeting. Do we
02:56have any u notations or corrections? If
03:00not, do I hear a motion to approve the
03:04minutes?
03:06>> Motion to approve.
03:08>> Second.
03:10>> Second.
03:15>> Patrice and Ann.
03:19>> All in favor? Hi.
03:21>> Hi.
03:26>> So, we only have one new case today.
03:29Uh, it's case number B OB 2026 00001.
03:36the appeal of Jacob Jacob Dearman
03:39property owner from a decision of the
03:42code official for compliance with
03:44chapter 3 supplemental section 302.7
03:48of the international existing building
03:50code 2018 as adopted by the uh city of
03:55Oklahoma City pertaining to the
03:57requirement for upgrade and compliance
04:00with all fire protection and suppression
04:02requirements
04:03of the IBC as it relates to the property
04:06located at 7:32 Northwest 18th Street.
04:12Scott, do you want to give us the staff
04:15analysis, please?
04:17>> I'll summarize here. I take it
04:19everybody's had a chance to read it. Is
04:22that correct? Um, in in summary, and of
04:26course the applicant here will be able
04:27to correct anything that's mis
04:29misstated, but um, we have an existing
04:32building uh, used as an apartment
04:34complex for however many years. Uh,
04:37there was a fire that occurred at one
04:39point uh, damage to the interior of the
04:42roof, the attic area uh, over at least a
04:45few units. And, uh, the work to our
04:48knowledge was completed, repaired by a
04:50prior tenant, a prior owner. Um the new
04:53owner came in uh
04:56I don't know unknowingly knowingly
04:58whichever um saw the work. Of course we
05:01still have to release the electrical
05:03meter which required a fire status check
05:07uh which required a fire status check
05:09inspection. Our inspectors went out to
05:10the job site, noticed the work that had
05:13been done, the fire damage that had
05:15occurred and uh had concluded that a
05:18building permit would be required to uh
05:21you know make the repairs even after the
05:23fact of course. Um you know regardless
05:26that was sold previously. Um, now since
05:29then, of course, we have our, you know,
05:31billing code, billing permits been
05:33submitted. Our staff has taken a look
05:35through this and done the review. And
05:37under the 2018 existing billing code,
05:39section 302.7, which should be up on
05:43your screen, um, anytime a building
05:46permit is pulled, that area of work, uh,
05:50what we define as a fire area, as
05:51mentioned in the code, has to be brought
05:53up to full compliance with chapter 9 of
05:55the IEB, excuse me, of the IBC, uh, the
05:59international building code 2018 as it
06:00for new construction. So that requires
06:02compliance with chapter 9 which kicks in
06:04fire suppression systems, alarms, um you
06:07know, anything else there included. Fire
06:10suppression being the number one I think
06:11issue in this case. Um
06:16let's see. Is there anything else on
06:18there? I know you'll have plenty of
06:19arguments on your side, but u um
06:23staff are going to take more of a
06:24neutral stance in this. We did not
06:26provide a recommendation for approval or
06:28denial being that our existing building
06:30code itself under the exceptions allows
06:32the board of appeals to determine
06:34whether or not this uh you know may
06:38identified as work of a minor nature as
06:40under one of our exceptions there. So,
06:43um, take a look at that. Uh, it'll kind
06:46of be on the board to decide, of course.
06:49I'll be willing to answer any more
06:51questions I can. Uh, but we don't have
06:54any recommendation at this time. One way
06:55or the other.
06:57>> Can I ask you um, how was it determined
07:01that a permit was needed? Was it just
07:03the opinion of an observer on the site
07:05at the time or
07:07>> Yeah, it would have been the uh
07:10interpretation of our building
07:12inspector. I forget the gentleman's name
07:14which one went out, but there was a fire
07:16status check that was required. The
07:18gentleman went on the job site, took a
07:20look at the attic area, the damage to
07:23whatever extent there was and determined
07:25in his notes that a building permit
07:27would be required. And that's what
07:29kicked this off. So, [clears throat] has
07:32the city
07:34um ever had an occasion where
07:38um someone thought a permit was required
07:41and then it was determined through
07:43internally or in another fashion that
07:47the permit was not required. Has that
07:49ever happened?
07:50>> That has happened. Uh being full upfront
07:52and honest, we see thousands of permits
07:54a year. Um there are various occasions
07:57they are fairly rare but there are
07:59occasions in which uh you know whether
08:02the the facts of the matter have changed
08:03once we get into the review or otherwise
08:06it's it's eventually determined you know
08:09that a bill permit would not be
08:10required. So that that has happened. Uh
08:12we're not going to deny that. It is very
08:14rare.
08:18>> So does anybody have any questions for
08:20the city before we call the applicant
08:22up?
08:25Is the applicant present?
08:28Would you uh approach approach the uh
08:31podium and state your name and address
08:33for the record and then tell us um how
08:37you're involved in this?
08:39>> Sure. My name is Jacob Dear. Um my
08:42address is the address of this property
08:44or where I live. Which one?
08:46>> Where you live?
08:47>> 436 Northwest 16th, Oklahoma City,
08:50Oklahoma 73103.
08:53And and are you the owner?
08:55>> I am uh the managing u sort of partner
09:01of a small LLC that owns the
09:04>> You want to tell us a little bit about
09:05your project or your application here?
09:08>> Yes. Um
09:11good afternoon, chair, members of the
09:13board. My name is Jacob Dearman. Um I am
09:18obviously like I just said, one of the
09:20owners of 732 Northwest 18th. I'm also a
09:23professor at Oklahoma City University
09:25Miner School of Business. Um, I'm a
09:28little bit nervous. I teach class all
09:29the time, but I'm a little bit nervous
09:30being here. This is an unusual sort of
09:32setting for me, so I apologize if I
09:34stutter or something. Um, so the current
09:37property under that sort of that we're
09:40looking at right now is an existing
09:42three-story five unit residential
09:44building built in 1915. It's Chartell
09:48Arms. It's in Messa Park. It's right
09:50across the street from the park. Many of
09:51you may may be familiar with that. It's
09:53got it's a white structure with black
09:55awnings and some gray paint. Um the fire
09:59and restoration work uh occurred before
10:02I acquired the property. The fire
10:04occurred on October 31st, 2025. We had
10:08put it under contract in September and
10:10we're to close in November, but the
10:14um the fire occurred and that pushed
10:16back closing until December 29th, 2025.
10:22So after the city advised me that the
10:24proper building permit had not been
10:26obtained, I sought to rectify the
10:28situation. I submitted the commercial
10:30permit application, sealed record
10:32drawings, and requested engineering
10:34documentation.
10:36Uh,
10:38I respectfully request um that the board
10:41approve the completed document work as
10:45work of a minor nature under the city
10:47adopted 2018 IEBC section 302.7
10:51exception one. I also ask that this
10:54approval resolve comments two and three.
10:58I will present evidence for work of a
11:00minor nature in four distinct
11:03categories.
11:05One is area,
11:07two is structural,
11:09three is roof, and four is restoration.
11:14So area, structural, roof, and
11:16restoration.
11:19And it
11:21while I'm no expert in this, it may be
11:24that this didn't even qualify for a
11:27permit. So I would ask that you would
11:29consider that as being experts
11:32uh there to to provide evidence for this
11:36work of a minor nature. Um I will refer
11:39to several different reports. One is the
11:41engineering reports, the fire incident
11:44report which was just handed out to you.
11:46Um
11:48the record drawings, the roofing letter,
11:52and the restoration email. The email's
11:54also in that attachment.
11:57Okay, so beginning with area on evidence
12:00for work of a minor nature. The fire
12:03incident report states the fire was
12:06contained to the ceiling and the attic
12:08space of the bathroom in apartment 4.
12:12This apartment was vacant. Notice that
12:14the incident report says the ceiling of
12:17the bathroom space, just the bathroom.
12:21The report, the fire incident report on
12:23page two lists the estimated property
12:25losses at 20,000 against an estimated
12:29property value of 1.1 mil 1.13 million.
12:34The estimated loss therefore according
12:37to this document is about 1.8%
12:40of the total value.
12:44If you look at the architectural
12:45drawings, they're going to include the
12:47bedroom.
12:49that bedroom that gets included there.
12:51The based on my understanding was when
12:55the firefighters needed to access the
12:59attic space, they cut a hole in the
13:01ceiling to access that. So, that part
13:04was another part where a ceiling joist
13:06had to be repaired. And so, that is a uh
13:10that is also included in the rendering.
13:12But even if we include for that unit
13:15both the bathroom part of the hallway
13:18and the bedroom that amounts to about
13:20four to 5% of the total building area if
13:23we include uh the basement
13:28on the structural side as we turn from
13:30the area to the structural side. The
13:33fire incident report states that
13:35occupants of the unaffected apartments
13:38were allowed to return to their
13:40apartments,
13:42implying that there was not a
13:44significant enough structural concern
13:46about the integrity of the building to
13:48keep individuals out that they were
13:50allowed uh to go back in and to reside
13:53in their in their doiciles.
13:56The structural engineers report
14:00also confirms this. And I should note
14:03that in that structural engineers
14:04report, he refers to it as unit five,
14:06but it is apartment 4. Okay, so I'm
14:09going to quote him. It's going to say
14:11five, but it's really four.
14:14He states, "Unit 5 was on the third
14:16floor and was the only unit affected by
14:19structural fire damage. The charred
14:21damage appear to be isolated to the roof
14:24structure above unit 5 only.
14:28Also, the structural damages observed
14:31were determined to be limited to the
14:32southeast corner of the structure. He
14:34also states, furthermore, charring does
14:37not completely reduce the structural
14:39capability of the structural member
14:40unless it is fully consumed. As such,
14:43some structural integrity would remain
14:45with charred members.
14:47And then finally,
14:49based on my interpretation of 2018 IEBC
14:53section 202
14:55and the damage observed to the
14:57structure, it is my opinion that the
14:59building damage did not meet the
15:01definition of substantial structural
15:04damage. Okay.
15:09So turning from structure to roof,
15:12trademark exteriors did the roof work.
15:16That roof work was contracted prior to
15:19the fire and was part of the closing
15:21process that that roof was going to be
15:23replaced prior to us taking ownership.
15:26So, it was already under uh already sort
15:29of under contract. Okay. And the
15:33trademark exteriors restoration letter
15:35states this. Prior to the fire, the roof
15:37had already been contracted for
15:39replacement as part of a real estate
15:42transaction and the installation had
15:45been scheduled.
15:46Once the fire related claim was
15:48scheduled, we were able to proceed with
15:51the roof replacement. The original scope
15:54of work remained substantially
15:56unchanged. In another part, and yet
15:59another part of the letter, the roof
16:01decking was thoroughly inspected from
16:03both the attic and the rooftop after the
16:07existing shingles were removed. Based on
16:09the these inspections, it was determined
16:11that only approximately 25 square ft of
16:14roof decking required replacement as the
16:17result of the fire. The remainder of the
16:20roof decking did not require replacement
16:22due to fire related damage.
16:26The roofer stated, not in his letter,
16:28but he did state if you look at the
16:30invoice, he bought 2500 square feet of
16:34shingles. 25 squares. And he said that
16:38there was 2,200 that roof size was 2200
16:41square f feet. So, we're looking at 25
16:44square feet relative to 2200, which is
16:47approximately 1.1% of the total area.
16:52So, that's that's the roof. And then on
16:54the restoration piece,
16:58Justin Brower in the email that you have
17:00at the back of that handout stated that
17:03the purpose was to restore the unit to
17:06its previous condition.
17:09He also states no walls removed or
17:11reframed and no changes were made to the
17:14existing floor plan or layout of the
17:17unit.
17:22He did note that we installed the
17:24bracing uh recommended by the structural
17:26engineer.
17:29And he his description of the work was
17:31that the repairs were relatively minor
17:33and consisted primarily of localized
17:35restoration cosmetic work.
17:41And the record drawings that were
17:42provided by the architect shows that or
17:45documents that the existing layout
17:47really did not change.
17:51And so across these four categories, the
17:53work was limited and restorative in
17:55scope. I respectfully ask uh the board
17:59to approve the completed documented work
18:02as work of a minor nature. The fire
18:05related decking replacement once again
18:07was 1.1% of the total roof area.
18:11The estimate of the affected area
18:13according to the drawings is between
18:15four to 5% of the total floor area
18:18including the basement. The report's
18:20estimated loss was approximately 1.8% of
18:24the estimated property value. The
18:26structural damage was localized. The
18:29engineer found that it did not meet the
18:32definition of substantial structural
18:33damage according to code and the work
18:37restored the existing layout
18:40and kept the occupancy the same.
18:44So I ask that the board resol would um
18:49define this as work of a minor nature
18:52and if that is not viable to consider
18:55whether a permit should have even been
18:57pulled and if not that then finally I
19:01would request relief under the Oklahoma
19:04City Municipal Code section 12-1331.
19:09We have seven tenants that occupy four
19:11of the five units. the installation of
19:14such systems would be um
19:18difficult um for them uh in their daily
19:22lives. Thank you so much for considering
19:25this case. I really appreciate your
19:27valuable time and consideration and I in
19:31advance apologize if I have not followed
19:33typical protocol because this is not
19:35what I do for my daily uh daily job.
19:37Sorry.
19:38>> So what what do you teach?
19:40>> I teach economics. Um, but right now
19:43this semester I'm teaching econometrics
19:45and business calculus.
19:46>> You did a very good job today,
19:48>> huh? Okay.
19:49>> You did a great job.
19:50>> Thank you.
19:50>> Um,
19:53so
19:54the fire was on the 31st of uh on
19:57Halloween I guess of uh 2025.
20:02You had or and that you did not own the
20:05property at that time.
20:07>> That is correct. We placed it under
20:08contract in September though.
20:10>> Oh, you did. It was under contract.
20:12>> Now, we were going to close in November
20:14because it was expected that rates would
20:16go down and then we could lock in the
20:17lower rate. That's why.
20:19>> And and who initiated the repairs, the
20:21original owner is that?
20:22>> Okay. So, the the person that's owned
20:24this property prior to me was uh an
20:27individual who had owned it for decades.
20:30>> He is currently sick. And the person
20:34that was taking care in of his external
20:37affairs including like his real estate
20:40properties was a um healthc care uh
20:44professional um that was managing sort
20:47of his estate. So this was well outside
20:50of his scope of normal work and
20:52expertise and he had I don't as far as I
20:55know he had no real estate holdings of
20:57his own and the other individual um was
21:01not in a capacity to deal deal with it.
21:04>> So so you hired the work to be done?
21:07>> No I I did not know he did. Okay. Um but
21:10I would say that the process in this
21:14case was difficult even for a real
21:16estate professional of which the
21:19previous owner the person that was
21:21managing the previous owner's estate uh
21:23was not right and the work that was done
21:27was done
21:29u prior to or subsequent to the initial
21:33study that was done by the structural
21:35engineer.
21:37Do you know do you know the chronology
21:39of all that or not?
21:42>> I believe the structural engineer the
21:44structural engineer came out did his
21:46assessment and then Justin came in and
21:49did his work
21:50>> and then the structural engineer has
21:52stated that he believes that the his
21:54recommendations were followed in the
21:56repair.
21:57>> That is correct. Yes. I had him as part
22:00of p pulling the permit um that was
22:03requested by the city. I had him come
22:05back out and give his assessment on the
22:08work that was done and that he believed
22:10it was followed. Um, and then I also had
22:13him write up whether he believed that
22:15the structural damage reached the level
22:17of that was called substantial in the
22:19building code and he said he did not.
22:24>> I have a question
22:25>> u in bringing this case forward.
22:29Was it due to you requesting a permit?
22:33because uh I see a a decision of the
22:36code official for non-compliance.
22:38Did they come out to do an inspection of
22:40of a permit or how did that come about?
22:43>> Yeah. So, how did this get on my radar
22:44to begin with? Yes.
22:46>> Um the gas meter on unit 2 had been
22:49turned off for over a year. And when the
22:51gas meter has been turned off for over a
22:52year, then you have to have the plumbers
22:54come out and pressurize it. And then
22:58once they pressurize, they call the
22:59city. the city issues a permit and then
23:01you can install a gas meter. So that was
23:04my request is for unit 2 to have a gas
23:07meter and then somebody
23:10I don't know if there's
23:11miscommunication. I'm not exactly sure
23:13what happened. An individual from the
23:15city showed up and then they went up to
23:17unit four and then took a look and then
23:20turned it turned around and said that
23:22you'll need to pull a pull a building
23:25permit or remodel permit or something.
23:27And so that's how that got started. So I
23:29called for another permit. It was
23:31brought to my attention that there was
23:33an outstanding permit that should have
23:34been pulled under the previous owner
23:36that was not. And so I went through the
23:40process of um doing everything they
23:43asked me to do, you know, filing for
23:45that remodel permit, getting the
23:47drawings and uh getting the structural
23:50engineers report.
23:51>> So this is for a building permit,
23:53approval of a building permit, correct?
23:56>> Today?
23:57>> Yes.
24:02So if you look at exception 302.7
24:06there is an there is a let me
24:12I have it somewhere
24:14>> and while he's pulling that up I'll I'll
24:16say as well um
24:20>> it is common practice and it's most
24:22likely I I don't have any proof one way
24:24or the other of course on this but it is
24:26common practice when our inspectors go
24:28out in the field. Uh you mentioned
24:30Justin was out there for the gas meter
24:31reset.
24:32>> Yeah.
24:33>> If he saw any damage or what looked like
24:36to him was repaired work, he they it's
24:40our common practice to notify staff,
24:43have a building inspector come out, take
24:44a look to determine whether the building
24:46improvement was required as well. We we
24:48work together across trades in that in
24:50that manner.
24:51>> Okay.
24:52>> So that's most likely. I can't prove
24:53that one way or the other because I
24:54don't have any evidence regardless, but
24:57uh that's likely what happened in this
24:59case. So,
25:00>> okay.
25:00>> Okay.
25:01>> I was I was sort of surprised. I'm not
25:03sure what the normal process flow is
25:04there, but as you can see on the screen,
25:07it says that there the exception
25:10exceptions. The first sentence under one
25:13for work of a minor nature were approved
25:15by the board of appeals. That's an
25:17exception to 302.7.
25:21So, I'm I'm asking for the
25:25um this exception to be recognized as a
25:27work of a minor nature in this case as a
25:30as my first request
25:33>> and then that would that would permit an
25:36approval of the permit.
25:38>> Okay.
25:41>> Yeah. No, I would I was just yeah
25:43summarize what each what you're saying
25:45is the ask here is is
25:48>> our job is determine whether it's work
25:50of a minor nature. Right. Right. So
25:51that's what we got to decide and Scott
25:55in in the staff recommendation because
25:56because that exception has to be
25:58approved by us. It says therefore staff
26:01makes no recommendation of approval or
26:02denial of this appeal. So our job is to
26:05weather approve or deny if this is work
26:07of a minor nature.
26:08>> Okay.
26:08>> Exactly right.
26:09>> Yeah.
26:10>> Right.
26:10>> That's correct. So Scott,
26:13if um if it is work of a minor, we do
26:17approve this as work of you know minor
26:20nature.
26:24>> Does the permit go away?
26:26>> Uh well the build excuse me the building
26:28permit would still uh you know work
26:31itself through the process by
26:33determining this work of a minor nature.
26:36You would negate the application of
26:37302.7. So, the building permit would
26:40move forward. It's just that we would
26:42not uh we would not be able to require
26:45fire suppression upgrades, fire alarms,
26:48those kind of fire safety standards.
26:50>> That was going to be my next question.
26:51>> Yeah.
26:52>> Okay.
26:52>> So, we would have a building permit.
26:54It's just they would they would get
26:56relief from those requirements.
26:57>> Okay.
27:02>> Anybody else have questions for either
27:04the applicant or the city?
27:07>> I have a question. Another one.
27:09>> Do you require your uh occupants to have
27:12uh smoke detectors in in their
27:14apartments?
27:15>> Yes, that is correct.
27:16>> And that you go in yearly and make sure
27:19the batteries are good and all that
27:21stuff.
27:21>> Yes. And in fact, um one of the things
27:24that I've been working on is for them to
27:26be able to take pictures of their smoke
27:27alarms. I'll ask them a few questions if
27:29they tested it and then it will take
27:31that and put it in Terso database. and
27:33that I can give you the phone number if
27:35you guys wanted to to mess around with
27:37it. Um, but you can text it and then
27:40there's going to be a and then there's a
27:41geocoded portion of it where you can
27:43display it on a map. So that way I can
27:45ask them every 3 months to take pictures
27:48of it. Does it work? Answer all these
27:50questions. If they're not answering
27:51those questions, if they're not doing
27:52it, then I can follow up.
27:54>> Got. So, I'm building systems to make
27:56this more robust in terms of uh having a
28:00pipeline of data for the fire marshall's
28:03office and make it easily accessible for
28:06them to look across all the units on my
28:08on my property.
28:09>> Excellent,
28:11>> Mr. Chris.
28:13>> Yes.
28:18>> Hello. Oh, here we go. Okay. All right.
28:20I haven't seen any language with the
28:23supplement from the building code or the
28:26uh fire code because the language that I
28:29think that's in there and what the
28:31inspector that went out on site looked
28:33at is that cosmetic
28:35um remodel is kind of like carpet
28:39replacing sheetrock paint. But whenever
28:41you get into the structural members
28:43whenever there's damage in that that's
28:45what he's looking at as far as requiring
28:47a a building permit. So looking at some
28:50of the pictures in here and it stated
28:53that it was the language that the
28:57engineer said was
29:00basically
29:02to what he can access. That was the
29:05pictures. So we didn't get a thorough
29:07picture of the damage. But even with the
29:10pictures that's shown, you can see that
29:12it was structural damage to more than
29:15just the shingles and roof covering.
29:17They got into the decking, support
29:19members, trusses.
29:22>> I do not believe that the trusses were
29:24actually affected by this. It was the
29:26gable embracing that was the uh
29:29structural member that was probably the
29:30largest structural member that was
29:32affected. There were some ceiling joists
29:34as well.
29:35>> Correct. And all of that will be
29:36considered structural members. And that
29:38will make that inspector that came out
29:40there to look at it and say that a
29:42building permit should have been pulled
29:44and this is not cosmetic.
29:47Right. That is my understanding as well.
29:48>> Correct. So that's why a building permit
29:50was recommended for that
29:53>> instance. Yes.
29:54>> So so the work that's been done does not
29:57look like it's cosmetic because cosmetic
30:00is all the small stuff we just talked
30:02about with the shingles and roof
30:04covering r carpet paint. But whenever
30:08you're talking about removing and
30:10cutting, replacing and repairing
30:12structural members, that's going to
30:14require building permit.
30:16That's correct. And that's why my
30:18question is to the work that was done to
30:22classify as work of a minor nature.
30:24That's my primary one. The the other
30:26question of whether a permit should been
30:28pulled in the first place. Um that was
30:30the explanation as to why the permit had
30:33to be pulled is because there was a
30:34structural engineers report that
30:36indicated gable in bracing as well as um
30:41the ceiling joist. So that's that's why
30:43the permit had to be pulled. If the
30:45permit's pulled, I um the question
30:48before you is the work that was done
30:50according to these documents, does it
30:52fall
30:55under work of a minor nature to allow
30:57for the exception or to allow for relief
30:59from um section 302.7?
31:02>> Okay. And that's why I was wanting to
31:04look at the language of either the
31:05supplement or the FAR code or what the
31:09inspectors, code inspectors go by on
31:11judging what a permit requires because
31:16um in our language I would think that as
31:19far as
31:21whenever that permit is required to be
31:23pulled then you will have to bring it up
31:25to code.
31:27So, Robert, um, what we were handed here
31:30today when we got to the dis was this
31:34was just supplementary information that
31:38was given to us that was on top of the
31:41original packet of information Scott
31:43sent us. And that's the original packet
31:46of information there. And I think if you
31:47look through that, you'll find three
31:49reports from a structural engineer who
31:51is u they're signed and sealed. and he
31:55did an analysis of the um the work that
32:00was the initial damage, then the work
32:02that was done, and then a final report.
32:06And in each of those cases, he
32:07references uh and I forgot what section
32:10it was though that lists the list area,
32:14list snow load. It's at the very front
32:18of the document. If you go up, what
32:21we're looking at here on our screen, if
32:23you'll go Oh, there they are. He lists
32:25the things in blue on your screen right
32:27there.
32:28>> Um,
32:31he he addresses each one of these
32:33issues, which are the exceptions.
32:35U, this is what what determines whether
32:39something is a sub substantial
32:42structural damage. So he's he's as a
32:46professional engineer, he's gone ahead
32:47and made the assessment uh and
32:50documented in three separate reports.
32:52Uh, and that's why when I started, I
32:55asked Scott if they've ever had uh a
33:01determination that a permit was required
33:03and then have subsequently find that it
33:06isn't required because I think what this
33:08documentmentation is showing us is that
33:11the structural engineers believes that
33:13there was no uh basis for claiming that
33:16there was sub substantial structural
33:18damage uh and that it should have always
33:21been considered minor and should have
33:22never required a permit to begin with.
33:25>> Right.
33:25>> And I think that's what what the full
33:27report what that full packet of
33:29information tells us.
33:31>> Would you agree with that, Scott?
33:33>> Yeah, I would agree with that. Um,
33:35>> yeah, and I've read all of that,
33:37>> but I didn't look at the supplement
33:38because I know with the city, we look at
33:41the building code and then we come up
33:43with our own supplement. Either be
33:44stringent than what's in here or what.
33:47And what he's not talking about is what
33:50did the city of Oklahoma City come up to
33:52as far as a supplement to this language?
33:55>> So, so I guess that would be a question
33:58for Scott. Scott, is there anything in
34:00the supplemental uh the amendments to
34:02the code that the city has adopted that
34:06would uh essentially change anything
34:10that was listed in this engineers
34:12report? I have a copy of the city's
34:15codes and it is basically the exceptions
34:18are the same and let me give you copy of
34:22this and let you read it.
34:25>> And which which section are you looking
34:26at?
34:27>> Chapter 3.
34:28>> Chapter 3
34:29>> 55.
34:31>> Are you looking at 302.7?
34:35>> No, I think they're looking at the
34:37>> uh 302 section 302 fire protection. Yes.
34:41302.7 fire protection. Yes. So it's on
34:43record. Okay.
34:45>> Okay. So 105 is where I would be
34:48concerned.
34:49>> Section 105. What is that talking about?
34:53>> So um to that point, uh Robert,
34:57hopefully you're bringing that up. um
35:00are amendments to the existing building
35:02code under chapter 4 repairs says says
35:07for 40 section 401.1
35:10is amended to add the following
35:11sentence. It says this classification
35:12shall only apply to work exempt from a
35:15building permit per section 105.2.
35:18So for us to define the work as a repair
35:21if that's where you're going
35:23>> um it has to be exempt uh from section
35:26105.2 2 and 105.2 of the six building
35:31code uh was amended. There are no
35:35exceptions for electrical, gas,
35:37mechanical, or plumbing, which we're not
35:39really arguing today. It's just the
35:40structural. Uh for the structural the
35:44work exempt from a building permit on on
35:45the building side is of course sidewalks
35:47and driveways, painting, papering,
35:49tiling, carpeting and cabinets,
35:50countertops, similar finish work, uh
35:52motion pictures, shade cloth structures,
35:55um awnings and movable cases. So none of
35:58that applies. None, you know, you're not
36:00exempt from any of those, of course. Um
36:02but then 105.2.2 Two, repairs states,
36:07"An application or notice to the code
36:08official is not required for repairs to
36:10structures and items listed in section
36:12105, those that I just mentioned.
36:14Provide that any such repairs do not
36:16include any of the following." So, it
36:17says, you know, the cutting away of any
36:19wall partition or portion thereof. So,
36:22if you're doing any work that requires
36:24the cutting away of a wall, partition or
36:25portion thereof, it is not exempt from
36:27getting a permit, which I think
36:29everybody understands. Um it goes on to
36:32say the removal or cutting of any
36:33structural beam or load bearing support.
36:36Um could be maybe up for argument there
36:38based on the engineering engineers
36:40report. Um the removal of change
36:43requirement of any means of egress or
36:45rearrangement of the structure additions
36:48alterations uh etc. I mean the rest are
36:50really non-applicated situation. So it's
36:52it's mainly the cutting away of any wall
36:54partition portion thereof or the removal
36:56or cutting away of any structural beam
36:57or loadbearing support that u you know
37:01would kind of kick in the build the
37:02requirement for a building permit in
37:03this case. U but that's
37:07also partly up for discussion here based
37:09on this engineer and cut supports. was
37:12cutting sports throughout the whole
37:18>> Hey Jim,
37:19>> we can't have conversations like that
37:21that are not part of the public
37:25>> you have to
37:26>> speak. I was pointing Jim
37:30with the pictures in here that if you
37:33look at the pictures that's in the
37:34document, there's a lot of cutting and
37:38replacing structural loadbearing members
37:48and that's to me not cosmetic.
37:57So, um, Scott, when it comes to substant
38:01substantial structural damage, then
38:05how does that weigh into, uh, what the
38:09is that wasn't a city amendment? That
38:11was um you
38:14Robert, you were quoting
38:17um were was that from the city
38:19amendments that you were
38:22>> Well, I was wondering what the city
38:23amendments was because that wasn't pro
38:25provided in here and I know that
38:27inspectors with the city. They go by the
38:30city amendments and supplements that
38:33pretty much states something to the
38:35effect of if there's damage to
38:36structural members, a building permit
38:38must be pulled.
38:39>> Yeah. And to that point, I'll state for
38:44the understanding of the board here, um,
38:46our inspectors, regardless of trade,
38:48they are not, you know, licensed
38:50engineers, structural or otherwise. U,
38:53you know, none of our staff that I'm
38:54aware of are. Um, what we are looking
38:58for, uh, what they're trying to look for
39:00on a fire restoration is to determine
39:02whether or not, you know, is there the
39:05what do you call it? the the
39:06alligatoring [snorts]
39:08that you'll see the charring of a of a
39:10member of wood and is the
39:13does that exceed the depth of of an
39:15eighth of an inch and uh for the life of
39:18me I cannot recall where where that come
39:19from. There was an old historical um
39:22reference for that. I just can't think
39:24of it off the top of my head at the
39:25moment. But so that's the extent of what
39:27they're looking at. We are not
39:29engineers. Um, you know, obviously a
39:32structural member can look perfect and
39:35still have, you know, structural faults
39:38and failures that you can't see. So,
39:42just
39:44take that with a grain of sand. We we
39:45only we can only go so far as
39:47inspectors.
39:53>> Do you have
39:55you have the full packet?
39:59>> Yeah.
40:02There it is.
40:02>> There isn't another full packet around
40:04here anymore.
40:08>> A printed one.
40:09>> Yeah, that's a full packet,
40:10>> right?
40:16>> Yeah. Um, so I'm looking at the um the
40:18staff analysis and it just Scott if you
40:22want to add anything to this. It says,
40:23"The applicant structural engineer
40:24reports that the observed fire damage
40:26were localized above one unit, that
40:28repairs adequately addresses the
40:29engineer's earlier recommendations that
40:31the damage did not meet the IEC
40:34definition of substantial structural
40:35damage. The applicant estimates the
40:38ceiling and framement repair area at
40:39approximately 210 ft or 4.7% of the
40:42building reported area. That estimate
40:44does not include the full roof
40:46replacement or interior finish work. So,
40:49I mean, me not being a structural
40:50engineer, I based my analysis over the
40:52staff analysis. Can is there anything
40:54that you'd like to add to that staff
40:56analysis?
41:00>> Not at this time. I mean, I think I've
41:02stated everything.
41:08>> Well, I'm I'm ready to make a motion.
41:11I'm going to make a motion
41:15that we approve his request.
41:20Let's see how I want to word this.
41:24Hold one second, please.
41:30>> Yeah. Uh so make a motion for approval
41:33of the appeal
41:36to deter to uh
41:39constitute this work of a minor nature.
41:42Does that work for everybody?
41:44>> Okay.
41:46>> So I have a motion.
41:49We have a motion on the floor. Do we
41:51have a second?
41:52>> Second.
41:53>> Patrice.
41:56>> Uh apologize for the late notice here.
41:58Um, with that motion, please include the
42:02uh reasons for for granting or denying
42:04it. So, have some part of the
42:08>> My reasoning is just looking I mean,
42:12>> is this going to go in it?
42:13>> Do I do I need to summarize it?
42:16>> Okay.
42:16>> Yeah, we
42:17>> This will be part of our
42:18>> restate the motion with the explanation
42:20for for it. Yeah.
42:27>> Yeah. This will teach me. [laughter]
42:31Okay.
42:33So, I want
42:36to
42:45>> Yeah. I want to make a motion to approve
42:48the request for appeal and to consider
42:51this
42:53work of a minor nature because it does
42:56not meet the the the criteria the three
42:58criteria to be considered
43:04>> major major.
43:12>> Yeah. Well, it's not
43:25Read me what you got.
43:29>> Um, I'll read what I've taken down here.
43:32Greater
43:33>> Tommy had a motion to approve the
43:34request of appeal
43:35>> to determine this as a work of a work of
43:38minor nature
43:39>> uh under the uh
43:43interpretation that this does not meet
43:45the three conditions to be considered as
43:47I'm assume you're going for what do we
43:49say structural significantly
43:52substantial what was that what was that
43:54again
43:54>> substantial damage
43:57>> I was looking for the correct technical
43:58term but I couldn't come up with it
44:00>> structural damage
44:01>> substantial structural damage
44:03But it encompasses more. I think it
44:05encompasses more than structural damage.
44:07It encompasses the whole the whole
44:08process. That's why I didn't want to say
44:10structural, but it'll work.
44:16>> So, you want to read that back before we
44:18ask for a second?
44:20>> Okay. Uh so Tommy Willis to approve
44:22requested appeal uh to consider this a
44:25work of a minor nature uh as it does not
44:28uh as they the board believes it does
44:30not meet the three criteria to be
44:32considered substantial structural
44:34damage.
44:37>> Patrice seconds that.
44:42Okay.
44:42>> So you want to have a roll call vote
44:44please? Yeah.
44:49Kylin Barter,
44:51>> yes.
44:52>> Tommy Willis,
44:53>> yes.
44:54>> Jim McGrder,
44:55>> yes.
44:56>> Austin Burton, absent. Patrice Simmer,
45:00>> yes.
45:01>> Annne Whipper,
45:02>> yes.
45:03>> And Robert Crisp,
45:04>> yes.
45:05>> All right, vote is unanimous. Motion
45:07passes.
45:08>> Congratulations. Um, your appeal is
45:11granted.
45:12>> Thank you so much. I appreciate it.
45:16>> Thank you. Appreciate it. So, uh, our
45:20next order of business, uh, we have no
45:23continued cases.
45:25Um,
45:27other business, Scott, I don't think
45:30there we don't take new business unless
45:32it's u on the agenda, correct?
45:35>> Yes. Well, I mean, you guys can bring up
45:38any other business you may have, but we
45:39have none to offer from our side.
45:44>> Hearing nothing, uh, we'll move on to
45:46adjournment. Do I have a motion for
45:47adjournment?
45:50>> Motion to adjurnn.
45:53>> Second.
45:54>> Second.
45:55>> Second.
45:55>> Ann and Tommy.
45:59>> And with that, we're adjourned.
46:00>> Uh do
46:01>> Oh, we need to vote. All in favor?
46:03>> I.
46:05>> Okay.
46:06>> With that, we're adjourned. Thank you
46:07for your time today, everybody.