2026-09-24 - Oklahoma City Airport Trust
Summary
Based on auto-generated captions; names and figures may be misheard.
- The captions begin mid-conversation, without a formal call to order, and end about six minutes before the video does. The trust approved the August 27, 2026 minutes.
- Maintenance department report: the airport's largest department has about 62 employees in five divisions (building maintenance, airfield, fuel storage, horticulture and equipment maintenance). Figures cited: about 588,000 square feet of terminal space kept running around the clock, 21 jet bridges, 479 pieces of equipment, 3,865 airfield lights and 74 miles of fence. Fuel storage holds about 630,000 gallons of jet fuel and issues about 3.2 million gallons a month. Runway deicing one pass of the parallel taxiway costs about $17,000. Items on the horizon: LED airfield lighting conversion, multitasking snow equipment (one ordered), work on recurring terminal water outages with Planning and Development, an enterprise asset management system, and vehicle transponders for airfield vehicles to reduce runway incursions. In answer to a trustee, maintenance staff said fleet mechanics also service equipment for the Wiley Post airport.
- Director's report: a new dashboard of operating, revenue and passenger figures will be added to the regular report. A record of roughly 9,800 passengers flew out the previous Sunday. A media event is planned for October to preview upcoming work and the long-range development program, to be branded "OKC Cleared for Takeoff."
- Coming construction: the last signalized intersection before the airport (at Amelia Earhart) becomes a roundabout, with lane closures for more than a year; terminal floor replacement and restroom remodels have started; the parking garage work starts by the end of the year. Longer-term projects include realigning the terminal roadway and expanding the terminal, in preparation for the Olympics.
- Consent-style items approved without discussion by voice vote, each category on a single motion: Will Rogers International items A through R (including construction contracts for terminal access roadway rehabilitation phase 4 and pedestrian access west, ground services agreements, an airport parking amendment, a Delta Airlines amendment, a Devon Energy lease renewal, and several change orders at the Aeronautical Center); Wiley Post items A through E (including a new air traffic control tower construction contract); general items A through E (annual maintenance contracts, a resolution naming authorized trust representatives under the master bond indenture, and ratification of financial reporting software support); two easements; and the requisition payment resolutions. Nothing was filed under Clarence E. Page. No trustee comments or citizen comments.
Issues discussed
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:06facial recognition. You just sit down.
00:30You haven't taken water from Lake or
00:33anything like that, right? This could be
00:34controversial.
00:37>> It's coming to us to Hefner
00:39>> after it melts along the way.
00:43>> The building
01:06Good morning and welcome to the
01:08September 24th, 2026
01:10Oklahoma City Airport Trust meeting.
01:14Our first uh item on the agenda is to
01:17approve the minutes of the Oklahoma City
01:19Airport Trust Meeting for August 27th,
01:222026.
01:23Is there a motion and a second?
01:38almost and the item passes. Okay, next
01:42up we have the director's report.
01:44>> Good morning, Mr. Chairman. Um, this
01:46morning we have another department
01:48report. John, if you want to work your
01:49way up here. So, John Horton heads our
01:52maintenance department at the airport.
01:54It's the largest department we have. Um,
01:57but he doesn't have a whole lot of
01:58people with him today because they're
01:59working on the front line, which is what
02:01they do. But, uh, so John um is going to
02:05go through some slides and as we've done
02:07with other departments, kind of describe
02:09what, uh, our maintenance folks do. So,
02:11take it away, John.
02:12>> Sure. So, uh, we have a pretty short
02:16presentation talking about our
02:17maintenance folks and some of the things
02:19we do for the airport. And, uh,
02:23we're going to highlight some numbers.
02:26Honestly, when we started putting this
02:27together, um, I was really surprised at
02:31some of the numbers that we're going to
02:32give you today. So, I hope you are, too.
02:35Uh, as Jeff said, we are the largest
02:38department in the airport. We've got
02:39about 62 employees. Um,
02:43Those are some of the numbers that we're
02:45going to talk about in the presentation
02:46as we go through this. Uh go ahead.
02:55This is a chart of how our divisions
02:57made up. Um we have five departments.
03:01Building maintenance, airfield, fuel
03:03storage, horiculture and equipment
03:06maintenance.
03:12talk a little bit about building
03:13maintenance. Um, building maintenance is
03:16led by Todd Michaelelsson. He's been at
03:19the airport over 20 years. He's got a
03:21deep knowledge of our facilities.
03:24He's a kind of a unique leader. He's
03:26hands-on. You'll find Todd most of the
03:29time working right alongside his guys,
03:32connected to the day-to-day operations.
03:35um building maintenance is staffed 24/7
03:38365. We have coverage uh all the time at
03:42the airport. So
03:45these [snorts] guys
03:48support approximately 58 588,000 square
03:52feet of conditioned terminal space
03:56which is a huge undertaking. Um they
03:59maintain multiple chillers, um four
04:03cooling towers,
04:06whole bunch of air handlers, bunch of
04:08VAVs,
04:10six boilers, and numerous package units
04:14that uh range from 2 to 25 tons. And
04:17also uh we have the units on our jet
04:21bridges. There's 21 of those that are
04:24approximately 60 tons a piece.
04:27um electricians. We've got some
04:29fantastic building maintenance
04:31electricians. They've been with us a
04:32long time. They know our building. They
04:34know our power distribution. Um they're
04:37a huge help to us and P&D when they're
04:40designing projects there at uh at Will
04:43Rogers. Um, we've got a plumber on task
04:46on staff that uh he's he'll tell you his
04:51job is to keep the water in the pipes
04:53and he does a very good job of that
04:55along with maintaining over 400 toilets
04:58and labs.
05:00Um, that group has some fantastic system
05:02support techs. Um they're busy handling
05:06our access control systems, uh perimeter
05:08gates, uh numerous other electronic
05:12systems on jet bridges, building
05:14automation, and others. And then we've
05:17got a great staff of building service
05:19workers that are busy painting,
05:21replacing tile, doing all kinds of other
05:24door repairs, and that sort of thing.
05:27So,
05:32there's some pictures. The one on the
05:34left was a dreadful day at the airport
05:36couple Saturdays ago when we lost our
05:38water.
05:40>> Um, if you can imagine that times about
05:4230, it was it was a bad day. Uh, Patrick
05:46was our only guy on staff that day and
05:49and uh he did a great job of getting us
05:52back up and running. Uh, the middle
05:54picture um is Richard. He's repairing
05:57one of our perimeter entry gates. Uh the
06:00other picture is a couple of our HVAC
06:04technicians, Stephen and Chris, and uh
06:07they're doing some work on a passenger
06:09boarding bridge.
06:11So,
06:13and then uh that's a pretty good picture
06:16of uh doing snow removal. I think that
06:20it's over by the covered north parking
06:22lot. We've been buying those guys some
06:24equipment. You know, in the past they
06:26did those sidewalks with shovels. Took a
06:29lot of manpower, a lot of energy, and
06:32and uh we're trying to upgrade them a
06:35little bit and allow them to be a little
06:36bit more efficient. They've got a huge
06:39snow route. If you can imagine all the
06:40sidewalks at the airport, um it's a huge
06:44task every time it snows. [snorts]
06:54And then our fleet department that takes
06:56care of our fleet equipment maintenance.
06:58Um Brian Stone heads that operation up.
07:02U he's our unit operations supervisor.
07:06Um he's got uh five mechanics and a
07:09welder under his supervision. Uh that
07:12division is responsible for ensuring
07:14that all airport operated vehicles and
07:16mobile equipment remain safe, reliable,
07:19mission ready and compliant
07:21to support continuous airport
07:23operations.
07:25We have a very diverse fleet that
07:27contains operations vehicles, airport
07:30maintenance trucks, mowing equipment,
07:32snow equipment, um our fire trucks. Uh
07:36we take care of the parking shuttles and
07:39all kinds of other specialized airport
07:41equipment. [snorts]
07:43Um fleet maintenance has a comprehensive
07:46scheduled preventive maintenance program
07:49set up for everything at the airport
07:50with an engine on it. Um, and if you
07:54think about what they do, basically they
07:56take care of everything there with an
07:57engine on it. So
08:02they also do a lot of routine repairs,
08:04tires, brakes, corrective repairs,
08:08emergency ondemand repairs. They do
08:11heavy repairs to hydraulic systems,
08:13vehicle powertrains, electrical systems
08:15on our huge fleet. and uh we can brag on
08:19them a little bit. Um between the five
08:22of them, they hold currently hold 51
08:25ASSE and EVT certifications for
08:28excellence in their field. So we're very
08:30proud of that. They maintain 479 pieces
08:34of equipment. They do 883 PMS annually,
08:40a lot of work orders, a lot of filters,
08:42and uh they're a very busy group. So,
08:47got some pictures.
08:49There's Jeff Johnson. He's repairing one
08:51of our airport snow rooms. And then, uh,
08:55mechanic Tony Torres. Um, he's working
08:58on our rubber and paint removal machine.
09:01That's a very interesting machine. We
09:03may talk a little bit about it later.
09:05And then on the right is a couple of our
09:08techs working on a on a shuttle bus.
09:11So,
09:21That brings us to our airfield
09:22maintenance division. Um, we recently uh
09:26lost our longtime airfield maintenance
09:29supervisor Gary Corvo to retirement
09:31after 30 some odd years and currently
09:34were rotating a couple of supervisors
09:36over there as acting. Um, Kenneth Primo
09:40and Blue Shipman.
09:47Those guys uh do all of our pavement
09:49repair and concrete repair on the
09:51airfield and and our roads. Um, they do
09:54a lot of airfield marking and striping,
09:58mowing and vegetation.
10:00They uh work on the drainage at the
10:02airport.
10:04They keep our drains clean. They
10:05maintain the the ditches and and and all
10:09the runoff at the airport. Um they
10:13maintain a lot of fence. U obviously
10:16they do snow and ice during snow events.
10:20Uh they do rubber removal in house. And
10:24then we have two airfield electricians
10:26that uh that maintain all our airfield
10:29lights. Um
10:32some of the numbers uh there's 3865
10:35airfield lights that they have to keep
10:37burning every night. Um 74 miles of
10:42airport fence including all the off
10:44properties that those guys maintain.
10:48They go through 7,500 gallons of paint
10:51every year on that airfield. 40,000
10:53pounds of reflective beads.
10:57They square footage painted 825,000
11:01square feet.
11:03Um, of course, their goal is to maintain
11:06that airport so that our part 139
11:08inspections will be good. They do a very
11:11good job of that. Their viable for
11:13that's the the circular 150 5380.
11:17And uh
11:20I haven't seen a bad inspection yet
11:22since I've been there. So they do a
11:23great job. Um that's a picture of 35
11:27right rubber after about 45 days.
11:32So as you can see the center line
11:34starting to get obstructed.
11:36Um all the grooves in the pavement are
11:38filling up with rubber. Once that
11:40happens we start losing friction and uh
11:44we have to remove it. Um, that's uh a
11:47big part of what we do. They try to do
11:49it at a convenient time and then close
11:52the runway. We do it all in house.
11:55[sighs]
11:57Next slide. There's a picture of our
12:00airfield painter, Michael. He's touching
12:02up some uh threshold markings
12:05on the runway. And then to some of our
12:09snow operations. I I love that picture.
12:11Caleb actually took that. Um, that's our
12:14snow blower. Um, [clears throat]
12:16or one of the two that we have working a
12:19wind row during a snow event. As you can
12:23see, it pushes a lot of snow. Um,
12:26there's our new ramp plow. Um, we bought
12:29that because our huge terminal ramp at
12:33Will Rogers. That's a 27 foot plow and,
12:38uh, it's speeds up our operations out
12:40there on that ramp by a lot. So
12:45there's some uh that's pretty good
12:48picture of snow snow removal on the
12:50runway. Um we typically go from the
12:53center line to the edge pushing a wind
12:56row all the way to the edge. And as you
12:58can see that first broom is taking his
13:01snow and leaving a wind row for the
13:03second broom. Second broom's picking up
13:05his snow and then leaving a wind row on
13:07the edge. and then that snowb blower
13:10will come along and and blow it all out
13:12into the grass.
13:14Uh some numbers that I didn't get put up
13:17out there. Uh you know, we do a lot of
13:20we get a lot of ice in Oklahoma City, so
13:24sometimes we get more ice than we do
13:25snow. Um
13:28we uh have a uh runway deicing truck. Um
13:33it's very expensive to run. Um
13:38that stuff's about $6.70
13:41a gallon and uh to treat the runway a
13:46parallel taxi way one time.
13:50It cost us about 70 $17,000. So it's a
13:54huge decision that our guys have to make
13:57out there. Uh their
14:00runway deicing is fluid is more of a
14:03preventative than a deicer.
14:06um constantly looking at the weather and
14:09looking at runway temperatures and
14:11trying to make a good decision.
14:13Sometimes we don't know if it's going to
14:15be ice or snow. Um if it happens to be
14:19snow and we treat it, uh it's a disaster
14:22because the snow just sticks to it. Um
14:26we keep about 18,000 gallons of runway
14:30deicer on hand. Um, as we go through
14:33that during the season, we call for more
14:36trucks to bring it to us. It's pretty
14:38big operation. They bring us 4,400
14:41gallons at a per truck. So, we also have
14:4585,800
14:47lbs of sodium formate
14:50>> [snorts]
14:50>> uh in stock. Um, it's more of a ice
14:54remover. It makes holes in the ice, so
14:56the deicer works better. Um, we use a
15:00lot of that
15:04for our snow and ice removal operations
15:06also. So,
15:11on to fuel storage.
15:14Um, Carrie Cox is our airport aviation
15:18fuel manager. Carrie's been around a
15:20long time. She's recognized everywhere
15:23for her knowledge, even by her vendors.
15:26Um she's very well thought of in the
15:28field. Uh we depend greatly on her. She
15:31runs that operation
15:33uh with a great deal of expertise.
15:37Um
15:40they store about 630,000
15:43gallons of of jet A in the tanks over
15:47there. And one of the numbers that just
15:50stuns me, they issue about 3.2 2 million
15:54gallons per month of jet A, which is
15:57hard to imagine, you know, that that
16:00much fuel leaves that facility, goes on
16:02a truck, and goes out to an airplane in
16:04one month's time. Just incredible.
16:08Um, Carrie runs her operation based off
16:11of advisory circular uh 5230 for
16:15aircraft fuel storage, handling, and
16:17dispensing. Um she uh does a lot of lab
16:22work over there to ensure the fuel is
16:24safe for aircraft
16:27and uh does a great job. So
16:30there's a picture of our storage
16:32facility. That's the three tanks for jet
16:358. Um most of our fuel comes in on a
16:38pipeline, sometimes on a transport. Um
16:41those those have a purpose. Uh one tank
16:46will be receive
16:48for fuel coming in on the pipeline. Uh
16:52another tank will serve as settle so
16:55that uh that fuel any sediment or
16:58anything in it can settle out and then
17:01one will be used to issue out of during
17:03the day and then every day that changes.
17:09So go ahead.
17:11There's one of the guys over there
17:13collecting some product for some lab
17:15work.
17:17Something they do a lot of over there.
17:34And on to horiculture. These guys
17:37maintain the land side of the airport.
17:39Um
17:41[snorts] they're led by Stephen Wright.
17:43Stephen's doing a great job for us. He's
17:45been with us a couple years. Uh his
17:48staff is made up by ground maintenance
17:50operators, Hort workers, and an
17:53irrigation specialist. Um they maintain
17:56most of the property north of the
17:59airport and then east over there by
18:01Portland.
18:03Um they take care of over 3 acres of
18:07flower beds.
18:10Um
18:11they plant about 18,000 tulips a year.
18:17They mow 71 acres during each cut.
18:23They actually edge 22 miles of sidewalk,
18:26which is crazy.
18:29And then they have 241 irrigation zones.
18:35So
18:37you've got a couple pictures there. Um
18:40some of our crew out during tulip time.
18:44Um Brad on the right there, he's our
18:46horiculturist.
18:48Um they tell me that he can plant 30
18:52tulips a minute with his planting eye
18:54with prepared soil. So that's moving.
18:57He's
18:58really good at what he does. He's very
19:00creative and does a great job over there
19:03in that plaza area.
19:06There's some obviously some tulips that
19:09have bloomed. And then there's Brad
19:11again.
19:15There's some of our ground maintenance
19:17workers out performing tasks, mowing,
19:20and then turning some mulch.
19:26Okay. So, the maintenance department is
19:29more than just maintenance. Uh, we have
19:32an emphasis on safety. Maintenance keeps
19:34the airport safe by making sure all
19:36equipment, systems, and facilities work
19:39the way they're supposed to. The team
19:41handles everything from electrical to
19:43mechanical systems to vehicles, airfield
19:46lighting, and building repairs. We help
19:49prevent disruptions, support safe
19:51aircraft and passenger movement, and
19:54keep the airport running smoothly every
19:56day.
19:58Uh we provide operational continuity. Um
20:01airport maintenance keeps operations
20:03running by making sure all critical
20:04systems, equipment, and facilities stay
20:07reliable through regular inspections and
20:09preventive work and quick repairs.
20:13team helps prevent disruptions and keeps
20:16aircraft, passengers and daily
20:17activities moving without interruption.
20:21Passenger experience.
20:23Airport maintenance plays a big part in
20:25making the passenger experience smooth
20:27and comfortable. The team keeps terminal
20:30systems working like lights, escalators,
20:32doors, HVAC, restrooms
20:35[snorts] so that passengers that move
20:37throughout the airport without delays
20:39and in inconveniences
20:41by fishing fixing issues quickly and
20:44staying ahead with preventative upkeep.
20:47Maintenance helps create a clean, safe,
20:49reliable environment that supports
20:52everything from check-in and eventually
20:55takeoff.
20:58Maintenance plays a huge role in asset
21:01preservation.
21:02Maintenance helps protect the airport's
21:04assets by keeping equipment, facilities,
21:06and infrastructure in good working
21:08condition through routine inspections,
21:11preventive maintenance, timely repairs,
21:14and proper care of systems and vehicles.
21:16The team extends the life of critical
21:19assets, and reduces long-term costs.
21:23Their work ensures the airport's
21:25buildings, equipment, and airfield
21:28infrastructure stay reliable, safe, and
21:31ready to support daily operations.
21:34We're involved in emergency response.
21:36Maintenance plays a critical role in
21:39keeping airport safe, and operational
21:41during emergencies.
21:43The team responds to urgent issues like
21:45jet bridges that won't dock or undock.
21:49In situations where individuals are
21:51trapped in elevators, maintenance also
21:53ensures essential systems, power,
21:55lighting, HVAC communications and access
21:58control remain functional during severe
22:01weather and other disruptions.
22:04In larger scale emergencies, the team
22:06provides manpower, vehicles, equipment,
22:08and onseen support to help emergency
22:10responders stabilize situations and
22:13restore normal operations as quickly as
22:16possible.
22:18Financial stewardship.
22:21Airport maintenance supports strong
22:23financial stewardship by extending the
22:25life of airports,
22:28[clears throat]
22:30reducing costly breakdowns, and ensuring
22:33resources are used efficiently through
22:36preventive maintenance, smart planning,
22:38timely repairs. The team helps avoid
22:40expensive emergency fixes and premature
22:43replacements.
22:45Maintenance also manages equipment
22:47materials contractor use responsibly
22:50and helping the airport control costs
22:53while keeping operations safe and
22:55reliable. So,
23:04and then some things on the horizon.
23:11We're uh working on our airfield
23:13infrastructure. um doing some airfield
23:16LED lighting conversions. Uh that's been
23:18ongoing for some time. Uh that's that
23:22continues. Uh we've got some stuff
23:24planned for this year. Um and at some
23:28point will be all LED, which will be
23:30huge, huge cost savings. Uh the LEDs are
23:34so much more reliable. They're more
23:37visible. Just a huge plus for our
23:39airfield.
23:41uh
23:43multitasking snow equipment. [snorts]
23:47Um we actually ordered one.
23:50Um as we replace some of our older
23:52equipment, we'll be integrating those
23:54in. Um the newer multitasking snow
23:58equipment will allow us to plow and
23:59broom simultaneous with one machine at
24:03higher speeds and do a much better job
24:06cleaning. Uh this upgrade will improve
24:09snow removal efficiency, reduce runway
24:12closure time and enhance overall winter
24:16operations.
24:19We're working on uh terminal potable
24:22water supply improvements. Um
24:27we continue to address longstanding
24:29water supply issues at the terminal.
24:31It's been a big deal for us. Um, that's
24:33something Jeff talked about at one point
24:36when when I first took this job, he
24:38said, "Sometimes these water outages are
24:40almost worse than electrical." So, uh,
24:43one of our goals is to, uh, find some
24:46answers and and see if we can mitigate
24:49some of that.
24:51We've been partnering with planning and
24:54development to identify solutions and
24:57develop a long-term plan to eliminate
25:00reoccurring water interruptions.
25:04asset management.
25:07We're advancing the airport's enterprise
25:09asset management system to create a
25:12unified data-driven system for tracking,
25:15maintaining, and planning the life cycle
25:17of all airport assets. This platform
25:21will streamline work orders, improve
25:23preventive maintenance scheduling,
25:26enhance budgeting accuracy and give
25:29every division clear visibility into the
25:31condition and performance of the
25:33equipment and infrastructure they rely
25:35on daily.
25:37Um, we got ongoing terminal LED lighting
25:41upgrades. Our building and maintenance
25:42department works that stuff in when they
25:44can.
25:46And then finally, VMAT. um vehicle
25:51movement area transponders.
25:53Um we're preparing to introduce
25:56transponders on all our ground vehicles
25:59that work on the airfield. These
26:02specialized transmitters provide real
26:04time vehicle tracking for air traffic
26:07control and significantly reduce the
26:10risk of runway incursions, enhancing uh
26:13airport safety. So
26:19behind every airport operation is a team
26:22maintaining it. We're real proud of
26:23ours.
26:26So and uh I want to introduce a couple
26:29of people. I have Michelle Folks, our
26:31assistant airport maintenance
26:32superintendent with me, Caleb Phillips.
26:36They were both instrumental in helping
26:38develop this uh presentation for you
26:40today. U I hope you liked it. If you
26:43didn't, it's Scott.keith
26:46at OKC.org.
26:48And that reminds me, Scott, we are under
26:52the direction of Scott. He does a great
26:53job with this. Uh he's a very
26:56hardworking guy. Uh I drop in on him
26:58from time to time and he's always in the
26:59middle of something and he always finds
27:01time to to break loose and and and
27:03assist me with whatever I need. So that
27:06concludes my presentation.
27:09>> Thank you, John. Appreciate it.
27:10[clears throat]
27:11>> I had a question. Uh, do you all oversee
27:13the WY Post um maintenance needs and
27:17others or is that another team?
27:19>> You know, they have a staff over there
27:21of grounds maintenance workers and uh
27:24operators and they have their own
27:26airfield electrician. We do provide
27:29fleet maintenance for them. So, our
27:32mechanics uh go back and forth between
27:34WY and C page and maintain their
27:37equipment. It's all maintained through
27:39our fleet maintenance system and on our
27:40preventive maintenance program. So,
27:42>> okay.
27:44>> Good.
27:45>> Thanks, John.
27:46>> Thank you.
27:47>> Yes. Appreciate that.
27:49>> I another U L do you have There we go.
27:52Um what I'm trying to introduce is a
27:55little uh dashboard of just what's going
27:58on. Some of the stuff I do talk about
28:00usually done the operational report just
28:01gives you guys a snapshot of revenues,
28:04expenses, income, and passengers. So
28:07we're trying we're starting with these
28:09kinds of things for a dashboard and
28:10we'll probably tweak it as maybe getting
28:12input from all of you or as we feel
28:15there's other things that we want to
28:16just report. [clears throat] So we'll
28:17just include this going forward as part
28:20of our report. But you can see we're
28:22doing fine operating wise revenue um and
28:25passenger wise. Um you know it's a it
28:29the airports are so unpredictable. We
28:31try to figure out when our busy days are
28:33and then we sometimes miss and uh we
28:36actually last Sunday for some reason we
28:39had 9,800 people flying out. That's
28:41probably a record for the airport. And
28:43there wasn't anything particularly going
28:45on. Uh no football games, but some of
28:47the staff said there was a parents day
28:50at both U and OSU. Maybe that's what
28:52happened. But anyway, it went off.
28:54Didn't even realize it was happening.
28:56And [laughter]
28:57I was like, that's good, you know. Um we
29:00are uh planning to um so Stacy our our
29:04public relations manager um is putting
29:06together an event in October uh where we
29:11plan to invite the media out just to
29:13talk about what's coming up for the
29:15airport of the next two years and
29:17beyond. um just to talk about all the
29:20activity and the construction and then
29:22long-term what we're planning to do uh
29:24for the long range development program
29:26that we're going to be calling OKC
29:28cleared for takeoff. Um but some of the
29:31things that are starting in the next
29:33couple months is the intersection work
29:35at Ameilia Airheart. That's the last
29:37signalization
29:39uh intersection before it gets to the
29:40airport. Turn it into a roundabout. That
29:43means lane closures for the next year
29:45plus. Um then we also has started in the
29:49terminal if you've been there recently
29:50our our floor um replacement for uh file
29:54from tile to Tzo floor and restroom
29:57remodels are starting and then our
29:59garage will be starting by the end of
30:01the year. So lots of things happening
30:03for people coming to the airport. We
30:04want to get in front of that so we can
30:06advise the community. Um it's going to
30:08be busy over the next year or two years
30:10as we get ready for the Olympics and um
30:13and then we're going to talk about some
30:14of the long-term projects which include
30:17realigning the terminal roadway and
30:20ultimately expanding the terminal. So
30:22we'll keep you posted. We're we haven't
30:24nailed a specific time on that yet, but
30:26just wanted to give you guys a heads up
30:27on that. So
30:29I think that's all we have operating
30:31wise. Mr. Chairman,
30:33>> thank you. All of it sounds really,
30:35really exciting. Uh we'll move on to
30:37Oklahoma City Will Rogers International
30:39Airport.
30:40>> Item A, final acceptance diversified
30:43construction ARB expansion joint Mike
30:45Moroni and nautical center. Item B,
30:48award construction contract Downey
30:50construction rehabilitate terminal
30:52access roadways phase 4. Item C, award
30:56construction contract Downey
30:58construction pedestrian access west.
31:01Item D, ground services agreement for
31:04United Properties. Item E, ground
31:06services agreement, Prime Time
31:08Transportation.
31:09Item F, ground services agreement, Rico
31:12Rick Rickshaw.
31:14Item G, third party vendor operating
31:17agreement with Mechco aircraft
31:19maintenance.
31:21Item H, um, approve amendment number one
31:26with for airport parking with ACE
31:28parking management.
31:30Item I, amendment one, Delta Airlines
31:34update commercial passenger operational
31:36requirements.
31:37Item J, amend one, first renewal lease
31:41agreement with Devon Energy.
31:43Item K, amendment nine, professional
31:46services, Cowin Engineering rehabilitate
31:49access roadways.
31:51Item L, supplement agreement uh with the
31:55Department of Homeland Security.
31:58Item M, change order one, final
32:00acceptance, diversified construction
32:02skylight replacement, Mike Bronier
32:04Nautical Center. Item N, change order
32:07one, Libra electric replace medium
32:09voltage switches, Mike Baron
32:11Aeronautical Center. Item O, um, change
32:15order two, globe construction registry
32:17building, chiller and boiler
32:19replacement, Mike Moroni or nautical
32:20center. Item P, change order three,
32:23Downey contracting tunnel and parking
32:25garage MEP upgrades. Item Q, change
32:29order three, uh, and approve partial
32:32substantial completion Oshkosh Aerotech,
32:35a passenger board iming replacement.
32:38Item R, a resolution authorizing rental
32:41of two temporary chillers, headquarters
32:44building, Mike Moroni or nautical
32:46center.
32:47Okay, you heard the request for approval
32:49for Oklahoma City Will Rogers
32:51International Airport. There any
32:52questions? Is there a motion and second?
33:14>> What do I do?
33:16And the item passes.
33:19Next up, we have Wally Post Airport.
33:22>> Approve addendum one and two award
33:24construction contract wind construction
33:27construct new air traffic control tower.
33:29Item B, addendum one, two, three,
33:31awarding construction contract total
33:33demolition services GFream demolition
33:35phase 2. [clears throat] Item C,
33:38amendment to farm lease agreement with
33:40Roy A and Janice Nuttle. Item D,
33:43professional service agreement,
33:45engineering [clears throat] services,
33:46KSA, amending contract to change name to
33:50Pave Dawson Group. Item E, supplemental
33:53agreement uh number five, lease and
33:55operations agreement with the FAA for
33:57the manufacturing inspection district
33:59offices facility.
34:01[clears throat]
34:01>> And you heard the request for approval
34:03for WY Post airport. Is there any
34:05questions? Is there a motion and second?
34:09[clears throat]
34:16There we go. There we go.
34:20>> And the item passes. Next up, we have um
34:25Clarence E. Page. And we don't have
34:27anything under that. So, we'll move on
34:29to general.
34:30>> Item A is award annual maintenance
34:33contracts to Libra and Guerrero Electric
34:36Services. Item B, annual maintenance
34:39contract diversified of Oklahoma annual
34:42miscellaneous repairs and maintenance.
34:44Item C, repair and maintenance services
34:47diversified construction
34:49um service and repairs Mike Ron
34:51Aeronautical Center. Item D, resolution
34:55designating establishing duties for
34:56authorized trust representatives for
34:58Oklahoma City Airport Trust relating to
35:00the amended and restated master bond
35:01indenture. Item E, ratify actions the
35:05director in approving financial
35:06reporting software subscription support
35:08services.
35:10>> Okay, you heard the request for approval
35:12under general. Are there any questions?
35:15Is there a motion in a second?
35:27And the item passes. Next up, we have
35:30easements. Item A is an easement with
35:33Oklahoma Gas and Electric Company. Item
35:35B is an easement for 8601 Commerce Park
35:39Drive.
35:40>> Okay, you heard the request for approval
35:43for easements. There any questions? Is
35:46there a motion and second?
35:57And the item passes. Next up, we have uh
36:00requisitions. A resolution ratifying the
36:03prior approval of certain requisitional
36:05payments and a resolution approving
36:08requisitional payments. Is there a
36:10motion to second?
36:20And the item passes. Are there any
36:23comments from trustees?
36:25Okay. There any staff wishing to be
36:27heard?
36:29Are there any citizens wishing to be
36:31heard? Seeing none, we are dismissed.
36:43>> Now that it's dark.
36:45>> Yeah.