The trust's captions begin at the call to order. All items passed; the captions give no individual vote counts.
- Routine: minutes of the August 18 meeting and August claims approved.
- OU Health job incentive (item 4A): up to $1 million in general obligation bond funds for the University of Oklahoma's health research expansion, tied to about 520 new jobs over five years. University officials said the plan includes 150 new research faculty on the health campus (part of a 200-hire initiative), at roughly $2.6 million of startup cost per hire, and aims to move the campus from 98th toward the top 50 in federal health research funding. Staff noted a $60 million capital investment was left out of the economic model because the university is tax exempt. See OU Health Project 200 Job Incentive.
- Affordable housing, South Oklahoma City (item 4B): up to $2,825,000 from the South Oklahoma City tax increment district, pre-funded with affordable housing bond money and repaid as increment is collected, for a 215-unit project at 60% of area median income (92 units in phase one, 123 in phase two; the name is captioned "Atoria Creek Apartments"). Phase one is already under construction because of a tax-credit deadline. See South Oklahoma City TIF District.
- Oklahoma River pedestrian bridge (item 4C): up to $4 million in bond funds advanced for the Interstate 35 multimodal bridge near Lincoln Boulevard, to be recovered when bonds are sold next May. Debbie Miller said the state transportation department has a $17 million grant, bids are due in October and construction should start in December, with the bridge finished in spring 2028 and aesthetic work after the 2028 Olympics. See Oklahoma River Pedestrian Bridge.
- Film incentives (items 4D, 4F, 4G, 4H): rebates of up to $74,697 for a third season of a talk series (about $747,000 in local spending, 100% filmed locally) and $90,265 for an independent feature (about $1.85 million local spending, 90% local crew), plus agreements of up to $31,488 and $69,385 for two completed or nearly completed projects. Staff said the program's remaining rebate balance after these would be about $3.87 million and four productions film in the city in November. A member asked about viewership of the series, which is released on YouTube; staff agreed to ask. See Film Incentive Certifications.
- Downtown strategic plan (item 4I): a $26,577.50 increase to the consultant contract, paid from planning department funds, bringing the total to about $850,000.
- Program administration (item 4J): an amended multi-year agreement with the Alliance for Economic Development for July 2026 through June 2031, up to $937,660 for fiscal 2027, including a $150,000 base increase funded from tax increment and bond funds. See Economic Development Program Administration Agreement.
- Headquarters incentive (item 4K): up to $400,000 from tax increment district 8 for United Petroleum Transports to keep its headquarters downtown with 75 existing employees ($150,000) and up to 100 new ones ($250,000 over time). See United Petroleum Transports Headquarters Incentive.
- Peerless building (item 4L): up to $750,000 from excess increment in district 2, paid at completion, for the rehabilitation of a vacant building in Automobile Alley, a $9.6 million investment, for a drone-detection company. See Peerless Building Rehabilitation Incentive.
- General manager's report: fund balances rose from prior-year adjustments; encumbrances rose in districts 2 and 13 for the soccer stadium ($20 million and $10 million allocated). See MAPS 4 Multipurpose Stadium.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
12:20Turn my microphone off. There we go.
12:22Good afternoon. Welcome to the Oklahoma
12:24City Economic Development Trust meeting
12:26of September 29th, 2025. I'll call the
12:28meeting to order. 26. What an idiot. Uh,
12:33first thing we need is approval of the
12:35minutes from the August 18th, 2026 trust
12:38meeting. We can take a motion, a second.
12:43Have a motion to second. Please vote.
12:47The items passed. Item three on the
12:50agenda is the ratification of claims for
12:52August of 2026.
12:55We'll take a motion.
12:59All right. Please vote.
13:11It passed. Thank you. Brings us to items
13:14for individual consideration. Item 4 A
13:16is a joint resolution approving the
13:18allocation of Gul bond funds in an
13:21amount not to exceed $1 million for job
13:24creation economic development incentives
13:26for the board of regents of the
13:28University of Oklahoma in consideration
13:30for expanding its health research
13:32enterprise and create approximately 520
13:37new tom market quality jobs. Misspad.
13:40>> Yes. Good afternoon. Um so this will be
13:42a traditional SIP project. Um, I did
13:45want to make mention that there is a $60
13:47million capex that they will present in
13:50their presentation since they are
13:52taxexempt. That was not considered when
13:54we ran the economic development model at
13:56the chamber. And so the million dollars
13:58is generated without that. And so I just
14:00wanted to let you know that that was
14:01excluded. Um, I'm going to bring Stuart
14:04Birkensshaw and Matt Holver up from OU.
14:06They're going to give us a presentation
14:08and answer questions if you need them.
14:10Thank you.
14:11>> Thank you.
14:16Sorry, I always have to do a mic
14:17adjustment whenever I get up to speak.
14:19Uh, thank you very much for the the time
14:20today to talk a little bit about the
14:22project that we're doing at the health
14:23campus. Now, the Herald Ham Health
14:25Campus, if you followed the news last
14:26week, um really excited to kind of walk
14:28through a little bit about the history
14:29of the university, where we're at right
14:31now, our Project 200 initiative that's
14:34tied to the incentive payment Joanna was
14:36talking about, and then I'll pass it off
14:37to Matt to talk a little bit about why
14:39Oklahoma City, why OU, what we're doing,
14:41and what's kind of special with what's
14:42happening right now. So, we want to go
14:43and go to the next slide.
14:46So, at the health campus, again, just a
14:49mile east of us here, uh four over 4,000
14:52students. We've got around 4,200, our
14:54largest class this fall, um largest
14:56nursing program in the state of
14:58Oklahoma. All six of our degree granting
15:00programs are hitting near record
15:02enrollment um right now. So, we've had a
15:04lot of growth. At the same time, we have
15:05a lot of employees on that campus, too.
15:07And if you look at the whole of OU and
15:09you kind of back out Department of
15:11Defense, Amazon, Walmart, we're the
15:13largest employer in the state of
15:14Oklahoma. So we have a big footprint
15:16here in the city in Norman in Tulsa and
15:19then spread out through a lot of
15:20different locations that we have in
15:21across the state. Um so proud of that
15:24growth that we're having here. I'll talk
15:25a little bit about the project 200
15:27growth here in a minute. But that's tied
15:29to where we talk about this top 100 in
15:31NIH funding. So this is National
15:33Institutes of Health. It's kind of the
15:34measuring stick when you're looking at
15:36health campuses on how they measure up
15:38when it comes to research. the more
15:40research we have, the more dollars that
15:42are coming in from outside the state,
15:44inside the state, generating jobs,
15:46allowing us to buy equipment, do
15:48different things that we wouldn't do
15:49otherwise. And so we cracked the top 100
15:51in NIH funding this year and hope to
15:54continue on a path to be a top 50 uh NIH
15:57funded university over time as part of
15:59this project 200 initiative. And right
16:02now, we're the largest research engine
16:04in the state. We have over $500 million
16:06research spend across our health campus,
16:07Norman campus and Tulsa campus. Uh the
16:10health campus again is more focused on
16:11that national institutes of health
16:12health related funding. Norman campus
16:15has a little bit different focus. But
16:16here today I'm really just talking about
16:18what's happening on our health campus.
16:19If you want to go and go to the next
16:20slide. So project 200 is our our main
16:24hiring initiative we have right here
16:25that I would say is really unique in the
16:27higher ed space right now. If you look
16:29across the higher ed landscape, you're
16:31talking about budget cuts at different
16:32universities and these are premier large
16:35universities. Oregon, Syracuse,
16:37Minnesota, uh Missouri's announced
16:40stuff, North Texas, they've there's
16:42challenging times out there, but the
16:43university is in a unique spot
16:45financially where we're able to kind of
16:46take this momentum and significantly
16:48increase the number of research faculty
16:50we have. And they're focused in four key
16:52areas that we think align with our
16:54expertise and the state workforce needs.
16:57And so those are on the board here
16:59around extreme weather, number one
17:00meteorology program in the country,
17:02national security and defense, energy,
17:05and health. And health is really what
17:07we're talking about today. So that's
17:09what's happening on our health campus,
17:11expanding hires around the college of
17:14medicine, college of public health,
17:16college of allied health, growing those
17:18and bringing in research productive
17:20faculty. And so if we go to the next
17:22slide, this is the piece that really
17:24kind of hits home on the volume of
17:26people that we talk about bringing to
17:28campus. And so we just had a a hire this
17:30past summer. His name was Dr. John
17:32Kerwin. He came from the Pennington uh
17:34biomedical lab in LSU. And so he's a top
17:37researcher in diabetes. He's leading our
17:39Harold Ham Center in diabetes and now
17:41our Herald Ham campus. He'll it's not
17:45just him that we're hiring. We're
17:46bringing his team with him. So you have
17:48a team of hires. So when we talk about
17:50project 200, 150 of those are on the
17:52health campus. He's one of those 150,
17:55but he's going to bring a team of
17:56researchers with him that make up that
17:58520 new direct jobs that we're talking
18:01about over the next five years. And so
18:03in reality, with 150 hires, that's less
18:06than four uh additional people that they
18:09bring with them. In reality, that number
18:10is pretty conservative. We'll bring more
18:12with them. Those teams could be 10, 15,
18:1520 researchers and requires us to build
18:18out different lab space on our campus.
18:20And so when you think about our
18:21footprint over here, I know we mentioned
18:22that the 60 is is tax exempt, but we
18:26we'll be spending money on building out
18:28lab space on our campus, bringing in new
18:31equipment for these researchers that
18:32they don't currently have. Uh, and it's
18:34a large investment for us, bigger than
18:36the the 60 million here. We we really
18:39budget around $2.6 6 million per faculty
18:42hire of that 150. That comes to over
18:44$400 million that we're investing to
18:46expand that footprint on the campus with
18:49that researcher and with the team that's
18:51coming along with them. So that's that's
18:53going to put us on that trajectory to
18:55move that NIH funding number up
18:57significantly from 98 where we currently
18:59sit near that top 50 where our ultimate
19:01goal resides. And the jobs here, these
19:03are you can stay on last slide here.
19:05You're good. Um they'll be highpaying
19:08jobs. These are full faculty members,
19:10full professors, assistant professors,
19:11associate professors. Those numbers for
19:13them will be significantly higher. We
19:15could be in the upper hundreds of, you
19:17know, near a million dollars in pay
19:19here. The teams that they'll bring in
19:21would be could be $75,000 type
19:23positions, lab techs, lab managers
19:25that'll run the labs for them, but staff
19:27positions that a lot of times will be
19:28funded on grant dollars. And so that's
19:31the kind of secret sauce on this is
19:32we're talking about we're bringing
19:33dollars in out from the state into the
19:36state that previously weren't here. So
19:38it's not repurposing of existing
19:39dollars. They'll be expected to be grant
19:41funded positions and it allows us to
19:44grow without a significant investment on
19:45our side other than we'll have to invest
19:47in capital in in research support
19:49positions that'll be a part of that 520.
19:51So you're going to have staff that help
19:53the research side that aren't directly
19:55involved in the research that will be
19:56critically important from a compliance
19:58perspective to monitoring that research
20:00and making sure we're doing things the
20:01right way. And the last number there is
20:04that 2.1 million additional payroll by
20:06the end of year one. That's that full
20:07team. We'll kind of stage it to kind of
20:09get to that 520 number over the next
20:12five years. So, um I'm going to pause
20:14there and let Matt kind of come up, our
20:16vice president of research and
20:17partnerships and talk a little bit about
20:19how this investment helps the university
20:21and the city and how we can kind of work
20:22together kind of moving forward and why
20:24that investment matters here in the
20:25city.
20:27>> Thank you. Thank you, Stuart. And I
20:29thank you all for your time and having
20:30us today. Next slide, please. Um, you
20:33know, I think one thing it's important
20:36to get across is the University of
20:38Oklahoma, I think, is at a different
20:40place in time than I would say the
20:41university has ever been. It's a very
20:42impact focused vision. The four areas
20:45you saw is focused on all those make a
20:47tremendous amount of sense where the
20:48state of Oklahoma can lead. uh where we
20:50sit in the state uh I don't need to tell
20:52you all or the state where we are in
20:54Oklahomaans as far as health outcomes
20:55depending on which one we're measuring
20:57we're somewhere between 40 and 50 you
20:59know and our university is setting goals
21:00is how can we reduce the um diabetes
21:03related deaths by 30% over a period of
21:05time just don't see many universities
21:07setting goals like that it's not just
21:09bringing research dollars into the
21:11university for the sake of doing
21:12research it's really bringing money into
21:14the university to grow economic impact
21:17to change the health of Oklahomaans
21:19And so the resources we're talking about
21:22um for example I've I led my own
21:23research program for about 25 years at
21:26one point I had two NIH grants and I had
21:2815 personnel in my laboratory 10 of
21:31those were graduate students five of
21:32them were you know support that so that
21:34gives you an indication as we recruit
21:36150 faculty that were purposely
21:38recruiting wellestablished faculty that
21:40bring programs with them and just the
21:42volume of personnel that it takes to do
21:44that all those graduate students need a
21:45place to live all those graduate
21:47students grocery shop etc. So, it's a
21:49significant amount of people that we're
21:50talking about with this recruitment. Uh,
21:52with these resources, we're going to
21:53building state of the state-of-the-art
21:54research, uh, laboratories. Um, and
21:58we're not just recruiting. We really
21:59want folks to come to Oklahoma because
22:01they want to be part of the impact
22:02driven focus we have at Oklahoma. We
22:04could recruit a world-class physicist
22:06and put them in a laboratory that could
22:08go anywhere in the country. We want
22:09somebody that wants to come here and
22:11specifically knows the maladies we're
22:13facing at Oklahomaans and wants to be
22:14part of the solution. And so we're going
22:16to building state-of-the-art research
22:17infrastructure. We're recruiting clinic,
22:19you know, we want to bring more clinical
22:20trials to the region so we can get
22:22state-of-the-art health care to
22:23Oklahomaans. All that compounds um and
22:26at the end result on the right there is
22:28improved health outcomes. That's
22:29entirely our goal. Next slide. Uh why
22:32Oklahoma City? Uh you know, OU is the
22:36only uh academic medical health center
22:38in the state. Um it's the comprehensive
22:42academic health campus. Um, university
22:44funding is funding exclusively this
22:47expansion. Uh, we're talking hundreds of
22:49millions of dollars in investment at the
22:50infrastructure it's going to take to
22:52support support these faculty. It's
22:54local incentives like this that are a
22:55big help as we contribute to uh those
22:58startup costs. Uh, and we're really
23:00doing this a national level. Uh, Stuart
23:02mentioned many universities today are
23:04contracting. We're taking advantage of
23:06that and we're going to recruit from
23:08those universities are contracting and
23:09bring the best of the best here. Uh, and
23:11we really want to make Oklahoma um
23:13Oklahoma City really the employer
23:16choice. Next slide.
23:18Uh, then impact on the metro. Uh, Stuart
23:20already mentioned high-paying jobs. Uh,
23:23but I can't emphasize enough the impact
23:25aspect of this. How can we move um
23:30better move discoveries to impact? Uh,
23:32we are not going to change the health of
23:33Oklahomaans by the next drug discovery.
23:35It would help. We're not going to change
23:36the health of Oklahomaans necessarily
23:38just by clinical trials, but it's really
23:40uh we need we want to treat four out of
23:41four cancer patients. Uh we want to
23:44develop innovative treatments and cures
23:45for diabetes with a very uh Oklahoma
23:48impact focused. Um so it's again it's
23:51very much economic impact driven. Uh and
23:54all along this education is central. We
23:56need to train the next workforce of the
23:57future. We need more nurses. We need
23:59more physicians that want to stay in
24:00Oklahoma. And that's our goal here. So
24:03and I believe that's it. Thank you for
24:05listening and be happy to answer any
24:06questions you all have.
24:08>> Thank you. I believe uh Dennis Bruit
24:11wanted to say a couple of things.
24:16>> Thank you members of the trust. Uh this
24:18is a really important project and the
24:20chamber of commerce strongly supports
24:21this this effort. There's a strong
24:25correlation between university research
24:27and economic growth. we see how
24:30important that is as we develop as a
24:31region in biosciences, life sciences,
24:35health. It's a very important sector for
24:37the Oklahoma City region. So, we're
24:38really excited about this project. Uh we
24:41appreciate the relationship we have with
24:43OU. Uh they've been a great resource to
24:46us as we bring in companies. Uh when we
24:49do a site visit, the the companies want
24:51to know about innovation. They want to
24:53know about the workforce pipeline. and
24:55we almost always have OU at the table
24:57with us as we're presenting to to
24:58prospects. And so we want this this
25:01project to take place and as you all
25:02know we have health challenges in
25:04Oklahoma. Uh I love that they're focused
25:07on practical outcomes with this research
25:10and so we we strongly support this
25:12project. We we wish OU much success and
25:15we're really honored to be here today.
25:16Thank you.
25:18>> Thank you. Any questions?
25:20>> Yeah, I was um interested about the
25:22Harold Ham gift. Uh, I know it's 150
25:25million with 50 million going to the
25:28diabetes center. How's the other 100
25:31million going to be used? And it's my
25:32understanding that's the largest gift in
25:34the history of the university.
25:36>> Yeah, largest gift in the history of the
25:37university. Um, we didn't ask for 150
25:39from you guys. Um, just the million. Um,
25:42but the other is going to what we're
25:45talking about today. um project when I
25:47say project 200 cost us $400 million as
25:50we look across and say we're going to
25:51hire 150 faculty and each of those is
25:53about 2.6 six million and what we call
25:55faculty startup. It's kind of insider
25:56baseball terminology for there's going
25:59to be lab cost. You might have some
26:00people coming from another university in
26:02and they're off the grant for a little
26:04bit and they need some support until
26:05they get on to another grant. There's
26:06costs associated with that and to build
26:08out certain space. So that other piece
26:10of the gift that's not going to diabetes
26:13is going to this and even the diabetes
26:15is that Dr. Kerr one piece that I was
26:17talking about. I mean he's one of those
26:19project 200 hires. He'll be key in
26:20growing research around diabetes with
26:23that support that Harold's already given
26:25to that center but expanding it even
26:27more. So it's all interconnected. It's
26:29not a separate kind of cut off. It's
26:31just this one's focused on diabetes. The
26:33other side we're talking about cancer
26:35research, chronic health disease,
26:37neuroscience. Those are three major
26:39areas on the health side that I would
26:41say that that's supporting and then
26:42diabetes fits within that whole health
26:45strategy. Yeah.
26:46>> Okay. Thank you.
26:47>> Glad to answer if there's any.
26:48>> Any other questions? No, before I vote
26:50on this, I just like to say thank you.
26:52And I always get amazed with U Health
26:54over there. It does amazing things. Uh I
26:57had a grandson that went over there for
26:58a little while and it was just amazing.
27:00His mom, my daughter, was like, "Man,
27:03I'm going to go in there myself next
27:04time." Even though she's not a kid.
27:06She's a little [laughter] old.
27:08Thank y'all very much.
27:09>> Appreciate it. Thank you.
27:11>> All right. We can go ahead and on item 4
27:13a take a motion.
27:16Have a motion.
27:18We have a second
27:23and the item passes. Thank you.
27:26brings us to item 4B, a joint resolution
27:29approving an allocation not to exceed
27:312,825,000
27:33from increment district A of the South
27:35Oklahoma City Economic Development
27:37Project Plan for the Histori Creek
27:40Affordable Housing Project consisting of
27:42approximately 215 affordable housing
27:45units and authorizing an allocation of
27:48$2,825,000
27:50in affordable housing gulp bond funds to
27:53preund the TIFF allocation.
27:56Mbpaden.
27:57>> Yes. So, um you all are approving
28:00essentially two tranches of funding. So,
28:01we've received funding or approval from
28:03the TIFF to do the TIFF allocation. Um
28:07the project needs the funding before the
28:09TIF will generate those funds. So, we'll
28:10preund it with gold and then we'll repay
28:12gold with those TIFF funds as they're
28:14generated. Um one other thing I wanted
28:16to point out about this project is it's
28:18two phases. Um and I want to let you
28:20know phase one is already under
28:21construction, which is unusual. We don't
28:23typically bring a project that's already
28:25under construction because we want to
28:26get in on the ground floor. Um the
28:28difference here is they received their
28:30tax credit funding for the affordable
28:32housing and after the fact um OFA issued
28:36a directive that they had to begin um
28:38construction at a certain date and so
28:40that kind of fasttracked them. They
28:41didn't quite have all their funding in
28:42place. So then they had been talking to
28:43us for we've been in talks with them for
28:45about six months or more. Um, and the
28:47other reason we would bring it forward
28:49is because if phase one doesn't get
28:51completed and their tax credits are in
28:53jeopardy, then phase two is also in
28:55jeopardy. So, this really helps us get
28:57that full benefit of the 215 units. And
29:00I'll bring up Donita Pierce. And we've
29:03got the other the developer, Paul
29:04Sakiier, too, to answer questions.
29:08>> Hello. Thank you for having us. Um, I'm
29:10here to talk to you about Atoria Creek
29:12Apartments. Um we are located on South
29:15I2 240 in Walker. Um over kind of by the
29:18service road and go ahead and go to the
29:20next one.
29:22Um it is a complete community. We have
29:24two phases again like she said. Phase
29:26one will be 92 units. Um phase two is
29:29123 units. Uh phase one is single story.
29:32Um and phase two will be twotory uh
29:34units. Okay. Um, we are asking for 9 uh
29:39925,000
29:41for phase 1 and then again that's 92
29:44affordable houses. Phase 2 is 1.9 that
29:47we're asking for. Again, that's 123
29:49units um with a total of the 2.8. Um it
29:52will be 215 completed affordable housing
29:55units once the project's um completed.
29:58Um here is a story of Creek phase one.
30:00Again, we have 92 houses. Um, we are
30:04part of the tiff like she said. Um,
30:07that's just kind of a look of it. Go
30:09ahead.
30:11Um, we are 60% AMI. Again, that is a
30:16where we're at, so we have to stay
30:17there. Go ahead. Um, here's our layout.
30:19We have 50 uh two-bedroom um and then 42
30:23of the three bedrooms. Again, with our
30:25community focused amenities, we will
30:26have a dark dog park, playground,
30:28walking trails, um a storm shelter for
30:31the community, as well as a clubhouse.
30:33Go ahead. Um and here's phase
30:34[clears throat] two. Uh 123 units.
30:37Again, we have 21bedroom, 71 twobedrooms
30:41with um 32 threebedrooms with 123 units
30:44total. Good. Um again, phase 2 is also
30:4860% AMI.
30:51And then here's our floor plan for um
30:53phase two. We have 20 one-bedroom units
30:56um 71 two-bedroom and then 32
30:58three-bedroom units. And those are
31:00twotory.
31:02Um our community impact um and our
31:04resident support. What will bring of
31:06course the location again it is um right
31:09on I240 and South Walker. You have all
31:11of the amenities over there. You have
31:13the shopping um groceries within um a
31:17certain mileage. um our
31:20project design and s sustainability
31:23sorry um it fits their surrounding
31:26neighborhood. So we are of course u
31:30fitting that I can't talk sorry um we
31:32are adding to the affordability crisis
31:33in the area that you might be aware of.
31:36Um our uh it is conveniently located. We
31:39have quality schools and parks in the
31:41area. Um, again, shopping. There's
31:43Target, Rip Crib, Home Depot, all of
31:45those things over there, Walmart. You
31:46have your grocery stores, Dollar
31:48General. Um, the we are providing
31:50employment for the area. Um, there is
31:53the medical, there's the new Oklahoma
31:54City Health Department that's located uh
31:57near the property as well as um access
31:59to all transits in the neighborhood. Um,
32:02our resident support, again, we are 5%
32:05handicap accessibility in the units. So,
32:08that is in there. Um, we will again have
32:10the walking trails, our storm shelter.
32:12We also will have um a security guard
32:15247 at the property. Um, as well as
32:18internet access for each unit.
32:23Sorry. Yeah. Um, Meg is our syndicator.
32:27We've worked with Meg several for
32:29several years. Um, they back us on on
32:33our our projects. Um, Hans Thomas is our
32:37architect. again, he is um he's worked
32:40on all of our affordable uh projects,
32:42our affordable housing units. We use him
32:45for everything. Go ahead. Um and that's
32:48it. Thank you. Do you have any
32:49questions?
32:50>> Yeah. Can you go back to the two slides
32:52with the rents and we walk through the
32:53rents real quick on phase one and phase
32:55two, please?
33:02>> Thank you.
33:06and then go to the next one, please.
33:12>> Okay,
33:14thank you very much.
33:18>> Yes.
33:20>> What was the inspiration behind naming
33:22it Atoria Creek?
33:24>> Um,
33:26I actually think I named it. Do you
33:28remember?
33:29>> Yes. My daughter actually came up with
33:30that name. uh my 10-year-old daughter
33:33about two years ago. And so that was
33:35just what we went with.
33:38>> Big name for a 10-year-old.
33:39>> Yeah. I I get my kids involved. We're
33:42involved. We're builders and so we get
33:43everybody involved. It's kind of a
33:44family business.
33:47>> It's going to be her complex.
33:50>> One day. Yes.
33:52>> Thank you.
33:53>> Any other questions, comments? All
33:55right. If not, we can take a motion on
33:57item 4B. Thank you.
34:04have a motion in a second.
34:09The item is passed. Thank you all very
34:10much.
34:12Item 4 C is a joint resolution approving
34:15usage up to $4 million in gold bond
34:18funds to assist in the construction of a
34:20pedestrian bridge to be located across
34:22the Oklahoma River near I35 and Lincoln
34:25Boulevard and morally pledging the
34:28city's expenditure of geo bond funds by
34:30administrative transfer to the Oklahoma
34:33City Economic Development Trust for the
34:35purchase of said bridge. Mr. McPaden.
34:38>> Yes. So in lay person I wanted to
34:40explain that. So, we're going to use
34:42four million in available Gul bonds to
34:45fund the project ahead of time. And then
34:46once the bond sale is completed next
34:49May, we would then recover those funds
34:51back. So, this is essentially a
34:53short-term loan. I was going to bring
34:54Debbie Miller up and she can give you a
34:56kind of some highlights of the project.
35:04>> Good afternoon. Debbie Miller, public
35:06works director. Um, this is a joint
35:08project. It's actually an ODOT project
35:10that we are working with them. Um it's
35:14part of the I35 bridge replacement and
35:17this is the multimmodal piece that's
35:19required for that. We've worked with
35:21them um a couple of years to get this
35:23location just east of Lincoln. Um they
35:26have a $17 million grant um to build the
35:30bridge. They don't expect the bridge to
35:31cost quite that much. So the remaining
35:34funds will go towards the aesthetics and
35:36then the four million will cover the
35:37rest of that. So, and as Joanna said, as
35:40soon as we sell the bonds in 2027, we'll
35:43make sure that it's reimbursed.
35:46>> You have any questions?
35:47>> So, when when will construction start
35:49and finish? Roughly,
35:50>> the bridge is actually out to bid.
35:52That's one reason we're having to do
35:54kind of borrow money um because our
35:58schedules did not quite align. So, it's
36:00out to bid. They should take bids in
36:02October and we expect them to start in
36:04December.
36:05>> And Debbie, what's the anticipated
36:07construction time? Do you know
36:09>> um the bridge portion should be complete
36:12um spring of 2028. Um the aesthetic part
36:15they'll have to come back after the
36:18Olympics to complete that portion of it.
36:24>> Great.
36:24>> Anything else?
36:25>> All right. We'll take a motion on item 4
36:28C. Excuse me. Yeah. 4C.
36:33We have a motion, a second. Please vote.
36:39The items passed. Thank you.
36:46All right. Item 4D is a joint resolution
36:48certifying that the project long table
36:51season 3 is an eligible project under
36:53the film incentive program and approving
36:56an allocation not to exceed $74,697
37:00in pay for performance film incentives.
37:02Miss McPaten.
37:04>> Yes. I will hand the mic over to Jill
37:06Simpson. She'll go through the next two
37:08presentations.
37:09>> Next two.
37:15>> Good afternoon. Jill Simpson, Oklahoma
37:17City Film and Creative Industries
37:18Office. And I have two applications for
37:21you to consider today. Um the first
37:24application is long uh what we call
37:28project longt season 3 and it's the
37:32third season of a 20 halfhour episode
37:36series uh scripted TV talk show being
37:40done uh by the people at Filmmakers
37:42Ranch. The series gathers agents,
37:45producers, editors and crew to talk
37:47about the experience of making movies.
37:49Filming will take place November 9th
37:51through the 13th of 2026
37:55and 100% of it will be filmed at
37:57Billmakers Ranch which is out on Post
38:00Road. 100% of the crew is Oklahoma City
38:03based from our seven 7ount qualifying
38:06area. Anticipated Oklahoma City
38:08expenditures total $746,973
38:14which is 93% of their budget.
38:18This being an episodic show, their
38:21minimum spend to get the full 10% is
38:24500,000. So, I'm recommending the 10%
38:27for them, which would be the 700 uh
38:30their qualifying spend of 746,973.
38:34So, they're meeting the criteria of more
38:37than 50% of crew members hired are
38:40full-time residents of our MSA. That's
38:42actually 100%. They're meeting the 50%
38:46filming in Oklahoma City requirement.
38:48They're actually filming 100%.
38:50Uh they're meeting the more than 50% of
38:53contracts with Oklahoma City vendors
38:54with an eye towards diversity. And
38:57they're at 100% on that as well. They're
39:00going they're planning to do their
39:01visual effects, re-recording, sound mix
39:04all at Apex Studio, which is at
39:06Filmmakers Ranch, and they're
39:08pre-qualified for the state of Oklahoma
39:10film incentive. So based on all of these
39:13elements and the fact that it's a
39:16sequence, the third season, the first
39:18season was 22 ups, the second season was
39:2120, and this one is 20 episodes. I'm
39:24recommending a rebate of 10% which is
39:2774,697.
39:31To break it down, they plan to hire 26
39:34local crew members. They that equates uh
39:38for five days of filming that equates to
39:401330 total days. 100% Oklahoma City
39:44residents. The qualifying labor income
39:47is 317,457
39:51and 100% of post-prouction done in Apex,
39:54which is something we really like to
39:55see.
39:57Um just the high points, 100% shot in
40:00Oklahoma City, 100% qualifying crew from
40:03Oklahoma City, 100% of vendors. So this
40:05is a great project for us. And then the
40:09e economic impact, the total local
40:11impact is 1.64 million. Job supported
40:15direct and indirect are 72.
40:18Labor income is $577,821.
40:23So the qualified expenditures breakdown
40:27um again total spend in Oklahoma City is
40:30746973
40:32and that breaks out to taxable goods and
40:34services at $32,982.
40:39Below the line salary and PDM and that
40:41is the actual working crew is 130
40:45130,734
40:47and above the line salary and PDM which
40:50is writer director producer 186,723
40:55and we did not have to make a reduction
40:57to meet the 25% cap. Any questions?
41:03As this is season three, where does it
41:05air and do you have metrics on
41:08viewership for seasons one and two?
41:10>> They are putting it out on YouTube,
41:12which has become a really popular way of
41:15getting content out there and that's how
41:17directors are being found in the
41:18industry. I don't have the metrics on
41:22how, you know, I I could ask them that,
41:24but I believe that we are basing
41:27qualification on the numbers that
41:29they're spending on the program.
41:31>> Sure, I respect that. It's just
41:33sometimes we like to know is there any
41:36are there any eyeballs on it if you
41:38will. So,
41:39>> you know, I can ask that. I did
41:40participate in an episode and was really
41:42impressed with what they were doing. Um
41:45they bring a lot of professionalism to
41:47it and it's very educational for
41:49upandcomers in the industry. They bring
41:51different people in whether it's a
41:53cinematographer, a producer, a writer
41:56and then they sit with them for an hour
41:58and break it down what they do. And
41:59there's there's a teaching element to
42:02it.
42:03>> It's somewhat of a u a workforce
42:05recruitment strategy.
42:07>> Yeah, absolutely. But I can get the
42:09metrics. I can ask it's Richard James at
42:12Filmmakers Ranch. He's a pretty good
42:14sales guy. So, I'm confident and that
42:17seems to be where people are finding
42:18content. So, and they're hoping that
42:21based on being on YouTube, a distributor
42:24would pick it up and maybe a Netflix or
42:26somebody like that.
42:35Thank you. All right, we can go ahead
42:37and take a motion on item 4 D.
42:45We have a motion.
42:50A second.
42:56The item is passed. Item 4E is going to
43:00be uh struck,
43:02>> right?
43:03>> And item 4F.
43:05>> So I have another in smaller independent
43:08project that I've cenamed Project Woods.
43:11It's an independent feature film and um
43:14it's it tells the tale of a rugged
43:16survivalist who takes his aranged
43:19daughter on a backcountry river trip to
43:22reconnect. But when a raft accident
43:24leaves them stranded in the woods, their
43:26adventure turns into a nightmarish bid
43:28for survival. So, right now, that genre
43:31of film is doing really well, which I'm
43:33sure leads to why they're producing this
43:36one here in Oklahoma. It's uh set to
43:39take place November 16th through the
43:4118th. And by the way, we will have four
43:43projects filming in November in Oklahoma
43:45City, which has not happened before,
43:47which is pretty exciting. Uh the
43:50production team, it's Effigy Movie LLC,
43:53but it's Red Clay Studios out of Tulsa.
43:56So, this is another Tulsa project coming
43:58down to film in Oklahoma City based on
44:00our rebate. Uh 100% filmed in Oklahoma
44:03City, city limits. Oklahoma based
44:06producer producer attached, which which
44:08is Cassidy Lennon. uh 90% Oklahoma
44:11Citybased crew anticipated Oklahoma City
44:14expenditures totaling 1,85,299
44:18which is 60% of their budget.
44:22Uh they're meeting the minimum threshold
44:24of 500,000 for the 5% rebate. Um it's
44:28anticipated to have local qualified
44:30expenditures of again one 1.8 8 million,
44:33a little over. And their uplifts or the
44:38extra qualifying considerations are more
44:41than 50% of crew hired locally, they're
44:44actually going to hire 90%. More than
44:4650% of filming days in Oklahoma City,
44:48it's going to be 100%. More than 50% of
44:51contracts with local vendors, they're
44:53projecting 90%.
44:55And they're going to do v visual effects
44:57re-recording sound mix here. They
44:59haven't chosen the studio yet. So, the
45:01good news is we have a few options. Um,
45:04they're pre-qualified for the state of
45:05Oklahoma incentive. So, I'm recommending
45:08the 5% rebate of $90,265.
45:13They will hire 50 crew members working
45:1625 days, which equals 1,250 mandays of
45:20work. 90% Oklahoma City residents.
45:24Qualifying labor 936821.
45:28facility for post-production is to be
45:30determined.
45:33So the high points are 100% of filming
45:36days, 90% of crew, 90% of vendors are
45:40local.
45:41And to break down the total local local
45:44economic impact of 4.3 million that's
45:47job supported direct and indirect of 186
45:51labor income of 1,757817
45:56and their qualifying expenditures of
45:581,85299
46:01break down into taxable goods and
46:02services of 350,25
46:07below the line salary impertium of
46:10$816,00
46:11821 and above the line salary and
46:14predium of 120,000. And I will just add
46:18to this, if you choose to approve this,
46:20it will leave us with a remaining rebate
46:23balance of 3,870,000.
46:27So these little projects create jobs and
46:30impact in a good way.
46:32>> Any questions, comments? All right, we
46:35could take a motion on item 4F.
46:42I have a motion to second
46:47and that item is passed. Thank you.
46:51All right. Item 4G is a economic
46:54development agreement with Pipe Cleaner
46:56Boy Movie LLC for a pay for performance
46:58film incentive agree agreement not to
47:01exceed $31,488
47:04for the proposed feature film project
47:07karma. in this big spot.
47:09>> Yes, this is our standard film agreement
47:11paid out at after the project is
47:12completed. They've submitted their
47:13application and documented their um
47:15compliance with the terms.
47:18>> All right, if we have no questions or
47:20comments, we can take a motion to second
47:22on item 4G.
47:25We have a motion to second.
47:29The items passed. Item 4 H is economic
47:32development agreement with the
47:33filmmakers table LLC for a pay
47:34performance film incentive agreement not
47:36to exceed $69,385
47:40for the proposed scripted television
47:42series project project long table season
47:451.
47:46>> Yes. So again our standard um EDA for
47:49the film project you saw film uh longt
47:52three. So this one is um nearing
47:54completion on season one standard
47:56agreement paid out at completion.
48:00All right. If we have no questions or
48:02comments on that, we can take a motion.
48:05Have a motion to second.
48:09Any items passed?
48:12Item 4 I, amendment number two to
48:14professional services agreement with the
48:16city of Oklahoma City and Sasaki
48:18Incorporated Consulting Services to
48:21guide the creation of a downtown
48:23strategic plan cost increase of
48:25$26,577.50.
48:2850 cents.
48:30>> Yes. If you all will recall, we uh
48:32contributed some funding to this project
48:34initially. So, this the trust is a party
48:37to the contract. These funds are
48:39planning department funds. So, we are
48:40not contributing any additional for us,
48:42but we need to approve the contract
48:43since we're a party. The increase is
48:46related to um additional services
48:48requested by staff for um extra outreach
48:50that they performed.
48:53And what was the total original total on
48:56that agreement
48:57>> of the agreement? So the total now with
48:59this increase is about 850,000.
49:02>> 850.
49:07All right. Any comments, questions?
49:13All right. We can take a motion.
49:18I have a motion and a second.
49:25The items passed. Item 4J is amended and
49:27restated professional services agreement
49:29with City of Oklahoma City and the
49:31Alliance for Economic Development for
49:33economic development program
49:35administration and project
49:37implementation not to exceed $937,660
49:42for fiscal year 2026 2027.
49:46Expad.
49:47>> Yes. So, this is a new multi-year
49:49contract. The term of the actual
49:51contract is July 1, 2026 retroback um
49:55through June 30th of 2031 and then we
49:58would have annual funding allocations
50:00like we do on many of our other annual
50:02contracts. Um the amount I will let you
50:04know is an increase to the base of
50:06150,000 to be funded by TIF and GOL.
50:09This is reflective of additional
50:11services, complex agreements, things
50:13that we have been working with. it
50:14shores up and kind of restates their
50:16contract and their um um contract
50:19expenses so that we can move forward
50:21with some pretty standard minimal
50:23increases over time is the expectation.
50:29No comments or questions. We can take a
50:31motion.
50:36Please cast your votes.
50:40That item's passed as well.
50:45brings us to item 4K, economic
50:47development agreement,
50:49uh, United Petroleum Transports
50:51Incorporated for locating their
50:52headquarters operation in downtown
50:54Oklahoma City, an amount not to exceed
50:56$400,000 from tax increment district
50:59number eight.
51:01>> Yes. So, as a reminder, this is that
51:03special budget category in TIFF 8 that
51:05allows us to fund headquarters projects.
51:07Um UPT is locating their headquarters
51:11portion of their um company. They're
51:13keeping their um their uh location on
51:17the south side of Oklahoma City, which
51:18was really a great deal for us. So, um
51:21they're bringing 75 existing employees,
51:23which would um allow us to allocate 150
51:26of the 400,000. And then they're also
51:29proposing to add up to a hundred new
51:32employees. And so we've split the
51:34$400,000 allocation. So 250 of that
51:37would be allocated over time as they add
51:39those new positions.
51:41>> Excellent.
51:43No comments or questions. We can take a
51:46motion.
51:50I have a motion in a second.
51:55The items passed. Item 4L is a economic
51:58development agreement with Mason Realy
52:00Investors LLC for assistance in
52:03development financing not to exceed
52:05$750,000
52:07in support of the peerless building
52:10project which consists of the reh
52:12rehabilitation of a vacant building for
52:15my defense a drone detection company.
52:19>> Yes. So this was a total $9,600,000
52:23investment by the developer. This um
52:26project is located in Auto Alley at 8th
52:29Street. Um we are proposing well we
52:32we've approved 750,000 from TIF 2 excess
52:35funds that would be paid at completion.
52:37Um the additional benefit of this
52:39project was that it was renovated for a
52:41tenant that had already been identified
52:44my defense. Um and there is some uh
52:46opportunities for growth for that um
52:49company. So it was a little bit of a
52:51double benefit for us.
52:55Any questions or comments?
52:58All right, we can take a motion on that
52:59item.
53:02Please cast your votes.
53:06That item is passed as well. General
53:08managers report, Mr. Madden.
53:11>> Yes. Um, so in general, we have seen
53:14some increases in fund balance from
53:16prior year adjustments as accounting
53:18wraps up FY25.
53:20Um the most of the expenses you'll see
53:22the the largest amounts are related to
53:24debt service. Um I also wanted to point
53:27out that in TIFF 2 and in TIFF 13 you'll
53:30see some significant increases in
53:32incumbrances because we have begun to
53:34encumber for the soccer stadium. If
53:36you'll recall we um allocated 10 million
53:39from TIFF 13 and 20 million from TIFF 2.
53:45>> Thank you. All right. Any comments from
53:48staff?
53:51Trustees,
53:53any citizens signed up to speak? All
53:55right, with that we are adjourned. Thank
53:57you.
53:58>> Thank you.