2026-10-02 - Central Oklahoma Transportation and Parking Authority

Summary

  • Public comment: One resident objected to the Amazon locker agreement on the agenda, saying it was corporate welfare because Amazon would pay no rent while the authority covered electricity, upkeep and restroom access. The resident also referred to arena interest costs raised at a council meeting. A second resident, later in the meeting, said a bus stop sign had lain on the ground for about two months and a driver skipped the stop, leaving him to walk several blocks in 100-degree heat; the board thanked him and the director said staff would follow up.
  • Consent and minutes: The September 11 minutes and the consent docket were approved.
  • Embark administrative building: The board approved a final contract amendment (a decrease of about $758) and final acceptance of the South May remodel, which starts the maintenance bond. A ribbon cutting and a dedication of a training room are planned.
  • Transit center restrooms: A change order of $5,884.37 for the downtown transit center employee restroom remodel was approved to cover unexpected plumbing found in the walls and slab.
  • Security services: The board approved a five-year agreement (October 4, 2026 to October 3, 2031) with Elite Protection Services for fare inspection and unarmed security guard services at about $700,000 a year, after a competitive bid. Elite has held the work for many years.
  • Fare equipment: A sole-source purchase of fareboxes, parts and services from Genfare at about $200,000 a year was approved. Staff said the fare policy update will bring stakeholder meetings and a recommendation on fare technology.
  • Amazon lockers: The board approved a five-year agreement, renewing automatically, for two Amazon lockers at the Arts District garage. Staff said it costs the authority nothing (the units are battery operated and Amazon funds and maintains them), would keep sales tax in the city, and could bring minor advertising revenue. All items passed (Amazon Locker Agreement Arts District Garage).
  • Claims and finances: Payroll and vendor claims for August 19 to September 15 were ratified. Two-month budget results: revenue about $8.9 million against expenses just over $7 million, with fixed route and BRT ridership up 3.8% in July and 1.3% in August, fuel spending at 10% of budget against 13% a year earlier, parking revenue up with event customers rising 36%, and strong river cruise and streetcar charter income. River cruise fares were below budget because of lock and dam maintenance and debris closures.
  • Fleet and heat: About 68% of the bus fleet runs on alternative fuel; a purchase order for eight more CNG buses was issued, and diesel buses are expected to be surplused after 2028. Staff said record heat caused air conditioning failures in operator areas, pulling buses off routes and hurting the 30-minute frequency. A trustee asked for regular updates on frequency and on-time performance next year (Bus Air Conditioning Heat Reliability).
  • Mobility management: Staff reported nearly 6,000 senior trips in July and August, over 10,000 one-day passes distributed to homeless and low-income riders, and 542 eviction hearing bus passes activated since launch. A $50,000 rideshare innovation grant will fund a new service, and a call for projects for federal fiscal year 2025 senior and disability funding opened that day.
  • Parking services: Hourly and event parking were up from last year. The Century Center elevator renovation is under contract, with roughly three months of work per elevator starting in early spring, and a crane replaced an HVAC unit at an administrative building, with two more mobilizations planned (Century Center Garage Elevator Renovation).
  • Trustee remarks: Trustees praised the South May remodel, asked for a future briefing on convention and event partnerships, and the director reported a two-day Federal Transit Administration regional visit that reviewed major grants. The meeting adjourned until next month.

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

02:13Okay. Good morning. I'll call the

02:16Central Oklahoma Transportation and

02:18Parking Authority October 2nd uh board

02:20meeting to order. There are no items

02:23from the chairman and I understand we

02:26have one resident to be heard. Uh Steve

02:30Hunt, if you want to go ahead and come

02:32forward.

02:37>> Yeah, we have a about a threem minute

02:40time limit.

02:41>> Steve Hunt 66300 Westbrook. I uh I

02:44didn't know that speak at the first of

02:45the meeting unlike council, so I'm might

02:48be a little uh rough around the red

02:49edges on this. Um so I don't know if

02:51y'all have looked at 6E yet. This is an

02:55egregious corporate welfare handout to

02:57multi-t trillion dollar corporation

02:59Amazon. I'm sure you're all familiar

03:01with Amazon.

03:03Give me just a second. I'm just going to

03:04read what I texted everybody and um

03:07maybe go from there. Check out Cotto's 9

03:10a.m. agenda item vie. The city is giving

03:13Amazon space for two locker hubs at the

03:16arts garage for 5 years. The contract

03:19says that Amazon pays zero in rent while

03:23taxpayers pay the electricity bill,

03:25maintain the area, and give Amazon

03:28drivers unconditional restroom access

03:30since Amazon doesn't give them any.

03:32Basically, if the city breaks the lease

03:35early, Amazon penalizes.

03:37So, I don't know if y'all read the legal

03:40stuff. Um,

03:42and y'all know Amazon, multi-trillion

03:44dollar company. uh two lockers in the

03:48arts garage and apparently there uh

03:50there's a lot of electrical stuff that

03:52and so we're paying all the electricity

03:55for Amazon. Um there's something in the

03:58agreement that says that the garage

04:01workers are required to keep the area

04:03clean. If snow is in front of it,

04:06there's they have to, you know, sweep it

04:08up. Um, and there's also a legal ob

04:10obligation that they have to act as

04:14concier for the drivers. Like if they

04:16come in and have questions, the people

04:17working in the garage have to say, you

04:19know, exactly what's going on there. And

04:21um, so Tuesday I spoke at council about

04:25the $222 million in interest that

04:29taxpayers are paying for the arena. And

04:31also with that, people have to pay to

04:34watch the Thunder on TV. you know, the

04:36new deal. They have to pay $20 a month.

04:39And we're we're

04:41not requiring Amazon to pay anything for

04:43this. So, um there's a lot more to it.

04:47The uh the legal ease was incredible.

04:49If, uh there's ever a legal problem,

04:52everything has to happen in King County,

04:54uh Washington. It's it's awful. And I

04:58don't know how this was even presented

05:00to this board because, you know, they

05:02got to pay they got to pay something. Um

05:05there's a light pole at the ballpark and

05:07a Georgia company is uh renting it to

05:11build

05:13um wi wireless infrastructure and then

05:16they're going to like subleasase to

05:18T-Mobile, AT&T and all that and they're

05:20going to make about 300,000 a year and

05:22at least they're paying the city 18,000

05:24for that which is a bad deal but at

05:26least we're getting something and Amazon

05:28is giving us nothing and the costs of

05:31this is going to be I think over a

05:32million dollars for five

05:3430 seconds.

05:36>> That's my presentation.

05:38>> Thank you.

05:39>> Thank you very much for coming and

05:40calling it to our attention.

05:43>> Okay. Any other residents to be heard?

05:46If not, we'll move on to item four,

05:48which is the approval of the minutes of

05:50the September 11th COPA board meeting.

05:55Is there a motion to approve?

05:59>> So move.

06:00>> It's We'll do that electronically. It's

06:03been moved and seconded.

06:08>> Oh, okay. Okay.

06:10>> Okay. Uhhuh. Okay. All in favor, please

06:14say I or vote electronically.

06:20>> Okay.

06:29>> Okay.

06:32We have

06:34we have eyes from uh Hinkle and Allen.

06:38Motion approved.

06:41Okay. Moving on to item five, which is

06:43the consent docket. Are there any of the

06:46items in the consent docket that any of

06:48the trustees would like to pull and

06:50consider individually?

06:55If not, is there a motion to approve the

06:57consent docket?

07:07It's been moved and seconded. Please

07:10vote electronically except for these two

07:12that will vote.

07:15>> I

07:19have three three I votes

07:24and the motion passes.

07:28Moving on to items for individual

07:31consideration. Item A is to approve the

07:34amendment number four with CAD

07:36construction decreasing

07:38uh the contract for $757.76

07:43and final acceptance of the embark

07:46administrative building renovation

07:49project and replace and placing a

07:51maintenance bond into effect.

07:53>> Yes. So, chairman, with this item, uh,

07:55we essentially wrap up the South May,

07:57uh, remodel at 2000 South Main. Uh, so

08:00this is a a slight decrease, essentially

08:03amending the, um, the pay quantities in

08:05the contract. Um, really just again

08:08amending the quantities. Uh, but with

08:10this item, uh, we wrap up the

08:12construction at the project. There's two

08:13minor punch list items left to to wrap

08:16up. Uh, but with this item, we also put

08:18the the maintenance bond into effect

08:20and, um, essentially wrap the project. I

08:23would point out that we are uh planning

08:25for a um ribbon cutting or reveal if you

08:29will and also a dedication of the Chris

08:31Kaufman training room. And so you guys

08:33will see a invite for that coming soon.

08:38>> Okay. Are there any questions or

08:40comments on this item?

08:43If not, is there a motion to approve?

08:48It's been moved and seconded. Please

08:51vote.

08:52The a the yays.

08:55>> I

09:00>> Okay, motion passes.

09:04>> Moving on to item number B is to approve

09:07change order number number number one

09:09with Midtown Construction for the Embark

09:12Transit Center restroom remodel at a

09:14cost increase of $5,884.37.

09:19You know, chairman, with this item, a

09:21reminder, you know, we entered into a

09:23contract with Midtown Construction to um

09:25essentially remodel the employee

09:28restrooms at the downtown transit

09:29center. Um essentially doubling the

09:32facilities there. Um again, making it

09:35much better for our operators uh with

09:37this item. So, what happened is, as it

09:41does with construction projects,

09:42especially remodel projects, as you

09:44start the work, um some things pop up,

09:46and that's exactly what happened here.

09:48So, as they began the work, they

09:50identified that there was some um

09:52unknown plumbing that was in the in the

09:54walls and in the slab. And so, this item

09:57uh is a cost increase to do additional

10:00slab cutting and some plumbing

10:01relocations to accommodate the project.

10:06>> Okay. Are there any questions or

10:08comments?

10:12If not, is there a motion to approve

10:13item B?

10:18It's been moved and seconded. Uh, please

10:21vote. All those in favor.

10:24>> All right.

10:31>> Motion passes.

10:34Moving on to item C, which is to approve

10:38the professional services agreement with

10:40DWIT Investments LLC, DBA, Elite

10:43Protection Services, for fair

10:46inspections and security guard services

10:49at an estimated annual cost of $700,000

10:52effective February or October 4th, 2026

10:57through October 3rd, 2031.

11:00So a reminder uh the board uh approved

11:03the RFP for uh fair inspection security

11:07services. Uh we went through the

11:09competitive bid process and um the the

11:12team that was put together to ident or

11:14review the RFP identified um elite

11:17protection as the best uh contract for

11:20this. Um

11:22reminder we've we've had a long-standing

11:25um relationship with Elite. They've

11:28performed fair inspection and security

11:30guard services for us for many years

11:32now. And uh with this item, we will

11:35continue that relationship with Elite. I

11:38will point out that um they'll be

11:40performing fair inspection services on

11:42the BRT and security guard services uh

11:45at the transit center and our fixed

11:47route services and street car. Um

11:50another item to point out is that they

11:52are um unarmed, right? So they are there

11:56essentially for security eyes and ears

11:59and uh they also perform ambassador

12:01services. So that's part of their

12:03training as well.

12:06>> And this isn't part of the parking

12:08garage. Uh

12:10>> that's a se that's a separate contract.

12:12Okay.

12:14>> Are there any questions or comments?

12:17>> If not, is there a motion to approve

12:19item C?

12:22It's been moved and seconded. All in

12:25favor say I. I

12:28>> or vote electronically.

12:32Those opposed?

12:35Motion passes. Okay. Moving on to item

12:38D, which is to approve an agreement and

12:41adopt a resolution authorizing Soul

12:43Source purchase of Fairbox equipment,

12:46parts, supplies, and services with

12:48Genfair LLC. Estimated annual cost of

12:52$200,000 effective October 3rd, 2026 to

12:57October 2nd, 2027.

13:00>> Yes, sir. with this item. Uh a reminder

13:02about our um fair collection technology

13:05that's currently on our our vehicles. Um

13:08we've had that equipment um since the

13:10late 90s. And so it is important that we

13:13continue to have the the supplies

13:16available to keep those uh up to date.

13:18And so with this contract that allows us

13:20to do that, um I would like to point out

13:23kind of as a a partner item for this is

13:25that uh we recently approved our our

13:28fair policy uh update. And so we're

13:31currently going through that process

13:33now. And so the the board can expect um

13:36some stakeholder uh meetings coming up

13:38soon to be able to interact with our

13:40contractor that's performing that policy

13:42update and uh be able to be able to move

13:45forward from that. And part of that will

13:47also be um a recommendation on how we

13:49move forward with our fair technology on

13:51our equipment.

13:56Okay.

13:58Any questions or comments? If not, is

14:01there a motion to approve item D?

14:09It's been moved and seconded. All in

14:11favor say I.

14:13>> Or vote electronically. Those against

14:17nay.

14:20Motion passes.

14:23Okay. Moving on to item E, which is

14:27approval of a resolution for Amazon

14:30locker location agreement with

14:31Amazon.com

14:33Services LLC allowing for the

14:35installation of two Amazon lockers to be

14:38installed at the Arts District garage

14:40for 5 years with automatic renewal until

14:42terminated by either party with advanced

14:45notice and authorizing the administrator

14:48or designate to execute the agreement

14:50once approved by the municipal

14:52counselor's office. Yeah. So, chairman,

14:54with this item, it was uh it's been

14:56identified that um you know, with city

14:59staff being downtown and uh also copless

15:02staff being downtown that there's a um a

15:05desire to have the ability to receive

15:07packages, uh from our downtown area. And

15:11so, um we've looked at it and we we feel

15:14like it's a a good use of some area in

15:18our garage that's, uh you know, we made

15:20sure that there's no ADA issues or

15:21anything like that. And so with this

15:23agreement essentially allows for two

15:25locker areas to allow um really anybody

15:28to be able to receive or uh return

15:30packages to Amazon through this locker

15:33agreement.

15:35And then Trusty, I don't know if you

15:37wanted to add anything.

15:38>> Yeah, thank you. Um I just wanted to add

15:41that this is an effort to keep our sales

15:43and use tax dollars in Oklahoma City. A

15:46lot of city kappa as well as other

15:48downtown residents live on the outskirts

15:51in some of our suburbs. And so if we can

15:54get those folks to utilize an Amazon

15:55locker in downtown Oklahoma City, we

15:58keep those sales and use tax dollars in

15:59our community. And so that's the that's

16:02the intention here. Um I did want to

16:04speak to some of the points that were

16:06brought up um earlier by our our

16:08resident, Mr. Hunt. Um this is at at no

16:12cost. Um there uh would be an electrical

16:16component, but we qualified for a

16:18battery operated unit that Amazon um

16:21funds and maintains and um related to

16:24the cleanliness in the area. Uh

16:26thankfully uh Corey and our parking

16:28services um already does those things

16:31and so keeps the area open and safe for

16:34for any foot traffic um for any of our

16:37our customers as well. And so uh looking

16:40forward to this amenity downtown.

16:44Okay. Are there any other questions or

16:46comments?

16:47>> Um,

16:48no cost to us.

16:53>> That's right. There's no cost. And in

16:55fact, there could be some revenue

16:57separate from the sales and use tax. Um,

16:59if Amazon wraps the locker um with some

17:02sort of an advertising campaign, maybe

17:04advertising Prime Day or other things

17:07like that, then there would be a small

17:09minimal amount of revenue to the trust.

17:13That's correct.

17:14>> $50.

17:15>> That's correct. At no expense.

17:23>> Okay. Are there any other questions or

17:24comments?

17:26If not, is there a motion to approve

17:28item E?

17:32It's been moved

17:35and seconded. All in favor say I or vote

17:39electronically. Those opposed same sign.

17:53Motion passes.

17:55>> James.

17:58>> Okay. Moving on to ratification of

18:00claims and payroll. Item A uh is the

18:04ratification of payroll and vendor

18:06claims for a period of August 19th

18:08through September 15, 2026.

18:13Are there any questions or comments?

18:16If not, is there a motion to ratify?

18:20It's been moved and seconded.

18:24All in favor say I or vote

18:27electronically. I

18:30>> those opposed. Same sign.

18:36Motion passes. Uh moving on to receive

18:41our financial reports for the schedule

18:43of revenue and expenses budget to actual

18:45for the two months of the fiscal year

18:482027 ending August 31st, 2026.

18:53>> Yes sir. I will I will be presenting our

18:56budget to actuals today.

18:59as soon as it is up. All right. So, as

19:03we uh move into the presentation here,

19:06uh you'll notice on this slide here that

19:09our revenues exceed our expenditures uh

19:12by $1.9 million. Our year-to- date

19:14revenue being 8.9 million, essentially

19:16meeting our budget. And then our

19:18year-to- date expenditures uh just a

19:20little over 7 million. This is below our

19:22budgeted amount by nearly a million

19:24dollars or or 12%. Then as we uh dive a

19:28little deeper uh with our fair revenue

19:31here. Um so while the report shows that

19:33we are slightly behind our forecasted

19:35amount uh we did see a slight increase

19:37from prior fixed route and BRT wrership

19:39in July being about 3.8%

19:42and then in August being about 1.3%. Uh

19:45we do however expect additional halfp

19:47price purchases throughout the remainder

19:49of the year uh which should help narrow

19:51that gap a little bit. And then as we we

19:54move down a little bit there are other

19:56passenger revenue. So this category

19:57includes uh revenue from the city

19:59employee bus pass program. Uh we did

20:02have a slight delay in receiving the

20:04August payment which resulted in

20:05temporary negative variance.

20:07>> Back to slide.

20:10>> Yep. Thank you. Um and so this payment

20:13has now been received and the September

20:15financials are expected to reflect this

20:17and show the category back on track.

20:19Then the last area there highlighted is

20:22areawide aging agency. Uh so as noted in

20:26last month's report, reimbursement

20:28payments from area are running slightly

20:30behind schedule, but our team has been

20:33on ongoing communication with area wide

20:35and the outstanding items are being

20:37addressed.

20:39All right. So as we move into

20:42our next item there, expenditures. Um so

20:46our first focus there is other services

20:47and fees. Uh so one of the main areas

20:50where we are currently under budget is

20:51in subscriptions. So one of our primary

20:54subscription vendors recently underwent

20:56an acquisition which is temporary

20:57delayed invoice processing.

21:00And so as soon as uh those payments are

21:02made available that variance will

21:04tighten. Then the next highlighted area

21:07is fuel. Uh so although we are showing a

21:09slight increase from prior year uh we

21:11are seeing a significant savings overall

21:13in fuel. Um, last year at this time we

21:16we had spent 13% of the overall budget

21:19versus this year where we have only

21:20spent 10% of our total fuel budget. And

21:23a reminder, you know, as we're we're

21:25bringing more alternative fuel vehicles

21:26online, we we start to see that uh

21:29variance um more, right? So, we continue

21:33to see savings in our fuel lines.

21:36And then as we move on to our parking

21:38operations, so uh with parking

21:41operations, revenues exceed our

21:43expenditures by

21:45nearly 500,000. Our year-to- date

21:47revenue being 1.1 million uh exceeding

21:50our budget by 66,000 or 6% and then our

21:53year-to- date expenditures 743,000

21:56where we are two nearly 270,000 below

21:59budget or 27%.

22:02As we dive a little deeper into our

22:04revenues, uh, events and transient

22:06parking. Um, so while monthly contract

22:09revenue remains right on target, uh, we

22:11want to highlight our transient parking

22:13category where we have seen significant

22:15growth compared to last year. Our event

22:17customer volume increased from 17,910

22:21customers at this time last year to

22:2224,000 this year. A 36% increase. Uh, so

22:27transit parking activity also grew by

22:3014% year-over-year.

22:32And then as we move into our next slide,

22:39uh you'll notice our parking garage

22:41operations uh slight variance there.

22:44This is uh tied back to our event

22:46parking, right? So we we've talked about

22:48this several times as we see this

22:50variance uh each time as as our event

22:54parking goes up. that means that we have

22:56to have more staff for more events. And

22:58so we we start to see that that variance

23:00grow a little bit. Um [clears throat]

23:03and then the payments to the city

23:05parking fund, uh we're working with

23:08folks there to get that variance more in

23:10line.

23:12Then as we move into river cruises,

23:15so our operating income being u

23:17exceeding expenditures by 16,000, our

23:20year-to- date revenues um exceeds budget

23:23by just a little over 3,000 or 2% and

23:26our year-to- date expenditures are below

23:28budget by about 2%.

23:32So moving to the next slide for our

23:34revenue. Uh so the main item to

23:37highlight there is our charters. So, our

23:39charter activity continues to be a

23:41strong contributor year-to- date. We

23:43have completed 16 charters and have

23:45collected approximately 32% of our

23:47annual charter revenue.

23:49The prior year comparison in the report

23:51shows only 175 collected at this point

23:53last year. However, actual collections

23:55were closer to 7,000. Uh the difference

23:57is due solely to the timing of when last

23:59year's report was compiled. Using

24:02accurate prior year figures, we have

24:04collected 23% of the charter revenue by

24:06this time last year.

24:09And then moving into

24:12our expenditures,

24:14um, total expenditures there, uh,

24:16year-to- date spending total is

24:18approximately 187,000, which is about

24:20three 3,000 or 2% under the year-to-

24:23date budgets. Our spending pace is

24:25consistent with last year. At this

24:27point, in the prior year, we had

24:28expended 15.7% of the annual budget

24:31compared to 16.1% this year. uh we

24:34expect to see an increase in expenses as

24:36we move into the off season.

24:39And so typically that is, you know, due

24:41to some refurbishing of boats and and

24:44things like that, making sure that they

24:45keep that um uh what do we call it? Uh

24:49Bristol, is that the condition? Yeah,

24:51Bristol condition. Mark's over there in

24:53the corner. Is that right? Bristol. All

24:54right. All right. All right. So, as we

24:57move into the street car, um, so our

24:59operating income being 284,000,

25:02uh, exceeding our expenditures by

25:04284,000, our year-to- date revenues, uh,

25:061.1 million or and this exceeds our

25:09budget by just about 1%. Then our

25:12year-to- date expenditures being at

25:1494,000, uh, about 21% below budget. And

25:17this is, um,

25:21I just have to call it out. It's due to

25:23Delano being very, very good at his job.

25:25He is very good about being able to pace

25:27out um um maintenance issues and being

25:31able to forecast and plan ahead. And so

25:34he's he does a very very good job with

25:36our street car operations as we move

25:38into our revenues. Uh so we'll focus

25:41there on our other revenue item. So our

25:43business development marketing team

25:44continues to secure additional revenue

25:46opportunities. uh the 99 $9,938

25:51in the other revenue line item uh

25:54represents our charter services. U again

25:58this is you know continued um with our

26:01our folks out there really pushing the

26:03the ability to have charters on the

26:06street car and so we've seen this grow

26:08year-over-year. Uh some of the items

26:11here were u from the Moose International

26:14Convention uh the Unity National Indian

26:17Tribal Youth Annual Conference and the

26:202026 uh National Association of State

26:23Procurement Officials annual conference.

26:27All right, as we move into

26:29expenditures there. Oh yeah, we already

26:31did it. Fantastic.

26:34That concludes my presentation of our

26:36BNA. If there are any questions,

26:39be happy to give it a shot.

26:41>> You have any questions?

26:42>> Well done. [laughter]

26:44>> Thank you.

26:44>> Uh, director, could you remind me, my

26:48memory is foggy. What if any percent of

26:52our bus fleet remains diesel?

26:59>> Great question. So we are currently

27:01sitting at uh 60 68% of our fleet is

27:06alternative fuel.

27:07>> Okay.

27:08>> Um so yeah, we're and we're clearly

27:12everything that we're buying now is

27:13alternative fuel whether it's CNG. Uh we

27:15just received, you guys had just

27:17approved a contract last month and we

27:19just received two uh electric um uh Ford

27:24Transit vans uh that will help support

27:26our mobility team and our our pair

27:28transit services and they're all ADA

27:31equipped. So pretty exciting to get

27:34those online.

27:35>> So

27:37about 30 something% remains that

27:40>> a little over 30. Mhm.

27:41>> Do we have any sense of a timeline of

27:43like what that transition out of it will

27:45look like?

27:45>> We do. So, you know, we're currently in

27:47the process. We just issued a PO for

27:49eight additional fixed route CNG buses.

27:53Um so, within I would say within two to

27:56three years, we'll be completely um CNG

27:59on our fixed route and BRT. Now I will

28:02point out that we are even as we replace

28:05these vehicles we're maintaining those

28:07vehicles just in anticipation of needing

28:09them for the Olympic games but then

28:11after uh 2028 we'll start dis uh dis

28:15disposing surplusing u the the diesel

28:18buses

28:20>> that's really good news I'm sure we're

28:22all following the diesel fuel cost that

28:25are

28:26>> record highs u another question I think

28:29to ask here instead of comments from

28:31trustees. But

28:33>> I've been hearing over the last few

28:36weeks related to the timeliness of the

28:39buses that some of the issues that's

28:42making buses show up late are actually

28:45related to the um

28:47>> the maintenance and and that that

28:49maintenance might be um the result of

28:52maybe the the increased heat we've been

28:54experiencing. Could you speak to that?

28:56I'm I'm unfamiliar with this.

28:58>> Happy to speak to that. So yeah, we, you

29:00know, we we had record uh record heat

29:03and we had a sustained period. I think

29:05we had what over a month of over 100°.

29:09Um just like like your automobile, the

29:12heat plays a a huge part in your

29:14automobile being able to keep up with

29:16with the AC and things like that. Um,

29:19one of the things that we did notice is

29:20that as we were uh in that record heat

29:24uh time frame, we did start having some

29:26AC equipment um fail. And specifically,

29:31it was failing in our operator area. So,

29:33if you think about it, our operators are

29:35sitting essentially like behind a um

29:38like a a microscope, right, with all the

29:40glass and we we can't tint the windows

29:43because then that um which would

29:45decrease the heat, but then it violates

29:47some of the Federal Highway Act um

29:49requirements. And so, making sure that

29:52it's safe for operators, if it gets

29:55above a certain temperature and the the

29:57bus can't keep up, then we we pull that

29:59bus off the road. So then that starts to

30:02affect the ability to maintain our

30:0430-minute frequency on our routes. Um to

30:07that point though, we do have

30:08contingency buses that when we pull a

30:10bus off the road, we're able to put that

30:12bus into service, but those buses are

30:14usually some of our older fleet that

30:17also have issues. So all that to say

30:20that is that is true that we were

30:22definitely having some issues,

30:23especially during the heat um time frame

30:25as far as being able to maintain our

30:2730-minute frequency. Um, we've seen that

30:31get back to normal as we've come out of

30:32the 100 degree heat. Um,

30:38I don't have much else to add. That is

30:40it is true that we're having some some

30:42issues there.

30:46it maybe it's too early but well it's

30:49too early for me right now but what is

30:50the um like the path forward because

30:54unfortunately

30:55I don't really see those temperatures

30:57decreasing for reasons

31:00>> y

31:01>> um

31:01>> so I I can speak to that so um

31:05>> clearly we identified that we had an

31:06issue

31:07>> and so our assistant director and our

31:09maintenance manager got together and

31:11essentially hotwashed that's what we

31:13call it hotwashed the the issue that

31:14we're having right and So what happens

31:17is clearly we're not going to let that

31:19happen again. And so essentially being

31:21able to plan for as we start to come

31:24into the to the warmer months next year

31:27or if we start to get to it again,

31:29essentially putting together um a

31:31planning exercise where we start pulling

31:35pulling the buses into the shop and

31:37basically going over the entire AC unit

31:39like top to bottom making sure that

31:41there's no, you know, freon leaking,

31:44there's no fans that are whatever. I'm

31:47not going to get super technical

31:49wobbling, right? Um, but basically front

31:52to back, top to bottom, making sure that

31:53all the AC equipment on the buses are

31:56tip-top shape before we start getting

31:57into the to the hot months so we don't

31:59have this issue again

32:03>> next. Okay, thank you for that update.

32:05Next year, would you update us on the

32:11frequency

32:12and the achievement of hitting our our

32:1530 minute

32:17targets

32:19because you well we already know I think

32:21this whole trust knows that frequency

32:24and reliability ultimately makes the

32:27system um an alternative option for

32:32choice riders number one actually I

32:34would put in this instance number two

32:36because number one is the folk who

32:38depend on it to get to their jobs and if

32:40those buses are hot in July and August

32:43and then they're

32:46the person waiting at the bus stop is in

32:51that heat for another 30 minutes and

32:54then that reflects on how they show up

32:56to their job or their destination, but

32:58it also reflects on our system. So, I

33:02really appreciate the attentiveness

33:04you're bringing to it. I just wanted to

33:05bring this um bring this up because I

33:08kept hearing from people this summer was

33:09like, "The buses are late. What's going

33:10on?" And I I couldn't I couldn't figure

33:12it out. But this this answer is helpful.

33:16So yeah, I would like next year just

33:17sort of regular updates on how we're

33:19doing with the frequency and the showing

33:21up on time.

33:22>> Yeah, be happy to do that.

33:23>> Thank you. Y

33:26>> Jesse, I have a question about the uh

33:28the riverboat and the general fairs uh

33:32didn't meet budget uh uh revenuewise on

33:36that and we opened up a new uh landing

33:41over at the the FAM landing.

33:43>> Yep.

33:43>> And I would have thought that that would

33:45have helped increase our revenue,

33:48general revenue.

33:49>> Yeah. So, we uh we have had some issues

33:51on the river. Uh specifically, we've had

33:53some uh locks and dams that have had

33:56some maintenance issues. Um so that has

33:59definitely played a part in our revenue

34:01going down. Um we've also had um earlier

34:05in the year we had some pretty heavy

34:07rains that then caused debris to come

34:09into the river and so there were a

34:10period of time where we had to shut down

34:12a portion of the of the routes and so

34:14that played a role into it also. Uh but

34:18our charters and our specialty cruises

34:20are making up uh majority of that fair

34:23and and Mark does a fantastic job of and

34:26his team do a fantastic job of getting

34:28that information out there. And uh if

34:30you've ever done one of the charters or

34:31the specialty cruises, uh we usually

34:33have return returned customers. Uh

34:36>> but our regular route that we run have

34:40have been interrupted and that has

34:42brought

34:43>> uh revenue down. In fact, we I think uh

34:46three days last week, our entire east

34:49portion of the river had to be shut down

34:50for a period of time.

34:52>> Okay.

34:53>> Okay. I just was curious about that. Are

34:56there any other thoughts or questions

34:59about our budget?

35:01>> If not, we will go ahead and uh receive

35:05a motion to

35:08uh to receive our

35:12budget to actual

35:15reports. It's been moved.

35:22Looking for a second.

35:25We have to.

35:28It's been moved and seconded. Please.

35:30Uh, all those in favor say I or vote

35:33electronically.

35:38>> Okay.

35:40Was that an I, Bailey? Okay.

35:45Okay,

35:47motion passes. Moving on to our program

35:50reports. We have uh our first

35:52presentation is a mobility management

35:55and Dr. Marilyn Dylan is presenting.

36:00>> Good morning. How's everybody doing?

36:03I'm Dr. Marilyn Dylan. I'm the mobility

36:05management administrator and the ADA

36:07coordinator. Um, for those of you that

36:09have been on the board for a bit, I'm

36:10going to apologize in advance that I'm

36:12going to say some things that you

36:13already know, but we have some new

36:14trustees and I want to make sure they

36:15understand the programs that I'm talking

36:17about.

36:19[sighs] So, the mobility management

36:21division's goal is to connect people.

36:24Uh, we want to improve their quality of

36:26life through increasing their ability to

36:27access services. Um, many of our

36:30programs address the social determinance

36:32of health to also support that quality

36:34of life improvement. Um, we offer senior

36:37transportation. We work with homeless

36:39and low-income individuals. Um, we have

36:42some significant programs away on

36:43health, wellness, and nutrition. Um, as

36:46well as several social service

36:47partnerships and grant programs that I'm

36:49going to talk to you about today.

36:51So, our our writership, this is just

36:53July and August of 2026. Um, the October

36:56board meeting came very early and we

36:59have not finished closing out our

37:00September writership numbers yet. So,

37:02I'll have those for you next time. Um,

37:04senior services obviously almost 6,000

37:06trips. Our partnerships are down just a

37:09little bit. Um, and I'll explain why

37:10later. Um, and then our homeless and

37:12low-income bus pass program has already

37:15distributed over 10,000 one-day bus

37:17passes in the first two months of this

37:19year.

37:21So, this is kind of a look back um on

37:23our mobility ridership over the last few

37:26years. Um, as you can see,

37:27year-over-year it has continued to grow

37:29as we add new programs and new

37:31partnerships. um with the exception of

37:33obviously 2020 2021 when we were going

37:36through COVID. You'll notice that drop

37:38of almost 9,000 trips where we ended

37:40last year. Um that is because if you'll

37:43recall during the federal government

37:45shutdown last fall um DHS asked us to

37:48pause one of our services with them um

37:50during the government shutdown so they

37:52could evaluate budgets. Um we took a

37:54significant hit because we were closed

37:56for almost two months. Um and so we and

37:59we've also um paused our sheriff program

38:02as I mentioned to the transportation

38:03committee. We've revamped that and

38:05increased the subsidy. We'll be

38:07launching that out in November again. So

38:09we're expecting the sheriff to kind of

38:11catch us back up on that ridership and

38:13can see that growth of trajectory

38:15continue in the future. So our eviction

38:18mitigation program is doing really well.

38:20Um it was a slow start. I'll be honest

38:22with you. We all knew that. We've been

38:24talking through this. Um, what this

38:26program does is it provides a QR code in

38:29a mailer with an eviction notice that

38:32allows the individual to scan it so that

38:34they can take a get receive a bus pass

38:36to attend their eviction hearing.

38:38Attendance at your eviction hearing

38:40protects your rights. Um, it gives you

38:42some options to negotiate down perhaps

38:44some of your rent that's in a rears so

38:46that you can stay in your home. And so

38:48it's very important that they show up

38:49for these these eviction hearings. Um

38:52we're partnering with the neighborhood

38:54services organization stay housed

38:55initiative um for those individuals that

38:58um do not have a cell phone or their

39:00ability to get the QR code um activated.

39:03They can pick up a one-day bus pass at

39:05the NSO or that they will mail them one.

39:08Um we had 63 pass activations in July

39:11and August of this year. Uh so far uh

39:14through the life of the program we've

39:16seen 542 of them.

39:20Our Embarkwell senior health and

39:22wellness program just continues to grow

39:23and grow. Um this program provides no

39:26cost um door-to-door service to seniors

39:2960 and over um that reside in the

39:31urbanized area. Um they are able to go 5

39:35days a week, Monday through Friday

39:36between 7 a.m. and 700 p.m. to the

39:39nearest wellness center to the

39:40residents. Um, it serves all of the YMCA

39:43locations, all of the MAPS senior health

39:45and wellness centers and some select

39:48Oklahoma City parks locations that have

39:50programming specifically targeted to

39:52seniors. Um, we now I it's rather funny

39:56to look at this graph when I look back

39:57in time because we started this program

39:59in 2019 and in the first year we did

40:02about 500 trips. Um, we're doing well

40:04over that every month now. It is a

40:07hugely popular service. Um, we have been

40:09able to double the cost of the budget

40:12for this program to meet the demand

40:14through our section 5310 funding

40:16program.

40:18Um, for those of you familiar, the

40:20Climide program is doing very well. Um,

40:23we are in Oklahoma County. We serve up

40:25to a 100 families. Um, for those of you

40:28that aren't unaware, when you are um,

40:30children are removed and placed in

40:32foster care, you are given what's called

40:34an individualized service plan from the

40:36courts in order to reunify with your

40:39children. Um, these are extensive plans

40:41requiring much travel and transportation

40:44access. Climb just closes that gap. It

40:47completely removes that barrier from the

40:49table for them. We have a uh mobility

40:51program coordinator embedded at the DHS

40:54offices in the case management team and

40:56she's serving a hundred families at any

40:58one time. Um our reunification rates are

41:02over 50%. So 50% of our our cases

41:05reunify. Uh we did a check last month on

41:08recidivism. We still have no recidivism.

41:11If we close a climb ride case, it stays

41:13closed and the family doesn't come back

41:15through the the services. And as I

41:17mentioned, the writership is a little

41:18low here as you see still because we're

41:19still ramping back up from that

41:21government shutdown um and getting

41:23ourselves back up to 100 family

41:24referrals.

41:27Climb right also is in transition age

41:29youth. We have a mobility coordinator

41:31embedded with pivot um working on some

41:33sustainable funding to keep this going

41:35on beyond the grant project. If you'll

41:37recall, it was a three-year grant

41:38project. Uh we have about 13 months left

41:41to find find the funding to keep it

41:43going. Um, we're working hard through

41:45that. The youth are doing amazingly well

41:48at the tiny homes. We've moved a couple

41:50of them out. Um, I was sharing with

41:52Jesse a few months ago that one of the

41:54youth who we've been assisting through

41:56this program has moved out. He's been

41:58able to get a full-time job. He's been

42:00able to buy a car, pray for his own

42:01insurance, and guess what? Started a

42:04nonprofit to help other youth. So, it's

42:06been very successful.

42:08Our mobility partnerships are doing

42:10really well. These are partnerships with

42:12local nonprofits to assist them in

42:14providing transportation. Um what we

42:17always tell our our nonprofit partners

42:18that are looking to get out of the

42:20transportation building, it's a little

42:22bit of a niche. Um it can be a cost

42:24drain on a nonprofit to keep a

42:26transportation program and a vehicle

42:28running. And so we've been really

42:30fortunate to be have these nonprofits

42:32reach out to us and assist. Um, we

42:34provide the transportation morning and

42:36afternoon for reemergent hope house

42:38participants and as well as having a

42:40vehicle and driver embedded at Palomar

42:42to assist victims of domestic violence.

42:46Um, I want to pause there for just a

42:47minute. Last month um you guys um

42:49approved a Uber innovation grant u for

42:52$50,000 that our team won. We've been

42:54working through what that's going to

42:56look like and what we're going to use

42:57that funding for. um pleased to tell you

43:00that we are going to be launching

43:02something called embark extend. Um this

43:04will enable people to access the social

43:06security office on 122nd. I'll have more

43:09details later um when we get ready to

43:12launch. Um so very excited about that.

43:16Our 5310 funding stream is going very

43:18well. Um we are actually issuing a

43:21notice of call for projects today. Um we

43:24are opening up call for project for our

43:26federal fiscal year 2025 funding. Um

43:29currently we've awarded 2022 2023s and

43:332024's funding. Uh we've had over 20

43:36applications and we're in the grant

43:37process. You're going to see start

43:39seeing those grant agreements go through

43:41in the next couple of months. Uh what

43:43are we focusing on funding? Well, we are

43:46focusing on funding vehicle maintenance

43:48for nonprofits. Um actual vehicle

43:51purchases. Um we're looking to do some

43:53sidewalk and paving projects to help

43:55seniors um access services and then

43:58we're also providing dispatching

43:59software funding for some of our partner

44:01agencies. The goal of that is to connect

44:03our vehicles together to become more

44:05efficient. Um so we're very excited

44:07about where this is going.

44:09One of the other big things that I've

44:11shared with with you over the years is

44:13that we've been working really closely

44:14with ODOT on their statewide mobility

44:16management program so that we can expand

44:18what we offer here in Oklahoma City to

44:20all 77 counties. Um we will next Monday,

44:24in fact, um we have a brand new

44:26transportation navigator that will be

44:27embedded at the Goodwill Opportunity

44:29Center working with individuals with

44:31disabilities to make sure that they have

44:33workforce transportation so that they

44:35can enter back into the workforce. Um

44:37her name is Katie. Uh she starts on

44:39Monday. Uh another exciting

44:41announcement, we have two more mobility

44:43navigators also starting with us on

44:44Monday. Um Joey and Jessica. They will

44:48be assigned to assist people in Canadian

44:50and Cleveland County. Um you can see

44:52Ariel there in the picture. She is the

44:54mobility navigator for Oklahoma County.

44:56Um so we're really excited to see this.

44:58These individuals connect people to

44:59resources, connect agencies together to

45:02form partnerships, and close those

45:03access gaps across the community. So,

45:05we're really excited to see what that

45:07looks like. And with that, I will take

45:09any questions. [sighs]

45:12>> Are there any questions or comments for

45:14Maryland?

45:19>> Thank you.

45:19>> Thank you.

45:21>> Okay. Our our second presentation is our

45:23parking services. Corey Hubert is our

45:29>> presenter.

45:30Welcome.

45:31>> Good morning.

45:33>> Parking

45:35Uh, can we go? Oh, thanks. Uh,

45:42hourly and daily parking is up in in

45:46comparison to last year. July, we had uh

45:516,000 plus more customers. That's

45:53roughly a 39% increase. And then in

45:57August,

45:58there was a decrease of 2.8 8 uh

46:02customers or 60 654 vehicles. Uh the two

46:09that goes in line with the uh event

46:12traffic

46:14um on events we had a 41% uh in July

46:19increase or 3.7%

46:223.7,000

46:24customers and then in August we had an

46:28additional 30% increase of 2.7,000

46:34customers. Um, as you can see, the

46:36economy continues to prosper and we

46:39continue to benefit from that along with

46:41the positive services that we provide to

46:44all of our customers. Uh, monthly

46:47parking, as Jesse noted earlier, is

46:49relatively flat. We are seeing some

46:52growth, um, but trivial at this point.

46:57Century Center elevator renovation,

47:00as you all are aware, we had a special

47:03meeting. We had we we were allowed to

47:05enter into an contract um in late

47:08August.

47:10Contractor is um executing agreements

47:13with its subcontractors that's underway

47:16where we started receiving submitts.

47:19Um subcontractors have been in and out

47:22of the area. Um and monthly meetings

47:26have started. Information that came

47:28after this presentation was forwarded to

47:31this group. um prior to 2027.

47:36This in the next couple of months,

47:38you'll start it we'll start seeing some

47:40work on site as it relates to guard

47:43rails on cabs, door roof hatches in the

47:48mechanical rooms, ladders and um HVAC

47:53systems and some mechanical doors being

47:56replaced

47:57while we wait for all of the materials

48:00to come in very early late winter, early

48:03spring. Uh so we'll start seeing

48:05elevator one being worked on out of the

48:08two in early spring. Um and again

48:13reminder that is a 55 day workday

48:18calendar for one elevator. So r pretty

48:21close to three months per elevator. Um

48:26it is possible that we can see some

48:28collapsing of schedules or condensing of

48:31schedules, but we just don't have that

48:33information right now. Um we're at the

48:36will of those folks building the

48:39hardware and whatnot.

48:42Um in case you were on your way here saw

48:45a major road closure, parking was

48:47involved with public works project uh

48:50early on. Very appreciative of that. On

48:53the lower left hand corner, you'll see

48:56our Sheridan Walker garage. What's

48:58taking place is um a crane should be

49:02arriving uh by the time you leave uh to

49:05replace the HVAC unit on 420, our main

49:08administrative building. Our operations

49:12at the uh Sheran Walker garage will

49:15continue through the entire project. Um,

49:18thanks to public works, they gave us

49:20some leeway and invited us to the party.

49:24Uh, major dates to look at. Um, f this

49:28is the first of three crane

49:29mobilizations. This mobilization

49:33uh will

49:35uh end uh early next week. The second

49:39one will be in uh October 23rd uh

49:44scheduled right after um a a major

49:47concert and before a game. Um and then

49:51um the third and final right around uh

49:55Thanksgiving. Uh we will have a game on

49:59the day that the road clos that that the

50:02closure takes place, but based off of

50:04our quantities of Thunder season ticket

50:07holders in that garage, parking staff

50:10has all the confidence in the world that

50:13we'll get them in and out. Zero

50:15problems.

50:17And that concludes my presentation.

50:21>> Okay. Are there any questions or

50:23comments to Corey?

50:26Glad we're making progress on the

50:28elevators, the old elevators at

50:32Century Center.

50:35Okay. Um,

50:38so is at this time is there a motion to

50:41receive our program reports?

50:46It's been moved

50:51and waiting on a second.

50:58Second.

50:59>> Okay. Matt seconds.

51:03>> All those in favor say I or vote

51:05electronically. [clears throat]

51:06>> I

51:07>> oppose. Same sign.

51:27Motion passes.

51:29Okay. Moving uh again moving to item 10

51:33which is items from the trustee. But

51:35beforehand we have another request uh

51:38from a citizen to be heard and we'll

51:41I'll go ahead and entertain that at this

51:42time. Uh, so John Angland, if you'd like

51:46to come forward and

51:49three minutes and tell us what you know

52:21test. There you go.

52:22>> Thanks.

52:23>> Yes, sir.

52:23>> Good morning, everyone. Sorry for my

52:25tardiness.

52:26Uh, this is my first

52:29visit here at city hall.

52:32Um,

52:35I guess um you guys tell me want to just

52:38explain why I'm here. Is that what I do?

52:41>> Yeah. Uh-huh.

52:42>> Okay. Um,

52:44there's been several incidents um to

52:47where

52:49I was told from a route supervisor as

52:53well as drivers um that being ADA you I

52:59am the bus stop.

53:02And however, uh just this last month,

53:07um there was two incidents with the same

53:10driver. Uh there was a bus stop sign

53:14down on the ground. There was a question

53:17as to whether it was still a bus stop

53:20and it's around the corner from where I

53:22live.

53:24Uh for over 50 years off and on, I've

53:27used Embark or

53:30public transportation. Excuse me.

53:33Anyway, um

53:36there was a young lady um she took

53:39fourth of Lindsay. I don't know if you

53:40guys It's right off of Lincoln. I mean,

53:43before you get to Lincoln, but anyway, I

53:44had I was taken

53:47approximately three blocks out of my

53:49way. Uh this was just two weeks ago on

53:53the second incident, which I had to walk

53:56and of course above 100 degree weather.

54:00Uh

54:02um

54:04I was told by the route supervisor that

54:08that bus stop which has always been a

54:12bus stop for like I said over 50 years

54:14to my knowledge um that being ADA um

54:19since it wasn't a bus stop um he

54:23mentioned something about the grass and

54:26the concrete.

54:28Okay. Well, west of the bus stop,

54:32um, there's sidewalk. I would have to

54:35cross over Lincoln Boulevard

54:38to research parkway the bus stop

54:42and going east. I would have, sorry, I

54:46muscle spasm. Um, I would have to travel

54:49uh

54:51I would have to walk approximately

54:53two blocks

54:55from Fort Lindsay

54:58and

55:01I was it was confirmed that the Fort

55:04Lindsay is still a bus stop. I know for

55:06a fact that the bus stop sign laid there

55:09on the ground for approximately two

55:11months

55:13and then it was removed. I mean,

55:15somebody finally came and picked it up

55:17and now there's a brand new SP bus stop

55:20sign there. I'm just wondering

55:24um and I know uh that um [clears throat]

55:27the bus has to have a safe location to

55:31pull over.

55:33I was a field supervisor in the oil and

55:36gas industry

55:38as a

55:40bill supervisor. So, I know all about

55:42safety pretty much. uh which is a full

55:45service safety company. Um

55:49and across the street from Fort Lindsay,

55:52directly where the bus stop is

55:57from the bus stop,

56:00um

56:02there's a

56:04vacant recreation center and there's

56:07other drivers. No problem. It's it's a

56:10two-lane. I'm sorry. Um,

56:15northeast forth is [clears throat]

56:17there's two lanes, east and west. And

56:22>> um,

56:25>> sir,

56:27so no, no. So, so you don't have to keep

56:29standing. If you don't mind, after the

56:31meeting, we'll we can get a Yes, sir.

56:33>> information. Yes. Thank you guys for

56:36hearing me out. Sorry.

56:38>> Yes. Thank

56:40you. I'll be right back.

56:42>> Yeah. Okay. And our uh director will

56:45address your issue and we appreciate you

56:47bringing your concerns

56:53to the meeting. So, thank you.

56:57Um so, now we'll move on into uh our uh

57:02items from trustees. Cynthia,

57:07>> thank you.

57:09>> Thank you. you know uh the program um

57:13reports that we received were very

57:14insightful. A couple of things that

57:16caught my attention were the uh well was

57:20the influence of conventions to our our

57:24parking to our ridership etc. I wonder

57:28if maybe for a future meeting we can

57:30have a little bit more of um just

57:33information on how uh your team partners

57:37with conventions with you know city

57:40planning etc for major events and what

57:43type of of marketing opportunities

57:45exist. Are there any packets? just

57:49interested in knowing how we're

57:50maximizing those um those opportunities

57:54to really promote the strong services

57:56that you provide.

57:58>> Yeah, I'd be happy to. Uh we can

58:00definitely include that in our business

58:01development marketing presentation. Yep,

58:04for sure. Yeah, thank you.

58:06>> Okay, Matt Jason,

58:09>> Angela,

58:10>> no.

58:11>> Oh, skip.

58:13>> Oh, I'm sorry.

58:14>> I was trying to find the mic.

58:17Yeah, I just uh so I wanted to just say

58:20Jesse, I'm looking forward to the

58:22reveal, ribbon cutting, whatever we're

58:24calling the unveiling of the South May

58:28uh remodel. Um I know it's been a

58:30project that uh you know, you've been

58:32working on, you and your team for a few

58:34years now, and I really just wanted to

58:36commend the the trust for supporting uh

58:38that project for your team for executing

58:41it. Um it's been a long time coming. I

58:44mean, other than, you know, a few well,

58:47a lot of offices added on ad hoc over

58:50the years, it's been relatively

58:51unchanged since it was a trucking

58:53company back in the 80s, right? Um,

58:57so, um, I'm looking forward to that. And

59:01I think it's worth saying that, you

59:03know, our employees and and I think the

59:05trust agrees with this, our employees

59:07really are the most valuable resource.

59:09Like, we can't provide the service

59:11without our team of employees. And I

59:14think creating a a modern,

59:16well-designed,

59:18updated um ADA accessible uh workspace

59:23is is really, you know, something we

59:26should do. Um I think it aligns with the

59:30vision to be worldclass transportation.

59:32Um I'm I also believe it's consistent

59:35with our core values on the city side of

59:38uh for example, keep getting better. We

59:40want to be a better employer. I think of

59:43Embark's own core values being there. I

59:45think it's an opportunity to be there

59:46for our employees. Um, so I just wanted

59:49to say a few comments because I know

59:51it's been in the works for a very long

59:53time. The planning goes back probably

59:55even five years and so I'm glad to see

59:58that we're we're here. I'm looking

1:00:00forward to the event and if I can do

1:00:02anything to assist, if you need to put

1:00:03me to work on a signin sheet or

1:00:06something, I'm willing to do it.

1:00:10>> Okay. Angel. Angela.

1:00:14>> Um yes. I just wanted to say um and

1:00:16remind folks that we've got the the

1:00:18Haunt the River this month. Um it's

1:00:20something that uh my family and my

1:00:22kiddos look forward to and we'll be

1:00:24we'll be doing that later this month. So

1:00:26just wanted to remind folks of that um

1:00:28exciting temporary event.

1:00:30>> Greatly.

1:00:32>> Okay. Of course. Of course. So, uh, I'd

1:00:36be remiss if I didn't point out that we

1:00:37had, um, our FTA Region 6, uh, team in

1:00:41Oklahoma City this week. Uh, we hosted

1:00:43them for two days. Uh, really huge shout

1:00:46out to to Chip, um, his team and, uh,

1:00:49Bella for putting together our agenda

1:00:51and making sure that everything went uh,

1:00:54off without a hitch. We toured uh, the

1:00:56First Americans Museum site or uh, River

1:01:00Landing. We toured the two Olympic

1:01:02venues. um toured possible future

1:01:05headquarter sites and then gave them a

1:01:07tour of the the South May remodel and

1:01:10then we also reviewed all of our large

1:01:12raise grants that we have in the works.

1:01:14Um multi-million dollars worth of of

1:01:17grants that we're um managing and um

1:01:20they left very pleased and happy to see

1:01:24that we are um managing them to the the

1:01:28highest standard that there is. And so

1:01:30we were able to provide an update, show

1:01:32them where all the money is going and

1:01:34how it's being handled. And so it's a it

1:01:36was a it was a really really good two

1:01:38days. And that's it.

1:01:41>> Okay. Well, thank you all for coming

1:01:43today and uh have a rest of your Friday

1:01:48and weekend. Uh I hope this safe and

1:01:51productive. We will see you next month.

1:01:54We're adjourned.