Draper Water Treatment Plant Improvements
At a glance
Based on auto-generated captions; names and numbers may be misheard.
- What: a bundle of upgrades at the Draper water treatment plant (project number captioned "WTO222-1B").
- Where it stands: on 2026-10-13 the Oklahoma City Water Utilities Trust approved the plans and specifications to be advertised for bids.
- Next: bidding, then construction over an estimated 555 calendar days.
Scope
- Motorized actuators on 21 large valves, tied into the plant control system.
- Chemical feed improvements, with a new chemical storage tank and enclosure.
- Rehab of two elevated backwash tanks that are in poor shape.
- Demolition of the presedimentation basin, out of service for years, and site restoration.
- Replacement of six aging, partly leaking large valves in the pipe gallery.
Sources
Discussion time
About 3 minutes across 1 meeting (from transcript timestamps; approximate).
| Meeting | Minutes |
|---|---|
| 2026-10-13 - Oklahoma City Water Utilities Trust | 3 |
Log
- 2026-10-13 - Oklahoma City Water Utilities Trust - Utilities project manager presented the scope; approved to advertise for bids with no questions.
- 2026-10-27 - Oklahoma City Water Utilities Trust - Libra Electric awarded $858,410 for High Service Pump Station Variable Frequency Drive No. 2 replacement at the Draper plant; Carollo Engineers contract of $179,728.50 for a Draper auxiliary high service pump station assessment (both approved 4-0).