2026-10-20 - Communications Reports and Council Oversight Committee
Summary
Built from the posted agenda and the video captions; no minutes were located. Auto-caption wording may contain errors, and Hawaiian names are often garbled.
Discussion highlights (from the video)
-
Comm. 942.2: the County Auditor updated the committee on the nonprofit grants compliance review after two of the five nonprofits that had not responded later sent information. A third organization is flagged for no further grant funds. The Auditor's office also adopted a procedure for grantees that do not respond after two contact attempts, and is standing up new grant management software. The file was closed with eight in favor and one excused.
-
Comm. 1112: a University of Hawaii presenter described the Hawaii Cesspool Prioritization Tool and the Act 217 Sewer Expansion Overlay. The analysis identified 103 possible sewer project areas statewide and sorted them by whether projects are planned or underway, under evaluation, or without plans, against the 2050 cesspool conversion deadline.
-
A council member asked for a Hawaii Island-specific view of the highest-return opportunities, which the presenter agreed to provide.
-
The committee closed file on Comm. 1112, with seven in agreement and two excused.
-
Comm. 942.2: County Auditor Clare McAdam's follow-up audit of the Waiwai nonprofit grants compliance review for fiscal year 2024-2025, sent September 30, 2026 with a PowerPoint presentation (not read). See Waiwai Nonprofit Grants Follow-up Audit.
-
Comm. 1112: Kimball's request for a University of Hawaii Water Resources Research Center and Sea Grant presentation on the Hawaii Cesspool Prioritization Tool and the Act 217 Sewer Expansion Overlay. See Cesspool Prioritization and Sewer Expansion Overlay Presentation.
-
Chair Michelle Galimba, vice chair Rebecca Villegas; members James E. Hustace, Holeka Goro Inaba, Jennifer Kagiwada, Matt Kaneali'i-Kleinfelder, Ashley Lehualani Kierkiewicz, Heather L. Kimball and Dennis Onishi. Who attended is not recorded.
-
Held at the West Hawaii Civic Center in Kailua-Kona; the Hilo Council Chambers were closed, with public attendance at courtesy sites (Ocean View, Pahoa and Waimea) and oral testimony by Zoom. Testimony deadline was noon on 2026-10-19.
-
Video listed on the County's YouTube channel as the 27th Session; the transcript is pending.
Agenda
Order of business: call to order, roll call, statements from the public on agenda items.
- Communications: Comm. 942.2, follow-up audit of the Waiwai nonprofit grants compliance review - Waiwai Nonprofit Grants Follow-up Audit
- Communications: Comm. 1112, presentation request on the cesspool prioritization tool and Act 217 sewer expansion overlay - Cesspool Prioritization and Sewer Expansion Overlay Presentation
- Adjournment
Sources
- Agenda: https://records.hawaiicounty.gov/WebLink/DocView.aspx?id=1137659&dbid=0&repo=ClerkCouncil
- Agenda folder: https://records.hawaiicounty.gov/weblink/Browse.aspx?dbid=0&startid=1091565
- Video: https://www.youtube.com/watch?v=lAywiMCuyDY (Hawaii County Council YouTube channel)
- Agenda hub: https://www.hawaiicounty.gov/our-county/legislative/county-council/meeting-agendas-and-actions
Video
Transcript
*These are auto-generated captions; names and numbers may be misheard.
Transcript
01:57Mhm.
02:08>> [snorts]
02:10>> Bosnia
02:11>> [laughter]
02:17>> Welcome to the 27th session of the
02:21Communication Reports and Council
02:23Oversight Committee.
02:25We are at the West Hawaii Civic Center
02:27today. It is October 20th, 2026.
02:31It is 1:30 p.m.
02:33Present here today are Council members
02:37Kagiwada, Hustace,
02:39Kirkwood,
02:41Onishi, Inaba,
02:44Viegas, and myself, the chair of this
02:46committee.
02:47Um
02:49and the Council members Kaniele, Klein
02:51Felder, and
02:54Kimball will be joining us shortly, I
02:56believe. We can go to statements from
02:59the public on agenda items, if any.
03:01>> Well, thank you, Committee Chair Glenn.
03:03I can report that we do not have any
03:04testimony to committee, so I'll just
03:06begin by reading communication 942.2,
03:08unless you prefer I do something else.
03:11>> [snorts]
03:11>> No, just
03:12>> Okay, I'll do that. Communication 942.2
03:16follow-up audit of the by value
03:17nonprofit grants complaints review for
03:19fiscal fiscal year 2024-2025
03:23from County Auditor Claire McAdam, dated
03:25September 30th, 2026, transmitting a
03:27PowerPoint presentation.
03:29>> Chair, motion to close file
03:30communication 90 942.2.
03:35>> It's been moved by Council member
03:36Hustace and seconded by Council member
03:39Onishi to close file on communication
03:41942.2.
03:45And
03:47I'm hoping that we will have the
03:49auditor's office online here.
03:58Excellent.
04:01Hello,
04:02auditor
04:04McAdam.
04:05Please proceed.
04:07>> Hi, good afternoon. Hi, yes. We
04:09submitted this communication just to um
04:12>> I think your audio's a little fuzzy. If
04:14you could perhaps um
04:17something do something.
04:27It might be us, but if there's any Nope,
04:29sorry.
04:33Yeah, it sounds like you're in a
04:34fishbowl or something like that.
04:40Maybe
04:41just try and speak very clearly to
04:43overcome it, perhaps.
04:45>> Okay. Okay, [laughter] sorry. We
04:46submitted this communication to you to
04:49update you because after the last time
04:52we presented the five grants
04:54>> We Yes, we still can't understand you,
04:56sorry.
04:58Um
05:02Perhaps
05:05Yeah, perhaps you could try logging back
05:07in um or we could take the next item and
05:11we could come back to you.
05:13>> No, sorry.
05:14>> Oh, there. That seems better.
05:16>> Yeah.
05:16>> Okay.
05:17>> Sorry.
05:17>> Okay, there we go.
05:19>> Okay, great. Yeah, we submitted this
05:21communication because um after the last
05:24presentation we did about the five
05:26grants and aid, we received um
05:28communication from two of the nonprofits
05:30that we had not been able to perform a
05:33review of
05:34um because they had not responded to our
05:36uh communications to them. And so, at
05:38that stage we decided to do another
05:41final review of of all the nonprofits.
05:43And so, we contacted the third of those
05:46three nonprofits and we um asked them to
05:49send the information to us
05:51and so in the end we managed to get the
05:54information requested from two of those
05:55and that was Conejo Historical Society
05:57and Liya Poor 2020. And so we performed
06:01a review of the information that they
06:03provided to us. And we rated them and
06:07scored them in accordance with the same
06:08procedures as we did for all those other
06:09nonprofits. And so we submitted that
06:12here as a the communication just to show
06:14that that's been done. As a result of
06:16that also we looked at our internal
06:18procedures and just tightened them up a
06:20bit about
06:21communications and what we should do in
06:23the event that we hadn't heard from
06:25nonprofits after two attempts to to
06:27obtain information from them. So that's
06:29that's that's basically the
06:30communication. Just wanted to update you
06:32to say that we received two further
06:35reviews and we've reviewed them and that
06:38you know we're presenting them to to
06:39close that file on the the library
06:41grants review for that period.
06:45>> Thank you so much.
06:48Council member Enaba.
06:49>> Thank you Ms. McAdams. Just wanting to
06:52make sure that the third organization I
06:56don't have the original report but that
06:58we do have them flagged
07:01for no further grant funds.
07:04>> Okay.
07:04>> And as we
07:06work to stand up our new grant
07:07management software
07:10this is for
07:12Jessica in our office. I know you're
07:13listening so make sure we are in
07:16conjunction with the auditor's office
07:19to put a
07:21put them on the blacklist for now
07:22whoever they may be. Thank you.
07:25>> Will do.
07:29>> Anyone else?
07:33Seeing none
07:35all in favor of closing file
07:39on
07:40communication 942.2
07:43please say I.
07:45Any opposed?
07:47Uh
07:48motion passes. Communication 942.2
07:53is closed with eight eyes and one
07:55excused,
07:57Council member Kanamoto Ee Klein Filter.
08:00We can now move on to the next item.
08:03>> Is there any communicate Is there any Is
08:04there any testimony for communication
08:061112?
08:09Hearing none, communication 1112,
08:12request for presentation by University
08:13of Hawaii Water Resources Research
08:15Center, University of Hawaii Sea Grant
08:17College Program Assistant Specialist
08:19Christopher K. Shuler entitled the
08:21Hawaii Cesspool Prioritization Tool and
08:23the Act 217 Sewer Expansion Overlay from
08:26Council member Heather L. Kimball dated
08:28September 22, 2026.
08:31>> Chair, motion to close file on
08:33communication 1112.
08:37>> It's been moved by Council member
08:40Kimball, seconded by Council member
08:41Viegas to close file on communication
08:431112.
08:47Council member
08:48Go.
08:48>> Thank you, Chair. Um um pleased to
08:50welcome Mr. Chris Shuler uh to present
08:53to us today on the prioritization tool
08:57that was part of an act that HZAC was
09:00involved in um getting passed at the
09:02state legislature. Um I thought this was
09:05timely since we most recently had
09:07presentations by um
09:10our Department of Environmental
09:11Management with with regard to their
09:13strategy around cesspool conversions. Um
09:17this was also in part uh a presentation
09:21and Council member Viegas was was here
09:23for that, too. At At HZAC, we had a
09:25working group with state and county
09:27officials
09:28um around cesspool conversions, and and
09:31Chris was able to present at that, as
09:33well. And one of the commitments we all
09:35made at that meeting was to ensure that
09:37we brought um
09:39Mr. Schuler to all of our councils to
09:41provide the same presentation at at the
09:44council levels for
09:46everyone's benefit. So, please join me
09:48in welcoming Mr. Schuler and I will pass
09:51it to you to to take it away and and
09:53give us your presentation. Thank you
09:54again for being here. We appreciate it.
09:57>> So much Councilmember Kimball. Can
10:00everybody hear me okay?
10:01>> Yes.
10:03>> Okay, great. And then I'll share screen
10:06here
10:07and let me know if you cannot see my
10:09presentation.
10:13>> Looks good.
10:14>> Awesome.
10:15>> [clears throat]
10:15>> All right. Well, thank you so much.
10:17Thanks for having me at this meeting.
10:20Really appreciate the opportunity to
10:21share our work. I'm a faculty member at
10:25University of Hawaii Manoa Water
10:27Resources Research Center
10:30and I'm also an affiliate faculty with
10:31Hawaii Sea Grant and Water Resources
10:34WRRC Grant have worked together for the
10:38last five years to
10:42try to help
10:44provide resources and information
10:47to legislatures, to the public,
10:50to everybody in the state of Hawaii to
10:52help chip away and solve the cesspool
10:55problem which is you know one of the one
10:57of the toughest problems that we have
10:59in the state. I'm sure I don't have to
11:00tell all of you that and so what I would
11:03like to do today is share a little bit
11:05about the tools that we have developed
11:08over the last five years and
11:09specifically over the last year and a
11:12half from Act 217 a sewer expansion
11:16overlay which is it's an it's it's an
11:19extension of the Hawaii cesspool
11:21prioritization tool. So,
11:24I'm going to try to keep this to 15
11:25minutes. You know, I'm an I'm an
11:27academic so I can certainly talk for a
11:28long time, but if anybody has questions
11:30or you know, wants me to
11:32um
11:33clarify anything, please let me know.
11:36So, I just threw this slide in there
11:38mainly so that I could share these um
11:41these kind of go-to references. You
11:43know, we all know that cesspools um have
11:46an impact on not only our coastal
11:48environments, but also human health um
11:51and recreational waters. So, again,
11:53there's some really good references down
11:54there um if you would like to use those.
11:57This presentation, by the way, is is all
11:59up on a website and is archived and is
12:02publicly accessible. So, I can share the
12:03link to that.
12:05Um
12:06So, you know, kind of skipping over the
12:08what is a cesspool. I think everybody
12:09here knows that. Um
12:12really want to start kind of setting the
12:14stage with what we did in two in 2021
12:17under a contract from Department of
12:19Health under at that time the Act 132
12:22Cesspool Working Group legislation.
12:25And they asked us to essentially develop
12:28a way to prioritize all of the cesspools
12:32in the state. At that time, a lot of the
12:34cesspools were under a data limitation.
12:37There wasn't enough data to prioritize
12:39them. And we developed a geospatial
12:42framework
12:44um
12:44as a decision support tool tool to take
12:47in
12:48all of the factors that we could
12:49possibly think of that related to human
12:52health and the environment and how
12:53cesspools affected them um and
12:55simplified it into a one, two, and three
12:58priority score for the public, for
13:01Department of Health, and and for
13:03legislature legislators and policy
13:05makers.
13:06Here's just kind of a overview of the 15
13:09factors. There's a lot of factors on
13:11there, everything from sea level rise to
13:14um coral cover, um how often people use
13:17the beach, as well as simple things like
13:19distance to wetlands and streams. Um you
13:21can check those out on the slide or in
13:23our report. But kind of the bottom line
13:25for it is we took all those factors, put
13:28them into this calculator, and the
13:30calculator yields this result of
13:33priority one, which is the top 25% of
13:36all of the scores um from those 15
13:38factors at each cesspool, priority two,
13:41and priority three. And so, here's the
13:43breakdown of how many um individual
13:46cesspools across the entire state fall
13:48into those categories. You can learn a
13:50whole lot more. We have informational
13:51videos. We have our report. We have an
13:53interactive web tool. All that Hawaii
13:55cesspool tool.org at that QR code right
13:57there.
13:59So, that was what we put together 2021,
14:012022. We had an expansion project to
14:03make the videos and the the outreach
14:05website. Um
14:07and then in 2024,
14:09we were tasked by the Hawaii State
14:12Legislature to answer this gap right
14:14here. So, what the original Hawaii
14:17cesspool tool was not designed to answer
14:19was how those cesspools should be
14:21replaced and by whom and at what cost,
14:24right? So, we really just said which
14:26ones are most impactful. Um and there's
14:29a little bit of a governance gap in that
14:31no single agency in Hawaii maintains a
14:34statewide picture of where sewer system
14:37expansion is planned um or is feasible
14:39or is likely. Um and this leads to
14:41problems. So, one of the main problems
14:43that was identified when Act 217 was
14:45written was that residents are uncertain
14:47whether they should you know, spend
14:49$50,000 now, replace their cesspool, or
14:52if they should wait for sewer service to
14:53come down the line. So, that's why um
14:57the Hawaii State Legislature mandated
14:59that we um develop this new expansion
15:02overlay to add to our existing tool to
15:06evaluate where centralized sewer
15:09is most likely and is most feasible to
15:12be constructed by the 2050 deadline.
15:16So,
15:17the way that we did this is we had we
15:18had a big staff. We had um like three or
15:20four full-time staff members, and we
15:22tried to reach out to everybody and
15:24talked with the county wastewater
15:26departments, private wastewater system
15:28purveyors. Um we talked a lot with
15:30Corollo Engineers um because they were
15:32putting together the report that um I'm
15:35I'm assuming that y'all heard about last
15:37last meeting. Um and kind of similar to
15:40what they did, you know, we worked
15:42closely with them and um tried to match
15:45our data sets to their data sets as
15:46well. Um we identified with a threshold
15:50that was the same as Corollo's,
15:52um areas where we had more than 50
15:54cesspools within an eighth of a mile,
15:56and that gave us our potential project
15:58areas. So, we identified 103 possible
16:01areas where basically we had the density
16:04to say a sewer system project makes
16:07sense. In in really rural, not very
16:10dense areas, it it doesn't make sense
16:12because it's, you know, just so
16:13expensive to put pipes between the
16:15houses. But, these 103 project areas
16:18were where um we were doing our
16:20analysis.
16:22So, we also tried to, you know, along
16:24the same lines as the Hawaii Cesspool
16:25Tool, really take a large body of
16:28complicated, site-specific information
16:31and condense it down into categories
16:34that could be actionable. So, we for
16:37each of the 103 project areas, we
16:39identified them either as planned or
16:41underway, under evaluation, or having no
16:44active plans. So, that was one way we
16:46categorized them.
16:48And then, to assess feasibility, you
16:50know, which ones of these projects make
16:52the most sense? When it really comes
16:54down to it, dollars are the bottom line,
16:56right? So, cost was the the you know,
16:59the way we
17:01um tried to aggregate all of the
17:02feasibility information that we could,
17:04and so we assigned these cost tiers by
17:07creating a
17:09a planning-level cost model. So, we're
17:11not engineers, we didn't make an
17:13engineering-level cost model, but this
17:15was a planning-level, statewide kind of
17:18landscape 10,000 ft view level cost
17:20model.
17:22Um, and we are able to apply that to all
17:23of the areas in the state.
17:25Okay. So, jumping into results,
17:28um,
17:29the key finding, the first key finding
17:30that that we wanted to share today is
17:33that, um,
17:35there's not very many projects that are
17:37currently planned. Um,
17:39for our potential project areas, we
17:40literally asked the counties,
17:43um, and private wastewater providers,
17:44which ones of these are you planning to
17:47have done, you know, by 2050 and can say
17:50yes, we will have these done.
17:53Out of the whole state,
17:54there is or four of them where the
17:56county said, yes, we will have these
17:58done.
17:59Um,
18:00with
18:01essentially 80% of them. So, that's 80
18:03other project areas with no identified
18:05plans. The ones in this blue category
18:08here, where they're under evaluation,
18:09those are project areas that have been
18:11written up in a CIP budget that, you
18:14know, there is an existing, you know,
18:17maybe community master plan that
18:19identifies a sewer project as
18:21something that people are interested in
18:23doing, but they're not to the point
18:26where we can put them into the planned
18:27or underway category. So, they're being
18:29evaluated plans,
18:31um, they're being talked about, but
18:33they're not necessarily going to happen.
18:35And and, you know, we hoped that this
18:36would communicate really clearly to
18:38homeowners, you know, if you're in one
18:39of these green areas, that, you know,
18:42that means that a sewer system is coming
18:44down the line, but everything else, it's
18:46not.
18:48Um,
18:48I probably don't have to say this, but,
18:50uh,
18:51you know, what
18:52our cost modeling found that feasibility
18:55is an exception. So, most of the
18:56projects, um, in general, are expensive.
18:59And so, as I mentioned, we did actually
19:02calculate numbers of dollars, but we
19:05wanted to sort of qualify that result
19:08because, again, you know, our we're not
19:10professional estimators,
19:12um,
19:13and, you know, it's a really complicated
19:14science to actually estimate costs
19:16accurately.
19:18Um
19:18>> [clears throat]
19:18>> but, we were able to estimate costs and
19:21then bend them so that we could have a
19:22relative cost estimate. And very few of
19:25the projects that we um
19:29uh estimated the cost of fell into these
19:31lower cost tier categories. So, most of
19:35them fell into these higher tier
19:36categories. You know, some of them were
19:38extremely expensive, um but most were um
19:42in in this category. So, just for a
19:45little bit of a reference, the
19:48um
19:49the actual costs are of these higher
19:52categories of of the fourth tier here is
19:55or the third and fourth are 18 to 14
19:57times more expensive than a typical
20:00onsite sewer uh septic system
20:02installation. So, you know, we're we're
20:04talking something along the lines of 300
20:08to uh 400,000 dollars per unit for these
20:12sewer system expansion projects.
20:15Okay. So, this is the graph that we
20:18really wanted to produce with this
20:20project because, when it really comes
20:23down to it, you know, it's a little bit
20:24of a complicated graph, but what the Y
20:27axis shows is essentially the
20:29feasibility. So, it shows this this kind
20:32of median relative cost. It's not in
20:34dollars, it's in just kind of the
20:35relative cost, but the ones that are
20:37lower cost less, the ones that are
20:39higher up on this graph cost more.
20:42Now, with the Hawaii cesspool
20:44prioritization tool, what we were able
20:46to do is quantify the impact that those
20:50cesspools have. So, we multiplied the
20:54prioritization score weight by the
20:56number of cesspools because, you know,
20:58the more cesspools that you can convert,
21:00the better, right? Um
21:02and that is this impact score. And so,
21:05projects that are higher on the impact
21:07score, we're converting more cesspools
21:10and
21:12they are higher priority cesspools. So
21:14that's kind of an index of that. So with
21:16this graph, what we can do is we can
21:17separate each of the 103 project areas.
21:20So each of the project areas is one of
21:22these bubbles. They're colored by that
21:24impact score, you know, the
21:25prioritization level. We can identify
21:28which areas and most of the I think I've
21:30labeled all of the the high impact low
21:33cost areas where we can essentially get
21:36the biggest bang for our buck, right?
21:38And so this is a statewide single glance
21:41figure where we can look at this and
21:43say, "Okay, which are the most
21:45cost-effective, which are the most
21:47impactful cesspool conversion areas?"
21:49They're the ones in this corner. The
21:51ones in this corner are the lowest
21:53impact and highest cost, right? So they
21:56you know, these are much less feasible
21:58and then you know, you have the the two
22:00side quadrants here where
22:02we've got things that are
22:04lower cost but you know, are more
22:06priority three and then these have you
22:09know, convert have a lot more impact.
22:12We're converting higher priority
22:13cesspools but you know, the costs rise
22:15as we go higher on this graph.
22:18So all of this is in our report and how
22:20we got to it is in our report.
22:22But I think this graph really kind of
22:23sums up the work that we did.
22:26Um you know, and and and with the data
22:28that we generated, we can look at each
22:30specific island and so I just put this
22:32table together. Um you know, Hawaii
22:35Island
22:36so we can highlight here has 42 of the
22:39areas. So you know,
22:40the great majority of the potential
22:43project areas that we identified
22:46um
22:46and then a lot of those are very
22:48expensive because a lot of the areas on
22:49Hawaii Island essentially are spread out
22:51and you know, distance between homes is
22:54is the primary driving factor for cost
22:56because it's you know, laying those
22:58collection pipes that's really quite
23:00expensive.
23:01Um and having an existing infrastructure
23:04there is is another strong predictor of
23:07of feasibility. So, on Oahu, there's a
23:09lot of existing infrastructure. So,
23:11that's really helpful because they, you
23:12know, potentially can send wastewater
23:14flows to existing um treatment plants as
23:17opposed to building new ones.
23:20Um, there are a couple lessons learned
23:22that we wanted to point out. I won't
23:24necessarily go through all of these in
23:27depth here. Again, um you know, these
23:29slides are posted online, but I do want
23:30to have a lot of room for questions. You
23:33know, I think one of the main things
23:34that we identified is is really more
23:36coordination would be helpful and
23:37useful. And I know Department of Health
23:39is working on that. You know, that and
23:41that's kind of part of why I'm here
23:42today, right? It's because um
23:44you know, Council member Kimball
23:46identified that, you know, more
23:49more spreading of this information and
23:51coordination would be helpful. So, um I
23:53think between departments, that's really
23:54helpful, especially between counties and
23:56state. Um
23:58one of the key um limitations too is
24:01disposal of the treated wastewater.
24:03Uh I don't believe Department of Health
24:05is permitting new um
24:07injection wells. Ocean outfalls are very
24:09difficult to permit at the federal
24:11level. So, the counties um you know,
24:13expressed a lot of concern over um being
24:15able to dispose of the wastewater, not
24:18just collect it and get it to the plant,
24:19but also what are we going to do with it
24:21afterwards.
24:22Um yeah, and then
24:25this this is also just kind of part of
24:27the you know, feasibility equation.
24:30Most um feasible projects are really
24:32those ones that are already within
24:34existing sewer service areas. Creating
24:36new sewer sewer service areas for
24:37cesspools
24:39is quite expensive. Um
24:41and then yeah, here's some other lessons
24:43that I'll I'll leave up on the screen
24:45while I take questions here um if
24:47anybody has any. So.
24:50Yeah, but I don't want to be
24:52respectful of the council's time and
24:54make sure we have plenty of time to
24:55answer any questions that come up.
24:56Thanks.
24:57>> Thank you so much, Chris, and and I hope
24:59you guys all find this as
25:02um useful as I do. Um especially in the
25:05context of the presentation we had from
25:09from DEM. Um you know, I think
25:12the same conclusions were reached in
25:15terms of the two reports
25:19here in terms of the feasibility in a
25:21number of these areas, but then on the
25:23flip side
25:24um the county really looking at
25:28many areas of this island where some
25:31sort of municipal wastewater is just
25:33impractical, and it's all going to have
25:35to be on the individual homeowner. Now,
25:39I think one of the factors in both cases
25:43is that the predominant
25:45decision-making
25:47component is the cost. And so, um you
25:51know, one of the discussions and maybe
25:53Council member Vicas, you can kind of
25:55reflect on your experience, but one of
25:57the the conversations at the
26:00working group at HZAC was that you know,
26:02these there are these other priorities,
26:05and they were all weighed against each
26:06other and and combined, um do we need to
26:10kind of look at those different measures
26:13and prioritize them a little bit
26:15differently depending on what actual
26:17outcomes we want, you know, perhaps in
26:20areas where we need more recycled water
26:24and looking at infrastructure to do
26:26wastewater that would only would a
26:28wastewater system that would not only
26:30treat wastewater, but would produce
26:32usable water for the community. Um
26:35that's maybe something that should be
26:36factored in. Proximity to
26:40for example, the the community-based
26:42subsistence fishing area in Milolii,
26:44perhaps that is something that needs to
26:46be weighed differently with respect to
26:48just cost. Um as Chris mentioned
26:52the one of the other outcomes of the
26:55conversation at the working group was
26:57this need for coordination, um,
27:00specifically between the counties and
27:03the state. Um, and looking at, um,
27:08potentially supporting funding for
27:11staffing within the Department of Health
27:13specifically focused on cesspool
27:15conversions. I think that that is, um,
27:18something that we were all coming to
27:20consensus around that that needed to
27:21happen. Um, but with that, I will love
27:24to have you guys ask questions. Um, this
27:27is Chris is an expert in this field, so
27:30give him the tough ones. Thank you.
27:32>> Thank you.
27:33>> Thank you so much, Chris. This is very,
27:36um, helpful information. Unfortunately,
27:39I do have a meeting that I need to jump
27:41on to, so I'm passing the chair to
27:43Council Member Viegas at
27:47uh, 1:56
27:49p.m. Thank you, Council Member Viegas.
27:51>> Thank you, Council Member Kimbell. Let
27:53the record reflect that Rebecca Viegas
27:55myself has taken,
27:57um, the chair position of the Committee
28:00on Communications, Reports, and Council
28:02Oversight at 1:56 p.m.
28:05And with that, uh, questions from my
28:08colleagues, Council Member Eustace.
28:11>> Thank you, Chair Viegas. Uh, appreciate
28:13the time. Thank you, Council Member
28:14Kimbell for for bringing Dr. Schuler
28:16here, um, before us, uh, for this
28:17presentation.
28:19Um,
28:20couple questions, Dr. Schuler, on
28:24kind of the the breakdown of prioritized
28:27areas.
28:30The, you know, some of the graphs,
28:33I'm trying to I'm going back and forth
28:34between the the the tool itself on the
28:36website
28:38and your your presentation here. Uh, so
28:41trying to get a better understanding of
28:44how these areas were were identified.
28:47Are they towns themselves,
28:50communities?
28:53>> Yeah, ab-
28:54absolutely. So, the 103 project areas
28:57specifically.
28:59>> Because on the
29:00on the on the on the website on the
29:03cesspool prioritization tool, it really
29:04just breaks it down into census tracts
29:07or is there another layer that can be
29:08activated there?
29:10>> Yep, absolutely. Yes, and and we've
29:12created a lot of layers and a lot of
29:14data. So, you know, I understand it's
29:15complicated. Um
29:17but the
29:19specifically there's two tools that we
29:22created and one of those is the original
29:24Hawaii cesspool prioritization tool,
29:26which is um the red, yellow, and um
29:31orange dots. And that right now is is
29:35primarily organized by census tracts and
29:37and prioritizes individual cesspools.
29:40Um So, then the overlay, if you go onto
29:43our website, there's a little blue
29:45banner at the top and there's also a
29:47section down below that says, "Check out
29:49the new
29:51um 2024 wastewater overlay." And that's
29:54where we identified those 103 project
29:56areas. And so, those project areas, you
29:58know, we tried to color them differently
30:00to try to make that distinction. So,
30:01those are the blue, green, and gray
30:03project areas. And so, those 103 project
30:06areas were um they were selected and
30:09defined utilizing the same methodology
30:13that uh Corollo Engineers and County of
30:15Hawaii used in the integrated wastewater
30:18management plan. We talked with Corollo
30:21and um
30:23County of Hawaii early on in our process
30:26and, you know, we recognized the need to
30:28try to standardize what we were doing um
30:31in a similar manner uh so that, you
30:33know, we wouldn't be producing confusing
30:35and conflicting information.
30:37And so, I'm not exactly sure, you know,
30:39if if our areas completely line up. That
30:41there's a little bit of difference in
30:43where we drew the boundaries versus
30:45where they drew drew the boundaries. We
30:47were able to validate on their Oahu
30:50report.
30:51Um
30:52and essentially, you know, we we kind of
30:54came to the same areas. And our cost
30:57model
30:58um is pretty similar to the cost model
31:00that they developed. So, you know, these
31:03this tool in those reports should, you
31:05know, essentially match pretty well
31:07together. And again, you know, those
31:09areas were really just defined by
31:11identifying areas where there are
31:13clusters or higher density groups of
31:16cesspools that are um that have 50
31:20cesspools in more than an eighth of an
31:22acre. And so, that was the same
31:23methodology they used, so that was the
31:25methodology we used.
31:27>> Thank you. I just didn't go far enough
31:28down on the website there to really
31:29activate the the overlay there itself.
31:31It Is there a way to put these two
31:34together though to kind of see because
31:36the the
31:37the sewer expansion overlay
31:39is really just identifying these high
31:40concentration of cesspools and it's not
31:43So, you kind of are
31:44and where you're either identifying
31:48plan projects, those that are underway
31:50or under valuation, or there's nothing
31:53no action being taken as far as you can
31:54tell. Is there a way to kind of
31:57put these two together to kind of see
31:58where some of those gaps are though
32:01based upon those those priority areas
32:03based upon Department of Health
32:04standards and those sort of things?
32:07>> Yes, so that
32:08you can and let me see if I can pull
32:11this up on my screen and can you see the
32:14wastewater overlay expansion tool?
32:16>> Yes.
32:18>> So,
32:19we do have this layer list here and it's
32:21hidden by default cuz it's a little bit
32:23cluttered. But you can turn on the
32:25tracked priorities of the cesspools
32:28on the overlay tool so you can see where
32:30there's higher priority cesspools, lower
32:33priority cesspools, etc. Does Does And
32:36that was Yeah, that was, you know kind
32:39of the one thing that we've put together
32:41by default on these public tools. You
32:43know, the other thing that we can do is
32:44if you have a request, we've got all the
32:46data layers and and we can you know, put
32:49together custom maps or custom data
32:51sets. I'm actually putting together one
32:52for DHH right now because they you know,
32:55they asked us to
32:56you know, prioritize some of the
32:58cesspools that were not in in the groups
33:00already and you know, we're able to
33:01produce that within a couple of days. So
33:04if there's an analysis you're interested
33:06in, please let us know.
33:07>> Thank you for highlighting the layer
33:08list there. I appreciate that.
33:10I'll be able to turn that on and kind of
33:11see the comparisons between
33:13uh your previous work in this one here.
33:15Um
33:18two other questions. The the project
33:23and the overlay
33:26and those potential project areas
33:29that's just an ongoing dialogue with
33:31different county administrations then or
33:34lack thereof or on better understanding
33:36what what are you missing there in terms
33:38of trying to
33:39get at making sure that the data
33:41represents the work that's ongoing.
33:44>> That's that's a great question and it's
33:47a little bit unknown at this point where
33:49this work will go in the future. And
33:52I've actually started um a couple of
33:55meetings with Department of Health to
33:58really um
34:00kind of define and you know, put
34:02together a plan for governance of the
34:05Hawaii cesspool prioritization tool and
34:07you know, by default this uh wastewater
34:09overlay.
34:11So at this point all of these projects
34:13have been funded by individual grants or
34:16legislative appropriations without any
34:19continuing funding or mandate or
34:22requests or anything to continue these
34:24into the future. So we've got this
34:26hosted right now on Hawaii Sea Grant
34:28servers. So that's you know, University
34:30of Hawaii computing infrastructure.
34:33We're able to maintain this, you know,
34:35I'm certainly able to to help with it.
34:39Um, but in the future, what we're really
34:40trying to do, you know, I just had a
34:42meeting with the Department of Health
34:43to, you know, try to figure out who
34:45exactly owns the tool, what should the
34:47update schedule be, um, if people want
34:49to use it for commercial use, how how
34:51are you know, what are the rules on
34:53that? And then, you know, as as laws are
34:56written and policy is is developed um,
34:59utilizing the tool. For example, I think
35:01the Hawaii Green Infrastructure grants
35:04may be, um,
35:05basing eligibility based on the priority
35:07tool. You know, it's really important
35:09for that to be governed by a regulatory
35:11body, specifically Department of Health,
35:13and and I think that's what they're
35:15interested in, but we we've just started
35:17those conversations, um,
35:19um, recently. So, I I don't have a a
35:22final answer uh, for your question yet,
35:25but
35:26hopefully it's in the works and
35:27hopefully, um, you know, we can figure
35:29that out with Department of Health.
35:30>> Per- perfect, and I just hope that the
35:31information about
35:34ongoing efforts is is shared, you know,
35:37to be able to kind of really demonstrate
35:39what what what actions are being taken.
35:41The
35:43the tiers 1 through 5 on the
35:46feasibility,
35:47you know, that
35:48I know you're not saying that
35:51the higher the tier, we shouldn't be
35:53doing these things, correct? Even though
35:54it's, you know, these are very we're
35:57going to be more costly, it's still
35:58these are we should still be pursuing
36:00those even though
36:02uh, the the sometimes the costs are
36:04going to be out of out of reach for a
36:06little bit.
36:08>> Yeah, and and absolutely, you know,
36:09we'll I I I will kind of hide behind my
36:12scientist hat here, right? So, what our
36:14goal is to create useful data for the
36:17public, for policy makers, for people
36:19to, you know, make their decisions on.
36:22Um, you know, we're not necessarily
36:23being policy prescriptive here. So, what
36:26we tried to do was take these factors
36:29right here, and and this is where the
36:31cost model comes from. It's just looking
36:33at the cost per foot of collection main,
36:35conveyance main, um if a treatment plant
36:38is needed, and the size of that
36:39treatment plant, um and then also pump
36:42stations. And so, what we're trying to
36:44say is just which areas would be more
36:46expensive. Um and as I mentioned before,
36:49it it really kind of comes down to if
36:51there's an existing treatment plant, and
36:52how spread out the neighborhood is. So,
36:54if it's a you know, a a
36:56tier five area, you know, that means
36:59that based on our kind of geographic
37:02calculations, again, you know, we didn't
37:04do site-specific engineering
37:06feasibility, but based on the geography,
37:08it looks pretty expensive.
37:10You know, that that doesn't mean that we
37:11shouldn't be, you know, doing expensive
37:13things, but that just is something that
37:15hopefully is helpful, um you know, when
37:18we're weighing out the costs and
37:19benefits.
37:20>> Thank you. And that last question here
37:22on your key finding number three on the
37:24cost and hazard data ID, the highest
37:26return opportunities.
37:28Is there a way you could you present
37:30this to us
37:31>> [clears throat]
37:32>> just for that the communities identified
37:34for Hawaii County?
37:37>> Um
37:38yes. Yeah, I could make a graph
37:42that omits the other
37:44um islands' points. I could certainly do
37:47that.
37:47>> Not not to exclude them, but I just
37:48wanted to really see
37:51you know, the kind of the biggest
37:52impacts
37:54as we have that those conversations here
37:56uh in Hawaii County, cuz I I definitely
37:58see other communities. I don't don't see
38:01necessarily a lot of our communities
38:03called out on this graph specifically by
38:05name. So, it'd be really interesting to
38:06see
38:07where where these kind of line up in
38:09this in this format here.
38:12>> Absolutely. Yeah, and and that's a great
38:13example of yeah, you know, any of the
38:15continued analysis that would be
38:17helpful, you know, we we spent a lot of
38:19time putting this data and framework
38:21together. And if we can interrogate it
38:24in ways that are more helpful than we
38:25put in the report, that would be great.
38:27So, yeah, I I can absolutely generate
38:30that graph um
38:32within within a week or two here and and
38:34send that over.
38:35>> Fantastic. Really appreciate that, Dr.
38:36Shuler. Thank you so much, Chair.
38:39>> Thank you, Councilmember Hustace. Anyone
38:42else?
38:46No?
38:48All right. Um just quickly, thank you,
38:50Chris, for being here and for your
38:53vigilance in taking a topic that
38:57uh
38:59it's more it's easy to avoid, right?
39:02It's become
39:05an issue
39:07that I know for myself has felt
39:09insurmountable, but your ability to take
39:12all the data and take those talking
39:14points and those priorities and break it
39:17down in a way that we can look at it and
39:21still use subjective value systems
39:27to prioritize what needs to happen
39:29first, but your ability to objectively
39:34take the data and present to us with um
39:39you know, what that says is best course
39:41of action moving forward. Um grateful
39:43for the work you're doing.
39:45Um
39:45so grateful that we
39:47have this opportunity to use um
39:52this technology
39:54to guide us as we move forward. So,
39:56thank you personally and professionally
39:58for being here with us today and for
40:01your generosity in sharing the
40:03information online. I remember seeing
40:06you speak at H-SEC and you
40:08just were very like, "It's online. It's
40:10online. I've got it all there." So,
40:12you're very forward-thinking and
40:14ensuring that people have access to the
40:16information. So, just want to thank you
40:19for that.
40:20Is there anything else you wanted to
40:21share with us before we wrap this up?
40:25>> Um yeah, I just want to say yeah, thank
40:26thank you so much and um yeah, you know,
40:30really glad that our work is useful.
40:31That that is the you know, that's the
40:33highest accolade is if somebody is using
40:35it and you know, again, just like I'll
40:37I'll make that graph and if there's any
40:39other um you know, information that we
40:42can provide or customized analysis we
40:44can do, um absolutely, you know, happy
40:47to continue the conversation um and and
40:49keep you know, keep it going. So, thank
40:51thank you so much. Really appreciate all
40:53of your time.
40:54>> Thank you.
40:55I was just thinking, can we get him to
40:57help the Department of Water Supply?
40:59>> [laughter]
41:00>> And map and track all of our water
41:03units. Um well, thank you, Chris.
41:06>> We'd be very happy to actually. So,
41:08I do a lot with the American Samoa Water
41:10Utility and um yeah, just just let me
41:13know. Just let me know.
41:13>> Okay.
41:14>> Thanks, Chris.
41:15>> Good thing for um future councils to
41:17keep in mind.
41:19All right.
41:22With that, all those in favor of closing
41:25file and communication 1112,
41:28please say I.
41:30Anyone opposed?
41:32We have seven members
41:34uh
41:36in agreement and two members excused,
41:39Councilmember
41:41Galimba and Councilmember Connie Li
41:44Klein Felder.
41:46And with that, seeing no other business
41:48on the Communications Reports and
41:50Council Oversight Committee,
41:52our meeting today is adjourned at
41:562:10 p.m.