2026-09-15 - Communications Reports and Council Oversight Committee
Summary
Built from the posted agenda (read from a scanned document) and the video's auto-generated captions; names and numbers may be misheard, especially Hawaiian names.
- Quarterly affordable housing report (Comm. 35.9): the Housing Administrator reported no changes since the last report. The file was closed, nine in favor.
- Watershed stewardship presentation (Comm. 999): a climate adaptation science center speaker proposed reintroducing traditional Hawaiian watershed divisions as a land-administration strategy, noting fog interception could raise water capture and that existing land-use maps may not reflect a century of land-cover change. Members linked it to coming General Plan amendments. The file was closed, nine in favor.
- Follow-up audit of the Abandoned Vehicle Program (Comm. 1061): of five original recommendations, safety equipment, more reporting options and cross-training were found complete; formal policies and procedures and the vehicle auction process were in progress. No auctions had been held since December 2024, and staff estimated 55 to 60 vehicles would be needed to make an auction worthwhile. Policies were expected to be final by year end. See Abandoned Vehicle Program Follow-up Audit. The file was closed with some members excused.
- Wastewater Facility Plan and Cesspool Conversion Evaluation (Comm. 1062): the facility plan identified 70 projects, with the near-term 10-year priority cost about $1.1 billion and total identified needs about $2.3 billion; the Hilo Phase 2 upgrade was described as consent-decree mandated for 2035. The cesspool study covered about 48,600 cesspools, an estimated $5 billion to convert all, which a county-facilitated plan would cut to about $2 billion by relying on individual wastewater systems (about $40,000 each) for most conversions and sewer extensions only in priority areas (about $266 million). Members questioned the cost-effectiveness of large sewer extensions and the effect of widespread individual systems on nearshore water, and one expressed frustration that this was not shown before the earlier sewer rate discussion. See Cesspool Prioritization and Sewer Expansion Overlay Presentation and Sewer Service Charges Increase. The file was closed with two members excused.
Agenda
Communications, Reports, and Council Oversight Committee, September 15, 2026. Chair Michelle Galimba, vice chair Rebecca Villegas.
- Comm. 35.9: Quarterly Affordable Housing Report, April 1 to June 30, 2026 (Housing Administrator, dated August 27, 2026).
- Comm. 999: request for a presentation on a land-use systems change and watershed stewardship and resilience project (from Heather L. Kimball, dated July 30, 2026).
- Comm. 1061 and 1061.1: follow-up audit of the Abandoned Vehicle Program and PowerPoint. Abandoned Vehicle Program Follow-up Audit
- Comm. 1062: presentation on the Wastewater Facility Plan and Cesspool Conversion Evaluation (dated August 27, 2026). Cesspool Prioritization and Sewer Expansion Overlay Presentation
Sources
- Agenda: https://records.hawaiicounty.gov/WebLink/DocView.aspx?id=1135805&dbid=0&repo=ClerkCouncil
- Agenda folder: https://records.hawaiicounty.gov/weblink/Browse.aspx?dbid=0&startid=1091565
- Video: https://www.youtube.com/watch?v=m0SxKBJjFYs (Hawaii County Council YouTube channel)
- Agenda hub: https://www.hawaiicounty.gov/our-county/legislative/county-council/meeting-agendas-and-actions
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:0015,
00:012026. It is 5:15
00:05p.m.
00:07Present in council chambers are council
00:10members Kimell, Jagis, Connie Lee,
00:14Klein, Felder, Inaba,
00:18Onishi, Kirkwitz, and Kagiada
00:22as well as council member Hustus in the
00:26Kona chambers. So, we have all of our
00:29council members here today
00:33and
00:37>> let's go to statements from the public
00:38on agenda items if any.
00:41>> Thank you, Madam Chair. Just confirming.
00:44Yep. I just got confirmation. No
00:46testifiers for your meeting, ma'am.
00:48>> Okay. Thank you very much. So, we will
00:52proceed with our agenda.
00:54Communication 35.9 Quarterly affordable
00:57housing report April 1, 2026 through
01:00June 30, 2026 from housing administrator
01:02Kolani M Costa dated August 27, 2026
01:06transmitting the report pursuant to
01:08section 11-9 of the Hawaii County code.
01:12>> Chair motion to close file on
01:15communication
01:17sorry 35.9.
01:20It's been moved by council member
01:22Kimble, seconded by council member
01:23Connie Le Kleinfelder to close file on
01:27communication 35.9.
01:30Administrator Costa, would you like to
01:33say a few words about the report?
01:40It is getting late so everyone feel free
01:42to be succinct.
01:45Khal Costa housing administrator. No
01:48changes since the last report.
01:50>> Thank you.
01:54See one wanting discussion. All in favor
01:58of closing file on communication 35.9
02:01please say I. Any opposed?
02:05Motion passes with nine eyes.
02:09>> Is there any comm is there any testimony
02:11or communication? 999
02:16hearing nation 999 request presentation
02:19by Pacific Islands climate adaptation
02:21science c center's climate adaptation
02:22planner koa plunkin regarding project
02:25vow land use systems change for societal
02:27watershed stewardship and resilience
02:28from council member Heather El Kimble
02:30dated July 3026
02:33>> chair motion to close file and
02:34communication 999
02:37>> it's been moved by council member Kimble
02:40seconded by council member Kagi wanted
02:42to close file on communication 999.
02:46Council member Kimble.
02:47>> Thank you. Um it is my honor to
02:49introduce Camala Plunkett from the
02:51Pacific Island Climate Adaptation
02:53Science Center to provide an overview of
02:57Project Vow. I thought this was
02:59particularly timely um especially as we
03:03start to discuss amendments to the
03:06general plan and incorporating
03:08potentially more um indigenous land use
03:13frameworks into our general planning. um
03:17is this presentation was um intended to
03:20happen before LA and then that happened
03:23and um we had to postpone it which I
03:26think actually since we're talking about
03:28watershed stewardship and management and
03:30resilience makes this all the more
03:32pertinent at this time. Um I do know
03:35it's late in the day but I do encourage
03:37you to pay full attention to this
03:39presentation because I think it provides
03:42some valuable insight for us as a body
03:44going forward. Thank you,
03:48Camwell. Take it away.
03:50>> Yes.
03:52>> Aloha council. Um, thanks for your time
03:55and for your service to our county. Um,
04:00uh, thank you for letting me present uh
04:02an overview of project vow. Um,
04:06I'm going to read.
04:08So, sorry if it sounds impersonable, but
04:11going to try and uh make sure I get all
04:13the points in.
04:15Um
04:18so thank you for this opportunity to
04:20present project V to you today. Um
04:24there's a lot of information in these
04:25slides. So I'll be reading a scripted
04:28narrative um in hopes of hitting the
04:30main points.
04:33um to outline this presentation. Um the
04:39the context of project vow is to
04:42reinduce reintroduce the ancestral
04:44watershed district districting strategy
04:48of these islands um and the tenants of
04:51land administration to help our society
04:53today plan for the future. Um, also to
04:57help the council and the public consider
05:00the premise that current land use maps
05:05um, project
05:07uh, future patterns of development that
05:10assume water withdrawal rates. However,
05:14they may not factor in land cover change
05:19over time, which has
05:22over a century or more affected the the
05:25capacity
05:27to uh refill our aquifers.
05:30Um, also to convey the future scenarios
05:33of decreased rainfall
05:35um and subsequent groundwater recharge
05:39uh projections.
05:42Um, also lastly,
05:45the intent of this presentation is also
05:48to to ask for your support in future
05:50engagements with county offices that um
05:53are engaged with land. So, this is
05:56planning, punk, oscar, and maybe office
05:59of housing.
06:04Um, I'd like to quickly introduce PIAS,
06:07uh, which stands for the Pacific Climate
06:09Adaptation Science Center. It's a branch
06:11of the USGS. Uh we serve to help uh
06:14resource manage resource managers have
06:18access to climate um information. My
06:21mentor is Mary von Johnson and um
06:26podcast does not just serve Hawaii. It
06:28serves um the South Pacific uh nations
06:31that have agreements with the US.
06:36I'm going to skip this for now. Um but
06:39basically the the products that project
06:42VA aims to use uh aims to produce well
06:47kind of is trying to address some of
06:49these uh land use issues pertinent to
06:53government but also for communities to
06:56implement as uh we plan for um the
07:01future challenges of climate change.
07:04I'm also going to pass through this
07:08So um project vow is a pilot project
07:12focused on uh west Hawaii island. Um so
07:18north kohala, south kohala and north and
07:20south kona.
07:22And from this slide, the first thing you
07:25see about Hawaiian watershed
07:27districtricting as a land administration
07:29practice is that um the kuna
07:35had these specific type of aua that kept
07:38all the lower aua. In other words,
07:42watershed districtricting was embedded
07:44in the society.
07:49All of us here heard the the terms Moku
07:51and AO before, but maybe we never saw it
07:54as a land administration uh strategy to
07:58ensure long-term um sustainability on
08:03islands.
08:06Oh, really quick. So, Lorenzo Lions, who
08:09was a cahoo in the 1800s, comments on
08:12this type of land division. And he says
08:15this was a comment that was um his
08:18comments were summarized in um 1995 work
08:24by Muffet and Fitzpatrick. He says, "The
08:26common land to which Lion referred was
08:28situated above most of the Au Pua and
08:31encompass forest and barren mountain
08:34land. Although the land may have
08:36technically belonged within a given aua,
08:39it was apparently available to all the
08:41people living within that district. In
08:44that sense, Moku may have come to refer
08:46to the portion of an island shared in
08:49common.
08:54Um so when we think about Moku and Aua,
08:59people may find it interesting that
09:03um in the more ancient days, the islands
09:06was not divided. That actually the
09:08creation of Moku and Aua uh divisions
09:11was an actual adaptation
09:14strategy to cope with the challenges of
09:16their time. And according to Kamako,
09:20that challenge was population growth. So
09:23he writes in the old days the lands were
09:25were divided up according to what was
09:27proper to the chiefs, the lesser chiefs,
09:30the prominent people
09:32um
09:34in general to have each family clearly
09:36understood what was their land, their
09:38birthplace, their anopa and their onl
09:41and the chiefs knew what land they had
09:44given to this and that person and the
09:46obligations that went with each portion
09:48of the land. So imagine a whole society
09:51saying we're going to make a change to
09:52face the challenges of our times.
09:55And it wasn't just to be administrative.
09:57It was to build relationship so that no
10:00matter what your social uh social class
10:03was, you understood
10:06the name of your place, the features on
10:10your place and your obligation. I'm not
10:14expect expecting for the future society
10:16of Hawaii to all become
10:18environmentalists, but it would be
10:20important for every every person to know
10:23what their relationality whether where
10:25you live, where you work, even over your
10:28commute.
10:30Um, it makes a difference how you use
10:32resources.
10:34Okay, I'll move on.
10:37Um so what I read from Malo David Malo
10:42um in his descriptions he describes
10:44three general zones of the watershed and
10:48then there's depending on interpretation
10:50there's 13 more specific zones
10:52distributed through these three major
10:55zones. Um something that is really
10:58interesting is
11:00the zone between your thick forest
11:03called the vow and
11:07um your and the zone below the vow
11:10kanaka/va mu. Uh mu is
11:16short for amu and it's talking about the
11:19amu fern. And if you can imagine that
11:22there was actually a vegetative zone
11:25that helped delineate
11:27where man should do their things and
11:30above that zone um is where you let
11:34nature do its thing. And imagine if we
11:38could reconstruct that today
11:41and that would help give us targets for
11:43restoration or preservation.
11:49Um now this Hawaiian
11:54um indigenous knowledge goes further
11:57back. This is I did a linguistic search.
12:00There's an online uh linguistic
12:04database
12:06and actually vow is found all the way
12:08back up to uh the Malo Polynesian
12:12islands um following the first initial
12:17migration out of um Taiwan.
12:20Um the common theme in in this word vong
12:24across the Pacific is wilderness
12:27um uninhabited and uncultivated.
12:31So you get this trend of nature is here
12:35man does its thing somewhere else.
12:40I have these pictures of these atals and
12:42smaller islands in the South Pacific
12:44because their amount of forest is so
12:47small.
12:49Um so when when I talk about islander
12:52I'm talking about the wisdom
12:55of living sustainably sustainably on
12:58islands
13:00and how do we bring that back into the
13:03minds of our society today. Just a quick
13:08uh reminder of a wershed. So according
13:09to the USGS a wershed is an area of land
13:12that drains all the streams and rainfall
13:14into a common outlet. Um, according to
13:17the Hawaii Watershed Alliance
13:20Partnership,
13:21it says for for Hawaii, this exit point
13:25is the ocean. Another interesting thing
13:27is to remember that fog may increase
13:30rainfall collection and absorption by as
13:33much as 30%.
13:39Okay. So how is project v um trying to
13:43reconstruct uh that body of knowledge
13:47in land administration through GIS maps.
13:51So again we're looking at this on this
13:53map um on the left we're looking at
13:57these capping aua and you can notice
13:59that they actually follow the ridges of
14:02the summits. When you overlay the
14:05district boundaries, you see that most
14:07of these um share a common boundary with
14:11the MOKU districts
14:13and interoku. So there's
14:17that's your level one of uh strategy or
14:22or tenant. [snorts]
14:24Lorenzo Lions's son um Curtis J. lines
14:28became a Hawaiian government surveyor.
14:31And he he noted about these um auang
14:37and he says the common auang
14:41um goes up
14:44into the beginning of the woods, not to
14:46the very top and on the inlands there's
14:49these capping.
14:55So when we when we overlay this with the
14:59aquafer map, it's super interesting to
15:02see that there there may be multiple
15:06aquifers in one district. And this is
15:08traditional districts,
15:10but you can see that the flow of the
15:12aquifers
15:15um
15:17are kind of situated within the
15:20traditional districts. Topographically,
15:23the surface water is draining in a
15:25common direction. Um, these extension
15:29lines that you see coming off of the MOU
15:31boundaries
15:32um is kind of to help you visualize
15:36water's common trajectory towards the
15:39ocean
15:40um for each district. So basically all
15:44the anu pua are in a similar water
15:47trajectory because the the mo boundaries
15:50are set that way. This is again islander
15:53watershed districtricting knowledge.
15:55Okay. Given that substrate
15:59the kuna also gave um delineations of
16:03vegetation. So the map on the right is a
16:07reconstruction from historic maps of the
16:10most densely forested part. And some of
16:12these maps go back
16:15um
16:17some go back to 100 years. The furthest
16:20I can go back is
16:22150 years and they depict um historic
16:27vegetation. There are gaps but the
16:30boundary commission testimonies
16:32in a relative sense will we'll talk
16:34about the different vegetation pattern
16:37going up the up in elevation. So this
16:41example at for South Kona at Kapoua is
16:45um
16:46this
16:48historic map overlaid
16:51conveniently had polygon shapes of with
16:56labels of what the vegetation pattern
16:58is. So that's easy. You can put it up.
17:01You can reconstruct where the vegetation
17:03pattern was um over a hundred years ago.
17:10Um, here's an example from South Kohala.
17:13And I want um I want I remind you guys
17:17to keep in mind about um cloud and fog
17:21intercept
17:22um being in the water budget, the
17:26potential w water budget. So this is for
17:29the Aupa of Uli and Pawah. Um
17:35on the map on the left there's a trail
17:39at the base of
17:42uh Pawahi. Pawahi is outland with the
17:45star. Um it's also in an agricultural
17:49field system.
17:53Now on the right side, I've kind of
17:56outlined the outline the the portions of
17:59those aua above the trail
18:03that are no longer forested.
18:08And I wanted to reference Pu Camoa and
18:10Pu Lani Kapu.
18:13Okay, so keep those in in mind when we
18:16put uh when we analyze LAR combined with
18:19the overlay. So the overlay on the left
18:22actually shows where the vegetation was
18:25in 1860.
18:27It's coming all the way down to the pu.
18:30If you look below the pu,
18:33and I know it's hard to see on this, but
18:34through LAR, you can actually see
18:37structures underneath the the current
18:39pasture.
18:41Now I wasn't able to talk uh lay this
18:44out clearly earlier but there's other
18:47ethnoistoric accounts of
18:50the trail the mala trail running
18:54in the fern belt and below the fern belt
18:59is traditional agriculture. So you see
19:01that intersection through these layering
19:03of information.
19:08So basically in this example, Pu Kamo
19:11and Lani Keo, Lani Keu are
19:15um references to the delineation between
19:18man does their their thing and where
19:22nature does its thing and basically and
19:25essentially for this topic watershed
19:26districtricting.
19:31So later on we're going to see that the
19:32projections for future rainfall um by
19:36the end of the century looks pretty um
19:39is drastically less. I don't want to be
19:42alarmist so it's less. I'll just say
19:45it's less. Um
19:50so what I'm saying is for to face the
19:52future
19:54it will be important for us to
19:55understand where our our most effective
19:59water collection areas are as targets of
20:02restoration.
20:06Why these images are important? Because
20:08remember cloud fog intercept can
20:11increase your water budget up to 30%.
20:16Um this was maybe two months ago these
20:18pictures were taken and you can see blue
20:21skies but if there was forest there
20:23above those pu it would be doing its
20:26work.
20:30Same thing on the slopes of Monaka in
20:33this image where you see the cloud
20:35touching down that would have been where
20:37the mamman forest would have been. Um
20:41it's not that it's not collecting, it's
20:43that the force would increase our
20:45collection.
20:49This image is to show where
20:54um the cloud intercept elevations are.
20:57Um in Hanani uh Heidi Kanye's work she
21:02said on the leeward side you want to
21:04estimate to about 2600 ft in elevation
21:07as that lower cloud intercept on the
21:10east side is 2,000. So if you look at
21:15where the vegetation map is beneath the
21:18cloud, you you start to get a future uh
21:22planning strategy or a planning strategy
21:26for one increasing forest, but also
21:29where to put water catchments
21:31that can already start collecting to
21:33help
21:35um source water for the restoration
21:37efforts. Also, I believe
21:41well I'll just keep going. running out
21:43of time. As far as
21:46um impact of land use over time to land
21:50cover, um I would see project vow being
21:53used in cooperation with landfire maps.
21:57Landfire maps is a model of
22:02previous vegetation before uh western
22:04contact with modern-day land use.
22:07Project Vow can actually bring ground
22:09truthing to these projections.
22:13How's my time over?
22:16>> Get in there.
22:16>> Okay.
22:18Water water uh rainfall projections um
22:22is looking to decrease by 50 to 30% at
22:28the end of the century.
22:30Same same numbers for groundwater
22:32recharge estimates. The thing is some of
22:35our aquafers are already impaired on the
22:37west side. So even in the most least
22:41impactful scenario,
22:44these aquifers with pre-existing
22:46conditions
22:47um um could could start to fail.
22:52So we're drawing down from the aquifers
22:55now
22:57with projected land use.
23:00They haven't been working to their full
23:02capacity for over a century.
23:05If our children and grandchildren are
23:07going to have a chance in some of these
23:08areas, we have to start supporting the
23:11recharge. Now,
23:16land cover matters because it m it it
23:19increases the water budget. Um
23:24and uh
23:27I think Also,
23:32thanks for letting me go over.
23:35>> Thank you.
23:37>> Thank you very much. Um, Council Member
23:39Kimble, you want to lead us off?
23:40>> Yeah, I just I just want to mahalo you
23:42for coming in and providing us um with
23:45this really great resource. Hopefully,
23:47you guys have a chance to go through all
23:48of the slides in more detail. Um I think
23:51the most profound thing that you said
23:54today was that there was a point in time
23:57when the decision was made to structure
24:00the society around stewardship of the
24:04and um if there were something that I
24:07want want to put up front of this body,
24:10there is an opportunity for us through
24:13the general plan amendments and through
24:15our work on this board to make that
24:17decision to restructure around these
24:21sort of stewardship practices that are
24:23based in this historic understanding of
24:25how land use provided resources and that
24:29relation relationshipbased
24:33um method of you know deciding where
24:37things happened. Um, you know, we are
24:40under a western model of governance with
24:42all the protections that exist under the
24:45constitution and state uh constitution
24:48for land rights and property rights. Um,
24:50and one might consider that there's like
24:53a fundamental conflict between that and
24:56um the traditional ways of land
24:59management. I don't think there is. I
25:01think there's actually an opportunity
25:02for synthesis towards something that is
25:05better. And I think our body is the
25:08entity that can provide that with the
25:10input of folks like Camala. So, thank
25:13you again for being here and um I hope
25:15you guys find this as interesting and
25:18informative as I do. Thank you.
25:25Yes,
25:25>> just really quick, I just have to thank
25:26you for being here and the synchronicity
25:28of the message, even some of the images
25:31and the reports uh that were presented
25:33to us earlier today and you are once
25:35again presenting
25:38hammer in the message and um but you're
25:42bringing an option and u just so enjoyed
25:46working with you and learning about your
25:48work and I'm so wildly grateful that
25:51you're bringing together these solutions
25:53and options for returning to the wisdom
25:55of our host culture. Appreciate it.
26:01>> Council member Ki Kleinfelder.
26:03>> I've never I've heard aua, but I've
26:06never heard it broken up into a layered
26:09approach just it's always been malakai.
26:12It's classic, you know, model you always
26:13see. So seeing it broken into different
26:18ecosystems which actually benefit each
26:20other which
26:22engrossed the idea of
26:25better land management not just this
26:29strip was chief so and so's this strip
26:31was chief so and so and this was this
26:33their area but broken in carefully to
26:37align with how to make the land better
26:40and work for the population over time.
26:44which it seems so common sense, but we
26:46moved so far away from that.
26:48I love this. This is amazing. And like
26:50Mr. V said, we had a land use decision
26:52that's in front of us today. Some of
26:55these same maps showed up. The aquifer
26:57discussion in areas where classically
27:00it's dry and yet we're told the aquifers
27:04are fine and we can continue pulling
27:06three million gallons a day and it's
27:08fine, right?
27:09>> But that but the reality and the common
27:11sense doesn't equal that. as we continue
27:13to clear and climate change and
27:16everything else that's going on. So, I
27:18love this presentation. Thank you very
27:19much.
27:26>> Thank you very much for coming in.
27:27Beautiful maps. Um, and we'll def I at
27:30least will definitely be looking at them
27:32again. Um, so seeing no other lights on,
27:37all in favor of closing file and
27:39communication 999, please say I.
27:43Thank you.
27:43>> Any opposed?
27:46I see none.
27:49That is nine in favor of closing file
27:52and communication 999.
27:57Testimony for communication 1061.
28:02Hearing n. Communication 1061 is a
28:04follow-up audit of the Department of
28:06Environmental Managers of Ben vehicle
28:07program report number 2024-02
28:11from County Auditor Clare McAdam dated
28:13August 2,626 transmitting the above
28:15audit report pursuant to section 318 D3
28:19of the Hawaii County Charter and
28:20communication 1061.1 from county auditor
28:23Clare McAdam dated August 26 2026
28:26transmitting a PowerPoint presentation
28:31>> chair motion to close file on
28:34communication 1061.
28:38>> A second.
28:40[gasps]
28:41It's been moved to close file on
28:44communication 1061
28:46by council member and seconded by
28:49council member Viegas. Uh
28:53please go ahead.
28:56>> Maxine Pekco, office of the county
28:58auditor. And I've asked Tiffany Wallace.
29:01She is the derelic and abandoned vehicle
29:04specialist to help me in navigating our
29:07PowerPoint presentation.
29:09Aloha chair Galima and members of the
29:12communications reports and council
29:14oversight committee. Good evening.
29:17Maxine Pekco, lead auditor for this
29:19review. Claire McAdams is unable to
29:22attend today. We're here to brief the
29:24committee on the first follow-up review
29:27of the Department of Environmental
29:29Management's Derelch and abandoned
29:31vehicle program, also known as the DAV
29:34program, report number 2026-02,
29:40published on August 26, 2026.
29:44Thank you to the audit team, Melissa
29:46Dort, audit analyst, and Claire McAdams,
29:49review supervisor.
29:51We also thank DEM's leadership, Director
29:55Gervin, Deputy Director Kawaguchi, Solid
29:58Waste Division Chief Rivera, and DAV
30:01Program Specialist Tiffany Wallace and
30:04her team for their exceptional
30:06cooperation.
30:07In its management response, DEM was in
30:11general agreement with our findings. Of
30:14the five recommendations from the
30:16original audit report, three have been
30:19completed and two remain in progress.
30:23Our objective for this review was to
30:25determine whether the DAV program
30:27implemented the recommendations from our
30:302024 audit. The review period covered
30:33August 2024 to August 2026.
30:38to verify the status of recommendation.
30:41Our work included site visits,
30:43writealongs to observe field inspections
30:46and program practices firsthands,
30:48interviews, reviewing draft safety and
30:51standard operating procedures, reviewing
30:55flyers and otherformational materials,
30:58reviewing photographs, documenting
31:00community outreach and meetings, as well
31:03as examining other evidence supporting
31:05the reported status of recommendations.
31:09Recommendation one focuses on
31:11prioritizing personal protective
31:13measures. During our July 8th ride
31:16along, we observe the DAV team using
31:19their required PPE, including county
31:22logo, reflective vests, and safety
31:24shoes. We also observed the use of the
31:27Zonar device, two-way radios, and the
31:30buddy system during inspections. We were
31:33able to see safe safety practices being
31:36implemented in the field status is
31:39completed. Recommendation 2 focuses on
31:43increasing reporting options for
31:45abandoned vehicles. DAV addressed this
31:48through community awareness in
31:50partnership with HPD community policing.
31:53The program participated in islandwide
31:56outreach and develop anformational flyer
31:59with a QR code providing access to free
32:02towing and disposal assistance. The
32:05application is available online and the
32:07flyer has been distributed throughout
32:10the community. The status has been
32:12completed.
32:14Recommendation three focuses on
32:16formalizing the program's policies and
32:19procedures. We re we review draft safety
32:23and standard operating procedures. While
32:26good progress has been made, final
32:28approval, including an effective aid and
32:30imple implementation, are still needed.
32:34Status is in progress.
32:42Recommendation four focuses on vehicle
32:45auctions. As of December 2024, no
32:49auctions took place. DAV is modernizing
32:52and standardizing their process,
32:54including developing inventorybased
32:57triggers and public vehicle viewing. The
33:01status is in progress.
33:03Recommendation five focuses on cross
33:06trainining and continuity of service.
33:09DAB addressed this recommendation by
33:11expanding staff responsibilities,
33:13providing islandwide coverage during
33:16absences, and training coordinators to
33:19conduct outreach events, helping to
33:22ensure uninterrupted service. The status
33:24is completed. In closing, one of the
33:28most rewarding parts of auditing is
33:30seeing audites take ownership of
33:32recommendations, turning them into
33:35meaningful, lasting improvements and
33:37bringing them across the finish line. We
33:40commend the DEV program for its progress
33:42since the original audit. Three of the
33:44five recommendations have been completed
33:47while the remaining two are in progress
33:49with focus on formalizing policies and
33:53improving vehicle auction procedures.
33:56Thank you to Tiffany Wallace, DAV
33:58program specialist for being available
34:00to address questions on DAV operations.
34:04Thank you, Chair Gimba and council
34:05members. This concludes our
34:07presentation. We are happy to answer
34:08questions.
34:10>> Thank you, Miss Pashco.
34:13Anyone have any questions, comments?
34:17>> Uh, Council Member Hust, go ahead.
34:20>> Thank you, Chair. Just a question on the
34:22the auction process.
34:25Um, no auction has been held since 2024,
34:28December 2024.
34:31What does that mean in terms of a a
34:32stockpile or a backlog of vehicles that
34:35are
34:36stored, kept, those sort of things?
34:41Tiffany Wallace, um, abandoned vehicle
34:43specialist. So, it means that we do have
34:46some good inventory, not enough to
34:48create an auction at this point. Um, I
34:51just came on board in February. So, now
34:53that I have myself and I have two other
34:55staff members, we are looking to
34:57increase um our inventory so that it
34:59would be worth our while to do an
35:01auction so that it would be fiscally
35:03responsible for us to do so.
35:05>> Is is there a certain number that would
35:07be that good threshold for you? So, in
35:08my mind, if I had to come up with one
35:10right now, it'd be 55 to 60 vehicles.
35:13>> Okay. Thank you. Appreciate that.
35:15>> Thanks.
35:15>> Thank you, Chair.
35:17>> Council member Kagi, thanks. Just a
35:20really quick thing. Actually, you have a
35:21nice little um flyer on here, free junk
35:25vehicle removal. Um can you send that
35:28out to everybody so I can include it in
35:30my um newsletter? All right. Thank you.
35:32That's all I have.
35:34>> Thank you.
35:38Um,
35:40seeing no one else, I just wanted a
35:42quick question myself. When do you think
35:43the um the formalizing policies and
35:47procedures
35:48uh recommendation will be fulfilled?
35:51>> Tiffany Wallace, abandoned vehicle
35:53specialist. So, we are looking to get
35:55that finalized before the end of the
35:57year.
35:58>> Awesome. Thank you so much and thank you
36:00for your work on this. It's very
36:01important to get those abandoned
36:04vehicles off the side of the road.
36:06Um, all right. Seeing anything else, um,
36:10all in favor of closing file and
36:12communication 1061, please say I. Any
36:16opposed? That'll be six in favor, I
36:21believe. And council members Kirkwitz
36:24and
36:26Connie Lee Kleinfelter and Inappa are
36:31excused.
36:34Motion carries.
36:37Is there any testimony for communication
36:391062?
36:41Hearing none. Communication 1062, a
36:43presentation on the wastewater facility
36:45plan and suspical conversion evaluation
36:47from our environmental management
36:48director Daniel Gervin dated August 27,
36:522026.
36:56Motion, please.
36:57>> Chair motion to close file in
36:59communication 1062.
37:02It's been moved by Council Member
37:03Kimell, seconded by Council Member
37:05Kagiada to close file on communication
37:071062.
37:10Go ahead.
37:14>> Hi everyone. Um, this is Kelly Hartman,
37:16the regulatory administrator with DEM.
37:18I'm just going to quickly open up the
37:20meeting. Uh, pursuant to the AOC, the
37:24department has been working on these two
37:26reports. the wastewater facilities plan
37:30which evaluates the condition of our
37:33existing facilities, ranks them, put
37:36costs to them um for our eventual
37:39long-term financial plan that will be
37:41coming due in 2027 2028. Um
37:45additionally, we have um Carla here to
37:47speak to the cesspool conversion
37:50evaluation report. Um, I will invite
37:54Gary De and Jason Hikaido up here to
37:58present. Before we start, I wanted to
38:01double check on the time uh requirement
38:05and and is it per presentation.
38:08>> 15 minutes total.
38:10>> Say
38:10>> 15 minutes total. Preferably
38:12>> 15 minutes total for the two reports.
38:15>> Yes.
38:15>> We'll do our best. Thank you.
38:17>> Thanks.
38:31Good afternoon, chair, members of the
38:33council. My name is Gary Dice. I'm with
38:34Corollo Engineers. I'll be joined by my
38:36colleague, Jason Nikkaido. We've Jason
38:39[clears throat] and I have been working
38:40with your county staff, the DEM, as well
38:42as finance over the last three years on
38:44these two particular reports. This is an
38:47overview and a briefing of the work
38:49that's been completed to date.
38:53So, our objectives today is to provide
38:55an overview of the wastewater facilities
38:57plan. We'll talk about the
38:58infrastructure condition and needs to
39:00we've developed a near and long-term
39:03capital improvement program working with
39:04the department of finance. We'll be
39:06talking about that. We also want to
39:08provide an overview of the successful
39:09conversion evaluation. talk about the
39:12basis of analysis and the range of
39:14conversion options that that are
39:16available and discuss next steps.
39:20The facilities plan and assessable
39:21conversion plan are key elements of the
39:24integrated wastewater master plan that's
39:26required by the administrative order on
39:28consent with EPA that Kelly had
39:30mentioned. You see the cessful
39:32conversion plan and the wastewater
39:33facilities plan being inputs on the
39:35left. On the right, there are other
39:37elements that go into the wastewater
39:40master plan, including operation and
39:42maintenance manuals, which we're
39:43assisting DEM with as well.
39:46This work has been ongoing for three
39:48years. Our original contract was
39:50approved and we received notice to
39:52proceed in in July of 2023. So, it's an
39:55effort that's been going on for some
39:57time.
39:58And as we talk about the analysis and
40:00the findings, I think there's several
40:02key factors that you know council needs
40:04to keep in mind as as we go through the
40:06discussion. One is the condition of
40:08existing facilities which we'll be
40:09talking about. The second one is the
40:12legally mandated projects. These are not
40:14only the projects that are required by
40:15the administrative orders on consent.
40:18They're also the the settlement at Kala
40:19Ka that requires uh compliance.
40:23Also, we need to recognize the county's
40:25limited role on cessible conversions.
40:27We'll emphasize how that role is really
40:29limited to the extension of existing
40:31county owned infrastructure, although
40:33there's other methods for cessible
40:35conversions. And then most importantly,
40:38the total cost of this program is just
40:40staggering. And it's beyond the
40:41financial capability of of the county.
40:44We've been working with finance to
40:45establish what available funding is and
40:47develop priorities for financing the
40:49program based on based on funding
40:52constraints.
40:54So first we'll talk about the wastewater
40:56facilities plan and then we'll get into
40:57the assessful conversion evaluation.
41:00So our agenda for this segment is just
41:02to talk about background basis of the
41:04plan. Review the overall condition of
41:06the existing above ground
41:07infrastructure. We'll talk about needs
41:10and we've broken those down into
41:11maintenance actions which are typically
41:13smaller projects that can be implemented
41:15by county staff versus capital projects
41:17which are usually large projects that
41:20are bond financed and then we'll go over
41:22the proposed wastewater capital
41:24improvement plan for 10 and 20 years.
41:29>> I asked Corolla to provide one slide on
41:32context. There's going to be a lot of de
41:34deliverables coming out of the
41:36department. And I wanted to take a
41:38minute just to talk about how they all
41:39fit together and what's required in the
41:42AOC. So first we have the integrated
41:44plan. Um Gary touched on that. It's part
41:49of the integrated plan is the facilities
41:51plan and the cesspool conversion. And
41:54what those plans do um is tell us what
41:57needs fixing and building islandwide for
42:00wastewater. Um and then we look at the
42:05priority ranking which is due to the EPA
42:08come December or January and we decide
42:12what what comes first in what order.
42:15[snorts] Um and then we provide cost
42:19estimates. We look at the sewer excuse
42:21me we look at the costs that's included
42:24in a long-term financial plan that we've
42:26been working on with finance for the
42:28next 20 years. And then finally, how do
42:31we pay for it? And so, um, we have the
42:34first 10 years programmed in. That's,
42:37you know, your AOC projects. The next 40
42:40years will depend on the pri how the
42:41priorities shifts with the remaining
42:43projects and ultimately the decisions
42:46that the county makes. Um, this also
42:48incorporates the sewer rate study that
42:50we met with you about a few hours ago.
42:53Um, that's one component for how we pay
42:56for our operations costs, not to be
42:58confused with how we pay for our capital
43:01costs, which um, we'll we'll discuss
43:04further. So, I hope that helps give some
43:07context to all the work we're doing in
43:10order.
43:12Thanks, Kelly. So, just go over the
43:15steps in developing the wastewater
43:17facilities plan. The first step was to
43:19establish the requirements, the legal
43:21mandates that we briefly talked about.
43:23Then we went out and we looked at all
43:25the all the above ground assets in the
43:28wastewater system and identified the
43:30condition of each and identified
43:32additional needs together. The legal
43:34mandates and the condition assessment
43:37led us to identify potential wastewater
43:39needs which were significant. costed all
43:42those all those needs and then we
43:44prioritized them based on the funding
43:46limitations and developed an overall
43:48proposed capital improvement program
43:50which we've been working with the
43:51finance department on. I want to state
43:53that we're going to talk about some
43:54costs. All the costs that we present in
43:57this discussion are 20 $25
44:00in the in the cash flow projections that
44:02we provided to finance. We've escalated
44:04those costs to uh center point of
44:07construction. So there may be some
44:08disconnect between some of the numbers
44:10we're presenting and what what's in the
44:11budget, but you know that's the that's
44:14the reasoning. It's just simpler to
44:16present it all in one 2025 cost for this
44:18discussion.
44:20So a key element of the the whole plan
44:23was the condition assessment of the
44:24existing wastewater infrastructure and
44:27this was done in in July of 2023. We
44:30visited all six wastewater treatments
44:32treatment plants and 17 sewage pump
44:34stations. This was done by a
44:36multi-disiplined team of engineers and
44:38operations specialists. And then we
44:40followed up in the spring of this year
44:42with visits again to the treatment
44:44plants and select pump stations just to
44:46see what has changed since 2023, some
44:49pro and some con, and to update the
44:51conditions that we obs we previously
44:53observed.
44:55We we provided a rating scale for every
44:58single above ground asset that the
44:59county has on the wastewater system and
45:01it was rated on a scale of 1 to five.
45:04one being excellent, two being good. We
45:06see fair, poor, to fail. And so we were
45:09able to come up with a I'll say a report
45:12card, if you will, as to the general
45:15condition of the of the above ground
45:17wastewater infrastructure in the county.
45:19And that's what we see on this graphic
45:21is that we found that in general 20% of
45:24the assets were in good to to m with
45:27minor defects. Half was fair with some
45:31significant defects. 25% is poor and
45:34unreliable and 5% has failed. And now
45:39when I say that this the 5% has failed,
45:41it doesn't necessarily mean the whole
45:42systems failed. So one example is in one
45:45plant there's two secondary clarifier
45:47units. One has failed, one is in
45:49service, but that it significantly
45:51reduces the reliability of that system.
45:54Overall, I'd say that the system is
45:56functional but with some but with issues
45:59and we'll talk about what those issues
46:01are. So that's kind of kind of a
46:03background. Now Jason's going to get
46:04into some of the details and the costs.
46:08>> Okay. Uh thank you Gary.
46:11So based on the condition assessment
46:14um we developed um
46:17>> sorry could you just introduce yourself
46:18for the record?
46:19>> Jason Ekitle with Coral Engineers. Uh so
46:22based on the condition assessment uh we
46:24identified maintenance actions um that
46:26would be uh required and these are uh
46:29smaller in scale and they tend to be
46:32operations funded and we identified 48
46:35um maintenance items and then we
46:37categorized them by priority and also
46:39gave a dollar value uh to them and uh
46:41you'll see they range anywhere from
46:43urgent um which should be done in the
46:45near term or longer term greater than
46:48two years and anywhere from under 500
46:52a,00 $100,000 for small up to over
46:55500,000 for a large uh maintenance.
47:00And these are just pictures of examples
47:03uh that we that maintenance uh actions
47:06would be required. Um things like
47:08replacing gate actu actuators, u
47:11removing vegetation,
47:13uh replacing hatches and ladders. So
47:15those are, you know, smaller items that
47:17maintenance uh staff could could do.
47:22Uh so this is a summary of the
47:24maintenance actions um both for priority
47:27and cost. So um on the priority side,
47:31they're kind of relatively uh equally
47:34distributed uh between uh near-term and
47:37long-term
47:38um ranges. And for the cost side, the
47:42majority of the uh maintenance actions
47:46are on the on the smaller uh dollar
47:48value.
47:52Moving on to capital, these tend to be
47:53the larger projects and these are debt
47:56financed. Uh we identified 70 total
47:59projects and we categorized them into um
48:04different categories being legally
48:06mandated, health and safety,
48:08rehabilitation and replacement.
48:10reliability and redundancy
48:12and then we prioritize them further
48:14based on what kind of funding uh was
48:17available.
48:19So here are some examples of the capital
48:21projects. Um we're all aware of the Hilo
48:23wastewater treatment plant. Uh then we
48:26have um CapeU wastewater treatment plant
48:29where we have code and safety violations
48:31and Kimono u treatment plant where there
48:34are some failed equipment that would
48:36larger equipment that would need to be
48:38replaced.
48:41Okay. So, moving on to the total program
48:44costs. Um, in the near term, the
48:49priority would be $1.1 billion and that
48:52is predominantly legally mandated uh
48:56projects and health and safety projects
48:58identified through the AOC and also um
49:00the kayak settlement.
49:03So, those are the first 10 years. Moving
49:06on to the 20-year horizon.
49:09um we add another uh half a billion
49:12dollars and that incorporates some
49:14rehabilitation and replacement and
49:16reliability and redundancy projects. Um
49:20so further prioritizing the CIP
49:24and then when we look at the entire
49:26wastewater needs throughout the county
49:28uh we identify that as $2.3 billion
49:31total and those would include uh
49:34unscheduled projects and unfunded
49:37projects um that are that would be
49:39included in the uh county CIP.
49:45Okay. So here you can see that the
49:48majority of the identified program is
49:51the AOC and the legally mandated
49:53projects
49:56and this is kind of your cash flow that
49:58we worked out with finance Dian Nakagaw
50:01and her team. Um the majority of the
50:03spend or expenditures are in the first
50:0610 years and then they um go down after
50:08that as u the priorities uh lesson.
50:14Okay, I'm going to hand it back to uh my
50:16colleague Gary to uh touch on the
50:18cessible conversion.
50:21>> Okay, so that was the work that we
50:23completed for the facilities plan. The
50:24cessible conversion plan is a complex
50:28complex issue as you all know. It's an
50:29issue that's the other counties are
50:31dealing with as well. Uh the other three
50:34counties have developed a cesspool
50:36conversion evaluation very similar to
50:38what we're going to describe for your
50:40county using the same general criteria
50:42and they're at about the same point too
50:44where it's just now being presented to
50:46administration and leadership.
50:49The agenda for this discussion is to
50:51talk about the background and basis of
50:53analysis review the full range of
50:55cessible conversion options and
50:57projects. Many of these projects are
50:59very expensive when compared to
51:02conversion of assessible to an
51:03individual wastewater system such as a
51:05septic tank and probably will not could
51:08not be implemented because of of the
51:10financial feasibility. We'll talk talk
51:12about that and we have some suggested
51:14approaches to extension of county sewers
51:16to priority sewer areas.
51:19So the purpose of this whole evaluation
51:22was to address the methodology and cost
51:25for converting all 48,6600
51:27cesspools in the county shown on the
51:31graphic on the right as to where they're
51:32located. The University of Hawaii has
51:34developed a prioritization tool
51:36prioritizing cess pools in the state as
51:38either one, two, or three. One having
51:40the greatest potential impact to the
51:43environment of public health. See most
51:45of the cess pools in the county are
51:47priority three but there are ones and
51:50twos.
51:52So the evaluation considers three
51:55methods of conversion. One is the
51:58connection to an existing county or
51:59non-county system. The extension of the
52:02existing county sewer system is really
52:04the is the primary means of which the
52:07county may affect cespool conversions.
52:09We also looked at connection to
52:11non-county systems and we'll talk more
52:13about that. The other option is new
52:15decentralized or cluster wastewater
52:18systems. So small treatment plants, new
52:20collection systems very much like what
52:22the county has implemented at Pahala. Um
52:26these are typically communitydriven with
52:29l with with minimal county input. And
52:32then the far right that's conversion to
52:34an individual wastewater treatment
52:36system we call IWS that's approved by
52:39the department of health and this is the
52:42parcel owner's responsibility working
52:44directly with do
52:47the cost these systems vary
52:48significantly what we found was the cost
52:51in general the cost to convert to
52:54on-site system IWS is the least cost the
52:57next tier in cost is extension of
53:00existing sewer infrastructure and the
53:03most costly is building new
53:04decentralized systems.
53:08So you all know this was driven by state
53:10legislation act two act 125 in 2017
53:14established that all cesspools must be
53:17converted by January 1, 2050 although
53:20their exemptions may be considered by do
53:23those exemptions include lot size, lot
53:25slope etc. uh act 132 formed the
53:28cesspool conversion working group which
53:30their work is now complete. There were
53:32two really valuable studies that that
53:35they commissioned and were completed.
53:36One was evaluation of the all the the
53:39technical u types of conversions that
53:42can be taken place and the other one is
53:44is a finance and the impact on
53:46affordability in the state. Both those
53:48documents on the are on DOH website and
53:51then act 217 provided additional funding
53:54to the University of Hawaii to do some
53:56additional prioritization studies.
54:00So the approach to identifying areas
54:03these cesspool areas that can be served
54:04by existing sewers or new sewers. This
54:08is the same approach that the other
54:09counties use was generally to identify
54:11where there are clusters of cesspools
54:13that are close together where it might
54:15be cost-effective to build new sewers or
54:17extend sewers and the criteria was 50
54:20cess pools within an eighth of a mile.
54:22We identified 77 77 density groups on
54:26the on in the county. Uh we then
54:29identified how much waste water would
54:31come from those groups based on the city
54:32and county of Honolulu standards. And
54:35then depending on the proximity to
54:37county and non-county sewers, we
54:39identified where those projects would be
54:40feasible. If they weren't proximity to
54:43sewers, then they're likely candidates
54:45for new decentralized facilities.
54:48If I can um have a point of personal
54:50privilege when we have maps that are
54:52presented without a legend, would you
54:54mind just briefly indicating what um the
54:56color coding represents?
54:58>> So in this case uh the with the image on
55:02the right, there's a bunch of numbers
55:03there. Those are those are those
55:05identification of the 77 density groups
55:08that were identified that are presented
55:11in the report. So that's what that's
55:12what those numbers represent.
55:18Okay. So we ident then took that
55:21information and say okay based on this
55:23criteria of 50 cesspools within an
55:25eighth of a mile what are the total
55:27potential projects that could be
55:29considered and we'll find that a lot of
55:31these projects are very expensive uh and
55:34Jason will talk more about that but we
55:36identified 39 potential projects where
55:38the county sewer system could be
55:40extended. The graphics that we see here
55:43is a map of the projects in the Hilo
55:45area and the graph in the table of the
55:47projects in in the particular Hilo area.
55:50You know obviously you know the number
55:52of sewer extension projects is more
55:54opportunities in Hilo in Kak because the
55:56service areas are larger.
56:00We then we also identified four areas
56:03where non where extension of non-county
56:06wastewater systems may be feasible. see
56:08what they're they're listed on on this
56:10particular slide. Puco is one of them,
56:13which I think you're all familiar with.
56:18And then there's a there's there's third
56:2126 projects that were identified for
56:23potentially new decentralized wastewater
56:25facilities. And you know, these these,
56:27as I mentioned, these are the most
56:29costly means of conversion, but we
56:31wanted to identify where there was
56:32potential areas. We're going to find
56:34that these are quite costly to
56:36implement.
56:38And then the remaining the remaining
56:40success pools would be converted to
56:42approved individual wastewater systems
56:44or IWS. So over approximately 30,000
56:49and so that that's and they're shown
56:51here by priority areas.
56:54Summary of just county all potential
56:57projects again
57:00county sewer system extensions about
57:018,000 non-county systems less new
57:05decentralized systems about 9,000 by and
57:08large mostly to individual wastewater
57:10systems and this is shown just just
57:12graphically the same information. Now
57:15what what we'll see is that the county
57:18sewer system extension projects and
57:19decentralized are so costly that they're
57:22not practical and so that the p percent
57:25that's going to be conversion converted
57:26to IWS is going to be much larger than
57:29the 60% shown here probably on the or on
57:32the range of 80 to 90% the conversions
57:35would be two individual wastewater
57:37systems.
57:43Thank you Gary. Uh Jason Niko with Coral
57:45Engineers again. Um so we develop cost
57:47estimates um for these projects based on
57:50local projects uh national projects and
57:54also um do database when uh assessible
57:58conversions occurred maybe like five
57:59years ago. And we also contacted uh
58:02multiple contractors to get IWS uh
58:06conversion estimates and we input that
58:08into our uh our cost models to develop
58:12overall uh project costs.
58:16Um so this is a summary of the potential
58:20conversion cost estimates. Um
58:24county sewer system extension projects
58:26would total about uh 784 million. On
58:30average, these would cost 93,000 per
58:32cesspool. Um, extensions to non-county
58:36systems, 122 million at roughly 140,000
58:42um per cessible. New decentralized
58:45systems. Uh, the total cost for all of
58:48those projects would be almost $3
58:51billion
58:52um at a peressible cost of $300,000.
58:57and IWS conversions uh 1.2 billion at uh
59:0240,000 um per cessible. So kind of
59:06matches what my colleague uh Gary was
59:08talking about earlier. Uh where is
59:11feasible
59:12IWS conversions are the most cost
59:15effective and new decentralized systems
59:19um cost are almost cost prohibitive. Um
59:23so the total potential costs for all the
59:25cesspools
59:27um in the county would be approximately5
59:29billion dollars
59:32according to uh the technical
59:34feasibility of it. Um
59:38they're just showing the different um
59:42the different costs for each category
59:44and the county's portion circled in red.
59:48Okay. So given the technical feasibility
59:51now we bring in the financial part to
59:54kind of prioritize the pro the potential
59:58conversions that way. Um county sewer
1:00:01extension projects we assume those would
1:00:03be led by the county and we would limit
1:00:06those to priority one cesspools and
1:00:09previously um identified areas within
1:00:12the Hilo service area. Uh and then the
1:00:15other projects would be remain un
1:00:18unfunded and unscheduled. Um
1:00:20non-counties would be led by the the
1:00:22private utilities themselves. Whether
1:00:24they decide to uh implement those
1:00:26projects or not would be up to them. Uh
1:00:28new decentralized wastewater systems
1:00:31would be uh up to the community um
1:00:35similar to what Puco is going to
1:00:37through. They would initiate the project
1:00:38themselves. Um and we would expect the
1:00:42county's assistance would be limited to
1:00:44you know facilitating uh those projects.
1:00:48And lastly um conversion to do approved
1:00:51individual wastewater systems would be
1:00:53the responsibleility of that property
1:00:56owner working with uh the department of
1:00:58health. So given these assumptions
1:01:02um the
1:01:04the proposed priority pro projects for
1:01:07sewer system extensions are listed here.
1:01:1010 projects. Um note that the kale kaha
1:01:15although we put a cost in there um it is
1:01:18DHHL uh own. So we assume DHHL would be
1:01:22responsible for that um project. Um and
1:01:25so in total about 3,3100
1:01:28cooles uh at um $266 million.
1:01:35Okay. So graphically here's where uh
1:01:38those projects will be located. uh in
1:01:40Hilo um more on the eastern and uh the
1:01:44western edges of the uh of the city and
1:01:48then Kala kind of throughout the uh
1:01:52service area.
1:01:56Um so this is comparing uh kind of the
1:01:59potential to a proposed um syso
1:02:03conversions. uh the county's uh portion
1:02:06would decrease from 784 to 266 million.
1:02:11Um
1:02:13connections to non-county would decrease
1:02:16as well. Uh we as part of this plan we
1:02:19don't have any decentralized
1:02:22um projects proposed but that is
1:02:25dependent on whether those communities
1:02:27would want to implement it or not. Uh
1:02:29financially
1:02:30uh there's not much of a driver there.
1:02:32So there would be other drivers um that
1:02:35would be required for th that county to
1:02:38I that community to implement those
1:02:40projects and as we decrease the number
1:02:43of projects in the other categories
1:02:45likewise the number of IWS conversions
1:02:48would go up. So that um number goes up
1:02:51as well but the overall uh conversion
1:02:54costs would drop from five billion down
1:02:56to$2 billion dollars.
1:02:59Okay, so here's a pie chart comparing um
1:03:03the two approaches. The on the left is a
1:03:06potential and on the right is a
1:03:08suggested or proposed um conversion
1:03:11plan. Um
1:03:14like you see on the right now the vast
1:03:16majority of the the conversions would be
1:03:18through IWS with limited uh sewer system
1:03:23extensions by the county and uh private
1:03:26utilities.
1:03:31Okay. So, next steps. Um, on August
1:03:3326th, uh, we briefed the Environmental
1:03:37Management Commission uh on the findings
1:03:40of both the facilities plan and the
1:03:42cessible conversion evaluation. Um,
1:03:45we're briefing the uh the county council
1:03:48today and um the compliance date for the
1:03:53AOC is January 31st. Um, our reports are
1:03:57in draft right now. Um, assuming uh no
1:04:01other comments u will be ready to
1:04:03finalize and meet the AOC deadline uh on
1:04:08January 31st.
1:04:10And then lastly, we'd like to thank all
1:04:13the um county staff, Director Gervin,
1:04:16deputy director Kawaguchi,
1:04:19uh our project manager, Kelly Hartman,
1:04:22and also Diane Nakagawa at her and her
1:04:25staff at the finance department who
1:04:27helped guide us um through these three
1:04:29years of finally seeing the end of the
1:04:32the light at the end of the tunnel. Um
1:04:35that concludes our presentation and open
1:04:37up to any questions or comments.
1:04:40Thank you so much, Council Member Con.
1:04:45>> Thanks, sir.
1:04:46>> So, I just want to point out those two
1:04:48guys at the end of the photo shoot. Some
1:04:50hats guys you got. I don't know who
1:04:52those guys are, but ugly
1:04:55shirt.
1:04:59>> Uh what what did you guys what was your
1:05:01cost per mile to run the main county
1:05:04line
1:05:07that you used? Do you know?
1:05:12>> Not off the top of uh our head, but we
1:05:15can we can get you that that number.
1:05:17>> And then did you consider
1:05:20did you consider where you have pockets
1:05:22of heavy density recess pools
1:05:27versus in rural areas that are possible
1:05:31connections versus urban areas where you
1:05:34have instant customers. But your cost to
1:05:37county streets and existing
1:05:40infrastructure around buried helpful
1:05:43lines and things like that becomes more
1:05:44expensive.
1:05:45>> Yes, the the rural um communities were
1:05:50typically more expensive because we
1:05:51would need to install more pipe to reach
1:05:54um the treatment plant areas.
1:05:57Um and then the unit costs do take into
1:06:00account construction around other
1:06:03utilities as well.
1:06:05>> But cheaper to go through rural areas
1:06:06because there's nothing there. You just
1:06:08go through rock. I mean we have a lot of
1:06:09rock. I'll give you that.
1:06:11>> Yes. Uh but with other areas too um
1:06:17there are other considerations also in
1:06:19the rural areas um such as uh easements
1:06:24that may be necessary. um the most
1:06:27direct path may not be on public
1:06:29rightway.
1:06:31Um so but we assume that and sometimes
1:06:33that's why the costs are longer are
1:06:35higher because of the need to go to
1:06:38public right away.
1:06:40>> So just looking I did some quick math on
1:06:43Calhe you had about 2,300 customers in
1:06:45two areas that could be connected.
1:06:48>> That was in your your math. Yeah. 1,700
1:06:50and 600 respectively. So about 2,300
1:06:54customers could be connected to the
1:06:55system at a cost of $219 million
1:07:00pencils out to about
1:07:03no 79 years worth of payments at our $52
1:07:07per unit rate. So it's pretty doable.
1:07:10I'm feeling this.
1:07:13My goodness. You know, the first time I
1:07:15met Kelly was on a phone call when we
1:07:17discussed the cost to improve sewer into
1:07:20the Puna district.
1:07:23both up and out to Paja and up towards
1:07:26Volcano. And I I looked at her, I was
1:07:28like, "This is crazy. You might as well
1:07:29just give everybody a $50,000 voucher
1:07:32and say, "Build your own septic system."
1:07:34And the numbers he gave me, I mean,
1:07:36yeah, you're kind of back to that as
1:07:38being the most cost effective. Even if
1:07:41the county gave everybody the funds to
1:07:44do it, it would still be the most cost
1:07:46effective in my opinion versus running
1:07:48the pipe, running back to a plant.
1:07:52Yeah. Is that is that in line with what
1:07:54you're saying? Even though your numbers
1:07:56didn't show that. I was interesting.
1:07:59>> I think they do. They did.
1:08:00>> Well, no. The cost for septic
1:08:02conversions
1:08:04to IWS, SEASPO conversions to IWS was
1:08:08higher than your cost for unless it was
1:08:11a joint combination thing.
1:08:13>> So, it was about half.
1:08:14>> So, the so the cost the cost we're using
1:08:16the average cost for conversion to an
1:08:18IWS is $40,000. per unit. That that
1:08:22number varies widely depending on site
1:08:24conditions. You know, we saw numbers is,
1:08:27you know, ranging from 10 to $100,000 or
1:08:29more. The median was about 40,000. And
1:08:32that that that cost per cessful
1:08:34conversion is the least cost of the
1:08:37other compared to the other options. So
1:08:40I'm looking at the summary of priority
1:08:41county sewer extension projects
1:08:45where you have your cesspool priorities
1:08:47or number of cesspools
1:08:49estimated capital costs for existing
1:08:51county service extensions and then your
1:08:53cost per conversion.
1:08:56>> So that cost per conversion is not an
1:08:58IWS conversion.
1:08:59>> No, that's for the extension of the
1:09:01sewer. So that's per customer
1:09:04a sewer connection conversion from
1:09:08cesspool to connecting to our county
1:09:10sewer system per unit.
1:09:12>> Correct.
1:09:12>> Correct.
1:09:13>> That's the 93,000 number that you're
1:09:14looking at.
1:09:15>> Okay. 630. I misread that. I was
1:09:17thinking sewer conversion
1:09:19>> accessible to IWS conversion. Okay. So
1:09:21you you came across the random sorry the
1:09:24the average price about $40,000 for an
1:09:26IWS conversion.
1:09:28>> Yeah. say it varies widely but that's
1:09:30that's what we use as the basis for the
1:09:31analysis
1:09:33>> much cheaper
1:09:34>> so I don't know if you were you here
1:09:36earlier when we had the discussion with
1:09:38the EM
1:09:39>> on the rates or
1:09:40>> yeah about the rates per unit
1:09:42>> we were outside
1:09:44>> and my thing has been we need to connect
1:09:45more people but then as I started doing
1:09:47the math I realized the math does not
1:09:48work in our favor
1:09:50>> at all
1:09:52>> okay
1:09:53>> you can kind of see that with um the
1:09:56cost estimates for pahala uh and not
1:10:00where you know it's like 30 plus million
1:10:03dollars for a new collection system and
1:10:05only like a hundred or so
1:10:08>> customers
1:10:08>> customers.
1:10:09>> Yeah, I'm having a hard time with that
1:10:10one. I still think we should do
1:10:11individual wastewater systems and call
1:10:13it a day.
1:10:15That's just my opinion.
1:10:17But can that can you bring that can you
1:10:20take those findings back to
1:10:23EPA and have the discussion with them on
1:10:25the cost conversion for an a treatment
1:10:28plant versus individual wastewater
1:10:30systems
1:10:31versus converting all the cesspools to a
1:10:34private or public funded
1:10:37facility that's going to cost us 30
1:10:39to$50 million for 100 customers.
1:10:44Maybe that's a that's that's a question
1:10:46for DEM perhaps. But um but that that's
1:10:49I mean those numbers are real. I mean
1:10:51that $300,000 per per year per cessible
1:10:55conversion for decentralized system
1:10:56that's based on Bahala based on the bid
1:10:58costs.
1:10:59>> I've been I've been watching these. I'm
1:11:00very interested. It's psychotic actually
1:11:02how much we're going to spend for 100
1:11:04people.
1:11:05But uh DM do you have a comment on that?
1:11:09Kelly, [laughter]
1:11:14it's been bugging me. Michelle and I
1:11:15have talked about it. I've talked about
1:11:16it with finance and I've just This is
1:11:19floating question I have of why we're
1:11:20spending that much money for so amount
1:11:23of customer base.
1:11:24>> The $300,000
1:11:26per property is a real number. That is
1:11:29really what it is costing us at Bahala.
1:11:33>> Understood.
1:11:35Um, as far as the EPA is concerned, they
1:11:39don't care how we do this. All they care
1:11:42about is that we close the gang susp.
1:11:44>> Okay.
1:11:46>> So, so IWS conversions is a possibility
1:11:49or off the [snorts] table.
1:11:50>> Very, very definitely a possibility.
1:11:52>> Well, my goodness.
1:11:54>> Well, I I have to put a restriction on
1:11:56that.
1:11:56>> Okay.
1:11:59do will have a hand in that because it's
1:12:03the same old problem with a dense
1:12:06community.
1:12:08Independent
1:12:10septic tanks work fine until the
1:12:13community gets dense enough that they're
1:12:17too close together and you don't have
1:12:18adequate drainage.
1:12:20So the DO would be the next
1:12:24potential control on what technology is
1:12:28acceptable in a in a condensed
1:12:31community.
1:12:33So they could come back and say there's
1:12:35not enough
1:12:37square feet per property to do IWS
1:12:43and then that leaves us with
1:12:45>> okay
1:12:45>> maybe a low pressure system.
1:12:47>> We're a little wandering away. So let's
1:12:50we can always have this conversation
1:12:51when we have and we've had it for years
1:12:53in Pahala. So let's not redo it tonight
1:12:55because I'm getting very grouchy.
1:12:59>> May continue, but let's not let's not
1:13:02talk about Pahala. And
1:13:03>> have we asked the O?
1:13:07>> Well, first off, please understand that
1:13:09PA was started a long time ago. So I I
1:13:13can't I can't answer for who was asked
1:13:15what then.
1:13:16>> Completely understand. And I don't want
1:13:17to make Michelle Margarouchi, but has do
1:13:19been asked the question.
1:13:20>> Um, let me just say that before we
1:13:23start, NAOU, we will ask those
1:13:26questions.
1:13:27>> God. Okay, good. Beautiful. Thank you.
1:13:29>> Okay.
1:13:30>> Awesome.
1:13:32Council member Kimble,
1:13:33>> let's try to be brief. Um the um at at
1:13:38the HSA conference um last week, we did
1:13:40have a working group. Dan was a
1:13:43participant. Thank you, Dan. Um and you
1:13:46know the the conversation I think really
1:13:49indicated that cost is the driving
1:13:52factor on a lot of the decision making
1:13:56um as
1:13:59and and that's not surprising. I mean
1:14:00I've seen that whether we're talking
1:14:02about wastewater or water or any kind of
1:14:05infrastructure. Um
1:14:08my question so one question um and you
1:14:11mentioned the uh um cesspool
1:14:14prioritization tool. Were you using the
1:14:17most recent version, the one that Chris
1:14:20presented at the HAC conference that had
1:14:23the 14 criteria for presentation or was
1:14:26this the initial version that came out
1:14:29of the CESPO working group?
1:14:30>> Their study, you just used the three
1:14:32levels. Is that correct?
1:14:34>> Yes. I his um his study with 14 levels
1:14:38was new news to me. Frankly, good news.
1:14:42>> Yeah. But it was certainly new news to
1:14:44me.
1:14:45>> Yeah. So just for my colleagues, you
1:14:47know, I think um clearly from a
1:14:51standpoint of cost alone, conversion to
1:14:55individual wastewater systems is, you
1:14:58know, it saves us
1:15:01a lot of money. Um at least what about
1:15:03$2 billion, $3 billion.
1:15:07However, um what I don't think is taken
1:15:09into account and correct me if I'm wrong
1:15:11in this analysis is we do know that
1:15:14there are locations where in IWS in
1:15:17terms of water quality is not an
1:15:19improvement, right? And that's also a
1:15:22goal here. Um and that is one of the
1:15:24factors that is taken into account. So
1:15:27um I can I assume that with respect to
1:15:30the proposal here that that particular
1:15:32element was not taken into account the
1:15:36the effectiveness of an IWS at that
1:15:39given location in terms of this
1:15:42proposal.
1:15:44>> Uh that is correct. So our evaluation
1:15:47was at a high level. uh we didn't do
1:15:49sight specific um evaluations which DOH
1:15:52would require an engineer to do um
1:15:54things like uh soil percolation and all
1:15:57that we did not do and that would change
1:15:59um what type of individual wastewater
1:16:02system DOH would approve so it could be
1:16:04higher than
1:16:06>> um 40,000 is a typical we assume is a
1:16:08typical septic tank installation.
1:16:11>> Yeah. So I, you know, I think as we move
1:16:13forward, um, potentially the ability to
1:16:16incorporate this more advanced tool from
1:16:21uh into some of these decision- making.
1:16:23I mean, as ideal as it seems to allow
1:16:26for most of the conversion to happen
1:16:28through a conversion to individual
1:16:29wastewater systems. You you mentioned
1:16:31workforce at our working group, that's
1:16:33another factor that's just outside of
1:16:35the cost factor. I mean, we're just not
1:16:37going to have the workforce, let alone
1:16:39the materials to convert to individual
1:16:42wastewater systems that fast um and and
1:16:46meet these these numbers. Um just for my
1:16:49colleagues, there was some discussion
1:16:50about refining even further the
1:16:53prioritization in terms of the timeline
1:16:55and the 2050 deadline to incorporate
1:16:59some of these other factors into that.
1:17:01And I think that's an interesting
1:17:03discussion to be had. the the last
1:17:05question I want to I mean we we brought
1:17:08up some other wastewater facilities
1:17:10development which I think yes we we we
1:17:13should think about cost per household in
1:17:17terms of these solutions. Um based on
1:17:21this assessment
1:17:22um does it make sense to fund phase two
1:17:25of Hilo wastewater?
1:17:30>> Sorry. [laughter]
1:17:33Uh I'm assuming you mean [clears throat]
1:17:35phase two of the Hilo project. Is that
1:17:37correct?
1:17:39>> Um phase two of Hilo project is a change
1:17:42in technology.
1:17:44Uh we would be going from the towers
1:17:47with the pack towers with I think
1:17:50they're called bioreactors
1:17:52>> to more of a of a traditional
1:17:57um activated sludge technology. Uh I I I
1:18:02think it's viewed as being a more stable
1:18:05uh more capable technology, but it also
1:18:08offers us uh new opportunities
1:18:12for nutrient removal that is not
1:18:15available to us with the biotowers. Um
1:18:19you know all of us should be aware that
1:18:21the next level of regulation on our
1:18:24wastewater discharge is coming and part
1:18:28one of it is going to look like nutrient
1:18:31control and then part two of it is going
1:18:33to be PAS and a lot of other things. So
1:18:37we're not done with having to perform
1:18:39better than we have done in the past.
1:18:43So you your perception is that it is
1:18:46likely that we would be required through
1:18:51potential mandate to move forward with
1:18:55the planned improvements that are in
1:18:58phase two.
1:18:58>> I'm going to have uh Jason either agree
1:19:01or disagreement with me here, but I
1:19:03don't think we're going to be required
1:19:05to utilize a specific technology. Let's
1:19:09call that phase two. we're going to be
1:19:11required to perform to a certain
1:19:14discharge standard
1:19:16and and in order to achieve that
1:19:18standard I think we have to upgrade our
1:19:20technology. Am I reading that correctly?
1:19:36>> Kelly Hartman, regulatory administrator.
1:19:38So the phase two of the Hilo project is
1:19:41in our AOC mandates
1:19:44um to replace those bio towers. The
1:19:47exact technology is not dictated to us
1:19:50but that's um the design that we've been
1:19:53working on in house.
1:19:54>> Okay.
1:19:56So basically yes it's regulatory
1:19:59required that we expend the funds to do
1:20:03phase two
1:20:04>> and it needs to be completed by 2035.
1:20:07Okay,
1:20:09remember how I used the over the barrel
1:20:11expression? Um, I'm going to use that
1:20:12again tonight. Um, I I'll leave it
1:20:14there. Thank you,
1:20:16>> Council Member.
1:20:18>> I just wanted to say I guess there's
1:20:20staff from DM that wanted to say
1:20:23something.
1:20:25>> You have your hand raised, so we
1:20:27wondered if you had something you wanted
1:20:29to add.
1:20:31>> Yeah, Chris Laud, the temporary
1:20:33assignment chief of the wastewater
1:20:35division. Just real quick, the the
1:20:39requirement from DOH is that all cess
1:20:43pools be closed, but they don't they
1:20:45don't say the county has to close all
1:20:48the SAS pools. Right? So, this is a
1:20:50mandate that's not really well defined
1:20:54and they don't identify a funding
1:20:56source. And as you can see from the
1:20:58report, the numbers that we're talking
1:21:00about are just astronomical.
1:21:04and and yes the the cheapest way seems
1:21:08to be
1:21:10u the most attractive. However, it was
1:21:13also pointed out that with these
1:21:15individual wastewater systems you may
1:21:17not get any treatment of the liquid
1:21:20train. So that the net um impact on the
1:21:24nearshore waters is is not going to be
1:21:27as uh dramatic. It's not going to be as
1:21:30dramatic of of an improvement as you
1:21:32might hope. And every year when we renew
1:21:36the permit, the NPDES permit for Hilo,
1:21:40they always put in a nutrient limits and
1:21:43every year we've been argue been able to
1:21:45argue against it. And you know, one of
1:21:49these years they're going to say, "No,
1:21:51the permit limit stands." And a risk
1:21:55that we run into is we allow everybody
1:21:58to just do IWS.
1:22:01Now, the nearshore waters are going to
1:22:03be impaired and our plant, even if we
1:22:06discharge nothing, is going to be
1:22:07non-compliant. So it's it's a
1:22:10complicated nuanced
1:22:12um analysis here but we definitely my
1:22:16recommendation is we need to upgrade uh
1:22:19the plant to get a more modern secondary
1:22:23treatment system which is the activated
1:22:25sledge system and then we also need to
1:22:28talk to DOH and figure out well who who
1:22:31is expected to convert these cesspools
1:22:33and who's going to pay for it is the
1:22:36huge thing and then if DO allows IWS's,
1:22:41they need to factor that into the future
1:22:44water quality standard studies that they
1:22:46do that would shape the discharge limits
1:22:50of our NPDS permits.
1:22:53Sorry to get too complicated, but th
1:22:56this is surprisingly complicated.
1:23:00>> Thank you. My only comment is is that
1:23:03too bad we didn't have this presentation
1:23:05before we talked about those rate
1:23:07increases.
1:23:09Thanks,
1:23:11>> Council Member Viegas.
1:23:12>> Yeah, just real f. I mean, back when I
1:23:15was in college in the 1900s,
1:23:17conversations were already being had
1:23:19about kind of the waste in our
1:23:23practices, especially in first world
1:23:25countries by um dealing with our
1:23:28personal solid and liquid waste with
1:23:31water. So I am hopeful that somewhere
1:23:34out there we've got the next generation
1:23:37of incredible thinkers and enlightened
1:23:40minds. Um and through traveling the
1:23:42world where not everybody has the luxury
1:23:45or the resources to use gallons of water
1:23:48to flush their waste um which then
1:23:51leaves us with dealing with more. I just
1:23:54I'm hopeful that somewhere out there um
1:23:57there will be the technology
1:23:58[clears throat] for us to um recalibrate
1:24:01the way we manage our waste flow,
1:24:04streams, cycles,
1:24:06uh whatnot. So that's just kind of my
1:24:09grand finale. I yield.
1:24:12>> Thank you, Council Member Viegas.
1:24:16Kona,
1:24:18Council Member Hustes, is he's gone.
1:24:21Okay. I just see someone over there.
1:24:23Okay.
1:24:24>> Yeah. Well, oh, it's Scott. Okay. Okay.
1:24:27Okay. So, thank you so much for all the
1:24:30work you folks have done for three years
1:24:34and DEM for getting this ready and, you
1:24:38know, having this financial plan ready
1:24:41for EPA on time, I I believe. So, that's
1:24:45wonderful work. I thank you so much.
1:24:48Thank you for s finding us. What is it?
1:24:50$3 million. three billion dollars less.
1:24:53So, yes, great work. Only two billion
1:24:56dollars. [laughter]
1:24:58Um, all in favor of closing file and
1:25:01communication 1062, please say I.
1:25:05>> Um, that is six in favor with council
1:25:09members,
1:25:11uh, Inaba and Kirkowitz
1:25:15excused. And that bring Oh, motion
1:25:18motion carries. And that brings us to
1:25:20the end of our agenda for the night.
1:25:23Thank you so much.
```*