- Flood Stat update from GIS Director Robert Hauck: the September and October king tide months passed, with one event influenced by a tropical system in the Gulf; the recap was held back because NOAA tide data is released about 30 days after each month, and another king tide month comes at the end of November. See Road Closure Mapping and Street Flooding Analysis.
- Hauck said the city's road closure map and the Tide Eye site are now the two most-used GIS websites (about 18,000 unique users in the period he cited), and that closure feeds now go directly and in real time to Waze, Google Maps, Apple Maps and TomTom, including Waze warnings for roads like Calhoun Street that stay open but partly flood.
- Hauck demonstrated a street flooding analysis tool on the city GIS website that uses road closure history, tide and rain data to identify what drives a road to flood, plus a Waze report explorer and a street forecast of roads at risk. A Lockwood Drive case study (flooding from 7.2 ft tide) showed 443 flood events since 2015 and how adding sea level rise sharply increases them.
- Kaylan Koszela, Director of Resilience, chaired the meeting and gave the committee's time to the stormwater design standards discussion; the full resilience update was skipped because she had presented it earlier that day to another advisory committee.
- Ron Bucci, Director of Development Services, presented the City of Charleston Stormwater Design Standards Manual (major revisions 2020 and 2025, a fee-only change in 2026). See Stormwater Design Standards Manual.
- Key requirements: designs must account for 5.5 ft NAVD 88 for sea level rise and surge and new dedicated roads at 7.5 ft; discharge-rate control for projects disturbing half an acre or more and 100-year analysis for one acre or more; a 20 percent flow and volume reduction in special protection areas (15 percent with low impact development); and tighter Church Creek rules (100-year detention, 1.25 to 1 fill displacement offset).
- Bucci also covered the wetland rule: wetlands may be used only for conveyance, and a wetland scientist must sign off that the wetland will still function after development; the manual does not currently prohibit wetland impacts. He said Charleston County is updating its manual and is largely aligned with the city.
- In Q&A, committee members asked how many developers use low impact development (Bucci: fewer than hoped, especially downtown, since the incentive only began in the 2025 manual), whether a 20 percent reduction means a 20 percent larger retention area, whether modeled results are compared with actual storms (not yet; more downstream gauges are being considered), and whether neighboring projects can be linked for cumulative benefit.
- Stormwater update from Director of Stormwater Matt Fountain was not presented; it was noted that the Army Corps MUSC pump station upfit is under construction. See Stormwater Projects Update.
- Mayor Cogswell thanked Bucci and the stormwater department for the manual update, calling it thoughtful and not overly restrictive while addressing growing runoff needs, and thanked members for their service.
- This was the final meeting of the committee in its current makeup after two years; new members are expected next year and members were invited to serve again. Public comment was not recorded in the captions.
Agenda
- Flood Stat, Robert Hauck, GIS Director
- Resilience Update, Kaylan Koszela, Director of Resilience
- Stormwater Update, Matt Fountain, Director of Stormwater
- Mayor Update, Mayor Cogswell
- Committee Member Discussion/Q&A
- Public Comment Period
Sources
- Agenda Center listing for this date: https://www.charleston-sc.gov/AgendaCenter/ViewFile/Agenda/_11052026-11323
- Documents: Charleston Basin Flood Action Committee Agenda
- Agenda Center: https://www.charleston-sc.gov/AgendaCenter
- Video: https://www.youtube.com/watch?v=0IqF0eWg9nY (City of Charleston YouTube channel)
Video
Transcript
*These are auto-generated captions; names and numbers may be misheard.
Transcript
00:01There we go. Everybody see that?
00:05So, uh you know, we start these meetings
00:08with a
00:09little flood stat presentation. And uh
00:13So, the end of September and October
00:15were pretty busy king tide months. And
00:19uh we got through all those. Uh
00:22Some of them weren't too bad because
00:23there there wasn't rain involved. A
00:25couple of them did have rain. And then
00:28uh
00:29there's one event that
00:31was influenced by the tropical system
00:33that was in uh the Gulf.
00:36But, NOAA releases their tide data about
00:3930 days after that month. So, we don't
00:42have the good tide data released yet,
00:44which makes some of the analysis of what
00:47happened and
00:48and how more interesting. So, I'm going
00:50to save the recap from those events for
00:52the next meeting, which could be a uh
00:55a 2026 recap.
00:58But, a reminder that uh the end of this
01:00month, we have another king tide month.
01:02So, just something to be aware of.
01:05So, instead of doing the the recap, um
01:08just some notable news from uh the GIS
01:10division is uh we've made some changes
01:13and improvements to uh
01:15our road closure system. And if you're
01:17not familiar with it, that uh
01:20the city maps all of our construction
01:23road closures, but during flooding
01:25events, we try to map closures in as
01:28close to real time as possible. And uh
01:30that those go to our road closure
01:32website and then uh the Tide Eye
01:34website.
01:36And uh
01:38it's interesting and I've I've kind of
01:40become more aware of this aware of it in
01:43uh in recent months, but uh of how many
01:46people go to these sites during uh
01:48events, especially if it's uh around the
01:51commute
01:52time. So, uh that I just pulled this
01:54from our Google Analytics for the site.
01:56That uh we had 18,000 unique users and
01:5937,000
02:01thousand
02:02and uh
02:03that number one and number two in the
02:06little table there is showing that the
02:08road closure website and Tide Eye are
02:10the number one GIS websites out there.
02:14So, it's a uh
02:16that I'm I'm proud of this because uh
02:18and it's interesting. It's uh the people
02:21of the city of Charleston using tools to
02:23adapt the best they can to uh to the
02:26situation we have.
02:29And uh the the recent improvement to our
02:31road closure
02:33system is uh that we're now
02:36much more directly integrated into the
02:39navigation apps. And that's Waze, Google
02:42Maps, Apple Maps, and TomTom.
02:45And uh that we haven't our our flooding
02:48closures would get into Waze in the
02:50past, but it was uh
02:52a little of a black box of how it was
02:54happening. I think they were
02:56uh ingesting our closure data, but
03:01that they want the format to be just
03:03right for it to actually show up. So, we
03:05we've got all that
03:07hammered down now and we our feeds go
03:09directly in real time into these apps.
03:11So,
03:13it's pretty cool that uh we just have a
03:16drop box on our road closure to send it
03:19to Waze or not. And if we put yes, it
03:22goes instantly into these navigation
03:23apps.
03:25And
03:25uh that this is kind of what it looks
03:27like in all the different apps. And we
03:29use this during uh the October floods
03:31and it seems to work really well.
03:34And uh a powerful part of the Waze
03:38platform is it allows us to do warnings.
03:42And uh that I've had people comment that
03:45they were getting the warnings coming
03:46into work.
03:48That uh that you can put a warning on a
03:50road where it doesn't reroute people,
03:52but uh the Calhoun is a perfect example.
03:54That one of the lanes gets uh gets
03:56pretty inundated, but the road stays
03:58open.
03:59So, now
04:01I can uh with a click of a button put a
04:03warning on Calhoun and as people are
04:05coming over the bridge, their phone will
04:06say, "Watch out, there's
04:09potential for water on the road."
04:11And that might make people move over
04:13into that center lane sooner, you know,
04:14so hopefully that'll be helpful for
04:16people.
04:18And then additionally, on top of uh
04:22all this road closure data that we're
04:24collecting,
04:25um that we're able to do stuff with the
04:27data that uh
04:30Over the summer, we had uh
04:32Spence Cox, a uh Duke student, uh
04:36approach us looking for internship
04:39opportunity.
04:40And we really didn't have one, but he
04:42wanted to work on something anyway, so
04:44he put this together
04:46using all of our road closure data and
04:49uh that we get Waze flood reports and uh
04:52he spent the summer putting this app
04:53together and we kind of went back and
04:55forth on
04:57on things we could do that would be
04:58interesting and he came up with this uh
05:00street flooding analysis and the point
05:03is to
05:04kind of identify the driving factors for
05:07why a road floods and I'll I'll give a
05:09demo of it in just a sec and it's on uh
05:12the GIS website now.
05:14It uh
05:15maybe not 100% ready for uh prime time,
05:18that we're still kind of vetting some of
05:20the data, but it's uh it seems to be
05:22pretty solid.
05:23And then uh this other one,
05:26we had a request uh you know, leading up
05:28to the election for the the
05:31transportation sales tax to uh
05:35to do a little bit of a little bit of a
05:37close look at a
05:38specific road and uh that we did
05:41analysis on Lackland Drive and this is
05:43just another app that looks at the
05:47history of flooding and then uh
05:49additionally, looking into the future,
05:51what would that same road look like with
05:53sea level rise? So uh
05:56Let me uh get out of this presentation.
06:06And just give a super quick demo cuz I
06:08know we're uh
06:12got a lot on the agenda.
06:15Can you guys still see the Charleston
06:17street flooding analysis?
06:21I think so.
06:22So, the way this works is uh
06:25you click what you want to do and just
06:26let us look at Lockwood.
06:35Yeah.
06:37And uh he they put this all together uh
06:40he developed this whole site. I think he
06:42did some of the coding with uh AI and
06:44it's all very impressive. So,
06:46this is looking at a road closure data,
06:48historical tide data, and historical
06:50rain data, and uh just looking at the
06:52date that the road was closed in time
06:54and determining the driving factor that
06:56causes that road to flood. And Lockwood,
06:59of course, is uh is tidally in
07:01influenced. So, uh
07:03that all makes sense. And then uh to go
07:05to some cool charts where it shows all
07:07the events and uh
07:09that you can hover over things and and
07:11get the dates and the tide height and
07:13the amount of rain that day.
07:16And uh I apologize, I don't have a
07:18mouse.
07:19And it's uh
07:22I'm having a little bit of trouble.
07:25Um
07:26yeah, just lots of cool information.
07:28This is on uh the JS website and you can
07:30go explore it and you can type in uh
07:32any road that's had a closure and get
07:35all sorts of cool information about why
07:37it floods and uh
07:39just to give you another quick example
07:42is uh we can put in Ogier Street, which
07:44is a super low street right off of
07:47Calhoun, that I already know that it's
07:50uh rain causes it to flood. And if we
07:51get heavy rain bomb, it's uh the first
07:53road to flood.
07:56But, I know that by uh you know, just
07:58from personal experience. This this lets
08:01uh this lets us get a pretty good idea
08:03of what causes a road to flood um
08:05if you didn't know anything about the
08:07you know, where it flooded in the
08:08peninsula.
08:09So super cool and uh
08:13Let's see.
08:15We do uh
08:17Let me go back to home. That those are
08:19looking at road closures, but then you
08:21can explore Waze reports, which those
08:24are uh anybody with the Waze app can can
08:27put a pin on the map saying that they
08:28see flooding.
08:30And it is useful because a lot of uh
08:33locations off the peninsula will show up
08:36and that that is typically where we
08:37don't have as uh
08:39our data would especially the road
08:41closures just isn't as great off the
08:43peninsula.
08:45And then uh this is really neat. The
08:47street forecast that
08:49uh it pulls
08:51NOAA's forecast for the next few days.
08:55And
08:57based on the conditions it sees, it'll
09:00uh try to guess what roads are at risk.
09:03And we can see we've got uh
09:05a decent tide
09:07in a couple days and then we've got uh
09:1014 roads at risk and you can hover it.
09:14And then uh we can look at these roads
09:16and the the roads we
09:18know are going to flood from uh
09:20the high tide Fishburn, Haygood.
09:22But some streets show up that uh are
09:25interesting that that I'm not super
09:27familiar with. Uh Central Park Road is
09:29one of them that it floods a lot, but
09:31I'm not super uh familiar with it like I
09:33am on some of the peninsula streets. So
09:36that's that app. That is on the city
09:38website and you can play with it.
09:40And uh then this other one was uh
09:43yeah, kind of leading up to the sales
09:45tax
09:46referendum. Um
09:49just to uh do a deep dive on one road
09:52and this could be applied to any road.
09:53It's just uh
09:55we're specifically kind of looking at
09:56Lockwood. Lockwood starts to flood at
09:597.2 ft and going back uh
10:03to 2015,
10:04like how many times did that road flood?
10:07Uh and this is looking at
10:10yeah, just that 7.2 ft. So, it's 443
10:13times 37 times a year.
10:16Um,
10:18403 days, and then uh, you know, almost
10:21800 hours
10:23of the road being past flood stage. And
10:25uh,
10:27Longest event, almost 8 hours. I'm
10:29pretty sure that's Irma.
10:31And uh,
10:33we got pictures, you know, different
10:35conditions.
10:37And I should say uh, that most of this
10:39was built with AI. So,
10:41uh,
10:42did a real impressive job. I just gave
10:44it these pictures, and it used the
10:45timestamp to to get the tide. And uh,
10:49It's just a cool way to look at uh, a
10:52specific location, and uh, and get all
10:55sorts of information about it. But,
10:58uh,
10:59more powerful thing about this app app
11:01is uh,
11:02you can see we have 443 events since uh,
11:062015,
11:08that you can add sea level rise
11:11to it. So, uh,
11:15Yeah, you just add point If the seas
11:17were point two feet higher, you know,
11:19which is uh, not that much higher,
11:22of just how quickly things uh, get a
11:24little bit out of control for this
11:26location.
11:27Which is why we need uh, mitigation
11:29measures.
11:30Um, so this is uh,
11:33a neat tool to look at, and uh,
11:34especially with the sea level rise to
11:36kind of peer into the future a little
11:38bit.
11:39But, uh, that is all I have. If anybody
11:41has any questions, I'd be happy to
11:43answer them. But, with that, I'll turn
11:45it back over to you, Cameron.
11:49>> Thanks, Robert. Does anybody have any
11:51questions for Robert?
11:53Think on it, and we can always um,
11:55share some questions later.
11:57So, we do have next on the agenda,
11:59resilience update. Um, I'm going to save
12:01that, cuz I want to make sure our main
12:03conversation today, um, Ron, so um, has
12:08has his time and space to have the
12:09conversation I know this committee's
12:11been interested about um, learning more
12:13about the stormwater um, design
12:15regulations and particularly some of the
12:17efforts as to what is existing in the
12:19city related to
12:22any wetland protections and how how that
12:26happens here at the city. So,
12:28Ron, I'm going to turn it over to you to
12:29take over if you'd like to introduce
12:30yourself. I think many folks on this
12:32committee obviously are city council
12:34members and mayor well aware of who you
12:36are and your role at the city.
12:38Please you should be able to share Ron,
12:40but let me know.
12:41>> For sure. I'm going to go to try and
12:42share right now and
12:46let it work.
12:50Let's see now.
12:54Okay, are you all seeing my full
12:56presentation?
12:58>> We're seeing your like preview one. If
13:01you share it on the main slide, yeah.
13:03>> I will stop sharing and try again.
13:14How about now?
13:17>> Yeah, there you go.
13:18>> Okay, great. Well,
13:20good afternoon everyone. Like Kaylin
13:22said, a lot of you may already know me,
13:24but my name's Ron Bucci. I'm the
13:26director of development services at the
13:27city of Charleston.
13:29Um one of the
13:31things that I oversee is the
13:34implementation of the stormwater design
13:36standard manual.
13:37It's gone through a few iterations in
13:40the years. 2013 was the first major one
13:43followed by a
13:45update in 2020 which really kicked into
13:48our more stringent requirements and then
13:49more recently in 2025 we made a another
13:53revision to the manual. Um so I
13:55previously created this presentation to
13:57kind of run through a manual overview
14:00and kind of highlight some of those
14:01changes. So it's an up-to-date
14:02presentation on you know what we enforce
14:05now. We did make a minor change in 2026,
14:07but that was just related to fees. So
14:10the last major revision that impacted
14:12design elements was in 2025. So with
14:15that I'll run through and Kaylin, just
14:17let me know about time if, you know, I'm
14:18running long, uh just let me know and I
14:21can
14:21>> Yeah, and I'll
14:22I'll I'd invite, you know, committee
14:24members, please
14:26raise your hand, interrupt if you have
14:27any question about what I'm presenting
14:29if that works for you, Ron.
14:31>> That would be great. That would be
14:32great.
14:33And if someone's hand is raised and I
14:34don't see it, please just let me know.
14:37>> Will do.
14:37>> Um so, a quick meeting agenda. So, kind
14:40of the purpose of the manual and then I
14:42cover some of the the highlights and I
14:45would say um
14:48the the things that we really want to
14:50stress when we're implementing our
14:51requirements to, you know, protect the
14:52city and also try and help improve
14:54flooding within the city, not just from
14:56capital projects, but from development
14:58as well. So, um the purpose of the
15:00manual, we cover some sea level rise,
15:03um the water quantity requirements and
15:05highlighting the special protection area
15:07requirements we have at the city.
15:09Um then I'll dive into Church Creek
15:11requirements. It's a uh it is a special
15:13protection area, but it has even more
15:15stringent requirements due to the
15:16flooding in that location. Um then I'm
15:19kind of going low over low impact
15:21development practices and how our manual
15:24encourages the use of it and try and
15:26incentivize it.
15:27Um and then wetland analysis, what we
15:29currently do when it comes to wetland
15:32impacts and what we require the design
15:34community to analyze when they do
15:36propose an impact that's been permitted
15:38by the Army Corps. And then I got some
15:40examples and then I kind of discuss some
15:42future revisions,
15:43um which I think I might taken out
15:45because I think it was just talking
15:46about the fees that we already put in.
15:47So, and then I'll open it up for more
15:49questions, but like Kaylin said, you can
15:51ask me questions whenever you have them.
15:53So, the purpose of the manual, the last
15:54major manual revision was in July 2020
15:57and then we revised it in 2025. Um
16:01we put a heavy emphasis on reduction in
16:03discharge rates and volumes for all
16:04projects that are in areas of known
16:06flooding, so targeting those areas where
16:08we know flooding is occurring or is
16:11within a watershed that would impact
16:13that flooding. Um
16:15we wanted to account for potential sea
16:17level rise, which I'll get into more
16:19detail. Um, we added additional
16:20requirements for publicly dedicated
16:22systems. That's systems that would be
16:24maintained by the systems. We want the
16:26city maintained by the city. We wanted
16:29to make sure they're meeting a certain
16:30standard. Um, we wanted to prevent
16:33adverse impacts to all surrounding
16:35properties, upstream, downstream, the
16:36public right-of-way, etc. And then we
16:39did additional what we call technical
16:41procedure documents to clarify the
16:44requirements. We wanted to keep the
16:45manual more more simple on what the
16:46requirement is, but then we wanted to
16:48provide
16:49more in-depth documentation to give to
16:51the um, designers and the engineers so
16:54that they have a better idea of what
16:56we're looking for.
16:59So with that, um, sea level rise is the
17:01first one I'm going to cover. So you may
17:02all be familiar with the title gauge
17:04data that we have. Um, and as you can
17:06see, this is all based on NAVD 88. Um,
17:09that's kind of what we use as engineers
17:11when we're looking at plans. So the mean
17:13high high water that you see here is
17:152.6.
17:17Um, that's not to mean that we don't get
17:18events that have higher than that. You
17:20know, we'll see 3.5, which we've seen
17:22recently, which will flood Calhoun.
17:24Perfect timing. Thank you, Robert, for
17:26um, setting me up for that. But when it
17:28comes to what we require, we want to
17:30build upon that. So going to the next
17:32slide kind of covers what we're
17:34requiring. So to accommodate sea level
17:36rise and storm surge, we require all our
17:38designs to account for a 5 and 1/2 NAVD
17:4188. So adding 2 ft on top of that 3 and
17:441/2 that we are seeing, you know, once a
17:47year, multiple times a year potentially.
17:49Um, we also require that our roadway
17:52elevation, so if you're going to build a
17:53new road and dedicate it to the city,
17:55um, that should be at 7 and 1/2 so that
17:59we are not flooding the road, also not
18:01flooding the road base and the the
18:03subbase material, so we're not damaging
18:06it. So we are trying to account for sea
18:08level rise
18:09um,
18:10that that could occur. And we do require
18:12that the applicants model it as if it
18:15was dynamic, so it actually shows the
18:17tides going up and coming down, and they
18:19need to account for that in their
18:20design.
18:24So, this is going into kind of our
18:26stormwater quantity requirements. So,
18:28all projects that are being reviewed by
18:31the city. So, we will review a project
18:33that is half an acre or more of land
18:35disturbance.
18:37So, any of those projects would have to
18:38meet our project discharge requirements.
18:40So, this is controlling the discharge
18:42rate
18:43from pre to post. So, if your site has a
18:46certain amount of water leaving its site
18:49in the post development condition, it
18:51needs to match that water. So, this is
18:53throughout the city,
18:54um even in
18:56uh non-special protection areas. So, it
19:00kind of it looks at certain storm events
19:02and make sure you're not making flooding
19:04worse during those certain storm events.
19:06And then we also require, if you're
19:08disturbing enough land, what is called
19:10the 1% of exceedance storm event
19:12analysis. So, it says here, you know,
19:15projects disturb one or more acre, we
19:16want you to look at even larger storm
19:19events, um up to what the 1% being the
19:22100-year event uh storm event that has
19:24the probability of hap- 1% probability
19:27of happening in a given year.
19:29So, we want to make sure that you are
19:31not proposing any adverse impacts during
19:34that event. Um
19:36if you increase the runoff, you need to
19:38show, "Hey, it's still not going to
19:40worsen flooding because everything's
19:42already flooded out during this large
19:43event." So, that will apply to any
19:45development within the city that's
19:47disturbing 1 acre or more, and the
19:49discharge rate requirement is for half
19:52an acre or more. And then going to the
19:53next slide, this goes into the special
19:56protection area requirements.
19:58So, if you're in a designated special
20:00protection area, that means there is
20:02either existing flooding in the area, or
20:05you your development is contributing to
20:09that flooding by being within the same
20:11watershed.
20:12So, if your parcel area is greater than
20:161 acre and you're disturbing half an
20:18acre, you have to reduce the flow rate
20:22and the flow volume by 20%. So, you
20:25actually have to improve the conditions
20:27of your site by holding the water back
20:29on your site and slow releasing it into
20:32whatever you're tying into. Might be the
20:34public right-of-way, might be a private
20:36road.
20:37Um we don't require sites to reduce
20:39below an assumed good condition woods.
20:42Basically, that is the best condition
20:45for stormwater runoff if you have a
20:47wooded site. So, reducing below that
20:49would be doing better than what is the
20:51best out there essentially. Um and this
20:53is I'll touch on this more later, but we
20:56do try to incentivize low impact
20:58development. So, if you utilize a low
21:00impact development, which is permeable
21:03pavers, uh rain garden, bioretention,
21:06instead of a 20% reduction, we would
21:09allow for just a 15% reduction. Um or if
21:13the project utilizes city funding, we
21:15allow this as well. But, low impact
21:17developments are much smaller, a little
21:19easier to maintain, and have a lot of
21:21added benefits like water quality. So,
21:23we want to incentivize the use of them,
21:25and this is just a small way where they
21:27may be able to provide less storage if
21:29they use these creative practices.
21:33>> Um question.
21:34>> Um Yes.
21:35>> Uh how many developers are taking you up
21:38on that um low impact development?
21:43>> Not as many as obviously we would like.
21:45Um I think we still are doing a lot of
21:47education on it. Um that that specific
21:50low impact development requirement just
21:52went in the 2025 manual. Um but we have
21:55seen a few, but I would say not as many
21:57as we like if I'm being honest.
22:00>> Thank you.
22:03>> Okay.
22:04>> Mr.
22:04>> Uh Councilmember Waring, yes.
22:06>> Thank you. Um
22:07So, to
22:08to account for the 20% additional
22:11runoff, that means the retention area
22:14would be 20% larger than it was prior to
22:16this update?
22:19>> Uh
22:19it depends really cuz it depends on like
22:21the the how the water is interacting,
22:23but that is a simple way to describe
22:25that. Yes. So, basically, in if you're
22:28not in a special protection area, if you
22:30have a fully impervious site previously
22:33and you have one now,
22:35you wouldn't have see any detention
22:37whatsoever.
22:38Um but, if you're within the special
22:40protection areas, you now have to
22:42provide storage, but it it's not a
22:44direct correlation of providing 20% more
22:47storage
22:48um because it's based on how the water
22:50is being held, how it's being released.
22:52So, it sometimes could be more than
22:54that, honestly.
22:55>> Mhm.
22:57Okay. Thanks.
22:59>> No problem. And I actually will touch on
23:01that a little later, too. Um
23:04With this actually, is this still
23:07requirement can you realize? Oh, yeah.
23:09So, this is um
23:11kind of uh the requirement where we also
23:14wanted to provide a simplified approach
23:16for sites that were doing exactly what I
23:18was describing, "Hey, I have a fully
23:20impervious area site um in the existing
23:24condition. It's going to be fully
23:26impervious once we develop the site. Um
23:29the complicate the computations are very
23:31complicated. They take a lot of time.
23:33So, we said, "If you can document that
23:36you're not increasing runoff cuz you're
23:37just fully impervious,
23:39um
23:40you can provide storage volume of a
23:42stormwater practice that equals the
23:45runoff volume of half the existing
23:48runoff during a certain storm event, the
23:5025-year storm event." Um
23:53we have ran computations and collected
23:55project data within the area to show
23:57that by providing half the runoff volume
24:00for that 25-year storm event, that will
24:04essentially meets the 20% reduction. So,
24:08we wanted to give the opportunity for
24:10developers to just provide that storage
24:12instead of running through the
24:13computations when we know it is going to
24:15improve
24:17um on the flood conditions. It's not
24:19going to have a worsening of flooding.
24:21Um again, we try to incentivize the LID
24:23practices. So, we say, "For every one
24:26unit of storage,
24:27um
24:29you can get 1.1
24:31units of credit if you use LID LID
24:34practice.
24:36Um
24:38and then we developed because there are
24:39other requirements tied to stormwater
24:41practices, so we developed a simplified
24:43approach to deal with freeboard,
24:46recovery computations, um orifice sizes,
24:49basically different elements of your
24:51stormwater practice, we tried to
24:52simplify all of that with this approach,
24:54so try and streamline it because we know
24:56that we're going to have a situation
24:58that's better than it was after the
25:00project.
25:05Um the last special protection area
25:08requirement we have, like I previously
25:10said, we only um
25:11look and review for projects that
25:13disturb an acre or more for full
25:16in-depth review cuz if we did everything
25:18smaller, we it would just overwhelm us,
25:21but we do require the developers to
25:24still implement practices based on very
25:26simple computation and just using this
25:28table saying, "If you are increasing the
25:30impervious area by 500 square feet or
25:32more and you're not disturbing half an
25:35acre or more, you still have to do
25:36something like install rain barrels to
25:38offset that increased impervious,
25:40install a rain garden, um disconnected
25:43downspouts is running the water through
25:45an open space area instead of directly
25:47onto impervious area to slow the water
25:49down." So, we are even putting the you
25:52know,
25:53we are still looking for even the
25:54smaller developments to help improve the
25:56conditions of the watershed in a special
25:58protection area.
26:01Okay, Church Creek. Um so, this is a
26:05very I guess a special special
26:07protection area, I will say. Um we do
26:09know that there is significant flooding
26:11and it's been documented over the years.
26:13Church Creek Basin went through uh
26:15significant increase in impervious area
26:18and development in the 1970s. I'm trying
26:20to look at some of the facts I have
26:21here. Um approximately 1/3 of the
26:23watershed is low and medium density
26:27residential and it's about 30% of the
26:30watershed is impervious. When you look
26:31at the before conditions, there was
26:33almost no development. So, that rapid
26:35growth of development with
26:37that happened before a lot of these
26:39requirements were in place have caused
26:42some of the flooding and the the um
26:46I mean, that's really it. Just some of
26:47the flooding in some of those areas at
26:48the pinch points such as culverts. And
26:51then it it slowly drains because the
26:54water gets to these pinch points so
26:56quickly that it gets stored behind it.
26:58So, because of that, we have heightened
27:00requirements for Church Creek.
27:03Um
27:04And this is kind of Yes?
27:08Okay.
27:09Um these are kind of a list of those
27:11requirements. So, you have to detain the
27:13excess runoff volume between
27:15pre-development and post-development up
27:17to that 1% storm event. Normally, our
27:20enforcement for special protection areas
27:22goes up to the 4% storm event, which is
27:24the 25-year, but we are looking for the
27:261% the 100-year storm event when it
27:29comes to Church Creek. Um
27:32we actually look case by case on
27:34developments in Church Creek of how we
27:36want you to release the water because
27:38sometimes it's more beneficial to get
27:40the water out faster, sometimes it's
27:42better to hold that water on site. So,
27:44depending on where you are in the Church
27:46Creek basin, we may have
27:48specialized requirements.
27:50Um so, another thing we do when we do
27:53the 1% analysis that I failed to mention
27:55is
27:56fill displacement. If you are filling in
27:58area that floods, you need to then
28:00provide additional storage
28:03to offset that fill one to one so that
28:05we can document you're not worsening
28:07flooding. In Church Creek, we actually
28:09require 1.25 to one. So, if you fill a
28:12flooded area, we actually make you add
28:14to the storage to start slowly providing
28:17storage to the watershed and then adding
28:19that benefit.
28:20Um and then the last thing is we And And
28:22this is true with all development, to be
28:24honest. We encourage basin improvement
28:26plan participation over onsite storage.
28:29The benefits from a water quantity
28:31standpoint that the city gets from doing
28:33a basin improvement, upgrading a
28:36culvert, installing check valves,
28:38improving a drainage system,
28:41um far outweighs what a developer can do
28:44on their site. So, we always push people
28:48as long as it has an equal or better
28:49benefit to do basin improvements.
28:53Um and sometimes it may even save the
28:55developer costs. So, you know, I I we
28:57always have those conversations with the
28:58developers up front to see what can be
29:00done.
29:02Okay, now we're getting into the LID
29:04practice encouragement. So, this is a
29:06line from our manual. So, we require the
29:08designers to consider the incorporation
29:10of LID or green infrastructure. Um and
29:13we require them to go through the
29:15exercise of considering um
29:18the six site planning and design
29:20elements that we have listed and I'm
29:21going to go through each one of those
29:23and provide examples of where we've seen
29:26those. Um
29:28again, a lot of these have even done it
29:30before just based on us requiring them
29:32to go through the exercise before we
29:34even incentivize them. And now that
29:36we're incentivizing them with these
29:37additional credits, we hope to see more.
29:43So, first one is maintaining site
29:45resources and natural undisturbed areas.
29:47I mean, this is basically avoiding your
29:49natural resources, um avoiding drainage
29:52ways, wetlands. We basically make them
29:54go through the exercise and say, "How
29:55were you trying to avoid it? What did
29:57you do? Why couldn't you avoid it?"
29:59Um
30:00our mitigation requirements, like I was
30:02mentioning that do one-to-one fill
30:04displacement and 1.5-to-1 in Church
30:06Creek, also push people to do this. But,
30:08this is a affordable housing project
30:10that it's under construction off of
30:13Bernice Robinson where they had, if you
30:14look in the top right, a isolated
30:16wetland where they actually built around
30:18it and um created it as a feature to
30:21protect it and kind of walking trail
30:23around it. Um and I'll get into what we
30:26require from a wetland analysis
30:27standpoint later, but I thought it was a
30:29good creative design where they still
30:31found use in that area while not
30:33impacting the wetland.
30:38Lower impact site layout techniques. The
30:40goal is to fit design layout to follow
30:42natural contours, to limit your clearing
30:45and grading, and avoid steep slopes.
30:48Trying to use non-traditional design to
30:50limit impervious areas,
30:53and utilize energy dissipation to avoid
30:55erosion. So this is parcel K. It's out
30:57in Daniel Island, where the old, I
31:00believe, soccer stadium was, I I
31:02believe. Basically, they they had two
31:05approaches to kind of
31:07meeting this requirement. They were
31:09doing, if you can see the grading in a
31:10lot of the the parking islands, they
31:12used those as bioswales
31:14that collected the water and slowly
31:17released it to the downstream. And
31:19you'll see this detail, which was a
31:20level spreader. So basically, the water
31:22would
31:23go through it, and then it was very
31:25flatly graded with riprap, so the water
31:27would spread out before going to the
31:30adjacent wetlands.
31:31It's not your traditional pipe to
31:33outfall, where you create a ditch.
31:36They they really wanted to protect the
31:38buffers around the site. So we thought
31:40it was a pretty creative solution, and I
31:41do have photos of of this site later.
31:45All right, minimum minimization of
31:47impervious cover. This is always a tough
31:49one, because people want to maximize
31:50their built-upon area, but we want them
31:52to do it in a strategic way.
31:55This is just a parking lot for
31:57um
31:58I think it was one of the car
31:59dealerships in West Ashley, but the
32:01entire thing is permeable pavers, and
32:04they used the permeable pavers to
32:06provide storage to meet the
32:07requirements. The only area, if you see
32:10the red line to the left of it, is that
32:13is not permeable pavers, because that's
32:14where the heavy trucks are doing
32:15drop-offs. So
32:18you know, you can't really drive over
32:19permeable pavers and do certain turns
32:21over them. So they saved it for the
32:23smaller cars in the lot where they're
32:25going to be stored. So it it was also a
32:27great way to minimize the impact to the
32:28trees that they were trying to protect
32:30in this area.
32:32So I thought it was a
32:33a a great solution, where that was their
32:35only stormwater BMP. They didn't need an
32:37expensive underground detention system,
32:39something along those lines. So,
32:41that was a great way to minimize
32:43true impervious cover.
32:45Councilman Ware.
32:49>> Mr. Butchy, where did you say this is
32:51again?
32:52>> Uh this is in
32:54it's in West Ashley. It's right near the
32:56526 ramp um on the south side of 17.
33:00Um I think it's called the Azalea
33:01parking. I could send you the location,
33:04but um it's gated. There's a gate right
33:07where the red is, so you can't even
33:08really see it, but I actually have a
33:10photo of it. I
33:12my short body just looked over the had
33:14to hold the phone over the gate to get
33:15the picture, but um yeah, it's really
33:17cool site.
33:18>> Yeah, if you can give me a call on the
33:20other side of the meeting about that,
33:21I'd be
33:22>> Absolutely.
33:23Absolutely.
33:27Um and then this is the the use of
33:30natural features for storm water
33:31management, so utilizing your
33:33undisturbed natural buffers, your
33:34vegetated swales, and avoiding the
33:37impacts to the major spillways. Um
33:40This is off of Folly Road. It's just a
33:43uh
33:43uh
33:44subdivision, small subdivision. Um you
33:47can see in this the image on the bottom,
33:50there was a channel, and previously they
33:52were
33:53uh bridging it and trying to build
33:55additional homes or something on the
33:56other side. And then after going through
33:58this exercise, they're like, "Really, we
33:59shouldn't be impacting this drainage
34:01way. Let's just cut it there, you know?"
34:03I think really maybe it was just a trail
34:05and and maybe a small building. I don't
34:07know if they did a home, I can't
34:08remember, but but that was a great
34:10exercise of seeing this and and
34:12realizing the impacts that it would have
34:14and kind of cutting it short. And then a
34:16lot of the created storm water storage
34:19is kind of ex- uh created wetlands is
34:21what they did here to connect and create
34:23kind of like a treatment train of
34:25wetlands cuz they were trying to
34:27um not only use the natural feature of
34:29the downstream wetland and channel, but
34:32also replicate it in this case.
34:38And then the last one uh no, this isn't
34:41the last one, we have one more, but
34:42engineered proprietary devices. So, the
34:44city is aware of the potential benefits
34:46of using these, you know,
34:47space constraints. So, these are your
34:49underground detentions, your
34:51manufactured devices.
34:53Um sometimes linear projects where you
34:55just don't have room.
34:56Um they're better solution. They do a
34:59little sometimes do a better job of
35:00targeting specific pollutants depending
35:02on what you're using. Um the city will
35:05review each one for is it going to meet
35:09the performance requirements,
35:10requirements. What is the maintenance?
35:13Does it put it too much maintenance? Is
35:14it reasonable? Is it realistic? And does
35:18it make sense in this situation?
35:20Um and we do have language in our manual
35:22that we reserve the right to require
35:23that certain devices be installed or
35:25certain devices be prevented from use.
35:28Um
35:29inlet inserts are an example where it's
35:31basically just a bag within the inlets.
35:33People try and use that for water
35:34quality, but they rip, they they are
35:37very tough to maintain, they need to be
35:38replaced constantly. So, the city has
35:40made the decision to not allow those.
35:43And um John, I do see your hand is
35:44raised.
35:45>> You have any examples of what these
35:47engineered devices might be?
35:49>> Yeah, so underground detention systems
35:52and above ground detention systems are
35:53considered engineered devices. Um
35:56a lot of times what we see at the city
35:58are what we call pass through devices.
36:00So, the water goes through the
36:04essentially looks like a manhole.
36:06And the water flows through it and all
36:08of the sediment settles to the bottom
36:09usually using like a vortex system where
36:12the fines and the sediments and the
36:14trash will settle out and clean water
36:16passes through.
36:17So, we normally see it used for water
36:19quality. Um and that's probably the most
36:21popular and like I said, we we've seen
36:23people try and use inlet inserts.
36:26But they they just don't function the
36:28way that the city feels is acceptable.
36:36Okay, green infrastructure. So, you
36:38know,
36:39>> A lot of these requirements don't apply
36:40to just
36:42development
36:43uh
36:44to city projects and even stormwater
36:46projects. So, this is Barbary Woods out
36:48in Johns Island. This was a huge
36:50drainage project. I'm sure you may all
36:51be familiar with it, but um
36:54it was it it's a project that really the
36:56purpose of it is to hold water and
36:58release it and and divert it away from
37:00the neighborhood to allow it to drain
37:02better.
37:03There's nothing stopping this project
37:05from just being a series of ponds.
37:08Um it could just and it could accomplish
37:10the same thing from a stormwater
37:11management standpoint, but because of
37:14our pushing for green infrastructure and
37:15you know, give credit to Matt Fountain,
37:17our director of stormwater, um coming up
37:19with a better solution that adds
37:20additional benefits by doing these
37:22created wetlands,
37:24um
37:25creating habitat, creating more water
37:27quality benefits
37:29uh through through
37:31water uh you know, trees and wetlands
37:34and infiltration and removal of
37:37pollutants. So, it it I think it's just
37:39a good reminder that the city is also
37:41going through this exercise and looking
37:44at what we can do better to
37:46implement low impact development as
37:47well. And I felt like this was a really
37:49good example of that.
37:54Um so, again, LID practice
37:57encouragement. So, I covered a lot of
37:59the water quantity encouragement
38:01previously, but water quality is another
38:05one.
38:06Uh this is a tiered approach for So, we
38:08require each developer to provide a
38:09certain amount of water quality. Um if
38:12they use a traditional pond, they have
38:15to treat 2.8 inches of rainfall
38:17essentially for water quality.
38:20Um but if they use a specific green
38:22infrastructure practice, if it has
38:24underdrain, we've allowed them to treat
38:26for 2 inches. If it's a green
38:27infrastructure that provides
38:29infiltration, it would just be 1 inch.
38:31So, again, we're just trying to create
38:33those incentive incentivize the
38:35developers to to look at different
38:37approaches because it could save them
38:39costs, could provide smaller practices.
38:45And then I added this in. This is our
38:47wetland system modeling and baseline
38:49functionality. So, this gets triggered
38:52whenever it's not just triggered if you
38:55are impacting a wetland. It is
38:57physically impacting a wetland by
38:59actually needing an Army Corps permit.
39:01It's triggered every time you change the
39:03drainage to that wetland. So,
39:06all applicable permit Obviously, all
39:08applicable permits must be provided to
39:10the city prior to any of physical
39:11impacts to an existing wetland.
39:14But, uh and we also say that your
39:15wetland can only be used for stormwater
39:18conveyance. You can't take credit for
39:20the wetland to provide your quantity
39:23quality requirements. You must do that
39:24before the wetland cuz we want to
39:26protect that wetland and treat it as an
39:28existing condition.
39:30But, what I'm saying that we do on top
39:33of that is
39:35we must account for the impacts to any
39:37wetlands in your actual stormwater
39:39model. So, when you do your existing
39:42conditions model, you're going to give
39:43the city this is how high the water in
39:46that wetland stages and this is how long
39:48water is held in that wetland. After we
39:50develop the site, these are the proposed
39:52changes to that wetland. So, we require
39:55a baseline functionality documentation
39:57from a wetland scientist to say, this is
39:59how it currently functions. The engineer
40:01gave you the computations of staging and
40:03inundation.
40:04Then, we say, here's the proposed
40:06results. All right, we're increasing the
40:08water elevation in that wetland or the
40:10wetland's holding water for an
40:12additional 10 minutes, however long it
40:14might be, maybe an hour. We need that
40:16wetland scientist to sign off and say,
40:18based on the results of that stormwater
40:20modeling looking at all those storm
40:22events, the health of this wetland will
40:24not be impacted and this wetland will
40:27remain a wetland even after the
40:29development. We Our manual does not
40:32currently restrict them impacting the
40:35wetland, but even if it's impacted, we
40:37want to make sure that whatever is to
40:38remain will still function properly and
40:41be a wetland.
40:43Um we do know that the Charleston County
40:45is going through, you know, uh similar
40:48manual revisions and I have been in talk
40:50with them directly on what they're
40:52looking at and what they're proposing.
40:54So, it is things for consideration
40:56moving forward if there's anything else
40:57we want to really do different.
41:03Um, okay. Now, I just got some example
41:05projects. Um,
41:07and and this is kind of the green
41:09infrastructure's one we're seeing. Um,
41:11you know, John, to your question, like
41:13we don't see them as much as I'd like. I
41:14was more answering that question. I
41:15should have said during in the downtown
41:17area, right? A lot of times in the
41:19downtown where people want to maximize
41:21their space, that's where they we really
41:22see the more traditional approaches. Um,
41:25but we do see people using their open
41:27space pretty effectively outside of the
41:29downtown area, for sure.
41:33So, this looks
41:34very simple, but it basically is a
41:36protected what it's called a vegetated
41:38filter strip. So, uh, it's it's not
41:41buildable area, and it basically filters
41:43out pollutants for any runoff that would
41:45flow through it. Um,
41:47it it not only minimizes the amount of
41:49impervious area, we get a basically
41:51almost a what you would call a
41:52restrictive covenant on this
41:54um, that would protect this area in
41:56perpetuity because it's using for water
41:58quality benefits. So, it's to stay open
42:00space. They usually do it along for rear
42:02lot drainage to provide treatment before
42:05going into the next downstream system.
42:11This is American Gardens downtown. Um,
42:14they have a lot of permeable pavement
42:16and they have used a lot of planters um,
42:19to basically try and get some
42:21groundwater recharge wherever they can.
42:23Um, but also filter the water out
42:25instead of doing a traditional
42:27underground detention system underneath
42:29the whole park. I thought it was a much
42:30more creative way. And and
42:32aesthetically, I mean, I think it really
42:35fits and works.
42:40So, this is a garden and pavilion. It's
42:41right near Revery Brew Brewery and Cool
42:44Blow. Um, I think this is built by
42:45Clemson.
42:47Um,
42:47and basically they they They a rain
42:50barrel. They tried to use more permeable
42:52pavement than
42:54than impervious area where possible. And
42:57all another thing that we talked about
42:59is offsite. There was an area of
43:02impervious area adjacent to here that
43:04wasn't being utilized. So as a part of
43:05this project, they removed that
43:07impervious area to offset the increases
43:10that were being shown here.
43:15Um the specific boxing crate downtown
43:19um
43:20near Edmonds Old Brewery. Um they have a
43:22lot of rain gardens, permeable pavement
43:25that you can see in this photo. And I
43:26think another really cool thing they did
43:28with their uh parking islands
43:30are
43:32um
43:32robust parking islands with with
43:34additional landscaping and kind of
43:36letting it grow and and not just mowing
43:38it down to provide that water quality
43:40benefit that we like to see. Um slows
43:42the water down to from a water quantity
43:45standpoint as well. So I I think it
43:46looks great.
43:50So this is the parcel K grass swales not
43:52as robust yet. This was right after
43:54construction, but you could see they do
43:56the long linear hold the water, tie it
43:59into the next one, heavily plant it. Uh
44:01this becomes an education of the
44:03landscaping crew to say, "Hey, don't cut
44:05the these. They are supposed to grow."
44:07So that's something we are constantly
44:08doing.
44:09And then in this next photo you could
44:11kind of see that level spreader. So they
44:12built it up. It has a little um weir
44:15wall that it overtops and then it flows
44:17into the downstream system and flows
44:18through a grassed area instead of
44:20concentrating that flow
44:22uh and causing erosion.
44:25So this is where I had to get on my
44:26tippy toes, get over the fence, uh get
44:28that permeable pavement picture Azalea
44:30parking um
44:33and then they strategically placed their
44:35parking islands to you know protect some
44:36of those larger trees that you'll see
44:38there. So
44:39um I felt like I I knew they needed a
44:41lot of surface area and it does look
44:44like a lot of impervious, but to use
44:45permeable pavement in an effective way
44:47really worked here.
44:52And this is a just a downtown site. This
44:53was under construction so when I
44:55actually reviewed one of the first ones
44:56I reviewed, but I thought it just showed
44:58even though you have a tight site, you
45:00can still do LID practices like
45:02permeable pavement. Um we see rain
45:04barrels and things like that a lot as
45:06well. I mean this site was under
45:08uh you know, under half an acre, but
45:09they did their whole drive aisles with
45:10permeable pavement.
45:13And then I just got some fun Barberry
45:14Woods wetland creation photos. Again,
45:17this could have been a traditional pond,
45:19but it this is an old photo. You should
45:21definitely go by if you're in the area
45:23and see how how it's grown and and
45:25really taken off.
45:27Um
45:28They even did a permeable pavement for
45:30their path connection. That's all
45:32permeable pavers.
45:33Um and then they have the short bridge
45:35to connect the two neighborhoods.
45:39This is Hal Ave. This is another uh
45:42storage with wetland plantings. Again,
45:44trying to just go above and beyond by by
45:46providing additional benefits uh to
45:49these projects.
45:51And this is going to be another city
45:52project. This is Bridge Point um in West
45:55Ashley.
45:56Again, creating habitat and wetland.
45:59And then the last one I had
46:01um
46:03Is it I think this is the Old Town. Oh
46:05my god, I'm blanking on the name. Sorry,
46:06everyone. Um it's out in West Ashley.
46:08It's the new building that's next to the
46:10new ca-
46:11Old Country. Thank you very much, John.
46:13Um
46:14But but you know, they did a lot of low
46:16impact development too and and really
46:19just tried to build around the
46:20environment that they have with uh they
46:23didn't do a full asphalt road. They have
46:25a center island with plantings.
46:28Um
46:28so so I feel like they did a really good
46:30job. Good example of
46:31trying to restrict impervious area
46:33wherever they could.
46:38So this is uh future
46:40ch- revisions that we're thinking of. So
46:43we do uh want to continue to make
46:45revisions even if they're minor and
46:47clarification revisions on a yearly
46:48basis if we can. Um we're always
46:50learning new things. We're always seeing
46:52what works, what doesn't work. Um and
46:55like we said, we want to
46:56include additional LID encouragement if
46:59we can.
47:00Um the fees was the revision from 2026
47:04and
47:05we understand that a lot of these
47:06changes
47:07take a lot of communication with the
47:09engineers and developers. We've had
47:10really great meetings with them and
47:12continue to and continue to get feedback
47:14from them for cuz they're the ones
47:17telling us what works and what doesn't
47:18work. Um they are just as experienced
47:21and they they have a ton of knowledge of
47:22the area.
47:24Um so it's a constant conversation with
47:27them that we try and have throughout the
47:29year.
47:32And that is all I have.
47:34Um
47:34and I will open it up to any more
47:36questions.
47:39>> Great, see you.
47:40Good.
47:41>> Hey Ron, I really appreciate seeing this
47:43presentation again here.
47:46I'm curious about like when you have an
47:48opportunity to provide feedback on a new
47:51project and whether you think the timing
47:54that you're able to get involved in that
47:56project is allowing for you to
47:59make the greatest impact on that or is
48:02forced more into
48:05kind of dealing with what's already been
48:06permitted in other stages.
48:09>> Yeah, I know, it's a great question. Um
48:11I I will say our sketch plan process
48:13that we have here at the city has been a
48:15huge help to get in that ground floor
48:18cuz that's before they even make a
48:19technical review submittal. So we have
48:22that the conversation with them up
48:24front.
48:25Um
48:26and I would say our reviewers do a
48:28really good job of just communicating
48:29options. Like we we aren't afraid to
48:31make suggestions. Of course, our manual
48:33doesn't allow us to require certain
48:35practices. If you meet the requirements,
48:36you meet the requirements.
48:38But um I do think we we have the time
48:40because of the sketch plan. That kind of
48:42gets our foot in the door before it
48:44before they even submit something for
48:45review.
48:51John, I see your hand raised.
48:52>> I've got two questions. One is
48:54you know, all of this is based upon
48:56modeling. Do you ever come back after
48:58the fact and say, oh, we've just had a
49:00100-year storm and this is what actually
49:01happened versus the modeling?
49:04>> Yeah, that's a great question. It's
49:05something we absolutely are looking
49:07into. I'm you know, I think one thing we
49:10can definitely do and and look into is
49:12getting more
49:13gauges in downstream systems to to model
49:17the potential impacts. We do have them
49:19in Church Creek. That's something we can
49:21look at.
49:22The hardest part of it, I will say, is
49:24you never get the same storm twice,
49:26right? So, it's a hard to make that
49:29apples-to-apples comparison of oh, it
49:32flooded like this, but because even a
49:35difference in an hour of rainfall and
49:37intensity can have such a major impact,
49:39but that is something um
49:42we we absolutely been talking about and
49:44and trying to come up with creative ways
49:46to to see the benefits we're having.
49:48>> Yeah.
49:49>> I will say for for the stormwater
49:51projects though, like Barberry,
49:53I'm sure that that those are can be a
49:55little more targeted cuz they have much
49:56greater impacts.
49:58>> Mhm. The other question is you um said
50:01uh and I know the county's updating
50:02their stormwater manual
50:04um are you guys in any way trying to
50:06align them? I.e. make the county as
50:09stringent as the city or what's
50:10happening there?
50:11>> Yeah, I mean that's we've I've met with
50:13them. I sat down with them. I think a
50:15lot of their updates were spurred from
50:18us making those 2025 updates. So, they
50:20they are bringing a lot of their
50:22requirements in line with ours.
50:25Um there were a few that they they felt
50:27like going a different direction and
50:29they basically were like, hey, what are
50:30your thoughts on this? How have you been
50:32seeing this implemented? I would say
50:34they're they're very aligned.
50:36Um
50:37but there were a few preferential things
50:40that that they did differently.
50:42>> Have you seen where um in a donut hole
50:45where someone may be in a county and
50:47they did a different stormwater um you
50:50know, regulations than you that has
50:52impacted the city properties?
50:58>> I would I would say because the
50:59requirements are pretty aligned
51:01especially with water quantity
51:03requirements. I would say our water
51:05quantity requirements are are
51:07you know, almost exactly the same. I I
51:09would say no.
51:10>> Okay, thank you.
51:16>> All right.
51:17Wait, Andrew.
51:20>> Ron, thanks for that. Um
51:22just wanted to
51:24really commend you all. I mean, I think,
51:25you know, it's the detail work that's
51:27important in a lot of this stuff and um
51:30you know, figuring out how to implement
51:31it and how to get developers to do it
51:33and what works and what doesn't.
51:34>> Yeah.
51:35>> It's really important. Um wondered if
51:36you all one, I guess, you know, you
51:38mentioned the reception, you know, kind
51:40of downtown
51:41has been not as good as the reception,
51:43you know, in the development community
51:45and some of the other areas. You know,
51:47in the areas where the reception's been
51:48generally positive, can you talk a
51:50little bit more about how developers are
51:51looking at this? Are they looking at it
51:54in terms of like, oh, this is just
51:55another set of rules I need to comply
51:56with or are they looking at it from the
51:58sense of like, hey, you know, these
52:00things kind of add an element um
52:03to my project that
52:05is an improvement over a basic storm
52:07water pond or a drain you know, basic
52:09drainage infrastructure?
52:11Uh that's the first part of the
52:12question. Then the second part of the
52:13question is, you know, has there been
52:14any discussions about the possibility of
52:16linking these things together to get
52:18after like, you know, cumulative
52:20benefits to like, if I'm doing LID here
52:22in this project, you know, the
52:23development next door is going to also
52:25do LID and we can link these things
52:26together, you know, to kind of create
52:29restored natural systems, so to speak.
52:31Um
52:31I know a lot of times with storm water
52:33and flooding issues, you know,
52:34cumulative impacts don't get considered
52:36maybe as well as they should. So.
52:39>> Yeah, I'll answer this. Yeah, of course.
52:41Thanks for the question. I'll answer the
52:42this second one first. Um
52:45absolutely. We we always push as it's
52:48tough because different developers,
52:50different properties, you have to get
52:51those people to negotiate, but when it's
52:53similar property owners, we're pushing
52:55them to do that, especially with the
52:58basin improvements where it's, hey,
53:00why don't you don't have to do your
53:02improvements directly on your parcel?
53:04You can do them somewhere else, um, you
53:07know, in the public right away or
53:09something creative. Um, so we do have
53:11those discussions, especially I would
53:13say with, um,
53:15you know, people who own a lot of
53:17property in in the general vicinity
53:19like, um,
53:21if it's the same property owner. That's
53:22really the challenge we have. If it's
53:24not the same property owner and they're
53:25having to negotiate and work on
53:27timelines with that. But it is important
53:29to remember that in a sense these
53:32systems do tie into one another because
53:34they all are within same watershed. So,
53:37um, but we are always pushing for these
53:39treatment trains and connections and
53:41things like that. Um,
53:42and then for your first part of the
53:43question, was that specific to, um,
53:47the LID? Cuz I do think that the manual
53:50in general is well received from a
53:52requirement standpoint. I think the
53:53developers and the engineers understand
53:56the good that it does. I was only trying
53:58to speak to like
53:59they're a little less receptive to do
54:01some of the LID practices because that
54:03they can get a little more space doing
54:06some more little more built upon space
54:08when they do more, um, traditional
54:11practices, right? So,
54:14>> Yeah, I'm more thinking about, and maybe
54:16this is a difficult question to answer,
54:17but the psychology of the development
54:19community, right? Like to me, you know,
54:22a project with these LID components is
54:24way more valuable than a project with a
54:26basic storm water pond.
54:27>> Mhm, absolutely.
54:28>> And, you know, they can almost be sold
54:30as, you know,
54:31you know, amenities so to speak. I'm not
54:33sure what they are called.
54:34>> Yeah, yeah, yeah, no, that I think
54:35that's right.
54:36>> Right, are folks looking at it that way
54:38or they looking at it like, you know,
54:40okay, LID's good, I understand it's
54:41impact for storm water flooding and all
54:43that's positive and you know, water
54:45quality and so on and so forth. You
54:46know, are they looking at it like, hey,
54:48this is an opportunity to really make
54:49this project, you know,
54:51obviously it's to make it more in tune
54:53with the natural environment. This is
54:55something I can sell as an amenity.
54:57>> Yeah, no, I think they are. I really do.
54:59I think again,
55:01it just comes down to space and and what
55:03they're trying to build. But even the
55:04downtown ones, you know,
55:06you got you just got to get more
55:07creative though, right? There's green
55:09roofs, there's
55:11there's internal, you know,
55:13uh there's tree wells that you could put
55:16into um inlets. Like we've actually saw
55:18those, I think Charleston Place is doing
55:20those. Um basically you plant a tree in
55:23the inlet so it can have uptake of
55:25water. So, um
55:27it it's just sometimes it gets
55:29challenging, especially with the ground
55:30water elevations and things like that
55:32downtown, but I do think when the people
55:34who are doing it are looking at it as a
55:36money cuz that is exactly how the city
55:38does look at it. It's it it adds to the
55:41aesthetic, it adds to it's something you
55:43can also sell to the the people, "Hey,
55:45look at us contributing in such a
55:47positive way to the surrounding area."
55:49So,
55:50um
55:51I I do think they are looking at it like
55:52that. Um I think sometimes it's just
55:55is a little bit challenging, but that's
55:57why we're trying to come up with those
55:59creative ways to simplify the
56:01computations for them, to make it easier
56:03for them to implement.
56:07>> Thank you.
56:08>> Thanks, everybody. I you know, I we're
56:11close cut on time right now, but I did
56:13want to um
56:14do an opportunity. I know we had our
56:16resilience update and storm water update
56:18still on here. Um the resilience update
56:21um you can actually I did it at a
56:23resilience and sustainability advisory
56:25committee this morning, so go to our
56:26YouTube channel, you can see that. Um
56:28it's it's pretty duplicative of what we
56:30would have shared here, but I think
56:31we've got a lot of really great things
56:33moving with the Army Corps of Engineers
56:35and our community adaptation planning
56:36that I've been um bringing you all up to
56:38speed on and I know Matt just wanted to
56:41highlight that as one of our Army Corps
56:42projects, we are under construction with
56:44the pump station upfit over at MUSC, so
56:47I know that was one of the exciting um
56:49um highlights. And then I did want to
56:51just give a moment if if the mayor
56:53wanted to have a moment of an update
56:54before we kind of close our meeting, but
56:58he's available.
57:01He may or may not be, but um
57:03I did want to remind everybody
57:05>> I was on mute.
57:06>> That's okay, Mayor. Did you want to have
57:07any um words for this committee? This is
57:09actually our final committee meeting as
57:12the makeup as this existing committee.
57:13If you can believe it, we've been
57:14already under operation for 2 years. So,
57:17we'll probably have some new members in
57:19the next year. But so, obviously thank
57:21you all for your service. But Mr. Mayor,
57:23please go ahead and any updates you want
57:25to provide with this committee before we
57:27sign off.
57:28>> Yeah, I just
57:29appreciate all the hard work that Ron
57:31and the
57:33stormwater department have done.
57:36This was a huge undertaking just
57:38updating the manual. And we're trying to
57:41be thoughtful.
57:43Um
57:44you know, not overly restrictive, but at
57:46the same time making sure that
57:50we do address these increasing
57:53needs when it comes to runoff. So, and
57:56being being thoughtful about it. So,
57:58really we just want to say give my
58:00compliments to Ron and his team for all
58:02the work they've done for this. And
58:04I mean,
58:05it really I think is making our city a
58:08better place. So, that's all I really
58:10have to add. Appreciate everybody that's
58:12on the committee
58:13for your service.
58:15Kim, with that I'll turn it back over to
58:16you.
58:17>> Yeah. Okay, thanks everyone again.
58:19I mean, I'll ask one more time. If
58:21you're interested in serving again,
58:22there's that opportunity. So, just let
58:24me know. And then for those of you that
58:26offered yourselves to return again, we
58:29we are very happy for that. And you'll
58:30probably see some messaging from you
58:33from the new year. And then you always
58:35know how to get a hold of any of us here
58:36at the city for any of these resources
58:38that's been shared. And we
58:40very much thank you for your service and
58:42representation of your neighbors and
58:44community. And if you can't serve again,
58:46please please
58:48get out the word that we're looking for
58:49folks. Cuz we want to keep moving on
58:51this. So.
```*