2026-10-26 - Committee on Public Works and Utilities
Summary
Built from the posted agenda and YouTube auto-generated captions; minutes are not yet posted. Votes were by voice and no tallies are recorded. Captions garbled some names, which are omitted.
- Approved the September 21 minutes.
- Easements and rights-of-way: recommended a release of a city drainage easement so restrictive covenants can be recorded first, then re-recorded; new drainage easements for city operations facility pipes and near Cumberland and Concord Streets; and notice to SCDOT that the city will accept maintenance of sidewalk along Waverly Drive.
- Broad Street sidewalk repair: recommended a construction contract with Wildwood Contractors for phase one, from King Street past Meeting Street on the north side. Work removes and reuses bluestone, resets curbing, makes intersections ADA compliant, removes parking meters and runs power to tree wells for holiday lights. Phases two through six, around the full length to East Bay, will return with quotes. See Broad Street Sidewalk Repair.
- Development Services: recommended a stormwater ordinance amendment adopting FEMA's definition of "functionally dependent use" and model variance procedure; a declaration of drainage and access easements for the Fire Station 23 parcel; and an easement and maintenance agreement for the common area around the One Vendue Range condominiums, which the city had repaired.
- Building and permit fees: recommended new and revised fees to take effect January 1, 2027, projected to add about $1.8 million to the general fund. Encroachment and engineering permits rise from $25 to $100, the permit center application fee from $40 to $80, residential new-building and addition fees rise about 50%, and new fees are $200 for a map revision for fill and $350 for a commercial certificate of occupancy (cost analysis supported up to $600). Staff said the fees stay in line with Charleston County and Mount Pleasant. See 2027 Building and Permit Fee Changes.
- Stormwater updates: a completed small project replaced two 18-inch pipes with 24-inch pipes in the Orleans Woods neighborhood of West Ashley using in-house crews; the work finished just before a storm in early October and the debris line showed no overtopping. The Army Corps selected a contractor for the MUSC pump station upfit, bid within budget, with work some months away. See Stormwater Projects Update.
- Market Street: staff and the mayor described coordinating the next phase of drainage (inlets and larger pipes feeding the drop shafts) with undergrounding of power and communication lines, utility work and a new streetscape; renderings were promised at a coming meeting. See Market Street Drainage and Streetscape.
- Orleans Road drainage (Dupont-Wappoo basin): recommended accepting $1 million in state funding for canal and drainage improvements. Design, permitting and bidding are done; a low-bid contractor is expected to come to council next month. See Stormwater Projects Update.
- Newmarket Creek restoration: recommended a $380,000 professional services contract with Thomas and Hutton for conceptual options and preliminary design, funded by a $1 million National Fish and Wildlife Foundation grant. See Stormwater Projects Update.
- Lake Dotterer: recommended a $28,700 amendment adding engineering support so city crews can build a first phase on Mariner's Ferry, funded by county ARPA money, with construction planned late this year. The council member for the area thanked staff for keeping the lake within its banks during a recent weather scare. See Lake Dotterer Drainage Easements.
- Avondale Mall Drive drainage: recommended a $25,000 agreement with Charleston County for its consultant to size downstream drainage at the realigned Avondale intersection, so new county infrastructure is not undersized. The county has agreed in concept to fund correctly sized pipes and inlets. See Stormwater Projects Update.
- FY27 stormwater small projects (discussion only): staff presented a tentative $2 million allocation, to be finalized with the budget. Members asked about a Neighbors Drive flooding concern tied to a town sidewalk project (about $125,000 placeholder) and Daniel Island curb and gutter repairs (about $75,000). Staff will send the list to all council members. See Stormwater Projects Update.
- The full council took up items on 2026-10-27 - City Council.
Agenda
Agenda PDF posted; see Sources. Items not yet read.
Sources
- Agenda Center listing for this date: https://www.charleston-sc.gov/AgendaCenter/ViewFile/Agenda/_10262026-11307
- Documents: Committee on Public Works and Utilities Agenda
- Agenda Center: https://www.charleston-sc.gov/AgendaCenter
- Start time and place are taken from the city's published 2026 schedule and may differ in practice.
- Video: https://www.youtube.com/watch?v=TFyUxZWycP0 (City of Charleston YouTube channel)
Video
Transcript
*These are auto-generated captions; names and numbers may be misheard.
Transcript
00:16And we are live streaming. We're just
00:20waiting for the mayor to join.
00:22>> Thank you, Madam Clerk.
00:24How's everybody doing?
00:27>> Good, Mr. Chairman. How are you doing?
00:30>> Yeah, I got a
00:32I got a clip of the Norris Sellers uh
00:35touchdown where he ran over that guy.
00:37>> Man, that was something.
00:40That's determination there, man.
00:42>> Man, there's a clip where he that comes
00:44from, you know, that little camera on
00:47the corner of the end zone, you know,
00:48that little
00:49that little thing they have.
00:52You know, right at the corner of each
00:53end zone.
00:54Uh and there's a camera in there, man.
00:56Have you seen that shot?
00:58>> I hadn't seen the one from that, no.
01:00>> I [clears throat] I I looked at that
01:01thing a dozen times. I still don't see
01:03how he got in that end zone, man.
01:05>> Mhm.
01:05>> One guy was holding on his leg. The
01:07second guy
01:08hit him and grabbed him.
01:10And boy,
01:12uh
01:12>> No.
01:13>> And he didn't go down. His
01:15forearm didn't go down.
01:18Well, I got to tell you uh
01:21that was a good one for us.
01:29Hey, Mark, I got it.
01:30>> The guy dropped it off.
01:31>> Oh, he did?
01:32>> Yeah.
01:33>> All right. Any problems?
01:34>> Yeah, the man, I I got to put some money
01:37to get rid of that thing.
01:39But I'm on it. I'm on a five
01:41five I'm on a Zoom. I'll be off of this
01:44in an hour. Okay, bye-bye.
01:56>> I had a different experience than South
01:57Carolina fans this weekend. So,
02:00>> [laughter]
02:02>> we went up to the Clemson game to see
02:04the kids and
02:05>> Oh, really? Oh, man.
02:06>> Yeah, I was rooting for you guys, man,
02:08but
02:09it's tough to watch, man. It's
02:11uh it is that is
02:12it is not fun to watch. It's
02:14>> Well, I got your defense actually played
02:16a pretty good game. It's just that they
02:18were on the field a lot.
02:19>> They did. Uh
02:21I mean, we I saw we had two passing
02:24touchdowns this year. The last one was
02:27North Carolina. I think that was
02:29it's over a month ago. We've had
02:31>> [laughter]
02:31>> We've had
02:32one passing That's not good. I mean, you
02:35>> So, y'all freshman guy got hurt, right?
02:38>> Yeah, but you know, I think it was
02:39questionable whether he was going to be
02:42you know,
02:42>> I was starting in that
02:43>> or whether he was, you know,
02:44I don't know.
02:47>> Mhm.
02:47>> Times have changed, that's for sure.
02:50>> [laughter]
02:51>> Well, listen, I'm going to root for
02:53y'all for the next 3 weeks.
02:55But, you know,
02:564 weeks from now, can't be can't be with
02:59you.
03:01>> My um you know, my kids they'll be home
03:03for uh
03:05get home for Thanksgiving and then uh
03:09they both got [clears throat] tickets to
03:10the South Carolina game at Clemson this
03:12year. So, they're leaving
03:14you know, the day after Thanksgiving.
03:16I'm like,
03:17y'all really want to do that? I mean,
03:19you know,
03:19>> So, the game is at Carolina this year?
03:21>> No, it's at No, it's at Clemson.
03:23>> Oh.
03:24>> And uh
03:25like, maybe maybe y'all want to just
03:27stay home for a few extra days. I'll
03:29I'll feed you.
03:29>> You know, don't take it don't take your
03:31kids out of life experience, man. What
03:32are you talking about?
03:34>> Yeah, you're right.
03:35>> The Mill's got some kids up there, too,
03:37right?
03:38>> Uh I think his daughter transferred. I
03:40think she she
03:41>> Yeah, she did. She She loved Clemson,
03:43but still big Clemson fan, but she went
03:46smaller.
03:47>> Oh, okay.
03:49All right. I think we're all up online
03:51now. Mr. Mayor for joining in.
03:53Uh Councilman Shealy, if you'd give a
03:55few words, I'd be very appreciative.
03:57>> Be happy to. Thank you, Mr. Chairman.
04:00Let us pray. Our dear heavenly Father,
04:02we thank you for the blessings of this
04:03beautiful day, Lord. We hope that you
04:05will allow us to be a blessing to others
04:07as well. We thank you for allowing us to
04:09be here and to
04:11be a part of the greatest city there is,
04:13Lord. We thank you for the blessings
04:15that you blessed this city and we ask
04:17that you'll continue to bless our city
04:19staff, our residents, our visitors. And
04:22Lord, that you'll lead us tonight and
04:23allow our actions to be acceptable unto
04:25you. For it's in your holy and precious
04:27name we pray. Amen.
04:28>> Amen.
04:29Thank you, uh Councilman Shealy.
04:32Um
04:33See I'll entertain the approval of the
04:35minutes from September 21st, 2026
04:38meeting.
04:39>> Move for approval.
04:40>> moved and seconded. Any questions on
04:41those minutes? Hearing none, all in
04:43favor, would you please say I?
04:45>> I.
04:45>> I.
04:46>> Any opposed? Thank you. Acceptance. We
04:49We down to item E.
04:51Um so um
04:54item E1, acceptance and dedication of
04:56rights-of-way and easements.
04:58Release of the city drainage easement.
05:01Uh Mr. Bucci.
05:04>> Yes, Mr. Chairman. Thank you. Um so this
05:06is the release of a city drainage
05:08easement just to make sure that we can
05:10record the restrictive covenants first.
05:13Um it's the process that the
05:15core requires. So once we record the
05:17restrictive covenants, we will then
05:19record the drainage easement again.
05:20>> Good. Good.
05:22Any questions of Mr. Bucci?
05:24What's the pleasure of the committee?
05:26>> Move for approval.
05:28>> Second.
05:28>> It's been moved and seconded. Any
05:30questions?
05:31>> And
05:33Mr. Chairman, who is the motion and
05:34second on that?
05:35>> Uh Councilman Shealy motion.
05:37>> Okay.
05:39>> I think it's the Councilman Gray who
05:40seconded.
05:41>> I'll second.
05:42>> All right. Thank you. [clears throat]
05:44>> All right. Any questions? All in favor,
05:47please say I.
05:48>> I.
05:48>> I.
05:48>> I.
05:49>> Any opposed? Item 2E,
05:52acceptance of a new variable
05:54with stormwater drainage. Mr. Bushy,
05:57that's you again.
05:58>> Yes, Mr. Chairman. So, this is just a
06:00traditional drainage easement for some
06:02stormwater pipes that are associated
06:04with the city operations facility.
06:06>> Okay.
06:09Motion?
06:10>> Move for approval.
06:11>> Second.
06:12>> Move and second. Any discussion? Hearing
06:14none, all in favor, please say I.
06:16>> I.
06:17>> Any opposed?
06:18Uh E3, acceptance of a stormwater
06:21drainage easement located in Cumberland
06:23and Concord Street.
06:26>> Yes, Mr. Chairman. It's me again.
06:29>> [laughter]
06:30>> So, this is another drainage easement
06:32near Fleet Landing,
06:34Cumberland and Concord, which was
06:35coordinated with the Department of
06:36Stormwater.
06:38>> Okay.
06:40Councilman Seekings, do you have a
06:42motion on that?
06:43>> Yeah, take it.
06:44>> Second.
06:45>> All right, move and second it. Hearing
06:47it, no questions. All in favor, please
06:50say I.
06:51>> I.
06:52>> Any opposed?
06:54Item E4, authorization
06:56to notify SCDOT that the city intends to
06:59accept maintenance. Oh, man. Go ahead.
07:02>> [laughter]
07:03>> Yes, Mr. Chairman. This is This is
07:05actually a little bit in coordination
07:06with the county as well. We've accepted
07:08maintenance for sidewalk up to this
07:11point and are continuing the sidewalk
07:13along Waverly Drive. That's within the
07:15DOT right away.
07:16>> Yeah, probably my emotions on that. They
07:19always
07:20motion. But anyway,
07:21um
07:23We have a motion?
07:25>> Move for approval.
07:26>> Second.
07:27>> Move and second it. Any questions? Any
07:29unreadiness? All in favor, E4, please
07:31say I.
07:32>> I.
07:33>> I.
07:34>> Any opposed? Thank you.
07:35Uh temporary encroachments usually this
07:37is put on for
07:39information only. Anything exceptional
07:41in this that we need to be calling
07:43attention to? Most of them are standard.
07:46>> Not at all, Mr. Chairman. Just standard
07:47fences, signs, and awnings.
07:49>> All right, good.
07:51H1, public service update.
07:54Um
07:55approve the construction contract with
07:56Wildwood Contractors. Who's going to
07:59address that one?
08:01>> Yeah, that's me.
08:02>> All right. Uh
08:04>> So, that is a contract with Wildwood um
08:06contractors for the first phase of the
08:09Broad Street sidewalk um
08:11repair.
08:13Um so, basically that is everything from
08:16King Street to um City Hall on the
08:21I guess it would be the south side.
08:23North side. North side. Yeah.
08:26>> I was going to say so you get all that
08:28kind of stuff. I mean, you need to
08:29repair a sidewalk on Broad Street?
08:31>> I I'm I'm looking out the window right
08:33now at the work that's going to be done
08:34outside my window. It's going to be
08:36fantastic.
08:37>> [laughter]
08:39>> Uh so, that's the first phase. We'll
08:41bring the other um they're working on
08:42the quotes and everything for phases two
08:44through six, and we'll bring those back
08:45as soon as those are ready.
08:47>> All right, thank you, Mr. Altop.
08:49Uh Council uh who was the second on
08:51that? I know Councilman Seeking moved
08:52it. Who was the second?
08:53>> Yeah, I was.
08:54>> All right, thank you.
08:56Uh all of oh
08:57well, I have uh Councilman Gray?
08:59>> I just had a quick question. So, can you
09:01um Mr. Altop, can you just give an
09:02overview of the scope?
09:05>> Yeah, so they're going to tear out all
09:07the old bluestone um and reuse as much
09:09of it as we can, fix the
09:11um
09:12under
09:14you know, the light or the the gravel,
09:15redo the base,
09:17um reset granite um curbing or bluestone
09:20curbing depending on what's there.
09:22Um make sure all the intersections are
09:24ADA compliant, uh remove any of the
09:27parking meters along there.
09:29Um and then on some of the sections
09:31we're going to run power to tree wells
09:34in order um for us to eventually put
09:37holiday lights and things there.
09:39>> Well, that's a pretty significant.
09:42>> Yes. [laughter]
09:44>> And the project's going all the way from
09:46the corner of King Street to East Bay on
09:48the north and south sides of the street.
09:50So, it's a fairly long run of sidewalk
09:52that ultimately will be done.
09:54>> But, this section is just King Street to
09:55Meeting Street, right?
09:56>> On the north side.
09:58>> Yeah.
09:58>> Just just across Meeting Street a little
10:00bit, just just past City Hall.
10:02>> Yep. And then it basically follows the
10:05blocks down and then turns and comes
10:07back up the other side of the street
10:09when we get to phase four, five, and
10:11six.
10:12>> Does anybody know the last time that
10:13this was done? I'm just curious like
10:14what the lifespan of of a bluestone
10:17sidewalk is and
10:19um,
10:20>> I don't think it's been done since it's
10:22been put down.
10:24>> Yeah.
10:24>> And I don't know when it was installed.
10:26That was I don't know. Do you remember,
10:27Mike?
10:28>> No, it's this hasn't been done in a long
10:30time. It was not part of the King Street
10:32improvement when they did all the
10:33underground wiring, so it's been a
10:36while. There's been some patchwork done
10:38and obviously some utility work, but not
10:39a full comprehensive redo of it all. And
10:43one of the things you might have heard
10:44is this is also part and parcel of the
10:47getting rid of all the parking meters,
10:48which will actually make the
10:50right away
10:51that much wider. It's going to be really
10:53nice.
10:55>> Looking forward to it.
10:56>> Yeah.
10:57>> And all longer we do as needed. Um, all
11:00in favor of the motion, please say aye.
11:03>> Aye.
11:04>> Any any ready to say any opposed? Thank
11:06you. Item H also I one.
11:11Department of Development Services
11:14update.
11:16Ms. Creech.
11:18>> Yes, good afternoon. The first item that
11:20we have up for today is an amendment to
11:24our stormwater ordinance to adopt the
11:27definition of functionally dependent use
11:29that FEMA has promulgated
11:32um, to adopt FEMA's model ordinance for
11:35a variance procedures for
11:37structures that meet that definition.
11:40Um, this is really for structures that
11:42are going to be above, uh, open water.
11:45Um, and if if I said that wrong, Ron
11:48will will correct me, but, um, we
11:50anticipate that we might see some more
11:51of these in the future and want to make
11:53sure that our process aligns with
11:54FEMA's.
11:56>> Okay.
11:58Um,
12:00need a motion to carry this forward.
12:03>> Move for approval.
12:04>> Second.
12:05>> Probably moved and seconded.
12:07By the mayor, seconded by Council
12:09member, uh, Greg.
12:11Any discussion? All in favor, please say
12:13I.
12:14>> I.
12:15>> I.
12:15>> Any opposed?
12:17Uh, item I2, declaration of exclusive
12:20storm water drainage easement and public
12:23access easement conjunction with fire
12:25station 23, Ms. Creech.
12:28>> Uh, yes. So, this is the parcel that
12:31will be fire station 23, and rather than
12:35give ourselves an easement since we own
12:37it and we can't do that, it's just a
12:38declaration of our standard, uh,
12:41drainage, uh, storm water drainage
12:43easement and and an access easement as
12:44well, so that if any, uh,
12:47time in the future the property were to
12:49change ownership, those easements would
12:52remain in place.
12:53>> Okay.
12:56A motion from the body.
12:58>> Move for approval.
12:59>> Second.
13:00>> Probably moved and seconded. Any
13:01discussion on that?
13:03Well, it sounds simple, Ms. Creech. All
13:05in favor, please say I.
13:07>> I.
13:08>> I.
13:09>> Any opposed? Thank you. Uh,
13:11I3, confirmation of easement and repair
13:14maintenance agreement between One Vendor
13:16Range
13:17and the city of Charleston, Ms. Creech.
13:19>> Huh.
13:21>> Yes. So, Councilman Seekings can help me
13:23out on this one if if I get anything
13:25wrong.
13:26>> I I can do this one if you want.
13:27>> Sure. I'd be happy to let you talk about
13:29it.
13:30>> So, no problem. And Magli has done a
13:31really This creature has done a really
13:33great job of doing this. So, you all
13:35know where One Vandu is, right by Joe
13:36Raby One Front Park with the City
13:38Gallery. Those condominiums, which have
13:40been there for a long time, just did a
13:41complete with it was just a complete um
13:44renovation and repair of the
13:45condominiums. At At the end of that
13:48project, the city came in and rep-
13:51replaced a bunch of trees and repaired
13:53all the common areas in front of the um
13:56City Gallery and along the sidewalks.
13:57All the sidewalks have been redone.
13:59>> Mhm.
14:00>> And one of the things we learned during
14:01the course of the project, both of
14:02renovation and doing the sidewalk and
14:04and tree work, is there were not really
14:07complete documents sort of memorializing
14:11who had responsibilities moving forward
14:13with maintenance. Um so, what has been
14:16done during the course of all this work
14:18is the legal side of it has been cleared
14:20up and through Miss Creature's hard
14:21work, we now have a complete
14:23understanding on whose responsibility it
14:25is to now maintain a beautifully redone
14:29common area in and around the One Vandu
14:31Range condominium complex.
14:33>> Okay.
14:35So, do you have a motion, Councilman
14:37Seekins?
14:39>> Pardon me, I'm sorry.
14:40>> I said, do you have a motion?
14:41>> Oh, yeah. Move to approve.
14:43>> Second.
14:43>> It's been moved and seconded.
14:45Aids on readiness. All in favor, please
14:47say aye.
14:48>> Aye.
14:49>> [clears throat]
14:50>> Any opposed? Thank you. E4, request for
14:52approval of a new and revised fees
14:55associated with building inspections.
14:57Uh Mr. Bucci.
14:58>> Uh yes, Mr. Chairman. I was going to
15:00share a very brief presentation with you
15:02all if that is okay.
15:13Um are you all able to see my screen?
15:15>> Yes.
15:16>> Okay. So, this is um some new and
15:18revised fees that we will be taking into
15:20effect January 1, 2027. Uh presenting to
15:23you all and then will be um reported out
15:26to council or first, second, and third
15:28reading.
15:29Um just a quick overview, all the fees
15:31that will be discussed are based on what
15:33is required to cover the cost of the
15:35city's time. Um all fees have been
15:37coordinated with BFRC and legal. Um as I
15:40just stated, the plan is to make all
15:42fees become effective January 1st, 2027.
15:46And um my department development
15:48services has projected about a 1.8
15:50million dollar additional general fund
15:52dollars based on these fee increases.
15:55And the goal is to better account for
15:56the city's cost when it comes to the
15:58permitting, review, and inspection of
16:00various city processes.
16:04>> So this ordinance, Mr. Bucci, uh
16:06this something has going on for a series
16:08of years, but even when we increase
16:10these fees, Mr. Bucci, comparing to the
16:12county, we
16:14and all the municipality, we're still
16:15pretty competitive, aren't we? In some
16:16cases, we still lag.
16:18>> Yeah, I absolutely. And I'll definitely
16:20get to to that nice comparison table we
16:22have for the the residential fees that
16:24we've changed, but you you're absolutely
16:26right.
16:27Um so so with the fee revisions, there's
16:30about uh a few that we revised. Um the
16:33encroachment permit fee is a one-time
16:35payment that's traditionally $25 for
16:37doing non-standard material in our
16:38right-of-way. That fee has increased to
16:40$100.
16:42Engineering permit is any work within
16:44our right-of-way, whether it be
16:45standard, non-standard, just, you know,
16:48digging, uh utility work. Again, that
16:50increased to 25 from 25 to 100. That
16:53requires review and inspection. And then
16:56our permit center application fee we
16:59have increased from 40 to $80. Um
17:03those are all existing fees and we do
17:04have and I see the building permit fee,
17:06I'll cover that in more detail on the
17:08next slide. But the new fees we have, um
17:11one of them is the letter of map
17:13revision for fill. We don't see these
17:15too often, but it's when a site wants to
17:16bring in a a certain amount of fill to
17:19revise the maps and take them out of
17:21flood zones. Um we're going to start
17:22charging $200 for that. And then for
17:25commercial buildings where we require a
17:27certificate of occupancy, there's
17:29actually a lot of coordination between
17:30fire, building, permit center, and
17:32zoning. Um we're proposing to to charge
17:36a $350 fee. Um our computations
17:39supported up to $600 but we felt with
17:42this being a new fee uh coming in at 350
17:46was a little more appropriate for for
17:48what we should be charging for now.
17:51>> Okay. Any questions of Mr. Butchie?
17:54>> I got one more thing I was going to
17:56cover, Mr. Chairman, if you I'll go
17:58quickly though. Yeah, sorry.
18:00>> Stage is yours. Go ahead.
18:01>> Yeah, so this is just the residential
18:03fees um for new buildings and additions.
18:07Um and basically what you'll see is it's
18:09a 50% increase for all of the fees. Um
18:13we were able to support much higher than
18:14that but going to the next slide, this
18:17column that says proposed 2027, this is
18:20the fees based on the cost of
18:22construction. And as you compare it to
18:24the county, we're we're very in line
18:26with the county
18:28um
18:28and even less in in some cases when you
18:31get to those higher values. And then we
18:33also compared it to Mount Pleasant which
18:34is is essentially the same.
18:37Uh
18:37basically meeting the the other
18:39municipalities that surround us and and
18:41coming more in line with them.
18:44And that's really it. And now I can open
18:46it up for questions if you have any.
18:48>> All right. Questions for Mr. Butchie?
18:53You did a solid job, Mr. Butchie. It was
18:54the pleasure of the committee. What's
18:56the motion?
18:57>> Move for approval.
18:59>> Properly moved.
19:01>> Second.
19:02>> Councilman Shealy second.
19:04>> Seeking's dead but I either way.
19:07>> Okay. All right.
19:08I second twice, Mr. Butchie. All in
19:10favor of the motion, please say I.
19:13>> I.
19:14>> Any opposed? Thank you. Uh Mr. Bushy,
19:17good job.
19:18>> Thank you.
19:19>> Stormwater management update, Mr.
19:21Fountain, J1.
19:23Table Hazelwood and Tablewood
19:25small project.
19:27>> Yeah, thank you, Mr. Chairman. I know
19:28this one is close to your heart.
19:31>> [laughter]
19:33>> I was hoping with with your permission
19:35we were going to have Ms. Jordan
19:36Mallette, who's the project manager for
19:37this project to a brief presentation.
19:40>> That'd be great.
19:41>> Yeah, thank you, Matt. Thank you, Mr.
19:43Chairman. I'm going to share my screen
19:47briefly.
19:49Okay.
19:52Um so, yeah, today going to provide an
19:54update on the recently completed
19:56project. This was a part of our small
19:58projects program uh located in the
20:01Orleans Woods neighborhood in West
20:03Ashley. Uh project ultimately replaced
20:05two existing city stormwater pipes at
20:07the intersection of Hazelwood,
20:09Taperwood, and Jaywood.
20:12>> Mhm.
20:12>> Um
20:14kind of zooming out before getting into
20:15the details, wanted to briefly put us in
20:18the context of other city efforts within
20:20the larger Dupont Wappoo basin. Um we
20:23have a handful of capital projects
20:24underway currently, including a
20:26collaborative effort with the Army Corps
20:28of Engineers,
20:29um as well as an upcoming project on
20:31Orleans Road, which should be begin
20:33construction in early 2027.
20:36>> [clears throat]
20:36>> Um and then looking a little bit closer,
20:38the project area, um this is where we
20:40replaced our pipes. Um in general, kind
20:43of in this neighborhood, stormwater
20:45flows through roadside ditches and
20:46through a rear rear yard ditch um before
20:49it reaches the larger ditch in the
20:50Orleans Road corridor. Um from there, it
20:53all passes to the south, generally to
20:55the larger Dupont Wappoo main drainage
20:58channel before it goes under 526,
21:00Savannah Highway, and the Greenway
21:01before it gets to the Stono River.
21:04Um now looking closer at this
21:06neighborhood, um project was developed
21:08in response to recurring drainage
21:10issues, particularly at this
21:11intersection.
21:13During significant rainfall, water
21:15typically accumulates around this
21:16intersection as well as at some
21:18mid-block side yard drainage ditches.
21:21We did do all model and design on this
21:23project in-house. Ultimately found that
21:26the biggest impacts
21:28looked at upsizing a handful of
21:29different pipes, but the biggest impacts
21:31were to upsize these two existing 18-in
21:33pipes to 24-in pipes. Which allowed
21:36water to drain out faster.
21:38Um
21:40Construction began this past September,
21:42so about a month ago, and all work was
21:44completed in early October. We were able
21:46to complete all of this using in-house
21:48city construction crews.
21:51And lucky enough,
21:53as an engineer, we always like to be
21:54able to test our designs.
21:56Project was completed right before a big
21:58storm event at the first week of
22:00October, and we can actually see where
22:02the debris line
22:03did not overtop the redway. So, which is
22:05an encouraging initial observation.
22:08Although, one storm event isn't enough
22:09to determine, you know, the overall
22:11impact or entirely solve flooding in the
22:13neighborhood. So, that's why we will
22:15continue with our other capital
22:16projects.
22:18Happy to take any questions.
22:20>> I don't have a question, but I certainly
22:22want to say thank you, ma'am. This is a
22:25uh
22:26This is well done for a neighborhood
22:28that's, you know, long
22:30asking for it. So, thank you, Mr.
22:32Felton, for you and your team
22:34getting it done.
22:36>> Thank you.
22:38>> Any uh
22:40Obviously, if if I were in presiding,
22:42I'd be the one making a motion on this
22:44one, but
22:45Can we get a motion?
22:46>> Move for approval.
22:47>> Properly moved and
22:48>> Second.
22:49>> Second.
22:50>> Do we need
22:51This is just updates. So, do we need
22:52[snorts]
22:53>> Yeah.
22:53>> Do we need a motion?
22:54>> You're right. You're right. Thank you.
22:56>> [sighs]
22:56>> I'm used to spending money. This money's
22:58already [laughter] been spent.
23:01>> This one actually was just updates Um um
23:05both in-house engineering and in-house
23:07construction effort um great
23:09collaboration between the project
23:10management team and the field ops team
23:12doing a really cost-efficient
23:15significant improvement very quickly or
23:16as as Mr. Knight mentioned uh less than
23:19a month basically instead of having to
23:20go through the long
23:21>> I'd like to make a motion for a round of
23:23applause for our stormwater
23:26>> You're right, man.
23:30Again, thank you, Mr. Flood. These small
23:32projects mean a lot because it normally
23:34happens I don't care where it is in the
23:36district. It happens in somebody's
23:37neighborhood, somebody's front or
23:39backyard. It matters.
23:41Um J2 update on MUSC pump station upfit
23:46project.
23:49>> Yeah, thank you, Mr. Chairman. So, this
23:50one is also a gem.
23:52Up to that slide.
23:56Uh so, this is also just an update. Um
23:58this is a project we've brought through
24:00council previously for the funding
24:01allocations. It's a collaborative effort
24:03with the US Army Corps of Engineers to
24:05upfit the MUSC pump station.
24:07Um similar to what we did recently for
24:09the Concord pump station with the city.
24:12Uh we just wanted to update y'all that
24:14the construction bidding was
24:15successfully completed by the core. We
24:17actually have our pre-con meeting I
24:19think it was today
24:20um for that
24:22project. Um Ruby Collins is the selected
24:25contractor from the core team. They're
24:26the ones doing the both the Lockwood
24:29pump station for us in Spring Fishburne
24:31as well as they did the
24:33on the Concord pump station. Great
24:35contractor. Uh bid came in within
24:37budget. So, that's moving forward. It'll
24:39likely be a few months till you see any
24:41work on the ground because there's a lot
24:42of long lead time items um on these pump
24:45stations, but looking forward to
24:46continuing that. So, happy to answer any
24:49questions, but just an update that
24:50that's um that's continuing apace.
24:54>> Any questions
24:55uh committee members.
24:59I continue Mr. Felton J3 update on
25:02Market Street project.
25:04>> Yeah, thank you Mr. Sherman. So, the
25:05Market Street project I think is one
25:07that many of the committee members are
25:09familiar with, but just as a very brief
25:11refresher,
25:12the city previously installed as you see
25:14in the bottom right corner
25:16tunnels, a deep tunnel and a drop shaft
25:19system with drop shafts between the
25:21market stalls to drain the street that
25:24it is generally no longer kayakable, but
25:28it does still flood about curb deep or a
25:31little bit higher for that water to
25:33drain down to these big inlets that you
25:36can see in the top right photo.
25:38The next phase of the project is to
25:41install a modern collection the curb
25:44inlets and
25:46grade inlets and upsize pipes to take
25:48that water to these drop shafts where
25:50then you wouldn't see really any
25:51flooding of substance within the street
25:54and temporary curb flooding
25:57like we see on most roads.
25:59That work is something that the city has
26:02initial plans for. We have recently
26:05finished the upfitting of the Concord
26:07pump station which is where all this
26:08water runs to
26:10and there are a number of large-scale
26:12projects in this area. So, we said we're
26:15talking with the mayor. I'm sure the
26:16mayor will will have
26:19some ideas to add into this, but
26:21to basically how do we coordinate all of
26:23these complex projects together into the
26:25same space cuz this the city project
26:27also includes undergrounding the power
26:28lines as well as all the cable and
26:30communication lines and working with CWS
26:32to update all of their water and sewer
26:34lines through the system and then put
26:36back an improved streetscape over all of
26:38it. So, we're going in right now. We're
26:40working through those plans making sure
26:42everything is in coordination.
26:44Doing our stakeholder engagement,
26:46reaching out to property owners,
26:48developers, business owners, market
26:51vendors, um
26:53residents in the area, and then of
26:55course the utility companies to try to
26:56make sure we're all on the same page,
26:58working together as quickly as possible
26:59cuz as we all know large-scale
27:02uh civil infrastructure projects like
27:03this are disruptive
27:04in construction, even though they are
27:06extremely impactful um
27:09post-construction.
27:10And uh Mayor, is there anything you'd
27:12like to add into that that process we're
27:14working through?
27:15>> No, we're we're close to um
27:19I I I I think this can be a very
27:20transformative project, not just from
27:22stormwater but from an aesthetic
27:24standpoint. Really from King Street all
27:27the way down to the water, and
27:30um some of the improvements that we're
27:32looking to add on to this, which I'm
27:35excited to show you all
27:38and then either the next meeting or the
27:40meeting following
27:41uh with the chair's permission
27:44are some of the renderings that um
27:48uh we're working on that really will
27:50make this um
27:53uh
27:54one of the biggest landmarks it already
27:56is in the region, but really dressing it
27:59up with more of an urban canopy because
28:01we're burying the power lines.
28:03Obviously, what Matt and his team are
28:05working on is critical with the uh
28:07movement of water and stormwater,
28:10but really beautifying Market Street in
28:14a pretty meaningful way um because most
28:17of the cost associated with this is
28:18subsurface. Uh so while we're at it, you
28:21know, may as well do some uh I think
28:25facelifts.
28:26And it is going to be a very complicated
28:28project just because of all the moving
28:30parts, but I do think I'm excited to
28:33share what we're working on with this
28:35committee um
28:37because I think it's going to be pretty
28:39spectacular.
28:41And appreciate Matt and his team
28:43kind of really leaning in. We We've got,
28:46you know, this touches almost every
28:47department in the city um when it's all
28:49said and done. So, it's going to be a
28:52Herculean lift to get it done, but I
28:54think we've got the team um put together
28:57to do it.
29:03>> Okay, any uh other
29:05questions of
29:07Mr. Felton or the mayor?
29:10>> All right.
29:15>> Uh
29:16move on to J4, uh Dupont Wapoo Orleans
29:19Road drainage improvements. Mr. Felton?
29:22>> Yeah, thank you, Mr. Chairman.
29:23Um
29:25This is as Ms. Mullett mentioned, we did
29:27a small project effort just upstream of
29:29this area. This is the
29:31capital scale effort that kind of
29:33leverages and this that project
29:34leverages off of uh to do some
29:36improvements in the canal system and the
29:39drainage along Orleans Road.
29:41Um
29:42we have finished design permitting,
29:44finished our construction bidding. Uh
29:46we're just finalizing the selection of
29:48the low bid contractor now that will
29:49come to council um probably in the next
29:52month's set of council meetings.
29:54Um but this item is to accept a million
29:56dollars of state funding from the annual
30:00appropriations that was supported by our
30:01legislative delegation, of course, and
30:03Representative Stavrinakis.
30:05Um so, the again, the vote I the vote is
30:07to basically receive um receive that
30:09funding and approve us to submit the
30:10forms to receive the funding.
30:14>> Uh um
30:16this does involve money, so Madam Clerk,
30:18this necessitates a motion, right?
30:23>> Yes.
30:25>> Second.
30:26>> All right. Uh any more discussion on
30:28this one?
30:30All in favor, please say I.
30:32>> I.
30:32>> Any opposed? Thank you. Uh
30:36and thank Representative Stavrinakis,
30:38too.
30:39I saw him Saturday. If had I known that,
30:42I would have thanked him again for this.
30:45Uh
30:45>> a very successful collaboration with the
30:47state and the city and the county in
30:49this area in finding funding and and
30:52bringing in efforts in this kind of
30:53multi jurisdiction state roads, um both
30:56city and county jurisdictions. Really
30:59good partnership work out here getting
31:00to improvements.
31:01>> It was great.
31:03Thank you for your efforts, too, Mr.
31:04Felton. Uh
31:06J5, uh Newmarket Creek restoration.
31:10>> Yeah, thank you, Mr. Chairman. This is
31:12um
31:13and I uh another actionable item, but
31:16one to update you that we've completed
31:18the RFQ process um for the professional
31:21services for the Newmarket Creek work.
31:23Selected Thomas and Hutton for
31:25recommended Thomas and Hutton to the
31:26committee for approval. Um we developed
31:29that
31:30scope for um at this point the funding
31:32is to do a review of the different
31:35conceptual project options and then take
31:37preliminary design. We'll come back with
31:40amendment to the scope for final design
31:42and permitting once we have a a better
31:43feel for the um exact recommendation.
31:46This is uh this work is funded from a
31:49million-dollar grant also from the
31:50National Fish and Wildlife Foundation.
31:53So, uh this is a
31:55motion as per the agenda to approve the
31:57professional service contract with T&H
31:59for $380,000
32:01for that initial work.
32:02>> Okay, chair entertains the motion.
32:04>> Move for approval.
32:05>> Second.
32:06>> Second.
32:07>> Uh let me ask a question, Mr. Felton.
32:08That that bull what what kind of low I
32:10mean
32:12the king tides to come I my swamp that
32:14thing, huh? That thing going to be?
32:16>> Yeah, this was a this was a decorative
32:18rendering from one of the early
32:20conceptual um project ideas of what
32:22Newmarket Creek could be. I think the
32:25stormwater project is is going to be a
32:27combination of ecological rest
32:29We're evaluating a combination of
32:31ecological restoration, probably some
32:34tide control, some limited tide control,
32:36and then improving public access because
32:38if we can get people to see the value of
32:40the marsh from ecological health and
32:42flood control, that also is a kind of a
32:45wonderful way to leverage our projects
32:46with public access. But you're right,
32:47Mr. Chairman, uh that one might go
32:49underwater a little too frequently, so
32:51maybe we'll bring it a little higher in
32:52the actual engineering.
32:53>> All right. Thank you. Thank you.
32:55All in favor of stated motion, please
32:57say I.
32:58>> I.
32:58>> I.
32:58>> Any opposed? Thank you.
33:00Uh okay. Uh
33:06Item J6, Lake Dotter.
33:09Uh
33:09>> Yeah, this one is uh I think near and
33:11dear to Councilman Chilly's heart, but
33:13um so this is a memorandum with Thomas
33:15Norton for $28,700.
33:18It's a
33:19uh lower dollar amendment that we
33:20normally see at council because we
33:22didn't establish a project budget yet
33:24for this project with the permission to
33:26be able to do minor amendments without
33:27coming back through council committee
33:29cuz we're still in the professional
33:30services firm, not yet in the
33:32construction contract firm. So it's
33:34coming back through council, but it's
33:35just a a small change. And basically,
33:38this is to add in the engineering
33:39support um to allow for in-house
33:42construction of the phase on Mariner's
33:45Ferry that we identified as part of the
33:47larger capital scale work um that will
33:49occur on more of the
33:51um the dam structure across Lake Dotter.
33:55The berm, technically.
33:57So, this basically lets our field ops
34:01crew go out with some construction
34:02staking support and some assistance in
34:04procuring materials um to to build
34:07similar to what we saw with Miss Mulot
34:09earlier in in Giba Wabu.
34:11Um to build this first phase in-house
34:13lets us have a a lower project budget,
34:15stay within our existing funding
34:16allocations, and get the work done much
34:18quicker
34:19um while we're working through uh the
34:22larger project going into its formal
34:24construction low-bid procurement. So,
34:27um this work all funded by the county um
34:30through ARPA funds that they provide to
34:32the city, scheduled for our construc-
34:34construction by our own field apps crew
34:35late this year. Um, if if again, we
34:38approve this and uh
34:39agree to that initial design work.
34:42>> With your pleasure, Mr. Shealy.
34:44>> Move for approval.
34:46>> Say again.
34:48>> Yeah, and um, Mr. Chairman, I just I
34:51just want to say thank you to the
34:53Stormwater Department. Um, people are
34:54excited around that area. They're
34:56starting to see see trucks come in and
34:58um, they're very very excited. A couple
35:00of weeks ago we had a little scare with
35:03the weather report and um, our
35:05Stormwater Department along with the
35:06Parks Department did an outstanding job
35:08of keeping Lake Dotter, um,
35:10within the banks for the most part, but
35:11keep certainly keeping it out of
35:12people's homes. Um,
35:14got some pumps over there and um, people
35:16are very happy with um, with the service
35:19they received. So, I just want to say
35:20thank you so much.
35:22>> Thank you for sharing that.
35:24Um,
35:28uh, did I call the motion yet? All in
35:30favor, please say aye. Did I?
35:31>> Aye.
35:32>> Aye.
35:32>> Aye.
35:33>> Okay. Any opposed?
35:35So much good news I forgot. Carried the
35:37motion. Uh, J7, uh, Avondale Mall Drive
35:41Drainage Improvements, Mr. Fountain.
35:43>> Yeah, thank you Mr. Chairman. So, this
35:44is a, um,
35:46another item for for a vote. This is an
35:48approval of an agreement with Charleston
35:49County for the city to provide $25,000
35:52of funding,
35:54um, basically for the
35:56county to have its engineering
35:58consultant for the Avondale Intersection
36:00project, which is Stantec, review
36:04the drainage infrastructure in um, sort
36:08of this Westwood-Avondale area that's
36:10coming down to the realigned
36:11intersection to see if you were to
36:14improve the downstream system, what size
36:17should the infrastructure go in, um,
36:22that is the new infrastructure that
36:23they're installing as part of their
36:24project. So, trying to sort of
36:26future-proof
36:27so you don't install new infrastructure
36:29that would then be undersized if we do a
36:30downstream improvement project and you
36:32have to come back and replace.
36:34Um county's agreed to have their
36:35consultant look at that, which is often
36:37the most efficient way to do it since
36:39they'll be the ones designing the
36:40project. Um we agreed conceptually um to
36:44transfer $25,000 towards this efforts
36:46with the approval of council, of course,
36:48which is what the MOU would allow.
36:50Um you would still need to have the
36:52city, county, state all collaboratively
36:54somehow make these downstream
36:56improvements for those upstream
36:57improvements to make an improvement to
37:00you're basically not installing a new
37:01construction as part of their project.
37:03They have agreed
37:04conceptually as well to fund the
37:06construction of the correct sized
37:08infrastructure, not asking for
37:10additional city funds at this point um
37:12towards those efforts. Most likely it'll
37:13be larger larger inlet boxes and some
37:16larger pipes um coming into that
37:17intersection in the new section of road
37:19that they're building. Happy to talk
37:20about that in more detail if helpful,
37:22but
37:23uh I think it's a a good continued
37:24collaboration between the two entities.
37:27>> All right.
37:28We have a motion on the floor.
37:32>> Move for approval.
37:33>> Second.
37:34>> Properly moved and seconded.
37:36Any more discussion?
37:38Last chance. All in favor, please say I.
37:41>> I.
37:42>> I.
37:43>> Any opposed?
37:44With that, that brings a conclusion to
37:47to this meeting uh
37:48>> S- Sorry Mr. Chairman, we have one more
37:50one more item.
37:51>> One more?
37:52Oh yeah, discussion. Okay.
37:55Thank you, Mr. Chairman.
37:57>> Yeah, I don't we have we have a lot of
37:58items um last last week was a little bit
38:00shorter than this week and it'll be a
38:02little heavier for stormwater items.
38:04>> Discussion of FY 27 small projects.
38:09>> Yeah, thank you, Mr. Chairman. So, this
38:10is this is just our kind of initial
38:12presentation of the items that we are
38:15currently putting together and assessing
38:17for potential small project funding for
38:19next year. Um it's just discussion at
38:21this point. wanted to show these to the
38:23committee,
38:24make sure there's time for the committee
38:26to ask questions for us and provide
38:28input before we'd eventually have to
38:29take a final vote.
38:31Normally, we do it in the
38:33November
38:35public works utilities meeting and then
38:37December when we actually finalize the
38:39budget because we can't technically
38:42approve any of the allocations until we
38:43have the budget approved for next year.
38:45But we can make a recommendation saying
38:47here's where we want to see that funding
38:48be allocated assuming budget passes.
38:51It's all more complicated. We do come
38:53back again with anything that requires
38:54council approval. These are not
38:57approvals of
38:59future projects. They are just
39:01approvals of an idea for allocation. If
39:03we come back with a contract, that would
39:05be approved. If we come back with, you
39:06know, construction contracts,
39:07professional service contracts. So just
39:08as a refresher of how this all works is
39:10a little bit unusual. Mr. Chairman, at
39:13your strong encouragement and
39:15suggestion, we have proposed $2 million
39:18in the small project allocation for next
39:20year with the support of
39:21the budget office, the mayor's office.
39:23>> [clears throat]
39:24>> So that's what we're showing here is a
39:25tentative identification of 2027
39:28funding. Again, this is not in any way
39:30final yet. It's just for your awareness
39:32and discussion.
39:33I can briefly go through any of the
39:35projects um
39:37or go through all of the projects if
39:39that's helpful, whatever the committee
39:40prefers.
39:42I do not have full slide presentations
39:45for each project. That one that would
39:46take a lot quite a while for this
39:47meeting which is long already, but happy
39:49to talk about them a little bit in more
39:51detail, especially some of the carryover
39:52projects. Oh, I should
39:54should reiterate that too. We do show in
39:552028 um
39:58if something is funded in 2027 and or
40:00has been previously funded and is likely
40:02to require additional funding in 2028,
40:05we do is likely to be required. Of
40:07course, it's not binding that in at this
40:09point uh
40:10and
40:11>> [clears throat]
40:11>> um approved in a budget yet.
40:13Just trying to make sure there's
40:13awareness of the scale of project size
40:15as we as we approve funding in any given
40:18year.
40:18>> Okay.
40:21All right, committee members, uh Ms.
40:23Gordon.
40:24>> Um I'm not seeing a project list um on
40:28my screen.
40:30Is there a
40:30>> Is anybody else not seeing the list?
40:32>> I see it.
40:33>> I see it.
40:34>> Okay. Well, apologies. Ignore me. Um
40:37would we be able to talk about Neighbors
40:38Drive at all?
40:40>> So that is one of the ones um shown on
40:41the list. That one's shown for
40:43tentatively at $125,000.
40:45Um that's one of the more
40:47unknown uh
40:49final budgets that we're still working
40:51through and that that town is doing a
40:53sidewalk project there, has identified
40:55there are some areas of flooding in a
40:57portion of the city where the sidewalk
40:58is
41:00passing through. Um they have just
41:03started doing some initial survey work,
41:05so we are
41:06using the initial survey work they've
41:08done, but they've indicated they're
41:09going to come back with some additional
41:11detail uh which will help us refine our
41:12budget, but at a very rough level, we're
41:16looking at probably $125,000 for the
41:18most straightforward improvement. We
41:20might have a cheaper idea that we're
41:21looking at, but we placeholder that for
41:23now.
41:24>> So in terms of next steps, just cuz we
41:26have um James Island and Nirgovan on
41:28Wednesday, and I'd love to update them.
41:29So they So the town owes us final design
41:34for the sidewalk, and then we'll be able
41:36to
41:38design a plan and and try to get funding
41:40for it.
41:42>> So we'll we'll continue looking at
41:43design even barring their final approved
41:47plans, uh but it will Any information
41:50they can Any information they provide us
41:52always helps us tighten up our cost
41:54estimates.
41:55>> Okay. So what would the next step be
41:57then um when the town's ready to to put
42:01shovels in the ground for the sidewalk
42:03and we transfer over the earmark we were
42:05able to get?
42:08>> So
42:10for the drainage work, if there's
42:11funding allocated by the committee, we
42:13would start doing either in-house design
42:15or
42:16um
42:17external design, probably in-house on
42:19this one, and then look at
42:21whether we need permitting or not,
42:23depending on which option is picked, and
42:24then construction likely with a con-
42:28tractor. We got to have to see which
42:29option is picked. So,
42:31we're we're putting it on here because
42:32we know it's likely to be a time issue
42:34next year, but it is pretty high-level
42:36at this point. So, we'll have to do a
42:38little bit more of that progressive
42:39work.
42:40>> Okay. So, I should tell them,
42:42"Let's move forward with the sidewalk on
42:45the other side, and then hopefully next
42:47year we'll be able to
42:49approve officially funding for a
42:50drainage project there."
42:53>> Yes, I don't think they're
42:55approaching it like short very
42:57short-term construction of that
42:58sidewalk. I think you could say you were
42:59looking for an allocation of funding to
43:01support drainage improvements um along
43:03with the sidewalk, so the sidewalk
43:04basically doesn't end up underwater.
43:06>> Okay. Thank you.
43:08>> Yep.
43:09>> Uh Councilman uh Greg.
43:12>> Uh thank you, Mr. Chairman. Thank you,
43:13Mr. Fountain. Uh Mr. Fountain, just real
43:15quick, we talked about earlier this year
43:18um
43:19uh playing out based on cost cost and
43:22effort, I think, how many of the uh curb
43:24and gutter repairs we could do on
43:27um Daniel Island due to ponding issues.
43:30Uh as you recall, we we
43:32unfortunately made some really poor
43:33decisions. Uh and by by we, I mean, you
43:36know, previous folks in the city and the
43:38developer on uh street trees, planting
43:41live oaks as street trees is not really
43:44uh anything sustainable or or workable
43:47for the long term. Um but we have a lot
43:49of curbs that are lifting up now causing
43:50ponding issues. I think you had said we
43:52were going to potentially look at pack-
43:54packaging some of
43:55the locations together on Daniel Island
43:57for a small project. Um any thoughts on
44:00what how we might be able to get that in
44:02the budget for next year?
44:03>> It Yeah, we do have those on there as a
44:05future allocation option for the curb
44:06and gutter realignment
44:08>> Okay, I see.
44:09>> program. We have it Yeah, we have it
44:10tentatively at $75,000.
44:13That'll likely be somewhere between 5
44:16and 12. We've been working on them
44:19in-house. Our field ops crews have kind
44:21of been
44:22have done the first couple in-house.
44:23It's much It's pretty time-consuming.
44:26a long a section you have to reset
44:27normally, but it does save
44:29quite a bit of money, so it'll be more
44:31like 12 if we can do them in-house.
44:33It'll be more like five if we can do
44:34them
44:35uh if we end up doing them
44:36contractor-wise, but we are setting that
44:38up and working through it.
44:40>> Okay.
44:41Um okay, so but that's So, that's
44:4475,000. I mean
44:47and then that's There's someone James
44:49Island that needs to be done out of that
44:5075,000.
44:50>> There's one on James Island right now
44:52that we have allocated. The rest of them
44:53are on Daniel Island.
44:54>> All right.
44:55>> For that For that budget item For that
44:57budget item.
44:58>> Yeah.
45:00Thank you.
45:01>> Yep, absolutely.
45:03>> Any question from any other committee
45:04member of the
45:06Think I can see all the hands.
45:09Um
45:11>> And again, Mr. Chairman, please if
45:12anyone want wants to reach out to me at
45:14any point before the next
45:16discuss in more detail. If there's
45:17something you see that's missing that
45:18you think should be on there, we can
45:20Uh this is just our initial
45:23uh initial distribution numbers will
45:24continue to refine as we work through
45:26them.
45:27>> Okay, great. Uh if you can, could you
45:30push this um
45:32summary out to all members of council,
45:34please?
45:35>> Absolutely.
45:35>> That'd be great.
45:37Uh these small projects, as I said,
45:39prove very positive
45:41and popular over the years.
45:43Uh unless there any last comments, by
45:46acclamation, this this meeting is
45:48is done. See you all tomorrow.
45:51>> Thank you, Mr. Chairman.
```*