Summary
Written from the auto-generated captions, which begin at the call to order; names and numbers may be misheard.
- The mayor added a second brief closed session, on a personnel matter, to the one already planned on a contract or lease; council agreed by nods.
- Butterfly icon public art: staff recapped the process (butterfly chosen as the town icon, 3D draft approved in May; the finished piece is about 4 feet 2 inches tall and 3 feet 9 inches wide and weighs 50 to 60 pounds). The parks, recreation and cultural resources advisory committee had prioritized five sites plus Northwest Park as an alternate. Council leaned toward sites at greenway intersections near Morrisville Community Park, Cedar Fork District Park and the Indian Creek Trail Head, and against the dog park, the Morrisville Aquatics and Fitness Center (which already has a mural) and the town center. Staff will return with additional, less prominent locations, and on whether pieces can be moved (they are bolted down). Council then ranked the ten artist designs with stickers; the five highest-ranked designs were chosen, and one council member suggested decorating utility boxes and stormwater structures in a later round.
- Wake Bus Rapid Transit western corridor extension (information item, with Bret Martin and a Capital Area MPO program manager): the extension would run from downtown Cary through Morrisville to Research Triangle Park along NC 54 and the McCrimmon Parkway extension, with every other western BRT bus continuing, about 20-minute weekday peak service, 14 articulated buses, an estimated $9.4 million a year to operate and $62.1 million in capital cost, a funding gap of about $24 million, and service as early as 2032. Perimeter Park would be only a future infill station. The locally preferred alternative goes to the MPO executive board on September 16, with public comment August 17 to September 15.
- Several council members said the route skips Morrisville neighborhoods and Davis Drive and would not benefit residents directly; most did not want to endorse it in the resolution planned for the August 11 consent agenda. Others noted its regional benefit of keeping commuter traffic off local roads. Staff said alternatives were screened out years ago, that a fixed route on Davis Drive could come through the countywide bus plan, and that the MPO board could still reject the alignment if Morrisville objects. Council agreed to pull the item from the August 11 agenda and have staff draft a letter explaining its concerns instead, with a return visit possible August 25.
- Council went into closed session to discuss the acquisition of real property and a personnel matter, then took a break; the captions end around then.
Issues discussed
- Butterfly Icon Public Art Sites
- Wake BRT Western Corridor Extension
- Smart Shuttle Service Expansion
- Comprehensive Transportation Plan Update
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
17:59Good evening. I now call the Morrisville
18:01Town Council work session to order for
18:03July 30th, 2026.
18:06Um, first I'd like to recognize the town
18:08manager for request for an additional
18:10close session.
18:11>> Thank you, Mayor. Uh, you have one close
18:13session on the agenda tonight for a
18:15matter involving a contract or lease.
18:17I'd like to add a second brief uh close
18:19session relating to a personnel matter.
18:22Okay. Um do I just need head knots for
18:25that since we don't really adopt an
18:27agenda or should we appropriate? Okay.
18:30Is everyone okay with that? Go ahead and
18:32add that. Okay. Seeing head knots all
18:34around. Um we have two discussion items
18:37this evening. At first we would like to
18:39recognize um Britney Johnson, our
18:42planning manager to help us with a
18:43public art update. the icon initiative.
18:47We're very excited to talk about this
18:48tonight. Thank you, Britney.
18:51>> Good evening, mayor and council. Um, it
18:54is my pleasure to be here as well. Super
18:56excited about this item that we're
18:58taking a very major step forward. We're
19:00here to select our final icon
19:03installation locations and also select
19:06design.
19:08Let's see.
19:12So before we get into those two tasks,
19:14first we'll have a little bit of
19:15background. So on January 28th, town
19:18council selected the icon initiative as
19:21their second initiative to our public
19:23art program.
19:25On May 27th, an administrative update
19:28was shared with council outlining the
19:30proposed project out timeline as well as
19:33public engagement strategies and artist
19:35selection.
19:37On November 25th, staff presented the
19:40top three icons that were derived from
19:42public engagement efforts and the
19:44butterfly was selected as our official
19:46icon. On February 26, town council
19:49selected design details.
19:56On May 26, an administrative update was
19:58shared with council and the 3D draft was
20:01approved. On May 27th, 2026, staff
20:05presented the location options to the
20:07parks, recreation, and cultural
20:08resources advisory committee, and
20:10locations were prioritized. And lastly,
20:12on July 22nd, staff presented design
20:15submissions to the parks, recreation,
20:17and cultural resources advisory
20:18committee, and the top 10 design loca
20:21design selections were prioritized as
20:24well.
20:27So here, if you look closely, this is a
20:30rough uh version of our final icon. So
20:34you'll see the edging haven't been
20:36removed here, but that is super
20:38exciting.
20:40With the final size, it is about 4t 2 in
20:45in height and 3 feet 9 in in width.
20:54Just to briefly review our icon
20:56initiative flowchart. Step one was
20:58public engagement. We introduced the
21:00project and solicited feedback at four
21:02inerson events and also online. Step two
21:06was our icon fabrication. The icon was
21:09selected. Design details were finalized
21:11and the manufacturer was selected as
21:13well and a contract was executed. Step
21:15three was location prioritization.
21:18An online call for artists was issued
21:20and the parks rights and cultural
21:22resources advisory committee did
21:24prioritize locations and now here for
21:27council to consider.
21:33Step four, which is our current step, is
21:36our icon installation and that will
21:38entail again final design selection and
21:41installation location selection and
21:43lastly site preparation installation.
21:46Our fifth and final step, we will review
21:48and evaluate our process.
21:57So, uh again, your task for tonight
22:00first will be your final location
22:02selection followed by design selection.
22:05So, first we'll have the location
22:07selection. On May 27th, Parks and Rights
22:10did review a list of town properties and
22:14uh the total list is here listed for
22:16you, which consists of Morrisville
22:18Community Park, MAFC, Cedar Fort
22:20District Park, Indian Creek Trail Head,
22:23the Morrisville Dog Park, Northwest Park
22:25as an alternative, uh Fire Station at
22:29Harris Mill, Church Street Park, Town
22:32Center when completed, and Town Hall as
22:34well. So the parks and rats advisory
22:37committee did select five locations and
22:41also selected one alternate. So you'll
22:43see those five here with an asterisk and
22:45I'll read those again. That's
22:47Morrisville Community Park, MAFC, Cedar
22:50Fork District Park, Indian Creek Trail
22:52Head, the Morrisville dog park and again
22:54Northwest Park as an alternative.
23:04So multiple factors were considered when
23:07uh selecting these locations and areas
23:10within these locations. First existing
23:12features like lighting, hardscape and
23:15you know its overall visibility as well
23:18uh reviewing each for uh how well they
23:23will uh again be interfaced by the
23:25public in a pedestrian way.
23:30So I will go over all of the locations
23:32and then we'll open for discussion. So
23:34the first is Morrisville Community Park.
23:36There were two areas identified. So
23:39you'll see the overall part here. One
23:41location there is an area that is
23:43directly adjacent to the playground and
23:46the picnic shelter and then another that
23:49is by the restroom shelter that is
23:51further uh into the park. So those are
23:54two areas that have been identified for
23:56possible installation.
24:01The second location is MASC. You'll see
24:03here that it is adjacent. So in the
24:06larger floor, the larger aerial here,
24:09it's about this location. It's adjacent
24:11to the current uh smart shuttle node.
24:21Third is Fish is Cedar Fork District
24:24Park and there were two again there is a
24:26location where I think it's three or two
24:29two or three greenways that converge at
24:31one point and it's really a really nice
24:33area. I don't know if you've been back
24:34there but certainly uh could make that
24:38area even more special.
24:42Next we have Indian Creek trail head
24:44which is adjacent to Lake Morrisville
24:46our stormwater facility here as well has
24:49a high visibility from town hall drive.
24:51It is separated from the playground
24:53which will help discourage uh those that
24:55may think that it is designed to be
24:56played upon.
25:02Next we have Morris dog park and there
25:04are two prime locations for our
25:06installation and again the we would be
25:09selecting one of the areas. So in the
25:11aerial you'll see here both of them are
25:13directly outside of the uh play area and
25:16there's one this one is a little closer
25:18to the gate and this one is a little
25:19further away and closer to the parking
25:21area.
25:24And lastly, as an alternative, Northwest
25:26Park was selected. And if this location
25:29is selected, the area of installation
25:31would be here, which is right where the
25:35picnic shelter is here, playground, and
25:37also the walking trail.
25:43Now that we have reviewed all five of
25:45the locations,
25:47uh our first question here is is council
25:50comfortable with the five locations that
25:51have been prioritized by parks and
25:53reccks and I will open up for discussion
25:55before we move on to design selection.
26:00>> Do you want to help you or you want to
26:01do it yourself?
26:02>> Um
26:04okay, I'll go ahead and and do it
26:06myself. So, I'm going to go back to the
26:08slide where we are showing all of the
26:11locations listed so you can see them
26:13together. Um, again, uh, the asterric is
26:17a little small, but hopefully you can
26:19see that these are the five locations
26:21that have been prioritized in Northwest
26:23Park is our alternate. So, uh, I guess
26:27we will start
26:36Thank you very much for bringing this
26:38next milestone to us for consideration.
26:42Um I have a basic question about how the
26:45installation location
26:48um suggestions were um presented to the
26:52park and Rex committee. Um, did they
26:56spontaneously offer locations or were
26:58they given a specific list to select and
27:01prioritize?
27:03>> Yes, they were given this full list here
27:05that's present on this on the screen and
27:07then they selected the five that have
27:09the asterric.
27:11>> Okay. Well, thank you for that um
27:15detail. I actually think that we're
27:17missing an opportunity for a location
27:20that is not on this list. And I think
27:23that there are several of our greenways
27:27that have kind of a a melding together
27:31where you can go multiple directions in
27:34town. Um I am terrible with names, but
27:38there's one that connects um the Cedar
27:41Fork trailway system. It's it's kind of
27:44like there's an intersection that'll go
27:46towards Preston and then all also go
27:49it's it's you know
27:50>> it's a hatcher. the Hedrick Creek
27:52Greenway.
27:54>> Um, having an icon there gives a sense
27:58of place and um, it's an unexpected
28:02surprise kind of thing versus the Morris
28:06Aquatics and Fitness Center. And I'm not
28:08in favor of that, by the way. We already
28:11have a mural. So, we're trying to use
28:14the icons to expand the um, impact of
28:19art in our town. And if we put two of
28:21our um art installations at Morseville
28:25Aquatic Center, we're not really
28:27expanding. We're we're more or less
28:30cluttering. And I I don't feel I think
28:33we really need to embrace the murals and
28:36uh let them stand on their own and not
28:39have some have something novel in
28:41another location. So,
28:45um I would want to see some areas of the
28:50greenway system that are intersection
28:52kind of bringing us together because we
28:54always say live connected, live well.
28:57The icons could do something like that.
28:59Connecting the town. So,
29:03I'd like to maybe suggest we look at
29:05three sites tonight and hold on the um
29:08last two till we revisit the locations
29:12again.
29:14And um because I think that um you know,
29:19in the dog park, I'm not a real fan of
29:21putting something at the dog park right
29:23now because I think again that is pretty
29:25close to one of the murals which is the
29:27fire station. I want to have um more
29:32bringing in. So, community park, I can
29:35see that uh Cedar Fork District Park,
29:38but maybe that district park location is
29:40not at the park itself, but it's at the
29:43greenway adjacent to the park where
29:45there's intersections of greenway
29:47trails. So, that's just a different way
29:49of thinking about the Cedar Fork
29:51District Park and Indian Creek Trail Net
29:55is good. I I will give you a little
29:59preview. I am not in favor of putting an
30:02icon at the town center because we just
30:05went through an extensive branding kind
30:07of thing. We want to create a certain
30:09vibe. So, we can integrate the butterfly
30:13into the town center without having an
30:16icon there. It's like we have all these
30:18icons around the town and then in the
30:20town center we have a different way of
30:24presenting and integrating the the
30:27butterfly like you were suggesting. So
30:30that way we can even expand that art
30:32experience a little bit further and get
30:34more um for our money. So that's might
30:39be back on location. Thank you.
30:45Where are the three murals?
30:48>> So, the three murals currently uh reside
30:50at Shiloh Park uh Fire Admin, which is
30:53here at the corner, and then MFC.
31:02So, I would the same thing that Vicki
31:05raised uh Council Member Scargin raised
31:07about the uh
31:10uh the Cedar Fork District Park. I have
31:12the same thought about the Morrisville
31:14Community Park. I'd love to have a a
31:16butterfly there, but right behind the
31:18playground, there's a place where three
31:20trails converge and that gets tons of
31:24foot traffic and bike traffic. And I
31:27mean, I've never been there that it
31:28hasn't been super crowded. So, I think
31:30that would be a better location
31:33at the than the location proposed
31:36because that location is so close to the
31:38playground that I worry that there's
31:40just going to be kids climbing all the
31:42time. So, um
31:45and the dog park, I I wonder if the
31:49people that think we should have a
31:50butterfly there have never owned a dog
31:53because I my concern there would be that
31:56the paint would be
31:59terminated off the the butterfly.
32:03I mean,
32:05within I I don't know, my dog, I'd
32:07probably do it by himself in in a couple
32:09months. So, I'm not in favor of the dog
32:11park. Um,
32:14and
32:16I I I I'm not in favor of Marsville
32:20Aquatics and Fitness Center. Um, but I
32:22do think it'd be nice to have one at
32:24town hall. I actually think having one
32:26right out there would be really nice.
32:29The only thing is I mean we can't just
32:32have five butterflies and stop like
32:35we're going to have to do another round
32:37of butterflies because five butterflies
32:40in a 10 square mile town is not a lot of
32:44butterflies. So, you know, I just but
32:46for the first locations that would be my
32:49feedback would be I'd like the community
32:51park one to be in that greenway
32:53intersection. Um, I agree with Council
32:56Member Scar Johnson about the Cedar Fork
32:58District Park one. Um, and I'd like to
33:01see one at town hall. I don't think
33:03Church Street Park needs one. And I I I
33:07agree we don't need one at the town
33:08center.
33:22So I agree with both Mamm and Council
33:27Scish Johnson on
33:31on trails. Uh I would like to see one
33:35there. Now did you both say that you are
33:38in favor of or not in favor of one at
33:41Town Center?
33:42I wasn't an icon like this. Not in town
33:47center. We can still use the, you know,
33:50visual of a butterfly in different ways.
33:54>> Okay.
33:54>> And we have a whole scape of um the
33:59spritzers and stuff like that. I'm just
34:01con concerned there'll be too much.
34:03>> Yeah, I I agree with you. I just wasn't
34:05sure.
34:06>> Also, I think that we if we if the town
34:09center Well, I'm sorry. If [snorts] the
34:11town center's built and then we have a
34:14space that's just crying out for
34:16something, I say we get it with the
34:17second round of butterflies. Like I want
34:19these installed as soon as possible.
34:22So, I would be in favor of uh one uh at
34:28least one at one of the trails uh and
34:31then one at town hall uh instead of the
34:35dog park. Dog definitely. Yeah, I agree
34:37with you. That doesn't sound right. And
34:42also the aquatic center already.
34:47>> I'm sorry. What's the last location?
34:50Morrisville Republic Center and and Dog
34:53Park.
34:55>> Those are
34:56>> not in favor of those two.
34:58>> And you did say Morrisville Community
35:00Park, Town Hall, and what was the third?
35:02I think it was here.
35:03>> The uh No, the what was the trail that
35:07you mentioned?
35:08>> District.
35:09>> Cedar District. So there and uh uh town
35:13too.
35:17just pointed at the intersection of
35:28>> Um so I'd like to echo what I was um had
35:32mentioned at the Tuesday meeting. Um and
35:35I I'll get on to the location in a
35:37second, but certainly finding those
35:39locations where if the butterflies are
35:41actually pointing towards town center,
35:43um that would be really nice. One thing
35:44I'm noticing with the list so far um all
35:47the asterisk squans minus Northwest Park
35:50is that they're pretty much all along um
35:54kind of this center belt of town. Um so
35:57I would be interested in certainly
35:59getting more vertical distance between
36:02them as opposed to having them on I
36:03guess Morrisville's equator essentially.
36:05Um but I do like um actually one
36:09question. um
36:12what would happen if kids climbed on
36:14them.
36:15>> So, uh they are built to withstand some
36:18pressure. However, we will have signs
36:20that are posted. So, they are durable,
36:22but we just don't want, you know, for a
36:24child to kind of hang on them, complete
36:26body weight, that kind of thing.
36:27>> Yeah. I remember seeing one of the
36:28pictures had um that brick kind of
36:31seating around it and then the the
36:34putting it right in the middle of that
36:35and I was thinking I don't think that's
36:37a good idea having people hanging out
36:39there. Um but I do um I like the
36:43crossroads. I like uh I think um where
36:52where the se Cedar Fork District Park I
36:54do like that location. Um,
36:58I do like Morrisville Community Park.
37:01Um, I do like Northwest Park. Um, I
37:04think there's nothing there's nothing no
37:06art up there now. And that's kind of
37:08that's pretty far away from, you know,
37:09where all all the action is. Um,
37:16I'm not in favor of Morrisville Aquatics
37:17and Fitness Center. Um, a couple
37:20reasons. I think the way it would be
37:22placed wouldn't point towards town
37:24center, I'm sure. Uh but also I think
37:26yes with the other mural that's there.
37:28Um I was not I was not I was thinking oh
37:32the dog park would work because you
37:33could point it towards town center but I
37:37agree with the rest of my colleagues
37:39here about um uh one being too close to
37:42the uh fire admin as well as being
37:45around uh dogs. That might not be such a
37:47great idea. Um, I like the Indian Creek
37:51trail head with that one. That's kind of
37:53like it's not necessarily pointing to
37:55the town green, but it's pointing to,
37:56you know, what the future town center is
37:57going to be. Um, certainly if it's, you
37:59know, kind of dead centered on the on
38:02the pad there, I think that's a good
38:03location. Um, would Indian Creek Trail
38:07Head be too close to town hall to um to
38:11have one? I don't know. Um
38:15certainly if uh
38:19the Indian Creek trail head I'm assuming
38:21would probably last longer because the
38:23town hall area as the town center
38:25redevelops it'll be a little bit
38:28different in the future I'm sure. Um so
38:31just think about that. But I think
38:36I think that's five right? I like the
38:39Morrisville Community Park. I like Cedar
38:40Fork District Park or the um
38:44trail head or the um where trails meet.
38:47Uh
38:50Indian Creek Trail Head. I like that. I
38:52like Northwest Park. I guess I don't
38:53have a fifth one for you.
38:55>> Sounds good.
38:57>> How about the library?
39:00>> That's town center.
39:07books.
39:19>> You ready for me?
39:20>> Okay. [laughter]
39:21So, I'm on the same wavelength.
39:24I [clears throat]
39:25um I don't want it at the dog park or
39:28the aquatics and fitness center because
39:29there's already art mural that's in
39:32close proximity, especially at Quax and
39:34Fitness Center. So, I'd like to that
39:37this idea of spreading it out across
39:39town. I like that. I honestly would put
39:41them all on a greenway somewhere. I
39:44would put them at those intersections.
39:46I'm looking at the greenway map trying
39:48to um figure out five locations. But um
39:51I would I would put them where Ann
39:55talked about, you know, if you're going
39:56to put it in Morsville Community Park,
39:58I'd put it back at that intersection
40:00where where you come behind Georgina is
40:02that intersection of the greenway there.
40:04You're right. There are tons of people
40:06that walk by there all the time. The
40:08intersection at the Cedar Park District
40:10Park, I think that's a fabulous
40:11location, too. Um, I I I I do like this
40:16idea of spreading it to Northwest Park,
40:19although there's no greenway
40:20intersection there, but um
40:24>> Yeah. Yeah. So, um I don't that's
40:27besides the greenway. I I got nothing
40:30else for you. [laughter]
40:31>> And I I don't want to put one um too
40:34close to the town center either.
40:35Although I will tell you the one that's
40:37kind of blue there that might if we land
40:39on the color scheme that might work
40:42really well at the Indian Creek trail
40:44head but you know which is close
40:47proximity to the town center but um
40:49anyhow that's as much feedback I'm
40:51giving right now Britney. Thank you.
40:55>> So I like all this. This is going a lot
40:57differently than I expected. Um lots
41:00more feedback. I was thinking kind of
41:02more generally. I I I've seen the trolls
41:06and they're not really like statues to
41:08look at. They're more like things to
41:10find. So like being along greenways is
41:13kind of more what I'm thinking. Quick
41:14question to staff. How sturdy is the
41:18installation? Like how movable are they?
41:20because I asked because it'd be nice to
41:22start like at Morrisville Community Park
41:25near the two baseball fields and show it
41:28like a statue for a month or two and
41:30then move it to a different part of the
41:32park like the butterflies are flying to
41:34different places and then we can do
41:37scavenger hunts and try to introduce
41:39people to more of our greenways because
41:41Mil Spring Greenway and Grace Park
41:43Greenway, I'd imagine that maybe 5% of
41:45our town knows they exist.
41:48So, we could use this as a a theme. So,
41:51they don't be permanently at these spots
41:55within each park. So, I was just
41:57wondering if that's reasonable.
41:59>> That should be weighing.
42:01>> They're about 50 to 60 pounds.
42:04>> Yeah. So, they can be moved. These are
42:06designed to be temporary. They are
42:08certainly fixed and so they won't be
42:10moved until they are moved by public
42:13works. But uh certainly they can be can
42:16be moved and I think that's one thing
42:18when you're looking at the colors for
42:20town center or branding keeping in mind
42:22that you know once that is solidified
42:24once town center has been established
42:27then we can always uh respond with uh
42:31public art and uh I think that the other
42:34thing was how is it fixed but yeah it
42:36can be moved. Okay. So, I'd like us to
42:39sort of think about that that these are
42:40initial locations. Um, in which case, if
42:43we're starting off like as statues, I
42:46think a lot of locations that were shown
42:47before, like um even at that little
42:50place uh near the shelter at Morsville
42:52Community Park, even though it has a
42:53thing, a lot of people see it there. So,
42:56we have to decide, are we looking for
42:57places where everyone's going to see it?
42:59Um, or where people see it when they
43:01walk by and it's kind of like a a
43:03surprise discovery. Um, so I'm I'm
43:06pretty good with what everyone said. Um,
43:09and so for if we were to do the dog
43:11park, for example, you could put it down
43:12at that that stub that you were talking
43:15about of Hadrick Creek where that thing
43:18is. So it's still near the dog park and
43:19moving around. I don't think the dog
43:21park is too close to the fire station,
43:23for example. MFC and the mural might be
43:26that might be a little close,
43:27>> but
43:28>> I can see
43:29>> you can see from both.
43:31>> Um, so those are just kind of my my
43:33loose thoughts. Doesn't like we're
43:35giving final decisions now, but I think
43:37whatever you've gotten from the group,
43:39I'm good with those locations knowing
43:41that we might move them around a little
43:42bit and have some fun with it. And I'm
43:45all in favor of doing five more as soon
43:47as possible. Um, funding is pretty much
43:49the thing. So, if we want to really lean
43:52into doing things like this for our
43:54community, we just have to realize that
43:56the funding is the holdback. Um, so it's
43:59up to us to decide on that.
44:03>> All right. So now that everyone has had
44:05a chance to weigh in, councel,
44:07>> I just have one one question. If we go
44:10with both town hall and Indian Creek
44:14trail head, are they too close?
44:24>> And that's what I'm asking.
44:28>> You don't need I would go with Indian.
44:34We already have it in fair. So,
44:36>> let's all try to use our microphones
44:37more. I know I've been guilty about not
44:39doing that. You're doing it fine.
44:40>> Okay.
44:42>> So, if if we don't
44:45uh do it at town hall, then maybe we can
44:48put it at one of the other trail
44:51intersection instead of town hall.
44:55>> Yeah. All right. So, then we just need
44:57to identify that.
45:00>> Okay. So
45:01>> now I have another question because I
45:03now it makes me nervous that they're
45:05movable.
45:06>> So are they like are they bolted down
45:09because
45:10>> they are bolted down. It's movable in
45:12the same sense that a park bench is
45:15movable. So it's there but it can be
45:18removed.
45:19>> Okay. Because I don't want these to end
45:20up in college dorms.
45:23>> No. Um, and to summarize what I've
45:26heard, uh, I hear one majority certainly
45:29want adjacency to greenways. So, I think
45:32that Morrisville Community Park
45:34identifying the location that is closest
45:36to the greenway. Uh, let's see here. Uh,
45:39Cedar District Park and Indian Creek
45:42Trail Head because those three are
45:44located close to greenways. So, moving
45:46forward with those three locations. The
45:49other is that you want us to come back
45:51with additional options and I think the
45:53runner up for the fourth would have been
45:56Northwest Park.
45:58Okay.
46:07Um I guess along the lines with the um
46:11thinking about you know kids climbing on
46:13it. Certainly Northwest Park is a
46:15popular place for kids. So that's a
46:17consideration as well especially if it's
46:19very prominently located. Um, but I also
46:24um I like your suggestion uh Mayor Gali
46:27about um where are the places that are
46:31least popular
46:33and putting them there to be a treasure
46:35to find maybe encouraging people to you
46:37to go to these more underutilized areas
46:40um of recreation in town.
46:43I kind of like the principle. I don't
46:45know how well that'll
46:47that makes sense. What about that?
46:50>> Okay. I think that uh you do have three
46:53selected prominent locations there. So,
46:55I think that having when we come back uh
46:58staff will come back with a list of
47:00least prominent locations, those that we
47:02would, you know, inspire those to visit
47:04areas of town where they have not. So,
47:06we'll come back with that list and
47:08certainly maybe additional locations in
47:10Northwest Park as well.
47:18I love this conversation. One last thing
47:21made me think about um maybe popping
47:24them around to different shopping
47:25centers at some point too. Like one of
47:27them moves around town for different
47:30things. Maybe bring one to an event,
47:32things like that. They won't be ready
47:34for Smoresville, but definitely for
47:36something soon after that. Maybe.
47:39>> Since they're going to be bolted down,
47:41I'm assuming that you're going to have
47:42to have some type of pad everywhere you
47:45take. Right.
47:46>> That's true.
47:47Okay,
47:47>> that could be a way to do it, too. I'd
47:49like to recognize the town manager,
47:50please.
47:51>> Yeah, they they will be bolted down and
47:53on a pad, perhaps elevated. Um, so I
47:56think before we commit to too much
47:58mobility, we want to talk with public
48:00works and see what kind of commitment
48:02we're making and then we can certainly
48:03bring that back to you when it comes
48:05back.
48:06>> Yeah, they're pretty strong, but maybe
48:08not that strong.
48:10>> Well, I think it's just the question of
48:11how much is involved with pouring that
48:13pad. Do you have to pull the pad after
48:15you? I mean, there's there's factors
48:16that we just want to sort out. Make sure
48:17you're fully informed before we make a
48:19commitment to move something that maybe
48:22maybe not.
48:22>> If if I could just make a comment about
48:24the mobility, I think that where we
48:27install these should have a minimum of a
48:29year. If you're interested in having
48:32something here, something there, maybe
48:34we should have an icon on wheels that
48:37you could take to events, but I don't
48:39think once things are installed, they
48:41should be moved around. But maybe think
48:44about it in a different way of where can
48:46we have a mobile one and then that
48:49allows a lot more flexibility and public
48:51works will be happy and safety you know
48:55is a very important issue too so we can
48:58ensure safety
49:00>> and also another uh point is that you
49:02know this is our first round of
49:04installation so additional locations can
49:06be prioritized that we can uh look at
49:08for installation in the future
49:11>> and just
49:13And once the first five were installed,
49:16I'm quite sure that we'll hear from the
49:17public a lot more about where there
49:19should be others.
49:22>> Sure.
49:22>> And just one more comment on mobility is
49:25uh
49:27if we're going to have a pad, I'm I'm
49:31assuming that once we move it somewhere
49:34else that we would have to do something
49:37with the pad and not just otherwise it
49:39would look ugly, right? So we're going
49:41to have to something else there
49:44or we just leave it there or what do we
49:47do?
49:48>> Yeah, I don't like a pad in general. Um
49:51I think that's
49:52>> unnecessary. I mean the disc golf
49:54baskets are kind of bolted down
49:56somewhat.
49:57>> Yeah. So we just need to consider that.
49:59>> I think there's a a middle ground there.
50:04>> All right. Thank you all for that
50:06feedback. We'll move on to task number
50:08two for tonight, which is our design
50:10selection. So again, this is a super fun
50:13portion here. So uh let's see here. We
50:16will evaluate both the work samples as
50:18well uh that has been provided by each
50:20artist and also those will be indicative
50:24of their skill level. So we'll want to
50:26look at those closely first. Then we'll
50:28also review the proposals as well. And
50:30then following that you'll each be given
50:33uh five stickers, one with one, two,
50:36three, four, and five. And then you will
50:38circulate and rank them five being the
50:41highest. So that the five designs with
50:44the highest tally overall sum of points
50:47will be the five that will be installed.
51:13This is right there.
51:20>> Yes. Uh this is the information that we
51:21have before us. I wanted to go over it
51:23here at the table and then have an
51:25opportunity to walk around. So we have
51:28the top 10 designs that have been
51:30prioritized by Parks and Rex. So our
51:32first artist is Molly Choppin. She is
51:36local to Raleigh and all artists are
51:38local to North Carolina. So she is a
51:41painter and art educator and her artwork
51:44is her endeavor she endeavors to inspire
51:48uh love, healing and resiliency. Her
51:50work is also uh exhibited in galleries
51:54and and festivals all over the United
51:56States as well as internationally.
51:58She, if you'll look at her designs,
52:00you'll see that she has a strong sense
52:01of movement, texture, and also uh can
52:05be, you know, visually viewed from afar
52:07and up close because that's something
52:08that we'll want to uh evaluate as you're
52:11looking at the designs. So, this is her
52:14proposal here. Um, again, you'll see the
52:16sense of movement and that kind of
52:18contrast. And this is the front and that
52:22would be the kind of upward facing. And
52:24then the back, which is downward facing.
52:26I'm not going to spend a lot of time
52:27going over them because you all will
52:29look at them very closely, but just
52:31wanted to give you a little bit um of
52:33that. So, Molly's proposal again, the
52:35design reflects diversity, inclusivity,
52:37and also the creative spirit of
52:39Morrisville, and that is intended to
52:41uplift and inspire viewers.
52:46And I'll also note that these are in
52:48order um of the ranking for public that
52:51uh the Parks and Rights Board ranked.
52:53And the first three were all tied for
52:55first place. I'll also mention that as
52:57well. So our second artist is Sata
53:00Agaral. She is a resident of Morrisville
53:02and she has a passion for uh visual
53:04arts. Uh again she is the artist that
53:08completed the mural at MAFC. So we have
53:10an example of her work there. Uh these
53:12are also some examples that she has
53:14provided. Again, she has a strong detail
53:17oriented style, a very skilled execution
53:20and a strong usage of color and pattern
53:23as well, which is evident from her mural
53:26at MSC. This is her proposal. Uh this is
53:30of the columary
53:33uh that is the style and it is
53:36indigenous to India. the uh intricate
53:38flowers and the nature kind of depict
53:41the style that uh of depicts beauty,
53:44change and growth.
53:51So our third artist, again these were
53:54all three tied for first place. Uh this
53:56is Hassani uh a local artist to Kerry,
54:00North Carolina. Uh, Hassani is a student
54:03at UNCC Chapel Hill majoring in
54:05psychology and has done three large
54:07scale murals, two at Green Level High
54:10School. And you'll see uh their work
54:13samples. Uh, again,
54:15lots of great kind of painting
54:17technique, lots of blending, use of
54:19shadow and texture. So, you can see that
54:21and you'll be able to see that a little
54:22closely uh when you walk around and see
54:24the work samples adjacent to their
54:25offerings as well. So the proposal's
54:28artwork represents Morrisville and it's
54:30designed to showcase the four seasons
54:33that we experience through four flowers
54:35that are associated with North Carolina
54:37during all seasons. And this is the
54:41design. So again, this would be the
54:43front and the back. And that's labeled
54:44as if you walk around as well.
54:47Our
54:50fourth artist is Ruchi Ralph and this
54:54artist is native to Charlotte Charlotte,
54:57North Carolina. So Roocci is a mixed
55:00media artist. Her work is displayed in
55:03galleries in Charlotte. And again,
55:05you'll see that most of her examples are
55:07more of mixed media as well as some
55:09painting as well. Lots of good use of
55:12color and pattern. Uh certainly looking
55:15at lights beside darks to add that
55:18contrast. And again their proposal here
55:23represents uh these colors and vibrant
55:26uh patterns are representative of the
55:29growth, hope and community.
55:34Our next artist is uh Kelsey. her uh she
55:39has a good use of lights and darks again
55:42for contrast uh good blending techniques
55:45um shadow usage and light uh so those
55:48are some things highlighted in her work
55:49samples so that you can see those again
55:51if you're looking at the designs a
55:53little on her proposal the design seeks
55:56to invoke the comfort of community and
56:00so that viewers can see the are are
56:03filled with childlike wonder so again
56:05the design showcases several flowers
56:08that are native to Morrisville and
56:10commonly found around the town and near
56:12Lake Crackree.
56:16Our sixth artist is Cecilia Walker. She
56:19is a resident of Morrisville. She is
56:22experiments with lots of forms of art.
56:25You'll see some watercolor work as well
56:27as acrylics. um good again with lots of
56:31strong uh design details and diversity
56:34with uh texture as well as use of shadow
56:38um as well in her work. Uh you'll want
56:41to look at her design proposal here
56:44which she endeavors to showcase the
56:47179 different species of butterflies
56:49native to North Carolina. One thing as
56:51you're walking around and I think that
56:53you'll want to notice as you're here,
56:57try to imagine that these will be
56:59viewable from afar and up close. So keep
57:01that in mind. So as you're at the table,
57:04think about what you see when you're at
57:06the table versus how you experience it
57:08when you're close because that will be
57:09representative of how it will be in the
57:11built form as well.
57:13Our
57:15next artist is Kristen Owens who is
57:18local to Goldsboro. Her work
57:21exploration,
57:23connectivity, and relationship between
57:24people and nature. Uh her work is very
57:27symbolic and you'll see that she has a
57:29really good style of kind of bold
57:31colors, textures, and symbolism.
57:35So again this is her proposal and it is
57:38entitled rise together and it is uh
57:41designed to celebrate the beauty that
57:43emerges from different people ideas and
57:46cultures together and then the butterfly
57:48symbolizes transformation transformation
57:50hope and growth with one ring wing that
57:53has more cool colors and the other that
57:55has more of your warm colors and again
57:58these are representative of energy
58:00strength and new beginnings.
58:03Our
58:05eighth artist here is May. She is a
58:10multi-discipline artist and she is
58:13located in Durham, North Carolina. Her
58:16public art is centered around public
58:18engagement. And again, this is her
58:21proposal.
58:23Very experienced, very bold and rich
58:25color usage, lots of move movement and
58:28contrast. So that's something to keep in
58:29mind here. and her proposal is really
58:32designed to be vibrant, vibrant and
58:35flowing abstract forms that are outlined
58:38uh with gold and this creates a sense of
58:40movement and depth and connection.
58:46Our next artist is Kaji Doer who is
58:50local to Wendell, North Carolina. again
58:53a multi-disiplined artist who works with
58:56uh transforming memories into place and
58:59that is her style. Uh very strong usage
59:02of color, movement, shadow and contrast.
59:05You'll see in their work samples and
59:08going on to the proposal. So this design
59:12uses again bold color and floral imagery
59:14to celebrate the honeybee honeycomb
59:17patterns which you'll see here as well
59:19as bees that are and native grasses
59:22which are symbolic of the relationship
59:24between pollinators and the ecosystem
59:26that they sustain. The reverse side uh
59:29has a chrysantheinum which is uh a
59:32flower that is native. So uh that's a
59:34little on this design.
59:37And then lastly, we have Ivy Grace who
59:39is our last artist. These are some work
59:41samples which again you'll see very bold
59:44color usage, movement, texture, very
59:47easily understood uh from afar and all
59:51uh again uh very bold color uh again and
59:55so we'll go on to her design as well. So
59:58it is inspired by Indian culture, native
1:00:02patterns and representative of a folk
1:00:05art feeling. So the front of this one,
1:00:08the front and back are exactly alike. So
1:00:10that's a little bit on the designs here.
1:00:13So again, we are going to get up in a
1:00:15moment here. It is important that as you
1:00:17all are walking around one, look at the
1:00:20work samples, think about how they are
1:00:22able to execute those work samples
1:00:24because again that is indicative of how
1:00:26they will execute onto the the icon
1:00:29itself. And then the other thing again,
1:00:32think about how they appear from where
1:00:34you're seated. And then when you move
1:00:36closer because one we want them to be
1:00:38able to be uh understood in a way or at
1:00:42least colorful and vibrant from afar and
1:00:44then also when you're closer that there
1:00:46is detail that you are able to take in
1:00:48closely as well. Uh so that's something
1:00:50and then so I will go ahead and uh hand
1:00:53out your stickers again. Uh yeah I have
1:00:57a question here. I will hand out
1:00:58stickers um here in a moment as well.
1:01:01And so you will use the five that is
1:01:03your highest ranking and one being your
1:01:05least. So I'm going to answer question
1:01:08first and then we'll get up and
1:01:09circulate.
1:01:11>> So the first thing is we are going to
1:01:14have five unique butterflies and that's
1:01:17what we're voting at. Correct. It's not
1:01:19like all five are going to be the same.
1:01:22>> Yes. All five unique. And so you will be
1:01:26selecting five different designs.
1:01:28>> Okay. The other one's a little more
1:01:30sensitive question is um we have a
1:01:35fantastic mural at the MAFC and the
1:01:39artist is very talented but I see the
1:01:44icons as having opportunities for other
1:01:48artists to participate and there is the
1:01:50artists that did the MAFC mural did
1:01:53submit and beautiful designs but
1:01:57I I want to try to expand our, you know,
1:02:02artists that participate. So, everybody
1:02:06can vote how they want, but I just want
1:02:08to kind of bring that as an awareness
1:02:12that um if we want to um include
1:02:16additional artists, that might be a
1:02:18consideration towards your selection.
1:02:20>> Okay. And I'll also note that on the
1:02:22application, we didn't specify the
1:02:24artists could not resubmit. And so if
1:02:26that is something that we have a concern
1:02:28in the future as well, that can be
1:02:29something that can be specified,
1:02:31>> right? Yeah. I it's just for
1:02:33consideration. Thank you.
1:02:34>> Thank you.
1:02:36>> So Courtney, I have a question about
1:02:38this um
1:02:40option down here on the lower right.
1:02:43>> Yes.
1:02:44>> In the presentation you it showed a dark
1:02:47option and then this white option. So
1:02:49are you telling me that's the one we're
1:02:51voting on, not the darker option? I'm
1:02:53trying to figure out why there's a
1:02:55another option here on the presentation.
1:02:57>> Yes. So, the lighter option was
1:02:59preferred by parks and reccks and so
1:03:01that is the one that would be moving
1:03:02forward.
1:03:04>> Okay.
1:03:04>> Again, if this body chose to if that one
1:03:07is selected as one of the top five and
1:03:10you all want to consider the dark
1:03:12version, then that's something that we
1:03:13can do as well.
1:03:14>> Okay. Thank you.
1:03:16>> Um, of the 10 artists, how many of them
1:03:19are modest residents? I counted at least
1:03:22two.
1:03:24>> Let's see here.
1:03:27>> I think it was
1:03:32>> two Morrisville residents.
1:03:34>> And the one who did the mural at Morris
1:03:37Fitness Center. That's one of them.
1:03:40>> Yes.
1:03:40>> Okay.
1:03:44>> I had a question about the butterflies.
1:03:47I thought one the upward was dark and
1:03:50the other was light.
1:03:52>> No, it's the uh front and back.
1:03:56>> That That's what I mean. So, these are
1:03:58two white. I I thought the option was
1:04:01black on one side, white on the other
1:04:03side.
1:04:04>> No, it's not front and back white or
1:04:06front and back black.
1:04:08>> Now, I understand. Thank you.
1:04:13>> All right, I think that we're ready to
1:04:15circulate. I'm going to hand out the
1:04:19the stickers here and I will also be
1:04:21circulating so if there are additional
1:04:22questions but again uh five will be our
1:04:25highest vote
1:04:27>> five is best
1:04:29>> it's a weighted average
1:04:34>> yeah quick question was it communicated
1:04:38to the artists that um
1:04:43while there is a front and a back this
1:04:44is kind kind of a 3D piece of art where
1:04:47someone could walk all the way around
1:04:49it.
1:04:49>> Yes,
1:05:11>> high five.
1:05:21Thank you. You're welcome.
1:05:23>> So, okay.
1:06:06little wigs.
1:06:20Oh yeah. Yeah.
1:06:22>> Yeah.
1:07:12All the stickers.
1:07:24[snorts]
1:07:24Wait, you don't have
1:07:27>> Good luck reading all those numbers on
1:07:29the stickers. That's not coming up.
1:07:55people brought their own stickers.
1:07:57>> That's right.
1:08:20It's been interesting
1:08:23because there's numbers on the not just
1:08:27numbers on
1:08:38I didn't bother to
1:09:11isn't going to do it,
1:09:12>> right?
1:09:17>> I'll just let you keep that fantasy
1:09:19right here.
1:09:21At
1:09:21>> least put it in their top five, I guess.
1:09:25>> Put it in your top five.
1:10:0036 is a great number. 6* all the
1:10:03squares.
1:10:07T-shirt.
1:10:23We all come together.
1:10:25>> No, that's it. That was crossed out.
1:10:27>> Okay, I was looking close. Thank you.
1:10:38That's my piece.
1:12:04Let's see here. The five that have I'll
1:12:06be pointing to the five that have been
1:12:08selected and then the six that will be
1:12:09the
1:12:11[snorts] one has been selected.
1:12:13>> Hold on one second.
1:12:15>> Oh, I have it. I'm
1:12:19Okay. So, this one has been selected in
1:12:21the top five.
1:12:25Top five.
1:12:37Top five.
1:12:41Top five.
1:12:44And top five. Our ultimate
1:12:53is this.
1:12:57Can you please um give the name of the
1:12:59artist?
1:13:01>> Okay. So, our first artist is Potter
1:13:03Agal.
1:13:07Next would be Kelsey Ferrara.
1:13:15would be our third,
1:13:20Hassani would be our fourth,
1:13:23and Mali would be our fifth
1:13:26with Paji being our ultimate.
1:13:31Thank you all very much.
1:13:42I would just like to share that um I
1:13:44think Chopen
1:13:46some of her other work that was
1:13:48demonstrated. I would love to consider a
1:13:51way to enhance some of our storm water
1:13:54infrastructure like at Park Village, the
1:13:56raised sewers and things like that as
1:13:58were evidenced. I'm not sure what the
1:14:01next steps would be to start doing stuff
1:14:02like that around town, but Raleigh and
1:14:05other places um do things like that,
1:14:08especially in their downtown area,
1:14:09covering up unattractive utility boxes
1:14:12and stuff like that. I think that would
1:14:13be another really nice way to augment
1:14:16our art programs in some way.
1:14:20>> I'd like to recognize the town manager.
1:14:23So I think we can add that to the list
1:14:24but that would come after the icons
1:14:26likely in the next funding cycle when
1:14:28you would be discussing I think do we do
1:14:30additional mural mural murals do we do
1:14:33icons do we do something like that
1:14:37understood like I said it's about
1:14:39resources and timing and stuff like that
1:14:41so appreciate that um that clarification
1:14:47>> all right again just to sum up now that
1:14:49we have our designs selected thank you
1:14:51all very much for that staff will be
1:14:53back with additional locations.
1:14:58>> You don't need anything else from us at
1:15:00this time.
1:15:01>> Okay.
1:15:02>> Not at this time.
1:15:03>> So, it's 7 o'clock. I think it's good
1:15:04for us to just move right into the next
1:15:06one. So, at this time, we'll give uh
1:15:09Miss Johnson a moment to step away and
1:15:11we're going to ask Brett Martin and Ben
1:15:12Howell. Uh Brett is from town of
1:15:14Morrisville. Ben is from Campo, used to
1:15:17be from town of Morrisville to discuss
1:15:18Wake bus transit rapid transit western
1:15:22corridor extension update. If you guys
1:15:24gentlemen could please join us at the
1:15:26table.
1:15:42>> That's right. Yeah. Gosh, that gets me
1:15:45every time. Um, all right. Well, good
1:15:49evening, Mayor Collie and members of
1:15:50town council. Brett Martin here,
1:15:52transportation project manager with the
1:15:55town. And also joining us this evening
1:15:56is Ben Hal, who is the Wake Transit
1:15:58program manager with Capitol Area
1:16:00Metropolitan Planning Organization. And
1:16:03tonight we are bringing you an update on
1:16:05the planning work that has transpired
1:16:07over the past year or so to further
1:16:09develop the service concept and
1:16:11infrastructure needs for the wake bus
1:16:14rapid transit western corridor extension
1:16:17uh which is proposed to extend a core
1:16:20bus rapid transit service between
1:16:22downtown Raleigh and downtown Kerry
1:16:23westward through Morrisville to Research
1:16:27Triangle Park. And most recently, with
1:16:30active participation by the town uh by
1:16:33town staff and a small financial
1:16:34contribution from the town, Campo
1:16:36completed a concept of operations study
1:16:39that followed up on prior alternatives
1:16:41analysis work uh to better refine what
1:16:44the western extension would look like.
1:16:47And the Campo Executive Board will soon
1:16:51consider and lock in what is called a
1:16:53locally preferred alternative. You'll
1:16:54hear more about this later to carry
1:16:56forward for further development and
1:16:58implementation at its regular meeting in
1:17:01September. And so tonight we are going
1:17:04to cover
1:17:07uh we are going to cover some background
1:17:09for this project including some planning
1:17:11history and context what we have done
1:17:13over the past year or so uh with the
1:17:16concept of operations study and then we
1:17:18will take a bit we will talk a little
1:17:20bit more about the locally preferred
1:17:22alternative which will be on council's
1:17:24consent agenda for your August 11th
1:17:27meeting uh to consider adoption of a
1:17:30resolution to endorse the locally
1:17:31preferred alternative before it's
1:17:32considered by the Campo board. So really
1:17:35today um we'll walk through what you see
1:17:39on the screen. Um this is just
1:17:42anformational item. There aren't any
1:17:44decisions at this juncture in the
1:17:46planning process where town council
1:17:48needs to step in and and provide
1:17:50feedback and make and make a decision on
1:17:52anything. Uh while no specific feedback
1:17:55is being requested, you are encouraged
1:17:57to ask questions to better understand
1:17:58the proposed project. And we're also
1:18:01happy to take feedback that will be
1:18:03helpful for informing next steps as this
1:18:06moves into project development once a
1:18:08project sponsor takes over and and takes
1:18:11us into that stage. Um so just wanted to
1:18:14mention that. And so we'll just get into
1:18:17the background planning uh context and
1:18:19and the town of Morsville participation
1:18:21and what has been done. so far and of
1:18:24course you'll hear a little bit more
1:18:25about more town of Morrisville
1:18:27participation in later in the
1:18:28presentation but to set the stage for
1:18:31what we are talking about when we refer
1:18:33to the western bus rapid transit
1:18:34extension we're talking about there's a
1:18:37core western bus rapid transit corridor
1:18:41that was originally laid out in the 2027
1:18:43wake transit plan that was adopted back
1:18:45in late 2015
1:18:47uh which runs between downtown Raleigh
1:18:49and downtown Kerry and you see the
1:18:52routing for that, the locally preferred
1:18:53alternative for that was adopted several
1:18:56years ago actually. And so what you're
1:18:58seeing on the map there in that location
1:19:00is the locally preferred alternative for
1:19:01that and it is currently under
1:19:02development and design well on its way.
1:19:05Uh and then we're talking about when we
1:19:08talk about the Western BRT extension,
1:19:09we're talking about from downtown Kerry
1:19:11to research Triangle Park. And the line
1:19:13that you see on the map there is the
1:19:15recommended lowly preferred alternative.
1:19:17But it's not locked in yet because the
1:19:19campo board has to take action on it to
1:19:21lock it in. But uh what you see there is
1:19:23is that um so why are we spending money
1:19:28on this? Uh why why this investment?
1:19:31Well, BRT is really mostly it's all
1:19:35about speed enhancing and reliability
1:19:37enhancing infrastructure.
1:19:39We already have transit service between
1:19:41RTP and downtown Kerry. Uh the one fixed
1:19:45route service which is route 310 which
1:19:47comes through Morrisville pretty much
1:19:48stays on the east side of Morrisville.
1:19:51Um but really the reason is is that BRT
1:19:54provides reliable transit service and it
1:19:56would provide more reliable transit
1:19:58service between Kerry and Research
1:20:00Triangle Park by implementing that speed
1:20:02enhancing and reliability enhancing
1:20:04infrastructure to bypass congestion
1:20:06points and facilitate faster transit
1:20:08service. that is more competitive and
1:20:10improves the rider experience. Um, it
1:20:13also would accommodate existing and
1:20:15continued growth of the corridor's
1:20:16travel market and provide a competitive
1:20:18alternative mode to driving. Um, as
1:20:22western Wake County continues to
1:20:24develop, densify, there's going to be
1:20:26more trips. There's going to be more
1:20:28congestion, particularly on some of the
1:20:30roadways that we have that are hard to
1:20:32expand capacity, as you know. Um, and
1:20:35so, uh, as as we as we continue to grow
1:20:39and develop, this will become more
1:20:40important. I also wanted to note that
1:20:43the concept of the bus rapid transit
1:20:45between Raleigh and and RTP through
1:20:47Morrisville has been assumed and
1:20:50included in the regional transportation
1:20:52plans going back to 2018. Um, it was
1:20:55first included in the 2045 Campo
1:20:58Metropolitan Transportation Plan and was
1:21:00subsequently included in the 2050 and
1:21:032055 plans. 2055 plan was just adopted
1:21:06recently. Um, it's been included in the
1:21:102030 and 2035 Wake Transit plans as
1:21:13well, uh, which were completed in 2021
1:21:15and 2025, respectively. It's in the
1:21:19North Carolina statewide transportation
1:21:21improvement program with with
1:21:23construction funding programmed in 2030
1:21:25and it's been in there for a while. It
1:21:27was actually awarded that funding
1:21:28through the spot process. I can't
1:21:30remember if it was spot five or six, but
1:21:32one of those. And it's I will say it is
1:21:35not included in the town's comprehensive
1:21:37transportation plan currently that of
1:21:39course was adopted back in 2019, but it
1:21:42will certainly be in the new one, the
1:21:44updated one that uh the council will
1:21:47consider later this fall and and heading
1:21:49into the early winter. So, just wanted
1:21:52to provide that background there on with
1:21:55some of the planning and then um really
1:21:59going back to the 2021 2022 time frame
1:22:01following up from that kind of planning
1:22:04work that I laid out in partnership with
1:22:05local government jurisdictions that the
1:22:07BRT concept would rever would traverse.
1:22:10Campo carried out a major investment
1:22:12study for the corridor that assessed the
1:22:14existing and future conditions of the
1:22:16study area which included looking at the
1:22:18travel market, land use plans and other
1:22:20factors, evaluated a whole lot of
1:22:23different potential segments that could
1:22:25be used for the alignment of the
1:22:28corridor uh to develop a locally
1:22:30preferred alternative and then collected
1:22:32a lot of public and stakeholder feedback
1:22:34at that time. And then moving following
1:22:36up from that the concept of operation
1:22:37study which kicked off last year uh was
1:22:41really meant to refine and refine a lot
1:22:43of the technical details of what the MIS
1:22:46produced. Um so looked at things like
1:22:49trying to match it up really well with
1:22:51the core BRT corridor and the service
1:22:53planning for that. So that's what route
1:22:55interlining is really getting at. uh
1:22:57identifying a project sponsor operator.
1:23:00Looking at the appropriate service
1:23:01levels for the travel market and then
1:23:03what kind of fleet is needed and then
1:23:05also looking at station requirements
1:23:08other infrastructure requirements that
1:23:10are needed for speed enhancing
1:23:11infrastructure and confirming confirming
1:23:13the alignment stations and technology.
1:23:15There wasn't any uh public engagement
1:23:18that happened with that because it was a
1:23:21very technical exercise. Okay. And there
1:23:23was a whole lot of public and
1:23:24stakeholder feedback that was provided
1:23:26in the last phase which was the MIS. Now
1:23:29following up from that it will be
1:23:30heading into following Campo's
1:23:33consideration of the LPA design and
1:23:35engineering for each station and other
1:23:37investments and each Q jump and if
1:23:40there's ever if there's going to be any
1:23:42bus lanes or bus on shoulder that's used
1:23:44of course it would identify that as well
1:23:46and if there's any rideway acquisition
1:23:48or easement acquisition needed it would
1:23:50identify that. Um the town of Morsville
1:23:52participated in all of this very
1:23:54closely. Um on the core the town of
1:23:57Morsville staff participation was on
1:23:58they participated on the core technical
1:24:00team for this study for the MIS
1:24:02participated in the core technical team
1:24:04for the concept of operation study and
1:24:05of course it provides a partial funding
1:24:07contribution for the study. But I do
1:24:09want to note for the design and
1:24:11engineering and moving forward there is
1:24:13no town financial contribution necessary
1:24:16for project design or implementation for
1:24:18this. This is a project that it's not
1:24:21completely funded yet, but it pro it
1:24:23will be. Um, it's there's a few pieces
1:24:26left with it. Uh, so the town's not on
1:24:30the hook for anything here financially,
1:24:31but if if there's a desire to do town
1:24:33betterments, which we will I don't want
1:24:35to go down that rabbit hole tonight.
1:24:36There will be plenty of times where we
1:24:38come back to you and talk about the
1:24:40project, then of course you a financial
1:24:43contribution can be provided to do that.
1:24:44Okay? Okay. And it's similar to what we
1:24:46would do for an NC dot project um in the
1:24:49town. So now I'm going to turn over to
1:24:51Ben. He's going to walk us through the
1:24:52rest of this um and really kind of pick
1:24:55up with a little bit more on the MIS and
1:24:57then take us through the BRT concept of
1:24:59operation study that was just completed.
1:25:01I'm going to hand this over to him.
1:25:05>> All right.
1:25:07>> Thank you.
1:25:11>> All right.
1:25:13So the major investment study uh that
1:25:15was done back in 2021 through 2023
1:25:18consisted of three phases. BRT education
1:25:21and development of the evaluation
1:25:23framework, development and analysis of
1:25:25alternatives for each corridor and then
1:25:27presentation of findings and initial
1:25:29locally preferred alternative
1:25:30recommendations. The MIS uh began around
1:25:33May 2021 was completed and presented to
1:25:36the Wake Transit Tack and Campo boards
1:25:38in March of 2023.
1:25:45The MIS first divided the western
1:25:47corridor extension into segments
1:25:49identifying alignment alternatives for
1:25:50each segment and ultimately the
1:25:52corridors narrowed down to the three
1:25:54alignments shown on the screen and these
1:25:56alignments were then evaluated against
1:25:58the four criteria that are shown on the
1:26:00screen.
1:26:04After the evaluation, the alignment
1:26:06alternative 2 was selected in the MIS
1:26:09utilizing NC54 and Evans McCreman.
1:26:17And now um getting into the BRT
1:26:20extension concept of operation study
1:26:22that we just recently completed.
1:26:25The concept of operation study recently
1:26:27completed confirmed the locally
1:26:28preferred alternative from the MIS and
1:26:30developed detailed operating capital and
1:26:32funding implementation plans for the
1:26:34extension corridor. The CONOP study also
1:26:37developed updated BRT program design
1:26:40guidelines based on the work previously
1:26:41completed by Raleigh for the core BRT
1:26:43corridors.
1:26:49As for the design guidelines, city of
1:26:52Raleigh published draft BRT system
1:26:54standards in September 2021, primarily
1:26:57for their use at the time in designing
1:26:59the four core BRT corridors, Newburn,
1:27:01Southern, Western, and Northern. The
1:27:04components included standards for
1:27:05dedicated lanes, transit signal
1:27:07priority, frequent on-time service,
1:27:09offboard fair collection, enhanced
1:27:11station, specialized vehicles, and
1:27:13unique branding. And the document also
1:27:15included detailed standards for green
1:27:17stormwater infrastructure based on
1:27:19Raleigh standards and practices at the
1:27:21time. And so from the time Raleigh
1:27:24drafted and published those guidelines
1:27:26until we worked on them through this
1:27:28conops, they were just used for those
1:27:31core BRT corridors. But when we were
1:27:34scoping the con concept of operation
1:27:36study, we realized that we needed to
1:27:38update those standards. Um and
1:27:40ultimately we transitioned them to
1:27:42guidelines that could be used for
1:27:44development of any future BRT in Wake
1:27:47County under Wake under the Wake Transit
1:27:49Plan.
1:27:54So the guidelines include two BRT
1:27:56service types, urban BRT and arterial
1:27:58BRT. Urban BRT operates in at least 50%
1:28:02dedicated guideway with peak frequencies
1:28:04of 10 minutes, closely matching the
1:28:06requirements for federal uh capital
1:28:08investment grant funds. An arterial BRT
1:28:11generally operates in mixed traffic with
1:28:13pre peak frequencies of 15 to 30
1:28:15minutes, but both service types may
1:28:18include unique branding, specialized
1:28:19buses, and utilize transit signal
1:28:21priority and Q jumps.
1:28:26As you can see, the recommended
1:28:28frequency for arterial BRT may be up to
1:28:31twice or actually half that of urban
1:28:33BRT, 15 to 30 minutes versus 10 minutes
1:28:36in the peak hours
1:28:45and stations are proposed to have
1:28:46similar standards although flexibility
1:28:48is built in based on the type of vehicle
1:28:50used and land use context of the area.
1:28:53And that's the other thing I want to
1:28:54bring up too with these guidelines is
1:28:56and that's one of the reasons we rea we
1:28:58renamed them to guidelines is that we
1:29:00wanted to build in flexibility to really
1:29:03um be able to address the land use
1:29:05context of the areas that these BRTs are
1:29:08going in.
1:29:11And you see here station elements. Um
1:29:13again after a lot of discussion we ended
1:29:16up keeping the um station elements the
1:29:19same for both styles of BRT with
1:29:22flexibility depending on the context of
1:29:24whether um some of these uh elements may
1:29:28or may not be cons may or may not be
1:29:30able to be constructed in certain um
1:29:32stations. But generally speaking all the
1:29:35BRT stations should have a shelter with
1:29:37seating, trash and recycling
1:29:38receptacles, bike racks and lighting.
1:29:41And then we have recommended station
1:29:42elements below.
1:29:47Urban BRT is expected to use specialized
1:29:5060-foot buses with boarding doors on
1:29:52both sides while arterial BRT may use
1:29:55either standard 40ft buses or the
1:29:57specialized 60ft buses. And um you
1:30:00cannot believe the amount of
1:30:01conversation we had over buses and the
1:30:03different types of buses and whether 40
1:30:05foot buses are available with doors on
1:30:07both sides or one side and whether 40
1:30:09foot buses can do level boarding or not.
1:30:11Um but this is what we settled on for
1:30:14the guidelines.
1:30:18And then the biggest difference here uh
1:30:20for the intersection guideway treatments
1:30:22is that urban BRT is expected to have at
1:30:24least 50% dedicated guideway or bus
1:30:27lanes while arterial BRT will likely be
1:30:29completely in mixed traffic. Although
1:30:32where possible we would love to see
1:30:34arterial BRT have bus lanes.
1:30:39And then finally with the branding
1:30:41guidelines, the guidelines clarify that
1:30:43use of the Go Plus branding is generally
1:30:45reserved for Raleigh but may be used by
1:30:47other operators in coordination with
1:30:49Raleigh.
1:30:51One final note too I'll make on the
1:30:53guidelines is we talked a lot about the
1:30:56green stormwater infrastructure chapter
1:30:58that was in the standards and we
1:31:00ultimately ended up um I can't remember
1:31:02if we kept the kept it in or not but we
1:31:05loosened and added a lot more
1:31:07flexibility to that because the original
1:31:10um requirements and standards that were
1:31:12in there were solely based on Raleigh um
1:31:15Raleigh standards and their practices
1:31:17and they have found out through design
1:31:19and and beginning construction of the
1:31:21newborn BRT that some of those green
1:31:23storm water um infrastructure just does
1:31:26not work well with BRT.
1:31:30So next I'll review the scenarios that
1:31:33we um evaluated. So we evaluated four
1:31:37scenarios for the Western BRT extension.
1:31:39Two scenarios operated by Go Raleigh and
1:31:42two scenarios operated by Go Triangle Go
1:31:44Carry. We also considered two additional
1:31:47scenarios but um eliminated them early
1:31:49on due to either very being very similar
1:31:52to the other four scenarios or um for
1:31:55example the skip stop service just was
1:31:57going to be very very difficult to um
1:32:00plan and implement.
1:32:06During the development scenarios we um
1:32:09talked about and and considered four
1:32:11different station types. the core BRT
1:32:14stations that'll be developed as part of
1:32:16the western BRT project, the transit
1:32:19facility which is the Kerry multimodal
1:32:21center. Um and then the and then we for
1:32:24the extension itself, we looked at
1:32:26opening day stations and future infill
1:32:28stations. And as you can see on this
1:32:30next slide, um the western extension
1:32:34through Morsville only has one future
1:32:35infill station identified at this time
1:32:37and that would be Perimeter Park. Um and
1:32:40that we identified that as a future
1:32:42infill really to because it's dependent
1:32:44on future development in the area and
1:32:46other transit connections within
1:32:47perimeter park. As we started talking
1:32:50about stations, we um came to realize
1:32:54that the perimeter park station which
1:32:55was plant which is identified and has
1:32:58been identified out on Chapel Hill Road
1:33:00only serves a very small portion of that
1:33:02area. Um and so we decided to designate
1:33:06as future infill and see if there's um
1:33:09can be developed a future need for it
1:33:11with more connections into the park.
1:33:14>> Yeah.
1:33:15>> The other thing to mention about that is
1:33:18perimeter park where that would be in
1:33:20and wake tech are very very close
1:33:22together. Um which really kind of
1:33:25defeats the guidelines of the spacing
1:33:28that you would want to have for BRT.
1:33:30Keep in mind, the more stops you have on
1:33:32BRT, the more you're slowing it down.
1:33:34And so, it's a really, really delicate
1:33:37uh balance between access and speed um
1:33:40that you have to maintain. And um
1:33:43they're so close together, it's kind of
1:33:45like, well, if there's if there's a lot
1:33:47of demand at Perimeter Park or whatever
1:33:50demands at Perimeter Park now, it could
1:33:52very easily access that at Wake Tech.
1:33:54But if those conditions change such that
1:33:56perimeter park on its own would warrant
1:33:59such a such a future infill station,
1:34:01then that could be done. The the amount
1:34:04of access that we have to provide would
1:34:06have to be pretty significant for that
1:34:09to be done though. So thank you. You're
1:34:13welcome.
1:34:16So next we'll get into the actual
1:34:18evaluation of the scenarios. So the
1:34:21first goal used to evaluate the
1:34:22scenarios was access to destinations.
1:34:25How long it would take to travel on the
1:34:26service from different destinations. And
1:34:29as you can see on the screen there, the
1:34:30two go Raleigh operated scenarios had
1:34:32the shortest travel time um primarily
1:34:35due to not having to transfer between
1:34:37buses.
1:34:39But as you can see, we looked at um both
1:34:42midpoint travel points and then the
1:34:44entire corridor and just the extension
1:34:46itself. And so um for anyone once this
1:34:50is in operation, if anyone wants to come
1:34:52from Clayton all the way up to RTP, it
1:34:54would take about 134 minutes on the bus.
1:35:01Next, we evaluated the scenarios on
1:35:03access to transit services, specifically
1:35:06looking at transfer and wait times for
1:35:07each scenario. The last two scenarios
1:35:10include a transfer time due to switching
1:35:12buses, while the two goaly operating
1:35:14scenarios have no transfer time.
1:35:20And the um I realize that there the
1:35:22legend wasn't isn't on these slides, but
1:35:25there is a um legend for the little
1:35:28arrow and circle symbols. It was on the
1:35:30previous slide, but um the up arrow and
1:35:33it's rel and we scored the scenarios
1:35:37relative to each other. So the up arrow
1:35:40means that a scenario is is considered a
1:35:42little bit better compared to the
1:35:44others. Circle means it's neutral
1:35:46compared to others and then down arrow
1:35:47means it's a lower um score than the
1:35:50others.
1:35:56Then we evaluated the scenarios against
1:35:58the goal of productive and sustainable
1:35:59service. We evaluated this using
1:36:01operating cost and capital costs per
1:36:03ride. This slide here shows the
1:36:05estimated operating cost per rider for
1:36:07each scenario based on the operator's
1:36:09operating cost per hour and the number
1:36:11of hours that the extension service
1:36:12would operate. And so as you can see
1:36:14there um the scenario one is a higher
1:36:19cost than scenario two primarily because
1:36:22it would be every single extend every
1:36:24single BRT bus would be continuing on so
1:36:27it's more hours whereas scenario two um
1:36:30is the lowest cost scenario and then
1:36:34scenario three is again higher cost
1:36:36because go triangle has a higher cost
1:36:39per hour and then scenario four is a
1:36:41little bit lower due to the fact that go
1:36:43carry has a lower cost per hour, but
1:36:45then you have to build in that they have
1:36:47additional buses. You they'd have to
1:36:49purchase additional buses and it would
1:36:51have a lower ridership.
1:36:56This slot shows capital cost per rider
1:36:58and the primary variable here is the
1:37:00cost of the buses both in number and
1:37:02type. So as you can see here, scenario
1:37:04one, go Raleigh would have to purchase
1:37:06additional 60ft buses which are more
1:37:08expensive.
1:37:10um in scenario one and two, scenario
1:37:12one, they would have to purchase um more
1:37:15than in scenario two. And then in
1:37:18scenarios three and four, both those
1:37:20agencies would have to purchase
1:37:21additional 40 foot buses.
1:37:26Finally, we also looked at qualitative
1:37:29operational concerns under this goal.
1:37:31location and capacity of operations and
1:37:33maintenance facilities, whether the
1:37:34vehicles could allow for level boarding
1:37:36or not, layover and turnaround
1:37:38challenges, and reliable reliability
1:37:40challenges.
1:37:43So um and as you can see here the the
1:37:47dead head distance of the nearest
1:37:48terminus um is the same for scenarios
1:37:52one and two because it's going back to
1:37:53go raleigh station whereas um in
1:37:56scenarios three and four it would have
1:37:57to go to either Kerry multimmoal center
1:38:00or up by RTP. Um and then the for this
1:38:05particular extension, the facility
1:38:07location was not as big of a
1:38:09determinant. Um on the southern
1:38:11extension, it was much bigger because it
1:38:13the southern extension is further away
1:38:15from all the bus operations maintenance
1:38:17facilities. And then um we'll I'll talk
1:38:20a little bit more about root length
1:38:22reliability in a later slide. But um as
1:38:25you can see with 60footers, we believe
1:38:27level boarding is possible and we'll
1:38:29certainly aim for that. With um
1:38:32scenarios three and four and utilizing
1:38:3340 foot buses, it's a lot more difficult
1:38:35for level boarding.
1:38:43Okay. Um the last goal used to evaluate
1:38:46the scenarios was safety and
1:38:47compatibility with surrounding
1:38:48environment. This was evaluated by
1:38:51looking at land use types and densities
1:38:53in the area in 2035 and 2055 and
1:38:56comparing that to the level land use
1:38:58density could support. So as you can see
1:39:00here in 2035 the density in this area
1:39:03would support 15 to 30 minute service
1:39:06and by 2055 we do believe that full 10
1:39:09to 15 minute BRT service could be
1:39:11supported. Um, and the that was one of
1:39:14the other considerations we had as we
1:39:16were reviewing and evaluating these
1:39:18scenarios is that with scenario two, it
1:39:22would be very easy to go from scenario
1:39:25two to scenario one where every bus
1:39:27serves the entire way from downtown
1:39:30Raleigh all the way out to RTP. Whereas,
1:39:32if we went with scenarios three or four,
1:39:34it would be a much more difficult um it
1:39:37would be much more difficult to do. And
1:39:39so we do fully believe that opening day
1:39:43we'll probably be operating at the at
1:39:45the 15 to 30 minute service, but we
1:39:47could you could see um the higher level
1:39:51true BRT service here within a few years
1:39:53after opening depending on wrership.
1:40:02There we go. Uh, in summary, scenario 2
1:40:06performed the best on all the evaluation
1:40:08criteria and goals as you can see on
1:40:10this screen.
1:40:14Um so speaking about the reliability
1:40:16trade-offs um we did look at that
1:40:19through the study and um we determined
1:40:22that scenario 2 was still the best
1:40:24option for for providing the most
1:40:25service and meeting goals of Wake
1:40:27Transit in this area, Wake County with
1:40:30the understand that understanding that
1:40:32with it being a longer route, it does um
1:40:35it does per it does open up some
1:40:37potential reliability concerns um such
1:40:40as if something happens to one the to a
1:40:42us as it's on the further end of the
1:40:44route towards RTP. Um but you know there
1:40:47are things that there are ways that they
1:40:49can um Raleigh as the project sponsor
1:40:52will be able to set up their operations
1:40:54to sort of hopefully plan plan for that
1:40:56and and avoid that um chance that risk
1:41:00as much as possible.
1:41:06The recommended service scenario um is
1:41:09again approximately 20 minute frequency
1:41:12during the weekday peak hours dropping
1:41:14to 30 to 40 minute frequencies and off
1:41:17peak hours and weekends. Similar span to
1:41:20the similar service span to the western
1:41:21BRT route. Um it may and it may open on
1:41:26opening day. It may um either start a
1:41:29little bit later or end a little bit
1:41:30earlier than the core BRT route, but
1:41:32it'll it's very similar in the total
1:41:34number of hours. And then the um
1:41:37extension will utilize transit signal
1:41:39priority and Q jumps to ensure
1:41:41reliability and travel time.
1:41:46So, as you can see on this map here,
1:41:49every other western BRT bus will
1:41:50continue western carried to serve the
1:41:52extension. And we do expect that that
1:41:54will likely replace go triangle 310. And
1:41:57the map above um shows the proposed
1:42:00station locations that have been
1:42:02identified through the MIS and the
1:42:03concept of operations study.
1:42:10Then this map shows the intersections
1:42:12where transit signal priority and Q
1:42:15jumps are recommended. All the
1:42:16signalized intersections are recommended
1:42:18to have transit signal priority and 18
1:42:21intersections are recommended to have Q
1:42:22jumps. As part of the concept operation
1:42:25study, when it came to Q jumps, we
1:42:28analyzed intersections um and
1:42:31recommended Q jumps to be constructed
1:42:32intersections that had supporting
1:42:34infrastructure such as um already wide
1:42:37paved shoulders on either side of the
1:42:39intersection where they could be
1:42:41constructed um at a lower cost and more
1:42:44quickly. So we we did actually go
1:42:46through an exercise through the study
1:42:48for each of the um intersections when
1:42:51we're looking at Q jumps to to determine
1:42:53whether it was a low cost Q jump, medium
1:42:56cost Q jump or high cost Q jump. And we
1:42:58are only recommending the Q jumps at um
1:43:01low or medium cost.
1:43:04>> That Q jump is where on either side of
1:43:08an intersection there will be an extra
1:43:09essentially an extra lane that allows
1:43:11the bus to pull. It would be a bus only
1:43:13lane. So it would allow them to pull
1:43:15beside traffic and then the light
1:43:17through transit signal priority would
1:43:18generally turn green a few seconds ahead
1:43:20of the rest of the traffic allowing them
1:43:22to pass all the traffic stopped at the
1:43:25light and get back into the regular flow
1:43:27of traffic.
1:43:34So as you can see on this slide annual
1:43:36operating costs of both the core and
1:43:37extension service altogether expected to
1:43:40be about $9.4 4 million and require a
1:43:43total of 14 60 ft articulated buses. The
1:43:46capital cost is estimated to be $62.1
1:43:49million. Um, but we did note that there
1:43:52are several bus and road infrastructure
1:43:54projects may affect the final design
1:43:57such as the triangle mobility hub that
1:43:59Go Triangle is currently working on, the
1:44:00downtown Kerry multimmoal center, and
1:44:03then the road construction around
1:44:04McCreman Parkway and NC54 with the
1:44:07overpass and the widening.
1:44:16my mouse doesn't like me. Um, so and
1:44:19service could be open as early as 2032,
1:44:21but that is dependent on um, as Brett
1:44:24said, you know, we have to fill a
1:44:26funding gap. And then we also um it's
1:44:28dependent on the go Raleigh staff
1:44:30availability on their BRT team and the
1:44:32progress on the western BRT because this
1:44:35extension will not o will not and should
1:44:37not open before the western BRT itself
1:44:40is open.
1:44:46And then um finally just a slide on
1:44:48coordination local investments. Um so
1:44:51again we're you know from the campo side
1:44:54from the wake transit program um we want
1:44:56to see Garner Clayton Carrie Morseville
1:44:58RTP prioritizing pedestrian biking
1:45:00connections to the future BRT stations
1:45:04um also ensuring the local transit
1:45:06services uh should be well coordinated
1:45:09and with the proposed BRT service and
1:45:11stations and then um you know potential
1:45:14for new local transit services that
1:45:16could expand the reach of the BRT in
1:45:18Clayton and Garner and in here in uh
1:45:21Morrisville around Perimeter Park. And
1:45:24then um we're, you know, we'll obviously
1:45:27be closely coordinating with Morrisville
1:45:29staff and Brett to track future projects
1:45:31and developments. Um transit oriented
1:45:34development planning for municipality
1:45:36should continue to take the plan. BRT
1:45:38stations into consideration. And then um
1:45:41we should continue to you know ensure
1:45:43that we coordinate and that that your
1:45:45staff coordinate with NC do on roadway
1:45:48projects and expansion.
1:45:56And then the locally preferred
1:45:58alternative
1:46:01um is shown here and it's um similar to
1:46:03the previous maps you've seen just
1:46:05without the stations. Um, but this is
1:46:08the locally preferred alternative map
1:46:09that will be considered by the Campo
1:46:11Executive Board in September. And again,
1:46:13while we've identified potential
1:46:14stations, the liquid preferred
1:46:16alternative action is only approving the
1:46:19mode BRT alignment and termin.
1:46:30The um locally preferred alternative or
1:46:33LPA adoption is required by Campo for
1:46:36regionally significant projects. And um
1:46:39we are as Brett said the you are
1:46:42expected to take action on an
1:46:44endorsement on um potential endorsement
1:46:47on August 11th. Campo will open a public
1:46:50comment period um on the LPA on August
1:46:5317th and that'll run through September
1:46:5515th. We'll have a TCC presentation
1:46:58consideration on September 3rd and the
1:47:00executive board public hearing and
1:47:02consideration on September 16th. And
1:47:04then following the adoption, um we will
1:47:07officially hand the reigns over to the
1:47:08city of Raleigh and they will become the
1:47:10project sponsor and we'll manage the
1:47:12future phases for design, engineering,
1:47:14and rightaway and construction.
1:47:19And then um just a couple notes on
1:47:21implementation. So, as Brett said, we
1:47:23have funding in the adopted step for
1:47:25hund00 million, but it's for the entire
1:47:27corridor from RTP to Clayton. We've
1:47:30identified about $20 million for this
1:47:32particular section. Wake Transit has
1:47:35programmed approximately $18 million as
1:47:38well. So, we currently have a capital
1:47:40funding gap of approximately $24
1:47:42million. Um the step funding is is going
1:47:46to be available as early as 2030,
1:47:48possibly even a little bit earlier. Um
1:47:50with Wake Transit funding available as
1:47:52early as FY27.
1:47:54Um sorry, ST funding available in 2030,
1:47:58wake trans funding available in FY27,
1:48:00but a lot of that is still dependent on
1:48:03the funding is there, but when the work
1:48:05starts is going to be dependent on the
1:48:06city of Raleigh. They're still working
1:48:08through the agreement process with NC
1:48:10DOT as well as staffing up their BRT
1:48:13team. Um, and then town involvement
1:48:16moving forward. Um, of course you'll
1:48:18have coordination with Raleigh on sign
1:48:19and sharing phases, provide input as
1:48:21necessary as station location design
1:48:24gets underway. Um, help manage manage
1:48:27any required permitting for stations or
1:48:29infrastructure. And then as we get
1:48:31closer to actually getting the service
1:48:32in operation, hopefully the town will
1:48:34help with marketing.
1:48:38And with that, I'm happy to answer any
1:48:40questions you may have.
1:48:46I have a mix of questions and comments.
1:48:50So, first of all, this very
1:48:52comprehensive scoring and analysis done.
1:48:55I would expect nothing less from you,
1:48:57Ben. So, um, appreciate that. With that
1:49:03said, um I am very disappointed that
1:49:06option three is not the selected or
1:49:09recommended option because I feel like
1:49:12just looking at the map with the way the
1:49:14option two is,
1:49:16it goes around Morrisville, it does not
1:49:20include any residential areas.
1:49:25perimeter park which was an office park
1:49:28intended um to have a lot of business
1:49:33areas is not planned to be activated day
1:49:37one. Um we have done a lot of work on
1:49:41along Mcrimman. So it's nice to see that
1:49:44there is some mcrimin activity with
1:49:47weight competition center. Um
1:49:50but
1:49:52it it seems like it's bringing people
1:49:55from out of Morrisville through to RTP
1:49:59instead of benefiting the Morrisville
1:50:01population. So although the
1:50:05recommendation is not option three,
1:50:07which I think would benefit the
1:50:09residents and businesses of Morrisville
1:50:11the most, we don't have to pay for
1:50:14something that might not benefit the
1:50:16town as much directly for its residents.
1:50:21Um I I think about access for people
1:50:26that live in Morrisville. A lot of
1:50:29traffic is from out of the area into the
1:50:33Morrisville and it will the bus rapid
1:50:37transit
1:50:39reduce that traffic.
1:50:42The analysis says possibly but for
1:50:46Morrisville residents, we will still
1:50:49have to get in a car at this point. Our
1:50:52Morrisville shuttle does not service the
1:50:55areas where the bus rapid transit stops
1:50:58are today. We also have an ondemand
1:51:02uh scenario. So someone wanting to take
1:51:05a routed bus may or may not be able to
1:51:10take that on a regular basis to go to
1:51:12work like to Raleigh because you might
1:51:16not be able to get the shuttle when you
1:51:18want to get the shuttle. So Morrisville
1:51:21has
1:51:23some discussion about what that shuttle
1:51:27needs to be because we need to get
1:51:30people
1:51:31up to this route somehow so they can
1:51:35take advantage of it because today they
1:51:36can't that we don't really have the
1:51:39stops that intersect. Maybe Park West
1:51:42Village is about the only one that I see
1:51:44on this list.
1:51:46It concerns me that
1:51:50Morrisville doesn't have more of a
1:51:54connection through our town instead of
1:51:56outside of the town. I I I know that you
1:51:59move buses more efficiently when you go
1:52:01around Morrisville because we do have a
1:52:03railroad,
1:52:04but our our residents need to access
1:52:09this and it's just going to be very
1:52:12cumbersome and the costs of, you know,
1:52:16Go Triangle and Go Carry. Why why are
1:52:21aren't Go Carry and Go Triangle talking
1:52:23more together to try to make this even
1:52:26more integrated? Because this is a
1:52:29really great concept with the bus rapid
1:52:32transit, but I see a lot of barriers
1:52:35with the different systems and the
1:52:38Morsville shuttle just adds icing on the
1:52:40cake to that. Um, I'd like to know more
1:52:44about park and ride lots.
1:52:48If we're going to have bus rapid transit
1:52:51and we don't have the buses coming
1:52:54through the town.
1:52:57We're going to use our cars to go park
1:53:01to get on a bus so we don't have to ride
1:53:03to downtown Raleigh. So, we need not
1:53:07just the shuttle coordinated, but we
1:53:09need park and ride lots and that's real
1:53:12estate that's very expensive.
1:53:14Um,
1:53:16so
1:53:18to summarize. I really prefer option
1:53:21three. Um
1:53:23the morsville shuttle needs to be re
1:53:26considered as to prioritization and
1:53:29where the stops are. I want perimeter
1:53:31park to have a stop if we can. Um,
1:53:35and I think that
1:53:40we need to really understand more about
1:53:44why we're not,
1:53:47you know, including more of Morrisville
1:53:49instead of just the outskirts. Thanks.
1:53:55>> If if I can, just a couple of notes on
1:53:58that. um one the um that alternative
1:54:03three alignment using Davis Drive was
1:54:05screened out in the initial MIS. So um
1:54:08that was a decision that was made four
1:54:10or five years ago for one. Um but with
1:54:13that said, the other thing I did want to
1:54:15say is that there is another BRT planned
1:54:19and identified for that Davis Drive
1:54:22corridor that would run from Apex all
1:54:24the way up to RTP along that Davis Drive
1:54:26corridor. and we do anticipate that to
1:54:29be um in a MIS and studied here probably
1:54:33in the next two to three years.
1:54:36>> That's that's helpful. Thank you.
1:54:37>> Yeah, just to add to that um that'll be
1:54:41the BRT on Davis though will be pretty
1:54:44long term.
1:54:45>> It will be past 2032.
1:54:47>> But the right now
1:54:50I guess I don't know the news and notes
1:54:52have gone out yet, but but right now the
1:54:54wake bus plan is being prepared, right?
1:54:56is being developed 2035 and that is
1:54:59looking at bus fixed route bus services
1:55:01throughout the county and concepts for
1:55:03new routes, route realignments, route
1:55:06redesigns and a couple of routes are in
1:55:09there uh that would traverse
1:55:11Morrisville. One is Davis Drive oriented
1:55:14route um from High House and um well
1:55:19pretty much Davis and High House on up
1:55:21to the regional transit center. Okay.
1:55:24And there's another one that would be
1:55:26more more east west oriented that would
1:55:28be from Park West Village and it would
1:55:30kind of zigzag up to Parkside Town
1:55:33Commons. So, um we don't have fixed
1:55:37route service on Davis Drive now,
1:55:40>> but we we we've been through that,
1:55:42right? We need it. We want it,
1:55:44>> right?
1:55:44>> We're I'm trying to rahrh that. Um and
1:55:48you really really need that before you
1:55:50can do BRT because it's really really
1:55:52hard to just be like, "Oh, yeah. we're
1:55:53just going to do BRT and you haven't
1:55:55done any seating of the market. You
1:55:56haven't done any evaluation of where
1:55:58people really want to get on and and
1:56:00where they're going and origins and
1:56:01destinations. So, we really need to get
1:56:03that fixed route service going first. Um
1:56:07and then it can build up from there to
1:56:08BRT. Um I'll also say with smart with
1:56:11the smart shuttle uh stops um we
1:56:15actually do have a lot of collocation
1:56:18already with of smart shuttle stops
1:56:20where these vert station locations are
1:56:23proposed.
1:56:25One that we don't is Walmart, you know,
1:56:28in Shiloh Glenn, which later in the
1:56:30summer into the early fall, you'll hear
1:56:32more about our new prioritization and
1:56:34and selection for our expansion. But,
1:56:37you know, Perimeter Park, Wake Tech, we
1:56:40have it um uh competition center, um
1:56:45Park West Village. So they're
1:56:47colllocated quite a bit, but I can
1:56:49pretty much assure you that
1:56:53when the BRT is built and it's
1:56:55operational, we are totally going to
1:56:57make a recommendation that we have nodes
1:57:00at those locations as well. There's no
1:57:01reason not to. I mean, why would you
1:57:03even part well so much of our writership
1:57:06now is is all about getting to other
1:57:10services, other fixed route services,
1:57:12right? whether it's go carry or go
1:57:13triangle that's that's not going to
1:57:15change uh with BRT it's actually going
1:57:17to become more important with BRT so
1:57:20just wanted to wanted to note that
1:57:22>> very good I appreciate the update about
1:57:25the Apex route because that could help
1:57:30balance out you know the Davis Drive
1:57:33avenue because eventually Davis Drive I
1:57:36believe is going to be six lanes but
1:57:37right now it's currently four
1:57:40so I I think that's like 2050. But
1:57:44[laughter]
1:57:44>> well, the CTP recommendation right now
1:57:48is six lanes, but the the sixth lane or
1:57:51the third lane on each side is a bus
1:57:53lane.
1:57:54>> Okay.
1:57:54>> Not a regular open to traffic lane.
1:57:56>> Well, that's helpful. Thank you. And one
1:57:59more thing I was just going to say, um,
1:58:02if it makes you feel any better, you're
1:58:03not, you know, Clayton also mentioned,
1:58:05you know, Clayton staff had brought up
1:58:06some of the similar concerns and what we
1:58:09told them and what we talked through is,
1:58:12you know, again, this is stepping back
1:58:13several years back to the MIS, but when
1:58:15the MIS was originally done for this
1:58:18project for both the extensions, the
1:58:21purpose really of this BRT was it was
1:58:24not to provide the local service. it was
1:58:27more to provide that that um regional
1:58:30trans regional travel shed regional
1:58:33travel market. So I I understand your
1:58:36concerns, but the purpose of this BRT
1:58:38extension really was not to provide loc
1:58:40a lot of local service in Morsville. It
1:58:42was it was really meant to be able to
1:58:43get people from downtown Kerry to RTP or
1:58:46from downtown Raleigh to RTP um and not
1:58:49necessarily make a lot of stops or serve
1:58:52a large portion of Morrisville. And so
1:58:54that that went into some that was went
1:58:56into why it was routed the way it was.
1:58:59>> Understood. Thank you.
1:59:07>> Okay, I'm up next. So I think I'm up
1:59:10next. Um, so I am going to echo
1:59:13everything Vicki just said. So, uh,
1:59:15Council Member Scrog and Johnson is 100%
1:59:18correct. Um,
1:59:20I'm sorry, Ben. I'm gonna I You're
1:59:23You're the messenger. I get it.
1:59:25[laughter] You too, Brett. You're the
1:59:26messenger. But I am deeply disappointed,
1:59:29too. And I will tell you what I'm really
1:59:32disappointed in more than anything
1:59:34because you were clear, Brett, at the
1:59:36beginning. You said there's no input
1:59:38here. You're not looking for input from
1:59:40this council. This is a here you are. Um
1:59:44and I also heard that um the campa board
1:59:47has to vote. I get that. But, you know,
1:59:50I we all know how that works. So, um I I
1:59:55guess what I'm really again echoing
1:59:57everything Vicki just said, um what I'm
2:00:00really disappointed in is that there is
2:00:03a resolution here that is asking for our
2:00:05endorsement. I can't endorse this. Um if
2:00:08there was if there was even some uh um
2:00:16um some residential aspect to this where
2:00:21our residents benefited to some degree.
2:00:25I I might be able to support a
2:00:27resolution of endorsement, but there's
2:00:30not. Um, and I I um
2:00:34I what I would prefer is we send a
2:00:37letter to say we can endorse this and
2:00:39here's the reasons why. Um, and come
2:00:41back in 20 or 30 years when you're ready
2:00:44for Davis Drive and maybe that future
2:00:46council will will endorse endorse the
2:00:48next um plan. But this one um I I can't
2:00:53do that. Um and um so this can't be on
2:00:57consent if we're even thinking about um
2:01:00endorsing in a resolution um because I
2:01:03will definitely be a no. And that pains
2:01:06me because I have been a huge um transit
2:01:09supporter here in Wake County and I have
2:01:12um I have been supportive of commuter
2:01:15rail and everything we've called it. I
2:01:17have been supportive of BRT, but there
2:01:19needs to be a benefit to our residents
2:01:21and there's not.
2:01:23And I understand. I hear everything
2:01:25you're saying, Ben. I hear you. But I'm
2:01:27representing the residents of
2:01:28Morrisville. And so, um, for me to tell
2:01:31them I endorse this when there's no
2:01:33benefit to them. And I agree. I I I I
2:01:36hear that there's no financial, um,
2:01:39there's no ask of us. Our residents are
2:01:43paying. Our residents are paying for all
2:01:46of this. Um, and yet they are not
2:01:48getting benefit. And so um you know
2:01:52there's not an additional ask right now
2:01:54but we are all paying. So um
2:01:58and yes we have these smart shuttle
2:02:01connections. I hear you Brett. Um we're
2:02:04going to overlap with these station
2:02:06locations but the reality is our
2:02:10residents are not going to take a
2:02:11shuttle bus to go over to Perimeter Park
2:02:14or Wake Tech or Mccrimin airport and
2:02:18then get on another bus. they're gonna
2:02:19get in their car and drive because it's
2:02:21going to be a heck of a lot faster. Same
2:02:23with Clayton. I mean, to think that
2:02:25somebody's going to take a bus from
2:02:26Clayton for two hours, two hours plus,
2:02:29they're going to get in their car.
2:02:31Although, I know they have different
2:02:32they have a different I know that that
2:02:35part of the county has um huge
2:02:37congestion compared to us. Um huge. And
2:02:40maybe that is quicker for them in the
2:02:42end. I don't know. But um so um I'm I'm
2:02:46disappointed. Again, I know you you're
2:02:49the bearer. You're you're you're you're
2:02:51the messenger. But um I've got to stand
2:02:54up for our residents, too, that are
2:02:56paying
2:02:58their their money. They're they're being
2:03:00taxed now, and that's the money that's
2:03:02being used to fund this project. So,
2:03:05>> I will defend Ben.
2:03:08He did not put together that resolution.
2:03:10>> Yeah, we're mad at that.
2:03:11>> I did. [laughter]
2:03:12I put it together. It is very customary
2:03:15for
2:03:17when a Metropolitan Planning
2:03:19Organization is going to take action on
2:03:22a locally preferred alternative for some
2:03:24signal of endorsement for that to be
2:03:27made by the governing bodies of the
2:03:28impacted jurisdictions. It happens all
2:03:31throughout the country. It's a
2:03:32riskmanagement technique. Um well, I
2:03:34don't know if I want to call it a
2:03:35technique, but it is part part of a risk
2:03:38management program. It's okay if you
2:03:41don't want to support it because that
2:03:44also sends a message. I mean supporting
2:03:47the the resolution or adopting the
2:03:49resolution of endorsement sends a
2:03:50message but also not doing that sends a
2:03:54message as well. So um you know that was
2:03:58that was me. I wrote it. I put it
2:04:00together. Um and it was my idea. Um it's
2:04:05very accustomed for that to have to
2:04:06happen though. Um
2:04:09but you know whatever your message is
2:04:11will be conveyed to
2:04:14camp
2:04:15TCC executive board. Um and that's we'll
2:04:20just take that forward.
2:04:21>> Thank you. Appreciate it.
2:04:27>> Can we go back to
2:04:29>> Can we go back to slide seven, please?
2:04:33>> Slide seven.
2:04:34>> Yes.
2:04:36way back.
2:04:37>> That was
2:04:39a click.
2:04:40>> Yeah, now the mouse works.
2:04:42>> It likes going backwards and I don't
2:04:43like going forwards.
2:04:45>> So, um
2:04:48I had actually I was looking at slide
2:04:51four. We don't have to go there, but I
2:04:53was looking at slide four and I was
2:04:54looking at the dots on the map.
2:04:56Actually, let's go to slide four.
2:05:00I was looking at slide four and I was
2:05:02seeing where um you know, all of these
2:05:04amenities were. uh the um parks,
2:05:08recreation, the shopping, grocery, the
2:05:10medical facility, EMS. And I do see uh
2:05:14kind of echoing uh council member Scott
2:05:16Johnson and council member uh Johnson
2:05:18here. Um and I looking at this map, I
2:05:22was thinking, man, it'd be really nice
2:05:24if uh we had the bus rapid transit along
2:05:26Davis Drive. And I thought of a route
2:05:31to go um we can go back to slide seven.
2:05:35Um, but I'm I I'm curious to see that uh
2:05:38this was not one of the options listed.
2:05:41Um, to go from NC54 to Morrisville
2:05:45Parkway to Davis to McCreman Parkway and
2:05:49then to NC54.
2:05:56>> I can look at
2:05:58>> Yeah. So, right.
2:06:02>> They're not entertaining that. That's
2:06:04the Yeah,
2:06:04>> they're not entertaining that
2:06:07>> way beyond that.
2:06:08>> What you see is what you get.
2:06:09>> Yes,
2:06:10>> this is a regional effort.
2:06:13>> There's a lot of other decisions and
2:06:15others that have contributed to this
2:06:16that have a vote,
2:06:18>> right? That contributed this. There's
2:06:19also technical data that has to be used
2:06:22to,
2:06:24you know, determine like that points to
2:06:26here's your travel market, here's your
2:06:27who you're serving and where you need to
2:06:29be. Um, I totally get all of these
2:06:32concerns, but nothing can change with
2:06:35with [clears throat] the the alignment.
2:06:36This is a decision that was made, I
2:06:39mean, shoot, back in 2022.
2:06:42>> Yeah.
2:06:42>> Um, and every and and part of the reason
2:06:45why transportation projects may not get
2:06:47done or they're they can be problematic
2:06:49is because there's a lot of, well, we
2:06:51want this or we decisions are made and
2:06:53then, oh, no, we want to go back. Oh,
2:06:55no, we want to go back. And that's
2:06:58that's a huge risk to projects and I
2:07:01don't think it's a risk that the powers
2:07:03that be at the regional level are
2:07:04willing to entertain.
2:07:05>> So what I'm curious about is what
2:07:07contributed to
2:07:11an alignment not along not from Davis
2:07:14Drive to NC54 along Mcrimman Parkway.
2:07:18Why was that not considered?
2:07:22So, we have the um all of the different
2:07:25alignments that were You didn't get that
2:07:27slide. We have all kinds of other slides
2:07:29here.
2:07:30>> I originally gave Brett a 86 slide
2:07:32presentation. He didn't think y'all
2:07:33would quite
2:07:34>> No, thank you. Thank [laughter] you.
2:07:37>> But there it looks like there is Yeah,
2:07:40that sort of
2:07:43that sort of alignment. At least there
2:07:45was a segment in here that did that
2:07:47>> where it came in from Morrisville and
2:07:49then it went along.
2:07:51multiple options.
2:07:53>> I mean, there's
2:07:53>> multiple
2:07:55>> all of these that were laid out. There
2:07:56was a phase one of all the potential
2:07:59segments and then they were phased out
2:08:02from there.
2:08:05[laughter]
2:08:06>> I um I I'm going to take a look at this.
2:08:08Um
2:08:10the little dash yellow lines on here
2:08:12were those options.
2:08:15>> That's my understanding.
2:08:17>> That's my understanding.
2:08:18>> Okay.
2:08:19Um, yeah,
2:08:20>> I was. Yeah,
2:08:22>> that was also four years [laughter] ago.
2:08:24>> Yes.
2:08:24>> Yeah.
2:08:25>> So, Ben and I actually traded places. I
2:08:27did the MIS and he did the I used to
2:08:29work at camp. He has my old job at camp.
2:08:31>> So,
2:08:32>> you guys did that.
2:08:34>> Brett started the MIS. I was
2:08:35representing I started representing
2:08:36Morsville on the MIS and I went to
2:08:38Clayton representing Clayton on the MIS
2:08:40and then Brett left Campo and the MIS
2:08:43got finished up and
2:08:45>> now we're here.
2:08:47history [laughter]
2:08:52>> for our residents.
2:08:54>> So, um
2:08:56it's a shame that we don't have it going
2:08:58up Davis Drive. Um I like hearing that
2:09:01there's going to be a a future bus rapid
2:09:04transit um from Apex to um RTP along
2:09:08Davis Drive. That's going to um take a
2:09:10while. But you did say that um you don't
2:09:13put bus rapid transit where you don't
2:09:15have fixed route service currently. You
2:09:18don't um add that on. So the question is
2:09:21what would it take to get fixed route up
2:09:23Davis Drive?
2:09:26>> Uh it would need to be included in the
2:09:282035 wake bus plan.
2:09:32Um that is underway right now. it
2:09:35actually there the first phase of public
2:09:37engagement is open right now until
2:09:39midepptember
2:09:41um
2:09:43in news and notes actually I put a whole
2:09:45blurb in there on it so you can look for
2:09:47that when that goes out I guess that
2:09:48goes out tomorrow where you you there's
2:09:51a survey you can go in and look at the
2:09:53different route concepts but there's
2:09:56there is a fixed route concept on Davis
2:09:58Drive from High House up to the regional
2:10:01transit center
2:10:03>> is it um kosher for us to um
2:10:12share that survey with our residents.
2:10:14>> Oh, absolutely.
2:10:16>> As as staff share.
2:10:18>> Yeah. I mean, we we're going to put it
2:10:20we're putting it in news and notes or if
2:10:21we put it in news and notes, we're
2:10:22putting it in next week in Morrisville.
2:10:24>> We're trying to get it out as well.
2:10:26>> Um
2:10:27>> we have printed materials coming to you,
2:10:30too.
2:10:30>> Yeah. Yeah. We want we want you to send
2:10:32it out to have get as much participation
2:10:35as possible.
2:10:37>> Um,
2:10:41and I know that this is a lot tied to
2:10:43land use and I'm sure that to get fixed
2:10:47route on Davis Drive sooner rather than
2:10:49later, it would have to have a higher
2:10:50density. So the oxymoron that I'm seeing
2:10:55here I'm thinking about is for there to
2:10:58be a benefit to our residents, can it be
2:11:01stated that Davis Drive would have to
2:11:03increase significantly in density
2:11:09>> for
2:11:11you mean to be right for BRT investment
2:11:13for a BRT like investment
2:11:16>> both BRT and fixed drop? I mean, my
2:11:20opinion is is right for fixed route
2:11:22investment today.
2:11:23>> Today,
2:11:24>> that's my opinion. It's been my opinion.
2:11:26Um, I think town of Kerry has the same
2:11:30opinion.
2:11:31Maybe even the town of Apex. I don't
2:11:33know. But, you know, we are dealing in
2:11:34an environment where there's only so
2:11:37many resources. Um, and it's a whole lot
2:11:40more resources than we had 10 years ago,
2:11:43right?
2:11:43transit tax. We're bringing in $160
2:11:46million a year, but there's still a lot
2:11:48of resources left to be able to program
2:11:51out a lot of improvements. But when
2:11:53you're with when you're dealing with a
2:11:54financially constrained environment, and
2:11:56Wake County right now particularly has a
2:11:58lot of big expensive projects that
2:12:00they're trying to get they're actually
2:12:01trying to get done within the next few
2:12:03years.
2:12:05You know, it eats away at that. Um but
2:12:08yeah, yeah, I think it's been ready for
2:12:11that.
2:12:13um
2:12:15what would be the effect of us saying no
2:12:20>> or we're saying you know we don't
2:12:22endorse the resolution.
2:12:26>> There's uh my opinion and I can let
2:12:28[laughter]
2:12:29Ben speak. I mean, I I certainly think
2:12:31it would send a message and there would
2:12:33be a desire to follow up on the why, but
2:12:37I also think and there would be there
2:12:40would be concern, but I also think
2:12:42following up on the why or why not for
2:12:46alternative three,
2:12:48that question, I think the thinking is
2:12:51that question's probably already been
2:12:52answered and there's a lot of good
2:12:56reasons for that.
2:12:58um mainly because again it's a regional
2:13:02it's a regional investment rather than a
2:13:04local investment
2:13:05>> right
2:13:09>> I don't know if you have anything to add
2:13:11>> the only thing I would say is at the end
2:13:13of the day the you know the LPA
2:13:15designations is a it is a job and duty
2:13:19of the NPO and um I think from the NPO
2:13:22standpoint we have to look at every the
2:13:25entirety of the you know corridor and
2:13:27not us how one municipality feels.
2:13:30>> Um, with that said, like Brett said, I
2:13:32think there would be a lot of concern.
2:13:34We would certainly be reaching out and,
2:13:36you know, want to find out more. But,
2:13:38um, you know, alternatives at this point
2:13:41are, you know, if the LPA doesn't get
2:13:43adopted, then the project stops.
2:13:47>> It'll get adopted. It won't matter.
2:13:50>> That's what that's what is so sad to me
2:13:52in all of this. It won't matter,
2:13:54>> right? It's about the vote. It's not
2:13:56about
2:13:58Um, I will have an additional additional
2:14:01comment later, I think, but I want to
2:14:03hear everybody else's first.
2:14:08>> So, I'll be short and sweet because I
2:14:11the vibe is you're not you're not
2:14:13seeking my opinion or my input. I I mean
2:14:16this in the in the nicest way possible.
2:14:18You're not. Right.
2:14:19>> Right.
2:14:20>> Okay. I agree with everything Liz said.
2:14:22I wouldn't vote for it either and I
2:14:23don't want it on the consent agenda and
2:14:28Yeah, looking forward to when you come
2:14:30back with good news about Davis Drive.
2:14:32It's always nice to see you though, Ben.
2:14:34[laughter]
2:14:35>> I will ask, can we can we put it on the
2:14:37agenda and if you're gonna if it's if
2:14:39it's going to get voted down, I'd rather
2:14:42that be a thing than not, right? Like
2:14:45give your opinion as a council on it,
2:14:48right? Like
2:14:49>> it should not be on consent.
2:14:50>> Yeah, but we can take Yeah, take it
2:14:51offent.
2:14:52>> Yeah, that's what I said. I don't want
2:14:53no consent.
2:14:56It should be on the agenda. Yes.
2:14:58>> So I I would agree with that. I think
2:15:00also you you could I mean you're
2:15:02discussing this in an open session
2:15:04tonight. Um this can you know Campo I
2:15:06assume might want to watch this at some
2:15:08point and hear this feedback. So I think
2:15:10you could you know either let it be on
2:15:13the agenda for further discussion
2:15:14although respect I think you're you're
2:15:16having that discussion now. I think you
2:15:18could also direct staff not to bring it
2:15:21back for consideration for endorsement.
2:15:23You can you can do either way.
2:15:26>> We are missing sorry we are missing one
2:15:29council member that might want to
2:15:31express. So that's the reason we
2:15:33>> possibly put it on August 11.
2:15:35>> Just options.
2:15:36>> I I appreciate that. Thank you.
2:15:49>> So if we said no.
2:15:52>> Thank you.
2:15:53So if we say no, what happens to the the
2:15:56plan staff that you have on this page 23
2:16:01which says point of station locations?
2:16:03So basically it stops.
2:16:05>> No,
2:16:06>> no, it'll go forward.
2:16:08>> It'll go forward anyway.
2:16:09>> That's the reality. That's the reality.
2:16:12>> Okay.
2:16:13I will say I mean unless you know if
2:16:16Mayor Collie is your executive board
2:16:18member brings up the concern and the
2:16:21rest of the executive board agrees that
2:16:23you know with and wants to support
2:16:27Morrisville's concerns, the executive
2:16:29board could decide not to adopt the LPA.
2:16:31So I would I would not say it's not
2:16:33necessar it's necessarily definitively
2:16:36going to be passed but um I mean we have
2:16:39had the we have had it happen in the
2:16:42past on different things um I think you
2:16:44know years ago with 540 and the around
2:16:47Garner you know the executive board
2:16:50stopped that in its tracks for a little
2:16:51while um because Garner had serious
2:16:54concerns so it's it's not a it's not a
2:16:57for sure thing if if the if Morrisville
2:17:01represent presresentatives on the TCC
2:17:02and executive board bring up the
2:17:03concerns that the executive board will
2:17:06still, you know, just still vote in
2:17:09favor of it.
2:17:10>> Thank you, Ben. Thank you. I
2:17:12>> mean, so I agree with my colleagues
2:17:14concerns, but even if we have a route
2:17:18through Davis Drive, uh we're still
2:17:21going to have two two of the three
2:17:23largest neighborhoods in Morrisville,
2:17:25Pride Space and Kids Creek are on Church
2:17:27Street.
2:17:29Whether the stops are on Davis Drive or
2:17:32Chapel Hill, it won't make much of a
2:17:34difference to to those residents.
2:17:36They're still going to drive. Doesn't
2:17:38matter where the stops are.
2:17:41So, I mean that's is coming. So uh uh if
2:17:45they even if we I don't think that's
2:17:48going to happen but even if there is an
2:17:50agreement to add daily route to the
2:17:53route we're still not going to satisfy
2:17:57most of majority of the residents.
2:18:05>> Um oh grab this one. Um I just wanted to
2:18:09make a a quick comment. I think one of
2:18:11the reasons why um scenarios one and two
2:18:16um were looked at closely originally was
2:18:18because of the to site um and when you
2:18:21look at um other plans um that is
2:18:25designated as a transit hub um and
2:18:28station. So just want to know the
2:18:30correlation there
2:18:33and that future stop.
2:18:39>> I will also say you know there's a whole
2:18:41lot of different things that can happen
2:18:42if you say no um and how far it's taken.
2:18:46Um, I do think one risk that you run is
2:18:51Campo does take very seriously when a
2:18:54the governing body of a municipality
2:18:55that's impacted by such an invest in
2:18:57investment is not in favor of it. But I
2:19:02also think they may look at it as are
2:19:04you not in favor of the investment or do
2:19:06you just want it somewhere else and is
2:19:09this and between not having the
2:19:10investment and having the investment
2:19:12would you still support it? I think
2:19:15that's what you might want to think
2:19:17about because it the money that's
2:19:21allocated for this could totally be
2:19:22taken and put somewhere else
2:19:24>> right on other on other corridors that
2:19:27are part of that bigger alignment all
2:19:29the way from RTP to Clayton. So one of
2:19:32the risks that you could run is you just
2:19:34don't get anything anywhere.
2:19:37So I'd be care I would be careful with
2:19:39that.
2:19:39>> Thank you.
2:19:40>> That's what I was going that at least we
2:19:41have something right now. So,
2:19:48>> is it my turn?
2:19:50>> Let me just add one more comment that I
2:19:53I lived in Philadelphia when I went to
2:19:57college and I used to take bus and
2:19:59subway and train and even in cities like
2:20:02Philadelphia, I had to walk or I didn't
2:20:07have cars, so I had to walk mile to get
2:20:10to the bus stop. So, this is not unique
2:20:12problem to just us right you the public
2:20:17transportation is not going to be able
2:20:19to serve every resident
2:20:25>> if I can real quick just to echo
2:20:27Michelle's comment and you know again
2:20:30we're looking back in time to 2021 2022
2:20:332023 but that was you know that was a
2:20:37big reason why um the alternatives one
2:20:40and two and and alternative two was
2:20:41chosen
2:20:42was because of the TOD planning that
2:20:45Morrisville had. You know, Morsville has
2:20:48been planning for that to for since
2:20:52Yeah. 2010, 2008. So, um, you know, that
2:20:56was a big, you know, that was a big
2:20:58reason why I I do believe that that
2:21:01Michelle's right that that's probably
2:21:02one of the big reasons why that
2:21:04alternative three did get screened out
2:21:06is that it did not service this large
2:21:08TOD. And for a long time that the
2:21:11thought, you know, when we had commuter
2:21:12rail, there was going to be a large
2:21:14commuter rail lot, a parking lot there
2:21:16and and it was going to have a lot of
2:21:18synergy. The commuter rail may not be
2:21:20here now, but there's still
2:21:21opportunities to really have some some
2:21:24substantial to development if you can
2:21:26say that you you have you have BRT
2:21:28service there. So, just something to
2:21:30think about. I also think if you go back
2:21:32to when we talked about the alternative
2:21:34transit study and I talked about the
2:21:35circuitous of route the circuitousness
2:21:37of certain routing and how you lose
2:21:40ridership because it's no longer
2:21:42competitive there's no you know travel
2:21:43time takes them long that's also if I'm
2:21:45remembering back to the MIS that was
2:21:47also a concern with that Davis drive
2:21:49alignment because you're going the the
2:21:51travel market is really between RTP and
2:21:54Kerry or RTP and Raleigh and you're kind
2:21:55of going way out here and then up here
2:21:58you know a little bit particularly for
2:22:01something that's a BRT investment that's
2:22:03supposed to have really really sharp
2:22:05directness of travel. Otherwise, you're
2:22:07defeating the purpose of BRT in some
2:22:09regards.
2:22:10>> Express.
2:22:10>> Yes. So, that's part of it, too.
2:22:16>> Go up 54. That would be
2:22:19bigger a better express.
2:22:24So, and that's a great caveat or um
2:22:28segue because 54 is two lanes and that's
2:22:32not an express in any case.
2:22:33>> It's already part of it's already two
2:22:35lanes.
2:22:36>> Exactly. This alternative already does
2:22:38two lanes on 54.
2:22:40>> Right. So, we're kind of skipping that
2:22:41chunk in the middle to essentially
2:22:43create the frequency and the speed that
2:22:47brings you from one place to the other.
2:22:49So if you look at it going over to Evans
2:22:52and up Crimin it's kind of like just the
2:22:54mirror of Davis but Mccrim extension
2:22:59what we paid for is actually got a bus
2:23:01lane there now it's rare that there's so
2:23:04much traffic that you wouldn't have a
2:23:06dedicated bus lane there Davis will
2:23:08never be that case until we actually
2:23:09have six lanes on Davis. So the future
2:23:13when that is when those two bus lanes
2:23:15are there then that's the correct time
2:23:17to do that because this is a
2:23:20pointto-point this is really Raleigh to
2:23:22carry to RTP this isn't designed
2:23:25necessarily to be a local for our
2:23:28residents this is designed to take those
2:23:32other cars off our roads. So that is the
2:23:36benefit because we were all around well
2:23:38we were around when Mark Stman was our
2:23:40representative to the way county transit
2:23:42plan and the big thing about that plan
2:23:45is that even if people aren't on the
2:23:47buses they benefit because some people
2:23:50are on the buses so we're taking the
2:23:52cars off the roads so the main benefit
2:23:54for us is getting those non Morrisville
2:23:57residents and commuters off our roads so
2:24:01I understand your
2:24:03everyone's opinion actually that this
2:24:05doesn't really benefit us directly and
2:24:09it might not benefit me but it does
2:24:12benefit me in so far as I can get to
2:24:14where I want to go in Morrisville in a
2:24:16car faster because I don't have everyone
2:24:18else clogging our roads which are
2:24:22everyone's roads. So in that way it this
2:24:24is a regional solution and it's not
2:24:27ideal in some ways but the fact that we
2:24:30built Mcrimman extension makes that the
2:24:35BRT's
2:24:37dream because there are essentially
2:24:40dedicated bus lanes so people get
2:24:41through there faster. If they're going
2:24:42to go up 54 that's really slow. Davis
2:24:46probably nearly as slow um because it at
2:24:49least has two lanes so we could do
2:24:50something there. maybe some jump lanes,
2:24:52but I just want to say that I hear
2:24:55everything you said. Um,
2:24:58but looking at the regional lens,
2:25:01this will help us. Um, and it is our tax
2:25:04dollars, the way county transit plan,
2:25:06this is our money, and it it helps, but
2:25:09just not as directly as we would all
2:25:11like. So, I will vote whichever way you
2:25:14all want. I think writing a letter would
2:25:17be good, whatever you want. I think we
2:25:19should definitely think about writing a
2:25:21letter about the Davis Drive fixed route
2:25:24because that's a shorter term solution
2:25:25that helps us and gets us that BRT
2:25:28later. Um, but you guys all make great
2:25:31points and I just want to share the
2:25:33perspective from long-term regional
2:25:35planning. Um,
2:25:39from be even before when I was on the
2:25:40campo board.
2:25:43I think we'll Michelle Steel, our
2:25:46planning director.
2:25:48Thank you. I It's not like we're
2:25:49bringing this back. Um, it will likely
2:25:52be voted down. Um, but I did want to
2:25:55encourage,
2:25:57you know, we've been talking about this
2:25:58as being a regional system. It's not
2:26:00necessarily designed for computers. Um,
2:26:04but they will be a large user of this
2:26:07type of system. So, it's also designed
2:26:09around large employment centers and
2:26:11mccrimin is going to be a large
2:26:14employment center for Morsville. So by
2:26:17coming down your prim, you're going to
2:26:19be hitting a lot of the new industries
2:26:21that are being constructed in that area,
2:26:23which will provide more opportunities
2:26:26for people live that live in other
2:26:27communities to commute and transfer in
2:26:30and get to those jobs quickly. And then
2:26:32again, right after that, you're getting
2:26:34um the TOD before you head up and make a
2:26:36turn and start heading towards arts and
2:26:38beaches. So just wanted to keep that
2:26:40commuter um component in mind as well
2:26:42given that this is more of a regional um
2:26:46system.
2:26:54I I just want one comment that you know
2:26:58if you really think about the
2:27:03the big city transit system, we are a
2:27:06suburb of Raleigh and if you go to any
2:27:10metropolitan city and suburban areas
2:27:15probably people travel at least as much
2:27:17as we would end up traveling if we
2:27:20If we voted yes for this for that reason
2:27:24I'll probably vote yes
2:27:27>> quite understand
2:27:30>> so if you compare uh this transit plan
2:27:33to any metropolitan
2:27:36cities uh transit system
2:27:40uh suburban areas of big cities
2:27:44uh they have similar issue people living
2:27:46in suburbs don't have direct access
2:27:50buses and the transportation centers
2:27:53they have to drive right and doesn't
2:27:56matter.
2:28:02>> Oh, I was at the end I was gonna mention
2:28:06a letter the letter about the Davis
2:28:10Drive fixed route and ultimate
2:28:13condition of BRT. um if if I should do
2:28:17something with that, but there's more
2:28:19comments to be made. So,
2:28:22>> yes. Um
2:28:27I think one of the downsides of Davis
2:28:29Drive fixed route, especially if it's
2:28:31going RGP to um Apex, is that it
2:28:34wouldn't go to Raleigh. Don't know
2:28:36necessarily what you do about that. um
2:28:38be nice if it did,
2:28:41but uh I like the idea of a letter,
2:28:43writing a letter. Um I also wanted to
2:28:47echo Mayor TJ's comment about less
2:28:50people on the road as well as the
2:28:52benefit to um not only some current
2:28:55residents that are living um along this
2:28:58route um uh but also the future
2:29:00residents that we could get um you know
2:29:03with the other uh multif family that is
2:29:06developing in that area. Um, and I think
2:29:09it makes um, echoing Mayor TJ's comment
2:29:13um, even louder. What I'll wrap up with.
2:29:17Um, so I'm I'm I'm a strong yes. Um,
2:29:24just I'm a strong yes because I think we
2:29:26need it and you know, I know it's not
2:29:29ideal for us. um uh 100% ideal for us,
2:29:34but you know, I think that's us voting
2:29:35on everything where there's not
2:29:38agreement, right? Um but I think it's a
2:29:42it's a good regional um regional thing.
2:29:45And I was trying to think of an analogy
2:29:49for what I'm about to say. I've not come
2:29:51up with a good one, but I think of this
2:29:54is a land use issue. you know, we have
2:29:57land use that is a little bit hard to to
2:30:00to manage. Um, some of that um certainly
2:30:05is from uh
2:30:08development that has happened to the
2:30:10town um but also some maybe some
2:30:13decisions that have been made in um in
2:30:18the past. Um, and so I feel that uh kind
2:30:22of like a a child sticking their finger
2:30:25on a cactus or something uh similar to
2:30:29that. It's like, ow. Like, well, don't
2:30:32do that. Um, like I said, it wasn't a
2:30:35good analogy. But are there land use
2:30:37decisions that we're making in
2:30:39Morrisville that
2:30:42have been in the past that doesn't make
2:30:44the Davis Drive feasible? That wouldn't
2:30:46have made the Davis Davis Drive that
2:30:48that doesn't make the DAS drive
2:30:50feasible. Now, were there land use
2:30:51decisions that could have been made
2:30:54along um along the way such as um you
2:30:57know what I know that most residents
2:31:00don't like apartments and density and
2:31:02whatnot, but if you had that in the
2:31:06along Davis Drive,
2:31:09would we have the fixed route serving
2:31:11along that? And that's one of the
2:31:13downsides or that's that's the
2:31:15trade-off, right? if you want to have
2:31:17this type of um transportation, this
2:31:19type of mobility, then having some of
2:31:22that additional density in that area,
2:31:23which ideally came with commercial
2:31:25activity as well. Um so that's kind of
2:31:29the the the message of sending the no
2:31:31vote, I feel, is
2:31:35it's like no, we don't like it. It's
2:31:38like, okay, well, you've um this is how
2:31:42you've built Morrisville, and so this is
2:31:45the only option that makes sense for
2:31:47Morrisville.
2:31:49That's my um thinking
2:31:53at the moment.
2:31:58So is it accurate that if we had more a
2:32:03higher intensity on DT drive we would
2:32:05have had better chances of getting that
2:32:08route.
2:32:10So, so maybe yes because what um
2:32:14whenever the bus planning
2:32:18started after the weight transit plan
2:32:19was adopted, the first thing that we
2:32:22jumped to was a market analysis of where
2:32:25do we have a need here? What's where
2:32:28what travel markets are out there that
2:32:29need to be served? So, it's possible.
2:32:31Yes. And back then, Davis Drive has
2:32:33exploded since then. I mean, it really
2:32:35has. If you go 10 years ago, Davis Drive
2:32:37looks very different now. Um, so yeah, I
2:32:40mean based on market analysis back then
2:32:42that could have contributed to that. Um,
2:32:46and maybe having higher density land
2:32:48uses which would be higher sugar
2:32:51generating um, origins and destinations
2:32:54would have would have would have changed
2:32:57that. But
2:33:00there's another factor out there which
2:33:02has been affected for the past several
2:33:04years which is Raleigh first. Okay. And
2:33:08I'm not complaining. That's every the
2:33:12you know, every major city that has a a
2:33:15large transit system or transit network.
2:33:18The the real
2:33:20need is in the higher density areas in
2:33:23the core of the the central city. Okay.
2:33:26So Raleigh first was a big part of, you
2:33:29know, coming out of the way transit
2:33:30planning with bus planning and
2:33:31allocating resources. Um, but Raleigh's
2:33:34pretty they're in really good shape now
2:33:37in terms of being they I mean I know
2:33:39there's some more things that they need
2:33:40to do, but they're pretty built out with
2:33:42their fixed route transit system and
2:33:44it's doing really really well. Um, and
2:33:47so now it's kind of like well what else
2:33:49is there out in the suburban areas that
2:33:52is right for this type of investment? So
2:33:55I think some of it's been Raleigh first
2:33:57and some of it's just been
2:33:59the the market data has not registered
2:34:03yet because 10 years ago when bus
2:34:06planning first started with the weight
2:34:08transit plan it was very different but
2:34:10now we know that it is and one of the
2:34:12arguments that I've made Ben's heard it
2:34:16with the weight with the wake bus plan
2:34:17is there's only one route and well it's
2:34:23only just come back on NC55 that serves
2:34:27western a north south pattern in western
2:34:29Wake County which is route 311 and it's
2:34:32it's oriented on to NC55 because it it's
2:34:36more of an express type of service. It's
2:34:38a go triangle route. Um
2:34:41and the fact that Davis Drive doesn't
2:34:43have anything but NC55 does kills me.
2:34:48[laughter]
2:34:48It really does. It kills me. It's like
2:34:50what? But part of that's because Davis
2:34:53Drive is slower. It comes down to it
2:34:56comes down to actually run cutting for
2:34:57the service with buses. It's slower. So
2:35:00it takes more buses which takes more
2:35:02investment and and you know it's more
2:35:04expensive to run. NC55 is a lot faster
2:35:08and you can spread out the access points
2:35:10more um on NC55. So that's a little bit
2:35:14of
2:35:16>> but the comparison to like Davy's drive
2:35:19route versus the current route. Um
2:35:24does this route have higher density than
2:35:25Davy's drive?
2:35:28>> But I'm sorry
2:35:30>> the the current proposed route does it
2:35:32have higher density than Davis Drive?
2:35:34>> No,
2:35:35>> it does. So, so that's why I asked the
2:35:37question that if if the if we had higher
2:35:40density in Davies drive it would it make
2:35:43a difference because it it looks like
2:35:45it's
2:35:45>> not for the BRT. Probably not
2:35:47>> for BRT. It's not
2:35:48>> not for the BRT.
2:35:49>> Could Could you suggest that discussions
2:35:51of what might or might not make a
2:35:52difference on Davis Drive? I we're
2:35:55really wandering from the point. I I I
2:35:58really want to just get us back on task,
2:36:01which is the current proposal and
2:36:04whether or not we support it. And can I
2:36:06suggest that we table other discussions
2:36:09for other meetings when they're more
2:36:11relevant?
2:36:11>> I mean, we're discussing so I'm just
2:36:13adding my comment. I Yes, everybody
2:36:15wants to get done early. I actually have
2:36:17to go to work after this. So, we can
2:36:19stop. Thank you.
2:36:22So I just have a but to that point it's
2:36:25the density of commercial development
2:36:27that is ideal for why this loops the way
2:36:31it does. So it it does to Michelle's
2:36:34point to everyone's point the route
2:36:38serves as a destination but it still is
2:36:41not benefiting our residents. So I am
2:36:44still a hard no in this resolution if
2:36:46we're going to vote on a resolution.
2:36:48That's why I brought up the option. I
2:36:50would much prefer not to vote on a
2:36:52resolution. I would much prefer to put
2:36:55our thoughts in a letter and send a
2:36:57letter explaining
2:36:59how we feel. And um but that that that's
2:37:03me. Um and then let just one thing and I
2:37:08I hear this idea that it will take cars
2:37:11off the road. I've used that argument
2:37:13before myself, but I'm looking at your
2:37:15slide 25 where we talk about the time
2:37:19it's going to take to get from one
2:37:21location to another. And again, I'm a
2:37:24pragmatic. I I like to be pragmatic. I'm
2:37:27I I I'm a realist. Um the reality is it
2:37:31is still going to be faster to drive
2:37:33your car to get where you want to go.
2:37:37the only those that like Harrison that
2:37:40are truly invested are going to take
2:37:42more than an hour to take a bus or those
2:37:46that don't have a vehicle are going to
2:37:48take a bus for an hour. Everyone else is
2:37:50going to get in their car. So,
2:37:53and again, I I would prefer that we we
2:37:56send a letter quite frankly with our
2:37:58thoughts, but that again is only me.
2:38:04>> That's me too.
2:38:07I like the letter idea.
2:38:14>> I'm in favor of the letter and voting.
2:38:16Yes.
2:38:18>> So, let me ask this. Um,
2:38:20>> can I just say one thing?
2:38:22>> Oh, sure. If
2:38:23>> we could um have staff take a look back
2:38:25at our discussions in 2021 and 22. um
2:38:28because we we looked at these routes
2:38:31alto together and I think we ended up
2:38:34with the mcrimman we chose it as a
2:38:38group. Um so it's kind of make the an
2:38:42analogy I would use is there's a lot of
2:38:44people that don't like airport boulevard
2:38:45now but we're going forward with it for
2:38:48lots of different reasons. Um this is
2:38:51similar in that way. we made decisions
2:38:52back then as you mentioned if you change
2:38:54routes you lose funding you lose
2:38:56credibility as a planning body so I
2:39:00think that would help us to sort of
2:39:01understand that we as a group back then
2:39:05did that if we did I think we did but
2:39:07I'd love for staff to sort of dig in on
2:39:10that a little bit
2:39:11>> thank you sir
2:39:12>> yeah I can one of the biggest risks with
2:39:15this project is the LPA could have been
2:39:19adopted right after the MIS but it
2:39:21wasn't
2:39:22And so a certain amount of time since
2:39:232022 has gone by, councils turn over,
2:39:27things conditions change, we find out
2:39:30more about the commuter rail not going
2:39:31to move forward. Um and and how
2:39:35essential that might be for co-location
2:39:36with the BRT. Um and this is what sort
2:39:41of what can happen, right? Like opinions
2:39:43change on alignment or where where
2:39:46investment should be. So yeah, I mean I
2:39:48would have preferred for [laughter] for
2:39:50the LPA to have been done in 2022 if
2:39:53that was the signal from council at the
2:39:54time uh because then you would have that
2:39:57would have been a better riskmanagement
2:40:00strategy I think regionally to get local
2:40:03governments on board if they were
2:40:05certainly if they were on board then.
2:40:07But I wanted to ask
2:40:10for the resolution. So there is no
2:40:13language in this resolution about um
2:40:17anything that has to do with other
2:40:19alignments and opinions on other
2:40:21alignments
2:40:23that could be added. So let me I was
2:40:25going to here's where I'm really going
2:40:26with this. Would you adopt the
2:40:30resolution if there was language added
2:40:33to it that expressed
2:40:38this dissatisfaction
2:40:41for the alignment that is being
2:40:43considered over the other one the the
2:40:46the Davis Drive one but it said
2:40:50something to the effect of understanding
2:40:52the regional
2:40:54um market and purpose and need for this
2:40:58project being on the alignment that it
2:41:01is
2:41:03fine. We endorse that. Some of it is
2:41:06like how are you what are you
2:41:08communicating in the language of the
2:41:10endorse of the resolution that could
2:41:13potentially be a fixed or if you'd
2:41:15rather go with a letter that's fine too.
2:41:17I'm just saying there resolutions can
2:41:20say whatever they you want them to say.
2:41:23Um, but I'm trying to still maybe and I
2:41:26want, you know, council should do what
2:41:28the council feels is best, but I'm I'm
2:41:30sort of trying to point you in the
2:41:31direction of are you willing to have
2:41:34this or nothing at all? Like if it was a
2:41:37choice between this or nothing at all,
2:41:38what would your what would your choice
2:41:41be?
2:41:48>> My turn.
2:41:52We can go. That's fine.
2:41:54>> So,
2:41:56I think we want to be clear first. Is
2:41:58there any timeline on this letter of
2:42:01endorsement?
2:42:03>> Yeah. So, if you want it to be
2:42:05considered before the vote, the campaign
2:42:07executive board will be voting on
2:42:09September, I think it's 16th.
2:42:12>> Okay. So, we've got a little time if we
2:42:14need to. So I also want to clarify
2:42:17you're asking for some summary
2:42:18information from you know five and six
2:42:21years ago. Do you want that before a
2:42:24decision is made or do you want that
2:42:25just as information for council?
2:42:31>> I guess information for council before
2:42:33we vote or something. I'm not sure. I
2:42:36think it might help inform people um
2:42:41about why it was then
2:42:44there's some differences now, but I'm
2:42:47just going with the analogy of Airport
2:42:49Boulevard. Well, I I think I understand
2:42:52what you're saying about, you know, what
2:42:54was the scenario since I was on the
2:42:56council in 2022, but it's also relevant
2:43:01that certain things have changed since
2:43:032022, like we lost the the rail stuff.
2:43:07We, you know, the delay of mccrimin
2:43:11flyover. I mean there's just you know a
2:43:13few big milestone things that have
2:43:16happened to the ecosystem of the
2:43:18Morrisville
2:43:20um transit you know road projects and so
2:43:22forth. So it'd be great to have the 2022
2:43:25but also I'd like to know what has
2:43:28happened majorly to maybe influence our
2:43:31current situation
2:43:35>> because as was mentioned we do have some
2:43:36time now till September. So, I'm not
2:43:39sure how much we want to keep digging in
2:43:40on this to council member's member
2:43:44body's point.
2:43:45>> Well, I don't think it's a good idea.
2:43:47So, August 11th is just not going to
2:43:51work. [laughter]
2:43:52>> No, that's that's why I was asking about
2:43:54the timeline and the others. So, I think
2:43:57>> because and I'll I'll sidestep a little
2:44:00bit um in terms of the resolution. I
2:44:03think the resolution if you adopt it to
2:44:05endorse, you're endorsing. I mean, you
2:44:08could have other language in it, but
2:44:10you're still endorsing the plan. So, I
2:44:12think there needs to be a clear decision
2:44:13around whether that's what you intend to
2:44:15do or not. Um, and you could still send
2:44:19a letter um that could be separate from
2:44:22that or could be in lie of a resolution
2:44:25that express what some of your concerns
2:44:27and that might be a letter that includes
2:44:28some of that background data of what you
2:44:30previously expressed and what your
2:44:32concerns are with the decision that's
2:44:34been made now about the selected route.
2:44:37So I think it's probably probably one or
2:44:40the other would I think be my
2:44:42suggestion.
2:44:45So what I further suggest we do is let
2:44:47us circle back on this. Um and again to
2:44:51council member Scott Johnson point, we
2:44:53have a council member that's not here.
2:44:55Um so we can certainly communicate with
2:44:57him. I think if we could come back the
2:44:5925th if if there's time I need to look
2:45:01at the rolling calendar we can make time
2:45:03I think to bring this back and then
2:45:05worst case there's still a meeting after
2:45:08that if we needed to squeeze it in
2:45:10before the campo vote
2:45:13is that reasonable
2:45:15head
2:45:16>> not
2:45:18yes I have one just to be perfectly
2:45:21clear [laughter]
2:45:23>> again this is me
2:45:25I want to send a message
2:45:28And that's what's important to me. This
2:45:31resolution,
2:45:33the most important part is the now
2:45:35therefore be it resolved. The rest of it
2:45:38is it's not slopp. The rest of it is
2:45:41very important.
2:45:43The gist of any resolution and the first
2:45:45thing I look at at every resolution is
2:45:48that last paragraph. That's what we're
2:45:50going to do and act on. And it says
2:45:54endorses. And that is not the message I
2:45:57want to send.
2:45:59Knowing full well that this is a
2:46:01regional plan and there's lots of things
2:46:03at play. That is not lost on me. For me,
2:46:08I want to send a message that
2:46:11more. We have a population that's in in
2:46:15being taxed now and is not seeing a
2:46:17benefit. So that's what's important to
2:46:19me. In a letter, however we do that,
2:46:22that would be fine with me. But anyhow,
2:46:24and I do not need the history. It
2:46:27doesn't matter what happened five years
2:46:29ago, six years ago. What matters is
2:46:32today. So you don't need to go back for
2:46:34me. You don't need to go back and do all
2:46:36that work. Um because I'm not going to
2:46:38change my mind in my position. But
2:46:41that's just to be perfectly clear.
2:46:48Um, I think that
2:46:51the reason that the letter is preferable
2:46:53to me than a resolution, whether we
2:46:55voted up or down, is because we had the
2:46:57opportunity to provide exactly that
2:47:00context. We understand that this is a
2:47:02regional project. We understand that
2:47:05there were times in the past when we
2:47:07might have supported such a thing. Like,
2:47:08I don't really need you to go back and
2:47:09find that out. I remember the
2:47:11discussions back when we thought we were
2:47:12getting light rail.
2:47:15who cared what us, you know, but
2:47:20that's why I would prefer a letter is
2:47:23because we can lay out exactly what we
2:47:25are in support of, which I believe were
2:47:28united in support that we'd rather have
2:47:29this than nothing. But we, you know, we
2:47:34have a responsibility to our residents,
2:47:36too. And they, everyone that this is
2:47:39benefiting is coming through
2:47:40Morrisville. They they don't live here.
2:47:42Morrisville people to get onto mccrimin
2:47:45onto mccrimin extension are still gonna
2:47:48have to get in their cars or on their
2:47:50bikes.
2:47:56>> You gentlemen have what you need.
2:47:58>> I think so. [laughter] Well, Brandon
2:48:00doesn't think so.
2:48:01>> Okay.
2:48:03So I would like to know if there's
2:48:04consensus or not before I task staff
2:48:06with bringing back a lot of five and
2:48:08sixy old information if there's
2:48:10consensus around needing that or not.
2:48:12Respectfully I just I don't want to ask
2:48:14them to do that if there's not a
2:48:16consensus around needing that.
2:48:17>> I I don't need it. Um,
2:48:21but
2:48:23it would just highlights of maybe some
2:48:26things that have happened in the last
2:48:28five years like the delays of the road
2:48:31projects or some something like that. I
2:48:33mean, you don't have to
2:48:37what has been the transit milestones,
2:48:39you know, up and down maybe the top five
2:48:43impacts or something. So, a suggestion,
2:48:47um, if we're going to draft a letter, I
2:48:49think that's information we could
2:48:50include in a letter. Um, again, I think
2:48:52some of the highlights. So, if you're
2:48:53okay with that approach, let us start
2:48:55working on I say us, I mean them. Um,
2:48:59start drafting a letter that will
2:49:01address what your concerns are and we
2:49:03can hit some of the highlights of one of
2:49:05your concerns is that things have
2:49:06changed and and this may not align with
2:49:08what you would like to see.
2:49:12>> So, I would like that history But I'm
2:49:14not familiar with most of the council
2:49:16list. So whatever information you can
2:49:19provide
2:49:23>> I I think I I'm clear on what you're
2:49:27looking for here. So um but it won't be
2:49:30on your August 11th agenda.
2:49:33>> So maybe
2:49:38>> Oh, sorry.
2:49:40>> Harrison, did you have a thought? Sorry,
2:49:41council member counseling. Excuse me.
2:49:43Yes. Um,
2:49:45so
2:49:47I was not here five years ago. So I, uh,
2:49:52you know, the conversation that we're
2:49:53having now is on the wake VRT.
2:49:57I have I I have the benefit of,
2:50:02it's maybe not a benefit. Um, it's
2:50:04neutral maybe, but coming in, it's like,
2:50:06oh yeah, you got TOD, you got Mcrimin,
2:50:09of course BRT is going to go that way.
2:50:12But it was not the that was not what was
2:50:16being discussed
2:50:18when that was being developed. It was um
2:50:20the light rail, the um
2:50:23>> commuter rail, the commuter rail, um
2:50:26these road projects that were coming in.
2:50:28Um I I would like to have a bit more
2:50:31information um to council member Scargin
2:50:34Johnson points of um because Wake BR BRT
2:50:38was not discussed at that time. Correct.
2:50:43I think I think it was
2:50:46>> been on We chose the alternative end
2:50:51was
2:50:51>> it was
2:50:52>> this alternative.
2:50:53>> Okay.
2:50:54>> Okay. So if there was a BRT
2:50:59option uh that was discussed at that
2:51:02time it would have likely have been a
2:51:04different um alternative let's say or
2:51:07emphasize a different alternative might
2:51:09have influenced the land use plan 2019
2:51:12land use plan in a different way. Have
2:51:14we not had we known that the
2:51:18had we known that the light rail
2:51:20[clears throat]
2:51:20>> the sorry
2:51:22>> rail station is still in the plans it's
2:51:25still in the plans
2:51:26>> yeah had we known then that that was not
2:51:29coming I think the discussion would have
2:51:32gone differently that's why I'm saying
2:51:33that
2:51:37I'm I'm just not sure there was a lot of
2:51:39conversation the situation was very
2:51:42different from transit perspective
2:51:44So, you know, I'm just not I just am not
2:51:47sure that the additional context would
2:51:51elucidate this situation that much. It's
2:51:54it's because it's it's very different.
2:51:56>> I I feel though it is important to
2:51:58include in our letter.
2:52:00>> Agree.
2:52:01>> To say, you know, this is not what we
2:52:04were intending when we first when we,
2:52:07you know, developed this um land use. I
2:52:11think that's kind of the critical thing
2:52:12here. kind of the journey.
2:52:14[clears throat]
2:52:20>> I'm sure you have more than you need.
2:52:23>> No,
2:52:24I'm good. I mean, I'm still If you have
2:52:26more to say, happy to take it. Um,
2:52:30[laughter]
2:52:30>> but I I think I'm picking up what you're
2:52:33putting down.
2:52:35>> I would I would like more detail on
2:52:38that, but that doesn't have to come
2:52:39before this letter is written. on kind
2:52:44of what was decid what was what was
2:52:45desired at that time um and then some of
2:52:48those changes that have been made.
2:52:50>> I'd be happy to talk to you about my
2:52:52perspective um and some of my thinking
2:52:55and then you know you can um ask
2:52:58follow-up questions of staff based on
2:52:59that and I'm sure everybody who was on
2:53:02council is open to that as well.
2:53:04>> And if not this has all the minutes in
2:53:06her basement.
2:53:09>> [laughter]
2:53:10>> I got lots of
2:53:18>> I would get out when nobody has to do
2:53:20anything.
2:53:20>> All right. Good. [laughter]
2:53:22>> You're good to go, man. Go home.
2:53:24>> Very nice.
2:53:29>> Good presentation. [laughter]
2:53:30Don't worry about sending us all 86
2:53:32slides. This was just about right.
2:53:34>> Appreciate that. Um, okay. Anything for
2:53:38the good of the order before we go into
2:53:39close session? Well, we're going to go
2:53:41into a break first.
2:53:42>> Yes, let's go into close session.
2:53:45>> Which is the direction? Which way you do
2:53:47it first? Close session first and then
2:53:48we take break. That's right. Now I
2:53:49remember.
2:53:50>> Um, I'd entertain a motion to enter
2:53:52close session for two different items.
2:53:54One property um acquisition contract and
2:53:58the other for personnel. I make a motion
2:54:01that we go into close session pursuant
2:54:03to NCGS143-318-11
2:54:07A5 and
2:54:10and A6 to discuss the acquisition of
2:54:13real property and a personnel matter
2:54:16>> second
2:54:18motion from speaker
2:54:20>> Mayor Brutam Rabati and apparently
2:54:23council member Scaris Johnson is
2:54:24claiming the second so I'll give it to
2:54:26her. All those in favor entering close
2:54:27session please say I. I. Any opposed?
2:54:30Hearing none. That carries unanimously.
2:54:326. We are now in close session. Please
2:54:34clear the room of unnecessary uh not
2:54:38needed personnel. And we're going to
2:54:39take uh 15. Is that good for people? 15
2:54:44minute break. So, please come.
2:54:45>> 10.
2:54:46>> Okay. Come back at 8:43. Split the
2:54:49difference. Thank you very
2:54:52Thank you. Math.