2026-09-03 - Planning and Zoning Board
Summary
Written from the auto-generated captions; names and numbers may be misheard. The captions begin shortly before the call to order, and a few minutes at the start are missing.
- Agenda and the prior meeting's minutes approved unanimously; a new member was welcomed.
- Bret Martin gave the board an update on the Comprehensive Transportation Plan Update: greenway prioritization results (new connections to unserved areas scored highest, including the Millspring Greenway segment), 19 proposed roadway cross-sections, and a draft implementation plan broken into immediate, near-term (10-year), mid-term (15-year) and long-term horizons.
- Cross-section standards: 11-foot travel lanes, 6-foot sidewalks, 10-foot side paths, and 5-foot bike lanes with a 3-foot buffer. Bus lanes were added for the Wake BRT western extension, which will replace the bike lanes on McCrimmon Parkway while keeping side paths.
- Priority intersections for a study running October to February: Davis Drive at Morrisville-Carpenter Road and Church Street at Trey Brook Drive, Jeremiah Street and Downing Glen Drive.
- Also under way: roadway landscaping guidelines (due in November, with a public survey) and a study of a signalized pedestrian crossing of Aviation Parkway near the entrance to HSNC, tied to the Crabtree Creek Greenway. The existing crosswalk farther away would close with the Aviation Parkway widening, scheduled for construction in 2029.
- Board discussion: members asked how side paths differ from sidewalks and suggested signage and education as bike lanes disappear; urged moving the bicycle and pedestrian bridges over the railroad (Kit's Creek Road and Barbee Road to NC 54) up in priority because of their connectivity impact; asked whether concrete barriers could protect bike lanes; and questioned the Church Street intersections, which staff said scored highest on congestion because side streets are unsignalized and traffic from the Airport Boulevard extension and the town center is expected.
- A member pressed again for low-cost fixes at Morrisville Parkway and Davis Drive, such as lane restrictions, signage and a clearer "don't block the box" marking; staff said an access management project is already in design, and that most of the intersection lies outside the town.
- Staff said a proposed roadway connection toward Providence Place was not supported by the adjacent property owner; the greenway link is still being pursued.
- The board voted unanimously, 4-0, to recommend a member as vice chair to the town council, replacing the departing vice chair.
- Staff newsletter: two new special use permit applications (an expanded county convenience center on Aviation Parkway and a wood processing facility on International Drive); a 900,000-square-foot building approved at the Spark campus; athletic field work at Cedar Fork Elementary to support the new high school opening next year; the butterfly art initiative to be unveiled at International Festival; the senior affordable housing project's tax-credit application approved; Morrisville named a 2026 All-America City; a new planning manager hired.
Issues discussed
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
12:42way. [clears throat]
12:46>> So, I got a cost estimate from the
12:48school district turn.
15:31So I guess if she will be a voting
15:34member,
15:53I would like to call to order the
15:55September meeting of the Morrisville
15:56Planning and Zoning Award. If you will
15:58please join me for the pledge of
15:59allegiance
16:05to the flag of the United States of
16:08America and to the standy
16:16for all.
16:19>> Thank you. [clears throat]
16:22Do we have any changes to the agenda?
16:25>> No, chairman, we do not.
16:27>> Uh, then I will entertain a motion to
16:29approve the agenda.
16:31>> Motion to approve the agenda.
16:33>> Uh, do we have a second?
16:37>> I.
16:38>> Yes. Second. Yeah. All in favor?
16:41>> I.
16:42>> Carries unanimously. Thank you. Um,
16:47do we have anyone here for public
16:49comment that's outside of anything? We
16:51don't seem to. Okay, thank you. Um, any
16:54changes or comments on the minutes from
16:56last meeting?
16:59Okay, then I will entertain a motion to
17:01approve the minutes from the last
17:02meeting.
17:03>> Motion to approve the minutes.
17:05>> And do we have a second?
17:10>> Yeah.
17:11>> Okay. Yeah. Uh all in favor I
17:14>> that motion carries unanimously. Thank
17:16you. Uh and I should introduce Justin
17:19Malier
17:20Mier. Uh he is a new member. Um so thank
17:25you. Um I guess we can jump right into
17:28the comprehensive transportation plan
17:30update
17:31with Brett Martin.
17:41All right. Good evening, Chair Langston
17:44and members of the board, and welcome
17:46new member Malleier. Right. I'm pretty
17:49confident this is going to be your
17:50favorite item on the on the board as you
17:54go along. So, I just want to mention
17:55that. Um, I am Brett Martin,
17:58transportation project manager with the
18:00town. Um, and I'm going to walk you
18:01through this today. Uh let me get this
18:05to the appropriate position in the slide
18:08deck. So I last came to you back in June
18:11to share our spring engagement results
18:14when we solicited input
18:16uh from the public on overall modal
18:18priorities, project evaluation
18:21priorities for each mode and specific
18:23transportation improvement project
18:25concepts.
18:27Uh we also reviewed the project
18:29prioritization framework and results for
18:31the roadway and intersection uh project
18:33concepts that were included in the
18:36universal projects and we shared the
18:38preliminary assignment of roadway
18:41cross-sections if you remember to the
18:43specific roadway segments throughout the
18:45uh comprehensive transportation plan
18:47update study area.
18:50And for tonight's item, I will share
18:52with you the results of our greenway
18:53priorization exercise, which we did not
18:55cover with you in June. We will then
18:58cover the proposed cross-section
19:00schematics
19:01that lay out the actual roadway elements
19:04and dimensions for each roadway in the
19:07comprehensive transportation plan study
19:09area. And up to this point um in the
19:13plan development process, we have been
19:16focused on the what, where, and why in
19:20terms of transportation improvements
19:22throughout the town. But with the
19:24development of the implementation plan
19:26that I will share with you tonight, we
19:28are transitioning to the who, when, and
19:31how for those improvements. So, uh we
19:35will cover that with you here in a
19:38moment. Um, we also will hit on
19:40recommendations from staff for priority
19:43intersections that will carry that we
19:45will carry forward for further
19:47operational and safety focused study and
19:50improvement. And we'll provide a
19:52briefing on some other tasks that we're
19:55doing that have already been kicked off
19:56that are kind of uh related to the CTP
19:59and to some extent will inform the CTP.
20:03uh one is a town roadway landscaping
20:05guidelines uh the development of those
20:07guidelines and the other is uh the
20:10assessment for a signalized pedestrian
20:12crossing uh of aviation parkway at or
20:16near the entrance to HSNC. Then we'll
20:18talk about next steps and then we'll uh
20:21turn it over to you for discussion and
20:22to receive any feedback that you have.
20:25All right. So just in to reorient you to
20:28where we are in the overall CTP update
20:31process, we have moved the needle a
20:34little bit and we are pretty much in the
20:36zone of moving between the action plan
20:39and documentation kind of stage of the
20:42process and then moving into the
20:45consideration of plan adoption. But we
20:47do have a few more steps to go before we
20:48get to that consideration of plan
20:51adoption. um which I'll talk about a
20:53little bit later in the next steps
20:56section. Um just to kind of also zero in
20:59on where we are in our project
21:00recommendations development process. If
21:03we look at the development,
21:05prioritization and programming of of
21:06actual project concepts, we are in the
21:09final stage of that process where I am
21:11sharing final recommendations with you
21:13today. They're not final until you make
21:14a recommendation later this fall into
21:17the winter, but they're final in terms
21:19of being the recommendations that staff
21:21is is putting in front of you. Okay. So,
21:25just to move on now to the greenway
21:28prioritization and results to fill you
21:29in on that.
21:31Um, to start, I'd like to reiterate
21:35what informed the development of the
21:37greenway prioritization framework. Um,
21:40first of all, we go back to the CTP
21:42guiding principles that we developed
21:44very early in the process, uh, going
21:47back almost a year and a looking at
21:50those and what do those tell us about
21:52what we need to do in the greenway
21:53landscape. um public stakeholder
21:55planning and zoning board and town
21:56council feedback along the way. Of
21:58course, deficiencies that we've
22:00identified from existing conditions and
22:02whether you like it or not, the funding
22:05program criteria and areas of emphasis
22:08used by external funding parties such as
22:10NC DOT and Campo through the programs,
22:13the primary programs where we can
22:15actually get external funding to
22:16implement a lot of these projects. Um,
22:19similar to the roadway and intersection
22:21prioritization framework that I shared
22:23back in June, this approach balances the
22:26interests of the town with those of
22:28external funding parties to better
22:29position improvements for actual funding
22:32opportunities and funding. The external
22:34funding partners part parties generally
22:37focus on things like safety looking at
22:40crashes and the severity of crashes,
22:42cost effectiveness, demand based on
22:45density,
22:46um accessibility, connectivity,
22:48overcoming major barriers and filling
22:50gaps through a balanced local regional
22:53lens. that there's an additional layer
22:55of town focus that we added with our
22:58greenway prioritization here that
22:59focuses on access to recreation,
23:02educational opportunities, community
23:04points of interest, and transit through
23:06a local lens. So, we're really focused
23:08on getting people around at a local
23:10level kind of on top of this larger
23:13level of what generates demand for
23:15greenway use, what, you know, how is
23:18this solving a safety problem as a
23:19separated facility from a roadway, that
23:22sort of thing. Um, I would also like to
23:24note that there are several proposed
23:26bike and pedestrian facilities such as
23:29side paths that are recommended in
23:32actual roadway rideways of course as you
23:36know you you would have seen last time
23:38when we shared um what the
23:41cross-sections look like for roadways
23:42and I'll share in a minute and those
23:43were prioritized through the roadway and
23:46intersection prioritization process. So
23:48those are not part of this greenway
23:49prioritization process. Um, however,
23:52there was a bicycle and pedestrian
23:55component to the scoring criteria for
23:58the roadway and intersection projects
24:00that adjusted for that. So, if you're
24:02interested in side paths and you know
24:05that are actually in roadway rights of
24:06way, that's not what this prioritization
24:08process does or did. Okay. And just to
24:13provide a connection back to uh the
24:16results of our public engagement effort
24:18back in April and to bridge that to our
24:21prioritization criteria, I want to just
24:24cover a bit of what we heard from the
24:27public as it relates to bicycle and
24:29pedestrian priorities. Uh safety was by
24:32far the number one priority that was
24:35indicated through the survey that we had
24:36out at the time. And then a close second
24:39um close distant however you want to
24:41look at it second was filling gaps in
24:43the existing network. And then after
24:44that it kind of dropped off with the
24:46other three multimodal connectivity
24:47activity center access and benefit
24:50versus cost. The reason I'm bringing
24:52that to you is because we really want
24:55what we heard from the public to
24:56influence
24:58the our prioritization. If it's if it's
25:01important to the public then it's
25:03important to us. Um so
25:06um how did public feedback really
25:08influence the prioritization framework?
25:10Well in the criteria first in the
25:13criteria development uh we had quite an
25:17emphasis on filling gaps and access to
25:19prominent origins and um destinations
25:22were given also more uh emphasis. We
25:24also included a specific public outreach
25:26criterion
25:28and the actual definition of the metrics
25:31which dictate how the criteria were
25:34measured was also influenced by
25:36community feedback. However, keep in
25:38mind we have to balance what people in
25:42the community want with the realities of
25:44being able to deliver projects that come
25:46down to access to external funding as I
25:49mentioned earlier. So this needs to be
25:50balanced with that with feasibility
25:52considerations for being able to tap
25:54into that external funding.
25:57All right. So how are the criteria and
25:59their respective weights
26:01um assigned? Well, you can see that
26:05emphasis that I just mentioned on
26:07filling gaps. not going to go into each
26:09of these real, you know, in in a lot of
26:11depth, but you can see that emphasis on
26:13filling the gaps and access to different
26:15types of prominent origins and
26:17destinations that I mentioned me
26:19mentioned. Um, we actually had multiple
26:22criteria that get at different things
26:24that are important to the community. uh
26:27community points of interest which would
26:29be like okay
26:31uh major activity centers future future
26:34town center f you know that sort of
26:37thing recreation opportunities education
26:40opportunities also we have to think
26:41multimmodally here so uh you know what
26:45kind of access do we have to transit we
26:48also had of course balancing with those
26:51external funding partners and their
26:53criteria what is the population density
26:56of the cats area, you know, are we
26:58serving an area that has enough people
27:00that live close by that that can make
27:03use of it, benefit cost? And then also
27:06we looked at planning consistency and
27:07public outreach.
27:10All right, so here are the results. The
27:12results are showed on this map, but
27:14they're also included as attachment one
27:15in your agenda packet. Um but what this
27:19slide is showing is generally and where
27:22the results landed is generally the
27:24highest priorities are greenway segments
27:25that provide completely new connections
27:27just completely new connections
27:30completely unserved areas where they're
27:32it's connecting people or different
27:35destinations to other people
27:38where pe places where people live and
27:40destinations. Um so that's really that's
27:45really kind of where this landed the
27:48highest priority scores uh for through
27:50the prioritization
27:53made at Milspring Greenway from
27:54Paramount Parkway to Transformation
27:56Roadway Tech. That's that's really G12
27:59you see up here really rose to the top.
28:02There's a proposed Church Street Park
28:04RTP greenway and that is in dotted that
28:08that is that is not a solid line there
28:11because that's still in question in
28:13terms of whether we can implement it.
28:15It's not in the town of Morrisville,
28:17right? Whether we can implement it and
28:18how it can be implemented to serve the
28:20purposes that we have in mind. Uh,
28:22interestingly, the Lexi Lane Greenway
28:24down here that's,
28:26you know, kind of connecting the far
28:29southeastern part of Morrisville to
28:30Kerry, scored really high. Um, Sturup
28:34Iron Creek Greenway, which is along the
28:37eastern boundary of Morrisville, scored
28:39really well as well. And then various
28:42connectors to the Millspring Greenway
28:44and Fairview Greenway um up here and
28:47down here. Now I want to me I I want to
28:52emphasize that prioritization
28:55does not mean
28:57programming. It does not it
28:59prioritization just because something
29:01was prioritized high here does not mean
29:04that oh my gosh we really got to do that
29:06Lexi Lane Greenway within the next five
29:08years. Um, it is meant to be a tool for
29:12project programming and is among is is
29:15one of many factors that drives
29:18recommendations for the order of project
29:20delivery. And so I'll talk more about
29:21that as we get into the implementation
29:23plan.
29:24All right, let's move along to our
29:26proposed and recommended roadway
29:28cross-section schematics.
29:30I do [clears throat] want to quickly
29:32review what purpose these serve before
29:34we get into them again.
29:37So just to of course plainly state what
29:41the roadway cross-sections are, these
29:44show exactly what roadway elements are
29:47proposed and recommended including their
29:49dimensions and overall space needs. So
29:52this is really like okay if you're
29:54interested in I want to know what
29:56McCrimman Parkway is supposed to look
29:58like if we implement all the
30:00recommendations in the plan. That's the
30:02cross-section that's assigned to
30:04McCreman Parkway is that's what this is.
30:06It'll look exactly like this. So, it
30:09what it does is it clarifies what each
30:11straight street is designed to do. It
30:13provides a a guide for future
30:14infrastructure development. Really a
30:17focus in our development of these is
30:18improving safety and accessibility for
30:20all users for all modes. We also use
30:24this to align street design with land
30:26use and community character. You will
30:27see as we get closer to town, the future
30:30town center, the street uh elements
30:33change a little bit, right? They become
30:35a little bit more focused on serving the
30:38goal of what town center as a place is
30:41meant to serve. It sets clear
30:43predictable expectations for developers.
30:45We put this in the CTP. Developers come
30:47along and develop a site. This is what
30:49you have to put in as frontage as
30:52frontage improvements for your
30:53development or you have to pay in lie of
30:55that. Um, and then it also balances NC
30:58DOT's interests with the towns. We have
31:00a lot of facilities that are the towns,
31:02Carrington Mill, Paramount, you know
31:04that the town hall drop that the town
31:07can do whatever they want with. I don't
31:09I wouldn't say whatever, but have we
31:11have a lot more flexibility, but keep in
31:12mind most of the thares in in town are
31:14DOT maintained and owned. So, we have to
31:18work with that and what their standards
31:20are. All right. All right. So, to get
31:22into the cross-sections themselves, this
31:24was included as attachment two in your
31:25agenda packet. Uh, there are 19 total
31:28cross-sections with five cross-section
31:31bases that were applied throughout the
31:33town to various roadway segments,
31:35specific roadway segments. The bases are
31:38two-lane undivided, two-lane divided,
31:40threelane undivided, and then four-lane
31:43divided, and six lane divided. We don't
31:46do anything undivided after when we get
31:48above three lanes. That becomes a
31:49dangerous situation. Um and medians are
31:53really important for being able to
31:56separate vehicles making opposing
31:58movements um down a thorough affair uh
32:01for safety purposes.
32:03Um there's various configurations of
32:06sidewalks, side paths, bike lanes, and
32:08on street parking added to the five
32:09bases that you'll see. Uh these were all
32:12determined by existing conditions. The
32:14universal projects, regional
32:16transportation planning efforts like the
32:1820 55 metropolitan transportation plan
32:21developed by Campo, the public planning
32:24and zoning board and town council
32:25feedback that we've received along the
32:27way. Um again, I want to reiterate the
32:31right of way needs. One of the things
32:32important about whenever we change up
32:35cross-sections from what's in the
32:36current 2019 CTP is what impacts does
32:39that have to the right of way? Um, which
32:42has impacts to property owners along the
32:44along the corridors that are involved.
32:47Well, the right-of-way needs for all of
32:49the updated crosssections fall within
32:51the applicable previous cross-section
32:53ride-of-way ranges in the 2019 CTP, but
32:57they are all above the minimum of that
33:00range. And part of that is because we
33:01are squeezing in
33:03side paths in places where we didn't
33:06previously have side paths recommended.
33:08We're squeezing in a buffer for bike
33:10lanes where we've never we have that's
33:13the first time that the town is doing
33:15that. So all of that that stuff takes
33:18space and whenever you need to take more
33:20space it requires a little bit more
33:23rideway. However, they all fall within
33:25the range. If you go back to the oop, if
33:27you go back to the CTP,
33:30there's a range that's provided for all
33:32for for most of the rightway rides of
33:34way. Also, I want to note, you don't see
33:37this in your materials, but the specific
33:39sides of roadway elements for segments
33:41with asymmetrical configurations will be
33:44noted in the CTP document. There are
33:46many crosssections where there's a side
33:49path on one side and a sidewalk on the
33:51other or there's on street parking on
33:52one side. [clears throat] And this
33:55doesn't tell you, well, I want to know I
33:57want to know what side of the street
33:58that's supposed to be on exactly. And
34:00yes, we know we have to do that. If
34:02we're going to give that to a developer,
34:03it has to be clear to them. Oh, the
34:04parking needs to be on this side or the
34:06side path needs to be on this side. That
34:08will be that will be laid out in the CTP
34:10document. But you're not seeing that in
34:12the materials that you have. All right.
34:15So, just some notable changes to the
34:17roadway cross-section assignment from
34:19the June meeting when we shared this
34:20with you. Um
34:23nothing big has not not a lot has
34:27changed. Okay. We did do uh some
34:29stakeholder interviews since we last
34:31came to you. We did stakeholder
34:32interviews with our close transportation
34:35planning and project programming
34:38partners. So that would be the town of
34:40Kerry,
34:41Campo, NC DOT and really research
34:45triangle foundation as well because of
34:47some of the some of the interests we've
34:49had in that area. Um the biggest change
34:53to roadway cross-section assignment
34:56really is how we are treating the
34:58western the wake BRT wake bus rapid
35:00transit western corridor extension that
35:03is proposed to run along NC54
35:06coming into the southeast part of
35:09Morrisville from Kerry down Weston
35:12Parkway. It leaves it leaves Morrisville
35:14and goes back into Kerry. Then it comes
35:16up Evans and still in Kerry. It
35:19re-enters Morrisville as Evans
35:22approaches Aviation Parkway and then it
35:25it runs along McCreman Parkway and then
35:28it comes back up NC54 and leaves the
35:30north side of Morrisville on NC54.
35:33[snorts] We did not have bus lanes in
35:36our cross-section for that. when we came
35:38to you in June in speaking with the town
35:41of Kerry, Campo and NC DOT, we have now
35:45added bus lanes to that because in the
35:482045 or 2055 MTP, but in the 2045
35:53decade of the MTP, Campo does have in
35:56there the addition of those buses. That
36:00investment, however, is that is
36:02currently set to have an opening year of
36:042032. when it is when at in opening year
36:07it will not have bus lanes but they are
36:09they are planned to be added later. So
36:11we did include that in the crosssection.
36:14McCway is an interesting animal because
36:16what's out there today it there's it has
36:19bike lanes and it has side paths and
36:22that's great if you are a bicyclist you
36:24have all these opportunities and all
36:26these options.
36:28However, um when we implement part of
36:31the plan here is when we implement the
36:34additional bus lanes though the bike
36:36lanes will go away. The side paths will
36:38stay but the bike lanes will go away
36:40mainly because bike lanes on a three
36:43lane what ultimately will be a
36:45three-lane thoroughare
36:47with the activity that is expected with
36:50uh with the the the BRT service is
36:54probably not a very safe solution.
36:57Um, so and
37:00we're we're getting into a situation
37:02where there's again there's only so much
37:04ride of way and so we have to find some
37:07space somewhere. Okay.
37:10Um, Morrisville Carpenter Road that
37:13includes side paths on both sides. We we
37:15went back and forth with side paths
37:17versus um bike lanes on Morrisville
37:21Carpenter Road.
37:23The problem there is there's not a lot
37:26of development opportunity on
37:28Morrisville Carpenter Road right now. A
37:30lot of what's on Morrisville Carpenter
37:31Road is already developed and it's not
37:33old. It's not really old development
37:36while there might be some opportunities.
37:38So, it's really really difficult with
37:40the development environment along there
37:41to get side paths with the ride ofway
37:45that exists anytime soon. But I do think
37:49it is worthwhile to have the an ultimate
37:52solution in mind of side paths on that
37:54thorough affair. So in the however in
37:57the interim which is it's a more
37:59achievable more
38:02realistic sort of approach in the in the
38:06in the near term to have bus or to have
38:10uh bike lanes
38:12um on Morrisville Carpenter Road. Keep
38:14in mind also that the Hatcher Hatcher
38:16greenway is parallel too. So there is
38:20another option there that's off-road for
38:22bicyclists to use. Church Street is a
38:25three-lane divided uh or sorry
38:27three-lane undivided from Carolina
38:29Street to Mason Farm Road and it's just
38:32two-lane undivided north of Mason Farm
38:34Road. That's really just a change that's
38:36being realistic about the fact that
38:38north of Mason Farm Road, why would we
38:40have a center turn lane when one whole
38:42side of it is railroad? Who's going to
38:45turn into the railroad? Nobody. Well,
38:48hopefully nobody. Um, so that's what
38:50that's what's going on there. I do want
38:53to just mention some other important
38:55cross-section notes um on what you would
38:58see in your packets to talk about the
39:00dimensions of a lot of things. Um, there
39:02are bike lanes on all applicable c the
39:05bike lanes on all applicable
39:06crosssections. They're not everywhere.
39:08If you and of course we've talked in the
39:09past, we're actually trying to get away
39:12from having facilities with with as many
39:15bike as many facilities with bike lanes
39:17and move more toward the side path
39:18separated sort of solution. But those
39:20that do have bike lanes, they are five
39:22feet with a three-foot buffer. Last time
39:24we spoke with you, it was just six feet
39:26with no buffer. Now we've gone to five
39:28feet with a three-foot buffer. Travel
39:31lanes are 11 feet wide. Sidewalks are
39:32six feet wide. Uh that's narrowing the
39:35travel lanes. That's increasing the
39:38width a little bit of the sidewalks. The
39:39sidewalk width we have right now in the
39:41CTP is uh 5T. Travel lanes were 12 feet.
39:45Side paths are 10 feet wide. Verges,
39:48which is the area between the curb of a
39:49roadway of travel lanes on a roadway and
39:51the sidewalk, 5t wide. Center turn lanes
39:54where we have them are 12 feet wide.
39:57uh two-lane divided roadway medians are
40:0018 feet wide and four-lane divided
40:02roadway medians or more go up to six
40:05lane are 23 feet wide. The reason
40:07there's a difference there is because
40:10there's in a on a two-lane divided
40:12roadway. There's very very minimal
40:14chance there's ever going to be opposing
40:16turn lanes that need to be installed. On
40:19a four-lane divided roadway, there could
40:21be. And we run into that throughout town
40:24um here and there where you may have to
40:27have opposing turn lanes separate from
40:28the through lanes that need to be
40:31squeezed in. And the only way you're
40:33going to squeeze them in is if you have
40:34enough space, right? And so 23 feet
40:36allows for that to happen and for some
40:39channelization to still occur so that
40:41you're not you're not setting them up to
40:43conflict with one another. On a two-lane
40:46roadway, you're never you're not really
40:48ever going to run into that. on street
40:50parking is eight feet wide and bus
40:52lanes, it's important to note bus lanes
40:54are not assigned to a specific side of
40:57the roadway because we don't yet know
40:58until until these uh BRT projects really
41:02get into the thick of project
41:04development. We don't know if they're
41:06going to be interior center running uh
41:09BRT or if they're going to be outside
41:11running BRT. So, the best way to deal
41:14with that is for the us to just assume
41:17we're going to be cutting something out
41:18of a really wide median.
41:21And if if we cut something out of a
41:22really wide wide median, what we cut out
41:25of the median could be, you know, it
41:27could be a a lane, just a a regular
41:30travel lane, and then we push if it's
41:32for outside if we just if it's decided
41:34we'll do outside running BRT, then we'll
41:37have the bus lane on the outside. If
41:38it's decided we'll do inside running
41:40BRT, then we'll cut out from the media
41:43and the bus lane and that'll be the bus
41:44lane. So that's how we have proposed to
41:46handle that when we don't really know
41:48the answer to that question until that
41:51until those projects get a little bit
41:52more um steam behind them and we figure
41:56more things out. All right, so I want to
41:58talk a little bit about the
41:59implementation plan as well. That's the
42:01other big thing in front of you. And
42:02again, this really breaks down to who,
42:04when, and how. we already addressed for
42:07most of the process the what, where and
42:09why. Um the who is is the entity that is
42:14assumed to be responsible for one or
42:16more steps for advancing a project from
42:19planning to delivery. So that could be
42:22the town itself, that could be NC DOT,
42:24that could be Campo, that could be
42:27developers,
42:28um that could be a neighboring
42:30jurisdiction,
42:32but the who in many cases, and I'll make
42:35I'll kind of follow up on this point
42:36later, the who in many cases in the
42:38draft implementation plan is influenced
42:41by such considerations as who has
42:44ownership of the impacted facilities,
42:46who has the technical capacity and
42:48funding or control of the funding, to
42:51deliver the project, whether the project
42:53would even be competitive in receiving
42:56funding controlled by an entity and many
42:59other considerations. So the who isn't
43:01just like, oh, we feel like doing, you
43:03know, the town feels like doing this or
43:04we think DOT feels like doing this. No,
43:07the who is very much influenced by the
43:10scale of projects, how competitive
43:12projects are in the environment, you
43:15know, with the who that's being
43:16considered and that sort of thing. The
43:18when is the time frame the projects are
43:20recommended for delivery or at least to
43:22be the foc focus for the town. They're
43:24breaking into fiveyear increments there.
43:27Immediate, near-term, immediate term,
43:29near-term, midterm, and long-term. The
43:32how is very much about the source of
43:35funding that we would pursue, which
43:38often ties to the who as well and
43:39sometimes also ties to the when. But it
43:43also includes how projects are defined
43:45into implementable segments and
43:47strategies for delivering them. Um so I
43:50wanted to make that point.
43:52Implementation uh moving on to some
43:54implementation plan background notes. I
43:57mentioned I hit on this a little bit
43:58earlier. Project prioritization is not
44:02projecting.
44:03Again, prioritization is a tool used to
44:06identify the greatest needs based on
44:08current conditions regardless of
44:10feasibility. But in the real world,
44:12there's this thing called feasibility.
44:14There's a whole lot of feasibility
44:15considerations that have to be taken in
44:17into account. So while programming is
44:21informed by prioritization and that's a
44:23major tool and a major thing it's
44:25informed by, it is also influenced by
44:27factors such as funding availability,
44:30project readiness, project efficiencies,
44:33partner coordination, plan future
44:35conditions, implementation feasibility,
44:37and so forth. So I want to really make
44:39sure that we drive that point home. The
44:41who, when, and how projects are
44:43recommended for delivery. I hit on this
44:44a little bit and the project feasibility
44:47and funding sources assumed are
44:48influenced by the scale and cost of
44:50projects. Generally, the smaller
44:53projects are more suitable for t for
44:55town funding and implementation. The
44:57town only has so much technical capacity
45:00and funding on its own to deliver
45:03transportation projects. Generally,
45:05those will be smaller projects. larger
45:07projects those are more suitable for
45:09external funding sources and external
45:11agency implementation.
45:13Most bike prep projects in the roadway
45:16rights of way will be provided over time
45:20with development or imple or they will
45:22be implemented with roadway projects. A
45:25lot of this is going to be very
45:27peacemeal, right? Just because we if you
45:30see a project, just because it says NC
45:32DOT will do this project doesn't mean
45:35that along the way as our CTP works to
45:38help implement what we want from
45:41development that we won't get pieces of
45:44that ultimate vision
45:47from devel from the development
45:48community as the town continues to
45:49develop or redevelop.
45:51The CTP also I want to make the point it
45:54builds from the 2019 CTP projects and
45:57progress to date on the recommendations
45:59are incl will be included therein. You
46:01did get an attachment four which lays
46:04out the projects that are being carried
46:06forward those that have been removed
46:08from further consideration that were in
46:10the 2019 CTP and the new projects that
46:12were not in that. But the point here is
46:14we aren't starting over. there's you
46:17know 2019 projects and the progress
46:19toward advancing them is really
46:22operating as our base.
46:24Okay. So let's get into them. The in the
46:27immediate term
46:29um this is the five year within the
46:31fiveyear horizon from the t from the
46:33time the CTP is adopted which is we're
46:37targeting for next spring. Um, it is
46:42designed to be what the town is either
46:43already focusing on or will within the
46:46next 5 years. And it's meant to be
46:48limited here. You don't see a really
46:51long list of projects and they're not
46:53big projects, right? But it is meant to
46:55be limited because of limited resources
46:57that we have available. And again, it
46:59goes back to sort of that what do we
47:01have the technical capacity to deliver?
47:04Uh, the inter you see a number of
47:05intersection improvements there. That's
47:07actually where most of the town's
47:08transportation problems are based on all
47:10of the existing conditions analysis that
47:12we've done. Slater Road at Serell Grove
47:14Church Road, NC54 at Morrisville
47:17Parkway, NC54 at Keybridge Drive, Church
47:20Street at Treybrook Drive, Church Street
47:22at Jeremiah Street, Downing Glenn Drive
47:24at Town Hall Drive, Church Street at
47:26Downing Glenn, and Davis Drive at
47:28Morrisville Carpenter Road. Um, for a
47:32roadway project, also something the
47:34town's been working on for a while. is
47:36more Morrisville Parkway access
47:37management and safety improvements. So
47:40that's also something that we're going
47:41to continue to focus on and we're
47:43recommending to continue to focus on in
47:44the next five years to deliver the
47:46improvements that have been designed for
47:49that. Um, and then also the Crabtree
47:52Creek Greenway connector, which is a new
47:55project that ties to what I'll be
47:57talking about in a moment, which is
47:58aviation parkway uh pedestalized
48:01pedestrian crossing assessment, but that
48:03would connect
48:05uh from wherever we are able to put in a
48:08pedestrian crossing across Aviation
48:09Parkway from there to the Crabtree Creek
48:12Greenway, which is not that far away
48:14where it runs. So, and as I said
48:17earlier, at or near the entrance of
48:19HSNC.
48:21All right, we go to near-term. We're
48:23getting to the 10-year horizon. This is
48:25to be implemented within 10 years or to
48:28have have a strong focus on delivering
48:29them within the next 10 years. Um,
48:33intersection improvements. Here you see
48:35uh NC54 at Northwest Kerry Parkway,
48:37Slater Road at Carrington Mill
48:39Boulevard, Davis Drive at Parkside
48:41Valley Drive. uh roadway projects.
48:44Church Street's uh center turn lane from
48:46Mason Farm Road to Carolina Street.
48:48That's probably one where we we might
48:51want to we're probably going to rely on
48:52a lot of development to provide rather
48:55than it being some type of standalone
48:56project that we go out and deliver uh
49:00greenway projects. You see the Fairview
49:01Greenway, Connector, Strup Iron Creek
49:03Greenway, Milsbury Creek uh Greenway,
49:06Sawmill Creek Greenway and Connector,
49:08and the Triangle Bikeway and Connector.
49:10And you see some B You may remember we
49:13talked very early in the process that
49:14actually this re the recommendation to
49:17even have these came from the planning
49:19and zoning board which is the bike ped
49:22connections
49:23over the North Carolina Railroad. Um and
49:27you see two there are in the near term.
49:29One is at Kits Creek Road and that would
49:31connect over to NC54 and the other is
49:34Barbie road to connect over to NC54.
49:36Interestingly, and gladly, those
49:40projects are pretty competitive in the
49:42lap uh landscape, the the Campo lap
49:46landscape for that funding source. Um,
49:49so just based on how some of the
49:52criteria they have laid out, being able
49:54to cross that those types of barriers
49:56with a bicycle and pedestrian project
49:59actually scores pretty well. So, just
50:01wanted to mention that midterm is 15
50:04years. Um you see the roadway pro I'm
50:06not going to go into a lot of depth as
50:08we're going farther out further out in
50:10time. Um
50:12again within 15 years or we'll focus on
50:14it within the next 15 years. Uh but you
50:17see the projects there. A lot of roadway
50:18projects are falling into that time
50:21frame. Um
50:23a lot of that has to do with where a lot
50:25of these larger roadway projects land in
50:28the Metropolitan Transportation Plan.
50:31And then long-term a number of projects
50:33there that's 20 plus years. Um
50:38so just you see you see there probably
50:40not as you know these are not
50:42necessarily um the highest priority
50:45projects. That doesn't mean that they're
50:46not important.
50:48um
50:50still there's still a need and the town
50:52still wants to see them delivered but
50:55not putting a huge amount of emphasis on
50:57them uh in the earlier years after
51:00adoption. Now one thing I want to say is
51:03that if you look at the immediate near
51:04and mid mid and long term
51:08the CTP is meant to be updated about
51:10every five years.
51:12So the CTP
51:15if these recommendations move forward as
51:18how they would be programmed in these
51:20time frames
51:22the way it works is near-term
51:25would become hopefully by the time we
51:27update this immediate term we're like
51:29okay yeah we got this we've delivered
51:31this or we're well on our way to
51:32delivering this. So the next time we
51:34update it near-term is what we would
51:35consider to to to take the first stab at
51:38that for immediate term right and so
51:40forth and so on. So that's how that's
51:42one way I think is good for you to look
51:45at that
51:47public transit projects BRT projects and
51:50the uh transit transfer facility
51:52programs to be implemented in the town
51:56were based on their inclusion in the
51:582055 MTP and the horizon years that were
52:01set in for them in in in that uh
52:05planning document. Um the Wake BRT
52:07western corridor again that's supposed
52:09to be operational by 2035.
52:12There's also Davis Drive BRT which is
52:15supposed to be in place by 2045.
52:18Airport boulevard BRT supposed to be in
52:20place by 2055.
52:22And the transfer the transit transfers
52:24facility is meant to is really right now
52:29programmed to be in place 2045 and
52:31onward in the Campo uh MTP.
52:35The Morsville smart shuttle node
52:37locations that we are looking to expand
52:39um are programmed based on node prior
52:42they will be programmed based on the
52:43node prioritization plan to be
52:44considered by town council this fall. Um
52:48four there's about four there's about
52:50four or five nodes that will be
52:51implemented in 2027 so in the immediate
52:53term and then additional nodes beyond
52:56that up to 10 by the end of 2029 in the
52:59also that would also fall in the
53:01immediate term. So that's where public
53:02transit projects would fall. And we'll
53:04go to the priority intersection uh
53:07assessment study. This is an additional
53:09task
53:11that
53:13we have scoped to follow up generally
53:16from the CTP. We already went through an
53:19exercise to prioritize various
53:22intersections throughout the town,
53:24right? And there were there were
53:25criteria that we used to do that.
53:27There's another study that we are
53:29looking to kick off in October that will
53:32go into more detail on evaluating
53:35operational safety and potentially other
53:37issues with identified intersections for
53:41up to four intersections.
53:44Um, and
53:46we'll we'll look at okay, what's the
53:48issue here? What are the solutions that
53:51we need to uh that we we need to bring
53:54into play to consider to to improve
53:56them?
53:57um based on measures of effectiveness.
54:00And really the the approach to it is
54:02going to be what can we squeeze out with
54:04what is already there first so that
54:07we're not so that there's not a huge
54:09cost impact. And if if we can't get to
54:11certain measures of effectiveness doing
54:13that, then we need to look at maybe some
54:16something that
54:18uh does cost money, maybe additional
54:20turn lanes, maybe re, you know, some
54:23type of reconfiguration of the lanage
54:25that's there and offering more storage
54:28uh for turn lanes or through lanes,
54:30whatever. It could run a number of
54:32different um ways. So, um, what we did,
54:37what we're bringing to you today is, um,
54:40the priority intersections that we're
54:42recommending to move forward. These were
54:45derived, as I mentioned, from the
54:46intersection prioritization through the
54:47CTP update process and from other
54:49planning efforts. The town council
54:51adopted the Morrisville and Motion
54:53safety action plan back in October of
54:55last year. We are also using that to
54:57inform this uh, where we have identified
54:59some safety issues. Um there is an
55:03emphasis on intersections again with
55:05significant safety or uncontrol
55:07uncontrolled congestion issues
55:10for which the town has a likelier
55:13technical capacity to address. There
55:15might be intersections out there that
55:16you're like man and it's it could be big
55:18intersections in town that are DOT
55:20intersections. You're like man I wish we
55:22could focus on that. Guess what? Those
55:24intersections are difficult. We don't op
55:27we don't own them. The bigger they are
55:29the harder they are to deal with. And if
55:31we want to do improvements to them,
55:32they're going to cost more and there's
55:34going to have to be a whole lot more
55:35coordination and buyin from NCBOT.
55:39There are intersections out there where
55:41the technical capacity needs are not as
55:43great as well. And so that really
55:45focused in that really kind of helped us
55:47focus on where can we really can we
55:49really make some improvements that we
55:52can actually feel comfortable
55:54implementing. So that study will occur
55:57in the October to February time frame.
56:00Um the intersections are Davis Drive and
56:02Morsal Carpenter Road and you'll see a
56:05string of intersections there on Church
56:06Street at Treybrook, Jeremiah and down
56:09in Glenn.
56:13Just to provide some additional backup
56:15for why the why behind their
56:17recommendation,
56:19uh Trey Brook had the highest congestion
56:22score for all of the intersections
56:23evaluated for the CTP update. It also
56:26had a high bike ped and benefit cost
56:28score from the prioritization that we
56:30did. Jeremiah Street was tied for sec
56:33the second highest congestion score for
56:35all intersections and it was tied for
56:38the highest bike pet score for all
56:40intersections. And then down in Glenn
56:42Church Street uh was tied for the second
56:46highest congestion score for all
56:47intersections and the high it had the
56:49highest benefit cost and bike ped scores
56:51for all for all intersections evaluated.
56:54And one of the reasons why is all of
56:56these intersections are almost
56:58completely uncontrolled. I mean, they're
57:01not completely under control because
57:02there there are some traffic control
57:04devices like stop signs at side streets
57:06and so forth, but they have a lot of
57:08activity, but they're generally they're
57:10unsalized, which means they're generally
57:14uncontrolled.
57:16Um, so
57:18just wanted to cover that. And then for
57:20Morseful Carpenter, this is the one
57:22where I would say yes, it's a bigger
57:24it's a bigger intersection. It might be
57:27more involved. What we need to do to it
57:29might cost a lot more money, but it is
57:31very very important for us to look at
57:34this closer
57:37um because it did receive the highest
57:39CTP update safety score for
57:41intersections. It was identified in the
57:43Morrisville emotion safety action plan
57:45as an intersection that we need to uh f
57:48focus on for further review and
57:50improvement.
57:52Um and it had a high activity center
57:54score because you know there's a lot of
57:56activity centers right around there as
57:58well. And so there that means there's a
57:59lot of pedestrians and so forth that are
58:01trying to navigate that intersection.
58:05All right. So just real quick going
58:06through some additional related tasks
58:08that we want to provide a briefing on.
58:10The town also recently kicked off the uh
58:13the development of roadway landscaping
58:15and hardscaping guidelines. This is
58:16really basically just okay, we want to
58:20put some guidelines together
58:23that lay out standards
58:26uh guidance and approach for developers
58:30or the town or whatever
58:33to install landscaping that meets
58:36certain goals
58:38um in our transportation rights board.
58:41So it's really to be used as develop to
58:43to be used as as part of our development
58:45requirements and guidance for
58:47landscaping and targeted areas. Veres as
58:50I mentioned earlier just that that area
58:52between uh roadway travel lanes and
58:55sidewalks town and special district
58:57gateways. So what we're talking about
58:58there is just gateways to the town in
59:00general but also the town center to
59:03future to that sort of thing. islands,
59:06roundabouts, and grade separated bridge
59:08areas where there's opportunities to
59:10really uh do something aesthetic. Uh it
59:14would provide the town with cohesive and
59:16coordinated direction for those for for
59:18betterments related to landscaping to be
59:20included in NCDOT roadway improvement
59:23project scopes of work and it would just
59:25provide direction to the town in general
59:27for uh any projects that we have where
59:30we want to do the same. It will, it is
59:33intended that these will be integrated
59:34into the roadway crosssections in the
59:36CTB update. So that we developers come
59:38in. You see the cross-section there.
59:40There's trees in the median and then
59:41there's trees on the side of the road.
59:43So that when developers come in and we
59:44say, "Okay, you got to here's the
59:46cross-section front for frontage
59:48improvements. Here's what you got to
59:49do." They have more guidance on the
59:51landscaping piece of what they need to
59:53do and and and what what they could put
59:55there that fits the guidelines. And
59:57these are being developed over uh the
1:00:00period. We kicked it off in July and we
1:00:02should be finishing this up in November.
1:00:04We did deploy a community survey to
1:00:06solicit input on the overall
1:00:08considerations. Um and we will of course
1:00:11become when we come back to you in
1:00:12November. We will share that with you. I
1:00:15also will let you know it. I I I will
1:00:18probably send out if you are not aware
1:00:19of the survey, I will probably send it
1:00:21out to the planning and zoning board
1:00:22members tomorrow so that you can take
1:00:24it. We'd like to get your input on it as
1:00:26well.
1:00:27Um, so just wanted to mention that. And
1:00:30then I mentioned the pedestrian crossing
1:00:31assessment. I'm not going to spend a lot
1:00:32of time on that. That again is to um
1:00:35evaluate
1:00:37whether we can
1:00:39install a signalized
1:00:41pedestrian crossing at or near the
1:00:43intersection of HSNC. That will tie into
1:00:46a multi-use path that is proposed as
1:00:48part of the aviation parkway widening
1:00:50project that is currently scheduled to
1:00:52be left for construction in 2029. but it
1:00:55would also tie into the Crabtree Creek
1:00:56Greenway.
1:00:58Um, one thing that's important to note
1:01:00is the Liberty the other the the the ex
1:01:02the the existing crosswalk that is a
1:01:05little bit farther south and west will
1:01:08be closed with the aviation parkway
1:01:10widening project. There is no other
1:01:13opportunity
1:01:15between International Drive and NC54 to
1:01:18cross aviation parkway. So, we feel this
1:01:20is very important for the town to be
1:01:23able to do this and to be able to
1:01:26facilitate special event traffic between
1:01:29HSNC and Cedar Fork District Park. U but
1:01:32just in general like people need to have
1:01:34a place to cross the street and they
1:01:36need to be safe doing it. And so uh we
1:01:39are working with to to to put that
1:01:42together and have uh really we're trying
1:01:45to make a case for DOT to incorporate it
1:01:47into the design for the aviation parkway
1:01:49widening project which will ultimately
1:01:51be a better to that project. All right
1:01:54so next steps where we go where are we
1:01:56going from here we will continue
1:01:59coordination with our major
1:02:00transportation planning and project
1:02:02programming stakeholders NC dot campo
1:02:04and town of Kerry to refine
1:02:05implementation details. I don't see
1:02:08there being a lot changing that we are
1:02:10re that we have from what we have
1:02:12recommended or what we put in front of
1:02:13you today, but we are still getting some
1:02:15comments from those parties. Uh and and
1:02:18so we want to make sure that we allow
1:02:21them to finish providing their input and
1:02:23we're able to consider all of that
1:02:24appropriately. We will work on this is
1:02:28this is a little dated from the time I
1:02:30included it in your packets, but we
1:02:32really want to work on developing the
1:02:33final document documentation for the
1:02:35plan beginning this month. Um, actually
1:02:38a lot of it's already done because we
1:02:40brought a lot of things to you in pieces
1:02:41and it's really just rolling it up to
1:02:43this final plan, but we will be working
1:02:46on that in September and in subsequent
1:02:48months. Um, stakeholder interviews. We
1:02:51also need to still have stakeholder
1:02:53interviews with the community. those
1:02:55stakeholders that have specific
1:02:56community interests like the Morrisville
1:02:58Chamber, Wake Tech, HSNC, Becks, that
1:03:01sort of thing. So, we will be doing
1:03:04those also in the September to October
1:03:06time frame. Um, we wanted we wanted to
1:03:09wait to go to them until we solidified
1:03:11more of like this is based on like the
1:03:13why and and all this other feedback that
1:03:16we got. This is what we want to do. So,
1:03:18it was more final that what we can put
1:03:20in front of them for them to react to.
1:03:22Then we'll be developing the draft plan
1:03:24document where we where I said we will
1:03:26be um developing the document but we
1:03:29will plan to bring that back to the
1:03:31planning and zoning board in the fall to
1:03:32winter time frame. I will just go ahead
1:03:34and say we will be back in front of you
1:03:37in November but what we will be back in
1:03:40front of and and put in front of you in
1:03:41November is not really that it's program
1:03:45and uh it's the policy and program
1:03:47measures piece that you see that is
1:03:50missing from the implementation plan. We
1:03:52also did a code assessment as part of
1:03:54the CTP and there's some recommendations
1:03:57that we have that came out of that for
1:04:00how you know what would do we do with
1:04:02our unified development ordinance if
1:04:04anything to strengthen how we implement
1:04:07our CTP.
1:04:08Um and then we also will share the
1:04:11results of our landscaping guidelines.
1:04:13So you you get a whole another meeting
1:04:15of more information that has been
1:04:18developed that ultimately will be worked
1:04:20into the CTP and then when we come back
1:04:22to you after that in the winter will be
1:04:25the final documentation for the plan.
1:04:30All right, now it's your turn. I know
1:04:32that was a lot.
1:04:34Um, some areas of potential discussion
1:04:37are provided here on the slide, but
1:04:39certainly want to get your reaction and
1:04:42feedback to what I was able to share
1:04:43with you today.
1:04:47>> Thank you.
1:04:50So, I guess comments you want to start
1:04:53with.
1:04:54>> Sure.
1:04:55>> Um, so thank you for the presentation.
1:04:57That was a lot of information.
1:04:59Um, I tried to take notes, so hopefully
1:05:01I can read them now. I did have a couple
1:05:04questions. So, back in the bike and
1:05:06pedestrian section, um, and maybe this
1:05:10is just like my lack of knowledge about
1:05:12how this works, but so what's the
1:05:14difference technically like in a
1:05:16sidewalk and the side, did you call it a
1:05:20side path? Like what is the
1:05:23use case difference?
1:05:26>> So, a sidewalk is meant to be just for
1:05:28pedestrians,
1:05:29>> right? A side path is meant to be
1:05:30multi-use between pedestrians and
1:05:32cyclists.
1:05:34>> It's wider
1:05:35>> wider 10 feet. So a sidewalk, what we're
1:05:38proposing in here is for for the those
1:05:40to be six feet, the side path would be
1:05:4210.
1:05:43>> Okay. And I guess I mean I've just
1:05:45probably never noticed the difference,
1:05:47but like around Morrisville, is it
1:05:50mostly sidewalks at this point and we're
1:05:52converting to side paths or is there
1:05:54just a mixture?
1:05:56>> It's a mix. I mean, and you and you can
1:05:58even along the same corridor, you'll see
1:06:00places where there's a five foot
1:06:02sidewalk and then it'll widen out.
1:06:04>> A lot of the side paths that we have
1:06:05now, I don't even know if you want to
1:06:07call them side paths, but they're eight
1:06:09feet. They're not quite 10 feet.
1:06:11>> We do have some that are 10 feet here
1:06:13and there as well. It's it's quite a
1:06:14hodgepodge.
1:06:15>> Yeah. It's just an interesting like
1:06:17because you were talking about um I
1:06:20guess eventually like the bike lanes on
1:06:22Mccrimin going away and becoming the bus
1:06:24lanes but then you have the side path
1:06:27there like my kids are at an age where
1:06:29they want to ride their bikes places and
1:06:31have some independence and they would be
1:06:34going down mccrimin and so just trying
1:06:36to figure out like we've always told
1:06:38them don't ride your bike on the
1:06:39sidewalk.
1:06:40>> Right.
1:06:41>> Right.
1:06:42But I guess I need like making sure that
1:06:45we understand the difference in a side
1:06:47when it is appropriate to ride on the
1:06:50side path and like what the difference
1:06:52is. Um, I don't know if that's just me
1:06:55or if that's more widespread, but it
1:06:57might be helpful to have some like
1:06:58educational efforts around um, if the
1:07:01especially the bike lanes are going away
1:07:04or not going to be present because
1:07:06otherwise I'm afraid you're gonna have
1:07:08people biking in the road where there's
1:07:10not a bike lane thinking they shouldn't
1:07:12be on the sidewalk. Again, I mean, I I
1:07:14don't know how widespread that is, but
1:07:16that's like what comes to my mind
1:07:20um, for that.
1:07:22>> Yeah. and signage. Another thing that to
1:07:25be used is signage to help with that as
1:07:28well.
1:07:29>> Yeah. I mean, people who are probably
1:07:30like like legit bikers know how to
1:07:33manage that [clears throat] kind of
1:07:34thing, but then there's your more casual
1:07:36bikers
1:07:37um that like signage and stuff would
1:07:39probably help. So, that that's helpful
1:07:41for me to understand.
1:07:44Um, and then when you talked about the
1:07:47bicycle and pedestrian
1:07:50connections, I think you were saying
1:07:52there would be one at Kits Creek over to
1:07:5554 and then there was another one
1:07:56mentioned. What does that mean? Is that
1:07:58a bridge over the Okay. Okay.
1:08:02>> Um, and what was the time frame on those
1:08:07projects? was that?
1:08:09>> So I have them in the near I have
1:08:11>> I have them in those in the near term
1:08:13which is within 10 years of
1:08:17>> Okay.
1:08:17>> uh CTP adoption.
1:08:19>> Yeah. I think I've heard a lot of people
1:08:22say just around the community that like
1:08:23that's one of the things we're really
1:08:25missing are some of those pedestrian
1:08:27connectors where like if you could get
1:08:29to the other side then like there are
1:08:31sidewalks or side paths or you know
1:08:33crosswalks or things. But I do think,
1:08:36you know, living down at that end of
1:08:38Morrisville, like there's really no way
1:08:40to get over there as a pedestrian.
1:08:43There's all kinds of places we want to
1:08:44go over there that you could walk to,
1:08:46but you can't get to. And so, you end up
1:08:48driving, you know, all the way around.
1:08:50So, I mean, I don't know what the I
1:08:53don't know how expensive that is, like
1:08:55how cost plays into that, but to me, I
1:08:58mean, I'm sure they are expensive. It
1:09:00seems like a small project and it seems
1:09:02like
1:09:03>> I mean, yeah, you That would be a big
1:09:05win if the price is actually lower. And
1:09:08maybe it's not. I
1:09:09>> mean, yeah, there's no possibility of
1:09:11doing this at grade. I mean, you got to
1:09:12spend $5 million on a bridge and you
1:09:14could spend
1:09:17$75,000 doing it at grade
1:09:20>> a pedestrian at crossing at grade.
1:09:23>> Why not?
1:09:24>> Yeah. North Carolina Railroad, that's a
1:09:26big no. [laughter]
1:09:29I mean that they they've been on a
1:09:31mission too over the past several years
1:09:33to just to close down at
1:09:35>> grade. But they took lanes from us and
1:09:36they didn't give them back. So they
1:09:38actually owe us lanes. But anyway,
1:09:39that's if you look at the actual tally
1:09:41of what their formula is. They took more
1:09:44lanes than we got back. But anyway,
1:09:45that's another story. It just seems
1:09:47crazy. I mean, there's no way you're
1:09:48going to do this for under $5 million
1:09:50per crossing.
1:09:51>> Yeah, there it would be expensive. I
1:09:53think even though even though the per
1:09:55because it's a bridge structure, right?
1:09:57That's that's always expensive.
1:09:59>> Yeah.
1:10:00>> Even I I don't know that I would think
1:10:01of I would think of the impact. It's
1:10:04there's when I look at transportation
1:10:06projects, I'm like impa impact versus
1:10:08cost.
1:10:09>> Yeah.
1:10:10>> I actually think that these are very
1:10:13high impact projects even though they
1:10:15might cost a lot.
1:10:16>> Yeah.
1:10:17>> There's no way anybody in Kits Creek can
1:10:21get over to Walmart.
1:10:22>> Exactly. and without going up to Hopson.
1:10:25>> Yeah.
1:10:25>> Or down to, you know, so there's just we
1:10:28have really significant connectivity
1:10:30challenges in the town and this is this
1:10:34in my opinion, even though it c it might
1:10:35cost a lot, it's a very high impact
1:10:37project.
1:10:38>> I guess that's what I'm trying to say is
1:10:39like to me this would be like a top
1:10:42priority. Again, I live at that end of
1:10:44town, but like like we'd love to be able
1:10:47to get to Fountain and that shopping
1:10:48center over there and it's like
1:10:49literally right through the woods, but
1:10:51it takes 20 minutes to get there. You
1:10:53know, if we had a bridge, we would just
1:10:55walk.
1:10:56>> Yeah.
1:10:56>> So, I think those kinds of things like
1:10:58maybe they are kind of expensive, but
1:11:00the impact would be you would open up
1:11:02this availability for several large
1:11:05neighborhoods right there um to be able
1:11:08to get places without having to drive at
1:11:10all. So if there's any opportunity for
1:11:13moving those in terms of
1:11:15>> Yeah, I will say to Chair Langston's
1:11:17point, I mean, we we can we can
1:11:18certainly ask
1:11:20>> why
1:11:20>> let's ask well at least ask, hey, can we
1:11:22do an
1:11:23>> people all throughout Europe walk across
1:11:26train tracks every day. They have
1:11:28actual, you know, it's like a miniature
1:11:30version of a car thing. But I mean,
1:11:33>> you know, I mean, people do dumb things,
1:11:35of course, but I mean that
1:11:39>> you could do this for like
1:11:41>> 10% or less of the cost of of a bridge.
1:11:45>> I mean, I see people just walking across
1:11:47the rail bridge,
1:11:47>> right? So, you could be doing that, but
1:11:49in a way that would at least limit it
1:11:50and I feel like would be
1:11:53>> safer. Yeah.
1:11:54>> So,
1:11:54>> any other comments? I guess I'm before
1:11:56we jump off of bikes.
1:11:58>> No, I want to stay on bikes for a
1:11:59second.
1:11:59>> That's Yeah. The So, has there been any
1:12:03consideration to
1:12:04>> I don't know if you've seen other towns
1:12:05or cities that have those concrete
1:12:07barriers for safety for cyclists.
1:12:10>> Has that ever been a consideration to
1:12:12have those maybe for
1:12:16>> I mean, yeah. Yeah. I mean, anything's
1:12:18on the table. I those actually are
1:12:24pretty good at
1:12:26because it's just another curb
1:12:28essentially that keeps cars in their
1:12:31travel lanes from being able to encroach
1:12:33over into bike lanes. I think what we
1:12:36were trying to do was being a be a
1:12:38little bit less
1:12:42ownorous in terms of cost and elements
1:12:46that would have to be put in to achieve
1:12:48the goal of separating
1:12:51uh travel lanes from bike lanes. But
1:12:55also keeping keeping in mind we have
1:12:57reduced the facilities on which bike
1:13:00lanes are
1:13:02uh recommended and have gone more toward
1:13:06a side path approach which already
1:13:08provides that same type of benefit. Um
1:13:12>> but I think a little bit of the issue
1:13:14with the side path is like road cyclists
1:13:16are traveling at 20 plus miles an hour.
1:13:19So you have kids on bikes, road cyclists
1:13:23sharing the same pedestrian pedestrians
1:13:25>> pedestrians, you know, sharing the same
1:13:27area. I think that increases the risk
1:13:30for a safety issue.
1:13:35>> Yeah. But I mean I I I think that way
1:13:40all the time, but the reality is on the
1:13:43ground the data do not show that.
1:13:47Um we
1:13:49You would think on our greenways with
1:13:52bicyclists and pedestrians, especially
1:13:54where we have a lot of greenways that
1:13:55come together and connect.
1:13:58Not really familiar with any serious
1:13:59injuries or fatalities
1:14:02um on side paths either. Where you get
1:14:05serious injuries and fatalities is in
1:14:07the roadway.
1:14:08>> I was going to say on the greenways like
1:14:10people are able to exist together
1:14:14somehow. Maybe they're not used by like
1:14:17road cyclists in the same way. So I
1:14:19don't know would that profile change
1:14:22that road cyclists are now switching
1:14:24from the road and there would
1:14:27>> it could. Yeah. And one of the things
1:14:29too with bike bicycle and pedestrian
1:14:31planning is we also really sort of
1:14:35prioritize utilitarian use over
1:14:37recreational use. When it comes to
1:14:39roadway traveling in the roadways when
1:14:41we talk about greenways it's different.
1:14:43It's a little different. still
1:14:44utilitarian, but in the road and with
1:14:46roadway travel, it's utilitarian over
1:14:48recreational. On the greenways, it's
1:14:51recreational over road over utilitarian.
1:14:55So, there's also that kind of thing
1:14:57going on. You know, if you are an avid
1:14:59cyclist that wants to go fast,
1:15:02>> you're staying the road anyway,
1:15:04>> but you but but you know, it's the same
1:15:06thing as a roadway. Yeah. Like if you
1:15:08have a Ferrari and you want to go 80
1:15:09miles per hour when everybody else is
1:15:11driving 30, I'm sorry, but people other
1:15:15people are using it for utilitarian
1:15:17purposes and you're trying to use it for
1:15:18recreational purposes and that's not the
1:15:20purpose of the roadway.
1:15:25>> Just
1:15:27at least in that.
1:15:29>> Yeah.
1:15:31>> Um no, I was I also found the pedestrian
1:15:34crossings pretty interesting. Although
1:15:36likewise, it's personally more available
1:15:39since I live in the neighborhoods. It'll
1:15:41be directly affected. But I'm just
1:15:43having any connectivity across the
1:15:45railroad tracks. Like the preparation
1:15:48I've done for joining the board like I
1:15:50keep coming back to the railroad tracks
1:15:51is like that's
1:15:53that just kills us no matter what we
1:15:55want to do. So anything that's realistic
1:15:58that would help in that regard I think
1:16:00is at least worth serious consideration.
1:16:04Um,
1:16:06yeah. Otherwise, still just trying to
1:16:09catch up with everything that's been
1:16:10discussed so far and get up to speed
1:16:12with everything. So, anything else,
1:16:15Trist?
1:16:17>> Yeah, I had a couple of other ones. Um,
1:16:20when you were talking about the priority
1:16:22intersections,
1:16:24um, so it was like the four three on
1:16:25Church Street.
1:16:27Um, so I guess I I'm interested in a
1:16:30little bit more information about those
1:16:32three on Church Street. So I drive down
1:16:36all of Church Street on a daily basis
1:16:38and I would not have picked any of those
1:16:40as needing specific consideration.
1:16:44Also understanding that the town center
1:16:46is going to change a lot of this. So I
1:16:47guess multi-part question, but like is
1:16:50this is it really just because of town
1:16:53center or is there really a need today?
1:16:56And then what do what does it mean? Like
1:16:59are we going to put stop lights here?
1:17:02It could um
1:17:05that's we don't know that's we don't
1:17:07know enough about them to say this is
1:17:08what we're going to do that's why we
1:17:10need to do the that's why we would do
1:17:11>> so that's what the assessment is of
1:17:13these specific intersections is going to
1:17:15do is come up with a recommendation
1:17:17>> right what I can tell you is
1:17:21just in terms of operations now
1:17:24>> um it's interesting that you've had your
1:17:26observations because I've also had mine
1:17:28which are different
1:17:30>> um which the am peak on Church Street at
1:17:34particularly at Treybrook is awful.
1:17:38Um mainly partially because of the
1:17:40school
1:17:42on on Treybrook and everybody pulling in
1:17:45and out of out there and then you add
1:17:46that with some pedestrian crossing sort
1:17:49of u traffic and sort of it's it's it's
1:17:52very
1:17:53>> it's a very limited time window though
1:17:55because like I drive through in the
1:17:57morning and I don't see any like I drop
1:17:59my kids off at school and drive back
1:18:00through there in the morning and have
1:18:01never
1:18:02>> I've seen it during midday operate the
1:18:05same way.
1:18:06Um,
1:18:07also our prioritization that we did with
1:18:10for the intersections, the data for V
1:18:13over C volume over capacity for an
1:18:15intersection, that was the highest
1:18:17congestion score for for all
1:18:19intersections in the town. Um, and
1:18:23that's that's not uncommon for uh
1:18:27intersections that are not controlled by
1:18:29signals
1:18:30>> because a lot of side street traffic
1:18:32sits and is delayed for so long because
1:18:34there are no gaps.
1:18:36>> And so you could and that's how V over
1:18:40that's how a lot of intersection
1:18:41operations are measured is the delay
1:18:43that one experiences by sitting there
1:18:45before they're able to actually make the
1:18:47movement they want to make. Um, the
1:18:50other thing is, you know, Town Center is
1:18:53is a piece of it. I actually have a note
1:18:55at the bottom of the slide.
1:18:56>> Um, keep in mind Airport Boulevard
1:18:58Extension will tee into Church Street
1:19:02north of this,
1:19:03>> right?
1:19:04>> That's a four-lane section that is
1:19:06emptying into a two-lane section.
1:19:09>> And most of that traffic probably isn't
1:19:11going to go south. They might. Um, I'd
1:19:14have to take a closer look at, you know,
1:19:16what the traffic forecast is for that.
1:19:18So, you have that happening. You have
1:19:20TOD to the north.
1:19:23>> So, ultimately, Church Street will be
1:19:24the primary connector between TOD
1:19:26development and Town Center.
1:19:29>> Um, and there's a good good chunks along
1:19:32Church Street that are just completely
1:19:34undeveloped today as well. So, there's
1:19:36there's a lot more development capacity.
1:19:38>> Yeah.
1:19:39>> That has the potential to add a lot more
1:19:41trips. So that's where a lot of the
1:19:43concern is coming from.
1:19:45Um also, yeah, you might point to other
1:19:48intersections that are bigger and busier
1:19:52>> um within the town. A lot of those are
1:19:54actually already addressed to some
1:19:56degree by a project that's committed.
1:20:00Right.
1:20:00>> Right.
1:20:01um McCreman at uh Davis for instance um
1:20:08MCR aviation at NC54 there's going to be
1:20:11some improvements there with the
1:20:12aviation uh parkway widening project. So
1:20:16really if you take a look and you see
1:20:18what's available for us to take a closer
1:20:20look at it's you'd be surprised at how
1:20:24many of those big intersections are
1:20:25already addressed somehow or we've
1:20:27already studied them to some extent.
1:20:29>> Yeah. Yeah. I guess it's just
1:20:31interesting like I'd heard it said
1:20:34before at various meetings that like
1:20:36there's no intention to ever widen
1:20:38Church Street. So like especially down
1:20:40at our end of Church Street like it's
1:20:41always just going to be two lanes or the
1:20:43three lanes undivided. Um I mean if
1:20:47we're talking about this volume of
1:20:48traffic and all of these other things
1:20:50feeding into it, I guess it just makes
1:20:52me kind of reconsider
1:20:54like is that really still a viable plan
1:20:57then? were saying we need uh
1:20:58intersection improvements and there's
1:21:00all this traffic coming but there's no
1:21:03plan.
1:21:05>> Yeah, I was a little confused when I saw
1:21:07that was staying with that threelane
1:21:09like even far into the future but
1:21:12>> I just I wonder if that could be
1:21:14considered. I mean I know it would not
1:21:15be near but at some point if all of this
1:21:18is happening and all you know we've got
1:21:20stop lights every you know 10 feet along
1:21:23here like wouldn't we consider
1:21:28So we do have um
1:21:32some indication from prior studies that
1:21:35have happened that church street the
1:21:37capacity of the roadway itself
1:21:40can actually take can actually handle a
1:21:42lot
1:21:44>> but
1:21:47we're we we don't really separate
1:21:49turning movements from through movements
1:21:52very well. You see Trey Brook here. I
1:21:54mean there's some of that.
1:21:56um along the corridor where we have more
1:21:59opportunity to do so. Um and that's what
1:22:03that center, you know, threelane
1:22:05undivided is really that center turn
1:22:07lane is really meant to do. If we
1:22:08provide that space, let's first see what
1:22:11we can improve along the corridor with
1:22:14the capac the actual roadway capacity
1:22:16that's there. And I don't think we've
1:22:18really ever done anything to do that to
1:22:21to be like, "Okay,
1:22:24let's let's squeeze out the most
1:22:27capacity that we possibly can with what
1:22:29we've already got
1:22:31>> just because there's no
1:22:33there's not much there's not really any
1:22:35signalization. I mean, there there will
1:22:37be there will be a Town Hall Drive or
1:22:40sorry, not Town Hall Drive, but uh
1:22:41Airport Boulevard when it tease into it.
1:22:43But
1:22:46that's kind of mainly the thinking
1:22:48behind Church Street.
1:22:50>> Okay.
1:22:51>> I don't know if this is going to go
1:22:52anywhere else, but you do have Jeremiah
1:22:53and down Glenn reverse. The pictures are
1:22:56the wrong
1:22:57>> are they? Okay.
1:22:58>> All right. May not matter.
1:22:59>> I will
1:23:00>> I mean, if this is going to go sit in
1:23:01the file somewhere, I just figure
1:23:03>> Well, yeah. I'm gonna have to Thank you.
1:23:05I'm gonna have to switch. I got this
1:23:06from our consultant the the pictures
1:23:08from So, but thank you. I'm not trying
1:23:11to blame them. It's my job to
1:23:13It's my job to
1:23:15>> review their work.
1:23:17>> Yeah.
1:23:18>> I had one other question.
1:23:21>> Um I was curious a little bit more about
1:23:23the being able to cross um
1:23:27av uh aviation the HSNC
1:23:32crossover.
1:23:33>> Um and I guess just understanding more
1:23:36like when I think about that area like
1:23:39why would you want to cross? there's
1:23:41nothing there to cross to like what I
1:23:44guess what is that trying to connect to.
1:23:47>> So
1:23:47>> you only touched on this but I know
1:23:49exactly why.
1:23:50>> Okay.
1:23:50>> Well, so Fork District Park is
1:23:54>> the big Sorry,
1:23:57>> I don't have any water. I can I can do
1:23:59this. I can do this. It's fine.
1:24:02Cedar Fork District Park is the big one
1:24:05where we have a lot of events and it's
1:24:07not just town events. There's also just
1:24:09a lot of other events there. And then
1:24:10HSN has big events as well,
1:24:12>> right?
1:24:13>> That is over capacity for the parking
1:24:16that they have. And so there's just a
1:24:19lot of there's a really strong
1:24:20relationship between HSN and Cedar Fork
1:24:22District Park. Also, keep in mind
1:24:25there's a lot of aviation parkway
1:24:27like some of a lot of that is not in
1:24:29that exact location is not going to be
1:24:32developed
1:24:33>> for types of uses where people want to
1:24:35cross and there's that would command a
1:24:38lot of pedestrian activity.
1:24:40However, as I mentioned earlier, if you
1:24:43go farther east or sorry, west and
1:24:46south,
1:24:48um, where there is an existing
1:24:50pedestrian crossing, where there is more
1:24:53potential pedestrian activity is going
1:24:55to close.
1:24:56>> So, right at the entrance to the park is
1:24:59where he's talking about at the other
1:25:01side. So, like literally just off this
1:25:03corner of this map, there's an existing
1:25:05place that will
1:25:06>> and I guess like that because that makes
1:25:08sense to me. there's a neighborhood and
1:25:10they would want to get over to the park,
1:25:12right? Like that's where the crosswalk
1:25:13is. So why would that one close?
1:25:16>> The put immediate down the road
1:25:18>> part of the Yeah, they and there's
1:25:20there's as you get closer to NC54, there
1:25:23has to be more access control for for
1:25:25that aviation parkway widening project
1:25:27to fulfill its purpose and need. So
1:25:31that's part of it as well. Yeah, that
1:25:33just seems like an odd given the people
1:25:35who want to cross over, it seems like a
1:25:37little bit of an odd configuration, but
1:25:41um it sounds like there's other things
1:25:42in play there. So,
1:25:45>> there are there are a lot of Yeah.
1:25:48>> Yeah.
1:25:48>> The the the main part of the main thing
1:25:50it's the events and the relationship
1:25:52between the two. Thank you. Oh, this is
1:25:54[laughter] if you give me just a few
1:25:55seconds,
1:25:56>> please.
1:26:03feel better.
1:26:04>> Yes. Thank you. Um,
1:26:07yeah, if you if you look at the
1:26:08relationship between HSNC and Cedar Form
1:26:11District Park, that's that's a big
1:26:13reason. Yes.
1:26:14>> Okay.
1:26:15>> But also for serving the purpose of we
1:26:18need to really um continue to advocate
1:26:22and try to get a pedestrian crossing
1:26:24somewhere between International Drive
1:26:26and NC54 on aviation. Yeah,
1:26:29>> because people are going to just like
1:26:30the railroad. They're probably going to
1:26:32cross anyway if there's a need to cross.
1:26:35And so at least you can give them
1:26:36hopefully something that's appealing and
1:26:39somewhat close to where they are.
1:26:41Hopefully they will gravitate towards
1:26:42that. I guess you know,
1:26:44>> it's just like that's a hype down here
1:26:45in that neighborhood.
1:26:46>> I mean, it is. It is. and tie and tying
1:26:48it into the greenway as well is
1:26:50important because that greenway can be
1:26:53used for a lot of different people
1:26:55coming from a number of different
1:26:56directions and it's it's actually
1:26:59unimpeded right when you get to the
1:27:02railroad and all of that. So, well, I
1:27:06think at that point it becomes H is it
1:27:07Hatcher Creek Greenway at that point? I
1:27:09don't know where the split between
1:27:10Crabtree and Hatcher Creek is exactly
1:27:13but generally.
1:27:16Okay. All right. Thank you.
1:27:20>> I guess the only with the So I know
1:27:22there's the study that we did on
1:27:24Morrisville Parkway. There's a larger
1:27:27plan, but like I mean that's not shown
1:27:30on this. Is that why that's not shown on
1:27:32this? Because there's this other plan
1:27:34that we did. I mean that's an
1:27:35intersection that doesn't doesn't work.
1:27:38And I still of the opinion that with a
1:27:41few gallons of paint and some signage,
1:27:43you could fix it simply by denying
1:27:46people the ability to go straight in the
1:27:48right lane.
1:27:49>> Yeah. Okay. Yeah.
1:27:51>> Because you could have 50 cars trying to
1:27:53go straight.
1:27:54>> Yes.
1:27:55>> And instead of having 51 cars trying to
1:27:57go straight, one car that wants to go
1:27:58straight is in the right lane that
1:27:59denies 50 more cars from turning right.
1:28:02And like it that's a very simple fix
1:28:06that will cost almost nothing. Um and I
1:28:09just it's I don't know.
1:28:11>> And you're talking about Morrisville
1:28:12Parkway at Davis,
1:28:14>> correct?
1:28:14>> Right. Yeah. So the town does have we we
1:28:17through the Morseville Parkway access
1:28:19management study, right? That was done.
1:28:20>> But does it really covering that part of
1:28:22it though?
1:28:23>> Yeah, there's some some of it. So, a
1:28:26right turn lane is part of the
1:28:28Morrisville access, the Morsville
1:28:29Parkway access management improvements
1:28:32that the town has done 65% design for
1:28:35and we're pursuing a lap plan.
1:28:36>> How much storage there? How many?
1:28:38>> I'd have to go back and look.
1:28:39>> I mean,
1:28:41>> probably probably.
1:28:44Do you do you remember is it 150 ft?
1:28:47>> Okay, so 10 cars. Not even that. Well,
1:28:50not no I mean you gota assume a if you
1:28:53want to be conservative one car per 25
1:28:56feet
1:28:57>> I think that
1:28:58>> that's not
1:28:58>> we would have more effect not me not
1:29:00being a transportation planner but just
1:29:03driving all the time. You would have
1:29:04more effect if you just said no right
1:29:07turns in this in the right hand lane
1:29:09than by adding what you're talking about
1:29:11doing and you save the town $500,000.
1:29:18>> I mean There was a study
1:29:21>> with traffic engineers involved.
1:29:24>> Um,
1:29:24>> well, I mean, there was a study, but
1:29:26traffic engineers want to do certain
1:29:27things just like the DOT. They love to
1:29:30propose crazy things that will make
1:29:31things difficult for people so that the
1:29:33plan they really want to get through or
1:29:35the plan that people can afford can be
1:29:37done. I mean, that's happened multiple
1:29:39times. I I mean, I don't know. I'm just
1:29:41saying I'm driving on the road and it
1:29:43used to work and it doesn't anymore and
1:29:45it used to work better. I you know, the
1:29:47same thing has happened. It was like a
1:29:49light switch on Morrisville Carpenter
1:29:52when we widened the road. An
1:29:54intersection that went from mostly
1:29:55working went to not working because
1:29:59people will sit in the righth hand lane
1:30:00and go straight across when if they just
1:30:03stayed in the lefth hand lane and go
1:30:04across and then got over it would work
1:30:05just fine. So I I mean that that was
1:30:08like they study it all they want to. I
1:30:10mean, I just drive on the road every day
1:30:12that they don't drive on and it's
1:30:13literally like a switch happened when
1:30:15that lane suddenly became a three lane.
1:30:18Um,
1:30:19>> so, you know, it's not a huge deal, but
1:30:22you know, when you sit there through
1:30:23multiple light cycles and there's just
1:30:24literally one person in the front that
1:30:26just is all they're going is to
1:30:27Walgreens,
1:30:29you know, it just like I said, I mean,
1:30:33we just have a few in and we've gone
1:30:35over this before and I've even tried to
1:30:37look at a few things, but like, you
1:30:38know, with down here at the corner with
1:30:40the stop with the um track, uh, you
1:30:43know, still a consistent problem with
1:30:44people who were just in the middle of
1:30:46the intersection. um and and or in the
1:30:50right-hand lane who will wait until the
1:30:52last second, stop in the travel lane and
1:30:54then try to get over,
1:30:56>> you know, and we don't there's a little
1:30:57bit of signage that could be more
1:30:59signage. I mean, I've seen other
1:31:00intersections throughout the area where
1:31:01there's signage
1:31:03>> before the light that says like, you
1:31:04know, this is no or we could put
1:31:06truncated domes or we could do plastic
1:31:10flexible stick. I I don't know. But
1:31:12there's just things that we could do and
1:31:15I and I struggled. I went through the
1:31:16MUTCD and I couldn't find anything that
1:31:19showed like a don't block the box
1:31:21painting that matches what's there. Um
1:31:24there's a lot of don't block the box
1:31:25recommended designs that are much
1:31:28tighter, smaller crosshatch. What we
1:31:31have there is painted. It looks like a
1:31:33railroading. And I I just think a lot of
1:31:35people don't realize that they're not
1:31:37supposed to be in that spot. I I Anyway,
1:31:40I guess we're just never going to do
1:31:41anything. I I don't know. I mean,
1:31:42>> well, there there are plans. So the
1:31:45other issue with that intersection is
1:31:48threequarters of it is not in the town.
1:31:51>> So I mean I guess we don't nothing's
1:31:53ever going to happen. Just just like
1:31:54asking him if we can do a grade cross. I
1:31:56mean what's the worst I can say is no.
1:32:00>> I mean I mean why can't we try? I mean,
1:32:02literally, people have been killed in
1:32:03the intersection before.
1:32:06And the exact behaviors that cause that
1:32:08are happening every single day with no
1:32:13attempt when no one's tried anything at
1:32:14all to to change those behaviors. We
1:32:17don't try to do it from a traffic
1:32:19standpoint. We don't try to do it from
1:32:21science standpoint or any other any
1:32:23other standpoint. We've not tried
1:32:24anything. So, we continue to do nothing
1:32:27and wonder why it's a problem. um you
1:32:30know because it not only just the safety
1:32:32impact it affects the flow of the road
1:32:34because people are parked in weird
1:32:35places and stopped and like cars can't
1:32:36turn from the other direction and so you
1:32:38you miss the light cycle you know that
1:32:41just you know and then that backs up
1:32:44into you know and causes a massive
1:32:47backup down 54 towards Park West because
1:32:50the cars can't get almost everybody
1:32:52wants to turn right left there but they
1:32:54can't because they you know can't get to
1:32:57the light and I don't know there's just
1:32:58a lot
1:33:00Yeah, I do not disagree with you. Um the
1:33:05the town town staff has talked about
1:33:07that intersection ad nauseium and we
1:33:10collaborated with the engineering
1:33:12department quite a bit to kind of put
1:33:13these recommendations together for
1:33:15intersections. We talked a lot about
1:33:18Mors Parkway and Davis. Um, and
1:33:22if you're if we're not going to focus on
1:33:24that as part of this study, which we
1:33:26have to we have to have a really good
1:33:28reason why not because it's very
1:33:30important to the town. Um, but you know,
1:33:33the reasons being um we it already has
1:33:36been studied to s to a certain degree.
1:33:39There's already improvements that have
1:33:40been recommended for it that the town
1:33:42has already started to advance and and
1:33:45do more advanced design for. But that's
1:33:47a 15 year.
1:33:50>> But also keep in mind again it's not
1:33:54it's mo most of it's not in the town.
1:33:57>> What if we just went out there in one
1:33:59middle of the night painted some
1:34:00diplines on the road? What
1:34:01>> we could I fully support the mayor in
1:34:03jail.
1:34:05[laughter]
1:34:06>> Mayor Daly got a lot of things done as
1:34:09the mayor of Chicago using that method.
1:34:12I mean, at the very least, I feel like I
1:34:14I would, you know, if we could at least
1:34:16have a legal
1:34:17legal paint scheme there because, like
1:34:19say, I literally can't find anything in
1:34:21MBTC that shows what we've got there.
1:34:24So, like we're worried about at least
1:34:26doing the right thing. I don't think
1:34:27we've done the right thing.
1:34:30I don't know. But maybe a big old sign
1:34:33says, "Don't block the box." And like
1:34:34just like what they have in New York
1:34:35City with the little small crosshatch
1:34:37that's much tighter than what we have
1:34:39there. I just think like if you look at
1:34:41what we have there, it looks like the
1:34:42crossbucks that are at a railroad
1:34:44crossing. I think people just they see
1:34:46the initial one that it does have the RR
1:34:48beside it, but then the next one to
1:34:50people who are just not thinking about
1:34:51it, it looks like the same thing and it
1:34:54doesn't occur to them. Oh, I'm not
1:34:55supposed to be in this anyway. I've
1:34:57labored this the last two meetings, but
1:34:58it's just, you know,
1:34:59>> well, I've thought about that a lot,
1:35:01too. It my take is just too much white
1:35:03paint on the confus.
1:35:05>> I think doing that in yellow would help.
1:35:07I put that in yellow. I mean, that's in
1:35:09the M2CV. Yellow crosshatch, small
1:35:12crosshatch is is is something that's
1:35:13allowed. It's in there.
1:35:15>> I mean,
1:35:16>> and I years ago, I actually I think it
1:35:19was the NC DOT that I contacted with an
1:35:21idea. I was suggesting for all the right
1:35:24on red that people do from southbound 54
1:35:28turning right, they just, you know, they
1:35:30roll up to where they can see and they
1:35:32go it. I think this the no turn on red
1:35:34signs are just in strange places that
1:35:37people just don't see them the way they
1:35:39tend to drive and do just came back and
1:35:42said, "Oh, we've studied this
1:35:43intersection. It's fine."
1:35:46So that there seems to be some headwinds
1:35:50against trying to do things for whatever
1:35:52reason at that intersection, but
1:35:54everybody agrees it needs something, but
1:35:56then but we do nothing of it. [snorts]
1:35:59>> Yeah. Like I say, if police are
1:36:00interested in writing tickets, you know,
1:36:02I know they love writing tickets on
1:36:03Morsville Parkway on Morrisville Car
1:36:06Road and this is part of Morel Carvin
1:36:07Road, stopping people from doing things
1:36:10that are, you know, risking their lives.
1:36:13>> That has confused me sometimes because
1:36:14I'll see people sitting out in the
1:36:16middle of the road and the cops go by
1:36:18and just like go right by and it's like,
1:36:20I mean, that's a safety. It's not just a
1:36:22matter of like I want somebody to get a
1:36:23ticket. Like there's like lots of safety
1:36:26issues happening there. Why would you
1:36:29not like give somebody a warning?
1:36:33I don't know. I do find that odd.
1:36:38>> Sorry.
1:36:42>> Anybody else have any other comments?
1:36:46>> It's a good presentation overall. Very
1:36:48action-packed, but
1:36:51>> No, I I appreciate it. I do want to
1:36:54mention, I didn't really hit on this
1:36:58because as this was being developed, we
1:37:00were getting more information from
1:37:03um Fujifilm
1:37:06and Research Triangle Foundation on our
1:37:09connectivity plan. You don't you don't
1:37:10see any roadways up here, right?
1:37:13>> Well, our efforts to try to work
1:37:17something in there
1:37:20have were not supported. Okay.
1:37:23um
1:37:25at least not right now with lines on a
1:37:27map that show the level of connectivity
1:37:31that we were showing earlier. Um so I do
1:37:34want to me I do want to make sure that's
1:37:36understood. Town Hall Drive extension
1:37:38would stop uh well it would really just
1:37:41stop at the town limit boundary there
1:37:43where you see there and so it would not
1:37:46extend up to provide any type of
1:37:48connection to Providence Place.
1:37:51uh there would not be a another
1:37:53connecting roadway from the Providence
1:37:56Place area over to Davis Drive at Little
1:37:58Drive. Uh one of the things that we're
1:38:01still trying to work out, you saw this
1:38:02with my dotted line here is we still
1:38:06very much want to get a greenway
1:38:09connection there. And actually what you
1:38:11see on the map here is in RTF's plans
1:38:13for RTP. Um, but that is still
1:38:16Fujifilm's property and we need to work
1:38:19that's outside of our jurisdiction and
1:38:22we we need to work with them on
1:38:24something that is comfortable to them to
1:38:27be able to to do that.
1:38:30And
1:38:30>> I know it's come up in like Providence
1:38:33Place HOA meetings in the past. You all
1:38:35may have heard this too. Um, but there's
1:38:38been discussion about like, well, what
1:38:39if we could connect? I mean, you know,
1:38:41this is obviously not like going through
1:38:42the town, but just like should we make a
1:38:44big thing about this? And I I think it
1:38:46would be great, but most of the
1:38:48neighborhood is very opposed to it.
1:38:50>> So, it's just an interesting um you
1:38:53know, people want to be connected, but
1:38:55then don't like the idea of the
1:38:56connection being their backyard, right?
1:38:59They don't. So, you know, I there's
1:39:01different perspectives on it. I think it
1:39:02would be amazing. We could get a lot of
1:39:04places a lot faster. Um, but there I
1:39:07think there is very mixed feelings about
1:39:10it from people that live there. So,
1:39:13>> okay. Well, thank you for that tidbit.
1:39:16Yeah, that that's I mean that's
1:39:18interesting.
1:39:20>> Well, it's like the a the airport
1:39:22boulevard being cut through. Like I see
1:39:24the same people on Facebook who
1:39:26complained about not being able to get
1:39:28anywhere and get across now complaining
1:39:30that they're building a road and it's
1:39:32like
1:39:33well did you want a road or not? like
1:39:36you have to cut down the trees to build
1:39:37a road. So,
1:39:39>> it's hard to please everyone all the
1:39:40time, I guess, is
1:39:43>> Well, yeah. And part of the reason why
1:39:45we have the traffic problems that we do
1:39:47in a lot of cases is because of our lack
1:39:49of connectivity,
1:39:50>> right?
1:39:50>> When you funnel all of your trips to
1:39:53fewer intersections,
1:39:55>> right?
1:39:55>> That's what happens. The most efficient
1:39:58transportation system is a perfect grid.
1:40:03>> And we don't have that in Morsville.
1:40:08Thank you.
1:40:09>> Thank you.
1:40:12>> I guess we can move on to number eight.
1:40:24So we
1:40:28our current vice chair is no longer
1:40:30going to serve on the board. Um so
1:40:34already given us balance. Is there
1:40:36anyone who would like to be the vice
1:40:38chair? I know I I want to recommend
1:40:42Kristen. Um anyone else want to
1:40:46potentially
1:40:47do that? Um support
1:40:54any other discussion or anything?
1:40:56Kristen, are you willing? Okay. So, I
1:40:59guess we can go ahead and vote over here
1:41:01and then we'll collect those and
1:41:02tabulate. uh on our very fancy balance
1:41:06which I'm like
1:41:08>> does it count since we only have four?
1:41:10>> Yes, we only need three to conduct that
1:41:13kind of business.
1:41:39It is unanimous. We have four votes for
1:41:42member Richardson to be recommended to
1:41:45town council
1:41:47for vice chair.
1:41:49>> Thank you.
1:41:55Now time for the wonderful staff
1:41:58newsletter.
1:42:00Staff comments and the planning.
1:42:04You may notice there is a
1:42:06>> change the name.
1:42:07>> Yeah, there's a different look and feel.
1:42:09Credit goes to Secretary Dawson. Um she
1:42:13updated the format and some of the
1:42:15information that we've been provided in
1:42:17the path past. the in the past. So yes,
1:42:20um different updated newsletter this
1:42:22time around. Um just to provide a broad
1:42:27overview of some of the information
1:42:29that's in the newsletter. Um in terms of
1:42:33new development applications, um we did
1:42:35have two new applications come in. Both
1:42:38of them um are special use permits um
1:42:43for new development. One is the expanded
1:42:46Wake County Convenience Center at 414
1:42:48Aviation Parkway and the other um a wood
1:42:53processing facility that is looking at
1:42:56122 International Drive.
1:43:00We also um continue to see a lot of
1:43:02progress um in regard to development.
1:43:05McCreman um Pathway Triangle has
1:43:08continued to see progress there um with
1:43:11their development um as well as the
1:43:13Spark development with a new 900,000
1:43:16square foot building um on that campus
1:43:18approved. So um encourage all of you to
1:43:21continue to drive up and down Mcrimman
1:43:23periodically. Every time I do, I I see
1:43:26something different. Just a lot going on
1:43:28there.
1:43:29Um, another exciting thing to share, um,
1:43:32is that work has begun on the athletic
1:43:35pro athletic field improvements at Cedar
1:43:38Fork Elementary School. So, again, those
1:43:40are to support Morsville High School,
1:43:42which is slated to open um, next year.
1:43:46Um, so those improvements just started a
1:43:49couple weeks ago, should be wrapped up
1:43:51next center, next summer um, in time for
1:43:54the opening of the new high school.
1:43:59Um the other thing I want to highlight
1:44:02um is the icon initiative. Um there has
1:44:05been a lot going on with butterflies
1:44:08over the last few weeks. I will say
1:44:10those butterflies have flown all over
1:44:12the place at this point. Um but the
1:44:15molds were delivered. Um the artists
1:44:18were selected and the locations were
1:44:20selected. Um so the molds were actually
1:44:23delivered to the five selected artists.
1:44:25Um we have been slowly getting um the
1:44:29decorated final product back. I cannot
1:44:32wait to share them with the community.
1:44:34Um just a lot of talented artists um and
1:44:37a lot of great designs. Um we are going
1:44:40to be unveiling those at international
1:44:42festival. Um so encourage you encourage
1:44:45you to come and take a look at those. Um
1:44:48all five will be on display at the
1:44:50festival before they make their way um
1:44:53out to their permanent homes.
1:44:57Um rental assistance also um is uh that
1:45:01pilot is continuing. Um also want to
1:45:04highlight um the Evergreen project that
1:45:07came before you not that long ago for a
1:45:10reasonzoning. Um, you may recall that
1:45:12having that entitlement in place was a
1:45:15requirement for their LITC application.
1:45:18So excited to share that the LITC LITC
1:45:21application was approved. So that
1:45:23development is going forward. Again,
1:45:26that's going to be a fully 100%
1:45:28affordable housing project for seniors.
1:45:31Um, so that's great for the town.
1:45:34Um, CTP implementation, you got a great
1:45:37update on that tonight, so I'm not going
1:45:38to touch on that. Um did also want to
1:45:42share just two other things with you. Um
1:45:45one a lot of great work was done by our
1:45:47communications team and other town staff
1:45:50and excited to share that u Morrisville
1:45:54was named um a 2026 all-American city.
1:45:57Um one of five one of I'm sorry 10
1:46:00communities in the nation that received
1:46:02that honor. Um so really proud of that.
1:46:06Um and then um our vacant planning
1:46:08manager position um was filled. So um
1:46:11Courtney Jensen has joined our
1:46:13department and is overseeing the per
1:46:16permits plat and code enforcement
1:46:18division. Um so excited to have her on
1:46:20board as well.
1:46:23Thank you.
1:46:24>> All right. Thank you. Welcome to
1:46:26Courtney.
1:46:28Um any board comments?
1:46:34Um, just thank you for the presentation
1:46:36and all the information. It was very
1:46:38informative.
1:46:46>> Yeah. Thank you. That's good. So, with
1:46:49that being said, I will entertain a
1:46:50motion to adjurnn.
1:46:52>> Motion to adjurnn.
1:46:53>> Do I have a second?
1:46:56>> Second. All right. All in favor?
1:47:00We are adjourned. Thank you.