2026-09-22 - Town Council Regular Meeting
Summary
Based on auto-generated captions; names, numbers and some speaker attributions may be misheard (the captions have no speaker labels, and the two Johnsons on the council are not distinguished; the mayor's name is rendered several ways).
Time on topic (from transcript timestamps; approximate, includes side talk; the roughly 50-minute closed session is excluded):
| Topic | Minutes | Share |
|---|---|---|
| Comprehensive Transportation Plan Update | 75 | 62% |
| Western Wake Farmers Market Lease | 17 | 14% |
| Other business | 12 | 10% |
| West Wake Solid Waste Facility Special Use Permit | 8 | 7% |
| Council Dynamics and Retreat | 5 | 4% |
| Growth and Zoning | 3 | 3% |
- Tuesday, September 22, 2026.
- Called to order about 16:23 on the transcript clock.
- Public business ended at 8:56 p.m. when the council entered a second closed session (personnel); the transcript stops there, so any outcome is not on this record.
- Every recorded vote was unanimous, 7-0.
Opening and agenda
16:23-20:48
- Mission statement, invocation (autumn, the International Festival, Diwali on October 17, the Saturday farmers market), and a pledge led with a large Boy Scout group and American Legion members present.
- No conflicts of interest were declared.
- Harrison Kesling first moved to pull the farmers market lease from the consent agenda and add a closed session; a Johnson objected that the discussion should be public. On advice from the manager he withdrew the motion, and the agenda was adopted as presented, 7-0.
Western Wake Farmers Market Lease
20:48-32:10, 42:15-45:23, 2:17:03-2:18:40, 3:08:25-3:09:17
- Consent agenda (August minutes, the farmers market lease extension, the community garden lease extension): the farmers market item was pulled by Kesling; the other two items passed 7-0 on a motion and second from other members.
- The council argued over process. One Johnson wanted the talks in public and wanted staff directed to set a timeline so the next contract is not another stopgap extension, noting the council could amend the contract before July 1 and recalling that she was on the council when the partnership began. Vicki Scroggins-Johnson (as heard, "strong Johnson") wanted to question dollar amounts in closed session because they bear on economic development, but also said she had financial questions before she could approve. Anne Robotti objected that she did not want a vote rushed before her questions were asked; Ashit Patel asked whether the vote could still happen in open session after a closed one (it can).
- A motion to take the item into closed session passed 7-0.
- Public comment: the market's board president said the market submitted its renewal package on August 10, that she and the market agreed with the assistant town manager and the parks and recreation director last week to meet monthly, and that a short white paper on how other Wake County markets partner with their towns is in the package. She introduced the new market manager.
- Closed session for attorney-client privilege began at 8:05 p.m. (about 50 minutes, not on the record). Back in open session at 8:55 p.m., a motion by a Johnson, seconded by Kesling, to approve resolution 2026-330-0 authorizing a lease agreement with the Western Wake Farmers Market, Inc. passed 7-0. The captions do not say whether this was the extension or a new multi-year lease.
Proclamation
32:13-36:28
- Veteran Suicide Awareness Month (September 2026) was proclaimed and presented to American Legion Lowe's Grove Post 416 members, who run a local program to reduce stigma around mental health treatment.
Morrisville Speaks (public comment)
37:06-45:30
- Three speakers signed up, no written comments or walk-ups. Themes: housing and zoning reform, an appointment request, and the farmers market update above. Speaker addresses are omitted here.
- Housing and zoning: a resident urged the council to end exclusionary zoning and allow missing-middle housing in every neighborhood, tying displacement and school segregation to past government housing policy, and praised the council's unanimous May approval of a senior affordable housing proposal (name as heard "LIT tech"). See Growth and Zoning (37:38-40:54).
- Appointment: a resident with a public health background asked to be considered for the Public Safety Advisory Committee, with interests in substance misuse, youth safety, mental health and vaping prevention (41:09-42:15).
West Wake Solid Waste Facility Special Use Permit
46:05-54:20
- Quasi-judicial item. Planner Rachel Cypher (name as heard) said there were no updates since the September 8 hearing, for a major utility facility at 414 Aviation Parkway. The evidentiary hearing rules were read, prior witnesses reminded they remain under oath, and any new witnesses were sworn in.
- No further questions or personal-knowledge facts from the board. One member said the applicant had substantively met the seven standards and that the facility would benefit the community.
- Motion by Satish Garimella (as heard "Garamela"), seconded by a Johnson, to adopt resolution 2026-291-0 approving the special use permit: passed 7-0. The written decision will be updated to list the witnesses and signed by the mayor; parties have 30 days to appeal.
Comprehensive Transportation Plan Update
54:34-2:06:50, 2:11:33-2:13:53
- Information item with no vote. Transportation project manager Bret Martin covered greenway prioritization results, 19 proposed roadway cross-sections built from five base types, the draft implementation plan, a priority intersection study, and next steps.
- Cross-section standards: 11-foot travel lanes (one foot narrower than the 2019 plan), 6-foot sidewalks, 10-foot side paths, 5-foot bike lanes with a 3-foot buffer. Right-of-way needs fall within the 2019 plan's ranges but above the minimums. Bus lanes are added for the Wake BRT western extension (in the regional 2055 plan for 2035-2045). Morrisville-Carpenter Road: side paths long term with bike lanes as an interim step. Church Street: three lanes from Carolina Street to Mason Farm Road, two lanes north of it. Fujifilm and the Research Triangle Foundation declined a Town Hall Drive extension north to Providence Place and a new connection to Davis Drive.
- Implementation tiers: immediate (within 5 years), near (10), mid (15), long (20). Staff said it is "very unlikely" that all immediate-term items will be built in five years and that the draft does not yet explain why projects sit in each tier. The plan is not fiscally constrained, and grant sources listed (CAMPO, SPOT, STIP) are options, not secured money.
- Priority intersections for study from October to February: Davis Drive at Morrisville-Carpenter Road, and Church Street at Trey Brook Drive, Jeremiah Street and Downing Glen Drive. Also under way: roadway landscaping guidelines (survey done; back to the council December 8) and a signalized pedestrian crossing study on Aviation Parkway near the HSNC entrance (due November). Plan adoption is expected in the December-April window after public review and Planning and Zoning review.
- Planning and Zoning Board feedback relayed: strong support for bike/pedestrian crossings of the NC Railroad with cost concerns, education on sidewalks versus side paths, "don't block the box" striping at Morrisville Parkway and Davis Drive, vertical protection in bike-lane buffers, and frustration with the Aviation Parkway and Carpenter Road intersection at NC 54.
- Council questions: Garimella asked about sidewalks and safe crossings at McCrimmon Parkway and Davis Drive near the new high school (project U-5747 has an 8-foot path on the north side and 5-foot sidewalk on the south, with refuge islands) and asked for the latest design; raised rail safety given the proposed Union Pacific and Norfolk Southern merger (staff to look at local jurisdiction). Robotti asked about the Kit's Creek Road to NC 54 bike/pedestrian bridge concept. Patel asked how prescriptive the cross-sections are once adopted (the plan can be amended any time, but developers can vest earlier) and about town financial exposure (not estimated). A Johnson asked about coordinating with Cary on the Morrisville Parkway/Davis Drive and Morrisville-Carpenter/Davis Drive intersections, which straddle the line; staff said CAMPO scoring would likely not favor shared intersections. Harrison Kesling asked for one map overlaying existing and proposed bike lanes, side paths and greenways to find gaps, questioned redundancy where a road facility parallels a greenway, wanted a look at physically separated lanes and two-way bike lanes (citing Austin and Amsterdam), and stated his goal as reducing car dependency. Staff agreed to all of it, and to check with the parks department about the parks master plan.
Council Dynamics and Retreat: staff workload and retreat timing
2:06:50-2:11:33, 2:17:04-2:17:12
- Anne Robotti said the council keeps piling individual requests on staff without weighing trade-offs, and asked Martin what he had committed to and what would slip. He said the requests were not a large lift. Robotti and a Johnson agreed the council should be mindful.
- Near the end, a member raised setting the retreat timing; the mayor deferred it.
Council comments
2:14:07-2:17:03
- Most members had no comments. Kesling thanked staff for handling a water main break and for safety work around the Airport Boulevard and Cedar Fork athletic fields construction, and recognized the fire marshal's Go Pack assembly event and an officer of the quarter who has been stopping drivers who endanger farmers market pedestrians. The mayor promoted Ready Wake sign-ups, a butterfly art installation, and a charity 5K.
Closed sessions
2:17:03-2:18:40, 3:09:19-3:09:54
- Two closed sessions were scheduled under NC General Statutes 143-318.11(a): (3) attorney-client privilege for the farmers market agreement, then (6) a personnel matter. Both motions passed 7-0. The personnel session began at 8:56 p.m.; the transcript ends there and no outcome is recorded.
Issues discussed: Comprehensive Transportation Plan Update, Western Wake Farmers Market Lease, West Wake Solid Waste Facility Special Use Permit, Council Dynamics and Retreat, Growth and Zoning
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
16:23Well, the room kind of sensed that we're
16:25coming to order. So, let's do that
16:28officially. I call the September 22nd,
16:312026 meeting of the Morrisville Town
16:32Council to order. We ask those in
16:35attendance tonight to please silence
16:36your cell phones. Thank you to those
16:38here in person with us tonight, those
16:40watching via liveream, and those who are
16:42watching the recording of this meeting.
16:43Our town mission statement, which helps
16:45guide our decisions tonight and into the
16:47future, is connecting our diverse
16:50community to an enhanced quality of life
16:52through innovative programs and
16:53services.
16:55Sergeant Strickland, right there in the
16:56back, is our sergeant-at-arms for this
16:58evening's meeting. We thank you for your
17:00attendance
17:01this evening. I'll be leading our
17:02invocation.
17:05As we gather this evening, we are
17:08reminded of how deeply we are connected
17:09to one another and to this community we
17:12are privileged to serve.
17:15Let me say that. Sorry, emphasized that
17:18wrong. As we gather this evening, we are
17:20reminded of how deeply we are connected
17:22to one another and to this community we
17:24are privileged to serve. Tomorrow marks
17:27the first day of autumn, a season of
17:29change, reflection, and gratitude. Just
17:32as the seasons turn, we continue growing
17:34together as an all-America city, finding
17:36new ways to live connected and live
17:38well. This past Friday evening, our
17:41international festival once again
17:42brought our community together in such a
17:44joyful way, filled with music, dance,
17:47and the shared experiences that make
17:48Morrisville so special.
17:51And as we look ahead, we're excited for
17:53a busy and meaningful holiday season,
17:55including our Morrisville Diwali
17:57celebration on Saturday, October 17th.
18:00And every Saturday morning, without
18:01fail, our community comes together at
18:03the Western Wake Farmers Market to shop,
18:05to socialize, to enjoy live music, and
18:08simply to be in each other's company.
18:10These moments remind us that belonging
18:12is not an abstract idea. It is something
18:15we create week by week, event by event,
18:18season by season. As we begin tonight's
18:22work, may we do so with appreciation for
18:24the people who who make Morrisville a
18:26vibrant, welcoming community and with a
18:28continued commitment to ensuring that
18:30all who call this place home feel
18:32connected, supported, and included. So,
18:36we're uh fortunate to have a group of
18:37people from group of young adults from
18:40the Boy Scouts of America joining us
18:42tonight. I'm going to ask them to come
18:44up and approach the stage and sort of
18:47get in information right over there. So
18:49stand come over there and then if the
18:52rest of the audience could also go ahead
18:54and rise for the pledge of allegiance.
18:57Nope. Just kind of in front here would
18:58be fine
19:01because you want to be able to face the
19:02flags.
19:08We've not had a group this large uh to
19:12help us with a pledge before. So we
19:14appreciate your patience for a second.
19:16We also see the Legion folks out there.
19:18They've already risen. If the rest of
19:20the audience could please rise for the
19:21pledge of allegiance, we'd appreciate
19:22it. All who are able.
19:35>> Ice
19:37to the flag of the United States of
19:40America and to the republic for which it
19:42stands. One nation under God,
19:45indivisible, with liberty and justice
19:47for all.
19:49>> Thank you. You may all be seated. Thank
19:51you.
20:31So before before we adopt tonight's
20:33agenda, town council policy is to review
20:35and ensure there are no conflicts of
20:37interest or appearance of conflict of
20:38interest with any items on the agenda.
20:40If you noticed anything in the agenda
20:42that could be a conflict or looked like
20:43one, please share that now.
20:48Okay. Um I believe that there is an
20:51interest in possibly adjusting the
20:53agenda to add a close session for
20:55attorney privilege um in order to
20:58discuss the western rank farmers market
21:00agreement. Um I guess we could just do
21:04that on consensus or do you want to say
21:06anything about that?
21:08recognize council member Kesler.
21:10>> Uh I would have a motion to pull it from
21:13the consent agenda.
21:15>> Okay.
21:16>> Second
21:18>> and add it as a close session later in
21:20the evening.
21:21>> Yes. Okay. I have a motion and a second.
21:24Any discussion on that?
21:28>> Council member Johnson. So, it was um my
21:32understanding
21:34um that the discussion could happen in
21:37public and I would hope that that would
21:39happen. Um I would like to be on record
21:45um so the folks from the West White
21:47Farmers Market can hear that
21:49conversation. So, I'm not sure White
21:51House be in close session.
21:54>> I would answer that because there's uh
21:56dollar values and a contract involved.
22:02I still think that should happen in our
22:04session.
22:05>> Okay. Thank you. So, I have a motion and
22:08a second, I guess, to adopt this
22:10evening's agenda. Would that change? Is
22:12that a proper motion? Um, journey.
22:14>> Yes, sir.
22:15>> Okay. All those in favor, please say I.
22:18>> Hold on. Yeah, please.
22:19>> I I don't know what we're adopting. I
22:21would also not be a horse to having it
22:23in an open session.
22:27We could discuss it both places if that
22:30would be helpful.
22:32>> Council, may I re make a recommendation
22:34that you adopt this evening's agenda.
22:37Then we'll move on to the consent
22:38agenda. You can pull it adopt the rest
22:41of consent agenda. If there's an open
22:43session discussion to be had, we can
22:45have it at that time and then we can
22:47motion to amend the agenda to add a
22:49close session if that's how you wish.
22:51So, I would recommend we start by just
22:52adopting [clears throat] the agenda as
22:54presented. That sounds like a plan.
22:58>> Thank you.
22:59>> Okay. Would you like to uh retract your
23:02motion then? I guess for just to make it
23:05clear and easy.
23:06>> Yes. Are we adopting the consent agenda
23:09with the
23:10>> No, we're just adopting the agenda in
23:12general right now. Consent agenda will
23:14be next. And
23:15>> yes,
23:15>> we'll get into that. Okay. Uh, Council
23:18Member Kesling has uh retracted his
23:20motion. So, now I'm looking for a clean
23:23motion to just simply adopt this
23:24evening's agenda as presented.
23:28>> I'll make that motion.
23:29>> Second.
23:30>> I have a motion from Council Member
23:31Johnson, a second from Mayor Petody. All
23:33those in favor of adopting the agenda as
23:35presented, please say I.
23:36>> I. Any opposed?
23:38>> Hearing not that carries unanimously.
23:4070. We have an agenda.
23:43Um, there are three items on our consent
23:46agenda. Approval of August Town Council
23:48meeting minutes, resolution authorizing
23:50a lease extension/update of the Western
23:53White Farmers Market Agreement, and
23:54resolution authorizing a lease extension
23:56update to the Morrisville Community
23:58Garden agreement. Would any council
24:00member wish to pull any item for
24:01discussion? Like to recognize council
24:03member Kesler?
24:04>> Wish to pull the resolution authorizing
24:06a lease extension update of the Western
24:09Farmers Market Agreement. Okay,
24:12that is pulled for discussion. I'd
24:14entertain a motion to adopt those other
24:16two items at this time.
24:20>> I'll make that motion.
24:22>> I'll second.
24:22>> Okay, I have a motion to adopt the
24:24consent agenda less that one item. Uh
24:27motion from council Johnson, second from
24:29body. All those in favor, please say I.
24:31I. Any opposed? Hearing none that
24:34carries unanimously 70. Um, at this time
24:37I'd like to recognize council member
24:38Kesling and we can start a discussion
24:40then decide if we need to go into have
24:42close session as well.
24:44>> Yes. Um, I was hoping to discuss some of
24:48the terms of the uh agreement
24:52which I assumed was attorney client
24:55privilege since we're talking about a
24:56lease contract.
24:57>> Okay.
24:59>> That would be under close session.
25:00>> Okay. I'd like to recognize Council
25:02Member Johnson if there's anything you'd
25:03like to share um in open session.
25:07>> Okay. Yes. Um um it is my understanding
25:12that um there had been negotiations
25:15between our staff and the Wester farmers
25:18market and there was agreement
25:21uh to extend the contract at this time
25:25knowing that there were some differences
25:30in agreement in negotiation and that um
25:33both parties agreed that we would they
25:36would we the town and the West Wright
25:39Farmers Market would continue those
25:41discussions over the next ensuing
25:43months. It was my hope that um now
25:47during this point where we have it off
25:49consent that um we would kind of direct
25:54staff um to not kind of but we would
25:57direct staff to
25:59to come up with a time frame and a
26:02timeline so that this would be uh this
26:05negotiation would be done in a more
26:08timely fashion. Um because I know there
26:11was some concern about getting to a July
26:161 date and being in the same boat we're
26:19in now where we have to do another
26:20extension. It is my hope that we do not
26:23do that and that if we can come to some
26:26agreement ahead of time that we can even
26:29amend the the contract ahead of time.
26:31you don't have to wait until this
26:34contract expires that this council can
26:37choose um to amend that contract before
26:40July 1st. So that was my hope that we
26:43could share that with the public and
26:45with the western rank farmers market. um
26:48that again I'm going to repeat again
26:50that we the council would direct our
26:53staff to come up with this process with
26:55a timeline and a time frame when council
26:58would be included um when our input
27:01would be um uh um surveyed into that
27:05whole process and then we could all
27:08together move forward in a a good
27:11solution because this is an important
27:13partnership. Western Wake Farmers
27:15Market. I was on council when we started
27:18that partnership and it was important to
27:20me all those years ago and it's
27:21important to me today. Um so that was my
27:25hope and that needs to happen in public
27:29and I I personally don't see a need to
27:32have a conversation in close session
27:34tonight. Um I think there's more to come
27:38and I personally need some more
27:40information as well. Um and that would
27:43be part of this process moving forward.
27:47I'd
27:47>> like to recognize council member strong
27:49Johnson, please.
27:52So I I wanted to discuss like material
27:58um issues with the amounts that the
28:03farmers market provides to the town and
28:05the town provides to the farmers market
28:08in close session just because it's more
28:10sensitive to economic development. But
28:13if council member Johnson wants us to do
28:16all the questioning um publicly and the
28:21western weight farmers market does not
28:23um feel like that is a problem because
28:27they had those discussions previously
28:30then I do have some questions about
28:32terms of the contract before I feel
28:34comfortable approving it that are
28:36financial in nature.
28:41Did you want to say anything
28:45before you get to go? I think that it be
28:49um beneficial to address those issues
28:52and have the council give their input
28:53tonight. I think that we have
28:54information from the agenda packet and
28:57the additional u item that the town
29:00manager provided to us. So, I think we
29:02have what we need to move that process
29:04forward rather than waiting to next July
29:06or later um to make sure that the market
29:10continues to um exist and keep going. Um
29:14[clears throat] does anyone want to say
29:15anything before we have a second round
29:18of people?
29:19>> So, I'm confused about this process.
29:22Mayor,
29:24>> I have questions.
29:25>> Yes.
29:26>> When are those questions going to be
29:29asked and answered? Is that in close
29:31session or do you want it in open
29:33session? Because I have questions and if
29:35you just want to move things along and
29:36approve a contract without giving me the
29:38opportunity for those questions, I don't
29:41know when I'm going to ask those
29:42questions. Can you clarify?
29:44>> Not yet. Not until we hear everyone's
29:46thoughts. Uh, Council Member Johnson
29:48wanted to speak again.
29:49>> So, first we're talking about process
29:50and that's just what we're talking
29:52about.
29:52>> Okay. Because I don't want you to hurry
29:54up a vote knowing that I have questions.
29:58I I definitely want to vote tonight
30:02and I would like to go into close
30:04session later in order to do that and we
30:06would vote after the close session after
30:08the discussion amongst the council
30:09members.
30:10So, I I think it's important that
30:13everybody be clear on whether we're
30:15going to have their our questions
30:18now or later because member Johnson
30:22wants to have them now so that we get
30:25that information out across everyone.
30:29>> Yep. I was trying to give her the
30:30opportunity to
30:31>> I just thought you were rushing. I I
30:33felt we were rushing. So,
30:34>> Yep. I understand that perspective. It
30:36was not my intention to rush it at all.
30:38Just hoping that we will vote tonight.
30:42Council member Patel, did you want to
30:44speak?
30:45>> So
30:47only question I have is that do we have
30:49to vote in open session or can then
30:53>> if we go to discussions in closed
30:55session and if you want vote tonight
30:58then how would that happen?
31:00>> We can come out of close session and
31:02still be in open public session.
31:04>> Okay, that's good. Thank you. Y
31:08Okay. So, um
31:12would you like to make a motion to
31:13create a close session or I can
31:17>> um Yes, I can make a motion to uh for
31:24this uh resolution authorizing a lease
31:26extension update of the western white
31:28farmers market agreement to be discussed
31:29in close session. Okay, motion council
31:33member Gland. Is there a second?
31:38I'll make that second. All those in
31:40favor, please say I. I. Any opposed?
31:47That carries unanimously. 70. So, we
31:49have added close session. Um, and we'll
31:52do that later. And there is our my hope
31:56that we will go ahead and after the
31:58close session come back into session in
32:01open session, vote on this um item.
32:05Okay,
32:10thank you very much everyone.
32:13We are now at proclamations. We have one
32:15proclamation this evening. Council
32:16member Johnson will read the
32:17proclamation recognizing Veteran Suicide
32:19Awareness Month.
32:21>> Did we skip the approval of the consent
32:23agenda?
32:24>> We already got the other two earlier
32:26before we had this further discussion.
32:31>> So,
32:32>> okay. So, I have the pleasure now of
32:35reading the proclamation recognizing
32:37September as veter veteran suicide
32:40awareness month. And we have some very
32:43special guests here tonight. After I
32:45read the proclamation, I'm going to ask
32:46you all to come forward um here on the
32:49podium so I can present you with the
32:51proclamation.
32:53Whereas the United States owes an
32:55enduring debt of gratitude to the men
32:58and women who have served in our armed
33:01forces defending our freedoms with
33:04courage, honor, and sacrifice. And
33:08whereas far too many of our nation's
33:10veterans face invisible wounds,
33:13including post-traumatic stress,
33:16depression, and other mental health
33:18challenges, which can place them at
33:21increased risk for suicide. And whereas
33:24the loss of even one veteran to suicide
33:28is a tragedy that impacts families,
33:32friends, and communities across our
33:34nation. And whereas raising awareness,
33:37reducing stigma, and in ensuring access
33:41to timely, effective mental health care
33:45are essential steps in preventing
33:47preventing veteran suicide.
33:50And whereas the American Legion through
33:53its be the one program at Lowe's Grove
33:57Post 416 has led local efforts to
34:01eliminate the stigma related to mental
34:03health treatment and in turn lower the
34:07number of veterans lost by suicide. And
34:10whereas September is recognized
34:13nationally as suicide prevention month,
34:16and we dedicate this month to honoring
34:19our veterans by renewing our commitment
34:22to their well-being and ensuring they
34:25know they are never alone.
34:28Now, therefore, the town council of the
34:30town of Morrisville does hereby proclaim
34:34September 2026
34:36as Veteran Suicide Awareness Month in
34:39Morrisville, North Carolina, and
34:41encourages all residents to learn the
34:44warning signs of suicide, reach out to
34:47veterans in need, and support programs
34:50that promote mental health and
34:53resilience. And here in front of us
34:55tonight are our very very special
34:58guests. These are members of our um
35:01American Legion Lowe's Grove Post 416.
35:05And I am um honored to be able to
35:07present you with this proclamation.
35:10>> Can we get all the council up here for a
35:12quick photo?
35:13>> Sure.
35:25>> [clears throat]
35:40>> Send that to him.
35:57Thank you very much.
35:58>> Thank you.
36:01>> Turn it on. First one.
36:02>> Thank you, Caleb. I I just want to thank
36:04everybody very much, especially the
36:07council members tonight. Thank you so
36:08much for recognizing uh September as
36:12Veterans Suicide Awareness Month. It's a
36:14cause near and dear to our heart and
36:16we're very proud to call Morrisville our
36:19home and we thank you very much for your
36:21support.
36:22>> Thank you. Thank you.
36:28>> Are we still We're still shooting.
36:58tonight especially the room is chopped
37:00filled with people willing to serve. So
37:03we do really appreciate that.
37:06Next on the agenda is Morrisel Speaks,
37:08which is our public comments section.
37:11For those who have signed up to speak,
37:12please approach the microphone and begin
37:14by stating your name and residential
37:15address and direct your comments to the
37:17council as a whole. Each speaker is
37:19allotted three minutes to ensure
37:21everyone has a fair opportunity to share
37:22their thoughts. A timer will start after
37:25you state your name and address, and a
37:26buzzer will sound when your time is up.
37:29We appreciate your cooperation and
37:30helping us manage time fairly for all
37:32participants. I'd like to ask uh town
37:34clerk department at this time if we have
37:36anyone signed up for public address.
37:38>> We do. And first is Stephanie Reed.
37:40>> Okay.
37:43>> Good evening. I think
37:46>> it's higher than that.
37:47>> Good evening council. I'm Stephanie Reid
37:50aka C Shanty Stef residing at 1672
37:54Legendary Morrisville.
37:57Tonight I want to follow up on my
37:58earlier remarks when I referenced Eddie
38:00Murphy's classic Mr. Robertson's
38:02neighborhood. Eddie Murphy made us laugh
38:05at a painful reality. How lower income
38:07residents get displaced and gentrified
38:10right out of their own homes. But since
38:12then, I've been reading The Color of Law
38:13by Richard Rothstein. It makes clear
38:15that the punchline runs even deeper.
38:18Displacement and gentrification aren't
38:20just modern accidents of the free
38:22market. They trace directly back to
38:24explicit housing policy, racial zoning,
38:27restrictive covenants, and FHA
38:28redlinining that intentionally
38:30segregated American violation of the
38:3213th, 14th, and 15th amendments. This
38:35wasn't de facto segregation driven by
38:37private or organic choices. It was dur
38:41segregation driven by government mandate
38:44at the federal, state, and local level.
38:46And it will take all three levels of a
38:48government to undo what was done in the
38:50past because we still am inside that
38:52map. It's why our schools are more
38:54segregated today than they were 40 years
38:56ago. It's because the neighborhoods
38:57feeding them are segregated. Consider
38:59what proactive integration could have
39:01meant for our region. Less spraw,
39:02smarter density, more walkable towns,
39:04lower infrastructure costs, fewer health
39:07care disparities, and better school
39:08equity. Wake County Public Schools
39:10wouldn't need extensive busing from
39:12southeast Raleigh to the northern
39:13western suburbs. In Durham, the historic
39:15black community of Hay Thai might not
39:17have been demolished for the Durham
39:19freeway. Mistake Durham is now working
39:21to reverse. These are the lasting
39:24repercussions of poorly made past policy
39:26decisions. When the Fair Housing Act
39:29passed in ' 68, it banned future
39:31discrimination, but it didn't undo the
39:33wealth gap that decades of segregation
39:36had already built between black and
39:37white families. Telling black families
39:40they can now buy in majority white
39:42suburbs means little if those suburbs
39:43have spent decades pricing them out.
39:45Today, race neutral policies, single
39:48family zoning mandates, highway heavy
39:50transportation budgets over public
39:52transit and lowincome tax credits that
39:54concentrate in already segregated
39:56neighborhoods continue to reinforce
39:58those own old lines implicity. I want to
40:01commend this council for unanimously
40:02approving the LIT tech senior housing
40:04proposal in May. That's a step in the
40:06right direction. True affordability has
40:09to be integrated across every
40:11neighborhood, not isolated in one pocket
40:13of town, which simply recreates
40:15segregation in a new form. This is why
40:17EMB policy matters by ending
40:20exclusionary zoning and legalizing
40:21missing middle housing in every
40:23neighborhood, including our wealthiest
40:25ones. We expand supply, lower costs, and
40:27open up enclaves that have stayed closed
40:29for 80 years. Morrisville's vision
40:32commits to a community that celebrates
40:34diversity and inclusion. Zoning reform
40:36is how we make that vision real, not
40:38just aspirational. Segregation was built
40:40locally and must be dismantled locally.
40:43I show up Tuesday nights and participate
40:45in citybuilder because no one was meant
40:47to live on the margin. Now it's
40:49council's turn to lead on true
40:50integration. Thank you.
40:54>> Thank you. Uh town clerk Bartling.
40:56Anyone else signed up?
40:58>> Next is Siron Sedona.
41:09Good evening.
41:10>> Good evening,
41:10>> Mayor and Council members. I'm Saran
41:13Sundar from 105 Haymonwood Place,
41:16Marsville, and I'm here tonight to ask
41:19for your consideration for appointment
41:21to the public safety advisory committee.
41:25My particular interest is in the
41:26intersection of public safety and public
41:29health issue issues such as substance
41:31misuse, youth safety, mental health
41:34created crisis, tobacco and vaping
41:37prevention, and community education.
41:41If appointed, I would approach the
41:44committee as a listener first. I would
41:46want to learn from our police officers,
41:50firefighters, town staff, fellow
41:52committee members, and residents and
41:55then contribute where my personal,
41:58medical, and public health background
42:00can add value. I would be honored to
42:03serve and I respectfully ask the council
42:07to consider my application while filling
42:10the upcoming appointment. Thank you very
42:13much.
42:15>> Thank you.
42:18Next we have Janice Crawford, the
42:21Western Wake Farmers Market.
42:25>> Hello again. Good evening, mayor,
42:27council members, and town staff. I'm
42:29Janice Crawford, the president of the
42:31Western Wake Farmers Market Board of
42:32Directors. We're located at 101 Town
42:35Hall Drive. I'm here primarily tonight
42:37to introduce you to our new market
42:38manager, Kelly Howard, and we're very
42:41excited to have her joining us. and I'll
42:43let her tell you a little bit about
42:44herself in just a second. I also wanted
42:47to give you a brief update on our lease
42:49renewal. Uh on August 10th, we submitted
42:52our proposed renewal package to the
42:54town, and we understand that more time
42:56is needed to evaluate that. Last week,
42:59we had a very productive meeting with
43:01Assistant Town Manager John Lenty and
43:03parks and recreation director Cindy
43:05King, and we agreed to meet monthly to
43:09to work on the proposal and to try to
43:11come to some uh consensus together. We
43:14really appreciate that offer, and we
43:17look forward to the discussions that
43:19we'll have as we work toward a mutually
43:21beneficial agreement. So, thank you
43:23guys. I also want to tell you as we
43:25developed our proposal, we also took the
43:27opportunity to look at how other farmers
43:29market in the Wake County area, how they
43:32partner with our municipalities. We
43:34summarized what we learned in a short
43:36white paper and that's included in our
43:38August lease proposal submission. And we
43:41hope that this provides some useful
43:42regional context as we work together on
43:45our next agreement. So, in some we're
43:47excited about the future of Western Wake
43:49Farmers Market, our education garden
43:52headed up by Donna and our continued
43:54partnership with the town of of
43:56Morrisville. And with that, I'm very
43:58pleased to introduce you to our new
44:00market manager, Kelly Howard. Thank you
44:02guys.
44:04Hi, I'm Kelly Howard. I graduated from
44:08Appalachin State last December, so I'm
44:11new to the area. After I graduated, I
44:14spent the last eight months working in
44:18an agricultural field. So, I started at
44:21an online food hub where I got to be a
44:24part of the operations behind the scenes
44:27and build connections with farmers to
44:30further understand what they go through.
44:32It was very interesting to be a part of
44:35the system like that. I also worked at a
44:38farm, so I got more experience there.
44:41And I
44:46I um interviewed for this place and I
44:51could immediately feel the warmth and
44:54community that the board had created.
44:56And when I was accepted, I was thrilled.
44:59In the last month that I've been here, I
45:02have built amazing connections and I am
45:06very excited for what the future brings.
45:08I have met people that I've built
45:11community with in the town, through the
45:14staff, through the council, as well as
45:16the mayor. So, I'm very excited for
45:19working with you all. And thank you.
45:23>> Thank you.
45:26That is the end of our signed up
45:27speakers and we had no audience
45:29submissions.
45:30>> Okay. Thank you. Thank you to everyone
45:31who has spoken. If anyone in the
45:33audience did not sign up and would like
45:35to address the council, please come
45:37forward to the microphone stand, state
45:38your name and residential address and
45:40you'll have up to three minutes to share
45:41your com comments. Does anyone else want
45:44to avail themselves of that opportunity?
45:48Okay. Thank you very much. That
45:50concludes that agenda item. As a
45:53reminder, we encourage the submission of
45:54written comments as they offer a
45:56valuable way for community members to
45:57share their feedback. To submit written
46:00comments, please email public input at
46:02morrisvillec.gov.
46:05And at this time, I'm going to need a
46:06second to get on my computer um because
46:08we're going to start the next part of
46:10our meeting, which is a a little bit
46:12different. It's a quasi jud judicial um
46:16item. So, that's item 10A. We're going
46:17to start with resolution approving a
46:19special use permit for West Wakeake
46:21solid waste facility. We'll have Rachel
46:23Cipher come to the microphone to
46:26facilitate this item, please.
46:43Sorry. Good evening, mayor and council
46:45members. Um, this is the special use
46:47permit for 414 uh aviation parkway um
46:51that was heard at the September 8th
46:53meeting that you will be voting on
46:54tonight. Um there's no updates um from
46:57the last presentation with this item.
47:02>> So, I'm going to read a few words here.
47:06This hearing is an evidentiary hearing.
47:08That means it is like a court hearing.
47:10State law sets specific procedures and
47:13rules concerning how this council must
47:15make its decisions. These rules are
47:17different from other types of land use
47:19decisions like resoning cases. The
47:21council's discretion is limited. The
47:24board must base its decision on upon
47:27competent, relevant, and substant
47:30substantial evidence in the record. A
47:32quasi judicial decision is not a matter
47:35of personal opinion. It is a decision
47:37constrained by the standards in the
47:39development regulation and based on the
47:41facts presented. If you will be speaking
47:44as a witness, please focus on the facts
47:46and standards, not personal preference
47:48or opinion. Participation is limited.
47:52This meeting is open to the public.
47:54Everyone is welcome to watch. Parties
47:56withstanding have rights to participate
47:58fully. Parties may present evidence,
48:01call witnesses, and make legal
48:03arguments. Parties are limited to the
48:05applicant, the local government, and
48:06individuals who can show they will
48:08suffer special damages. Other
48:11individuals may serve as witnesses when
48:13called by the board. General witness
48:15testimony is limited to facts, not
48:17opinions. For certain topics, this board
48:20needs to hear opinion testimony from
48:22expert witnesses. These topics include
48:24projections about impacts on property
48:26values and projections about impacts of
48:28increased traffic. Individuals providing
48:31expert opinion must be qualified as
48:33experts and provide the factual evidence
48:35upon which they base their expert
48:37opinion. Witnesses must swear or affirm
48:40their testimony. For those who were
48:42sworn in on September 8th, I remind you
48:44that you are speaking under oath. You're
48:46still speaking under oath. At this time,
48:48we will administer the oath for all
48:49individuals who intend to provide
48:51witness testimony who are not sworn in
48:54on September 8th. I'd like to recognize
48:56the clerk at this time to do that part.
48:59>> Is there anyone here tonight who was not
49:01sworn in on September 8th who will be
49:03speaking this evening?
49:06>> Great. Thank you.
49:12>> We'll swear you in now just to make it.
49:14So, if you'll come forward and sign in
49:16for me, please
49:22[clears throat]
49:54Do you solemnly swear or affirm that the
49:57evidence you shall give the board in
49:58this action shall be the truth of the
49:59whole truth and nothing but the truth
50:01shall help?
50:03Okay.
50:03>> Thank you.
50:07Thank you, Council Clerk Bartling. And
50:09now we invite Rachel Cipher, Planer 2,
50:11to the podium once again. Before you
50:13begin, if you could please confirm that
50:14you were sworn in.
50:16>> I was.
50:16>> Okay. Thank you. Proceed.
50:21>> Well, now it's back to me, right? Okay.
50:22Deliberation or did you want to say
50:24anything else?
50:24>> Yeah, there's no updates with this item
50:26from the last meeting.
50:28So, um, does the board have any more
50:30questions for the parties or witnesses
50:32before we move into deliberation?
50:35We had the opportunity at the end of
50:37last time and now we have the staff and
50:40the applicant here. Okay.
50:45Now, there's more I'm going to read.
50:47Does any board member have personal
50:49knowledge of additional facts relevant
50:50to this case that should be entered into
50:52the record?
50:56Seeing none hearing no additional
50:58questions or presentation of relevant
50:59facts, the board will now continue
51:01deliberation. The evidentiary hearing
51:04remains open so the board may ask
51:05clarifying questions if needed. As a
51:08reminder, if this council is tasked with
51:09deciding if based on the evidence
51:11presented, this proposal meets the
51:14applicable standards. This decision
51:16cannot be based on the personal
51:17preference of council members. Rather,
51:19it is based on standards and evidence.
51:21Council members are encouraged to
51:23reference the applicable standards and
51:25specific evidence in the deliberations.
51:28So at this time, if anyone would like to
51:30share anything, um I would recognize
51:32you.
51:35I would just say that I believe that the
51:37um applicant has uh substantively
51:41supported that they met the seven
51:43standards and I think that uh this will
51:45benefit the community to have this um
51:48facility here in Morrisville's
51:51area. Um
51:54and not seeing anything else, we can
51:57entertain a motion if we could go ahead
51:58and put that on the screen. There we go.
51:59If we could read that in full. Before
52:01you make the motion, I just wanted to
52:03let you know on advice of the town
52:05attorney, the final decision document
52:07that mayor you will sign based on this
52:09resolution, it's just going to update
52:10the resolution to list the witnesses.
52:13Um, I just want to make you aware of
52:14that before you make the motion. Thank
52:16you.
52:16>> Okay. Thank you very much. Um, so who
52:21would like to be recognized to read the
52:22motion?
52:29I'll recognize council member Garamo,
52:31please.
52:35I'm going to approve a motion to adopt
52:37resolution 2026-291-0
52:40of the Morrisville Town Council
52:42approving a special use permit for a
52:45major utility facility used to
52:47accommodate the future development of
52:49the West V solid waste facility at 414
52:54Aviation Park uh V County PIN 0755462
53:02762
53:05Qua-26-000012.
53:11>> I'll second.
53:12>> I have a motion from council member
53:13Garamela, a second from council member
53:15Johnson. All those in favor, please say
53:16I.
53:17>> I.
53:17>> I.
53:18>> Any opposed?
53:20Hearing none. That carries 70
53:21unanimously.
53:23So I get to say resolution 2026-291-0
53:27will serve as the written decision and
53:29will be provided to the applicant and
53:31other parties with the right to such
53:33notice. Parties have 30 days to appeal
53:35this decision. Um this is the end of the
53:38September 22nd discussion and as was
53:40mentioned by the town clerk, she'll be
53:42updating the resolution. I'll be signing
53:44that and we're putting this one to bed.
53:46And we really appreciate the time and
53:47the effort and the staff time that you
53:49all put into all the hard work and all
53:51the hard work that's coming forward as
53:53you guys develop this facility. But
53:54thank you for coming out and visiting us
53:56twice and we look forward to a great
53:58facility here in Morrisville. Thank you
53:59very much.
54:20So, it was funny. I was talking to the
54:22Boy Scouts earlier outside and they were
54:23like, "Well, we need to have something
54:25contentious that we have to be able to
54:26write about." And there hasn't really
54:27been anything contentious tonight. So, I
54:29apologize for that. But that's a good
54:31important facility for us. At this time,
54:34we're going to go on to presentations.
54:36We have one presentation this evening.
54:37We now invite Brett Martin,
54:39transportation project manager, to the
54:40podium. Bless you,
54:43Mr. Martin.
54:46>> All right. Thank you. Good evening,
54:49Mayor Collie and members of town
54:51council. Brett Martin here,
54:52transportation project manager with the
54:54town.
54:55Um, and we are going to catch you up on
54:57some more work that has been done with
54:59the comprehensive transportation plan
55:01update. Um, we last came back to you on
55:05this in June uh to share our spring
55:07engagement results when we solicited
55:09input from the public on overall modal
55:11priorities, project evaluation
55:13priorities for each mode and
55:15transportation improvement project
55:17concepts. We also covered our review of
55:20the CTP project prioritization framework
55:22and results for the roadway and
55:24intersection project concepts included
55:26in the CTP universal projects for that.
55:29and we shared the preliminary assignment
55:31of roadway crosssections to specific
55:33roadway segments throughout the
55:35comprehensive transportation plan update
55:37study area. And for tonight's item, I
55:40will share with you results of our
55:41greenway prioriti prioritization
55:43exercise, which we did not cover with
55:45you in June. We will then cover the
55:47proposed cross-section schematics that
55:49lay out the actual roadway elements and
55:51dimensions for each roadway in the CTP
55:54study area. Up to this point in the plan
55:56development process, we have been
55:58focused on the what, where, and why in
56:00terms of transportation improvements
56:02throughout the town. But with the
56:04development of the implementation plan,
56:05we are transitioning to the who, when,
56:08and how for those improvements, and we
56:10will cover that with you. We also will
56:12hit on the recommendations from staff
56:14for priority intersections we are
56:16proposing to carry forward for further
56:18study focused on operational and safety
56:20issues and potential improvement.
56:23provide a briefing on a couple of other
56:25tasks town staff has commenced that are
56:28related to the CTP and then we will talk
56:30about the next steps uh in the process
56:33and turn it over to you for discussion
56:34and feedback.
56:37Just to reorient you real quick to where
56:39we are in the overall CTP update
56:41process. We have moved the needle a
56:42little bit since June and are pretty
56:44much in the zone of refining and
56:46finalizing our action plan and
56:47documentation and moving closer to
56:49consideration of plan adoption. But we
56:51do have a few more steps to go before
56:53getting there. And to zero in on where
56:56we are in our project recommendations
56:58development process in terms of
57:00development, prioritization and
57:01programming of actual project concepts,
57:04we are in the final stage of that
57:06process.
57:08Okay. So let's get into the greenway
57:10prioritization framework and results.
57:11And I will go through this component of
57:13the presentation pretty quickly because
57:14while it informed the implementation
57:17plan for the Greenway project concepts
57:20among other considerations, it really is
57:22not as important to the CTP as where the
57:25Greenway project concepts landed for
57:27time frames of implementation.
57:30And to start, I'd like to reiterate what
57:32informed the development of the Greenway
57:34prioritization framework. O overall it
57:36was influenced and informed by the CTP
57:39guiding principles, the range of
57:40feedback received from engaged parties,
57:43uh identify deficiencies and external
57:45funding program criteria and areas of
57:47emphasis. Similar to the roadway and
57:49intersections prioritization framework,
57:51the greenway framework aims to balance
57:53the interests of the town and those
57:55external funding parties uh to better
57:58position improvements for funding
57:59opportunities. With respect to
58:02greenways, external funding parties
58:04focus on safety, cost, cost
58:06effectiveness, demand based on density,
58:09accessibility and connectivity,
58:10overcoming major barriers, and filling
58:12gaps through a balanced local and
58:14regional lens. While these are also
58:16important to the town, there was
58:18additional focus on access to
58:20recreation, educational opportunities,
58:22community points of interest, and
58:23transit through a local lens. I would
58:26also like to note that there are several
58:28proposed bike and pedestrian facilities
58:30such as uh side paths that are
58:33recommended in the actual roadway rights
58:35of way and those were prioritized
58:37through the separate roadway and
58:38intersection prioritization processes
58:40which included a bicycle and pedestrian
58:42effectiveness scoring criteria. So, in
58:45the greenway prioritization, you will
58:46not see the on-road facilities involved
58:49or included in that because, well,
58:51they're included in the roadway
58:53projects.
58:55To provide a connection between the
58:56prioritization criteria I will touch on
58:58in a moment, I just want to quickly
58:59recap what we heard from the public
59:01regarding bike priorities. In response
59:03to our survey in the spring, when we
59:05asked which criteria are most important
59:07for prioritizing bicycle and pedestrian
59:08projects, the two factors that rose to
59:10the top were safety and filling gaps in
59:13the existing network, which outweighed
59:15multimodal connectivity, activity center
59:17access, and benefit versus cost.
59:21And how did public feedback influence
59:23the prioritization framework? Well, in
59:25the criteria development, filling gaps
59:27and access to prominent origins and
59:29destinations were given more emphasis.
59:31We also included a specific public
59:33outreach criterion and the actual
59:36definition of the metrics which dictate
59:38how the criteria were measured was also
59:40influenced by community feedback. For
59:42greenways, you will not see as much
59:44emphasis on safety because greenways are
59:47inherently safer than facilities in the
59:50roadway. And uh you know safety features
59:53for how they interact with roadways are
59:55more of a project level design
59:56consideration than a project concept
59:59consideration.
1:00:01And here are the criteria used for
1:00:03greenway prioritization and their
1:00:05respective weights. I'm not going to go
1:00:07into each of these for this
1:00:08presentation, but from this you will see
1:00:09the emphasis on filling gaps in access
1:00:11to different types of prominent origins
1:00:14and destinations.
1:00:16And also keep in mind that we'd need to
1:00:18balance the criteria with those of
1:00:19external funding programs like the campo
1:00:21lap program or the NC DOT spot and stip
1:00:24development process.
1:00:27And the results of the greenway
1:00:28prioritization were included in your
1:00:30agenda packet as attachment one. And as
1:00:32you might expect from the criteria, the
1:00:35highest priorities or are greenway
1:00:37segments that provide completely new
1:00:38connections that are not served by
1:00:40alternative means or they involve
1:00:42connections to more activity centers.
1:00:44The highest priority scoring segments
1:00:46include Milspring Greenway from
1:00:48Paramount Parkway to Wake Tech, a
1:00:51proposed Church Street Park to Research
1:00:53Triangle Park Greenway, which we are
1:00:54still working with the Research Triangle
1:00:56Foundation and Fujifilm to evaluate its
1:00:58conceptual feasibility, the Lexi Lane
1:01:01Greenway from Northwest Kerry Parkway to
1:01:03Northwest Maynard uh Maynard Road. the
1:01:06Stirup Iron Creek Greenway from Serell
1:01:07Grove Church Road to Aviation Parkway
1:01:10and smaller connectors to the Mill
1:01:12Springs Greenway in the Wake Tech area
1:01:15and to the Fair Fair View Greenway at
1:01:18Aviation Parkway in Liberty Hill Pence.
1:01:21And please note that prioritization is
1:01:23an important tool for projecting and
1:01:25timeline planning, but it is only one of
1:01:28many factors that drives recommendations
1:01:30for the order of project delivery, which
1:01:32I will address a bit later.
1:01:36Okay, so let's get into our proposed
1:01:39recommended roadway cross-section
1:01:41schematics.
1:01:43And to start for this, I do want to
1:01:44quickly review what purpose these serve
1:01:46before we get into them. These show
1:01:49exactly what roadway elements are
1:01:50proposed and recommended, including
1:01:51their dimensions and overall space
1:01:53needs. They provide a guide for future
1:01:55infrastructure development throughout
1:01:57the town for the town itself, NC do
1:02:00developers and other implementers of
1:02:02projects or improvements. For the
1:02:04proposed crosssections, we put an added
1:02:06emphasis on improving safety and
1:02:09accessibility to roadway rights of way
1:02:10for all users and modes. The
1:02:13crosssections are also how the town
1:02:14aligns street design with land use and
1:02:17community character. And the proposed
1:02:19cross-sections aim to balance NC DOT's
1:02:21interest with those of the town. as many
1:02:23of our roadway facilities are NCDOT
1:02:26maintained and serve both a local and
1:02:28regional travel purpose.
1:02:32So, moving on, the cross-sections were
1:02:34included in your agenda packet as
1:02:35attachment two, and there is a total of
1:02:3819 cross-sections that were built from
1:02:40five base cross-section types,
1:02:44which include a two-lane undivided
1:02:47section, a two-lane divided section, a
1:02:49threelane undivided section, a fourlane
1:02:52divided section, and a sixlane divided
1:02:54section.
1:02:56And to yield the 19 total crosssections,
1:02:59various configurations of sidewalks,
1:03:01side paths, bike lanes, and on- street
1:03:03parking were added to those five bases.
1:03:07There has been some discourse among town
1:03:10council and staff throughout the plan
1:03:11development process regarding rights of
1:03:13way for updated cross-sections and
1:03:15whether they would entail additional
1:03:17space and to continue to stay a breast
1:03:19of that. The ride-of-way needs for all
1:03:23updated cross-sections fall within the
1:03:25previous applicable ride-of-way ranges
1:03:27as indicated in the 2019 CTP, but are
1:03:30all above the minimum of those ranges.
1:03:32So, we're within the range, but they're
1:03:34all above the minimum of those ranges in
1:03:36the 2019 CTP.
1:03:38I would also like to note that specific
1:03:41sides of roadway elements for segments
1:03:43with asymmetrical configurations will be
1:03:45noted in the CTP document, but that is
1:03:47not something that is noted for each
1:03:49cross-section as it applies to specific
1:03:51roadway segments in your attachment too
1:03:55just in case there's a question there.
1:03:58for roadway cross-sections assignment to
1:04:00specific roadway segments. There are
1:04:02some notable changes that are now
1:04:04recommended that vary a bit from what
1:04:07you saw in June. We added bus lanes to
1:04:09accommodate the Wake BRT western
1:04:11corridor extension.
1:04:13While the 2032 opening year plans do not
1:04:16include bus lanes along the alignment,
1:04:18they are included in the 2055
1:04:20Metropolitan Transportation Plan for
1:04:22implementation within the 2035 to 2045
1:04:25decade. The ultimate solution proposed
1:04:28for more uh for McCreman Parkway which
1:04:32is a significant part of the alignment
1:04:34is to include those bus lanes and retain
1:04:36the side paths but not carry forward the
1:04:39existing bike lanes. However, the bike
1:04:41lanes and side paths are recommended to
1:04:43remain sorry the bus lanes and side
1:04:46paths are recommended to remain sorry
1:04:48the bike bike bike lanes and bus lanes
1:04:50I'm getting confused here. The bike
1:04:52lanes and side paths are recommended to
1:04:55remain until the bus lanes are
1:04:56implemented.
1:04:58So for Morseful Carpenter Road, we have
1:05:01gone back and forth on whether it should
1:05:02include side paths or bike lanes. And
1:05:04where we landed as a recommendation is
1:05:06for the ultimate solution to include
1:05:08side paths. But because there are
1:05:11significant rideway constraints, a high
1:05:13cost and effort of implementing side
1:05:15paths as an individual project, and a
1:05:17low likelihood of near-term development
1:05:19and redevelopment along the extent of
1:05:20the facility, we recommend, oh, sorry,
1:05:23we recommend an interimm solution of
1:05:25including bike lanes.
1:05:27We now recommend Church Street to be a
1:05:30three-lane undivided section from
1:05:31Carolina Street to Mason Farm Road and
1:05:33two-lane undivided north of Mason Farm
1:05:36Road. We previously recommended it to be
1:05:38a three-lane undivided section from
1:05:40Carolina Street all the way to the
1:05:41northern town boundary, but with its
1:05:44position abuing the railroad north of
1:05:46Mason Farm Road, there isn't much of a
1:05:48need for a two-way left turn lane um in
1:05:50the middle there. So, that was taken
1:05:53out. And the last notable change I'll
1:05:56mention is we did take a good amount of
1:05:58time to coordinate with the research
1:05:59triangle foundation and Fujifilm on the
1:06:01extension of Town Hall Drive northward
1:06:03to connect to Providence Place as well
1:06:05as a concept to connect Providence Place
1:06:07to Davis Drive near Little Drive with a
1:06:09new location roadway. However, that
1:06:12coordination
1:06:14or through that coordination, it is not
1:06:16something Fujifilm would like to
1:06:18entertain or support as it plans for
1:06:21that campus would not do well to
1:06:23accommodate those connections.
1:06:27And moving on to some important
1:06:29overarching details for the range of
1:06:30cross-sections. All bike lanes where
1:06:33they are included are 5t wide with a
1:06:35three foot wide buffer between them and
1:06:38the travel lanes for motor vehicles.
1:06:41Travel lanes are 11 feet wide, which is
1:06:43a one foot in width reduction from the
1:06:452019 CTP. Sidewalks are six feet wide,
1:06:48which is a one foot in width increase
1:06:50from the 29 uh 2019 CTP. Side paths are
1:06:5410 feet wide. Bridges between roadway
1:06:56curbs and sidewalks are 5t wide. Center
1:06:59turn lanes where included are 12 feet
1:07:02wide. Two-lane divided roadway medians
1:07:05are 18 feet wide and four lane divided
1:07:07roadway medians are 23 feet wide. On
1:07:10street parking stalls are eight feet
1:07:12wide and bus lanes are not assigned to a
1:07:15specific side of a roadway as that would
1:07:17be determined through specific project
1:07:20level feasibility study as BRT projects
1:07:23move through project development.
1:07:25Instead, bus lanes on applicable roadway
1:07:28sections are assumed to be taken from a
1:07:3142- ft median with bus lane
1:07:33implementation to accommodate a final
1:07:35configuration of either center running
1:07:38or outside running bus lanes.
1:07:41All right,
1:07:43so let's move into the proposed
1:07:44implementation plan for the CTP update.
1:07:48As previously mentioned, the
1:07:49implementation plan is focused on the
1:07:50who, when, and how for recommended
1:07:52transportation projects and
1:07:54improvements. The who is the entity
1:07:55assumed to be responsible for one or
1:07:58more steps for advancing a project from
1:08:00planning to delivery. The when is the
1:08:03time frame the projects are recommended
1:08:04for delivery or at least to be a focus
1:08:07of implementation for the town. And the
1:08:09how is very much about the source of
1:08:11funding to support projects but also how
1:08:13projects are defined into implementable
1:08:16segments with independent utility and
1:08:19strategies for delivering them. The
1:08:21draft implementation plan is included as
1:08:23attachment three in your agenda packet.
1:08:28And I do have some very important notes
1:08:30to cover for the implementation plan
1:08:32before diving into its details. It is
1:08:34first important to point out that
1:08:36project prioritization is not
1:08:38projecting.
1:08:40Going back to June, we shared project
1:08:42prioritization results with town council
1:08:44planning and zoning board and other
1:08:46groups. With it being understood that
1:08:47prioritization is a tool used to
1:08:50identify the greatest needs against a
1:08:51set of criteria based on current
1:08:53conditions regardless of more specific
1:08:56feasibility considerations.
1:08:58While programming is informed by
1:09:01prioritization, it is also influenced by
1:09:03many other factors such as funding
1:09:05availability, project readiness, project
1:09:07efficiencies, partner coordination,
1:09:10planned future conditions,
1:09:11implementation feasibility,
1:09:13environmental issues, and others. High
1:09:16priority does not necessarily mean a
1:09:19project can or should be implemented
1:09:21right away.
1:09:23Also the who, when, and how for projects
1:09:26as well as their feasibility and the
1:09:28funding sources assumed for them are
1:09:30heavily influenced by the scale, effort
1:09:33and cost of the projects. Smaller
1:09:35projects are more suitable for town
1:09:36funding and technical capacity for
1:09:38implementation and larger projects are
1:09:40more suitable for external funding
1:09:42sources and external party technical
1:09:44capacity for implementation.
1:09:47I would also like to note that most bike
1:09:49ped projects or improvements that are
1:09:51within roadway rights of way are not
1:09:53broken down into individual projects
1:09:55separately from overall roadway
1:09:57projects. I mentioned that earlier.
1:09:59These are assumed to be provided over
1:10:00time as development or redevelopment
1:10:02occurs or they are assumed to be
1:10:05implemented with the roadway projects.
1:10:07Many roadway improvements will also be
1:10:09peacemeal over time as development
1:10:11occurs and that's kind of the nature of
1:10:12the CTP. You get a little bit from
1:10:14developers, you and then you get to a
1:10:16point where you can actually fund the
1:10:17whole thing. Some of it's done for you
1:10:19because it's been done by developers and
1:10:20then you get the money and you implement
1:10:22the rest of it. And lastly, this CTP
1:10:25update builds from the projects included
1:10:27in the 2019 CTP and progress made to
1:10:29date on those prior recommendations. The
1:10:32CTP update was not scoped to start over
1:10:34from scratch. Included in your agenda
1:10:36packet as attachment four is a status
1:10:38update on projects included in the 2019
1:10:41CTP and indicates whether any of those
1:10:44are proposed to be removed or if any new
1:10:46project concepts are proposed to be
1:10:48added.
1:10:50Okay, so let's get on to how the
1:10:53proposed conceptual projects are
1:10:55organized into the time frames laid out
1:10:57in the implementation plan. The first
1:10:59tier time frame for project
1:11:01implementation is the immediate term
1:11:03which is within five years of CTP update
1:11:05adoption and this tier intends to
1:11:07capture what the town is already
1:11:08focusing on for further study and
1:11:10implementation or will within the next
1:11:13five years. What is included in this
1:11:16tier is meant to be reasonably limited
1:11:18because of constraints on financial
1:11:20resources and technical capacity. As the
1:11:23CTP update development process has
1:11:25uncovered, the town's transportation the
1:11:28town transportation networks most
1:11:30pressing deficiencies manifest at
1:11:32intersections and a number of
1:11:34intersection improvements are included
1:11:35in the immediate turn. These include
1:11:38Slater at Surell Grove Church Road, NC54
1:11:41at Morsville Parkway, NC54 at Keybridge
1:11:43Drive, Church Street at Treybrook,
1:11:45Jeremiah and Downing Glenn, Downing
1:11:48Glenn at Town Hall Drive, and Davis
1:11:50Drive at Morseful Carpenter Road. One
1:11:52roadway project falls into this tier,
1:11:55which is the Morsville Parkway access
1:11:56management improvements project, which
1:11:58also includes some intersection
1:11:59improvements at Morseville Parkway and
1:12:01Davis Drive. And there is one greenway
1:12:03project which is a connector to the
1:12:05Crabtree Creek greenway from a desired
1:12:07signalized pedestrian crossing across
1:12:10Aviation Parkway at or near the entrance
1:12:12of HSNC.
1:12:15The near-term time frame which is within
1:12:1710 years of CTP update adoption includes
1:12:20a wider range of identified project
1:12:22concept needs. For the sake of time, I
1:12:24won't really dive into each of these,
1:12:25but I do want to note that the town has
1:12:27already taken some steps needed to
1:12:28implement some of the greenway projects
1:12:29listed, including pursuit of funding
1:12:31opportunities to begin implementation on
1:12:33the north end of the stirup Iron Creek
1:12:35Greenway in accordance with the reason
1:12:37feasibility study completed for it back
1:12:39in I think it was a couple of years ago
1:12:41and implementation of a significant
1:12:43segment of the Mill Spring Greenway
1:12:45through development of a school site on
1:12:47Paramount Parkway. So, between Paramount
1:12:48Parkway and Wake Tech. I also would like
1:12:51to note that grade separated bike peg
1:12:53connections from Kits Creek Road to NC54
1:12:56and Barbie Road to NC54 are included in
1:12:58the near term in conjunction with these
1:13:01other improvements and the triangle
1:13:03bikeway to considerably improve east
1:13:05west bicycle and pedestrian connectivity
1:13:07and travel on the north side of
1:13:09Morrisville. Another point I would like
1:13:11to make about the near-term time frame
1:13:13is one way to think of these near in the
1:13:15near term is with a CTP update roughly
1:13:18every five years. The next time the CTP
1:13:20is updated after this current update,
1:13:23these projects would naturally be those
1:13:25assessed and considered for immediate
1:13:28term implementation because in five
1:13:30years, you know, that that five years
1:13:33becomes immediate term.
1:13:36All right. So for the midterm projects,
1:13:38the main takeaway I want to
1:13:41uh point out here is and this is within
1:13:4415 years of CTP uh update adoption is
1:13:46that it includes a number of roadway
1:13:48widening projects in accordance with
1:13:49their recommended phasing in the Campo
1:13:512055 metropolitan transportation plan,
1:13:54which is the primary driver for why they
1:13:55landed in this tier. However, for the
1:13:58airport boulevard extension phase 2
1:14:00project concept, we recommended putting
1:14:02that in the midterm time frame ahead of
1:14:04when it is recommended for
1:14:05implementation in the MTP because of its
1:14:08importance to the town for better
1:14:10facilitating east east west connectivity
1:14:12and for airport boulevard extension
1:14:14phase one to really realize its ultimate
1:14:18purpose sooner.
1:14:20And in this year, we also have the
1:14:21completion of the sty stirrup Iron Creek
1:14:23uh greenway between Airport Boulevard
1:14:25and Aviation Parkway.
1:14:28The long-term time frame is the last
1:14:30tier, which is within 20 years of CTP
1:14:32update adoption. This tier also includes
1:14:34a number of roadway projects in
1:14:36accordance with their recommended
1:14:37implementation phasing in the 2055
1:14:40Metropolitan Transportation Plan. Uh,
1:14:42one point I would like to make about the
1:14:44projects in this tier related to NC54 is
1:14:46the proposed implementation plan breaks
1:14:49up the widening of NC54 between Western
1:14:52Parkway and McCreman Parkway into two
1:14:54separate segments to focus on
1:14:57implementation on two different time
1:14:58frames. The widening of NC54 from Weston
1:15:02Parkway to Aviation Parkway is included
1:15:05in the midterm time frame. So if we go
1:15:07back here, sorry, it's it's listed here
1:15:10and it's in the implementation plan in
1:15:11the midterm and widening from Aviation
1:15:14Parkway to McCreman with intersection
1:15:16improvements that may involve a grade
1:15:18separation at Aviation Parkway uh Morsel
1:15:21Carpenter Road is included in the
1:15:22long-term time frame. This is because
1:15:25these two widening project concepts have
1:15:27independent utility and differences in
1:15:30competitive merits on their own with the
1:15:33segment from Weston Parkway to Aviation
1:15:35Parkway being the most competitive and
1:15:38important piece to implement based on
1:15:39traffic analysis and impacts.
1:15:42One note I would like to pass along for
1:15:44the time frame tiers to which projects
1:15:45were recommended of all those that I
1:15:47went through is the current draft of the
1:15:49implementation plan does not really do
1:15:51much to explain the why behind projects
1:15:54placement among the tiers and staff will
1:15:57be working with the CTP update
1:15:58consultant to provide more of that
1:16:00explanation in the implementation plan
1:16:01document to lay out more of that why.
1:16:06Okay. And moving on to public transit
1:16:08projects. There are a number of BRT
1:16:10projects included based on their
1:16:11implementation phasing in the 2055 NTP.
1:16:14The Wake BRT western corridor extension
1:16:16which is scheduled for opening year
1:16:18before 2035 falls in the near term. The
1:16:23Davis Drive BRT
1:16:25is phased for implementation within the
1:16:272045 horizon and falls in the long term.
1:16:30The Airport Boulevard is phased for
1:16:32implementation within the 2055 horizon
1:16:35and also falls in the long term. and a
1:16:37transit transfer facility that could go
1:16:40beyond just serving as a BRT station
1:16:43near the intersection of NC54 and
1:16:45McCreman Parkway is also included in the
1:16:48long-term tier. At the more local
1:16:51service provision level, smart shuttle
1:16:52node locations will be programmed in
1:16:54accordance with the node prioritization
1:16:55plan to be considered by town council
1:16:58this fall and all of those are included
1:16:59in the immediate term tier.
1:17:02All right. So, moving on from the CTP
1:17:05itself and and we're gonna get into a
1:17:08couple of other a few other things that
1:17:10we have cooking with this. Um, so we'll
1:17:13move to the intersections we want to run
1:17:14by you for a priority intersection
1:17:16assessment study that the town will be
1:17:18kicking off soon. Uh, we have scope to
1:17:21do further investigation of specific
1:17:22operational and safety issues and and to
1:17:25develop.
1:17:27>> Can you want questions as we go or at
1:17:29the end?
1:17:31uh up to I mean we can do questions if
1:17:33we want to have questions on the
1:17:35implementation what what I just covered
1:17:36with the CTP we can probably go ahead
1:17:37and do that before I move on. Yeah.
1:17:40>> Recognize council member Garamela.
1:17:44>> Thank you.
1:17:45>> Thanks Brett. Um I'm looking at one
1:17:47particular one. I'm looking at the
1:17:49pedestrial u sidewalks on Davis and
1:17:54Macan. uh with the high school coming
1:17:57there sidewalk around that is the um U
1:18:035747B
1:18:05covering that or how how is that getting
1:18:09resolved?
1:18:11>> So up there at at at Little and Davis
1:18:14Drive for the new high school site,
1:18:17U5747
1:18:18is not addressing that. U 5747 does have
1:18:22some intersection pedestrian
1:18:24improvements at Parkside Valley included
1:18:27in in it as betterments, but it doesn't,
1:18:30you know, it there there's no impacts
1:18:32that far north.
1:18:34>> No, I'm saying not not on the uh not on
1:18:38Little Road at all. I'm talking of Davis
1:18:41and Merman.
1:18:42>> There's no sidewalk. Um, and so when the
1:18:47Macan extension is getting done, does
1:18:50that resolve the issue? Because I want
1:18:53the kids to be freely biking from the
1:18:57high school to say Kids Creek or
1:19:00Providence or Town Hall, you know, and
1:19:03right now there isn't. So I'm not seeing
1:19:06either it's getting resolved or I'm
1:19:09seeing the big gap here. So that's what
1:19:11I wanted to. So on on McCrimman for the
1:19:14project limit extents of U5747 which is
1:19:18McCreman widening from west of Davis
1:19:21Drive to Perimeter Park. Yes, there will
1:19:24be an 8 foot
1:19:26sidewalk/multi-use
1:19:28path on the north side for the entire
1:19:30extent and then there will be a five
1:19:32foot sidewalk on the south side for the
1:19:34entire extent. And what about
1:19:39Okay. So,
1:19:41so we already have a walkway on the
1:19:43north side uh towards the Harry Studio
1:19:46side uh where there's a sidewalk till I
1:19:49think uh Little Drive. Uh what are we
1:19:54doing about u
1:19:58intersections where those things are not
1:20:01safe? like are we doing those
1:20:04intersection improvements as part of the
1:20:05macre because they have to cross almost
1:20:08like six lanes to go to the other side.
1:20:12>> Yeah. And and I was going to talk more
1:20:14about what where we're going with the
1:20:17intersection um improvements or
1:20:20intersection assessment. So that is that
1:20:23intersection does have sidewalks and
1:20:25crosswalks in it in the design for the
1:20:28improvements for McRman Parkway
1:20:31widening. I know it's going to be a
1:20:33confusing intersection. There's going to
1:20:35be in some cases multiple phases for
1:20:38people to have to cross um partially
1:20:41because of the the northbound lanes are
1:20:44coming over to be closer to where so
1:20:46that they don't have a conflict in
1:20:47turning left.
1:20:49>> Um
1:20:51you know that project is designed it's
1:20:54well far along now it's getting close to
1:20:57100% design um with that much traffic
1:21:01that has to be facilitated there I I
1:21:05hear you but when when the project came
1:21:07to us we were very specific and what we
1:21:10were told was there will be airlines in
1:21:13the middle that you know you can stop
1:21:17and then proceed so and that's part of
1:21:20the intersection improvements that will
1:21:22be done. I want to make sure that that
1:21:25is not getting lost in that equation
1:21:27there.
1:21:29>> Yeah. So there are refues, right? There
1:21:31are refues for multi-phase crossings
1:21:34there in the design.
1:21:36>> Yeah. Could we get a latest design? I
1:21:38know like this keeps changing if if
1:21:41council can get it. So I want to
1:21:43especially focus on the intersection how
1:21:46safe it is and if uh we do the
1:21:49betterment charges anyway like so is
1:21:51there anything that we are missing out
1:21:53because that will be one of the most
1:21:56critical busiest and for life because
1:22:00high school is not going away from
1:22:03>> yeah absolutely
1:22:04>> thank you
1:22:10may prot body, please.
1:22:12>> Uh, could we briefly talk about the
1:22:15extension of Kits Creek Road to 54?
1:22:23Where did I see that? Yeah, Kits Creek
1:22:26Road to MC54.
1:22:28Can you explain to me exactly where that
1:22:31is?
1:22:33>> So, that would be So, that is a bicycle
1:22:35pedestrian connection. Um, this is a
1:22:38project concept. So there hasn't been
1:22:41any project level study to point to
1:22:44exact an exact sighting for it, but it
1:22:46would generally be around Kits Creek
1:22:49Road uh where K where Kids Creek Road
1:22:52terminates or nearby at Church Street
1:22:55and then connecting over to NC54.
1:22:59>> Okay. So there's no road there. It's
1:23:01just going to be a bike path or right
1:23:03>> greenway of some type.
1:23:05>> Yeah. By a bridge. It would be a bridge.
1:23:08>> A bridge.
1:23:08>> Yeah. Bike pad bridge
1:23:10>> grade separation,
1:23:11>> right? Grade separated from the
1:23:12railroad.
1:23:14>> Okay. [clears throat]
1:23:18>> Would that bridge go over to the other
1:23:20side of 54 or land in between the 54 and
1:23:22the railroad? We don't know yet.
1:23:25>> Don't know. Uh it it could. Yeah. So,
1:23:28the project there's been no project
1:23:30level study for it. You know, the the
1:23:32first step is getting the concept in the
1:23:34CTP if there's a desire for that. It's
1:23:37um and then going from there to study it
1:23:40further um to look at where exactly
1:23:43should it be cited, how should it tie in
1:23:45or interact with the other side. Should
1:23:47you know should should the bridge carry
1:23:48over NC completely over NC54? My initial
1:23:52opinion is yes because NC54 is going to
1:23:54be wider there and more in overtime
1:23:56busier. So, but questions like that, you
1:24:00know,
1:24:02>> okay,
1:24:02>> haven't dug into.
1:24:05Council member again.
1:24:08>> Okay. Thank you, Brett. That's an
1:24:10interesting concept. I look forward to
1:24:11seeing more about that.
1:24:13>> Yeah, absolutely. I'm actually very
1:24:14excited about those. There's another one
1:24:16at Barbie Road that I put it that we put
1:24:18in there and and planning and zoning
1:24:20board is very excited about it as well.
1:24:22>> We used crossing at Barbie Road. Many
1:24:25>> Yeah, I know. We that's it's caused some
1:24:28problems.
1:24:30I would definitely like to hear more
1:24:32about that because I I see so many
1:24:35people just walking across crossing the
1:24:37railroad tracks
1:24:40from that area.
1:24:42>> Yeah, I I've heard that too. Um which is
1:24:45not safe but
1:24:48>> Okay, so moving on. um the the um
1:24:52intersections we want to run by you for
1:24:54a priority intersection study,
1:24:55intersection assessment study for which
1:24:58the town has scoped to do further
1:24:59investigation of of specific operational
1:25:02and safety issues
1:25:04um based on identification of
1:25:06intersections with deficiencies through
1:25:08the CTBFDA process. So that's where this
1:25:10came from.
1:25:11The priority intersections the town
1:25:13planning and engineering departments
1:25:14recommend to carry forward for further
1:25:17study were derived from the intersection
1:25:19prioritization carried out through the
1:25:20CTP update process and from other
1:25:23planning efforts such as the Morrisville
1:25:25in motion safety action plan adopted by
1:25:27town council last fall. Uh, one
1:25:30important point to make about these are
1:25:31that in selecting intersections to carry
1:25:34forward for further study and potential
1:25:35improvement, our focus was on safety
1:25:38and/or uncontrolled congestion issues
1:25:41for which the town has likelier
1:25:43technical capacity to address, meaning
1:25:46staff resources and funding are more
1:25:48likely to be directed to them. Another
1:25:51important point about potential
1:25:53intersections to carry forward is many
1:25:55of the larger intersections with more
1:25:56substantial operational and safety
1:25:58issues are already slated for some level
1:26:01of improvement through programmed step
1:26:04projects and we mentioned one earlier
1:26:05with UC U5747 which is mccrimin parkway
1:26:09widening at that uh and then that would
1:26:11involve the Davis drive mccrim
1:26:13intersection. Um, we anticipate the
1:26:16study of these intersections to
1:26:17generally occur during the October to
1:26:19February time frame. And the recommended
1:26:20intersections include Davis Drive and
1:26:23Morrisville Carpenter Road and Church
1:26:25Street at Trey Brook Drive, Jeremiah
1:26:27Street, and Down in Glenn Drive.
1:26:30And for the Church Street intersections,
1:26:33these rose to the top because they
1:26:34received the highest congestion scores
1:26:36among all intersections evaluated for
1:26:38the CTP update, which is heavily
1:26:40influenced by overall delay on all
1:26:43approaches to those intersections. And
1:26:45they have a high bike pad and benefit
1:26:47cost score. Additionally, all three
1:26:50intersections are limited control
1:26:52intersections, and there is some concern
1:26:53with future traffic on Church Street
1:26:55with the Town Center construction,
1:26:57Airport Boulevard extension, development
1:26:59of the town's transit oriented
1:27:01development to the north, and other
1:27:03potential development pressures.
1:27:05There isn't a recommendation to increase
1:27:07the overall roadway capacity of Church
1:27:10Street to accommodate these pressures,
1:27:11but in conjunction with the
1:27:13recommendation to assign a three-lane
1:27:15undivided cross-section to Church
1:27:17Street, it is recommended that the town
1:27:18take a closer look at operational and
1:27:21safety issues at this roadways
1:27:23intersection.
1:27:26for Morsville Carpenter Road. It had the
1:27:28highest safety score from the CTP update
1:27:30prioritization results for intersections
1:27:33that are not already planned for
1:27:34improvement through NCBOT STIP projects.
1:27:37And what I mean by high safety score is
1:27:38it did not score well. Okay. It is
1:27:41identified in the Morrisville in motion
1:27:43safety plan safety action plan as a
1:27:45priority intersection to be targeted for
1:27:48safety review and programming within the
1:27:49first five years of that plan's
1:27:51adoption. and it has a high activity
1:27:53center score from the CTP prioritization
1:27:55results for obvious reasons. There's a
1:27:57lot of activity there, right? A lot of
1:27:59lot of points of interest.
1:28:02And moving along now to a quick briefing
1:28:04on a couple of other tasks the town has
1:28:05scoped and is currently carrying out
1:28:07that are related to the CTP update.
1:28:10The first is the development of town
1:28:11roadway hardscaping guidelines to be
1:28:13used as development guidance for
1:28:15landscaping in targeted areas within
1:28:17roadway rights ofway including verges,
1:28:20medians, town gateways and gateways to
1:28:22special districts within the town,
1:28:24islands, roundabouts and great separated
1:28:27bridge areas. These are also intended to
1:28:30provide the town with cohesive and
1:28:31coordinated direction for landscaping
1:28:33betterments to be included in NCDOT
1:28:35roadway improvement project scopes of
1:28:37work and for general direction per town
1:28:40transportation or infrastructure
1:28:41projects. These guidelines are
1:28:44ultimately intended to be integrated
1:28:46into the roadway crosssections in the
1:28:48CTP update. Um, town staff deployed a
1:28:51community survey on this in August into
1:28:55early September to solicit input on
1:28:57overall factors that should be
1:28:58considered with the development of the
1:29:00guidelines. Um, this overall task is
1:29:03underway and should finish up in
1:29:05November and staff will be back with you
1:29:07in December to share to share them with
1:29:09you.
1:29:12The second additional task is to
1:29:14evaluate the feasibility of a signalized
1:29:16pedestrian crossing of Aviation Parkway
1:29:17near the entrance of HSNC that would tie
1:29:20into the pedestrian facilities planned
1:29:22with Aviation Parkway widening project
1:29:24and the Crabtree Creek Greenway. Uh this
1:29:27assessment is necessary for NC DOT
1:29:30approval to incorporate a signalized
1:29:32crossing into the design and delivery of
1:29:34the widening project and it will
1:29:36evaluate impacts to traffic and
1:29:37operations of the improved aviation
1:29:39parkway facility and will generate
1:29:41conceptual design of those improvements.
1:29:44And this task is also underway and
1:29:46should finish up by November.
1:29:49All right, we're almost to the end here.
1:29:51So we'll get into next steps.
1:29:54So, a couple some milestones that we're
1:29:56still in and that we're getting getting
1:29:58ready to hit and embark upon. We are
1:30:01still in coordination with our major
1:30:03transportation planning and project
1:30:05programming stakeholders. Um there's a
1:30:08lot of back and forth with them as you
1:30:09might imagine at this stage in the
1:30:11process, NCOT, Campo, Town of Kerry, uh
1:30:14and then of course Research Triangle
1:30:16Foundation. Um but we got a lot of
1:30:18closure from them on uh kind of what we
1:30:20were planning up around that Fujifilm
1:30:22area. Um, so that's going to be
1:30:24continuing probably in a little bit into
1:30:26next month. We also are going to be
1:30:30holding our next round of stakeholder
1:30:32interviews for those that stakeholders
1:30:34that represent community interests in
1:30:36the September October time frame. So at
1:30:38the end of this month and into early
1:30:39October. So examples there are the
1:30:42Morrisville Chamber, Wake Tech and so
1:30:45forth. Um, then we will develop final
1:30:48documentation for the plan. Following up
1:30:50from that, uh, we will come back to you.
1:30:53There was so much that I had to share
1:30:55with the town council and it was a lot
1:30:57and I we've decided we can't do it. We
1:31:00can't put all that in front of you at
1:31:01one time. So, I still have more that's
1:31:03been done that I want to share. So, that
1:31:06we're you're only biting off so many,
1:31:08you know, so many pieces at a time. Um,
1:31:11so I'll come back to you with that in
1:31:13the November December time frame.
1:31:14Actually, it's it's scheduled to come
1:31:16back to you in on December 8th, but that
1:31:18will be the draft program and policy
1:31:20measures, um the town transportation
1:31:23code assessment, and the draft uh
1:31:25roadway landscaping guidelines that I
1:31:27just mentioned. I'll be sharing that
1:31:28also with the planning and zoning board
1:31:30in November before it comes to you. Then
1:31:33we'll go through a period where, okay,
1:31:35we're going to wrap everything up. There
1:31:37will be a draft plan document. It needs
1:31:38to go through a public review and
1:31:40comment period. Um it will be then
1:31:43presented to the planning and zoning
1:31:44board and to town council and then
1:31:47through that December to April time
1:31:49frame will be the time during which
1:31:50you're considering adoption or asking
1:31:52for you know you providing additional
1:31:56feedback and we're following up and so
1:31:58forth.
1:32:00So now it's time for your feedback but I
1:32:03do want to share the planning and zoning
1:32:04board's feedback.
1:32:06Um the planning and zoning board saw all
1:32:09of this information as well and they did
1:32:13have very there was very strong support
1:32:14for the bicycle and pedestrian crossings
1:32:17of the North Carolina Railroad. But
1:32:19there was some concern with the cost
1:32:20versus the impact because when we're
1:32:23talking about elevating over the
1:32:24railroad, there's always this, well,
1:32:26that's going to cost a lot because you
1:32:27got to put in a structure and then it's
1:32:29got to be approved by all, you know, the
1:32:31railroad and all these other parties and
1:32:34that puts in engineering specifications
1:32:37that could, you know, raise the cost of
1:32:39it some more. And so there was some
1:32:41discussion on that. Um, my opinion on
1:32:44that is those would be very, very high
1:32:47impact projects for connectivity across
1:32:51northern Morrisville. Even if you can't
1:32:53get a road, even if you can't get a
1:32:55roadway that facilitates vehicular
1:32:56travel, um, a bicycle or pedestrian
1:32:59crossing would do a lot to make that
1:33:03part of town feel very connected and
1:33:05have access to options that are very
1:33:07difficult for them right now. Um, so
1:33:10while the cost might be high, I would,
1:33:12you know, also think about the impact.
1:33:14There's also some discussion on putting
1:33:16those in the immediate term versus
1:33:18near-term implementation time frames
1:33:19because there was some excitement about
1:33:21them. However, we have not done any
1:33:23project level study on those. They are
1:33:25in the near- term within the next 10
1:33:27years. In order for us to really to
1:33:30really say, okay, yeah, we're going to
1:33:31we want to move forward with this and
1:33:33here's how it's going to work and where
1:33:34it's going to be cited and everything,
1:33:36we have to do that project level study.
1:33:38Um and certainly before we ask for any
1:33:41uh funding from external parties for it.
1:33:44Um another point I want to make about
1:33:46those is they're actually pretty
1:33:49competitive. I mean they would be
1:33:51whenever you're crossing a barrier like
1:33:52a railroad or a limited access highway
1:33:57with a bicycle and pedestrian
1:33:58connection. There are a lot of external
1:34:00funding programs where those are pretty
1:34:02competitive. Those types of things are
1:34:04very competitive. So I do want to note
1:34:06that. Um they also mentioned that the
1:34:08town want may want to do some education
1:34:10to help differentiate modal use of side
1:34:12paths versus sidewalks. And what this
1:34:14comes down to is the you people
1:34:17bicyclists using sidewalks um ra you
1:34:20know rather than side paths. Um the
1:34:23sidewalks are pedestrians side paths are
1:34:26multi-use paths and so they're meant for
1:34:28both bicyclists and pedestrians. And so
1:34:30maybe some concern about, you know, does
1:34:32does do our residents and visitors in
1:34:34Morrisville
1:34:36understand kind of what the intended
1:34:38modal use of those two types of
1:34:39facilities are.
1:34:41There are some questions about the need
1:34:43for targeting intersections on Church
1:34:44Street for further study and potential
1:34:46improvement. I think a lot of that came
1:34:47from
1:34:49uh there's all these other sections
1:34:51other intersections in town that have a
1:34:53lot that have problems and some big
1:34:55intersections that have problems. And
1:34:58what kind of when I explained that well
1:35:00a lot of those are actually already
1:35:01being addressed by something or we've
1:35:03already studied them
1:35:06there aren't very many of those left if
1:35:08you if you actually think about it. So
1:35:10that was kind of how the discussion went
1:35:12there. Um there was some discussion
1:35:14about improving turning movement
1:35:16efficiencies at the intersection of
1:35:17Morrisville Parkway and Davis Drive
1:35:19specifically
1:35:20um with don't block the box striping so
1:35:23that you're not you know not block
1:35:24people are not blocking the
1:35:25intersection. We do have designs from
1:35:28the Morseville Parkway access management
1:35:31uh projects to add a right turn lane
1:35:33there. Um there's not a whole lot else
1:35:35that we've included there in the design
1:35:37for a variety of reasons. It's a very
1:35:39complex intersection and threequarters
1:35:41of it is not even in the town. So
1:35:44there's that. um discussion about
1:35:47potential for vertical protective
1:35:49features in the bike lane buffers such
1:35:51as some sort of concrete barrier barrier
1:35:53and I don't think they meant jersey
1:35:56barrier if you you know those big jersey
1:35:58barriers. Um I think what was meant by
1:36:00that was some type of lower profile but
1:36:02still vertical elevated feature. Um, and
1:36:06with the planning and zoning board talks
1:36:07a little bit about how to plan for
1:36:09recreational cyclists versus utilitarian
1:36:11cyclists and how that factors into the
1:36:13the CPP and then also just general
1:36:16frustration with the aviation parkway
1:36:18carpenter road intersection at NC54.
1:36:22Um, who's not frustrated with that,
1:36:25right? So that's what we heard from them
1:36:28and I'll turn it back over to you for
1:36:30any questions or feedback.
1:36:34I think the trains are not frustrated
1:36:36with that intersection.
1:36:38>> What?
1:36:39>> Trains. The trains are the only ones who
1:36:40go through that intersection cleanly.
1:36:42>> That's right.
1:36:42>> I recognize council member Patel
1:36:44followed by council member Garam. Please
1:36:52>> if we can go to proposed rule
1:36:54cross-sections section. Um
1:36:57u once we
1:37:00adopt these cross actions u how
1:37:04prescriptive are they? So uh if
1:37:06conditions or cost change later how much
1:37:10flexibility will council have without
1:37:12formally embeding doing anything without
1:37:14formally emitting the city.
1:37:19>> Can you say that last part again? I'm
1:37:21sorry. If the condition of cost change
1:37:24later, what kind of flexibility council
1:37:27has to do anything without actually
1:37:29amending the CTP?
1:37:33>> I mean that's a good question. Um
1:37:37I mean the CTP can be amended at any
1:37:39time.
1:37:40>> Yeah. One of the pro one of the things
1:37:42that we run into is if a developer comes
1:37:45in there's a so with a site plan and
1:37:49there there's a certain point at which
1:37:51they become vested and this these
1:37:54cross-sections are attached to you know
1:37:57through the UDO through by extension of
1:37:59the UDO they're attached to the UDO as
1:38:02this is what they need to provide.
1:38:05um
1:38:07that can be a there could be a
1:38:09significant period of time between when
1:38:11they come in and when something's built.
1:38:14Um and and and where during which there
1:38:18might be a desire conditions have
1:38:20changed. Um we might want to alter what
1:38:24these cross-sections look like or do.
1:38:28You know, I think we just have to I
1:38:31mean, that's kind of just punches that
1:38:33we have to roll with. I mean, um, the
1:38:37CTP can be amended at any time at the
1:38:39pleasure of the council,
1:38:41um, after this is adopted with these
1:38:44cross-sections if there's a desire to go
1:38:46in another direction with them. But
1:38:49there's always going to be something in
1:38:50between with the development community
1:38:53where even if you do that, there could
1:38:55still be vesting that they have to put
1:38:58in what was originally in the old CTP
1:39:01before you amend it type of thing.
1:39:03>> Okay.
1:39:04>> So,
1:39:05>> thank you. And um
1:39:08what is the estimated total town
1:39:10financial exposures associated with
1:39:12everything we are calling immediate term
1:39:15>> the fund the town funding?
1:39:17>> Mhm. So that is not a that is not an
1:39:20equation that the CTP solves for. The
1:39:24CTP is not financially constrained.
1:39:27>> Um
1:39:29the the extent of what this CTP does is
1:39:33with the technical capacity that we have
1:39:35with the prioritization, the public
1:39:38feedback and all that. If we had all the
1:39:41resources we needed
1:39:44to do what we want to do, this is what
1:39:47we would do.
1:39:48>> Got it. Right. Let me ask a different
1:39:50question.
1:39:52When the implementation plan lists lab
1:39:55or spot or strip or discretionary
1:39:57grants,
1:39:59uh does that mean that it's a secure
1:40:02funding, a realistic funding strategy or
1:40:04uh it simply says eligibility for those
1:40:08funding?
1:40:09>> That pretty much means those are options
1:40:11to pursue to provide that funding uh or
1:40:15to or to fund that particular project
1:40:18concept. Um, in some cases you see
1:40:22multiple listed
1:40:24that's a jud that's a that's a kind of
1:40:26an assessment or a judgment call that
1:40:28needs to be made at the time of well
1:40:30should we pursue this or should we
1:40:31pursue this. Some cases you can pursue
1:40:33more than one and bring them together as
1:40:35well. Um,
1:40:38so I mean that's
1:40:41>> I think that's all the questions I have
1:40:43and I'm sorry I jump straight into
1:40:45question without thanking you for the
1:40:47work you have done to put this together.
1:40:49Appreciate it.
1:40:50>> Those are good questions. I appreciate
1:40:51it. Thank you.
1:40:53>> Council member Gar Melo, please.
1:40:58>> All right. This is uh
1:41:01a different conversation. I wanted to
1:41:03talk about the railroad. Um there's a
1:41:06merger which is going on between Union
1:41:09Pacific and North Southern.
1:41:13And uh
1:41:15the reason I bring this up is because I
1:41:18was with NCLM folks and Erin
1:41:21specifically. There were lobbyists from
1:41:26Midwest who are trying to say that north
1:41:30folks uh not the safety standards of
1:41:33Union Pacific is not that good and
1:41:37especially their signaling and all those
1:41:40too many accidents and uh they wanted
1:41:44NCL to get engaged and you know
1:41:47basically do it. Um obviously they don't
1:41:51pick those kind of issues but that thing
1:41:54really struck me because we are like a
1:41:57we have our railroad running across it
1:42:00and safety is the most important thing.
1:42:04How would we ensure that those safety
1:42:08standards are kept and you know they're
1:42:11not sliding because one example they
1:42:14said there's a certain 20 seconds rule
1:42:17or something like you know the doors
1:42:19have to be shut or something they have a
1:42:21different rule sets um so I'm not an
1:42:24expert in the safety areas but when CTP
1:42:28and all these things are playing in I
1:42:30think that plays a very very important
1:42:32role because our uh east west corridor
1:42:37we are passing through them.
1:42:42>> I mean I don't know that much about it
1:42:44either. Council member Garamala um in
1:42:46terms of I'm sure there's some
1:42:49jurisdiction issues um involved with
1:42:53that. Um the railroads enjoy incredible
1:42:58freedom and independence under the law,
1:43:01at least federal law.
1:43:02>> [laughter]
1:43:03>> So, um, but it's something I can look
1:43:05into.
1:43:06>> Yeah, I just if not, I'll uh put you in
1:43:09touch with Erin, uh, because this
1:43:12particular lobby group from Midwest is
1:43:14hounding to basically see like, you
1:43:17know, that North Carolina can pick up
1:43:20this issue. Um, because I don't think
1:43:22they like union pass for some reason.
1:43:25But, uh, that's not our case. Safety
1:43:27standards are our main issue. So that is
1:43:30one thing I would consider. We can do
1:43:32all these things but somewhere it's not
1:43:36triggering correctly. You don't want
1:43:37fatalities on any of the signals.
1:43:41>> Yeah. I mean it's important what what
1:43:43you bring up is important. I
1:43:44>> Yeah.
1:43:45>> I just can't I don't know that much
1:43:48about what we can do there but I can
1:43:50look I can check I can dig into it.
1:43:56Council
1:43:56>> member Johnson please.
1:44:01Thank you for the um robust sharing of
1:44:05information and our update. I know we
1:44:08ask a lot of questions because we are so
1:44:10passionate about this. Um
1:44:14my question relates to our neighbors and
1:44:19Carrie. Now, we are doing our
1:44:23um transportation plan update, but there
1:44:26are several roads that either are
1:44:30segments of Kerry along the same stretch
1:44:32as ours and so forth, or the
1:44:35intersections literally are this is
1:44:38Morrisville, this is Kerry. And the two
1:44:41intersections that I really um
1:44:46feel a lot of challenges with is the
1:44:48Morrisville Parkway Davis Drive
1:44:50intersection and it's the Morrisville
1:44:53Carpenter
1:44:55uh Davis Drive intersection. Those two
1:44:58have components of the town of Kerry
1:45:01with them. In the case of Morrisville
1:45:03Carpenter, I think it's it's literally
1:45:05like there's, you know,
1:45:09um, some jurisdiction there with some of
1:45:12the trails and greenways and and so
1:45:14forth like that. in Morrisville Parkway.
1:45:16It literally is the the road is split in
1:45:19two with Kerry having the blind spot
1:45:23segment of the road and Morrisville
1:45:25having the um
1:45:28the ramping up of the intersection kind
1:45:31of thing. How do we coordinate
1:45:35our plan when we have these intermediate
1:45:38term projects with Carrie? Do they have
1:45:41a similar intermediate term listing that
1:45:45include these intersections?
1:45:48Because ultimately it's going to be
1:45:49funding to improve the intersection
1:45:51holistically.
1:45:54>> So they have more so they're believe it
1:45:58or not our comprehensive transportation
1:46:01planning is more pretty a lot more
1:46:04robust than the town of carries. Um they
1:46:08do have thoroughfare plans for what
1:46:10roadways you know in the future
1:46:13what they should be rightway needs are
1:46:15attached to that and all of that but
1:46:20they have not we have been collaborating
1:46:22with the town of Kerry transportation
1:46:24staff through this process and they have
1:46:26not shared with me any specific plans
1:46:29for that. Now, they have been working on
1:46:33very recently and should be getting
1:46:35pretty close to consideration of
1:46:37adoption of a bicycle plan
1:46:40um that from which we were able to get a
1:46:43lot of good information to inform us on
1:46:45how we should match up with what they're
1:46:47they're doing. There's a lot of cases of
1:46:49that at the edges of our boundaries with
1:46:51with the town of Kerry. Um they have
1:46:54also provided a lot of input or signaled
1:46:58support for um where we do have roadways
1:47:02that where where we share boundaries or
1:47:05we go we we go through Morsville then
1:47:07Carrie then back into Morrisville. Um so
1:47:10I have gotten a lot of feedback. That is
1:47:11one of the entities also that I'm still
1:47:13going back and forth with a little bit.
1:47:15>> Well I don't think it's easy. That's why
1:47:17I'm asking the questions. Right. Um the
1:47:21other thing with the Campo I mean these
1:47:23are NC DOT roads. Davis Drive is an NC
1:47:27DOT road. Morrisville Parks NCDOT road.
1:47:30So any improvements have to go through
1:47:32Campo and get funding. Do they score
1:47:35higher because they have two communities
1:47:39in with these intersections, you know,
1:47:41for funding, LAP funding or or whatever,
1:47:44you know, funding source they might be
1:47:46evaluated at
1:47:48>> with with LAP. No, just without without
1:47:52me going and looking at the scoring
1:47:54criteria, my I'm going to say no. I can
1:47:57go and check if I'm wrong, I'll follow
1:47:59up, but I'm gonna say no to that. I
1:48:02don't think it matters um whether it
1:48:06impacts two or not because pro mainly
1:48:08because that would sort of also be
1:48:10unfair to other intersections that could
1:48:13be that are wholly within communities. I
1:48:15think it's just completely based on the
1:48:17merits of how they operate, safety
1:48:19issues, that sort of thing.
1:48:21>> I mean scoring is kind of mysterious to
1:48:23me anyway. So I, you know, it does, you
1:48:26know, help if Carrie was supportive of
1:48:30improvement, you know, um, with this
1:48:34kind of challenge.
1:48:35>> I mean, it helps to an it would help to
1:48:37an extent. Um, depending on
1:48:40who submits it. Um, it'd be interesting
1:48:43to see what happens if we both if both
1:48:46communities would submit a project like
1:48:47that. and that would happen
1:48:49>> if you did rather than just being like,
1:48:50"Oh, well, Mor Carrie submits it and
1:48:53Morrisville supports it and vice versa."
1:48:56What if both then I wonder that might
1:49:00that might get some sort of traction
1:49:02beyond what I'm thinking for scoring,
1:49:04but
1:49:04>> historically there has been some
1:49:07disjointed improvements in some of these
1:49:09intersections. I'm just gonna leave that
1:49:13there. But coordination is helpful and
1:49:17it also might be a louder voice. You
1:49:20know, the safety of those intersections
1:49:23is really important. I I know that the
1:49:25planning board also expressed some
1:49:28concern about safety with the
1:49:29Morrisville Carpenter. I do hear the
1:49:32fire trucks. I do, you know, hear the
1:49:34police cars up and down Morrisville
1:49:36Carpenter a lot. and some times they're
1:49:40leaving the intersection of Davis Drive
1:49:41and Morrisville Carpenter, but there is
1:49:43a serious amount of um activity um in
1:49:47those areas. So, appreciate everything
1:49:50that you do um just if there is
1:49:55something that the council can do um to
1:49:59maybe raise awareness about this. I
1:50:02mean, I can do one-on-one conversations,
1:50:04but if there's some way that we can um,
1:50:08you know, look at this a little more
1:50:10strategically with Carrie or, you know,
1:50:14a meeting or something that might be
1:50:16helpful, I think.
1:50:18>> Thank you.
1:50:21>> Council member Kesling, please.
1:50:24>> Brett, thank you for uh this
1:50:26presentation and all the work that
1:50:27you're doing on the conference
1:50:29transportation plan update. Um, I think
1:50:31we're really lucky to have you. Um,
1:50:33especially with all of our, um, traffic
1:50:35congestion problems, having someone
1:50:37dedicated to solving those problems is,
1:50:40uh, we're very fortunate for that. Um,
1:50:42if we could go to slide 14, please, that
1:50:45shows the cross-sections.
1:50:49So, as I was reviewing our materials and
1:50:52looking through this and looking at the
1:50:55um the different cross-sections and you
1:50:58know uh uh where they where they exist
1:51:00on this map, I found that I was running
1:51:03into uh one issue in particular. Um I
1:51:07obviously care about uh the bike and
1:51:11pedestrian connectivity. Um, and I found
1:51:15while this map does have um,
1:51:19uh, all the cross-sections listed out
1:51:21um, whatnot, what I'm particularly
1:51:24interested in is seeing a map that shows
1:51:29the roads with bike lanes, side paths,
1:51:32and greenways all on one map. Um,
1:51:37the reason being is to identify where
1:51:40gaps may occur. um specifically as it
1:51:43relates to cycling um but also to a to
1:51:47another extent um the the pedestrian um
1:51:50connectivity as well. Um
1:51:54so the the with that gap um you know
1:51:58where is where are the points where
1:52:00someone has to transition from one
1:52:02facility to another facility or to get
1:52:04to the next facility have to then get on
1:52:07the roadway. Um, so I I it was very
1:52:10difficult to kind of figure that out for
1:52:12me based on this map and comparing that
1:52:14with the greenway map and trying to kind
1:52:16of put the two two and two together on
1:52:17my own. Um,
1:52:21uh, and you had in your presentation
1:52:23that safety was another concern. Uh,
1:52:25gaps was the second concern. I think
1:52:26those both go hand in hand. There might
1:52:28be um 95% connectivity with the bike
1:52:32lanes and the uh side paths and
1:52:35greenways, but one gap uh can be a
1:52:38safety concern. Um and I know we've been
1:52:42experiencing increased outreach with
1:52:44regards to the construction that's
1:52:45happening on Town Hall Drive. Um that is
1:52:47causing gaps to form and the safety
1:52:50issues um that that come from that. So
1:52:53that's I guess what would it take to
1:52:57um
1:53:00basically I don't want to necessarily
1:53:02make a I guess I am asking to make a new
1:53:04map um but essentially looking at the
1:53:07the greenway and or crosssections that
1:53:11have the um the bike lanes and the side
1:53:14paths and seeing you know overlaying
1:53:16those two um and maybe it's just the
1:53:19three kind of sections there just three
1:53:22colors essentially on the map. Seeing
1:53:24what that looks like.
1:53:27>> Yeah. Yeah. Absolutely. [clears throat]
1:53:31>> Excellent.
1:53:32>> Yeah.
1:53:33>> That should be easy. And no, I I think
1:53:36you're I think it sounds like you're
1:53:37interested in what's existing
1:53:40all three bike lanes, side paths, and
1:53:44greenways. And then what taking what
1:53:48where that's going to show you where
1:53:50gaps are. And then also having
1:53:53what's proposed for all three also on
1:53:56the same map. So you have it all in one
1:53:58place,
1:53:59>> right? Yes. I think the greenway map has
1:54:01um the the current greenway and then the
1:54:05future. I understand that this is not
1:54:08necessarily
1:54:10current and future. It's I guess it's
1:54:12future, but it's also not current,
1:54:16right?
1:54:16>> If that makes sense. Yes, I know.
1:54:18>> Yeah. Um,
1:54:21so yeah, I think that would provide real
1:54:23greater clarity on um, you know, where
1:54:26some of those um, for me at least on
1:54:29where some of those bike and pedestrian
1:54:31um, gaps may be. And when it comes to
1:54:33prioritization,
1:54:35um, certainly if there's recognized gaps
1:54:38in that network, um, I would I would
1:54:42want to prioritize filling some of those
1:54:45gaps. Um,
1:54:50but I would want to see I guess I'd want
1:54:52to see that that new map first um to
1:54:55understand you know where where could
1:54:56the I know that there's automobile um
1:55:00you know connectivity and and
1:55:02improvement prioritization but then also
1:55:03the bike ped prioritization. I mean, if
1:55:05there's the benefit of having them both
1:55:06where we get the side path with the
1:55:09improved um automobile uh um what
1:55:15yeah, just improved automobile travel.
1:55:17Um and I would imagine that that would
1:55:19score rather highly if we can do both.
1:55:22Um but certainly if we can get those
1:55:24bike pad stuff even if it's a small
1:55:25something to to close those gaps um and
1:55:28alleviate some of those skate safety
1:55:29concerns.
1:55:30>> Yeah, absolutely.
1:55:32>> Um another thing that I wanted to
1:55:35mention was uh redundancy.
1:55:38So, I'm seeing on here uh up Town Hall
1:55:42Drive, we've got the fourlane divided
1:55:44with one sidewalk and one side path. And
1:55:47then further up um that it's
1:55:54I see it's a um I got my colors wrong.
1:55:56So, it's it is the fourlane divided with
1:55:58the sidewalks
1:56:00that So, in terms of redundancy, I know
1:56:02that there's a greenway adjacent to this
1:56:04roadway. Um, but what is is there any
1:56:09issue with the,
1:56:12you know, having that extra bike
1:56:14facility on the road adjacent to the
1:56:17greenway?
1:56:20>> There's not an issue with it. Um it's
1:56:24just
1:56:26the I think the biggest things that
1:56:27we've run into is will it entail
1:56:30rightway impacts
1:56:32in a residential area that which is an
1:56:35which are areas where you want to
1:56:36minimize rideway impacts. I don't know
1:56:38the answer to that without looking at it
1:56:40but I can look at it. U but the reason
1:56:43why it stops where it stops with the
1:56:46side path is because as you noted there
1:56:48is an adjacent greenway. We have the
1:56:50same kind of concept relationship sort
1:56:53of thing going on with Church Street and
1:56:55the Sawmill Creek Greenway. Why you
1:56:57don't see facil, you know, specific
1:57:00facilities on Church Street to
1:57:01facilitate bicycle travel. But we can
1:57:04look at it and see um if if there's
1:57:07going to be rightway impacts. You know,
1:57:10I don't know. It it it depends if you
1:57:12think it's redundant. I mean, sometimes
1:57:14that's in the eyes of the user and
1:57:17whoever, you know,
1:57:20a lot of times that's a judgment call.
1:57:22So, I'm not saying that there's anything
1:57:23wrong with it or
1:57:24>> or right with it,
1:57:25>> right?
1:57:26>> Yeah. In my in my field, we we deal with
1:57:28N plus one. So, having um you know, two
1:57:31chillers and having an extra one chiller
1:57:34just for that redundancy sake. So having
1:57:36having multiple ways to get around town,
1:57:39multiple routes, um I think certainly
1:57:42would alleviate if if we do connect in
1:57:45such a way that we have more cyclists
1:57:47travel on our greenways. Um and that
1:57:50might be impacting the pedestrians that
1:57:52are using the greenway, then you know
1:57:54having that uh road facility might be um
1:57:58might be better for the pedestrian
1:58:00experience, but also you know
1:58:01potentially for the cyclist experience.
1:58:02It might provide a more direct path. Um,
1:58:05so I think
1:58:07yeah, just just investigating that a
1:58:09little bit further I think would be um
1:58:11would be good. I want to echo the PCB
1:58:15said about the buffered bike lanes. Um,
1:58:18some of our uh um crosssections. It's
1:58:21four lane um with the bike lane on it
1:58:25and we don't have any sort of uh
1:58:27separation on that except for the paint
1:58:29on the road. Um, and I just I'm just
1:58:31concerned about um the safety of riding
1:58:34your bike in those bike lanes. Even
1:58:36though it's um
1:58:39even though it's, you know, that you
1:58:40have that buffer, it does end up being a
1:58:42little bit it's it's wider than probably
1:58:45what we have now. And so I can see some
1:58:48of that. Um my understanding is that the
1:58:51wider the lanes, the faster you travel.
1:58:53Um the the small the narrower the lanes,
1:58:55the slower you travel. But if you've got
1:58:58kind of a big shoulder you can play
1:59:00with, I just see that as being a safety
1:59:02concern for um for cyclists. And also um
1:59:07in went down to Austin, Texas recently
1:59:10and they have the
1:59:13bike lanes on the side. So they have the
1:59:15sidewalk bike lane. Sometimes it's
1:59:17parked cars and then the and then the
1:59:19travel paths or the the um um the road
1:59:21sections, but those bike lanes are
1:59:23two-way.
1:59:25Um, so I'd be curious to know if we
1:59:27could make some of those bike lanes
1:59:29two-way um, such that, you know, someone
1:59:32wouldn't have to go all the way down to
1:59:35um, you know, a traffic light and then
1:59:37cross the road to get on the to get on
1:59:40the um, uh, the opposite direction. Um,
1:59:43if they could just kind of pull off onto
1:59:45the uh, on the grass on the side um, and
1:59:48then just, you know, turn their bike
1:59:49around and just go straight into the
1:59:51opposite direction. I'd be curious to um
1:59:53investigate that um because that I mean
1:59:57that's the way they do it in Amsterdam
1:59:58as well. It seems to work out for them.
2:00:02>> Yeah, I mean that I can we can look into
2:00:03that. I with two lane or sorry with two
2:00:07eight bike lanes I think they work
2:00:09really well when you don't have a
2:00:11divided facility, a divided roadway
2:00:13facility. They don't work as well if
2:00:16unless you're talking about on both
2:00:17sides. um they don't work as well when
2:00:21you have a divided facility because
2:00:22there's at some point a user is going to
2:00:25have to get to the other side of the
2:00:27road and then but
2:00:30you know
2:00:33I guess help me understand um yes you
2:00:36have the divided you have the median
2:00:38then if you have a two-way on even if
2:00:41it's just on one side then they can go
2:00:44they would whether it be one way on one
2:00:47side or two ways on one
2:00:48you'd still have to go up to the
2:00:50crosswalk to get across to get to the
2:00:52other side of the street.
2:00:54>> If you're if you're suggesting that, so
2:00:56typically with bicyclists when they use
2:00:58bike lanes, from my experience, they
2:01:00want to use the bike lane on the side of
2:01:02the road where they meet up with the
2:01:04roadway as long as they can until they
2:01:06get to their destination or where they
2:01:07need to cross to maybe get to another
2:01:09connection.
2:01:11So,
2:01:14what I'm saying, if there's a bike lane
2:01:17on both sides and you're just suggesting
2:01:18a two-lane bike or two-way bike lane on
2:01:20one and there's still a bike lane on the
2:01:22other, then it that's fine or that that
2:01:24doesn't come into play. Um,
2:01:28but if you just have one two-way bike
2:01:31lane on one side of the street, that
2:01:33could be problematic for some.
2:01:36>> Yeah. I in Austin they have the two
2:01:39two-way on both sides and I think that's
2:01:40the way it is in Amsterdam as well. So I
2:01:42think I think that's important and um
2:01:45I'd be curious to see what it would take
2:01:47to um make some of those a reality.
2:01:52>> I mean yeah we can look into that. Um, I
2:01:55think really where you're at with just
2:01:58the council in general, it's a, you
2:02:00know, you're in a there's a lot of
2:02:02things that are the science of
2:02:04transportation planning and traffic
2:02:06engineering and all that. It it's not to
2:02:09some of this is not going to apply. A
2:02:11lot of this is judgment, right? And
2:02:13there's not necessarily a right or wrong
2:02:16answer one way or the other. Um, so you
2:02:21know just
2:02:22>> I know we're bringing in the values into
2:02:25into this on this conversation, right?
2:02:27Trying to figure out what we have, what
2:02:29is, and then, you know, determining what
2:02:30ought, you know, we have a we have that
2:02:32value statement. I can tell you that my
2:02:34where I'm coming from is reducing car
2:02:36dependency. That's my big goal is is
2:02:39doing that.
2:02:44>> Cool. Council member Johnson followed by
2:02:46member body please.
2:02:48>> So thank you Brett. I'm I'm only going
2:02:50to bring up three quick things. One um
2:02:54uh planning and zoning their
2:02:56conversation about don't block the box.
2:02:58I love that conversation that could
2:03:02happen at every intersection all over
2:03:04Morrisville all over the triangle. So I
2:03:06think we need to keep that in mind and
2:03:08figure out figure out a way how to
2:03:10incorporate that. I love that idea. Um,
2:03:13I also love the um bike peg crossing on
2:03:17the north church over 54. I you know I
2:03:21re we've had these conversations in
2:03:23years past and I realize that's a a
2:03:26really expensive solution like you
2:03:28talked about and there's lots of parties
2:03:30involved and lots of others that would
2:03:33need to weigh in on that, the railroad
2:03:36and DOT and all that. But I think it's
2:03:38important to have that kind of a
2:03:40solution or concept in the plan um
2:03:43moving forward. So number one, it
2:03:44doesn't get lost. Number two, maybe
2:03:46it'll be emphasized
2:03:48uh down the road because it is kind of a
2:03:51long-term surely a long-term um project.
2:03:54But uh love that. And then um only other
2:03:57comment I want to make is you know and I
2:03:59get this um intermediate term versus
2:04:03near-term you know you you got to kind
2:04:06of put these projects all in buckets and
2:04:09I also um clearly understand that this
2:04:12is not a fiscally constrained plan and
2:04:15that these projects will um when when
2:04:19outside third party funding becomes
2:04:22available these projects will move a
2:04:24little bit. totally get all that too.
2:04:26But when you when you look and
2:04:28especially at the at the um immediate
2:04:31term page, um
2:04:34and I know some of these projects are
2:04:36already in the works. So um some of them
2:04:38will be complete in five years, but is
2:04:42is this realistic that these projects
2:04:45can potentially be be
2:04:49um you know completed or at least
2:04:52started in five years? is was that a
2:04:55part of the whole um planning and why
2:04:58you put these particular projects on
2:05:00this page? It yeah it is. I mean so the
2:05:04intent here is really okay
2:05:07what is the town already focused on or
2:05:11is it are we already sort of committed
2:05:13to focusing on at the at the project
2:05:16level of study for these things. Um, I
2:05:20will say it's very unlikely that all of
2:05:24this will actually be can actually be
2:05:27implemented and on the ground and
2:05:28operational in five years. But
2:05:32um,
2:05:34you know, the town is focused on a lot
2:05:36of on these things.
2:05:39Let this helps us stay focused on these
2:05:41things and try and keeps us working to
2:05:44deliver them as soon as we can. That's
2:05:48kind of the idea behind immediate term.
2:05:51But if you were pushed me against the
2:05:52corner and say, "Brett, you need to be
2:05:54real with me about whether or not you
2:05:56think this is all going to get done in
2:05:59five years." I'd say probably not.
2:06:01So,
2:06:02>> okay. Well, thank you for the honesty.
2:06:04That's what actually what I was looking
2:06:05for. And um and I get it. Projects,
2:06:09these projects, they don't we don't go
2:06:11straight to um construction. There are
2:06:14multiple steps along the way. I mean,
2:06:16design, there's all kinds of steps along
2:06:18the way. So, you're right. These
2:06:21projects potentially could be in that
2:06:23process, maybe not all on the ground um
2:06:28complete, but um I I get that too. So,
2:06:31um Okay, thank you. I appreciate all the
2:06:33work. I know how how timeconsuming
2:06:36um the a transportation update plan
2:06:40process is. So, um I appreciate all the
2:06:43work. It looks it you you make it look
2:06:45so easy and it's not. I know that. So
2:06:49appreciate
2:06:50>> Mayor Pamati please.
2:06:54Speaking of time consuming,
2:06:56um, so I feel like we we have these
2:07:00discussions and everybody is asking you
2:07:03for different things,
2:07:05information, they want different ways or
2:07:07or reports and you are such a good guy
2:07:11and you always say sure and but I I'm
2:07:15beginning to be concerned that this is
2:07:18kind of becoming a thing where not just
2:07:21for you but where you know We we ask
2:07:24staff for things. We like we don't ask
2:07:26for it as a council and we ask for 10
2:07:28different things and then you're stuck
2:07:31holding a bag with having committed to a
2:07:35bunch of things that either we may not
2:07:38all want or we may want but we need to
2:07:40understand what the tradeoff is. What's
2:07:43either not going to get done, what's
2:07:45going to be slow rolled. So, can we just
2:07:48like take a step back and can you tell
2:07:52me
2:07:53what additional materials you've
2:07:56committed tonight to produce and then
2:07:59explain to me the likely because there's
2:08:02no way that you're going to be able to
2:08:04produce all that and there's not going
2:08:05to be some kind of impact like you're
2:08:07not Superman. You have to sleep, you
2:08:09know, walk outside, whatever. So, can
2:08:13you just kind of break down for me what
2:08:16you're going to be producing next? And I
2:08:20is there anything that's a significant
2:08:22chunk of work that would require council
2:08:25direction for you to undertake that
2:08:28because it's going to impact other work.
2:08:32>> Yeah, thank you for that. Um, council
2:08:34member or mayor body. Um so I have noted
2:08:40with the railroad um looking looking
2:08:44into really the primary focus there
2:08:46would be looking into the jurisdiction
2:08:48of what we could do with safety at the
2:08:52railroad crossings that is within our
2:08:56power that is not within or could go
2:09:00beyond what the railroad's power is.
2:09:02That to me is really just a pretty basic
2:09:04jurisdiction question that I think could
2:09:07be answered. Um, so I also have um
2:09:13the map that council member Kesling
2:09:15asked for. That's easy. Uh, putting and
2:09:18I think it's worthwhile for every for
2:09:21everybody to see putting the bike lane,
2:09:23slide pass, and greenways on one map.
2:09:25Um, and then all the existing of those
2:09:27as well to see where gaps are. Um
2:09:30because I think that's important for you
2:09:31to understand that those are being
2:09:33filled because through our
2:09:34prioritization process that was also a
2:09:36really significant factor. Um for the
2:09:40sidewalks and uh side paths on Town Hall
2:09:43Drive, continuing those up, that's
2:09:45really just looking at the rideway
2:09:47impacts. I think that's the only thing
2:09:48that I would say you might want to take
2:09:50into consideration before um committing
2:09:54to adding side paths uh farther north.
2:09:59uh to be also somewhat parallel with the
2:10:03greenway that also kind of runs north
2:10:05south there just to the west of Town
2:10:08Hall Drive. Um
2:10:11there was a request to look into two-way
2:10:12bike lanes. Um
2:10:15you know, can is that something that we
2:10:18could do? Again, to me, for the purposes
2:10:21of the council, all that comes down to
2:10:23is rightway impacts. If you want two-way
2:10:25bike lanes, we can put two two-way bike
2:10:27lanes in there. I might take a a look at
2:10:29a couple of other things to see if, you
2:10:32know, some best practices to see if it
2:10:34it's a it might be a bad idea, if
2:10:36there's other impacts that we're not
2:10:37thinking about, that sort of thing. But,
2:10:40um, I don't necessarily think that's a
2:10:43huge lift. Um,
2:10:48compared to most evenings that I've come
2:10:50to the town council, this is actually
2:10:52not I don't see these request I
2:10:55appreciate you looking out for me
2:10:56though. That's that but I don't see
2:11:00these requests as being that huge of a
2:11:02lift. At least for what I have in my
2:11:04mind of what I'm gonna how I'm going to
2:11:06follow up.
2:11:08>> Okay. All right. Yeah, just checking
2:11:10because I to me frankly it all sounded
2:11:12like a ton of work. So, you know, and I
2:11:14just I just would really I just think we
2:11:18all ought to be careful about that
2:11:19because, you know, one person asks for a
2:11:22statistic and one person asks for an
2:11:24opinion and and I just feel like it's
2:11:26all a lot of work. But if you're
2:11:28confident, then I I trust you. Thank
2:11:30you.
2:11:31>> Thank you.
2:11:33>> Yeah. I look at this, I'm like, "Yeah,
2:11:35let's keep our head down. Let's get
2:11:36these things done. Let's move on to the
2:11:37next. Let's just keep it moving." I'd
2:11:40like to recognize Council Member
2:11:41Garamel, but Council Member Kesling,
2:11:43we're kind of in our second round now.
2:11:47>> Okay. Council member Kesling, followed
2:11:49by Council Member Johnson, please. Um,
2:11:53I wanted to echo Mayor Pro Timber's uh
2:11:56comment as well and to say that I
2:11:58appreciated the um the materials being
2:12:01provided ahead of time as well as the
2:12:03here's what um it would be prudent to
2:12:06focus on. Um, and that's certainly what
2:12:08I've done. um in my preparations and I I
2:12:11appreciate that and I hope that also is
2:12:14I'm sure that that is helpful to give us
2:12:16some um you know here's what you need
2:12:18here's what I would like you to focus on
2:12:20and then we have the discussion here so
2:12:22I appreciate that a
2:12:26have you talked with the parks
2:12:28department about the parks master plan
2:12:31>> I have not
2:12:32>> because
2:12:34one of the things in that was um a a my
2:12:39kind of desire for walking before
2:12:41exercise. And I think that would be just
2:12:44good to have um just good to have a
2:12:47conversation I would say um about that
2:12:49before
2:12:51um
2:12:53I think it's I think it's pertinent to
2:12:55uh to to our conversation with the CTP.
2:12:58>> Yeah, we can do
2:13:01>> I'll begin with you Sandy.
2:13:06Thank you, Council Member Johnson.
2:13:09>> So, I am also going to echo and thank U.
2:13:12Mayor Prom Roboti for her comments, and
2:13:15I'm going to ask her to continue to do
2:13:17that um and keep us in check because I
2:13:21think that is a
2:13:24an important question
2:13:27that we should all answer. Um and I
2:13:30think we should be mindful of that. So,
2:13:32I appreciate that comment.
2:13:37Okay, this was an item for information.
2:13:40Did you get what you need from us?
2:13:42>> I did. I appreciate how engaged you all
2:13:44are in this and um I'll be back in
2:13:47December to share the next round of
2:13:50information before we move to wrap
2:13:52everything up.
2:13:53>> Okay, wonderful. Thank you very much.
2:13:56Appreciate your time. Brett, you're
2:13:58looking questioning like there's
2:14:00something else.
2:14:03Okay.
2:14:07Okay, we're starting to wrap up uh the
2:14:09open session of our meeting. If you are
2:14:12interested in knowing more about our
2:14:14upcoming events, please check for a full
2:14:16listing our of our events at the town
2:14:19calendar at www.morrisvillenc.gov.
2:14:23We're going to move on to council
2:14:24comments at this time. Council member
2:14:25Scar Johnson will share first and we'll
2:14:27be followed by council member Garamela.
2:14:30>> No comments tonight. Thank you. Council
2:14:32member Garamela, followed by Council
2:14:34Member Johnson, please.
2:14:36>> No comments.
2:14:37>> Council member Johnson, followed by
2:14:38Council Member Patel, please.
2:14:40>> Okay, I'm going to say no comments. We
2:14:41still have a full agenda when we get to
2:14:44close session.
2:14:46>> Council member Patel, followed by
2:14:47Council Member Kesling.
2:14:49>> No comments for me either.
2:14:51>> Council member Kesling, followed by
2:14:52myself. I wanted to say that I
2:14:55appreciate the staff's um handling of
2:14:58the um water main break. Uh we had a
2:15:01very good comment that uh you know staff
2:15:04did a very good job with uh
2:15:05communicating that. Um as well as
2:15:07looking into the safety measures um as
2:15:09the construction of Airport Boulevard in
2:15:11the Cedar Fork athletic fields
2:15:12progressed. Appreciate that. Um I also
2:15:15want to recognize um Fire Marshall Bird
2:15:17for the Go Pack um assembly event. Um I
2:15:20think she did a really great job and uh
2:15:22it's really important um
2:15:25as really as climate change starts to is
2:15:28impacting the our environment more and
2:15:30more to be prepared. Um and then also
2:15:33officer Barrett who I believe was um
2:15:36officer of the quarter and who I also
2:15:38understand has been catching folks that
2:15:39are endangering um pedestrians uh the
2:15:42the farmers market patrons as they cross
2:15:44the street. I saw him catch two people
2:15:47on Saturday. Um that that really almost
2:15:50hit some folks. So I really appreciate
2:15:52um and I understand I think I spoke with
2:15:54Chief Rosser that that was his he
2:15:56initiated that and wanted to do that and
2:15:58which is probably why he's officer of
2:16:00the quarter. Um so thank you staff for
2:16:03you know all of that. Thank
2:16:06>> yeah. Um a shout out to Ready Wake and
2:16:08let's encourage all our residents go
2:16:10ahead and sign up for that because
2:16:11that'll let us know whenever there's any
2:16:13kind of emergency. Um, and yes, please
2:16:15slow down and stop for people in the
2:16:17sidewalks. I want to say that earlier
2:16:19tonight, we enjoyed welcoming the
2:16:21butterfly artists to town hall. Um, keep
2:16:24an eye out for these great new additions
2:16:26to Morrisville's parks and greenways.
2:16:28Thank you to the Anog Foundation for the
2:16:305K, which is in support of
2:16:32Intellectually Challenged Children. That
2:16:34was a fundraiser at Morsville Community
2:16:36Park. Just wanted to say that our
2:16:38greenways are perfect for a 5K. You see
2:16:40two of our parks and are in shade most
2:16:42of the time. Uh, next to share is
2:16:45Council Member Robati, please.
2:16:48>> No comments. Thank you.
2:16:50>> Town Manager Zuda, do you have any
2:16:51comments at this time?
2:16:54>> No comments. I think Kayla has a bit of
2:16:56an overview for you about how we'd like
2:16:58to handle the close session and the
2:17:00coming out to vote when you're ready to
2:17:01do that.
2:17:03>> Okay. Uh, we are
2:17:04>> before we move to that, we were also
2:17:06going to discuss retreat uh timing if we
2:17:10still are going to do that this evening.
2:17:12Let's let's hold that.
2:17:16>> Okay. Uh Templator Courtley, we're ready
2:17:18to go into what you think is the best
2:17:21procedure going forward for our two
2:17:23close sessions and then coming back into
2:17:24open session.
2:17:25>> Great. So on your agenda, you have um
2:17:27A3, which is to protect attorney client
2:17:30privilege. That's for the Western
2:17:31Farmers Market Agreement. And then after
2:17:33that, you have A6 to pro to discuss a
2:17:35personnel matter. Um, I'm going to
2:17:37recommend that you go in to close
2:17:39session per A3 to protect attorney
2:17:41client privilege. Once you finish that
2:17:43discussion, we'll come back out. The
2:17:45stream will still be going. They'll
2:17:46unmute it when that is over so we can
2:17:48make the announcement on stream for
2:17:50anyone watching and for those in the
2:17:51room and then you can rego into close
2:17:53session for A6 for personnel. So, I will
2:17:57ask you make a motion for A3 to protect
2:17:59the return privilege. I'd like to make a
2:18:02motion that we enter close session
2:18:04pursuant to NCGS143-318
2:18:0911 A3
2:18:12to protect a cling attorney client
2:18:15privilege and to to just as a matter of
2:18:18attorney client privilege. That's what
2:18:19we're doing in A3.
2:18:20>> Yes.
2:18:21>> Okay.
2:18:22>> Oh, and A6 is the next one.
2:18:24>> Yeah.
2:18:25>> Okay. I have a motion from member body.
2:18:29Can I get a second, please?
2:18:31>> Second.
2:18:32>> A second from Council Marlin. All those
2:18:34in favor of entering a close session for
2:18:35that item, please say I. I. Any opposed?
2:18:39Hearing none, that carries unanimously.
2:18:4070. It is 8:05. We are now in close
2:18:43session. If we could please clear the
2:18:44room. Um, appreciate it.
3:07:54And the microphones are back on.
3:07:57>> I know they're still here.
3:08:00>> I remember the day when I used to say
3:08:13manager. Let me Are we streaming again?
3:08:16Were you back on?
3:08:17>> Double check.
3:08:18>> Thank you, sir.
3:08:25>> Looks like microphones are back on
3:08:29and the live stream is live.
3:08:32>> Okay, we are back. We concluded our
3:08:34first close session. It's 8:55 p.m. Now,
3:08:37I'd like to recognize Council Member
3:08:38Johnson for a motion.
3:08:40>> So, I make a motion to approve
3:08:42resolution 2026-330-0
3:08:47of the Morsel Town Council authorizing a
3:08:49lease agreement with the Western White
3:08:51Farmers Market, Inc.
3:08:53>> Second. A motion from Councilman
3:08:56Johnson, a second from Council Member
3:08:57Kling. All those in favor, please say I.
3:08:59>> I.
3:09:00>> Any opposed? That carries unanimously.
3:09:0270. It is 8:56 and that is the
3:09:06conclusion of our public business at
3:09:08this time.
3:09:10Thank you very much for joining us.
3:09:12Appreciate it. We look forward to
3:09:13continuing our relationship with the
3:09:15Western Farmers Market. You're doing a
3:09:17great job.
3:09:19At this time, I'd entertain a motion to
3:09:21enter close session.
3:09:23>> I'd like to make a motion that he enter
3:09:24close session. pursuant
3:09:31pursuant to
3:09:34uh NCGS143-318-11
3:09:39A6 to discuss a personnel.
3:09:42>> I'll second
3:09:43>> a motion from me body, a second from
3:09:45council member Johnson to enter close
3:09:47session. All those in favor, please say
3:09:48I. I.
3:09:49>> Any opposed? Hearing none, that carries
3:09:51unanimously. 70. It's 8:56. We are now
3:09:54in close session.