2026-07-13 - Finance Committee
Summary
Based on auto-generated captions; names, dollar figures and details may be misheard.
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| Richer School Project | 26 | 58% |
| Richer School Area Stormwater Bond | 12 | 27% |
| Recreation Department Reorganization | 5 | 10% |
| Other business | 3 | 6% |
- Monday, July 13, 2026.
- Called to order at 6:30 p.m., adjourned about 7:15 p.m. Councilor Irish chaired (apparently); all three votes were 5-0, each with a request for suspension of the rules at the July 20 council meeting.
Recreation Department Reorganization
0:37-5:10
- Order 26-1009778: job description and salary ordinance for a new recreation coordinator.
- Mayor's letter: the position is covered by the MMEA union contract and was approved by the union; it merges the former program manager and senior clerk roles, and the assistant recreation director job is reinstated.
- Pay is set at the head clerk level. Changes to the terms would need to go back to the union.
- Councilor Vital called the position much needed; recreation staff work around the clock.
- Michael Ossing noted that, with the recreation director and assistant director salary changes, about a $39,000 shortfall or transfer will be needed.
- Approved 5-0, with a suspension and advertising of the salary ordinance.
Richer School Project
5:10-22:15, 32:53-33:54, 35:40-43:39
- Order 26-1009766: bond of $160,544,091 for the new Richer K-5 elementary school (total project about $162.5 million, with $2 million already appropriated for the feasibility study).
- Presented by Christopher Eberly and John Lemieux of Vertex (owner's project manager), with the LPA architects present. The mayor's letter says the state school building authority (MSBA) approved the project and the city's schedule targets a fall 2029 opening.
- The project is about 30 percent through design. Cost per square foot (about $792) is above the MSBA cap of just under $700, so the first roughly $90 to $100 per square foot is not reimbursed.
- MSBA reimbursement: 78.8 percent on eligible costs (86 percent of the budget), about 63 percent of total cost; up to about $103.1 million back, leaving the city about $57.4 million for the school.
- Tax impact per the treasurer: about $193 a year for the median home on average, peaking near $275 in about year three, around $20 lower than at an earlier estimate.
- Ossing asked the comptroller to explain level-principal bonding (more paid up front, less interest). He warned that the $35 million fire station (about $150 more on the average bill) and a coming capital plan (about $50 more) add to the burden, and challenged Vertex to match the Goodnow school, which came in under budget and let the city rescind about $9 million in bonds.
- Eberly said furniture and technology are budgeted at about $4.15 million, all but about $847,000 reimbursable; reuse of old Richer furnishings will be decided later.
- Schedule: construction manager (at-risk) to be chosen by October, design development by year end, early packages as early as March, fall 2029 opening, closeout summer 2030.
- Approved 5-0 on a motion by Councilor Fucillo, with a suspension.
Richer School Area Stormwater Bond
22:15-32:53, 43:39-45:10
- Order (number garbled in captions, same as the school bond): $6.3 million for stormwater drainage design and construction.
- Eberly said the DPW found recurring flooding every three years or so at Ripley and McGee Avenues; the school site contributes about 3 percent but the flooding reaches its southern entrance. Cost split: about $5 million construction and $1.3 million design.
- City engineer Thomas DiPersio: Millham Brook was piped through the neighborhood in undersized trunk lines that surcharge in intense storms. Work is to double the trunk line (more than 1,000 feet, outfall at Glen Street), fix a MassDOT stilling basin and drainage channel behind the school, and add controls at the Lake Williams dam.
- Councilor Oram asked about outfall capacity (DiPersio said the brook section can take it) and detention basins (no room); the new school will have its own detention.
- Councilor Ducette confirmed there is no state money for this; it is all city.
- Approved 5-0, with a suspension.
Other business
0:00-0:37, 33:54-35:40, 45:10-45:21
- The comptroller (first name Brian, per captions) answered the bonding question.
Sources
Video
Transcript
Auto-generated YouTube captions; names and terms are likely misheard.
Transcript
0:03Good evening. I will call to order the
0:05Finance Committee meeting on July 13th,
0:082026 at 6:30 p.m.
0:11Uh, we have three items on the agenda
0:13this evening. Uh, proposed ordinance
0:15amendment uh, to the city code code
0:18chapter 125 personnel. Uh, proposed
0:21Richer K through 5 elementary school
0:23project bond uh, in the amount of
0:26$160,544,091.
0:30And also a proposed storm water bond in
0:33the amount of $6,300,000.
0:37I will begin uh, with order number
0:3926-109778.
0:43Um, that the proposed uh, ornament
0:46ordinance amendment to the city code
0:47chapter 125 personnel personnel section
0:515 preparation of classification
0:53descriptions. And to chapter 125
0:56personnel section 6 uh, salary schedule
1:00relative to the position of recreation
1:02coordinator. Um, I'll read the uh,
1:05letter submitted uh, by the mayor.
1:08Dear Council President Ossining and
1:10Counselors, enclosed for your review and
1:12approval is a job description and salary
1:15ordinance for the recreation coordinator
1:17position.
1:18This position is covered under the
1:20collective bargaining agreement between
1:22the City of Marlborough and the
1:23Marlborough Municipal Employees
1:25Association. MMEA
1:28and has been reviewed and approved by
1:30MMEA. Uh, the purpose of this job
1:33description is to align the growing and
1:35evolving needs of the recreation
1:37department through the reorganization of
1:40the positions within the department. Um,
1:43this job description has been uh,
1:45recalibrated due to the collective uh,
1:47collaboration between the recreation
1:49director, human resource department, the
1:51mayor's office, and MMEA.
1:54Uh, the former city uh, senior clerk
1:57position within the recreation
1:58department no longer aligns with the
2:01operational needs of the department to
2:04to improve efficiency and better support
2:07departmental functions
2:09a restructuring was undertaken that
2:11reinstated the assistant recreation
2:13director position and combined the
2:16responsibilities from the former program
2:18manager and the senior clerk position
2:20into the recreation coordination
2:22coordinator position.
2:24The proposed salary ordinance amendment
2:26places the position at the same level as
2:28the head clerk pay schedule.
2:30While city council approval is required
2:33and appreciated any modifications to the
2:35job description or compensation
2:38structure would constitute a change to
2:41the terms that were negotiated and
2:43agreed upon and would therefore require
2:45further discussion within the union
2:47prior to implementation.
2:49Please do not hesitate to contact me or
2:51my office with any questions sincerely
2:54Jay Christian Zum is mayor.
2:56Um.
2:57I will open this up to committee.
3:00This is something that I support and I
3:02know
3:03uh uh.
3:05Chuck Theobald has been working
3:07diligently to get this the director
3:09getting this
3:11toward the city council council vital.
3:13>> Thank you Mr. Chair.
3:14The this position is is
3:16very much needed down the recreation
3:18department.
3:20This is one of the few organizations DPW
3:23being another one of you but they're
3:2524/7 they're in need down there at the
3:27recreation department and having
3:28somebody who has the the skill set to be
3:32able to uh
3:33prioritize and divvy out
3:35responsibilities to the managers and to
3:37DPW and other other departments across
3:39the city is critical for the department.
3:42So I would strongly suggest that we we
3:44uh
3:45approve the description and salary
3:46ordinance for the recreation
3:47commissioner.
3:48Or coordinator.
3:50>> Is that is that your motion?
3:51>> It is in my motion. Motion has been
3:53made. I will second that
3:55to approve order number 26109778
3:59that the proposed ordinance amendment to
4:00the city code chapter 125 personnel
4:03section 5 preparation classification
4:04descriptions and to chapter 125
4:07personnel section 6 salary schedule and
4:10the job description of the recreation
4:13coordinator. Any further discussion? Mr.
4:15Chair.
4:16>> Councilor Pajal. Thank you, Mr. Chair. I
4:18would just ask that we also make sure
4:20that we advertise
4:22and as well as ask for suspension when
4:24this is reported out on the floor.
4:25>> do that. That's a good good point,
4:26Council. And we're okay with that,
4:28committee?
4:29And to to average suspension and to
4:32advertise.
4:33All in Mr. President.
4:34>> Thank you, Mr. Chair. I just want to
4:36point out to the committee that
4:38before us on next Monday's night, we're
4:40going to be approving salary changes to
4:42the recreation director, the assistant
4:43recreation director, and then with this
4:45one, there's going to be a $39,000
4:47shortfall or transfer that's going to be
4:49needed to pay for all these positions.
4:52All right? So, even though, you know,
4:54everybody's all excited about them, we
4:55still got to pay for them.
4:58Thank you, Mr. Chair.
4:59>> Thank good point, Mr. President. All in
5:01favor?
5:021 2 3 4 5. It carries 5 to 0 with the
5:06suspension to advertise as well.
5:10Moving on to
5:12agenda item 26-109766.
5:17Proposed Richard K. 3-5 Elementary
5:20School project bond in the amount of
5:22$160,544,091.
5:26And I'll begin by reading the letter
5:29submitted by the mayor.
5:33Honorable President Osing and
5:35councilors, enclosed for your review and
5:37approval are two bond authorization
5:39requests for the Richard School project
5:42in the amount of $160,544,091
5:47to be bonded for the built built of the
5:50school and $6,300,000
5:53for the capital improvement project for
5:55storm water flooding.
5:57Our journey toward a new Richer School
5:59began in the summer of 2024.
6:02Since then, we have successfully
6:03completed several milestones, including
6:06the selection of the owner's project
6:07manager, OPM, and the feasibility study,
6:11and the schematic design phase. This
6:14vote will not only allow the project to
6:16move forward, but will have the final
6:18determination and the reimbursement
6:20rate. We are submitting the bond request
6:23for the total project projected dollar
6:25amount of the project because this is
6:27the process used to fund the project and
6:30cover its cost. We will receive the
6:32final determination of the city's cost
6:34during the June 24th MS MSBA meeting and
6:39vote and and determination of the
6:41reimbursement total. In the enclosed
6:44packet, you will find a letter from OPM
6:46Vertex with a breakdown of the cost and
6:49the expected reimbursement totals. These
6:51numbers are preliminary and are not
6:53final. Based on the scheduled date of
6:56the upcoming vote by MSBA on June 24th,
6:59the city council schedule, we needed to
7:02submit the packet for this meeting so
7:03you are as a body can approve the bonds
7:06and project costs at the July 20th city
7:10council meeting. The goal is to have
7:12this referred to the finance committee
7:14prior to the July city council meeting.
7:16The following the June 24th MSMBA vote,
7:20representatives from Vertex will attend
7:22the committee meeting to answer any
7:24questions, discuss the final project
7:26figures, and provide an update on the
7:28outcome of the MSBA vote. Regarding the
7:31bond of the storm water infrastructure
7:33improvements,
7:34this has been a long-standing issue in
7:37the area that requires necessary
7:39attention.
7:40With the construction of the new school
7:42moving forward, the opportunity to
7:43address this critical infrastructure
7:45need is now. Taking action at this time
7:48will help make sure the necessary
7:50improvements are made to support both
7:52the community and future developments.
7:54Uh we do not fix the storm water issue
7:57and build the school, we may see
7:58increase uh in flooding in the
8:00neighborhood that abuts the site. Uh
8:02thank you for your flexibility in
8:04accommodating meeting times as we work
8:06to maintain this ambitious schedule and
8:08achieve a fall 2029
8:11opening. I want to thank the school
8:13building committee, all the
8:15subcommittees, Vertex, LPA architects,
8:18school committee, city council, and
8:19everyone who has done their part uh to
8:21get this project to this milestone. If
8:24you have any questions or concerns,
8:25please do not hesitate to contact me
8:27sincerely, J. Christian Dumas, mayor.
8:30And we did we did through our email as
8:32well receive the letter from uh the uh
8:35the MSBA
8:37um determining uh that we were approved.
8:40Um at this time, I would like to bring
8:42up
8:45Are you Are you Yeah.
8:47If you could do your uh introduction and
8:50start your slideshow as well. Thank you,
8:52Chris.
9:04>> So, um my name is Christopher Eberly.
9:06I'm the project executive from The
9:08Vertex Companies. We've been working
9:10with the city of Marlborough since
9:12October of 2024. With me tonight is John
9:15Lemieux, our senior managing director um
9:19for The Vertex Company. Also joining us
9:21um as needed is um Peter Caruso,
9:25Chris Lee, and Christina Besmann for
9:28those on this side. She's behind the
9:29column.
9:31Um they are the principal in charge,
9:33project manager, and project architect
9:35from Lamoureux Pagano Architects.
9:38Um also with us tonight as needed for
9:41the um stormwater is Ted Scott.
9:45And
9:46um
9:47So, I'd like to thank you for uh having
9:50us here tonight. We've been working for
9:52quite a while on this um since October
9:5524 and since February 25 with the
9:58designers to advance this exciting
10:01important project. The project
10:05The project is at about 30% of its
10:08overall design phase at this time. And
10:10so, this is the time that the MSBA has
10:12you vote to approve the total project
10:14budget. As you can see on the screen,
10:19as you can see on the screen, um we have
10:22progressively decreased the pros cost of
10:24this project both in terms of its soft
10:26cost and also its construction cost as
10:28we've developed this since our initial
10:30numbers were available in June of 2025.
10:34And with the most recent cost, we are
10:37looking at a total project cost
10:38inclusive of the previously authorized 2
10:41million for the feasibility study of 162
10:44million 544,091
10:48dollars.
10:49Now,
10:50this these refinements have been the
10:52work of LPA, the work of Vertex, and the
10:54work of the school building committee as
10:56they've made disciplined decisions
10:58throughout the project to ensure that
10:59the project comes in at an affordable
11:02cost for the taxpayers of Marlborough.
11:05Here you can see a chart that is put out
11:07by the MSBA that places all of the
11:09projects that are within their purview
11:11on the same chart with their bid dates.
11:14As you can see, we've highlighted the
11:15Goodnow project because at the time the
11:17Goodnow project within its one-year time
11:20frame was the lowest cost project in the
11:24MSBA pipeline. Now, at that time, you
11:26could build a project for almost close
11:28almost at the reimbursement rate in
11:31terms of funding caps, but one of the
11:34things that we noticed is that with the
11:35richer project that we're proposing
11:37tonight, not only are we again
11:39the um lowest cost MSBA project within
11:43the last year,
11:44but similar to the Goodnow project that
11:47was 5% below the cost of its next
11:49nearest project, we're 4% below the cost
11:53of the next nearest project, another
11:55Vertex project in Wrentham.
11:58Now, as we look at the budget, it's
12:00think it's important for you to
12:02understand that this budget is
12:04all-inclusive. The MSBA has a fairly
12:08restrictive
12:09um schedule that's included in your
12:11packet that describes all the areas of a
12:14project and making sure that you budget
12:16comprehensively for the project, both in
12:18terms of covering design fees, covering
12:21soft costs, covering FF&E and
12:23technology, covering the construction
12:25itself, and also carrying a healthy
12:27contingency.
12:29In putting together this budget,
12:31the OPM designer services, the estimated
12:34construction costs, the furniture,
12:35fixture, and equipment are all
12:37professionally estimated. So, we brought
12:40in an estimator that working with the
12:42Vertex company, an estimator working
12:44with LPA. They both estimated the same
12:46drawings and they reconciled those to
12:48arrive at that construction cost.
12:50We also had um LPA working with their
12:53consultants develop a furniture cost
12:56based on actual pricing and a review of
12:59what furniture was necessary so that we
13:00could establish an accurate budget, and
13:02we reviewed the technology and computers
13:04that would be part of the project. Now,
13:06those two are important because the MSBA
13:08also reimburses for those costs, so it's
13:11important to both find a reasonable for
13:13the project value, but also to include
13:17something that will maximize the
13:18reimbursement that is available on a per
13:20student basis.
13:23We've also um
13:25as I mentioned,
13:26you have already appropriated 2 million
13:28of this amount, and I think that's
13:31important to echo because it really it
13:33lowers the amount that you're looking to
13:34spend now.
13:37Now, in your packet, there is a very
13:40very complex spreadsheet, and that
13:43spreadsheet takes into account all the
13:44things that the MSBA uses when they
13:46determine what your reimbursement is,
13:49and in making sure that you have a
13:51comprehensive budget. It'll take into
13:53account their category and ineligible
13:55costs, which are based on the guidelines
13:58of the grant program that you're
13:59pursuing. It will take into account the
14:01cost and budget caps,
14:03any ineligible building area,
14:06any reimbursement rates or changes to
14:08those reimbursement rates, and the
14:10eligibility of things like contingency,
14:12but also things that are excluded scope.
14:15Now, it would take us hours to go
14:17through all the details of this, and so
14:18what I've developed today is a way to
14:20try and simplify this for all of you so
14:22that I can
14:24co- uh informatively explain how the
14:27system works, and what the reimbursement
14:30will be for the city of Marlborough.
14:33Now, this is the Reader's Digest version
14:36of the
14:38MSBA program. Ultimately, what it means
14:40is that you are going to receive your
14:43base rate
14:45for all eligible costs. The base rate is
14:47recalculated up until you come to the
14:49agreement with the MSBA, and they
14:51actually raised your base rate based on
14:53socioeconomic factors that they study
14:56from when you originally agreed to the
14:57feasibility study. So, moving forward,
15:00you'll have a higher reimbursement rate.
15:02They evaluate your maintenance school
15:05score, and they found that you were in
15:06the top 25th percentile in terms of
15:09maintenance of the schools that they
15:10look at, so you got an extra 1.54%
15:14on top of that. We've also made the
15:17decision that you would be moving
15:18forward with the green schools program,
15:21and so by meeting the requirements of
15:22the Opt-in Energy Code and delivering a
15:25school that provides a higher quality of
15:27air quality for the students, you'll get
15:29an additional 4% of those eligible
15:31costs. Now, I keep saying the same
15:33thing, which is eligible costs, and
15:35that's an important component of the
15:36MSBA grant program. They put certain
15:39caps in place, and I've shown some of
15:41them on the screen here, that establish
15:43up to those amounts, they will reimburse
15:45those costs.
15:47Now, in their analysis of your total
15:49project budget, they found that 86% of
15:52those costs in that budget were
15:54eligible. And so, of those amount, that
15:57is what you will receive your 78.8%
16:00reimbursement on. Works out to be about
16:0263% in total of the costs of the project
16:05will be coming back to Marlborough from
16:07the state.
16:11So, here I've just illustrated a little
16:12bit about how that reimbursement works.
16:14It's a paid as spent, so you as you
16:18incur costs associated with the grant
16:20program, the MSBA will receive a
16:24reimbursement request that will itemize
16:26those costs as the warrants go out to
16:28pay those bills. They review those, they
16:30audit them on the fly throughout the
16:32entire process, and that, based on what
16:35those eligible costs determined by that
16:37audit are, you'll receive the payments
16:40periodically, usually monthly,
16:42throughout the course of the project.
16:44I've illustrated here sort of the two
16:46differences because what you'll find is
16:48that much more of the costs in the
16:50design phase are eligible. And so, I've
16:53illustrated using the cash flow that's
16:55in your packet, what you can expect in
16:57terms of reimbursement should all of the
17:00facts and figures that we have provided
17:03show to be eligible after that audit.
17:06And what you find is that about 74% of
17:08those costs in design end up being
17:11reimbursed.
17:12When you get to construction, you're
17:14much more exposed to the cost caps. They
17:17work out to be just under $700
17:20um per square foot. And so, of that
17:23amount of that cost cap,
17:25because you are so much higher than it
17:27at the $792
17:30per square foot that the project came in
17:32at, you are actually that first hundred
17:35or ninety or so dollars a square foot is
17:38not reimbursed. The effect of that is
17:41that when you get to construction versus
17:43design, where you're getting 74% of the
17:46costs in design, by the time you're in
17:47construction, you're closer to 63. But
17:50construction makes up so much of the
17:53overall grant reimbursement that
17:55ultimately, should you spend every
17:57dollar,
17:58you would get 63% of those dollars back
18:01from the state
18:02if the eligibility calculations after
18:04audit prove true through the course of
18:07the job.
18:09Now,
18:10to make that clearer, I came up with a
18:12couple of different scenarios here to
18:14help explain how your decisions and the
18:18school building committee's decisions as
18:19they move through this project can have
18:21a huge effect on your reimbursement.
18:23So, the first option in the green box is
18:25that you decide to spend every dollar
18:28within your budget. You follow all the
18:30rules, everything ends up eligible. The
18:33city of Marlborough can look at a
18:34project that is 160,000 square feet that
18:38they would get for 59,400
18:41and 9,098
18:43dollars,
18:44which is a great value. It's much better
18:47than a lot of communities are getting
18:48from the MSBA.
18:50Now, construction, let's say, comes in
18:535% under budget. You hire your CM, they
18:56get their bids, and we find out that the
18:58bids are 5% down. What you can see here
19:01is that while
19:03the um
19:06construct or the eligible costs are
19:08almost the same,
19:09you're still getting
19:11103 million 59,192
19:14dollars. So, you're only losing roughly
19:1870,000 dollars in grant,
19:20but you're spending
19:226 million dollars less.
19:25Because the way that they do they
19:27calculate it is that they calculate
19:28where you are at bid,
19:30they'll adjust your grant down.
19:32They'll say, "Oh, this what we thought
19:34would be construction, that's that
19:3670,000 dollars, you're not going to need
19:39because your bid came in low, but we'll
19:40still pay you up to a quarter percent of
19:43your soft cost contingency and up to 1%
19:46of your construction contingency." Now,
19:48let's say the bid comes in, we spend
19:51everything up to up to bidding, the bid
19:54comes in exactly on target, but we're
19:56disciplined in the construction phase.
19:58We don't encounter a lot of unforeseens.
20:00When that extra scope comes up, the
20:02school building committee says, "We
20:03don't really need that. We want to be
20:05fiscally disciplined." as they've been
20:06through the process.
20:08In that case, you're still going to get
20:11that same grant because you've spent
20:14every dollar up to that point, but the
20:17total project cost to the city is going
20:19to be 54 million 919,997
20:23dollars. And the reason is that because
20:26they cap your costs, all that spending
20:28above that cost is spending that is paid
20:32for 100% by the city of Marlborough,
20:35whereas the spending under those cost
20:36caps get reimbursed. And the best dollar
20:39spent
20:41is the one that you don't spend because
20:43you get that full dollar back for all
20:45that stuff over the top that you don't
20:47need to put the money into.
20:51Now, it's important because construction
20:53is schedule and cost. It's important to
20:56just touch on the schedule and see what
20:58the commitments that we're working on
20:59here are.
21:01We're coming to you today because our
21:02schedule requires a very aggressive
21:04approach. We're currently procuring the
21:06CM now. I know you previously this body
21:09voted to approve the CM at risk
21:12approach. We're currently soliciting
21:14qualifications and we hope to have the
21:16CM CM on board in October. We're moving
21:19forward with design development, which
21:20is roughly 50% of the design phase,
21:23hopefully by the end of the year.
21:25And then we'll be doing early packages
21:27as early as March. And the goal would be
21:30that we have 100% of the drawings 1 year
21:33from now
21:34going to bid, but we'd have early
21:37packages that would allow us to start
21:39early mobilization and early
21:41um structure packages so that we can
21:43begin the wheels moving of the
21:44construction machine and really have
21:47shovels in the ground as soon as school
21:48is out at the Richer school at the end
21:50of this school at this next school year.
21:53So all told, that's what allows us to
21:55open the school in the fall of 2029
21:59and
22:00close out the construction in the summer
22:02of 2030 after we've finished all of that
22:05site work that we're not able to get
22:07done because eventually winter will hit.
22:12And
22:13with your permission, Mr. Chair, I'll
22:15just continue on the storm water.
22:16>> Thank you. Thank you.
22:17>> Um so the storm water came up through
22:20the course of the job. It was identified
22:23by the DPW that they had a recurrent
22:25issue at Ripley and McGee Avenue where
22:28every 3 years or so they would have
22:31substantial flooding.
22:32And the substantial flooding would occur
22:34at the intersection of um Ripley Ave and
22:37McGee, but it would also occur
22:41through this area that is also wetlands
22:43on the back side of the site. And so we
22:45wanted to understand what the impact of
22:48that storm water would be on the project
22:51and how the project's impact would also
22:54affect that storm water.
22:56And so uh we retained the civil engineer
22:59through the designer Nitsch Engineering
23:01to do a study to they did HydroCAD which
23:04is some computer modeling of how
23:06drainage works within the area and they
23:09determined that while the school only
23:11committed 3% to the problem, the problem
23:15encroached on the school. It encroached
23:17on the southern entrance which serves as
23:19both a bus and parent entrance to the
23:21school. And so it had the potential of
23:24if you're going to spend $162 million to
23:26build this school, wouldn't you want to
23:28make sure that we're keeping the water
23:29from taking taking over? So in
23:32discussions with the DPW, we researched
23:34various ways that we could move forward
23:36with it. We identified a budget um
23:39working with the DPW and um Tom DePersio
23:42who is also here tonight.
23:44And we identified that it's about $5
23:46million in construction to pursue two of
23:48the options that were in that study.
23:51And a contingency was reasonable for
23:53design costs of about $1.3 million that
23:56would pay to bring the designer on board
23:59and to do the to run the project
24:01separately from the school project
24:03entirely as a DPW project. That was an
24:06important distinction because the MSBA
24:08will only
24:09allow you to have one project as part of
24:12their vote. They want it to be entirely
24:15separate for various reasons, legal
24:17procurement requirements as well as they
24:19want to make sure that when they report
24:21on the cost of schools, they're
24:23reporting on the cost of the school, not
24:26the cost of the school plus whatever the
24:27city or town decides to tack on to it.
24:31So ultimately
24:33what we're before you today to discuss
24:36is that you have
24:39a budget before you that's $162,554
24:43or $544,091.
24:45You have already appropriated $2 million
24:48of those dollars. So you are looking at
24:51a school that will give you that will
24:53cost you $160,544,091.
24:58The MSBA, if you spend every dollar,
25:02will give you 103 million 134,993
25:06dollars.
25:08If you spend everything but half your
25:10contingency, they will give you that
25:12same amount.
25:14When you take that out, you're looking
25:16at the total cost of that school being
25:1857 million
25:20409,098
25:23dollars. And if you take the Add the
25:25storm water to that to that, the two
25:27appropriations combined are 63,709,098
25:32dollars.
25:33Similar to what we did when we visited
25:35the Urban Affairs Committee for PSR, we
25:36reached out to the treasurer and asked
25:39him to help us with the tax impact. He
25:41found that for the average um
25:45median home,
25:47the annual impact would be on average
25:49193.23
25:51cents. And in that highest single year,
25:53which is about year three,
25:55it would be 275
25:58dollars and 50 cents, which both numbers
26:01are
26:02um about 20 dollars lower than they were
26:05at PSR.
26:07And as the letter that we have provided
26:09to each of you tonight also states, the
26:12MSBA has confirmed at their board
26:14meeting that they will fund the project.
26:16So, the next step would be to enter into
26:18a project scope and budget agreement
26:20with the MSBA pending approval of the
26:22financing. So, if you vote next week to
26:25fund the project, that would be the next
26:28step. We like to describe the project
26:30scope and budget and the project funding
26:32agreement is like buying a house. You
26:34put in an offer and you sign that offer.
26:36That's your project scope and budget
26:37agreement. And then your project funding
26:40agreement is the thing that actually
26:41starts the grant flowing. So, that's
26:43what those two documents are. So, should
26:46this committee ultimately vote to fund
26:48the project on Monday, those would be
26:51the two next step and then the MSBA
26:54would begin the reimbursement project.
26:56LPA and Vertex would continue to design
26:58your building and by the time we get to
27:01October, we'll have a third partner in
27:03on board with the CM so that we can
27:05deliver this school in 2029.
27:09With that,
27:10I will open it up to questions that
27:12myself or any of the assembled partners
27:16that we've worked with very successfully
27:18on this project are able to answer.
27:20>> Thank you, Chris. Thank you, Chris.
27:21>> Councilor Vital?
27:22>> Mr. Chair, could we please have Mr.
27:24DePersio give us a little breakdown of
27:27what the uh
27:28the the water project's going to entail?
27:32>> Please.
27:34Thank Thank you, City Engineer DePersio.
27:50>> Uh thank you, councilors.
27:52So, uh Chris did a good job of
27:54explaining kind of how we came to the
27:56decision that this drainage project
28:00um needs to be done in conjunction with
28:03the school project and Nitsch
28:05Engineering
28:07uh did a good job at from a high level
28:09of breaking down all the different
28:11components to this drainage issue.
28:14Um
28:15the short version is that Millham Brook
28:20is piped through the neighborhood there
28:22when that neighborhood was built. They
28:23took the brook and put it in a drainage
28:26trunk lines through the neighborhood
28:27that are they're undersized now.
28:30And what happens in intense storm events
28:33is where the brook enters the drainage
28:35system, it surcharges and and floods
28:38that area as Chris said, and uh sort of
28:42the wetland system that really surrounds
28:44that whole southern part of the school
28:45site. It's all tied into that Mill Ham
28:47Brook flow.
28:49Um so
28:51there's a couple of
28:53phases we call them of the drainage
28:54project that were uh
28:57in the
28:57design uh
28:59phase is starting now.
29:01One is to kind of double up the size of
29:04that trunk line.
29:06Um
29:07that's a big project. It's It's
29:09difficult to
29:10>> the development, right?
29:11>> Right, all the way through.
29:13Uh
29:14that's one piece of it, and the other
29:16piece is going to involve um
29:19some of the MassDOT infrastructure for
29:21the highway.
29:22Um there's a big uh stilling basin they
29:25call it that's behind the school.
29:28And uh and a drainage channel
29:31doesn't function properly. So that's
29:34that's a piece of it that we're going to
29:35have to get MassDOT. We've started
29:37conversations with them
29:39to get them on board for that work.
29:41Um
29:42and I also want to do some work at
29:45the Lake Williams Dam because
29:49to the extent we can kind of get a
29:50spillway there that we can easily
29:52control, we can maybe
29:54close that in advance of a big storm and
29:56kind of delay that that part of the
29:58flow, too. So there's several different
30:00components to it, but that's kind of the
30:01overview.
30:03>> Scheduling, if this gets approved by
30:04this body, when can you begin?
30:07>> So we're we're working on the drainage
30:10improvement part through the
30:11neighborhood in-house now. So um we
30:15anticipate anticipate being ready to
30:18go out to bid with that part when we
30:21have the funding.
30:25>> Thank you.
30:25>> And the other part, like I said, we're
30:27working with MassDOT, so we're a little
30:29bit
30:30beholden to their schedule, so hopefully
30:32we can get them uh to move on that part
30:34of it, too.
30:34>> Our ideal schedule was to do it in
30:37concert with the school so that it'd be
30:39a separate contractor. They'd be doing
30:41the work on their own, but we'd do it in
30:43two phases, ideally one that begins as
30:46soon as the
30:48winter ends next year, and then the
30:51second one would begin the following
30:53year.
30:54So that by the time we open the school,
30:56the goal would be that both are
30:59um
31:00are complete. Obviously, that requires
31:04DOT to work with the city and the other
31:07components there, and um we've had lots
31:09of conversations with the DPW to make
31:12sure that the contractor that we hire
31:14for the school understands their role
31:16in um working with that contractor and
31:20getting them access when they need to
31:21through the site to make sure that the
31:23both can occur concurrently.
31:25>> Right.
31:26>> Thank you.
31:28Thank you, Mr.
31:28>> Thank you, counselor.
31:29Thank you, Engineer DePersio. Got
31:31counselor Orum.
31:36Is there a question for
31:37>> A question. Uh
31:38Tom, you can stay up there, too.
31:40Um
31:41So, how much lineal feet uh
31:44are there in this pipe that we have to
31:46replace?
31:49>> Uh
31:50I don't know the exact number, but it's
31:52uh
31:53it's over 1,000 ft.
31:55>> I see. So, it's going to go through
31:57several streets, then.
31:58>> It is.
31:59>> It has to be replaced by the three.
32:00>> Yeah, all the way to the outfall at Glen
32:03St.
32:03>> was my other question, the outfall.
32:04Where is the outfall, and will it be
32:06able to handle
32:07I'm sure you've studied it. Will it be
32:09able to handle all this additional flow?
32:11>> Yes, the outfall is at Glen St. It back
32:13into Millham Brook.
32:15Um that section of the Brook has uh
32:19it has the capacity to handle that.
32:22>> Okay, and there's no detention basins
32:24planned for this or anything like that
32:25to slow it down before
32:26>> No, there's really there's really no
32:28place to do anything like that.
32:31>> Thank you.
32:31>> Yep.
32:32>> Thank you, Mr.
32:33>> being said, the new school will have
32:34detention
32:36on the facility, so that that piece of
32:38it, that's going to be an improvement as
32:39well.
32:40>> Thank you.
32:41>> Thank you. Thank you, Engineer
32:43DePascale. I'll open up to any further
32:45questions of the council.
32:48No.
32:49President Ossining.
32:51>> Thank you, Mr. Chairman.
32:53>> Thank you, Mr. Chairman. I was wondering
32:54if I could have Comptroller and then
32:56maybe Chris answer these questions.
32:59So, the
33:00the
33:02tax impact, right? I mean, it's nice to
33:04say we want a new school and how much
33:05it's going to cost, but
33:07you know, people want to know what's it
33:08going to cost them, right? That that's
33:11So, you go through a scenario where you
33:13say it's up to $275,
33:16then drops down. Could you give an up
33:18Could you or Brian give us a
33:21insight as to why it's Cuz my mortgage
33:23doesn't go up or down, right? My
33:24mortgage is
33:25fixed at this rate and it's good for 30
33:27years.
33:32>> If Brian can answer that easily more
33:34easily than I can while I shuffle
33:36through my papers and find
33:38the tax impact.
33:41>> So,
33:42let me answer the tax impact.
33:43>> So, how does the city do their bond?
33:49>> All good.
33:50All right. Thank you.
33:52So, the city we do our bonding, we're
33:54very aggressive. We do level principal,
33:56unlike your mortgage, which is a level
33:58payment. So, your mortgage is the same
34:01over 30 years, we'll say,
34:03amount every month.
34:05The way the city does it, we divide
34:08we take the
34:09principal, we divide it by the number of
34:13years
34:14and we take that level off the every
34:17year, so that we pay a lot more up front
34:20and less later on in the schedule. Why
34:23we do it that way is because, as you
34:25know, we're always adding more bonds.
34:28So, as that one declines, then we bring
34:30on the next one and decline, we bring on
34:32the next one. If you do it where it's
34:34always level, you're always adding to
34:37that payment. So, we try to do it this
34:40way, and also it saves you interest. By
34:42paying a lot of principal up front and
34:44level principal, you pay less interest
34:46over the life of the project. And in
34:49this case, it's millions of dollars.
34:50>> So, so that's the point that I wanted
34:52the public to understand and why the why
34:55the payment schedule set up that way so
34:57that it actually does benefit the tax
34:59payers. Cuz what's not said here
35:02is a $35 million fire station,
35:05which is now going to add another $150
35:08>> [snorts]
35:08>> to the average tax bill.
35:10All right. We have a capital plan that
35:13has not come down yet that usually runs
35:15in the order of 10 to 12 million dollars
35:17that's going to add
35:19my math, $50
35:21to the average tax bill. So, as you vote
35:24on this, it's not just a single bond.
35:27You need to take the whole concept. Now,
35:30I'm confident the city's got the
35:31capacity to handle it.
35:33Now, the taxpayers may not like the fact
35:35that we have the capacity to handle it,
35:38but you you but you're voting on is
35:40going to be
35:42you know, increasing the average tax
35:45by about $275
35:47if both project Well, both projects have
35:49to be approved in order to make the
35:51project work. You can't just do the
35:53school and not do the the storm water.
35:55The storm To me, the storm water we need
35:57it regardless of whether we do the
35:58school or not. The storm water piece of
35:59that
36:00is going to have to get done, and that
36:01would show up on a future capital plan.
36:05So, Chris, I'm going to challenge you.
36:07Um
36:09for the Goodnow school,
36:10uh we have we were able to rescind about
36:129 million dollars worth of bonds.
36:15So, I'm going to put it out to you that
36:16it came in under budget. It came in
36:18ahead of schedule. Um
36:20I'm confident you guys can pull off the
36:22same feat cuz we do estimate
36:24conservatively, and that'll all work out
36:26in the end, but I just wanted to like to
36:28challenge you to the fact that uh
36:30uh there's a benchmark before you that
36:32was able to rescind a significant
36:34portion of the bond that we approved for
36:35good now, and I'm hoping that uh you and
36:37your team uh can do the same thing. I'm
36:40confident you will based on the
36:42presentations I've seen uh your team
36:44make uh in various uh meetings
36:46uh over the last year, so uh
36:50hopefully you accept the challenge.
36:52>> I I can certainly accept that challenge.
36:54Um well, uh as any financial advisor
36:57will tell you, past results are not a
37:00guarantee of the future. I can tell you
37:02that my MSBA project that is closest to
37:05construction
37:07um had a $159
37:09million
37:11budget, and it is currently $22
37:16million
37:17another year and a half to go.
37:20>> So, counselors, I'm not guaranteeing
37:22this, but I'm just saying past
37:23performance I mean, they're they are
37:25estimates. They they put the best they
37:27can cuz they're trying to predict what
37:29the price of wood, steel, pick the
37:31product is going to be 3 4 years from
37:33now,
37:34uh and what labor costs are going to be,
37:36but uh hopefully they've done their uh
37:38proper estimating, and this should be
37:41the highest it is and not
37:44come in
37:45any higher than what they're projecting.
37:47If you want John wants to say something.
37:49>> join in cuz he has much more statistics
37:51about
37:52>> Well, I'm not going to give statistics,
37:53but what I will say is um
37:56you know, having the benefit of a CM on
37:58our team in the next few months, that's
38:00the benefit of the build that's actually
38:02going to do the project in this year as
38:05we keep moving forward, you check that
38:07you're well within that schematic design
38:09budget, at design development, you check
38:12it again at construction document. So,
38:13we're going to have numerous occasions,
38:15and we will challenge that CM as well.
38:18Just hey, just because we have X amount
38:20of millions for construction, we want
38:22you to do better. We're hiring you to
38:24come to the table to help give us ideas
38:26to do better. So, that if we don't have
38:28it, and LPA doesn't have it, hey CM,
38:30what have you done recently that can
38:32help bring this thing in to keep our
38:34project in that lower right-hand corner
38:36because listen, it's it's great cuz I've
38:39sat in communities where that number is
38:40at the other end, and it's a
38:42it's a much harder discussion, but
38:45I think the team's done a phenomenal job
38:47with keeping the numbers down, and the
38:49challenge is finding the right CM that
38:51will sing that sheet of music with us so
38:53that we can, you know, we talk in
38:56extremes because it's easier for the
38:57math. If you spend all of this, you will
39:00get all of this, but that was my
39:02question to or my comment to Chris was
39:04the best dollar is the one not spent.
39:06You don't worry about any reimbursement
39:07in a dollar if it never comes out of
39:09your pocket, right? And that's that's
39:11super important these days where we know
39:13this is not the only community. We hear
39:16that very same list of capital coming,
39:19you know, potential issues with
39:20operating budgets, right? All sorts of
39:22things. So, we we hear it, and we, you
39:25know, we take it to heart because
39:27ultimately, you know, we want you to be
39:28happy and not stress over this thing
39:31from, you know, from the get-go. So,
39:33we're going to work to work to do just
39:34that.
39:35>> Thank you, John. Thank you, Mr.
39:36Chairman.
39:36>> Thank you, President Eisen. Council
39:38Vidal.
39:38>> Thank you, Mr. Chair. Gentlemen, it's my
39:40understanding that all furnishings, all
39:42equipment, all technology is going to be
39:45reimbursed. So, we're going to get a new
39:46school with everything new inside.
39:49>> They're
39:49>> There is a limit to the reimbursement in
39:51terms of they do it per student. So,
39:54they have um I'm not going to know the
39:56number off
39:58>> 1,900 for furnishings per student, and
40:011,700 for for technology.
40:04>> Do you guys believe that that will be
40:06>> Oh, probably especially
40:08it's more challenging if at an older
40:10school, but for high school middle
40:12school and high school where there's
40:13that much more technology, where the
40:16furniture is bigger, it's easier to
40:18achieve in a small in small school for
40:21the smaller humans, right?
40:22>> So if we So if we have a new school, new
40:24new furnishings, new equipment, new
40:26technology, we have an old school which
40:28has all that stuff. Is there any value
40:30to that facility and what's in it?
40:33>> So it's a great question and that's part
40:35of what will be discussed as the project
40:37keeps moving. What do you want to do
40:39with the the old old stuff? Do you want
40:41to recycle it through the the other
40:44schools? Is it, you know, is some of the
40:46stuff in richer
40:4710 years old and there is other schools
40:50it's 20. Yeah, absolutely. The value is
40:52is more of that value to you.
40:54Um ultimately when the CM is on board,
40:57they are coming on board to manage that,
41:00but they will be part of the process to
41:02say,
41:03"Okay, if we've got to empty the school
41:05out,
41:06you know, this is going to be part of
41:07our number. If we're going to recycle
41:08it, here's what we can suggest."
41:10Um or it's a wholesale, "Guys, it's all
41:13yours. Take it and use it, you know, as
41:15you like." But
41:17>> To add to that, um
41:19I had to take the glasses off for this
41:20one.
41:21Um the budget carries about 4.15 million
41:25for technology and furniture combined.
41:29Of that, all but 847,000
41:32are reimbursed. Now, we base that off of
41:36an actual accounting of what we think
41:38the furniture will be at this time using
41:40unit costs at this time and a little bit
41:43of contingency and a little bit of
41:45escalation. Now, we have to do that now
41:47so that we make sure we carry an
41:48appropriate budget so that we can
41:50deliver on the goals of Marlborough by
41:52the time we get to buying that stuff in
41:552029.
41:57But the reality is that we're going to
41:58make decisions the closer we get to
42:00those about every aspect of this budget
42:03to try and deliver the project for the
42:04best value for the citizens of
42:06Marlborough. And if we can deliver it
42:09for, you know, that
42:123.2 by reusing something because that's
42:14the decision that the school building
42:16committee chooses to move forward, that
42:18just adds to that graphic I showed you
42:20where every dollar that you don't spend
42:22of that $847,000,
42:25that comes straight out of Marlborough.
42:27MSBA's not paying that portion of it,
42:29but you want to make sure you get every
42:30dollar that MSBA is paying for.
42:32>> Thank you, gentlemen. Thank you, Mr.
42:33Chair.
42:34>> Councilor Vital.
42:35>> Thank you, Chris. Thank you, John.
42:37Any further discussion
42:39in the committee?
42:40If no further discussion, I will
42:41entertain a motion.
42:48>> Mr. Chair.
42:49>> Councilor Ficciolo.
42:49>> Thank you, Mr. Chair. Um I've enjoyed
42:52the presentation and conversation and um
42:54with that would move to approve the
42:57proposed Richer K-5 Elementary School
42:59Project Bond in the amount of
43:01$160,544,091.
43:06>> Thank you, Councilor Ficciolo. Uh
43:07motion's been made and seconded uh to
43:09approve order number 26-19766
43:12proposed Richer School K-5 Elementary
43:15School Project Bond and the
43:16appropriation amount of $160,544,091.
43:24Councilor Ficciolo.
43:25>> Mr. Chair, I would just ask that um that
43:27uh a suspension is asked at the next
43:29meeting so we
43:30>> Councilor Ficciolo. Thank you.
43:30Absolutely well noted.
43:33All in favor?
43:351 2 3 4 5. That carries with the
43:38suspension. Thank you, Councilor
43:39Ficciolo. Uh next up is order number
43:4226-19766
43:46uh proposed stormwater bond in the
43:48amount of $6,300,000
43:51for the design, construction, and
43:53improvement of the stormwater drainage
43:55and related municipal infrastructure. Um
43:58we were uh
43:59nicely educated by uh engineer DePersio,
44:02so I will certainly entertain a motion
44:05on this if the committee is ready to do
44:07so.
44:07>> Mr. Chair.
44:08>> Councilor Picillo.
44:09>> Thank you, Mr. Chair. Move to approve
44:11the proposed storm water bond in the
44:13amount of $6,300,000.
44:15>> Thank you, Councilor Picillo. Motion's
44:17been made made made and I will second
44:19that to approve order number 109766
44:22proposed storm water bond and the
44:25appropriation amount of $6,300,000
44:27for the design, construction, and
44:29improvement of the storm water drainage
44:30and related municipal infrastructure.
44:32Any further discussion?
44:34Councilor Duso.
44:35>> Thank you very much, Mr. Chair. Just for
44:37a clarification, there is no state
44:40coverage of this expense. This is all on
44:42us, right?
44:42>> That is correct.
44:43>> Okay. Just
44:44wanted to confirm that. Thank you.
44:45>> as President Assing mentioned earlier,
44:47too, and engineer to prove that these
44:48things that needed to be done
44:50uh prior to this.
44:51>> Yeah, completely understandable. Yes.
44:53Okay.
44:53>> Thank you, Councilor Duso.
44:54>> Yep.
44:56>> Motion's been made and seconded. All in
44:57favor? 1 2 3 4 5. That carries with a
45:01suspension, Councilor Chair.
45:03>> to ask. Thank you, Mr. Chair.
45:04>> so much, thank you so much, Picillo.
45:06Councilor Picillo.
45:08With that said, I will entertain a
45:10motion to adjourn.
45:12>> Mr. Chair.
45:13>> Councilor Byrnes.
45:14>> Motion to adjourn.
45:15>> Motion's been made and seconded to
45:17adjourn. All in favor? 1 2 3 4 5. We are
45:21adjourned at 7:15 p.m. Thank you.