2026-06-09 - School Committee Richer School Project Forum

Summary

Based on auto-generated captions; names and figures may be misheard and outcomes incomplete.

Time on topic (from transcript timestamps; approximate, includes side talk):

Topic Minutes Share
Richer School Project: schematic design (LPA) 14 33%
Richer School Project: why the project is needed 9 22%
Richer School Project: cost, schedule and tax impact 9 22%
Questions and comments 7 17%
Richer School Area Stormwater Bond 2 6%
  • Tuesday, June 9, 2026.
  • Called to order about 6:03 p.m. by J. Christian Dumais (mayor, committee chair); adjourned about 6:42 p.m. A public forum on schematic design, with no votes except to adjourn.

Richer School Project: why the project is needed

0:00-9:07

  • Superintendent Jason DeFalco said the elementary schools are at capacity: libraries serve as classrooms and offices as pullout rooms, and the Richer building has structural, HVAC and accessibility problems.
  • The new school would hold about 950 students, nearly double the current roughly 500. Students would be redistricted, freeing space in the other three elementary schools (including bringing libraries back).
  • Design goals: flexible, technology-ready classrooms; special education, speech/OT and counseling spaces; community use of the building.

Richer School Project: schematic design (LPA)

9:07-22:46

  • An LPA architect (captioned "Chris Lee") presented a three-story, just over 160,000 sq ft building built into the hillside on the field below the existing school, so it reads as two stories from the street. The MSBA's minimum formula area is about 137,000 sq ft.
  • Fifth grade and the cafeteria on the lowest level; kindergarten, first grade and the gym on the entry level (Foley Road side); grades two through four and the library on the top floor; a central atrium brings in daylight.
  • Site: a new bus loop off Foley Road (about six buses) plus a rear loop (about five), a separate parent loop with an estimated 70-car queue, expanded parking, an outdoor classroom, a soccer field and play areas.
  • Solar expected on the roof soon after opening; the building will have electrification-ready infrastructure.

Richer School Project: cost, schedule and tax impact

22:46-29:30, 31:50-34:13

  • Christopher Eberly of Vertex (the owner's project manager) said the design is about 30 percent developed, with a total budget of about $162.5 million, down at each milestone.
  • At about $792 per sq ft, he called it the lowest-cost MSBA project of its period.
  • The MSBA's final grant offer is to be set June 24. Estimated reimbursement is 78.8 percent of eligible costs, about $103.3 million, or roughly 63 percent overall. The city's share would be about $57.4 million.
  • The city asked for $160.5 million (the other $2 million was appropriated in 2023).
  • Tax impact for the median home: about $193 a year on average over 30 years, peaking near $275 in year three, both lower than figures shown last fall.
  • Schedule: a construction manager at risk comes on in the fall; early site package around March 2027; about two years of construction; the new school opens fall 2029, then demolition of the old building and site work through 2029-30.

Richer School Area Stormwater Bond

29:30-31:50

  • Persistent flooding at McGee and Ripley Avenues about every three years; the new school adds only about 3 percent.
  • The MSBA will not fund the fix, but the building committee recommended a separate $6.3 million DPW project anyway, run alongside the school. Combined city cost is about $63.7 million.
  • The mayor said both bonds were referred to Finance June 8 and will not be approved until after the June 24 MSBA vote; a Finance meeting with Vertex and LPA is expected late June or early July.

Questions and comments

34:13-41:18

  • A neighbor (name and address unclear in the captions) asked whether the traffic pattern is settled; answer: still being worked, but it is the best option so far. Whether the street gets repaved will be reconsidered after construction.
  • A committee member asked about solar over the parking lot; the team said it can plan the infrastructure so it can be added later (the MSBA does not fund solar).
  • Other questions: cafeteria acoustics for assemblies (accounted for) and special-needs play areas (to be designed later).
  • A Ward 3 councilor on the committee told neighbors, who have endured a nearby earlier project (captioned "Apex"), that their concerns are heard.

Sources

Video

Watch the video

Transcript

Auto-generated YouTube captions; names and terms are likely misheard.

Transcript

0:05Good evening. Today is 6:03 and welcome

0:08to the school committee meeting

0:10regarding the retro school project. Call

0:12this meeting to order. We are being

0:14taped live and pre-recorded or

0:16re-recorded through WMCTV. So, we'll

0:19kick off the meeting with the

0:19superintendent to a quick and

0:21introduction. Then we'll turn over to

0:22Vert.ex and LPA where they get into the

0:24meat and potatoes regarding the project.

0:26Great.

0:26>> So, superintendent, thank you.

0:28>> Thank you, Mr. Mayor. Good evening

0:29everybody. Uh great to be here and great

0:31to be discussing such an important topic

0:33uh not only to our school district but

0:35to our community as a whole. Uh in a

0:37moment I'm going to turn the

0:38presentation over to our uh owner's

0:40project manager and our architects that

0:43have been very hard at work with our

0:44school building committee to put

0:45together uh a design that is very future

0:48forward and future focused as it relates

0:51to the educational opportunity and

0:53experience that we are uh eager to bring

0:55forward to our richer school community

0:57but also to our Malboro community as a

0:59whole.

1:01Uh and so um with that um I know this is

1:04not a new topic to anybody here and

1:06probably to those tuning in at home. Uh

1:09but we have spent a lot of time thinking

1:12about the impact uh the richer project

1:14could have not just on the students that

1:17are um attending the richer school but

1:20actually how we can really leverage that

1:22facility to help us uh restructure and

1:24reorganize uh the other elementary

1:27schools as well. Um and so as we walk

1:29through the first few slides, we'll talk

1:30a little bit about uh the why and the

1:32how of that. Uh but we know there is

1:34urgency behind um bringing forward this

1:37project to our community uh not just for

1:40the students of the richer school and

1:42the staff of the richer school.

1:46So uh if you've spent any time in the

1:48building, you're aware that uh there are

1:51lots of uh structural issues that need

1:53to be addressed and richer. Um we have

1:58uh the city has done an incredible job

1:59of investing in its schools. The last

2:01new school uh that was opened was the

2:04Good Now Brothers uh school in I believe

2:06it was 2020. Um and uh they opened with

2:09about 750 students which is about where

2:11their enrollment is now kindergarten

2:13through fifth grade. Um even with the

2:17Good Now Brothers building open with the

2:19enrollment of around 750, our schools

2:22are still at the elementary level uh

2:24pretty much at capacity. Um every space

2:27across each of those uh four buildings

2:31is at um full utilization. Uh so our

2:34libraries are unfortunately not

2:36libraries but are being used as

2:37classrooms. Uh every office space uh is

2:41utilized. Um many are being uh are being

2:45or have been converted to uh pullout

2:47rooms for either special education or uh

2:51for literacy or math intervention. Uh

2:54but certainly being used as spaces than

2:56other um of how they were designed. Um

3:00you also will notice uh very creative

3:02conference rooms as you walk around the

3:04buildings at the end of hallways. Uh you

3:07will notice uh particularly at the

3:08richer school uh library in the

3:10cafeteria. Uh it's the only place to

3:12store the books. Um and I wish I could

3:15say that was unique to the richer

3:17school, but it's not. Um our school

3:19staff at the elementary level have done

3:21an amazing job of utilizing every space

3:23they have, but unfortunately they're not

3:26always used as the spaces were designed

3:28and intended. And so part of bringing

3:31forward a new uh elementary building to

3:33the richer neighborhood and to the

3:35students that we would ultimately u uh

3:38zone and assigned to the richer school

3:40will impact significantly the other

3:43elementary schools. Bringing back spaces

3:45in the other buildings as they were

3:46intended for their original use uh such

3:49as our libraries which would be

3:50tremendous. Uh we have a strong literacy

3:53focus across our district. Um, and it is

3:56a little headscratcher sometimes for

3:58folks to say, "That's weird. We have

4:00such a strong focus on literacy, but we

4:01don't have libraries in our elementary

4:03schools because they're utilized as

4:04classroom space."

4:07Um, there are many challenges, as I

4:09mentioned, um, to the richer school. And

4:12again, I know to many of our folks at

4:14home that are tuning in and to our

4:15friends in the audience, none of this is

4:17probably new information as it relates

4:19to the structural issues. There's a lot

4:21of content here. I won't read all of

4:23these to you. Um but you can see that

4:25the ranges uh range of issues uh stem

4:28from HVAC and accessibility issues to

4:32actual student learning issues as it

4:34relates to the physical space itself. Um

4:37I mentioned a term in the beginning

4:39beginning of um our conversation this

4:41evening that is one of future forward

4:44future focused as it relates to the

4:46teaching and learning spaces. Uh and the

4:48richer school um is far from that. I

4:51will say that the staff do a tremendous

4:53job of utilizing every space they can to

4:55the fullest extent possible. Uh but the

4:58building is dated and needs a

5:00significant amount of work. Um and so we

5:04are very eager to be moving forward with

5:06this project particularly to address the

5:08issues that are outlined here.

5:12Uh the enrollment is an important factor

5:15in this equation. Uh we've spent a lot

5:18of time um studying the enrollment

5:21possibilities and uh where we landed was

5:26uh selecting a project that would house

5:28about 950 elementary students. Uh if

5:32that sounds like a very large elementary

5:34school, it is because it is a very large

5:36elementary school. Um but the idea here

5:39is to take the current richer school,

5:41which is about 500 students, and almost

5:44double that. Um, in the creation of this

5:47larger building, we will redistrict

5:50students and create space in the other

5:53three elementary schools. And that was a

5:55major part of this project. And why the

5:57impact is so significant on the

6:00community as a whole is because it will

6:02not just impact the richer community,

6:04but it will actually help create space

6:06across the other elementary schools. Um

6:09and again you can see this idea of

6:11strengthening community pride uh

6:13enhancing the neighborhood appeal. Um if

6:15you have spent any time over near

6:18GoodNow recently it is a it is a

6:20beautiful building um that adds a lot to

6:23the area. Uh property values of course

6:25are impacted by new buildings in a

6:27positive way in terms of increasing the

6:29value um and creating new community

6:32space. And I think that's something

6:34that's really important for our school

6:35building committee. we've spent time

6:37talking about uh is that how do we

6:39utilize this space not just for your

6:41typical bell-to-bell instructional

6:43school day, but how do we actually

6:45create a space that's open uh and

6:47vibrant and available to our community?

6:49And the architects um our architecture

6:52firm has spent a lot of time really

6:54leaning into that idea and bringing

6:56different concepts into the into the

6:58space.

7:03Um again overall this idea of kind of

7:05future focused future forward teaching

7:07and learning. These are some snapshots

7:10of uh some classroom spaces and we'll

7:12see more of these 3D renderings uh in a

7:14few moments as uh I hand the

7:16presentation over to our architects. Um

7:19but the idea is to create these flexible

7:21instructional spaces to really leverage

7:23technology. And I sort of laugh when I

7:25say that because um as soon as we think

7:28we have a plan for technology and AI and

7:30how we're going to integrate that, it's

7:32going to change because the technology

7:34is moving quicker than we can keep pace

7:36uh with. But the idea is to create these

7:38flexible learning spaces that allow us

7:41to stay on the cutting edge to the most

7:43degree possible as it relates to

7:44integrating teaching and learning into

7:47our technology uh and our curricular

7:49work.

7:52Um and I think very important to mention

7:56um the idea of student inclusion and

8:00student support. Um if you had a moment

8:02to tune in to our graduation on Sunday

8:05uh and to our friends that are tuning in

8:07at home uh you may have heard a theme

8:09across many of the uh speeches and

8:12remarks that were given and that theme

8:14was really one of inclusivity and that

8:16malware was a place where all are

8:17welcome and all belong. um we need to

8:20design our buildings in that same

8:24mindset. And so the idea here is to

8:26create multiple spaces throughout the

8:29building where we are really focused on

8:31ensuring that we are meeting the needs

8:33of all students. Uh in this particular

8:35case, we're talking about special

8:36education spaces. We're talking about uh

8:39speech and OT. Um we're talking about uh

8:42mental health and uh clinical spaces for

8:45our counselors to be able to work with

8:47our students. Uh we know that school is

8:49not just reading, writing and math. Uh

8:52but there are multiple other components

8:54involved as we think about the whole

8:55child and how we best meet the needs of

8:57all of our students. So we are looking

8:58at designing a space that will allow us

9:01to do that.

9:05I'll turn it over to Chris Lee from our

9:07architecture firm LPA.

9:09>> Thank you and good evening. There are a

9:12lot of different ways to look at a

9:13building. First table is just one way.

9:16So the summary of the program that's

9:18within you see the different categories.

9:21I'm not going to read them all, but core

9:23academic, special education, etc., etc.

9:26Um, all have a lot of different rooms

9:28that fall beneath them.

9:30Excuse me. And we're looking at

9:32basically a building that is just over

9:34160,000 square feet.

9:37Get rid of this little menu here.

9:40And

9:42what you can see on the far right are

9:44the MSBA guidelines. Um, and those are

9:47just the the minimum areas that the

9:51school board school building authority

9:54um has a formula and they pump out and

9:56they just say these these are the spaces

9:58we think a school should have. And so

10:01while you see that number being 137,000

10:04and about that's just at a basic level

10:07that doesn't say that's going to have

10:09every space a district needs. That's

10:11just an initial consideration of the

10:13spaces.

10:18Taking another look from above kind of a

10:21bird's eye view as we like to say uh you

10:24can see the site plan here. The four

10:26colored spaces are where the existing

10:28school is now. And really, the only

10:30space to build a new building is on the

10:33field that's kind of down the hill.

10:36Again, we're talking about a school

10:38that's going to house 950 students. So,

10:42it's a lot of kids. It is a big

10:43building. It's three stories and we're

10:45utilizing the hill to the best we can.

10:47So, while it is three stories, it's only

10:50going to appear as two stories because

10:52we're engaging into the hillside. Those

10:56colored um you know blocks and squares

11:00and circles represent age appropriate uh

11:03recreation areas. That's the area for um

11:06a field here. So soccer is very popular.

11:08So there's a field there and there are

11:10some different play structures and

11:13basketball area, heartscape area for

11:15different activities for

11:17the students.

11:21This next slide or maybe I should go

11:22back. Um, so there's a couple features

11:24here that I I should also point out. So

11:27the far left, we're expanding the

11:28parking that is up the hill. There's a

11:30little parking now that's going to be

11:31expanded to um fit the total parking

11:35need. There's going to be other parking

11:37in front of the school for about um 20

11:40or so spaces including

11:43visitors and handicap spaces.

11:46We also have a little opportunity to put

11:48some spaces in the back of the building

11:50where the new loading dock is going to

11:51be in a secondary kind of pickup drop

11:54off zone. The large uh magenta uh color

12:00in front of the school is the new drop

12:02off area, the new front of the school.

12:05And so there's going to be a lot of

12:07landscaping and a canopy to help um with

12:10transition from outside to inside.

12:13The orange circle you can see at the top

12:15edge of the building is an outdoor

12:17classroom that can hold about one to two

12:20classroom size worth of students.

12:26On this slide, we'll just talk briefly

12:29about the vehicular circulation

12:32that um that we're anticipating having.

12:36So in the front road off of Foley Road,

12:40we see moving the bus loop kind of right

12:42now comes off of Ripley. So we're seeing

12:44buses uh having better advantage coming

12:48off of Foley and having a little loop

12:50there for about six buses.

12:54We also see that there's an opportunity

12:57around the back of the building to bring

12:59about five buses so that um the arrival

13:04and dismissal can be a little more

13:05expedited because we're talking about a

13:07lot of kids.

13:08>> We live on that road is like we live

13:10right next to school.

13:12>> It's really busy road and if we could

13:14just if we just keep the public comments

13:16to the end people at home can't hear you

13:18as well. So I just want you to be

13:19mindful of that. So thank you.

13:23And then we've seen the blue arrows um

13:26using what is now the the bus loop

13:28that's really the the route for parents

13:30and we can really onboard the site with

13:32the majority of the traffic that we

13:34anticipate having um for the those

13:36parents bringing their kids to and from

13:39school. And so we anticipate that being

13:41about like a 70 car q and we can bet

13:43most of that. We just think that the

13:45flow will be much better uh much better

13:48situation than it is now.

13:52In terms of the building, we'll start on

13:53the on the lowest floor. Again, there's

13:55three floors here. Um, you can see the

13:57the progress we've made, the distinction

13:59between the last phase, which is uh the

14:02PSR, the preferred schematic report is

14:05what that acronym stands for. And then

14:08on the right is the schematic design,

14:10which is the phase that we're really

14:13concluding right now.

14:16and different spaces have settled into

14:18positions that um after a lot of study

14:22seemed to be the best fit for making

14:25sure students in classrooms where they

14:28are the most with staff where they are

14:29the most have the most daylight because

14:31this is a very compact building. So

14:34we're trying to prioritize

14:36those spaces. So the fifth grade while

14:39still on the floor changed from that top

14:41position to the bottom right for

14:43instance. So there's a lot of musical

14:44chairs, if you will, in the planning and

14:47layout of the building. Cafeteria is

14:50also at this level, as well as the music

14:53suite of spaces and other support spaces

14:56to to um

14:59work with and support the fifth grade

15:01neighborhood.

15:04On this main floor is really the middle

15:06floor is the entry level from the poly

15:10road side of the site. You can see the

15:13big arrows, the red arrows. That's the

15:14main entry. So, really just entering the

15:17in the middle of that left edge of this

15:22um of this floor plan.

15:25And so here there's two grades,

15:27kindergarten and first grade. Uh we

15:30heard that um the smallest students want

15:34to kind of be mindful of their travel

15:36speed and and and needs and so they're

15:39on this entry level to to help

15:41accommodate that.

15:44The gym is also on this level. And so

15:46you start to notice maybe a little

15:48pattern that there is a major space on

15:49every floor. On the floor below we have

15:51the cafeteria. On this floor we have the

15:53gym.

15:55And as Dr. Falco mentioned the library

15:57is coming back and it's going to be

15:59located on the top floor. And also on

16:02this floor are the remaining three

16:04grades, second grade, third grade, and

16:07fourth grade.

16:10Um blue spaces you see are our rooms.

16:12There's three of them. And there's also

16:14an ST uh science uh type room, excuse

16:20me. Here are some architectural diagrams

16:24that just use color to help convey how

16:27we're organizing this building. You can

16:29see in that smaller diagram in blue that

16:32ring that donut that represents all the

16:34typical classrooms.

16:37And then purple, green, and red are the

16:40spaces I just described. Cafeteria, gym,

16:43and media center. They're all on

16:44different levels, all at the center of

16:47this basically um square cube of a

16:51building.

16:55We know daylight's important and we know

16:57that uh having a dense building presents

16:59its challenges. So, we've introduced a

17:03feature to help kind of combat what

17:07would normally be the worst part of the

17:08building, the center, the darkest part,

17:11and just bring in and flood it with a

17:13lot of light. And it's it's an atrium

17:15space, and so it's just it's a large

17:18volume that could bring in light from

17:20above and share it with spaces that are

17:22adjacent.

17:24You also can see some of the smaller

17:26circles up there. Um, those are rooms.

17:29We're bringing light in from both above

17:32since we have that opportunity and also

17:33borrow light from those larger volumes

17:36just to make those spaces the best we

17:39can.

17:41And here's another look. You can see the

17:43the same three colored volumes, the gym,

17:46cafeteria, and media center

17:50and their relationship within the

17:51overall massing of the building. Here's

17:55a little video of what we anticipate the

17:58project becoming. So, you can see very

18:00large building over the field. You can

18:04see um the buses and their new loop in

18:07the front off of Foley Road. You see a

18:09few buses

18:11off of the um Prickley Avenue driveways.

18:15complete ring road around the building

18:19and ring road around the um landscape

18:22recess area.

18:25We do anticipate um solar being put on

18:28the roof um probably after very close

18:32after the building's completed. And so

18:33we are tracking

18:35um an easy way to plug in solar as part

18:39of the code requirements actually to

18:41have infrastructure in place for

18:43electrification.

18:46And here are some other views just

18:49looking around the outside at the

18:51different elevations of the building.

18:53Here's that main entrance facade, the

18:55canopy. You see the bus loop in the

18:57foreground. See the parent loop around

19:00the playground recess area beyond and

19:03they all all drop offs will convene to

19:07one central location.

19:10Here's the opposite corner of that same

19:11facade.

19:14The uh roadway starting to uh navigate

19:17downwards

19:19to the south and we're revealing all

19:22three floors of the school.

19:26Here's

19:27the back of the building and the loading

19:29dock and um some of those necessary um

19:33items to run the school facilities and

19:36maintenance. Uh we did extend one of the

19:38stair towers for maintenance and fire

19:41department access. So that's going to be

19:43a little bit taller, but it's going to

19:44be kind of tucked away in the back.

19:48We do have some solar shading devices on

19:51the windows. This is the the south side

19:52and there's a lot of sun exposure. So,

19:55we're just trying to ease the um solar

19:57glare that's going to be um going to

20:00those classrooms.

20:02Taking a peek on the inside. This is

20:04just after the main vestibule coming

20:07into the the school. We have a central

20:10stair

20:11and we have a mural that will probably

20:14be refined and evolve over the next few

20:17phases.

20:19Something that's going to represent uh

20:21the richer school community. Uh this was

20:24inspired by an art piece in the school

20:26actually. It was a pair of hands I

20:28believe or several hands and so there's

20:31uh time to develop some kind of mural

20:35feature

20:36at the front of the building.

20:41We also can see these little wooden

20:43portals. Um we saw different examples

20:45going to different schools in the

20:47Commonwealth of um these portals or this

20:50idea that students can um have a little

20:53space to uh take a rest to uh hang out

20:57to kind of look through if there's a

20:59window on the other side to to observe a

21:02space from a different space

21:05and bring a little playful and notation

21:07of those. Um, you can see some of them

21:09on the right hand side. That's the media

21:11center on the other side of the wall.

21:13And here's that indication of the light

21:15in the atrium that I was mentioning

21:17earlier.

21:19Here's a look at the media center.

21:22Again, this is kind of an island or

21:26doesn't have direct access

21:29to windows, but we have access above.

21:32So, we pop the roof and have what we

21:34call a clear story or just windows.

21:37um up high. That'll bring a lot of light

21:39into the space. It also signifies a

21:41meeting area within the library media

21:43center.

21:46Here's a look at our gymnasium. Also

21:49borrowing light from that room space.

21:55Here's a look at our cafeteria.

21:58Bring light in from both sides. borrowed

22:00light, not direct light, but still we uh

22:04are very generous with the with the

22:06glass to try to get this to be a very

22:08welcoming and um inspiring space to be

22:12in.

22:14Here's a look at what could be an art

22:17room. Um we are anticipating having a

22:20larger skylight, but there is room to

22:22study having multiple skylights to see

22:26what the best configuration is moving

22:28forward. There's some again bar lights

22:31and windows for the media center off to

22:33the left just to help give more

22:35transparency to this room so it's just

22:37not boxed with skylight but there's

22:40additional connections in different

22:43directions.

22:46So I'm going to hand it off to

22:49Thank you. So I'm Chris Everly. I'm the

22:51project executive for Vertex. for the

22:53owner's project manager that was hired

22:55by the city to bring the project to to

22:58you today. Um, at this point, we've been

23:00working on this project since really we

23:03were hired in 2024. And so, um, October

23:08of 24, we're coming up on two years that

23:11have gone into this. And what Chris and

23:14his team have shown you today represents

23:1630% of the development of this building.

23:18And so we're really at a milestone where

23:21we've developed the scope of the

23:23project, the schedule of the project,

23:26and the cost budget of the project. And

23:29so I just want to speak to you a little

23:31bit about schedule and a little bit

23:33about the cost of the project. Here you

23:36can see a sort of overlay of the

23:38schedule. And the choice to move forward

23:41with the richer site means that we're

23:42going to be bringing on a CM should the

23:44project be funded early in um the fall.

23:48and they're going to help us work out

23:50the details of the best way to build

23:52this project so close to how to preserve

23:54safety for the students who will be in

23:56the neighborhood, how to manage the

23:58traffic and the logistics of building in

24:01the neighborhood so that we're good

24:02neighbors as we build the project. Um

24:05they'll work with us as we move towards

24:07an early site package. And while it says

24:10we're going to start that in March,

24:11that's really to make sure that we have

24:13the right preparation so that we can hit

24:16the ground running in the first summer.

24:18That first summer, we're really going to

24:19try and make sure we do all the

24:21preparation we need to to get this

24:22building off on the right foot. So that

24:25by the time that the kids return in the

24:26fall to what is partially a construction

24:29site, we have the right amenities, the

24:31right playgrounds, the right

24:32opportunities to really have the

24:35contractor and the kids coexist. And

24:38everyone involved in projects like these

24:40knows that ultimately while we're

24:41building you a new building, it's really

24:44about the learning that's happening now

24:45and the learning that's going to happen

24:46in the future. That process of building

24:49is going to take about 2 years. And the

24:51hope would be that by the end of 2029

24:55school or the 2829 school year, we'll

24:57have the opportunity to actually be

24:59taking down the existing richer school

25:02and opening the rest of the school in

25:05the fall of 29 when the first students

25:07at the new school will will begin to

25:10enter. There will be some follow-on work

25:13as the demolition process and the site

25:15improvements and managing New England

25:17weathers has to be taken into account,

25:19but that construction will continue in

25:22the same managed way through the end of

25:25um the 29 uh the 29 2030 school year and

25:29you'll ultimately be complete with the

25:31project at the end of that school year.

25:35Um, as we've reported throughout this

25:38process, we've had a progressive

25:40evolution. And one of the things that is

25:42really informed by the great work that

25:44the Lamar Popagano team did um,

25:48illustrating the building is that

25:49they've also built a relatively dense

25:51building and they've done a great job in

25:52refining it over time. So, we've had a

25:55progressive decrease in the project

25:57budget as we've studied this in each of

25:58the milestones as we've figured out

26:00efficient solutions to deliver

26:02education, deal with a fairly

26:05constrained site, but also have the

26:07features that were highlighted by Chris

26:09in his presentation. Ultimately, the pro

26:12total project budget that we arrived at

26:14is $162,544,91.

26:20And that represents um both about

26:23$150,000 in costs that have been

26:26professionally estimated and with the

26:28remaining being contingencies.

26:32The MSBA puts out this chart as part of

26:34their website. You can actually go to

26:36their website. They feature it right

26:37prominently on the the website and it

26:39gives you the opportunity to see what

26:42schools cost in other parts of the state

26:45for all of the MSBA pro projects that

26:47they've undertaken. We know that the

26:49good now project when it came in was

26:51extremely cost effective in how it was

26:53produced to use the model school program

26:55and you had a really incredible um co

26:59cost per square foot which is what this

27:01table's showing you for that project. We

27:03also know that when we previously

27:05visited with you, the cost per square

27:07foot for the time that we're in was also

27:10the lowest cost per square foot of any

27:12of the projects that are on a similar

27:13timeline. And actually, if you look at

27:16this box, it represents about a year

27:18worth of projects around that same

27:20timeline. And in both cases, with the

27:22good now and today with the richer, we

27:24are looking at the lowest cost project.

27:27And with the conclusion of schematic

27:29design, we've actually improved upon

27:30that. So the $792 per square foot took

27:34the lowest cost MSBA project and

27:36actually made it cheaper, which is a

27:38great achievement for both the uh

27:40frugality and also the quality that

27:43Lamro um Pagano was able to provide to

27:46the city in terms of what you saw in

27:48their presentation, but also the the

27:50cost to taxpayers.

27:53As the MSBA is finalizing the grant, the

27:56grant really factors into how much

27:58reimbursement you get at the end of the

27:59day.

28:01This process is ongoing and will not be

28:04final until June 24th when the MSBA

28:07board finalizes their offer to the city

28:10of Marboro in terms of the total

28:12facilities grant project. So until the

28:1424th, we're talking about the estimates

28:17that we have for what this will be.

28:19Since the project began, they've

28:20actually increased the base

28:22reimbursement rate to the city of

28:23Marboro. That's helped to improve what

28:26the potential reimbursement is. We've

28:29also chosen to move forward with um the

28:32specialized energy code and certain

28:33indoor air quality um requirements which

28:36will give you an extra 4% of

28:38reimbursement. And um the great way that

28:42the maintenance department within the

28:44city of Marorrow maintains your

28:45buildings got you a 1.54

28:48out of two. So in the 75th or the top 25

28:52percentile in terms of your maintenance

28:54score reimbursement enhance. So overall

28:57they're going to give you 78.8% of your

28:59total costs

29:02um for the project as part of the

29:05reimbursement or the the forecast is

29:07that that will be what's coming. Now

29:09that's eligible costs and there are

29:10certain cost caps which are illustrated

29:12on the other side of the screen that are

29:15the structure of the project or of the

29:17grant program for all projects across

29:19the Commonwealth. And then of those

29:21costs up to those caps you'll get 78.8%

29:238% of that.

29:26Now, we also want to talk and I know

29:28that the text size is a little small.

29:30Through the course of developing the

29:31project, we also identified that there

29:33is a persistent problem that occurs on

29:36um McGee and Ripley AB where in heavy

29:39storms every 3 years or so, um you

29:43really get some substantial flooding in

29:44that area. And it was something that we

29:46were made aware of by the DPW. And so we

29:49had Lamaro Pagano bring their uh civil

29:52engineer in and they brought in their

29:53traffic division and they actually

29:55studied how the storm water would work

29:57and they modeled this to come up with

29:59some solutions to that potential

30:01problem. In discussing it, we did

30:04identify that the impact of the new

30:06building itself because we're

30:08introducing a lot of infiltration

30:09systems. It actually isn't the building

30:12itself that will create will add to

30:14that. It's very marginal, less than 10,

30:16I think it was less than 3%. Um, but

30:20it's still a problem that needs to be

30:22solved and it's going to serve as the

30:24parents entrance into the building and

30:26it's also going to be something that the

30:28MSBA cares about because the resiliency

30:31of the building. They're making an

30:32investment in Marboro to build this

30:34building and they want to make sure it's

30:36going to last for that 50-year lifespan

30:38that they're seeking to do. in

30:40discussion with the MSBA because of

30:42their internal rules, they don't want

30:43this to be part of the project budget,

30:45but in discussing it with the school

30:47building committee, the school building

30:48committee felt that we should recommend

30:50that this moves forward anyway, even

30:52though it's not part of the the funding

30:54bill. So, when this went before city

30:56council last night, there's actually two

30:58measures that are included in that vote.

31:00One is to fund the school, and one is

31:03$6.3 million to fund the improvements to

31:06the um

31:09excuse me, the improvements to this uh

31:11storm water issue. The DPW will run that

31:14as a DPW project separate from the

31:17project, but we have identified a

31:19project budget so that this work can

31:21occur concurrently with the school. And

31:23we're recommending that both move

31:25forward, not just because it's the right

31:27thing to do, but also because the MSBA

31:29may decide that they want this

31:30contingent on them funding the school.

31:33So, we wanted to make everyone aware

31:34that that is an improvement that we we

31:36feel should be made as part of the

31:38school.

31:39So the what they considered last night

31:42was based on this slide right here. And

31:44so you're looking at a a $162.5

31:48million budget, but of that money, 2

31:51million of it was actually appropriated

31:53in 2023 to fund the work that we've all

31:55been doing to get to this point. So

31:57you're actually looking to fund just the

32:00school. The ask is $160.5

32:03million. and that of that the MSBA would

32:07put 103,34,993

32:12based on the current estimates that we

32:13have working with the MSBA. That is a

32:16significant percentage of the overall

32:18cost. I believe it's somewhere around

32:1963%.

32:20And so the total cost, should the MSBA

32:24confirm that on June 24th, would be 57.4

32:28million to bring this beautiful school

32:29that LMRON

32:31has designed for the city of Marboro.

32:34Adding in that storm water mitigation,

32:36the total cost of the city is $63.7

32:40million. And that's a substantial

32:42decrease from what we brought to the

32:44city of Marbor at the PSR stage when we

32:47last discussed this last fall. We did um

32:50work with the mayor's office to

32:52determine the um tax impact of those two

32:56combined projects. And on average over

32:58the 30 years that the bond would be out

33:01there, you'd be looking at $19323

33:05annually to the median home. And that

33:08would be highest in the third year where

33:10it would be $275

33:14um50.

33:16Both of those numbers are decreases from

33:18the numbers that we shared with the um

33:21city council when we met with them in

33:23the fall. And it is a tremendous value

33:26for the work that Lamar Pagano and

33:28Vertex have done with um Marbor Public

33:31Schools to really get to this point that

33:33we can present this to you. There's

33:35still a lot of work to be done should

33:37this be approved and um already we've

33:40provided both um proposals for

33:43Lamaragano and Vert.Ex s that are

33:45factored into those budgets to move that

33:47forward. And as I mentioned, most of

33:49those budgets, over 150 million of the

33:52total budget is based on estimated costs

33:55by professional estimators um or

33:58comparative analysis with similar

34:00schools in Massachusetts. So, we've

34:02really dotted the eyes and crossed the

34:04tees to ensure that we know what this

34:06project will cost and that we've planned

34:08for contingencies for anything that we

34:10don't know. So, with that, I will turn

34:13it over to um the mayor to take any

34:16questions from the public.

34:18>> So, we will open this up for questions.

34:20So, if you have a questions, we'll have

34:21you go up to the podium, state your name

34:24and your address and your question.

34:28So, we will go and going once. If anyone

34:31has any questions, please traffic.

34:34>> If you could please come up to the

34:35podium and state your name and your

34:36address, please. Thank you.

34:38>> You have to push a button or is it all

34:39set?

34:39>> It should be red. No, that's right. It's

34:42right

34:44>> burger 64 road. Uh my question is the

34:47traffic pattern for buses and parents.

34:49Is that settled the way it was shown or

34:52is there still potentially some movement

34:54on how the traffic will flow.

34:56>> So we're still working through that, but

34:57that is by the most ideal situation when

35:00it comes to traffic pattern.

35:04>> Along that one more question. All the

35:05road itself hasn't been paved as part of

35:07the overall pavement project in

35:09neighborhood.

35:10>> Sure.

35:10>> Is that just after the end of this

35:12construction or is that someone

35:14>> we will reevaluate after this project is

35:16done?

35:17>> Okay. Yeah. All right. Yeah. Thank you.

35:18>> You're welcome.

35:22>> Any further questions going once?

35:27Any further questions going twice? I'm

35:30only going to ask three times.

35:33Any further questions? Last and final

35:36from anyone in the audience. School

35:39committee members. We'll open up to

35:40school committee members. Any school

35:42committees have any questions? We've

35:43seen this numerous times. I would hope

35:45all your questions concerns have been

35:47answered already. If not, now's the

35:50time.

35:50>> I I have one question.

35:53>> Um I know you said that you there will

35:56be solar going on the roof later on in

35:59the project. What about on the parking

36:02lot? We talked about that at all?

36:06>> We have not discussed that as a

36:09potential option. It's certainly

36:10something that could be studied as part

36:12of the ongoing. Typically in an MSBA

36:15project, the solar decision is less left

36:17to the municipality because solar is not

36:20something that the MSBA supports. But as

36:23we develop the drawings further, it's

36:25certainly if that is a strong um

36:28indication of what Marorrow is looking

36:29for, it's something that could be

36:31planned for as we develop the uh design,

36:34development, and permitting process to

36:36move the project forward. And even if we

36:40decided not to do it in the initial

36:43construction phase, I I just be

36:46interested in making sure that the

36:49parking lot is set up so that down the

36:52line if we wanted to add it that it

36:54would structurally

36:56>> make sense.

36:58>> Yeah, we can certainly bring that um

37:00into the next phases. I think hearing

37:02that now it's easy to plan and get some

37:04of that infrastructure in while we're

37:06digging everything up, putting it in. so

37:08we're not tearing up

37:09>> playgrounds and driveways. So, we'll

37:12take note of that and

37:14>> um try to plan accordingly.

37:15>> Thank you.

37:18>> Anything for Yes,

37:20>> sorry, just two things. I think we

37:22talked about it before, but just rather

37:24say it um relative to the cafeteria area

37:27which often would be utilized for like

37:29auditorium kind of space. I'm assuming

37:32um acoustic aspect is being thought of

37:35in that space.

37:38Yes, absolutely. We've done many of

37:40these cafeterias that are used for

37:42assemblies and performances and so uh we

37:45have systems allowed for right now.

37:48>> Perfect. So,

37:50>> and then um second, I know we had had

37:52some discussions around the the

37:54playground spaces um and age specific,

37:57but I'm also assuming um thinking about

37:59the special education classrooms that we

38:01probably would need specific um place

38:05playcapes to make sure that we were kind

38:07of addressing those needs too, which I

38:09think you have in place. We've talked

38:11about it a couple times.

38:12>> So, we have the the general area is kind

38:14of carved out, but we haven't picked

38:15anything out yet. And so we'll be coming

38:17back and having meetings to and make

38:19sure we bring um and engaging the

38:22different folks to make sure that all

38:23the different pieces and all the

38:24students are accounted for.

38:26>> Great. Thank you.

38:27>> You're welcome.

38:29>> Anything else? Calling once, twice.

38:33No. Okay. So, I'd like to remind you

38:35also this is all still in the works. So,

38:38you the MSBA still needs to approve this

38:41project. So, we're doing all this work,

38:44which is I want to say thank you to LPA

38:46and Vert.Ex for all their hard work. We

38:48have a building committee that's been

38:50doing their due diligence. We meet

38:52pretty regularly, you know, like once a

38:54week, if not once a month, and it's it's

38:56very it's been a lot um since October of

39:002024. So, um this is all leading up to

39:03the MSBA vote on June 24th. I will

39:06update with you all that this bond as

39:09Chris had mentioned from Vert.Ex that

39:11this is in front of city council to

39:12approve the bonds for both the school

39:15and the storm water. However, they will

39:17not approve that until after June 24th.

39:21So, it has was on the agenda for Monday

39:23night. It's in finance. So, once the

39:25June 24th happens with MSBA, then city

39:27council will have another meeting with

39:29Vert.Ex and LPA to go over the same

39:31content, but we'll go over numbers a

39:33little bit more specifically. Um, so

39:36that will be coming up probably

39:39somewhere between

39:42third week of June, fourth, first week

39:44of July. So be on the lookout for the

39:46finance meeting for that. That's where

39:48we'll get more in depth with numbers and

39:50the approval. I would also like to know

39:52I know there's some neighbors here that

39:53live in the area. Um, obviously being

39:55your city councelor for Ward 3, you all

39:58have been through a lot with Apex and

40:00everything else. I have not forgotten

40:02that. Um, so it's been very

40:04conscientious to make sure that the

40:06neighbors are being looked after and

40:08taken care of with the construction. Um,

40:11this school needs to happen and

40:13unfortunately you guys been through a

40:14lot the last nine years that I've been

40:16um, in public government. Um, so I just

40:19want to make sure that I hear you. I I

40:21know your concerns and I'm always

40:23available to listen to those concerns so

40:25I can really that back to the actual

40:28developer and construction. We actually

40:31going with a at a risk um construction

40:34crew which is very sensitive to the

40:36needs of neighborhood and working very

40:38closely with the school. So that was

40:40already approved. Um so we are trying to

40:42do our best to look after all aspects

40:45not just the students but also the

40:46neighbors that live in that area. Um we

40:49all need to live, work and play

40:50together. So I understand that and I'm

40:52receptive to that. So I just want to

40:54make sure that you guys are are are

40:57heard at the end of the day. Having said

41:00that, everything will come down to June

41:0124th and then we can move on with the

41:03project. Anything else? If not, I will

41:06ask for um a motion to adjurnn.

41:10>> Move to adjurnn.

41:11>> Motion to adjourns on the table and

41:12seconded. All in favor, we adjourned.

41:15Thank you everyone for coming up and uh

41:18good luck to June 24th. Thank you.