2026-07-07 - Climate Resiliency Committee

Summary

Based on auto-generated captions with no speaker labels; speakers are identified only where the captions make it clear, and names and details may be misheard.

Time on topic (from transcript timestamps; approximate, includes side talk):

Topic Minutes Share
Geothermal Thermal Network 56 97%
Other business 2 3%
  • Tuesday, July 7, 2026, on order 26-1009726 (a communication from Councilor Ducette asking the city to investigate geothermal energy). Ducette chaired.
  • Adjourned at a time captioned "8:05" (garbled).
  • The one vote was unanimous.

Geothermal Thermal Network

0:02-51:03, 51:52-56:55

  • Ducette opened with three slides: the series of meetings is meant to produce a proposal for a feasibility study, with meetings about every other week and different specialists each time.
  • He floated a non-binding referendum on the 2027 ballot, a search for funding so the city does not carry the study cost, and using AI both to draft a feasibility-study proposal and to analyze Marlborough geology for well locations.
  • Audrey Schulman, executive director of Black Swan Lab (funded by the Barr Foundation, apparently), presented on thermal networks: heat pumps drawing from ground loops, wastewater or waste heat, with Eversource's Framingham pilot as the first gas-utility installation.
  • Claimed benefits: lower electric peaks and future bills (an E3 study assumed 22% of New England homes and 49% of businesses on thermal networks by 2050), cooling and hot water as well as heat, and modular growth.
  • Ownership options: a for-profit gas utility, or the municipality as a nonprofit utility (examples cited were Denver, Boise, West Union, Ann Arbor). A federal tax credit of 30 to 50% of installation cost was described as a direct-pay grant, said to run to 2033 (speakers disagreed between 2033 and 2035).
  • Marlborough sites she pointed to: one of the two wastewater treatment plants (about 3.5 million gallons per day, enough for roughly 300 homes); the New England Sports Center (12 rinks, about 50 homes per rink, so roughly 600 homes; its HVAC may be old); and Boston Scientific, which has reportedly expressed interest in geothermal and would need bore holes. A west-side site was requested by a councilor and the other plant was not examined.
  • A state DEP wastewater energy recovery grant is first-come, about $5 million total, never offered before, and Black Swan said sooner is better. It can also use a sewer interceptor, and it prioritizes underserved communities. The feasibility phase was cited as about $15,000.
  • Black Swan offered to help with grants, technical, legal and financing questions, and said it is already doing the same for South Hadley.
  • Questions from councilors:
    • Capped landfill: bore holes through the cap are a bad idea; uncapped parking areas near it might work.
    • Conservation land and state land would raise stewardship and Article 97 questions; Conservation officer Priscilla Ryder and Ted (apparently from DPW) are to be invited.
    • Street disruption is similar to gas main replacement, so utility work could be coordinated. A Black Swan colleague (first name Karen) said gas utilities can use "non-pipeline alternatives" instead of replacing pipes, a legal point still contested at the State House.
    • Reliability: a shared backup heat source is typical (a Colorado Mesa University system has never used its gas boiler in 15 years), but a main break would affect everyone on that loop.
    • Cost of conversion: a councilor (apparently Mike, likely Council President Ossing) asked how to persuade owners to retrofit. Black Swan said Framingham customers all agreed except one provided retrofits were paid for; owning the heat pumps earns a larger tax credit, and municipal revenue bonds borrow cheaply.
    • Other New England examples named: Smith College, Mount Holyoke, National Grid in Dorchester, Beverly. A $15 million thermal-network grant is in the state environmental bond bill headed to conference committee (not certain).
  • Ducette wants the city to consider TIFs, the tax credit and state grants as three funding sources, and said a thermal network should lock in heating and cooling prices (he said 10 years) that cover the bond costs. He said Boston Scientific is looking at this on its own.
  • A member (addressed as Trey) said he would not commit to a feasibility study without knowing the funding, and a member who may be Mike said he would not commit municipal resources to something not yet well understood after one hour.
  • Vote: a motion (mover captioned "Mark") to explore funding sources for a wastewater-energy feasibility study, through the Conservation Commission or DPW and with Black Swan, passed unanimously. Members stressed it commits the city to no study, only to bring staff in at the next meeting.

Other business

51:03-51:52, 56:55-57:54

  • Next meeting set for Tuesday, July 21 at 7 p.m. (the council meets July 20). Ducette hopes to bring Conservation officer Priscilla Ryder and Ted from DPW, and to discuss the wastewater grant and the broader utility question.
  • A councilor noted a June 15 Boston Globe article on geothermal energy, shared by Councilor Robey, for the committee file.

Sources

Video

Watch the video

Transcript

Auto-generated YouTube captions; names and terms are likely misheard.

Transcript

0:02This is a meeting of the climate

0:04resiliency committee to cover order

0:06number 26-10009726.

0:11Uh communication from council Dave Ducet

0:13regarding requests for the city to

0:14investigate geothermal energy. Uh

0:17there's some handouts and there's some

0:18stuff that's also been posted on the

0:20website. Uh there's some updates that

0:22need to be done for the data on the

0:24website that'll show up in the next uh

0:26council meeting. Um

0:30but uh what I wanted to do really is

0:33just go through some uh general ground

0:36loose issues for now. Uh I'm doing this

0:40through PowerPoint because basically

0:43uh I organized my own notes in

0:45PowerPoint so it made it easier to do

0:46that. Um so the goal of the the series

0:50of meetings is to develop proposal for a

0:52feasibility study. Uh I expect multiple

0:55meetings um with different speakers and

0:57specialists based upon who shows up and

0:59what we need. Um but the structure of

1:02the meeting we get the agenda we have

1:03new business old business prove the

1:06minutes all that this is an ongoing

1:08series of meetings. Um and if Mike

1:12correct me if I'm wrong if this is not

1:14the appropriate approach. So um but uh

1:18you know the assumption is basically

1:19that we will have multiple meetings with

1:21different speakers uh specialists uh

1:24probably plan a few meetings ahead. I'd

1:26like to try to do meetings every other

1:27week or so and try to get things paced

1:30that way. Um and I think the uh

1:33fundamental assumption here is that

1:34basically the cost of getting energy to

1:37us is cheaper than the energy itself.

1:38And we got to start developing our own

1:40local energy and fossil fuels seems to

1:42be a likely oh sorry uh thermal exchange

1:45networks would be a likely candidate for

1:48us to uh heat and cool our homes. So

1:52hold on.

1:54Um, for today's blue knit, uh, new

1:56business, uh, Black Swan Lab will be

1:59doing a presentation when they show up.

2:01Um, there's other actions I've been

2:03discussing, but hadn't put it into the

2:06draft of the editorial, but having the

2:08non-binding referendum in 2027

2:11ballot and getting that in place to get

2:14the view of the people of the city of

2:16whether or not they want to do something

2:17like this. um and basically you know the

2:20infamous search for funding uh for the

2:23feasibility study etc. So we don't have

2:25to cover a lot of the cost. Um the use

2:29of AI, I've been toying with AI just

2:32doing research with this and I found it

2:34very effective and to if if there's a

2:38structure for a feas proposal for a

2:40feasibility study. You could feed it

2:42into AI and it'll give you the first

2:45draft. I'm not saying it's the final

2:47draft, but it will give you a first

2:48draft that you can then walk through,

2:50edit, and change as necessary. Um and uh

2:54the other part of AI is actually just to

2:57if we can capture geological data of

2:59Malber, feed it into an AI model and ask

3:02them where to drill the wells. So um

3:05there's opportunities with the

3:07technology I think we need to be keeping

3:09an eye on. Um

3:12Oops.

3:14And that's basically the three slides

3:16that I had. Um, you know, when we get

3:20the minutes, we'll go through that in

3:21the next for the next meeting. Um, for

3:24the three of us, are we comfortable

3:26having a meeting in like two weeks? Two

3:28weeks from Tuesday, two weeks from

3:30today.

3:32Are you

3:33guys available for that?

3:42That'd be the 21st.

3:47Yeah,

3:52>> I'm good.

3:53>> You get both of you guys. So, I'm

3:55getting confirmation.

3:56>> We have the council meeting on the 20th.

3:58>> On the 20th. That's fine.

3:59>> Yep.

3:59>> Yeah.

4:01>> Mr. Chair.

4:02>> Yes.

4:03>> Thank Thank you, Mr. Chair. Yeah. I I

4:04mean, I can confirm I would be available

4:06in the evening of the 21st. I think

4:07just, you know, so long as we know kind

4:10of who's coming, who's presenting, what

4:11Yeah. Right. All that sort of stuff

4:12ahead of time, I would be comfortable

4:14with that.

4:14>> Yep.

4:15>> Yep. 7 p.m.

4:16>> Uh 7. We'll do 7 p.m. Yep.

4:22>> Dave, you're here.

4:24>> You are here. Excellent.

4:41>> Yeah.

4:45just planning the next meeting after

4:47this one. We're meeting in two weeks

4:48again. So for folks online, uh the folks

4:53in Black Swan Labs just showed up. So um

4:57do you want to start with the

4:59presentation now? You good? Okay, let me

5:01switch controls for a minute.

5:21slideshow up there.

5:29>> Slideshow up on the top.

5:37I guess

5:39there's the remote such a sense of

5:40power. Um,

5:42>> you can stand there with the mic.

5:44>> Okay, awesome. Thank you so much. Um,

5:48hey, uh, pleased to talk to you all.

5:50Thank you so much for the the honor of

5:52being here. Um, I'm Audrey Schulman. Uh,

5:54I'm the executive director at Black Swan

5:56Lab. Uh, we do practical solutions uh to

6:01solve, you know, to reduce climate

6:03change. Um, and we're funded by the Bar

6:06Foundation.

6:08Cool. Um, so I don't know if you've

6:10heard of thermal networks, but the uh

6:12I'll explain what they are in a second,

6:14but they um the very first one installed

6:17ever in the world by gas utility is uh

6:20installed in Framingham. Um and

6:24uh it is uh it's quite exciting and I

6:29was lucky enough to be one of the major

6:30people to to help ha make it happen.

6:34Um, no.

6:38Okay, good. Um, this is a thermal

6:42network. Uh, to give you a better idea

6:44what it is, it is uh heat pumps. If you

6:47know what heat pumps are, they're

6:49basically like air conditioners that can

6:51run forward or backward. So, they

6:53provide heating and cooling. But instead

6:56of pulling that temperature from the air

6:58outside, which as you can imagine is

7:01very volatile in temperature, they pull

7:04temperature from pipes under the ground

7:07where it's way easier to control that

7:10the temperature of the water. So the

7:11heat pumps connected can always work at

7:14their greatest efficiency. And so

7:16because of that, they are very very

7:18efficient. Um

7:23there. No,

7:26there we go. So they can p they get that

7:29temperature of the water which is just

7:32not over not hot, not cold. It's in an

7:35ambient temperature range between like

7:3740 and 90°. So it's just keeping it sort

7:41of you know it would be cold almost to

7:43your touch uh by running the water

7:46either through bore holes in this case

7:51or getting that temperature from

7:53wastewater.

7:55Um this is an installation going in in

7:57Syracuse that will be owned by National

8:00Grid and the city the county in Syracuse

8:03I think will be selling the wastewater

8:06temperature to National Grid.

8:09um and or that you can get that thermal

8:12energy from uh waste heat such as from

8:16an ice rink. So an ice rink you can

8:19imagine is always pulling wants lots and

8:21lots of cold so it would return the

8:24water into the that that pipe hotter and

8:28that heat can then go to homes down the

8:30street. Every ice rink produces enough

8:35temperature to heat 50 homes.

8:39Yeah,

8:41it's a shame to waste.

8:42>> We get 12 ranks in Marboro.

8:44>> Exactly.

8:45>> That doesn't count the name.

8:47>> Um, so you've you've got a lot of this

8:51right here. Um, so thermal networks are

8:54being installed uh everywhere across the

8:57continent. In Europe, they're installing

9:00systems of 10,000 units at a time.

9:04Uh, so they're they can go very large.

9:09Um there's some of them sorry for the

9:12>> quick question on the other uh go back a

9:14minute.

9:15>> Um what's the definite why are there

9:17different colors? Is there

9:18>> some of them are owned by utility you

9:20know there uh you can go to that link

9:22it's building decarbonization coalition

9:24okay

9:25>> and look I think some of them are owned

9:26by utilities some of them are owned by

9:28universities some of them are wastewater

9:30some of them are waste heat some of them

9:32are you know so it's different types of

9:34uh thermal networks

9:38um so one of the things they can do is

9:40radically reduce because they're so

9:42efficient our electric peaks as we move

9:45more and more towards electricity

9:48for everything. Um, so this is ISO New

9:51England's prediction of how much

9:53electricity New England will need in the

9:55future. Um, and on the left, how much

10:00that might cost to increase our

10:02transmission that much. So 25 billion at

10:05the top. So the more we can bring that

10:08peak down,

10:10the lower our electric bills will be.

10:12And that's just transmission.

10:14It's going to be much more also to do

10:16distribution system.

10:18So, uh here's Oh, wait. I gotta get

10:22hold. Okay, there we go. Here's uh a

10:26estimate on how much thermal networks

10:28can save. Each of these lines, each of

10:31these are are pathways towards that

10:34electrification towards all of our

10:36buildings using only electricity,

10:39different methods using airsource heat

10:41pumps, etc. And thermal networks have

10:45the lowest peak use and so they can save

10:48us an enormous amount not only in

10:50transmission but also in distribution

10:52system and all of that all of us get get

10:55you know electric customers we're the

10:57ones who pay. So what this means is

10:59thermal networks can reduce how much our

11:02electric bills rise in the future which

11:05Lord knows everybody would be happy

11:08about after last winter. So in back up a

11:13so in this one in particular um what is

11:16the ramp up of thermal networks in doing

11:19that on the existing customer base I

11:22mean what's your buildout assumption to

11:24make

11:25>> so that's by 2050 this is for New

11:27England this is done by E3 which is you

11:29know and they were assuming uh I think

11:3122% of homes would go to thermal

11:34networks and 49% of businesses

11:38>> 22% of homes

11:40and 49% of businesses.

11:43Um, and so that is, you know, but any

11:47thermal network, each thermal network

11:49will reduce your electric peak in

11:51comparison.

11:52>> Oh, absolutely.

11:53>> To airsource heat pumps, etc. Anybody

11:56have airsource heat pumps here?

11:59>> Um, I I do too. They're they're uh great

12:03and this is better.

12:06Um so your thermal energy bills uh they

12:10will be so this is with gas furnace.

12:12This is by applied economics clinic. Uh

12:15the next one is uh the your annual

12:19heating bill uh for the average

12:21Massachusetts home with thermal network

12:24using the heat pump rate that we

12:25currently have. But we're probably

12:28moving to a version two of the heat pump

12:30rate. And so the thermal network charge

12:33annual heating charge would be even

12:35lower.

12:38So uh that is if it was if it's done

12:40this is a prediction by applied

12:41economics clinic if it's done by a gas

12:44utility and that's a for-profit gas

12:47utility. But you've got another option

12:49open

12:50which is uh you could have them

12:53installed by your municipality which is

12:55nonprofit,

12:57right? You don't need to pay back the

12:59investors. Denver is doing it uh is

13:03installing thermal networks now. They're

13:06going to do so with wastewater as well

13:07as with bore holes. Boise, Idaho has a

13:10system that's been functioning since the

13:1270s, I think maybe the 80s. Uh, West

13:15Union has had one for 20 years. Uh, and

13:18Ann Arbor, Michigan is currently

13:21installing one. So, this is an option

13:24available to you. And that would reduce

13:28the am costs for all of your residents

13:31in comparison to a for-profit

13:34utility doing it. But for-profit

13:37utilities are always an option. Yes. So

13:40I know one of these and I forget which

13:42one it was um might have been the West

13:44the ones that's been been there for a

13:45while. It seems that in these cases,

13:48some of the older networks, are they

13:51continu are they expanding the network

13:52or is it staying the way it is

13:54>> because it seems that they don't seem to

13:57expand much.

13:58>> And uh Karen's here too and so she'll

14:00correct me if I get any of this wrong

14:01and she can look stuff up as we talk.

14:03But I believe uh Boise if I remember

14:06correctly is expanding and uh and West

14:10Union has been bringing more not

14:12expanding the loop if I remember

14:13correctly but has been adding more

14:15customers to it and the more they do

14:17that the lower cost it is for each

14:19customer

14:20>> because you've already installed the

14:22system and so this the customers are

14:25paying back for the installation and the

14:28operations and maintenance. So, the more

14:29you have on the system.

14:31>> So, the town does the I was just going

14:32to ask that does the operation and

14:34maintenance of the system as well.

14:36>> Yeah. In uh West Union, I think they

14:38have a nonprofit uh that they

14:40subcontract to to do that. Um or

14:43for-profit, I think it's for-profit or

14:45they call it a for-profit and it doesn't

14:47seem to make much profit. Um and uh

14:49Boise, I think they they have the city

14:52do it and you know, we can put you in

14:54contact with the you know, either one if

14:57you want. Uh and Ann Arbor is is just

15:00installing now and it's using a

15:02Department of Energy grant.

15:04>> Okay.

15:05>> Um

15:05>> a number of cities nearby that have uh

15:08utilities. The city, the municipality

15:10runs this the utilities.

15:11>> Yes. Yeah. I mean, and you run your

15:13water and your sewer, I assume. So, and

15:16it would be very similar to that. Um,

15:19and if you do it, you're not gonna uh

15:24you it'll be much you won't change the

15:28energy the thermal bill much as opposed

15:30to for-profit utilities potentially.

15:33Um, so there's a lot of Massachusetts

15:36municipalities who are interested in

15:38thermal networks. Um, and that's partly

15:41because the tax credit exists still, not

15:45for solar, not for renewable, but it

15:47does for for thermal networks on bore

15:49holes. Um, and so these are all the

15:52feasibility studies of different

15:53Massachusetts towns

15:56uh who want uh to do to go to thermal

15:59networks. Um, and that IRA tax credit is

16:0430 to 50% of the cost. So that's a chunk

16:09of of potential savings right now.

16:12>> So the 30 to 50% is taken over for how

16:16many years?

16:18>> Uh it's just the cost of the

16:20installation.

16:21>> So if you spent $10 million, you would

16:23get $5 million back up to $5 million

16:26back.

16:26>> Right. But how many years does it take

16:27to depreciate? I went through all this

16:29when I had my solar panels installed.

16:31>> Oh.

16:31>> I got threeear depreciation schedule for

16:33the solar panels. Uh, so depreciation.

16:37>> I'm not sure I'm going to get the

16:38depreciation right. Um, but as I

16:40understand it, it's a direct pay at the

16:42so it never leaves the municipality's

16:44pocket.

16:45>> So, so it's not depreciation. It's like

16:49just

16:50>> it's a grant

16:51>> basically. Yeah.

16:52>> Okay,

16:53>> Mr. Chair.

16:54>> Yes.

16:55>> A quick clarification.

16:55>> Oh, sure.

16:56>> Thank you. Um, what is the how long is

16:59that funded through?

17:00>> I think it's 2035.

17:03It's 33.

17:04>> 33. Okay.

17:05>> Thank you.

17:06>> We're gonna have the the person in the

17:07back will correct me each time I'm

17:09wrong.

17:09>> That's great. Thank you.

17:12>> Um,

17:13so in Marboro,

17:17you got two wastewater treatment plants,

17:19not one, but two. Um, and you've got the

17:23largest ice rink in North America.

17:26Uh, and you've got the ground

17:29everywhere. So, you've got three really

17:31great options to get that thermal energy

17:34from. Um, and so let's look at them a

17:37little more closely. Uh, right now, you

17:40know, here's one of your wastewater

17:42treatment plants up in the corner there.

17:45Uh, and you can see there's a lot of

17:47buildings nearby.

17:49U, most of them are commercial. You've

17:51got, if I remember correctly, about 3.5

17:54million gallons per day through that

17:56wastewater treatment plant. So that

17:58means uh you have enough for about you

18:00know approximately 300 homes which is

18:04probably several of those large

18:05commercial buildings.

18:07Um

18:08>> 300 homes will get my neighborhood right

18:10down in the bottom.

18:12>> Yeah, there you go. You just have to get

18:14the pipe there. Um, right now there's a

18:18Department of Environmental Protection

18:19grant to do both the feasibility study,

18:23the design and the installation

18:26of that wastewater energy recovery

18:28system. So, that's just the the thermal

18:32source. You'd still have to install the

18:35distribution system and there'd still be

18:36the building conversions.

18:39>> Um, uh, and that D grant is a rolling

18:44grant. they've got only $5 million. So

18:48once that's used up, that goes. You

18:50can't you can't that offer is not there

18:51anymore. So I recommend you look at that

18:55first.

18:57Um

18:58>> is it a rolling grant period or does it

19:00refresh every year?

19:02>> It's uh just the first time they've ever

19:03offered it. I don't think, you know,

19:05they don't think they have plans to

19:06offer it again.

19:07>> Okay.

19:10>> Uh here's the New England Sports Center.

19:13You got a lot of homes across the

19:15highway. Uh that's again because you got

19:1812 ice rinks there. In my rough

19:20figuring, you've got enough to heat 600

19:23homes because it's 50 homes

19:26approximately per ice rink.

19:30So there's a lot of homes. Or you could

19:33do on this side,

19:34>> but they are for profit. They would have

19:37obviously need to get their permission

19:39to

19:39>> Oh, yeah.

19:40>> They would make money off of this. Yes,

19:42they could get revenue from it. And I

19:44looked up on the web and you know, Lord

19:46knows if it's right, but it looks like

19:48one of their HVAC units might be uh

19:50fairly old.

19:53>> So that might be a time that they might

19:55be very interested in replacing it

19:59and moving to the system where they're

20:01selling their heat.

20:04>> Mr. Chair,

20:05>> yes, thank you. uh what is the forgive

20:08my ignorance on a heat pump and how

20:10these networks um work but what is the

20:13capacity what's the distance for

20:15something like this to

20:16>> be functional right you point up to

20:19those homes and to the commercial but

20:20how far

20:22>> uh so um the the Framingham installation

20:26is a onem loop approximately uh there's

20:29other installations that are bigger the

20:31frame you know there you want to if

20:34generally you want to have some thermal

20:36source uh every

20:40you know half mile something like that

20:41so you can bring things back to

20:43temperature if you need to.

20:44>> Okay, thanks.

20:45>> Um

20:49>> yes, they're they're modular so you can

20:51install one and then grow over time.

20:53They're like Lego blocks

20:55>> even though each block is a well that's

20:573 to 600 feet deep,

20:59>> right?

21:00>> Uh yes, if you do bore holes, they're

21:02they're 300 to 600 feet deep,

21:05>> right? or or if you're able to tap into

21:07um a sewer tap or something like that,

21:09>> right? There could be a sewer

21:10interceptor in there too,

21:13etc.

21:14>> So, one of the things that we talked

21:16about is that the network itself because

21:19it's all under the frost line, the

21:21network actually provides a thermal uh

21:24register as well. So, as it if it

21:28travels further, it's still in ground

21:30temperature. So the, you know, if it

21:33comes back warm and if it travels half a

21:36mile to a well, it may actually be at

21:38ground temperature before it gets to its

21:40destination because of the length of the

21:42pipes, it's still underground. So

21:44>> yeah.

21:45>> Do you mind speak to the thermal battery

21:46aspect of it?

21:47>> Yeah. And it's

21:48>> You want to come up to the mic and

21:49speak?

21:52>> Okay.

21:53>> Um, so one of the things is the water

21:56itself has an enormous amount of thermal

21:58storage in it, right? if you if that

22:00water there's a an installation at

22:02Colorado Mesa University with over

22:04100,000 gallons of water in that loop

22:07that's over a mile long. And so if that

22:10water of 100,000 gallons uh in that big

22:14pipe running around the system is at 90°

22:19um that's an enormous

22:21battery thermal battery that you can

22:23pull the temperature off at any time.

22:26It's it's equivalent to many many you

22:28know therms of gas and I could go I

22:32don't have the numbers off the top of my

22:33head but you can just it's a giant

22:34battery.

22:36>> Um and if you did it to the to those uh

22:39businesses instead each of them use

22:41energy in a very different way. So one

22:44of them would to be taking heating and

22:46making the water colder. The next one

22:48would be taking cold maybe and making

22:51the water, you know, like it they would

22:53go back and forth and you'd get

22:54simultaneous load cancellation also,

22:57right? That ice rink to the homes kind

22:59of concept.

23:01Um, uh, and here's Boston Scientific,

23:05which uh I believe uh Dave, you've

23:09talked to them or something and they

23:10might

23:10>> someone talked to them and they

23:11expressed interest in putting geothermal

23:13in. Yes.

23:14>> So they they might do bore holes.

23:16There's a lot of buildings around them.

23:18There's some schools

23:20etc. And that way they might take on the

23:23cost of doing the bore holes and you

23:25just do the distribution system or you

23:28choose your utility to do the

23:30distribution system.

23:32Um,

23:33>> so this could be something that say

23:34could go to the hospital, which is the

23:36emergency department at UMass, or it

23:38could go to the high school and the uh

23:42um the the elementary school uh good now

23:46brothers up in front.

23:47>> Yeah, you're missing the dental care

23:49place in the corner. Um yes,

23:52>> you could you could do it many different

23:53ways.

23:54>> Yeah.

23:54>> Um and this would be, you know, you'd

23:57want to do uh an engineering study to

24:00try to figure this out.

24:02Um, but if there's a lot of different

24:04ways forward here, I would talk to

24:06Boston Scientific, check and make sure

24:09they're interested in this concept and

24:11then potentially do a feasibility study.

24:14I would go to New England Sports Center

24:16and ask like, "Hey, is your HVAC gold?

24:18Do you want revenue?"

24:20>> Um, and I would uh fill out the

24:23Massachusetts D grant for wastewater

24:25energy recovery. We will help you. We're

24:28already doing that with uh for South

24:30Hadley and uh potentially for you know

24:34we we'll find out but maybe for for

24:36other towns. Um so we are happy to do

24:39that

24:40>> Mr. Chair.

24:41>> Yes.

24:41>> In the area of Boston Scientific we have

24:44a capped landfill as well as an ice

24:47skating rink right across the street.

24:49>> Really?

24:49>> Yes. It's a Naven rink. It's one rink,

24:52but um council n

24:54>> that right that

24:55>> curious on this athletic field

24:58>> that right building right next to it.

24:59>> No way there.

25:00>> Yeah.

25:01>> You're just curious on capped landfills.

25:04Can they be utilized in any way for this

25:07type of energy?

25:08>> I would think uh you'd have to go

25:11through uh so you probably don't want to

25:13do bore holes on the capped land because

25:15you don't want to go through the cap and

25:17break it. Um, and

25:20>> no, I don't.

25:21>> Is all of that cap land? The parking

25:24lot, the

25:27>> parking lots possibly.

25:29>> Yeah,

25:29>> those areas

25:31the right.

25:33>> All of that is kept. Okay.

25:35>> Just curious.

25:36>> I'm not an engineer, but I assume that

25:38that might be a difficult that might be

25:40a problem.

25:40>> Just the edges maybe or the parking lots

25:42you were saying for the cap landfill. If

25:45there's parking lots there and that

25:47aren't capped,

25:48>> yeah, then I then I would assume you

25:49would not want the bore holes anywhere

25:51in the capped land. However, for our

25:52understanding,

25:52>> uncapped land should be fine.

25:54>> Yeah.

25:54>> Good.

25:55>> I was talking with Priscilla Ryder. You

25:56said that, you know, and we have to get

25:59Priscilla Ryder and probably um uh Ted

26:04from DPW up in here because, you know,

26:07can we drill in conservation land? And

26:11is, you know, if if we're doing just a

26:13thermal capture, is that considered

26:14stewardship of conservation land?

26:17Because it's a very minor, you know,

26:19insignificant impact. Uh but there's a

26:22whole bunch of conservation land around

26:24here and other places that we could tap

26:26into.

26:27>> Yeah, I think if it's under if it's

26:29state land, then you have to do article

26:3097 if I remember correctly. And so uh

26:33they the uh EA at you know the

26:37governor's office might want to make

26:38that process simpler. So if you want to

26:41go to them to ask for a simpler process,

26:44that would probably be helpful for you

26:45and others.

26:47>> Thank you.

26:48>> Okay. Yes, Trey.

26:51>> Thank you, Mr. Chair. Just a a quick

26:53question. So, looking at these three

26:55sites, right, the the wastewater

26:56treatment plant, the New England Sports

26:58Center, and Boston Scientific. I can

27:00understand that with the wastewater

27:01treatment plant, we're we're using the

27:02actual wastewater itself. Um we wouldn't

27:05be drilling bore fields there in theory,

27:08right? And and same is true for the

27:10sports center and Boston Scientific.

27:12Yeah. Right. Yes.

27:12>> So, how how are we

27:13>> Boston Scientific would be drill holes,

27:15bore holes.

27:16>> Okay. Okay. Okay. But

27:17>> but the other two would not be.

27:19>> I guess my question is how are we

27:21capturing the the waste heat from these

27:23sites? I mean this I'm just unfamiliar.

27:26>> No, it's it's a totally confusing

27:28concept. So waste water has temperature

27:30to it. All those warm showers all you

27:33know it

27:34>> fermenting stuff.

27:37>> It's it's generally between 60 and 90

27:39degrees. Sure. which is the kind of

27:41temperature that heat pumps are very

27:43happy and they work very efficiently

27:45with to provide you the temperature you

27:47want in your house whether heating or

27:49cooling.

27:50>> Uh and uh with ice rinks you would only

27:53be able to provide heating because you'd

27:56be taking the ice rink would take all

27:58the cold off the water and all the homes

28:00would get all the the heat or any

28:02businesses.

28:04>> Thank Yeah know that helps a lot. Thank

28:06you. And the the bedrock you get

28:09temperature because it's in this area

28:10it's about 55 degrees all the time which

28:12again is a temperature range that makes

28:14heat pumps happen.

28:15>> Sure. And that's what Ever Source is

28:17doing in Framingham. Those are three

28:18bore fields that they drilled on Sounds

28:21like municipal property. Um Yes.

28:23>> Right. To then heat that small

28:25neighborhood.

28:25>> Yeah.

28:26>> Gotcha. Thank you. Thank you.

28:29>> Um so uh here's some uh press for

28:33different thermal networks. Um here's uh

28:37the Black Swan Lab team that we have.

28:40We're available, you know, we got the

28:41center of public enterprise who tries to

28:43figure out how public money can help uh

28:46econ, you know, economic uh everything.

28:50Um we got thermal energy insights, Eric

28:52Bosworth, who installed the Eversource

28:56Framingham thermal network and now he's

28:58on his own. Um and Lord knows what

29:02happened to all the formatting on this.

29:04And then uh we got uh Jamie von Nostrin

29:06who uh was the department of public

29:09utilities chair last year in

29:12Massachusetts and now is at the future

29:14of heat initiative. And uh so we are

29:16ready to help out with uh econom you

29:19know economic and financial questions uh

29:22with technical questions with

29:24legislative and regulatory questions and

29:26with who owns what how.

29:30Um and uh so if you're interested,

29:33please just, you know, any more

29:35questions, we're happy to help. We will

29:37help you do grants. We will help you do,

29:39you know, take whatever steps you want

29:41forward on this issue because I think

29:43Marorrow can lead on this.

29:45>> So,

29:45>> and we would love to help. Um, so go

29:49back to the three bullets of next steps

29:52type thing that um,

29:56you know, New England sport, reach out

29:57to New England Sports Center, reach out

29:58to Boston Scientific, that that's ours

30:01to do. Um, but, um, the D grant for

30:06wastewater energy recovery,

30:08>> you said you could do that. we would

30:10need uh numbers from your you know

30:14>> D sorry uh DPW

30:16>> DPW okay

30:18>> um and it wouldn't so if we do this

30:22quickly we could get a basically the

30:25grant for free

30:26>> potentially. Yeah. Sooner is better,

30:29right?

30:29>> Sooner is better. Uh the other thing to

30:31know about and uh the other thing to

30:33know is well two things to know. One you

30:36they prioritize underserved communities.

30:38So if you can get any affordable housing

30:41uh or you know have it in any

30:43environmental justice area, it's better.

30:45And the second thing to know about that

30:47grant uh is that um the you can also use

30:51a sewer interceptor. So it does not have

30:53to be at the treatment plants.

30:55>> Okay. Um,

30:56>> it could be a made what I understand is

30:58basically you drop a hose a hose loop

31:02into a sewer pipe that can be as long as

31:04it needs to be because it's just a sewer

31:06pipe and that's how you capture the

31:07thermal energy, right?

31:09>> I I think it might be a little more

31:10complex than that, but we could go, you

31:11know, you uh you basic you you put a

31:14heat exchanger in the pipe potentially

31:17or you pull the waste water out into

31:19another compound.

31:20>> Okay.

31:20>> Yeah.

31:21>> Okay. But Okay. Yes, sir.

31:24>> Mr. too. Um, and these seem to me make

31:28great sense to me.

31:29>> Oh, great.

31:30>> As everyone else, I suspect. However,

31:32uh, they're all on the north and east

31:34side of Marbor.

31:36>> There's not much on the west side of

31:37Marbor where we're having a lot of

31:39development these days. And we have some

31:41Fortune 500 companies on that side. Does

31:43it not make sense to not put all of our

31:46baskets in the all of our apples in the

31:48Boston scientific basket and open it up

31:50to other industries here in town? Uh, so

31:54I I recommend always exploring as many

31:56options as possible to figure out which

31:58one works best. Um, and if you want

32:01things on the west side of town, I think

32:03you have another treatment plant on that

32:04side. I I did not look at that one. I

32:07just, you know, so we we could look at

32:08that one instead.

32:09>> Would a feasibility study tell us the

32:12best

32:13path forward?

32:15uh uh yes potent you know and it depends

32:18you know feasibility studies uh would

32:20cost some money uh unless you did it

32:22through you know the D wastewater energy

32:25recovery grant so I mean and that's only

32:28for $15,000 so I just want to um so the

32:32bigger the feasibility study the more

32:34money the town might have to pay but it

32:37might be well worth it

32:39>> thank you thank you Mr. Chair

32:40>> Sure Mr. Yes.

32:43>> I'm curious about the end pro end side

32:45of it and that's how much disturbance in

32:48the streets would have to happen to pipe

32:50this to each individual house such as my

32:53neighborhood. They're going to be

32:54replacing gas lines. Wouldn't this be

32:56the appropriate time maybe to put in

32:59these pipes for future heat from these

33:03thermal energy units. But curious how

33:06that works and how big is the pipe? How

33:08much disturbance in the street? That

33:10type of situation. It's it's very

33:12similar to uh a gas pipe replacement

33:15what you're you know what you'll be

33:17going through it will be very similar if

33:19they if you had to drill bore holes that

33:21would be a different thing uh but that

33:23would generally be away from the house

33:25and in a parking lot nearby. Um so you

33:29know it's it's a it's a pipe maybe a

33:31little bit bigger than a gas pipe and

33:33instead of one service pipe going to

33:35your house you'd have a service loop a

33:36pipe going to your home and then coming

33:39one coming back. Um, and other than

33:41that, uh, it's about the same.

33:44And, uh, yes, of course, it's a great

33:46time to install.

33:47>> Well, that's why I was going to say, in

33:48other cities and towns like Denver or

33:51wherever you mentioned, Boise and so

33:53forth, have they utilized piping to the

33:57homes with other utilities when they

33:59were putting in their utilities, or is

34:01this something they had to put in

34:02themselves?

34:03>> Uh, the uh,

34:05>> just thinking of tearing up the streets

34:06more than once.

34:07>> Yeah. Gosh, who you never want to,

34:09right? limited chapter 90 funding, isn't

34:11it?

34:12>> Um, yeah. So, you always want to do uh

34:15do as many utilities, underground

34:17utilities as you possibly can. Uh, and

34:20Worcester has a cooperative uh paving

34:23program. I don't know if you've ever

34:24heard of it, where they have all the

34:26underground utilities tell them where

34:28they want to work over the next five

34:30years, and then they sequence them

34:32together.

34:33uh and it's allows the paving dollars to

34:36go uh you know 60% further. So I

34:41recommend you consider that. And Karen,

34:43you wanted to add

34:45>> just to say you could ask your gas

34:48utility what their plans are for the

34:50next four years and see where they are

34:52going to be planning to replace pipes

34:54because the electricity utilities have

34:58the option of putting money to what they

35:00call a nonpeline replacement which would

35:03be exactly this if they choose to rather

35:05than the millions of dollars per mile to

35:08replace the pipe. Um there are pros and

35:10cons of working with utilities as they

35:12know, but it certainly is another avenue

35:15to explor.

35:16>> Yes,

35:18>> you can see if there's overlap on any of

35:20these maps and Audrey has described

35:23other potential locations with the call

35:27gas system enhancement.

35:29So, I appreciated that explanation was

35:32really good, which is why I wanted you

35:34in front of a mic.

35:36Okay.

35:37>> Okay.

35:38>> So, yeah, the the gas utilities do

35:40replace pipes. They have funds to do

35:42that. They are allowed to instead

35:44install this kind of system

35:46>> as a replacement

35:47>> instead of a gas pipe replacement. Um,

35:51and

35:51>> even if it's not gas,

35:53>> if it's not gas, yeah, it's called a

35:54non-pipeline alternative. That's their

35:56term.

35:57>> Okay. uh and they can do this this type

36:00of system. Um

36:01>> even if they lose customers doing it,

36:04>> they uh it's a super complicated legal

36:07problem right now in the middle and and

36:09the Senate and the House and everybody's

36:11fighting and over it. So I'm I won't get

36:13into that one.

36:14>> Okay.

36:15>> But uh it's it should be clarified soon

36:17that legal issue.

36:19>> Mr. Chair.

36:20>> Yes.

36:20>> Thank you. I want to clarify something

36:23um again on how these work. So

36:29is it sim is it is it like you mentioned

36:31the airflow heat pumps that people have

36:32at their homes right is it is it similar

36:34to that regard in that it is

36:37it has capacity or has limits to the

36:40capacity for temperatures and whatnot

36:42will these will this completely replace

36:44somebody's home heating and cooling or

36:46will it kind of be like a dual fuel

36:49system will they will retain their own

36:52>> so the instead of having uh so first

36:56off. Air source heat pumps have, you

36:57know, if they're cold climate, they

36:59should be able to deliver all the

37:00heating and cooling you need, assuming

37:02your home, you know, you have the

37:04windows closed. Um, right, it's that

37:08should work at this point. They're very,

37:10very capable. But this system, uh, it

37:13has an easier time of it because when

37:15it's super cold or super hot outside,

37:19the water in the pipes down below, you

37:21know, in the ground is still the same

37:23temperature. It's not 100°. it's not

37:26zero degrees

37:27>> and so they the heat pumps connected can

37:29work at just perfect efficiency all the

37:32time delivering you the heating or

37:34cooling you need and uh in addition

37:37there is generally a backup heating and

37:40cooling system attached to the system so

37:43that you don't have to each customer

37:45doesn't have to have a backup the water

37:47pipe themselves has a backup on

37:50>> what is that what is that fueled by

37:52>> uh it can be fueled by gas or

37:54electricity or whatever. The Eversource

37:57one is electric.

37:58>> Got it. Okay.

37:58>> Uh and I Yeah. To Yeah. And there's many

38:01ways you can do it.

38:02>> Yep. That's helpful.

38:03>> And those are outages. That would

38:04effectively be an outage. Recovery from

38:06an outage,

38:07>> right?

38:07>> Uh it could it it could uh it could be

38:09many things. It could be like, you know,

38:11the something's gone terribly wrong,

38:15>> right?

38:15>> And uh you need to get the the water up

38:17to temperature again. There's that. The

38:20installation in Colorado Mesa has uh a

38:23gas boiler attached to it. In 15 years,

38:26they've never had to use the gas boiler

38:29>> to do that, but it's there as a

38:31supplemental backup system just in case.

38:34>> Yeah. And then my other question was um

38:37the communities you showed that had

38:38already done feasibility studies, I

38:40think it was Somerville, Lexington,

38:42Arlington, a couple other community,

38:44what are they doing now? I assume I

38:46don't know when they were completed, but

38:47kind of what is the takeaway for these

38:49communities?

38:50>> They're each confused about what the

38:52next step is. Um they're trying to

38:54figure out, you know, do they have the

38:57gas utility do it? Do they bring in a

38:59third party? Do they do it themselves?

39:01Where does the money come from? How do

39:04they govern it? etc. Yeah.

39:06>> And so, uh that is why exactly why Black

39:09Swan Lab is trying to help.

39:11>> Great. Thank you. And uh wait can I have

39:13Karen say something that might be

39:16>> so Mr. Chairman if Karen for the PD

39:19audience you got to come up otherwise

39:21it's not of any value.

39:22>> It's small issue it's very tiny. I was

39:24just going to say that um this is not so

39:27much an issue in Marboro I imagine but

39:29for many communities they don't have

39:31cooling and they're getting cooling for

39:34the first time with this system. So when

39:37we look at even the idea of a cost

39:38comparison, a lot of times they forget

39:40to factor in what does it cost to do air

39:42conditioning and the all that. So this

39:44is sort of a cooling and heating system

39:46especially double benefit for people

39:48that don't otherwise have cooling.

39:49>> Yes.

39:51>> One other thing um if I'm no basically

39:55it's not just heating and cooling but

39:56they'll also provide hot water. The

39:58system can also

39:59>> domestic hot water.

40:00>> Yes.

40:01>> So

40:03and correct me if I'm wrong. Let's go

40:04back to our our very famous uh skating

40:08ring that's going to

40:09>> Oh, yeah. There we go.

40:10>> That's going to supply 500 homes.

40:12>> 600. Yeah.

40:13>> 600 of homes. This is a system that goes

40:15through all the different homes. If

40:17there's a crack anywhere in that system

40:20where that water is not continuing now

40:23that we have 600 homes that don't have

40:25hot and cold, is that correct?

40:27>> Uh yes. Same same as if your uh an

40:31electric wire broke or a gas pipe broke.

40:35Yeah.

40:36>> So when the systems down, it affects

40:38everybody that's on the system.

40:39>> But that's also why there was a backup

40:41in Colorado that hasn't been used in 15

40:43years.

40:43>> Yes. But if there if there's something

40:44catastrophic, if a you know construct,

40:47you know, somebody's doing construction

40:48and they dig into a pipe, that pipe is

40:51out.

40:52>> Um they they generally have shut off

40:54valves. There's there's same sort of

40:55process as exists with gas and with

40:58electric only it's way less dangerous,

41:01right? You hit a gas pipe, there's

41:03trouble.

41:05>> Thank you.

41:05>> I mean, if we're we stand on New England

41:08Sports Center just for heating, um it

41:11could go up Bigalow Street, you know,

41:13and do the neighborhoods of Bigalow

41:15Street, which is the street that goes

41:16under 49 uh 290.

41:20>> Yeah, that one. um or go down Edge

41:24Boulevard and start doing the actual

41:26office buildings in there. And we're

41:29brokers, like we don't we buy it from

41:31New England Sports Center and we sell it

41:33to someone else, but we basically do

41:36thermal exchange broking. And I would I

41:39would state that this is an incredible

41:40economic development option because if

41:44done through the city, you know, you can

41:47tell people their energy bill for the

41:49next 50 years just pegged to inflation.

41:52You know what the operations and

41:54maintenance is. You know what the

41:55installation cost was. every business

41:58for the next 50 years would know what

42:00their heating and cooling bill would be,

42:02which would be one of the biggest ways

42:04you could help businesses, especially

42:06now. Um, it would be amazing.

42:10>> Mr. Chair, if I can.

42:11>> Yes.

42:12>> One of your biggest businesses was a

42:14very promising business when it was a

42:16mall. Malls are slowly starting to go

42:18away. My wife was down at the mall last

42:20week when it was very hot and they

42:22weren't running their air conditioning

42:23that well. They're trying to save cost.

42:26This would be a win-win if New England

42:29Sports Center could provide energy such

42:31as thermal energy to that mall because

42:33they're looking at variable options

42:36including housing and this would be the

42:38time to consider that type of situation

42:41if they go that route. Uh but and they

42:44got lots of parking area too. So, who

42:46knows backup wells and so forth. But

42:48yeah, you're right next to a place

42:50that's looking for help and this would

42:52be helpful to the mall. Well, I I agree

42:55that it could be helpful to the mall,

42:56but not necessarily from New England

42:58Sports Center because I see a whole

42:59bunch of customers between there and

43:01there. Yes. I mean, you know, this is

43:03this is a great photo because it shows

43:05New England Sport Center on one side and

43:07that big honking building on the other

43:08side is basically Salmon Pond Mall,

43:11>> but all that parking space could be made

43:13into a well fields that could then

43:16support going back. It's almost like a

43:18barbell effect, right? Exactly. You got

43:20one on one side and one on the other

43:22side feeding the middle. Um

43:24>> but

43:25>> yeah, you know, when it comes um you

43:28know, anything that could be done with

43:29New England Sports Center could be

43:31something of a um you know, restoration,

43:34low-income housing, all that as well.

43:36>> Great.

43:37>> Um

43:39so,

43:39>> thank you.

43:40>> Yeah, you're very welcome. Um

43:44any other questions at this point?

43:46>> Yes, Trey.

43:48>> Thank you, Mr. Chair. Just one quick

43:49question and I um was taking a look at

43:52that map that you'd referenced of the

43:53different um geothermal networks, the

43:55thermal energy networks, right? Um I

43:57found the the web link and um just

44:00looking I can't help but notice that

44:01there there are no other thermal energy

44:03networks currently in New England,

44:04right? A lot of them are district

44:06energy, which sounds like it's other

44:07renewables, correct me if I'm wrong, and

44:10then smaller geothermal networks. But

44:13you'd mentioned that Mass D has a grant

44:15for wastewater recovery specifically. Is

44:17there any such funding for like these uh

44:20the different borefield drilling sites,

44:22that sort of stuff? Because to me, it

44:23seems like what Framingham's doing is

44:25maybe a little bit more palatable,

44:27right? It's a lot smaller. I know

44:28they're still in, you know, in the in

44:30the pilot program. We're less than two

44:32years into the construction, but um or

44:35post construction, I should say, but is

44:37there any kind of funding for something

44:39like that rather than a full-scale

44:40thermal energy network?

44:42So, uh, you're asking is there any

44:45funding for just the bore holes part?

44:47>> Yeah, just because I think I think right

44:48I appreciate what we're talking about,

44:50but all of this would be a fullscale

44:52thermal energy network. It sounds like

44:54all all three of these sites that would

44:55be kind of the ad.

44:56>> And so, you're thinking more single

44:58building. I I'm not see I mean the map

45:01there's a few across the US like you

45:02referenced, but there's nothing in New

45:04England for this. We would be really

45:05kind of

45:06>> Oh, no. Smith Smith College has just

45:08finished it. Uh, Mount Holio did their

45:11entire has done is doing their entire

45:13campus uh um

45:15>> and that's a that's a thermal energy

45:17network. It's not to to me I got the

45:19impression that that was they're using

45:20existing renew renewables and stuff like

45:22that. No, they're they're doing a

45:23thermal

45:24>> they're doing uh bore holes. I think

45:26Mount Holio has a central plant so it's

45:29a slightly different model.

45:30>> Gotcha.

45:31>> Uh and they're doing it in three phases

45:33to interconnect. Okay. Uh I don't know

45:35as much about Smith College,

45:38>> but regardless, we're Yes, this would be

45:40cutting edge, but other people are kind

45:42of doing

45:42>> Yeah. more and and National Grid's also

45:44doing it in uh Dorchester. Um there are

45:47there are other installations in

45:48Massachusetts.

45:50>> Beverly is one as well. Just to add to

45:52your question about where's the money,

45:54um, this is not a done deal, but the

45:56current environmental bond bill that is

45:59going to be going to conference

46:00committee has $15 million for pretty

46:03much anything related to thermal energy

46:05networks,

46:06>> um, which could include, you know,

46:08grant. So, this would be it has to I

46:10it's $15 million grant. It's not a bond.

46:12So, if that makes it through

46:15>> the committee, we'll make sure you know

46:16about it so you can apply for some

46:18money.

46:19>> Thank you. Yeah. So, um, Mike, do you

46:22want to say anything?

46:23>> Thank you, Mr. Chair. Um, so the the

46:27cases you've cited are all like Smith

46:31College, Holio College, they're all the

46:35one user. the concept of putting one in

46:39Malro. I now got to convince people

46:42andor commercial folks to change their

46:46current heating system to a geothermal

46:49system. Right. So hang on. So solar as

46:54councelor Ducet has told me and finally

46:57after years going that way I don't have

47:00an electricity bill but that was a

47:02$30,000 investment on my part which I

47:06won't see the payback in for five years

47:08>> y

47:08>> to do that. So, h how do I convince

47:12residential users, commercial, the West

47:15Union one? I just sent you all the case

47:18study. There's only 12 individuals or 12

47:21buildings hooked up to that, but they're

47:23all in there downtown and I'm assuming

47:25the downtown

47:27gang flex some muscle to say, "Okay, we

47:29all want to participate." How how how do

47:32you how do I go to a resident and say

47:34your neighborhood we want to make sure

47:36you all go on to geothermal that that's

47:39that is not an easy ask

47:41>> it I totally agree and so one of the

47:43greatest things we're working on the

47:45biggest problems is how to pay for the

47:47building retrofits if we can do that I

47:50think uh from the Eversource Framingham

47:52installation every customer they

47:55contacted except for one said yes so

47:59long as the building retrofits were paid

48:01for because they were getting cooling

48:03because they were getting their improved

48:05indoor air quality because

48:07>> but that was an important thing you just

48:09glossed over as long as it was being

48:10paid for by who?

48:12>> Yes. So that's the the critical thing.

48:14So right now with the inflation

48:17reduction act there is part of the thing

48:20the way to get that is to own the heat

48:22pump. Uh and so it's possible that the

48:25whoever installs it, if they include the

48:28heat pumps, which is a large portion of

48:31the cost of the building retrofits, they

48:33get more credit. They get more of a tax

48:36write off. Um so there's and then also

48:39with a municipality which has the you

48:42know the mandate to do public good if

48:44you did either revenue bonds for this

48:48you could your cost of capital would be

48:50so much lower in comparison to a gas

48:54utility. You could still give people

48:56lower energy bills and uh make back that

49:00money and the only people paying for it

49:02would be the people connected to the

49:03system. So, so it's interesting this

49:05West Union case study, they the city

49:08doesn't own their their

49:11utility, if you will. They rent it.

49:14>> So, you know, this there's still some

49:16work to be done.

49:18>> Oh, crazy amounts. I do not want to Yes.

49:20That's why we have the team to be able

49:22to help to let you choose the ways

49:24forward.

49:25>> But I think you've raised the biggest

49:26issue there is. And I I want to add to

49:30that because basically, you know, there

49:32is the federal uh funding through the

49:35IR, you know, IRA tax credit. Um there

49:38is state grants to help with payment. I

49:41do believe that we should be as a city

49:43doing tiffs for these types of projects.

49:46So there's three buckets of money that

49:48we can help fund it. there is a return

49:50on investment which even if it's five

49:53years after five years you're in the

49:55gravy as far as savings goes at the end

49:58you know I would hope that you know

50:01based upon what I analysis I've done is

50:05that you know this if if we do well let

50:10me phrase it any thermal exchange

50:13network should be locking in a price

50:15point for heating and cooling for 10

50:17years the for for the 10 years, which is

50:20effectively covering the cost of the

50:21bonds. So, from the financial side, if

50:24we know what the bonds costs are and

50:26we're getting a customer base, that

50:28should actually be enough to cover the

50:30bonds as we go forward. And then after,

50:33you know, after the 10-year contract's

50:36over, you see where we are in 10 years

50:38as far as price point goes. And

50:40hopefully, we're lower than what they

50:41came in at the beginning of the 10 years

50:43because as long as we're undercutting

50:45fossil fuels, which should be pretty

50:47easy, uh we're showing cost savings and

50:50the businesses will you know will look

50:53at that. I mean Boston Scientific is

50:55looking to do this on his own because

50:56they see the savings you know

50:59>> Mr. Chair if I may.

51:00>> Yes sir.

51:01>> I was just looking at again today and

51:03thank you councelor Austin for sharing

51:05your article. Councelor Roby shared an

51:08article with us from the Boston Globe on

51:10June 15th. It was about geothermal

51:13energy and pretty much speaks to what

51:15councelor Det just said is after those

51:18years go by of cost then you're as you

51:20said in the gravy but I'd say in the hot

51:23water or cool water but um that's a very

51:26interesting article. It was on June 15th

51:28that Sarah shared it with us from

51:30councelor Roby. I would suggest going

51:32back to that article. It was excellent

51:33about it was in the globe and it was

51:35about geothermal energy. talks about one

51:38of the uh universities I think

51:40Smithfield in Massachusetts. It was a

51:42very interesting pros and cons but spoke

51:45to the longterm effects and I thought

51:47that'd be helpful for this committee to

51:50keep on file. Yeah.

51:51>> Thank you, Mr. Chair.

51:52>> I mean just as as far as solar panels

51:54goes, I had solar panels installed 10

51:57years ago. I own them, okay, which is an

52:00important part of this. Um and yeah, I

52:03paid them off in seven years. It was a

52:05seven sevenyear 0% loan almost like a

52:09car. But after that and you know I I

52:12have a contract for SREx for 20 years.

52:14So I am making money off my solar panels

52:17right now.

52:19>> The volatility of gas bills. Has anyone

52:21noticed other than me? I mean I think we

52:24paid $900 in January or something for my

52:27home gas bills. I can't imagine what a

52:29business is paying if I'm paying $900.

52:31So I feel like as you said relative to

52:34fossil fuel costs it's really

52:36>> as long as we show a price point that's

52:37lower than that and part of the

52:39feasibility study is basically proving

52:41in within the feasibility study they

52:43would that can be done at a price point

52:45that makes it competitive against fossil

52:46fuels. So that's the end result of the

52:48fossil feasibility study. Um

52:53so

52:54thank you for for this presentation. My

52:56question to uh members of the committee,

53:00do we want to take an action to do a

53:04feasibility study just on um waste heat

53:09wastewater energy recovery as a

53:10feasibility study and say yes, Trey?

53:14>> Thank you, Mr. Chair. I I guess I would

53:17I would encourage that we have the city

53:19go after this mass D grant funding for

53:22that wastewater recovery before kind of

53:24committing ourselves to any anything

53:26like that. I I wouldn't want to commit

53:28to a feasibility study without knowing

53:30what what funding we would have for it,

53:32right? Um, so I think, you know, it's

53:34encouraging to hear that there is, you

53:36know, grant funding out there for this

53:37kind of a project, but, um, I'm not

53:40sure. I don't know if Priscilla has kind

53:42of if you guys have talked about this

53:43before or um, if there's been an effort

53:45from the city to attain any of this

53:46funding. I'm not sure. I guess I

53:48>> not at this point. No, I was going to

53:50talk to Priscilla and, uh, Ted to come

53:53in and, uh, talk to us in the next

53:55meeting. So, um, but I think as, um, so

54:00just as far as the wastewater, uh, you

54:04know, uh, wastewater energy recovery,

54:06um, do you also agree in doing all those

54:09in favor and just getting a feasibility

54:11study just on wastewater recovery? Yes,

54:14sir.

54:15>> Mr. Chairman, you're not allowed to make

54:17a motion.

54:18>> Ah, do I Thank you very much for that

54:20correction. I appreciate that. So,

54:24go back to what you said at the

54:25beginning of the meeting. We need a

54:26couple one hour in. I'm not going to go

54:29commit funds or try to get funds for

54:30something I don't fully understand.

54:33>> My opinion. I'll let the committee

54:35decide what they want, but I'll tell you

54:36where I stand right now. There's still a

54:39little more work I think that's got to

54:40be done before I'm going to go commit

54:42any municipal resources to something

54:45that's not well understood yet. We only

54:48met for one hour. Mhm. Okay. Thank you.

54:53Okay.

54:55So,

54:56anyone interested in

54:59>> Yes.

54:59>> Uh Mark,

55:00>> thank you, Mr. Chair. I make a motion to

55:02explore the feasibil uh to explore

55:05funding sources for a feasibility study.

55:08>> Okay. For wastewater energy.

55:09>> Yes.

55:10>> Okay.

55:11>> Just to explore

55:13monies available for feas whether it's

55:15through our a conservation commissioner

55:18or through our DPW. Okay. Um,

55:21>> and utilizing black swan as well.

55:23>> Okay. Okay. Uh, I'll second that. All

55:27those in favor?

55:29>> Discussion.

55:30>> Oh, discussion first. Any discussion?

55:32Yes, Trey.

55:33>> Thank you, Mr. Chair. Just clarifying

55:35questions. Sorry. doesn't commit us to a

55:37feasibility study, but rather it kind of

55:39gives the intention that this this body

55:42would like to have folks come before us

55:43at our next meeting to address um you to

55:46kind of clarify some questions about

55:49>> what you know what the wastewater

55:51recovery feasibility study would look

55:52like and what funding sources there are

55:55for it,

55:55>> right? Which is which is different than

55:56the original proposal, which is why I'm

55:58asking for the vote, but yes.

56:00>> Sure.

56:00>> Yeah. Okay. Thank you. Sure. Okay. Um,

56:04okay then. All those in favor?

56:06Unanimous. All Okay. Um,

56:10okay. So, do you folks have anything

56:14else at this point? Are you

56:17>> I'm a teeny bit confused. What is your

56:19role in all this?

56:20>> We uh

56:22>> How do you get funding?

56:23>> We get funding from We get funding from

56:25foundations uh from the state, etc. to

56:29be able to help municipalities reduce

56:31their emissions and uh come up with

56:34practical solutions to provide people

56:36energy.

56:37>> Great. We're not paying for it. Welcome.

56:39>> Nope.

56:41>> Appreciate you guys showing up.

56:42>> Thank you so much.

56:43>> Yeah.

56:44>> Any question other should we

56:47>> stay nearby? But I think we're set for

56:49now. So

56:51>> thank you.

56:52>> Yeah, it's a good question too.

56:55>> Thank you.

56:55>> Okay. Um, so we we talked about having

57:00the next meeting in two weeks and I'll

57:02see if we can get uh Priscilla and Ted

57:04to show up, one or both if at all

57:06possible and talk about um a would be

57:10the best place to do wastewater energy

57:12recovery just because there is an open

57:14grant for that and then also talk about

57:17just doing the whole utility thing. So

57:20which you know the the conversation

57:23seems to be and even um

57:28was Eversource is doing Framingham?

57:30Eversource did Framingham.

57:31>> Yeah.

57:32>> They I heard someone describe it as

57:33saying they still don't know how to sell

57:35this stuff. So there's still lots of

57:37issues to be addressed.

57:39>> So So we'll have another meeting in two

57:42weeks. And yes sir.

57:45>> Make a motion to adjurnn.

57:47>> Motion seconded to adjurnn. All those in

57:48favor.

57:50Okay. We are adjourned at 5 8:05.

57:54Thank you very