2026-07-07 - Climate Resiliency Committee
Summary
Based on auto-generated captions with no speaker labels; speakers are identified only where the captions make it clear, and names and details may be misheard.
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| Geothermal Thermal Network | 56 | 97% |
| Other business | 2 | 3% |
- Tuesday, July 7, 2026, on order 26-1009726 (a communication from Councilor Ducette asking the city to investigate geothermal energy). Ducette chaired.
- Adjourned at a time captioned "8:05" (garbled).
- The one vote was unanimous.
Geothermal Thermal Network
0:02-51:03, 51:52-56:55
- Ducette opened with three slides: the series of meetings is meant to produce a proposal for a feasibility study, with meetings about every other week and different specialists each time.
- He floated a non-binding referendum on the 2027 ballot, a search for funding so the city does not carry the study cost, and using AI both to draft a feasibility-study proposal and to analyze Marlborough geology for well locations.
- Audrey Schulman, executive director of Black Swan Lab (funded by the Barr Foundation, apparently), presented on thermal networks: heat pumps drawing from ground loops, wastewater or waste heat, with Eversource's Framingham pilot as the first gas-utility installation.
- Claimed benefits: lower electric peaks and future bills (an E3 study assumed 22% of New England homes and 49% of businesses on thermal networks by 2050), cooling and hot water as well as heat, and modular growth.
- Ownership options: a for-profit gas utility, or the municipality as a nonprofit utility (examples cited were Denver, Boise, West Union, Ann Arbor). A federal tax credit of 30 to 50% of installation cost was described as a direct-pay grant, said to run to 2033 (speakers disagreed between 2033 and 2035).
- Marlborough sites she pointed to: one of the two wastewater treatment plants (about 3.5 million gallons per day, enough for roughly 300 homes); the New England Sports Center (12 rinks, about 50 homes per rink, so roughly 600 homes; its HVAC may be old); and Boston Scientific, which has reportedly expressed interest in geothermal and would need bore holes. A west-side site was requested by a councilor and the other plant was not examined.
- A state DEP wastewater energy recovery grant is first-come, about $5 million total, never offered before, and Black Swan said sooner is better. It can also use a sewer interceptor, and it prioritizes underserved communities. The feasibility phase was cited as about $15,000.
- Black Swan offered to help with grants, technical, legal and financing questions, and said it is already doing the same for South Hadley.
- Questions from councilors:
- Capped landfill: bore holes through the cap are a bad idea; uncapped parking areas near it might work.
- Conservation land and state land would raise stewardship and Article 97 questions; Conservation officer Priscilla Ryder and Ted (apparently from DPW) are to be invited.
- Street disruption is similar to gas main replacement, so utility work could be coordinated. A Black Swan colleague (first name Karen) said gas utilities can use "non-pipeline alternatives" instead of replacing pipes, a legal point still contested at the State House.
- Reliability: a shared backup heat source is typical (a Colorado Mesa University system has never used its gas boiler in 15 years), but a main break would affect everyone on that loop.
- Cost of conversion: a councilor (apparently Mike, likely Council President Ossing) asked how to persuade owners to retrofit. Black Swan said Framingham customers all agreed except one provided retrofits were paid for; owning the heat pumps earns a larger tax credit, and municipal revenue bonds borrow cheaply.
- Other New England examples named: Smith College, Mount Holyoke, National Grid in Dorchester, Beverly. A $15 million thermal-network grant is in the state environmental bond bill headed to conference committee (not certain).
- Ducette wants the city to consider TIFs, the tax credit and state grants as three funding sources, and said a thermal network should lock in heating and cooling prices (he said 10 years) that cover the bond costs. He said Boston Scientific is looking at this on its own.
- A member (addressed as Trey) said he would not commit to a feasibility study without knowing the funding, and a member who may be Mike said he would not commit municipal resources to something not yet well understood after one hour.
- Vote: a motion (mover captioned "Mark") to explore funding sources for a wastewater-energy feasibility study, through the Conservation Commission or DPW and with Black Swan, passed unanimously. Members stressed it commits the city to no study, only to bring staff in at the next meeting.
Other business
51:03-51:52, 56:55-57:54
- Next meeting set for Tuesday, July 21 at 7 p.m. (the council meets July 20). Ducette hopes to bring Conservation officer Priscilla Ryder and Ted from DPW, and to discuss the wastewater grant and the broader utility question.
- A councilor noted a June 15 Boston Globe article on geothermal energy, shared by Councilor Robey, for the committee file.
Sources
Video
Transcript
Auto-generated YouTube captions; names and terms are likely misheard.
Transcript
0:02This is a meeting of the climate
0:04resiliency committee to cover order
0:06number 26-10009726.
0:11Uh communication from council Dave Ducet
0:13regarding requests for the city to
0:14investigate geothermal energy. Uh
0:17there's some handouts and there's some
0:18stuff that's also been posted on the
0:20website. Uh there's some updates that
0:22need to be done for the data on the
0:24website that'll show up in the next uh
0:26council meeting. Um
0:30but uh what I wanted to do really is
0:33just go through some uh general ground
0:36loose issues for now. Uh I'm doing this
0:40through PowerPoint because basically
0:43uh I organized my own notes in
0:45PowerPoint so it made it easier to do
0:46that. Um so the goal of the the series
0:50of meetings is to develop proposal for a
0:52feasibility study. Uh I expect multiple
0:55meetings um with different speakers and
0:57specialists based upon who shows up and
0:59what we need. Um but the structure of
1:02the meeting we get the agenda we have
1:03new business old business prove the
1:06minutes all that this is an ongoing
1:08series of meetings. Um and if Mike
1:12correct me if I'm wrong if this is not
1:14the appropriate approach. So um but uh
1:18you know the assumption is basically
1:19that we will have multiple meetings with
1:21different speakers uh specialists uh
1:24probably plan a few meetings ahead. I'd
1:26like to try to do meetings every other
1:27week or so and try to get things paced
1:30that way. Um and I think the uh
1:33fundamental assumption here is that
1:34basically the cost of getting energy to
1:37us is cheaper than the energy itself.
1:38And we got to start developing our own
1:40local energy and fossil fuels seems to
1:42be a likely oh sorry uh thermal exchange
1:45networks would be a likely candidate for
1:48us to uh heat and cool our homes. So
1:52hold on.
1:54Um, for today's blue knit, uh, new
1:56business, uh, Black Swan Lab will be
1:59doing a presentation when they show up.
2:01Um, there's other actions I've been
2:03discussing, but hadn't put it into the
2:06draft of the editorial, but having the
2:08non-binding referendum in 2027
2:11ballot and getting that in place to get
2:14the view of the people of the city of
2:16whether or not they want to do something
2:17like this. um and basically you know the
2:20infamous search for funding uh for the
2:23feasibility study etc. So we don't have
2:25to cover a lot of the cost. Um the use
2:29of AI, I've been toying with AI just
2:32doing research with this and I found it
2:34very effective and to if if there's a
2:38structure for a feas proposal for a
2:40feasibility study. You could feed it
2:42into AI and it'll give you the first
2:45draft. I'm not saying it's the final
2:47draft, but it will give you a first
2:48draft that you can then walk through,
2:50edit, and change as necessary. Um and uh
2:54the other part of AI is actually just to
2:57if we can capture geological data of
2:59Malber, feed it into an AI model and ask
3:02them where to drill the wells. So um
3:05there's opportunities with the
3:07technology I think we need to be keeping
3:09an eye on. Um
3:12Oops.
3:14And that's basically the three slides
3:16that I had. Um, you know, when we get
3:20the minutes, we'll go through that in
3:21the next for the next meeting. Um, for
3:24the three of us, are we comfortable
3:26having a meeting in like two weeks? Two
3:28weeks from Tuesday, two weeks from
3:30today.
3:32Are you
3:33guys available for that?
3:42That'd be the 21st.
3:47Yeah,
3:52>> I'm good.
3:53>> You get both of you guys. So, I'm
3:55getting confirmation.
3:56>> We have the council meeting on the 20th.
3:58>> On the 20th. That's fine.
3:59>> Yep.
3:59>> Yeah.
4:01>> Mr. Chair.
4:02>> Yes.
4:03>> Thank Thank you, Mr. Chair. Yeah. I I
4:04mean, I can confirm I would be available
4:06in the evening of the 21st. I think
4:07just, you know, so long as we know kind
4:10of who's coming, who's presenting, what
4:11Yeah. Right. All that sort of stuff
4:12ahead of time, I would be comfortable
4:14with that.
4:14>> Yep.
4:15>> Yep. 7 p.m.
4:16>> Uh 7. We'll do 7 p.m. Yep.
4:22>> Dave, you're here.
4:24>> You are here. Excellent.
4:41>> Yeah.
4:45just planning the next meeting after
4:47this one. We're meeting in two weeks
4:48again. So for folks online, uh the folks
4:53in Black Swan Labs just showed up. So um
4:57do you want to start with the
4:59presentation now? You good? Okay, let me
5:01switch controls for a minute.
5:21slideshow up there.
5:29>> Slideshow up on the top.
5:37I guess
5:39there's the remote such a sense of
5:40power. Um,
5:42>> you can stand there with the mic.
5:44>> Okay, awesome. Thank you so much. Um,
5:48hey, uh, pleased to talk to you all.
5:50Thank you so much for the the honor of
5:52being here. Um, I'm Audrey Schulman. Uh,
5:54I'm the executive director at Black Swan
5:56Lab. Uh, we do practical solutions uh to
6:01solve, you know, to reduce climate
6:03change. Um, and we're funded by the Bar
6:06Foundation.
6:08Cool. Um, so I don't know if you've
6:10heard of thermal networks, but the uh
6:12I'll explain what they are in a second,
6:14but they um the very first one installed
6:17ever in the world by gas utility is uh
6:20installed in Framingham. Um and
6:24uh it is uh it's quite exciting and I
6:29was lucky enough to be one of the major
6:30people to to help ha make it happen.
6:34Um, no.
6:38Okay, good. Um, this is a thermal
6:42network. Uh, to give you a better idea
6:44what it is, it is uh heat pumps. If you
6:47know what heat pumps are, they're
6:49basically like air conditioners that can
6:51run forward or backward. So, they
6:53provide heating and cooling. But instead
6:56of pulling that temperature from the air
6:58outside, which as you can imagine is
7:01very volatile in temperature, they pull
7:04temperature from pipes under the ground
7:07where it's way easier to control that
7:10the temperature of the water. So the
7:11heat pumps connected can always work at
7:14their greatest efficiency. And so
7:16because of that, they are very very
7:18efficient. Um
7:23there. No,
7:26there we go. So they can p they get that
7:29temperature of the water which is just
7:32not over not hot, not cold. It's in an
7:35ambient temperature range between like
7:3740 and 90°. So it's just keeping it sort
7:41of you know it would be cold almost to
7:43your touch uh by running the water
7:46either through bore holes in this case
7:51or getting that temperature from
7:53wastewater.
7:55Um this is an installation going in in
7:57Syracuse that will be owned by National
8:00Grid and the city the county in Syracuse
8:03I think will be selling the wastewater
8:06temperature to National Grid.
8:09um and or that you can get that thermal
8:12energy from uh waste heat such as from
8:16an ice rink. So an ice rink you can
8:19imagine is always pulling wants lots and
8:21lots of cold so it would return the
8:24water into the that that pipe hotter and
8:28that heat can then go to homes down the
8:30street. Every ice rink produces enough
8:35temperature to heat 50 homes.
8:39Yeah,
8:41it's a shame to waste.
8:42>> We get 12 ranks in Marboro.
8:44>> Exactly.
8:45>> That doesn't count the name.
8:47>> Um, so you've you've got a lot of this
8:51right here. Um, so thermal networks are
8:54being installed uh everywhere across the
8:57continent. In Europe, they're installing
9:00systems of 10,000 units at a time.
9:04Uh, so they're they can go very large.
9:09Um there's some of them sorry for the
9:12>> quick question on the other uh go back a
9:14minute.
9:15>> Um what's the definite why are there
9:17different colors? Is there
9:18>> some of them are owned by utility you
9:20know there uh you can go to that link
9:22it's building decarbonization coalition
9:24okay
9:25>> and look I think some of them are owned
9:26by utilities some of them are owned by
9:28universities some of them are wastewater
9:30some of them are waste heat some of them
9:32are you know so it's different types of
9:34uh thermal networks
9:38um so one of the things they can do is
9:40radically reduce because they're so
9:42efficient our electric peaks as we move
9:45more and more towards electricity
9:48for everything. Um, so this is ISO New
9:51England's prediction of how much
9:53electricity New England will need in the
9:55future. Um, and on the left, how much
10:00that might cost to increase our
10:02transmission that much. So 25 billion at
10:05the top. So the more we can bring that
10:08peak down,
10:10the lower our electric bills will be.
10:12And that's just transmission.
10:14It's going to be much more also to do
10:16distribution system.
10:18So, uh here's Oh, wait. I gotta get
10:22hold. Okay, there we go. Here's uh a
10:26estimate on how much thermal networks
10:28can save. Each of these lines, each of
10:31these are are pathways towards that
10:34electrification towards all of our
10:36buildings using only electricity,
10:39different methods using airsource heat
10:41pumps, etc. And thermal networks have
10:45the lowest peak use and so they can save
10:48us an enormous amount not only in
10:50transmission but also in distribution
10:52system and all of that all of us get get
10:55you know electric customers we're the
10:57ones who pay. So what this means is
10:59thermal networks can reduce how much our
11:02electric bills rise in the future which
11:05Lord knows everybody would be happy
11:08about after last winter. So in back up a
11:13so in this one in particular um what is
11:16the ramp up of thermal networks in doing
11:19that on the existing customer base I
11:22mean what's your buildout assumption to
11:24make
11:25>> so that's by 2050 this is for New
11:27England this is done by E3 which is you
11:29know and they were assuming uh I think
11:3122% of homes would go to thermal
11:34networks and 49% of businesses
11:38>> 22% of homes
11:40and 49% of businesses.
11:43Um, and so that is, you know, but any
11:47thermal network, each thermal network
11:49will reduce your electric peak in
11:51comparison.
11:52>> Oh, absolutely.
11:53>> To airsource heat pumps, etc. Anybody
11:56have airsource heat pumps here?
11:59>> Um, I I do too. They're they're uh great
12:03and this is better.
12:06Um so your thermal energy bills uh they
12:10will be so this is with gas furnace.
12:12This is by applied economics clinic. Uh
12:15the next one is uh the your annual
12:19heating bill uh for the average
12:21Massachusetts home with thermal network
12:24using the heat pump rate that we
12:25currently have. But we're probably
12:28moving to a version two of the heat pump
12:30rate. And so the thermal network charge
12:33annual heating charge would be even
12:35lower.
12:38So uh that is if it was if it's done
12:40this is a prediction by applied
12:41economics clinic if it's done by a gas
12:44utility and that's a for-profit gas
12:47utility. But you've got another option
12:49open
12:50which is uh you could have them
12:53installed by your municipality which is
12:55nonprofit,
12:57right? You don't need to pay back the
12:59investors. Denver is doing it uh is
13:03installing thermal networks now. They're
13:06going to do so with wastewater as well
13:07as with bore holes. Boise, Idaho has a
13:10system that's been functioning since the
13:1270s, I think maybe the 80s. Uh, West
13:15Union has had one for 20 years. Uh, and
13:18Ann Arbor, Michigan is currently
13:21installing one. So, this is an option
13:24available to you. And that would reduce
13:28the am costs for all of your residents
13:31in comparison to a for-profit
13:34utility doing it. But for-profit
13:37utilities are always an option. Yes. So
13:40I know one of these and I forget which
13:42one it was um might have been the West
13:44the ones that's been been there for a
13:45while. It seems that in these cases,
13:48some of the older networks, are they
13:51continu are they expanding the network
13:52or is it staying the way it is
13:54>> because it seems that they don't seem to
13:57expand much.
13:58>> And uh Karen's here too and so she'll
14:00correct me if I get any of this wrong
14:01and she can look stuff up as we talk.
14:03But I believe uh Boise if I remember
14:06correctly is expanding and uh and West
14:10Union has been bringing more not
14:12expanding the loop if I remember
14:13correctly but has been adding more
14:15customers to it and the more they do
14:17that the lower cost it is for each
14:19customer
14:20>> because you've already installed the
14:22system and so this the customers are
14:25paying back for the installation and the
14:28operations and maintenance. So, the more
14:29you have on the system.
14:31>> So, the town does the I was just going
14:32to ask that does the operation and
14:34maintenance of the system as well.
14:36>> Yeah. In uh West Union, I think they
14:38have a nonprofit uh that they
14:40subcontract to to do that. Um or
14:43for-profit, I think it's for-profit or
14:45they call it a for-profit and it doesn't
14:47seem to make much profit. Um and uh
14:49Boise, I think they they have the city
14:52do it and you know, we can put you in
14:54contact with the you know, either one if
14:57you want. Uh and Ann Arbor is is just
15:00installing now and it's using a
15:02Department of Energy grant.
15:04>> Okay.
15:05>> Um
15:05>> a number of cities nearby that have uh
15:08utilities. The city, the municipality
15:10runs this the utilities.
15:11>> Yes. Yeah. I mean, and you run your
15:13water and your sewer, I assume. So, and
15:16it would be very similar to that. Um,
15:19and if you do it, you're not gonna uh
15:24you it'll be much you won't change the
15:28energy the thermal bill much as opposed
15:30to for-profit utilities potentially.
15:33Um, so there's a lot of Massachusetts
15:36municipalities who are interested in
15:38thermal networks. Um, and that's partly
15:41because the tax credit exists still, not
15:45for solar, not for renewable, but it
15:47does for for thermal networks on bore
15:49holes. Um, and so these are all the
15:52feasibility studies of different
15:53Massachusetts towns
15:56uh who want uh to do to go to thermal
15:59networks. Um, and that IRA tax credit is
16:0430 to 50% of the cost. So that's a chunk
16:09of of potential savings right now.
16:12>> So the 30 to 50% is taken over for how
16:16many years?
16:18>> Uh it's just the cost of the
16:20installation.
16:21>> So if you spent $10 million, you would
16:23get $5 million back up to $5 million
16:26back.
16:26>> Right. But how many years does it take
16:27to depreciate? I went through all this
16:29when I had my solar panels installed.
16:31>> Oh.
16:31>> I got threeear depreciation schedule for
16:33the solar panels. Uh, so depreciation.
16:37>> I'm not sure I'm going to get the
16:38depreciation right. Um, but as I
16:40understand it, it's a direct pay at the
16:42so it never leaves the municipality's
16:44pocket.
16:45>> So, so it's not depreciation. It's like
16:49just
16:50>> it's a grant
16:51>> basically. Yeah.
16:52>> Okay,
16:53>> Mr. Chair.
16:54>> Yes.
16:55>> A quick clarification.
16:55>> Oh, sure.
16:56>> Thank you. Um, what is the how long is
16:59that funded through?
17:00>> I think it's 2035.
17:03It's 33.
17:04>> 33. Okay.
17:05>> Thank you.
17:06>> We're gonna have the the person in the
17:07back will correct me each time I'm
17:09wrong.
17:09>> That's great. Thank you.
17:12>> Um,
17:13so in Marboro,
17:17you got two wastewater treatment plants,
17:19not one, but two. Um, and you've got the
17:23largest ice rink in North America.
17:26Uh, and you've got the ground
17:29everywhere. So, you've got three really
17:31great options to get that thermal energy
17:34from. Um, and so let's look at them a
17:37little more closely. Uh, right now, you
17:40know, here's one of your wastewater
17:42treatment plants up in the corner there.
17:45Uh, and you can see there's a lot of
17:47buildings nearby.
17:49U, most of them are commercial. You've
17:51got, if I remember correctly, about 3.5
17:54million gallons per day through that
17:56wastewater treatment plant. So that
17:58means uh you have enough for about you
18:00know approximately 300 homes which is
18:04probably several of those large
18:05commercial buildings.
18:07Um
18:08>> 300 homes will get my neighborhood right
18:10down in the bottom.
18:12>> Yeah, there you go. You just have to get
18:14the pipe there. Um, right now there's a
18:18Department of Environmental Protection
18:19grant to do both the feasibility study,
18:23the design and the installation
18:26of that wastewater energy recovery
18:28system. So, that's just the the thermal
18:32source. You'd still have to install the
18:35distribution system and there'd still be
18:36the building conversions.
18:39>> Um, uh, and that D grant is a rolling
18:44grant. they've got only $5 million. So
18:48once that's used up, that goes. You
18:50can't you can't that offer is not there
18:51anymore. So I recommend you look at that
18:55first.
18:57Um
18:58>> is it a rolling grant period or does it
19:00refresh every year?
19:02>> It's uh just the first time they've ever
19:03offered it. I don't think, you know,
19:05they don't think they have plans to
19:06offer it again.
19:07>> Okay.
19:10>> Uh here's the New England Sports Center.
19:13You got a lot of homes across the
19:15highway. Uh that's again because you got
19:1812 ice rinks there. In my rough
19:20figuring, you've got enough to heat 600
19:23homes because it's 50 homes
19:26approximately per ice rink.
19:30So there's a lot of homes. Or you could
19:33do on this side,
19:34>> but they are for profit. They would have
19:37obviously need to get their permission
19:39to
19:39>> Oh, yeah.
19:40>> They would make money off of this. Yes,
19:42they could get revenue from it. And I
19:44looked up on the web and you know, Lord
19:46knows if it's right, but it looks like
19:48one of their HVAC units might be uh
19:50fairly old.
19:53>> So that might be a time that they might
19:55be very interested in replacing it
19:59and moving to the system where they're
20:01selling their heat.
20:04>> Mr. Chair,
20:05>> yes, thank you. uh what is the forgive
20:08my ignorance on a heat pump and how
20:10these networks um work but what is the
20:13capacity what's the distance for
20:15something like this to
20:16>> be functional right you point up to
20:19those homes and to the commercial but
20:20how far
20:22>> uh so um the the Framingham installation
20:26is a onem loop approximately uh there's
20:29other installations that are bigger the
20:31frame you know there you want to if
20:34generally you want to have some thermal
20:36source uh every
20:40you know half mile something like that
20:41so you can bring things back to
20:43temperature if you need to.
20:44>> Okay, thanks.
20:45>> Um
20:49>> yes, they're they're modular so you can
20:51install one and then grow over time.
20:53They're like Lego blocks
20:55>> even though each block is a well that's
20:573 to 600 feet deep,
20:59>> right?
21:00>> Uh yes, if you do bore holes, they're
21:02they're 300 to 600 feet deep,
21:05>> right? or or if you're able to tap into
21:07um a sewer tap or something like that,
21:09>> right? There could be a sewer
21:10interceptor in there too,
21:13etc.
21:14>> So, one of the things that we talked
21:16about is that the network itself because
21:19it's all under the frost line, the
21:21network actually provides a thermal uh
21:24register as well. So, as it if it
21:28travels further, it's still in ground
21:30temperature. So the, you know, if it
21:33comes back warm and if it travels half a
21:36mile to a well, it may actually be at
21:38ground temperature before it gets to its
21:40destination because of the length of the
21:42pipes, it's still underground. So
21:44>> yeah.
21:45>> Do you mind speak to the thermal battery
21:46aspect of it?
21:47>> Yeah. And it's
21:48>> You want to come up to the mic and
21:49speak?
21:52>> Okay.
21:53>> Um, so one of the things is the water
21:56itself has an enormous amount of thermal
21:58storage in it, right? if you if that
22:00water there's a an installation at
22:02Colorado Mesa University with over
22:04100,000 gallons of water in that loop
22:07that's over a mile long. And so if that
22:10water of 100,000 gallons uh in that big
22:14pipe running around the system is at 90°
22:19um that's an enormous
22:21battery thermal battery that you can
22:23pull the temperature off at any time.
22:26It's it's equivalent to many many you
22:28know therms of gas and I could go I
22:32don't have the numbers off the top of my
22:33head but you can just it's a giant
22:34battery.
22:36>> Um and if you did it to the to those uh
22:39businesses instead each of them use
22:41energy in a very different way. So one
22:44of them would to be taking heating and
22:46making the water colder. The next one
22:48would be taking cold maybe and making
22:51the water, you know, like it they would
22:53go back and forth and you'd get
22:54simultaneous load cancellation also,
22:57right? That ice rink to the homes kind
22:59of concept.
23:01Um, uh, and here's Boston Scientific,
23:05which uh I believe uh Dave, you've
23:09talked to them or something and they
23:10might
23:10>> someone talked to them and they
23:11expressed interest in putting geothermal
23:13in. Yes.
23:14>> So they they might do bore holes.
23:16There's a lot of buildings around them.
23:18There's some schools
23:20etc. And that way they might take on the
23:23cost of doing the bore holes and you
23:25just do the distribution system or you
23:28choose your utility to do the
23:30distribution system.
23:32Um,
23:33>> so this could be something that say
23:34could go to the hospital, which is the
23:36emergency department at UMass, or it
23:38could go to the high school and the uh
23:42um the the elementary school uh good now
23:46brothers up in front.
23:47>> Yeah, you're missing the dental care
23:49place in the corner. Um yes,
23:52>> you could you could do it many different
23:53ways.
23:54>> Yeah.
23:54>> Um and this would be, you know, you'd
23:57want to do uh an engineering study to
24:00try to figure this out.
24:02Um, but if there's a lot of different
24:04ways forward here, I would talk to
24:06Boston Scientific, check and make sure
24:09they're interested in this concept and
24:11then potentially do a feasibility study.
24:14I would go to New England Sports Center
24:16and ask like, "Hey, is your HVAC gold?
24:18Do you want revenue?"
24:20>> Um, and I would uh fill out the
24:23Massachusetts D grant for wastewater
24:25energy recovery. We will help you. We're
24:28already doing that with uh for South
24:30Hadley and uh potentially for you know
24:34we we'll find out but maybe for for
24:36other towns. Um so we are happy to do
24:39that
24:40>> Mr. Chair.
24:41>> Yes.
24:41>> In the area of Boston Scientific we have
24:44a capped landfill as well as an ice
24:47skating rink right across the street.
24:49>> Really?
24:49>> Yes. It's a Naven rink. It's one rink,
24:52but um council n
24:54>> that right that
24:55>> curious on this athletic field
24:58>> that right building right next to it.
24:59>> No way there.
25:00>> Yeah.
25:01>> You're just curious on capped landfills.
25:04Can they be utilized in any way for this
25:07type of energy?
25:08>> I would think uh you'd have to go
25:11through uh so you probably don't want to
25:13do bore holes on the capped land because
25:15you don't want to go through the cap and
25:17break it. Um, and
25:20>> no, I don't.
25:21>> Is all of that cap land? The parking
25:24lot, the
25:27>> parking lots possibly.
25:29>> Yeah,
25:29>> those areas
25:31the right.
25:33>> All of that is kept. Okay.
25:35>> Just curious.
25:36>> I'm not an engineer, but I assume that
25:38that might be a difficult that might be
25:40a problem.
25:40>> Just the edges maybe or the parking lots
25:42you were saying for the cap landfill. If
25:45there's parking lots there and that
25:47aren't capped,
25:48>> yeah, then I then I would assume you
25:49would not want the bore holes anywhere
25:51in the capped land. However, for our
25:52understanding,
25:52>> uncapped land should be fine.
25:54>> Yeah.
25:54>> Good.
25:55>> I was talking with Priscilla Ryder. You
25:56said that, you know, and we have to get
25:59Priscilla Ryder and probably um uh Ted
26:04from DPW up in here because, you know,
26:07can we drill in conservation land? And
26:11is, you know, if if we're doing just a
26:13thermal capture, is that considered
26:14stewardship of conservation land?
26:17Because it's a very minor, you know,
26:19insignificant impact. Uh but there's a
26:22whole bunch of conservation land around
26:24here and other places that we could tap
26:26into.
26:27>> Yeah, I think if it's under if it's
26:29state land, then you have to do article
26:3097 if I remember correctly. And so uh
26:33they the uh EA at you know the
26:37governor's office might want to make
26:38that process simpler. So if you want to
26:41go to them to ask for a simpler process,
26:44that would probably be helpful for you
26:45and others.
26:47>> Thank you.
26:48>> Okay. Yes, Trey.
26:51>> Thank you, Mr. Chair. Just a a quick
26:53question. So, looking at these three
26:55sites, right, the the wastewater
26:56treatment plant, the New England Sports
26:58Center, and Boston Scientific. I can
27:00understand that with the wastewater
27:01treatment plant, we're we're using the
27:02actual wastewater itself. Um we wouldn't
27:05be drilling bore fields there in theory,
27:08right? And and same is true for the
27:10sports center and Boston Scientific.
27:12Yeah. Right. Yes.
27:12>> So, how how are we
27:13>> Boston Scientific would be drill holes,
27:15bore holes.
27:16>> Okay. Okay. Okay. But
27:17>> but the other two would not be.
27:19>> I guess my question is how are we
27:21capturing the the waste heat from these
27:23sites? I mean this I'm just unfamiliar.
27:26>> No, it's it's a totally confusing
27:28concept. So waste water has temperature
27:30to it. All those warm showers all you
27:33know it
27:34>> fermenting stuff.
27:37>> It's it's generally between 60 and 90
27:39degrees. Sure. which is the kind of
27:41temperature that heat pumps are very
27:43happy and they work very efficiently
27:45with to provide you the temperature you
27:47want in your house whether heating or
27:49cooling.
27:50>> Uh and uh with ice rinks you would only
27:53be able to provide heating because you'd
27:56be taking the ice rink would take all
27:58the cold off the water and all the homes
28:00would get all the the heat or any
28:02businesses.
28:04>> Thank Yeah know that helps a lot. Thank
28:06you. And the the bedrock you get
28:09temperature because it's in this area
28:10it's about 55 degrees all the time which
28:12again is a temperature range that makes
28:14heat pumps happen.
28:15>> Sure. And that's what Ever Source is
28:17doing in Framingham. Those are three
28:18bore fields that they drilled on Sounds
28:21like municipal property. Um Yes.
28:23>> Right. To then heat that small
28:25neighborhood.
28:25>> Yeah.
28:26>> Gotcha. Thank you. Thank you.
28:29>> Um so uh here's some uh press for
28:33different thermal networks. Um here's uh
28:37the Black Swan Lab team that we have.
28:40We're available, you know, we got the
28:41center of public enterprise who tries to
28:43figure out how public money can help uh
28:46econ, you know, economic uh everything.
28:50Um we got thermal energy insights, Eric
28:52Bosworth, who installed the Eversource
28:56Framingham thermal network and now he's
28:58on his own. Um and Lord knows what
29:02happened to all the formatting on this.
29:04And then uh we got uh Jamie von Nostrin
29:06who uh was the department of public
29:09utilities chair last year in
29:12Massachusetts and now is at the future
29:14of heat initiative. And uh so we are
29:16ready to help out with uh econom you
29:19know economic and financial questions uh
29:22with technical questions with
29:24legislative and regulatory questions and
29:26with who owns what how.
29:30Um and uh so if you're interested,
29:33please just, you know, any more
29:35questions, we're happy to help. We will
29:37help you do grants. We will help you do,
29:39you know, take whatever steps you want
29:41forward on this issue because I think
29:43Marorrow can lead on this.
29:45>> So,
29:45>> and we would love to help. Um, so go
29:49back to the three bullets of next steps
29:52type thing that um,
29:56you know, New England sport, reach out
29:57to New England Sports Center, reach out
29:58to Boston Scientific, that that's ours
30:01to do. Um, but, um, the D grant for
30:06wastewater energy recovery,
30:08>> you said you could do that. we would
30:10need uh numbers from your you know
30:14>> D sorry uh DPW
30:16>> DPW okay
30:18>> um and it wouldn't so if we do this
30:22quickly we could get a basically the
30:25grant for free
30:26>> potentially. Yeah. Sooner is better,
30:29right?
30:29>> Sooner is better. Uh the other thing to
30:31know about and uh the other thing to
30:33know is well two things to know. One you
30:36they prioritize underserved communities.
30:38So if you can get any affordable housing
30:41uh or you know have it in any
30:43environmental justice area, it's better.
30:45And the second thing to know about that
30:47grant uh is that um the you can also use
30:51a sewer interceptor. So it does not have
30:53to be at the treatment plants.
30:55>> Okay. Um,
30:56>> it could be a made what I understand is
30:58basically you drop a hose a hose loop
31:02into a sewer pipe that can be as long as
31:04it needs to be because it's just a sewer
31:06pipe and that's how you capture the
31:07thermal energy, right?
31:09>> I I think it might be a little more
31:10complex than that, but we could go, you
31:11know, you uh you basic you you put a
31:14heat exchanger in the pipe potentially
31:17or you pull the waste water out into
31:19another compound.
31:20>> Okay.
31:20>> Yeah.
31:21>> Okay. But Okay. Yes, sir.
31:24>> Mr. too. Um, and these seem to me make
31:28great sense to me.
31:29>> Oh, great.
31:30>> As everyone else, I suspect. However,
31:32uh, they're all on the north and east
31:34side of Marbor.
31:36>> There's not much on the west side of
31:37Marbor where we're having a lot of
31:39development these days. And we have some
31:41Fortune 500 companies on that side. Does
31:43it not make sense to not put all of our
31:46baskets in the all of our apples in the
31:48Boston scientific basket and open it up
31:50to other industries here in town? Uh, so
31:54I I recommend always exploring as many
31:56options as possible to figure out which
31:58one works best. Um, and if you want
32:01things on the west side of town, I think
32:03you have another treatment plant on that
32:04side. I I did not look at that one. I
32:07just, you know, so we we could look at
32:08that one instead.
32:09>> Would a feasibility study tell us the
32:12best
32:13path forward?
32:15uh uh yes potent you know and it depends
32:18you know feasibility studies uh would
32:20cost some money uh unless you did it
32:22through you know the D wastewater energy
32:25recovery grant so I mean and that's only
32:28for $15,000 so I just want to um so the
32:32bigger the feasibility study the more
32:34money the town might have to pay but it
32:37might be well worth it
32:39>> thank you thank you Mr. Chair
32:40>> Sure Mr. Yes.
32:43>> I'm curious about the end pro end side
32:45of it and that's how much disturbance in
32:48the streets would have to happen to pipe
32:50this to each individual house such as my
32:53neighborhood. They're going to be
32:54replacing gas lines. Wouldn't this be
32:56the appropriate time maybe to put in
32:59these pipes for future heat from these
33:03thermal energy units. But curious how
33:06that works and how big is the pipe? How
33:08much disturbance in the street? That
33:10type of situation. It's it's very
33:12similar to uh a gas pipe replacement
33:15what you're you know what you'll be
33:17going through it will be very similar if
33:19they if you had to drill bore holes that
33:21would be a different thing uh but that
33:23would generally be away from the house
33:25and in a parking lot nearby. Um so you
33:29know it's it's a it's a pipe maybe a
33:31little bit bigger than a gas pipe and
33:33instead of one service pipe going to
33:35your house you'd have a service loop a
33:36pipe going to your home and then coming
33:39one coming back. Um, and other than
33:41that, uh, it's about the same.
33:44And, uh, yes, of course, it's a great
33:46time to install.
33:47>> Well, that's why I was going to say, in
33:48other cities and towns like Denver or
33:51wherever you mentioned, Boise and so
33:53forth, have they utilized piping to the
33:57homes with other utilities when they
33:59were putting in their utilities, or is
34:01this something they had to put in
34:02themselves?
34:03>> Uh, the uh,
34:05>> just thinking of tearing up the streets
34:06more than once.
34:07>> Yeah. Gosh, who you never want to,
34:09right? limited chapter 90 funding, isn't
34:11it?
34:12>> Um, yeah. So, you always want to do uh
34:15do as many utilities, underground
34:17utilities as you possibly can. Uh, and
34:20Worcester has a cooperative uh paving
34:23program. I don't know if you've ever
34:24heard of it, where they have all the
34:26underground utilities tell them where
34:28they want to work over the next five
34:30years, and then they sequence them
34:32together.
34:33uh and it's allows the paving dollars to
34:36go uh you know 60% further. So I
34:41recommend you consider that. And Karen,
34:43you wanted to add
34:45>> just to say you could ask your gas
34:48utility what their plans are for the
34:50next four years and see where they are
34:52going to be planning to replace pipes
34:54because the electricity utilities have
34:58the option of putting money to what they
35:00call a nonpeline replacement which would
35:03be exactly this if they choose to rather
35:05than the millions of dollars per mile to
35:08replace the pipe. Um there are pros and
35:10cons of working with utilities as they
35:12know, but it certainly is another avenue
35:15to explor.
35:16>> Yes,
35:18>> you can see if there's overlap on any of
35:20these maps and Audrey has described
35:23other potential locations with the call
35:27gas system enhancement.
35:29So, I appreciated that explanation was
35:32really good, which is why I wanted you
35:34in front of a mic.
35:36Okay.
35:37>> Okay.
35:38>> So, yeah, the the gas utilities do
35:40replace pipes. They have funds to do
35:42that. They are allowed to instead
35:44install this kind of system
35:46>> as a replacement
35:47>> instead of a gas pipe replacement. Um,
35:51and
35:51>> even if it's not gas,
35:53>> if it's not gas, yeah, it's called a
35:54non-pipeline alternative. That's their
35:56term.
35:57>> Okay. uh and they can do this this type
36:00of system. Um
36:01>> even if they lose customers doing it,
36:04>> they uh it's a super complicated legal
36:07problem right now in the middle and and
36:09the Senate and the House and everybody's
36:11fighting and over it. So I'm I won't get
36:13into that one.
36:14>> Okay.
36:15>> But uh it's it should be clarified soon
36:17that legal issue.
36:19>> Mr. Chair.
36:20>> Yes.
36:20>> Thank you. I want to clarify something
36:23um again on how these work. So
36:29is it sim is it is it like you mentioned
36:31the airflow heat pumps that people have
36:32at their homes right is it is it similar
36:34to that regard in that it is
36:37it has capacity or has limits to the
36:40capacity for temperatures and whatnot
36:42will these will this completely replace
36:44somebody's home heating and cooling or
36:46will it kind of be like a dual fuel
36:49system will they will retain their own
36:52>> so the instead of having uh so first
36:56off. Air source heat pumps have, you
36:57know, if they're cold climate, they
36:59should be able to deliver all the
37:00heating and cooling you need, assuming
37:02your home, you know, you have the
37:04windows closed. Um, right, it's that
37:08should work at this point. They're very,
37:10very capable. But this system, uh, it
37:13has an easier time of it because when
37:15it's super cold or super hot outside,
37:19the water in the pipes down below, you
37:21know, in the ground is still the same
37:23temperature. It's not 100°. it's not
37:26zero degrees
37:27>> and so they the heat pumps connected can
37:29work at just perfect efficiency all the
37:32time delivering you the heating or
37:34cooling you need and uh in addition
37:37there is generally a backup heating and
37:40cooling system attached to the system so
37:43that you don't have to each customer
37:45doesn't have to have a backup the water
37:47pipe themselves has a backup on
37:50>> what is that what is that fueled by
37:52>> uh it can be fueled by gas or
37:54electricity or whatever. The Eversource
37:57one is electric.
37:58>> Got it. Okay.
37:58>> Uh and I Yeah. To Yeah. And there's many
38:01ways you can do it.
38:02>> Yep. That's helpful.
38:03>> And those are outages. That would
38:04effectively be an outage. Recovery from
38:06an outage,
38:07>> right?
38:07>> Uh it could it it could uh it could be
38:09many things. It could be like, you know,
38:11the something's gone terribly wrong,
38:15>> right?
38:15>> And uh you need to get the the water up
38:17to temperature again. There's that. The
38:20installation in Colorado Mesa has uh a
38:23gas boiler attached to it. In 15 years,
38:26they've never had to use the gas boiler
38:29>> to do that, but it's there as a
38:31supplemental backup system just in case.
38:34>> Yeah. And then my other question was um
38:37the communities you showed that had
38:38already done feasibility studies, I
38:40think it was Somerville, Lexington,
38:42Arlington, a couple other community,
38:44what are they doing now? I assume I
38:46don't know when they were completed, but
38:47kind of what is the takeaway for these
38:49communities?
38:50>> They're each confused about what the
38:52next step is. Um they're trying to
38:54figure out, you know, do they have the
38:57gas utility do it? Do they bring in a
38:59third party? Do they do it themselves?
39:01Where does the money come from? How do
39:04they govern it? etc. Yeah.
39:06>> And so, uh that is why exactly why Black
39:09Swan Lab is trying to help.
39:11>> Great. Thank you. And uh wait can I have
39:13Karen say something that might be
39:16>> so Mr. Chairman if Karen for the PD
39:19audience you got to come up otherwise
39:21it's not of any value.
39:22>> It's small issue it's very tiny. I was
39:24just going to say that um this is not so
39:27much an issue in Marboro I imagine but
39:29for many communities they don't have
39:31cooling and they're getting cooling for
39:34the first time with this system. So when
39:37we look at even the idea of a cost
39:38comparison, a lot of times they forget
39:40to factor in what does it cost to do air
39:42conditioning and the all that. So this
39:44is sort of a cooling and heating system
39:46especially double benefit for people
39:48that don't otherwise have cooling.
39:49>> Yes.
39:51>> One other thing um if I'm no basically
39:55it's not just heating and cooling but
39:56they'll also provide hot water. The
39:58system can also
39:59>> domestic hot water.
40:00>> Yes.
40:01>> So
40:03and correct me if I'm wrong. Let's go
40:04back to our our very famous uh skating
40:08ring that's going to
40:09>> Oh, yeah. There we go.
40:10>> That's going to supply 500 homes.
40:12>> 600. Yeah.
40:13>> 600 of homes. This is a system that goes
40:15through all the different homes. If
40:17there's a crack anywhere in that system
40:20where that water is not continuing now
40:23that we have 600 homes that don't have
40:25hot and cold, is that correct?
40:27>> Uh yes. Same same as if your uh an
40:31electric wire broke or a gas pipe broke.
40:35Yeah.
40:36>> So when the systems down, it affects
40:38everybody that's on the system.
40:39>> But that's also why there was a backup
40:41in Colorado that hasn't been used in 15
40:43years.
40:43>> Yes. But if there if there's something
40:44catastrophic, if a you know construct,
40:47you know, somebody's doing construction
40:48and they dig into a pipe, that pipe is
40:51out.
40:52>> Um they they generally have shut off
40:54valves. There's there's same sort of
40:55process as exists with gas and with
40:58electric only it's way less dangerous,
41:01right? You hit a gas pipe, there's
41:03trouble.
41:05>> Thank you.
41:05>> I mean, if we're we stand on New England
41:08Sports Center just for heating, um it
41:11could go up Bigalow Street, you know,
41:13and do the neighborhoods of Bigalow
41:15Street, which is the street that goes
41:16under 49 uh 290.
41:20>> Yeah, that one. um or go down Edge
41:24Boulevard and start doing the actual
41:26office buildings in there. And we're
41:29brokers, like we don't we buy it from
41:31New England Sports Center and we sell it
41:33to someone else, but we basically do
41:36thermal exchange broking. And I would I
41:39would state that this is an incredible
41:40economic development option because if
41:44done through the city, you know, you can
41:47tell people their energy bill for the
41:49next 50 years just pegged to inflation.
41:52You know what the operations and
41:54maintenance is. You know what the
41:55installation cost was. every business
41:58for the next 50 years would know what
42:00their heating and cooling bill would be,
42:02which would be one of the biggest ways
42:04you could help businesses, especially
42:06now. Um, it would be amazing.
42:10>> Mr. Chair, if I can.
42:11>> Yes.
42:12>> One of your biggest businesses was a
42:14very promising business when it was a
42:16mall. Malls are slowly starting to go
42:18away. My wife was down at the mall last
42:20week when it was very hot and they
42:22weren't running their air conditioning
42:23that well. They're trying to save cost.
42:26This would be a win-win if New England
42:29Sports Center could provide energy such
42:31as thermal energy to that mall because
42:33they're looking at variable options
42:36including housing and this would be the
42:38time to consider that type of situation
42:41if they go that route. Uh but and they
42:44got lots of parking area too. So, who
42:46knows backup wells and so forth. But
42:48yeah, you're right next to a place
42:50that's looking for help and this would
42:52be helpful to the mall. Well, I I agree
42:55that it could be helpful to the mall,
42:56but not necessarily from New England
42:58Sports Center because I see a whole
42:59bunch of customers between there and
43:01there. Yes. I mean, you know, this is
43:03this is a great photo because it shows
43:05New England Sport Center on one side and
43:07that big honking building on the other
43:08side is basically Salmon Pond Mall,
43:11>> but all that parking space could be made
43:13into a well fields that could then
43:16support going back. It's almost like a
43:18barbell effect, right? Exactly. You got
43:20one on one side and one on the other
43:22side feeding the middle. Um
43:24>> but
43:25>> yeah, you know, when it comes um you
43:28know, anything that could be done with
43:29New England Sports Center could be
43:31something of a um you know, restoration,
43:34low-income housing, all that as well.
43:36>> Great.
43:37>> Um
43:39so,
43:39>> thank you.
43:40>> Yeah, you're very welcome. Um
43:44any other questions at this point?
43:46>> Yes, Trey.
43:48>> Thank you, Mr. Chair. Just one quick
43:49question and I um was taking a look at
43:52that map that you'd referenced of the
43:53different um geothermal networks, the
43:55thermal energy networks, right? Um I
43:57found the the web link and um just
44:00looking I can't help but notice that
44:01there there are no other thermal energy
44:03networks currently in New England,
44:04right? A lot of them are district
44:06energy, which sounds like it's other
44:07renewables, correct me if I'm wrong, and
44:10then smaller geothermal networks. But
44:13you'd mentioned that Mass D has a grant
44:15for wastewater recovery specifically. Is
44:17there any such funding for like these uh
44:20the different borefield drilling sites,
44:22that sort of stuff? Because to me, it
44:23seems like what Framingham's doing is
44:25maybe a little bit more palatable,
44:27right? It's a lot smaller. I know
44:28they're still in, you know, in the in
44:30the pilot program. We're less than two
44:32years into the construction, but um or
44:35post construction, I should say, but is
44:37there any kind of funding for something
44:39like that rather than a full-scale
44:40thermal energy network?
44:42So, uh, you're asking is there any
44:45funding for just the bore holes part?
44:47>> Yeah, just because I think I think right
44:48I appreciate what we're talking about,
44:50but all of this would be a fullscale
44:52thermal energy network. It sounds like
44:54all all three of these sites that would
44:55be kind of the ad.
44:56>> And so, you're thinking more single
44:58building. I I'm not see I mean the map
45:01there's a few across the US like you
45:02referenced, but there's nothing in New
45:04England for this. We would be really
45:05kind of
45:06>> Oh, no. Smith Smith College has just
45:08finished it. Uh, Mount Holio did their
45:11entire has done is doing their entire
45:13campus uh um
45:15>> and that's a that's a thermal energy
45:17network. It's not to to me I got the
45:19impression that that was they're using
45:20existing renew renewables and stuff like
45:22that. No, they're they're doing a
45:23thermal
45:24>> they're doing uh bore holes. I think
45:26Mount Holio has a central plant so it's
45:29a slightly different model.
45:30>> Gotcha.
45:31>> Uh and they're doing it in three phases
45:33to interconnect. Okay. Uh I don't know
45:35as much about Smith College,
45:38>> but regardless, we're Yes, this would be
45:40cutting edge, but other people are kind
45:42of doing
45:42>> Yeah. more and and National Grid's also
45:44doing it in uh Dorchester. Um there are
45:47there are other installations in
45:48Massachusetts.
45:50>> Beverly is one as well. Just to add to
45:52your question about where's the money,
45:54um, this is not a done deal, but the
45:56current environmental bond bill that is
45:59going to be going to conference
46:00committee has $15 million for pretty
46:03much anything related to thermal energy
46:05networks,
46:06>> um, which could include, you know,
46:08grant. So, this would be it has to I
46:10it's $15 million grant. It's not a bond.
46:12So, if that makes it through
46:15>> the committee, we'll make sure you know
46:16about it so you can apply for some
46:18money.
46:19>> Thank you. Yeah. So, um, Mike, do you
46:22want to say anything?
46:23>> Thank you, Mr. Chair. Um, so the the
46:27cases you've cited are all like Smith
46:31College, Holio College, they're all the
46:35one user. the concept of putting one in
46:39Malro. I now got to convince people
46:42andor commercial folks to change their
46:46current heating system to a geothermal
46:49system. Right. So hang on. So solar as
46:54councelor Ducet has told me and finally
46:57after years going that way I don't have
47:00an electricity bill but that was a
47:02$30,000 investment on my part which I
47:06won't see the payback in for five years
47:08>> y
47:08>> to do that. So, h how do I convince
47:12residential users, commercial, the West
47:15Union one? I just sent you all the case
47:18study. There's only 12 individuals or 12
47:21buildings hooked up to that, but they're
47:23all in there downtown and I'm assuming
47:25the downtown
47:27gang flex some muscle to say, "Okay, we
47:29all want to participate." How how how do
47:32you how do I go to a resident and say
47:34your neighborhood we want to make sure
47:36you all go on to geothermal that that's
47:39that is not an easy ask
47:41>> it I totally agree and so one of the
47:43greatest things we're working on the
47:45biggest problems is how to pay for the
47:47building retrofits if we can do that I
47:50think uh from the Eversource Framingham
47:52installation every customer they
47:55contacted except for one said yes so
47:59long as the building retrofits were paid
48:01for because they were getting cooling
48:03because they were getting their improved
48:05indoor air quality because
48:07>> but that was an important thing you just
48:09glossed over as long as it was being
48:10paid for by who?
48:12>> Yes. So that's the the critical thing.
48:14So right now with the inflation
48:17reduction act there is part of the thing
48:20the way to get that is to own the heat
48:22pump. Uh and so it's possible that the
48:25whoever installs it, if they include the
48:28heat pumps, which is a large portion of
48:31the cost of the building retrofits, they
48:33get more credit. They get more of a tax
48:36write off. Um so there's and then also
48:39with a municipality which has the you
48:42know the mandate to do public good if
48:44you did either revenue bonds for this
48:48you could your cost of capital would be
48:50so much lower in comparison to a gas
48:54utility. You could still give people
48:56lower energy bills and uh make back that
49:00money and the only people paying for it
49:02would be the people connected to the
49:03system. So, so it's interesting this
49:05West Union case study, they the city
49:08doesn't own their their
49:11utility, if you will. They rent it.
49:14>> So, you know, this there's still some
49:16work to be done.
49:18>> Oh, crazy amounts. I do not want to Yes.
49:20That's why we have the team to be able
49:22to help to let you choose the ways
49:24forward.
49:25>> But I think you've raised the biggest
49:26issue there is. And I I want to add to
49:30that because basically, you know, there
49:32is the federal uh funding through the
49:35IR, you know, IRA tax credit. Um there
49:38is state grants to help with payment. I
49:41do believe that we should be as a city
49:43doing tiffs for these types of projects.
49:46So there's three buckets of money that
49:48we can help fund it. there is a return
49:50on investment which even if it's five
49:53years after five years you're in the
49:55gravy as far as savings goes at the end
49:58you know I would hope that you know
50:01based upon what I analysis I've done is
50:05that you know this if if we do well let
50:10me phrase it any thermal exchange
50:13network should be locking in a price
50:15point for heating and cooling for 10
50:17years the for for the 10 years, which is
50:20effectively covering the cost of the
50:21bonds. So, from the financial side, if
50:24we know what the bonds costs are and
50:26we're getting a customer base, that
50:28should actually be enough to cover the
50:30bonds as we go forward. And then after,
50:33you know, after the 10-year contract's
50:36over, you see where we are in 10 years
50:38as far as price point goes. And
50:40hopefully, we're lower than what they
50:41came in at the beginning of the 10 years
50:43because as long as we're undercutting
50:45fossil fuels, which should be pretty
50:47easy, uh we're showing cost savings and
50:50the businesses will you know will look
50:53at that. I mean Boston Scientific is
50:55looking to do this on his own because
50:56they see the savings you know
50:59>> Mr. Chair if I may.
51:00>> Yes sir.
51:01>> I was just looking at again today and
51:03thank you councelor Austin for sharing
51:05your article. Councelor Roby shared an
51:08article with us from the Boston Globe on
51:10June 15th. It was about geothermal
51:13energy and pretty much speaks to what
51:15councelor Det just said is after those
51:18years go by of cost then you're as you
51:20said in the gravy but I'd say in the hot
51:23water or cool water but um that's a very
51:26interesting article. It was on June 15th
51:28that Sarah shared it with us from
51:30councelor Roby. I would suggest going
51:32back to that article. It was excellent
51:33about it was in the globe and it was
51:35about geothermal energy. talks about one
51:38of the uh universities I think
51:40Smithfield in Massachusetts. It was a
51:42very interesting pros and cons but spoke
51:45to the longterm effects and I thought
51:47that'd be helpful for this committee to
51:50keep on file. Yeah.
51:51>> Thank you, Mr. Chair.
51:52>> I mean just as as far as solar panels
51:54goes, I had solar panels installed 10
51:57years ago. I own them, okay, which is an
52:00important part of this. Um and yeah, I
52:03paid them off in seven years. It was a
52:05seven sevenyear 0% loan almost like a
52:09car. But after that and you know I I
52:12have a contract for SREx for 20 years.
52:14So I am making money off my solar panels
52:17right now.
52:19>> The volatility of gas bills. Has anyone
52:21noticed other than me? I mean I think we
52:24paid $900 in January or something for my
52:27home gas bills. I can't imagine what a
52:29business is paying if I'm paying $900.
52:31So I feel like as you said relative to
52:34fossil fuel costs it's really
52:36>> as long as we show a price point that's
52:37lower than that and part of the
52:39feasibility study is basically proving
52:41in within the feasibility study they
52:43would that can be done at a price point
52:45that makes it competitive against fossil
52:46fuels. So that's the end result of the
52:48fossil feasibility study. Um
52:53so
52:54thank you for for this presentation. My
52:56question to uh members of the committee,
53:00do we want to take an action to do a
53:04feasibility study just on um waste heat
53:09wastewater energy recovery as a
53:10feasibility study and say yes, Trey?
53:14>> Thank you, Mr. Chair. I I guess I would
53:17I would encourage that we have the city
53:19go after this mass D grant funding for
53:22that wastewater recovery before kind of
53:24committing ourselves to any anything
53:26like that. I I wouldn't want to commit
53:28to a feasibility study without knowing
53:30what what funding we would have for it,
53:32right? Um, so I think, you know, it's
53:34encouraging to hear that there is, you
53:36know, grant funding out there for this
53:37kind of a project, but, um, I'm not
53:40sure. I don't know if Priscilla has kind
53:42of if you guys have talked about this
53:43before or um, if there's been an effort
53:45from the city to attain any of this
53:46funding. I'm not sure. I guess I
53:48>> not at this point. No, I was going to
53:50talk to Priscilla and, uh, Ted to come
53:53in and, uh, talk to us in the next
53:55meeting. So, um, but I think as, um, so
54:00just as far as the wastewater, uh, you
54:04know, uh, wastewater energy recovery,
54:06um, do you also agree in doing all those
54:09in favor and just getting a feasibility
54:11study just on wastewater recovery? Yes,
54:14sir.
54:15>> Mr. Chairman, you're not allowed to make
54:17a motion.
54:18>> Ah, do I Thank you very much for that
54:20correction. I appreciate that. So,
54:24go back to what you said at the
54:25beginning of the meeting. We need a
54:26couple one hour in. I'm not going to go
54:29commit funds or try to get funds for
54:30something I don't fully understand.
54:33>> My opinion. I'll let the committee
54:35decide what they want, but I'll tell you
54:36where I stand right now. There's still a
54:39little more work I think that's got to
54:40be done before I'm going to go commit
54:42any municipal resources to something
54:45that's not well understood yet. We only
54:48met for one hour. Mhm. Okay. Thank you.
54:53Okay.
54:55So,
54:56anyone interested in
54:59>> Yes.
54:59>> Uh Mark,
55:00>> thank you, Mr. Chair. I make a motion to
55:02explore the feasibil uh to explore
55:05funding sources for a feasibility study.
55:08>> Okay. For wastewater energy.
55:09>> Yes.
55:10>> Okay.
55:11>> Just to explore
55:13monies available for feas whether it's
55:15through our a conservation commissioner
55:18or through our DPW. Okay. Um,
55:21>> and utilizing black swan as well.
55:23>> Okay. Okay. Uh, I'll second that. All
55:27those in favor?
55:29>> Discussion.
55:30>> Oh, discussion first. Any discussion?
55:32Yes, Trey.
55:33>> Thank you, Mr. Chair. Just clarifying
55:35questions. Sorry. doesn't commit us to a
55:37feasibility study, but rather it kind of
55:39gives the intention that this this body
55:42would like to have folks come before us
55:43at our next meeting to address um you to
55:46kind of clarify some questions about
55:49>> what you know what the wastewater
55:51recovery feasibility study would look
55:52like and what funding sources there are
55:55for it,
55:55>> right? Which is which is different than
55:56the original proposal, which is why I'm
55:58asking for the vote, but yes.
56:00>> Sure.
56:00>> Yeah. Okay. Thank you. Sure. Okay. Um,
56:04okay then. All those in favor?
56:06Unanimous. All Okay. Um,
56:10okay. So, do you folks have anything
56:14else at this point? Are you
56:17>> I'm a teeny bit confused. What is your
56:19role in all this?
56:20>> We uh
56:22>> How do you get funding?
56:23>> We get funding from We get funding from
56:25foundations uh from the state, etc. to
56:29be able to help municipalities reduce
56:31their emissions and uh come up with
56:34practical solutions to provide people
56:36energy.
56:37>> Great. We're not paying for it. Welcome.
56:39>> Nope.
56:41>> Appreciate you guys showing up.
56:42>> Thank you so much.
56:43>> Yeah.
56:44>> Any question other should we
56:47>> stay nearby? But I think we're set for
56:49now. So
56:51>> thank you.
56:52>> Yeah, it's a good question too.
56:55>> Thank you.
56:55>> Okay. Um, so we we talked about having
57:00the next meeting in two weeks and I'll
57:02see if we can get uh Priscilla and Ted
57:04to show up, one or both if at all
57:06possible and talk about um a would be
57:10the best place to do wastewater energy
57:12recovery just because there is an open
57:14grant for that and then also talk about
57:17just doing the whole utility thing. So
57:20which you know the the conversation
57:23seems to be and even um
57:28was Eversource is doing Framingham?
57:30Eversource did Framingham.
57:31>> Yeah.
57:32>> They I heard someone describe it as
57:33saying they still don't know how to sell
57:35this stuff. So there's still lots of
57:37issues to be addressed.
57:39>> So So we'll have another meeting in two
57:42weeks. And yes sir.
57:45>> Make a motion to adjurnn.
57:47>> Motion seconded to adjurnn. All those in
57:48favor.
57:50Okay. We are adjourned at 5 8:05.
57:54Thank you very