2026-10-08 - Utilities Committee
Summary
Based on auto-generated captions; names and details may be misheard and outcomes incomplete.
Time on topic (from transcript timestamps; approximate, includes side talk; items under a minute are rounded up to 1):
- Thursday, October 8, 2026.
- The first 12 minutes of the recording are crowd noise and chatter with no meeting business; the chair (Councilmember Kazy, judging by context) calls the committee to order at about 12:25 and adjourns at about 1:22:56 to the call of the chair, with the next meeting set for October 29.
- The committee heard four emergency ordinances, all from the Department of Public Utilities or tied to its projects.
- Every item was recommended for approval, and the full council passed all four on October 12.
- The roll call at the start is inaudible, so attendance is not recorded.
- Apart from one roll call on an amendment, votes were by voice ("stands approved").
Utilities Easement Authority Cap (1037-2026)
12:49-39:20
- The Public Utilities director asked to lift the $3,500 cap, set in 1984, on easements the department can grant or acquire on its own. Easements would be priced at appraised fair market value (value of the property before and after the easement). The ordinance as introduced also sent each transaction through the city Board of Control. The director said the cap forced a redesign of a sewer project on Lee Road when the easement valuation exceeded it, and that the largest recent easement needed council approval at about $18,000.
- The chair and Councilmember Shaw questioned the Board of Control step: the director sits on that board, it has not, to the director's knowledge, ever rejected a department request, and it adds no insight on appraised value, so it looked like a formality that blurs accountability. The director said it was added after talks with the law department to give council a check and balance.
- Councilmember Hudson moved to strike "as determined by the board of control." Councilmember Polensek (name garbled in the captions) asked whether the director would then need to return to council for every easement (no) and raised notifying the clerk of council of each easement; the director said notification would not be a burden. Councilmember Davis confirmed fair market value would still control. A roll call on the amendment drew six yes responses and no audible no (individual names are not clear in the captions).
- Councilmember Shaw floated a cap of $50,000 as a safeguard; the director had been thinking about $30,000 and said anything near that would signal a design problem. No cap amendment was offered. The ordinance was approved as amended.
Electrical Test Equipment Requirements Contracts (1038-2026)
39:22-48:48
- A two-year requirements contract, to be bid, for testing, maintenance, repair and training on Cleveland Public Power electrical test equipment (high voltage cable test sets, meter, transformer and relay test equipment). Budget about $100,000 a year; the current contract expires in the first quarter of 2027. The equipment is not proprietary.
- Councilmember Davis asked why the prior contract was $571,000 and why no dollar maximum appears in a requirements contract; the director said the earlier contract replaced worn-out equipment, while this one only maintains it, priced item by item.
- Councilmember Gray asked whether the testing would help with street lights in the Dixon area near East 102nd Street that flicker and go out every couple of months. The director said the equipment tests meters and transformers rather than fixtures or storm damage, and agreed to review the complaint history with Cleveland Public Power staff. Councilmember Conwell added a Collinwood outage complaint and asked that the department share its IT strategic plan (SCADA and the street light management system) with the chair. Approved by voice vote.
Stokes Building Food Service Concession (1135-2026)
48:51-52:01
- Authority for the Public Utilities director to seek a food and beverage concessionaire for the cafeteria kitchen in the Carl B. Stokes public utilities building, two years with two one-year renewal options, through a request for proposals. The director said the small kitchen serves about 300 employees and that the department wants better options. The current vendor was named as Take a Break Quick Catering.
- Councilmember Shaw asked that vegetarian options be offered; the director said the current contract allows a small selection and agreed with the goal. Approved by voice vote.
Big Creek Storage Tunnel Easements (688-2026)
52:17-1:22:51
- A law department amendment package was read first: it adds a gift-of-cash agreement to the title and new sections allocating $220,400 of the easement proceeds and a $450,000 sewer district gift to Emery Park improvements, and $56,400 to Estabrook Park improvements.
- The parks commissioner and sewer district staff described the Big Creek Storage Tunnel, the seventh of seven combined sewer overflow tunnels in Project Clean Lake: over 4 miles, 20 feet in diameter, cutting overflows by about 550 million gallons a year. Whole project about $324 million plus a roughly $60 to $70 million follow-on at Emery Park, paid by sewer district ratepayers across 63 communities, not by the city. The district needs three permanent surface, four subterranean and three temporary easements.
- The chair said his own neighborhood loses about three quarters of Emery Park for several years, and pressed on timing, the 17 temporary 60-foot poles (and nine replacement poles) on West 130th Street, and whether new poles could be kept. He proposed an amendment (seconded) that the district seek the electric utility's approval to remove or replace the poles and temporary construction power poles, at district cost, by December 31, 2032; members settled on inserting it as new section 7 and renumbering the rest. The voice vote on it is not clear in the captions.
- Councilmember Hudson confirmed that recently planted trees along Fulton Road at Estabrook Park will be relocated and replanted with new trees, asked what the $56,400 will fund (to be decided with her; it could also go to rec center improvements), and asked about a home needed for a shaft near West 37th Street. The district said it is negotiating a relocation agreement, that it can use eminent domain because the federal consent decree sets the schedule, and that it has already relocated owners at the Henry Road end. Councilmember Shaw noted eminent domain is routine for public entities; the district said Project Clean Lake is about three quarters done and could finish about two years early.
- Councilmembers Conwell and Gray praised the sewer district for door-to-door outreach and for leaving neighborhoods better. Approved as amended.
Agenda
Committee legislation review. Items heard (from the meeting video): Utilities Easement Authority Cap (1037-2026); Electrical Test Equipment Requirements Contracts (1038-2026); Stokes Building Food Service Concession (1135-2026); Big Creek Storage Tunnel Easements (688-2026). See 2026-10-08 - Utilities Committee.
Sources
- Video: https://youtube.com/watch?v=pG2z2ON-7gg
- Agenda: https://cityofcleveland.legistar.com/View.ashx?M=A&ID=1452603&GUID=4E5E14B9-17A0-4B28-B0DC-F702ECDFDD41
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:26feel
00:55Hey, hey, hey, hey, hey, hey, hey, hey,
00:55hey, hey,
01:18hey.
02:05everybody.
02:19Hey
02:48Hey.
04:51baby.
04:54Baby,
05:00daddy.
05:32Hey, hey, hey.
06:26Hey, hey, hey.
07:06Hey,
07:17hey, hey.
07:38down. I got a
10:23Hey, baby.
10:56Heat. Heat. N.
11:06Heat. Heat. N.
11:34Hey.
11:38Hey. Hey.
11:58Hey,
12:00hey, hey.
12:25Good morning. Today is Thursday, October
12:278th. Calling the utilities committee to
12:30order. Madame clerk, can you please call
12:32the role?
12:33>> Present.
12:41Thank you. Uh, director, you want to
12:42come up to the table? We have four
12:44pieces of legislation. We're going to do
12:46uh, Department of Public Utilities
12:47first.
12:49Ordinance number 1037 2026 by council
12:52members Ky Bishop and Griffin by
12:54departmental request and emergency
12:55ordinance to amend section 129.22 22 of
12:59the codified ordinance of Cleveland,
13:00Ohio 1976 as amended by ordinance number
13:041548-84
13:06passed October 8th, 1984 relating to
13:09easement acquisitions. Director, you
13:12want to explain this one?
13:14>> Thank you, chairman, members of the
13:15utilities committee. The Department of
13:16Public Utilities enters into uh
13:19easements very very regularly. This
13:22ordinance, this cap that was set in
13:241984,
13:25um has uh caused some concerns as
13:29projects go. Most specifically and
13:31recently was on Lee Road where the
13:33design of the sewer project entered into
13:35private property. Um and then the
13:38easement valuation was greater than the
13:40$3,500 that was set in 1984 by in which
13:44we either had to go through the
13:46legislative process or redesign the
13:48sewer. In that instance, we redesigned
13:50the sewer and moved it over. But that
13:52also comes at a cost. What we're
13:55proposing is to establish the value of
13:57the easement based on fair market value,
14:00which is by an appraisal, which is
14:02typically determined by the value of the
14:04property before the easement, value of
14:06the property after the easement, and
14:08then the difference in those two numbers
14:10is typically a standard appraisal of an
14:13easement. This would give the authority
14:15to the director of the department of
14:16public utilities to engage in that
14:19activity, that transaction by and
14:21through the board of control in order to
14:25uh allow the projects to proceed. So
14:28again, I understand council's
14:30reservations on caps. Uh I don't know,
14:34in 1984, I wasn't here. Um but
14:38>> $3,500 in in 1984 is a much different
14:42number now. And we know the property
14:44valuations throughout primarily either
14:46sewer or water. Obviously on the power
14:48side we don't do a lot too many
14:50easements but a ton on the water and
14:52sewer side. It gives us the flexibility
14:55again based on fair market value. So we
14:58assure that our customers are not
14:59negatively impacted by the transaction
15:02and then take it to board of control to
15:04ensure that there is a formal process to
15:06get the easement transaction completed
15:09and then properly filed so we can
15:11maintain the project.
15:13>> Director, the piece of legislation in '
15:1584 passed did not have the border
15:17control in it and now you're adding the
15:19border of control. What was the process
15:22prior to as opposed to adding the board
15:25of control? So currently the director of
15:27public utilities has standing authority
15:29to enter into easements and vacate
15:31easements based on the charter as
15:32established by councel. So it would just
15:34happen uh any easement below $3,500 any
15:38easement in the right of way any
15:39easement throughout the service area
15:41would just happen by right in the
15:43director's seat. So as we are lifting
15:46the cap that council established we
15:48thought it appropriate to have a process
15:50the appraisal and then the board of
15:51control which is then the formal process
15:54before
15:55uh having the authority to sign the
15:57easement and then file it with the
15:59county recorder.
16:00>> But wouldn't it be easier director if we
16:02just kept it with the director of public
16:06utilities and not added the additional
16:07step of going to the border control?
16:09Yes, but chairman this was uh based on a
16:13number of conversations with the law
16:14department understanding how council
16:17does not well chair this chairman or
16:20this committee doesn't want to give up
16:21the responsibilities or give that kind
16:24of blanket authority. Uh we thought it
16:26to have a good check and balance to have
16:28it go to another administrative step
16:30which would be board of control after an
16:32appraisal process. And then does the
16:35department does the the director of
16:38public utilities sit on border control?
16:40>> Yes, chairman.
16:42>> So why the additional step?
16:44>> Again, it's just a formality.
16:47>> Any questions on 1037 2026?
16:51>> Yes.
16:52>> Uh Councilwoman Gray,
16:53>> thank you. Uh could you kind of clarify
16:57again what easement is for? Is it cheer
17:00to the uh director? Is it for like to
17:02help sewer problems
17:05>> chairman to the council members? So the
17:07easement is the legal right for the
17:09utility to have access to that
17:11underground infrastructure. So it would
17:13prohibit anyone and typically it's it's
17:15very close to the right of way as a
17:18sewer line water line. Sometimes on
17:20bends you can't take 90°. You sometimes
17:23encroach onto private property. What the
17:25easement would allow us to do is to in
17:28perpetuity forever have the ability to
17:30go and fix it in the event that it
17:32breaks. So they couldn't build a
17:34structure over our water pipe sewer
17:36pipe.
17:38>> Typically I've never seen an instance
17:40where they could because it's so close
17:42to the right ofway, so close to the
17:44roadway, but we still need the legal
17:46assurance that we can get to that pipe
17:48to fix it. And if there's any
17:50obstructions above it, if they close a
17:51roadway, if they like you can't you
17:54can't restrict access to the utilities
17:56to fix the infrastructure to serve our
17:58customers.
17:59>> Okay. All right. Thank you.
18:02>> Uh, anybody else? Director, I'm still
18:04stuck on this board of control thing.
18:06the department of public if the chair if
18:08the the director of public utilities
18:12sits on the board of control and it's
18:14got to go in front of the border of
18:15control. The director of public
18:16utilities then has to vote on their own
18:19piece in front of the border of control
18:22as opposed to just having
18:25for us just the blanket authority like
18:27you like it's been since 1984 without
18:30the border control. I mean it it doesn't
18:33to me it doesn't doesn't make much
18:34sense. I again it's the prerogative of
18:37council. We tried to obviously lifting
18:40the the cap that was placed on there in
18:421984. We thought the administrative step
18:45everything we do by charter, by code, by
18:47law is fair market value. That
18:50evaluation is done in accordance with A,
18:52B, C and D. Uh we come up with a number
18:55that is agreed upon by the private
18:56property owner and by the utility and we
18:58execute the easement and then we duly
19:00file with the county of record. Standing
19:03authority is something that I would
19:06request as the current occupant of the
19:08seat and hopefully any further occupants
19:11of the seat would respect the codified
19:14ordinances of the city of Cleveland. In
19:16this instance, it was just $3,500 was a
19:19madeup number a long time ago and the
19:22standing authority of any director to my
19:25knowledge has been uh an open line of
19:28communication and discussion.
19:29>> Director, I I appreciate that. I
19:31understand that. Right. And I don't
19:33think the issue doesn't come with the
19:35fair market value. The issue comes with
19:37the board of control. Council,
19:40Councilman Sha, thank you, chair. Um,
19:43yeah, I think I I wanted to understand a
19:45little more of like I I echo some of
19:48those concerns. I it seems like the
19:50board has I'm granted I'm new so I'm I'm
19:53still observing and learning but has the
19:55board of control ever
19:58denied or turned down a request from a
20:03department because as far as I've seen
20:05it's kind of been a rubber stamping body
20:08>> chairman to the council member so a
20:10matter wouldn't get to the board of
20:11control without the sitting director's
20:14approval and then without the
20:16appropriate reviews so matter a number
20:18of matters don't make it to the board of
20:20control due to some type of uh a missing
20:24document or a missing process or
20:26procedure or it doesn't meet the legal
20:28form and correctness or any number of
20:30things. So, it wouldn't make it to the
20:31board of control. But as a d a sitting
20:34director who also uh represents the
20:36department on the board of control, a
20:38matter won't make it to the agenda
20:40without the approval of that director
20:42and that department with the additional
20:45reviews that are required. Right? So,
20:47there's a number of reviews to get to
20:49the board of control, but to your point,
20:52if I'm there to recommend its approval
20:55to the the mayor and to the members of
20:57the board, um then typically it is well
20:59received.
21:01>> That's that's helpful, but that still I
21:04don't think answers my question. Has
21:05anything in as far as your knowledge
21:07goes, has the board of control ever
21:09denied something that a director has
21:12asked for?
21:13>> Not to my knowledge. Uh there has been
21:16active discussion in my time at the
21:18board of control discussion at the board
21:20of control where a matter would be
21:21removed from the agenda. So maybe a ne
21:24not a negative vote to your question.
21:25Sure. But it would be removed uh and
21:28then adjusted or uh something would
21:32happen and it would later come up and
21:33likely get approved.
21:36>> Yeah, I think I I I
21:39echo the concerns that the chairman
21:40brought up. To me, the having the board
21:43of control be the determination
21:46body instead of the director, I think
21:50obfiscates
21:52accountability because if there was
21:54hypothetically, right, if we're saying
21:56we have an issue with some a decision
21:58that was made, at least as of right now,
22:00the way it is structured, we would be
22:02able to come to the director of public
22:03utilities and say, "Hey, why was this
22:06decision made?" We can't really do that
22:08same thing with the board of control.
22:12Chairman of the council member, if I'm
22:15understanding the question, say the
22:17evaluation of the easement was $20,000.
22:20>> Sure.
22:21>> Then I would need to get the request for
22:23legislation. I would have to draft the
22:24legislation, get it introduced, get it
22:27heard, and then ultimately passed. What
22:30we're asking for here, and again, the
22:32board of control was added as just a
22:34formality with the currently standing
22:36authority of of the director of public
22:39utilities, whoever he or she is, has the
22:42standing authority to enter into
22:43easements and vacate easements on behalf
22:47of our customers to deliver highquality
22:49service. If that evaluation was $20,000,
22:52then this process would come into play.
22:56I don't know if I answered the question
22:57because I didn't fully understand the
22:59question
23:00>> and I apologize for that.
23:01>> No, no, no. I I I think I You're saying
23:03that you're still going to have to go
23:05through
23:07the legislative process to get the
23:09approval. So, the board of control isn't
23:11necessarily the one that is making that
23:13determination of what the fair market
23:14value is independently or separately.
23:17>> That's correct. Chairman to the
23:18councilman.
23:19>> Okay. Um that's then I I guess as if
23:22it's it is just a formality. I I mean I
23:25would still want to just keep it with
23:26the director of public utilities. Um and
23:29>> I think my other concern with this was
23:33seems to be that like what what kind of
23:37do you foresee
23:39>> uh
23:40>> through through the chair? Um do you
23:42foresee a um in the future uh not as
23:44principal director of public utilities
23:47or um a different administration,
23:49different conditions um using this to
23:54acquire
23:55other part parcels and easements that
23:58may not necessarily be for that reason,
24:01but it's under disguise. But now that
24:03we've kind of opened up the cap, it's
24:05going to leave it up for abuse for other
24:08uses. Do you foresee that happening of
24:10like kind of Trojan horsing other
24:12acquisitions?
24:13>> No, I understand the question. Thank you
24:15chairman to the council member. Uh
24:16again, this is for the easement, right?
24:18So there has to be underground
24:19infrastructure that it we are required
24:21access to. So, um, in the easement
24:25conversation, I don't see how because,
24:29for instance, when we designed the Green
24:31Road pump station and the the
24:34distribution mains take a different
24:36route and potentially tie in at a
24:38different location under private
24:39property. The pipes there, we need
24:41access to the pipe in the event of its
24:43failure. We would execute an easement.
24:46So I I can't envision a scenario where a
24:51um where where that circumstance would
24:54happen. I can't
24:56>> guess
24:56>> as we sit here today.
24:57>> Sure. And I guess kind of the example I
24:59would s offer up um through the chair
25:01would be you know if we have a private
25:04company who we are trying to bring here
25:06and they're saying hey these kind of
25:08hookups or these kind of things are
25:10something that we would need before we
25:12want to do it. In order to make that
25:13more attractive, we would try to, you
25:16know, I can imagine a administration
25:18wanting to make the pot a little sweeter
25:20and say, "Hey, we'll actually undertake
25:22this type of work. We're going to go
25:23ahead and do this before you even
25:24acquire it."
25:26And this would be kind of I would
25:28imagine this would be the avenue they
25:30would use to acquire that first or get
25:32the easement, put in those hookups, and
25:34then turn around, market it for
25:36development.
25:38>> Chairman to the councilman. Um yeah, I
25:43any of those projects would have come
25:44through council anyhow
25:46>> first and foremost, right? But we're not
25:48going on to private property. This is
25:51just the transmission or distribution
25:53mains or the moving of storm or sanitary
25:55sewer. This is not uh like a connection,
25:59okay,
26:00>> uh per se past the curb stop where we do
26:02not have the chartered responsibilities
26:05uh under well under the constitution of
26:07the state of Ohio or the city of
26:08Cleveland charter past the curb. This is
26:10the transmission. If we cut a if we cut
26:13a a corner, right? Because you don't
26:15want that 90 degree turn in a in a
26:18utility distribution and you take some
26:21private property or you go under the
26:23private property. We need to make sure
26:24forever we have access to that to fix
26:27it. So, um, again, I hope I'm answering
26:31the question, but certainly not a
26:32connection from a curb stop or from a
26:35lateral sewer connection to a potential
26:39business. That is not our
26:40responsibility, nor do we have the
26:42authority to do that.
26:45>> I that that explains it. I think I was
26:48misunderstanding the portion there. So,
26:50thank you. Um, that's all my questions.
26:52Thank you, Chair.
26:52>> Thank you, Councilman Penc.
26:56>> Thank you, Mr. chairman, honorable
26:58colleagues to the director, what is the
27:01the
27:03is it what is the most we've ever spent
27:05for an easement? Do you happen to know?
27:08>> Uh I know last year we came to council
27:11for I think it was $18,000
27:13was the fair market value for a and I I
27:17think it was Green Road um
27:20>> in I don't remember the municipality it
27:22was in, but we did have to go through
27:24the legislative process. Okay. Okay.
27:26>> Lee Road, I believe, uh the sewer
27:29project, chairman of the council member,
27:31I believe we redesigned it because of
27:34the number of different uh easements
27:36that were necessary. So, I think we we
27:38avoided it, but it would have been
27:40significant amounts because that the
27:42whole frontage of a parcel uh on Lee
27:46Road and all of those individual
27:48parcels, we were going to need
27:49individual easements and then negotiate
27:51fair market value with each of them. So
27:53we knew that the cumulative number would
27:55have been significant.
27:56>> Yeah. Okay. Have we've ever been barred
28:01from getting an easement?
28:03>> Chairman of the councilman, not to my
28:06knowledge. No. We have had uh in some
28:09projects we have had property owners who
28:12have respectfully declined uh
28:15negotiations on easements which like
28:17then we have to redesign, right? We
28:20can't take property from someone to move
28:22water or sewer. So, we have to redesign.
28:25And there have been instances of that.
28:27>> Okay. See, I'm just trying to get a
28:29better I think all of us are trying to
28:31get a better understanding as it
28:33pertains to the mechanism. Um because
28:36you're not seeking an easement just for
28:38the heck of it. You're seeking an
28:39easement because you need it.
28:40>> Chairman of the councilman. That's
28:41correct.
28:41>> Either water, sewer, or
28:44>> those or power.
28:45>> Correct. Chairman of the councilman.
28:46>> Okay. Thank you, Mr. Chairman. Thank
28:48you, Councilwoman Hudson.
28:50>> Thank you, Mr. Chair. Um, I'd like to
28:52propose an amendment to strike the
28:54phrase as determined by the board of
28:57control.
28:58>> There's an amendment on the table to uh
29:00under section 129.22.
29:04Uh, the last line as determined by board
29:07of control, there's an amendment to
29:09strike that from the legislation. Do I
29:11have a second?
29:11>> Second.
29:12>> We have a first and second. Any
29:14discussion?
29:14>> Yes.
29:15>> Councilman Palinsk. Okay. Um, there's
29:18nobody around this table that defends
29:20the authority and the protocol more than
29:23I do as it pertains to city council. Um,
29:26because we got elected to serve and to
29:28represent. My question is to the
29:30director
29:32um by that being stricken.
29:35Would you then have to come back to
29:37council for every easement?
29:39>> Chairman, to the council member, I would
29:41or the director of public utilities
29:42would not.
29:43>> Okay, that's all I need to know.
29:47Well, hang on
29:48>> because I'm trying to understand we're
29:49we don't I have a as you know I have an
29:52issue about giving up our authority
29:55>> and so but I want to make sure in the
29:57process that we are not creating a
29:59problem as well for the three utilities
30:02who need an easements to perform or
30:06install water, sewer or power lines.
30:12chairman of the council member. Again,
30:14the the board of control was added as a
30:16formality in pre-introduction
30:19discussion to we understanding council's
30:23reservations in um foregoing those
30:27response and and by no means am I asking
30:29that question here today. I I again it's
30:32the $3,500
30:34that is prohibitive to the projects that
30:37we need to complete. That's the reason
30:40that that we started talking about this.
30:42It was established in 1984. It's no
30:45longer a equitable number. It's no
30:47longer a number that can work in uh in
30:50our business. So, the thought was to to
30:53lift it, but not requesting council just
30:56to lift it arbitrarily, knowing that
30:58that would likely receive great
31:00resistance. uh right
31:02>> we determine based on fair market value
31:04after an appraisal and then present it
31:07to the board of control because well
31:09they meet every Wednesday if the
31:11director supports it and it's legally
31:13defensible
31:15uh the likelihood of success would be
31:17high again these are time-sensitive
31:19decisions that need to happen when two
31:23years of design did not identify this
31:25parcel corner and we have to pivot
31:28quickly if we want to keep digging up
31:30this roadway. Well, Mr. Chairman, to the
31:32director, based on the the amendment uh
31:36that was that was just um sponsored,
31:40if you're not going to go before the
31:41board of control, who do you go before
31:43then?
31:44>> Chairman to the council member, it would
31:45still be the fair market value as
31:47determined by an appraisal. And then I
31:49would work with MOAP and the
31:50commissioner of real estate to have it
31:52properly executed. We file our own
31:55easements at the Department of Public
31:56Utilities. So, we have our engineering
31:58staff goes to the county, make sure that
32:00it's properly filed, we pay the fees,
32:02and we get it on the the deed of that
32:05property holder.
32:06>> Do you have any idea how many easements
32:08a year you see?
32:09>> Holy moly. There are quite a few
32:11chairman of the council member,
32:14>> not necessarily in the city of
32:15Cleveland, but throughout the division
32:16of water service area, there are I mean,
32:19because they are they do require
32:21signature of uh with the standing
32:23authority that's currently rests with
32:25the director of public utilities. There
32:27is the the requirement of legal
32:28analysis, the commissioner of real
32:30estate to my knowledge, the director of
32:32public utilities, then the the person
32:35that is granting the easement and then
32:38back to law for seal and then back to
32:43I'm it it is a but it's a very important
32:46process. There's a lot of utilities that
32:48just don't because it's our pipe and we
32:50know we can get there. But in in a
32:53number of our our uh our service area
32:57municipalities, sometimes they will put
32:59things very close to our pipes or they
33:01will close a road which then we have a
33:03water main break that's affecting 3,000
33:05people that we have to get to and we
33:06have to call the municipality to either
33:08raise the gates, allow access, move the
33:11ballards, uh you know, it's
33:13>> it's important to us in order to
33:15continue to deliver service. So I don't
33:17>> if we are to include in the amendment
33:20that that you would have to you would
33:22notify you would notify the clerk
33:25council on the on the easement. Would
33:29that would that create a problem
33:31>> chairman? We obviously we respect
33:33council's role in everything that we do.
33:35Notification to anyone is not a burden
33:38an additional burden on us.
33:40>> Thank you.
33:41>> Thank you Mr. Chairman.
33:42>> Anybody else on discussion?
33:45I want to ask the um director a
33:46question. You want to kill
33:49>> through the chair.
33:49>> Through the chair. I'm sorry. Through
33:51the chair.
33:52>> Um what you saying cuz what I think I
33:56hear you want to kill the time
33:57constraints that that it take you to get
34:01to execute on the work that you need to
34:03work on. Is that is that correct?
34:06>> Chairman to the council member. Our hope
34:08was to more seamlessly uh deliver these
34:13large projects
34:15>> across large pieces of property across
34:17many different jurisdictions. That has
34:20proven to be complicated in certain
34:21circumstances. I'm not saying that it
34:23happens in every project, but recently
34:25is coming up more and more where the
34:28easements and then the value of the
34:29easement exceeds our current cap, which
34:32is what brought about the discussion of
34:34this legislation. Um, I I knew that it
34:37would be a conversation obviously, but
34:41uh we need to deliver these projects on
34:44time, under budget,
34:46>> and with as little disruption to our
34:49neighborhoods as possible.
34:50>> And it cost to the chair, it cost you
34:52more dollars to it now. And since I
34:55think it was in ' 84 or something, it
34:57was passed. That money value is not the
35:01same as it is decades later chair. Is
35:04that correct? Is that
35:05>> chairman to the councilman? That's
35:06That's exactly right.
35:08>> You're looking at time and cost. That's
35:10what you're looking at.
35:12>> Yes.
35:12>> All right. Thank you. That's what I want
35:13to know. So, I'm there. Thank you, Mr.
35:15Chair.
35:17>> Any other discussion on the amendment?
35:19Yes, Councilman Davis.
35:21>> Thank you, Mr. Chairman. Through the
35:23chair to the chief, if we strike the
35:26language chief
35:28>> Yeah, that's right. I forgot.
35:29>> I've been called worse.
35:32>> Chief
35:33>> by me sometimes, too. But through the
35:34chair, uh, if we strike as termed by
35:37border control, the fair market value
35:38would still control, right, for for this
35:41amendment.
35:43>> If we strike, I'm sorry, can you repeat
35:45that?
35:46>> That was probably too fast. So, we're
35:47the the amendment before us right now is
35:49a strike as determined by the board of
35:51control. Correct. Correct.
35:52>> And if we do that, you would still be
35:55paying fair market value, just not
35:56checking in with border control.
35:58>> Chairman to the council member, that's
35:59correct. So the standing authority of
36:00the director of public utilities for
36:02easement language the granting of or
36:04vacating of is determined by the fair
36:07market value.
36:08>> Very good. And then through the chair
36:09fair market value is I mean has board of
36:13who appraisals right?
36:15That's correct.
36:16>> Okay. So board of through the chair
36:18board of control doesn't really have any
36:20insight to offer on what is a fair
36:22market value or not.
36:23>> Chairman of the councilman that's
36:24correct.
36:24>> Okay. Through the chair then I I yield.
36:26>> Any other discussion on the amendment?
36:28Yes. Where will that be strike? That was
36:31everybody talking so fast. Where? What
36:34area?
36:34>> Right here.
36:35>> Okay.
36:37>> Okay.
36:38>> Any other discussion?
36:39>> Seeing none, madam clerk, can you please
36:40call the role on the amendment?
36:44>> Yes.
36:46>> Yes.
36:48>> Yes.
36:49>> Davis,
36:49>> yes.
36:51>> Yes.
36:52>> Yes.
36:56>> All right. Seeing no further questions
36:59on 1037 2026.
37:02Councilman Shaw,
37:03>> just one final one. Uh potentially
37:05debate. So 3500 through the chair to the
37:10chief. I get it. 3500 is too it's
37:13outdated.
37:14>> Mhm.
37:14>> How much would it hamper or limit your
37:17ability to do things if you put the cap
37:19at like 50,000?
37:22>> I chairman to the to the councilman.
37:25Certainly I I have had that conversation
37:27with with staff. Um and we were if if
37:31again the number I had was more 30. So
37:3530 I don't I can't see anything um being
37:38more than that or it or I would have
37:41real problems with the engineers and
37:43designers who put the project together.
37:46>> Right. So, I that's the other that's the
37:48other variable is that these things go
37:50years of design um with the site surveys
37:54and with all of those needed points. I'm
37:57not saying it doesn't happen, but if I
37:59got a $35,000 easement that wasn't
38:02anticipated, then whoever is sitting in
38:05that seat should have real concerns with
38:07it. So, fair question. That's the best
38:10number that I came up with just with
38:12conversations in preparation for the
38:14legislation's introduction
38:17>> that but since the 30,000 isn't in the
38:21ordinance any at all um so this would I
38:25think you already answered it earlier
38:26right is whatever the fair market value
38:28would be the director would be able to
38:30go forward on that
38:31>> chairman of the councilman that's
38:32correct
38:33>> that's fair I guess my
38:36thoughts to the rest of the the
38:37committee would just be I I'm still a
38:40um uh struck from the I think it was a
38:44shot spot or the board of controls
38:46approval for the IT clause where we
38:48didn't have a cap that we got stung on
38:51earlier. Um I don't know if we
38:52anticipate anything like this. I would
38:54if there's interest I think that would
38:56make sense to cap it at 50 to account
38:58for the fear of the 35 30 limit. But um
39:02if there's no interest, I I'm happy to
39:06trust the administration uh and get
39:08stung later if there's no other
39:09interest. I yield.
39:12>> Got it.
39:13>> Okay. Okay. All right. Any other
39:15questions on 1037 2026? 1037 2026 as
39:20amended stands approved. Please sign up.
39:22Ordinance number 1038, 2026 by council
39:25members KZ and Griffin by departmental
39:27request an emergency ordinance
39:28authorizing the purchase by one or more
39:30requirement contracts for various types
39:32of electrical test equipment and labor
39:34and materials necessary to maintain and
39:36repair electrical test equipment
39:39including training when necessary for
39:41the division of Cleveland Public Power,
39:43Department of Public Utilities for a
39:45period of two years. Director,
39:47>> thank you chairman. um going out to bid
39:49to continue this important service for
39:51the equipment that allows our employees
39:53to do this very dangerous work which
39:55would include the testing and
39:57maintenance and also training of things
39:59like a high voltage cable test sets,
40:01meter test equipment, transformer test
40:03equipment, relay test equipment.
40:06Obviously crucial to uh to the work that
40:09the men and women of the division of
40:10Cleveland Public Power do every day. We
40:13budget $100,000. So, this is a two-year
40:15current contract expires first quarter
40:18of 2027. Um, and we are uh looking to
40:22continue this and go out to bid for it.
40:25Chairman,
40:25>> and again, director, this is going out
40:27to bid.
40:27>> Correct.
40:28>> Any questions on 1038 2026, Councilman
40:31Davis?
40:32>> Thank you, Mr. Chairman, through the
40:33chair to the chief. Uh it did strike me
40:36that the prior contract was $571,000
40:41for about two years and right now you're
40:43anticipating only $100,000 for per year
40:45for two years. Can you just tell us
40:46what's going on?
40:47>> Chairman to the councilman, we did have
40:48a number of we and we budgeted for that
40:50and came to council for it. We had a
40:52number of the equipment that had to be
40:54replaced. It had reached the end of its
40:55useful life. So we had upgraded it. Now
40:58we need to maintain it, which is the
40:59purpose of this um legislation.
41:01>> Oh, good to know. So through the chair,
41:03there's Yeah, you weren't spending
41:04equipment replacements last year and not
41:06this year.
41:06>> Correct.
41:07>> Um, additionally through the chair to
41:09the chief, the
41:12the way CBP budgets is always a little
41:14um confusing to me just because it's so
41:15different. My understanding is there's
41:17no dollar maximum in this legislation
41:20that we're um proposed here, but it's
41:24it's from your appropriations from
41:25earlier this year. That's like a to me
41:27an unusual way to go about contracting.
41:30Usually there's a max dollar value or
41:31something like that. Can you just tell
41:32us more of that process?
41:34>> So, thank you chairman to the council
41:36members. So, this would be by way of
41:38requirement. So, it would be a
41:39requirements contract where we would say
41:42the uh transformer test equipment needs
41:44to be u uh validated or or tested to
41:48maintain compliance with the regulations
41:51that we're required to follow that there
41:53would be a number associated with that,
41:55right? the testing of the transformer
41:57test equipment, uh the replacement of so
42:00those their prices in just the menu of
42:02things that we need and then the the
42:05number is what we've historically used
42:07to maintain that equipment. So as
42:09opposed to replacement which was what we
42:11did over the last couple years. This is
42:13a requirements contract essentially a
42:15widget. How much is that widget? And
42:17they give us a number and then we get
42:19the most compliant and lowest bid and
42:21then we maintain the u the equipment.
42:23>> Understood. It's the nature through the
42:25chair. The nature of requirements
42:26contracts always throws me off. Thank
42:28you, sir.
42:28>> Thank you.
42:29>> And thank you, Councilman Davis. Uh,
42:32this equipment is not proprietary.
42:34Correct.
42:34>> Chairman, it's not.
42:35>> Okay. Any other questions? Councilwoman
42:38Gray?
42:38>> Yes. Thank you, Chair. Um, pertaining to
42:41uh the testing of equipment and uh uh
42:43keeping it stabilized. Does this
42:46equipment also um
42:49uh is help with um help with the wiring
42:54on the poles when the um light uh when
42:58the light structures um when the light
43:01fixtures on the poles attached to the
43:04light bulbs constantly go out all the
43:08time? Is this part of the testing, you
43:11know, to ensure, you know, that won't
43:13constantly happen?
43:15you know, weather with a storm because
43:17these are questions that I have
43:19constantly been getting recently uh
43:22pertaining to the uh fixtures of the
43:26light of the lights going out all the
43:28time, you know, during a storm, you
43:30know. So, you know, so will this help
43:33that chair to the uh director chief
43:36>> chairman to the council member? Not
43:39primarily storm related. this ordinance
43:41wouldn't be other than just the safety
43:43equipment to ensure something's
43:45deenergized, okay, which is the
43:46equipment and very very important before
43:49our uh employees start working on it.
43:51But on every day, if there's a customer
43:54that's uh experiencing regular outages,
43:57this would be the equipment to test the
43:58meter to test the transformer that
44:01delivers that power um to make sure that
44:03they're properly functioning. And in the
44:05event that they're not, then we would
44:06replace. So, yes, all of the things that
44:09you said other than kind of the storm um
44:11because really not storm response except
44:15for the relay test equipment to make
44:16sure that it's deenergized. Uh but yeah,
44:20everything that we uh that we do needs
44:22to be tested and maint make sure that
44:24it's working properly and that would be
44:25this ordinance.
44:27>> Okay. So, one more question. Okay. So,
44:31>> uh, pertaining to that, that's great.
44:33But I'm getting recently I'm getting
44:36constant constant calls pertaining to,
44:40um, your light fixtures.
44:43The light fixture that a house, the bug
44:48that keep the street lights on.
44:50>> Okay.
44:51>> Those are constantly going out all the
44:54time. uh in the Diction of you know um
44:57you know in the Dixon area okay of 102nd
45:01those polls are flickering you know the
45:04lights are freickling and then they go
45:06out constantly like every two months I'm
45:09calling your governor affairs manager uh
45:12uh and the um and the um and the crew is
45:16going out constantly you know replacing
45:19those buffs that's constantly going out
45:22all the time. So due to that uh how you
45:27know how that can be maintained if this
45:30is not the source you know for if this
45:33is not the source for it to you know be
45:35taken care of chair to the director
45:38chief
45:39>> chairman to the council member certainly
45:41I can take a look at it and talk to to
45:43chief Jackson and and get a the history
45:45of the complaints and talk to the
45:47commissioner who's um currently uh in a
45:51in another meeting. But I will look into
45:54it a little closer and find out. But
45:56yes, to your point, this would be the
45:58this would be the equipment that tests
46:00that distribution of power to maintain
46:03the the light. If it's if it's the
46:05fixture itself, it needs to be replaced.
46:07If it's how the power gets there, this
46:09would test it and then determine what
46:10needs to be upgraded.
46:12>> Okay.
46:12>> All right. Thank you.
46:14>> All right. Councilman Thank you,
46:15Councilwoman Gray. Councilman Conwell,
46:17>> you know, um to the chair, to the
46:19director, um you're going to check to
46:22see that and when you check also check
46:24and see why the issues at the same time
46:28what's going on uh in Columwood that I
46:31have to call you about several times
46:34even when it's not a storm. And um if
46:37you can through the chair, talk with our
46:40chairman about your IT strategic plan
46:44and where you're at with that. Your IT
46:47strategic plan will be able to tell the
46:49council woman instead of you just
46:51checking what's going on with it because
46:53you look at your IT strategic plan
46:57constantly. Is that true? To the chair
46:59to the um man, you got so many titles.
47:02Councilman, director, chairman,
47:04>> chairman. Chairman chief chairman of the
47:07council changing them man
47:09>> I just say Marty when I talk with him
47:11>> chairman of the councilman yes that's
47:13absolutely the IT the infrastructure and
47:16the between the SCADA and the um the
47:20bright city application on the street
47:22lights that's something that takes a lot
47:24of of uh time and energy pardon the pun
47:28>> yeah but you have a strategic plan on
47:30that with your IT chairman of the
47:31council yes
47:32>> and you can narrate that to us and the
47:34reason why.
47:35>> Yes.
47:36>> And they could tell you, you're not just
47:38going back to the chair saying, "I got
47:39to check on it." No, you get at least a
47:42quarterly or monthly update. Uh, is that
47:45correct? To the chair, to the chief,
47:48>> chairman of the councilman. Yes, I do
47:50get regular updates. I I don't know of
47:52the Dixon. It was only in response to
47:54the council members. I I just not fresh
47:56on my mind. I'm sure we've talked I get
47:59plenty of emails from all of council and
48:01and welcome it because it's on behalf of
48:03our customers, right? I mean, that's why
48:05that's why CPP exists. So, I I'm I'm in
48:08no way complaining about it. I'm saying
48:10that yes, I get regular updates. We know
48:12where we have certain uh infrastructure
48:14improvements that need to be made. uh we
48:17know areas where we experience problems
48:20and and work really hard to try to
48:22minimize the the disruptions in service
48:25based on the IT strategic plan based on
48:28every other uh report that's generated
48:30regularly.
48:31>> Yeah, that could that could help us out
48:33with the column issue also. I was
48:35wondering yeah we could and I was
48:36thinking about it and you could share
48:38that with us to the chair to the um
48:40director
48:43you know are you good? Yes,
48:44>> I'm good.
48:45>> All right. Thank you. Any other
48:46questions on 1038 2026? Seeing none,
48:481038 2026 stands approved. Please sign
48:51up. Ordinance number 11352026
48:55by council members Kazy and Griffin by
48:56departmental request an emergency
48:58ordinance authorizing the director of
48:59public utilities to enter into one or
49:01more concession agreements for the
49:03operation of a firstass food and
49:06beverage service at the Carl B. Stokes
49:09public utility building for a period of
49:11two years with two one-year options to
49:14renew established by the director of
49:16public utilities director. This is going
49:17out. You guys are going out for an RFP.
49:19>> Yes, chairman. We are trying desperately
49:22to go out again to see if there's
49:24interest. It's a very small kitchen at
49:261201. We have a number of employees in
49:29the building and in the area that we
49:31like to have options available. Um,
49:35we've had good uh many iterations over
49:38the history of this par this piece of
49:40kitchen uh in our cafeteria. Um, we're
49:43hoping that someone can get creative um
49:46and to think outside the box and put a
49:48good proposal together to better serve
49:51our employees.
49:53>> Would you take them if they weren't
49:54first class?
49:56>> Chairman, I'm going to That's our
49:57effort. That's That's our That's our
50:00charge. Any questions on 11:35 2026?
50:04>> Councilman Sha.
50:05>> Yeah, just uh quick um urging through
50:09the chair to the chief. Can we make sure
50:12that they are also able to offer uh
50:14vegetarian options? That's something
50:16that I've been getting asked a lot from
50:18other city employees now that the word
50:20is out that I'm a vegetarian. So, I'm
50:22trying to make more of an effort that we
50:23have those offerings at our um food
50:25places.
50:27>> Yeah, absolutely. and chairman of the
50:28council member, the current vendor, the
50:31the version of the current contract uh
50:34does allow for very small selection uh
50:38of of
50:40>> vegetarian options. Um unfortunately, we
50:43go out to bid and and it's again a very
50:45small uh spa space. It's it's 300
50:50employees in one building. So, you know,
50:52is the demand there? How do you how do
50:54you meet that supply? So, it's um
50:58something that that uh again it's our
51:02commitment to offer a better option uh
51:06in the cafeteria. Our employees are
51:08everything to us, right? And and they
51:10they want something that meets their
51:13expectations. Whether we can find that
51:16will be determined. So, I will I will
51:19echo your uh sentiments.
51:22>> Thank you.
51:23>> Director, what is the current contract?
51:25Taste of class, taste of take a break,
51:28quick catering.
51:29>> Take a break, quick catering.
51:31>> Yeah.
51:31>> Okay.
51:32>> And again, there there I'm not at all
51:34saying anything negative. They have a
51:36business to run and we have a uh
51:40a product, if you will, like we have
51:42employees that want certain things and
51:45>> it's just a hard it's hard to find the
51:47middle ground and and they've also taken
51:49over the federal building to my
51:50knowledge. So, we're getting some
51:52sandwiches and some options and and it
51:54it just es and flows.
51:56>> Okay.
51:56>> Is I guess.
51:58>> Yeah, it's a work in progress.
52:00>> Good luck to you on that.
52:01>> Thank you, chairman. Appreciate
52:01>> it. 1135 2026 stance approved. Please
52:04sign up.
52:06>> Thank you very much, director. We will
52:07see you on the 29th.
52:17>> Ordinance number 688 2026. as amended by
52:20council members Kazy, Hudson, Bishop,
52:22and Griffin by departmental request, an
52:25emergency ordinance authorizing the
52:26director of parks and recreation to
52:28execute various deeds of easements
52:30granting to the Northeast Ohio Regional
52:32Sewer District certain easement rights
52:35at or under several city-owned
52:37properties at Emory Park and Esther
52:40Brookbrook Park for the Northeast Ohio
52:42Regional Sewer District's Big Creek
52:44Storage Tunnel project and declaring the
52:46easement rights not
52:49needed.
52:50for city's public use.
52:53The amendments
52:58director,
53:00>> there is no legal objection to the
53:02legislation if amended as follows. one
53:04in the title at the end, strike the
53:07period and insert quote semicolon and to
53:11enter into an agreement with Northeast
53:13Ohio Regional Sewer District to accept
53:15the gift of cash for park improvements
53:19end quote. Number two, insert new
53:21sections seven and eight to read as
53:23follows. Section 7 that the director of
53:26parks and recreation is authorized to
53:28allocate 2,200
53:31$220,400
53:33for the sale proceeds of the
53:36non-exclusive easement interest
53:38authorized in section one of this
53:39ordinance to finance park improvements
53:42at Emory Park and $56,400
53:48of the sale proceeds to finance park
53:50improvements at Esesterbrook Park and
53:52that the funds are appropriated solely
53:54for that purpose. Section 8, that the
53:57director of of parks and recreation is
54:00authorized to enter into an agreement
54:01with NEOSD to accept the gift of cash in
54:05the amount of $450,000
54:08to finance park improvements at Emery
54:10Park, that the director is authorized to
54:13file all papers and execute all
54:15documents necessary to receive the
54:17funds, and that the funds are
54:19appropriated for these purposes. Number
54:22three, re number existing section seven
54:24to new section nine.
54:28What's your title? I I know you're Are
54:30you director? Director Commissioner.
54:32Commissioner. All right. Commissioner.
54:35>> Okay. Thank you, uh, Mr. Chairman. So,
54:37this project is known as the Big Creek
54:39Storage Tunnel. It's the seventh of
54:42seven combined sewer overflow storage
54:45tunnel projects um or cso for combined
54:48sewer overflow which are part of sewer
54:50district's project clean lake uh it
54:53which is a $3 billion 24-year program
54:57aimed at significantly reducing uh csos
55:01released into Lake Erie and other
55:03waterways in the greater Cleveland area.
55:05The Big Creek Tunnel is over four miles
55:08long. Um it's a 20 foot diameter tunnel
55:10built in rock 50 to 100 feet below the
55:14surface under Cleveland and also under
55:16the villages of Brooklyn and Lindale. Um
55:18this tunnel will capture and store
55:21combined sanitary and storm water from
55:2311 combined sewer outfalls and upon
55:26completion cso volume discharged to Big
55:29Creek and its tributaries will be
55:31reduced by 550 million gallons per year.
55:34Uh the sewer district is going to
55:36require access for construction and
55:38future maintenance for the project and
55:40is sinking three permanent surface
55:42easements, four subterranean easements
55:45and three temporary easements uh from
55:48the city at Emory and Esbrook parks. Um,
55:51and just to give you an overview of
55:53what's happening at each of the parks,
55:54at Emory Park, the tunnel is being
55:56constructed at the north end of the
55:58park, 70 feet below the surface, and
56:02park operations will not be affected
56:04other than contractor occupation of
56:07portions of the park green space. The
56:09contractor will provide acoustical
56:11fencing around the work area to reduce
56:12impact on park users and residents. And
56:16um I also want to note that future
56:17permanent easements will be needed at
56:19Emory Park for a future CSO project
56:22known as BCSO3
56:24uh which will begin immediately after
56:27Big Creek Tunnel is constructed and it's
56:30anticipated to start uh that is BCSO3 is
56:33anticipated to start in 2029 and be
56:36completed by 2031 at which time the
56:39sewer district will coordinate with
56:40parks and wreck on restoration of the
56:44park at Asterbrook Park. The sewer
56:46district will construct a tunnel shaft
56:48at the north northwest corner of the
56:50park 50 ft below ground. Park operations
56:53will not be affected other than a
56:56temporary relocation of the path from
56:58the playground in ball field or to the
57:01playground in ballfield. Um and similar
57:03to Emory, the work area will be fenced
57:06with acoustical fencing. And at the
57:09completion of the project, the sewer
57:11district will coordinate with parks and
57:12wreck on uh park restoration at
57:14Esesterbrook. The value of the easements
57:17um at Emory Park is $220,400
57:24and the sewer district has agreed to
57:26increase its restoration budget by uh
57:30$450,000 which totals $670,400.
57:35um to cover costs to install future
57:38improvements at the park. And these
57:40funds will be uh deposited into a a fund
57:43to be used solely for improvements at
57:44the park. At um Estherbrook Park, um the
57:49value of the easements is $56,400.
57:53And similarly, those funds will be
57:55deposited into a a fund created uh
57:59solely to be used for improvements at
58:01the park. We also have um guests from
58:03the sewer district. Doug Lata is to my
58:05right and Doug, what's your title?
58:08>> Program manager.
58:09>> Use the microphone, please.
58:10>> Program manager. And we have Angela
58:12Jones as well, who's our government
58:15affairs uh representative for Norid. And
58:18they can answer any questions that you
58:20might have.
58:22>> All right. Um, Commissioner, how much is
58:25this total project worth? So, the total
58:28the total amount of the easements um are
58:33let's see $670,400
58:38is the value of the easements and the
58:40gift of cash at Emory and at Estherbrook
58:45the um value of the easements is 56,400.
58:49So, I need to do some quick
58:50>> No, that that No, what I was asking is
58:53the whole project.
58:54>> Oh, the whole project. How much is the
58:56whole what is what is
58:58>> to the chairman? Uh $324 million is the
59:01big creek tunnel project. Uh the BCSO3
59:04project has not been bid yet, but it's
59:06in the60 to $70 million range that'll be
59:08at Emery.
59:09>> So we're looking at north of $350
59:12million for the whole project. Yes.
59:14>> Correct. Or right around 350. Um who
59:17pays for that? Who's paying for that?
59:19>> To the chairman, that would be the
59:20entire rateayer system uh of our 63
59:23communities.
59:24>> Okay. So this is being paid for by the
59:26rateayers of Northeast Ohio Regional
59:29Sewer District,
59:32not the Division of Water, not Water
59:34Pollution Control because a lot of
59:36people have a difficult time
59:38differentiating, right? Northeast Ohio
59:41Regional Sewer District is a county
59:44>> state
59:44>> state agency. Cleveland water, Northeast
59:48Ohio Regional Sewer District rates are
59:51set by Northeast Ohio Regional Sewer
59:53District, not us. As we set Cleveland
59:56water rates, I just want to make sure
59:59because I I've already started getting
1:00:01the phone calls, right? I just want to
1:00:03make sure that even to my colleagues
1:00:05that this is not uh a Cleveland project
1:00:08even though it's in the city of
1:00:09Cleveland that Cleveland's not paying
1:00:11for it. This is on Northeast Ohio
1:00:14Regional Sewer District. Um, and
1:00:16Cleveland Water doesn't have any
1:00:18responsibility
1:00:19here, uh, or anything like that. I just
1:00:22wanted to to put that out there and make
1:00:23sure that people are differentiating
1:00:26between the two because one of the
1:00:29confusions is Cleveland Water Bills for
1:00:31Northeast Ohio Regional Sewer District.
1:00:33So, everybody just thinks that it's all
1:00:35one, right? And it's really not. Um, but
1:00:38when it comes to a big project like
1:00:40this, this is not on um the city of
1:00:44Cleveland, right? And even though the
1:00:46city of Cleveland residents are part of
1:00:49your portfolio, so the the city of
1:00:52Cleveland residents ultimately because
1:00:54the rateayers are paying for this
1:00:57ultimately are paying for it. This is
1:00:59not a city-run project. You're just here
1:01:02looking for easements and and stuff,
1:01:06right, that they need to get this that
1:01:08they need to get this done. Um, now we
1:01:12have been having numerous conversations
1:01:14regarding this project because this is a
1:01:16very long project. U, we've met actually
1:01:19out at the site and you know that I do
1:01:21have some some issues and some concerns.
1:01:24um the fact that we're losing
1:01:28the the majority of even though I know
1:01:31you said that the park won't be
1:01:33interrupted. It it will be interrupted
1:01:35because they're taking twothirds of the
1:01:36park for
1:01:39up to seven years, five years, four,
1:01:42however long it's going to be. My
1:01:45neighborhood is losing three4s of its
1:01:47park for a significant amount of time.
1:01:51Um, and I'm I I didn't go over to the
1:01:54Esserbrook site, but I'm assuming that
1:01:55there's going to be some sort of
1:01:57disruption for some amount of time. I
1:01:59know that it's being staged at Emory
1:02:01Park, which is why it's going to be so
1:02:03long, you know, why it's going to be so
1:02:05long at Emory Park. My question is, how
1:02:07long will it take to get from Emory Park
1:02:11to start being disrupted
1:02:13at Esbrook? How long will it take that
1:02:16boring machine to get to Emory Park?
1:02:19>> To the chairman. Um, so essentially the
1:02:22the tunnel the large tunnel boring
1:02:24machine does not get to Esesterbrook
1:02:26Park. That's a different tunnel boring
1:02:28machine. It's a 10-ft diameter machine
1:02:29that will be run out of Esbrook. Uh, so
1:02:32that'll go in two directions out of
1:02:34Estherbrook to Brookside and then to the
1:02:36tunnel. Um, so from Emory, you probably
1:02:40have about a year to sink the shaft and
1:02:42get the machine to the shaft and put it
1:02:45into the shaft down to the bottom. Then
1:02:48you're looking at about a two-year
1:02:50tunneling operation, one and a half to
1:02:51two years. This is our longest tunnel at
1:02:5322,000 ft. That gets it all the way to
1:02:57uh Hener Road and 24th Street. So shaft
1:03:02three in the middle approximately half
1:03:04of that. So I would say a little less
1:03:06than a year um of tunneling. So from
1:03:09start to finish, you're probably looking
1:03:10at a year and a half to two years before
1:03:12it passes Estherbrook underneath Memphis
1:03:15Road. And then where where exactly? It's
1:03:17it's going to stop at west under we're
1:03:19never going to see it, right? Because
1:03:20it's going to be underground, but it's
1:03:22going to stop at West 24th over by over
1:03:25by Memphis over there.
1:03:27>> Yeah. At that point, chairman, it it
1:03:28ties uh there's gates that control it
1:03:31and it uh ties back into the Big Creek
1:03:33interceptor which runs along Hener Road
1:03:35and 24th Street in that area. So, we
1:03:37have to tie back into the existing
1:03:39infrastructure.
1:03:40>> Okay. Um, and then, uh, obviously, you
1:03:44know, I had the poll issue, right?
1:03:46Because one, you decided to go with
1:03:49First Energy and not Cleveland Public
1:03:51Power.
1:03:52Two, we have a number, how many how many
1:03:56additional polls are going to be dropped
1:03:58on West 130th between Emory and just
1:04:02past Bair?
1:04:03>> To the chairman, that's 17 new polls as
1:04:05we discussed, but those will be removed
1:04:07as well.
1:04:07>> Right.
1:04:08>> Wow. And how many how many poles are
1:04:11being removed when those 17 get placed?
1:04:17>> Uh to the chairman, we're installing
1:04:20nine new poles that will replace
1:04:22existing poles and then 17 new poles
1:04:25that we will remove.
1:04:26>> Okay. So we're we're replacing nine
1:04:28poles, right? Because
1:04:31>> they for whatever reason, right? We
1:04:34number number of different reasons.
1:04:35>> Yeah. they need to be higher to carry
1:04:37these the new power to the site. Um, and
1:04:39we found that those nine are areas we
1:04:42can consolidate where there was an old
1:04:43pole. We can put the lines existing
1:04:45lines onto those new poles and then just
1:04:48keep that new pole.
1:04:49>> All right. And then of the 17 new poles,
1:04:52these are going to be taller poles. So
1:04:53these are 60 foot poles as opposed to
1:04:55the 50 foot poles, right? How many of
1:04:57those 17 are going to remain um once the
1:05:01project is done?
1:05:03>> None of them.
1:05:03>> Okay. None. So, they'll all be gone.
1:05:05>> Correct.
1:05:06>> Is there a possibility
1:05:08um that some of the existing poles
1:05:10because these new these newer poles will
1:05:13be newer they're newer poles, right? As
1:05:15opposed to the older looking one. Any
1:05:17possibility of just transferring it that
1:05:21when when the project is done from to
1:05:24the new pole and removing the old pole
1:05:28so that when we're done it looks like we
1:05:30have a bunch of new poles as opposed to
1:05:34holes that have been replaced.
1:05:37>> To the chair, I think we'll continue to
1:05:39work with you, CI, CPP, on consolidating
1:05:42all those poles in the future. I think
1:05:44the ones that we're putting in are the
1:05:46larger diameter ones. So, there might
1:05:48not be a desire once those go in to
1:05:50leave those.
1:05:51>> Um, but we'll continue to work with you
1:05:53and everyone else to try to, you know,
1:05:55optimize what's out there.
1:05:57>> And this street is a little unusual
1:05:58because one side of the street is CI and
1:06:00the other side of the street is CPP. So,
1:06:03just for my colleagues um for that kind
1:06:06of knowledge. Um all right. Uh that's
1:06:09all the questions I have.
1:06:11>> Uh Councilwoman Hudson.
1:06:14>> Thank you, Mr. Chair. Um through the
1:06:17chair, I we've um exchanged some emails
1:06:19about the the trees that exist at um
1:06:23Aster Brook Park. Um, so I just want to
1:06:25clarify that um that for this section of
1:06:30uh park that's going to be um affected
1:06:33by this project that um you know there
1:06:36are several new trees that have been
1:06:38planted along um along Fulton there. Um
1:06:42and um I Suzanne let me know that um
1:06:48that Jim Mcnite requested that your
1:06:50contractor relocate the trees that were
1:06:53planted in 2024. So um I just want to
1:06:56confirm that that's part of the plan
1:06:58through the chair
1:06:59>> through the chair to the councilwoman
1:07:01that is part of the plan. Uh we've
1:07:02already talked about that. Um, so we
1:07:05will relocate those as well as when
1:07:07we're done uh with the Esesterbrook
1:07:08site, which will probably be around a
1:07:102year 2 and a half year period, we will
1:07:13replant trees in those uh in the area
1:07:16that we were occupying. So you'll get
1:07:17the relocated trees as well as new trees
1:07:20along Fulton.
1:07:21>> So um through the chair, all trees that
1:07:24will be removed, I'm sorry, that will
1:07:27all of the trees along Fulton will be
1:07:29relocated.
1:07:32the the trees that we will Yes. Uh
1:07:34that's correct. They're small enough
1:07:36where they can be relocated. Um they're
1:07:38not super large at this point because
1:07:40they were just planted. So, we will
1:07:42relocate those uh to wherever the city
1:07:44would like us to. And then we'll um
1:07:47hopefully establish them in their new
1:07:49locations as well as plant new trees.
1:07:51>> And then will um the sewer district be
1:07:54responsible for maintaining these re
1:07:57relocated trees? I would say for a
1:08:00period of time to establish them. Yes.
1:08:02>> Okay.
1:08:02>> Yeah.
1:08:03>> And so then is it correct to say through
1:08:06the chair that there are no trees that
1:08:08will be lost as a result of this
1:08:10project? And actually once it's
1:08:12completed, we will have several
1:08:14additional trees
1:08:16>> through the chair to the councilwoman.
1:08:17That is correct.
1:08:18>> Okay. And um it it was also uh mentioned
1:08:22that the $56,400
1:08:24that will be um you know paid for the
1:08:28easements that that it'll be used for
1:08:31improvements at Esesterbrook Park. Um
1:08:33what what will those improvements
1:08:35entail?
1:08:42>> Um uh through the chairman the
1:08:43counciloman. So we would work with you
1:08:46on what those improvements would be. We
1:08:48haven't we haven't really talked about
1:08:49that yet. Um I do know that there are um
1:08:53um you know some some seating that will
1:08:56be going in soon and and it's up to you
1:08:58how these funds would um complement
1:09:01everything else that's happening there.
1:09:03>> Okay. Thank you. And so through the
1:09:04chair, the $56,400
1:09:06in improvements would be in addition to
1:09:10uh restoring the site to its um you know
1:09:15existing or better condition that it is
1:09:17correct now.
1:09:18>> Okay. And then I have a question also
1:09:21about um I believe it's shaft BCT-2
1:09:27um which would be at uh 42 uh close to
1:09:324270 West 37th Street. There's a vacant
1:09:36lot there, but then there's also one
1:09:38home that was going to be affected by
1:09:40this project. Um can you give me an
1:09:42update you through the chair? Um, have
1:09:45you been able to acquire that property?
1:09:48>> Yep. Through the chair, to the
1:09:50councilwoman, we are still working on
1:09:51that. Um, we have had numerous uh
1:09:54yearslong discussion with that property
1:09:56owner through our real estate group. Um,
1:09:58we have uh also gotten approval from our
1:10:00board to appropriate that location. Uh,
1:10:03and we're in the process of filing that,
1:10:05but also working on a relocation
1:10:07agreement with the property owner um as
1:10:10well.
1:10:10>> Okay. So, um your your goal uh through
1:10:14the chair is to come to an agreement
1:10:17with the property owner and not use um
1:10:22eminent domain to acquire the property
1:10:25>> through through the chairman to the
1:10:26councilman. That's always our goal um to
1:10:28not um you know force someone out. Um
1:10:31however, we do have the consent decree
1:10:32and the federal timeline here. We've
1:10:34we've given that site another year of uh
1:10:37duration before we'll actually be there
1:10:39from the start of the project to give us
1:10:41even more time to negotiate there. Um
1:10:44but we do have to have that particular
1:10:46location to build the project. And so
1:10:48we're working diligently to relocate
1:10:50that individual as well as negotiate on
1:10:53the price of the new house that they
1:10:56would move into and the relocation cost
1:10:59would be covered as well.
1:11:00>> Okay. Thank you. um could you separately
1:11:04provide me with the contact information
1:11:06for the homeowner? I just want to, you
1:11:08know, be in contact with them and um
1:11:10make sure that
1:11:12>> that everything's okay.
1:11:14Um
1:11:16oh, and then I have another question.
1:11:17So, there's also shown on the map shaft
1:11:22BCT1.
1:11:24Um is that the end point
1:11:27>> through the chair to the councilman?
1:11:28That's correct. That is the shaft where
1:11:30we'll remove the tunnel boring machine
1:11:31and the flows will kind of be held there
1:11:33with a a gate when the project's done
1:11:35and then it'll tie back into the big
1:11:37creek interceptor that's on Henry.
1:11:40>> And I don't believe that's in W 11. I
1:11:42think that's in Councilman Harsh's ward.
1:11:44Um
1:11:44>> that's correct.
1:11:45>> Are there any homes or um is that in a
1:11:49um you know vacant land area?
1:11:52>> So we've acquired two homes there um
1:11:55which are in the process of
1:11:56transferring. Uh those two homes will be
1:11:58uh the homes will be raised and then
1:12:00we've gotten another uh property
1:12:02agreement with the Melnik Automotive
1:12:04Group which was a grass parcel that's in
1:12:07the back there. Uh so those three sites
1:12:10as well as one land bank site uh will
1:12:12kind of make up uh the shaft site to do
1:12:15the work. Then we'll we'll kind of
1:12:17shrink down a little bit for the final
1:12:19restoration there, but we will have
1:12:20maintenance responsibilities there to
1:12:22maintain the gates uh and to check on
1:12:24the sewer system long term. Uh so we'll
1:12:27landscape those with trees and other,
1:12:29you know, grass that will maintain
1:12:31forever.
1:12:31>> Okay. Thank you. And so through the
1:12:33chair, were you able to reach an
1:12:34agreement with those homeowners?
1:12:37>> We were. And we relocated those folks um
1:12:40out of out of those houses. Correct.
1:12:42>> Okay. Thank you. That's all.
1:12:43>> Thank you. Uh Councilwoman Uh, Hudson,
1:12:47uh, one quick question. The the the
1:12:50dollars that Estherbrook that's being
1:12:51allocated for Esther Brookbrook, does it
1:12:53have to go to the outside the
1:12:55restoration or or could if there's money
1:12:57left over, could it go to inside
1:12:59improvements as well at the rec center?
1:13:03I was just wondering
1:13:04>> uh, it Mr. Chairman, it could be either.
1:13:07So, it's just up to the as long
1:13:08>> as it's at Esesterbrook.
1:13:09>> Yes.
1:13:09>> Okay. Um, and then how many easements
1:13:13does the sewer district have around the
1:13:16city? Do we know approximately?
1:13:18I I know a ton. Right.
1:13:20>> That That's a good question, Mr.
1:13:22Chairman. I I'd have to go back and
1:13:24check. You mean for for the tunnel? The
1:13:26seven tunnel projects
1:13:28>> for that or for for whatever, right?
1:13:30>> For everything. Because my question is,
1:13:33does the sewer district just pay a
1:13:34one-time easement fee and then they have
1:13:36the easement forever or is there is it
1:13:38an on is there an ongoing charge to the
1:13:41sewer district to to have the easement?
1:13:43>> No, it's just a one-time fee. It's like
1:13:45a property transfer, you know, like a
1:13:48purchase of of deed rights. And so, it's
1:13:50just the onetime fee and it's, you know,
1:13:52it's set by appraised value.
1:13:54>> So, if they have an easement right, who
1:13:57owns that property? like who's gonna own
1:14:00where the easement is at Emory Park when
1:14:03the project's over.
1:14:05>> Um it would be the city. The city
1:14:07retains
1:14:08>> we still we still maintain it. They just
1:14:10Yes.
1:14:10>> The the sewer district then just has the
1:14:12right to come onto the property whenever
1:14:14they want and do whatever they need to
1:14:15do and da da da.
1:14:17>> Exactly. Exactly.
1:14:18>> Okay. Anybody else? Councilman Sha.
1:14:22>> Okay.
1:14:23>> Yeah. Um just um wanted to follow up on
1:14:27um Councilwoman Hudson's questions on
1:14:29the eminent domain. So sounds like the
1:14:32sewer district has is willing to use
1:14:34eminent domain for a public par to
1:14:39convert a private parcel into a public
1:14:41parcel for a need that the sewer
1:14:43district has determined. Correct.
1:14:45>> Through the chairman to the councilman.
1:14:47Yes. Uh we don't like to do that
1:14:49obviously. um we haven't done it very
1:14:52often but um the schedules for all these
1:14:54projects are dictated uh to us by the uh
1:14:57US EPA federal EPA um so certain cases
1:15:01that does come up uh we continue to
1:15:03negotiate even after we file we continue
1:15:05to do mediation and try to negotiate to
1:15:08a different location um but that does
1:15:11happen that's a tough one I'm just
1:15:14flagging that for my colleagues um and I
1:15:18know you've made it a point I know
1:15:19there's been some concern about using em
1:15:21domain. Um, and I just want to point out
1:15:24that it is a routine thing that other
1:15:26public entities do and we should be
1:15:28doing more of that as well. So, um, I
1:15:30wanted to, um, follow up on the can you
1:15:32just explain briefly what project clean
1:15:35lake is and kind of where we are in that
1:15:37time frame? We're still on track to
1:15:40finish within the initial I think it was
1:15:4124 year timeline.
1:15:44>> Yeah, through the chairman to the
1:15:45councilman. Uh, yes, that's correct. Uh
1:15:47we're probably at the 3/4 point of the
1:15:50program. Uh it was originally a 25-year
1:15:52program. We've negotiated it down to a
1:15:5424 for some other concessions. Um we'll
1:15:57probably finish, if everything goes well
1:15:59in the Big Creek Tunnel, uh about two
1:16:01years early. Um but if something were to
1:16:04happen underground, that two years could
1:16:06evaporate, you know, rather quickly. So
1:16:08we try to, you know, move projects up as
1:16:10early as we can. Um and yes,
1:16:14everything's going well. The whole
1:16:15program is essentially to keep the
1:16:17combined sewer overflows uh out of the
1:16:20waterways of Cleveland uh Kaihoga River,
1:16:23other uh streams and that. Um so at the
1:16:26end of the program, we'll go from 4 and
1:16:28a half billion gallons going out per
1:16:30year to 150 million gallons going out.
1:16:34Um and we're already making great
1:16:35progress with our our other five tunnels
1:16:38that are online. Uh, so we have tunnels
1:16:40on the east side that are already
1:16:42online, a westerly tunnel and a
1:16:43southerntherly tunnel that's about 70%
1:16:46constructed.
1:16:47>> That's great. Um, that's all. Thank you.
1:16:50>> Thank you, Councilman Conwell.
1:16:52>> Yeah, you know, um,
1:16:56Northeastern Regional Sewer District,
1:16:59you guys do a great job through the
1:17:01chair and, um, have you reached out to
1:17:04the residents to talk with them? you
1:17:06know, after you talk with the council
1:17:07member
1:17:10>> through the chair, to the counciloman,
1:17:12uh, councilman. Uh, yes. Uh, we've had,
1:17:14uh, meetings with, uh, Councilman Kazy.
1:17:16Uh, we're going to have one on Veterans
1:17:18Day with Councilwoman Hudson. Uh, we've
1:17:21had many other conversations uh, along
1:17:23the way. So, since this was a two-year
1:17:26design, we've uh, we've had a chance to
1:17:28to meet with a lot of people so far.
1:17:31>> Yeah, they're they're very very good.
1:17:33Um, councilwoman through the chair to
1:17:35the council woman. Matter of fact, um,
1:17:39C uh
1:17:42um, Angela Jones through the chair, I
1:17:45remember um, when we didn't have a huge
1:17:48meeting and we had to do some sewer um,
1:17:51work over there 123rd Street. Well, we
1:17:55were we went knocking on doors. Did the
1:17:57chair remember that? They will actually
1:18:00so that way the residents will be able
1:18:02to talk with them even if they don't
1:18:04come to meetings cuz they know that um
1:18:08all the time that majority of your
1:18:10residents will not come to a meeting but
1:18:11they'll call you about an issue and
1:18:13concern and they went door to door with
1:18:15me uh which I was very very happy and
1:18:18the residents saw that they were honest
1:18:20they didn't over um promise but they
1:18:23came through and every
1:18:26uh um project that they did in the
1:18:29Glennville community. Uh they left it
1:18:31better. The parks, um everything that
1:18:34they touched, first the residents were
1:18:36nervous about it, but they left it
1:18:38better. Matter of fact, to a point that,
1:18:40um I end up developing around their
1:18:44projects to make that whole area better
1:18:47to kill some of the blight. Um, I was
1:18:50looking at two weeks ago around the KAB
1:18:52Bates house where they build I don't
1:18:55know what you call it, but they made it
1:18:57better. Everywhere they go, they make it
1:19:00better and they listen to the residents.
1:19:01So, you won't have any problems out of
1:19:03them. It's a good They do a great great
1:19:06job. Matter of fact, um, their doors are
1:19:09open to me and I like I visit you
1:19:12unannounced. I visit them unannounced as
1:19:15well and it's open and they narrate
1:19:17things to me. So they're good partners
1:19:19to work with and thank you very much.
1:19:22>> All right. Thank you, Councilman
1:19:23Conwell. Councilwoman Gray.
1:19:25>> Yes. Thank you, Chair. I just want to
1:19:27echo what Councilman Conwell said
1:19:30because uh when uh I want to echo I just
1:19:32want to say Angela, you are just
1:19:34fantastic. Not saying any you guys are
1:19:36not. I just work very closely with uh
1:19:39Angela Jones that always email me and we
1:19:42meet at meetings. But I want to say that
1:19:45they have done a great job. Even when
1:19:47they did the Union Buckeye
1:19:48infrastructure many years ago, that is
1:19:51just still uh exquisite. The residents
1:19:55love the whole green space
1:19:58infrastructure how you have it set up.
1:20:01You know, they were even thinking that
1:20:03you was going to come back chair to the
1:20:05team that you was going to come back and
1:20:06build housing
1:20:09pertaining to the, you know, pertaining
1:20:11to what you have left. But it was a
1:20:13beautiful, beautiful uh setting, you
1:20:15know, especially up and down Buckeye
1:20:17Road. So, I just want to echo uh
1:20:19Councilman Conwell on that on that
1:20:22project and also the Southern Thing
1:20:23project, you know, which is Kingsbury
1:20:25that you're working on now. So, thank
1:20:27you for that.
1:20:29>> Thank you. Anything else, Councilwoman
1:20:30Gray?
1:20:31>> No, that's it, Tier. All right, one more
1:20:33thing
1:20:34>> with that. One more thing. I'm sorry.
1:20:36Yes, we have a a proposed amendment on
1:20:39order 6882026.
1:20:42Um, since the chairman, you know, the
1:20:45chairman uh have u issue with the polls
1:20:50and I have an amendment per se. So, the
1:20:54district shall seek CI's approval to
1:20:57remove or replace existing poles that
1:21:00carry the large power supply lines and
1:21:03poles used to provide temporary
1:21:06construction power for the tunneling
1:21:09equipment along West 13th after the
1:21:12completion of the district projects all
1:21:15at the district cost and must be
1:21:18completed on or before 1231 2032. We
1:21:22have an amendment. Do we have a second?
1:21:24>> Second. Do we have any discussions? All
1:21:27in favor of the amendment?
1:21:28>> I
1:21:34do.
1:21:36So it'll have to be after the where's
1:21:39somewhere
1:21:41>> where
1:21:47>> I mean this is
1:21:49>> this is kind of this is a big so it
1:21:52would be
1:22:03>> why don't we make it a new section
1:22:04eight. Oh, no. Why don't we Why don't we
1:22:09make it
1:22:11the new section seven and then renumber
1:22:14section seven, I guess, because that's
1:22:16already an amendment, section seven,
1:22:18isn't it?
1:22:23>> So, this is new section seven.
1:22:24>> This will be new section seven. And then
1:22:27the new section
1:22:29seven will be eight. Eight will be nine
1:22:31and nine will be 10. Now,
1:22:33>> all right. Make make sense?
1:22:35>> You got that?
1:22:36>> Got it.
1:22:36>> Okay. All right. Any other questions?
1:22:42>> No.
1:22:43>> All right. Thank you very much. We
1:22:45appreciate it. Uh with that, section 688
1:22:482026 as amended, stands approved. Please
1:22:51sign up. That concludes this uh
1:22:54committee of utilities until the call of
1:22:56the chair on October 29th.
1:22:59Thank you, Susan. Thank