2026-10-13 - Planning Commission
Summary
Based on auto-generated captions; names and details may be misheard.
Time on topic (from transcript timestamps; approximate, includes side talk):
| Topic | Minutes | Share |
|---|---|---|
| Mosby Bragtown Rezoning | 52 | 30% |
| Lakewood Small Area Plan | 50 | 29% |
| Glenn School Road Mixed Use Rezoning | 25 | 15% |
| Omnibus 20 UDO Text Amendment | 19 | 11% |
| Thompson Village Rezoning | 11 | 6% |
| Shannon at Old Chapel Hill Road Text Modification | 8 | 5% |
| Other business | 7 | 4% |
- Tuesday, October 13, 2026.
- Captions start at 00:28 with a false start while audio was sorted out; the meeting began at about 00:51 and adjourned at 2:52:12 (8:22 p.m.).
- Shares use the roughly 171-minute meeting.
- There was no recess or closed session; a short pause around 1:51:42-1:52:17 while the room emptied after the Mosby Bragtown item is not counted.
- The Planning Commission advises City Council and the County Board of Commissioners; the final say is theirs.
- Chair Shagaras presided; a quorum was present at roll call and two more commissioners arrived later (votes ranged from 8 to 1 up to 11 to 0).
Other business
0:51-5:04, 2:49:37-2:52:12
- Roll call, no agenda changes, and minutes and consistency statements of 2026-08-11 approved by voice vote.
- No committee updates. Officers: Vice Chair Cameron was chosen chair and Chair Shagaras vice chair, both by voice vote with no nays (staff explained the city-appointee and county-appointee rules).
- Staff announced a planner, Andy Lester, left the department and the position will be filled.
Omnibus 20 UDO Text Amendment
5:04-23:32
- Robin Schultz presented case TC260003: technical updates to 10 articles of the ordinance, many driven by new state laws on appeals, home businesses and window requirements.
- Two public speakers said the changes narrow notice, appeal and record rights more than state law requires and asked for a one-cycle delay. Staff said it would check with the city attorney's office.
- Chair asked about notifying renters and calling the chicken rule "hens"; staff said both could be done.
- Commissioner Clemens's motion to postpone to 2026-11-10 died without a second. Favorable recommendation passed 8 to 1.
Thompson Village Rezoning
23:32-34:30
- Payton Burgess presented case Z250026: about 4.5 acres from Residential Suburban 20 to Planned Development Residential 4.161, now up to 19 units (down from up to 80 requested in August).
- One neighbor worried about annexation and utility costs; the chair said the city does not annex involuntarily. A commissioner asked about emergency access.
- Favorable recommendation passed 9 to 0.
Glenn School Road Mixed Use Rezoning
34:30-59:10
- Case Z250024: about 180 acres at Glenn School Road and I-85 for light industrial, up to 235 townhouses and up to 20,000 sq ft of commercial, with Intercross Road realigned away from the interstate ramp.
- The applicant's attorney highlighted a commitment that every townhouse be affordable to households at 80 percent of area median income. Speakers were supportive or asked for community contributions, a supermarket and clarity on street connections.
- Applicant added commitments on special-use limits and a buffer; favorable recommendation passed 8 to 1.
Mosby Bragtown Rezoning
59:15-1:51:27
- Payton Burgess presented case Z250047: about 13.3 acres in Braggtown to Planned Development Residential 22.414 for up to 299 apartments. The owners' representative and attorney announced several new commitments (school contribution up from $4,000 to $7,000, 60 percent of area median income affordability for 5 percent of units, EV charging, stormwater).
- About a dozen speakers, including several from the neighboring Sikh temple, raised traffic on Roxboro Road and Banner Street, school and Durham Tech funding, sidewalks and recreation; the temple asked for denial unless eight commitments were added. Pablo Friedman spoke on school proffers and emergency services.
- Applicant said a traffic study was not required, a signal would not be allowed by the state, and it was open to dropping vehicular access on Berwin Avenue.
- Motion for a favorable recommendation failed 6 to 3, which sends it to Council as a denial recommendation.
Shannon at Old Chapel Hill Road Text Modification
1:52:17-2:00:00
- Javar Jones presented case Z260011: replacing 17 approved apartments with 17 townhouses (up to 60 townhouses), no zoning or density change.
- No public speakers; favorable recommendation passed 11 to 0.
Lakewood Small Area Plan
2:00:06-2:49:35
- Sarah Long presented the draft plan for the Lakewood, Weston and Lion Park neighborhoods, including guidance for redeveloping the Shops at Lakewood.
- Owner representatives asked to continue the plan, saying the drawings overreach and ignore recorded restrictions; a resident said the plan was good but outreach missed neighborhood demographics.
- Commissioners praised the work but cited missing cost estimates, representative outreach, the closed Lion Park, and owner engagement. Motion to continue to 2027-01-12 passed 11 to 0.
Sources
Video
Transcript
These are auto-generated captions; names and numbers may be misheard.
Transcript
00:28[clears throat] the members of the dur.
00:30Yikes.
00:37>> The members
00:39>> disconnect audio.
00:41>> It's already out.
00:43>> Turn your sound off.
00:51>> All right,
00:53let's try again. Good evening and
00:55welcome to the Durham Planning
00:56Commission. The members of the Durham
00:58Planning Commission are appointed by
01:00city council and the Durham County Board
01:03of Commissioners to make recommendations
01:06to the elected officials. We emphasize
01:09that the elected officials have the
01:10final say on any issue before us
01:12tonight. If you are intending in person
01:14and wish to speak on a particular agenda
01:17item, please register on the signup
01:19sheets located on the table to my left.
01:23You will be called upon to make your
01:24comments at the appropriate time. You
01:27may also call in during the meeting by
01:29592.
01:31If you call in during the meeting, you
01:32will need to wait until the particular
01:34public hearing you are interested in
01:36starts. After all of the pre-registered
01:39speakers have shared their comments, I
01:41will ask if there is anyone else wishing
01:43to speak. At that point, you will need
01:46to digitally raise your hand by pressing
01:48star9 on your phone. When recognized,
01:52state your name and address address
01:55before making your comments. The
01:57applicant has a total of 10 minutes for
01:59their presentation.
02:01Each speaker after the applicant has two
02:03minutes to speak. Commissioners will be
02:06given five minutes for Q&A. Please keep
02:09your comments succinct. Commissioners,
02:12as a reminder, after the public hearing
02:14is closed, you obtain the floor by being
02:17recognized by the chair. The time to
02:19make all public statements is before
02:21motions are made. All motions are stated
02:24in the affirmative. So if a motion fails
02:26or ties, the recommendation is for
02:29denial.
02:30After the case you are here for ends,
02:32please exit the chambers quietly and
02:35pursue further discussion in the lobby
02:37as the commission continues its meeting.
02:40Finally, I ask everyone here and on the
02:42Zoom, the commission members, the staff,
02:45and the public to conduct themselves in
02:47a courteous and respectful manner. If
02:50someone fails to act in that manner, the
02:52chair will ask the offending person or
02:54persons to be muted on the Zoom or asked
02:57to leave the council chambers until such
03:00time they can regain personal control.
03:03If decorum fails to be restored, the
03:05chair will recess the meeting until a
03:07genuine commitment to act respectful and
03:10courteous is observed.
03:12May we have the roll call, please.
03:22>> Chair Shagaras
03:23>> here.
03:24>> Vice Chair Cameron
03:26>> here.
03:27>> Commissioner Bailey
03:28>> here.
03:31Commissioner Capers,
03:33Commissioner Clemens [snorts]
03:34>> here,
03:36>> Commissioner Chicowski
03:37>> here,
03:38>> Commissioner Hunter,
03:41Commissioner Huarez Maldonado
03:44>> here,
03:45>> Commissioner Montes,
03:48Commissioner Ninker,
03:51Commissioner Pionek
03:52>> here,
03:54>> Commissioner Richie,
03:57Commissioner Wen
03:59>> here,
04:00I'm sorry.
04:01>> I'm sorry. That was Wen [laughter]
04:04>> here.
04:06>> Commissioner Woke
04:07>> also here.
04:08>> We're going to have to get used to that.
04:10So, I understand that Commissioners
04:12Richie and Hunter are on their way. Um,
04:14they will be able to participate in any
04:17item for which they are here for the
04:18opening presentation. Um, but we do have
04:21a quorum.
04:25>> Item number three, adjustments to the
04:27agenda. There are no adjustments to the
04:30agenda.
04:32Item number four, approval of the
04:34minutes and consistency statements.
04:38Madame Chair, I move to approve the
04:40minutes and consistency statements from
04:42August 11th, 2026.
04:45>> A second.
04:47>> It has been moved by Vice Chair Cameron
04:49and seconded by Commissioner Bailey to
04:52approve the minutes and consistency
04:54statements. All in favor, please say I.
04:59>> any nays? Nope. The eyes have it. Item
05:04number five on the agenda, public
05:07hearings, text amendments, omnibus 20
05:10TC26 quadruple 03. May we have the staff
05:14report, please?
05:30All right, while the presentation is
05:32getting pulled up, I'm just going to
05:33start. Uh, good evening. My name is
05:35Robin Schultz. Um, before I begin, all
05:39planning public hearing items have been
05:42heard and noticed in accordance with
05:44state law and affidavit of such are in
05:46record of the planning department. I
05:48haven't said that in a minute, so if any
05:49of that is incorrect, um, you can find
05:51me personally. But we should be good.
05:54Uh, we did notice everything. Anyway, my
05:57name is Robin Schultz. I'm presenting to
05:59you all tonight on TC26 quadruple03
06:02omnimous 20 um here at the planning
06:05commission tonight.
06:09Uh so as a reminder an omnibus is a
06:12specific type of text amendment is
06:13intended to provide clarifications,
06:16corrections, technical revisions and
06:18updates to the ordinance as uh
06:22essentially mandated through legislative
06:23updates. Um larger policy shifts go
06:26through a different process. Um
06:28generally they have you know more
06:29engagement um things of that nature. Uh
06:33and so this is more of a hey these are
06:35changes that we need to make either to
06:37clarify the ordinance um or to ensure
06:40that the UDO is in compliance with all
06:42state uh uh regulations.
06:47So Omnivis 20 makes updates to 10 of the
06:50articles within the UDO. Majority of
06:52those are technical revisions or
06:53response to legislative updates. Um
06:56there are quite a few things that have
06:58popped up. Um the appropriations act.
07:01So, we finally got a budget uh which
07:03altered the process of appeals for
07:05administrative decisions uh no impact
07:08homebased businesses. So, removed our
07:10ability to uh require permitting for
07:13most homebased businesses uh and the
07:16regulatory reform act uh which limits
07:18the amount of glazing so windows uh uh
07:22that local governments can require on
07:24commercial or multif family structures.
07:27And I did just want to note that there
07:28were some other changes uh but those
07:31required updates to our processes um
07:34things around permit choice and free
07:35transparency. So you will not see those
07:38in the omnibus 20 document. Those are
07:40administrative.
07:44Uh and staff is available to answer any
07:45questions.
07:55Are there any
07:58The chair is now opening the public
07:59hearing. We've already had the
08:01applicant, but community members in
08:04person,
08:05Mimi Kesler.
08:12[snorts]
08:23Good evening, commissioners. My name is
08:25Mimi Kesler and I live in Durham. I
08:28always call these omnibus text
08:30amendments ominous because they are very
08:33tricky. I sent you an email this
08:36afternoon when I realized that whatever
08:38time I would be allotted would not be
08:41sufficient for me to go through my
08:43concerns. As stated in the cover letter
08:46for these amendments, it is to clarify
08:48language, correct inconsistency, and
08:51reflect legislative updates.
08:54As I read the law and the document being
08:57edited, I do not think that this draft
09:00reaches that goal. Some of it removes
09:03access to the public and the law does
09:06not require the narrowing of the notice
09:08provision already in 3.1.5.
09:14The statute does not expressly require
09:16Durham to eliminate other
09:18interpretations
09:19procedures or restrict all requests for
09:23interpretation to the people under
09:26subsection B1.
09:29The proposed changes to 3.1.5
09:33raise additional questions about how the
09:35city is incorporating the new statutory
09:38requirements.
09:403.1.5 does not expressly address the
09:44statute's written notice requirement.
09:47The proposed amendment narrows that
09:49language to the newly defined official
09:53interpretation,
09:54potentially reducing the scope of
09:57Durham's existing public notice
09:59requirements rather than merely
10:02implementing the new state law.
10:05These distinctions matter because
10:07subsection B already governs
10:10administrative determinations and is
10:12expressly
10:14referenced in Durham's existing
10:16interpretation procedure.
10:19It does not expressly require Durham to
10:22narrow the notice provisions already
10:24established under 3.1.5.
10:30I have more to say, but [laughter] but I
10:32respectfully ask that you continue this
10:36for one cycle at least until we can get
10:40these questions answered. Thank you.
10:42>> Thank you.
10:45>> Is there a response from the applicant?
10:48>> Sure. So, this was drafted in
10:52coordination with the city attorney's
10:53office. Um essentially state law did not
10:57give broad authority to or it was uh
11:00much there was not direct uh direction
11:05to the planning and development director
11:06on how to provide those interpretations
11:09beforehand and it actually reduced the
11:11amount u that she is able to provide. Um
11:15so essentially what it's done is it says
11:17that you can no longer ask the planning
11:19and development director for large broad
11:22interpretations. So you cannot ask the
11:25the the director how does this work in
11:27every situation. What you can do is
11:30submit uh for an official interpretation
11:33of how a certain uh administrative
11:35decision affected a certain site. So she
11:38can make uh determinations and
11:40interpretations on a case-byase basis
11:42that are specific to a site. Um and then
11:45those can be then appealed through that
11:48administrative decisions uh process. Um,
11:52so that that is the the the real change
11:55in the shift. However, this was written
11:57uh like I said with the city attorney's
11:59office. We it's not our intent to change
12:01any recordkeeping, any uh changes of
12:04notice, anything along those lines. Um
12:07the planning director does have the
12:08authority to make determinations um
12:10which are not constructed and noticed
12:12right in the sort of everyday manner
12:15that uh departments function. So that is
12:18not changing. Essentially what is
12:19changing is making it very clear what
12:21Sarah or the planning and development
12:23director can interpret at what time and
12:25then how it is um how it can be
12:28appealed. Though I will say we will take
12:31this um and those concerns and speak
12:34with the city attorney's office to
12:36double check and make sure that we are
12:38not creating a situation in which we are
12:41providing less notice um or keeping
12:43records in a different fashion.
12:48Thank you. Is there anybody on the Zoom
12:50that wishes to speak on this item?
12:52Please
12:53raise your hand. Use the raise your hand
12:56function.
13:05Nope. Anybody?
13:07Oh, Malora McCall.
13:25Hi, can you hear me?
13:27>> Yes.
13:29>> Oh, hi. Thank you. Um, my name is Mor
13:31McCall. I also had some similar
13:34questions. Um, and I emailed you just
13:36shortly before this meeting that I think
13:37have also more than I will be able to
13:38say tonight. But I think my central
13:41concern is that the public and the
13:42voting body hasn't provided the
13:44sufficient information to meaningfully
13:46understand these amendments. The staff
13:48memorandum cites 39.5A of the session
13:52law concerning the administrative
13:54appeals. But section 3.1 has to do with
13:57section 39.5E
13:59which is establishes that new
14:01requirement for written binding
14:03interpretive determinations.
14:05Um, so I understand that the new law
14:07established as an additional statutory
14:09interpretive determination procedure,
14:11but it didn't require Durham to go
14:13restrict its existing interpretation
14:16procedures. Um, so the UDO already
14:19provided for that interpretation
14:20authority for written requests and
14:22responses. Um, I'll note that the new
14:26language says a proposed uh language,
14:30sorry, the interpreter may only issue an
14:32official interpretation for
14:33administrative decisions, which is also
14:35in the new title, but the statute
14:37requires written binding determinations
14:40concerning how development regulations
14:41apply to a given set of facts. It does
14:44not require a prior administrative
14:46decision. So, I wonder about this
14:48proposed ordinance language um kind of
14:51imposing that limitation.
14:54Um the constructive notice language I
14:57also noted kind of narrowed from an
14:59interpretation to only an official
15:01interpretation.
15:03And I think it's hard to sus out what
15:05changes were legally required under this
15:08new session law versus what's
15:10discretionary policy changes being
15:12introduced um you know kind of as these
15:15technical amendments. Um so I do think
15:17there are some substantive questions
15:19about how things work today and what's
15:24being reduced by calling them all
15:26official interpretations. Um while the
15:29director maintains the ability to
15:31interpret the ordinance which is written
15:33in the proposed language and current
15:34language but the ability to appeal or be
15:38noticed or written record is reduced
15:40down to the official interpretations
15:43only. So I think it should also be
15:45deferred for more clarification. Thank
15:47you.
15:50>> Thank you. Is there anybody else
15:53[clears throat] on the Zoom wishing to
15:54speak on this item?
15:58Please raise your hand
16:00or press star 9 if you're on the phone.
16:12Going once, going twice,
16:17gone. The chair is now
16:21No.
16:23Yes. Do you have any response to those
16:26questions or are they the same concerns?
16:28>> Those sound to me to be the same
16:30concerns. However, I have not seen what
16:34um Miss McCall has sent. Um, so like I
16:37said before, I'm happy to take this back
16:40to the city attorney's office before it
16:42moves forward to ensure that it is in
16:44line with state law without reducing any
16:46of the uh notice or recordkeeping
16:49capacity and ensuring that it still is
16:52holding true to what the state says that
16:54Sarah can issue an official
16:56interpretation for.
16:59>> Thank you.
17:02>> All right. Now the public hearing is
17:04closed or open for commissioner
17:06discussion. Do the commissioners have
17:07any questions or comments?
17:10>> Yes.
17:12Is there any reason not
17:13>> Commissioner Clemens?
17:15>> Yes.
17:16>> Thank you. Is there any reason to not
17:19continue it for further public comment
17:22and review?
17:23>> You have the ability to uh provide that.
17:27You have the ability to continue at any
17:29point. Um, and I don't want to advise
17:31you on that. Um, but I will say that I
17:35feel confident that we can speak with
17:36the city attorney's office and provide
17:39that as a followup within the next memo
17:41for city council sort of detailing those
17:43concerns. But like I said, um, I have
17:46not seen that email or read those
17:50concerns. So, um, but given what I've
17:53heard, um, I feel confident that we can,
17:57uh, speak with the city attorney's
17:58office. However, like I said, um, I
18:01don't want to advise you on your action.
18:02I'm just letting you know, um, either
18:04path forward would work for the planning
18:06and development department.
18:12>> Okay. Can we request that it be
18:15continued
18:17before the public comment and review?
18:22uh Boinsky plan development. I would
18:24just add the to your to your question
18:26about any um there are other portions of
18:28the honor text amendment that currently
18:30aren't in align with the new
18:32legislation. So we certainly do have uh
18:36an interest in moving forward with these
18:38changes so that our uh our local
18:40ordinance aligns with state statute.
18:45>> I have a few questions. Are there any
18:47other commissioners? Nobody over here.
18:51>> D Commissioner Chicowski.
18:53>> Thank you. Yeah, just a a quick comment.
18:56I think [clears throat] a thing that is
18:57under discussed in my opinion here and
18:59and and municipal governments broadly is
19:01the cost of moving slowly. There is a
19:03real cost to delaying. And so I think
19:05for that reason I would I would like us
19:06to move forward kind of based on the the
19:08comments from from staff. Um if that's
19:10something that folks would be open to.
19:15>> Thank you. Any other commissioner
19:17comments? I'm going to ask my questions.
19:19They're a little bit simpler. In article
19:22three, there is no notice sent out to
19:24renters. It's just a property owners.
19:28Is there any way we could get the
19:29renters included so they know what's
19:32going on?
19:34>> Yes.
19:35>> Even if that's not part of the North
19:36Carolina General Statute, I don't think
19:38it would be against the law. I can
19:40definitely look into seeing if we can
19:42incorporate that into the draft before
19:44it goes to the governing bodies for
19:46sure. We have a precedent for that in
19:48other parts of the ordinance.
19:50>> All right. And on article five, just to
19:52prove that I actually read it that
19:55refers to domestic chickens.
19:57>> Can is that wise or should we say hens
20:00because I don't think people want
20:01roosters running around, but if you want
20:03chickens that's fine also.
20:06>> Yes. So
20:08it's currently called domestic chickens
20:10right now because that's what it's
20:11called in that actual section of the
20:13ordinance lower. So we've just altered
20:16it from limited agriculture city only to
20:18domestic chickens so that it matches the
20:20other ordinance title which does state
20:23that you can't have roosters within the
20:25city limits. Um
20:28I see your point about semantics and
20:30that's something that we can definitely
20:31consider. Um it would just require
20:33bringing in that other section and just
20:34calling it hins as well.
20:37Thank you. That's all my questions. Um,
20:41uh, Commissioner Clemens, if you wanted
20:43to make a motion to
20:46postpone this, you can make a motion.
20:48Then it would have to be seconded and
20:50then we would have to vote on it.
20:53I'm personally in favor of moving
20:55forward on this this evening and having
20:59uh, city staff communicate with the
21:02attorney's office on the feedback we've
21:04received here tonight.
21:10Madame Chair, I would like to offer a
21:12motion that we continue this for further
21:14public comment and review.
21:18If I may, staff would ask that you uh
21:21post if you are going to postpone to
21:22postpone to a date certain
21:25um so that everyone knows what the date
21:27is that it would come back and we would
21:29not have to readvertise.
21:34Would that date be the next planning
21:35commission meeting?
21:37>> Would that date be the next planning
21:38commission meeting?
21:41>> It it could certainly be the next
21:42planning commission. You would just uh
21:44postpone it to or you would your motion
21:46would be to postpone to the November 10,
21:48I believe.
21:51>> Yes, the November 10th meeting.
21:54>> Okay. So, do I need to redo my motion?
21:58I'd like to make a motion to postpone
22:01this item until the November
22:0610th
22:07>> November 10th meeting before the
22:09commission.
22:11Commissioner Clemens has made a motion
22:14to postpone or delay this item for one
22:17cycle until the November 10th meeting.
22:19Is there a second?
22:27Seeing no second, the motion fails and
22:30we
22:32can now move to vote on the item as
22:35presented.
22:37>> Chair, regarding case
22:40omnibus 20ct
22:4326 quadruple 03. I move that we forward
22:48this case to city council with a
22:50favorable recommendation for approval.
22:53A second.
22:56>> It has been moved by Vice Chair Cameron
22:58and seconded by Commissioner Bailey to
23:00move this case TC26
23:04quadruple 03 omnibus 20 forward with a
23:07favorable recommendation. Please open
23:09the electronic voting.
23:27The motion passes 8 to one.
23:32Next item on the agenda, 6A, public
23:36hearings, zoning map changes, Thompson
23:40Village Z25026.
23:44May we have the staff report, please?
23:56Good evening, Chair Shagaras, Vice Chair
23:58Cameron, and planning commissioners. My
24:00name is Payton Burgess, and I am here
24:01tonight to present Z250026
24:05Thompson Village.
24:09The proposal requests to reszone seven
24:11parcels of land totaling approximately 4
24:13and a half acres from residential
24:15suburban 20 to plan development
24:17residential 4.161.
24:19This request was continued at the August
24:22planning commission meeting where the
24:24applicant was previously requesting to
24:25be reszoned to residential suburban
24:27multifamily with a development plan that
24:30would have allowed for up to 80 units.
24:32The newly requested PDR 4.161 zoning
24:36would allow for up to 19 dwelling units
24:38to either be single family detached,
24:40attached, townhouse, detached rowhouse,
24:43or duplexes.
24:47Again, the updated request is to reszone
24:49the existing residential suburban 20 to
24:51plan development residential 4.161.
24:54The site is currently surrounded by
24:56residential suburban 20.
25:00The aerial map shows the general
25:02location of the project.
25:08The property is designated mixed
25:09residential neighborhood on the place
25:11type map. The proposal was found to be
25:13consistent with the designated place
25:15type.
25:18The textual development plan has a
25:20variety of commitments that were heard
25:21at the August meeting. Since this case
25:23was last heard by the planning
25:24commission, the applicant has added
25:26commitments regarding yard minimums,
25:28garage setbacks, additional grading
25:30limitations, and remove the commitment
25:32to 5% tree coverage.
25:36The applicant held neighborhood meetings
25:38on March 11th, 2026 and July 27th, 2026.
25:42No community members attended the first
25:44and one attended the second. There have
25:46been two comments against this proposal
25:48received on the Durham Reszoning
25:49Explorer.
25:52The proposal is consistent with the
25:54designated place type map of mixed
25:55residential neighborhood and with 13 of
25:5821 applicable comprehensive plan
25:59policies. Though it should be noted that
26:02three of the policies are to be
26:03determined as the fiscal impact analysis
26:05and utility extension agreement are
26:07being completed. Thank you. Staff and
26:09the applicant are available to answer
26:11any questions.
26:13>> Thank you. The chair is now opening the
26:15public hearing. May we have the
26:16applicant, please?
26:28Good evening, Madame Chair and Planning
26:30Commission. My name is Lee Lambert. I
26:32live at 505 Yorktown Court, Chapel Hill,
26:35NC. I have extensive history of Durham.
26:39In fact, over 60 years ago, my
26:41grandfather helped my aunt buy this
26:43property. And I remember as about a
26:465-year-old a little while later helping
26:49build the house that's on the corner.
26:51[clears throat] I've met with neighbors.
26:53Um we actually had a third meeting and
26:56we've had three people come had did have
26:58three people come to that meeting.
27:01Um, I have listened to the concerns that
27:04were presented to you last time and we
27:07have made dramat dramatic or drastic
27:09reductions in potential zoning and
27:11potential densities, cutting it down to
27:1417 to 19 units. Uh, so it's much much
27:17much smaller, much uh more much less
27:21dense and I I think it will fit in with
27:24the community over there very well. I've
27:26been there all of my life and I think
27:28this will work and I'm trying to do
27:30something that Durham would be proud of,
27:32that I would be proud of, that my
27:34grandfather and my aunt would also be
27:37proud of.
27:48Thank you.
27:52There are no other community members.
27:55Are there any other community members
27:57that nobody signed up? Anybody else
27:59wishing to speak on this in the
28:01audience? Anybody on the Zoom wishing to
28:04speak on this item?
28:09I saw a hand raised at the back. Do you
28:12wish to speak on this item? Ma'am,
28:18>> please step to the podium and state your
28:20name and address.
28:32My name is Joyce Gregory and uh I live
28:35at 3904 Mary Martin Road which would be
28:38across from which the area he wants to
28:42develop. I uh have no objective to him
28:46developing it the way as long as they
28:50don't extend us into the city limits.
28:53That bothers me a lot because uh I've
28:57been in the county and I've had to pay
29:00to have my water ran and everything
29:02else. So, I don't want any added expense
29:05at this time in my life to just live it.
29:08[laughter]
29:09Uh so and most of the people around
29:11there near me are the same in the same
29:14boat. We have lived there 50 years. So
29:18that's my only uh thing about it is not
29:22putting more expense on us for we don't
29:24need it. when we uh
29:27[snorts and clears throat]
29:28and it's to be honest with you, Durham
29:30has turned into a mess. And I I'm sorry
29:35to say that, but it has. And it I don't
29:38see any anything changing at this time.
29:42But as far as him wanting to build
29:44those, yes, he did change that. And I
29:47agree that that's better than But I
29:50don't want to pay for sewer. I don't
29:51want to pay for more crap running down
29:54my road because there's enough traffic
29:56out there to for the uh they're going to
29:59build like 200 apartments out there and
30:02it just it's just ridiculous. I mean,
30:06there comes a time you have to put the
30:09uh
30:11horse before the cart. I mean, it's just
30:14I don't understand any of what they're
30:17trying to accomplish because these
30:20aren't lowincome housing places. If it
30:23was that, I might be more considerate
30:27there. If there's so many lowincome
30:29housing, how come there's people living
30:32on the tents and streets?
30:35So, I wish y'all would take that in
30:37consideration.
30:39Uh, but that's all. I don't care about
30:41the rest of it. If he wants to build
30:44those houses, that's fine. At least they
30:46can use a weed whacker.
30:52Thank you. And just as a matter of
30:55policy, the city does not do involuntary
30:58annexations. And so if they did approve
31:01this and annex it, it would not annex
31:05any of the adjacent
31:08properties unless they wanted to be
31:10annexed.
31:14Anybody on the Zoom wishing to speak on
31:17this item, Thompson Village, please
31:20raise your hand [clears throat] or if
31:22you're on a cell phone, star9.
31:30Nobody going once.
31:36Going twice. Gone.
31:39The public hearing is now closed. We are
31:42ready for commissioner discussion. Any
31:44commissioners have questions or
31:46comments.
31:52I have a question. We saw this one and
31:55you have come down from the houses and
31:57we wanted a specific number of houses
31:59and you have given us that number now.
32:01Thank you. Um, have you worked out the
32:04road? Because I believe at the last
32:07meeting there was no point of entry
32:10figured out and some of the concern was
32:13that the
32:15roads connecting to this would be small
32:18or insufficient. I just, you know, I'm
32:21more worried about uh emergency vehicles
32:24and EMS and stuff like that being able
32:27to access.
32:29>> Yes, ma'am. the my engineer is here and
32:32if and if I say anything wrong you just
32:34raise your hand and tell me but the road
32:36that is in Mary Martin road was paved
32:40five six seven eight year 10 years ago I
32:42don't know Miss Gregory will know um and
32:45it is of sufficient width it is a city
32:47street it meets um DOT standards um
32:50there everything that we do will be DOT
32:54approved and there with a vastly reduced
32:57number of homes there'll probably be one
32:59entrance I don't know exactly what the
33:01design will be, but we will certainly
33:03make it uh to be approved by the fire
33:06department, by emergency police,
33:09everything will be done. We're very
33:10close to a police substation. We're
33:12close to the um EMS and the school
33:16that's down the streets where my
33:18grandmother and my mother went and it's
33:19a good school.
33:24>> Okay. Thank you. Yes.
33:26>> Any other questions or comments on this
33:28case?
33:29>> We're all good. Okay. May I have a
33:31motion to move case Z25
33:35triple026
33:38Thompson Village forward with a
33:40favorable recommendation.
33:42Chair, regarding case
33:46Z250026
33:48Thompson Village, I move that we forward
33:50this case to the city council with a
33:52favorable recommendation for approval.
33:56I second.
33:58It has been moved by Vice Chair Cameron
34:01and seconded by Commissioner Bailey to
34:03move this case forward with a favorable
34:05recommendation. May we have the
34:07electronic voting, please?
34:22The motion passes 9 to zero.
34:30Next item on the agenda, Glenn School
34:33Road mixed juice Z25
34:36triple024.
34:38May we have the staff report, please?
34:41>> Thank you, Chair Shagarus. As you said,
34:43this item is Z 2500024
34:47Glen School Road mixed use.
34:54This site is located in the northwest
34:56quadrant of Glenn School Road and I 85.
34:59It is in the suburban tier and is
35:01pending annexation which is part of the
35:03application. The site is just over 180
35:06acres and is currently zoned
35:08residential, rural, and commercial
35:10neighborhood. The proposed zoning is
35:12industrial light with a textual devel
35:15I'm sorry with a development plan
35:17development residential 3.345
35:20and commercial neighborhood with a
35:22development plan. The place type is
35:25mixeduse neighborhood and staff is not
35:28recommending a change.
35:30The uh there are the FJB and MTC I85
35:36overlay zones on the site and the
35:39proposal is for 825,000
35:41ft of light industrial uses up to 235
35:45town houses and up to 20,000 ft of
35:48commercial uses.
35:52As you can see, the the site is
35:55predominantly rural residential at this
35:57time with a small portion of commercial
36:00neighborhood to the south of the site.
36:04The you can see where the locations of
36:06the [laughter]
36:09you can see where the locations of the
36:10three different districts are. The blue
36:12is the prian development residential
36:15which is where the town houses would be.
36:17The light purple is the industrial light
36:20area to the east closest to I 85. And
36:23then close to the interchange of Glen
36:25School Road and I 85 would be the
36:27commercial section in that red area.
36:33The aerial map shows the location uh
36:35with some residential uses to the west.
36:37As you can see, I 85 to the east of the
36:40site.
36:44As mentioned before, the place type
36:45designation would not change. This is
36:47mixeduse neighborhood on the place type
36:49map with some recreation and open space
36:52uh accommodating for flood plane on the
36:54site. [snorts]
36:57There are a number of commitments on the
37:01site and these are mostly segregated by
37:04zoning district, proposed zoning
37:06district. There are a handful of
37:08commitments that would apply to the
37:09entire site. You can see these here.
37:13And then on the next slide, we will see
37:15the
37:17on the next slide you will see the uh
37:19commitments that are given for or
37:22proposed for each of the three districts
37:26that would be on the site.
37:32The northern half of the site, as I
37:33mentioned, it's just over 180 acres, so
37:35it is sizable. Uh this is the northern
37:38half of the site. That red line is
37:40separating the PDR, the residential area
37:44from the ILD, the light industrial area
37:47to the east. The building and uh parking
37:51envelope does stay outside of the flood
37:54plane that is indicated on the site.
37:59Uh this is the southern half with the
38:01interchange with I 85 and Glenn School
38:04Road with the commercial shown. One
38:06other thing you can also see is that
38:08intercross road would be realigned to be
38:13intersect with Glenn School farther up
38:15uh farther from the interchange for
38:18safety uh purposes.
38:22Neighborhood meetings were held in
38:24accordance with the neighborhood meeting
38:25guidelines on August 27th, 2025 and
38:28September 22nd, 2026. There were 15
38:31attendees at each meeting. Three
38:34comments have been uh submitted to the
38:36dorm resoning explorer for this case.
38:38All of them against the proposal.
38:42As mentioned before, the proposal is
38:43consistent with the place type
38:44designations of mixeduse neighborhood
38:47and recreation and open space and is
38:49consistent with 16 of 24 applicable
38:52comprehensive plan policies. Staff and
38:54the applicant are here to answer any
38:56questions.
38:59>> Thank you. The chair is now opening the
39:01public hearing. May we have the
39:02applicant, please?
39:11>> Good evening, Chairwoman Shagaras, Vice
39:12Chair Cameron, members of the planning
39:14commission. I'm Patrick Biker. I live at
39:162614 Stewart Drive. I'm an attorney with
39:19Morning Star Law Group, and I'm here
39:20tonight representing Smith Douglas, a
39:22fine townhouse builder and Traml Crow
39:25Company, a class A light industrial
39:27developer. In the top right corner of
39:29this slide, you can see a building Traml
39:31Crow Company recently built outside of
39:33Charlotte to see the type of quality we
39:35wish to build at Glen School Road. It
39:37has been a pleasure to represent these
39:39two outstanding companies collaborating
39:42on this mixeduse development. With me
39:45tonight are Caroline Cheese, our traffic
39:47engineer with DRMP, Preston Royster, our
39:50civil engineer with Thomas and Hutton,
39:52our townhouse leader with Smith Douglas,
39:54is Tyler Gould. And we also have Michael
39:56Lewis with Traml Crow Company, our
39:59business park developer.
40:02I first want to address the mixeduse
40:03neighborhood place type that governs the
40:05ballpark 180 acres we're discussing
40:07tonight.
40:09While I think this community did a great
40:11job moving forward with the adoption of
40:13our comprehensive plan three years ago,
40:15I would have to say the mixeduse
40:17neighborhood place type is probably the
40:18most difficult place type to comply with
40:20fully.
40:22and I think this project complies with
40:24it very very well. Our team has been
40:27working together for many months and it
40:29is rare that I can present a development
40:31plan that implements three uses
40:33industrial, commercial and residential
40:35like this one does. Out of that 180
40:38acres, about 100 acres are proposed to
40:40be industrial light zoning in order to
40:42create a class A business park. It is
40:46very important for Durham's economic
40:47development to maintain a steady supply
40:50of class A and light industrial space so
40:52Durham can attract new jobs and perhaps
40:54even more important provide space for
40:56our local businesses to thrive and
40:59expand. It's been my privilege over the
41:01past few years to work on the Scanel
41:03properties 200 acre 1.2 million square
41:06foot business park located at Junction
41:08Road and Feral Road and that is about
41:10one mile south of tonight's Glen School
41:12Road development. I also greatly enjoyed
41:14working on Welcome Venture Park on
41:16Hamlin Road which has 160 acres and 1.2
41:19million square feet and that's about 2
41:21miles northwest of tonight's Glen School
41:24Road proposal. I mention this because
41:26Scanel and Welcome Venture Park are very
41:28successful, but they probably will be
41:30fully built out in a couple more years.
41:32And so it would be a solid community
41:34benefit for the Glen School Road
41:36Business Park to becoming online at that
41:38time to to provide growth opportunities
41:41in order to keep our local economy
41:43strong.
41:45I'd like to briefly address why this 180
41:48acres lays out so well with the
41:49development plan we are looking at
41:51tonight. The stream that divides the
41:53Traml Crow Company Business Park from
41:55the Smith Douglas town homes creates a
41:57200 foot buffer between these two uses.
42:00I want I want to contrast that 200 foot
42:02buffer with a project I worked on over
42:0420 years ago when I was the attorney for
42:07Keystone Development. Over 20 years ago,
42:10we brought forward an infill residential
42:12neighborhood of town houses and small
42:14single lot family detached called
42:16Keystone Crossing located between
42:18Keystone Business Park along Davis Drive
42:20and the railroad tracks south of Hopson
42:22Road close to RTP. As you can see on
42:25this slide, the spacing between the
42:26industrial buildings that were built
42:28first at Keystone and the new homes in
42:30Keystone Crossing that came second, that
42:33spacing is only about 90 ft. Keystone
42:36Crossing has been very successful and we
42:38have more than double that spacing you
42:40see here between the light industrial
42:42and the residential at Glen School Road.
42:46Next, a major community benefit if we
42:49are fortunate to have this resoning
42:50approved will be the realignment of
42:52Intercross Road so that it no longer
42:54crosses the off-ramp of Interstate 85,
42:57which you can see on this slide. Our TIA
43:00was reviewed for quite a few months by
43:02NC DOT and NC DOT has approved the
43:05realignment of Intercross Road shown on
43:08this slide. Accordingly, approval of
43:11this resoning will create much safer
43:13traffic conditions than exist today. And
43:16it's important to look at the traffic
43:18volumes in this area. On page seven of
43:19your staff report, you can see both
43:21Glenn Road and Glenn School Road are
43:24under capacity.
43:26Last, I want to touch on the retail and
43:28the residential. Our 10 acres of retail
43:30is owned by a group of older Durham
43:32families who are very longtime property
43:33owners. They have not identified any
43:35endusers at this time, but we think that
43:3810 acres of retail close to I 85 is
43:40another benefit for the community and
43:42the new town houses that we have
43:44proposed in this development.
43:46And now to close, I want to talk about
43:48the what I think is incredible text
43:52commitment Smith Douglas has made about
43:53the price point of every one of the more
43:56than 200 town homes that will be built
43:59here. Every townhouse, no exceptions,
44:03will be available at a sales price that
44:05is affordable to folks making 80% of our
44:07area median income. I recall about seven
44:11or eight years ago when Durham was first
44:13starting to grapple with our affordable
44:14housing problem that I was in a meeting
44:16with former deputy city attorney Don Oul
44:19who said to me that developers could
44:21address the affordability problem with a
44:23tax commitment that would lock in a
44:24certain price.
44:27I told Don that would never happen
44:29because it takes so long to get through
44:31the entitlements process that no home
44:33builder could figure out how to price a
44:35townhouse that would not be built for
44:37another couple of years given how
44:39unpredictable building costs and
44:40interest rates are. Well, I was wrong.
44:44It wasn't the first time. And so despite
44:46today's volatility of building costs,
44:49fuel costs, and interest rates, Smith
44:51Douglas has put forward a tax commitment
44:53in this development plan so that every
44:55single townhouse sold, be it in 2028 or
44:582029, will be affordable to people
45:00earning 80% of our area median income.
45:03Today, that translates to a price point
45:05in the low to mid300s. It is important
45:08to recognize that you could live in
45:09affordable housing your whole life and
45:11never create any generational wealth.
45:15And you can see that putting these town
45:17houses next to a business park where
45:20maybe some townhouse residents could
45:22walk to work along with an elementary
45:24school that's nearby, shopping that's
45:25nearby, and other community assets. We
45:28can build what I think is the best
45:31project I've ever worked on in my 32
45:33years to create generational wealth for
45:36Durm residents. For all these reasons,
45:38we respectfully ask for your
45:39recommendation of approval. Our team
45:41will be happy to answer any questions.
45:43Thank you. like to reserve the balance
45:44of my time.
45:49>> Thank you.
45:53Community members in person wishing to
45:56speak on this item. Jose
46:00Martinez.
46:24Hello everyone.
46:25[cough and clears throat] Hello
46:26everyone. My name is Jose Martinez Mahia
46:28and I live at 641 North Hardy Street.
46:31For those who have for those of us who
46:33have lived and or have called Durham our
46:36home for the last 20 years, we know the
46:38hard truth. There just haven't been many
46:40affordable new town homes built for
46:42sale. The shortage has made the shortage
46:44has made it really tough for young
46:46people like me become homeowners in a
46:48city we love. We I grew up right here in
46:50Durham. I graduated from Southern High
46:52School in 2018. I've been working in
46:54residential construction for several
46:56years now, swinging a hammer and
46:58learning the trade every day. I have
47:00been carefully saving my hard-earned
47:02money because I have one clear goal, to
47:04put down roots and finally buy a home of
47:06my own and my glorious city of Durham.
47:09These new town homes along Glenn School
47:11Road are exactly the kind of opportunity
47:12young people like me need. They're
47:14affordable, they're close to jobs, and
47:16they're right by a grocery store. For
47:18someone like me, that location makes
47:19home ownership actually possible and
47:21convenient. More than anything, I want
47:23to stay in the city I grew up in, close
47:25to my family and the friends who have
47:26been with me through everything. So, I'm
47:28asking all of you tonight, please go the
47:29extra mile. Support this mixeduse
47:32project. Give you residents a real
47:34chance to become Durham homeowners just
47:36like so many of you have been just like
47:39so many of you have been able to do.
47:41Thank you for your time.
47:45>> Thank you. Any other in person? Nobody
47:48else has signed up wishing to speak on
47:50this item? No. Anybody on the Zoom
47:53wishing to speak on this item?
47:56Marshall Boon,
48:03>> can you hear me, madam?
48:05>> Yes, please state your address for the
48:08record.
48:09>> My address at this point is 2406 Turtle
48:13Bay Drive in Newburn.
48:16Uh, I've have been a property owner on
48:19Glenn School Road since the early 1980s.
48:23Yes. 40 years. And the property west of
48:28I5 on Glenn School Road is essentially
48:31unchanged for those 40 years. Has been
48:34no development to speak of whatsoever.
48:37Now, it looks like Snook Douglas is
48:39going to finally make it happen. I want
48:42to express my strong support for this
48:45zoning map change so this project can
48:48move forward. I don't know of any losers
48:51in this project. To me, it sounds like a
48:55win-win, but I thank you for the
48:57opportunity to make my comments this
48:59afternoon and I wish you well.
49:04>> Thank you,
49:06Eveise Vargas.
49:18Hi there. Can you hear me? All right.
49:21>> Yes. Please state your address for the
49:23record.
49:24>> Great. Thank you. My name's Eve Vargas.
49:26I'm at 11-11 Merlin Street. So, just
49:28south of this development. Um uh and at
49:33this new development called Griffin
49:34Place, so just just south of that site
49:36off of East Gear Street. not here to uh
49:39to oppose the project. Uh was just
49:41thinking of some things that could maybe
49:43improve kind of the development as uh
49:45the iterations come. Uh because I think
49:48jobs next to ownership housing is is
49:50awesome and the right idea for this
49:52corridor. Mostly just asking to think
49:54about a few commitments and thoughts. Um
49:57one of those is just wondering if there
49:59if it would be possible for the
50:00industrial half to make a community
50:02contribution. I know that there are no
50:05tenants currently. Um, but I also know
50:07that some of the other developments in
50:09the area have been able to achieve and
50:12receive greater contributions um than I
50:14think this one. I think this one has a
50:16$25,000 school contribution and I think
50:18the the Lee VA the Lee Village and
50:22Picket Road one uh received uh you know
50:25community contributions in the hundreds
50:27of thousands of dollars. Um, and then
50:29the fourth piece is, um, I know the
50:32gentleman who spoke before me had
50:33mentioned a a supermarket. Um, and that
50:36was one of the things that we discussed
50:37on the meeting, uh, in September. So, I
50:39was just curious kind of if there could
50:41be some more inquiries into the kinds of
50:44businesses that would come into the
50:4520,000 square feet of commercial space.
50:48Um, because I do think a supermarket of
50:49some sort would be awesome um, if it
50:51could be built there. Um yeah, those are
50:54really my comments, but um you know,
50:55supportive and and have appreciated uh
50:58the way the the team has uh engaged with
51:00us uh as community members. So, thank
51:02you.
51:05Thank you. Anybody else on the Zoom
51:07wishing to speak? Please
51:11raise your hand or press a star 9 if
51:13you're on a cell phone.
51:201 562 3741341
51:26please state your name and address.
51:32>> Hi there. Uh can you repeat what you
51:35said? Um I have my phone muted.
51:39>> Yes, we can hear you. Please state your
51:41name and address for the record.
51:44>> Uh yes, my name is Cindy. I am at 305
51:48Long Drive. Um, I just received notice.
51:52Uh, we're I I was able to make to the
51:54September notice and then I'm here on
51:57for this notice. I do just have a
51:59concern. I live in the new Glenn uh
52:02crossing development um town home
52:05development and I did see on the
52:07planning that there would be access uh
52:10public access through Pino Road. Um, but
52:15I'm just kind of concerned on that piece
52:18because there's another public access
52:20entrance on Glenn Road. So, I'm just I'm
52:23just questioning why they would need to
52:25kind of go through the Glen Crossing
52:27neighborhood.
52:29Um, yeah, I just kind of wanted that
52:31clarified. Um, thank you.
52:36Thank you. Anybody else on the Zoom,
52:40please raise your hand
52:43or star nine if you're on a cell phone?
52:52Nope. Nobody. Going once,
52:56[clears throat] going twice.
53:00Okay. Could the applicant please respond
53:02to some of these concerns?
53:04>> Yes, certainly. Um, I do want to draw
53:06the
53:08planning commission's attention to the
53:10number of uses that have been eliminated
53:13from the commercial and industrial so
53:15that any noxious uses [snorts] are
53:18struck off. And I do want to um clarify
53:20one point in regards to policy 88 that
53:23was mentioned in your staff report. U we
53:26wish to profer a text commitment that no
53:28uses requiring a special use permit
53:31shall be allowed in the aisle district.
53:33So that means no uh auto repair auto
53:36salvage yards would be allowed within
53:38this development in order to be a good
53:40neighbor. I also want to emphasize um a
53:44profer on to address policy 80. Uh that
53:47is we will provide a 20 foot.04 opacity
53:50buffer along the northern property line
53:52of REID 169415 and that's adjacent to
53:56the LB Creek WHED association parcel so
53:59that we comply with policy 80. Uh in
54:02regards to uh the concern about Glen
54:04Crossing, I was the attorney for that uh
54:07the infrastructure uh issues with that
54:10neighborhood and all the connections
54:12that are being uh shown on our
54:14development plan are required by the
54:15UDO. Uh we need to build grid systems uh
54:18for our streets. Uh we should not be
54:20having culde-sacs any anymore to the
54:23extent possible. And so we certainly
54:26appreciate the concern, but everything
54:27that uh we're connecting to was laid out
54:30with the Glenn Crossing neighborhood uh
54:32back when I worked on it. And then I
54:34want to uh also emphasize something else
54:36about Smith Douglas um um in terms of
54:40sustainability. Uh they have a great
54:42track record as a Duke Energy hero and
54:44show that that will be how we comply
54:46with policy 49. So uh I realize there
54:49are no perfect projects, but I think
54:51this one checks about as many boxes as
54:53you can. uh for a mixeduse neighborhood
54:56that's uh again has a lot of
54:58prescriptive elements in our
55:00comprehensive plan that our team has
55:01worked on very diligently and again we
55:04respectfully ask your approval. Our team
55:05will be happy to answer any further
55:07questions. Thank you.
55:10>> Thank you. The public [clears throat]
55:11hearing is now closed. We're open for
55:13commissioner discussion. Are there
55:15questions or comments from the
55:17commissioners? Commissioner W.
55:20>> Thank you. I So I'm sorry I didn't hear
55:24um for the um policy 80, how big of a
55:29buffer did you just proper? What was the
55:31buffer?
55:31>> Yeah. Yeah. Um if I could show you the
55:33slide, Commissioner W, let me show you.
55:37Um
55:38yeah, here it is. Uh if you look at the
55:41top of the yellow um uh PDR zoning, uh
55:45the very top where the yellow and the
55:47purple come together, uh that parcel to
55:49the north of us is a uh is owned by the
55:52Elerby Creek and so we are committing to
55:54a 20 foot uh point4 opacity buffer along
55:59that common property line
56:01and that will comply with policy 80.
56:05>> Um sorry I have another question. So
56:08policy 82 um requests a 600 foot stream
56:13buffer
56:15and I know that that is not
56:17>> yeah that would be our entire PDR site.
56:19So we wouldn't be able to be a mixeduse
56:21project if we had a 300 foot buffer
56:23there.
56:24>> And you know I'm gonna ask this 50%
56:27natives. Can we go up?
56:29>> Preston, do you have any thoughts on
56:31that?
56:35>> Yeah, we we'll certainly investigate it
56:37before city council, but we haven't had
56:38a chance to evaluate that.
56:40>> Thank you.
56:44>> Any other commissioners
56:46questions or comments?
56:50Nope. I have uh the the staff report
56:53says the development plan does not
56:55include additional protections adjacent
56:58to the Ellerby Creek wershed association
57:00managed area, but it's a different REID
57:03number 168861.
57:06Does that have to do
57:07>> that's the one adjacent to it. Our pro
57:09our site that we can commit to is
57:11169415. So we'll word smith that with
57:14Mr. Kane later this week, but we agree
57:16with that and we'll address it with a 20
57:18foot 0.04 opacity buffer. Good.
57:21>> So there will be additional protections
57:24>> correct
57:24>> for this
57:26>> right above what the UDO requires.
57:28That's correct.
57:28>> An additional stream buffer widths
57:30across the perennial streams any extra
57:33possible. No, we're we're comfortable
57:36with the 200 foot that'll be in place as
57:38the appropriate uh separation between
57:41the PDR and the and the IL. And that
57:44again is based on the case I worked on
57:46over 20 years ago that I shared with the
57:48commission.
57:50>> Okay. Do we need those profers written
57:52down or do you already have those Aaron?
57:56>> I have those and I discussed those with
57:58Patrick prior to the meeting so we're
58:00aware.
58:03>> Excellent. Thank you.
58:04>> Okay.
58:06May I have a motion to move case Z25
58:10triple024 Glenn School Road mixed
58:13forward with the favorable
58:14recommendation.
58:17Chair regarding case Z25 Triple024 Glenn
58:22School Road mixeduse. I move that we
58:25forward this case forward to the city
58:26council with a favorable recommendation
58:29for approval.
58:34Second.
58:37It has been moved by Vice Chair Cameron
58:40and seconded by Commissioner
58:46Pontac
58:48to move this case forward with a
58:49favorable recommendation. May we have
58:51the electronic voting, please?
59:07The motion passes 8 to one.
59:10>> Thank you very much. We appreciate your
59:12time.
59:15>> Next item on the agenda is
59:19Mosby Bragtown Z25047.
59:24May we have the staff report, please?
59:36Good evening, Chair Shakaris, Vice Chair
59:38Cameron, and Planning Commissioners.
59:40Pton Burgess here again tonight to
59:42present Z250047
59:45Mosby Bragtown.
59:51The request is to reszone approximately
59:5313.3 acres located at 200 and 500 Berwin
59:57Avenue, 320 and 606 Belvin Avenue, and
1:00:013200 Dominion Street from residential
1:00:03urban 5 to plan development residential
1:00:0622.414
1:00:08to allow for up to 299 apartment units.
1:00:14Again, the existing zoning is
1:00:16residential urban 5 and the request is
1:00:18for plan development residential 22.414.
1:00:21The site is surrounded by mostly
1:00:23residential urban 5 with some commercial
1:00:25neighborhood, residential suburban 8 and
1:00:27commercial general also adjacent to the
1:00:29site.
1:00:32The aerial map shows the general
1:00:33location of the project which is in the
1:00:35Bragtown area.
1:00:39The property is primarily designated
1:00:41mixed residential neighborhood on the
1:00:43place type map and the proposal was
1:00:45found to be consistent with the
1:00:47designated place type. Also, I said it's
1:00:49primarily it is all designated mixed
1:00:51residential neighborhood on the place
1:00:52type map. Sorry about that.
1:00:55The application profers a variety of
1:00:57commitments including 5% of the units
1:01:00affordable at 80% AMI for 30 years, a
1:01:03minimum street yards, a maximum of 60 ft
1:01:06and building height, a maximum of 60%
1:01:09impervious surface, a minimum of 10%
1:01:11tree coverage, all required plantings to
1:01:14be native species. Buildings with four
1:01:16or more stories must have an elevator.
1:01:19Um, a publicly accessible recreation
1:01:21amenity. $4,000 to Durham public schools
1:01:24and off-site sidewalk.
1:01:28The applicant held neighborhood meetings
1:01:29on April 2nd, 2026 and September 3rd,
1:01:322026. Eight community members attended
1:01:35the first and two attended the second.
1:01:38There have been no comments regarding
1:01:39this proposal received on the Dur Durham
1:01:42reszoning explorer.
1:01:44The proposal is consistent with the
1:01:46designation of mixed residential
1:01:47neighborhood and with 12 of 16
1:01:49applicable comprehensive plan policies.
1:01:51I do want to note that this is different
1:01:53than your staff reports because policy
1:01:5682, which is about additional buffering
1:01:58for perennial streams, is currently
1:02:00listed as not being met. The applicant
1:02:02has provided documentation that the
1:02:04stream on site is intermittent, so this
1:02:06policy is instead not applicable.
1:02:08Thank you. Staff and the applicant are
1:02:10available to answer any questions.
1:02:15>> Thank you. May we have the applicant,
1:02:18please?
1:02:23The chair is now opening the public
1:02:24hearing. Applicant, please.
1:02:26>> Thank you, Miss Burge, for your
1:02:28presentation. And good evening, Chair
1:02:29Shagaras, Vice Chair Cameron, members of
1:02:31the planning commission. I'm Neil Go, an
1:02:33attorney with the Morning Star Law Group
1:02:35at 700 West Main Street here in Durham.
1:02:37And I'm pleased to be joined by Mr.
1:02:38Preston Royster with Thomas and Hutton
1:02:40and our representation of the property
1:02:42owners for this Mosby Bracktown project.
1:02:46Before I begin, I do want to ask Mr.
1:02:48Singh from the ownership group to say a
1:02:50few words about his family's history
1:02:51here in Durham and their vision for this
1:02:53project. Mr. Singh.
1:02:56>> Thank you. Good evening chair and
1:02:59commissioners. My name is Sai Paul Singh
1:03:02and I represent Prairie Shore Partners,
1:03:04the property owner and my family in
1:03:07support of Mosby Bragtown.
1:03:11Looking at me, you would never guess I'm
1:03:13a fourth generation US citizen on both
1:03:15sides of my family.
1:03:17Our family's connection to Braggtown
1:03:20goes back almost 40 years. My
1:03:24grandparents Dr. Manone Singh and Ji
1:03:27Singh who are here with us tonight
1:03:31came to this country America in 1967
1:03:35with $26 in their pockets and a
1:03:39determination to build a life through
1:03:41medicine and selfless service, a tenant
1:03:44of our sick faith.
1:03:46My grandparents still live in the home
1:03:48that they built 50 years ago. For me, it
1:03:52holds a lifetime of happy family
1:03:54memories.
1:03:56But when they built that life in
1:03:58Smithfield, just two miles from their
1:04:01home, stood a Ku Klux Clan billboard
1:04:04that said, "Welcome to Smithfield. This
1:04:07is clan country. Love it or leave it."
1:04:10Imagine caring for the community sick
1:04:13and injured, raising your children
1:04:15there,
1:04:17and passing a sign each day that
1:04:19reminded you you're just now welcome and
1:04:22you don't belong. My grandparents recall
1:04:26how in 1982 at a restaurant near their
1:04:29home, our family and sick friends were
1:04:32badly harassed inside a restaurant by
1:04:35local clansmen. Those men's those men
1:04:38even took the far extent of shooting
1:04:41shots from a gun
1:04:43at my grandfather's car. My
1:04:46grandparents, you know, believe it or
1:04:48not, that same night along with their
1:04:51local friends and family decided the
1:04:54idea to build the gudoir outside of
1:04:57Johnston County, our sheik temple. This
1:05:00encounter with the KKK shaped their
1:05:02determination to establish a place where
1:05:05they could worship, gather, and feel
1:05:08safe. Durham became that place. Bragtown
1:05:12became that place. My grandparents
1:05:15established with two families and have
1:05:19built and sustained our gdwara, the seek
1:05:22temple here in Braggtown for the last 40
1:05:25years. Four generations of my family on
1:05:28both sides have worshiped at that
1:05:31Braggtown Goodwa. For our family, it
1:05:35made us feel that finally we belonged. I
1:05:38speak for our family tonight. I share
1:05:41the history because it explains why
1:05:43Bragg means so much to us. But more
1:05:46importantly, it also reminds me that our
1:05:49story is not the only story that matters
1:05:51here.
1:05:52Bragtown's long-standing residents have
1:05:55built their own lives, memories, and
1:05:57institutions here. Its rich black
1:05:59history, its churches, and other places
1:06:02of worship, and the neighbors who have
1:06:04worked to sustain this community deserve
1:06:07respect. Our connection to this
1:06:09community deepens our responsibility to
1:06:11listen. Questions about traffic,
1:06:14drainage, construction, and children's
1:06:16safety deserves clear, substantive
1:06:19answers. Our [snorts]
1:06:23family's history cannot substitute for
1:06:25those answers. This application should
1:06:27be judged on its merits.
1:06:30We also want to be straightforward and
1:06:32truthful about our interest. This is a
1:06:35private investment and we want it to
1:06:37succeed.
1:06:39For us, success should include good
1:06:41housing and being a good, responsible
1:06:45neighbor who uplifts the community with
1:06:47us. Mosby Bragtown proposes additional
1:06:50homes, including affordable homes. An
1:06:53older person could have the opportunity
1:06:55to live closer to family and worship.
1:06:58Someone working nearby could live closer
1:07:00to work. A young adult could find a
1:07:03place to begin an independent life.
1:07:06Those possibilities extend across
1:07:09faiths, generations, and beliefs, and
1:07:12backgrounds.
1:07:14In his final speech, the great Dr.
1:07:16Martin Luther King Jr. said, "All we can
1:07:20say to America is be true to what you
1:07:24said on paper." I take those words
1:07:26literally and as a reminder of our own
1:07:29responsibilities. Our commitment should
1:07:31be clear. Our answers should be honest
1:07:34and the promises made in this process
1:07:36should be honored. We recognize that not
1:07:39everyone agrees with this proposal. We
1:07:41remain willing to meet, listen, and work
1:07:44through concerns. My grandfather came
1:07:47here for an opportunity. I have grown up
1:07:50benefiting from the life he and my
1:07:52grandmother worked so hard to build. I
1:07:56feel a responsibility to use that
1:07:57opportunity for good. We hope to
1:08:00contribute to Braggtown through homes
1:08:03that serve people, an investment that
1:08:05strengthens the neighborhood, and a
1:08:07continuing relationship with a community
1:08:09that has melt meant so much to my
1:08:11family. We respectfully request a
1:08:13favorable recommendation on Mosby
1:08:15Bragtown and I thank you for your time
1:08:17this evening.
1:08:20>> Thank you, Mr. Singh. Little longer than
1:08:22two minutes we talked about. I'll try to
1:08:24get through through what I've got here.
1:08:26Um,
1:08:27>> so I hope you'll bear with me because
1:08:28there is a lot to cover and we have a
1:08:30fair number of changes as well. Some of
1:08:31these are due to some more recent
1:08:32changes that were adopted by the city
1:08:34council uh with respect to the
1:08:36application and language of comp plan
1:08:38policies. Uh and other changes are
1:08:40driven by extensive community engagement
1:08:42we've conducted around this project. In
1:08:44addition to the two required
1:08:45neighborhood meetings, we've had several
1:08:46in-person and virtual meetings and email
1:08:48exchanges with members of the Bragtown
1:08:50community uh and the Gurudara. Um we
1:08:54also have been actively engaged in the
1:08:55city small area planning efforts uh for
1:08:57Btown community. So I'll start with some
1:08:59of the great commitments that are
1:09:00already in the application. On the
1:09:02environmental front, we have a
1:09:04commitment that limits the impervious to
1:09:05no more than 60%. We also have a
1:09:07commitment to using native plants. And
1:09:09we've committed to coverage, tree
1:09:11coverage that is in excess of UDO
1:09:13requirements. But perhaps most
1:09:14importantly on the environmental front
1:09:16is our commitment to handle the existing
1:09:18contamination on the site. Evidently,
1:09:20when the site was used as a school, um
1:09:22there was an on-site underground storage
1:09:24tank for heating oil which leaked. It
1:09:27was actually my clients who discovered
1:09:29the contamination and reported to DEEQ.
1:09:32The state has a program um that monitors
1:09:35this type of contamination. So, the
1:09:38contamination will be subject to that
1:09:39program. As part of this project, we're
1:09:41going to deal with the contamination as
1:09:43provided for within the state program.
1:09:45And I think we can all agree that
1:09:47cleaning up past environmental
1:09:49contamination is always a good thing.
1:09:51Now, I'll touch on some of the things
1:09:52that are changing. Uh I guess I can
1:09:54stick on the environmental theme for
1:09:55now. We already have a commitment
1:09:57related to green building techniques,
1:09:59specifically committing to utilizing the
1:10:00Energy Star multifamily new construction
1:10:02program, but recent guidance from the
1:10:05planning department suggests that this
1:10:06commitment may not be enforceable by the
1:10:08planning department uh as a zoning
1:10:11condition because of uh the the timing
1:10:14of the certification.
1:10:16So, that being the case, we're going to
1:10:17remove that commitment as a zoning
1:10:19condition and replace it with something
1:10:21that planning can enforce. Uh we're
1:10:23committing to providing a minimum of 10
1:10:25publicly accessible level two or higher
1:10:27EV charging spaces within the community
1:10:30and I think that's probably the
1:10:31strongest EV charging commitment I've
1:10:32seen on a res resoning. Additionally, we
1:10:35are also making commitment to locate
1:10:37some amount of open space or tree
1:10:38coverage contiguous with environmentally
1:10:40sensitive areas on the property which
1:10:43speaks to specific guidance in the comp
1:10:45plan. We also will commit to at least
1:10:47one green storm water measure in our
1:10:48initial site plan. that might be a green
1:10:51roof, bio swell, rain garden, bio
1:10:53retention pond, perable paver, something
1:10:55like that. Uh we haven't quite figured
1:10:57out, but we will make that commitment
1:10:58tonight as well. Um and that's being
1:11:01responsive to changes uh to the comp
1:11:04plan language for policy 108. And we
1:11:07have a commitment, we will add a
1:11:08commitment to handle the 100red-year
1:11:09storm. And then I finally, I want to
1:11:11touch on some things that are already in
1:11:13the application but need some
1:11:14adjustment. I think one of the strongest
1:11:16commitments we have here um is the
1:11:18commitment to provide a publicly
1:11:20accessible amenity on the property. The
1:11:22way that condition is written, it would
1:11:23be for a pickle ball court. The latest
1:11:25feedback we received from the community
1:11:27on this is that publicly accessible
1:11:29amenity would be a positive, but pickle
1:11:31ball ain't it. So, we want to adjust the
1:11:34condition just to take out any reference
1:11:36to pickle ball. We'll keep the existing
1:11:38dimensional requirements and that type
1:11:39of thing, but rather than call it pickle
1:11:41ball, we'll just not as being a publicly
1:11:42accessible amenity. We also want to
1:11:44increase our commitment to DPS from
1:11:464,000 to 7,000. And just to clarify some
1:11:49of the language on the multi-use path
1:11:51going to make sure that for Burwin that
1:11:53multi-use path will be provided where we
1:11:55are improving Burwin along our frontage.
1:11:58Uh and additionally there was a
1:12:00commitment that we added from a BPAC
1:12:02suggestion about sidewalks remaining
1:12:03flush across the driveway. The staff
1:12:06report has it correct. We meant all
1:12:07driveways but the condition is written
1:12:09in a way that suggests it's only for one
1:12:10driveway. We meant any. And that was
1:12:12just a typo on our on our part. And
1:12:14finally, we're changing our affordable
1:12:16housing commitment from what it
1:12:17currently says to the UDO definition of
1:12:19affordable housing. 5% of the units will
1:12:22be offered as affordable units under the
1:12:24UDO definition. So on a rental project
1:12:26like this, that means 60% AMI. Uh I know
1:12:29that's a lot to digest in a short amount
1:12:31of time, but I'm out.
1:12:37>> Thank you. Community members in person.
1:12:41Uh, Matt, we'll start with number one,
1:12:43Matt Palm.
1:12:51>> Uh, good evening everyone. My name is
1:12:52Matt Palm. I live at 2920 Chapel Hill
1:12:56Road in Hope Valley. Uh, I'm also a
1:12:58professor of city planning at UNCC
1:13:00Chapel Hill. I teach a graduate course
1:13:02where students provide technical
1:13:04assistance to community- based
1:13:05organizations in small towns. And this
1:13:08semester, four of our lovely students
1:13:09had the opport the privilege to work
1:13:11with the BCA, the Bragtown Community
1:13:13Association, to document residents
1:13:16concerns about this resoning and
1:13:17investigate relevant data. And they've
1:13:19prepared a memo that I shared with
1:13:21someone over there who said, "Yes, thank
1:13:23you." Oh, yay. Okay. Thank you. Um,
1:13:26however, my comments uh tonight in
1:13:28person are my own. Um, you know, as a
1:13:3130-some who still doesn't own own a home
1:13:33yet, I very much understand that Durham
1:13:35needs housing and I understand that
1:13:38growth can bring new neighbors and new
1:13:40investment and new opportunities. Um,
1:13:42but growth also makes long-standing
1:13:44unmet infrastructure needs just much
1:13:47much much more apparent. Um, so for
1:13:50example, using city data, uh, I've
1:13:52calculated that Durham has about a half
1:13:54mile of sidewalk for every mile of
1:13:56roadway in the city. But in Braggtown
1:13:59that neighborhood or um in Braggtown
1:14:01that uh ratio is just.3. So about a
1:14:04third of a mile of sidewalk per mile of
1:14:06roadway. And um I haven't investigated
1:14:10but I would imagine that there are other
1:14:12disparities in terms of the
1:14:13infrastructure that's been provided to
1:14:14Bragtown as opposed to other
1:14:16communities. And so these gaps are not
1:14:19new and neither are residents concerns
1:14:21about safety uh traffic safety in
1:14:23particular.
1:14:24Um, and my main concern is that Bragtown
1:14:27is uh frequently being asked to
1:14:29accommodate substantial growth while its
1:14:32long-standing infrastructure needs
1:14:33remain unmet. And I understand that that
1:14:36is much bigger than this particular
1:14:38conversation. Uh so I hope the
1:14:39commission will consider uh not only
1:14:41whether the proposal satisfies existing
1:14:43requirements but how we can ensure that
1:14:46growth makes Braggtown safer, more
1:14:48connected and more livable uh for both
1:14:52current residents and newcomers and
1:14:54future residents as well. So thank you.
1:14:57>> Thank you. Constance right.
1:15:14Good evening. My name is Constance
1:15:16Wright and I live in the Red Maple Park
1:15:18community of Bragtown and I'm here to
1:15:21ask you to deny the approval of the
1:15:23reszoning for the Mosby um Braggtown
1:15:26Apartments, 299 apartments um in the
1:15:30Belvin Street area. uh in addition to
1:15:33approximately 654 apartments and houses
1:15:37that have been built or will be built um
1:15:41are SK I'm sorry that have been built
1:15:44which is S Kofa Landing or will
1:15:46scheduled to be built uh will cause
1:15:49apartment overload
1:15:51in a less than one mile radius beginning
1:15:54at Roxboro Road and continuing down old
1:15:57Oxford Merryweather Dearbornne Berwin
1:16:00Belvin in in that area. If all the
1:16:03apartments and houses in that area
1:16:05become occupied and each household
1:16:07occupies two to four residents, which is
1:16:10the average household size, if all the
1:16:12new residents are filled, all the new
1:16:14apartments are filled, that would be
1:16:17approximately 1,97
1:16:19to 3,695
1:16:22new people living within that one mile
1:16:25radius. Picture that disaster waiting to
1:16:27happen. Others have already spoken or
1:16:30will speak on the extreme increase in
1:16:33traffic infrastructure and nightmares
1:16:35that will um because of bursting pipes,
1:16:39uh lack of walkability, the lack of safe
1:16:41spaces, and because of the new
1:16:43residents, but I want to speak on the
1:16:45lack of recreation also that will be in
1:16:48the area. One pickle ball court won't
1:16:51cut it, although it's been ro withdrawn,
1:16:54so that's a good thing. But there needs
1:16:56to be a recreation center built in the
1:16:58Bragtown community, preferably in the
1:17:00Red Maple Park area. There's already a
1:17:04great deal of crime in our city. Idle
1:17:06Mines will find something to entertain
1:17:08themselves, good or bad, mostly bad.
1:17:11With so many new people moving to the
1:17:13Bragtown area on top of the each other
1:17:17and mixed with the people who already
1:17:19live in the Bracktown area. Uh, okay.
1:17:24that you okay living in the Btown area
1:17:27on top of each other.
1:17:29>> Thank you.
1:17:30>> Okay.
1:17:32Anyway,
1:17:33>> so I'm asking you to um not approve it.
1:17:37>> Donna
1:17:38Frederick Friedrich.
1:17:47>> Good evening and thank you, Commission.
1:17:49My name is Donna Frederick and I live in
1:17:50Bracktown and I've lived there over 30
1:17:53years. Um, I'm coming to you. Uh, we've
1:17:57heard a lot about the transportation
1:17:59issue along the corridor and the
1:18:01transportation that will ensue with
1:18:04adding extra additional apartments. The
1:18:06key is that the 299 I know is the
1:18:09maximum that they can use according to
1:18:12the resoning of this particular parcel.
1:18:15But if you look around the residential
1:18:17area, the gridlock that would occur
1:18:20that's happening right now, it is very
1:18:22hard to get out on Roxboro Road from the
1:18:25four churches that are on the corridor
1:18:27or saw the apartments on Old Oxford
1:18:29Highway. We did submit to you some maps.
1:18:32We've been talking like for more than a
1:18:34year. Right now, it's very very
1:18:38difficult to move within that spaces.
1:18:41And if we have an emergency, can the EMS
1:18:44get in to serve the 299
1:18:47plus the 500 coming down the road? It's
1:18:50really a compact area. DOT has made some
1:18:54adjustments for sidewalk, but that is
1:18:56not impacting the the the volume that
1:18:59will come there. I think, you know, we
1:19:02need some more housing. I don't know if
1:19:05apartments
1:19:06at this rate is what we need right now
1:19:08in Bragtown. We need to have some
1:19:10residential people can grow. That's what
1:19:13we need for wealth. Thank you so much.
1:19:17>> Thank you, Vanessa Evans.
1:19:28>> Good evening everyone. I'm Vanessa Mason
1:19:30Evans. I stay at 3223 Dearborn Drive. My
1:19:34concerns would be that they have changed
1:19:36the um EMI to 60, which was what we were
1:19:41asking for. But at the same time, we
1:19:43would like to know if we could have it a
1:19:4630-year instead of a 30-year, a 60-year
1:19:48plan for those people that will be
1:19:49staying in those apartments because the
1:19:53the way things are changing in Durham as
1:19:55well as the income status, the the the
1:19:59rates are going up, but the income is
1:20:01not changing. In the data that we've
1:20:03gotten from three years ago, it was
1:20:05saying that people in Durham should be
1:20:07making 35 to $45 an hour. That's just
1:20:10people coming out of high school. So, a
1:20:11person coming from out of college should
1:20:13be making 50. I would like to say two
1:20:16when it comes down to the area of um
1:20:21which they're building. It started out
1:20:23at 160, but now it's at 299. So, I'm
1:20:26hoping that maybe they can lure some of
1:20:28it if they don't want to change it to
1:20:30housing instead of apartments because it
1:20:33is going to be a lot of traffic in that
1:20:34area. The other thing is I would like to
1:20:37see the school with Durham Tech. We've
1:20:40been doing a lot of work with Durham
1:20:41Tech and sending students from uh Lake
1:20:44View School and Northern High School. It
1:20:47takes $2,000 per student to go to Durham
1:20:51Tech. So, we would prefer that money
1:20:53going to Durham Tech so it can help
1:20:54people to get living wage jobs. So,
1:20:57we're asking for 50,000. Not saying
1:20:59we're going to get it, but what this
1:21:02what they're willing to give us right
1:21:03now is not going to put that many kids
1:21:05in school. And not just kids. We're
1:21:07hoping that it'll help adults be able to
1:21:09go to school as well in Braggtown and
1:21:11other surrounding areas of Durham. Thank
1:21:13you for your time.
1:21:16>> Thank you,
1:21:17Pat. Pat James.
1:21:22>> Hi, I'm Pat James. I'm in the Red Maple
1:21:25area. The proposal named three schools,
1:21:29Cub Boulevard, Brogden, and Riverside.
1:21:31None are in our district. According to
1:21:33the proposal, the one time 4,000 is for
1:21:35all the Durham public schools. The
1:21:37Durham public school students already
1:21:39don't have what they need for daily
1:21:40operations, and that would be adding 299
1:21:44apartments and lord knows how many more
1:21:46students. They offered the community
1:21:484,000 for the Durham public schools and
1:21:50as you heard the pickle ball court was
1:21:52shot down. We have had our share of
1:21:56projects adding to the problem and it's
1:21:58time for solutions and recent and really
1:22:01supporting our community. They also
1:22:03mentioned Red Maple Park which I open
1:22:05and close daily. There is no completed
1:22:07sidewalks leading from Red Maple Park to
1:22:10the new development for public to access
1:22:12safely. Supporting this project would
1:22:14not benefit
1:22:17our area because of all the other
1:22:19apartments and housing being built that
1:22:21created the traffic issues and increased
1:22:24property taxes we're already facing.
1:22:26Please vote against this apartment
1:22:28project building, especially that many
1:22:30apartments. Thank you.
1:22:35>> Thank you, Raj Rajinder Sanju.
1:22:40I probably butchered
1:22:46Good evening commissioners. My name is
1:22:48Raj Bender Singh and I'm serving as the
1:22:51president of the Sik Gardara Temple of
1:22:53North Carolina which is located at 3214
1:22:56Banner Street. I speak on behalf of our
1:22:59board and our congregation. Many of our
1:23:02members are here tonight and if you
1:23:05permit I ask them to stand.
1:23:11Thank you.
1:23:13So our guro is next door to this site.
1:23:16We have worshiped there since 1985.
1:23:20About 250 to 300 people come every
1:23:22Sunday. Many are elders, many are
1:23:25children. Goodw also holds weekday
1:23:28evening classes for the youth. I want to
1:23:31be clear on behalf of the congregation
1:23:33about what we are not saying. We are not
1:23:35against the housing or the affordable
1:23:37housing. We are not against the people
1:23:39who will live in these apartments. Our
1:23:42faith teaches us to welcome and to feed
1:23:44anyone who walks through our door and we
1:23:47will welcome them. Our objection to this
1:23:50application as it is written. I it asks
1:23:53you for 299 apartments 60 ft tall with
1:23:58buildings allowed 5 feet from the
1:24:00property line. The staff report runs
1:24:03many pages but it does not mention the
1:24:05guro ones.
1:24:07We have sent a letter to growth
1:24:11durhamnc.gov. So I was surprised that it
1:24:13mentioned that no comments have been
1:24:15received. Um
1:24:18that report was immediately shared with
1:24:20the uh the applicant's regal
1:24:22representative. We had highlighted eight
1:24:25specific commitments that would address
1:24:27these concerns. They are reasonable.
1:24:30They cover the driveway location,
1:24:32Bourban Avenue, a Sunday traffic count,
1:24:35a real setback and buffer, storm water,
1:24:38construction, lighting, and the
1:24:41petroleum cleanup. Uh we are willing to
1:24:43meet with the applicant and we are doing
1:24:45so in good faith. But tonight, none of
1:24:48those commitments are in the plan. So we
1:24:51ask you to recommend denial unless they
1:24:54are added before the case reaches the
1:24:56city council. Thank you.
1:25:01Thank you,
1:25:04Jasine. Joseline Core Core.
1:25:16>> Good evening, council members. My name
1:25:18is Justine Carr and I serve on the board
1:25:20of directors and the board of trustees
1:25:22of the sick curdoir of North Carolina
1:25:24which is located off of Banner Street
1:25:26and has a shared boundary with the south
1:25:29side of the proposed development. I was
1:25:31also able to review the staff report
1:25:34about the proposed zoning change and the
1:25:36traffic analysis section seems to have
1:25:40overlooked completely overlooked the
1:25:41traffic impact on Banner Street and
1:25:44based on what we were told by the
1:25:46attorney representing the proposed
1:25:48development will have an opening
1:25:49vehicular opening on Berwin and Banner
1:25:51Street. So three according to you know
1:25:54my knives estimates 300 apartments could
1:25:56be like 600 cars and a lot of the
1:25:59drivers would need to go to downtown and
1:26:02which makes them very likely to prefer
1:26:04the shorter uh least resistance without
1:26:06traffic lights route through Banner
1:26:08Street. Now if you've ever driven on the
1:26:10street it's a thin one-way street that
1:26:13just cannot handle that amount of
1:26:14traffic load especially during peak
1:26:16hours. Hence, I request that this zoning
1:26:19change be considered only after a
1:26:21thorough traffic analysis and impact on
1:26:23the south side of the development is
1:26:25also considered. In my opinion, at the
1:26:29very least, Berwin Avenue, the small
1:26:31street right along the boundary of this
1:26:33development, needs to be converted to a
1:26:34proper two-way traffic if there's going
1:26:36to be vehicular access there. And a
1:26:38traffic light should be added at at its
1:26:41intersection with Roxboro. That second
1:26:43part I really hope uh you know you all
1:26:46are able to understand because I
1:26:48personally visit the gard you know
1:26:50anywhere from up to four times a week
1:26:52because my kids also do classes there
1:26:54and turning on to Roxboro already feels
1:26:57like I'm waiting you know for so long to
1:26:59get onto perhaps a congested Manhattan
1:27:02bridge and finally when I do get to the
1:27:04head of the line I kind of feel like Tom
1:27:06Cruz trying to turn onto the traffic
1:27:08without getting into an accident and I
1:27:10don't have the sports car that Tom Cruz
1:27:12owns. and I have kids sitting in my car.
1:27:14So this is as a mother I feel guilty
1:27:17about this risky thing I have to do
1:27:18pretty much weekly. So I last sentence
1:27:21I'll stop after this. I believe with
1:27:23respectful conversations there are ways
1:27:25to mitigate these issues and you know we
1:27:27hope that future communications with the
1:27:29developers will lead to those but as of
1:27:31now there's nothing in the plan to
1:27:32address this. Thank you. Thank you
1:27:36Herman Kal.
1:27:51Hello, my name is Harman Kor Bupal and I
1:27:54am a member of the board of trustees of
1:27:55the Sik Gordara of North Carolina
1:27:58located on Banner Street adjacent to the
1:28:00property being discussed. My family and
1:28:02I have been a part of the congregation
1:28:03there since 1999, which has meant that
1:28:06we come to the Gordara regularly,
1:28:08meaning at least once per week,
1:28:10sometimes up to even three to four times
1:28:12per week over the last 25 plus years. We
1:28:15visit on Sundays and during the week,
1:28:18both during high traffic times like rush
1:28:20hour and on off- peak traffic times,
1:28:22although these days I don't know what
1:28:23off- peak would really look like. Um, I
1:28:26respectfully ask this council to
1:28:27carefully consider the traffic
1:28:29implications of the project being
1:28:30discussed. The intersection with Roxboro
1:28:33Street when arriving or leaving the
1:28:34Gorda is congested as it already is and
1:28:37will only get worse with more cars
1:28:39frequenting it and driving through the
1:28:41area. Due to high traffic, turning onto
1:28:44and off of Roxboro can be a lengthy and
1:28:46sometimes stressful part of the drive.
1:28:47As you have already heard, a long line
1:28:49of cars can build up because it takes so
1:28:51long for each car to turn without a
1:28:53street light. This increases the chances
1:28:55of being rearended and other safety
1:28:57issues. And I myself have witnessed near
1:29:00incidents of road rage trying to turn at
1:29:02that intersection. I have heard the same
1:29:04concerns from several others in the
1:29:06congregation who aren't able to be here
1:29:08tonight to speak to their experiences.
1:29:10And I have also heard these concerns
1:29:12from non-drivers, particularly those who
1:29:14may walk up to the Gorda or take public
1:29:16transit and then walk the last part. I
1:29:19have no ill will towards the project,
1:29:20but I am asking the city to consider its
1:29:22implication on the community that
1:29:24already exists there. Up to 300 more
1:29:27apartments means hundreds more cars on
1:29:29the road. And I asked the council to
1:29:31require a traffic study or otherwise
1:29:33fully evaluate the impact of increased
1:29:35traffic on the community that already
1:29:37lives and worships near this property to
1:29:39see if a street light, a turn lane, or
1:29:42other protected crosswalk or other
1:29:43options could address these community
1:29:45concerns. I feel that these needs are
1:29:47important before moving forward with the
1:29:49project because they will impact
1:29:51hundreds if not a thousand plus people
1:29:53that already live and worship in this
1:29:55area regularly. Thank you.
1:30:01>> Thank you. That is the inperson people
1:30:05who have signed up. Anybody else in the
1:30:12Please step to the podium and state your
1:30:14name and address.
1:30:16And then
1:30:19that man
1:30:24good evening uh respected chair and uh
1:30:26commissioner members I want to begin by
1:30:29recognizing and sincerely appreciating
1:30:31the contributions of Dr. Mon Singh to
1:30:33the guruara but my comments are today
1:30:36are not about the contribution I'm
1:30:38speaking as a member of SGNC
1:30:40because I have the serious concerns
1:30:42about the traffic and public safety
1:30:44during the Sunday congregation we
1:30:46already experienced significant vehicle
1:30:48and pedestrian traffic particularly with
1:30:50the worshippers that walking to and fro
1:30:53from the adjacent uh church as well. Our
1:30:57biggest concerns is exiting the area and
1:31:00making the left turn on the Roxboro Pro
1:31:02Street [snorts] without protection of
1:31:04the traffic signals. We often face very
1:31:07very significant long times while trying
1:31:10to make a left turn on the Roxboro Pro
1:31:11Street and I personally escaped two
1:31:14times narrowly escaped the collisions on
1:31:16on that street. So adding this 300 uh
1:31:20additional apartments is only going to
1:31:22make the matters worse uh especially for
1:31:24the traffic.
1:31:26So I respectfully request comprehensive
1:31:29traffic impact and uh safety analysis
1:31:31particularly attention to the entry and
1:31:33exit points on the banner street and the
1:31:35Berwin street and left turn movements
1:31:38onto the Roxro street pedestrian safety
1:31:41and whether additional traffic control
1:31:43measures are needed. We support uh
1:31:46responsible development
1:31:49but we also want to make sure the growth
1:31:50does not come at the expense of safety
1:31:53and accessibility of our congregation
1:31:55and the surrounding community. Thank you
1:31:58for your time.
1:32:00>> Thank you.
1:32:10>> All right. [clears throat]
1:32:12Good evening, Planning Commission. Uh,
1:32:14hundreds of folks in the audience who
1:32:16care about democracy and the millions of
1:32:17folks online. Um, I'm here tonight to
1:32:20speak.
1:32:20>> Can you please state your name and
1:32:21address for the
1:32:22>> Freedman address on file with the board
1:32:24of elections? I'm here tonight to speak
1:32:26to this specific development. Um, and
1:32:29specifically, I really enjoy reading the
1:32:30planning commission's comments. Um,
1:32:32lately the city council has set the
1:32:34expectation around development projects
1:32:37that profers to the school system should
1:32:39be pegged at roughly $1,000 per pupil.
1:32:42And so I'd like to really encourage
1:32:43planning commissioners to make sure
1:32:44they're holding developers to that
1:32:46expectation moving forward. I do thank
1:32:48the development project for increasing
1:32:50that profer. Also in this community,
1:32:53there's also been a unique partnership
1:32:54that's been developed with Durham Tech
1:32:56and I'd like the planning commission to
1:32:58continue to uphold that sort of special
1:33:00arrangement. Uh you heard comments from
1:33:02somebody earlier around a offer for
1:33:05Durham Tech and I think for this
1:33:07community um that's something that's
1:33:08been established before and I'd like the
1:33:10planning commission to honor that
1:33:12separately. Um as you've noticed
1:33:14recently in the reports that go to city
1:33:16council, there's been a lot more data
1:33:18around paramedic services. And so you've
1:33:21seen some development projects give
1:33:22offers around first responders because
1:33:25we have situations here in Durham where
1:33:27if you call for EMS, you may get an
1:33:29ESTAT mode and you won't get an
1:33:30ambulance. And so I think it's really
1:33:32important if we're going to add 600
1:33:34units, we're adequately um measuring the
1:33:37cost to build first responders and
1:33:41making sure that we're holding
1:33:42developers to that standard or making
1:33:45sure that as part of the process they're
1:33:46making these commitments. Lastly, I'd
1:33:48encourage the planning commission to
1:33:50review some of the analysis that
1:33:52attorney Katie Ross has put together.
1:33:54Um, even by the most favorable
1:33:56estimates, Durham has reached in very
1:33:58short time the amount of housing we'll
1:34:00need for the next 30 years. Why that's
1:34:02important is because I think the
1:34:03planning commission has an opportunity
1:34:04to hold developers to a higher
1:34:06expectation to what development should
1:34:09be, and I'd encourage all of you to do
1:34:10that moving forward. Thank you.
1:34:16>> Thank you. Is there anybody on the Zoom
1:34:19wishing to speak? Emmy Grace.
1:34:27Hello. Uh, my name is Emmy Grace. I live
1:34:29at 2717 Highland in Northgate Park,
1:34:33about 3/4 of a mile from the site. I'd
1:34:36like to thank everyone involved in this
1:34:38process. I appreciate that the applicant
1:34:41has gone above some of the UDO
1:34:44requirements, but I really think this is
1:34:45an opportunity to do more, especially at
1:34:48such an important location. This is at
1:34:51the edge of the urban development tier.
1:34:53So, we really do not need any more car
1:34:55oriented development in Durham,
1:34:57especially in this place. So, I'd like
1:34:59to echo some of the recommendations for
1:35:01some better bike ped
1:35:05um safety and considerations.
1:35:08Additionally, on the note of the
1:35:09schools, if I'm understanding correctly,
1:35:11the report indicated that there'd be a
1:35:15net seven increase of students, and they
1:35:18estimate that the per student annual
1:35:20cost is $5,374.
1:35:24So, a contribution of $7,000 would only
1:35:27cover one and a half students for a
1:35:30single year. So, the school
1:35:32contribution, whether that's through DPS
1:35:34or through Durham Tech, really ought to
1:35:37be at least $40,000 minimum.
1:35:40Um, at the last community meeting, um,
1:35:43Mr. Do also indicated that there could
1:35:45be a possibility to incre
1:35:49um, affordable housing to boost that
1:35:51number. So, I'd really like to see the
1:35:53applicant consider a higher percentage
1:35:55of affordable units. Uh, thank you all
1:35:58so much and I hope you consider some of
1:36:00these um suggestions as you make your
1:36:02decision this evening.
1:36:06>> Thank you.
1:36:08Anybody else on the Zoom wishing to
1:36:10speak on this item? Please raise your
1:36:12hand or if you're on a cell phone, star
1:36:15nine.
1:36:24Going once,
1:36:26going twice,
1:36:29gone. The chair is now closing the
1:36:31public hearing and we are open for
1:36:33commissioner
1:36:36Oh,
1:36:38applicant, would you like to respond to
1:36:39some of these concerns?
1:36:47>> Uh, sure. Um, so I'll just say we've
1:36:51heard a lot of uh uh from from the
1:36:54community and and as as I've mentioned,
1:36:55we've been involved in some, in my
1:36:59opinion, fairly robust community
1:37:00engagement with various meetings.
1:37:02Traffic has emerged as the number one
1:37:04concern in this area. Now, your staff
1:37:07report, you know, it it shows or it has
1:37:09its own analysis from the professional
1:37:12staff here in the city uh related to the
1:37:15expected traffic impacts. It's true that
1:37:18a uh traffic impact analysis was not
1:37:20required and that's probably not that
1:37:23surprising given that uh as compared to
1:37:26the current zoning designation
1:37:29uh our proposed development would result
1:37:32in a reduction of 120 trips daily
1:37:35including a reduction 35 trips in the
1:37:37PMP hour and only an additional two
1:37:40trips in the AM power based off what
1:37:42could currently be built. So I don't I
1:37:46don't
1:37:47I think you heard from some of the
1:37:49speakers, there are several uh places of
1:37:51worship in this corridor.
1:37:53And I am certain that there is a lot of
1:37:55traffic if they're all in session at the
1:37:57same time. Uh I live I personally live
1:38:00across the street from a school. I can
1:38:01set my watch to the traffic at that
1:38:03school. We have traffic every day, every
1:38:05school day, I should say, at that
1:38:06school. And I'm sure there is traffic,
1:38:08but I think the staff report bears out
1:38:10the numbers on the the uh on on the
1:38:14traffic in this area. Another thing I
1:38:16want to point out is that one of the
1:38:17things that makes this a great site for
1:38:20uh an apartment community is in fact its
1:38:23access to transit. Uh there are very
1:38:27nearby there are uh transit stops which
1:38:31you can walk to. A couple of which uh at
1:38:34least one of which I think two are being
1:38:36improved either through the city's own
1:38:38investment in sidewalk projects or from
1:38:41other private developments. And you can
1:38:42walk to those safely from here. We have
1:38:44commitments to to include sidewalk uh
1:38:47including off-site sidewalk to make sure
1:38:49that you can actually walk to a bus
1:38:51stop. So the the comment about there
1:38:55needing to be less uh car centric
1:38:58development. I mean I think we agree
1:38:59with that. I think the reality is people
1:39:02do need a car to get around Durham, but
1:39:03this is a great location primarily
1:39:05because of its access to transit. Thank
1:39:07you.
1:39:12Okay, the chair is now closing the
1:39:14public hearing. Is there any
1:39:16commissioner questions or comments?
1:39:22Commissioner
1:39:24>> Huarez.
1:39:27Hi everyone. Um well, first thing I want
1:39:30to know is like thank you for sharing
1:39:31your story. I know that was very
1:39:33important for you. I come from immigrant
1:39:34parents as well. Um, but I also grew up
1:39:37here in Durham and I cross and I drive
1:39:39through Roxboro Street all the time. And
1:39:42let me tell you, growing up here, I've
1:39:44seen the increased amount of traffic in
1:39:46that area. I mean, El Superior is right
1:39:49there and that's where a lot of Latino
1:39:51goes to buy groceries and all that
1:39:53stuff. And so, when I hear a lot of the
1:39:55public um concerns on traffic, I agree,
1:39:59right? Because there's so much,
1:40:01especially how narrow the street is when
1:40:03you're driving by. people don't go 35 an
1:40:06hour and I I can tell you that for sure.
1:40:09And as well as even though it is um a
1:40:12good spot, I feel like there still needs
1:40:14to be an infrastructure built there for
1:40:16folks to truly be able to navigate their
1:40:19day-to-day life because again, people
1:40:21are there to transport as well through
1:40:23that street. And if we continue to see
1:40:25these types of traffics, it's kind of
1:40:27hard to um yeah, envision how that's
1:40:32going to look like if there's not an
1:40:33infrastructure ready for for the 299
1:40:36units that y'all want to bring. And you
1:40:39can imagine that's not just going to
1:40:40include one person. It includes multiple
1:40:43people sometimes in those units. So, um
1:40:46I hope my folks here can consider that
1:40:49as well. Um, and that I hear a lot of
1:40:52the folks who came here and I'm just so
1:40:54thankful for everyone who spoke up here
1:40:56today.
1:40:59>> Thank you. Other commissioner comments,
1:41:01questions,
1:41:04Commissioner Woke.
1:41:06>> Um, yes. And so I'm I also have concerns
1:41:11with the traffic. Um, and but also I
1:41:15appreciate that the affordability went
1:41:17down to 60% AMI. That's awesome. But I
1:41:20do also think that 15 units seems very
1:41:23low and I'm hearing that a lot also from
1:41:25the community and um from the
1:41:28neighborhood meetings in that and I just
1:41:30was wondering if there was any um if
1:41:34that if you would consider increasing
1:41:36that in any way.
1:41:43>> I mean we're definitely considering it
1:41:45but we're not in a position to make the
1:41:46commitment tonight. We we we take our
1:41:49commitment seriously. Uh and we just
1:41:51don't know that we'll be able to hit a
1:41:53higher number, but it's our goal to do
1:41:55that. Um but you know, to answer your
1:41:57question, I can't make that commitment
1:41:59tonight.
1:42:05Any other commissioner questions,
1:42:07comments?
1:42:09Do I have a question for the applicant?
1:42:11So, where is your connection going to
1:42:13be? Is it going to be just on Banner
1:42:15Street or are you going to be connecting
1:42:16to Bellevin Avenue?
1:42:19>> Yeah, the the um so we don't have direct
1:42:23access to Banner. The site is bounded
1:42:27between Bellevin and Berwin and then
1:42:30Banner intersects with Berwin. So there
1:42:33will be points of access off of Bellevin
1:42:36which is to our north. Um and the site
1:42:39does have frontage on Berwin. Um
1:42:44something we've been uh trying to figure
1:42:46out is whether we actually need to have
1:42:48a vehicular access to Burwin. Um and you
1:42:52know we we are open to the idea of not
1:42:55having a vehicular access off Berwin
1:42:57because we do have access to Bellevin.
1:43:04>> Okay. Thank you. And also this area is
1:43:08under I guess is part of the small area
1:43:11planning for the Braggtown community. Is
1:43:14this part of that plan
1:43:17>> or is this
1:43:18>> I think your question is is this
1:43:20property within the plan district for
1:43:22the small area plan? It is.
1:43:24>> Yes.
1:43:26>> Yes.
1:43:27>> Okay. Thank you.
1:43:31Any other questions or comments? I'd
1:43:34also like to I travel down Roxboro Road
1:43:37and I would like to echo Commissioner
1:43:40Huarez's one. It is
1:43:45uh
1:43:46an obstacle course
1:43:49and Rock Roxboro Road. I mean, it is it
1:43:53the infrastructure there needs some
1:43:55serious improvement before additional
1:43:58traffic is added. So, it'd be nice to
1:44:01get some profers about
1:44:04uh more sidewalks or a commitment to
1:44:10bus shelters or
1:44:12>> So, we do have commitments to more
1:44:13sidewalk including off-site sidewalk and
1:44:15the bus shelters
1:44:17while
1:44:18>> or anything that would promote less
1:44:20traffic going on.
1:44:21>> They're getting improved. The the bus
1:44:22shelters, one is getting improved
1:44:24through a city uh sidewalk program. the
1:44:27other one. None of these bus stops are
1:44:29are directly adjacent to our site. We
1:44:31don't have a bus stop in front of our
1:44:33assemblage, but they're just they're
1:44:34very close by, less than tenth of a mile
1:44:37if I remember correctly. And and those
1:44:39bus stops are getting improved. One by
1:44:41the city and then if I remember
1:44:43correctly, one by the Bragtown Walk
1:44:44project as well, but you can walk to
1:44:46those bus stops from this development.
1:44:50>> Okay, Commissioner Bailey.
1:44:53>> Okay. So, I just want to make sure I
1:44:54heard you correctly. You just said you
1:44:55there's no access. If I'm looking at
1:44:57this map correctly, through Bellevin
1:45:00and so the only access is Berwin
1:45:03outside.
1:45:03>> No, no, the so the property has frontage
1:45:07on both Berwin and Bellevin. What I said
1:45:09is we don't have direct access to
1:45:11Banner.
1:45:12>> Okay.
1:45:12>> Um which which is a street that
1:45:14intersects with Burwin and it goes
1:45:17>> roughly north south. I think Banner goes
1:45:19north south
1:45:20>> which is where um the uh Gdoara has
1:45:24their access. Right. So that was the
1:45:26street that was the the subject of a lot
1:45:28of the comments you heard. We don't have
1:45:30direct access to Banner, but we do have
1:45:33direct access to Berwin. I think the
1:45:35concern is that if we have vehicular
1:45:37access on Berwin, people will exit our
1:45:40site, go to Berwin, and then go to
1:45:42Banner. And what I was suggesting is our
1:45:45team,
1:45:46I haven't talked to planning about it,
1:45:48so I don't know if there are some
1:45:49impediments, but our team is open to the
1:45:51idea of not having a vehicular access on
1:45:53Berwin, which would then limit our
1:45:56vehicular access essentially only to
1:45:57Belvin. So, would it be possible to,
1:46:02and I heard you say that the traffic
1:46:04analysis was not a requirement? Um, but
1:46:09as you're hearing the comments from the
1:46:11public, is that something that you would
1:46:13consider doing as you move forward, if
1:46:15if the project were to move move
1:46:17forward, so you can help
1:46:20kind of mitigate or alleviate some of
1:46:21those concerns that folks are having
1:46:24because the traffic is an issue. I don't
1:46:25go down Roxboro Road for this very
1:46:27reason because it's a lot. Um, and I'm
1:46:29looking at how this exit is going to be.
1:46:32And if you're wanting a project of this
1:46:34magnitude, while it is a a solid project
1:46:37itself, the traffic analysis would be
1:46:39something that would be helpful to help
1:46:41comfort the residents and those people
1:46:43in the community that are going to be
1:46:44there.
1:46:45>> So, I don't know if we I couple things I
1:46:48want to say about that. There was I
1:46:50think a couple of people mentioned that
1:46:51they would like to see a stoplight at
1:46:54the intersection of Burwin and Roxboro.
1:46:57Now the issue with that is NCDOT is
1:47:00never going to allow a stoplight in that
1:47:02location because there's already a
1:47:03stoplight just up the street. So they
1:47:05have a spacing requirement for stop
1:47:07lightss and as I understand it the you
1:47:10just don't meet the spacing. There isn't
1:47:11going to be a stoplight there. Um, so I
1:47:14I want to be clear that regardless of
1:47:16any, you know, if a traffic uh analysis
1:47:19is done, that to my understanding is not
1:47:22possible just based off of the uh
1:47:25spacing requirements that NC DOT has for
1:47:27their roads for for traffic signals. Um,
1:47:31I I I don't know that we that I can make
1:47:34the commitment tonight to to do a
1:47:35traffic impact analysis, but we have
1:47:37heard that feedback. I mean, I I I've
1:47:39heard what the community said about
1:47:40traffic, and as I said, we're we've been
1:47:42thinking about the best way to address
1:47:44that. One of the ideas we came up with
1:47:46is, well, what if we just didn't have a
1:47:49vehicular access on Berwin, right?
1:47:51Because that going south, going across
1:47:53banner, that's where we're hearing the
1:47:55most about traffic concerns. Roxboro
1:47:57also a traffic concern, but I can't
1:47:58avoid Roxboro on this side. I just can't
1:48:00do that.
1:48:05Uh, Vice Chair Cameron.
1:48:07>> So, um,
1:48:10how much environmental cleanup do you
1:48:12have to do on this site?
1:48:15>> So, the the actual area, there's
1:48:17actually a recorded, um, uh, documents
1:48:20called a notice of residual petroleum
1:48:22that's on the site and it actually has a
1:48:24map. Uh, I don't know if that map is in
1:48:27your packet. I don't think it is. Um the
1:48:30contamination area is is a very small
1:48:32area where the tank was. It's actually
1:48:35to my understanding it wasn't the tank
1:48:37that leaked. It was that when the tank
1:48:39was removed some of the uh components
1:48:42were left behind
1:48:43>> like the spot uh was kind of left behind
1:48:46and that's what the contamination stems
1:48:48from. So it is a small area but it is
1:48:51contamination nonetheless. We don't know
1:48:54uh what will need to be done uh to
1:48:58address that contamination, but as you
1:49:00see, we have a zoning commitment to
1:49:01address that before we have any
1:49:03residential development in that area. Um
1:49:06and
1:49:08I will just say the state has DEQ has a
1:49:11program that monitors this stuff and
1:49:12they have I guess I'll say multiple
1:49:14avenues on how this could be addressed
1:49:17depending on the extent and the actual
1:49:20uh contaminant. And as I had mentioned,
1:49:22I think uh this was like a a storage
1:49:26tank for oil for heating that the school
1:49:29had.
1:49:30>> So at the most you may have to do some
1:49:31soil remediation going on,
1:49:33>> soil remediation, soil management,
1:49:35something like that. In some instances,
1:49:37you can cap that contamination.
1:49:39Obviously
1:49:41it's also possible that it would require
1:49:43a complete removal, although I don't
1:49:44think that's that's probably not the
1:49:46case in this location. For what it's
1:49:47worth, the site already has a no further
1:49:51action notice from DEEQ for
1:49:54non-residential development.
1:49:55>> For non-resident,
1:49:56>> but residential development is held to a
1:49:57higher standard for obvious reasons.
1:49:59>> Will you uh be able to qualify for
1:50:02brownfield funding on that or no?
1:50:04>> You know, we haven't looked into into
1:50:06the brownfield. It's also I will say
1:50:08it's such a small area. I don't know
1:50:10that it would even be worth the headache
1:50:11even if we could.
1:50:12>> Got it. Thank you.
1:50:16Any other questions or comments?
1:50:20Nope, we're good. All right. May I have
1:50:22a motion to move case Z25 triple0
1:50:2847 Mosby Bragtown forward with a
1:50:32favorable recommendation.
1:50:34Chair regarding case Z25047
1:50:40Mosby Bragtown. I move that we forward
1:50:44this case to city council with a
1:50:46favorable recommendation for approval.
1:50:52>> Second.
1:50:54>> It has been moved by Vice Chair Cameron
1:50:56and seconded by Commissioner Pionek to
1:50:59move this case forward with a favorable
1:51:01recommendation. May we have the
1:51:03electronic voting, please?
1:51:21The motion fails 6 to three.
1:51:27Thank you. Next item on the agenda.
1:51:29Shannon at Old Hap Chapel Hill Road Text
1:51:33Modification
1:51:35Z26 A triple01
1:51:38one.
1:51:42Yes, please. Please exit quietly.
1:51:53[clears throat]
1:51:58>> [clears throat]
1:52:17>> May we have the staff report, please?
1:52:20>> Um, good evening, Chair Shagaras, Vice
1:52:22Chair Cameron, planning commissioners.
1:52:24I'm Javar Jones. I'm here to present
1:52:27case Z26000
1:52:3211 Shannon at Old Chapel Hill text
1:52:34modification.
1:52:38The proposal includes amending an
1:52:40existing development plan for Shannon at
1:52:43Old Chapel Hill located at 3638 Old
1:52:46Chapel Hill Road and 3641 Shannon Road.
1:52:50The existing zoning is commercial
1:52:52general with a development plan and
1:52:54residential compact with a development
1:52:57plan. The applicant proposes to keep the
1:53:00current zoning designations while
1:53:02amending the existing development plan
1:53:05to allow for more townouses to be built
1:53:07on the site. The current development
1:53:09plan was approved for the development of
1:53:1143 town houses and 17 multif family
1:53:14units. The applicant seeks to develop an
1:53:17additional 17 townhouse units in lie of
1:53:20the previously approved multif family
1:53:22units. This proposal would allow for up
1:53:25to 60 townhouse units to be developed on
1:53:27the site.
1:53:32The aerial map shows the general
1:53:33location of the project along Shannon
1:53:35Road and Old Chapel Hill Road. You can
1:53:37see there just to the west of Shannon
1:53:40Road is the Hope Valley Square Shopping
1:53:43Center.
1:53:47So the amended development plan with the
1:53:49updated housing type is graphically
1:53:51depicted within a bubble and has been
1:53:53updated under the land use section of
1:53:55sheet three of attachment D.
1:53:58Additionally, the amendment has been
1:53:59notated on sheet one under text
1:54:01commitments.
1:54:13Okay. Uh, neighborhood meetings were
1:54:15held on June 9th, 2026 and September
1:54:1815th, 2026. There were 14 attendees at
1:54:22the first meeting and seven attendees at
1:54:24the second meeting. Additionally, one
1:54:26neutral comment has been received for
1:54:28this proposal on the Durham Reszoning
1:54:30Explorer.
1:54:35The proposal would amend the existing
1:54:38graphic development plan to allow for
1:54:40the development of 17 additional
1:54:42townhouse units to replace the
1:54:43previously approved 17 apartment units
1:54:46located on the southern end within the
1:54:48CGD commercial general with the
1:54:51development plan zone portion of the
1:54:53site. Again, this proposed amendment is
1:54:56not requesting to change the previously
1:54:58approved zoning districts. Due to the
1:55:01limited nature of the request, the
1:55:04proposal was not reviewed against the
1:55:06policies of the comprehensive plan.
1:55:08Thank you. Staff and the applicant are
1:55:10available for any questions.
1:55:13>> Thank you. The chair is now opening the
1:55:15public hearing. May we have the
1:55:17applicant, please?
1:55:21>> Good evening, commissioners, chair, vice
1:55:22chair. My name is Scott Harmon. I'm the
1:55:24applicant of this project. Uh I'm a uh
1:55:28one of the founders of Center Studio
1:55:29here in downtown Durham. Um I wanted to
1:55:34um we are uh simply we're not changing
1:55:40the density. We're not changing any of
1:55:42the other commitments that we worked and
1:55:43negotiated very carefully with the
1:55:45adjacent neighborhoods and the our
1:55:47neighbors the Markhamm Street uh Baptist
1:55:50Church. Um, and we're simply, um, we
1:55:54originally had planned to do a mixeduse
1:55:57vertical building on the corner that had
1:55:59ground level commercial and retail with
1:56:0217 flats above. That kind of a building
1:56:06has become too expensive to construct at
1:56:09that small of a scale. The people who
1:56:12are building 200 and 300 unit apartments
1:56:14can still afford to build those because
1:56:16of the scale that they're working at.
1:56:17But the small infill stuff that we're
1:56:19known for, have done a lot of downtown,
1:56:22those with the rise in interest rates,
1:56:25those kind of buildings are just
1:56:26prohibitively expensive. Uh town homes
1:56:29remain a viable economic option there.
1:56:31So, we just simply wanted to change it
1:56:33from apartments, 17 apartments for phase
1:56:362 to 17 town homes. All of our
1:56:38commitments on affordability, all the
1:56:40access uh storm water commitments that
1:56:43we've made remain in effect. Um if we
1:56:47had actually used the word multif family
1:56:49in our original zoning application, uh
1:56:52we could do either apartments or town
1:56:53homes, but because we specifically said
1:56:55apartments for that one building type,
1:56:57staff said we really did need to come
1:56:59back before you uh to edit that. I want
1:57:02to point out just a couple things.
1:57:05Um uh we did very robust community
1:57:09engagement on this project. We uh always
1:57:11mailed to 1,000 ft instead of the
1:57:13minimum 60 600 ft. We mail to every
1:57:16resident, not just the owners. We mail
1:57:18to every apartment dweller uh within
1:57:20that area. This is something we just do
1:57:22on principle. Uh we have a very close
1:57:25relationship that we maintain with the
1:57:27Markham Chapel Baptist Church, our
1:57:29immediate neighbor. Our property
1:57:31literally surrounds their their church.
1:57:33That congregation is historic and has
1:57:35been in that location more or less since
1:57:37the late 1800s. Dr. Richard McM McMillan
1:57:40says hello and is looking forward to
1:57:42meeting his new neighbors. Um, I also
1:57:46want to just mention that our original
1:57:47zoning case in 2023 was unanimously
1:57:50approved by the planning commission and
1:57:53uh it was approved by the council 5 to
1:57:55one. I know this is a different body of
1:57:58different people and you should all have
1:57:59your own opinions about these matters
1:58:01but I think the uh the example that we
1:58:04set back in 23 23 is important uh
1:58:07context for what we're asking for today.
1:58:09We're almost done with the first phase
1:58:11of construction and vertical townhouse
1:58:13construction would be beginning
1:58:14hopefully before the end of the year.
1:58:16And I'm happy to answer any questions
1:58:18y'all have.
1:58:22>> Thank you.
1:58:24[clears throat]
1:58:25have any uh community other community
1:58:27members? Only the applicant has signed
1:58:29up in person.
1:58:33Nope. Anybody on the Zoom, please raise
1:58:35your hand or star nine if you're on a
1:58:40cell phone if you're wishing to speak on
1:58:42this item.
1:58:46Nope. Going once.
1:58:49Going twice. Gone. Chair is now closing
1:58:52the public hearing and we're open for
1:58:54commissioner questions or comments.
1:58:57Any questions, comments on this one?
1:59:01Nope. That's easy. Okay. May I have a
1:59:04motion to move case Z26011
1:59:08Shannon at Old Chapel Hill Road text
1:59:10modification forward with a favorable
1:59:13recommendation.
1:59:14chair regarding case
1:59:18Z2601
1:59:21Shannon at Old Chapel Hill Road text
1:59:24modification. I move that we forward
1:59:27this case to city council with a
1:59:29favorable recommendation for approval.
1:59:33>> Second [clears throat] second.
1:59:36>> It has been moved by Vice Chair Cameron
1:59:38and seconded by Commissioner Richie to
1:59:40move this case forward with a favorable
1:59:41recommendation. May we have the
1:59:43electronic voting, please?
1:59:56>> The motion passes 11 to zero. Y'all are
1:59:59awesome. Thank you. Hope you're not
2:00:00right here all night.
2:00:03>> Thank you. Next item on the agenda, uh,
2:00:06item number seven, small area plans
2:00:08update, Lakewood West, and Lion Park
2:00:12small area plan.
2:00:16Good evening, planning commission chair,
2:00:18vice chair, and um, the entire planning
2:00:21commission in public. My name is Sarah
2:00:23Long, and I am a project manager for the
2:00:25Lakewood, Weston, and Lion Park small
2:00:27area plan. And tonight, I will be
2:00:29sharing with you an overview of the
2:00:30draft small area plan.
2:00:33So, as a reminder, small area plans, um,
2:00:36it's an initiative that engages
2:00:38community members in identifying the
2:00:40needs of a specific area. They're a way
2:00:43for us to implement the adopted derm
2:00:45durm comprehensive plan by making
2:00:47recommendations to guide future
2:00:48development and public investment in the
2:00:51area.
2:00:54So, as a brief overview of the project,
2:00:56we chose this location for our second
2:00:58small air plan because of the potential
2:00:59redevelopment of shops at Lakewood. The
2:01:022023 comprehensive plan identifies the
2:01:04shopping center as a transit opportunity
2:01:06area. So that's an area with the
2:01:08potential for transitoriented infill
2:01:10development and we recognize that this
2:01:13transitoriented development would impact
2:01:15not only the shopping center but the
2:01:16commercial corridor along Chapel Hill
2:01:18Road and nearby neighborhoods. So we
2:01:21included the Weston and Lion Park
2:01:22neighborhoods because these historically
2:01:24disinvested areas um could use a look in
2:01:27terms of determining what their needs
2:01:29are and assessing those needs for any
2:01:31future development.
2:01:34So our work over the past year can be
2:01:36divi broken down into five main phases
2:01:39starting with the preliminary research
2:01:40in the late spring and summer of 2025.
2:01:44The phase one began with the project
2:01:47launch in August of 2025 after which we
2:01:49identified the project topic topic areas
2:01:51for engagement.
2:01:53In phase two, we conducted engagement
2:01:55from December to June of this year. And
2:01:58at the same time, we drafted plan
2:02:00recommendations based on that community
2:02:02input and staff analysis. In July of
2:02:04this year, we entered the stage of
2:02:05finalizing the draft recommendations and
2:02:07the community engagement on the draft
2:02:09plan, which wrapped up in September. And
2:02:11this meeting is beginning our adoption
2:02:13process.
2:02:17The project methods can be broken down
2:02:19into two main areas. Um, we had our land
2:02:21use analysis and research that was
2:02:24conducted by staff and the incorporation
2:02:25of community input. For our land
2:02:28analysis, we looked at unused city-owned
2:02:30parcels, paper streets or unbuilt
2:02:32dedicated rightway, vacant properties,
2:02:35and we also looked at potential changes
2:02:36for zoning districts and place type
2:02:38designations as well as infrastructure
2:02:41work that was planned or scheduled in
2:02:42the area. Our second approach was
2:02:45incorporating community input and that
2:02:47process included um started working with
2:02:50community members to identify concerns
2:02:52or requests for improvements,
2:02:53verification of those concerns which
2:02:55usually included a site visit,
2:02:57coordination with respective
2:02:58departments. Um and for the shops at
2:03:01Lakewood engagement specifically, we
2:03:03focused on um design ideation exercise
2:03:06to help with visual visualization of
2:03:08what um the community vision would be
2:03:10for that shopping center.
2:03:14Just briefly our engagement highlights
2:03:16again the project was launched in August
2:03:18of 2025. Um in December we held an
2:03:21engagement on transportation which
2:03:23allowed participants to identify areas
2:03:25on a map where they recognize safety
2:03:27concerns or mobility barriers. We also
2:03:30had transportation staff collect um
2:03:32feedback for the equitable green
2:03:34infrastructure traffic calming project
2:03:36in the area. In April, we held an
2:03:38engagement on parks, open space and
2:03:40connectivity. And there was a similar
2:03:42method used where participants could
2:03:44identify on a map um what open spaces
2:03:46they use and parks that they use and how
2:03:48they get to those locations. For the
2:03:50shops at Lakewood engagement, we held um
2:03:52three different engagement
2:03:53opportunities. One was the map based and
2:03:55design engagement I mentioned before, a
2:03:57virtual engagement where participants
2:03:59gave feedback on height preferences and
2:04:01an online survey.
2:04:06So in terms of the plan structure itself
2:04:08is organized into five chapters
2:04:10including um background information,
2:04:12existing conditions, the overall
2:04:13planning process um and we get into the
2:04:16policy re policy recommendations um and
2:04:18action recommendations in chapters three
2:04:20and four. In chapter five we have an
2:04:23implementation schedule.
2:04:29So for the specific planning um
2:04:31recommendations
2:04:33in transportation um we listed
2:04:36improvements uh requested for sidewalks
2:04:39um improvements to traffic calming
2:04:41measures like the image you can see the
2:04:43Morehead and Chapel Hill Road
2:04:45intersection um recommendations for
2:04:47transit stop improvements um
2:04:49particularly along um Chapel Hill Street
2:04:52and also Chapel Hill Road as well as
2:04:55improving bike and pedestrian access to
2:04:57Lion Park and Wrightwood park. And for
2:05:00parks, um we also included
2:05:01recommendations for improved park
2:05:03amenities for the Carol Street park and
2:05:05a and shade infrastructure for Maplewood
2:05:07Park.
2:05:11For recommendations for public land, we
2:05:14noted the potential use of vacant
2:05:15property along Wrightwood Park to
2:05:17improve that bike and ped pedestrian
2:05:19connection. Um there are also two
2:05:21historical black cemeteries in the area,
2:05:24the Fitzgerald and Henderson cemeteries.
2:05:26The plan recommends expansion of the use
2:05:28of um ground penetrating radar surveys
2:05:30to identify potentially potential
2:05:32unmarked graves and for further recogniz
2:05:35recognition and preservation of these
2:05:37cemeteries.
2:05:39Our analysis of the paper streets and
2:05:41alleyways um included recommendations
2:05:43for exploring the feasibility of bike
2:05:45and pedestrian access along the Norwood
2:05:47and Dean Street paper streets as well as
2:05:50a potential uh street or agreement
2:05:52access along Proctor Street.
2:05:58terms of place type and zoning, there
2:05:59was just one area just south of Morehead
2:06:02Avenue, which is in the center of the
2:06:03map there, where we noted um that there
2:06:06was existing residential and one or two
2:06:08story commercial um uses that were zone
2:06:10as office and institutional, which
2:06:12typically allows for higher intensity
2:06:14that is that we see in the current area
2:06:16we expect to be in that area. So we
2:06:18recommended instead a mixed use zoning
2:06:20district that aligns with the res
2:06:23residential and commercial character of
2:06:24the area and our zoning recommendation
2:06:27um would be addressed by the new UDO
2:06:32project. So should that be restarted or
2:06:34through a separate reszoning process. So
2:06:36in this so for this plan itself we are
2:06:38not calling for resoning.
2:06:40In terms of historic preservation, we
2:06:41identified the Weston and Lion Park
2:06:43neighborhoods as potential heritage
2:06:44communities which would allow for
2:06:46archiving and recognition of those
2:06:48areas.
2:06:51And at the moment, um the housing and
2:06:53neighborhood service services department
2:06:55is in the process of developing an
2:06:57affordable housing plan for the city. So
2:06:59with that in mind, our recommendations
2:07:00emphasize working with that department
2:07:02on neighborhood stab stabilization
2:07:04efforts. Um, we also noted and
2:07:06emphasized this the comprehensive plan
2:07:08uh has guidance for new housing
2:07:10developments in TOAS. Shops at Lakewood
2:07:13that would include a minimum of 20%
2:07:15affordable residential units for new um
2:07:18residential development.
2:07:22So that brings me to the guidance for
2:07:24the shops at Lakewood. As I mentioned
2:07:27before, um this is designated as a
2:07:29transit opportunity area and
2:07:33transit opportunity areas prioritize or
2:07:35intended to prioritize moving people
2:07:37safely. Um they should include buildings
2:07:40that are located close together and in
2:07:42general areas that provide a mix of uses
2:07:44that serve the daily needs of the
2:07:46community.
2:07:53So based on the community input and the
2:07:55comprehensive plan guidance, we wrote
2:07:56the following recommendations for the
2:07:58shops at Lakewood um in terms of
2:08:00connectivity and transportation,
2:08:02prioritizing non-vehicular modes of
2:08:03movement throughout the shopping center
2:08:05should include safe paths for
2:08:07pedestrians and cyclists and designated
2:08:09automobile access points that prioritize
2:08:11visibility and safety. We also uh
2:08:14recommended an expansion of green space
2:08:16as well as expanding the tree canopy
2:08:18throughout the parking lot.
2:08:24For public services, we recommended
2:08:26prioritizing services such as such as
2:08:28trash receptacles, water filling
2:08:30stations, and a public restroom as well
2:08:32as an improved transit stops um by the
2:08:36shops at Liquid. For mix of uses, we are
2:08:38recommending both commercial and
2:08:40residential uses within the shopping
2:08:42center. And again, at least 20% of all
2:08:44new residential units being affordable
2:08:47for massing. Um the building massing
2:08:49recommend recommendations
2:08:52provide height guidance on existing
2:08:54commercial buildings um based height
2:08:56guidance based on the existing
2:08:57commercial buildings and nearby
2:08:59residential areas. So we're talking
2:09:00about recommendations for five to three
2:09:03stories for new buildings.
2:09:05And we emphasized that this additional
2:09:08density is intended to promote more
2:09:10affordable housing in the area.
2:09:13In terms of infill, we noted a couple of
2:09:15opportunities for small-scale affordable
2:09:17commercial spaces in the vacant
2:09:19buildings.
2:09:22So here we have a diagram that
2:09:23summarizes the ideas that are laid out
2:09:25in the staff recommendations and we show
2:09:28areas for additional green space. In
2:09:30blue we have potential areas for new
2:09:31building locations. So, these aren't
2:09:33building footprints themselves. They're
2:09:34just areas that where we could break up
2:09:36the shopping center with additional
2:09:37building info. And we also identified
2:09:40ideal entry points for vehic vehicles
2:09:42versus bicycle and pedestrian movement.
2:09:47And as I mentioned, we included an
2:09:49implementation table and that
2:09:52categorizes the recommendations as
2:09:54discrete actions or ongoing policies. It
2:09:57also provides details on the
2:09:58responsibility um of these
2:10:00recommendations, the timeline and the
2:10:02associated plans related to each of the
2:10:04recommendations.
2:10:08So the next three images um include a or
2:10:12a visual representation of the recommend
2:10:14recommendations
2:10:15and here we can see potential new
2:10:18building footprints um and then new
2:10:20building heights relative to existing
2:10:22structure. We also see a redesigned
2:10:24parking area and expanding green space.
2:10:34And again, this these are additional
2:10:36images um different views of the shops
2:10:38at Liquid area. And these images give us
2:10:40an idea of the scale of what the
2:10:42additional building height would look
2:10:44like in comparison to existing
2:10:45buildings. And it really served the
2:10:47purposes of of providing um a more
2:10:49accessible way of seeing what is in the
2:10:51text of the small area plan.
2:11:00I just wanted to note we had an open
2:11:02survey that ended um right before this
2:11:05presentation and we had a bit more
2:11:07feedback from residents. Um some of the
2:11:09things that were noted were was further
2:11:11emphasizing the or asking for additional
2:11:14or stronger language around affordable
2:11:15housing for shops at Lakewood. Um there
2:11:18was emphasis on um environmentally
2:11:21friendly lighting um concerns and in
2:11:24interest around um infrastructure within
2:11:27shops at Lakewood that would address
2:11:29concerns around safety.
2:11:31Um, and there were there were questions
2:11:34and concerns around parking availability
2:11:36in the shops at Lakewood.
2:11:39And that's addressed through our
2:11:40recommendations for structured parking.
2:11:44Right. After tonight's hearing, we will
2:11:47respond to your recommendations and our
2:11:48next steps are the city council work
2:11:50session on November 5th and the December
2:11:5221st city council public hearing. Thank
2:11:55you. And we're available for your
2:11:57questions and comments.
2:12:00Thank you. Are there any questions or
2:12:02comments?
2:12:06Oh, opening the public hearing.
2:12:10>> Is there a signup sheet for this one?
2:12:12>> Yes.
2:12:24>> Okay. Dan Juel.
2:12:33>> Good evening, commissioners. I'm Dan
2:12:34Juel. I live at 1025 Gloria Avenue. Been
2:12:37practicing as a professional landscape
2:12:39architect here in Durham for over 40
2:12:41years. Partially here at the request of
2:12:43my long-term client, Brody Co, but also
2:12:45as someone who's been a consultant and a
2:12:48customer at the shops of Lakewood for
2:12:49more than 35 years. members of the
2:12:52Birdie Crow team and I attended most if
2:12:54not all of the in-person sessions uh
2:12:57since last year. There was much
2:12:59enthusiasm among the community members.
2:13:01We applaud and support the community
2:13:03input process that was followed.
2:13:05However, some of the recommendations put
2:13:08forth particularly in chapter 4 of the
2:13:09draft plan are actually conjecture by
2:13:12the planning department and were not
2:13:14produced as part of the community
2:13:16workshops. Specifically, we think that
2:13:19the relatively abbreviated time allotted
2:13:21for workshop exercises in no way
2:13:24supports the level of design uh that you
2:13:27saw here a second ago. To say that our
2:13:30group was surprised that the city would
2:13:32expend the effort to put together what
2:13:34people in my industry would describe as
2:13:36schematic design is an understatement.
2:13:39The drawings in the plan are what we
2:13:41would expect from a design cheret, not
2:13:43from the workshops that were actually
2:13:45held. Workshops result in a narrative
2:13:48that captures aspirational ideas
2:13:50gathered from community input. They do
2:13:52not result in designs. Design cherettes
2:13:55on the other hand pull experienced
2:13:57design professionals, owners and experts
2:13:59together for anywhere from a few days to
2:14:01a week of intensive analysis drawing
2:14:03feed feedback. For point of privilege, I
2:14:06know how to run workshops, how to run
2:14:08design cherettes. As co-founder of the
2:14:10Dermary Designers Group, I have
2:14:12organized and facilitated dozens of
2:14:14these exercises over the last 25 years.
2:14:17The detailed drawings therefore should
2:14:19not be part of this plan. And this is a
2:14:23critically important distinction because
2:14:25once adopted, this plan will become a
2:14:27future guiding document for zoning
2:14:29decisions down the road. And even though
2:14:31staff has said these are uh
2:14:34illustrative, we know that will not
2:14:37happen. the council will use this as uh
2:14:40verbatim. In closing, I would say in my
2:14:42professional opinion, this plan is not
2:14:44yet ready to be acted on and should be
2:14:47sent back to the planning department for
2:14:49revisions. Thank you.
2:14:52>> Thank you, Neil Gosh.
2:14:59>> Thank you. I'm Neil Gos, attorney with
2:15:01the Morning Star Law Group at 700 West
2:15:02Main Street. As Dan mentioned, he and I
2:15:05have been consulting with Brody Co,
2:15:06which owns about half of the acreage
2:15:07that makes up the existing shops at
2:15:09Lakewood. I think it's also important
2:15:11for me to mention that I was very
2:15:12involved in the small area plan process
2:15:14for the Walltown community and my
2:15:16clients in that case ultimately
2:15:17supported the adoption of the small area
2:15:19plan and ultimately I think that's our
2:15:22goal here. We want to be in a position
2:15:23to support the Lakewood small area plan.
2:15:25Unfortunately, as it's currently
2:15:26drafted, we're not in a position to do
2:15:28so in large part because of some of the
2:15:30things that Dan already mentioned. Uh
2:15:32while we recognize the utility of having
2:15:34visual aids or diagrams within the plan,
2:15:37uh we're very concerned that the images
2:15:39used create a false sense of feasibility
2:15:41without really acknowledging the many
2:15:42challenges any such redevelopment would
2:15:45face. For example, there is no mention
2:15:47in the plan about the existing
2:15:49declarations and restrictions that
2:15:52govern the property, which would in
2:15:53large part make the development uh make
2:15:56any development consistent with the
2:15:57renderings a sheer impossibility. uh
2:16:00leaving any discussion of those existing
2:16:02limitations out of the plan entirely I
2:16:05think is a disservice to the community.
2:16:07Uh one should be able to read the plan
2:16:08and get an understanding of what it is
2:16:10the community desires and the challenges
2:16:13associated with achieving that vision.
2:16:15It should not be acceptable that the
2:16:17response we got back when we asked how
2:16:19the various public spaces envisioned in
2:16:21the plan will be implemented is that the
2:16:23recommendations in the plan were
2:16:25garnered from community feedback with an
2:16:27understanding that the funding and
2:16:29maintenance of any of those potential
2:16:30services will need to be further
2:16:32explored to determine feasibility. In
2:16:34other words, the small area plan does
2:16:36not have a plan for that.
2:16:38uh in my opinion the strength of a small
2:16:40area plan is not necessarily in its
2:16:43feasibility but instead in providing a
2:16:45complete picture of the path forward and
2:16:48I don't think that this plan does that
2:16:50yet. So for this reason we're
2:16:52respectfully asking the planning
2:16:53commission to continue this item to a
2:16:55later date to allow time for some of
2:16:57these items to be addressed in
2:16:58consultation with the property owners.
2:17:00Thank you for your time.
2:17:04Thank you. Ruby
2:17:06Sinrich Sinrich Senrich.
2:17:12Hello, Planning Commission. My name is
2:17:14Ruby Senich and I live in the um area
2:17:18being studied here uh on Rosedale Avenue
2:17:20at the corner with Halley. Um I did
2:17:24participate in the small area plan
2:17:26meetings. I'm that kind of nerd as Dan
2:17:28knows.
2:17:29Um, I
2:17:32did not actually read through the plan
2:17:33until this week when I realized this
2:17:35meeting was coming up. Um, and I think
2:17:38that speaks to the fact that, um,
2:17:40although there was a lot of thought that
2:17:42went into the community parts of the
2:17:44process, there was also a lot of
2:17:46information that we didn't have. Um, a
2:17:49lot of it which I only just saw when I
2:17:51read the plan and I could have read it
2:17:52before, but we didn't get a reminder and
2:17:54I reminded myself. Um, I will say I love
2:17:58the proposals. I love both section three
2:18:00and four. A lot of them, again, I went
2:18:03to lots of meetings and didn't see any
2:18:04of those details until I actually read
2:18:06the plan, but once I read it, I was
2:18:07like, "Oh my god, I love this. We need a
2:18:09sidewalk over here." I love all the
2:18:12vision in there. Um, I know from
2:18:14experience that it's very hard to get
2:18:16people involved in local government uh
2:18:19stuff like this. Uh and I would
2:18:21recommend that this be taken as a
2:18:23learning point since I think this is the
2:18:24first small area plan since the
2:18:26comprehensive plan was adopted, the
2:18:28current one. Um so let's look at this
2:18:30and see what worked and what didn't
2:18:31work. Um some of these engagements were
2:18:34very abstract and difficult to to
2:18:38understand. Um they tried to separate
2:18:40things out that were very connected. And
2:18:42if you read through the report, you'll
2:18:44see that the demographics of those of us
2:18:46that were at those meetings don't really
2:18:48accurately reflect the demographics of
2:18:50our neighborhood. And that's really
2:18:51important. Again, not an easy problem to
2:18:53solve, but it's something that we do
2:18:55have to work on. Um, I also noted in the
2:18:59plan that it mentions that the shape of
2:19:01this neighborhood is very much defined
2:19:03by where the trolley car used to go
2:19:06right out to the Lakewood Amusement
2:19:08Park, also to serve Lion Park, which was
2:19:10workforce housing where people were
2:19:12taking the trolley to go downtown to
2:19:13work. And now that I feel like we've
2:19:16come back around full circle, um, I'm
2:19:18looking to see how much time. Okay. um
2:19:20because now we're making these decisions
2:19:22again that are going to shape the
2:19:24community for a long time to come as
2:19:26fixed guideway transit does and and a
2:19:28lot of transportation decisions do. So,
2:19:30I would recommend adopting this, but I
2:19:32also don't oppose um holding it off for
2:19:35longer because we clearly do need some
2:19:36more neighborhood input.
2:19:41Thank you. Anybody [clears throat] on
2:19:44the Zoom wishing to speak on this item,
2:19:47please raise your hand or if you're on a
2:19:49cell phone, star nine.
2:20:04Okay. Would the applicant like to
2:20:07respond to some of the
2:20:12>> Sure. Um, with respect to the
2:20:15visualization, I do want to emphasize
2:20:17that the intention of this was not um
2:20:20was not actually creating a design that
2:20:23we would use to follow redevelopment.
2:20:25The idea is to get um community ideas on
2:20:28paper and also to combine those
2:20:31community ideas of what is stated in the
2:20:33comprehensive plan and transit
2:20:34opportunity areas.
2:20:36We can um add additional language that
2:20:41notes that any redevelopment is subject
2:20:43to existing e easements. Um, but we also
2:20:46wanted to make sure that we showed
2:20:47something that could represent not
2:20:49what's going to happen in the next two
2:20:51or three years, but in the future based
2:20:52on what the the TOA designation is.
2:21:00>> Thank you. [clears throat] Public
2:21:02hearing is now closed. We have
2:21:03commissioner comments or discussion.
2:21:05Commissioner Richie,
2:21:07>> I just wanted to follow up on that
2:21:08point. Um,
2:21:11is the current are the renderings is
2:21:14there currently built in um possible
2:21:16under the current UDO?
2:21:20>> Under the current UDO the renderings are
2:21:30>> the Rinsky plan development uh with the
2:21:32low level of detail that's shown on the
2:21:34renderings, right? Like they're really
2:21:35just showing the scale. I can't confirm,
2:21:38you know, it's not the level of a site
2:21:40plan or building permit. Um, but
2:21:43residential uses would be allowed in the
2:21:45current CC district. Uh, up to 50 feet
2:21:48would be allowed in the current um
2:21:50district for the Shaman Center. Um, so a
2:21:54similar development
2:21:56I think could be allowed. Maybe not in
2:21:58that location. There may be other uh
2:22:00restrictions such as easements or
2:22:02private agreements. Um so yeah but but
2:22:05with the low level detail shown on the
2:22:06rendering I can't you know definitively
2:22:08say that.
2:22:10>> Great. I think just this is a follow-up
2:22:12question um with a comment which is that
2:22:16I think this is an excellent plan. Thank
2:22:18you so much staff for putting it
2:22:19together. It is reflective of all the
2:22:21things that we want in Durham. Um and my
2:22:24concern with it is that if we
2:22:26communicate things that we want that
2:22:27aren't actually possible that we're sort
2:22:29of setting ourselves up for failure. Um,
2:22:32and so I think an opportunity and maybe
2:22:34this is a request is that we communicate
2:22:37specifically like right now we actually
2:22:39could not do these things in the plan.
2:22:41Things have to change. And I think being
2:22:43as specific about that as possible is
2:22:45like tomorrow if we tried to make these
2:22:48investments and if there was enough
2:22:49money and enough buy in uh it still
2:22:52actually wouldn't be possible. I want to
2:22:54make sure that we set that expectation
2:22:56because like you said this is a five to
2:22:5810 year goal. Um, and I really really
2:23:00hope we achieve it. But I think
2:23:02expectation setting is a challenge we've
2:23:03had with small area plans in the past
2:23:05and is an opportunity we have for this
2:23:07one to get it right because again I
2:23:09think this is excellent, but I do want
2:23:11to make sure that we're setting
2:23:12expectations as clearly as possible. So
2:23:13I guess I would ask if it is possible
2:23:15for us to put in specific language
2:23:17stating that under the current
2:23:19restrictions or whatever, uh, this is
2:23:22not technically possible and things
2:23:23would have to change.
2:23:26we can put in language that clarifies
2:23:28what is possible at this stage and what
2:23:30isn't and we want to emphasize that even
2:23:33with the toas the considerations of that
2:23:36these are iterative processes right so
2:23:39some areas that are have existing
2:23:40shopping centers the expectation is
2:23:42they're not going to change overnight or
2:23:44even within a couple of years um so we
2:23:46can be more clear with that language
2:23:48>> thank you
2:23:52>> commissioner Chakowski
2:23:54>> uh thank you chair here. [clears throat]
2:23:55I just wanted to start by acknowledging
2:23:57the immense amount of time, energy, and
2:23:59care that that went into this from both
2:24:01staff and and the community. But I do
2:24:02have a couple of quick questions. And so
2:24:04I'd love to know actually a little bit
2:24:06more about the history of small area
2:24:08plans in Durham. And this is I believe
2:24:09the second one that's come to us since
2:24:10I've been uh on on the planning
2:24:12commission. And so how did this get
2:24:14started and sort of what's the why
2:24:15behind small area planning? And this is
2:24:18also for me, but I think hopefully for
2:24:19some folks at home that that might be
2:24:20wondering and wanting to learn more.
2:24:31So B's going to give a bit more
2:24:33information about historically what's
2:24:34been happening. But for the the purposes
2:24:36of these small smaller plans, so
2:24:38starting with Walltown and this small
2:24:39area plan, the intention was to
2:24:42implement the comprehensive plan. So
2:24:44even with the history of what happened
2:24:45before, these are sort of a new
2:24:47approaches to that because of the
2:24:48comprehensive plan and because of our
2:24:50intention um and the intentions that
2:24:52were set for set forth in that plan.
2:24:54>> Yeah. And I think my uh my next question
2:24:57is, you know, do we have any data that
2:24:58we can point to for folks that ask that
2:25:00that show that small area plans are are
2:25:02leading to better outcomes for for
2:25:03Durham, but also surrounding communities
2:25:05as well?
2:25:09Yeah, I think we've got um previous
2:25:11examples uh of long range plans that
2:25:15have been adopted that have resulted in
2:25:16uh zoning changes or um potentially
2:25:19public investment. Uh don't have data in
2:25:22terms of you know quantitative studies
2:25:24across jurisdictions that that I'm aware
2:25:26of.
2:25:27That's something that would would love
2:25:28to see and I think might be beneficial
2:25:30for council to see of of what the
2:25:32benefits are because I think you know
2:25:33the amount of time that went into this.
2:25:35It it's substantial staff staff time and
2:25:37that's one of the most valuable
2:25:38resources the city has and so want to
2:25:40make sure that the outcomes are are
2:25:41yielding us at least what what's going
2:25:43into it. I'd also you know we might not
2:25:45be at the right stage of the process yet
2:25:46but do we have a rough cost for the
2:25:49things that the city of Durham would be
2:25:50owning uh under this plan and and yeah
2:25:53and how much of a cost? So we don't have
2:25:55a rough cost of everything that's in the
2:25:58plan. It would have to be broken up
2:26:00piece-wise recommendation by
2:26:01recommendation and we would need to work
2:26:03with specific departments to determine
2:26:05what those costs would be. So for the
2:26:07spec specific actions for example some
2:26:08of those things are already stated in
2:26:11other departments plans for example the
2:26:14draft bikew walk plan um and they have
2:26:16estimates for what that would be for the
2:26:18area. um and others are things that we
2:26:20recommend be prioritized and that would
2:26:22be th those cost estimates would be
2:26:25determined um prior to the CIP process.
2:26:28>> Okay. And would it be possible for us to
2:26:30get any any rough estimations earlier
2:26:32because I think we're voting on a plan
2:26:35without a price tag, right? We're voting
2:26:36on an aspirational thing and to make a
2:26:38recommendation and I and it feels like
2:26:40we are making an incomplete
2:26:41recommendation without some of those
2:26:43those numbers.
2:26:46And so in
2:26:48in a lot of these cases the so for
2:26:50example if if it goes through the CIP
2:26:52process that will be a part of the
2:26:54budgeting process um within the city and
2:26:57other um other elements of the plan will
2:26:59be addressed through let's say resonings
2:27:02that have that have its own process and
2:27:04have its own um information that's
2:27:06provided in terms of feasibility and
2:27:08thank you
2:27:10>> um I'll just add to I definitely
2:27:12recognize that it is tough um it is also
2:27:15tough for us to come up with cost
2:27:16estimates as the price of construction
2:27:19changes uh and in just generally
2:27:21increases right over time and this is a
2:27:23long range plan so a lot of these things
2:27:25we don't expect to happen tomorrow as
2:27:27Sarah said so predicting the cost of
2:27:30construction over the next however many
2:27:33years is um can be a bit misleading as
2:27:37well right so most of what we want to do
2:27:39is make sure that we are communicating
2:27:42uh what we've heard from residents and
2:27:45ensuring that once we have opportunities
2:27:47to include things within the budget
2:27:49through the CIP or other processes that
2:27:52we have a document which sort of already
2:27:55um outlines those asks. Um I definitely
2:27:58hear you on the cost but I I do just
2:28:00want to be honest that that is that's
2:28:02pretty tough.
2:28:03>> You know that that totally makes sense
2:28:04that that sounds like a mighty tough
2:28:06thing to project. So so understood. Um
2:28:08and I just want to say again thank you
2:28:09all so much for the amount of time and
2:28:10love and effort that went in went into
2:28:12this process. It definitely shows in the
2:28:14document. Um I do think that there we
2:28:17would benefit from delaying and and kind
2:28:18of going back to well on a couple of
2:28:20things uh for my fellow commissioners,
2:28:21but that I'll shut up.
2:28:26>> Uh any other questions, comments?
2:28:29Commissioner Huarez Maldonado.
2:28:33>> Yeah. Um, I just wanted to highlight I
2:28:36think one of the speakers um mentioned
2:28:38the demographics that showed up um
2:28:41weren't really representing of the
2:28:43community. So, I'm wondering if delaying
2:28:46this can help give an opportunity to
2:28:48really talk to community members and and
2:28:50maybe seeing a different approach to
2:28:52outreach um to really get their input.
2:28:55Maybe it could be showing the current
2:28:57map and explaining a little bit more
2:28:59about what you know they like about it
2:29:01and what they would change. So you're
2:29:04not taking away all the work that y'all
2:29:05did, which I'm very appreciative of
2:29:08because I believe a lot in co-governance
2:29:10and bringing community in these spaces,
2:29:13especially when they're the ones who
2:29:15live there. So um yeah, I'm open to also
2:29:18delaying this to ensure that uh people
2:29:20are well represented in that community
2:29:23area.
2:29:27Any other questions, comments?
2:29:32Commissioner Musu Clemens.
2:29:36>> Yes. I echo Commissioner's comments
2:29:39about the input rep the representational
2:29:44um
2:29:46input of the community. I raised I
2:29:48attended many of these community
2:29:50engagement meetings because I live in
2:29:52Lakewood Park and I at each meeting I
2:29:55raised the question of demographics.
2:29:59Yes, community engagement was done, but
2:30:03no, the demographic didn't reflect the
2:30:05community. And in the in the in the
2:30:08draft, it states an effort to recognize
2:30:12the historic African-American
2:30:14neighborhoods in in in the small area
2:30:16plan. That did not happen.
2:30:19I am not sure how the city decides how
2:30:23to hold community engagement, but it did
2:30:25not reach those populations. And that's
2:30:27a tough tough thing to do. I know that.
2:30:29I've done that work. It's not easy. But
2:30:34this is this this plan will impact those
2:30:36neighborhoods and the views of those
2:30:38communities should be reflected and we
2:30:40need to do a better job in how we reach
2:30:42them. Uh the second thing
2:30:46um I'd like to comment on, you know, I
2:30:49love some of the things that we came up
2:30:52with.
2:30:53uh not having any clue as to cost.
2:30:57You we're we're being asked to improve
2:30:59something. It's aspirational and that's
2:31:01fine, but are we setting ourselves up
2:31:03for failure? I don't know.
2:31:07And maybe this is how these things are
2:31:08done. You you you get the views that you
2:31:11can get and then you figure out how to
2:31:13how to cost it out later. But maybe the
2:31:14community knew how much it would cost.
2:31:16They would not be willing. I don't know.
2:31:18But yes, I agree that the demographics
2:31:20of of the neighborhoods don't reflect
2:31:22that. The third thing I'd like to add,
2:31:24Lakewood Park is uh still closed due to
2:31:30lead contamination. And nowhere in the
2:31:32plan does it mention that. What are we
2:31:34going what are we going to do about Lion
2:31:35Park? I mean, Lion Park. Um that's
2:31:39that's the critical piece for me. We we
2:31:41don't talk about that. We talk about
2:31:43Carol Street and the other two, but
2:31:44there was a major park in that
2:31:46neighborhood that served the
2:31:47African-American communities and then
2:31:49those communities around in the small
2:31:52area plan, but there's no mention of
2:31:53what what's going to happen with that.
2:31:55And to me, that's a major failing. So, I
2:31:58appreciate the work that that was done.
2:32:00As I said, I participated in many of
2:32:01those community engagement sessions, so
2:32:04I know what I'm talking about. Thank
2:32:05you.
2:32:08>> Thank you. Any other comments?
2:32:12Vice Chair Cameron.
2:32:14>> Good evening everyone and again thank
2:32:16you to city staff for all this work.
2:32:18Again echoing all my fellow
2:32:20commissioners. One I'm just wondering
2:32:22why all those three neighborhoods were
2:32:24put together because to me Lakewood and
2:32:26the Lakewood Shopping Center is almost
2:32:29its own monster so to speak by itself.
2:32:33Um and then the you know the other
2:32:35neighborhoods I think of more just
2:32:37strictly residential. So, I'm just
2:32:39wondering why, don't have to answer it,
2:32:41just wondering why all three of these
2:32:43neighborhoods were put together for a
2:32:45neighborhood plan when we look at other
2:32:47neighborhoods and it's just that kind of
2:32:48one neighborhood. Um, two, echoing my
2:32:53fellow commissioners too again about uh
2:32:56community engagement um and the myth
2:32:58that black and brown people don't come
2:33:00out. We we do come out. we you just have
2:33:02to have some type of personal handshake,
2:33:05personal invitation sometimes to get
2:33:08them to come out. Um and uh depending
2:33:12upon the type what time of day, the day
2:33:15of the week, all those different type of
2:33:17techniques, get folks out. I've done
2:33:19this as well. Um engaging community
2:33:21advisory committees and getting people
2:33:22to come out to give their input on
2:33:25things. Um and then
2:33:29the other thing is um great we got
2:33:32community input but um there are owners
2:33:36of this shopping center two different
2:33:38owners and long-term leases retail
2:33:41leases. Did we engage the owners and
2:33:44these uh holders of these long tail long
2:33:46long-term leases to get their input in
2:33:50this process as well? They are the
2:33:52owners and part of the community and
2:33:54help shape the community. And again,
2:33:56this is why I think Lakewood is is its
2:33:59own monster by itself. Um, and then just
2:34:03reading through the policy and the
2:34:05recommendations and the guidance, there
2:34:07was a lot of should shoulds, it should
2:34:10do this. And um, it kind of reminds me
2:34:13of shall. And I'm wondering how many of
2:34:15those shoulds could be maze. Um because
2:34:18again we could tie ourselves up into
2:34:20something that really could not happen
2:34:22and set ourselves up for disappointment
2:34:24and things that don't work um for uh
2:34:28financing of redevelopments and how long
2:34:31it may take for city improvements. Um so
2:34:34with all that I think that some of these
2:34:36things should be considered and I'm uh
2:34:39for uh delaying this for a little bit as
2:34:41well.
2:34:44[snorts]
2:34:44>> All right. Anybody else have any input?
2:34:49All right. May I have a motion to
2:34:54I just had a couple of comments. Um so
2:34:57with respect to Lion Park, we don't have
2:35:00a specific recommendation in there, but
2:35:02we do mention that they're undergoing um
2:35:05analysis by DEQ. So as a part of this
2:35:08plan, we actually are not able to make
2:35:09decisions on that. That's going to be um
2:35:12after we get the after we get the
2:35:13information BEQ working with the parks
2:35:16and recreation department, they'll
2:35:17determine based on the level of
2:35:18contamination what should be done moving
2:35:21forward. And there's also a process of
2:35:23funding for that. So that's why we
2:35:25didn't include in this specific plan
2:35:27because there are too many aspects that
2:35:28are outside of um the purview of what
2:35:30we're doing at this point.
2:35:33And I did want to say um in terms of
2:35:35terms of engagement and outreach, we
2:35:38intentionally held our engagements at
2:35:41the Community Family Life and Recreation
2:35:43Center at Lion Park. Um went to several
2:35:45events at um the Community Family Life
2:35:48and and Recreation Center at Lion Park
2:35:50as well as several community events
2:35:52flying letting people know that this
2:35:54event is happening. I do recognize that
2:35:56the numbers do not reflect um do not
2:35:59reflect what the the neighborhood looks
2:36:00like. I also want to do I also want to
2:36:02say that um the numbers are also fairly
2:36:05skewed from the online surveys and
2:36:07online surveys tend to um lend
2:36:10themselves more to flu folks who are
2:36:12more affluent and white. Um so that also
2:36:15impacts the overall numbers. Um the
2:36:18numbers looked a little bit different in
2:36:19terms of what was happening in person.
2:36:22And I do want to note um that the
2:36:25decision to include uh Lion Park and the
2:36:29West End was because we didn't want to
2:36:31solely focus on a commercial area
2:36:32without recognizing that there are
2:36:34impacts um in terms of what happens in
2:36:36that shopping center and how it impacts
2:36:38other communities. So we wanted to look
2:36:39at what investment is happening in those
2:36:42neighborhoods and what can be improved
2:36:44before something like this um a
2:36:45redevelopment like this happens.
2:36:50Thank you for that response. Any other
2:36:53questions from the commissioners?
2:36:56Any discussion?
2:36:59>> Yes, Commissioner Richie.
2:37:01This is kind of to fellow commissioners,
2:37:04so I'm not really sure how this question
2:37:05sits, but I am curious what we're
2:37:06asking. Um, you know, we've seen the
2:37:10history of small area plans in Durham,
2:37:12and some are very positive, some are
2:37:14challenging. I think that um one of the
2:37:17questions I would ask is is what we are
2:37:19asking specifically of staff here. Is it
2:37:22to do a whole another engagement
2:37:23process? Um is it to do things to change
2:37:26those numbers? I think that those are
2:37:28very very legitimate concerns. The
2:37:30[clears throat] concern I have on the
2:37:31other side is that um the
2:37:37challenges that we've had in the past is
2:37:38that delay has led to really poor
2:37:40outcomes. Um I think Northgate is a
2:37:42great example of that. I don't think
2:37:44that anyone got what they wanted there.
2:37:46Um, and that's not to say that either
2:37:50[sighs]
2:37:51that that would change here, but I do I
2:37:53want to make sure that we are very clear
2:37:54about what we're asking and that we're
2:37:56putting in a time round that staff can
2:37:57actually work with because I agree that
2:37:59these numbers are not reflective of what
2:38:01we want in terms of demographics. But I
2:38:03also worry um about a year-long process
2:38:06becoming a fiveyearong process and that
2:38:08leading to the types of development that
2:38:10we definitely don't want in Lakewood
2:38:11moving forward. Um, so wanted to add
2:38:14that as a note and just clarify the ask
2:38:16before we sort of let this sit. Can
2:38:19someone clarify what the ask is to staff
2:38:21in terms of further engagement?
2:38:28If I may,
2:38:29>> Commissioner Clemens,
2:38:30>> I I would say uh
2:38:36we need a different kind of outreach
2:38:40so that we really can feel at the end of
2:38:42the day we have community input that
2:38:44reflects these three neighborhoods.
2:38:47Um and
2:38:49I am not always certain that's faster is
2:38:52better.
2:38:54And so I I don't know
2:38:57Hey, I'm I'm not sure faster is better.
2:39:00I would rather slow the process and feel
2:39:04at the end of the day we really
2:39:05understand what the community wants. How
2:39:08do we balance community needs and
2:39:10expectations against what is doable in
2:39:13Durham and financially sometimes that we
2:39:16will be able to balance other times we
2:39:17will not be. But right now we couldn't
2:39:19answer those kinds of questions and so I
2:39:21think we need to give it some more time.
2:39:26Commission, Vice Chair Cameron,
2:39:28>> and I so and with that what's doable and
2:39:31not I I just think that because Lakewood
2:39:34and having the two owners is so funky
2:39:37and you have um a longtime retail client
2:39:40there, really understanding that whole
2:39:44um
2:39:47layout and what's doable and what's not,
2:39:50I think is really important, especially
2:39:52if we're um showing some uh elevation.
2:39:57And um so and I you know I don't know
2:40:00how long those leases go but I do know
2:40:02retail leases kind of go 40 years
2:40:04sometimes. So um when we when we're
2:40:07talking about 10 years out in the future
2:40:10still may not be doable 10 years out in
2:40:12the future. So just having a a good
2:40:15understanding of that um and engaging
2:40:18those two owners would be great.
2:40:23I think everybody knows the scrap
2:40:24exchange is one owner and then some
2:40:26other people are other owners of
2:40:28Lakewood if you're not clear of what I'm
2:40:29talking about.
2:40:34Yes, thank you. Um, Commissioner Richie,
2:40:37to your point about the Northgate
2:40:38project, I don't know that I know the
2:40:42small area plan there
2:40:45was
2:40:46not it was based on the comprehensive
2:40:49plan and that is not an enforcable
2:40:52ordinance. Um, so if this is according
2:40:58to the comprehensive plan or the current
2:41:01UDO which is being rewritten or redone,
2:41:05it would be enforcable under a different
2:41:09maybe better for Durham
2:41:11policy. Um,
2:41:17whether that would have happened or not,
2:41:19I don't know that. Yeah, that that that
2:41:21outcome may still have been the same on
2:41:23the Northgate plan. I don't know. But
2:41:26anyway, so
2:41:29what I'm hearing here is we need more
2:41:32time on this project and better
2:41:34community engagement. I don't know how
2:41:37well to get the people out, make it not
2:41:39online, go out to talk to the people and
2:41:43get input and maybe by the time we get
2:41:45the actual input and from the proper
2:41:48demographics that represent the people
2:41:51that are there,
2:41:53then it would be but what's within our
2:41:56power tonight, I believe, is to delay
2:41:59for three cycles at the maximum.
2:42:03Is that correct?
2:42:11Sorry, holding up. Yeah, I I just wanted
2:42:14to ask that obviously uh as you all are
2:42:16familiar um delay to a day certain um
2:42:20for notification purposes. Um and I
2:42:23wanted to uh clarify obviously we can
2:42:27you know continue to try to uh engage
2:42:30with community members certainly um in
2:42:32the interest of more representative um
2:42:35participation but in those 90 days we
2:42:38would not be able to provide um accurate
2:42:41uh cost information for the entire
2:42:44implementation of the plan. So, I just
2:42:45wanted to really um be upfront about uh
2:42:49expectations for you all and and what we
2:42:51were able to accomplish in that time
2:42:52frame.
2:42:59>> Yes. Uh Commissioner Huarez, um I'm I'm
2:43:03curious about the outreach.
2:43:05Um I do organizing as well and I think
2:43:08one of the most effective ways of
2:43:10outreach is door knockocking because
2:43:12then you get to the actual residents who
2:43:13are in that community. Um, has that been
2:43:17done uh as part of like community
2:43:19engagement?
2:43:21Um,
2:43:22and maybe it could help uh in, you know,
2:43:26getting people who are engaged or maybe
2:43:27even the schools that are nearby um the
2:43:30churches that are nearby um and really
2:43:33gathering the people who live there. Um
2:43:38yeah, I'm just wondering maybe or I
2:43:40don't know if it's more of a comment on
2:43:42like maybe we could do door knocking.
2:43:45um to get a better response and actually
2:43:49perspectives of the folks that live
2:43:50there.
2:43:52>> For the engagement launch, we sent out
2:43:54notices to all um residential and
2:43:58commercial properties in the area. Um we
2:44:03for so small for smaller plans um and
2:44:06sort of based on the amount of staffing
2:44:08we have um knocking on residential doors
2:44:11isn't an option but we were able to um
2:44:14visit locations commercial um businesses
2:44:17around shops at Lakewood and knock on
2:44:19doors and let them know that the project
2:44:21was going on and invite them to events.
2:44:23Um we did have extens extensive um
2:44:26communication with both the Strap
2:44:28Exchange and Brody Co. Um,
2:44:31and in terms of reaching out to
2:44:34residences, we we primarily work with
2:44:38the neighborhood associations
2:44:40um because they have a list of folks
2:44:42that that they're in communication with
2:44:44already. Um, and we rely on them to
2:44:46bring to bring people out when we can.
2:44:48Um, and then we also go to neighborhood
2:44:51events and do tableabling to try to get
2:44:53folks to be as involved as possible. Um,
2:44:56but we were not able to do uh
2:44:58door-to-door knocking for this.
2:45:06All right. Anybody else? Any more
2:45:08questions, comments? No.
2:45:12[sighs]
2:45:13May I have a motion
2:45:16to
2:45:19delay this item for three cycles?
2:45:28If you decide to make that motion, we
2:45:30would uh ask that you move that to a
2:45:32date certain rather than just three
2:45:34cycles. Uh three cycles from now would
2:45:37be January 12th following your normal
2:45:41uh second Tuesday of the uh of the
2:45:45month. You have not adopted your meeting
2:45:48calendar yet. Um that will happen next
2:45:51month. um that a proposed meeting
2:45:54calendar will be brought to you next
2:45:56month. Um so the only the only wrinkle
2:45:59here could be if you move it to January
2:46:0112th and then for whatever reason you
2:46:04decide not to meet on January 12th, we
2:46:06could end up with a problem. Just want
2:46:07to throw that out there.
2:46:09>> Yes. And I don't know, three months for
2:46:12community engagement, I guess it's
2:46:14better than nothing,
2:46:16especially over the holiday season. But
2:46:18>> and again again that's fine. just um
2:46:22just just so it's been said that uh
2:46:24we're we're assuming your meeting on
2:46:26January 12th even though we have not
2:46:27adopted that yet.
2:46:30Okay,
2:46:30>> chair. I'm ready. Make a motion. Chair,
2:46:34regarding case.
2:46:35>> Oh, I did I didn't want to offer um we
2:46:38could extend this for 60 days, which
2:46:40would send us to December 10th. It would
2:46:42allow some engagement prior to the
2:46:44holiday season. Um particularly because
2:46:47after that date, it would be fairly hard
2:46:48to engage with people um in late
2:46:51December and early January.
2:46:53>> And I just want to say engage the owners
2:46:55too. not just the community but the
2:46:57owners of Lakewood Shopping Center.
2:46:59>> So December 10th and then if it doesn't
2:47:01come out we do another month until
2:47:03January.
2:47:05>> Just to clarify it would be December 8th
2:47:06and obviously if that it's up to you all
2:47:09it's up to you all. We just wanted to
2:47:11offer that option that you know um we
2:47:13would obviously be jumping on
2:47:15>> J.
2:47:25December.
2:47:27>> Okay.
2:47:30>> We have to say this out loud.
2:47:31>> Do you Okay. I'm sure. I want to make
2:47:34sure we're before I make the motion. 90
2:47:37or 60. [clears throat]
2:47:39>> So, for me, if we're meeting on December
2:47:428th,
2:47:42>> yes.
2:47:43>> When the staff reports need to be out a
2:47:44couple weeks, I mean, is that enough
2:47:46time to do
2:47:50Let's do January 12th.
2:47:52>> Yeah.
2:47:53>> Okay. And if they get it done faster,
2:47:54right, they can come faster, right?
2:47:57Yeah. Okay. Chair, in regards to
2:48:01small area updates,
2:48:05Lakewood West End, Lion Park, and small
2:48:07area plan. I move that we delay um
2:48:12hearing um moving.
2:48:14>> Excuse me. It's going to be a move to
2:48:16continue. Move to Okay. Move to Thank
2:48:19you. I'm trying to get the wording
2:48:20right. Move to continue this case or
2:48:24this plan um until January 12th, 2027
2:48:32to allow for the concerns of the
2:48:34planning commission to be addressed.
2:48:40>> Second.
2:48:42It has the move to continue has been
2:48:45moved by Vice Chair Cameron and seconded
2:48:49by Commissioner Bailey to have this on
2:48:54January 12th.
2:48:57Do we do an electronic vote or just an
2:49:02uh we'll have an electronic vote,
2:49:04please? Thank you.
2:49:30The motion passes 11 to zero.
2:49:35>> Okay.
2:49:37Next item on the agenda number eight,
2:49:39committee updates.
2:49:42I don't believe there's any committee
2:49:43updates.
2:49:45Um,
2:49:46so we move to item number nine, new
2:49:48business, election of officers.
2:49:51>> Yes. So, uh, normally you elect your
2:49:54officers in September, but we had our,
2:49:57um, retreat last month, so we will be
2:50:00doing it this month. Um, just as a
2:50:02reminder, uh, Chair Shagaras can serve a
2:50:05second term. Um,
2:50:09but if you do decide to go with somebody
2:50:11other than Chair Shagaras as the chair,
2:50:14you would need to bring you would have
2:50:16to be a city appointee. And then if you
2:50:19do that, if Chair Shagaras is reelected,
2:50:22uh, you would need to have a city
2:50:24appointee be the vice chair. If Chair
2:50:26Shagaras is not reelected, you would
2:50:28need to have a city appointee be the
2:50:30chair and then a county appointee be the
2:50:33vice chair. With that, I will turn it
2:50:35over to you.
2:50:37>> I make a motion that we have I would
2:50:40like to nominate Vice Chair Cameron to
2:50:42be chair.
2:50:46>> Second.
2:50:50>> Do we electronically vote or do we just
2:50:52say yes or no?
2:50:55>> Please.
2:50:57All in favor?
2:51:02the there are the eyes have it.
2:51:06My god.
2:51:12I move that um I nominate um Chair
2:51:17Shagares as vice chair.
2:51:21>> Second.
2:51:24>> All in favor?
2:51:27I. The eyes have it. There are no nays.
2:51:32>> All right, staff announcements.
2:51:34>> Yes, I just have one staff announcement
2:51:36that I'm very sad to make. Um, he's not
2:51:39here to say goodbye because his last day
2:51:41was Friday. Andy Lester is no longer
2:51:43with Durham Planning and Development. He
2:51:45has taken a position in another
2:51:47jurisdiction. So, uh, please bear with
2:51:50the rest of us that remain. uh we may be
2:51:53a little bit slower getting back to you
2:51:55and we're going to be looking to fulfill
2:51:57fill that position as soon as we can.
2:52:03>> All right, Andy, we'll miss you. Have
2:52:05fun in Burlington. Uh item number 11,
2:52:09adjournment 8:22 p.m.
2:52:12We're journed.