Mosby Bragtown Rezoning
At a glance
Based on auto-generated captions; names and details may be misheard.
- What: case Z250047, a request to rezone about 13.3 acres on Berwin Avenue, Belvin Avenue and Dominion Street in Braggtown from Residential Urban 5 to Planned Development Residential 22.414, allowing up to 299 apartments.
- Where it stands: on 2026-10-13 the motion to recommend approval failed 6 to 3. Because the commission states motions in the affirmative, a failed motion goes to City Council as a recommendation of denial.
- Next: City Council hearing. The applicant's commitments are still changing, and the neighboring Sikh temple asked for eight commitments to be added.
Proposal
- Payton Burgess reported commitments of 5 percent affordable units, 60-foot maximum height, 60 percent maximum impervious surface, 10 percent minimum tree cover, native plantings, elevators in buildings of four or more stories, a publicly accessible amenity, a school contribution and off-site sidewalk. Staff found it consistent with the Mixed Residential Neighborhood place type and 12 of 16 policies; the stream-buffer policy was reclassified as not applicable because the stream was shown to be intermittent.
- Neighborhood meetings were held 2026-04-02 and 2026-09-03; no comments were posted on the Rezoning Explorer, although the temple said it had written to the planning department.
- Changes announced by the applicant at the hearing: affordable units set to the ordinance definition (60 percent of area median income for rentals); the school contribution raised from $4,000 to $7,000; pickleball wording dropped from the public amenity; at least 10 public Level 2 EV charging spaces; one green stormwater measure; handling the 100-year storm; open space or trees next to sensitive areas; a multi-use path along Berwin Avenue; and flush sidewalks across all driveways. An Energy Star commitment was removed because the city could not enforce it.
- The site has a recorded notice of residual petroleum from an old heating-oil tank at the former school; a commitment would address it, under the state environmental quality program, before any residential building there.
Main concerns
- Traffic on Roxboro Road and Banner Street (a narrow one-way street beside the temple), difficult left turns without a signal, and emergency access. Several temple board members asked for a traffic study, a two-way Berwin Avenue and a traffic signal.
- The temple (next door since 1985, 250 to 300 worshippers on Sundays) said it was not against housing but asked for denial unless eight commitments were added: driveway location, Berwin Avenue, a Sunday traffic count, setback and buffer, stormwater, construction, lighting and petroleum cleanup.
- Residents cited apartment overload from about 654 other units nearby, sidewalk gaps, no recreation center, and school and Durham Tech contributions (requests of at least $40,000 and $50,000). Pablo Friedman (captions render "Freedman") urged holding developers to the roughly $1,000-per-pupil school proffer expectation, honoring the Durham Tech arrangement, and accounting for emergency medical service costs.
- A university planning professor noted Braggtown has about 0.3 miles of sidewalk per mile of road versus about 0.5 citywide.
Applicant response
- A traffic impact analysis was not required; compared with current zoning the proposal cuts about 120 daily trips and 35 PM peak trips and adds two AM peak trips.
- The state would not allow a signal at Berwin Avenue and Roxboro Road because of spacing from an existing signal.
- The applicant said it is open to dropping vehicular access on Berwin Avenue (using Belvin Avenue only) but made no commitment on a traffic study or more affordable units.
Commissioner discussion
- Commissioner Huarez Maldonado and the chair described Roxboro Road as congested and asked for infrastructure first; the chair asked for sidewalk and bus shelter commitments.
- A commissioner called 15 affordable units too low. Commissioner Bailey asked for a traffic analysis. Vice Chair Cameron asked about cleanup scope (small area; possible soil remediation or capping).
Votes
- Favorable recommendation (moved by Vice Chair Cameron, seconded by Commissioner Pionek): failed 6 to 3.
Sources
- 2026-10-13 - Planning Commission (Planning Commission video, auto-captions)
Discussion time
About 52 minutes across 1 meeting (from transcript timestamps; approximate).
| Meeting | Minutes |
|---|---|
| 2026-10-13 - Planning Commission | 52 |
Log
- 2026-10-13 - Planning Commission - Staff report, owner and attorney presentations, about 13 public speakers (mostly traffic and temple access concerns); favorable recommendation failed 6 to 3.