2026-11-05 - Somerset Needs Area Sewer Extension Information Session

Summary

Built from the meeting notice and the YouTube auto-caption transcript; names and numbers may be misheard.

  • Remote public update on the Somerset Sewer Extension Project, led by the town's project manager (Kevin) with the design engineer from Weston and Samson (Anna Wick) presenting; Drew Patnode (Public Works Director) and a Planning staff member (Megan) answered questions. No votes; the session was recorded for the town's YouTube page.
  • Background: Somerset was named a sewer needs area in the 2004 comprehensive wastewater plan and reaffirmed in the 2014 update, citing sandy soils, nitrogen from septic systems and algae blooms in Hummock and Miacomet ponds. The project is also the first step in carrying future flows from the Hummock North and South needs areas.
  • Design: about 15,200 feet of gravity sewer and 9,500 feet of low-pressure sewer (Clara, Henderson's and Doc Riders drives moved to low pressure); a pump station at town-owned 77 Bartlett Road with a force main to the Surfside treatment facility; about 7,000 feet of new water main (High Brush Path extended to the cul-de-sac); drainage on Raceway Drive; an easing of the Raceway Drive and Bartlett Road turn; and a multi-use path along Somerset Lane (southern alignment preferred).
  • Financing: the 2026 Annual Town Meeting appropriated the funds before the June 30, 2026 deadline; a $35.6 million Clean Water State Revolving Fund application went in during September and MassDEP review is pending. The rate is 1.5%, possibly 0% for nutrient removal (about $5.6 million interest avoided versus 1.5%, about $16.2 million versus 4% borrowing). Construction must be awarded by June 30, 2027.
  • Costs to owners: $4,000 connection permit fee per dwelling, a capacity fee of roughly $6,700 minimum for three bedrooms or fewer, plus private-side connection and septic decommissioning (varies by property). The betterment (up to 25% of cost, roughly $20,000 to $25,000 per property) was removed at Town Meeting. Capacity fee can be financed through a voluntary sewer lien (10% down, up to 20 years, about 4.4% interest); a Title 5 septic loan is offered at 2% over 20 years. Owners get two years after notice to connect; Board of Health waivers are case by case.
  • Grinder pumps: needed in low-pressure areas and some gravity-served homes; the town expects to pre-purchase and sell approved units to owners. Tank holds about 150 gallons (roughly 48 hours); an alarm sounds on high water; only toilet paper should be flushed. Staff said an overflow would back up to the lowest fixture and that a crew would be needed to pump down; pumps are long-established technology.
  • Schedule: final documents ready for bidding February 2027, 2 to 3 months of bidding, construction from spring or summer 2027 for about two years (no roadway work in summer), completion spring 2029. Connections are about 2.5 to 3 years away. A pre-construction public meeting is expected in late spring or summer 2027.
  • Public comment was mixed. Several residents questioned whether sewer would restore the ponds, called for dredging or further study, asked about the cost burden on year-round and fixed-income households, and asked why homes nearer Miacomet Pond are not included. Staff answered that the Miacomet area is a future needs area, since the town cannot do all seven at once, and pointed to the 2014 wastewater plan documents on the sewer department page. One resident spoke in favor. Asked about funding, the project manager said the team is confident the appropriation covers the estimated cost.
  • Development concern: Public Works and Planning noted residents' worry that sewer will enable buildout; Planning will mail a brief survey to affected property owners to gauge views, with two to three Town Meeting cycles available for any zoning changes.

Time on topic

Topic Approx. minutes
Introduction and project background 4
Design, water, drainage and paths 9
Financing, owner costs and grinder pumps 10
Schedule and next steps 3
Questions and public comment 26

Related issue: Somerset Sewer Extension Project (see also Sewer Enterprise Fund Budget).

Agenda

  • Information session; no agenda posted. Presentation covered background, project overview, funding, owner costs, schedule, then questions.

Sources

Video

Watch the video

Transcript

*These are auto-generated captions; names and numbers may be misheard.

Transcript

00:11Okay, it is 5:30 on the dot, so we're

00:13going to get started. And I'll say good

00:15evening everybody and welcome to this

00:17evening's public information session on

00:19the Somerset Needs Area Sewer Extension

00:21Project. Joining me this evening on the

00:24call, we have members of both our

00:25project team and representatives from

00:27different town departments would be here

00:29to answer any questions you have. For

00:31the info session, we do have a slide

00:33deck presentation which is going to give

00:35you an overview of the project, but more

00:37importantly, what we've accomplished

00:38thus far working on the Somerset project

00:40for the last year and what we hope to

00:42accomplish moving forward in the coming

00:44months and new year. After the

00:47presentation, we'll be happy to take any

00:48comments, questions, or feedback that

00:50members of the public have. And of

00:52course, if we can't get an answer to you

00:54this evening, I'll follow up directly

00:55with you after this evening's info

00:57session with a response.

01:00Now, before we get into the

01:01presentation, I just want to make two

01:02notes. First, this info session, just

01:05like all of our past info sessions, is

01:07being recorded and will be posted to the

01:08town's YouTube page for later viewing.

01:11But also, if you are interested in

01:13finding out more information about the

01:14projects, looking at project documents,

01:16or even going through our long list of

01:18frequently asked questions, we do have a

01:20project page which you can find from the

01:22town website. We post on there regularly

01:24with updates, changes to the project,

01:27and you also have direct contact

01:28information from me should you like to

01:29reach out.

01:31So, with that being said, I'll now hand

01:33it over to Anna who's going to take us

01:34through the project overview slide

01:36presentation.

01:38>> Great. Thanks, Kevin. We'll share my

01:40screen here.

01:44Can everyone see the presentation?

01:48Great. Okay. Well, good evening everyone

01:51and thank you for joining us. Uh my name

01:53is Anna Wick and I'm one of the design

01:56engineers for the project. As Kevin

01:58mentioned, we're here to provide an

01:59update on the Somerset Needs Area Sewer

02:01Extension project. As the design

02:03continues to advance and we move closer

02:05to bidding and construction, uh we've

02:07held several public outreach meetings

02:09over the course of this year, including

02:11three this spring leading up to annual

02:13town meeting and another in August where

02:16we provided updates on specific aspects

02:18of the project. So tonight, we'd like to

02:20build on those discussions and provide

02:22an update on where the project currently

02:24stands as we move through final design.

02:29So before we get into the presentation,

02:31I'd like to briefly reintroduce the

02:32project team. As we've discussed at

02:35previous meetings, this project involves

02:37coordination across a number of town

02:38departments, including town

02:40administration, the sewer department,

02:43department of public works, planning and

02:45land use services, the water department,

02:48health and human services, as well as

02:50town council. and representatives from

02:52those groups are here with us along with

02:53the design team from Weston and Samson

02:56and the owner's project manager Apex.

03:01And for tonight's presentation, we're

03:03going to start with a quick look back at

03:05the planning history and the

03:07environmental drivers behind the

03:09project. Some of you may have seen this

03:11information at previous meetings, but we

03:13want to provide a brief recap for those

03:14who may be new to the project. And for

03:17those who have been following along, a

03:18reminder of what led us here and why the

03:21project is moving forward. And from

03:23there, we'll provide an overview of the

03:25project and the proposed infrastructure

03:27improvements and touch on some of the

03:29common questions we've heard from

03:31residents as the project has moved

03:33through design. Then finally, we'll talk

03:36through the current project schedule and

03:38next steps before opening the floor for

03:40questions and discussion.

03:45So to start, I'd like to provide a

03:46little background on how we got to where

03:48we are today. The need for improved

03:51wastewater management in the Somerset

03:54area has been identified by the town for

03:56more than 20 years, driven by the

03:58environmental concerns associated with

04:00on-site septic systems. Somerset was

04:03first identified as a needs area

04:05recommended for sewer service back in

04:07the town's 2004 comprehensive wastewater

04:10management plan. Then following that

04:12report between 2004 and 2014, additional

04:15information became available through the

04:17Massachusetts Eststeraries projects or

04:20MEPs which evaluated water bodies across

04:23the Cape Islands and identified nitrogen

04:26as an important contributor to water

04:28quality impacts. Uh that information

04:31along with subsequent watershed planning

04:33helped inform the town's 2014 CWMP

04:37update which reaffirmed the need for

04:39sewer service in the Somerset area uh to

04:42help protect nearby water bodies and the

04:44groundwater in the area. So as you can

04:46see from the timeline, the town has

04:48continued to build on that work through

04:50additional wastewater planning,

04:52infrastructure improvements, and a more

04:54detailed evaluation of the Somerset

04:56area. moving from identifying the need

04:59to evaluating solutions and ultimately

05:02to advancing the sewer extension that is

05:04now in final design.

05:09And that brings us to the project

05:11drivers and why sewer is being proposed

05:13for Somerset. As discussed on the

05:15previous slide, Somerset was identified

05:17as an area recommended for sewer service

05:20through the town's wastewater planning

05:22documents. One of the factors considered

05:25was the soil conditions within the

05:27Somerset needs area. Much of the area

05:29consists of highly permeable sandy

05:32soils. And while these soils can

05:34accommodate septic systems, their high

05:36permeability means septic discharge can

05:39move through the soil relatively quickly

05:41and this provides less time for

05:42treatment before reaching the

05:43groundwater. So that creates a concern

05:46for the groundwater quality itself. But

05:49groundwater can also act as a pathway

05:51for nutrients and other contaminants in

05:53septic discharge to travel towards

05:55surrounding surface waters. So as shown

05:57on the maps here, the Somerset needs

06:00area is located within the Humik Pond

06:02and my pond watershed areas. Now,

06:05through the town's wastewater planning,

06:08including the MEP studies and the

06:11CWMPPS, nitrogen from on-site septic

06:14systems has been identified as an

06:16important concern for groundwater and

06:18surrounding water resources. So, while

06:21conventional septic systems are designed

06:23to treat waste water, they're not

06:24designed to adequately remove nitrogen

06:27in nitrogen sensitive areas. So also

06:29looking specifically at the Humm Pond

06:31watershed on the lower right. Something

06:34important to note is the Humm and Hum

06:37needs areas. These needs areas were also

06:40identified as areas recommended for

06:43sewer service in the town's 2014 CWMP

06:46update. and Somerset is an important

06:49first step because the infrastructure

06:51constructed through this project will

06:53ultimately be needed to convey future

06:55sewer flows from those areas as well

06:58into the town's collection system. So,

07:00taking all those factors together, the

07:02town's wastewater planning identified

07:04sewer as the most effective long-term

07:07approach for addressing the wastewater

07:09and environmental needs of the Somerset

07:11needs area.

07:16Uh so we've talked about some of the

07:17environmental drivers behind the

07:19project. This slide provides a little

07:21more context on what extending sewer

07:23service can mean for water quality in

07:24this area. So under existing conditions,

07:27septic systems discharge nutrients

07:30including nitrogen to the ground where

07:31they can enter the groundwater and

07:33ultimately make their way into

07:35surrounding water resources. uh too many

07:38nutrients in the water can lead to

07:39excessive algae growth and lower oxygen

07:42levels and also cause other water

07:44quality problems that can affect the

07:46health of the ponds. So one visible

07:48example is of harmful algo blooms or

07:51habs. The green material you can see

07:54along the shoreline in those photos from

07:56Hik Pond and my pond show the types of

08:00conditions that we're talking about.

08:01These blooms can degrade aquatic habitat

08:04and water quality and can also affect

08:06the recreational use of the ponds. Um so

08:10what changes with sewer? Instead of

08:12septic discharge continuing to enter the

08:14ground, instead waste water is collected

08:17and conveyed to the town treatment

08:19system. And this is removing any septic

08:21derived nutrient loading from the

08:23project area into the ponds and also

08:26addresses other contaminants found in

08:28septic discharge including PAS which has

08:31become an emerging issue uh

08:33pharmaceuticals and other emerging

08:35contaminants. So ultimately extending

08:37sewer service in this area helps reduce

08:39those inputs into groundwater and to

08:42surrounding surface waters uh with the

08:44long-term goal of protecting water

08:45quality and the ecosystems of hum and my

08:48comment ponds. So now that we've covered

08:51really the why behind the project, we're

08:53going to take a look at what's actually

08:55proposed for infrastructure.

08:57Uh this project began as a sewer

08:59extension project with the goal of

09:02providing municipal sewer service

09:04throughout the Somerset needs area. The

09:06figure on the left shows the overall

09:08area proposed to be served as part of

09:09the project. Uh the current design

09:11includes approximately 15,200 linear

09:15feet of gravity sewer which is shown in

09:17blue and approximately 9,500 linear feet

09:21of low pressure sewer which is shown in

09:23orange. The roadways proposed to receive

09:26each type of sewer service are also

09:27listed on the right side of the slide.

09:30And as design has progressed, we've

09:32continued to refine where gravity and

09:34low pressure sewer are proposed based on

09:36more detailed evaluation of the

09:38elevations and existing conditions

09:41throughout the project area. Uh in

09:43particular, at the end of Clara Drive,

09:46Henderson's Drive, and Doc Riders Drive,

09:48the homes sit at lower elevations

09:51relative to the proposed sewer. So at

09:53those locations, it's not feasible for

09:55those properties to connect by gravity.

09:58So those areas are now proposed to be

09:59served by low pressure sewer. And for

10:02anyone less familiar with the

10:03difference, whether a property is served

10:05by gravity or low pressure sewer is

10:07primarily driven by the existing

10:09topography and elevations throughout the

10:12project area. Where the elevations

10:14allow, flow can move naturally through

10:16the system by gravity. Um but in

10:19lowerlying areas providing gravity

10:21service would require the sewer

10:22throughout the entire project area to be

10:24installed at significant depths. So low

10:27pressure sewer is utilized to convey the

10:28flow instead.

10:30Uh we also know residents may have

10:32questions about what the proposed system

10:34means for their specific property

10:36including whether they would be served

10:37by gravity or low pressure sewer. And as

10:39the project advances toward

10:41construction, property owners will

10:42receive additional information about

10:44their individual connection point and

10:46the type of sewer service proposed for

10:48their property. So in the meantime, if

10:50you have any uh individual property

10:52specific questions, please reach out to

10:54the project team and we'd be happy to

10:56work through those with you.

11:01This figure just builds on the previous

11:03map and shows the proposed Somerset

11:05system and how it will connect into the

11:07town's existing sewer infrastructure. So

11:09flow from the entire Somerset needs area

11:12will be collected at the proposed pump

11:14station at the town owned property 77

11:17Bartlett Road and pumped through a new

11:19force main along Bartlett Road. And that

11:21force main will connect the existing

11:23sewer collection system near Surfside

11:25Road and from there flow will continue

11:27to the Surfside wastewater treatment

11:29facility for treatment.

11:35And as we've discussed, this project

11:36includes coordination across a number of

11:38town departments. And that coordination

11:41has created opportunities to address

11:43other infrastructure needs while the

11:44sewer work is being completed. So as

11:47part of the current design,

11:48approximately 7,000 linear feet of new

11:50water mane is proposed within the

11:52Somerset needs area, which is shown in

11:55blue on this figure. The water man is

11:57proposed on all streets within the

11:59project area that do not currently have

12:02town water service and allowing those

12:05improvements to be coordinated with the

12:07sewer construction.

12:09Just want to point out one update to the

12:11water man layout since our last public

12:13meeting. At that time we showed the

12:15proposed water man on high brush path

12:18terminating near a nine high brush path

12:20rather than continuing to the end of the

12:22culde-sac. Uh but based on further

12:24evaluation, the design is being revised

12:26to extend the water mane to the end of

12:28high brush path which is consistent with

12:30what had been originally proposed for

12:32the project.

12:38And in addition to the sewer and water

12:40improvements, the project also provides

12:43an opportunity to address roadway

12:45drainage and multi-use path improvements

12:47within the same corridor. So starting

12:50with the figure on the bottom left, uh

12:52new drainage infrastructure is proposed

12:55along Raceway Drive uh to help address

12:58existing drainage and flooding concerns.

13:00On this street, storm water will be

13:02collected and directed to a new

13:04infiltration system to improve storm

13:07water management in the area. Um this

13:10project also includes roadway

13:11improvements at the intersection of

13:13Forway Drive and Bartlett Road. uh the

13:16existing intersection has a very sharp

13:18turn. So the proposed realignment is

13:21proposed to soften that curve and

13:23improve the overall roadway

13:24configuration and safety through the

13:26intersection.

13:29We're also proposing improvements to the

13:32multi-use path network in the area. The

13:34existing sidewalk on Raceway Drive will

13:37be upgraded to a multi-use path and

13:40relocated to the opposite side of the

13:42roadway to improve connectivity and

13:44mitigate roadway crossings through the

13:46corridor. Uh on the top right, you can

13:49see the current preferred alignment for

13:51the new multi-use path along Somerset

13:53Lane. This path will provide a

13:56connection between existing Cisco and

13:58Bartlett road path networks. And the sum

14:01southern alignment is still preferred as

14:04the preferred alignment because it

14:05reduces impacts to the adjacent

14:07properties and allows the path to

14:10continue along Somerset Lane without

14:12requiring an additional roadway

14:14crossing.

14:15And as the rendering shown on the top

14:18left of the slide uh gives you an idea

14:20of what that proposed multi-use path

14:22will look like as you travel down

14:24Somerset Lane from Raceway Drive toward

14:27Hum Pond Road.

14:34So talked about the environmental and

14:36wastewater needs driving the project and

14:38what's included. Another important piece

14:40is funding and the state revolving fund

14:43provides a very favorable opportunity

14:45for the town to finance a project that's

14:47already moving forward to address those

14:49needs. The town pursued financing for

14:52the project through the clean uh water

14:54state revolving fund or CWSRF and has

14:58received eligibility for favorable

15:00financing through that program. An

15:03important step in maintaining that

15:04eligibility was appropriating the

15:07necessary project funds by June 30th,

15:092026, uh, which the town voted to

15:12approve at the 2026 annual town meeting.

15:15So, with that funding authorization in

15:17place, the town submitted a $35.6

15:20million application to the CWSRF in

15:23September, and Mass E's review is

15:26currently underway. And for context, the

15:29SRF program provides below market

15:31financing for eligible clean water

15:34projects. And specifically for Somerset,

15:36the town is eligible for 1.5% financing

15:40with the potential for that rate to be

15:42reduced to 0% based on the project's

15:45nutrient removal benefits. We are

15:47anticipating that the project will

15:49qualify for 0% financing, but we're

15:52still waiting to hear from Mass D on

15:54that determination.

15:57And the interest rate really does make a

15:58difference on a project of this size. As

16:01you can see here, financing at 1.5%

16:03would result in approximately 5.6

16:05million in interest over the life of the

16:08loan compared to 0% financing. And for

16:11context, the town has recently seen

16:13borrowing rates in the range of 4%. And

16:16at that rate, the same financing would

16:19result in approximately $16.2 million in

16:21interest. And of course, if the project

16:23ultimately qualifies for 0% financing

16:26through SRF, those interest costs would

16:28be eliminated altogether.

16:30There's one more important timing

16:32requirement to maintain eligibility for

16:34this funding cycle. Uh the project needs

16:37to be awarded for construction by June

16:3930th, 2027. That deadline is an

16:42important consideration as the town

16:43moves through final design and bidding.

16:50Looking ahead, we wanted to provide some

16:51context on what property owners can

16:53expect once sewer service becomes

16:55available in the area. So once sewer

16:58service is available, the town will

17:00provide notice to property owners and

17:02from that point, properties abuing the

17:04new sewer will have two years to

17:06connect. As part of the project, the

17:08town will provide a sewer service stub

17:10to the property line and property owners

17:13will be responsible for the costs

17:14connecting their home to that service as

17:17well as decommissioning their existing

17:19septic systems which will need to be

17:21decommissioned in accordance with health

17:23department requirements.

17:25There is a process for property owners

17:27to request a waiver from the board of

17:29health for this requirement. Those

17:31requests are reviewed on a case-by case

17:33basis.

17:38And next, we also wanted to provide some

17:39information on the cost property owners

17:42should expect when it comes time to

17:43connect. Uh the first is the sewer

17:46connection permit application fee, which

17:49is currently $4,000 per dwelling and is

17:51due with the required application to

17:53connect to sewer.

17:55Next is the sewer capacity fee. Uh for a

17:58home with three bedrooms or fewer, the

18:00minimum fee is currently approximately

18:03$6,700.

18:05For larger homes, that fee increases

18:07based on the number of bedrooms and

18:09anticipated wastewater flow for the

18:11property. And the third component is the

18:14private property connection itself. And

18:17that includes hiring an engineer and a

18:19contractor to design and install the

18:22sewer service from the dwelling to the

18:24connection stub provided at the property

18:26line, as well as properly

18:28decommissioning the existing septic

18:30system. The cost of that private

18:32connection will vary depending on the

18:34individual property. Uh things like

18:37distance to the house from the house to

18:38the connection point, whether the

18:41property is served by gravity, low

18:43pressure sewer, existing site

18:45conditions, and the amount of

18:46restoration required will all factor

18:48into that cost. And since all these

18:50factors can vary from property to

18:52property and actual connections are

18:55still approximately 2 and 1 half to 3

18:57years away, it's difficult to provide

18:59one estimated construction cost that

19:02would accurately represent what every

19:04property owner should expect.

19:07Another thing to note is the original

19:09article 15 presented at the 2026 annual

19:13town meeting included the ability to

19:15recover up to 25% of the project cost

19:19through betterments to project area

19:20properties. Uh based on estimates at the

19:23time that could have resulted in a

19:25betterment of roughly 20,000 to $25,000

19:28per property in addition to the

19:30connection costs we just discussed. But

19:32at town meeting that betterment language

19:33was removed from the article. So

19:35property owners will not be assessed

19:37that additional project betterment as

19:39part of the Somerset project.

19:46And uh we recognize that even without a

19:47betterment connecting to a sewer to

19:49sewer represents a significant expense

19:51for homeowners. So there are some

19:53options available to help spread certain

19:55costs over time. Uh for the sewer

19:57connection permit application fee, this

19:59is due in full at the time of applying.

20:03For the sewer capacity fee, property

20:05owners have the option to pay the fee in

20:07full upfront or spread the cost out over

20:10time through a voluntary sewer lean

20:12agreement. Under that option, the

20:14property owner is required to pay a

20:16minimum of 10% of the sewer capacity fee

20:19up front along with applicable recording

20:21fees. The voluntary sewer lean agreement

20:25is recorded at the registry of deeds and

20:27the remaining balance is added to the

20:29property tax bill and paid in

20:32installments with a 4.414

20:35interest over a period of up to 20

20:37years.

20:39Lastly, for the private property

20:41connection costs, there's also a septic

20:44management or title 5 loan program

20:47available through the Nucket Health

20:49Department subject to available funding

20:51for eligible costs. The current terms

20:53are 2% interest over 20 years.

21:00And we talked a little earlier about why

21:02topography in some areas requires low

21:04pressure sewer. So we wanted to provide

21:06a little more context on the grinder

21:07pumps that go along with those systems.

21:10In some of the lowerlying areas, homes

21:12uh can't simply feasibly connect to

21:14gravity by gravity without requiring the

21:17sewer to be installed at significant

21:19depths. So in um some cases there will

21:23be connection to low pressure sewer when

21:24low pressure sewer is fronting your

21:26property and then in some limited cases

21:29an individual property along a gravity

21:32sewer may still require a grinder pump

21:34if the elevation of the home doesn't

21:36allow for a feasible gravity connection

21:38or if the home is is too far from the

21:40sewer. Uh so for those properties, an

21:43individual grinder pump would be needed

21:45to collect flow from the home and pump

21:47it into the sewer in the roadway. Uh

21:50similar to how projects have been

21:52completed in the past, the town

21:54anticipates pre- purchasing the approved

21:56grinder pump units and selling them to

21:58the homeowner.

22:00We've also had some questions about pump

22:02reliability and what happens during a

22:04power outage. Uh the pump does require

22:07power to operate, but the tank provides

22:09approximately 150 gallons or roughly 48

22:13hours of storage depending on household

22:16water use. Uh there's also been a very

22:19limited number of failures um reported

22:22with existing grinder pump installations

22:24on Nucket. And proper use is really a

22:27very important part of keeping the pumps

22:29operating reliably. So as the graphic on

22:31the right shows, only toilet paper

22:33should be flushed. uh wipes, even

22:36flushable wipes, sanitary products,

22:38other materials can cause problems with

22:41the pumps. So being mindful of what goes

22:43into the system is really important.

22:45And also more detailed information on

22:47the equipment, operation, maintenance of

22:51the pumps will be provided to property

22:53owners before they're required to

22:55connect.

22:59And now looking ahead, this slide shows

23:01where we are now and the major

23:03milestones between today and completion

23:05of the project. One important point is

23:08that the schedule is also tied to the

23:10SRF process. So before the project can

23:12move into bidding and ultimately

23:14construction, the town will need the

23:16applicable permissions and approvals

23:18from Mass D to advertise the project and

23:21award the construction contract. So the

23:23schedule shown here assumes these

23:26approvals will be received within the

23:27anticipated time frames. Currently final

23:30designs ongoing with the current

23:32schedule for final contract documents to

23:35be ready for bidding in February of

23:372027.

23:38From there we anticipate approximately 2

23:40to 3 months for bidding uh with

23:42construction beginning in the spring or

23:44summer of 2027.

23:47Construction is expected to take

23:48approximately two years, bringing us to

23:51an anticipated project completion in

23:53spring of 2029.

23:55And another important point to note is

23:57that roadway construction will not occur

23:59during the summer months. So while the

24:00overall construction period is

24:02anticipated to extend over the two

24:03years, work within the roadways will be

24:05scheduled around those summer

24:07restrictions.

24:12And before we close, we want to

24:13encourage everyone to stay connected as

24:15the project moves forward. Uh the

24:17project website, which you can access

24:19using the URL or the QR code shown here,

24:23will continue to be the main source for

24:25project updates, schedules, meeting

24:28information, and other materials as they

24:30become available. You can also follow

24:32the town social media channels for

24:34project announcements and updates.

24:37We're anticipating another public

24:39meeting in late spring or summer of 2027

24:42which will be a pre-construction focused

24:44meeting. Uh by that meeting we will have

24:47the contractor on board and we'll be

24:49able to provide more detailed

24:51information on construction sequencing,

24:53anticipated roadway impacts and what

24:56residents can expect while work is

24:57underway. We will also have

24:59representatives from the contractor and

25:01the engineering team who will be working

25:03in the field available at that meeting.

25:05So residents will have an opportunity to

25:07ask more detailed questions about

25:09construction and how the work may affect

25:11their street. And of course, in the

25:12meantime, if you have any questions

25:14specific to your property, please

25:15continue to reach out to the town and

25:17the project team.

25:21And that brings us to the end of the

25:22presentation. I'll pause in case anyone

25:24from the project team has anything

25:26they'd like to add, but a thank you and

25:28we'll open it up for questions.

25:31I just want to start again. Anna, thank

25:33you so much for taking us through these

25:34slides. As a reminder, these slides as

25:36well as the ones that we've presented at

25:38all of our past public info sessions are

25:40available on the town project page on

25:43off of the website, excuse me, as well

25:46as other relevant project docs. A lot of

25:47the maps and aerials that you saw, we

25:49have that available. Uh and again, all

25:51of the past questions that have been

25:53asked during public info sessions or

25:55sent in to me or the project team are

25:57also there as well for your viewing. So

26:00with that, we will now open it up to

26:01questions. So what I'd like you to do if

26:04you would like to ask a question or

26:05provide feedback to the team, please

26:07raise your virtual hand. We'll call you

26:09out and unmute you and you can ask your

26:11question.

26:12Okay. So first we have Karen Alent

26:17and I see that I personally can't

26:18unmute. So Frank, from your standpoint,

26:20if you could unmute Karen, that'd be

26:22great.

26:27>> Hi. Can you hear me? Yes, we can. Go

26:29ahead, Karen.

26:30>> Great. So, I have some comments I'd like

26:32to share with everyone who's listening.

26:34Um, when the voters approved allocating

26:36money for this project at last town

26:38meeting, the project was being pushed

26:41for environmental reasons as you spoke

26:43today, but specifically it was being

26:45sold to the voters as necessary to bring

26:47back the health of my pond. However,

26:51voters were unaware that there was a

26:53scientific research study commissioned

26:55by the town to assess the pond and what

26:58would be necessary to bring it back to a

27:00healthy state. That study in summary

27:03clearly stated that the only options to

27:06prevent the cyanobacteria blooms have

27:09been narrowed down to dredging and

27:11inactivation.

27:12Dredging would represent the true

27:14restoration and is highly desirable.

27:17So with that in mind, the town sought to

27:20override um an override to allocate 4

27:22million for dredging in 2023 and it was

27:25approved. For whatever reason, they

27:28didn't move forward until this fall and

27:31then the dredging bid came in almost

27:32four times as much as was allocated at

27:3516.6. So they recently abandoned the

27:38dredging project that would actually

27:39have restored the pond to health.

27:42Bringing in sewer lines will not have an

27:44effect on pond restoration. There's not

27:46been any study confirming that septic le

27:49leakage is traveling anywhere near my

27:51pond. So on top of that, there's a large

27:54group of opposition to this project who

27:57would like to see it stopped and the

27:59remaining money out of the 44 million

28:01diverted towards dredging the ponds

28:03which would actually have a positive

28:05effect. And I just wanted to share that

28:07that that's ongoing right now.

28:20Karen, thank you for your comments. I do

28:21think that that is referencing a

28:22completely different study though, but I

28:24do appreciate the feedback in the

28:26comments. We'll now move to Ed Sanford.

28:34>> Uh yeah, hi. Um I uh I'm got a little

28:37bit of confusion. Kevin, you know, we

28:39emailed a little bit about the cost of

28:42to the individual homeowner, and I just

28:45looked at the email you sent me. You

28:47told me that the sewer capacity fee

28:50would be at a minimum $25,000

28:53uh for this project, and I just saw the

28:56slide that said 6,700.

28:58So, what what's the discrepancy?

29:02>> So, I do apologize for that. It was

29:04recalculated after I sent that email.

29:06And what was presented this evening is a

29:07more accurate um estimate for that size

29:10of house.

29:13>> Okay. Uh the the other thing that that

29:16you know I'm I'm I'm obviously not

29:19thrilled about this. I have a I live at

29:2112 doer drive. I moved into my house in

29:242017. I have a a septic system that was

29:27designed according to Richard Ray's most

29:30stringent septic regulations. as we all

29:33been told to believe that he created the

29:35toughest septic regulations in the

29:37Commonwealth of Massachusetts and was

29:39lauded for all his hard work. You know,

29:42clearly I uh installed my system

29:46obviously to to to those current septic

29:49regulations. I maintain I maintain the

29:52system and and now I'm being told that I

29:55have to abandon it. I'm being forced to

29:57abandon it probably to a at a cost uh

30:01somewhere on top of the sewer capacity

30:03fee. So, it's at about $11,000

30:07for the uh the fees to the town. You're

30:10probably adding anywhere I would say a

30:13minimum of $50,000 for a homeowner to to

30:16do this connection. Uh and that that is

30:19maybe a simple installation. And I spoke

30:22to a civil engineer who said that most

30:25of of the properties will have to

30:27replace their septic tanks to install a

30:31tank that has a lowflow uh uh ejector

30:35pumpout system in order to get the waste

30:37to the to the town sewer line. Uh so so

30:41the long story short is for for the 400

30:43some odd property owners in this area,

30:46they're they're being forced to to come

30:48up with millions and millions of dollars

30:51to comply with this with this new

30:53regulation. And to to Karen's point, I

30:57think it's it's it's imperative that the

31:00town stop I I feel like that this

31:02environmental stuff is just sort of

31:03platitudes. Oh yeah, we're we're we're

31:06going to improve the health of my comet

31:08pond, but where are the studies? Where

31:10is the specific information that says

31:13specifically my septic system, which is

31:16over a half a mile away from my pond, is

31:19is causing nitrogen

31:22nutrient lo, whatever it is, nitrogen

31:25nutrient lo overloading in the pond. I I

31:28I don't know if the town's ever done

31:29anything like that. Have they ever

31:31tested any of the the wells in the area

31:33to see see what the groundwater the

31:35nitrogen the nitrogen levels in the

31:38groundwater are at the and the plenty of

31:40people have wells in this area? I have

31:43an irrigation well. Has any study been

31:46done in that regard. Uh I just it just

31:49seems like this is just uh it's it's a

31:53huge expense for for the neighborhood.

31:55It's going to it's going to cause a

31:57significant

31:59uh change to the makeup of the

32:00neighborhood because the people that can

32:02least afford this are year- round

32:05families uh may maybe who are retired.

32:08This is a very old year-round area. It

32:11was developed in the late 70s and early

32:1380s. So, you've got families that have

32:16been out there for 30 or 40 years. they

32:19they probably are at the end of their

32:20economic livelihoods and you're sort of

32:24saying, well, too bad. You know, you got

32:26to cough up 50, 60, 75,000 bucks. That's

32:29just the way it is to to to in theory,

32:32you know, save my comet pond. So, I I

32:36think before you go much further, you

32:38really need to come clear with the

32:40residents and in the island community

32:42that this is going to work, that my

32:44comet pond is going to be infinitely

32:46better. uh and that and that you know

32:49our our hard hard-earned and money that

32:53we're spending uh not to our uh our

32:57liking is uh is doing the job and I I

33:00don't frankly

33:02think that that's going to be the case.

33:04Uh last thing I'll say and then I'll

33:05shut up is that what this will also do

33:07is is open up this this is a very

33:10desirable area now as you as we all know

33:13uh the properties have sold in this in

33:15this sewer district area for 78 million

33:19property just closed on the dirt road

33:22portion of Somerset Lane for 7.5

33:24million. Uh a property on a uh in the

33:28Austin farm subdivision sold for over 8

33:30million. There's a fairly substantial uh

33:34uh spec build that's going on on

33:36Somerset Lane that'll probably be listed

33:38in the 8 8 figure range. So, it's a

33:40hugely popular seasonal area. And by

33:44eliminating board of health regulations

33:46and septic capacity issues which are

33:49currently in place, you're you're really

33:52opening up this whole area for

33:53significant seasonal home uh development

33:58which will just end up, you know,

34:01pushing pushing the year round residents

34:03who have been there for for decades.

34:05They're just going to have to leave. And

34:07I think that's really unfortunate. and

34:09and and then that result really how

34:11environmentally appropriate is it in the

34:14end run when you open up this huge area

34:16huge very very uh attractive area to

34:20seasonal residents to make it easier to

34:22to expand and to develop their

34:24properties. So thank you

34:29thank you Mr. Sanford

34:32>> Amy Eldridge.

34:36Hi. Um Amy Eldridge. I do not live in

34:40the area. I am a community member. Um my

34:44question is

34:46if they're worried about nitrogen

34:48loading into the pond, why are not the

34:51properties on the dirt part of West Mia

34:55and my Comet Road who are closer to the

34:58ponds?

35:00Why is that not included

35:03in this project? because I would think

35:05their septics are more susceptible to

35:07the nitrogen loading than the people

35:09that are living up on Somerset

35:12and uh High Brush Path and Austin Farm

35:14area. Um,

35:17I I understand that there are people who

35:19have failed septics in that area. And I

35:22understand there are people who, and I

35:25have friends who have just put in a

35:27$60,000

35:29um septic in a brand new house, and

35:34you know, you're supposed to be getting,

35:35you know, 20 to 30 years out of your

35:37septic. And now they're going to be

35:39forced to pay

35:41all this crazy money. Yes, I get there's

35:44variances with the health department and

35:45you can go to in front of the board of

35:47health and get pushed back a couple of

35:50years, but that's only going to go so

35:52far. And you're asking people that are

35:53going to be out of pocket way more than

35:56just the tie-in rate with the town.

35:59They're going to have to abandon, fill,

36:01remove septics on septics they just paid

36:04for it. It [snorts] I understand the

36:07need, but I also understand that you

36:10still have a lot of yearround

36:14year-round residents that live in this

36:15area, some on fixed incomes that aren't

36:19going to be able to afford this, whether

36:20there's an abetment or a 0% interest

36:23loan. Um, I just think that that this is

36:27um needs to get tabled and and and

36:30further study like Karen had mentioned

36:32because I'm not 100% convinced that the

36:35houses in this area are the culprits of

36:39the ponds.

36:41Thank you.

36:46Thank you, Amy. Drew.

36:52>> Yeah. Hi, everybody. Can you hear me?

36:53>> Yes, we can.

36:54>> All right. Thanks. Um, I I just wanted

36:56to touch on a couple things that I think

36:58Amy and Ed Sanford had brought up. Um,

37:02and and there was a lot, so I'm going to

37:03do my best to just cover a couple of

37:05them. Uh, for those that don't know me,

37:06I'm Drew Padin. the director of public

37:08works, formerly uh wastewater engineer

37:11myself. Um I think and and I'm not going

37:14to do these in order, but I'll try my

37:16best. So um as far as has the town done

37:18any studies, yes, the 2014 CWMP is

37:22available on the town's website. If you

37:23go to the sewer department page on the

37:25left, you click sewer archives and um

37:31under there you can click on

37:32comprehensive wastewater management plan

37:33and there's a ton of documents in there

37:35and I suggest that people take a look at

37:37those. Um something Anna touched on in

37:39the presentation is certainly not only

37:41is is groundwater quality in in this

37:44area and because of the properties in

37:46this area important, but this area is

37:49critical to extend sewers beyond that to

37:51Humuck North and Humuck South. So sure,

37:53this extension is not a magic bullet. It

37:55doesn't solve all of our groundwater

37:57surface water uh quality issues. Um but

38:00it is a step in the right direction as

38:02was you know taking 7 purchasing 77

38:05Bartlett for the pump station as was

38:07upgrading the Surfside sewer pump

38:09station at the corner of Windy Way and

38:11Surfside Road. I think additionally I

38:13I'd like to try to get ahead of a little

38:15bit of a misconception that we seem to

38:17hear at every one of these public

38:19meetings. I have a quote unquote

38:20perfectly good septic system. Sewer

38:23service

38:25removes 100% of, as Anna said,

38:28nutrients, dyes, detergents, uh, PAS,

38:33other things from your groundwater where

38:35if you're not on town water, uh, you're

38:38getting your the water that you drink

38:40and that you use to cook from from

38:43beneath your home, you know, beneath

38:45your property. Um,

38:47a perfectly good septic system does not

38:50remove the overwhelming majority or

38:53nearly any of that. Um, so, you know, we

38:56we certainly understand that there is a

38:58cost. Do not get me wrong. We we we

39:01understand that very much. Um, as far as

39:03what it'll cost for an individual

39:05property to connect, again, as Anna

39:07mentioned in the presentation, all

39:09properties differ. Um I think about I

39:12don't know if we have a number about how

39:13many properties would be serviced by

39:15gravity and how many would be let by low

39:16pressure. Um but it's your distance from

39:18the street. It's a lot of different

39:20factors that ultimately um you know we

39:23we can't put a number on. Um you know

39:26certainly at this time for for every

39:27individual property. Um

39:30I uh I I think there's a lot of

39:32additional secondary benefit to this

39:34project. Uh, as the DPW director, I've

39:38kind of struggled for the last three

39:39years while working for the town to

39:40understand what is the plan for Somerset

39:43Lane, for example, extending a a a bike

39:46path, repaving that road, which is

39:48obviously in in undeniably poor

39:50condition. Um, but we certainly wouldn't

39:52want to make these improvements and then

39:53dig them up and and disturb, you know,

39:56that that investment. Um, and so I I

39:59think the timing of this is is kind of

40:00critically important for a number of

40:02different reasons. Um, so anyways, I

40:04just I just wanted to respond to a

40:05couple of things that that have come up.

40:07So, thank you.

40:12>> Thanks, Drew. Dan, you have your hand

40:14up. Go ahead.

40:15>> Yeah. Um, I just want to answer I think

40:17it was um Amy asked the question. Um, my

40:20com the my pan needs area is a future

40:23needs area identified the CWMP.

40:25So, that project is coming down the

40:27road. Um, the town can't do all seven

40:31needs areas all at once. So they have

40:33to, you know, schedule the work out. So

40:36right now, Somerset was identified so

40:38that Humm North and Humm South can get

40:40done to help help with the the Humm Pond

40:43area. And then we'll follow up at a

40:45future date doing more work over at my

40:48um around my pond and the my needs area.

40:52So it is coming down the road at some

40:54point. It's just not not everything can

40:56happen at once.

41:01Thanks, Dan. Okay, next we have Jean

41:04Fonts.

41:06Jean, go ahead.

41:11>> I don't know if you can hear me or not.

41:12Hi, I'm Jean Fones. Um I my my question

41:15is is I'm in a low pressure area and I

41:18don't understand why um having to get to

41:21Human North and South

41:23areas has to include area the areas on

41:26the outskirts of Somerset Road and um

41:30this project here has 440 houses

41:33according to it and o over a hundred of

41:35them are going to have to have grinder

41:38pump systems put in and I know you

41:40mentioned [clears throat] that not many

41:42of them failed but

41:44um from the word on the street is a lot

41:46of them do fail and um that's just I

41:51think unfair to um homeowners to force

41:54them into systems that are really not um

41:57great. And then the other question is is

41:59when they fail, do they back up into

42:00your house or do they back up onto the

42:03land? Cuz I know you said 150 gallons

42:04now um of excess water um time 48 hours

42:10if the power goes out. But I I'm

42:12probably one one of the unique people

42:13who has had a pump system before. Not a

42:15ground pump system, grind pump system,

42:18but a um graywater pump system for

42:20septic. And um [clears throat] it took

42:23us quite a while to figure out and

42:25definitely more than 48 hours to figure

42:27out the system wasn't working. And um so

42:29I just want to know where the waste goes

42:31once the system breaks since it's been a

42:33record of showing that they do.

42:36Thank you.

42:39I can handle that one for you. Anna, the

42:41um so the the grinder pump unit, it's

42:44not a new technology. It's been around

42:47for a very very long time. Used in

42:49numerous numerous communities anywhere

42:52around water bodies. Flow cannot happen

42:55by gravity. They have to be using

42:56grinder pumps. We've designed them back

42:59in the early 80s when I when I graduated

43:02back in the late 80s. They've been in

43:04place. So it's not a new technology.

43:07number one and they they are reliable.

43:10Most of the problems with grinder pumps

43:11are user related. Um when things get

43:14flushed down the toilet, a lot of grease

43:17goes down the toilet. I mean, you know,

43:19down your sink, it's going to plug up

43:21the pump. You know, people, you know,

43:23little kids may throw matchbox trucks

43:25that is going to damage the pump. But

43:27the pumps are do come with an alarm

43:28panel. So, when you do have a power

43:31outage, you will have an alarm that goes

43:33off. when the the water level gets high,

43:35you do have an alarm that gets off goes

43:37off. So, you'll have an opportunity. I

43:40mean, if a lot of people have generators

43:42that put the power in their homes, uh I

43:45believe a lot of folks on Ant probably

43:47have those with with power outages. Um

43:51if not, you know, you do have like Anna

43:53was saying, 40 hours of time. You know,

43:56when we lose power up, I'm up in New

43:58Hampshire. You know, we don't take

44:01showers, hot showers. We don't do

44:03dishes. you don't do laundry, you you ve

44:06very limited amount of water gets used

44:07during those periods of time.

44:10Um so you know we will provide more

44:12information as we get closer and more

44:15information on operation and maintenance

44:18how to maintain and operate the grinder

44:19pumps as the time as we get closer to

44:22construction.

44:26>> Thank you Dan.

44:28Does anyone else have any other

44:29questions or comments for the project

44:31team?

44:35Okay. Karen Alance.

44:39>> Hi. Um, I just wanted to comment about

44:42the studies because I have gone on the

44:44board of health website. I have read

44:47every single study that was referred to

44:49and the [clears throat] one that not the

44:522014 but the one that is specific to

44:55restoration of the ponds was from 2017.

44:59It was a joint commissioning from the

45:01town of Nantucket, the land and water

45:04council and the pond coalition

45:06coalition. And this specifically said

45:10that the um septic ch moving over to

45:13septic lines is not going to have an

45:15effect on restoring the pond. The only

45:18thing that will work is dredging.

45:21Um, so and then the other thing is none

45:25of those studies have shown that septic

45:30runoff has reached the pond or even

45:33gotten close to it or they haven't shown

45:35anything where septic runoff has gone.

45:36What they have shown is where the

45:38groundwater flows and where the flow

45:40goes to the pond. But nothing was shown

45:43nothing is documented that anything from

45:46septic systems gets where they where it

45:49goes or groundwater. Thank you.

45:56>> Okay, I'll move to Brett Dean.

46:02>> Hey, can you hear me, Kevin?

46:04>> Yes, we can. Go right ahead.

46:05>> Thanks for uh taking my comment. At the

46:07risk of uh irritating my Somerset

46:10neighbors, I just want to tell you how

46:11much in favor of this project I am. I

46:15would be faced with very substantially

46:17higher costs should we not go ahead and

46:20do this. and and I know a number of my

46:21neighbors would be um as well. Um so I

46:25think you know once something like this

46:26passes th those that are in favor of it

46:29kind of go by the wayside and you hear

46:32more and more and I respect those that

46:33oppose it. But I just want to let you

46:36know that there's a lot of people in

46:38favor of it. I I never saw it as a

46:40simple proxy vote of saving the pond. I

46:44think this is a complicated area for

46:46septic. a lot of the locations or some

46:48of the locations in Somerset are um I I

46:51don't think it's as simple as saving uh

46:53the pond and I respect the varying

46:55opinions on the the studies. My question

46:57for you and I think you're hearing a

46:58little bit of it tonight uh your degree

47:01of confidence and do you have a degree

47:03of confidence at this standpoint that

47:06the existing appropriation will be

47:08sufficient to proceed with the projects?

47:11I I I think you may hear you'll be

47:13having some challenges if that's not the

47:14case. So, if you could give me any in

47:17any any information on that, I

47:18appreciate it and thank you for your

47:19time and for doing this.

47:23>> Yeah, thank you Brett. I don't want to

47:24speak for everybody on the project team,

47:25but I think we are confident in the

47:26current estimates that the appropriation

47:28that was passed is sufficient to cover

47:30the cost for this project.

47:34Drew, go ahead.

47:37Yeah, sorry to jump in. I was I was kind

47:40of just remembering some of the things

47:41that were brought up. Um, I know we

47:43don't have any representatives from the

47:45planning department here, but you know,

47:46we've heard, you know, on a number of

47:49occasions that there's concern about

47:51development and buildout and um, you

47:53know, just to reiterate, if this project

47:55goes out to bid in February, I think you

47:59know, construction maybe at the pump

48:00station maybe starting over the summer,

48:02working in the roadways probably not

48:04starting till the fall and we're looking

48:05at two and a half to three years. So I

48:08think we have somewhere between two to

48:09three town meetings to um two two or

48:14three opportunities at town meeting to

48:17address development concerns in the area

48:19for example. So, I know that um I think

48:21there's an an initiative from our

48:24planning department to reach out to a

48:25Butters in the neighborhood um or in in

48:28the area to kind of gauge uh concern

48:31interest uh in in addressing their

48:34concerns and and coming up with ideas um

48:37well in advance because again, you know,

48:39it's going to be I would say at least 3

48:41years before people are expected to

48:43start to connect. Oh, and it looks like

48:44Megan is here, so I'll stop putting

48:46words in Megan's mouth. But um yeah, I I

48:50you know, the town definitely hears

48:51these things and and uh there's stuff in

48:53the works. But sorry, Megan, not to put

48:55you on the spot, but if you want to jump

48:56in, feel free.

48:57>> No, that's okay. That's why I'm here. Um

49:00so, we are going to be sending out a

49:04very very brief survey um to all

49:07affected property owners. Um that's

49:10going to be step one. So, the intent of

49:11that survey is to just let planning

49:14staff and the planning board know um the

49:16neighborhood's thoughts on existing

49:18development um potential future buildout

49:22so that we can gather more information

49:24on um whether or not zoning changes

49:27would be warranted in the future. Like

49:29Drew mentioned, there will be several

49:31town meeting cycles um for any changes,

49:34if necessary, to be put into place. So,

49:36it's not going to be a rush for this

49:39town meeting cycle. That said, um it's

49:42important to us to kind of get that line

49:44of communication started and just kind

49:46of see where um where everyone's at on

49:50future development.

49:57>> Thank you, Megan. Thank you, Drew.

49:58Sorry, I know you're in the attendee

50:00section, Megan, for most of this. I was

50:01able to finally push you over.

50:05Um all right. Any other questions uh for

50:07the project team? Miss FS,

50:12>> thank you and thank you for answering my

50:13questions and I understand um you know

50:16people think they don't use water during

50:18during blackouts or whatever, but um you

50:20didn't answer the question of where does

50:22the water go if it if that 150 gallon

50:24tank fells up. So I'd like to know where

50:26the raw sewage will go

50:29um

50:30from these pump systems because that's

50:32what I'll be on.

50:35Thank you.

50:43Dan, go ahead.

50:44>> Yeah, I mean I I don't know what the

50:46system what her pump system is going to

50:47look like once it's designed, but um I I

50:52don't imagine I mean I'm assuming if

50:53this alarm goes off that there's going

50:56to be, you know, the high water alarm

50:58that someone's going to come with a

51:00generator or a power source to pump that

51:03thing down. Um, so it doesn't go back up

51:06into your basement or into your home or

51:09onto the street. But if you have a

51:12basement service, yeah, it would end up

51:14toward in your basement if it

51:16overflowed. Just like if somebody's on a

51:18gravity line and their line breaks, it's

51:21going to back up into their the lowest

51:23fixture in their home. Um, if you happen

51:26to be on

51:28only a first floor level service above

51:30the street, I would have to look at how

51:32that was designed to figure out where

51:34it's going in overflow. But I would not

51:36if you, like I said, you're going to get

51:38an alarm and at that point, you know,

51:40you're going to call somebody to come

51:41out and they're going to have to pump it

51:43down for you. But again, I mean, I'm not

51:46sure how much water use people are going

51:49to do during a power outage, but

51:50typically there's not a lot other than

51:52flushing a toilet. All

52:02right. Does anyone else in the attendee

52:04section have any questions for the

52:05project team?

52:14Okay, seeing none, I want to take the

52:17time to thank everybody for attending

52:18this evening's public info session.

52:20Again, as a reminder, this session is

52:22being recorded and will be posted at the

52:24town's YouTube page for later viewing.

52:26And of course, if any questions come to

52:28mind uh after this evening session,

52:30please feel free to reach out to me

52:31directly and I'll get a response back to

52:33you as soon as we can. So, thank you

52:35again everybody for your time. We

52:36appreciate it. Have a good rest of your

52:38evening.

52:41And we can stop the recording now.

52:42crying, please.

52:50All right. Thank you everybody. I

52:53appreciate your time as always. Great

52:55job again.

52:57>> All right. Thanks everybody. Have a good

52:58night.

```*