2026-11-05 - Somerset Needs Area Sewer Extension Information Session
Summary
Built from the meeting notice and the YouTube auto-caption transcript; names and numbers may be misheard.
- Remote public update on the Somerset Sewer Extension Project, led by the town's project manager (Kevin) with the design engineer from Weston and Samson (Anna Wick) presenting; Drew Patnode (Public Works Director) and a Planning staff member (Megan) answered questions. No votes; the session was recorded for the town's YouTube page.
- Background: Somerset was named a sewer needs area in the 2004 comprehensive wastewater plan and reaffirmed in the 2014 update, citing sandy soils, nitrogen from septic systems and algae blooms in Hummock and Miacomet ponds. The project is also the first step in carrying future flows from the Hummock North and South needs areas.
- Design: about 15,200 feet of gravity sewer and 9,500 feet of low-pressure sewer (Clara, Henderson's and Doc Riders drives moved to low pressure); a pump station at town-owned 77 Bartlett Road with a force main to the Surfside treatment facility; about 7,000 feet of new water main (High Brush Path extended to the cul-de-sac); drainage on Raceway Drive; an easing of the Raceway Drive and Bartlett Road turn; and a multi-use path along Somerset Lane (southern alignment preferred).
- Financing: the 2026 Annual Town Meeting appropriated the funds before the June 30, 2026 deadline; a $35.6 million Clean Water State Revolving Fund application went in during September and MassDEP review is pending. The rate is 1.5%, possibly 0% for nutrient removal (about $5.6 million interest avoided versus 1.5%, about $16.2 million versus 4% borrowing). Construction must be awarded by June 30, 2027.
- Costs to owners: $4,000 connection permit fee per dwelling, a capacity fee of roughly $6,700 minimum for three bedrooms or fewer, plus private-side connection and septic decommissioning (varies by property). The betterment (up to 25% of cost, roughly $20,000 to $25,000 per property) was removed at Town Meeting. Capacity fee can be financed through a voluntary sewer lien (10% down, up to 20 years, about 4.4% interest); a Title 5 septic loan is offered at 2% over 20 years. Owners get two years after notice to connect; Board of Health waivers are case by case.
- Grinder pumps: needed in low-pressure areas and some gravity-served homes; the town expects to pre-purchase and sell approved units to owners. Tank holds about 150 gallons (roughly 48 hours); an alarm sounds on high water; only toilet paper should be flushed. Staff said an overflow would back up to the lowest fixture and that a crew would be needed to pump down; pumps are long-established technology.
- Schedule: final documents ready for bidding February 2027, 2 to 3 months of bidding, construction from spring or summer 2027 for about two years (no roadway work in summer), completion spring 2029. Connections are about 2.5 to 3 years away. A pre-construction public meeting is expected in late spring or summer 2027.
- Public comment was mixed. Several residents questioned whether sewer would restore the ponds, called for dredging or further study, asked about the cost burden on year-round and fixed-income households, and asked why homes nearer Miacomet Pond are not included. Staff answered that the Miacomet area is a future needs area, since the town cannot do all seven at once, and pointed to the 2014 wastewater plan documents on the sewer department page. One resident spoke in favor. Asked about funding, the project manager said the team is confident the appropriation covers the estimated cost.
- Development concern: Public Works and Planning noted residents' worry that sewer will enable buildout; Planning will mail a brief survey to affected property owners to gauge views, with two to three Town Meeting cycles available for any zoning changes.
Time on topic
| Topic | Approx. minutes |
|---|---|
| Introduction and project background | 4 |
| Design, water, drainage and paths | 9 |
| Financing, owner costs and grinder pumps | 10 |
| Schedule and next steps | 3 |
| Questions and public comment | 26 |
Related issue: Somerset Sewer Extension Project (see also Sewer Enterprise Fund Budget).
Agenda
- Information session; no agenda posted. Presentation covered background, project overview, funding, owner costs, schedule, then questions.
Sources
Video
Transcript
*These are auto-generated captions; names and numbers may be misheard.
Transcript
00:11Okay, it is 5:30 on the dot, so we're
00:13going to get started. And I'll say good
00:15evening everybody and welcome to this
00:17evening's public information session on
00:19the Somerset Needs Area Sewer Extension
00:21Project. Joining me this evening on the
00:24call, we have members of both our
00:25project team and representatives from
00:27different town departments would be here
00:29to answer any questions you have. For
00:31the info session, we do have a slide
00:33deck presentation which is going to give
00:35you an overview of the project, but more
00:37importantly, what we've accomplished
00:38thus far working on the Somerset project
00:40for the last year and what we hope to
00:42accomplish moving forward in the coming
00:44months and new year. After the
00:47presentation, we'll be happy to take any
00:48comments, questions, or feedback that
00:50members of the public have. And of
00:52course, if we can't get an answer to you
00:54this evening, I'll follow up directly
00:55with you after this evening's info
00:57session with a response.
01:00Now, before we get into the
01:01presentation, I just want to make two
01:02notes. First, this info session, just
01:05like all of our past info sessions, is
01:07being recorded and will be posted to the
01:08town's YouTube page for later viewing.
01:11But also, if you are interested in
01:13finding out more information about the
01:14projects, looking at project documents,
01:16or even going through our long list of
01:18frequently asked questions, we do have a
01:20project page which you can find from the
01:22town website. We post on there regularly
01:24with updates, changes to the project,
01:27and you also have direct contact
01:28information from me should you like to
01:29reach out.
01:31So, with that being said, I'll now hand
01:33it over to Anna who's going to take us
01:34through the project overview slide
01:36presentation.
01:38>> Great. Thanks, Kevin. We'll share my
01:40screen here.
01:44Can everyone see the presentation?
01:48Great. Okay. Well, good evening everyone
01:51and thank you for joining us. Uh my name
01:53is Anna Wick and I'm one of the design
01:56engineers for the project. As Kevin
01:58mentioned, we're here to provide an
01:59update on the Somerset Needs Area Sewer
02:01Extension project. As the design
02:03continues to advance and we move closer
02:05to bidding and construction, uh we've
02:07held several public outreach meetings
02:09over the course of this year, including
02:11three this spring leading up to annual
02:13town meeting and another in August where
02:16we provided updates on specific aspects
02:18of the project. So tonight, we'd like to
02:20build on those discussions and provide
02:22an update on where the project currently
02:24stands as we move through final design.
02:29So before we get into the presentation,
02:31I'd like to briefly reintroduce the
02:32project team. As we've discussed at
02:35previous meetings, this project involves
02:37coordination across a number of town
02:38departments, including town
02:40administration, the sewer department,
02:43department of public works, planning and
02:45land use services, the water department,
02:48health and human services, as well as
02:50town council. and representatives from
02:52those groups are here with us along with
02:53the design team from Weston and Samson
02:56and the owner's project manager Apex.
03:01And for tonight's presentation, we're
03:03going to start with a quick look back at
03:05the planning history and the
03:07environmental drivers behind the
03:09project. Some of you may have seen this
03:11information at previous meetings, but we
03:13want to provide a brief recap for those
03:14who may be new to the project. And for
03:17those who have been following along, a
03:18reminder of what led us here and why the
03:21project is moving forward. And from
03:23there, we'll provide an overview of the
03:25project and the proposed infrastructure
03:27improvements and touch on some of the
03:29common questions we've heard from
03:31residents as the project has moved
03:33through design. Then finally, we'll talk
03:36through the current project schedule and
03:38next steps before opening the floor for
03:40questions and discussion.
03:45So to start, I'd like to provide a
03:46little background on how we got to where
03:48we are today. The need for improved
03:51wastewater management in the Somerset
03:54area has been identified by the town for
03:56more than 20 years, driven by the
03:58environmental concerns associated with
04:00on-site septic systems. Somerset was
04:03first identified as a needs area
04:05recommended for sewer service back in
04:07the town's 2004 comprehensive wastewater
04:10management plan. Then following that
04:12report between 2004 and 2014, additional
04:15information became available through the
04:17Massachusetts Eststeraries projects or
04:20MEPs which evaluated water bodies across
04:23the Cape Islands and identified nitrogen
04:26as an important contributor to water
04:28quality impacts. Uh that information
04:31along with subsequent watershed planning
04:33helped inform the town's 2014 CWMP
04:37update which reaffirmed the need for
04:39sewer service in the Somerset area uh to
04:42help protect nearby water bodies and the
04:44groundwater in the area. So as you can
04:46see from the timeline, the town has
04:48continued to build on that work through
04:50additional wastewater planning,
04:52infrastructure improvements, and a more
04:54detailed evaluation of the Somerset
04:56area. moving from identifying the need
04:59to evaluating solutions and ultimately
05:02to advancing the sewer extension that is
05:04now in final design.
05:09And that brings us to the project
05:11drivers and why sewer is being proposed
05:13for Somerset. As discussed on the
05:15previous slide, Somerset was identified
05:17as an area recommended for sewer service
05:20through the town's wastewater planning
05:22documents. One of the factors considered
05:25was the soil conditions within the
05:27Somerset needs area. Much of the area
05:29consists of highly permeable sandy
05:32soils. And while these soils can
05:34accommodate septic systems, their high
05:36permeability means septic discharge can
05:39move through the soil relatively quickly
05:41and this provides less time for
05:42treatment before reaching the
05:43groundwater. So that creates a concern
05:46for the groundwater quality itself. But
05:49groundwater can also act as a pathway
05:51for nutrients and other contaminants in
05:53septic discharge to travel towards
05:55surrounding surface waters. So as shown
05:57on the maps here, the Somerset needs
06:00area is located within the Humik Pond
06:02and my pond watershed areas. Now,
06:05through the town's wastewater planning,
06:08including the MEP studies and the
06:11CWMPPS, nitrogen from on-site septic
06:14systems has been identified as an
06:16important concern for groundwater and
06:18surrounding water resources. So, while
06:21conventional septic systems are designed
06:23to treat waste water, they're not
06:24designed to adequately remove nitrogen
06:27in nitrogen sensitive areas. So also
06:29looking specifically at the Humm Pond
06:31watershed on the lower right. Something
06:34important to note is the Humm and Hum
06:37needs areas. These needs areas were also
06:40identified as areas recommended for
06:43sewer service in the town's 2014 CWMP
06:46update. and Somerset is an important
06:49first step because the infrastructure
06:51constructed through this project will
06:53ultimately be needed to convey future
06:55sewer flows from those areas as well
06:58into the town's collection system. So,
07:00taking all those factors together, the
07:02town's wastewater planning identified
07:04sewer as the most effective long-term
07:07approach for addressing the wastewater
07:09and environmental needs of the Somerset
07:11needs area.
07:16Uh so we've talked about some of the
07:17environmental drivers behind the
07:19project. This slide provides a little
07:21more context on what extending sewer
07:23service can mean for water quality in
07:24this area. So under existing conditions,
07:27septic systems discharge nutrients
07:30including nitrogen to the ground where
07:31they can enter the groundwater and
07:33ultimately make their way into
07:35surrounding water resources. uh too many
07:38nutrients in the water can lead to
07:39excessive algae growth and lower oxygen
07:42levels and also cause other water
07:44quality problems that can affect the
07:46health of the ponds. So one visible
07:48example is of harmful algo blooms or
07:51habs. The green material you can see
07:54along the shoreline in those photos from
07:56Hik Pond and my pond show the types of
08:00conditions that we're talking about.
08:01These blooms can degrade aquatic habitat
08:04and water quality and can also affect
08:06the recreational use of the ponds. Um so
08:10what changes with sewer? Instead of
08:12septic discharge continuing to enter the
08:14ground, instead waste water is collected
08:17and conveyed to the town treatment
08:19system. And this is removing any septic
08:21derived nutrient loading from the
08:23project area into the ponds and also
08:26addresses other contaminants found in
08:28septic discharge including PAS which has
08:31become an emerging issue uh
08:33pharmaceuticals and other emerging
08:35contaminants. So ultimately extending
08:37sewer service in this area helps reduce
08:39those inputs into groundwater and to
08:42surrounding surface waters uh with the
08:44long-term goal of protecting water
08:45quality and the ecosystems of hum and my
08:48comment ponds. So now that we've covered
08:51really the why behind the project, we're
08:53going to take a look at what's actually
08:55proposed for infrastructure.
08:57Uh this project began as a sewer
08:59extension project with the goal of
09:02providing municipal sewer service
09:04throughout the Somerset needs area. The
09:06figure on the left shows the overall
09:08area proposed to be served as part of
09:09the project. Uh the current design
09:11includes approximately 15,200 linear
09:15feet of gravity sewer which is shown in
09:17blue and approximately 9,500 linear feet
09:21of low pressure sewer which is shown in
09:23orange. The roadways proposed to receive
09:26each type of sewer service are also
09:27listed on the right side of the slide.
09:30And as design has progressed, we've
09:32continued to refine where gravity and
09:34low pressure sewer are proposed based on
09:36more detailed evaluation of the
09:38elevations and existing conditions
09:41throughout the project area. Uh in
09:43particular, at the end of Clara Drive,
09:46Henderson's Drive, and Doc Riders Drive,
09:48the homes sit at lower elevations
09:51relative to the proposed sewer. So at
09:53those locations, it's not feasible for
09:55those properties to connect by gravity.
09:58So those areas are now proposed to be
09:59served by low pressure sewer. And for
10:02anyone less familiar with the
10:03difference, whether a property is served
10:05by gravity or low pressure sewer is
10:07primarily driven by the existing
10:09topography and elevations throughout the
10:12project area. Where the elevations
10:14allow, flow can move naturally through
10:16the system by gravity. Um but in
10:19lowerlying areas providing gravity
10:21service would require the sewer
10:22throughout the entire project area to be
10:24installed at significant depths. So low
10:27pressure sewer is utilized to convey the
10:28flow instead.
10:30Uh we also know residents may have
10:32questions about what the proposed system
10:34means for their specific property
10:36including whether they would be served
10:37by gravity or low pressure sewer. And as
10:39the project advances toward
10:41construction, property owners will
10:42receive additional information about
10:44their individual connection point and
10:46the type of sewer service proposed for
10:48their property. So in the meantime, if
10:50you have any uh individual property
10:52specific questions, please reach out to
10:54the project team and we'd be happy to
10:56work through those with you.
11:01This figure just builds on the previous
11:03map and shows the proposed Somerset
11:05system and how it will connect into the
11:07town's existing sewer infrastructure. So
11:09flow from the entire Somerset needs area
11:12will be collected at the proposed pump
11:14station at the town owned property 77
11:17Bartlett Road and pumped through a new
11:19force main along Bartlett Road. And that
11:21force main will connect the existing
11:23sewer collection system near Surfside
11:25Road and from there flow will continue
11:27to the Surfside wastewater treatment
11:29facility for treatment.
11:35And as we've discussed, this project
11:36includes coordination across a number of
11:38town departments. And that coordination
11:41has created opportunities to address
11:43other infrastructure needs while the
11:44sewer work is being completed. So as
11:47part of the current design,
11:48approximately 7,000 linear feet of new
11:50water mane is proposed within the
11:52Somerset needs area, which is shown in
11:55blue on this figure. The water man is
11:57proposed on all streets within the
11:59project area that do not currently have
12:02town water service and allowing those
12:05improvements to be coordinated with the
12:07sewer construction.
12:09Just want to point out one update to the
12:11water man layout since our last public
12:13meeting. At that time we showed the
12:15proposed water man on high brush path
12:18terminating near a nine high brush path
12:20rather than continuing to the end of the
12:22culde-sac. Uh but based on further
12:24evaluation, the design is being revised
12:26to extend the water mane to the end of
12:28high brush path which is consistent with
12:30what had been originally proposed for
12:32the project.
12:38And in addition to the sewer and water
12:40improvements, the project also provides
12:43an opportunity to address roadway
12:45drainage and multi-use path improvements
12:47within the same corridor. So starting
12:50with the figure on the bottom left, uh
12:52new drainage infrastructure is proposed
12:55along Raceway Drive uh to help address
12:58existing drainage and flooding concerns.
13:00On this street, storm water will be
13:02collected and directed to a new
13:04infiltration system to improve storm
13:07water management in the area. Um this
13:10project also includes roadway
13:11improvements at the intersection of
13:13Forway Drive and Bartlett Road. uh the
13:16existing intersection has a very sharp
13:18turn. So the proposed realignment is
13:21proposed to soften that curve and
13:23improve the overall roadway
13:24configuration and safety through the
13:26intersection.
13:29We're also proposing improvements to the
13:32multi-use path network in the area. The
13:34existing sidewalk on Raceway Drive will
13:37be upgraded to a multi-use path and
13:40relocated to the opposite side of the
13:42roadway to improve connectivity and
13:44mitigate roadway crossings through the
13:46corridor. Uh on the top right, you can
13:49see the current preferred alignment for
13:51the new multi-use path along Somerset
13:53Lane. This path will provide a
13:56connection between existing Cisco and
13:58Bartlett road path networks. And the sum
14:01southern alignment is still preferred as
14:04the preferred alignment because it
14:05reduces impacts to the adjacent
14:07properties and allows the path to
14:10continue along Somerset Lane without
14:12requiring an additional roadway
14:14crossing.
14:15And as the rendering shown on the top
14:18left of the slide uh gives you an idea
14:20of what that proposed multi-use path
14:22will look like as you travel down
14:24Somerset Lane from Raceway Drive toward
14:27Hum Pond Road.
14:34So talked about the environmental and
14:36wastewater needs driving the project and
14:38what's included. Another important piece
14:40is funding and the state revolving fund
14:43provides a very favorable opportunity
14:45for the town to finance a project that's
14:47already moving forward to address those
14:49needs. The town pursued financing for
14:52the project through the clean uh water
14:54state revolving fund or CWSRF and has
14:58received eligibility for favorable
15:00financing through that program. An
15:03important step in maintaining that
15:04eligibility was appropriating the
15:07necessary project funds by June 30th,
15:092026, uh, which the town voted to
15:12approve at the 2026 annual town meeting.
15:15So, with that funding authorization in
15:17place, the town submitted a $35.6
15:20million application to the CWSRF in
15:23September, and Mass E's review is
15:26currently underway. And for context, the
15:29SRF program provides below market
15:31financing for eligible clean water
15:34projects. And specifically for Somerset,
15:36the town is eligible for 1.5% financing
15:40with the potential for that rate to be
15:42reduced to 0% based on the project's
15:45nutrient removal benefits. We are
15:47anticipating that the project will
15:49qualify for 0% financing, but we're
15:52still waiting to hear from Mass D on
15:54that determination.
15:57And the interest rate really does make a
15:58difference on a project of this size. As
16:01you can see here, financing at 1.5%
16:03would result in approximately 5.6
16:05million in interest over the life of the
16:08loan compared to 0% financing. And for
16:11context, the town has recently seen
16:13borrowing rates in the range of 4%. And
16:16at that rate, the same financing would
16:19result in approximately $16.2 million in
16:21interest. And of course, if the project
16:23ultimately qualifies for 0% financing
16:26through SRF, those interest costs would
16:28be eliminated altogether.
16:30There's one more important timing
16:32requirement to maintain eligibility for
16:34this funding cycle. Uh the project needs
16:37to be awarded for construction by June
16:3930th, 2027. That deadline is an
16:42important consideration as the town
16:43moves through final design and bidding.
16:50Looking ahead, we wanted to provide some
16:51context on what property owners can
16:53expect once sewer service becomes
16:55available in the area. So once sewer
16:58service is available, the town will
17:00provide notice to property owners and
17:02from that point, properties abuing the
17:04new sewer will have two years to
17:06connect. As part of the project, the
17:08town will provide a sewer service stub
17:10to the property line and property owners
17:13will be responsible for the costs
17:14connecting their home to that service as
17:17well as decommissioning their existing
17:19septic systems which will need to be
17:21decommissioned in accordance with health
17:23department requirements.
17:25There is a process for property owners
17:27to request a waiver from the board of
17:29health for this requirement. Those
17:31requests are reviewed on a case-by case
17:33basis.
17:38And next, we also wanted to provide some
17:39information on the cost property owners
17:42should expect when it comes time to
17:43connect. Uh the first is the sewer
17:46connection permit application fee, which
17:49is currently $4,000 per dwelling and is
17:51due with the required application to
17:53connect to sewer.
17:55Next is the sewer capacity fee. Uh for a
17:58home with three bedrooms or fewer, the
18:00minimum fee is currently approximately
18:03$6,700.
18:05For larger homes, that fee increases
18:07based on the number of bedrooms and
18:09anticipated wastewater flow for the
18:11property. And the third component is the
18:14private property connection itself. And
18:17that includes hiring an engineer and a
18:19contractor to design and install the
18:22sewer service from the dwelling to the
18:24connection stub provided at the property
18:26line, as well as properly
18:28decommissioning the existing septic
18:30system. The cost of that private
18:32connection will vary depending on the
18:34individual property. Uh things like
18:37distance to the house from the house to
18:38the connection point, whether the
18:41property is served by gravity, low
18:43pressure sewer, existing site
18:45conditions, and the amount of
18:46restoration required will all factor
18:48into that cost. And since all these
18:50factors can vary from property to
18:52property and actual connections are
18:55still approximately 2 and 1 half to 3
18:57years away, it's difficult to provide
18:59one estimated construction cost that
19:02would accurately represent what every
19:04property owner should expect.
19:07Another thing to note is the original
19:09article 15 presented at the 2026 annual
19:13town meeting included the ability to
19:15recover up to 25% of the project cost
19:19through betterments to project area
19:20properties. Uh based on estimates at the
19:23time that could have resulted in a
19:25betterment of roughly 20,000 to $25,000
19:28per property in addition to the
19:30connection costs we just discussed. But
19:32at town meeting that betterment language
19:33was removed from the article. So
19:35property owners will not be assessed
19:37that additional project betterment as
19:39part of the Somerset project.
19:46And uh we recognize that even without a
19:47betterment connecting to a sewer to
19:49sewer represents a significant expense
19:51for homeowners. So there are some
19:53options available to help spread certain
19:55costs over time. Uh for the sewer
19:57connection permit application fee, this
19:59is due in full at the time of applying.
20:03For the sewer capacity fee, property
20:05owners have the option to pay the fee in
20:07full upfront or spread the cost out over
20:10time through a voluntary sewer lean
20:12agreement. Under that option, the
20:14property owner is required to pay a
20:16minimum of 10% of the sewer capacity fee
20:19up front along with applicable recording
20:21fees. The voluntary sewer lean agreement
20:25is recorded at the registry of deeds and
20:27the remaining balance is added to the
20:29property tax bill and paid in
20:32installments with a 4.414
20:35interest over a period of up to 20
20:37years.
20:39Lastly, for the private property
20:41connection costs, there's also a septic
20:44management or title 5 loan program
20:47available through the Nucket Health
20:49Department subject to available funding
20:51for eligible costs. The current terms
20:53are 2% interest over 20 years.
21:00And we talked a little earlier about why
21:02topography in some areas requires low
21:04pressure sewer. So we wanted to provide
21:06a little more context on the grinder
21:07pumps that go along with those systems.
21:10In some of the lowerlying areas, homes
21:12uh can't simply feasibly connect to
21:14gravity by gravity without requiring the
21:17sewer to be installed at significant
21:19depths. So in um some cases there will
21:23be connection to low pressure sewer when
21:24low pressure sewer is fronting your
21:26property and then in some limited cases
21:29an individual property along a gravity
21:32sewer may still require a grinder pump
21:34if the elevation of the home doesn't
21:36allow for a feasible gravity connection
21:38or if the home is is too far from the
21:40sewer. Uh so for those properties, an
21:43individual grinder pump would be needed
21:45to collect flow from the home and pump
21:47it into the sewer in the roadway. Uh
21:50similar to how projects have been
21:52completed in the past, the town
21:54anticipates pre- purchasing the approved
21:56grinder pump units and selling them to
21:58the homeowner.
22:00We've also had some questions about pump
22:02reliability and what happens during a
22:04power outage. Uh the pump does require
22:07power to operate, but the tank provides
22:09approximately 150 gallons or roughly 48
22:13hours of storage depending on household
22:16water use. Uh there's also been a very
22:19limited number of failures um reported
22:22with existing grinder pump installations
22:24on Nucket. And proper use is really a
22:27very important part of keeping the pumps
22:29operating reliably. So as the graphic on
22:31the right shows, only toilet paper
22:33should be flushed. uh wipes, even
22:36flushable wipes, sanitary products,
22:38other materials can cause problems with
22:41the pumps. So being mindful of what goes
22:43into the system is really important.
22:45And also more detailed information on
22:47the equipment, operation, maintenance of
22:51the pumps will be provided to property
22:53owners before they're required to
22:55connect.
22:59And now looking ahead, this slide shows
23:01where we are now and the major
23:03milestones between today and completion
23:05of the project. One important point is
23:08that the schedule is also tied to the
23:10SRF process. So before the project can
23:12move into bidding and ultimately
23:14construction, the town will need the
23:16applicable permissions and approvals
23:18from Mass D to advertise the project and
23:21award the construction contract. So the
23:23schedule shown here assumes these
23:26approvals will be received within the
23:27anticipated time frames. Currently final
23:30designs ongoing with the current
23:32schedule for final contract documents to
23:35be ready for bidding in February of
23:372027.
23:38From there we anticipate approximately 2
23:40to 3 months for bidding uh with
23:42construction beginning in the spring or
23:44summer of 2027.
23:47Construction is expected to take
23:48approximately two years, bringing us to
23:51an anticipated project completion in
23:53spring of 2029.
23:55And another important point to note is
23:57that roadway construction will not occur
23:59during the summer months. So while the
24:00overall construction period is
24:02anticipated to extend over the two
24:03years, work within the roadways will be
24:05scheduled around those summer
24:07restrictions.
24:12And before we close, we want to
24:13encourage everyone to stay connected as
24:15the project moves forward. Uh the
24:17project website, which you can access
24:19using the URL or the QR code shown here,
24:23will continue to be the main source for
24:25project updates, schedules, meeting
24:28information, and other materials as they
24:30become available. You can also follow
24:32the town social media channels for
24:34project announcements and updates.
24:37We're anticipating another public
24:39meeting in late spring or summer of 2027
24:42which will be a pre-construction focused
24:44meeting. Uh by that meeting we will have
24:47the contractor on board and we'll be
24:49able to provide more detailed
24:51information on construction sequencing,
24:53anticipated roadway impacts and what
24:56residents can expect while work is
24:57underway. We will also have
24:59representatives from the contractor and
25:01the engineering team who will be working
25:03in the field available at that meeting.
25:05So residents will have an opportunity to
25:07ask more detailed questions about
25:09construction and how the work may affect
25:11their street. And of course, in the
25:12meantime, if you have any questions
25:14specific to your property, please
25:15continue to reach out to the town and
25:17the project team.
25:21And that brings us to the end of the
25:22presentation. I'll pause in case anyone
25:24from the project team has anything
25:26they'd like to add, but a thank you and
25:28we'll open it up for questions.
25:31I just want to start again. Anna, thank
25:33you so much for taking us through these
25:34slides. As a reminder, these slides as
25:36well as the ones that we've presented at
25:38all of our past public info sessions are
25:40available on the town project page on
25:43off of the website, excuse me, as well
25:46as other relevant project docs. A lot of
25:47the maps and aerials that you saw, we
25:49have that available. Uh and again, all
25:51of the past questions that have been
25:53asked during public info sessions or
25:55sent in to me or the project team are
25:57also there as well for your viewing. So
26:00with that, we will now open it up to
26:01questions. So what I'd like you to do if
26:04you would like to ask a question or
26:05provide feedback to the team, please
26:07raise your virtual hand. We'll call you
26:09out and unmute you and you can ask your
26:11question.
26:12Okay. So first we have Karen Alent
26:17and I see that I personally can't
26:18unmute. So Frank, from your standpoint,
26:20if you could unmute Karen, that'd be
26:22great.
26:27>> Hi. Can you hear me? Yes, we can. Go
26:29ahead, Karen.
26:30>> Great. So, I have some comments I'd like
26:32to share with everyone who's listening.
26:34Um, when the voters approved allocating
26:36money for this project at last town
26:38meeting, the project was being pushed
26:41for environmental reasons as you spoke
26:43today, but specifically it was being
26:45sold to the voters as necessary to bring
26:47back the health of my pond. However,
26:51voters were unaware that there was a
26:53scientific research study commissioned
26:55by the town to assess the pond and what
26:58would be necessary to bring it back to a
27:00healthy state. That study in summary
27:03clearly stated that the only options to
27:06prevent the cyanobacteria blooms have
27:09been narrowed down to dredging and
27:11inactivation.
27:12Dredging would represent the true
27:14restoration and is highly desirable.
27:17So with that in mind, the town sought to
27:20override um an override to allocate 4
27:22million for dredging in 2023 and it was
27:25approved. For whatever reason, they
27:28didn't move forward until this fall and
27:31then the dredging bid came in almost
27:32four times as much as was allocated at
27:3516.6. So they recently abandoned the
27:38dredging project that would actually
27:39have restored the pond to health.
27:42Bringing in sewer lines will not have an
27:44effect on pond restoration. There's not
27:46been any study confirming that septic le
27:49leakage is traveling anywhere near my
27:51pond. So on top of that, there's a large
27:54group of opposition to this project who
27:57would like to see it stopped and the
27:59remaining money out of the 44 million
28:01diverted towards dredging the ponds
28:03which would actually have a positive
28:05effect. And I just wanted to share that
28:07that that's ongoing right now.
28:20Karen, thank you for your comments. I do
28:21think that that is referencing a
28:22completely different study though, but I
28:24do appreciate the feedback in the
28:26comments. We'll now move to Ed Sanford.
28:34>> Uh yeah, hi. Um I uh I'm got a little
28:37bit of confusion. Kevin, you know, we
28:39emailed a little bit about the cost of
28:42to the individual homeowner, and I just
28:45looked at the email you sent me. You
28:47told me that the sewer capacity fee
28:50would be at a minimum $25,000
28:53uh for this project, and I just saw the
28:56slide that said 6,700.
28:58So, what what's the discrepancy?
29:02>> So, I do apologize for that. It was
29:04recalculated after I sent that email.
29:06And what was presented this evening is a
29:07more accurate um estimate for that size
29:10of house.
29:13>> Okay. Uh the the other thing that that
29:16you know I'm I'm I'm obviously not
29:19thrilled about this. I have a I live at
29:2112 doer drive. I moved into my house in
29:242017. I have a a septic system that was
29:27designed according to Richard Ray's most
29:30stringent septic regulations. as we all
29:33been told to believe that he created the
29:35toughest septic regulations in the
29:37Commonwealth of Massachusetts and was
29:39lauded for all his hard work. You know,
29:42clearly I uh installed my system
29:46obviously to to to those current septic
29:49regulations. I maintain I maintain the
29:52system and and now I'm being told that I
29:55have to abandon it. I'm being forced to
29:57abandon it probably to a at a cost uh
30:01somewhere on top of the sewer capacity
30:03fee. So, it's at about $11,000
30:07for the uh the fees to the town. You're
30:10probably adding anywhere I would say a
30:13minimum of $50,000 for a homeowner to to
30:16do this connection. Uh and that that is
30:19maybe a simple installation. And I spoke
30:22to a civil engineer who said that most
30:25of of the properties will have to
30:27replace their septic tanks to install a
30:31tank that has a lowflow uh uh ejector
30:35pumpout system in order to get the waste
30:37to the to the town sewer line. Uh so so
30:41the long story short is for for the 400
30:43some odd property owners in this area,
30:46they're they're being forced to to come
30:48up with millions and millions of dollars
30:51to comply with this with this new
30:53regulation. And to to Karen's point, I
30:57think it's it's it's imperative that the
31:00town stop I I feel like that this
31:02environmental stuff is just sort of
31:03platitudes. Oh yeah, we're we're we're
31:06going to improve the health of my comet
31:08pond, but where are the studies? Where
31:10is the specific information that says
31:13specifically my septic system, which is
31:16over a half a mile away from my pond, is
31:19is causing nitrogen
31:22nutrient lo, whatever it is, nitrogen
31:25nutrient lo overloading in the pond. I I
31:28I don't know if the town's ever done
31:29anything like that. Have they ever
31:31tested any of the the wells in the area
31:33to see see what the groundwater the
31:35nitrogen the nitrogen levels in the
31:38groundwater are at the and the plenty of
31:40people have wells in this area? I have
31:43an irrigation well. Has any study been
31:46done in that regard. Uh I just it just
31:49seems like this is just uh it's it's a
31:53huge expense for for the neighborhood.
31:55It's going to it's going to cause a
31:57significant
31:59uh change to the makeup of the
32:00neighborhood because the people that can
32:02least afford this are year- round
32:05families uh may maybe who are retired.
32:08This is a very old year-round area. It
32:11was developed in the late 70s and early
32:1380s. So, you've got families that have
32:16been out there for 30 or 40 years. they
32:19they probably are at the end of their
32:20economic livelihoods and you're sort of
32:24saying, well, too bad. You know, you got
32:26to cough up 50, 60, 75,000 bucks. That's
32:29just the way it is to to to in theory,
32:32you know, save my comet pond. So, I I
32:36think before you go much further, you
32:38really need to come clear with the
32:40residents and in the island community
32:42that this is going to work, that my
32:44comet pond is going to be infinitely
32:46better. uh and that and that you know
32:49our our hard hard-earned and money that
32:53we're spending uh not to our uh our
32:57liking is uh is doing the job and I I
33:00don't frankly
33:02think that that's going to be the case.
33:04Uh last thing I'll say and then I'll
33:05shut up is that what this will also do
33:07is is open up this this is a very
33:10desirable area now as you as we all know
33:13uh the properties have sold in this in
33:15this sewer district area for 78 million
33:19property just closed on the dirt road
33:22portion of Somerset Lane for 7.5
33:24million. Uh a property on a uh in the
33:28Austin farm subdivision sold for over 8
33:30million. There's a fairly substantial uh
33:34uh spec build that's going on on
33:36Somerset Lane that'll probably be listed
33:38in the 8 8 figure range. So, it's a
33:40hugely popular seasonal area. And by
33:44eliminating board of health regulations
33:46and septic capacity issues which are
33:49currently in place, you're you're really
33:52opening up this whole area for
33:53significant seasonal home uh development
33:58which will just end up, you know,
34:01pushing pushing the year round residents
34:03who have been there for for decades.
34:05They're just going to have to leave. And
34:07I think that's really unfortunate. and
34:09and and then that result really how
34:11environmentally appropriate is it in the
34:14end run when you open up this huge area
34:16huge very very uh attractive area to
34:20seasonal residents to make it easier to
34:22to expand and to develop their
34:24properties. So thank you
34:29thank you Mr. Sanford
34:32>> Amy Eldridge.
34:36Hi. Um Amy Eldridge. I do not live in
34:40the area. I am a community member. Um my
34:44question is
34:46if they're worried about nitrogen
34:48loading into the pond, why are not the
34:51properties on the dirt part of West Mia
34:55and my Comet Road who are closer to the
34:58ponds?
35:00Why is that not included
35:03in this project? because I would think
35:05their septics are more susceptible to
35:07the nitrogen loading than the people
35:09that are living up on Somerset
35:12and uh High Brush Path and Austin Farm
35:14area. Um,
35:17I I understand that there are people who
35:19have failed septics in that area. And I
35:22understand there are people who, and I
35:25have friends who have just put in a
35:27$60,000
35:29um septic in a brand new house, and
35:34you know, you're supposed to be getting,
35:35you know, 20 to 30 years out of your
35:37septic. And now they're going to be
35:39forced to pay
35:41all this crazy money. Yes, I get there's
35:44variances with the health department and
35:45you can go to in front of the board of
35:47health and get pushed back a couple of
35:50years, but that's only going to go so
35:52far. And you're asking people that are
35:53going to be out of pocket way more than
35:56just the tie-in rate with the town.
35:59They're going to have to abandon, fill,
36:01remove septics on septics they just paid
36:04for it. It [snorts] I understand the
36:07need, but I also understand that you
36:10still have a lot of yearround
36:14year-round residents that live in this
36:15area, some on fixed incomes that aren't
36:19going to be able to afford this, whether
36:20there's an abetment or a 0% interest
36:23loan. Um, I just think that that this is
36:27um needs to get tabled and and and
36:30further study like Karen had mentioned
36:32because I'm not 100% convinced that the
36:35houses in this area are the culprits of
36:39the ponds.
36:41Thank you.
36:46Thank you, Amy. Drew.
36:52>> Yeah. Hi, everybody. Can you hear me?
36:53>> Yes, we can.
36:54>> All right. Thanks. Um, I I just wanted
36:56to touch on a couple things that I think
36:58Amy and Ed Sanford had brought up. Um,
37:02and and there was a lot, so I'm going to
37:03do my best to just cover a couple of
37:05them. Uh, for those that don't know me,
37:06I'm Drew Padin. the director of public
37:08works, formerly uh wastewater engineer
37:11myself. Um I think and and I'm not going
37:14to do these in order, but I'll try my
37:16best. So um as far as has the town done
37:18any studies, yes, the 2014 CWMP is
37:22available on the town's website. If you
37:23go to the sewer department page on the
37:25left, you click sewer archives and um
37:31under there you can click on
37:32comprehensive wastewater management plan
37:33and there's a ton of documents in there
37:35and I suggest that people take a look at
37:37those. Um something Anna touched on in
37:39the presentation is certainly not only
37:41is is groundwater quality in in this
37:44area and because of the properties in
37:46this area important, but this area is
37:49critical to extend sewers beyond that to
37:51Humuck North and Humuck South. So sure,
37:53this extension is not a magic bullet. It
37:55doesn't solve all of our groundwater
37:57surface water uh quality issues. Um but
38:00it is a step in the right direction as
38:02was you know taking 7 purchasing 77
38:05Bartlett for the pump station as was
38:07upgrading the Surfside sewer pump
38:09station at the corner of Windy Way and
38:11Surfside Road. I think additionally I
38:13I'd like to try to get ahead of a little
38:15bit of a misconception that we seem to
38:17hear at every one of these public
38:19meetings. I have a quote unquote
38:20perfectly good septic system. Sewer
38:23service
38:25removes 100% of, as Anna said,
38:28nutrients, dyes, detergents, uh, PAS,
38:33other things from your groundwater where
38:35if you're not on town water, uh, you're
38:38getting your the water that you drink
38:40and that you use to cook from from
38:43beneath your home, you know, beneath
38:45your property. Um,
38:47a perfectly good septic system does not
38:50remove the overwhelming majority or
38:53nearly any of that. Um, so, you know, we
38:56we certainly understand that there is a
38:58cost. Do not get me wrong. We we we
39:01understand that very much. Um, as far as
39:03what it'll cost for an individual
39:05property to connect, again, as Anna
39:07mentioned in the presentation, all
39:09properties differ. Um I think about I
39:12don't know if we have a number about how
39:13many properties would be serviced by
39:15gravity and how many would be let by low
39:16pressure. Um but it's your distance from
39:18the street. It's a lot of different
39:20factors that ultimately um you know we
39:23we can't put a number on. Um you know
39:26certainly at this time for for every
39:27individual property. Um
39:30I uh I I think there's a lot of
39:32additional secondary benefit to this
39:34project. Uh, as the DPW director, I've
39:38kind of struggled for the last three
39:39years while working for the town to
39:40understand what is the plan for Somerset
39:43Lane, for example, extending a a a bike
39:46path, repaving that road, which is
39:48obviously in in undeniably poor
39:50condition. Um, but we certainly wouldn't
39:52want to make these improvements and then
39:53dig them up and and disturb, you know,
39:56that that investment. Um, and so I I
39:59think the timing of this is is kind of
40:00critically important for a number of
40:02different reasons. Um, so anyways, I
40:04just I just wanted to respond to a
40:05couple of things that that have come up.
40:07So, thank you.
40:12>> Thanks, Drew. Dan, you have your hand
40:14up. Go ahead.
40:15>> Yeah. Um, I just want to answer I think
40:17it was um Amy asked the question. Um, my
40:20com the my pan needs area is a future
40:23needs area identified the CWMP.
40:25So, that project is coming down the
40:27road. Um, the town can't do all seven
40:31needs areas all at once. So they have
40:33to, you know, schedule the work out. So
40:36right now, Somerset was identified so
40:38that Humm North and Humm South can get
40:40done to help help with the the Humm Pond
40:43area. And then we'll follow up at a
40:45future date doing more work over at my
40:48um around my pond and the my needs area.
40:52So it is coming down the road at some
40:54point. It's just not not everything can
40:56happen at once.
41:01Thanks, Dan. Okay, next we have Jean
41:04Fonts.
41:06Jean, go ahead.
41:11>> I don't know if you can hear me or not.
41:12Hi, I'm Jean Fones. Um I my my question
41:15is is I'm in a low pressure area and I
41:18don't understand why um having to get to
41:21Human North and South
41:23areas has to include area the areas on
41:26the outskirts of Somerset Road and um
41:30this project here has 440 houses
41:33according to it and o over a hundred of
41:35them are going to have to have grinder
41:38pump systems put in and I know you
41:40mentioned [clears throat] that not many
41:42of them failed but
41:44um from the word on the street is a lot
41:46of them do fail and um that's just I
41:51think unfair to um homeowners to force
41:54them into systems that are really not um
41:57great. And then the other question is is
41:59when they fail, do they back up into
42:00your house or do they back up onto the
42:03land? Cuz I know you said 150 gallons
42:04now um of excess water um time 48 hours
42:10if the power goes out. But I I'm
42:12probably one one of the unique people
42:13who has had a pump system before. Not a
42:15ground pump system, grind pump system,
42:18but a um graywater pump system for
42:20septic. And um [clears throat] it took
42:23us quite a while to figure out and
42:25definitely more than 48 hours to figure
42:27out the system wasn't working. And um so
42:29I just want to know where the waste goes
42:31once the system breaks since it's been a
42:33record of showing that they do.
42:36Thank you.
42:39I can handle that one for you. Anna, the
42:41um so the the grinder pump unit, it's
42:44not a new technology. It's been around
42:47for a very very long time. Used in
42:49numerous numerous communities anywhere
42:52around water bodies. Flow cannot happen
42:55by gravity. They have to be using
42:56grinder pumps. We've designed them back
42:59in the early 80s when I when I graduated
43:02back in the late 80s. They've been in
43:04place. So it's not a new technology.
43:07number one and they they are reliable.
43:10Most of the problems with grinder pumps
43:11are user related. Um when things get
43:14flushed down the toilet, a lot of grease
43:17goes down the toilet. I mean, you know,
43:19down your sink, it's going to plug up
43:21the pump. You know, people, you know,
43:23little kids may throw matchbox trucks
43:25that is going to damage the pump. But
43:27the pumps are do come with an alarm
43:28panel. So, when you do have a power
43:31outage, you will have an alarm that goes
43:33off. when the the water level gets high,
43:35you do have an alarm that gets off goes
43:37off. So, you'll have an opportunity. I
43:40mean, if a lot of people have generators
43:42that put the power in their homes, uh I
43:45believe a lot of folks on Ant probably
43:47have those with with power outages. Um
43:51if not, you know, you do have like Anna
43:53was saying, 40 hours of time. You know,
43:56when we lose power up, I'm up in New
43:58Hampshire. You know, we don't take
44:01showers, hot showers. We don't do
44:03dishes. you don't do laundry, you you ve
44:06very limited amount of water gets used
44:07during those periods of time.
44:10Um so you know we will provide more
44:12information as we get closer and more
44:15information on operation and maintenance
44:18how to maintain and operate the grinder
44:19pumps as the time as we get closer to
44:22construction.
44:26>> Thank you Dan.
44:28Does anyone else have any other
44:29questions or comments for the project
44:31team?
44:35Okay. Karen Alance.
44:39>> Hi. Um, I just wanted to comment about
44:42the studies because I have gone on the
44:44board of health website. I have read
44:47every single study that was referred to
44:49and the [clears throat] one that not the
44:522014 but the one that is specific to
44:55restoration of the ponds was from 2017.
44:59It was a joint commissioning from the
45:01town of Nantucket, the land and water
45:04council and the pond coalition
45:06coalition. And this specifically said
45:10that the um septic ch moving over to
45:13septic lines is not going to have an
45:15effect on restoring the pond. The only
45:18thing that will work is dredging.
45:21Um, so and then the other thing is none
45:25of those studies have shown that septic
45:30runoff has reached the pond or even
45:33gotten close to it or they haven't shown
45:35anything where septic runoff has gone.
45:36What they have shown is where the
45:38groundwater flows and where the flow
45:40goes to the pond. But nothing was shown
45:43nothing is documented that anything from
45:46septic systems gets where they where it
45:49goes or groundwater. Thank you.
45:56>> Okay, I'll move to Brett Dean.
46:02>> Hey, can you hear me, Kevin?
46:04>> Yes, we can. Go right ahead.
46:05>> Thanks for uh taking my comment. At the
46:07risk of uh irritating my Somerset
46:10neighbors, I just want to tell you how
46:11much in favor of this project I am. I
46:15would be faced with very substantially
46:17higher costs should we not go ahead and
46:20do this. and and I know a number of my
46:21neighbors would be um as well. Um so I
46:25think you know once something like this
46:26passes th those that are in favor of it
46:29kind of go by the wayside and you hear
46:32more and more and I respect those that
46:33oppose it. But I just want to let you
46:36know that there's a lot of people in
46:38favor of it. I I never saw it as a
46:40simple proxy vote of saving the pond. I
46:44think this is a complicated area for
46:46septic. a lot of the locations or some
46:48of the locations in Somerset are um I I
46:51don't think it's as simple as saving uh
46:53the pond and I respect the varying
46:55opinions on the the studies. My question
46:57for you and I think you're hearing a
46:58little bit of it tonight uh your degree
47:01of confidence and do you have a degree
47:03of confidence at this standpoint that
47:06the existing appropriation will be
47:08sufficient to proceed with the projects?
47:11I I I think you may hear you'll be
47:13having some challenges if that's not the
47:14case. So, if you could give me any in
47:17any any information on that, I
47:18appreciate it and thank you for your
47:19time and for doing this.
47:23>> Yeah, thank you Brett. I don't want to
47:24speak for everybody on the project team,
47:25but I think we are confident in the
47:26current estimates that the appropriation
47:28that was passed is sufficient to cover
47:30the cost for this project.
47:34Drew, go ahead.
47:37Yeah, sorry to jump in. I was I was kind
47:40of just remembering some of the things
47:41that were brought up. Um, I know we
47:43don't have any representatives from the
47:45planning department here, but you know,
47:46we've heard, you know, on a number of
47:49occasions that there's concern about
47:51development and buildout and um, you
47:53know, just to reiterate, if this project
47:55goes out to bid in February, I think you
47:59know, construction maybe at the pump
48:00station maybe starting over the summer,
48:02working in the roadways probably not
48:04starting till the fall and we're looking
48:05at two and a half to three years. So I
48:08think we have somewhere between two to
48:09three town meetings to um two two or
48:14three opportunities at town meeting to
48:17address development concerns in the area
48:19for example. So, I know that um I think
48:21there's an an initiative from our
48:24planning department to reach out to a
48:25Butters in the neighborhood um or in in
48:28the area to kind of gauge uh concern
48:31interest uh in in addressing their
48:34concerns and and coming up with ideas um
48:37well in advance because again, you know,
48:39it's going to be I would say at least 3
48:41years before people are expected to
48:43start to connect. Oh, and it looks like
48:44Megan is here, so I'll stop putting
48:46words in Megan's mouth. But um yeah, I I
48:50you know, the town definitely hears
48:51these things and and uh there's stuff in
48:53the works. But sorry, Megan, not to put
48:55you on the spot, but if you want to jump
48:56in, feel free.
48:57>> No, that's okay. That's why I'm here. Um
49:00so, we are going to be sending out a
49:04very very brief survey um to all
49:07affected property owners. Um that's
49:10going to be step one. So, the intent of
49:11that survey is to just let planning
49:14staff and the planning board know um the
49:16neighborhood's thoughts on existing
49:18development um potential future buildout
49:22so that we can gather more information
49:24on um whether or not zoning changes
49:27would be warranted in the future. Like
49:29Drew mentioned, there will be several
49:31town meeting cycles um for any changes,
49:34if necessary, to be put into place. So,
49:36it's not going to be a rush for this
49:39town meeting cycle. That said, um it's
49:42important to us to kind of get that line
49:44of communication started and just kind
49:46of see where um where everyone's at on
49:50future development.
49:57>> Thank you, Megan. Thank you, Drew.
49:58Sorry, I know you're in the attendee
50:00section, Megan, for most of this. I was
50:01able to finally push you over.
50:05Um all right. Any other questions uh for
50:07the project team? Miss FS,
50:12>> thank you and thank you for answering my
50:13questions and I understand um you know
50:16people think they don't use water during
50:18during blackouts or whatever, but um you
50:20didn't answer the question of where does
50:22the water go if it if that 150 gallon
50:24tank fells up. So I'd like to know where
50:26the raw sewage will go
50:29um
50:30from these pump systems because that's
50:32what I'll be on.
50:35Thank you.
50:43Dan, go ahead.
50:44>> Yeah, I mean I I don't know what the
50:46system what her pump system is going to
50:47look like once it's designed, but um I I
50:52don't imagine I mean I'm assuming if
50:53this alarm goes off that there's going
50:56to be, you know, the high water alarm
50:58that someone's going to come with a
51:00generator or a power source to pump that
51:03thing down. Um, so it doesn't go back up
51:06into your basement or into your home or
51:09onto the street. But if you have a
51:12basement service, yeah, it would end up
51:14toward in your basement if it
51:16overflowed. Just like if somebody's on a
51:18gravity line and their line breaks, it's
51:21going to back up into their the lowest
51:23fixture in their home. Um, if you happen
51:26to be on
51:28only a first floor level service above
51:30the street, I would have to look at how
51:32that was designed to figure out where
51:34it's going in overflow. But I would not
51:36if you, like I said, you're going to get
51:38an alarm and at that point, you know,
51:40you're going to call somebody to come
51:41out and they're going to have to pump it
51:43down for you. But again, I mean, I'm not
51:46sure how much water use people are going
51:49to do during a power outage, but
51:50typically there's not a lot other than
51:52flushing a toilet. All
52:02right. Does anyone else in the attendee
52:04section have any questions for the
52:05project team?
52:14Okay, seeing none, I want to take the
52:17time to thank everybody for attending
52:18this evening's public info session.
52:20Again, as a reminder, this session is
52:22being recorded and will be posted at the
52:24town's YouTube page for later viewing.
52:26And of course, if any questions come to
52:28mind uh after this evening session,
52:30please feel free to reach out to me
52:31directly and I'll get a response back to
52:33you as soon as we can. So, thank you
52:35again everybody for your time. We
52:36appreciate it. Have a good rest of your
52:38evening.
52:41And we can stop the recording now.
52:42crying, please.
52:50All right. Thank you everybody. I
52:53appreciate your time as always. Great
52:55job again.
52:57>> All right. Thanks everybody. Have a good
52:58night.
```*