  • Opening: All five members were present (Dawn E. Hill, Brooke Mohr, Jill Vieth, Matt Fee and Bob DeCosta). Erika Mooney said National Grid asked that two Somerset Road utility petitions on the agenda be continued.
  • Car rental medallions: The board gave final approval to the previously tentative car rental medallion allocations for two applicants, Grey Lady Jeeps and Compass Point Rentals (eight medallions in all, per a member's remarks), with an April 1, 2027 deadline for final license applications. The vote was 5-0. Discussion covered parking for the vehicles, airport kiosk space (which would trigger procurement), and peer-to-peer rentals such as Turo; applicants said they had removed or would not use their vehicles on Turo. A member said she remains committed to revisiting the bylaw, including the roughly 140 unused medallions out of the 700 cap and peer-to-peer rentals, separately from this action.
  • Theatre Workshop liquor license: The board approved an administrative change of the corporate name on its annual all-alcoholic-beverages on-premises license to Cedar Nantucket Inc., 4-0, with Ms. Mohr recused because the theatre is a tenant of a church where she is an officer.
  • Compliance policy: The board approved, 5-0, an administrative policy letting licensing staff issue written compliance warnings and set correction periods for minor liquor-license violations that pose no immediate threat to public health, safety or welfare. Alcohol-service, public-safety and similar violations still come to the board, and staff will report annually.
  • Sparks Avenue utility petitions: After the hearing had been continued three times, the board heard Verizon and National Grid petitions tied to a housing development on Sparks Avenue where poles 9 and 10 are to be removed. Town staff raised concerns about the school's fiber connection and town offices served from pole 9, a sewer force main in the sidewalk, sidewalk standards and the planned multi-use path. National Grid said its conduit must be kept separate from communications conduit and installed under an approved road-opening permit; the developer said the poles are old and leaning and that it will bear the cost of relocating town infrastructure and grant easements. Delays were said to hold up occupancy of subsidized units. Both petitions were approved unanimously, 5-0, on condition that the developer and utilities produce a coordinated survey-quality plan signed off by town staff (otherwise it returns to the board), the developer pays for any town infrastructure relocation, electrical service is routed across the developer's property where possible, any road work is done at night with a noise waiver if needed, and a neighboring business owner is kept informed.
  • Somerset Road petitions: The public hearings on the two National Grid Somerset Road petitions were continued to November 16 by 5-0 votes. The meeting then adjourned.

Issues Discussed

Agenda

Posted agenda: Monday, September 28, 2026, 11:00 AM; Remote participation via Zoom webinar.

  • Call to order, announcement of audio/video recording, and adjournment.
  • Request for Final Action on Car Rental Medallion Allocations (continued from July 20, 2026; August 17, 2026).
  • Request for Approval of Application for Change of Corporate Name for Annual All-Alcoholic Beverages General On-Premises Liquor License for Theatre Workshop of Nantucket, Inc. to Theatre Nantucket, Inc.
  • Request for Approval of Policy for Administrative Compliance Violations.
  • Public Hearing: Utility Petition from Verizon New England Inc., Plan No. 4A0XH3W, to install approx. 453' of 4" conduit on southerly shoulder of Sparks Avenue from Pole 8 to Pole 11; existing joint-owned poles 9 and 10 to be removed as part of project to accommodate new construction at 18-26 Sparks Avenue (continued from April 27, 2026; May 18, 2026; July 20, 2026).
  • Public Hearing: Utility Petition from Nantucket Electric Company/National Grid, Plan #31051086, to install approx. 520' of concrete encased conduits, 1 junction box (JB 11-5), 1 transformer and 2 handholes (HH 6-2, HH 6-3) on Sparks Avenue; existing joint-owned poles 9 and 10 to be removed as part of project to accommodate new construction at 18-26 Sparks Avenue.
  • Public Hearing: Utility Petition from Nantucket Electric Company/National Grid, Plan #30352439, to install approx. 1,056' of 2-3" conduit starting at existing vault near base of Pole 45 on Hummock Pond Road, down Somerset Lane, ending at existing junction MT1 on Somerset Lane (continued from March 16, 2026; April 27, 2026; May 18, 2026).
  • Public Hearing: Utility Petition from Nantucket Electric Company/National Grid, Plan #31106075, to install 2-3" conduit from existing junction MT1 on Somerset Lane for approx. 475' to property line of 31 Somerset Lane; and approx. 45' across Somerset Lane between property lines of 35 and 40 Somerset Lane (continued from March 16, 2026; April 27, 2026; May 18, 2026).

Sources

Video

Watch the video

Transcript

These are auto-generated captions; names and numbers may be misheard.

Transcript

00:00if they're coming on.

00:02>> Jill and I are here.

00:03Yes, okay, I see that now. Thank you.

00:18Well, I'll go ahead and call the

00:20September 28th

00:24I will go ahead and call the Select

00:25Board September 28th Licensing meeting

00:29to order at 11:00 a.m.

00:32Currently, there are three board members

00:34present. Let me just make sure everyone

00:35can hear me. Brooke Moore?

00:38>> Yep, I'm here.

00:39>> Jill Veith?

00:40>> Here.

00:41>> Okay, and then if anyone else comes on,

00:43we'll note that at that point. I'm

00:46sure that Bobby won't be here, but we

00:47might have Matt.

00:49>> He said that he is joining, so he should

00:51be on.

00:52>> Okay, well, the Select This meeting's

00:54being audio and video recorded.

00:57Um,

00:58>> [clears throat]

00:59>> there's no changes to the agenda that

01:00I'm aware of.

01:01>> Yes, there are.

01:03>> Oh, I'm sorry.

01:04>> So, we um

01:08National Grid has asked that you

01:10continue item

01:13uh Roman numeral four, items three and

01:16four regarding Somerset Road to your

01:19November meeting. So, when we get to

01:21those, we'll just need a motion.

01:23>> Okay, three and four.

01:24>> And I will note also that Bobby and Matt

01:27just joined.

01:28>> Oh, okay, great. Um, let me just make

01:30sure that they can both hear me. Um, Bob

01:33DeCosta?

01:34>> Yes.

01:35>> Matt See?

01:37>> Yes, I got you.

01:38>> Okay, great. We have everyone.

01:40All right, um with those two changes

01:43noted, um we'll deal with that when we

01:45get to three and four in terms of

01:46continuing, we will move to Licensing

01:48Departmental Requests. Number one,

01:51request for final action on car rental

01:53medallion allocations continued from

01:56both our July 20th and our August 17th

01:59meetings. Amy?

02:01>> Okay, thank you so much. Um so

02:05as as you mentioned it's a continuing

02:07discussion here

02:09and both

02:11applicants

02:12have

02:13submitted updated business plans as

02:16they're working through this. So a

02:17couple of things

02:19for our recommendation here. So you

02:21know, recommend obviously the usual

02:23review and ask questions of the

02:25applicants on the submitted updates of

02:27their business plans. You know,

02:28highlight any concerns or

02:30recommendations that you have for moving

02:32forward.

02:33But what I do recommend in in one of the

02:35applicants I quoted him here is to allow

02:38the company to continue developing their

02:41business plan and set a deadline as we

02:42mentioned

02:44in the initial meeting of by April 1st

02:46of 2027 to submit the final application

02:50for the agency license.

02:52The comment below which I think

02:54summarized what I agree with is that

02:57they appreciate having some extra time

02:58to organize, finalize details. They're

03:00just about all the way there now. It'd

03:02be helpful for the board to officially

03:04issue the medallions at this point to

03:06the extent they are inclined to do so as

03:08a lot of the steps we have to take on

03:10our side, insurance, investment, asset

03:12planning, etc. require we have the

03:14medallions in hand or confirmed and not

03:17provisionally awarded which is what I

03:18believe we have today. So I think that

03:20summarizes it and I agree with that as

03:23well. These things do take time. This is

03:25kind of a new process and they

03:28have done a lot of work both. I met, you

03:31know,

03:33with Jeff at one point too and had a

03:35long discussion. So it's in the process

03:37and I would appreciate that they do have

03:40that time

03:41to further explore that as well. So I'll

03:45leave it with that and see if the board

03:47has any questions of the applicants.

03:50Okay, um, board members?

03:55>> John, I have a question for Grey Lady

03:57Jeeps.

03:58>> Yes.

03:59>> Um, so, it it looks as though you've

04:02secured parking

04:05for four

04:06uh, four parking spaces at Amelia Drive.

04:09How will you manage parking all of the

04:11rental vehicles and staff parking?

04:14Um, it doesn't uh, feel like enough

04:17spaces if all vehicles were um,

04:21not out

04:23at any given point in time. I'm just

04:25curious about that.

04:28>> Uh, yes, can you hear me?

04:31>> Yes, go ahead.

04:33>> Okay, um, so, um,

04:35there are six available spots there, of

04:39which four of them um, were have

04:42secured. Um, if you look at the

04:45presentation, I just wanted to um,

04:47point out that um,

04:50that I have a proven track record of

04:52like 90% utilization and a lot of loyal

04:55customers, about 130 five-star reviews

04:57with 200 uh, customer base. And I also

05:01was able to chat with the um,

05:04Preston over at the airport and uh,

05:07allow exposure there, which should also

05:09increase the utilization. So, um,

05:12we have like five years of actual data

05:15that

05:16um, shows that the Jeeps are not sitting

05:18idle, that they are um,

05:21rented at a 90% utilization rate. So, we

05:24don't anticipate

05:26having the Jeeps parked there, but just

05:27in case

05:29you know, happens, we do have six spots

05:32that are available.

05:36>> Um,

05:37if [clears throat]

05:39if I may, so, um,

05:41I realize public parking is, you know,

05:44available on the street in a

05:46neighborhood with very limited parking,

05:47so I would be, you know, just concerned

05:49about consuming on-street parking spots.

05:52And then I think Amy's probably got her

05:54hand raised to talk about this situation

05:56with the airport. I'd love to hear more

05:58about that as well if from Amy.

06:00>> Yep. Go ahead, Amy.

06:02>> Great. Thank you.

06:03Um Erica forwarded, I think, to everyone

06:05today the um answer from Preston

06:08uh at the airport. I'll just read that

06:10uh quickly into the record. Um he said a

06:12little background on Grey Lady Jeeps

06:13that they had previously inquired about

06:15advertising at the airport. Um they've

06:17not heard back from them since the

06:18initial discussions. He also mentioned a

06:20potential kiosk location in the

06:22terminal. And what Preston says is if

06:24they decide to pursue the kiosk, that

06:27will likely trigger a procurement

06:28process, so we would not be able to

06:30simply offer space in the terminal

06:32without following the appropriate

06:33procurement requirements, which we've

06:35discussed before.

06:47>> Okay.

06:48>> Don, if I may.

06:49>> Yeah. Go ahead.

06:50>> Um so I think um obviously as we've just

06:54heard that advertising at the airport to

06:57um

06:58you know, increase utilization, fine,

07:01but you know, following up with that and

07:03if that's part of the plan and then um

07:06also they did not include anything about

07:09kiosk in this business plan. So I think

07:11that was probably

07:12left over from when we originally

07:15before we sussed out the kiosk situation

07:17and procurement. So I'm not concerned

07:19about that piece.

07:22>> Um Bobby,

07:23you had your hand up. Are you still

07:25there?

07:25>> Yeah. Yeah, I'm still here. Um my

07:27question is if we give you the

07:29medallions, are you still going to try

07:31to rent on Turo, or you just going to

07:33use the medallions only?

07:36>> So

07:38um can you hear me?

07:38>> I Yep. Go ahead.

07:39>> you.

07:40>> Um so I've already taken all my Jeeps

07:42off Turo and the plan is to just not use

07:45Turo. Just strictly um

07:47like legitimize the existing business.

07:51>> Thank you.

07:53Any follow-up?

07:56Okay, does anybody else have questions

07:57or comments?

07:59>> Uh

08:00>> Brooke?

08:02>> I just I would be interested to know

08:03whether legally whether we could put in

08:07um

08:08the licensure of

08:10uh

08:11what we would need to do for anyone that

08:13has a uh license to run a rental car

08:16agency that they agree not to use um

08:22the right share uh the uh car sharing

08:25apps. Whether we can do that legally,

08:26it's just a question for town council at

08:28some point down the road as we work

08:29through this process.

08:33>> And I would imagine you'd have to amend

08:35chapter 58 in order to do that.

08:39>> I mean, I I would just say on our

08:40behalf, we're happy to just make that

08:42commitment to the board. I'm not sure I

08:44mean, even if you don't have an

08:45enforcement mechanism per se, we're

08:47happy to make that commitment.

08:49>> Likewise. I just wanted to also add that

08:52um

08:52Turo in their agreement, if you do if if

08:56I had these medallions, it would be

08:57against it would be a violation with

08:59Turo to do anything outside. So

09:01um

09:02we're we're totally done with Turo.

09:04>> Okay. Thank you.

09:06Matt and then Bobby.

09:11>> You can Yeah, Bobby, go first. I'll go

09:13second. It's fine.

09:15>> Uh how do you attach

09:18I guess my question is how many vehicles

09:20do you have now that you're going to

09:21rent? And are these medallions attached

09:24to a license plate? How how are we to

09:26know that if we give you four medallions

09:28and you have eight Jeeps that you're not

09:29renting eight Jeeps

09:31even though you only have four

09:32medallions?

09:35>> Uh currently I have four Jeeps and

09:39um, I think it's

09:40according to chapter 58, it's a $300

09:44fine and I'm and I know the

09:46medallions get assigned to the

09:48registration.

09:50So, um, I would just have the four Jeeps

09:53with assigned

09:54registrations assigned to the um,

09:56medallions.

09:58>> Thank you. Matt?

10:00>> Yeah, no,

10:01as you all know, I've been uncomfortable

10:03from the beginning with a lot of this,

10:05you know, adding more and you know, up

10:07up in the This isn't up in the number,

10:09but the idea that we're up in the

10:10number,

10:11uh, I'm you know, I'm uncomfortable all

10:13the way around. So, if we're buying more

10:15time to look at the, uh, business plans

10:19will we also have more clarity on how

10:21we're going to handle, uh,

10:24all the various, you know, the 700

10:26licenses, 140 not used. Are we going to

10:29have clarity on how we're going to move

10:30forward with that?

10:32Because I, you know, I still believe

10:33Turo is illegal. They should not be

10:35doing that here and it's clear in our

10:38chapter 58 is clear to me on that. And

10:42you know, I would like to stay within

10:44the 700 and have some clarity on how

10:46we're going to do that.

10:49>> Okay, Amy.

10:51>> Um, thank you. So,

10:55I've already drafted

10:57a bylaw, yet another bylaw amendment and

11:01including peer-to-peer as a separate

11:03entity, but um, you know, I spoke with

11:06Chief Caswell about it. I still have to

11:07go through legal for some more questions

11:09on this. Um, and I've done a lot of work

11:13on this back and forth and as much as we

11:15think our current bylaw includes it,

11:18depends on which lawyer you talk to and

11:20what phrase that they're focusing on.

11:22So,

11:23technically and on the Hertz situation,

11:26we clearly their attorney had no idea

11:29what we're talking about that 140 are

11:32unused. And the way that that bylaw

11:35reads, it says that they have rights to

11:37it. So, we have to kind of go into what

11:39property rights and what type of you

11:41know, what their attorneys are going to

11:43pull out of that. So, it's a very

11:44complicated, it's not just a I believe

11:46it includes this situation. I do not

11:49want to walk the town into yet another

11:51lawsuit on this, so I'm trying to, you

11:53know, step-by-step

11:56kind of go into this. So, I need more I

11:58I did ask for time to present, but uh we

12:02believe we need to kind of talk to um

12:04our attorneys first about this.

12:08Um

12:11I I understand where you're going there,

12:13but Turo is not necessarily illegal, and

12:18we have to figure out

12:20what these legal terms mean, honestly.

12:23Um when it says non-expiring rights to

12:26the medallions, and it wasn't properly

12:30um the you needed to have you really

12:32should have done some regulations that

12:35regulated this bylaw. So, we're kind of

12:37in a really weird area here. So, I'll

12:40just finish by saying I've drafted all

12:44all these items already, but we just

12:45need to really be careful and got kind

12:47of go down how this works, and if we

12:50amend it

12:52giving time to the current agencies

12:53because they are valuing these

12:55medallions, right? I don't think we can

12:57just remove them.

12:59Uh if that makes sense. I'm trying to

13:01kind of be careful with what I'm saying,

13:02but we are

13:04doing our best to try to figure out

13:06legally

13:07um where this stands because also I

13:10don't believe the state is ready to go

13:12on a vote about peer-to-peer. 28 other

13:15states have separated the definition um

13:19from rental car agencies, but for some

13:21reason Massachusetts has other things on

13:23its mind. So, it's not inevitable that

13:26they're going for a vote. So, we may

13:28have to figure something out here. So,

13:30if I can just ask for Trust me, we're

13:32putting in a lot of time on this.

13:35Um I just want to make sure legally that

13:37we're in a sound position as to how we

13:39move forward. So, it it it's it's coming

13:43if I can just say that. Um

13:47Yeah, it's just complicated.

13:48>> up, Don. My my point is that's great, it

13:49buys us time. I I'd feel more

13:51comfortable if we knew how we were

13:53handling it. I you know, I know I know

13:56what my plain reading of it is. I know

13:58the argument that I think we should be

13:59making. You know, I know other people

14:01will make other arguments, but at some

14:04point, you know, and if there are things

14:06we should fix, we should fix them. But I

14:08think it's a mistake, you know, to open

14:11this up to more cars, you know, all in

14:13the airport in the old self-road area,

14:16an area that's already overwhelmed, and

14:18putting more cars all over the place on

14:20that side of the island after what we

14:23just experienced this past summer. You

14:25know, and when people are talking about,

14:27"Oh, we're going to be rented all the

14:29time." I look and go, "Well, that's not

14:30necessarily a good thing." You know,

14:32we're That's why we did 700 was to avoid

14:36that situation. You know, so I So,

14:39anyway, I just I think that we I want

14:41some I hope we have some clarity on how

14:43we're going to, you know, keep that

14:45you know, sort of that

14:47limitation in place or keep some sort of

14:50limitation in place because you know,

14:52and so anyway, you guys know how I feel.

14:54Thank you.

14:55>> Thanks, Matt. Jill?

14:58>> I just thought that the whole point was

15:00this person who was on Turo is now going

15:02to get medallions, so he's trying to

15:04cooperate with our local bylaw. So, I

15:06don't really understand the complaint

15:08about that.

15:10And if you don't want more traffic,

15:13then it seems like what um

15:17Jeff Smith was doing, he's going to

15:18deliver the cars. And he's he's actually

15:22trying to address that. I I assume

15:24um

15:25Nick will do the same. I I don't I I

15:28guess I just don't really see where

15:29you're going with that. I I understand

15:31your concern about Turo, but this is

15:32actually setting a good path for all the

15:35other

15:36Turo um renters to to become compliant

15:40with what we want, I thought.

15:45>> If if I can answer that, um my my point

15:48is

15:49it doesn't matter whether it's called

15:50Turo or something else. We we as a

15:52community limited the number of rental

15:54cars at 700.

15:56I you know, I want to I would like to

15:58keep that limitation in place. I don't

16:00want a backdoor where we add another

16:03150, 250, 350 cars, compliant or not.

16:07And I don't believe that you know, that

16:10delivering the cars is is making it less

16:13traffic. You know, I almost think it's

16:15making more traffic. You have to drive

16:17there and maybe you take a bike back or

16:19something, but you know, like I I almost

16:21think

16:22that that doesn't answer it in my mind.

16:24It's still double trips to get the car

16:26back picked up and get the car dropped

16:28off. You know, so I I just think that

16:31there's

16:32it's more of volume. We've got a we've

16:35got a math equation

16:37and I don't think adding more to the you

16:39know, to the to the

16:41bucket of you know, the 5-gallon bucket

16:43is going to you know, is going to make

16:45the bucket go down.

16:46It makes the water go up. So, that's you

16:48know, that's So, I'm not necessarily you

16:52know, and if the idea of this was to

16:54say, "Okay, Turo can you know, buy these

16:56140 over time and keep us at 700." If if

17:00we were doing something like that, I'd

17:01be all on board with it. But that's

17:03seemingly not what we're doing. So.

17:09>> Well, it's sort of what we're doing, but

17:11we're just starting with the eight.

17:12Brooke?

17:14>> Yeah, I think the two things are

17:16separate and I'm committed to the

17:18process of reevaluating

17:20the bylaw and making another attempt to

17:26um

17:27figure out what to do with the 140

17:29medallions or give or take that are

17:31unused um and addressing the

17:33peer-to-peer um situation, but I see

17:35that as as um in my mind separate from

17:38this process. So, I would make a motion

17:40to approve the allocation of um

17:44the medallions as um

17:48we have done tentatively to formalize

17:50that.

17:52>> Okay, is there a second?

17:54>> I'll second that.

17:55>> Okay, and Bob on the motion?

17:59>> Uh

18:01No, not on the motion, but I have a

18:04>> Question?

18:05>> Yeah, so

18:07>> I

18:08I I know I'm coming into this new

18:10because I missed the last meeting, but

18:12um

18:12this whole concept of delivering cars to

18:16to customers at the ferries um

18:21we I'd like to discuss that a little

18:23more because

18:25there as someone who spends a lot of

18:27time in Straight Wharf

18:29and the amount of traffic that goes in

18:31and out of Straight Wharf with the High

18:32Line and the amount of double and

18:34sometimes triple parking in the parking

18:36lots and literally cars that are sitting

18:39double parked in that parking lot for

18:40sometimes 20-30 minutes at a time and

18:43sometimes the cars the rental cars that

18:45I've seen delivered there are left with

18:47no one in them and if you're parked in

18:49front of one of those cars, you have to

18:51wait for the person who's coming to pick

18:53up the car or the person who's trying to

18:55find the person who's picked up the car

18:57because he's walked down to the ferry to

18:59find the person. It's if we're going to

19:01be starting to deliver cars and this is

19:03the idea now is we're going to we're

19:06going to emphasize that cars have to be

19:08delivered to boats, we need to come up

19:10with a central location

19:13whether it be the town lot or over by

19:15the NERA station or somewhere else just

19:17like we did with the tour buses where

19:19they can pick up these cars because it's

19:20it's getting out of control and if we're

19:22going to add another 150 medallions to

19:25be picked up for delivery vehicles

19:27they're going to be picked up at the

19:28ferries.

19:30The infrastructure just can't handle

19:32that so

19:34um

19:36that we need to we need to factor this

19:39into this because we're giving out what

19:41eight or 10 medallions here now to two

19:43two companies that have been running

19:45tour businesses. Well, there's probably

19:48another 100 people on the island that

19:49are running tour businesses. So, are we

19:51going to give another 100 medallions

19:53out? I mean, once we open up this

19:56once we open this up it's not going to

19:58stop. There's going to be everyone and

19:59their brother's going to be coming in

20:00asking for for more medallions. I mean,

20:03I

20:04we I I don't know maybe maybe y'all

20:06don't know but I know plenty of people

20:08that have a second vehicle that run it

20:09on tour. Um it's it's just the it's the

20:13way of the world now in Nantucket and

20:15and you know, I I don't know. So, I just

20:18I want to really talk about delivering

20:21vehicles to Straight Wharf in some

20:24aspect cuz this is um

20:27this is just going to compound the

20:28problem even more down there.

20:31>> Jeff Smith.

20:34>> Uh just wanted to address uh for Bobby

20:37um

20:38the only way that I would ever bring a

20:40car down to the wharf would be uh if I

20:42had a dedicated spot. I'm working with

20:44NIR right now. Uh the old tank farm has

20:48a little parking lot in it and uh those

20:51spots are for sale, for rent. So, there

20:54would be a dedicated spot I you know, if

20:57I'm going to bring the car down in July,

21:00I'm not going to

21:01uh take up a spot in the A&P parking lot

21:04because there isn't one and it would be

21:06a waste my time. So, just to let you

21:09know uh we're not going to be double

21:11parking if that

21:13is the case uh and delivery is

21:16delivery happens, which won't happen

21:18every time, there would be a dedicated

21:21rental spot down at the wharf that would

21:23be, you know, our company's.

21:26Um but I wouldn't have it any other way

21:27than that. Thank you.

21:30>> Thank you. Jill, did you still have

21:32something?

21:35>> I was just going to make the point to

21:36Bob. I mean, we can't really enforce

21:38what's going on in that lot anyway. So,

21:40I I hear what you're saying,

21:43but also I want to make the point that

21:44the people on Turo, if we think they're

21:46out of compliance or you all don't like

21:49the business that they have, whether

21:50it's legal or not, don't you want to

21:52legitimize them?

21:54Don't we want to bring them in the fold?

21:57Those are local people who are trying to

21:59have a little business here. I

22:01understand the complaint about Hertz and

22:02they're not using their medallions, and

22:03I guess, like Brooke said, that's a

22:05separate issue, but I just want to

22:07understand as a policy in the board,

22:10I would think we want to encourage the

22:11Turo folks to get a medallion.

22:16>> Erica?

22:19You're muted.

22:20>> Yeah. Sorry, just for the minutes, um

22:23under Compass Point Rentals, there's two

22:25people there, but I'm not sure the names

22:27of who's speaking.

22:29>> Uh Jeff Smith was the one who just

22:31spoke.

22:31>> the other one.

22:33Um the

22:33>> I am Daniel Daniel Walsh.

22:36>> You're Daniel.

22:37>> Daniel Walsh. And then uh with me is

22:39Patrick Tully as well.

22:41>> Thank you.

22:44>> You're welcome.

22:46>> Um

22:49yeah, I mean, on the

22:50on the delivering the cars, I would have

22:52a concern if they were being delivered

22:55and parked,

22:56but if they're being if they're picking

22:59up the customer at the ferry, I don't

23:01see it as a big difference than them

23:04getting a taxi or an Uber from the

23:06ferry.

23:07It seems like it would actually kind of

23:10save a trip if they did a straight pick

23:12up.

23:13>> [gasps]

23:13>> Um, but it is really all about vehicle

23:17trips rather than number of vehicles,

23:20but the right now we're really we're

23:22only talking about eight. So, um, I

23:26would like to move forward with the

23:27motion if no one else has anything.

23:32>> Did anyone second that motion by the

23:33way?

23:34>> Jill Fee, I did.

23:38>> Okay, um, I'm going to go to a vote

23:40then.

23:41Brooke Moore?

23:43>> I.

23:44>> Jill Veith?

23:44>> I.

23:45>> Matt Fee?

23:47>> Uh, I.

23:50>> Bob DeCosta?

23:51>> I.

23:52>> Kate Donahue, I. That carries

23:53unanimously. Five to zero.

23:56>> Okay, and to clarify, um, the motion was

24:00to

24:01um, approve the allocation of the

24:02medallions as previously stated, which

24:04was

24:06um, four for Compass

24:09Point and four

24:10>> Grey Lady.

24:11>> Grey Lady.

24:11>> Correct. Yes.

24:15>> And we will move forward.

24:18Okay, next up we have a request for an

24:20approval of an application for a change

24:22of corporate name for an annual all

24:24alcoholic beverages general on premise

24:26liquor license for Theatre Workshop.

24:29Um, Bethany Oliver, manager.

24:32>> Yes, thank thank you. This is just

24:35purely administrative, um, application.

24:37They're changing, uh, the corporate

24:39name, uh, owner of the license.

24:42Um, no other conditions are changing.

24:44They're changing to Cedar Nantucket Inc.

24:47So, administrative change and if I may,

24:49I'm going to take the moment to

24:51introduce, there she is, Kate Evans, um,

24:55who is now our new compliance officer

24:58who is I am training to be me and better

25:02than me and take over our compliance and

25:05a lot of the administration of this. So,

25:06you'll be seeing her

25:08more and more.

25:10So, we're we're thrilled to have it cuz

25:11with 111 of these guys, it's a lot of

25:14work. So, we appreciate her efforts so

25:16far and uh

25:18and she's going to be great. So, welcome

25:21Kate.

25:22>> [clears throat]

25:23>> Hi all. I'm Kate. Nice to meet you.

25:26>> Um

25:27>> John

25:28>> Yeah.

25:28>> John, I'm I'm actually going to recuse

25:30on this because the theater is a tenant

25:33of the Congregational Church where I'm

25:34an officer.

25:35>> Okay, Brooke. Thanks.

25:37>> Okay.

25:37>> Bobby

25:38>> some simple change there. Go ahead.

25:40>> Are we ready for a motion?

25:42>> Yes, please.

25:43>> Motion to approve.

25:44>> Second.

25:45>> Okay, made by Bobby, seconded by Matt.

25:47All those in favor, Jill Veith.

25:49>> I.

25:50>> Matt Fee.

25:51>> I.

25:51>> Bob DeCosta.

25:52>> I.

25:53>> Don Hill, I. That carries unanimously 4

25:55to 0 with Brooke Mar recused.

25:58Uh next up we have a request for an

26:00approval of a policy for administrative

26:02compliance violations.

26:05>> Thank you.

26:06Um so, Chief Casper and I worked on

26:09this, had discussed it with all the

26:11compliance uh that we've been working on

26:15and now with Kate here. So, this policy

26:17basically is an administrative policy to

26:20discuss administrative violations of

26:22liquor licenses and associated licenses

26:25to be managed by licensing staff without

26:27having to necessarily bring it to the

26:29select board um for a hearing.

26:33Um and just generally it authorizes our

26:35staff to address minor violations by

26:37issuing written compliance warning

26:39warnings, establishing reasonable

26:41correction period. Um

26:44things such as you know, not posting

26:46licenses as they they have to do,

26:48anything that does not present immediate

26:49threat to public health, safety, or

26:51welfare.

26:53Um it doesn't authorize us to resolve

26:55alleged violations using alcohol

26:56service, public safety, unlawful

26:58contact. Those will all be obviously

27:01elevated to the select board. This will

27:04also

27:05um

27:06be reported to you

27:08um at the very least at the annual

27:10renewal period to to show you kind of

27:12that if it tends to be something that's

27:14happening a lot with one licensee, then

27:16of course it will be brought up, but

27:17this is a way for us to manage these

27:19things

27:20uh in an administrative fashion. So, um

27:23we just wanted to put this policy forth

27:25um for that. Do any questions?

27:31Okay.

27:33>> Bobby has his hand raised.

27:36But Don, you're you're muted.

27:39>> Bobby, then Matt.

27:41>> Amy, um

27:43can you

27:44with this policy, would you be able to

27:46give people days off without having to

27:48come to our board?

27:49>> No, not at all. This is more of written

27:52warning type of things. Um you know,

27:55we're doing a lot of compliance checks.

27:56They don't have the staff list. They

27:57don't have the tips, you know, different

27:59things. They don't have the licenses

28:01um posted, but they have them issued.

28:04Nothing, it's administrative things that

28:06they need to be careful of because the

28:07ABCC will come in on those. Um just to

28:10give them, you know, you have a week to

28:11put these posted, things of that sort.

28:13Um we would never do anything that

28:15required a suspension of a license

28:17without the select board. That's purely

28:19your um purview. So, this is

28:22administrative to give us that

28:23opportunity to do that and help them

28:26come up into compliance without having

28:27to do a hearing.

28:30>> Thank you.

28:31>> Matt.

28:32>> Yeah, I think it makes a lot of sense.

28:34I'll move approval if people are ready.

28:37>> Okay. Second.

28:38Okay, made by Matt, seconded by Bob. All

28:41those in favor, Brookmore.

28:43>> I.

28:44>> Jill Deith.

28:45>> I.

28:47>> Matt Fee.

28:48>> I.

28:49>> Bob DeCosta.

28:50>> Aye.

28:51>> Dan Hill, aye. That carries unanimously

28:53five to zero.

28:54Thank you very much.

28:57Licensing and petitions public hearings.

29:00Uh number one, we will open a public

29:02hearing to consider a utility petition

29:05for Verizon.

29:07Um poles nine and 10, 18 to 26 Sparks

29:12Avenue. This has been continued three

29:15times.

29:17Um

29:17>> Madam Chair, if I may. Uh

29:20Robert Bystrowski. I Good morning. Um

29:22Bob Bystrowski, real estate specialist.

29:25Uh what what the board may want to

29:26consider doing is combining this hearing

29:29with number two, which is the

29:32>> really

29:33>> same project area for National Grid. We

29:36this is in the area of the former Downey

29:38Flake. There's a

29:40proposals for some pole removals, and we

29:43recognized early on the impact this

29:44could have not only on that area, but on

29:47our public school fiber optic service.

29:50So, we brought in Mike Alvarez, who's

29:53uh at the hearing today. And we you have

29:56online, select board members, uh

29:59representatives from National Grid, from

30:01Verizon. We also have Comcast, because

30:04they are on the pole as well. Um and you

30:06have some developer representatives. So,

30:08you have everybody

30:10that's important to hear from. There's a

30:12lot of departmental comments. You have

30:14your departments. Many uh several

30:17department heads are here, and Kevin

30:19Manuel, the project manager.

30:21>> Okay. I mean, I think mainly we were

30:24waiting to get a recommendation from you

30:26that this was ready to go pending all of

30:29the

30:31the

30:32complying with all of the comments.

30:34>> Certainly coming into the hearing,

30:37uh

30:38I have not been given assurances

30:39personally uh that everything's ready to

30:42go, but perhaps with the folks at the

30:45hearing today, uh both myself and and

30:48more importantly the select board could

30:50be given those assurances so you feel

30:51comfortable uh voting in support. There

30:54has been a lot of meetings and

30:55discussions behind the scenes. People

30:58have been putting a lot of work into

30:59this, and I know people are very eager

31:00to get this moving, but again, um I'll

31:04defer to Erica who has her hand up if

31:06she has more late-breaking information

31:09than I do.

31:10>> Um Erica. Oh, and just to note, we will

31:12have to take separate votes on these

31:14public hearings even though the

31:15discussion will be mainly on both.

31:19>> You said exactly what I was going to

31:20say. Um I will note one other thing.

31:22There is the town fiber, which is a

31:24question. Um one of my main concerns,

31:28too, was if we are allowing these poles

31:31to be taken down,

31:33um then there needs to be alternative

31:36infrastructure in place, either a

31:39junction box or a transfer, uh tran-

31:42What is it called? A um

31:46>> [gasps]

31:46>> Oh, God. Um

31:50Anyway.

31:50>> Hand hole. Hand hole.

31:52>> Hand holes.

31:53Um or a transformer.

31:58Um and so

31:59my personal biggest concern was as new

32:04sidewalks are being installed down here,

32:07um and it is my understanding

32:10as of today that the sidewalk area in

32:14front of this property all has to be

32:16built by the developer per their um

32:20special permit issued by the planning

32:22board,

32:23um and it needs to be done in

32:24consultation with the town, meaning the

32:27DPW.

32:28Um so it needs to be built to our specs,

32:31especially since we are currently

32:33undergoing design process for a new

32:37multi-use path from Surfside Road down

32:40to the Milestone Rotary. Um

32:43that anything that is now kind of put in

32:46the ground or on the ground

32:49per the removal of these two poles isn't

32:52going to take up space in the sidewalk

32:55and um

32:58impact

33:00people's ability to use it.

33:06>> So, Madam Chair, my my suggestion would

33:08be the best single person perhaps to

33:11kick us off would be Kevin Manuel who

33:13has been coordinating this with all the

33:16stakeholders.

33:17>> Okay, Kevin.

33:18>> Uh

33:19Madam Chair,

33:20my apologies. I'm actually not involved

33:22in this project.

33:23>> Oh, sorry.

33:24>> [laughter]

33:25>> Sorry, Kevin.

33:26All right, Drew Patnode.

33:28>> It it's Drew, Mike, and myself have been

33:31working with the utilities this summer.

33:33Um so, I'll defer to Drew.

33:37>> Hi, Drew.

33:38>> Thank you, Madam Chair. Yeah, I I mean,

33:40I think we have assurances from National

33:42Grid if they have a representative

33:43online to confirm it'd be helpful. I

33:44think we have assurances that the

33:46infrastructure that they need to install

33:49by removing the poles wouldn't impede

33:51the sidewalks.

33:53Um

33:54and not to turn this into a hot potato,

33:55but I think David Gray might be the best

33:57person to talk about it. Um

33:59the only plans I've seen are very

34:01limited in terms of the level of detail

34:04on the plans. And I think we have major

34:06concerns that when they bury these

34:08utilities under the road or under the

34:10sidewalk, they're going to end up being

34:11on top of

34:12or in very close proximity horizontally

34:15to town infrastructure.

34:17Um and so, I think, you know, we we're

34:19going to need a more detailed plan. I

34:21requested one I think last week and I

34:23still have not received one

34:25um

34:25there's just not enough detail on these

34:27plans for us to know that it's not going

34:28to get buried on top of a sewer main um

34:31or or too close to a water main for

34:33example, you know, to that would

34:34preclude the town from doing

34:36um

34:37maintenance or repair in the future.

34:41That's my biggest concern.

34:46>> Uh David and then Bob.

34:49>> Good morning everyone. Yeah, the town

34:50sewer main is under that sidewalk

34:52directly where they trying trying to put

34:54this. So,

34:55that's a a big issue for us as well as

34:59the force main that comes from the fire

35:01station is right near the other pole

35:03that I show on that little plan that's

35:07that's on the screen now.

35:12>> Okay, so what is the answer to this?

35:16>> Can I ask a quick question?

35:18What is the reason for burying the

35:20poles? Because I'm looking as I look

35:23Hold on Chris. As I drive down there and

35:26I see the two poles,

35:27they're not interfering with the

35:29buildings as they're being constructed.

35:31Is it aesthetics?

35:34I mean cuz right now you could connect

35:36power to the building that's been

35:38constructed by just burying off one of

35:40those poles.

35:44>> Uh Chris, do you want to answer that?

35:46>> Yeah, sure. Sure. Sure. So, it's it's a

35:48it's a numerous things here. Those poles

35:50are too it's they're way too close to

35:51the house.

35:53Um and you can see that when you drive

35:55down there right now. The house that's

35:56built already, the one building that's

35:57already built over there. It's just way

35:58too close.

35:59But to to address the the concerns that

36:02have been brought up, of course though

36:04they're not going to be impeding the the

36:05sewer lines. And of course, we're going

36:07to put these in the proper places so

36:09they're not going to impede with any

36:11utilities

36:12with the with the town or or anyone

36:15else. I mean that that's

36:16that goes without saying and I

36:18understand we got to put on the plan

36:19where it's going to be put away, but I

36:20think

36:21and I think the national grid guys and

36:22Verizon guys

36:24that's been addressed. I mean, clearly

36:26we're not going to have the you know,

36:27double double in that up over there, but

36:30you can't put these the the the the the

36:32the poles

36:33but too close to the homes. They're all

36:35one's almost hitting the house. They're

36:37leaning off. They're very old and it's a

36:38mess. And guys, believe me,

36:41it's it's I'm incurring the cost on

36:43this. It's a lot cheaper for me to keep

36:46those poles up.

36:47Way cheaper. It's a lot of money that

36:50I'm I'm incurring to do it, so

36:52I'm doing this for a lot of different

36:54reasons here.

36:55Um

36:56>> So, are you granting easements on your

36:57property for the utilities so that can

36:59go in there so it doesn't impact the

37:01>> Of course. Of course. Of course. Of

37:03course.

37:05Of course.

37:07>> Okay. Um Bob DeCosta.

37:10>> Um so

37:14I guess I have a lot of questions, too,

37:15about exactly where everything's going.

37:17I'd like to see a more detailed plan

37:19because I remember when

37:21the sewer main broke on Is it Beach

37:23Street, David? And the three cables were

37:26right over the top of it. So, you know,

37:28it's all good and well to say it's not

37:30going to impede in there, but there's a

37:31force main that comes across the fire

37:33department there that goes all the way

37:34to Surfside Treatment Plant. There's a

37:36sewer line that goes down that street. I

37:38would love to see these poles go away,

37:39too, and I don't have a problem with

37:41them going away. I just want to make

37:43sure that everything goes in the place

37:45it's going to go. And then my other

37:46concern is

37:48what's the time frame on this? Are we

37:50going to lose

37:51is is the IT department going to lose

37:55our communication between

37:58the police department and the school?

37:59Are they going to lose I mean, if

38:01they're going to do this work, are they

38:02going to try to plan it around summer

38:04time school vacation or at least at

38:06Christmas vacation or February vacation

38:09so that when when all this stuff

38:11happens, I mean, obviously you don't

38:12want to disconnect all the power and

38:14everything to that part of the island

38:16during the summer, but it'd be nice to

38:17try to do this

38:18in the time of year when

38:21um

38:22it's the least impact on the residences

38:24there and the school and our IT

38:27department. So,

38:29um

38:29>> Madam Chair, to answer Bobby's question,

38:32can either Chris or Kelly talk about

38:34their time frame cuz I know that they

38:36are anxious to get this done sooner

38:38rather than later so they can get power

38:40to the building that's already built.

38:42>> I guess the other [clears throat]

38:43question I have is how long is it going

38:44to take? Is this going to be a couple

38:46day project or a week long project?

38:48That's, you know, so. Cuz that road's

38:50going to have to be closed, right? To

38:51dig the trenches and stuff.

38:55>> We can't close the road.

38:57>> I don't think guys I I guys I don't

38:59think they're going to be closing roads

39:00here. There might be some detouring some

39:02stuff here here here and there. The

39:04answer to the question is with ASAP.

39:07The minute we get this approval,

39:09um you know, and and I and

39:11I understand about making sure that

39:13these

39:14um

39:16trenches whatever manholes whatever

39:17transformers going to be in place

39:19they're not going to encroach you know,

39:20the public utility which we're happy to

39:23make sure we have a plan that will show

39:24that

39:25uh so that that that's not become an

39:27issue, but it's it's ASAP. We have this

39:30has been postponed postponed postponed.

39:32I can't wait any longer. These utility

39:34companies

39:35it's it's now fall. This is the time to

39:38do this work when this island is not

39:41busy.

39:42And I can't give you what it's going to

39:44take National Grid to do it, but it it's

39:46mean I don't it's not going to impede in

39:48the no no communication off for long

39:51period of time. They'll they'll be

39:53um you know, temporary

39:56service implemented if this is if it's

39:58like, you know, longer than a day. I'm

39:59sure that that that these National Grid

40:01Verizon will

40:02accommodate that. They're not going to

40:03just cut off communication to the to the

40:05town police that I mean that's just

40:07crazy. I mean, so you know, that's all

40:10well and good concerns and I'm with you,

40:12but I think I can promise you that these

40:13things concerns will be addressed

40:15uh prior

40:17to any of that happening.

40:18>> I think thank you.

40:20Mike Alvarez.

40:23>> Uh, thank you, Madam Chair. Um, so, uh,

40:27in general, or rather, uh,

40:29town IT in general does not oppose the

40:31burying of the poles. However, and more

40:33importantly, pole nine very specifically

40:35also has a 4-in conduit pipe that

40:37connects over to 131 Pleasant Street

40:39that is part of our connection for not

40:41only helping human services, natural

40:44resources, but also the meeting trailers

40:45that are there that also then connects

40:47into for um, public safety's uh,

40:50connection into uh, that 131 Pleasant

40:53Street connection. The connection to the

40:55school is a backup redundant line. Um,

40:59they still use it. So, if there you

41:01know, obviously when there is downtime,

41:03it won't be a major um, component loss

41:06for the school. Um, so, so if it happens

41:09during the fall when school's in

41:10session, it's not as it's not as though

41:13the high school won't have internet or

41:14something like that. Um, but, uh, 131

41:18Pleasant, um, will, um, will in fact be

41:21down. And if when they're doing that

41:24burying, that connection carries through

41:27uh, 37 Washington, uh, the harbormaster

41:30building, and 16 Broad. So, that's

41:32downtown will be down when those lines

41:35are temporarily cut over and so on.

41:37Might just be a brief time, but just so

41:39people folks are aware, there will be a

41:42brief,

41:42uh, downtime no matter what. Um, one

41:45last thing to note is I have not seen

41:47any plans addressing the connection or

41:51uh, if we'll be in a conduit or anything

41:53like that for our lines. Um, I'm

41:56assuming those are in place, but just

41:58full disclosure, I have not seen

41:59anything.

42:00>> Okay, thank you. Chris Young.

42:06>> Hold on.

42:11Chris, you need to unmute.

42:14>> Hi, thanks. Can you guys hear me now?

42:16>> Yes.

42:16>> Okay, thank you. Um so, Madam Chair,

42:19through you, I just the question would

42:21be regarding loss of service if 16 and

42:2414 Sparks Ave would be impacted. Um

42:28what would be the length of time that's

42:30um you know, I appreciate what Bob was

42:31saying about the schools

42:33and [snorts] the town, but this is our

42:35place of business. Um so, I wanted to

42:36know what we should be expecting for um

42:40being out of service. Not only when is

42:42it going to happen, but how long will it

42:43take?

42:44>> Yeah. Um can anyone answer that now, or

42:47is that something that just um should be

42:49coordinated and keep Chris Young in the

42:51loop?

42:54>> Can I know one more thing? I just got a

42:56text from Charles at NCTV who said that

42:59NCTV's fiber uplink to Comcast for their

43:02cable channels also go through the old

43:04fire station as well.

43:07>> Okay.

43:10Um Bob DeCosta, then Brooke Moore.

43:13>> Can someone from the utilities tell me

43:16how long they think this work is going

43:17to take? Is it a day, 2 days, a week?

43:20>> Uh someone from Verizon has his hand up.

43:22>> Ross. And just so you know, Ross is from

43:25Verizon. We have Tim Lyford from

43:27National Grid, and we have Kev uh Jamie

43:29Monteiro, and

43:31um Richard Chisholm from Comcast.

43:36>> Yes, good morning. Russ Bilodeau

43:37representing Verizon New England.

43:40Um you know, I can't really speak for

43:41the other utilities,

43:43but I can say

43:46that any there will you know, there'll

43:48be a flick of a second where there's

43:51downtime

43:52from where our cable is spliced in

43:55to where the new cable is, you know, the

43:57old cable is removed, rather.

43:59Um

44:01as far as placing the conduit, I got a

44:04question for the developer here.

44:06It is my understanding that he was

44:07placing the conduit and the utilities

44:10were using it. And I'm sorry if that's

44:12incorrect information, that's what I was

44:14told.

44:15Um

44:16so I'm hoping they can answer that

44:18question. So, you know, I think it would

44:20be better, you know, if he does place

44:22that conduit, he can work around all

44:24those other utilities and you don't have

44:26people trying to work on top of each

44:27other. And that's,

44:29you know, suggestion, but

44:32>> Yeah, so

44:33yeah, to that, very quickly, guys,

44:36>> Yes.

44:36>> Uh yeah, I I spoke Yes, so Trevor

44:38Barrett, uh who's my utility

44:42job con- contractor here, has is the one

44:46with will be placing the conduit to for

44:48this exact reason that we were talked

44:50about as well, to move around all these

44:52different utilities. Uh so that there

44:54will there won't be any conflicts.

44:56>> Okay, great. Brooke?

45:00>> Um

45:02this is uh

45:03a

45:04a shining example of the challenges of

45:07undergrounding utilities for those in

45:09the community who think this is just

45:11something we {quote} {unquote} get done.

45:14Um I want to I want to remind everybody

45:16that there's an affordable housing

45:18element to this development as well. And

45:21that delays uh mean delays in in folks

45:24getting

45:25um into affordable units that that we've

45:29uh subsidized with uh town money. That

45:32isn't to say we shouldn't do this right,

45:33but I just want to have a placeholder

45:35for that element of this project. And um

45:39it seems to me

45:41that no one singularly seems to be

45:45responsible for delivering a schematic

45:48plan that shows where this will be

45:50relative to existing utilities. And I

45:54don't know

45:55um it

45:56That's a little frustrating to me

45:59uh that

46:00in this, you know, multi-utility

46:03circumstance, but Chris, if you're

46:05laying the conduit, that it should be

46:08really simple. If everybody's going in

46:10that conduit, then there should be a

46:12simple plan

46:14that lays out where that conduit's going

46:16relative to to existing infrastructure.

46:19And that

46:21um that should satisfy the concerns, you

46:24know, once once our folks, IT, um sewer,

46:29see the location depth

46:33of that conduit and its relative

46:36location to other existing municipal

46:39services.

46:40Um

46:41that that's sort of a missing element

46:44here. I don't know how we get there

46:45timely.

46:48>> Can I make one note?

46:50Sorry. And I would love for Tim Leyford

46:52to chime in because I don't think

46:55everything can go in one conduit. Um

46:59power has to be separated

47:01from other utilities. So, would love to

47:04hear from Tim about I mean, how many

47:07conduits are we actually talking about?

47:09And National Grid usually installs their

47:11own.

47:12Um we usually don't allow

47:14private contractors to install in the

47:17public right away unless it's all going

47:19on private property.

47:21>> Okay. Um Tim, did you want to address

47:23that?

47:26>> Yes, I can address that. Um can you hear

47:28me okay?

47:29>> Yes.

47:31>> So,

47:33that is correct. National Grid's

47:35conduits will be separate from Verizon.

47:38Our existing standards require a minimum

47:40of a foot

47:42um distance between communications

47:45conduits to be installed.

47:48Um

47:49we do allow private contractors to

47:52install conduits that we will own after

47:56the fact. Um, they just have to be

48:00able to open

48:02road opening permits with the town to do

48:04that and then they just get them

48:06inspected by our operations supervisors

48:09to make sure everything's being

48:10installed correctly.

48:12>> Yeah.

48:14>> Thank you.

48:15>> real quick. I have a question for Tim. I

48:17the the ongoing issue that's been

48:19brought up here about where they're

48:21going to

48:22Hello?

48:24Tim, are you there?

48:25>> Oh, go ahead.

48:26>> Oh, yeah, yeah. About where they're

48:28going to be located has not been

48:29addressed by you guys already. I I I

48:32assumed it was. That's why I'm a little

48:33confused hearing this from the group.

48:37>> The the existing plan that we have right

48:39now is to

48:41have those conduits and that duct bank

48:44to be installed

48:46in the edge of road. Um, but we are more

48:49than happy to work with the town to make

48:51sure nothing gets installed on top of

48:53other existing infrastructure.

48:57>> Okay. So, if we have to just have to

48:58make those adjustments, we can hopefully

49:00get an approval today pending the um the

49:04adjustments on the plan that won't over

49:06over supersede any issues with the

49:07utilities.

49:12Is that Is that correct saying that,

49:14Tim? We can do that?

49:15>> Absolutely, yeah.

49:17>> Okay. Okay, great. Great.

49:19>> Thank you. Um, Richard Chisholm?

49:23>> Hi, good morning.

49:25Um, just wanted to jump on. I know

49:26Verizon answered that question about the

49:28time services will be down. So,

49:31we typically target any sort of force

49:33relocation work for night cuts

49:36to avoid that customer impact. And our

49:39window that we target is between 2:00

49:41and 5:00 a.m.

49:43depending on the scope of the project.

49:44If it's a larger project, we target

49:46between 1:00 and 6:00 a.m. So, I know

49:48Jamie's in touch with the site more than

49:50I am.

49:51But, I just wanted to give you those

49:52time frames just because there was some

49:53questions about customer impact. So, we

49:56do a lot of audit work prior to. We do

49:57contact folks to let them know the work

49:59will be taking place and then we do we

50:01do everything in our power to do

50:03everything overnight uh with no

50:05spillover into normal business hours.

50:07So, well that's never a guarantee,

50:09um that's our target for sure.

50:11Uh and I know this area has been

50:13discussed a lot in our office and

50:15and um you know, like I said, Jamie's

50:17working hand in hand with the site on

50:18whatever's needed. So, I'm I'm confident

50:21you know, we can provide that or or hit

50:22those goals on our end. Um but just

50:25wanted to address the customer impact

50:27questions.

50:28>> Okay, thank you. Um are we going to need

50:31a noise bylaw waiver for that work?

50:33>> If they are cutting the if if they're

50:36using existing

50:41conduits that is being installed by

50:44>> Then that's probably not

50:45>> contractor.

50:46>> It would just be if they were cutting

50:48during the night.

50:49>> Yeah, so you would need

50:50pulling the wires.

50:52>> As far as No, we'll pull the wires

50:53during the day. So, whenever we do work

50:55like this,

50:55>> Are you doing the splicing?

50:56>> ahead of time, we do all the prep work.

50:58We get all the new wiring in place,

51:01uh any other hardware that's needed. And

51:03then once that midnight hour that 1:00

51:05hour hits, then we simply, you know, cut

51:08the old stuff, splice the new,

51:11and we we target having everybody back

51:13up and running by 6:00 a.m.

51:16So, as far as noise goes, it's just, you

51:18know, splicing vehicles on site with um

51:20hazards and police detail usually, but

51:22there's not a lot of noise generated by

51:24what we

51:25Yeah.

51:26>> So, they might be able to get away with

51:27just a a street blocking with detail.

51:30Okay, great.

51:31>> Usually, yeah, usually overnight work

51:33like that it's just a police detail.

51:34Yeah.

51:35>> Okay, thank you. Bob DeCastro.

51:38>> Um

51:40I just want to clarify something

51:42and I am more than happy to have Drew

51:46follow up on this, but

51:48the plan that I looked at shows the duct

51:51work or the conduit in the sidewalk.

51:54But, I just heard the Verizon

51:56representative say edge of road, and

51:59there's a big difference between

52:00sidewalk and edge of road.

52:02So, I want to make sure that

52:04I'm clear

52:06or the town is clear anyway that if we

52:08continue forward with this that

52:11the electrical conduit can go through

52:13the road. I know that the phone can, and

52:15I know what the Comcast can and all

52:17that, but is there some rule

52:20that says that the electricity has to be

52:23in a public way and not in the sidewalk?

52:26I just Cuz if we have to cut that road,

52:28that's that's a whole different animal

52:30than digging up the sidewalk.

52:33>> Well, again, the electricity can go

52:34through the developers' private

52:37property if they grant an easement.

52:40>> Yeah, but it's going all the way up to

52:42to Chris at at HouseFitters. It's not

52:45just his property. So, where is is it

52:47going to Is that conduit going to come

52:49back out and go into the into the

52:51sidewalk, or is it just going

52:54Is it going in the road? I I'd like

52:56clarification on that before we go

52:58forward.

53:00>> Okay.

53:01>> So, what's What's the the National Grid

53:03here to answer that?

53:06>> Yes, Tim is here.

53:08Or is he?

53:11Verizon has Ross has his hand up

53:14as well.

53:16>> So,

53:17if I may, um

53:19again, the plan right now for the

53:21electrical conduits is to be installed

53:25in the edge of road. Um there will be

53:28crossings

53:30on a couple sections of the sidewalk to

53:34to bring power

53:35onto private property

53:38both for new service and to refeed

53:42um existing existing equipment.

53:45But the majority will the majority of

53:47the duct bank is planned to be installed

53:50in the edge of road.

53:51>> So the road is going to be cut?

53:54>> That's correct.

53:54>> road. Yeah, see this is completely

53:56different.

53:57The developer is saying he's going to

53:59put it in the sidewalk. You're telling

54:00me we're going to cut that road. If we

54:02have to cut that road, that road's going

54:04to be shut down for a while. It's going

54:06to be a single lane at least. That's a

54:07busy busy road.

54:09So

54:11I can't go in the sidewalk.

54:14>> Can Can we go more on my property, Tim,

54:16opposed to the, you know, into the road?

54:19>> We can absolutely explore that option,

54:21yes.

54:23>> Okay. So that's

54:25that's a very doable situation, okay.

54:27>> I don't think we want it to go in the

54:28sidewalk because we don't want it on top

54:30of the sewer.

54:32Right.

54:34So we don't end up with another downtown

54:36issue where we go to repair a sewer and

54:38we can't get to it cuz there's electric

54:40on top of it.

54:41>> Well,

54:42the sewer main runs across that road,

54:44correct, David?

54:46The force main?

54:48>> It does, um,

54:50about in the center of that lot right by

54:52the, meeting trail, yes.

54:56>> So we're going across the sewer line

54:57regardless.

54:58>> There's two crossings there, yes.

55:00>> Yeah.

55:01I I just I'm trying to avoid having to

55:03cut that road if it's all possible. I'd

55:05rather see it Does the sewer line go

55:07down the sidewalk? Is that what we're

55:08talking about, David, for those

55:10properties?

55:11>> Yes, all the way from Nantucket Auto

55:12Body all the way to where it crosses,

55:14yes.

55:16>> Got you.

55:19It would be nice if we

55:21It would be nice if we

55:22>> only, uh,

55:24David, just on the sidewalk?

55:27>> It's just in the sidewalk where until it

55:29crosses over.

55:31>> Where'd it cross over?

55:34>> Just about in the center.

55:36I think in the center of your parcel.

55:38Can I share my

55:39>> So from my

55:40So from from the Tuckett Auto past

55:43Cummington to the middle of my property

55:45then it crosses over the street.

55:47>> Yes, and then there's the other crossing

55:49closer to um

55:51Chris said down at 1416.

55:53>> Okay. So there's plenty of space to to

55:56to make sure that we're in we know

55:57between my property

55:59East Mountain Road and everything else

56:01to to address these issues. Would you

56:02say that's accurate?

56:06>> And and your property next to the

56:08sidewalk?

56:09>> Yeah.

56:10>> Uh without physically going over there

56:12and looking, I can't I can't answer

56:14that.

56:15>> Yeah, sure. But there's there's there's

56:16plenty of space that we can address that

56:18we're not impeding on the sewer lines

56:20here.

56:21Let me ask Tim. Tim, would that Tim,

56:24would that be an an accurate statement?

56:27>> I would say that's an accurate

56:28statement. We have a lot of flexibility

56:31as to where exactly

56:33we can put this duct bank.

56:35>> Okay, good. So we can make the

56:36adjustments to address the town's needs

56:39without it without an issue, correct?

56:42>> I would say so, yes.

56:44>> Okay, good. That's good news.

56:45>> Is it going to be encased in concrete?

56:47>> Okay, guys, I got to take control of

56:49this meeting and I have so many hands up

56:51and people are just talking.

56:54Um Bob Bystrowski.

56:56>> Yes, Madam Chair, thank you. Another

56:59assurance that the Select Board will

57:01need uh when you are ready to move

57:04forward on a motion is that the cost of

57:07the relocation of any town

57:09infrastructure as described by Mike

57:12Alvarez will be borne by the developer.

57:14This is not a town project. It's a

57:16private project. There will be costs

57:19associated with relocating the town

57:22infrastructure conduit cables to splice.

57:25That presumes you're installing brand

57:27new cable.

57:28Um and that just I would think you would

57:31want that assurance.

57:33>> Okay.

57:35Drew?

57:36Patnode?

57:39>> Thank you, Madam Chair. Can I share my

57:40screen real quick? I was just going to

57:42try to help people understand where all

57:44the utilities are.

57:46Uh give me 1 second.

57:51Can you guys see my screen?

57:55>> There's nothing there yet.

57:56>> No.

57:56>> Oh, now we got it. Yeah.

57:58>> Okay. So, just to give everyone some

58:01bearings, here's the old fire station.

58:03This is a sewer manhole in the sidewalk.

58:05And David, I believe this is where it

58:07crosses the road, essentially under the

58:09vehicle that took this photo.

58:12And then this sewer line runs up the

58:13sidewalk

58:15past Cumberland Farms to this manhole

58:17that is literally in the curb line.

58:19So, the way I've thought of this is that

58:22the easiest thing to do is to bring any

58:24underground utilities out into the

58:26middle of this travel lane.

58:27The water main is on the opposite side

58:29of the road. You can actually see that

58:30some of the valving here along the other

58:32edge of the road. So, the middle of the

58:33road is kind of wide open.

58:35But, I I think at the end of the day we

58:38I don't want to speak for everybody. I

58:39just have concerns that

58:41we're talking very theoretically about

58:43we can avoid this and we can do that. I

58:44don't know why this is not on a

58:46survey-quality plan that shows where

58:48existing utilities are and where the

58:50proposed infrastructure is so we can

58:52review it.

58:53I I think that that kind of needs to be

58:55the ask.

58:56>> Okay.

58:57Thank you.

58:59Brooke?

58:59>> Trying to figure out how to stop sharing

59:01my screen. Sorry.

59:02>> That is exactly where I was getting at.

59:05I I I mean, we are we are

59:06problem-solving on the fly in a select

59:08board meeting that um

59:11it feels to me it is coming to us

59:13incomplete and

59:15um I you know

59:19>> [clears throat]

59:20>> another month is a problem, right? On

59:23the development timeline. However,

59:26um

59:28we have a lot of different opinions from

59:30select board members, my

59:32>> Well, uh Brooke, can I

59:33>> self-included, who are not engineers and

59:35don't really understand.

59:37Yeah.

59:38>> If they can get a plan done sooner, why

59:41we can put this on a Wednesday night.

59:44Would just be my suggestion. So, they

59:46don't have to wait a full month like if

59:48it's ready

59:49next week.

59:51Does that make

59:52Does that seem fair?

59:54>> Yeah.

59:55Yeah.

59:56That would be my inclination is

59:58y'all need to get in a room. Chris, you

1:00:00need to get in a room with town staff

1:00:02and come up with an engineered plan for

1:00:04them to review and a plan if it's going

1:00:07to be in the road, I mean, we're talking

1:00:08about multiple property own

1:00:11>> Mhm.

1:00:11>> owners, right? It's not just Chris's

1:00:13property that we're talking about. So,

1:00:15it seems to me that, um,

1:00:18we need a more comprehensive plan.

1:00:20>> Yeah, well, I got to say, Brooke, I'm

1:00:21I'm just I'm just as as as surprised as

1:00:23you are right now, too. So, I thought

1:00:24this plan was done properly and

1:00:27comprehensive already done between all

1:00:29the the Verizon and National Grid and

1:00:31and with everyone here. I'm So, I'm I'm

1:00:34a little surprised as well. So, yeah, I

1:00:35I

1:00:36I'm with you.

1:00:37I I I don't think it's

1:00:39You're right, we need to problem solving

1:00:41here. We don't need to problem solve

1:00:42here. What we need is an approval

1:00:44pending the plan.

1:00:46Okay? That That's what I would need.

1:00:47That's my ask for tonight. We'll get

1:00:49this thing approved pending an approved

1:00:51plan

1:00:52by you guys at that point.

1:00:55So, I can get the ball rolling here.

1:01:00>> Um, I don't think we can do that without

1:01:02the plan.

1:01:03I think we'll have to put it on the next

1:01:05available Wednesday night.

1:01:06>> Well, here's ano- another way to do it.

1:01:08We could, uh,

1:01:10we could we could approve it contingent

1:01:13on, uh, you know, Drew and, uh,

1:01:17Drew and Bob, you know,

1:01:19signing off. Like, we could give our

1:01:20authority to Drew, Bob, Erica to sign

1:01:23off on this, you know, with the

1:01:25understanding it's not going to in

1:01:27interfere with town,

1:01:29etc. And not have to go to a Wednesday

1:01:30night. Cuz if we put it on a Wednesday

1:01:32night, then it's got to be in the packet

1:01:34by a Friday, and all of a sudden we're,

1:01:36you know, we're a month out again. You

1:01:38know, I think if if we could, you know,

1:01:40if this could be drawn up sort of by the

1:01:43end of the week, and the and staff is

1:01:45happy with it beginning in next week,

1:01:47can't we move on?

1:01:49And I agree with And I also agree with

1:01:51Brooke that we are doing this on the

1:01:52fly. And it, you know, I wish there was

1:01:55better coordination from everybody so

1:01:57that this was sort of done when it was

1:02:00brought to us. Thank you.

1:02:11>> Hi.

1:02:12Um Bob DeCosta.

1:02:15>> Madam Chair, if if you

1:02:18If you don't mind, I'd like to make a

1:02:19motion, and then we can see if we can

1:02:21proceed.

1:02:22>> If you're going to make a motion, you

1:02:24have to make a motion to close the

1:02:25public hearing first.

1:02:26>> Yes.

1:02:26>> And you have one hand up.

1:02:28>> Brooke has her hand up.

1:02:29>> So we'll let her go first.

1:02:31>> Yeah.

1:02:31>> Yeah.

1:02:32>> Uh Brooke, uh to follow up on what Matt

1:02:34said,

1:02:36um

1:02:37ultimately, I can't make engineering

1:02:39decisions. So, I'm okay in principle. I

1:02:41think this is a good idea, right? So,

1:02:43that's our authority. And then we need

1:02:45to make sure that

1:02:46everybody, all the T's are crossed and

1:02:49the I's are dotted. So, along with what

1:02:52Matt said, I'd like to know from town

1:02:55staff represented here today who wants

1:02:58sign off permission on this before if we

1:03:00were to craft a motion for a contingent

1:03:02approval.

1:03:04Who I'm I'm seeing Drew, Mike,

1:03:07um

1:03:08David,

1:03:09anyone else that we need to put in a

1:03:12motion

1:03:13that needs to have We We to have 100%

1:03:16sign off from those individuals.

1:03:18>> They market water.

1:03:20>> And and water. And how about Mike Burns

1:03:22at transportation?

1:03:25>> Sure.

1:03:26>> Okay.

1:03:27So so that's that uh

1:03:30to keep this going and not hold it up to

1:03:33my non-engineering brain,

1:03:35I would be inclined to go that

1:03:36direction. And then when they get all

1:03:39those ducks in a row, and they get those

1:03:41permissions, then they will they will

1:03:43essentially have approval. [snorts]

1:03:46Um and obviously the utilities have to

1:03:48agree to it as well. So um I

1:03:52given that, I would make a motion to

1:03:53close the public hearing if no one else

1:03:54is willing to wishing to speak.

1:03:57>> Just Chris Young has his hand up again.

1:03:59>> Oh, sorry. Couldn't see that.

1:04:01>> Chris Young.

1:04:03>> Thank you. Um so I appreciate the

1:04:06urgency on

1:04:07behalf of the developer and and the

1:04:09housing needs, but

1:04:11what we're talking about is closing down

1:04:12Sparks Avenue

1:04:14um

1:04:15for an undetermined amount of time. So I

1:04:17just am worried about

1:04:19this

1:04:20being a given

1:04:22uh you know, approval pending technical

1:04:25approvals from the various departments

1:04:26without the consideration of what it's

1:04:28going to be doing to traffic flow. Um I

1:04:31don't quite understand because of the

1:04:32plan that I was presented with what is

1:04:35happening to the

1:04:37um

1:04:38east of pad 11-6. In other words, in

1:04:40front of 16 and 14 Sparks Avenues. Is

1:04:43that

1:04:45going to be is is the sidewalk being

1:04:46removed? Is are we talking about uh an

1:04:49easement? If there's an easement that's

1:04:50being proposed by the developer across

1:04:5318 through uh

1:04:5622 Sparks Ave,

1:04:58what happens when that easement

1:04:59terminates at 16 Sparks Ave? There's

1:05:01just a lot of

1:05:02concern on my part that this could get

1:05:05uh a blanket approval without really

1:05:07seeing a plan um not understanding what

1:05:10we're about to do to the traffic on

1:05:11Sparks Avenue for an undetermined amount

1:05:13of time and uh and how it's going to

1:05:16impact our property if easements are

1:05:18being thrown about without seeing

1:05:22really what the impact is

1:05:24in a as it was said a survey quality

1:05:26plan. So

1:05:28as much as I want to you know be a good

1:05:30neighbor and help this project along. I

1:05:32feel like

1:05:34all of this designing on the fly is

1:05:36really going to net us

1:05:37a headache that I'm going to have to

1:05:38bear and [clears throat]

1:05:40the entire town. I don't know if I'm the

1:05:41only one speaking on behalf of everybody

1:05:43who drives up and down Sparks Avenue

1:05:44every day but

1:05:45we went from having a easement

1:05:48under the developers land to now tearing

1:05:51up Sparks Ave. So I'm a little bit

1:05:53concerned how this conversation is

1:05:55going.

1:05:56>> Okay.

1:05:57>> Stop. That's that's not what

1:05:59we're talking about.

1:05:59>> Okay.

1:06:02Can you please wait for me to recognize

1:06:04you? Sorry. Oracca's hand up first.

1:06:07>> Madam chair, I'm just sharing the

1:06:10Verizon plan right now. So there are

1:06:14four poles along this stretch and and

1:06:17Ross and Tim please correct me if I'm

1:06:20wrong but according to this plan there's

1:06:21four poles along the stretch of of land

1:06:24along Sparks Avenue. Pole 11 is

1:06:27remaining.

1:06:29Um

1:06:31poles

1:06:3210 and nine which are in front of the

1:06:35Poseidon development are leaving. Those

1:06:38are going to be underground and then

1:06:40pole eight which is in front of Crest, I

1:06:44believe,

1:06:45um is to remain. Ross, can you confirm

1:06:49that?

1:06:51>> Yes, I can confirm that.

1:06:52>> Ross. Okay.

1:06:54>> Yep. So sorry about that. Yes, I can

1:06:55confirm.

1:06:56>> Thank you. Although National Grid's plan

1:07:01shows a hand hole down here.

1:07:06So I'm not

1:07:07>> that's National Grid's thing. That's

1:07:09they're using that to tie into other

1:07:11properties. I'll let Tim talk on that.

1:07:13>> Okay.

1:07:14>> thing Verizon is asking for here is for

1:07:16a 4-in conduit from pole 8 to pole 11 so

1:07:19that we can dip down our existing aerial

1:07:22cable at pole 8 and rise back up at 11

1:07:25and keep all of our connectivity along

1:07:27Sparks Ave through here.

1:07:32>> Okay.

1:07:34Uh Chris?

1:07:36Piemonte?

1:07:38>> So, just just just to address Chris

1:07:40Young's issue, I think we we addressed

1:07:42that issue by not going on the street by

1:07:45National Grid saying we can go into my

1:07:47property to avoid that issue. I think I

1:07:49thought I wanted to I thought that was

1:07:50clear.

1:07:52Uh we've spoken before.

1:07:56>> Uh Madam Chair, if I

1:07:58>> Oh, yes. Go ahead, Chris.

1:08:00>> I So, Drew, can you address that? You're

1:08:02Drew just said that we were going down

1:08:04the center line of Sparks Avenue.

1:08:12>> Drew Petner?

1:08:13>> I haven't decided where anything's

1:08:14going. I just the the

1:08:16level of detail on the plans that were

1:08:18submitted

1:08:19along with the petitions doesn't give us

1:08:23enough information to work from. I just

1:08:25understand where some of the town

1:08:26infrastructure is and I think down the

1:08:28middle of the road is the path of least

1:08:30resistance, but there's also been talk

1:08:32of doing it on private property. Again,

1:08:34I I just think that's why we need a

1:08:35formal plan and that we can review and

1:08:38>> Who's the engineer on Who's the Who's

1:08:40the surveyor engineer on this?

1:08:43>> Dan Malloy.

1:08:44>> Okay.

1:08:45Can you guys get an internal meeting

1:08:48going with Dan Malloy and get this

1:08:49finalized?

1:08:52>> I said I thought this was finalized,

1:08:55Don. I I This is the first I'm hearing

1:08:57of this right now. I'm very I'm just as

1:08:59surprised as this group is, but however,

1:09:02we can get it finalized with depending

1:09:04the approvals of all the heads of the

1:09:06departments to get the ball rolling. Cuz

1:09:10these utility companies aren't They need

1:09:13this for me to get this thing moving.

1:09:14It's just that simple. I don't get this

1:09:16approval, I can't get anything moving,

1:09:17and I can't get electricity on my sites,

1:09:19and I can't get apartments going, and

1:09:21I'm ready These homes are almost ready

1:09:22to go.

1:09:23Like the one building is ready to go. I

1:09:25need the approval, and if we I have no

1:09:28problem at heating to all these

1:09:30different approval heads, and not to

1:09:32have any road

1:09:33detours if you have if it's very

1:09:35minimal, it's minimal. It's a turn, you

1:09:37know, for in the middle of the winter

1:09:38when there's not a lot of, you know,

1:09:40traffic going on, which is what I'm

1:09:42hoping we can do it in.

1:09:44So, this the one impede a lot a lot of

1:09:46issues. It might be for a day or two

1:09:48times.

1:09:50>> Okay, David Gray.

1:09:53>> I think National Grid has their own

1:09:55engineers that design their stuff, but

1:09:56that's

1:09:58that's just my comment.

1:10:00>> Erica.

1:10:03>> I would like to make a suggestion. Um

1:10:06because National Grid, Verizon, and

1:10:09Comcast are three completely different,

1:10:12separate utilities who don't work

1:10:13together.

1:10:15Um and I don't mean that in any

1:10:17condescending way. It's just they have

1:10:18their own engineers that develop their

1:10:20own plans. Um that Chris have has Dan

1:10:25work with the engineers of

1:10:28Comcast, Verizon, and National Grid, and

1:10:31come up with a

1:10:33What did Drew say? A um

1:10:39>> Engineer.

1:10:39>> Well, [clears throat] a survey quality

1:10:41plan showing existing utilities,

1:10:44existing town utilities,

1:10:47and what is being proposed and where

1:10:51by the

1:10:52National Grid, Verizon, and Comcast, and

1:10:55that way it can be reviewed by Mike

1:10:58Alvarez, Mike Burns, Drew Patno, David

1:11:00Gray, Mark Willett,

1:11:02um

1:11:03to say yay or nay.

1:11:06>> Yep, that makes sense.

1:11:08Bob DeCosta.

1:11:09>> I would that be fine with that.

1:11:11>> I make a motion to close the public

1:11:13hearing.

1:11:14>> Second.

1:11:16>> Okay, made by Bobby, seconded by Matt.

1:11:19All those in favor by roll call. Matt

1:11:21Fee.

1:11:21>> I.

1:11:22>> Bob DeCosta.

1:11:23>> I.

1:11:24>> Brooke Moore.

1:11:25>> I.

1:11:26>> Phil Deeth.

1:11:27>> I.

1:11:28>> Don Hill, I. That carries unanimously.

1:11:30And now, um, can we make a motion,

1:11:33basically what Erica just said?

1:11:35>> That's That's my I was just going to say

1:11:37I make the motion that what would Erica

1:11:39just said

1:11:40to, um,

1:11:42to to put that group together, come up

1:11:44with that plan, pending approval of the,

1:11:48uh,

1:11:50the town of the town

1:11:52>> staff

1:11:53>> the town people that she listed,

1:11:56um, then they could get their approval.

1:12:00>> And

1:12:00>> Make sure that Chris Young is kept in

1:12:03the loop as well, since he's very

1:12:05impacted by this.

1:12:07>> Should we say anything about the

1:12:09developer also incurring all the costs

1:12:12associated with town infrastructure

1:12:14relocation?

1:12:16>> Yes, and and that

1:12:18and one one last thing to add to it that

1:12:21if

1:12:22and I say this if if it can't be worked

1:12:24out that the

1:12:25uh, electrical service can

1:12:28ideally I'd like to see the electrical

1:12:29service go across the developer's

1:12:31property and not down the road, but if

1:12:33the road has to be cut, that the work be

1:12:35done at night, just like they did on

1:12:37Surfside Road, because that road is too

1:12:38busy even in February to be shut during

1:12:41the day.

1:12:42>> Yeah, but then we will need to do a

1:12:43noise bylaw waiver, so we'd have to

1:12:45>> It's mostly commercial there anyway, so

1:12:47I think we could probably do that, so.

1:12:48>> No, it's fine. We'll just have to

1:12:50actually do it, which is a problem.

1:12:54Um and can we keep Chris Young in the

1:12:55loop on this?

1:12:57>> Absolutely.

1:12:58>> the impact. Okay. Um

1:13:01>> Can I So

1:13:02>> Yep.

1:13:03>> Dawn, I'm willing to second the motion,

1:13:05but I just want clarity. We're we're

1:13:06giving approval pending all of the these

1:13:10conditions.

1:13:11>> And it comes back to us if there's a

1:13:12problem.

1:13:14>> Okay. I'll make I'll second that motion.

1:13:16>> Okay.

1:13:17Erica, were you saying something?

1:13:19>> I I was just going to clarify the

1:13:21motion, but I think I've got it.

1:13:22>> I think we're good. Okay. All those in

1:13:24favor by roll call, Bob DeCosta.

1:13:26>> I.

1:13:27>> Matt Fee.

1:13:28>> I.

1:13:28>> Brooke Moore.

1:13:30>> I.

1:13:30>> Jill Dearth.

1:13:31>> I.

1:13:32>> Dawn Hill, I. That carries unanimously

1:13:34five to zero. Thank you. I hope everyone

1:13:36>> Thank you, guys. Thank you. Thank you.

1:13:38>> Uh Ross, did you have a follow-up?

1:13:40>> It was only for item number two, for

1:13:43Verizon.

1:13:44>> But what

1:13:45>> Okay.

1:13:45>> Wait. Item number

1:13:46>> Yeah, I just wanted to clarify

1:13:48I just wanted to clarify that

1:13:50that

1:13:50I just wanted to clarify that this item

1:13:53was approved pending all that

1:13:54coordination.

1:13:55>> That is correct. Yes.

1:13:57>> Thank you very for very much for your

1:13:59time.

1:13:59>> Now, we do have to separately open the

1:14:02public hearing for item number two, and

1:14:04then go to a go to

1:14:07the same vote essentially.

1:14:09But um it is a public hearing. Is there

1:14:10anyone wishing to speak more

1:14:12specifically on item number two? I think

1:14:14we've pretty much already covered it.

1:14:16So, does someone want to make a motion

1:14:17to close the public hearing?

1:14:19>> So moved.

1:14:20>> Second.

1:14:21>> Made by Brooke, seconded by Jill. All

1:14:23those in favor, Brooke Moore.

1:14:25>> I.

1:14:26>> Jill Dearth.

1:14:27>> I.

1:14:27>> Matt Fee.

1:14:28>> I.

1:14:29>> Bob DeCosta.

1:14:30>> I.

1:14:30>> Dawn Hill, I. That carries unanimously,

1:14:33and then can someone make the same

1:14:34motion?

1:14:35>> I'll make the duplicate motion related

1:14:37to National Grid um with the same

1:14:39conditions as laid out in the Verizon

1:14:41motion.

1:14:43>> Seconded.

1:14:44>> Okay. May um seconded by Matt. All those

1:14:46in favor?

1:14:47>> Aye.

1:14:49>> Matt Fee?

1:14:49>> Aye.

1:14:50>> Bob DeCosta?

1:14:51>> Aye.

1:14:52>> Brooke Moore?

1:14:53>> Aye.

1:14:54>> Jill Veith?

1:14:55>> Aye.

1:14:56>> Donehill aye, that carries unanimously 5

1:14:58to 0. Okay,

1:14:59>> Chris, time is ticking for you. You need

1:15:01to get Dan DeLorenzo in touch with these

1:15:02guys.

1:15:03>> The minute I get off here, he's the

1:15:04first guy I'm calling.

1:15:06>> Okay.

1:15:06>> Okay, well, you're all set. We're moving

1:15:08on to the next

1:15:08>> Thank you. Thank you. Thank you. Thank

1:15:10you. Thank you. Thank you. Thank you.

1:15:11>> Okay, good luck with everything.

1:15:13>> Ma'am, I'm sure I think for three and

1:15:14four you just need to open each one and

1:15:16then motion to continue.

1:15:17>> Yep, I will open the public hearing for

1:15:19number three. And when are we continuing

1:15:20it to again, Erica?

1:15:21>> Um, November 16th.

1:15:24>> Okay, can someone make a motion to um

1:15:28continue item number three's public

1:15:30hearing to November 16th?

1:15:32>> I make a motion.

1:15:33>> Okay. Made by Bobby, seconded by Brooke.

1:15:37Or um all those in favor? Bob DeCosta?

1:15:40>> Aye.

1:15:41>> Brooke Moore?

1:15:42>> Aye.

1:15:43>> Matt Fee?

1:15:44>> Aye.

1:15:44>> Jill Veith?

1:15:46>> Aye.

1:15:47>> Donehill aye, that carries unanimously 5

1:15:48to 0. I will open the public hearing for

1:15:50item number four, and I need the same

1:15:52motion to continue.

1:15:54>> to close the public

1:15:56>> Did we close the public

1:15:57>> We're not closing the

1:15:58>> We're not closing, we're continuing.

1:16:00>> Oh, right, right. Sorry. Brain's not

1:16:01working.

1:16:02>> a motion to continue the public hearing

1:16:03item four to November 16th.

1:16:05>> Okay, is there a second?

1:16:06>> Second.

1:16:07>> Okay, made by Bobby, seconded by Jill.

1:16:09All those in favor? Bob DeCosta?

1:16:11>> Aye.

1:16:11>> Brooke Moore?

1:16:13>> Aye.

1:16:13>> Matt Fee?

1:16:14>> Aye.

1:16:15>> Jill Veith?

1:16:16>> Aye.

1:16:16>> Donehill aye, that carries unanimously.

1:16:18And then um if there's nothing else, we

1:16:20can make a motion to adjourn.

1:16:22>> So moved.

1:16:23>> Okay, made by Bobby, seconded by Jill, I

1:16:26think.

1:16:27All those in favor? Um Bob DeCosta?

1:16:30>> Aye.

1:16:31>> Brooke Moore?

1:16:32>> Aye.

1:16:32>> Jill Veith?

1:16:33>> Aye.

1:16:34>> Matt Fee?

1:16:35>> Aye.

1:16:36>> Donehill aye, that carries unanimously 5

1:16:37to 0. Thank you, everyone.

1:16:39>> Thank you.

1:16:40>> Bye.

1:16:40>> Bye.